HomeMy WebLinkAboutREG 2016-11-21 COMPLETE AGENDA PACKETTukwila City Council Agenda
• ❖ REGULAR MEETING ❖
Allan Ekberg, Mayor Counci /members: • :- Dennis Robertson • :- Verna Seal
David Cline, City Administrator Kathy Hougardy • :- De'Sean Quinn
Joe Duffie, Council President Kate Kruller • :- Thomas McLeod
Monday, November 21, 2016; 7:00 PM • Ord #2510 • Res #1896
1. CALL TO ORDER / PLEDGE OF ALLEGIANCE / ROLL CALL
2. CITIZEN
At this time, you are invited to comment on items not included on this agenda
COMMENT
(please limit your comments to five minutes per citizen). To comment
on an item listed on this agenda, please save your comments until the issue is
presented for discussion. (Refer to back of agenda page for additional information.)
3. CONSENT
a. Approval of Minutes: 11/7/16 (Regular)
AGENDA
b. Approval of Vouchers
c. A resolution adopting a new Public Works fee schedule. [Reviewed
Pg.i
and forwarded to Consent by the Committee of the Whole on
11/14/16.]
d. Authorize the Mayor to sign Supplement #1 to contract #14 -164 with
Pg.9
Northwest Hydraulic Consultants, Inc., to provide levee certification
services for the Tukwila 205 Levee certification in the amount of
$316,788.00. [Reviewed and forwarded to Consent by the Committee
of the Whole on 11/14/16.]
e. Award a bid and authorize the Mayor to sign a contract with
Pg.11
Westwater Construction Company for the Tukwila International
Boulevard and South 144th Street Midblock Crossing Project in the
amount of $88,300.00 (plus contingency). [Reviewed and forwarded
to Consent by the Transportation Committee on 1117116.]
f. Authorize the Mayor to sign a contract with BNSF Railway Company
Pg.21
for the Boeing Access Road over BNRR Bridge Rehabilitation Project
in the amount of $149,428.00. [Reviewed and forwarded to Consent
by the Transportation Committee on 1117116.]
4. UNFINISHED
a. Authorize the Mayor to sign Supplement #6 to contract #12 -010 with
Pg.105
BUSINESS
CH2M Hill for the 42nd Avenue South Phase III Project in the amount
of $218,783.05.
b. Tax levy legislation:
Pg.107
(1) An ordinance levying the general taxes for the fiscal year
Pg.109
commencing January 1, 2017.
(2) An ordinance relating to the limiting factor for the regular
Pg.113
property tax levy above the rate of inflation (Implicit Price
Deflator).
(3) An ordinance increasing the regular levy from the previous year
Pg.115
on all property, both real and personal, by 1% commencing
January 1, 2017.
(continued...)
REGULAR MEETING
Monday, November 21, 2016
Page 2
4. UNFINISHED
c. An ordinance amending Ordinance No. 2458, which adopted the
Pg.117
BUSINESS
biennial budget for the 2015 -2016 biennium, to adopt an amended
(cost.)
year -end budget.
d. An ordinance authorizing the issuance of Unlimited Tax General
Pg.129
Obligation Bonds in the aggregate principal amount of not to exceed
$36,500,000 to finance costs related to its Public Safety Plan.
e. A resolution adopting updated policies related to the Financial
Pg.151
Planning Model and other general financial policies.
f. A resolution updating and clarifying the non - represented employees'
Pg.157
compensation and adopting the Non - Represented Salary Schedule and
benefits summary, effective January 1, 2017.
g. Approve the process for developer selection for four parcels of City-
Pg.169
owned land at 14420, 14440, 14442 and 14452 Tukwila International
Boulevard (motel site) as outlined in the agenda packet.
5. NEW BUSINESS
A resolution of the City Council of the City of Tukwila reaffirming its
Pg.181
commitment to being a diverse, tolerant and inclusive City.
6. REPORTS
a. Mayor
b. City Council
c. Staff - City Administrator Report
Pg.185
d. City Attorney
e. Intergovernmental
7. MISCELLANEOUS
S. EXECUTIVE SESSION
9. ADJOURNMENT
Tukwila City Hall is ADA accessible.
Reasonable accommodations are available at public hearings with advance notice to the
City Clerk's Office (206- 433 -1800 or TukwilaCityClerk @TukwilaWA.gov). This agenda is available at
www.tukwilawa.gov, and in alternate formats with advance notice for those with disabilities.
Tukwila Council meetings are audio /video taped (available at www.tukwilawa.00v)
HOW TO TESTIFY
If you would like to address the Council, please go to the podium and state your name and address clearly for
the record. Please observe the basic rules of courtesy when speaking and limit your comments to 5 minutes.
The Council appreciates hearing from citizens but may not be able to take immediate action on comments
received until they are referred to a Committee or discussed under New Business.
CITIZEN COMMENTS
At each Council meeting, citizens are given the opportunity to address the Council on items that are not
included on the agenda during CITIZEN COMMENTS. Please limit your comments to 5 minutes.
SPECIAL MEETINGS /EXECUTIVE SESSIONS
Special Meetings may be called at any time with proper public notice. Procedures followed are the same as
those used in Regular Council meetings.
Executive Sessions may be called to inform the Council of pending legal action, financial, or personnel
matters as prescribed by law. Executive Sessions are not open to the public.
PUBLIC HEARINGS
Public Hearings are required by law before the Council can take action on matters affecting the public
interest such as land -use laws, annexations, rezone requests, public safety issues, etc. Section 2.04.150 of the
Tukwila Municipal Code states the following guidelines for Public Hearings:
The proponent shall speak first and is allowed 15 minutes for a presentation.
2. The opponent is then allowed 15 minutes to make a presentation.
3. Each side is then allowed 5 minutes for rebuttal.
4. Citizens who wish to address the Council may speak for 5 minutes each. No one may speak a second
time until everyone wishing to speak has spoken.
5. After each speaker has spoken, the Council may question the speaker. Each speaker can respond to the
question, but may not engage in further debate at that time.
6. After the Public Hearing is closed and during the Council meeting, the Council may choose to discuss
the issue among themselves, or defer the discussion to a future Council meeting, without further public
testimony. Council action may only be taken during Regular or Special Meetings.
COUNCIL MEETING SCHEDULE
No Council meetings are scheduled on the 5th Monday of the month unless prior public notification is given.
Regular Meetings - The Mayor, elected by the people to a four -year term, presides at all Regular Council
Meetings held on the 1st and 3rd Mondays of each month at 7:00 p.m. and Special Meetings. Official
Council action in the form of formal motions, adopting of resolutions and passing of ordinances can
only be taken at Regular or Special Council meetings.
Committee of the Whole Meetings - Councilmembers are elected for a four -year term. The Council
President is elected by the Councilmembers to preside at all Committee of the Whole meetings for a
one -year term. Committee of the Whole meetings are held the 2nd and 4th Mondays at 7:00 p.m.
Issues discussed there are forwarded to Regular or Special Council meetings for official action.
COUNCIL AGENDA SYNOPSIS
Meetin g Date
Pre .pared 6
May ls review
Council review
11/14/16
BG
❑ Resolution
Mtg Date 11121116
❑ Ordinance
Mtg Date
11/21/16
BG
n Other
Mtg Date
17
SPONSOR'S The City's water, sewer, and surface water rates need to be increased to meet operational
SUMMARY and capital expenditures. Residential and Multi-family water base rates and
Commercial/ Industrial water consumption rates will increase in 2017 and 2018. King
County's sewer treatment charges will increase in 2017 and the City's sewer fund will
increase in 2018. The surface water residential fees will increase from $163 to $171 in
2017 and $171 to $176 in 2018, along with an increase for commercial properties.
REVIEWED BY [:] cow mtg. ❑ CA&P Cmte ❑ F&S Cmte ❑ Transportation Cmte
Z Utilities Cmte ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
DATE: 10/25/16 COMMIT-FEE CHAIR: KATHY HOUGARDY
RECOMMENDATIONS:
SPONSOR/ADMIN. Public Works Department
COMMFITEIE Unanimous Approval; Forward to Committee of the Whole
COST IMPACT/ FUND SOURCE
EXPENDITURJ� REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$0.00 $0.00 $0.00
Fund Source: 401 WATER, 402 SEWER, AND 412 SURFACE WATER
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
11/14/16
ITEM INFORMATION
rza�&na
3.C.
_STAFF
SPONSOR: BOB GIBERSON
ORIGINAL AGENDA DATE: 11/14/16
AGENDA ITEM TiTj,i,,, Resolution updating the Public Works Fee Schedule for the
2017 & 2018 Water, Sewer, and Surface Water Rates
CATEGORY Z Discussion
Mtg Date 11114116
❑ Motion
Mtg Date
❑ Resolution
Mtg Date 11121116
❑ Ordinance
Mtg Date
❑ BidAward
Mtg Date
❑ Public.Hearin
,g
Mtg Date
n Other
Mtg Date
SPONSOR ❑ Council ❑ Mayor ❑ HR ❑ DCD [:] Finance [:] Fire [:1 IT [:] P&R [:] Police Z PWI
SPONSOR'S The City's water, sewer, and surface water rates need to be increased to meet operational
SUMMARY and capital expenditures. Residential and Multi-family water base rates and
Commercial/ Industrial water consumption rates will increase in 2017 and 2018. King
County's sewer treatment charges will increase in 2017 and the City's sewer fund will
increase in 2018. The surface water residential fees will increase from $163 to $171 in
2017 and $171 to $176 in 2018, along with an increase for commercial properties.
REVIEWED BY [:] cow mtg. ❑ CA&P Cmte ❑ F&S Cmte ❑ Transportation Cmte
Z Utilities Cmte ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
DATE: 10/25/16 COMMIT-FEE CHAIR: KATHY HOUGARDY
RECOMMENDATIONS:
SPONSOR/ADMIN. Public Works Department
COMMFITEIE Unanimous Approval; Forward to Committee of the Whole
COST IMPACT/ FUND SOURCE
EXPENDITURJ� REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$0.00 $0.00 $0.00
Fund Source: 401 WATER, 402 SEWER, AND 412 SURFACE WATER
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
11/14/16
Forward to next Regular Meeting
11/21/16
MTG. DATE
ATTACHMENTS
11/14/16
Informational Memorandum dated 10/21/16
Exhibit A - Rate Matrix, Exhibit B - KC Ord. #18305, & Exhibits C - Comparisons
Resolution - Public Works Fee Schedule
Attachments D, E & F, Proposed 2017 CIP
Minutes from the Utilities Committee meeting of 10/25/16
11/21/16
j Resolution
City of Tukwila
Washington
Resolution No.
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF TUKWILA, WASHINGTON, ADOPTING
A NEW PUBLIC WORKS FEE SCHEDULE; AND
REPEALING RESOLUTION NO. 1869.
WHEREAS, each year the City analyzes the rate model for the three utility
enterprise funds, which are water, sewer and surface water, to ensure revenues keep
pace with expenses, to update the traffic model, and to analyze the transportation
network to ensure continued compliance with the Growth Management Act and the
City's adopted Comprehensive Plan; and
WHEREAS, the City is authorized to impose fees to recoup the costs of services
rendered;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. Public Works fees will be charged according to the following schedule,
which shall supersede any previously adopted Public Works Fee Schedule and take
effect as of January 1, 2017:
PUBLIC WORKS FEE SCHEDULE
WATER RATES
FEE
Water Meter Installation
.75 inch
$ 600.00
1 inch
$ 1,100.00
1.5 inch
$ 2,400.00
2 inch
$ 2,800.00
3 inch
$ 4,400.00
4 inch
$ 7,80 ' 0.00
6 inch
$12,500.00
Water Meter Deduct
$25.00
WAWord Processing\Resolutions\PW fee sched-utility and transportation fees 11-15-16 Page 1 of 6
GL:bjs
3
WATER RATES
FEE
Water Base Charge (Monthly)
In addition to the monthly water base charge, each
100 cubic feet of water used will be charged as
shown in "Water Rates (Monthly)."
2017 2018
Single Family (one dwelling unit)
$17.00 $18.00
2017 2018
Multi - Family (more than one dwelling unit);
$17.00 $18.00
each dwelling is charged the base charge
Commercial /Industrial Customers:
3/4 inch Service
$ 45.00
1 inch Service
$ 55.00
1 -1/2 inch Service
$ 80.00
2 inch Service
$105.00
3 inch Service
$150.00
4 inch Service
$200.00
6 inch Service
$300.00
8 inch Service
$400.00
10 inch Service
$500.00
12 inch Service
$600.00
Water Rates (Monthly)
In addition to the monthly water base charge listed
above, each 100 cubic feet of water will be charged at
the following rates:
2017 2018
Single Family Residence (Oct -May)
$2.80 $2.80
Single Family Residence (Jun -Sept)
$3.90 $3.90
Multi - Family (Oct -May)
$3.30 $3.40
Multi - Family (Jun -Sept)
$4.60 $4.70
Commercial /Industrial (Oct -May)
$4.82 $5.10
Commercial /Industrial (Jun -Sept)
$6.60 $6.90
Fire Protection Service Charges (Monthly)
Per month based on size of service.
2 inch Service
$ 9.50
3 inch Service
$ 21.00
4 inch Service
$ 37.00
6 inch Service
$ 84.00
8 inch Service
$126.00
10 inch Service
$210.00
12 inch Service
$273.00
WATER SERVICES
FEE
Water Turn On
$ 50.00
After -Hour Water Turn On - additional fee for
customer requested after -hours water turn on
$100.00
Unauthorized Water Usage - after shut -off for
$100.00
non - payment
W: \Word Processing \Resolutions\PW fee sched - utility and transportation fees 11 -15 -16
Page 2 of 6
GL:bjs
0
WATER SERVICES (cont.)
FEE
Special Meter Read — customer requested
$ 30.00
meter read outside normal read schedule
Shut-off no Fic—e
$ 30.00
Change in owner, tenant, and/or third party
$ 20.00
paying agent
Emergency Conservation Sanction
$100.00
Temporary Water Meter Deposit
2.5" water meter
$1,500.00
Temporary Water Meter Rental per minimum
60 days expiration
2.5" water meter
$150.00
WATER INTEREST CHARGE
RATE
On all water accounts 30 days in arrears from
8% per annum computed on a monthly basis
the date of delinquency until paid
SEWER RATES
FEES
Residential Sewer Service
Flat rate of $29.00 per month in 2017
(single dwelling unit)
Flat rate of $30.00 per month in 2018
Residential Sewer Service (multiple dwelling
Flat rate of $29.00 per month for each dwelling unit in
unit, permanent type)
2017
Flat rate of $30.00 per month for each dwelling unit in
Commercial and Industrial Sewage Service
In 2017: Flat rate of $53.50 per month and, in
addition, any usage over 750 cubic feet of water per
month shall be at the rate of $53.50 per 750 cubic feet
In 2018: Flat rate of $55.36 per month and, in
addition, any usage over 750 cubic feet of water per
month shall be at the rate of $55.36 per 750 cubic feet
SEWER INTEREST CHARGE
RATE
On all sewer accounts 30 days in arrears from
8% per annum computed on a monthly basis
the date of delinquency until paid
vV:\vord �esched�Un�ond�anspn�uUon�uo114��O
''~---='------ Page 3of8
GL:bj»
SURFACE WATER RATES
UNIT
FEE PER YEAR
Surface Water Utility Rates Per Year
Service Charge Per Acre
Category:
2017
2018
1. Natural
$ 206.08
$ 212.26
2. 0 - 20% Developed Surface
$ 448.10
$ 461.54
3. 21 - 50% Developed Surface
$ 821.30
$ 845.94
4. 51 - 70% Developed Surface
$1,225.54
$1,262.30
5. 71 - 85% Developed Surface
$1,476.42
$1,520.70
6. 86 - 100% Developed Surface
$1,722.26
$1,773.92
7. Single-Family Residential Parcels
$ 171.00
$ 176.00
(flat rate per residential parcel)
SURFACE WATER INTEREST CHARGE
RATE
On all surface water accounts 30 days in arrears
8% per annum computed on a monthly basis
from the date of delinquency until paid _
TRANSPORTATION CONCURRENcy TEST FEE SCHEDULE
Fees for Residential Use
UNIT
ALL TYPES OF RESIDENTIAL'
Between 1 and 3
$ 300.00
Between 4 and 5
$ 600.00
Between 6 and 10
$ 1,200.00
Between 11 and 15
$ 2,000.00
Between 16 and 20
$ 3,500.00
Between 21 and 25
$ 5,000.00
Between 26 and 30
$ 6,500.00
Between 31 and 40
$ 8,000-00
Between 41 and 60
$10,000.00
Greater than 60
$12,000.00
All residential uses defined by the ITE Trip Generation Manual Land Use Codes 200-299, including
single family, multi-family, mobile home parks, and shared housing
W:\Word Processing\Resolutions\PW fee sched-utility and transportation fees 11-15-16 Page 4 of 6
GL:bjs
Fees for Non - Residential Use
GROSS FLOOR AREA
INDUSTRIAL2
OFFICES
RETAIL4
EATERY5
INSTITU-
TIONAL &
PORTS
ALL
OTHER
USES
Less than 5,000
$1,000
$1,800
$2,700
$5,400
$500
$1,500
Between 5,001 and 10,000
$1,500
$2,700
$4,050
$8,100
$1,000
$2,000
Between 10,001 and 20,000
$2,000
$3,600
$5,400
$10,800
$1,500
$2,500
Between 20,001 and 30,000
$3,000
$5,400
$8,100
$10,800
$2,000
$2,500
Between 30,001 and 40,000
$4,000
$7,200
$10,800
$10,800
$2,500
$2,500
Between 40,001 and 50,000
$5,000
$9,000
$13,500
$10,800
$3,000
$2,500
Between 50,001 and 70,000
$6,000
$10,800
$16,200
$10,800
$4,000
$2,500
Between 70,001 and 90,000
$7,000
$12,600
$18,900
$10,800
$5,000
$2,500
Between 90,001 and 150,000
$8,000
$14,400
$21,600
$10,800
$6,000
$2,500
Between 150,001 and 200,000
$9,000
$16,200
$24,300
$10,800
$7,000
$2,500
Greater than 200,000
$10,000
$18,000
$24,300
$10,800
$8,000
$2,500
2 All industrial /agricultural uses defined by the ITE Trip Generation Manual Land Use Codes 100 -199,
including light and heavy industrial, manufacturing, and warehousing
3 All office, medical, and service related uses defined by the ITE Trip Generation Manual Land Use
Codes 600 -699, 700 -799, and 900 -999, including general office, medical facilities, and banks
4 All retail and recreation uses defined by the ITE Trip Generation Manual Land Use Codes 400 -499,
800 -830 and 837 -899, including retail sales, rental sales, athletic clubs, and theaters
5 All food service uses defined by the ITE Trip Generation Manual Land Use Codes 831 -836, excluding
accessory (stand - alone) drive - through espresso stands (or similar) under 250 sq. ft., which are
assessed $300
6 All institutional and transportation uses defined by the ITE Trip Generation Manual Land Use Codes
000 -099 and 500 -599, including schools, places of worship, day care, terminals, and transit
POLE ATTACHMENT FEES
FEE PER YEAR
Pole Attachment (per pole) Natural ................
$100.00 per year
Pole revisions to allow for attachments..........
Actual costs (engineering, labor, inspections, etc.)
Conduit Rental ................. ...............................
$1.00 per foot per year
City Dark Fiber Rental ..... ...............................
$200.00 per strand per mile per year
Installation fees ................ ...............................
Actual costs (engineering, labor, inspections, etc.)
W: \Word Processing \Resolutions\PW fee sched- utility and transportation fees 11 -15 -16
Page 5 of 6
GL:bjs
7
Section 2. Repealer. Resolution No. 1869 is hereby repealed.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a
Regular Meeting thereof this day of 12016.
ATTEST/AUTHENTICATED:
Christy O'Flaherty, MIVIC, City Clerk
Rachel B. , Turpin, City Attorney
Joe Duffie, Council President
Filed with the City Clerk:
Passed by the City Council:
Resolution Number:
WAWord Processing\Resolutions\PW fee sched-utility and transportation fees 11-15-16 Page 6 of 6
GL:bjs
F-F�
COUNCIL AGENDA SYNOPSIS
Initials
Meeting Date
Prepared by a
Ma or'.r review
Council review
11/14/16
B
❑ Resolution
Mtg Date
❑ Ordinance
Mtg Date
11/21/16
BG
❑Other
Mtg Date
SPONSOR ❑ Council ❑ Mayor ❑ HR ❑ DCD ❑ Finance ❑ Fire ❑ IT ❑ P&'R ❑ Police ® PWI
SPONSOR'S This Supplemental Agreement No. 1 with Northwest Hydraulic Consultants is for Phase 2 of
SUMWT RY the Tukwila 205 Levee Certification Project. Phase 2 will collect additional site information
for the Tukwila 205 Levee, develop alternatives for correcting deficiencies, and develop
cost estimates. Council is being asked to approve Supplemental Agreement No. 1 to
Contract No. 14 -164 with Northwest Hydraulic Consultants for $316,788.00.
REVII3WED BY ❑ COW Mtg. ❑ CA &P Cmte ❑ F &S Cmte ❑ Transportation Cmte
® Utilities Cmte ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
DATE: 10/25/16 COMMITTEE CHAIR: KATHY HOUGARDY
RECOMMENDATIONS:
SPONSOR /ADMIN. Public Works
COMMITTEE Unanimous Approval; Forward to Committee of the Whole
COST IMPACT/ FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$316,788.00 $317,000.00 $0.00
Fund Source: 412 SURFACE WATER (PAGE 100, PROPOSED 2017 CIP)
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
11/14/16
ITEMNO.
3.D.
CAS NUMBER:
STAFF SPONSOR: BOB GIBERSON
ORIGINALAGENDA DA'I'S: 11/14/16
AGENDA ITEM TITLE Tukwila 205 Levee Certification Phase 2
Supplemental Agreement No. 1 with Northwest Hydraulic Consultants
CATEGORY ® Discussion
Mtg Date 11/14/16
® Motion
Mtg Date 11/21/16
❑ Resolution
Mtg Date
❑ Ordinance
Mtg Date
❑ Bid Award
Mtg Date
❑ Public Hearing
Mtg Date
❑Other
Mtg Date
SPONSOR ❑ Council ❑ Mayor ❑ HR ❑ DCD ❑ Finance ❑ Fire ❑ IT ❑ P&'R ❑ Police ® PWI
SPONSOR'S This Supplemental Agreement No. 1 with Northwest Hydraulic Consultants is for Phase 2 of
SUMWT RY the Tukwila 205 Levee Certification Project. Phase 2 will collect additional site information
for the Tukwila 205 Levee, develop alternatives for correcting deficiencies, and develop
cost estimates. Council is being asked to approve Supplemental Agreement No. 1 to
Contract No. 14 -164 with Northwest Hydraulic Consultants for $316,788.00.
REVII3WED BY ❑ COW Mtg. ❑ CA &P Cmte ❑ F &S Cmte ❑ Transportation Cmte
® Utilities Cmte ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
DATE: 10/25/16 COMMITTEE CHAIR: KATHY HOUGARDY
RECOMMENDATIONS:
SPONSOR /ADMIN. Public Works
COMMITTEE Unanimous Approval; Forward to Committee of the Whole
COST IMPACT/ FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$316,788.00 $317,000.00 $0.00
Fund Source: 412 SURFACE WATER (PAGE 100, PROPOSED 2017 CIP)
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
11/14/16
Forward to the next Regular Meeting
11/21/16
MTG. DATE
ATTACHMENTS
11/14/16
Informational Memorandum dated 10/21/16
Page 100, Proposed 2017 CIP
NHC Supplement No. 1 to Contract No. 14 -164
Minutes from the Utilities Committee meeting of 10/25/16
11/21/16
o attachments
2
W
COUNCIL AGENDA SYNOPSIS
----------------------------- - - - - -I nitialr
Meetingo Date Pre .p—d by Ij j, Ma ors rV i ew Council reviey
11/21/16 BG
ITEM INFORMATION
ITEMNO.
3.E.
CAS NUMBER: —STAFF
SPONSOR: BOB GIBERSON I
ORIGINAi,AGI,',NDADA'1'1-,: 11/21/16
AGENDA I,n,"m Tukwila International Blvd & S 144th St Midblock Crossing
Bid Award to Westwater Construction Company
CATEGORY F-1 Discussion
Mt Date
❑ Motion
Mt
,g Date
❑ Resolution
Mtg Date
❑ Ordinance
Mt
,g Date
Z Bid Axard
MtS Date 11121116
❑ Public Hearing
Mt
,g Date
❑ Other
Mt
,g Date
SPONSOR ❑ Council ❑ Major ❑ HR ❑ DCD ❑ Finance ❑ Fire ❑ IT ❑ P&R ❑ Police Z PWI
SPONSOR'S The Tukwila International Blvd and South 144th Street Midblock Crossing Project was
SUMMARY advertised for bids through MRSC's Small Works Roster and three bids were received on
October 13. Westwater Construction Co. had the apparent low bid of $88,300.00. This
project will install a Flashing Rectangular Beacon and ADA compliant curb ramps. Council is
being asked to award the bid to Westwater Construction in the amount of $88,300.00.
REVIEWED BY ❑ cow Mtg. ❑ CA&P Cmte ❑ F&S Cmte ❑ Transportation Cmte
❑ Utilities Cmte ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
DATE: 11/07/16 COMMITTEE CHAIR: DENNIS ROBERTSON
RECOMMENDATIONS:
SPONSOR/ADMIN. Public Works
Comm"i-l"'E Unanimous Approval; Forward to Regular Consent Agenda
COST IMPACT / FUND SOURCE
ExPEND1,i,u1u,, REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$88,300.00 $94,800.00 $0.00
Fund Source: 104 ARTERIAL STREETS (PAGES 19 & 20, 2015 CIP)
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
11/21/16
MTG. DATE
ATTACHMENTS
11/21/16
Informational Memorandum dated 11/04/16
Pages 19 & 20, 2015 CIP
Bid Tabulation
Minutes from the Transportation Committee meeting of 11/07/16
F—
I
11
12
TO:
FROM
BY:
CC:
DATE:
City of Tukwila Allan Ekberg, Mayor
Public Works Department - Bob Giberson, Director
INFORMATIONAL MEMORANDUM
Transportation Committee
Bob Giberson PE, Public Works Director 4$9
Scott Bates, Traffic Engineering Coordinator
Mayor Ekberg
November 4, 2016
SUBJECT: TIB & S 144th Street Midblock Crossing
Project No. 91610406
Bid Award
ISSUE
Award the bid for the retrofit construction of the Tukwila International Blvd (TIB) and S 144th St Midblock Crossing with Rapid
Flashing Rectangular Beacons (RRFB) and ADA compliant curb ramps.
BACKGROUND
Phase 1 of the TIB Improvements constructed two midblock crossings using overhead signs and in- roadway lighting. These
in- pavement systems were prone to failure and required frequent repairs to maintain operations. In 2014, the ADA
Improvement Project replaced the TUIB and S 1501h St crossing with the Rapid Rectangular Flashing Beacon system.
In 2015, the City commissioned a pedestrian crossing evaluation by the Transpo Group to study the high levels of pedestrian
crossing activity near the Abu -Bakr Mosque, located at TIB and S 141 st St. Based on the study information, maintaining a TIB
crossing at the existing location between S 142nd St and S 144th St and upgrading it to a RRFB signal was recommended. In
May 2016, KPG Inc. was awarded the design contract, which they completed in September 2016.
DISCUSSION
A call for bids was sent to the MRSC Small Works Roster and three bids were received on October 13 with Westwater
Construction Co. as the apparent low bidder at $88,300.00. The Engineer's estimate was $79,167. No errors were found in the
bid tabulation and a background check was conducted on Westwater Construction Co.
