Loading...
HomeMy WebLinkAboutTrans 2016-11-21 Item 2D - Final Acceptance - 2016 Overlay and Repair Program with Lakeside IndustriesTO: FROM BY: CC: DATE: Public Works Department - Bob Giberson, Director INFORMATIONAL MEMORANDUM Transportation Committee Bob Giberson, Public Works Director,40 David Sorensen, Project Manager Mayor Ekberg November 18, 2016 SUBJECT: 2016 Overlay and Repair Program Project No. 91610401, Contract No. 16-070 Project Completion and Acceptance ISSUE Accept contract as complete and authorize release of retainage. BACKGROUND Allan Ekberg, Mayor The Notice to Proceed for Contract No. 16-070 with Lakeside Industries, Inc. of Kent, Washington was issued on June 14, 2016 for the 2016 Overlay and Repair Project. This overlay project provided hot mix asphalt (HMA) paving at nine locations throughout the City and a portion of the parking lot at Fort Dent Park. The street improvements included; paving, removing and replacing concrete curbs, gutters, sidewalks and ADA ramps, installing traffic loops and junction boxes, adjusting surface utilities to grade, and installing roadway channelization. ANALYSIS Construction was physically completed on August 12, 2016. No change orders were executed. Asphalt quantities and pavement repairs were less than expected, allowing Minkler Boulevard to receive a complete overlay in lieu of the planned pavement repairs. Retainage of $54,903.12 is being withheld. The budget for the 2016 Overlay & Repair construction was $1,360,000.00 and included a 5% contingency, which was not utilized. Construction Contract Amount $1,277,956.80 Under-runs (179,894.56) Total Amount Paid a1-09-8-062.24 RECOMMENDATION Council is being asked to formally accept and authorize the release of the retainage, subject to standard claim and lien release procedures, for the 2016 Overlay and Repair Project with Lakeside Industries, Inc. in the final amount of $1,098,062.24 and consider this item on the Consent Agenda at the December 5, 2016 Regular Meeting. Attachment: Notice of Completion Contract No. 16-070 rV W:\PW EngkPROJECTSW RW & RS Projecls\Annual Overlay & Repair Programs\2016 Overlay & Repair Program\Construction\Contractor\Close Out to TC\Docs to TC\Info Memo 2016 Overlay Closeout 111816 gi.docx $TA Original a ❑ Revised # 3ft taa NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT Date: August 5, 2016 Contractor's UBI Number: 601 - 106 -847 Name & Mailing Address of Public Agency Department Use Only City of Tukwila Assigned to: 6200 Southcenter Boulevard Tukwila, WA 98188 Date Assigned: UBI Number: 91- 6001519 Notice is herebv given relative to the completion of contract or project described below Project Name Contract Number Job Order Contracting City of Tukwila 2016 Overlay Program #91610401 T16-070 Amount Retained $ El Yes l � I No Description of Work Done /Include Jobsite Address(es) Hot Mix Asphalt (HMA) Overlay at the following locations: S 130th Street, 48th Ave S, Interurban Ave S, 52nd Ave S, Fort Dent Way, Minkler Boulevard, Andover Park E, Fort Dent Park, and S 144th Street. Federally funded transportation project? ❑ Yes ❑✓ No (if yes, provide Contract Bond Statement below) Contractor's Name E -mail Address Affidavit IDS Lakeside Industries, Inc. Craig .Nickel @Lakesidelndustries.com 674247 Contractor Address Telephone # PO Box 7016 Issaquah, WA 98027 (425) 313 -2600 If Retainage is not withheld, please select one of the following and List Surety's Name & Bond Number. ❑ Retainage Bond ❑ Contract/Payment bond (valid for federally funded transportation projects) Name: Bond Number: Date Contract Awarded Date Work Commenced Date Work Completed Date Work Accepted 5/16/2016 6/15/2016 8/18/2016 Were Subcontracters used on this project? If so, please complete Addendum A. Yes ❑ No Affidavit ID* - No L &I release will be granted until all affidavits are listed. Contract Amount Additions ( + ) Reductions (- ) Sub -Total Sales Tax Rate 0 % (If various rates apply, please send a breakdown) Sales Tax Amount TOTAL $ 1,277, 956.80 $ 0.00 $ 179,894.56 $ 1,098,062.24 Liquidated Damages $ 0.00 Amount Disbursed $ 1,043,159.12 Amount Retained $ 54,903.12 1VUZL: These two totals must beequal Comments: TOTAL $ 1,098,062.24 Note: The Disbursing Officer must submit this,clompleted notice immediately after acceptance of the work done under this contract. NO PAYMENT SHALL BE MADE FROM RETAINED FUNDS until receipt of all release certificates. Submitting Form: Please submit the completed form by email to all three agencies below. Contact Name: Diane Jaber Email Address: Diane.Jaber @TukwilaWA.gov Department of Revenue Washington state Department of Public Works Section Labor & Industries (360) 704 -5650 Contract Release PWC @dor.wa.gov (855) 545 -8163, option # 4 ContractRelease @LN I. WA. GO V REV 31 0020e (10/26/15) F215 -038 -000 10 -2014 Title: Fiscal Specialist Phone Number: (206) 433 -1871 Employment Security Department Registration, Inquiry, Standards & Coordination Unit (360) 902 -9450 76 publicworks@esd.wa.gov Addendum A: Please List all Subcontractors and Sub-tiers Below This addendum can be submitted in other formats. Provide known affidavits at this time. No L&I release will be granted until all affidavits are listed. Subcontractor's Name: U131 Number: (Required) Affidavit ID* A & R SAWING & DRILLING CO 601514268 657710 BEST PARKING LOT CLEANING INC 601901928 660899 BROTHER'S TRUCKING L.L.C. 602506532 661327 C & E TRANSPORT CORP 602408510 663713 CASCADE UTILITY ADJUSTING LLC 603407046 672708 CORLISS RESOURCES INC 602237779 675398 GROUND UP ROAD CONST INC 602790246 674709 LAKERIDGE PAVING CO L L C 601592135 660160 MOBY'S 24-HR ST SWPNG SVCS INC 603358194 661278 NORTHWEST SWEEPING 602609350 669278 PIONEER CABLE CONTRACTORS INC 600464320 67015 SILVERSTREAK INC 600432781 657693 STRIPE RITE INC 601048084 665610 TIGER MOUNTAIN RENTAL, LLC 601720071 660161 WILSON CONCRETE CONST INC 602168956 678707 For tax assistance or to request this document in an alternate format, please call 1-800-647-7706. Teletype (TTY) users may use the Washington Relay Service by calling 711. 77 IREV 31 0020e Addendum (10/26/15) F215-038-000 10-2014