FINANCIAL IMPACT
Contract
Engineer's Estimate
2016 Budget
Bid Award
$88,300.00
$79,167.00
Contingency (5 %)
4,415.00
3,958.35
Annual Traffic Signal Program
$ 74,500.00
ADA Improvements
20,300.00
Total
2 71
83 12_ _
94 800.00
RECOMMENDATION
Council is being asked to award the construction contract for the TIB & S 1441h St Midblock Crossing to Westwater
Construction Co. in the amount of $88,300.00 and consider this item on the Consent Agenda at the November 21, 2016
Regular Meeting.
Attachments: Pages 19 & 20, 2015 CIP
Bid tabulation
W:U'W EngU'RO)ECTS\A- RW & R5 Projects\TIB -144th Midblock crossing (91610406)AI)esignA100% designAAward \Info Memo TIB Mid -block Bid Award gl 110416.docx
13
14
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
PROJECT:
Annual Traffic Signal Program Project No. 81410404
Design and construct traffic signal upgrades and repairs of signals that exceed routine maintenance work;
DESCRIPTION:
loop replacement, head replacement, and controllers. Replace direct bury cable for existing lighting system.
City is adding traffic signals to inventory every year. New traffic control center will warrant an additional staff
JUSTIFICATION:
person to be fully operational.
LEDs are on a 4 to 5 year replacement cycle. Work includes adding additional signal heads, luminaires, loop
STATUS:
repairs, and controller upgrades including signal timing and coordination plans.
25
Reduces maintenance costs. Preventative maintenance on every traffic signal is required to be completed
MAINT. IMPACT:
quarterly.
COMMENT:
Ongoing project, only one year actuals shown in first column.
FINANCIAL
Through Estimated
lin S000'sl
2013 2014 2015 2016 2017 2018 2019 2020 BEYOND TOTAL
EXPENSES
Design
25
35
35
40
40
45
45
265
Land(R/W)
0
Const. Mgmt.
0
Construction
115
100
80
80
80
80
80
80
80
775
TOTAL EXPENSES
115
100
105
115
115
120
120
125
125
1,040
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Traffic Impact Fees
0
City Oper. Revenue
115
100
105
115
115
120
120
125
125
1,040
TOTAL SOURCES
115
100
105
115
115
120
120
125
125
1,040
2015 - 2020 Capital Improvement Program
m
15
CITY OFTWKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
PROJECT:
Americans with Disabilities Act (ADA)Improvements Project No. 31210405
DESCRIPTION:
Construct ADA compliant upgrades to City infrastructure in conjunction with a City developed plan.
JUSTIFICATION:
enforcement Recent
The enfbm � studies.
court rulings now mandate ADA compliance. The City must provide upgrades with most construction projects.
STATUS:
Provide annual funding to construct improvements as necessary. For 2015, develop a citywide plan.
D0A|0T.|0OPACT:
Negligible.
PnUe�*iUbe ongoing und|ChYfaoi|�eoand inho�m�uremm�8D8�quimma�s.On� one year o�ue|o
��80��NT'
'
shown in first column.
FINANCIAL Through Estimated
(in $000's) 2013 2014 2015 2016 2017 2018 2019 2020 BEYOND TOTAL
EXPENSES
Construction
93
50
50
50
50
50
50
50
443
TOTAL EXPENSES
31
109
163
63
63
63
63
63
63
681
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Traffic Impact Fees
0
City Oper. Revenue
31
109
163
63
63
63
63
63
63
681
TOTAL SOURCES
31
109
163
63
63
63
63
63
63
681
2015 2020 Capital Improvement Program 20
CITY OF TUKWILA
TIB & 144TH ST MIDBLOCK CROSSING
CONSTRUCTION COST ESTIMATE - 100% Submittal
KPG
SEATTLE • TACOMA
June 3, 2016
- _ Prime Ele4tnc-„--
Titan'Earthwntk�s
Section
No.
No.
Item
Quantity
Unit
Unit
Price
�_llNt -
= -. -, ". Total Cost
Total Cost Price
'._;,_- . -: �... •.,.:.
Unit
# Tvtat Cbsk 1
.. -PtICe . _.. - ..a _......;
ROADWAY
1
1 -04
Unexpected Site Changes
1
FA
$ 2,000.00
$
2,000.00
$ 2,000.00
$ 2,000.00
$ 2,000.00
$ 2,000.00
$ 2,000.00
$ 2,000.00
2
1 -09
Mobilization
1
LS
$ 6,000.00
$
6,000.00
$ 5,000.00
$ 5,000.00
$ 9,900.00
$ 9,900.00
$ 19,000.00
$ 19,000.00
3
1 -10
Project Temporary Traffic Control
1
LS
$ 4,000.00
$
4,000.00
$ 8,000.00
$ 8,000.00
$ 8,000.00
$ 8,000.00
$ 30,000.00
$ 30,000.00
4
2 -01
Clearing and Grubbing
1
LS
$ 1,500.00
$
1,500.00
$ 1,500.00
$ 1,500.00
$ 1,500.00
$ 1,500.00
$ 2,500.00
$ 2,500.00
5
2 -02
Removal of Structure and Obstruction
1
LS
$ 1,000.00
$
1,000.00
$ 5,000.00
$ 5,000.00
$ 1,500.00
$ 1,500.00
$ 6,000.00
$ 6,000.00
6
2 -03
Roadway Excavation, Incl. Haul
100
SY
$ 25.00
$
2,500.00
$ 50.00
$ 5,000.00
$ 45.00
$ 4,500.00
$ 38.00
$ 3,800.00
7
4 -04
Crushed Surfacing Top Course
20
TN
$ 30.00
$
600.00
$ 25.00
$ 500.00
$ 100.00
$ 2,000.00
$ 265.00
$ 5,300.00
8
5 -04
HMA Class 1/2" PG 64 -22
15
TN
$ 150.00
$
2,250.00
$ 500.00
$ 7,500.00
$ 350.00
$ 5,250.00
$ 450.00
$ 6,750.00
9
8 -01
Erosion / Water Pollution Control
1
FA
$ 500.00
$
500.00
$ 500.00
$ 500.00
$ 500.00
$ 500.00
$ 500.00
$ 500.00
10
8 -01
Silt Fence
30
LF
$ 5.00
$
150.00
$ 10.00
$ 300.00
$ 10.00
$ 300.00
$ 18.00
$ 540.00
11
8 -01
Inlet Protection
3
EA
$ 100.00
$
300.00
$ 100.00
$ 300.00
$ 70.00
$ 210.00
$ 150.00
$ 450.00
12
8 -04
Cement Conc. Traffic Curb and Gutter
45
LF
$ 25.00
$
1,125.00
$ 150.00
$ 7,500.00
$ 65.00
$ 3,250.00
$ 86.00
$ 4,300.00
„TRAFFIC; SIGNALS
13
8 -20
Rectangular Rapid Flashing Beacon (RRFB) System, Complete 1 LS $ 42,500.00
$
42,500.00
$ 26,000.00
$ 26,000.00
$ 46,500.00
$ 46,500.00
$ 31,000.00
$ 31,000.00
SIDEWALK
14
8 -14
Cement Conc. Sidewalk
70
SY
$ 50.00
$
3,500.00
$ 100.00
$ 7,500.00
$ 50.00
$ 3,750.00
$ 75.00
$ 5,625.00
15
8 -14
Cement Conc. Curb Ramp, Type A Perpendicular
2
EA
$ 800.00
$
1,600.00
$ 2,500.00
$ 5,000.00
$ 1,750.00
$ 3,500.00
$ 2,300.00
$ 4,600.00
16
8 -14
Detectable Warning Surface
55
SF
$ 15.00
$
825.00
$ 60.00
$ 3,300.00
$ 60.00
$ 3,300.00
$ 55.00
$ 3,025.00
TRAFFIC CONTROL DEVICES.
17
8 -22
Thermoplastic Stop Line
50
LF
$ 10.00
$
500.00
$ 10.00
$ 500.00
$ 15.00
$ 750.00
$ 15.00
$ 750.00
18
8 -22
Thermoplastic Crosswalk Line
140
SF
$ 8.00
$
1,120.00
$ 10.00
$ 1,400.00
$ 13.00
$ 1,820.00
$ 8.00
$ 1,120.00
ROADSIDE DEVELOPMENT
19
8 -02
Topsoil Type A
5
CY
$ 40.00
$
200.00
$ 150.00
$ 750.00
$ 75.00
$ 375.00
$ 200.00
$ 1,000.00
20
8 -02
Bark Mulch
5
CY
$ 40.00
$
200.00
$ 150.00
$ 750.00
$ 75.00
$ 375.00
$ 200.00
$ 1,000.00
ESTIMATED CONSTRUCTION COST $
71,970.00
$ 88,300.00
$ 99,280.00
$ 129,260.00
10% CONTINGENCY $
7,197.00
TOTAL CONSTRUCTION COSTS $
79,167.00
loft
im
TRANSPORTATION COMMITTEE
City of Tukwila
City Council Transportation Committee
Meeting Minutes
November 7, 2016 -5.30 P.M. — Foster Conference Room, 630o Building
Councilmembers: Dennis Robertson, Chair; Verna Seal, De'Sean Quinn
Staff: David Cline, Bob Giberson, Ryan Larson, Gail Labanara, Steve Carstens, Scott
Bates, and Laurel Humphrey
CALL TO ORDER: Committee Chair Robertson called the meeting to order at 5:30 p.m.
I. PRESENTATIONS
II. BUSINESS AGENDA
A. Overpass Agreement: Boeing Access Road over BNRR Bridge Rehabilitation Project
Staff is seeking Council approval of an Overpass Agreement with BNSF in the amount of
$149,428.0o for the Boeing Access Road over BNRR Rehabilitation Project. This is required for
construction and maintenance costs related to work over the railroad right -of -way and covers
inspection and flagging services required by BNSF. UNANIMOUS APPROVAL. FORWARD TO
NOVEMBER 21.2o16 REGULAR CONSENT AGENDA.
B. Supplemental Agreement: 42r'd Avenue South (South 16oth Street — South 131St Place) Phase III
Staff is seeking Council approval of Supplemental Agreement No. 6 to Contract No. 12 -010 in the
amount of $218,783.05 with CH2M Hill forthe 42nd Avenue South Phase III Project combined with
the Gilliam Creek Culvert design. The project is at 900/6 design and this supplement will redesign
the relocation of storm water detention facilities in compliance with the City's shoreline buffer
requirements and plan mitigation for landscaping and stream relocation. Additional utility
coordination will also be required. Funding for this design is available from the proposed
increased construction budget as reflected on the updated CIP page. UNANIMOUS
APPROVAL. FORWARD TO NOVEMBER 14,2o16 COMMITTEE OF THE WHOLE.
C. Bid Award: Tukwila International Boulevard and South ILLth Street Midblock Crossina
Staff is seeking Council approval of a construction contract in the amount of $88,300.00 with
Westwater Construction Company for the Tukwila International Boulevard and South 144th
Street Midblock Crossing. This project will retrofit the crossing with Rapid Flashing Rectangular
beacons and ADA compliant curb ramps. Westwater was the low bidder of three bids received in
October. UNANIMOUS APPROVAL. FORWARD TO NOVEMBER 21, 2o16 REGULAR
CONSENT AGENDA.
D. Stop Sign and Crosswalk Guidelines
Staff provided the Committee with a briefing on how stop signs, crosswalks, speed humps, and
speed limit changes get approved for installation. Residents often make requests for traffic
calming devices, but the City must follow the 2oog Edition of the Manual on Uniform Traffic
W
20
COUNCIL AGENDA SYNOPSIS
Meeting Date Prepared b Mayor's - ew Council revinp
y
11/21/16 BG
W
I
ITEM INFORMATION
rl �Onf
IF
CAS NUMBER:
STAFF SPONSOR BOB GIBERSON
ORJG,1NAI, AGENDA DA'FE: 11/21/16
AGENDA Ii'j,,m Trn,i: Boeing Access Rd over BNRR Bridge Rehabilitation
BNSF Railroad's Overpass Agreement
CATEGORY ❑ Discussion
Mtg Date
E Motion
Mtg Date 111211M
❑ Resolution
Mtg Date
❑ Ordinance
Mt
,g Date
EILBid Aivard
Mtg Date
F-] Public Hearin
,g
Mtg Date
EJ Otber
Mtg Date
SPONSOR ❑ Council ❑ Major ❑ HR ❑ DCD ❑ Finance ❑ Fire ❑ IT ❑ P&R ❑ Police Z PW'
SPONSOR'S This Overpass Agreement with Burlington Northern Santa Fe Railroad is for the Boeing
SUMMARY Access Road over BNRR Bridge Rehabilitation Project. The Overpass Agreement is required
for construction and maintenance costs for work in the railroad's right-of-way and covers
inspections and railroad flagging. Council is being asked to approve the Overpass
Agreement with BNSF for $149,428.00.
RE,V11,1'WLD BY F-1 cow Mtg- ❑ CA&P Cmte ❑ F&S Cmte Z Transportation Cmte
❑ Utilities Cmte ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
DATE: 11/7/16 COMMITTEE CHAIR: DENNIS ROBERTSON
RECOMMENDATIONS:
SPONSOR/ADMIN. Public Works
Comm"i-fl,"E Unanimous Approval; Forward to Consent Agenda
COST IMPACT/ FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$149,428.00 $1,224,000.00 $0.00
Fund Source: 104 ARTERIAL STREETS (PAGE 10, PROPOSED 2017 CIP)
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
11/21/16
MTG. DATE
ATTACHMENTS
11/21/16
Informational Memorandum dated 11/04/16
Page 10, Proposed 2017 CIP
BNSF Overpass Agreement
Minutes from the Transportation Committee meeting of 11/07/16
21
22
TO:
FROM
BY:
CC:
DATE:
City of Tukwila Allan Ekberg, Mayor
Public Works Department - Bob Giberson, Director
Transportation Committee
Bob Giberson, Public Works Director
Steve Carstens, Senior Program Manager
Mayor Ekberg
November 4, 2016
SUBJECT: Boeina Access Rd over BNRR Bridae Rehabilitation Proiect
Project No. 99410408
BNSF Overpass Agreement
ISSUE
Approve Burlington Northern Santa Fe's (BNSF) Overpass Agreement.
BACKGROUND
In October 2013, the City contracted with Jacobs Engineering, Inc. to provide the design for the
rehabilitation of the Boeing Access Rd over BNRR Bridge. Since that time, the City has been
working with BNSF to finalize an agreement which allows the project to be constructed over their
right-of-way. This Overpass Agreement allows the City and its contractor to work in the BNSF right-
of-way and pays for required railroad flagging and inspection services performed by BNSF.
ANALYSIS
BNSF's Overpass Agreement is for required construction and maintenance costs related to the
work over the railroad's right -of -way and covers inspection services and flagging required by the
BNSF. Attached are the Overpass Agreement, Exhibit A-1 for the flagging services, and Exhibit A-
2 for inspection services.
FISCAL IMPACT
The Overpass Agreement is within the approved construction management budget which includes
a contingency for unanticipated work. Staff is currently working on RFQs for the construction
management contract and hopes to advertise for construction bids in early 2017.
BNSF Flagging and Inspection
RECOMMENDATION
Contract CM Budget
$149,428.00 $1,224,000.00
Council is being asked to approve the Overpass Agreement with BNSF for the Boeing Access Rd
over BNRR Rehabilitation Project in the amount of $149,428.00 and consider this item on the
Consent Agenda at the November 21, 2016 Regular Meeting.
Attachment: Page 10, Proposed 2017 CIP
BNSF C/M Agreement
WAPW Eng\PROJECTS\A- RW & RS Projects\Boeing Access Rd Bridge Rehab (99410408)\05 ROW Esmt Permfts\lnfo Memo BNSF CM Ag gl 110416.docx
23
24
CITY OF T0KVNLA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT:
Boeing Access Rd over BNRR Bridge Rehabilitation Project No. SS41O4O8
D���R|PT|DN�
Rehabi|�o�the ex��ngbhdgewdho34U' long ooncm�oru�e|bhdgeaim�uro.|twiUbeO�neo and have
a sidewalk on one side.
The existing bridge is structurally and seismically deficient. Several pedestals are leaning, have concrete
JUSTIFICATION:
spalls, exposed rusty anchor bolts and reinforcements and some cracks. The existing railings do not meet
current bridge standards.
1,249
Type, size, and location draft report (specifically required for bridges) was completed in 2005. Federal grant
STATUS:
applications were submitted in 2008 and 2010 and the bridge rehabilitation was successful for funding in
2012 for federal bridge funds. A Public Works Trust Fund (PWTF) loan was rescinded in 2013.
K0AJN[|K8PACT:
Maintenance will bareduced.
Bridge will be rehabilitated in phases to allow continued traffic use. Federal bridge grant of $9,745,600
COMMENT:
requires a 20% local match. A bond issue for the City match was issued in 2015 with the Interurban Ave S.
FINANCIAL Through Estimated
EXPENSES
Design
1,249
84
20
1,353
Const. Mgmt.
1,224
1,224
Construction
9,745
9,745
TOTALEXPENSES
1,249
84
1 10,989
1 01
01
01
01
01
01
12,322
FUND SOURCES
Awarded Grant
905
63
8,777
9,745
Proposed Grant
0
Fund Balance-Bond
344
21
2,212
I
MW
2,577
Mitigation
0
on,r-eo22 Capital Improvement Program
10
I
MW
1111M I
on,r-eo22 Capital Improvement Program
10
W
This Agreement ("Agreement"), is executed to
("Effective Date"), by and between BNSF
corporation ("BNSF"), and the City of Tukwila,
Washington ("Agency").
RECITALS:
BNSF File No. BF10009078
Boeing Access Rd
U.S. D.O.T. No. 085597G
LS 051
MP 07.02OX
Seattle Subdivision
be effective as of
RAILWAY COMPANY,
a political subdivision of
a Delaware
the State of
WHEREAS, BNSF owns and operates a line of railroad in and through the City of
Tukwila, State of Washington; and
WHEREAS, Agency desires to widen and improve the existing structure known as the
Boeing Access Rd Bridge, D.O.T. No. 085597G.
NOW, THEREFORE, in consideration of the mutual covenants and agreements of the
parties contained herein, the receipt and sufficiency of which are hereby acknowledged,
the parties agree as follows:
ARTICLE 1)
SCOPE OF WORK
1. The term "Project" as used herein includes any and all work related to the
construction of the proposed improvements to the Boeing Access Rd Bridge (hereinafter
referred to as the "Structure"), more particularly described on the Exhibit A, which is
attached hereto and incorporated herein, including, but not limited to, any and all
changes to telephone, telegraph, signal and electrical lines and appurtenances,
temporary and permanent track work, fencing, grading, alterations to or new
construction of drainage facilities, preliminary and construction engineering and contract
preparation. Additionally, temporary controls during construction must comply with
Section 8A-08, "Temporary Traffic Control Zones" of the Manual of Uniform Traffic
Control Devices ("MUTCD"), U.S. Department of Transportation.
27
q
In consideration of the covenants of Agency set forth herein and the faithful
performance thereof, BNSF agrees as follows:
1. Upon Agency's payment to BNSF of an administrative fee in the sum of zero and
No/100 Dollars ($0.00), together with the Temporary Construction License Fee in the
sum of $0 and No/100 Dollars ($0.00), BNSF hereby grants to Agency, its successors
and assigns, upon and subject to the terms and conditions set forth in this Agreement, a
temporary non-exclusive license (hereinafter called, "Temporary Construction License")
to construct the Structure across or upon the portion of BNSF's right-of-way described
further on Exhibit A-1, excepting and reserving BNSFs rights, and the rights of any
others who have obtained, or may obtain, permission or authority from BNSF, to do the
following:
(a) Operate, maintain, renew and/or relocate any and all existing railroad
track or tracks, wires, pipelines and other facilities of like character upon,
over or under the surface of said right-of-way;
(b) Construct, operate, maintain, renew and/or relocate upon said right-of-
way, without limitation, such facilities as the BNSF may from time to time
deem appropriate, provided such facilities do not materially interfere with
the Agency's use of the Structure;
(c) Otherwise use or operate the right-of-way as BNSF may from time to time
deem appropriate, provided such use or operations does not materially
interfere with the Agency's use of the Structure; and
(d) Require the Agency or its contractor to execute a Temporary Construction
Crossing Agreement, for any temporary crossing requested to aid in the
construction of this Project.
The term of the Temporary Construction License begins on the Effective Date
and ends on the earlier of (i) substantial completion of the Structure, or (ii) eighteen
months following the Effective Date. The Temporary Construction License and related
rights given by BNSF to Agency in this provision are without warranty of title of any kind,
express or implied, and no covenant of warranty of title will be implied from the use of
any word or words herein contained. The Temporary Construction License is for
construction of the Structure only and shall not be used by Agency for any other
purpose, Agency acknowledges and agrees that Agency shall not have the right, under
the Temporary Construction License, to use the Structure for any other purpose than
construction. In the event Agency is evicted by anyone owning, or claiming title to or
any interest in said right-of-way, BNSF will not be liable to Agency for any damages,
losses or any expenses of any nature whatsoever. The granting of similar rights to
others, subsequent to the date of this Agreement, will not impair or interfere with the
rights granted to Agency herein.
W.
Upon Agency's payment to BNSF of the additional sum of $ zero and No/100
Dollars ($0.00), such payment to be made within thirty (30) days of issuing the Notice to
Proceed pursuant to Article 111, Section 16 of this Agreement, and provided further that
Agency is in compliance with the term and conditions of this Agreement, BNSF will
grant to Agency, its successors and assigns, an easement (hereinafter called, the
"Easement") to enter upon and use that portion of BNSF's right-of-way as is necessary
to use and maintain the Structure, substantially in the form of Exhibit B attached to this
Agreement. If Agency fails to pay BNSF within the thirty day time period set forth in the
preceding sentence, BNSF may stop construction of the Project until full payment is
received by BNSF.
2. BNSF will furnish all labor, materials, tools, and equipment for railroad work
required for the construction of the Project, such railroad work and the estimated cost
thereof being as shown on Exhibit D attached hereto and made a part hereof. In the
event construction on the Project has not commenced within six (6) months following
the Effective Date, BNSF may, in its sole and absolute discretion, revise the cost
estimates set forth in said Exhibit D. In such event, the revised cost estimates will
become a part of this Agreement as though originally set forth herein. Any item of work
incidental to the items listed on Exhibit D not specifically mentioned therein may be
included as a part of this Agreement upon written approval of Agency, which approval
will not be unreasonably withheld. Construction of the Project must include the following
railroad work by BNSF:
(a) Procurement of materials, equipment and supplies necessary for the
railroad work;
(b) Preliminary engineering, design, and contract preparation;
(c) Furnishing of flagging services during construction of the Project as
required and set forth in further detail on Exhibit C;
(d) Furnishing engineering and inspection as required in connection with the
construction of the Project;
(e) Providing a contract project coordinator, at Agency's expense, to serve as
a project manager for the Project
3. BNSF will do all railroad work set forth in Article 11, Section 2 above on an actual cost
basis, when BNSF, in its sole discretion, determines it is required by its labor
agreements to perform such work with its own employees working under applicable
collective bargaining agreements,
29
4. Agency agrees to reimburse BNSF for work of an emergency nature caused by
Agency or Agency's contractor in connection with the Project which BNSF deems is
reasonably necessary for the immediate restoration of railroad operations, or for the
protection of persons or BNSF property. Such work may be performed by BNSF
without prior approval of Agency and Agency agrees to fully reimburse BNSF for all
such emergency work.
5. BNSF may charge Agency for insurance expenses, including self-insurance
expenses, when such expenses cover the cost of Employer's Liability (including, without
limitation, liability under the Federal Employer's Liability Act) in connection with the
construction of the Project. Such charges will be considered part of the actual cost of
the Project, regardless of the nature or amount of ultimate liability for injury, loss or
death to BNSF's employees, if any.
6. During the construction of the Project, BNSF will send Agency progressive
invoices detailing the costs of the railroad work performed by BNSF under this
Agreement. Agency must reimburse BNSF for completed force-account work within
thirty (30) days of the date of the invoice for such work. Upon completion of the Project,
BNSF will send Agency a detailed invoice of final costs, segregated as to labor and
materials for each item in the recapitulation shown on Exhibit D. Pursuant to this
section and Article IV, Section 7 herein, Agency must pay the final invoice within ninety
(90) days of the date of the final invoice. BNSF will assess a finance charge of .033%
per day (12% per annum) on any unpaid sums or other charges due under this
Agreement which are past its credit terms. The finance charge continues to accrue
daily until the date payment is received by BNSF, not the date payment is made or the
date postmarked on the payment. Finance charges will be assessed on delinquent
sums and other charges as of the end of the month and will be reduced by amounts in
dispute and any unposted payments received by the month's end. Finance charges will
be noted on invoices sent to Agency under this section.
ARTICLE 111) AGENCY OBLIGATIONS
In consideration of the covenants of BNSF set forth herein and the faithful performance thereof,
Agency agrees as follows:
1. Agency must furnish to BNSF plans and specifications for the Project. One
digital copy of said plans (reduced size 11" x 17"), together with calculations, and
specifications in English Units, must be submitted to BNSF for approval prior to
commencement of any construction. BNSF will give Agency final written approval of the
plans and specifications substantially in the form of Exhibit E, attached to this
Agreement and made a part hereof. Upon BNSF's final written approval of the plans
and specifications, said plans and specifications will become part of this Agreement and
are hereby incorporated herein. Any approval of the plans and specifications by BNSF
shall in no way obligate BNSF in any manner with respect to the finished product design
and/or construction. Any approval by BNSF shall mean only that the plans and
30
specifications meet the subjective standards of BNSF, and such approval by BNSF shall
not be deemed to mean that the plans and specifications or construction is structurally
sound and appropriate or that such plans and specifications meet applicable
regulations, laws, statutes or local ordinances and/or building codes.
2. Agency must make any required application and obtain all required permits and
approvals for the construction of the Project.
3. Agency must provide for and maintain minimum vertical and horizontal
clearances, as required in Exhibit C and as approved by BNSF as part of the plans and
specifications for the Project.
4, Agency must acquire all rights of way necessary for the construction of the
Project.
5. Agency must make any and all arrangements, in compliance with BNSF's Utility
Accommodation Manual (hftp://www.bnsf.com/communities/fags/pdf/utilitv.Dd , for the
installation or relocation of wire lines, pipe lines and other facilities owned by private
persons, companies, corporations, political subdivisions or public utilities other than
BNSF which may be necessary for the construction of the Project..
6. Agency must construct the Project as shown on the attached Exhibit A and do all
work ("Agency's Work") provided for in the plans and specifications for the Project,
except railroad work that will be performed by BNSF hereunder. Agency must furnish
all labor, materials, tools and equipment for the performance of Agency's Work. The
principal elements of Agency's Work are as follows:
(a) Construction of the Structure;
(b) All necessary grading and paving, including backfill of excavations and
restoration of disturbed vegetation on BNSF's right-of-way;
(c) Provide suitable drainage, both temporary and permanent;
(d) Intentionally left blank;
(e) Intentionally left blank;
(f) Intentionally left blank
(g) Provide appropriate pedestrian control during construction;
(h) Intentionally left blank
(i) Installation and maintenance of an 8-ft. high fence and/or concrete
combination (throw fence) on the outside barrier of the Structure;
5
31
Job site cleanup including removal of all construction materials, concrete
debris, surplus soil, refuse, contaminated soils, asphalt debris, litter and
other waste materials to the satisfaction of BNSF.
7. Agency must apply and maintain said D.O.T. Crossing number 085597G in a
conspicuous location on the Structure.
8. Agency's Work must be performed by Agency or Agency's contractor in a
manner that will not endanger or interfere with the safe and timely operations of BNSF
and its facilities.
9. For any future inspection or maintenance, either routine or otherwise, performed
by subcontractors on behalf of the Agency, Agency shall require the subcontractors to
comply with the provisions of the attached Exhibit C and execute the agreement
attached hereto as Exhibit C-1. Prior to performing any future maintenance with its own
personnel, Agency shall: comply with all of BNSF's applicable safety rules and
regulations; require any Agency employee performing maintenance to complete the
safety training program at the BNSF's Internet Website "httg://bnsfcontractor.com/";
notify BNSF when, pursuant to the requirements of Exhibit C, a flagger is required to be
present; procure, and have approved by BNSF's Risk Management Department,
Railroad Protective Liability insurance.
10. Agency must require its contractor(s) to notify BNSF's Roadmaster at least thirty
(30) calendar days prior to requesting a BNSF flagman in accordance with the
requirements of Exhibit C attached hereto. Additionally, Agency must require its
contractor(s) to notify BNSF's Manager of Public Projects thirty (30) calendar days prior
to commencing work on BNSF property or near BNSF tracks.
11. Agency or its contractor(s) must submit a digital of any plans (including
calculations in English Units) for proposed shoring, falsework or cribbing to be used
over, under, or adjacent to BNSF's tracks to BNSF's Manager of Public Projects for
approval. The shoring, falsework or cribbing used by Agency's contractor shall comply
with the BNSF Bridge Requirements set forth on Exhibit F and all applicable
requirements promulgated by state and federal agencies, departments, commissions
and other legislative bodies. If necessary, Agency must submit a digital copy of a
professionally engineered demolition plan, as set forth in Exhibit G, with applicable
calculations to BNSF's Manager of Public Projects.
12. Agency must include the following provisions in any contract with its provider(s)
performing work on said Project:
(a) The Provider is placed on notice that fiber optic, communication and
other cable lines and systems (collectively, the "Lines") owned by
various telecommunications companies may be buried on BNSF's
property or right-of-way. The locations of these Lines have been
9
32
included on the plans based on information from the
telecommunications companies. The Provider will be responsible for
contacting BNSF and the telecommunications companies and notifying
them of any work that may damage these Lines or facilities and/or
interfere with their service. The Provider must also mark all Lines
shown on the plans or marked in the field in order to verify their
locations. The Provider must also use all reasonable methods when
working in the BNSF right-of-way or on BNSF property to determine if
any other Lines (fiber optic, cable, communication or otherwise) may
exist.
(b) The Provider will be responsible for the rearrangement of any facilities
or Lines determined to interfere with the construction. The Provider
must cooperate fully with any telecommunications company (ies) in
performing such rearrangements.
(c) Failure to mark or identify these Lines will be sufficient cause for BNSF
to stop construction at no cost to the Agency or BNSF until these items
are completed.
(d) In addition to the liability terms contained elsewhere in this Agreement,
the Provider hereby indemnifies, defends and holds harmless BNSF
for, from and against all cost, liability, and expense whatsoever
(including, without limitation, attorney's fees and court costs and
expenses) arising out of or in any way contributed to by any act or
omission of Provider, its subcontractors, agents and/or employees that
cause or in any way or degree contribute to (1) any damage to or
destruction of any Lines by Provider, and/or its subcontractors, agents
and/or employees, on BNSF's property or within BNSF's right-of-way,
(2) any injury to or death of any person employed by or on behalf of
any telecommunications company, and/or its contractor, agents and/or
employees, on BNSF's property or within BNSF's right-of-way, and/or
(3) any claim or cause of action for alleged loss of profits or revenue
by, or loss of service by a customer or user of such telecommunication
company(ies). THE LIABILITY ASSUMED BY PROVIDER WILL NOT
BE AFFECTED BY THE FACT, IF IT IS A FACT, THAT THE
DAMAGE, DESTRUCTION, INJURY, DEATH, CAUSE OF ACTION
OR CLAIM WAS OCCASIONED BY OR CONTRIBUTED TO BY THE
NEGLIGENCE OF BNSF, ITS AGENTS, SERVANTS, EMPLOYEES
OR OTHERWISE, EXCEPT TO THE EXTENT THAT SUCH CLAIMS
ARE PROXIMATELY CAUSED BY THE INTENTIONAL
MISCONDUCT OR SOLE NEGLIGENCE OF BNSF. It is mutually
negotiated between the parties that the indemnification obligation
shall include all claims brought by Agency's employees against
BNSF, its agents, servants, employees or otherwise, and Agency
expressly waives its immunity under the industrial insurance act
33
(RCW Title 51) and assumes potential liability for all actions
brought by its employees.
13. Agency must require compliance with the obligations set forth in this agreement,
including Exhibit Q and Exhibit C-1, and incorporate in each prime contract for
construction of the Project, or the specifications therefor (i) the provisions set forth in
Article III and IV; and (ii) the provisions set forth in Exhibit C, Exhibit C-1, and Exhibit F
attached hereto and by reference made a part hereof,
14. Except as otherwise provided below in this Section 13, all construction work
performed hereunder by Agency for the Project will be pursuant to a contract or
contracts to be let by Agency, and all such contracts must include the following:
(a) All work performed under such contract or contracts within the limits of
BNSF's right-of-way must be performed in a good and workmanlike
manner in accordance with plans and specifications approved by BNSF;
(b) Changes or modifications during construction that affect safety or BNSF
operations must be subject to BNSF's approval;
(c) No work will be commenced within BNSF's right-of-way until each of the
prime contractors employed in connection with said work must have (i)
executed and delivered to BNSF an agreement in the form of Exhibit C-1,
and (ii) delivered to and secured BNSF's approval of the required
insurance; and
(d) To facilitate scheduling for the Project, Agency shall have its contractor
give BNSF's representative four (4) weeks advance notice of the proposed
times and dates for work windows. BNSF and Agency's contractor will
establish mutually agreeable work windows for the Project. BNSF has the
right at any time to revise or change the work windows, due to train
operations or service obligations. BNSF will not be responsible for any
additional costs and expenses resulting from a change in work windows.
Additional costs and expenses resulting from a change in work windows
shall be accounted for in the contractor's expenses for the Project.
(e) The plans and specifications for the Project must be in compliance with
the Bridge Requirements set forth on Exhibit F, attached to this
Agreement and incorporated herein.
15. Agency must advise the appropriate BNSF Manager of Public Projects, in writing,
of the completion date of the Project within thirty (30) days after such completion date.
Additionally, Agency must notify BNSF's Manager of Public Projects, in writing, of the
34
date on which Agency and /or its Contractor will meet with BNSF for the purpose of
making final inspection of the Project.
16. TO THE FULLEST EXTENT PERMITTED BY LAW, AGENCY HEREBY
RELEASES, INDEMNIFIES, DEFENDS AND HOLDS HARMLESS BNSF, ITS
AFFILIATED COMPANIES, PARTNERS, SUCCESSORS, ASSIGNS, LEGAL
REPRESENTATIVES, OFFICERS, DIRECTORS, SHAREHOLDERS, EMPLOYEES
AND AGENTS FOR, FROM AND AGAINST ANY AND ALL CLAIMS, LIABILITIES,
FINES, PENALTIES, COSTS, DAMAGES, LOSSES, LIENS, CAUSES OF ACTION,
SUITS, DEMANDS, JUDGMENTS AND EXPENSES (INCLUDING, WITHOUT
LIMITATION, COURT COSTS AND ATTORNEYS' FEES) OF ANY NATURE, KIND
OR DESCRIPTION OF ANY PERSON (INCLUDING, WITHOUT LIMITATION, THE
EMPLOYEES OF THE PARTIES HERETO) OR ENTITY DIRECTLY OR INDIRECTLY
ARISING OUT OF, RESULTING FROM OR RELATED TO (1N WHOLE OR IN PART)
(1) THE USE, OCCUPANCY OR PRESENCE OF AGENCY, ITS CONTRACTORS,
SUBCONTRACTORS, EMPLOYEES OR AGENTS IN, ON, OR ABOUT THE
CONSTRUCTION SITE, (II) THE PERFORMANCE, OR FAILURE TO PERFORM BY
THE AGENCY, ITS CONTRACTORS, SUBCONTRACTORS, EMPLOYEES, OR
AGENTS, ITS WORK OR ANY OBLIGATION UNDER THIS AGREEMENT, (111) THE
SOLE OR CONTRIBUTING ACTS OR OMISSIONS OF AGENCY, ITS
CONTRACTORS, SUBCONTRACTORS, EMPLOYEES, OR AGENTS IN, ON, OR
ABOUT THE CONSTRUCTION SITE, (IV) AGENCY'S BREACH OF THE
TEMPORARY CONSTRUCTION LICENSE OR EASEMENT GRANTED TO AGENCY
PURSUANT TO ARTICLE 11 OF THIS AGREEMENT, (V) ANY RIGHTS OR
INTERESTS GRANTED TO AGENCY PURSUANT TO THE TEMPORARY
CONSTRUCTION LICENSE OR EASEMENT DISCUSSED IN ARTICLE 11 OF THIS
AGREEMENT, (VI) AGENCY'S OCCUPATION AND USE OF BNSF'S PROPERTY
OR RIGHT -OF -WAY, INCLUDING, WITHOUT LIMITATION, SUBSEQUENT
MAINTENANCE OF THE STRUCTURE BY AGENCY, OR (VII) AN ACT OR
OMISSION OF AGENCY OR ITS OFFICERS, AGENTS, INVITEES, EMPLOYEES OR
CONTRACTORS OR ANYONE DIRECTLY OR INDIRECTLY EMPLOYED BY ANY
OF THEM, OR ANYONE THEY CONTROL OR EXERCISE CONTROL OVER. THE
LIABILITY ASSUMED BY AGENCY WILL NOT BE AFFECTED BY THE FACT, IF IT
IS A FACT, THAT THE DAMAGE, DESTRUCTION, INJURY OR DEATH WAS
OCCASIONED BY OR CONTRIBUTED TO BY THE NEGLIGENCE OF BNSF, ITS
AGENTS, SERVANTS, EMPLOYEES OR OTHERWISE, EXCEPT TO THE EXTENT
THAT SUCH CLAIMS ARE PROXIMATELY CAUSED BY THE INTENTIONAL
MISCONDUCT OR SOLE NEGLIGENCE OF BNSF. It is mutually negotiated
between the parties that the indemnification obligation shall include all claims
brought by Agency's employees against BNSF, its agents, servants, employees
or otherwise, and Agency expressly waives its immunity under the industrial
insurance act (RCW Title 51) and assumes potential liability for all actions
brought by its employees.
17. Agency must give BNSF's Manager of Public Projects written notice to proceed
( "Notice to Proceed ") with the railroad work after receipt of necessary funds for the
0
35
Project. BNSF will not begin the railroad work (including, without limitation,
procurement of supplies, equipment or materials) until written notice to proceed is
received from Agency.
ARTICLE IV) JOINT OBLIGATIONS
IN CONSIDERATION of the premises, the parties hereto mutually agree to the
following:
1. All work contemplated in this Agreement must be performed in a good and
workmanlike manner and each portion must be promptly commenced by the party
obligated hereunder to perform the same and thereafter diligently prosecuted to
conclusion in its logical order and sequence. Furthermore, any changes or
modifications during construction which affect BNSF will be subject to BNSF's written
approval prior to the commencement of any such changes or modifications from the NW
Division Manager Engineering Services.
2. The work hereunder must be done in accordance with the Bridge Requirements
set forth on Exhibit F and the detailed plans and specifications approved by BNSF.
3. Agency must require its contractor(s) to reasonably adhere to the Project's
construction schedule for all Project work. The parties hereto mutually agree that
BNSF's failure to complete the railroad work in accordance with the construction
schedule due to inclement weather or unforeseen railroad emergencies will not
constitute a breach of this Agreement by BNSF and will not subject BNSF to any
liability. Regardless of the requirements of the construction schedule, BNSF reserves
the right to reallocate the labor forces assigned to complete the railroad work in the
event of an emergency to provide for the immediate restoration of railroad operations of
either (BNSF or its related railroads) or to protect persons or property on or near any
BNSF owned property. BNSF will not be liable for any additional costs or expenses
resulting from any such reallocation of its labor forces. The parties mutually agree that
any reallocation of labor forces by BNSF pursuant to this provision and any direct or
indirect consequences or costs resulting from any such reallocation will not constitute a
breach of this Agreement by BNSF.
4. BNSF will have the right to stop construction work on the Project if any of the
following events take place: (i) Agency (or any of its contractors) performs the Project
work in a manner contrary to the plans and specifications approved by BNSF; (ii)
Agency (or any of its contractors), in BNSF's opinion, prosecutes the Project work in a
manner that is hazardous to BNSF property, facilities or the safe and expeditious
movement of railroad traffic; (iii) the insurance described in the attached Exhibit C-1 is
canceled during the course of the Project; or (iv) Agency fails to pay BNSF for the
Temporary Construction License or the Easement pursuant to Article 11, Section 1 of this
Agreement. The work stoppage will continue until all necessary actions are taken by
Agency or its contractor to rectify the situation to the satisfaction of BNSF's Division
10
36
Engineer or until proof of additional insurance has been delivered to and accepted by
BNSF. In the event of a breach of (i) this Agreement, (ii) the Temporary Construction
License, or (iii) the Easement, BNSF may immediately terminate the Temporary
Construction License or the Easement. Any such work stoppage under this provision
will not give rise to any liability on the part of BNSF BNSF's right to stop the work is in
addition to any other rights BNSF may have including, but not limited to, actions or suits
for damages or lost profits. In the event that BNSF desires to stop construction work on
the Project, BNSF agrees to immediately notify the following individual in writing:
Robin Tischmak
City Engineer
City of Tukwila
00 Southcenter Blvd, Suite 1 Ot
Tukwila, WA 98188
5. Agency must supervise and inspect the operations of all Agency contractors to
ensure compliance with the plans and specifications approved by BNSF, the terms of
this Agreement and all safety requirements of BNSF If BNSF determines that proper
supervision and inspection are not being performed by Agency personnel at any time
during construction of the Project, BNSF has the right to stop construction (within or
adjacent to its operating right-of-way). Construction of the Project will not proceed until
Agency corrects the situation to BNSF's reasonable satisfaction. If BNSF feels the
situation is not being corrected in an expeditious manner, BNSF will immediately notify
Robin Tischmak
City Engineer
City
• Tukwila
6300 Southcenter Blvd, Suite 100
Tukwila, WA 98188
for appropriate corrective action.
6. Agency agrees to provide, to the BNSF Manager Evidence Preservation, such
Project documentation and records as are agreed to between the parties including: any
project applications; any letters of approval and/or authorization forms (eg. PR-1240 or
the equivalent); any and all payment Voucher forms requesting FHWA reimbursement
(eg. PR-20 or the equivalent) or any other such project authorization or funding records
as BNSF may request from time to time. Such records will be provided by the Agency
to BNSF on a mutually agreeable schedule or within two (2) months after such records
are generated or received by the Agency. Section 130 Documentation shall be
provided to BNSF in the one of the following manners:
11
37
Manager Evidence Preservation
2600 Lou Menk Drive, AOB-3
Fort Worth, Texas 76131
Or electronically to:
Manager Evidence Preservation
Section130 @bnsf.com
7. Pursuant to this section and Article 11, Section 6 herein, Agency must reimburse
BNSF in full for the actual costs of all work performed by BNSF under this Agreement
(including taxes, such as applicable sales and use taxes, business and occupation
taxes, and similar taxes), less BNSF's Share as set forth in Article IV, Section 6 herein.
BNSF's Share must be paid upon completion of the Project.
In any action brought under this Agreement, the prevailing Party shall be entitled to
recover its actual costs and attorneys fees pursuant to California Civil Code Section
1717, as well as other litigation costs, including expert witness fees. The prevailing
Party shall also be entitled to recover all actual attorneys fees and litigation costs
incurred in connection with the enforcement of a judgment arising from such action or
proceeding.
8. All expenses detailed in statements sent to Agency pursuant to Article 11, Section
6 herein will comply with the terms and provisions of the Title 23 U.S. Code, Title 23
Code of Federal Regulations, and the Federal-Aid Policy Guide, U.S. Department of
Transportation, as amended from time to time, which manual is hereby incorporated into
and made a part of this Agreement by reference. The parties mutually agree that
BNSF's preliminary engineering, design, and contract preparation costs described in
Article 11, Section 2 herein are part of the costs of the Project even though such work
may have preceded the date of this Agreement.
9. The parties mutually agree that neither construction activities for the Project, nor
future maintenance of the Structure once completed, will be permitted during the fourth
quarter of each calendar year. Emergency work will be permitted only upon prior
notification to BNSF's Network Operations Center (telephone number: 800 832-5452).
The parties hereto mutually understand and agree that trains cannot be subjected to
delay during this time period.
10. Subject to the restrictions imposed by Article IV, Section 9 above, the
construction of the Project will not commence until Agency gives BNSF's Manager of
Public Projects thirty (30) days prior written notice of such commencement. The
commencement notice will reference D.O.T. Crossing No. 085597G and must state the
time that construction activities will begin,
12
ai]
11. In addition to the terms and conditions set forth elsewhere in this Agreement,
including, but not limited to, the terms and conditions stated in Exhibit F, BNSF and
Agency agree to the following terms upon completion of construction of the Project:
(a) Agency will own and maintain, at its sole cost and expense, the Structure,
the highway approaches, and appurtenances thereto, lighting, drainage
and any access roadways to BNSF gates installed pursuant to this
Agreement. BNSF may, at its option, perform maintenance on the
Structure in order to avoid conflicts with train operations. BNSF will notify
Agency prior to performing any such maintenance on the Structure. In the
event such maintenance involves emergency repairs, BNSF will notify
Agency at its earliest opportunity. Agency must fully reimburse BNSF for
the costs of maintenance performed by BNSF pursuant to this subsection
(b).
(b) Agency must, at Agency's sole cost and expense, keep the Structure
painted and free from graffiti.
(c) Agency must provide BNSF with any and all necessary permits and
maintain roadway traffic controls, at no cost to BNSF, whenever requested
by BNSF to allow BNSF to inspect the Structure or to make emergency
repairs thereto.
(d) It is expressly understood by Agency and BNSF that any right to install
utilities will be governed by a separate permit or license agreement
between the parties hereto.
(e) Agency must keep the Structure and surrounding areas clean and free
from birds, pigeons, scavengers, vermin, creatures and other animals.
(f) If Agency (including its contractors and agents) or BNSF, on behalf of
Agency, performs (i) alterations or modifications to the Structure, or (ii)
any maintenance or other work on the Structure with heavy tools,
equipment or machinery at ground surface level horizontally within 26-0"
of the centerline of the nearest track, or (iii) any maintenance or other
work outside the limits of the deck of the Structure vertically above the top
of the rail, then Agency or its contractors and/or agents must procure and
maintain the following insurance coverage, which may be changed from
time to time:
Railroad Protective Liability insurance naming only BNSF as the
Insured with coverage of at least $5,000,000 per occurrence and
$10,000,000 in the aggregate. The policy shall be issued on a
standard ISO form CG 00 35 12 04 and include the following:
13
39
• Endorsed to include the Pollution Exclusion Amendment
• Endorsed to include the Limited Seepage and Pollution
Endorsement.
• Endorsed to remove any exclusion for punitive damages.
• Endorsed to include Evacuation Expense Coverage Endorsement.
• No other endorsements restricting coverage may be added.
• The original policy must be provided to BNSF prior to performing
any work or services under this Agreement
• Definition of "Physical Damage to Property" shall be endorsed to
read: "means direct and accidental loss of or damage to all property
owned by any named insured and all property in any named
insured' care, custody, and control arising out of the acts or
omissions of the contractor named on the Declarations.
As used in this paragraph, "BNSF' means "Burlington Northern Santa
Fe, LLC", "BNSF RAILWAY COMPANY" and the subsidiaries,
successors, assigns and affiliates of each.
In lieu of providing a Railroad Protective Liability Policy, Agency may
participate in BNSF's Blanket Railroad Protective Liability Insurance
Policy if available to Agency or its contractors. The limits of coverage
are the same as above.
12. Agency hereby grants to BNSF, at no cost or expense to BNSF, a permanent
right of access from Agency property to BNSF tracks for maintenance purposes.
13. Agency must provide one set of digital as-built plans (prepared in English Units)
to BNSF, as well as one set of computer diskettes containing as built CAD drawings of
the Structure and identifying the software used for the CAD drawings. The "as built
plans" must comply with the Bridge Requirements set forth on Exhibit F and depict all
information in BNSF engineering stationing and mile post pluses. The "as built plans"
must also include plan and profile, structural bridge drawings and specifications, and
drainage plans. All improvements and facilities must be shown.
14. Subject to the restrictions imposed by Article IV, Section 9 above and in
accordance with the requirements of Article 111, Section 9 above, Agency must notify and
obtain prior authorization from BNSF's Manager of Public Projects before entering
BNSF's right-of-way for INSPECTION OR MAINTENANCE purposes, and the BNSF
Manager of Public Projects will determine if flagging is required. If the construction work
hereunder is contracted, Agency must require its prime contractor(s) to comply with the
obligations set forth in Exhibit C and Exhibit C-1, as the same may be revised from time
to time. Agency will be responsible for its contractor(s) compliance with such
obligations.
15. In the event that BNSF shall deem it necessary or desirable in the future, in the
performance of its duty as a common carrier, to raise or lower the grade or change the
14
W
alignment of its tracks or to lay additional track or tracks or to build other facilities in
connection with the operation of its railroad, BNSF shall, at its expense, have full right to
make such changes or additions, provided such changes or additions do not change or
alter the Structure herein proposed to be constructed and provided further, however,
that should it become necessary or desirable in the future to change, alter, widen or
reconstruct the Structure to accommodate railroad projects, the cost of such work,
including any cost incidental to alteration of railroad or highway facilities made
necessary by the alteration of the Structure shall be the sole responsibility of Agency.
16. Agency may, at Agency's sole expense, alter or reconstruct the highway
components of the Structure if necessary or desirable, due to traffic conditions or
pedestrian or other recreational traffic, provided, however, that any such alteration or
reconstruction must receive BNSF's prior written approval as evidenced by either a
supplement to this Agreement, or execution of a new agreement that provides for the
termination of this Agreement. Furthermore, any alteration or reconstruction of the
highway components of the Structure will be covered by a Commission Order.
17. Any books, papers, records and accounts of the parties hereto relating to the
work hereunder or the costs or expenses for labor and material connected with the
construction will at all reasonable times be open to inspection and audit by the agents
and authorized representatives of the parties hereto, as well as the State of
Washington and the Federal Highway Administration, for a period of three (3) years
from the date of final BNSF invoice under this Agreement.
18. The covenants and provisions of this Agreement are binding upon and inure to
the benefit of the successors and assigns of the parties hereto. Notwithstanding the
preceding sentence, neither party hereto may assign any of its rights or obligations
hereunder without the prior written consent of the other party.
19. In the event construction of the Project does not commence within eighteen
months of the Effective Date, this Agreement will become null and void.
20. Neither termination nor expiration of this Agreement will release either party from
any liability or obligation under this Agreement, whether of indemnity or otherwise,
resulting from any acts, omissions or events happening prior to the date of termination
or expiration.
21. To the maximum extent possible, each provision of this Agreement will be
interpreted in such a manner as to be effective and valid under applicable law. If any
provision of this Agreement is prohibited by, or held to be invalid under, applicable law,
such provision will be ineffective solely to the extent of such prohibition or invalidity and
the remainder of the provision will be enforceable.
22. This Agreement (including exhibits and other documents, manuals, etc.
incorporated herein) is the full and complete agreement between BNSF and Agency
15
41
with respect to the subject matter herein and supersedes any and all other prior
agreements between the parties hereto.
23. Any notice provided for herein or concerning this Agreement must be in writing
and will be deemed sufficiently given when sent by certified mail, return receipt
requested, to the parties at the following addresses:
AM4
AGENCY:
42
BNSF's Manager of Public Projects
Richard W Wagner
2454 Occidental Avenue South Ste 2D
Seattle, WA 98134
206.625.6152
Richard.Wa-qner(a)-BNSF.com
Robin Tischmak
City Engineer
City of Tukwila
6300 Southcenter Blvd, Suite 1
Tukwila, WA 98188
(206) 431-2455 1
16
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be
executed and attested by its duly qualified and authorized officials as of the day and
year first above written.
WITNESS:
WITNESS:
17
In
Printed Name: Richard Wagner
Title: Manager Public Projects NW
Division — ID, WA & BC
AGENCY
CITY OF TUKWILA, WASHINGTON
In
Printed Name: Allan Ekberg
Title: Mayor, City of Tukwila
43
mmm-v
[Insert drawing of the Project and/or Structure]
18
EVA
EXHIBIT A
M.
I7
47
'RUSSELL H. FLUENT, CHAIPkAR ARCHIE E. PHELPS
COMMISSIONER, FIRST DISTRICT COMMISSIONER. SECOND DISTRICT
KING COUNTY COMMISSIONERS
402 COUNTY -CITY BUILDING
SEATTLE
December 12, 1944
Department of Highways
Transportation Building
Olympia, Washington
Dear Sir: Attention: Earl F. Dickinson
JOS. A. WHETS76N6
COMMISSIONER. THTRD DISTRICT
This will acknowledge receipt of duly executed agreement be-
tween Oregon - Washington Railroad & Navigation Company, Union
Pacific Railroad Company, State of Washington and County of
King.
In accordance with your request of December 5, 1944, this
document has been recorded in the office of the King County
Auditor in volume 2290 of Deeds at Page 409 and bears the
County Auditorts File No. 3433396.
Very truly yours,
BOARD OF COUNTY COMMISSIONERS
ROBERT A. MORRIS, Cl k o Board
By
Deputy
ICES : ym
cc- S.murray, Resident Engineer
Operating Dept.,IInion Pacific R.R.Co.,
828 Pittock Block
Portland 5, Oregon
IF-
i. L
t
•_•t
�yy
i
I T s e s T 4
A Otru or UO 0" U%Wfir" "Onty (120 1 feet 9"0
all to 14 tu Nowsb"at % Ortar. of thio wutbweet %OUL"W
Imi of 8") Of "*sign TU** (a), To" On-t3%otbl"
9 23) Worth,, mmge Four (4) ftat or thanoll"1111-to mdrMum
I -
tight (it V*V br UW xavw*w
Comparq* 104"d to the Union POOLtio ft*)XOS4 � "O that
lies VIVU& otx+#y (40) t00%* meaurod at r ani$U*# as
each side at * *ad -PeraUol with the hwatroafter 4eii4rib"
ester Ilse of* A40,000 good, Boelpa we ft Plantoo
DAs-V 1 ('86) at agme to nurvVpd, lobato4,
aiid stalted out,, over and asrost sold rigbt of MI.
Said oantiW Una of �,#*exs Road as surveyed* loosted
4md otakod outi, over and aorass seld riot, of w&y and other
property boing demorib*d an Vollows to-wits
S491nains at apotat. on the north UU4 South aeater 34ne
of said Peatlon three (3) that Is on h=.43*d r1 'W— %W9
alit" aWfen W4118 (Mov) feet diount 0outh ftbo tho aghter
of Said G"tion meagm,*4 along sold north ajad dovWx Cautex
lino l
theuae masterly 610na a stv"Isht line 4"t romm an
114$10 Of OlgUty-ftUr d0pe*G abd thirtjVwV*Ur MIAUtOf
(84'0 340) from wix*4b to weist with said north and souft
centeir line of -`,leotim Throe (Z) a diatar-as of SOVOA hundVed
fOrtYWOOM OA4 MIZ tOU+.hS 041.6) toot to a point in the
avater It-no *f the main t"ok of said ,,"Irom4 QoMwq at,
railroad %"ay rUtjou L,65 ptuo 32,7 which equols i�oaoas
R*ad x-Iurvey Station 13 plus 59*361 said fitVuLOt line fOXWz
an auGle of aixty-oover. dogrees and twenty-six minutes
(67° set) r"t .peat to parth Vith a tanaesit to 061d mj'n
track at ieeilrood :',,'urVey JVotion 265 plus 1E.171
theuoe 0011tinuing r-eaterly 44014[" said strpaif�ht line a
diatatee of two hundrod tit--Jtty emid twfanty-eit-Mti hun4redths
(;W0,28) feet to i -Oeers N064 "'mrvey sztatiaft- le Plun 19,094,
14"he a harelabotare desoribed is 'shown "a rovra4onted U7 yollow
4010r an ilvlawtug Nov woo date4 'Wuly 201, 19j, hw*oto annexed,,
marked "Imbibit --,I OnA UY this rerc-Tan ce mde a part Or this
(b) JA 44dttlan thereto, tba AaLlroad t;ompanioe so far
as tboy lawfully may do a*, hereUy grant to the 3tate wW county,
oubjeas to e*ob and all of the Vimm-g provlelouxt# eanditioltaq
50
:A r,:fii �o-'6ea. :p z ; �+ a.;• i n; . €.. ,,�, rik•,;,r, $:.
10st-dosarlbed proVertr is shown amd Sndloated by atom eolei t
3
on p blt A hereto, j
le pr sOs 81 OVO ASSOrl'41W U Vafteftpbs (a) and (t�
i. Mall be used tM U is WW Oounty only for IOU yuooses agar**
said and not Otherwise, Orul It at axay t! U* pperiy of
s
l �riies b�ifaba rare
WS s"tt*A da; 'ibodp or !
fI� pact or Parts therOmfo EMU POSMUOntly O"AW to be nab for Ow
(! pUr#0800 of ratald or *hall be umA far Pia utbarlmA
E
�; t�ssrz the aa. t hAV07 Granted as to suok fir; ovorst or O'er a
4411 agave and t t#.
(d) The right* h by~ gated sboU be and a ro jjbjaat tsar
all OUtstan4l2w, superior rlehty, whether pubile or p;rivaatet gad
f
e%tei'ii 1MW or !`I'fifsl*ftle thozvot i attd the IUV*d CoMeataM
i
She riaAt to use tho proporty baa!etn W*V* d egorl tr for. ate' WA a
PWPOSOO not UUOU618tent Idth the li4maso P"01t a sses at
I heray tea. and partutllarly "WWvO t ri $, aMpD 4*% to a%JA I
i
004smals U *Of otmO adfditiefal treehs teaks or #aeiUtxss jVq&&
alongv ever, wear, or ,eras the areas de*fvitq,, at any tbW arA
ac'a +fa t $0 t o so erjd whan tbo a04%*rMln*,
51
bftr 404 pad' all %i#- 8 AAd 8300 # ve or as cisa , qtr k1w or waws,
algr.6"Out 10TU4 or asap -easod upon or upinst the vpr&v w dd
In thls Fu =00tim j j tlat t eas l vtod vpm am Ag a lnet the saw
as a ca a0*4 part of the Asilt"d Corfani eas' p"yor ► loba MAIO
of a as a wbolt*
to to rerAmm or qt t4 4f, keep.* 0.6e M pew a
Of the 1CM40 v i"emiso Ott 41110" mss oovowats of tbs's
the sia l 000841" may$ Von 61TW to 00 Ou a v 04,
•a
52
TIC "m
agroemant aka of %he dad' am Year ttrat he wrtt .
Approved as o fo
_- � day of.. .19
...y.:.. u AL
l
ft�ow
a yi4 �' 4
T ti i
91
ward Of I;Oun*wy d4�wdjp-
�slorro mr Uu "Msy
,
53
E-4
= 0
43
54
C:I
W4 IL 0 r=4
O
;*4
A
bdD
UN
4-4 43
cd
4-')
to o;
to
(D •
U UN
.4 ca
55
56
VOL4CUU, PAGEU04
4:2 �Ts' R. W. 4431
The NORTHERN PACIFIC RAILWAY,CCQFA.NY, a VTisconsin (;orporation,
hereinafter' referred to, as the "Railway Company ", does hereby in con-
sideration ;of One,!)ollar, to.it in hand paid, the receipt whereof is
hereby`,:ackno4ledged, 'a of-the agreemntai,herein contained, GRANT
to the STATE OF ViASBINGTON,• hereinafter called the "State" permission
save as herein li ted, to,use for highway - purposes, in common with the
us a of said Rai w Company for° railroad purposes, and to construct
- thereover an overhead Access: Read Viaduct to carry traffic from East
Marginal Way to Empire_ Way for the Boeing Aircraft Corporation near
the south city limits of the-City of Seattle, in the location indicated
on the attached plat =prepared in 'tie Office of the Assistant Chief
Engineer of said'Rai Company, dated April 7th 1944 and identified
as' Exhibit "A". o- ,wit ... ; ..
: Qt A, strip of land one hundred twenty (120) feet in width, or
sixty .(60) feet wzde as a permanent easement on each side
of the .center'line of said Access Road. over and across that
portion of its raz7road right of way in tha, North half of
southneat quarter (ijo €sw-'I of section three, (3), taynship
twentst, -three (23)t'-to Aih of;range four'(4; east of the Willem-
,
ette Meridian, ahown;outliued'in RED on'said plat attached
hereto nd'msde ,a s' identified as Exhibit "A" s (to-
part�hQraof°
la, total of 20C fest�ar " "'100 f ®oach with slopes not to exceed
ether .with "the rz t to encroach
pt on either sidle of said highway
centerline far highway approach embankments.
The rights hereby granted'are, subject, however, to any and all
exis -blkg rights of,'the Railway Company and 'to, any permits and leases
that ,may heretof ore 'have been granted by said Railway Company across or
along said above described premises. -
j
The State shall Fit
,its 'sold cost and expense provide and maintain
connections With any`,'OkIsting'oulverts' "or such additional culverts as the
�Rai.lway,.Crnn airy may,= eleot`tc eonstruot so as to'diveit the drainage through
thy, higiwvy. grade .on ,the easeiwnt' strip. If at &ry time in the future, due
to the construction or . improvement of s aid , highway , drainage conditions should
require" a ,dhange in tie existing culverts or the placing of any new culverts
throughthe 'roadbed of the Railway Company, the State shall bear the entire
expens`0,of donstrgction of same ~ `and shall, provide such additional culverts
as may', be necessary to keep tha" Railway Company's right of way free from
accumulation of v6ter.
The State sh "all indemnify and` "nave 'harmless the Railway Company from
any and all claims for flood damage due to the constructionof said highway
across the Railway.Company ►s right of 'way.,
The State also .agrees "that in removing anow from said Highway and
fr.cm'6aid overhead Viaduct to perform the i1ork in such a manner so as not to
deposit'tly snow on the "roadbed and tracks of the Railway Co>apar3Y.
in tIM'6vent the construction snd maintenance of said highway shall
interfere with or .damage t2z poles .'and, wires of the Railway Company or the
Western'-Union Telegraphy Company or, other Telegraph or Telephone Company
doing business wit3 the poneet*, of eai d'` Rai•7aray Company; the l Uilway Cotapmw
=W p ' ' 'or fepaif'hzq* danage� done thereto and the
relooata 3a3d ` olesE �usd ,wires
State shall pay all post of 0uch work. upon preae"ntation of bills therefor.
1.
voL2300 pAcE583
The State agrees to,indemnifyf and save harmless t}n Railway Company
and any other, RaiNey Company that say be using its tracks with ita
consent, from any and`, all lose, cost, damage or expense arising in any
p rof to ra k herein provided b
forreA'bytle Sateo s contotor„regardlessof whether
cost, damage of"expense arises out of damage to or destruction of the
property of tha,7#ailway Company or of any person, firm or corporation
whatsoever, or,�;ut of ,claims for personal injuries or death.
Dated t w
`day of ].944 s
RN PACIFIC .RATiWAY CohIFANY,
J Yr
r rye. icoPreaide
Attest:
Accepted: Secretary.
STATE OF'4ASHINVTCE,
Departmeri `Higbways,` ;
By
Director of: °Highways.
STATE OF MINNESOTA
(am
CoUnty ,of Ramsey.
k
On this' . day of `1944,
me pars onally appeared , W. tk`an to me known to be the Vice
President of tYa, corporation ' t -tea that t within and foregoing
instrume,3A,'and acknow edged said instrument to be the free and voluntary
eot.and dead of said ''eoxpII t'
on; for the uses and purposes therein
mentioned, and on oatYi "stated that he was atkthorised to execute said
instrument and that floe seal 'affixed is the corporate seal of said
corporation.
IN WITZSESS WffEI�E(F I';have hereunto sat my hand and affixed
my offigi'el seal the clay; mod• year first above written.
r '
0,t] 11.
of 016
'R0 EAT
. . _ MAW ,
I
2
W
EASEMENT
3441262
M-8
61
MA
va006 m417
5��c d 2
E gEXENT
The PACIFIC COAST R. R. CO., a Washington corporation,
hereinafter referred to as the "Railroad Company," does hereby,
in consideration of One Dollar to it in hand paid, the receipt
whereof is hereby acknowledged, and of the agreements herein con-
tained, GRANT to the STATE OF WASHINGTON, hereinafter called the
"State," permission, save as herein limited, to construct an
Overhead Access Road Viaduct over a strip of land and to maintain
and use said Viaduct for highway purposes to carry traffic from
East Marginal Way to Empire Way for the Boeing Airplane Company
near the south city limits of the City of Seattle, in the location
indicated on the attached plat prepared in the office of the As-
sistant Chief Engineer of the Northern Pacific Railway Company,
dated April 7th, 1944 and identified as Exhibit "A ",to -wit:
A strip of land one hundred twenty (120) feet
in width, or sixty (60) feet wide as a per -
manent easement on each side of the center
line of said Access Road over and across that
portion of its railroad right of way in the
North half of Southwest quarter (N* of SWJ)
of Section three (3)0 Township twenty -three
(23) North of Range four (4) East of the
Willamette Meridian, shown outlined in RID
on said plat attached hereto and made a part
hereof, identified as Exhibit "A."
The rights hereby granted are subject, however, to any
and all existing rights of the Railroad Company and to any permits
and leases that may heretofore have been granted by said Railroad
Company across or along said above described premises. Said
Viaduct shall be constructed in such a manner and of sufficient
height above Railroad Company's existing tracks so that the use
of said tracks for railroad purposes will not be interfered with
and the maintenance of overhead electric power lines for use by
Railroad Company or any lessee of its, will not be prevented.
The State, at its sole cost and expense, shall provide
and maintaiii connections with any existing culverts or such addi-
tional culverts as the Railroad Company may elect to construct so
as to divert the drainage through the highway grade on the ease-
ment strip. If at any time in the future, due to the construction
or improvement of said highway, drainage conditions should require
a change in the existing culverts, or the placing of any new cul-
verts through the roadbed of the Railroad Company, the State shall
bear the entire expense of construction of same and shall provide
such additional culverts as may be necessary to keep the Railroad
Company's right of way free from accumulation of water.
The State shall indemnify and save harmless the Rail-
road Company from any and all claims for flood damage due to the
construction of said highway across the Railroad Company's right
of way.
The State also agrees that., in removing,snow from said
highway and from said overhead Viaduct, it will perform the work .
in such a manner as riot to deposit the snow on the roadbed and
tracks of the Railroad Company.
W
�(1}
63
r
In the event the construction and maintenance of said
highway shall interfere with or damage the poles and wires of
the Railroad Company or the Western Union Telegraph Company or
other telegraph or telephone company doing business with the
consent of said Railroad Company, the Railroad Company may re-
locate said poles and wires or repair any damage done thereto
and the State shall pay all cost of such work upon presentation
of bills therefor.
The State agrees to indemnify and save harmless the
Railroad Company and any other Railway Company that may be using
its tracks with its consent, from any and all lass, cost, damage
or expense arising in any manner out of the performance of any
of the work herein provided to be performed by the State or its
contractor, regardless of whether such loss, cost, damage or
expense arises out of damage to or destruction of the property
of the Railroad Company or of any person, firm or corporation
whatsoever, or out of the claims for personal injuries or death.
In case said Viaduct shall at any time finally cease
to be used for highway purposes, or by operation of law or other-
wise becomes vacated or abandoned, this easement and all rights
hereunder granted shall immediately cease and terminate and if
Railroad Company elects, State shall remove said Viaduct at
State's expense,
DATED this day of 1946.
PACIFIC COAST R. R. CO.
At
Accepted:
STATE OF WASHINGTON,
Department of Highways,
By
Director o Highways
.• ',
(2)
=21506 FAA19
STATE OF WASHINGTON � SS
COUNTY OF KING ) A
On this 2 Ag day of ,, 1946, before
me personally appeared and,,��'1)V S
to me known to be the President and Secretary,
respective Sy, of ,PACIFIC COAST R. R. CO., the corporation that exe-
cuted the within and foregoing instrument and acknowledged said in-
strument to be the free and voluntary act and deed of said corpora-
tion for the uses and purposes therein mentioned, and on oath
stated that they were authorized to execute said instrument and that
the seal affixed is the corporate seal of said corporation.
IN WITNESS WHEREOF, I have hereunto set my hand and af-
fixed my official seal the day and year in this Certificate first
above written.
Notary Pub is 3n and for the State
of Washington, reaiding at
r
rhea tdr Recwo 1� �/3d
Request af��
ROSERT; M KRIS. my Aud4or
65
3--m
EASEME.NT
t_
FILED for -RecA at Request ot
Q m
f
1 i S+i
ill 2 t� ►':�
Co
Q Cl .
ty
Tp
w
LL
m
AcceSS ►goads
Sec.Z - Segf"le To IR n+.ri
3oC M3 �Vrc ra �-� Pl q n+5
66
�...
�
J
+� ,
„y ta...w ni,uw.an. \'.,1
�
�✓ ""`�Ier/�"..,
..
� �
`t..��
N
%u,
IA
,
,Y*^ N
t
(6"s
�1.h.. ^�. �"
�m
p
Mx � n
I J I
ss
✓
� a 4 y N
I4 °G m' d
n n >
tl
i.
ro
^
3
r
w
u�
t,,W
r� E %HltilT a
f'M
.4
P7fW,"F
n4
.yb4 .�w.v „. y .�.... ......,. .. y, w.,_..,.,.m..
3X'i,S %{.,Fr . n w
4
. >,. e.a„r.i�M,
�r
✓ a .x s,. 1N ra. .fir �re "',c e,< 'rG`,.�..,IL/f.�rl a,. >, v, o+n.
J61%
Asr~"J='
ANNNMNW� WAILWAY
EXHIBIT VICIN
CONTRACTOR REQUIREMENTS
1.01 General:
1.01.01 The Contractor must cooperate with BNSF RAILWAY COMPANY,
hereinafter referred to as "Railway" where work is over or under on or adjacent to
Railway property and/or right-of-way, hereafter referred to as "Railway Property",
during the construction of Boeing Access Road Bridge.
1.01.02 The Contractor must execute and deliver to the Railway duplicate copies
of the Exhibit "C -1" Agreement, in the form attached hereto, obligating the Contractor
to provide and maintain in full force and effect the insurance called for under Section
3 of said Exhibit "C-1". Questions regarding procurement of the Railroad Protective
Liability Insurance should be directed to Rosa Martinez at Marsh, USA, 214 -303-
8519.
• 1.01.03 The Contractor must plan, schedule and conduct all work activities so as
not to interfere with the movement of any trains on Railway Property.
1.01.04 The Contractor's right to enter Railway's Property is subject to the
absolute right of Railway to cause the Contractor's work on Railway's Property to
cease if, in the opinion of Railway, Contractor's activities create a hazard to
Railway's Property, employees, and/or operations. Railway will have the right to stop
construction work on the Project if any of the following events take place: (i)
Contractor (or any of its subcontractors) performs the Project work in a manner
contrary to the plans and specifications approved by Railway; (ii) Contractor (or any
of its subcontractors), in Railway's opinion, prosecutes the Project work in a manner
which is hazardous to Railway property, facilities or the safe and expeditious
movement of railroad traffic; (iii) the insurance described in the attached Exhibit C-1
is canceled during the course of the Project; or (iv) Contractor fails to pay Railway
for the Temporary Construction License or the Easement. The work stoppage will
continue until all necessary actions are taken by Contractor or its subcontractor to
rectify the situation to the satisfaction of Railway's Division Engineer or until
additional insurance has been delivered to and accepted by Railway. In the event of
a breach of (i) this Agreement, (ii) the Temporary Construction License, or (iii) the
Easement, Railway may immediately terminate the Temporary Construction License
or the Easement. Any such work stoppage under this provision will not give rise to
any liability on the part of Railway. Railway's right to stop the work is in addition to
any other rights Railway may have including, but not limited to, actions or suits for
damages or lost profits. In the event that Railway desires to stop construction work
34
Z
ANNENNW�
NAACWAY -
on the Project, Railway agrees to immediately notify the following individual in
writing:
Robin Tischmak
City Engineer
City of Tukwila
6300 Southcenter Blvd, Suite 100
Tukwila, WA 98188
Desk: (206) 431-2455
1.01.05 The Contractor is responsible for determining and complying with all
Federal, State and Local Governmental laws and regulations, including, but not
limited to environmental laws and regulations (including but not limited to the
Resource Conservation and Recovery Act, as amended; the Clean Water Act, the
Oil Pollution Act, the Hazardous Materials Transportation Act, CERCLA), and health
and safety laws and regulations. The Contractor hereby indemnifies, defends and
holds harmless Railway for, from and against all fines or penalties imposed or
assessed by Federal, State and Local Governmental Agencies against the Railway
which arise out of Contractor's work under this Agreement.
• 1.01.06 The Contractor must notify City of Tukwila Washington at
and Railway's Manager Public Projects, telephone number ( L at least thirty
(30) calendar days before commencing any work on Railway Property. Contractor's
notification to Railway must refer to Railway's file
1.01.07 For any bridge demolition and/or falsework above any tracks or any
excavations located with any part of the excavations located within, whichever is
greater, twenty-five (25) feet of the nearest track or intersecting a slope from the
plane of the top of rail on a 2 horizontal to 1 vertical slope beginning at eleven (11)
feet from centerline of the nearest track, both measured perpendicular to center line
of track, the Contractor must furnish the Railway five sets of working drawings
showing details of construction affecting Railway Property and tracks. The working
drawing must include the proposed method of installation and removal of falsework,
shoring or cribbing, not included in the contract plans and two sets of structural
calculations of any falsework, shoring or cribbing. For all excavation and shoring
submittal plans, the current "BNSF-UPRR Guidelines for Temporary Shoring" must
be used for determining the design loading conditions to be used in shoring design,
and all calculations and submittals must be in accordance with the current "BNSF-
UPRR Guidelines for Temporary Shoring". All submittal drawings and calculations
must be stamped by a registered professional engineer licensed to practice in the
state the project is located. All calculations must take into consideration railway
surcharge loading and must be designed to meet American Railway Engineering
and Maintenance-of-Way Association (previously known as American Railway
Engineering Association) Coopers E-80 live loading standard. All drawings and
35
70
A081
,VAIZ WAY
calculations must be stamped by a registered professional engineer licensed to
practice in the state the project is located. The Contractor must not begin work until
notified by the Railway that plans have been approved. The Contractor will be
required to use lifting devices such as, cranes and/or winches to place or to remove
any falsework over Railway's tracks. In no case will the Contractor be relieved of
responsibility for results obtained by the implementation of said approved plans.
• 1.01.08 Subject to the movement of Railway's trains, Railway will cooperate with
the Contractor such that the work may be handled and performed in an efficient
manner. The Contractor will have no claim whatsoever for any type of damages or
for extra or additional compensation in the event his work is delayed by the Railway.
1.02 Contractor Safety Orientation
• 1.02.01 No employee of the Contractor, its subcontractors, agents or invitees
may enter Railway Property without first having completed Railway's
Engineering Contractor Safety Orientation, found on the web site
hftl2:1/bnsfcontractor.com/. The Contractor must ensure that each of its
employees, subcontractors, agents or invitees completes Railway's
Engineering Contractor Safety Orientation through internet sessions before
any work is performed on the Project. Additionally, the Contractor must
ensure that each and every one of its employees, subcontractors, agents or
invitees possesses a card certifying completion of the Railway Contractor
Safety Orientation before entering Railway Property. The Contractor is
responsible for the cost of the Railway Contractor Safety Orientation. The
Contractor must renew the Railway Contractor Safety Orientation annually.
Further clarification can be found on the web site or from the Railway's
Representative.
1.03 Railway Requirements
• 1.03.01 The Contractor must take protective measures as are necessary to keep
railway facilities, including track ballast, free of sand, debris, and other foreign
objects and materials resulting from his operations. Any damage to railway facilities
resulting from Contractor's operations will be repaired or replaced by Railway and
the cost of such repairs or replacement must be paid for by the Agency.
• 1.03.02 The Contractor must notify the Railway's Division Engineer
at ( and provide blasting
plans to the Railway for review seven (7) calendar days prior to conducting any
blasting operations adjacent to or on Railway's Property.
36
71
ASr~"A#='
AMMMMMMM�
RA A4 ;;_Y 7A
1.03.03 The Contractor must abide by the following temporary clearances during
construction:
■ 15'-0" Horizontally from centerline of nearest track
® 21'-6" Vertically above top of rail
■ 27'-0" Vertically above top of rail for electric wires carrying less than 750
volts
■ 28'-0" Vertically above top of rail for electric wires carrying 750 volts to
15,000 volts
■ 30'-0" Vertically above top of rail for electric wires carrying 15,000 volts to
20,000 volts
■ 34'-0" Vertically above top of rail for electric wires carrying more than
20,000 volts
• 1.03.04 Upon completion of construction, the following clearances shall be
maintained:
* 25' Horizontally from centerline of nearest track
■ 23' 6" Vertically above top of rail
1.03.05 Any infringement within State statutory clearances due to the Contractor's
operations must be submitted to the Railway and to the City of Tukwila
Washington and must not be undertaken until approved in writing by the Railway,
and until the City of Tukwila Washington has obtained any necessary
authorization from the State Regulatory Authority for the infringement. No extra
compensation will be allowed in the event the Contractor's work is delayed pending
Railway approval, and/or the State Regulatory Authority's approval.
1.03.06 In the case of impaired vertical clearance above top of rail, Railway will
have the option of installing tell-tales or other protective devices Railway deems
necessary for protection of Railway operations. The cost of tell-tales or protective
devices will be borne by the Agency.
• 1.03.07 The details of construction affecting the Railway's Property and tracks not
included in the contract plans must be submitted to the Railway by City of Tukwila
Washington for approval before work is undertaken and this work must not be
undertaken until approved by the Railway.
1.03.08 At other than public road crossings, the Contractor must not move any
equipment or materials across Railway's tracks until permission has been obtained
from the Railway. The Contractor must obtain a "Temporary Construction Crossing
Agreement" from the Railway prior to moving his equipment or materials across the
Railways tracks. The temporary crossing must be gated and locked at all times when
not required for use by the Contractor. The temporary crossing for use of the
Contractor will be constructed and, at the completion of the project, removed at the
37
72
'
AM
RAILWAr
expense of the Contractor.
1.03.09 Discharge, release or spill on the Railway Property of any hazardous
substances, oil, petroleum, constituents, pollutants, contaminants, or any hazardous
waste is prohibited and Contractor must immediately notify the Railway's Resource
Operations Center at 1(800) 832-5452, of any discharge, release or spills in excess
of a reportable quantity. Contractor must not allow Railway Property to become a
treatment, storage or transfer facility as those terms are defined in the Resource
Conservation and Recovery Act or any state analogue.
1.03.10 The Contractor upon completion of the work covered by this contract,
must promptly remove from the Railway's Property all of Contractor's tools,
equipment, implements and other materials, whether brought upon said property by
said Contractor or any Subcontractor, employee or agent of Contractor or of any
Subcontractor, and must cause Railway's Property to be left in a condition
acceptable to the Railway's representative.
1.04 Contractor Roadway Worker on Track Safety Program and Safety
Action Plan:
1.04.01 Each Contractor that will perform work within 25 feet of the centerline of a
track must develop and implement a Roadway Worker Protection/On Track Safety
Program and work with Railway Project Representative to develop an on track safety
strategy as described in the guidelines listed in the on track safety portion of the
Safety Orientation. This Program must provide Roadway Worker protection/on track
training for all employees of the Contractor, its subcontractors, agents or invitees.
This training is reinforced at the job site through job safety briefings. Additionally,
each Contractor must develop and implement the Safety Action Plan, as provided for
on the web site hftp://bnsfcontractor.com/, which will be made available to
Railway prior to commencement of any work on Railway Property. During the
performance of work, the Contractor must audit its work activities. The Contractor
must designate an on-site Project Supervisor who will serve as the contact person
for the Railway and who will maintain a copy of the Safety Action Plan, safety audits,
and Material Safety Datasheets (MSDS), at the job site.
1.04.02 Contractor shall have a background investigation performed on all of its
employees, subcontractors and agents who will be performing any services for
Railroad under this Agreement which are determined by Railroad in its sole
discretion a) to be on Railroad's property, or b) that require access to Railroad
Critical Infrastructure, Railroad Critical Information Systems, Railroad's Employees,
Hazardous Materials on Railroad's property or is being transported by or otherwise
in the custody of Railroad, or Freight in Transit involving Railroad.
38
73
A
RA /L WAY
The required background screening shall at a minimum meet the rail industry
background screening criteria defined by the e-RAILSAFE Program as outlined at
http://www.e-railsafe.com, in addition to any other applicable regulatory
requirements.
Contractor shall obtain written consent from all its employees, subcontractors or
agents screened in compliance with the e-RAILSAFE Program to participate in the
Program on their behalf and to release completed background information to
Railroad's designee. Contractor shall be subject to periodic audit to ensure
compliance.
Contractor subject to the e-RAILSAFE Program hereunder shall not permit any of its
employees, subcontractors or agents to perform services hereunder who are not first
approved under e-RAILSAFE Program standards. Railroad shall have the right to
deny entry onto its premises or access as described in this section above to any of
Contractor's employees, subcontractors or agents who do not display the authorized
identification badge issued by a background screening service meeting the
standards set forth in the e-RAILSAFE Program, or who in Railroad's opinion, which
may not be unreasonable, may pose a threat to the safety or security of Railroad's
operations, assets or personnel.
Contractors shall be responsible for ensuring that its employees, subcontractors and
agents are United States citizens or legally working in the United States under a
lawful and appropriate work VISA or other work authorization.
1.05 Railway Flagger Services:
• 1.05.01 The Contractor must give Railway's Roadmaster (telephone _)
a minimum of thirty (30) calendar days advance notice when flagging services will be
required so that the Roadmaster can make appropriate arrangements (i.e., bulletin
the flagger's position). If flagging services are scheduled in advance by the
Contractor and it is subsequently determined by the parties hereto that such
services are no longer necessary, the Contractor must give the Roadmaster five (5)
working days advance notice so that appropriate arrangements can be made to
abolish the position pursuant to union requirements.
• 1.05.02 Unless determined otherwise by Railway's Project Representative,
Railway flagger will be required and furnished when Contractor's work activities are
located over, under and/or within twenty-five (25) feet measured horizontally from
centerline of the nearest track and when cranes or similar equipment positioned
beyond 25-feet from the track centerline could foul the track in the event of tip over
or other catastrophic occurrence, but not limited thereto for the following conditions:
39
74
NA IL;;A Y
• 1.05.02a When, upon inspection by Railway's Representative, other conditions
warrant.
• 1.05.02b When any excavation is performed below the bottom of tie elevation, if,
in the opinion of Railway's representative, track or other Railway
facilities may be subject to movement or settlement.
• 1.05.02c When work in any way interferes with the safe operation of trains at
timetable speeds.
• 1.05.02d When any hazard is presented to Railway track, communications,
signal, electrical, or other facilities either due to persons, material,
equipment or blasting in the vicinity.
• 1.05.02e Special permission must be obtained from the Railway before moving
heavy or cumbersome objects or equipment which might result in
making the track impassable.
• 1.06.03 Flagging services will be performed by qualified Railway flaggers.
• 1.05.03a Flagging crew generally consists of one employee. However,
additional personnel may be required to protect Railway Property and
operations, if deemed necessary by the Railways Representative.
• 1.05.03b Each time a flagger is called, the minimum period for billing will be the
eight (8) hour basic day.
• 1.05.03c The cost of flagger services provided by the Railway will be borne by
City of Tukwila Washington. The estimated cost for one (1) flagger is
approximately between $800.00-$1,600.00 for an eight (8) hour basic
day with time and one-half or double time for overtime, rest days and
holidays. The estimated cost for each flagger includes vacation
allowance, paid holidays, Railway and unemployment insurance, public
liability and property damage insurance, health and welfare benefits,
vehicle, transportation, meals, lodging, radio, equipment, supervision
and other costs incidental to performing flagging services.
Negotiations for Railway labor or collective bargaining agreements and
rate changes authorized by appropriate Federal authorities may
increase actual or estimated flagging rates. THE FLAGGING RATE IN
EFFECT AT THE TIME OF PERFORMANCE BY THE
CONTRACTOR HEREUNDER WILL BE USED TO CALCULATE THE
ACTUAL COSTS OF FLAGGING PURSUANT TO THIS
PARAGRAPH.
40
75
"~.SrAr=-
R.411C W.4 r
• 1.05.03d The average train traffic on this route is 36 freight trains per 24-hour
period at a timetable speed 50 MPH and 24 passenger trains at a
timetable speed of 79 MPH.
1.06 Contractor General Safety Requirements
1.06.01 Work in the proximity of railway track(s) is potentially hazardous where
movement of trains and equipment can occur at any time and in any direction. All
work performed by contractors within 25 feet of any track must be in compliance with
FRA Roadway Worker Protection Regulations.
1.06.02 Before beginning any task on Railway Property, a thorough job safety
briefing must be conducted with all personnel involved with the task and repeated
when the personnel or task changes. If the task is within 25 feet of any track, the job
briefing must include the Railway's flagger, as applicable, and include the
procedures the Contractor will use to protect its employees, subcontractors, agents
or invitees from moving any equipment adjacent to or across any Railway track(s).
1.06.03 Workers must not work within 25 feet of the centerline of any track without
an on track safety strategy approved by the Railway's Project Representative.
When authority is provided, every contractor employee must know: (1) who the
Railway flagger is, and how to contact the flagger, (2) limits of the authority, (3) the
method of communication to stop and resume work, and (4) location of the
designated places of safety. Persons or equipment entering flag/work limits that
were not previously job briefed, must notify the flagger immediately, and be given a
job briefing when working within 25 feet of the center line of track.
• 1.06.04 When Contractor employees are required to work on the Railway Property
after normal working hours or on weekends, the Railway's representative in charge
of the project must be notified. A minimum of two employees must be present at all
times.
1.06.05 Any employees, agents or invitees of Contractor or its subcontractors
under suspicion of being under the influence of drugs or alcohol, or in the
possession of same, will be removed from the Railway's Property and subsequently
released to the custody of a representative of Contractor management. Future
access to the Railway's Property by that employee will be denied.
1.06.06 Any damage to Railway Property, or any hazard noticed on passing trains
must be reported immediately to the Railway's representative in charge of the
project. Any vehicle or machine which may come in contact with track, signal
equipment, or structure (bridge) and could result in a train derailment must be
41
76
Ayr~ 'F'
I7AAMAY
reported immediately to the Railway representative in charge of the project and to
the Railway's Resource Operations Center at 1(800) 832 -5452. Local emergency
numbers are to be obtained from the Railway representative in charge of the project
prior to the start of any work and must be posted at the job site.
• 1.06.07 For safety reasons, all persons are prohibited from having pocket knives,
firearms or other deadly weapons in their possession while working on Railway's
Property.
1.06.08 All personnel protective equipment (PPE) used on Railway Property must
meet applicable OSHA and ANSI specifications. Current Railway personnel
protective equipment requirements are listed on the web site,
hftp : / /bnsfcontractor.com /, however, a partial list of the requirements include: a)
safety glasses with permanently affixed side shields (no yellow lenses); b) hard hats;
c) safety shoe with: hardened toes, above - the -ankle lace -up and a defined heel; and
d) high visibility retro- reflective work wear. The Railway's representative in charge of
the project is to be contacted regarding local specifications for meeting requirements
relating to hi- visibility work wear. Hearing protection, fall protection, gloves, and
respirators must be worn as required by State and Federal regulations. Nt OTE
Should there be a discrepancy between the information contained on the web
site and the information in this Para-graph, the web site will govern.)
1.06.09 THE CONTRACTOR MUST NOT PILE OR STORE ANY MATERIALS,
MACHINERY OR EQUIPMENT CLOSER THAN 25' -0" TO THE CENTER LINE OF
THE NEAREST RAILWAY TRACK. MATERIALS, MACHINERY OR EQUIPMENT
MUST NOT BE STORED OR LEFT WITHIN 250 FEET OF ANY HIGHWAY /RAIL
AT -GRADE CROSSINGS OR TEMPORARY CONSTRUCTION CROSSING,
WHERE STORAGE OF THE SAME WILL OBSTRUCT THE VIEW OF A TRAIN
APPROACHING THE CROSSING. PRIOR TO BEGINNING WORK, THE
CONTRACTOR MUST ESTABLISH A STORAGE AREA WITH CONCURRENCE
OF THE RAILWAYS REPRESENTATIVE.
1.06.10 Machines or vehicles must not be left unattended with the engine running.
Parked machines or equipment must be in gear with brakes set and if equipped with
blade, pan or bucket, they must be lowered to the ground. All machinery and
equipment left unattended on Railway's Property must be left inoperable and
secured against movement. (See internet Engineering Contractor Safety Orientation
program for more detailed specifications)
1.06.11 Workers must not create and leave any conditions at the work site that
would interfere with water drainage. Any work performed over water must meet all
Federal, State and Local regulations.
• 1.06.12 All power line wires must be considered dangerous and of high voltage
M
RA 11;;A7 Y
unless informed to the contrary by proper authority. For all power lines the minimum
clearance between the lines and any part of the equipment or load must be; 200 KV
or below - 15 feet; 200 to 350 KV - 20 feet; 350 to 500 KV - 25 feet; 500 to 750 KV -
35 feet; and 750 to 1000 KV - 45 feet. If capacity of the line is not known, a
minimum clearance of 45 feet must be maintained. A person must be designated to
observe clearance of the equipment and give a timely warning for all operations
where it is difficult for an operator to maintain the desired clearance by visual means.
1.07 Excavation:
1.07.01 Before excavating, the Contractor must determine whether any
underground pipe lines, electric wires, or cables, including fiber optic cable systems
are present and located within the Project work area. The Contractor must
determine whether excavation on Railway's Property could cause damage to buried
cables resulting in delay to Railway traffic and disruption of service to users. Delays
and disruptions to service may cause business interruptions involving loss of
revenue and profits. Before commencing excavation, the Contractor must contact
BNSF's Field Engineering Representative ( ). All underground
and overhead wires will be considered HIGH VOLTAGE and dangerous until verified
with the company having ownership of the line. It is the Contractor's
responsibility to notify any other companies that have underground utilities in
the area and arrange for the location of all underground utilities before
excavating.
• 1.07.02 The Contractor must cease all work and notify the Railway immediately
before continuing excavation in the area if obstructions are encountered which do
not appear on drawings. If the obstruction is a utility and the owner of the utility can
be identified, then the Contractor must also notify the owner immediately. If there is
any doubt about the location of underground cables or lines of any kind, no work
must be performed until the exact location has been determined. There will be no
exceptions to these instructions.
1.07.03 All excavations must be conducted in compliance with applicable OSHA
regulations and, regardless of depth, must be shored where there is any danger to
tracks, structures or personnel.
1.07.04 Any excavations, holes or trenches on the Railway's Property must be
covered, guarded and/or protected when not being worked on. When leaving work
site areas at night and over weekends, the areas must be secured and left in a
condition that will ensure that Railway employees and other personnel who may be
working or passing through the area are protected from all hazards. All excavations
must be back filled as soon as possible.
43
W
AirAW"A#='
AUMMWW� RAIZZY
1.08 Hazardous Waste, Substances and Material Reporting:
1.08.01 If Contractor discovers any hazardous waste, hazardous substance,
petroleum or other deleterious material, including but not limited to any
non-containerized commodity or material, on or adjacent to Railway's Property, in or
near any surface water, swamp, wetlands or waterways, while performing any work
under this Agreement, Contractor must immediately: (a) notify the Railway's
Resource Operations Center at 1(800) 832-5452, of such discovery: (b) take
safeguards necessary to protect its employees, subcontractors, agents and/or third
parties: and (c) exercise due care with respect to the release, including the taking of
any appropriate measure to minimize the impact of such release.
1.09 Personal Injury Reporting
1.09.01 The Railway is required to report certain injuries as a part of compliance
with Federal Railroad Administration (FRA) reporting requirements. Any personal
injury sustained by an employee of the Contractor, subcontractor or Contractor's
invitees while on the Railway's Property must be reported immediately (by phone
mail if unable to contact in person) to the Railway's representative in charge of the
project. The Non-Employee Personal Injury Data Collection Form contained herein
is to be completed and sent by Fax to the Railway at 1(817) 352-7595 and to the
Railway's Project Representative no later than the close of shift on the date of the
injury.
44
79
AISr~"A#='
'
AM
&.4 At WAY
NON-EMPLOYEE PERSONAL INJURY DATA COLLECTION
(If injuries are in connection with rail equipment accident/incident, highway rail grade crossing accident or automobile
accident, ensure that appropriate information is obtained, forms completed and that data entry personnel are aware that
injuries relate to that specific event.)
Injured Person Type:
Passenger an train (C) F] Non-Employee (N)
(e, empufaflotherradmBdar fla,74NV amp invakediflyableleard4kal iflZAV&7§
company vehicles)
F—] Contractor/safety sensitive (F) [_] Contractor/non-safety sensitive Q
F] Volunteer /safety sensitive H F—] Volunteer/other non-safety sensitive (1)
F1Non-trespasser (0) - to include highway users involved in highway rail grade crossing accidents who did not
go around or through gates
F1Trespasser (E) - to include highway users involved in highway rail grade crossing accidents who went
around or through gates
0 Non-trespasser (d) - Off railroad property
If train involved, Train 10:
Transmit attached information to Accident /incident Reporting Center by:
Fax 1-817-352-7595 or by Phone 1-800-697-6736 or email to: Accident-Repartina.Center@BNSF.com
Officer Providing Information:
(Name)
(Employee No.) (Phone #)
REPORT PREPARED TO COMPLY WITH FEDERAL ACCIDENT REPORTING REQUIREMENTS AND PROTECTED FROM
DISCLOSURE PURSUANT TO 49 U.S.C. 20903 AND 83 U.S.C. 49D
45
m
NON-EMPLOYEE PERSONAL INJURY DATA COLLECTION
INFORMATION REGUIREO TO BE COLLECTED PURSUANT TO FEDERAL REGULATION, IT SHOULD BE USED FOR COMPLIANCE WITH FEDERAL REGULATIONS ONLY AND IT Is NOT
INTENDED TO PRESUME ACCEPTANCE OF RESPONSIBILITY OR LIABILITY.
1. Accident City/St:
County:
k1l ❑U❑ U110F 1LJLdL1UJ1)
Mile Post / Line Segment:
S. Driver's License No (and state) or other 10:
B. Name (lost, first, mi):
7. Address:
8, Date of Birth:
phone Number:
9. Injury:
(iz, Laceration, Etc.)
11. Description of Accident (To include location, action, result, Etc.):
12. Treatment:
F� First Aid Only
F-1 Required Medical Treatment
F-1 Other Medical Treatment
13. Dr. Name:
14. Dr. Address:
Street:
15. Hospital Name:
16. Hospital Address:
Street:
17. Diagnosis:
City:
City:
2. Date:
3. Temperature:
City:
and/or Age:
(if available)
Employer:
Time:
4. Weather:
SSN (required):
St: Zip:
Gender:
10. Body Part:
Date:
(i.e,, Hand, etc.)
St: Zip:
St:
Zip:
REPORT PREPARED TO COMPLY WITH FEDERAL ACCIDENT REPORTING REQUIREMENTS
AND PROTECTED FROM DISCLOSURE PURSUANT TO 49 U.S.C. 20903 AND 83 U.S.C. 490
i
EXHIBIT "C-1"
Agreement Between
BNSF RAILWAY COMPANY
and the
CONTRACTOR
Railway File:
Agency Project: Boeing Access Rd Bridge (085597G) Widening
<%Contractor. Legal Name%> [insert contractor's legal name here] (hereinafter
called "Contractor"), has entered into an agreement (hereinafter called "Agreement")
dated , 201_, [***Drafter's Note: insert the date of the contract
between the Agency and the Contractor here] with City of Tukwila WA for the
performance of certain work in connection with the following
project: Performance of such work will necessarily require
Contractor to enter BNSF RAILWAY COMPANY (hereinafter called "Railway") right of
way and property (hereinafter called "Railway Property"). The Agreement provides that
no work will be commenced within Railway Property until the Contractor employed in
connection with said work for City of Tukwila WA (i) executes and delivers to Railway
an Agreement in the form hereof, and (ii) provides insurance of the coverage and limits
specified in such Agreement and Section 3 herein. If this Agreement is executed by a
party who is not the Owner, General Partner, President or Vice President of Contractor,
Contractor must furnish evidence to Railway certifying that the signatory is empowered
to execute this Agreement on behalf of Contractor.
Accordingly, in consideration of Railway granting permission to Contractor to enter upon
Railway Property and as an inducement for such entry, Contractor, effective on the date
of the Agreement, has agreed and does hereby agree with Railway as follows:
1) RELEASE OF LIABILITY AND INDEMNITY
Contractor hereby waives, releases, indemnifies, defends and holds harmless
Railway for all judgments, awards, claims, demands, and expenses (including
attorneys' fees), for injury or death to all persons, including Railway's and
Contractor's officers and employees, and for loss and damage to property
belonging to any person, arising in any manner from Contractor's or any of
Contractor's subcontractors' acts or omissions or any work performed on or
about Railway's property or right-of-way.
This obligation shall not include such claims, costs, damages, or expenses
which may be caused by the sole negligence of Railway or its contractors,
47 of 62
M.
agents or employees; Provided, that if the claims or damages are caused
by or result from the concurrent negligence or other acts or omissions of
(a) Railway, its contractors, agents or employees and (b) Contractor, its
subcontractors, agents or employees, this provision shall be valid and
enforceable only to the extent of the negligence of the Contractor, its
subcontractors, agents or employees.
It is mutually negotiated between the parties that the indemnification
obligation shall include all claims brought by Contractor's employees
against Railway, its agents, servants, employees or otherwise, and
Contractor expressly waives its immunity under the industrial insurance
act (RCW Title 51) and assumes potential liability for all actions brought by
its employees.
THE INDEMNIFICATION OBLIGATION ASSUMED BY CONTRACTOR
INCLUDES ANY CLAIMS, SUITS OR JUDGMENTS BROUGHT AGAINST
RAILWAY UNDER THE FEDERAL EMPLOYEE'S LIABILITY ACT,
INCLUDING CLAIMS FOR STRICT LIABILITY UNDER THE SAFETY
APPLIANCE ACT OR THE LOCOMOTIVE INSPECTION ACT, WHENEVER SO
CLAIMED.
Contractor further agrees, at its expense, in the name and on behalf of Railway,
that it will adjust and settle all claims made against Railway, and will, at Railway's
discretion, appear and defend any suits or actions of law or in equity brought
against Railway on any claim or cause of action arising or growing out of or in
any manner connected with any liability assumed by Contractor under this
Agreement for which Railway is liable or is alleged to be liable. Railway will give
notice to Contractor, in writing, of the receipt or dependency of such claims and
thereupon Contractor must proceed to adjust and handle to a conclusion such
claims, and in the event of a suit being brought against Railway, Railway may
forward summons and complaint or other process in connection therewith to
Contractor, and Contractor, at Railway's discretion, must defend, adjust, or settle
such suits and protect, indemnify, and save harmless Railway from and against
all damages, judgments, decrees, attorney's fees, costs, and expenses growing
out of or resulting from or incident to any such claims or suits.
In addition to any other provision of this Agreement, in the event that all or any
portion of this Article shall be deemed to be inapplicable for any reason, including
without limitation as a result of a decision of an applicable court, legislative
enactment or regulatory order, the parties agree that this Article shall be
interpreted as requiring Contractor to indemnify Railway to the fullest extent
permitted by applicable law.
It is mutually understood and agreed that the assumption of liabilities and
indemnification provided for in this Agreement survive any termination of this
Agreement.
48 of 62
F.*N
2) TERM
This Agreement is effective from the date of the Agreement until (i) the
completion of the project set forth herein, and (ii) full and complete payment to
Railway of any and all sums or other amounts owing and due hereunder.
3) INSURANCE
Contractor shall, at its sole cost and expense, procure and maintain during the
life of this Agreement the following insurance coverage:
A. Commercial General Liability insurance. This insurance shall contain broad
form contractual liability with a combined single limit of a minimum of
$5,000,000 each occurrence and an aggregate limit of at least $10,000,000
but in no event less than the amount otherwise carried by the Contractor.
Coverage must be purchased on a post 2004 ISO occurrence form or
equivalent and include coverage for, but not limit to the following:
+ Bodily Injury and Property Damage
♦ Personal Injury and Advertising Injury
♦ Fire legal liability
+ Products and completed operations
This policy shall also contain the following endorsements, which shall be
indicated on the certificate of insurance:
♦ The definition of insured contract shall be amended to remove any
exclusion or other limitation for any work being done within 50 feet of
railroad property.
♦ Waver of subrogation in favor of and acceptable to Railway.
♦ Additional insured endorsement in favor of and acceptable to Railway.
♦ Separation of insureds.
+ The policy shall be primary and non-contributing with respect to any
insurance carried by Railway.
It is agreed that the workers' compensation and employers' liability related
exclusions in the Commercial General Liability insurance policy(s) required
herein are intended to apply to employees of the policy holder and shall not
apply to Railway employees.
No other endorsements limiting coverage as respects obligations under this
Agreement may be included on the policy with regard to the work being
performed under this agreement.
49 of 62
M,
B. Business Automobile Insurance. This insurance shall contain a combined
single limit of at least $1,000,000 per occurrence, and include coverage for,
but not limited to the following:
♦ Bodily injury and property damage
* Any and all vehicles owned, used or hired
The policy shall also contain the following endorsements or language, which
shall be indicated on the certificate of insurance:
♦ Waiver of subrogation in favor of and acceptable to Railway.
♦ Additional insured endorsement in favor of and acceptable to Railway.
♦ Separation of insureds.
♦ The policy shall be primary and non-contributing with respect to any
insurance carried by Railway.
C. Workers Compensation and Employers Liability insurance including coverage
for, but not limited to:
* Contractor's statutory liability under the worker's compensation laws of
the state(s) in which the work is to be performed. If optional under
State law, the insurance must cover all employees anyway.
♦ Employers' Liability (Part B) with limits of at least $500,000 each
accident, $500,000 by disease policy limit, $500,000 by disease each
employee.
This policy shall also contain the following endorsements or language, which
shall be indicated on the certificate of insurance:
* Waiver of subrogation in favor of and acceptable to Railway.
D. Railroad Protective Liability insurance naming only the Railway as the
Insured with coverage of at least $5,000,000 per occurrence and $10,000,000
in the aggregate. The policy Must be issued on a standard ISO form CG 00
35 12 04 and include the following:
♦ Endorsed to include the Pollution Exclusion Amendment
♦ Endorsed to include the Limited Seepage and Pollution Endorsement.
♦ Endorsed to remove any exclusion for punitive damages.
* No other endorsements restricting coverage may be added.
♦ The original policy must be provided to the Railway prior to performing
any work or services under this Agreement
♦ Definition of "Physical Damage to Property" shall be endorsed to read:
"means direct and accidental loss of or damage to all property owned
by any named insured and all property in any named insured' care,
50 of 62
M.
custody, and control arising out of the acts or omissions of the
contractor named on the Declarations.
In lieu of providing a Railroad Protective Liability Policy, Licensee may participate
(if available) in Railway's Blanket Railroad Protective Liability Insurance Policy.
Other Requirements:
Where allowable by law, all policies (applying to coverage listed above) shall
contain no exclusion for punitive damages.
Contractor agrees to waive its right of recovery against Railway for all claims and
suits against Railway. In addition, its insurers, through the terms of the policy or
policy endorsement, waive their right of subrogation against Railway for all
claims and suits. Contractor further waives its right of recovery, and its insurers
also waive their right of subrogation against Railway for loss of its owned or
leased property or property under Contractor's care, custody or control.
Allocated Loss Expense shall be in addition to all policy limits for coverages
referenced above.
Contractor is not allowed to self-insure without the prior written consent of
Railway. If granted by Railway, any self-insured retention or other financial
responsibility for claims shall be covered directly by Contractor in lieu of
insurance. Any and all Railway liabilities that would otherwise, in accordance
with the provisions of this Agreement, be covered by Contractor's insurance will
be covered as if Contractor elected not to include a deductible, self-insured
retention or other financial responsibility for claims.
Prior to commencing services, Contractor shall furnish to Railway an acceptable
certificate(s) of insurance from an authorized representative evidencing the
required coverage(s), endorsements, and amendments. The certificate should be
directed to the following address:
BNSF Railway Company
c/o CertFocus
P.O. Box 140528
Kansas City, MO 64114
Toll Free: 877-576-2378
Fax number: 817-840-7487
Email: BINISFOcertfocus.com
www.certfocus.com
51 of 62
L-* I •
Contractor shall notify Railway in writing at least 30 days prior to any
cancellation, non-renewal, substitution or material alteration.
Any insurance policy shall be written by a reputable insurance company
acceptable to Railway or with a current Best's Guide Rating of A- and Class VII
or better, and authorized to do business in the state(s) in which the service is to
be provided.
If coverage is purchased on a "claims made" basis, Contractor hereby agrees to
maintain coverage in force for a minimum of three years after expiration,
cancellation or termination of this Agreement. Annually Contractor agrees to
provide evidence of such coverage as required hereunder.
Contractor represents that this Agreement has been thoroughly reviewed by
Contractor's insurance agent(s)/broker(s), who have been instructed by
Contractor to procure the insurance coverage required by this Agreement.
Not more frequently than once every five years, Railway may reasonably modify
the required insurance coverage to reflect then-current risk management
practices in the railroad industry and underwriting practices in the insurance
industry.
If any portion of the operation is to be subcontracted by Contractor, Contractor
shall require that the subcontractor shall provide and maintain insurance
coverage(s) as set forth herein, naming Railway as an additional insured, and
shall require that the subcontractor shall release, defend and indemnify Railway
to the same extent and under the same terms and conditions as Contractor is
required to release, defend and indemnify Railway herein.
Failure to provide evidence as required by this section shall entitle, but not
require, Railway to terminate this Agreement immediately. Acceptance of a
certificate that does not comply with this section shall not operate as a waiver of
Contractor's obligations hereunder.
The fact that insurance (including, without limitation, self-insurance) is obtained
by Contractor shall not be deemed to release or diminish the liability of
Contractor including, without limitation, liability under the indemnity provisions of
this Agreement. Damages recoverable by Railway shall not be limited by the
amount of the required insurance coverage.
In the event of a claim or lawsuit involving Railway arising out of this agreement,
Contractor will make available any required policy covering such claim or lawsuit.
These insurance provisions are intended to be a separate and distinct obligation
on the part of the Contractor. Therefore, these provisions shall be enforceable
and Contractor shall be bound thereby regardless of whether or not indemnity
52 of 62
RYA
provisions are determined to be enforceable in the jurisdiction in which the work
covered hereunder is performed.
For purposes of this section, Railway shall mean "Burlington Northern Santa Fe
LLC", "BNSF Railway Company" and the subsidiaries, successors, assigns and
affiliates of each.
4) SALES AND OTHER TAXES
In the event applicable sales taxes of a state or political subdivision of a state of
the United States are levied or assessed in connection with and directly related
to any amounts invoiced by Contractor to Railway ("Sales Taxes"), Railway shall
be responsible for paying only the Sales Taxes that Contractor separately states
on the invoice or other billing documents provided to Railway; provided, however,
that (i) nothing herein shall preclude Railway from claiming whatever Sales Tax
exemptions are applicable to amounts Contractor bills Railway, (ii) Contractor
shall be responsible for all sales, use, excise, consumption, services and other
taxes which may accrue on all services, materials, equipment, supplies or
fixtures that Contractor and its subcontractors use or consume in the
performance of this Agreement, (iii) Contractor shall be responsible for Sales
Taxes (together with any penalties, fines or interest thereon) that Contractor fails
to separately state on the invoice or other billing documents provided to Railway
or fails to collect at the time of payment by Railway of invoiced amounts (except
where Railway claims a Sales Tax exemption), and (iv) Contractor shall be
responsible for Sales Taxes (together with any penalties, fines or interest
thereon) if Contractor fails to issue separate invoices for each state in which
Contractor delivers goods, provides services or, if applicable, transfers intangible
rights to Railway.
Upon request, Contractor shall provide Railway satisfactory evidence that all
taxes (together with any penalties, fines or interest thereon) that Contractor is
responsible to pay under this Agreement have been paid. If a written claim is
made against Contractor for Sales Taxes with respect to which Railway may be
liable for under this Agreement, Contractor shall promptly notify Railway of such
claim and provide Railway copies of all correspondence received from the taxing
authority. Railway shall have the right to contest, protest, or claim a refund, in
Railway's own name, any Sales Taxes paid by Railway to Contractor or for which
Railway might otherwise be responsible for under this Agreement; provided,
however, that if Railway is not permitted by law to contest any such Sales Tax in
its own name, Contractor shall, if requested by Railway at Railway's sole cost
and expense, contest in Contractor's own name the validity, applicability or
amount of such Sales Tax and allow Railway to control and conduct such
contest.
53 of 62
FOP
Railway retains the right to withhold from payments made under this Agreement
amounts required to be withheld under tax laws of any jurisdiction. If Contractor
is claiming a withholding exemption or a reduction in the withholding rate of any
jurisdiction on any payments under this Agreement, before any payments are
made (and in each succeeding period or year as required by law), Contractor
agrees to furnish to Railway a properly completed exemption form prescribed by
such jurisdiction. Contractor shall be responsible for any taxes, interest or
penalties assessed against Railway with respect to withholding taxes that
Railway does not withhold from payments to Contractor.
5) EXHIBIT "C" CONTRACTOR REQUIREMENTS
The Contractor must observe and comply with all provisions, obligations,
requirements and limitations contained in the Agreement, and the Contractor
Requirements set forth on Exhibit "C" attached to the Agreement and this
Agreement, including, but not be limited to, payment of all costs incurred for any
damages to Railway roadbed, tracks, and/or appurtenances thereto, resulting
from use, occupancy, or presence of its employees, representatives, or agents or
subcontractors on or about the construction site. Contractor shall execute a
Temporary Construction Crossing Agreement or Private Crossing Agreement
(httn://www.bnsf.com/communities/faqs/Sermits-real-estate/), for any temporary
crossing requested to aid in the construction of this Project, if approved by BNSF.
Contractor is responsible for and hereby indemnifies and holds harmless Railway
(including its affiliated railway companies, and its tenants) for, from and against
all damages arising from any unscheduled delay to a freight or passenger train
which affects Railway's ability to fully utilize its equipment and to meet customer
service and contract obligations. Contractor will be billed, as further provided
below, for the economic losses arising from loss of use of equipment, contractual
loss of incentive pay and bonuses and contractual penalties resulting from train
delays, whether caused by Contractor, or subcontractors, or by the Railway
performing work under this Agreement. Railway agrees that it will not perform
any act to unnecessarily cause train delay.
For loss of use of equipment, Contractor will be billed the current freight train
hour rate per train as determined from Railway's records. Any disruption to train
traffic may cause delays to multiple trains at the same time for the same period.
Additionally, the parties acknowledge that passenger, U.S. mail trains and certain
other grain, intermodal, coal and freight trains operate under incentive/penalty
contracts between Railway and its customer(s). Under these arrangements, if
Railway does not meet its contract service commitments, Railway may suffer loss
54 of 62
•
of performance or incentive pay and/or be subject to penalty payments.
Contractor is responsible for any train performance and incentive penalties or
other contractual economic losses actually incurred by Railway which are
attributable to a train delay caused by Contractor or its subcontractors.
The contractual relationship between Railway and its customers is proprietary
and confidential. In the event of a train delay covered by this Agreement,
Railway will share information relevant to any train delay to the extent consistent
with Railway confidentiality obligations. The rate then in effect at the time of
performance by the Contractor hereunder will be used to calculate the actual
costs of train delay pursuant to this agreement.
Contractor and its subcontractors must give Railway's representative
) _ (_J weeks advance notice of the times and
dates for proposed work windows. Railway and Contractor will establish mutually
agreeable work windows for the project. Railway has the right at any time to
revise or change the work windows due to train operations or service obligations.
Railway will not be responsible for any additional costs or expenses resulting
from a change in work windows. Additional costs or expenses resulting from a
change in work windows shall be accounted for in Contractor's expenses for the
project.
Contractor and subcontractors must plan, schedule, coordinate and conduct all
Contractor's work so as to not cause any delays to any trains.
55 of 62
M
IN WITNESS WHEREOF, each of the parties hereto has caused this Agreement to be
executed by its duly authorized officer the day and year first above written.
<%Contractor.Leqa11Name%>
In
Printed Name:
Title:
Contact Person:
Address:
City:
State: Zip:
Fax:
Phone:
E-mail:
56 of 62
BNSF Railway Company
M
Name: Richard W. Wagner
Manager Public Projects NW Division
Accepted and effective on 2016.
91
57 of 62
r
[]ate:
Mr./M8.
Exhibit E
[Public Projects a
[Name of Agency Here]
[Address for Agency]
Re: Final Anornvo| of Plans and Specifications dated . 20_, drafted
by [insert name of architecture or engineering
firm here] (hereinafter called, the "Plans and Specifications")
Dear
This letter serves as BNSF RAILWAY COMPANY's ("BNSF") final written approval of the Plans
and Specifications covering the construction Of
[insert description of the project here]. This final written approval is given to
[insert name of Agency here] ("Agency") pursuant to Article |||. Section 1
of that certain Underpass Agreement between BNGF and Agency. dated 20 '
which this Exhibit Eio attached 10 and made o part thereof.
If the Plans and Specifications are revised by Agency subsequent to the date set forth above,
this letter shall no longer serve as final written approval of the Plans and GoeoifiooUona and
Agency must resubmit said Plans and Specifications to BNSF for final written approval.
It is understood that the approvals contained in this letter do not covmr, the approvals of plans
and specifications for any to|sevvorh, ahoring, and demolition that may be subsequently
submitted to BN8F by CITY or its contractor for approval.
BNSF has not reviewed the design details or calculations for structural integrity or engineering
accuracy. BNSF accepts no responsibility forerrorsoromissions in the deeiqnVf the mroient.
Regards,
[Public Projects Manager's Name]
����
Exhibit F
BNSF Bridge Requirements
BRIDGE DESIGN, PLANS & SPECIFICATIONS:
Except for the design of temporary falsework and shoring, BNSF review of the Structure plans
will be limited to the vertical and horizontal clearances, sight distance for existing train signals,
foundation dimensions and drainage characteristics as they relate to existing and future tracks.
BNSF will not review structural design calculations for the pennanent Structure unless a member
or members are influenced by railroad live loads.
Temporary falsework and shoring plans and calculations must be reviewed and approved by
BNSF prior to beginning construction. The Agency shall perform an independent review of the
design calculations for temporary falsework and shoring prior to submitting them to BNSF for
approval. Temporary construction clearances must be no less than 15 feet measured horizontally
from the centerline of the nearest track and 21 feet -6 inches measured vertically from the top of
rail of the most elevated track to the bottom of lowest temporary falsework member. State
regulatory agencies may have more restrictive requirements for temporary railroad clearances.
For the permanent Structure, the Agency will submit plans showing the least horizontal distance
from the centerline of existing and future tracks to the face of the nearest member of the
proposed Structure. The location of the least horizontal distance must be accurately described
such that BNSF can determine where it will occur in both the horizontal and vertical plane. If
the permanent member is within 25 feet of the nearest track (or future track), collision walls shall
be incorporated into the permanent Structure design according to American Railway Engineering
and Maintenance Association Manual of Recommended Practice - Chapter 8 - Article 2.1.5.
For the permanent Structure, the Agency will submit plans showing the least vertical clearance
from top of the most elevated rail of existing and future tracks to the lowest point of the proposed
Structure. A profile of the existing top of rail elevation shall be plotted on the bridge plans. The
profile shall extend for 500 feet in each direction of the proposed Bridge and a separate profile
shall be plotted for each track. If the existing top of rail profile(s) is not uniform such that a sag
exists in the vicinity of the proposed Structure, the permanent Structure vertical clearance shall
be increased sufficiently to accommodate a raise in the track profile to remove the sag. Prior to
beginning construction of the permanent Structure, the top of rail elevations should be checked
and verified that they have not changed from the assumed elevations utilized for the design of the
bridge.
Prior to issuing any invitation to bid on construction of the Structure, the Agency should
conduct a pre -bid meeting where prospective Providers have the opportunity to communicate
with BNSF personnel regarding site specific train speeds, train density, and general safety
requirements for men and equipment working near live tracks. Any invitation to bid and
59 of 62
b
specifications for the Structure must be submitted to BN6F for review and approval prior to
letting nfbids for the Project.
BRIDGE (}N:
After awarding the bid, but prior to the Provider entering 0NSF`s —way or property, the
Agency should conduct a pre-construction meeting with BN8F personnel ill attendance to
reiterate the safety requirements of construction activity adjacent to live tracks.
[}uhxg construction, BN0F may require an independent engineering inspector to be present
during ccdoio critical activities of the Project, including but not |inohcd to: driving foundation
piles, erecting bzlmcvvork, construction of shoring and retaining *a|io, placing concrete, placing
uni| b4okfii\ and compaction processes. The Agency shall reimburse BNSF for all costs of
supplemental inspection services,
Within 90 days of the conclusion of the Project and final acceptance bvBNSFthe Agency will
provide BY4SFvvith anoozpinte electronic set ofthe bridge plans labeled ^\Am Built`. Those plans
will reflect any and all deviations from the original plans that occurred during construction. The
^^/\m Built" plans will be submitted in Micro Station *.dgn c|cotnoniu format (preferred) or
/\utoCAD *.dvvg fboou1. ElcotnVolc plans are 1n be submitted in the original format used for
CAD p)uo preparation and not converted to another format prior to submission. Actual
measured "as constructed" clearances shall be shown uswell aa depth, size and location of all
foundation components. The plans shall show dimensioned locations nf existing and relocated
The Agency will be responsible for maintenance and repair nfthe Structure including the earth
retention components, embankment slopes, erosion control, surface drainage, fencing, deck
drains, landscaping, paint, vvu|knmvn, handrails, lighting, and other improvements associated
with the Project.
Fencing and other pedestrian access controls within BNSF`s and incorporated into
the Project shall be designed and maintained 6v the Agency. Trespasser control shall be the
responsibility of the Agency. Graffiti removal will be the responsibility of the Agency.
BRIDGE INSPECTION:
The Agency will conduct annual roxduc structural inspections. Lu the event ofuu
fire, flood, damage from vehicular impacts nc other emergent situations, the Agency will provide
ou immediate inspection bvqualified personnel and notify IBNSFof damage that may affect safe
passage of trains. lf necessary the Agency will eo`hacgn weights or provide lane closures or
H-17-W.-N
other such measures to protect the structural integrity of the Structure such that there can be
continuous safe passage of trains until repairs are made.
BRIDGE ALTERATIONS:
Except as provided otherwise by this Agreement, there will be no alterations made to the
Structure that will alter the railroad vertical or horizontal clearances provided by the original
design. Pipelines will be not be added or attached to the Structure without first submitting plans
and calculations to BNSF for review and approval.
61 of 62
••
Exhibit G
Avenue Grade Separation Project
Estimated Total Project Cost
62 of 62
97
••
tMej
A-1
12,
AUTHORITY FOR EXPENDITURE
..............
LOCATION BOEING
----------
LINE SEGMENT 51
------ - ---------- -------- ------ — - ---------------
AFENUMBER
-------
PLAN(TEM NUMBER 229244001
MILEPOST 77,02
RFA NUMBER
5928516
PROPERTY OF BNSF RAILWAY COMPANY
DIVISION N\V
CPAR NUNIBER
CF1960016
OPERATED BY BNSF RAILWAYCOMPANY
SUBDIVISION SEATTLE
BUDGETYEAR
2016
JOINT FACILITY CI"TYOF TUKWILA
TRACK TYPE 3
BUDGETCLASS
6
BILLABLE 1000
TAX STATE %VA
REPORTING OFFICE
716
-- - ------- ----------- --- -------- ......
SPONSOR VP ENGWEEREN'O
-------- - -------------------- - --------------
CENTER/ROLLUII
--------------- -- -------------- ---------------
29125
— -----
PURPOSE, JUSTIFICATION AND DESCRIPTION,
0
0
0
PIP ENGINEERING INSPECTION N%VN DIV SEATTLE SUB LS 51 NIP 7 02X - DOT P 085597G
- BOEING ACCESS BRIDGE.
100',6 BILLABLE TO
CITY OF TUKWILA, WA
PRINIARY FUNDM SOURCE IS CITY
FUNDS
- BUY AMERICAN) APPLIES 1*
PLAN ITEM LINE SEG BEG NIP END NIP
TRKNBR BEGIN STATION END STATION
PROJECT TYPE
BUD YEAR
229244001 51 702 702
3 BOEING BOEING
INSPECTOR/ COORDINATOR 2016
SYSTEM MAINTENANCE AND PLANNING
ESTIMATE REP NUMBER 5928516
COSTING DATE 05/11/3016
Page 1 of 2
HUNTED ON 051130-016
ESTIMATED BY Elkins
PRINTED BY Elkins
I
CASH CAPITAL
NONCASH CAPITAL
OPERATING EXP
REMOVAL COSTS
BILLABLE
TOTALS
LABOR COSTS
0
0
0
0
0
0
NIATEP IAL COSTS
0
0
0
0
0
0
OTHER COSTS
0
0
0
0
46,662
46,662
TOTALS
0
0
0
0
46.662
46662
SYSTEM MAINTENANCE AND PLANNING
ESTIMATE REP NUMBER 5928516
COSTING DATE 05/11/3016
Page 1 of 2
HUNTED ON 051130-016
ESTIMATED BY Elkins
PRINTED BY Elkins
I
NI.AINTAI,', PROPRIETARY CONFIDEN"fiALI'F)'
BN'SF RAILWAY COMPANY
FHPM ESTIMATE FOR
CITY OF 1 UKWILA
LOCATION BOEING DETAILS OF ESTIM.Al E PLAN ITEM 229244001 VERSION I
PURPOSE, JUSTIFICATION AND DESCRIPTION
11111 ENGINEERING INSPECTION NWIN DIV SEATTLE SUB LS 51 MP 7 02,X - DOT 9 035597G - BOEING ACCESS BRIDGE - 100%5 BILLABLE TO
CITY OFTUKWILA, WA
REQUESTOR TYLER SCOT-rGEYER05(09/16
PRIMARY FUNDING SOURCE IS CITY FUNDS
as BUY AMERICAN) APPLIES "
DESCRIPTION
QUANTITY UNI COST
TOTALS
LABOR
adiaadia is
TOTAL LABOR COST
0
0
NIATEFUAL
...........
ToTAI, MATERIAL COST
0
0
OTHER
..........
ENGINEERING INSPECTION
4 0 LS 42,000
TOTAL OTHER ITEMS COST
42,000
42,000
PROJECT SUBTOTAL
42,000
CONTINGENCIES
4,200
BILL PREPARATION FEE
462
GROSS PROJECT COST
46,662
LESS COST PAID BY BNSF
0
TOTAL BILLABLE COST
46,662
Page 2 of 2
100
LOCATION
BOEING
PLANITFM NUMBER
229244000
PROPERTY OF
BNSF RAILWAY CONIPANY
OPERATED B Y
BNSF RAILWAY COMPANY
JOINT- FACILITY
CITY OF 7UKWILA
% BILLABLE (+/-)
1000
AUTHORITY FOR EXPENDITURE
LINE S E GN I ENT
5I
MILEPOST
7 02
DIVISION
NW
SUBDIVISION
SEATTLE
TRACK TYPE
3
TAX STATE
WA
SPONSOR
VP ENGINEERING
AFE NUMBER,
CASH CAPITAL
REA NUMBER
5925416
CPAR NUNIBER
CB960016
BUDGET YEAR
2016
BUDGET CLASS
6
REPORTING OFFICE
716
CENTERJROLLUP
29123
7, gy e — —e-
fr, I IL
PURPOSE, JUSTIFICATION AND DESCRIPTION
PIP FLAGGING NWN DIV SEATTLE SUB LS 51 NIP 7 02X - DOT' 085597G - BOEING ACCESS BRIDGE - 100',6 BILLABLE TO CITY OF TUKWILA,
%VA
PRINIARYFUNI)MG SOURCE IS CITY FUNDS
- BUYANIERICA(N) APPLIES -
PLAN ITENI LINE SEG BEG NIP END NIP TRK NBR BEGIN STATION END STATION PROJECT TYPE BUD YEAR
229244000 51 702 702 3 BOEING BOEING FLAGGING 2016
SYSTEM MAINTENANCE AND PLANNING
ESTIMATE REF NUMBER 5928416
COSTING DATE 05/11/2016
Page 1 of 2
PRINTED ON 0513'2016
ESTINIATED BY Elkins
PRINTED BY Elkins
101
CASH CAPITAL
NONCASH CAPITAL
OPERATING EXP
REMOVAL COSTS
BILLABLE
TOTALS_
LABOR COSTS
0
0
0
0
84,999
84,999
NIATERIAL COSTS
0
0
0
0
0
0
OTHER COSTS
0
0
0
0
17,767
17,767
TOTALS
0
0
0
0
102,766
102,766
SYSTEM MAINTENANCE AND PLANNING
ESTIMATE REF NUMBER 5928416
COSTING DATE 05/11/2016
Page 1 of 2
PRINTED ON 0513'2016
ESTINIATED BY Elkins
PRINTED BY Elkins
101
NIAINTAINPROPRIEI'ARYCONFIDENTIALITY
B,",'SF R-All- WAY COMPANY
FT IPM ESTINIATE FOR
CITY OF TLJKWILA
LOCATION BOEING DETAILS OF ESTIMATE PLAN ITEM 229244000 VERSION I
PURPOSE, JUSTIFICATION AND DESCRIPTION
PIP FLAGGING NWN DIV SEATI LF SUB LS 51 Nit' 1.02X - DOT 9 0855970 BOEING ACCESS BRIDGE - 100% BILLABLE TO CITY OF TUKwILA
WA
REQUESTOR TYLER SCOTT GEYER05/09116
PRINIARYFUNDENG SOURCE IS CITY FUNDS
BUYANIERICA(N) APPLIES
DESCRIPTION QUANTITY LIN I COST TOTAL $
LABOR
«...... « «.
FLAGGING - GRADING - CAP
PAYROLL ASSOCIATED COSTS
DA OVERHEADS
EQUIPMENT EXPENSES
INSURANCE EXPENSES
TOTAL, LABOR COST
-.1 ........
MATERIAL
TOTAL MATERIAL COST
..........
OTHER
RENTAL VEHICLE
TOTAL OTHER ITEMS COST
PROJECT SUBTOTAL
CONTINGENCIES
BILL PREPARATION FEE
GROSS PROJECT COST
LESS COST PAID BY BNSF
TOTAL BILLABLE COST
102
Page 2 of 2
900 0 NTH 27,731
18,213
26,929
7,470
4,656
75 0 DAY
84,999 84,999
0
7,500
7,500 7,500
92,499
9,249
0
102,766
TRANSPORTATION COMMITTEE
City of Tukwila
City Council Transportation Committee
Meeting Minutes
November 7, 2016 -5.30 P.M. — Foster Conference Room, 630o Building
Councilmembers: Dennis Robertson, Chair; Verna Seal, De'Sean Quinn
Staff: David Cline, Bob Giberson, Ryan Larson, Gail Labanara, Steve Carstens, Scott
Bates, and Laurel Humphrey
CALL TO ORDER: Committee Chair Robertson called the meeting to order at 5:30 p.m.
I. PRESENTATIONS
II. BUSINESS AGENDA
A. Overpass Aareement: Boeina Access Road over BNRR Bridae Rehabilitation Proiect
Staff is seeking Council approval of an Overpass Agreement with BNSF in the amount of
$149,428.0o for the Boeing Access Road over BNRR Rehabilitation Project. This is required for
construction and maintenance costs related to work over the railroad right -of -way and covers
inspection and flagging services required by BNSF. UNANIMOUS APPROVAL. FORWARD TO
NOVEMBER 21.2o16 REGULAR CONSENT AGENDA.
B. Supplemental Agreement: 42r'd Avenue South (South 16oth Street — South 131St Place) Phase III
Staff is seeking Council approval of Supplemental Agreement No. 6 to Contract No. 12 -010 in the
amount of $218,783.05 with CH2M Hill forthe 42nd Avenue South Phase III Project combined with
the Gilliam Creek Culvert design. The project is at 900/6 design and this supplement will redesign
the relocation of storm water detention facilities in compliance with the City's shoreline buffer
requirements and plan mitigation for landscaping and stream relocation. Additional utility
coordination will also be required. Funding for this design is available from the proposed
increased construction budget as reflected on the updated CIP page. UNANIMOUS
APPROVAL. FORWARD TO NOVEMBER 14,2o16 COMMITTEE OF THE WHOLE.
C. Bid Award: Tukwila International Boulevard and South ILLth Street Midblock Crossina
Staff is seeking Council approval of a construction contract in the amount of $88,300.00 with
Westwater Construction Company for the Tukwila International Boulevard and South 144th
Street Midblock Crossing. This project will retrofit the crossing with Rapid Flashing Rectangular
beacons and ADA compliant curb ramps. Westwater was the low bidder of three bids received in
October. UNANIMOUS APPROVAL. FORWARD TO NOVEMBER 21, 2o16 REGULAR
CONSENT AGENDA.
D. Stop Sign and Crosswalk Guidelines
Staff provided the Committee with a briefing on how stop signs, crosswalks, speed humps, and
speed limit changes get approved for installation. Residents often make requests for traffic
calming devices, but the City must follow the 2oog Edition of the Manual on Uniform Traffic
103
104
COUNCIL AGENDA SYNOPSIS
Meefi,g Date
Pre aced by
Major,s review
Council review
11/14/16
B
❑ Resolution
Mtg Date
❑ Ordinance
Mt g Date
11/21/16
BG
n Otber
M1g Date
SPONSOR ❑ Council ❑ Mayor ❑ HR ❑ DCD ❑ Finance ❑ Fite [:] IT ❑ P&R ❑ Police ❑ PV
SPONSOR'S This Supplemental Agreement No. 6 with CH2M Hill is for the 42nd Ave S Phase III Project
SUMMARY This Supplement includes redesign and relocation of the storm water detention facilities in
order to comply with the City's shoreline buffer requirements for Gilliam Creek. It also
includes additional work with Seattle City Light, easements, and geotechnical services.
Council is being asked to approve Supplemental Agreement No. 6 to Contract No. 12-010
with CH2M Hill for $218,783.05.
REVIEWED BY ❑ cow Mtg. ❑ CA&P Cmte ❑ F&S Cmte Z Transportation Cmte
❑ Utilities Cmte ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
DATE: 11/07/16 COMMITTEE CHAIR: DENNIS ROBERTSON
RECOMMENDATIONS:
SPONSOR/ADMIN. Public Works
COMMITTFIEUnanimous Approval; Forward to Committee of the Whole
COST IMPACT/ FUND SOURCE
ExPi,'1NDITLJRI:,, REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$218,783.05 $211k and $73k $0.00
Fund Source: 103 RESIDENTIAL STREETS& 412 SURFACE WATER (PAGE2 & 100, PROPOSED 2017 CIP)
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
11/14/16
ITEM INFORMATION
ITEMNO.
CAS NUMBER:
STAFF SPONSOR: BOB GIBERSON
I ORIGINAL, AGENDA DATE: 11/14/16
AGENDA ITEM TITLE 42nd Ave S Phase III (S 160th St - Southcenter Blvd)
Supplemental Agreement No. 6 with CH2M Hill
CATEGORY Z Discussion
Mig Date 11114116
Z Motion
MtS Date 11121116
❑ Resolution
Mtg Date
❑ Ordinance
Mt g Date
n.BidAward
Mt g Date
❑ Public.Hearin
,g
Date
Mt g
n Otber
M1g Date
SPONSOR ❑ Council ❑ Mayor ❑ HR ❑ DCD ❑ Finance ❑ Fite [:] IT ❑ P&R ❑ Police ❑ PV
SPONSOR'S This Supplemental Agreement No. 6 with CH2M Hill is for the 42nd Ave S Phase III Project
SUMMARY This Supplement includes redesign and relocation of the storm water detention facilities in
order to comply with the City's shoreline buffer requirements for Gilliam Creek. It also
includes additional work with Seattle City Light, easements, and geotechnical services.
Council is being asked to approve Supplemental Agreement No. 6 to Contract No. 12-010
with CH2M Hill for $218,783.05.
REVIEWED BY ❑ cow Mtg. ❑ CA&P Cmte ❑ F&S Cmte Z Transportation Cmte
❑ Utilities Cmte ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
DATE: 11/07/16 COMMITTEE CHAIR: DENNIS ROBERTSON
RECOMMENDATIONS:
SPONSOR/ADMIN. Public Works
COMMITTFIEUnanimous Approval; Forward to Committee of the Whole
COST IMPACT/ FUND SOURCE
ExPi,'1NDITLJRI:,, REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$218,783.05 $211k and $73k $0.00
Fund Source: 103 RESIDENTIAL STREETS& 412 SURFACE WATER (PAGE2 & 100, PROPOSED 2017 CIP)
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
11/14/16
Forward to next Regular Meeting
11/21/16
MTG. DATE
ATTACHMENTS
11/14/16
Informational Memorandum dated 11/04/16
Page 2 and 100, Revised Proposed 2017
Supplement Agreement No. 6 to Contract No. 12-010
Minutes from the Transportation Committee meeting of 11/07/16
11/21/16
No attachments
I
105
106
Meelhi
,g Dale
Prepared by
Mayors "I view
Council review
11/14/16
PMC
❑ Resolution
At g Date
Z Ordinance
Aig Date 11121116
11/21/16
PMC
F-1 Other
Nltg Dale
SPONSOR ❑ Council ❑ Mayor ❑ FIR ❑ DCD E]Eina&-e ❑ Fire ❑ TS ❑ P&R E] Polwe ❑ PV
SPONSOR'S The Council is being asked to approve three property tax ordinances for the 2017 property
SUMMARY tax levy - one to authorize the levy, the second to approve an increase in the levy from the
previous year and the third to declare a substantial need so that the full 10/0 property tax
increase can be assessed.
Rj-,, V I j,"W i 1' 1) 13 y ❑ cow Mtg. ❑ CA&P Cmte ❑ F&S Cmte ❑ Transportation Cmte
❑ Utilities Cmte ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
DATE: N/A COMMIT= CHAIR: N/A
RECOMMENDATIONS:
SPONSOR /ADMIN. Finance Department
Comm"'-'T'U, Directly to C.O.W. per FS Chair and Council President
COST IMPACT / FUND SOURCE
ExPI3NI)IT0R1,1' REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
Fund Source:
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
11/14/16
ITEM INFORMATION
ITEMNO.
107
STAFF SPONSOR: PEGGY MCCARTHY
I ORIG INA]. AGFINDA 11/14/16
A(3EINDA I•n,',m Ti,rjs? Approve property tax ordinances for 2017 property tax levy.
CATEGORY Z Disxfsion
Mt Daie 11114116
❑ Motion
Mtg Date
❑ Resolution
At g Date
Z Ordinance
Aig Date 11121116
F-I.BidAxard
Mi g Date
® Pub&+Ieafing
MtS Dale 11114116
F-1 Other
Nltg Dale
SPONSOR ❑ Council ❑ Mayor ❑ FIR ❑ DCD E]Eina&-e ❑ Fire ❑ TS ❑ P&R E] Polwe ❑ PV
SPONSOR'S The Council is being asked to approve three property tax ordinances for the 2017 property
SUMMARY tax levy - one to authorize the levy, the second to approve an increase in the levy from the
previous year and the third to declare a substantial need so that the full 10/0 property tax
increase can be assessed.
Rj-,, V I j,"W i 1' 1) 13 y ❑ cow Mtg. ❑ CA&P Cmte ❑ F&S Cmte ❑ Transportation Cmte
❑ Utilities Cmte ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
DATE: N/A COMMIT= CHAIR: N/A
RECOMMENDATIONS:
SPONSOR /ADMIN. Finance Department
Comm"'-'T'U, Directly to C.O.W. per FS Chair and Council President
COST IMPACT / FUND SOURCE
ExPI3NI)IT0R1,1' REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
Fund Source:
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
11/14/16
Forward to next Regular Meeting
MTG. DATE
ATTACHMENTS
11/14/16
Informational Memorandum dated 11/9/16
Draft Ordinances and Preliminary Levy Limit Worksheet
11/21/16
Ordinanres (3)
107
WT.*
City of Tukwila
Washington
Ordinance No.
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
TUKWILA, WASHINGTON, LEVYING THE GENERAL TAXES
FOR THE CITY OF TUKWILA IN KING COUNTY FOR THE
FISCAL YEAR COMMENCING JANUARY 1, 2017, ON ALL
PROPERTY, BOTH REAL AND PERSONAL, IN SAID CITY,
THAT IS SUBJECT TO TAXATION FOR THE PURPOSE OF
PAYING SUFFICIENT REVENUE TO CARRY ON THE
SERVICES OF THE SEVERAL DEPARTMENTS OF SAID CITY
FOR THE ENSUING YEAR, WITH AN EXCESS PROPERTY TAX
LEVY FOR THE PURPOSE OF PAYING DEBT SERVICE ON
THE CITY'S UNLIMITED TAX GENERAL OBLIGATION BONDS
ISSUED IN 2016, AS REQUIRED BY LAW; PROVIDING FOR
SEVERABILITY; AND ESTABLISHING AN EFFECTIVE DATE.
WHEREAS, the City Council of the City of Tukwila has considered the City's
anticipated financial requirements for 2017 and the amounts necessary and available to be
raised by ad valorem taxes on real, personal and utility property; and
WHEREAS, the following sentence is provided for information only: The maximum
Statutory Levy Rate for the City of Tukwila, as allowed by RCW 84.52.043, is $3.825,
which includes $0.225 for the Firemen's Pension Fund as allowed by RCW 41.16.060; and
WHEREAS, the City, pursuant to an ordinance adopted by the City Council, has
authorized the issuance and sale of $36,500,000 principal amount of the City's Unlimited
Tax General Obligation Bonds, 2016 (the "Bonds "), and has determined that to provide the
money necessary to pay the debt service requirements on the Bonds in the year 2017 an
excess property tax levy in the amount of $2,699,000 for the Bonds must be levied in year
2016, and collected in year 2017; and
WHEREAS, the final assessed valuation calculation has been determined;
W: Word Processing \Ordinances \General Tax Levy + Excess Levy 11- 9- 16.doc
vc:b)s Page 1 of 3
109
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY ORDAINS AS FOLLOWS:
Section 1. Regular and Excess Tax Levy.
A. There shall be and hereby is levied on all real, personal and utility property in the
City of Tukwila, in King County, whose estimated assessed valuation is $5,751,820.403
current taxes for the ensuing year commencing January 2017, in the amount and at the
rates specified below:
Rate Amount
Regular Tax Levy $2.58 $15,200,000
Excess Tax Levy $0.47 $ 2,699,000
B. The said taxes herein provided for are levied for the purpose of payment upon the
general bonded indebtedness of the City of Tukwila, the General Fund, and for the
maintenance of the departments of the municipal government of the City of Tukwila for the
fiscal year beginning January 1, 2017.
C. The excess levy is levied for the purpose of debt service payments on the
unlimited tax obligation bonds sold to finance costs related to the City's Public Safety
Plan, as submitted to the qualified electors of the City at a special election held on
November 8, 2016.
Section 2. Collection. This ordinance shall be certified to the proper County
officials, as provided by law, and taxes here levied shall be collected to pay to the Finance
Director of the City of Tukwila at the time and in the manner provided by the laws of the
State of Washington for the collection of taxes for non-chartered code cities.
Section 3. Corrections by City Clerk or Code Reviser. Upon approval of the
City Attorney, the City Clerk and the code reviser are authorized to make necessary
corrections to this ordinance, including the correction of clerical errors; references to
other local, state or federal laws, codes, rules, or regulations; or ordinance numbering
and section/subsection numbering.
Section 4. Severability. If any section, subsection, paragraph, sentence, clause or
phrase of this ordinance or its application to any person or situation should be held to be
invalid or unconstitutional for any reason by a court of competent jurisdiction, such
invalidity or unconstitutionality shall not affect the validity or constitutionality of the
remaining portions of this ordinance or its application to any other person or situation.
Section 5. Effective Date. This ordinance or a summary thereof shall be published
in the official newspaper of the City, and shall take effect and be in full force and effect
January 1, 2017.
W: Word ProcessingkOrdinanceskGeneral Tax Levy + Excess Levy 11 -9-16.doc Page 2 of 3
VC:bjs
110
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at
a Regular Meeting thereof this day of 12016.
ATTEST/AUTHENTICATED:
Christy OFlaherty, MMC, City Clerk
Rachel B. Turpin, City Attorney
Allan Ekberg, Mayor
Filed with the City Clerk:
Passed by the City Council:
Published:
Effective Date:
Ordinance Number:
W: Word Processing\Ordinances\General Tax Levy + Excess Levy 11-9-16.doc
VC:bjs
Page 3 of 3
111
112
City of Tukwila
Washington
Ordinance No.
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY
OF TUKWILA, WASHINGTON, RELATING TO THE
LIMITING FACTOR FOR THE REGULAR PROPERTY
TAX LEVY ABOVE THE RATE OF INFLATION (IMPLICIT
PRICE DEFLATOR); PROVIDING FOR SEVERABILITY;
AND ESTABLISHING AN EFFECTIVE DATE.
WHEREAS, the City Council of the City of Tukwila has considered its budget for the
2017-2018 biennium; and
WHEREAS, in the course of considering the 2017-2018 biennial budget, the City
Council reviewed all sources of revenue and examined all anticipated expenses and
obligations; and
WHEREAS, due to the needs regarding parks, residential and arterial streets, City
facilities, and police and fire services, the City Council found there is substantial need to
increase the regular property tax limit factor above the rate of inflation; and
WHEREAS, the City Council desires to continue that rate in order to meet service
needs in the City in 2017 and beyond;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY ORDAINS AS FOLLOWS:
Section 1. Regular Tax Levy. The City Council of the City of Tukwila finds there is
substantial need to increase the regular property tax limit factor above the rate of inflation,
and hereby establishes that the limit factor for the regular levy for the calendar year 2017
shall be 101% of the highest amount of the regular property taxes that could have been
lawfully levied in Tukwila in any year since 1985.
Section 2. Corrections by City Clerk or Code Reviser. Upon approval of the
City Attorney, the City Clerk and the code reviser are authorized to make necessary
corrections to this ordinance, including the correction of clerical errors; references to
other local, state or federal laws, codes, rules, or regulations; or ordinance numbering
and section/subsection numbering.
W: Word Processing\ordinances\Property tax levy limiting factor 11 -1 -1 6.doc Page 1 of 2
VC:bjs
113
Section 3. Severability. If any section, subsection, paragraph, sentence, clause or
phrase of this ordinance or its application to any person or situation should be held to be
invalid or unconstitutional for any reason by a court of competent jurisdiction, such
invalidity or unconstitutionality shall not affect the validity or constitutionality of the
remaining portions of this ordinance or its application to any other person or situation.
Section 4. Effective Date. This ordinance or a summary thereof shall be published
in the official newspaper of the City, and shall take effect and be in full force and effect
January 1, 2017.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at
a Regular Meeting thereof this day of 2016.
ATTEST/AUTHENTICATED:
Christy OFlaherty, MMC, City Clerk
Rachel B. Turpin, City Attorney
Allan Ekberg, Mayor
Filed with the City Clerk:
Passed by the City Council:
Published:
Effective Date:
Ordinance Number:
W: Word Processing\Ordinances\Property tax levy limiting factor 11 -1 -1 6.doc
VC:bjs
114
Page 2 of 2
City of Tukwila
Washington
Ordinance No.
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
TUKWILA, WASHINGTON, INCREASING THE CITY OF
TUKWILA REGULAR LEVY FROM THE PREVIOUS YEAR,
COMMENCING JANUARY 1, 2017, ON ALL PROPERTY,
BOTH REAL AND PERSONAL, IN COMPLIANCE WITH
RCW 84.55.120; PROVIDING FOR SEVERABILITY; AND
ESTABLISHING AN EFFECTIVE DATE.
WHEREAS, the City of Tukwila has properly given notice of a public hearing held on
November 14, 2016, pursuant to RCW 84.55.120; and
WHEREAS, after such hearing and after duly considering all relevant evidence and
testimony presented, the City Council has determined that in order to discharge its
expected expenses and obligations the City requires an increase in property tax revenue
from the previous year, in addition to the increase resulting from the addition of new
construction and improvements to property and any increase in the value of State-
assessed property; and
WHEREAS, the City Council has determined it is in the City's best interest and
necessary to meet its expenses and obligations for the property tax revenue to be
increased for 2017, and the final assessed valuation calculation has been determined;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY ORDAINS AS FOLLOWS:
Section 1. An increase in the regular property tax levy, in addition to any amount
resulting from the addition of new construction and improvements to property and any
increase in the value of State-assessed property, is hereby authorized for the 2017 levy in
the amount of $131,254, which is a percentage increase of 1% from the previous year.
This increase is exclusive of additional revenue resulting from new construction,
improvements to property, any increase in the value of State-assessed property, any
annexations that have occurred and refunds made.
W: Word Pror-essing\Ordinances\Regular Tax Levy Increase 11-1-16 Page 1 of 2
VC:bjs
115
Section 2. Corrections by City Clerk or Code Reviser. Upon approval of the
City Attorney, the City Clerk and the code reviser are authorized to make necessary
corrections to this ordinance, including the correction of clerical errors; references to
other local, state or federal laws, codes, rules, or regulations; or ordinance numbering
and section/subsection numbering.
Section 3. Severability. If any section, subsection, paragraph, sentence, clause or
phrase of this ordinance or its application to any person or situation should be held to be
invalid or unconstitutional for any reason by a court of competent jurisdiction, such
invalidity or unconstitutionality shall not affect the validity or constitutionality of the
remaining portions of this ordinance or its application to any other person or situation.
Section 4. Effective Date. This ordinance or a summary thereof shall be published
in the official newspaper of the City, and shall take effect and be in full force and effect
January 1, 2017.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at
a Regular Meeting thereof this day of 12016.
ATTEST/AUTHENTICATED:
Christy OFlaherty, MMC, City Clerk
00wim
Rachel B. Turpin, City Attorney
Allan Ekberg, Mayor
Filed with the City Clerk:
Passed by the City Council:
Published:
Effective Date:
Ordinance Number:
W: Word Processing\Ordinances\Regular Tax Levy Increase 11-1-16
VC: bjs
116
Page 2 of 2
COUNCIL AGENDA SYNOPSIS
Meelily
,g Dale
Prepared by
Mayors review
review
11/14/16
PMC
[_-] Resolution
M�g Date
Z Ordinance
MIS Dale 11121116
11/21/16
PMC
❑ 01ber
YVItg Dale
SPONSOR ❑ Counc7l ❑ Mayor [:]FIR ❑ DCD Z.Finance Ej Fire ❑ TS E].P&R ❑ Police ❑ PIF
SPONSOR'S The 2016 year-end budget modification amends the 2015-2016 biennial budget. Council is
SUMMARY being asked to review and approve the ordinance authorizing the amendments.
RiJ,XiF'1WF1D BY ❑ cow Mtg. Z CA&P Cmte Z F&S Cmte ❑ Transportation Cmte
❑ Utilities Cmte ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
DATE: 11/8/16 COMMITTEE CHAIR: SEAL
RECOMMENDATIONS:
SPONSOR/ADMIN. Finance Department
Comm"ITEF Unanimous Approval; Forward to Committee of the Whole
COST IMPACT / FUND SOURCE
Exj)i,"Nl)]'I'URl-'Rl3(,)Ulltl,' 'D AMOUNT BUDGETED APPROPRIATION REQUIRED
Fund Source:
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
11/14/16
ITEM INFORMATION
ITEM NO.
4.C.
117
Fr,\1,'F'SP0NS0R: PEGGY MCCARTHY
11/14/16
I,n.,"m Trri,i, Approve year-end 2016 budget amendment ordinance
CAITGORY Z Discussion
. � Dale 11114116
W/
ElMotion
Ml� Dale
[_-] Resolution
M�g Date
Z Ordinance
MIS Dale 11121116
F_I .Bid Award
MIS Dale
Z Pubficfleafil�
YW g Dale 11114116
❑ 01ber
YVItg Dale
SPONSOR ❑ Counc7l ❑ Mayor [:]FIR ❑ DCD Z.Finance Ej Fire ❑ TS E].P&R ❑ Police ❑ PIF
SPONSOR'S The 2016 year-end budget modification amends the 2015-2016 biennial budget. Council is
SUMMARY being asked to review and approve the ordinance authorizing the amendments.
RiJ,XiF'1WF1D BY ❑ cow Mtg. Z CA&P Cmte Z F&S Cmte ❑ Transportation Cmte
❑ Utilities Cmte ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
DATE: 11/8/16 COMMITTEE CHAIR: SEAL
RECOMMENDATIONS:
SPONSOR/ADMIN. Finance Department
Comm"ITEF Unanimous Approval; Forward to Committee of the Whole
COST IMPACT / FUND SOURCE
Exj)i,"Nl)]'I'URl-'Rl3(,)Ulltl,' 'D AMOUNT BUDGETED APPROPRIATION REQUIRED
Fund Source:
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
11/14/16
Forward to next Regular Meeting
MTG. DATE
ATTACHMENTS
11/14/16
Informational Memorandum dated 11/2/16
Ordinance in draft form
Year-end budget amendment detail - narrative and spreadsheet formats
Ordinance
11/21/16
117
118
City of Tukwila
Washington
Ordinance No.
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
TUKWILA, WASHINGTON, AMENDING ORDINANCE NO.
2458, WHICH ADOPTED THE CITY OF TUKWILA'S BIENNIAL
BUDGET FOR THE 2015 -2016 BIENNIUM, TO ADOPT AN
AMENDED YEAR -END BUDGET; PROVIDING FOR
SEVERABILITY; AND ESTABLISHING AN EFFECTIVE DATE.
WHEREAS, on November 17, 2014, Ordinance No. 2458 adopted the 2015 -2016
biennial budget of the City of Tukwila; and
WHEREAS, on November 14, 2016, following required public notification, the City
Council conducted a public hearing on the proposed 2016 Year -End Budget
Amendment to the 2015 -2016 Biennial Budget;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY ORDAINS AS FOLLOWS:
Section 1. Ordinance Amended. Tukwila Ordinance No. 2458 is hereby amended
with the City Council's adoption of the document entitled " 2016 Year -End Amendment
to the 2015 -2016 Biennial Budget," attached hereto and incorporated by this reference
as if fully set forth herein, in accordance with RCW 35A.34.200.
Section 2. Estimated Revenues and Appropriations. The totals of the estimated
revenues and appropriations for each separate fund amended and the aggregate
budget totals are as follows:
FUND
EXPENDITURES
REVENUES
000 General
$130,749,947
$130,749,947
103 Residential Street
13,135,671
13,135,671
104 Arterial Street
38,986,080
38,986,080
105 Contingency
6,078,6321
6,078,632
109 Drug Seizure
755,000
755,000
301 Land Acquisition
6,602,0001
6,602,000
Aggregate Budget Totals
$196,307,330
$196,307,330
W: Word Processing \Ordinances\Budget amendment -2015 -2016 year -end 11 -1 -16
Page 1 of 2
VC:bjs
119
Section 3. Copies on File. A copy of this amending ordinance shall be
transmitted by the City Clerk to the Division of Municipal Corporations of the Office of
the State Auditor and to the Association of Washington Cities.
Section 4. Corrections by City Clerk or Code Reviser. Upon approval of the
City Attorney the City Clerk and the code reviser are authorized to make necessary
I
corrections to this ordinance, including the correction of clerical errors; references to
other local, state or federal laws, codes, rules, or regulations; or ordinance numbering
and section/subsection numbering.
Section 5. Severability. If any section, subsection, paragraph, sentence, clause
or phrase of this ordinance or its application to any person or situation should be held to
be invalid or unconstitutional for any reason by a court of competent jurisdiction, such
invalidity or unconstitutionality shall not affect the validity or constitutionality of the
remaining portions of this ordinance or its application to any other person or situation.
Section 6. Effective Date. This ordinance or a summary thereof shall be
published in the official newspaper of the City, and shall take effect and be in full force
and effect five days after passage and publication as provided by law.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at
a Regular Meeting thereof this day of 12016.
ATTEST/AUTHENTICATED:
Christy O'Flaherty, MMC, City Clerk
APPROVED AS TO FORM BY:
Office of the City Attorney
Allan Ekberg, Mayor
Filed with the City Clerk:—
Passed by the City Council:
Published:
Effective Date:
Ordinance Number:
Attachment: 2016 Year-End Budget Amendment to the 2015-2016 Biennial Budget
W: Word Processing\Ordinances\Budget amendment-2015-2016 year-end 11 -1 -16
VC:bjs
120
Page 2 of 2
City of Tukwila 2016 Year -End Budget Amendment - Draft Ordinance Detail
Reconciliation of Budget Amendment ORIGINAL AMENDED 2016 Year -Enc AMENDED
Summary to Ordinance BUDGET BUDGET 2015 Amendment BUDGET 2016
EXPENDITURES
Total
Expenditures
Total Expenditures
Expenditure
amendment
Total Expenditures
000 General
$ 125,817,778
$ 128,196,824
2,553,123
750,000
1,900,000
275,000
575,000
-
2,600,000
-
$ 130,749,947
101 Hotel /Motel
2,597,316
2597,316
2,597,316
103 City Street
11,081,721
12,385,671
13,135,671
104 Arterial Street
35,906,080
37,086,080
38,986,080
105 Contingency
5,703,632
5,803,632
6,878,632
109 Drug Seizure Fund
180,000
180,000
755,000
200 LTGO Bonds
1,415,333
1,415,333
1,415 333
211 Limited Tax G.O. Refunding Bonds, 2008
1,623,400
1,623,400
1,623,400
212 Limited Tax G.O. Bonds, 2009A
866,315
438,355
438,355
214 Limited Tax G.O. Bonds, 2010A
1,172,100
1,172,100
1,172,100
216 Limited Tax G.O. Refunding Bonds, ValleyComm
229,800
229,800
229,800
217 2011 Refunding Bonds
1,095,500
1,095,500
1,095500
218 2014 Urban Renewal
226 ,260
226,260
226,260
206 LID Guaranty
669,000
669,000
669,000
233 2013 LID
2,400,813
2,949,390
2,949,390
301 Land Acquisition, Park Devl.
3,902,000
4,002,000
6,602,000
302 Facility Replacement
10,582,204
8,719,204
8,719,204
303 General Government Improvements
901,000
901,000
901,000
304 Fire Improvements
550,200
550,200
550,200
401 Water
18,422,000
17,699,000
17,699,000
402 Sewer
19,986,000
21,871,000
21,871,000
411 Foster Golf Course
4,181,494
4,181,494
4,181,494
412 Surface Water
20,429,000
20,173,000
20,173,000
501 Equipment Rental
11567,136
11,608,610
11,608,610
502 Insurance Fund
14,280,958
13,274,958
13,274,958
503 Insurance - LEOFF 1 Fund
1,772,191
1,510,191
1,510,191
611 Firemen's Pension
1,617300
1,617,300
1,617300
Total
$ 299,176531
$ 302,176,618
$ 8,653,123
is 310,829,741.
REVENUES
Total
Revenues
Total
Revenues
Revenue
amendment
Total
Revenues
000 General
$ 125,817,778
$ 128,196,824
2,553,123
750,000
1,900,000
27-5,000
575,000
-
2,600,000
$ 130,749,947
101 Hotel /Motel
2597,316
2,597,316
2,597,316
103 City Street
11,081,721
12,385,671
13,135,671
104 Arterial Street
35,906,080
37,086,080
38,986,080
105 Contingency
5,703,632
5,803,632
6,078,632
109 Drug Seizure Fund
180,000
180,000
755,000
200 LTGO Bonds
1,415,333
1,415,333
1,415333
211 Limited Tax G.O. Refunding Bonds, 2008
1,623,400
1,623,400
1,623,400
212 Limited Tax G.O. Bonds, 2009A
866,315
438,355
438,355
214 Limited Tax G.O. Bonds, 2010A
1,172,100
1,172,100
1,172,100
216 Limited Tax G.O. Refunding Bonds, ValleyComm
229,800
229,800
129,800
217 2011 Refunding Bonds
1,095,500
1,095,500
1,095,500
218 2014 Facility
226,260
226,260
226,260
206 LID Guaranty
669,000
669,000
669,000
233 2013 LID
2,400,813
2,949,.390
2,949,390
301 Land Acquisition, Park Devl.
3,902,000
4,002,000
6,602,000
302 Facility Replacement
10582,204
8,719,204
8,719,204
303 General Government Improvements
901,000
901,000
901,000
304 Fire Improvements
550,200
550,200
550,200
401 Water
18,422,000
17,699,000
17,699,000
402 Sewer
19,986,000
21,871,000
21,871,000
411 Foster Golf Course
4,181,494
4,181,494
4,181,494
412 Surface Water
20,429,000
20,173,000
20,173,000
501 Equipment Rental
11,567,136
11,608,610
11,608,610
502 Insurance Fund
14,280,958
13,274,958
13,274,958
503 Insurance - LEOFF 1 Fund
1,772,191
1,510,191
1,510,191
611 Firemen's Pension
1,617 300
1,617,300
1,617,300
Total
$ 299,176531
$ 302,176,618
$ 8,653,123
$ 310,829,741
11/2/2016
121
2016 Year End Budget Amendments
2016 Departmental Expenditure Reductions
Salary &
Other Total
benefits
TOTAL DEPARTMENTAL EXPENDITURE REDUCTIONS $ $
MAYOR (115,000) (115,000)
000.03.512 ]UD|O41
000.03.512.500.41.00 PROFESSIONAL SERVICES (DIUUO
000.03.513 EXECUTIVE
000D3.513.100.41.02 PROFESSIONAL SERVICES MISC. (50'000)
000.03.558 PLANNING &[Oy0N1NTYDEVELOPMENT
000.03.558.700.41.00 PROFESSIONAL SERVICES (45'000)
CITY ATTORNEY
(170,000)
(170,000)
000.06.515.3004II8
SPECIAL MATTERS
(100/}00
O00.O .S�.300.41.0}
PROFESSIONAL SERVICES
(70,000)
COMMUNITY DEVELOPMENT
(40,000)
(160,000)
(200,000)
000.08.558.501
BLDG, PERMITS, PLAN REVIEW
000.08.558.501.11.00
SALARIES
(120,000)
000.08.558.501.21.00
FICA
(8,000)
000.08.558.501.23.00
PER6
(lO'OUO)
000.08.558.501.24.00
INDUSTRIAL INSURANCE
(S,UOU)
000.08.558.501.25.00
K8 ED] CAL, DENTAL, UFE,OPT|CAL
(I0,000)
000.08.558.501.25.97
SELF INSURED MEDICAL &DENTAL
(7,000)
000.08.558.501.49.02
MISCELLANEOUS
(40,000)
PUBLIC WORKS
(80,000)
(93,000)
(173,000)
000.13.518.300.11,00
SALARIES
(20'000)
000.13.518.300.25.00
MsD}[ALDENTAL,VFE,OPT|O\L
(6'000)
000.13.543.130
ENGINEERING PLANS AND SERVICES
000.I3.543.130.11.00
SALARIES
(55'000)
000.13.54].1]0.25.97
SELF INSURED W1ED|CAL&DENTAL
(12,000)
000.13.543.130.41.00
PROFESSIONAL SERVICES
(00,000)
00015.576.800 GENERALPADK8
000.15.576.80021.00 SALARIES (60/}00
000.15.576.800.25.97 SELF-INSURED MEDICAL& DENTAL (8,000)
FINANCE (215,000) (70,000) (285,000)
000.05.514.230.11.00 SALARIES (40,000)
00005.514.I30.12.00 EXTRA LABOR B0,000
000.05.514.230.49.03 CLAIMS AND JUDGMENTS (215,000)
2016 Year End Budget Amendment Detail
2016 Increase (Decrease)
Ref Explanation I Acct Desc
Beg Fund Expense Revenue End Fund
I
Balance Balance
GENERAL FUND
POLICE DEPARTMENT
Category 2 - Revenue Backed
- 318,896 " 318,896 -
1 Reimbursement from the Washington Auto Theft Prevention P WATPA grant
112,100
Authority ( WATPA) grant for salary and benefits for a i revenue
(detective assigned as a Auto Theft Task Force (ATTF)
,Salaries
84,300
Detective. Began July 1, 2015. This item was presented to -•- - -- - -- _ _.
27,$00
4 Finance & Safety Committee at the March 22, 2016 meeting. !Benefits
2 I Reimbursement of salary and benefits for an officer assigned I WSCJTC BLEA
126,200
Ias a trainer at the Washington State Criminal Justice Training reimbursement
Center ( WSCJTC) for the Basic Law Enforcement Academy —
I g Salaries
90, 000
(BLEA), began June 1, 2015. Three year agreement. This
{ Benefits
- -
36,200
i item was presented to Finance & Safety Committee at the
IMarch 22, 2016 meeting. p
3 P COPS grant; previously the grant expenditure budget was Grant revenue
51,500
reduced by the grant revenue and no grant revenue budget 1- ---, . _ __..._. _ ..._..
_
Salaries
iwas recorded. This amendment corrects for this by adding 1_ _ __ _ __ _ . _. _
27,100
the revenue budget and the corresponding expenditure E Benefits
24,400
budget. This item was presented to Finance & Safety
Committee at the March 22, 2016 meeting.
4 Boeing Founders Day Event - reimburseable services provided; Security Revenue
29,096
by three departments - Police, Fire and Technology Services Overtime
25,075
f I Benefits
4,021
Category 3 - Carryovers }.
_ _._ .
383,000 (383,000)
5 !Spillman Records Management System carryover from 2N 1- 5. 1 Capital asset
137,000
The 2015 budget was not used and is being carried to 2016. G
iThe system has been acquired and will be paid for in entirety
in 2016.
6 tSpillman Records Management System carryback from 2017 Capital asset
246,000
!The system was acquired and implemented ahead of I
schedule; it will be paid for in entirety in 2016. The 2017
budget is therefore moved to 2016.
7 Police Department Total
- 701,896 318,896 (3831000)'
FIRE DEPARTMENT
Category 2 - Revenue Backed i
37,805" 37,805
8 I Boeing Founders Day Event - reimburseable services provided ISecurity Revenue
37,805
I by three departments - Police, Fire and Technology Services I Overtime
31,217
{ I Benefits
6,588
9 Are Department Total G
b
37,805. 37,805
11/3/2016 1 2�of 5
2016 Year End Budget Amendment Detail 1 2016 Increase (Decrease)
Ref Explanation I Acct Desc
Beg Fund " Expense I
Revenue End Fund fi
Balance
Balance
MAYOR & CITY ATTORNEY
Category 1- Existing Service Levels or Plans
285,000 )
285,000,
,
10 6 Reduce budget for under expenditures I See expenditure
(115,000)
I(reduction list
11 1City Attorney, reduce for under expenditures ISee expenditure
(170,000)',
reduction list
f
Category 3 - Carryovers (
93,179
(93,179);
12 jLazerfiche Rio digital records software upgrade. This item Isoftware
93,179
{was presented to the Finance and Safety Committee on i
March 22, 2016.
13 "Mayor Total
(191,821),
191,8211
COMMUNITY DEVELOPMENT
(200,000)'
200,0!00
Category 1- Existing Service Levels or Plans i
_ —..___
_....____.__._--
14 (Reduce budget for underexpenditures I See expenditure
(40000)!
reduction list
15 4 Reduce budget for underexpenditures - salary & benefits ISee expenditure
(160;000)-
! reduction list
16 (Community Development Total I
(200,000);
200,000'
PUBLIC WORKS & STREETS
Category 1- Maintain Current Service Levels I
(66,000)
66,000
_ .__ _ _'
Pro
17 Move property insurance from Finance to Public Works f Property -
107;000
I Facilities I Insurance
18 (Reduce budget for underexpenditures ISee expenditure
(80;000)-
reduction list
19 i Reduce budget for underexpenditures salary &benefits (See expenditure
(93,000)
reduction list
20 Public Works Total
(66,000);
66,000
PARKS & RECREATION
Category 1- Existing Service Levels or Plans !
(28,000)
28,000
21 E Reduction for underspending in Parks - salary & benefits ISee expenditure
(68,000)"
`reduction list
22 REACH after school program staffing Extra labor
40,000
Category 2 - Revenue Backed ;
50,200
36,950 (13,250)
23 j Revenue and expenditures for the expanded preschool l Revenue
21,750
program; increased services were approved by Council at the Salaries .5 to .75
13,485
August 3, 2015 regular council meeting. This amendment ".F1�E._ _ __.... _ _..
._.._
! adjusts the 2016 budget for these increased services. [-Extra-Labor"'
Extra Labor
8;813
! I Benefits
11,102 ;
Supplies __.....
1,100
_ Prof Services
24 ~Partners in Com munity Health _ (PICH _ ) grant _ additional _ funding Revenue
500
15,200
!through supplemental grant awards. Approved by Council at - — -- - -- --
_
(the 9/19/16 meeting. j Expenditures
15,200
25 4 Parks & Recreation Total B
22,200
36,950 14,75!3
124
11/3/2016 2 of 5
2016 Year End Budget Amendment Detail
2016 Increase (Decrease)
Ref Explanation 0 Acct Desc
Beg Fund
Expense Revenue End Fund
Balance
Balance
FINANCE
Category 1- Existing Service Levels or Plans
(392,000)
392,000
26 ; Reduce budget for underexpenditures I See expenditure
(215,000);
reduction list
27 Reduce budget for underexpenditures - salary & benefits ! See expenditure
(70,000)'
reduction list
28 , Move property insurance from Finance to Public Works Property
(107,000)
(Facilities I Insurance
29 ; Finance Total
(392,000)
392,000,,
TECHNOLOGY& INNOVATION SERVICES
Category 1 Existing Service Levels or Plans
110,000
- (110,000)`
30 (Additional budget for director transitional costs Salaries &
110,000
overtime
Category 2 - Revenue Backed
1,472
1,472
31 ,Boeing Founders Day Event - reimburseable services provided, Security Revenue
1,472
I by three departments - Police, Fire and Technology Services (Overtime
1,235
_ .
@ Benefits
237
Category 4 - Initiatives _. _ -
170,240
- (170,240),
_.... _. _ _ ___ _ ._. _ __ - _..- .. _.. _ _... _. ___ _. _. _ ___ _ _ _._ .. _.. _ __. _ .__
32 Additional service request; approved by Council on 10/17/16.; professional
170,240
d iservices, other
33 C Technology Services Total
281,712
1,472 (280,240),
TRANSFERS, REVENUE ,& OTHER
Category 1- Existing Service Levels or Plans
1,558,000
(525,000)
600,000 2,683,000,
34 =Adjust budgeted General Fund beginning fund balance to Beginning fund
1,558,000
2015 actual ; balance
35 =Increase gambling tax revenue budget to reflect revenue Gambling Tax
600,000
!increase
36 ; Reduce transfer into Arterial Street Fund. REET received
(800,000)
4 exceeded budget by $900,000 providing supplanting the 1
need for funding from the General Fund
_ . _.__ ..._ .. _. .. ...... ...... . .........__. _ ._.... __ _.. ._... .._ . _... _ _..... _...._ -. .
37 Additional transfer to Contingency Reserve fund for the f
275,000
discretionary one time revenue reserve and to adjust the
"ending fund balance for increased ongoing revenues.
38 ,Transfers, Revenue & Other Total
1,558,000
(525,000);
600,000 2,6$3,000
Total General Fund 000
1,558,000 !
(331,208)
995,123 2,884,331
Less beginning fund balance adjustment
(1,558,000)
Addition to fund balance
1,326.331
General fund net additiona before 2016 year -end budget amendments
** (1,324,048)
General fund net additiona after 2016 year -end budget amendments
2.283
** Represents the ($1,148,040) negative effect of the 2015 -16 mid- biennial budget amendments on the
budgeted 2016 ending fund balance in addition to the orignally budgeted draw down of ($177,120)
11/3/2016 12 3of 5
RESIDENTIAL STREET FUND 103
Category 1- Existing Service Levels or Plans 750,000 t ' - 750,000
41 djust beginning fund balance based on actual 2015 results ! Beginning fund 750,000 ;
balance
Total Residential Street 750,000 , - - 750,000
ARTERIAL STREET FUND 104
Category 1- Existing Service Levels or Plans I 2,700,000 (800,000) 1,900,000
42 Reduce transfer in from General Fund; unexpected increase Transfer In (800,000)
in 2015 REET revenue of over $800,000 provides sufficient I
(funding [
43 IAdjust beginning fund balance to reflect 2015 actual results; I Beginning fund 2 „700,000
x$2.3 million represents unspent bond proceeds for the balance
Boeing Access Road Bridge project
[Total Arterial Street 2;700,000 (800,000): 1.900,000
SEIZURE FUND 1:09
Category 1- Existing Service Levels or Plans 50,000 575,000 525,000
44 wOver $600,000 in Federal seizure monies was received =Seizure revenue 575,000
'through September 30, 2016; most of this stems from the
12013 motel seizures. k
45 ;Additional expenditure budget to ensure adequate coverage ;various — 50;000
lof actual costs. 6
Total Seizure Fund 109 50,000 = 575,000 525,000
LOCAL IMPROVEMENT DISTRICT (LID) FUND 233
Category 1- Existing Service Levels or Plans 300,000 (300,000)
46 Increase principal payments to reflect corresponding increase LID debt 300,000
l in LID assessment payments; 7 assessments were paid in full @ principal
I in 2015. I
Total LID Fund 233 300,000 - (300,000)'
Category 3 - Carryovers S 1,800,000 800,000 800,000 , 11800,000
47 jAdjust beginning fund balance based on actual 2015 results (Beginning fund 1,800,000
balance
48 { Duwamish Gardens - Project planned for 2015 but carried Grant revenue 800,000
forward to 2016. I~ _. __ . • -- - __ _ __
l �CIP expenditures 800,000
Total Land Acquisition Fund 301 1,800,000 800,000 800,000 1,800,000
126
11/3/2016 4 of 5
2016 Year End Budget Amendment Detail 2016 Increase (Decrease)
Ref i Explanation 1 Acct Desc Beg Fund Expense Revenue End Fund
Balance Balance
SELF INSURED HEALTHCARE FUND 502
Category 1- Existing Service Levels or Plans
49 Additional budget to ensure sufficient coverage of actual medical claims 200,000 (200,000)
costs
Total Self insured Healthcare Fund 502 200,000 (200,000)
TOTAL AMENDMENT TO 2015-2016 BIENNIAL BUDGET $ 6,808,000 $ 1,018,792 $ 1,845,123 $ 7,634,331
11/3/2016 12 7of 5
1
COUNCIL AGENDA S
------------ ---------------- - - - - -- Initials
Meefiq Dale
Prepared by
Mayors review
Council review
11/14/16
PMC
❑ Resolution
Dale
lt g
❑ Ordinance
Mtg Date 11121116
11/21/16
PMC
❑ Otber
Al g Dale
SPONSOR ❑ Council [:] Mayor ❑ HR [:1 DCD Z.Einance [-] -Fire ❑ IT ❑ P&R [:] Police [:] mr/
SPONSOR'S The Council is being asked to approve an ordinance authorizing issuance of unlimited tax
SUMMARY general obligation bonds not to exceed $36,500,000.
REVII,"WED BY El cow Mtg. ❑ CA&P Cmte ❑ F&S Cmte ❑ Transportation Cmte
F-1 Utilities Cmte ❑ Arts Comm. ❑ Parks Comm. F-1 Planning Comm.
DATE: NA commn'rFE CHAIR: NA
RECOMMENDATIONS:
SPONSOR/ADMIN. Finance Department
Comm"ITEJ" Directly to C.O.W. per F&S Committee Chair and Council President
COST IMPACT / FUND SOURCE
Exj)ENDITURI? RF"QUIRFID AMOUNT BUDGETED APPROPRIATION REQUIRED
Fund Source:
Comments.-
MTG. DATE
RECORD OF COUNCIL ACTION
11/14/16
ITEM INFORMATION
ITEMNO.
129
STAFF SPONSOR PEGGY MCCARTHY
ORIG INA], A(,kNDA D,\'I'I,": 11/14/16
A(-,j21'NDA ITJ"MTITLF Approve the Public Safety bond ordinance for the 2016 UTGO Bond Issue
CATEGORY Z Dismssion
,A 11g Date 11114116
[:] Motion
Alt g Date
❑ Resolution
Dale
lt g
❑ Ordinance
Mtg Date 11121116
F-1 BidAulard
Mig Date
F-1 Public•Hearing
Atg Date
❑ Otber
Al g Dale
SPONSOR ❑ Council [:] Mayor ❑ HR [:1 DCD Z.Einance [-] -Fire ❑ IT ❑ P&R [:] Police [:] mr/
SPONSOR'S The Council is being asked to approve an ordinance authorizing issuance of unlimited tax
SUMMARY general obligation bonds not to exceed $36,500,000.
REVII,"WED BY El cow Mtg. ❑ CA&P Cmte ❑ F&S Cmte ❑ Transportation Cmte
F-1 Utilities Cmte ❑ Arts Comm. ❑ Parks Comm. F-1 Planning Comm.
DATE: NA commn'rFE CHAIR: NA
RECOMMENDATIONS:
SPONSOR/ADMIN. Finance Department
Comm"ITEJ" Directly to C.O.W. per F&S Committee Chair and Council President
COST IMPACT / FUND SOURCE
Exj)ENDITURI? RF"QUIRFID AMOUNT BUDGETED APPROPRIATION REQUIRED
Fund Source:
Comments.-
MTG. DATE
RECORD OF COUNCIL ACTION
11/14/16
Forward to next Regular Meeting
MTG. DATE
ATTACHMENTS
11/14/16
Informational Memorandum dated 11/9/16
Ordinance in Draft Form
Bond Presentation
11/21/16
Ordinance
129
130
City of Tukwila
Washington
Ordinance No.
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
TUKWILA, WASHINGTON, AUTHORIZING THE ISSUANCE OF
UNLIMITED TAX GENERAL OBLIGATION BONDS OF THE CITY IN
THE AGGREGATE PRINCIPAL AMOUNT OF NOT TO EXCEED
$36,500,000, TO FINANCE COSTS RELATED TO ITS PUBLIC
SAFETY PLAN AND PAYING COSTS OF ISSUING THE BONDS;
PROVIDING THE FORM, TERMS AND COVENANTS OF THE
BONDS; PROVIDING FOR THE DISPOSITION OF THE PROCEEDS
OF THE SALE OF THE BONDS; DELEGATING AUTHORITY TO
APPROVE THE METHOD OF SALE AND THE FINAL TERMS OF
THE BONDS; AND PROVIDING FOR OTHER MATTERS
RELATING THERETO; PROVIDING FOR SEVERABILITY; AND
ESTABLISHING AN EFFECTIVE DATE.
WHEREAS, at an election held in the City of Tukwila, Washington (the "City ") on
November 8, 2016, the City submitted the question to the qualified electors of the City
of whether the City shall issue unlimited tax general obligation bonds in the aggregate
principal amount of not to exceed $77,385,000 (the "Bond Authorization ") to provide the
funds necessary to implement its Public Safety Plan, which includes replacing three fire
stations, financing critical items such as fire trucks and other life /safety equipment as
necessary, and constructing a justice center to hold the Tukwila Police Department and
Municipal Court, as identified in Ordinance No. 2509 (the "Election Ordinance ") passed
by the City Council on August 1, 2016 (collectively, the "Project "); and
WHEREAS, the number and proportion of the qualified electors of the City required
by law for the adoption thereof voted in favor of the Bond Authorization and the election
results are expected to be certified by King County Elections, as ex officio supervisor of
elections in King County, Washington, on or around November 29, 2016; and
WHEREAS, it is deemed necessary and advisable that the City authorize the
issuance of the first series of such unlimited tax general obligation bonds (the "Bonds ")
to provide part of the funds necessary to finance the Project and to pay costs of
issuance for the Bonds; and
W: Word Processing \Ordinances\Bond issuance - Public Safety Plan 11 -9 -16
PM:bjs Page 1 of 16
131
WHEREAS, this Council wishes to delegate authority to the Finance Director, or his
or her designee (the "Designated Representative"), for a limited time, to approve the
method of sale and the interest rates, maturity dates, redemption terms and principal
maturities for the bonds within the parameters set by this ordinance; and
WHEREAS, the Bonds shall be sold by negotiated or competitive public sale as set
forth herein;
NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY ORDAINS AS FOLLOWS:
Section 1. Definitions. As used in this ordinance, the following words and terms
shall have the following meanings, unless the context or use indicates another or
different meaning or intent. Unless the context indicates otherwise, words importing the
singular number shall include the plural number and vice versa.
Beneficial Owner means any person that has or shares the power, directly or
indirectly, to make investment decisions concerning ownership of any Bonds (including
persons holding Bonds through nominees, depositories or other intermediaries).
Bond Authorization means the unlimited tax general obligation bonds in the
aggregate principal amount of $77,385,000 authorized by the Election Ordinance and
approved by the requisite number of voters of the City at a special election held on
November 8, 2016 for the purpose of providing the funds necessary to carry out the
Project and to pay the costs of issuance of such bonds.
Bond Counsel means Pacifica Law Group LLP or an attorney at law or a firm of
attorneys, selected by the City, of nationally recognized standing in matters pertaining to
the tax exempt nature of interest on bonds issued by states and their political
subdivisions.
Bond Purchase Contract means the contract, if any, for the purchase of any
Bonds sold by negotiated sale to the Underwriter, executed pursuant to Section 12.
Bond Register means the registration books showing the name, address and tax
identification number of each Registered Owner of the Bonds, maintained pursuant to
Section 149(a) of the Code.
Bond Registrar means, initially, the fiscal agent of the State, for the purposes of
registering and authenticating the Bonds, maintaining the Bond Register, effecting
transfer of ownership of the Bonds and paying interest on and principal of the Bonds.
Bonds mean the City's Unlimited Tax General Obligation Bonds, 20XX, or other
such series designation as approved by the Designated Representative, authorized to
be issued pursuant to the terms of this ordinance.
Certificate of Award means the certificate, if any, for the purchase of any Bonds
sold by competitive sale awarding the Bonds to the initial purchaser as set forth in
Section 12 of this ordinance.
W: Word Processing\ordinances\Bond issuance-Public Safety Plan 11-9-16 Page 2 of 16
PM:bjs
132
City means the City of Tukwila, a municipal corporation duly organized and existing
under the laws of the State.
City Clerk means the duly appointed and acting City Clerk of the City or the
successor to the duties of that office.
City Administrator means the duly appointed and acting City Administrator,
including anyone acting in such capacity for the position, or the successor to the duties
of that office.
Closing means the date of delivery of the Bonds to the Underwriter.
Code means the Internal Revenue Code of 1986 as in effect on the date of
issuance of the Bonds or (except as otherwise referenced herein) as it may be
amended to apply to obligations issued on the date of issuance of the Bonds, together
with applicable proposed, temporary and final regulations promulgated, and applicable
official public guidance published, under the Code.
Commission means the United States Securities and Exchange Commission.
Continuing Disclosure Certificate means the written undertaking for the benefit of
the owners and Beneficial Owners of the Bonds as required by Section (b)(5) of the
Rule.
Council or City Council means the Tukwila City Council, as the general legislative
body of the City as the same is duly and regularly constituted from time to time.
Debt Service Fund means the fund or account created pursuant to this ordinance
for the purpose of paying debt service on the Bonds.
Designated Representative means the Finance Director, or his or her designee.
DTC means The Depository Trust Company, New York, New York, a limited
purpose trust company organized under the laws of the State of New York, as
depository for the Bonds pursuant to Section 4 of this ordinance.
Election Ordinance means Ordinance No. 2509 passed by the Council on August
1, 2016.
Fair Market Value means the price at which a willing buyer would purchase the
investment from a willing seller in a bona fide, arm's length transaction (determined as
of the date the contract to purchase or sell the investment becomes binding) if the
investment is traded on an established securities market (within the meaning of Section
1273 of the Code) and, otherwise, the term "Fair Market Value" means the acquisition
price in a bona fide arm's length transaction (as referenced above) if: (i) the investment
is a certificate of deposit that is acquired in accordance with applicable regulations
under the Code; (ii) the investment is an agreement with specifically negotiated
withdrawal or reinvestment provisions and a specifically negotiated interest rate (for
example, a guaranteed investment contract, a forward supply contract or other
investment agreement) that is acquired in accordance with applicable regulations under
W: Word Processing\Ordinances\Bond issuance-Public Safety Plan 11-9-16 Page 3 of 16
PM:bjs
133
the Code; (iii) the investment is a United States Treasury Security--State and Local
Government Series that is acquired in accordance with applicable regulations of the
United States Bureau of Public Debt; or (iv) any commingled investment fund in which
the City and related parties do not own more than a 10% beneficial interest therein if the
return paid by the fund is without regard to the source of the investment. To the extent
required by the applicable regulations under the Code, the term "investment" shall
include a hedge.
Federal Tax Certificate means the certificate executed by the Designated
Representative setting forth the requirements of the Code for maintaining the tax
exemption of interest on the Bonds, and attachments thereto.
Finance Director means the duly appointed and acting Finance Director of the City
or the successor to such officer.
Government Obligations means those obligations now or hereafter defined as
such in chapter 39.53 RCW, as this chapter may be hereafter amended or restated.
Letter of Representations means the Blanket Issuer Letter of Representations
given by the City to DTC, as amended from time to time.
Mayor or City Mayor means the elected Mayor of the City or the successor to the
duties of that office.
MSRB means the Municipal Securities Rulemaking Board or any successors to its
functions.
Official Statement means the disclosure documents prepared and delivered in
connection with the issuance of the Bonds.
Project means the capital projects described in Section 2 of this ordinance.
Project Fund means the account created pursuant to Section 8 of this ordinance.
Record Date means the close of business for the Bond Registrar 15 days
preceding any interest and/or principal payment or redemption date.
Registered Owner means the person named as the registered owner of a Bond in
the Bond Register. For so long as the Bonds are held in book-entry only form, DTC or
its nominee shall be deemed to be the sole Registered Owner.
Rule means the Commission's Rule 15c2-12 under the Securities Exchange Act of
1934, as the same may be amended from time to time.
Sale Document means the Bond Purchase Contract or Certificate of Award, if any,
executed by the Designated Representative in connection with the sale of the Bonds
pursuant to Section 12 of this ordinance, which shall provide for the name, principal and
interest payment dates and amounts, redemption /prepayment rights, and other terms to
describe such Bonds as determined to be necessary by the Designated Representative.
W: Word Processing\Ordinances\Bond issuance - Public Safety Plan 11-9-16 Page 4 of 16
PM:bjs
134
State means the State of Washington.
Underwriter means any underwriter, in the case of a negotiated sale, or initial
purchaser, in the case of a competitive sale, of the Bonds selected pursuant to Section
12.
Section 2. Authorization of the Project. The Bonds are being issued to finance
and/or reimburse the City for costs related to implementing its Public Safety Plan, which
includes, but is not limited to: (a) replacing three fire stations, (b) financing critical items
such as fire trucks and other life/safety equipment as necessary, and (c) constructing a
justice center to hold the Tukwila Police Department and Municipal Court, as authorized
and further described in the Election Ordinance, which description is incorporated
herein by this reference (the "Project"), and to pay costs of issuance for the Bonds.
Section 3. Authorization of Bonds and Bond Details. For the purpose of paying
and/or reimbursing the City for costs of the Project and paying costs of issuance of the
Bonds as authorized by the Election Ordinance and by the qualified electors of the City
at a special election held on November 8, 2016, the City is hereby authorized to issue
and sell unlimited tax general obligation bonds in an aggregate principal amount of not
to exceed $36,500,000 (the "Bonds"). Notwithstanding anything in this ordinance to the
contrary, the issuance of the Bonds shall be subject to satisfaction of the conditions set
forth in Section 12 of this ordinance.
The Bonds shall be general obligations of the City and shall be designated "City of
Tukwila, Washington, Unlimited Tax General Obligation Bonds, 20XV with additional
series designation or other such designation as determined to be necessary by the
Designated Representative. The Bonds shall be dated as of the date of Closing; shall
be fully registered as to both principal and interest; shall be in the denomination of
$5,000 each, or any integral multiple thereof, within a maturity; shall be numbered
separately in such manner and with any additional designation as the Bond Registrar
deems necessary for purposes of identification; shall bear interest from their date
payable on the dates and commencing as provided in the Sale Document; and shall
mature on the dates and in the principal amounts set forth in the Sale Document, as
approved and executed by the Designated Representative pursuant to Section 12 of
this ordinance.
Section 4. Registration, Exchange and Payments.
(a) Bond Registrar /Bond Register. The City hereby specifies and adopts the
system of registration approved by the Washington State Finance Committee from time
to time through the appointment of state fiscal agencies. The City shall cause a bond
register to be maintained by the Bond Registrar. So long as any Bonds remain
outstanding, the Bond Registrar shall make all necessary provisions to permit the
exchange or registration or transfer of Bonds at its designated office. The Bond
Registrar may be removed at any time at the option of the Finance Director upon prior
notice to the Bond Registrar and a successor Bond Registrar appointed by the Finance
Director. No resignation or removal of the Bond Registrar shall be effective until a
successor shall have been appointed and until the successor Bond Registrar shall have
W: Word Processing\Ordinances\13ond issuance-Public Safety Plan 11-9-16 Page 5 of 16
PM:bjs
135
accepted the duties of the Bond Registrar hereunder. The Bond Registrar is authorized,
on behalf of the City, to authenticate and deliver Bonds transferred or exchanged in
accordance with the provisions of such Bonds and this ordinance and to carry out all of
the Bond Registrar's powers and duties under this ordinance. The Bond Registrar shall
be responsible for its representations contained in the Certificate of Authentication of
the Bonds.
(b) Registered Ownership. The City and the Bond Registrar, each in its discretion,
may deem and treat the Registered Owner of each Bond as the absolute owner thereof
for all purposes (except as provided in the Continuing Disclosure Certificate), and
neither the City nor the Bond Registrar shall be affected by any notice to the contrary.
Payment of any such Bond shall be made only as described in Section 4(g), but such
Bond may be transferred as herein provided. All such payments made as described in
Section 4(g) shall be valid and shall satisfy and discharge the liability of the City upon
such Bond to the extent of the amount or amounts so paid.
(c) DTC Acceptance/Letters of Representations. The Bonds initially shall be held
by DTC acting as depository. The City has executed and delivered to DTC a Blanket
Issuer Letter of Representations. Neither the City nor the Bond Registrar shall have any
responsibility or obligation to DTC participants or the persons for whom they act as
nominees (or any successor depository) with respect to the Bonds in respect of the
accuracy of any records maintained by DTC (or any successor depository) or any DTC
participant, the payment by DTC (or any successor depository) or any DTC participant
of any amount in respect of the principal of or interest on Bonds, any notice which is
permitted or required to be given to Registered Owners under this ordinance (except
such notices as shall be required to be given by the City to the Bond Registrar or to
DTC (or any successor depository)), or any consent given or other action taken by DTC
(or any successor depository) as the Registered Owner. For so long as any Bonds are
held by a depository, DTC or its successor depository or its nominee shall be deemed to
be the Registered Owner for all purposes hereunder, and all references herein to the
Registered Owners shall mean DTC (or any successor depository) or its nominee and
shall not mean the owners of any beneficial interest in such Bonds.
(d) Use of Depository.
(1) The Bonds shall be registered initially in the name of "Cede & Co.", as
nominee of DTC, with one Bond maturing on each of the maturity dates for the Bonds in
a denomination corresponding to the total principal therein designated to mature on
such date. Registered ownership of such Bonds, or any portions thereof, may not
thereafter be transferred except (A) to any successor of DTC or its nominee, provided
that any such successor shall be qualified under any applicable laws to provide the
service proposed to be provided by it; (B) to any substitute depository appointed by the
Finance Director pursuant to subsection (2) below or such substitute depository's
successor; or (C) to any person as provided in subsection (4) below.
W: Word Processing\Ordinances\Bond issuance-Public Safety Plan 11 -9 -16 Page 6 of 16
PM:bjs
136
(2) Upon the resignation of DTC or its successor (or any substitute depository
or its successor) from its functions as depository or a determination by the Finance
Director to discontinue the system of book entry transfers through DTC or its successor
(or any substitute depository or its successor), the Finance Director may hereafter
appoint a substitute depository. Any such substitute depository shall be qualified under
any applicable laws to provide the services proposed to be provided by it.
(3) In the case of any transfer pursuant to clause (A) or (B) of subsection (1)
above, the Bond Registrar shall, upon receipt of all outstanding Bonds together with a
written request on behalf of the Finance Director, issue a single new Bond for each
maturity of that series then outstanding, registered in the name of such successor or
such substitute depository, or their nominees, as the case may be, all as specified in
such written request of the Finance Director.
(4) In the event that (A) DTC or its successor (or substitute depository or its
successor) resigns from its functions as depository, and no substitute depository can be
obtained, or (B) the Finance Director determines that it is in the best interest of the
beneficial owners of the Bonds that such owners be able to obtain physical Bond
certificates, the ownership of such Bonds may then be transferred to any person or
entity as herein provided, and shall no longer be held by a depository. The Finance
Director shall deliver a written request to the Bond Registrar, together with a supply of
physical Bonds, to issue Bonds as herein provided in any authorized denomination.
Upon receipt by the Bond Registrar of all then outstanding Bonds together with a written
request on behalf of the Finance Director to the Bond Registrar, new Bonds of such
series shall be issued in the appropriate denominations and registered in the names of
such persons as are requested in such written request.
(e) Registration of Transfer of Ownership or Exchange; Change in Denominations.
The transfer of any Bond may be registered and Bonds may be exchanged, but no
transfer of any such Bond shall be valid unless it is surrendered to the Bond Registrar
with the assignment form appearing on such Bond duly executed by the Registered
Owner or such Registered Owner's duly authorized agent in a manner satisfactory to
the Bond Registrar. Upon such surrender, the Bond Registrar shall cancel the
surrendered Bond and shall authenticate and deliver, without charge to the Registered
Owner or transferee therefor, a new Bond (or Bonds at the option of the new Registered
Owner) of the same date, maturity, and interest rate and for the same aggregate
principal amount in any authorized denomination, naming as Registered Owner the
person or persons listed as the assignee on the assignment form appearing on the
surrendered Bond, in exchange for such surrendered and cancelled Bond. Any Bond
may be surrendered to the Bond Registrar and exchanged, without charge, for an equal
aggregate principal amount of Bonds of the same date, maturity, and interest rate, in
any authorized denomination. The Bond Registrar shall not be obligated to register the
transfer of or to exchange any Bond during the 15 days preceding any principal
payment or redemption date.
W: Word Processing\Ordinances0ond issuance-Public Safety Plan 11-9-16 Page 7 of 16
PM:bjs
137
(f) Bond Registrar's Ownership of Bonds. The Bond Registrar may become the
Registered Owner of any Bond with the same rights it would have if it were not the Bond
Registrar, and to the extent permitted by law, may act as depository for and permit any
of its officers or directors to act as a member of, or in any other capacity with respect to,
any committee formed to protect the right of the Registered Owners or beneficial
owners of Bonds.
(g) Place and Medium of Payment. Both principal of and interest on the Bonds
shall be payable in lawful money of the United States of America. Interest on the Bonds
shall be calculated on the basis of a year of 360 days and twelve 30-day months. For
so long as all Bonds are held by a depository, payments of principal thereof and interest
thereon shall be made as provided in accordance with the operational arrangements of
DTC referred to in the Letter of Representations. In the event that the Bonds are no
longer held by a depository, interest on the Bonds shall be paid by check or draft mailed
to the Registered Owners at the addresses for such Registered Owners appearing on
the Bond Register on the Record Date, or upon the written request of a Registered
Owner of more than $1,000,000 of Bonds (received by the Bond Registrar at least by
the Record Date), such payment shall be made by the Bond Registrar by wire transfer
to the account within the United States designated by the Registered Owner. Principal
of the Bonds shall be payable upon presentation and surrender of such Bonds by the
Registered Owners at the designated office of the Bond Registrar.
If any Bond is duly presented for payment and funds have not been provided by
the City on the applicable payment date, then interest will continue to accrue thereafter
on the unpaid principal thereof at the rate stated on the Bond until the Bond is paid.
Section 5. Redemption Prior to Maturity and Purchase of Bonds.
(a) Mandatory Redemption of Term Bonds and Optional Redemption. The Bonds
shall be subject to mandatory redemption to the extent, if any, set forth in the Sale
Document and as approved by the Designated Representative pursuant to Section 12.
The Bonds shall be subject to optional redemption on the dates, at the prices and under
the terms set forth in the Sale Document approved by the Designated Representative
pursuant to Section 12.
(b) Purchase of Bonds. The City reserves the right to purchase any or all of the
Bonds offered to it at any time at a price deemed reasonable by the Finance Director
plus accrued interest to the date of purchase.
(c) Selection of Bonds for Redemption. For as long as the Bonds are held in
book-entry only form, the selection of particular Bonds within a maturity to be redeemed
shall be made in accordance with the operational arrangements then in effect at DTC. If
the Bonds are no longer held by a depository, the selection of such Bonds to be
redeemed and the surrender and reissuance thereof, as applicable, shall be made as
provided in the following provisions of this subsection (c). If the City redeems at any
one time fewer than all of the Bonds having the same maturity date, the particular
Bonds or portions of Bonds of such maturity to be redeemed shall be selected by lot (or
in such manner determined by the Bond Registrar) in increments of $5,000. In the case
W: Word Processing\Ordinances\Bond issuance-Public Safety Plan 11-9-16 Page 8 of 16
PM:bjs
138
of a Bond of a denomination greater than $5,000, the City and the Bond Registrar shall
treat each Bond as representing such number of separate Bonds each of the
denomination of $5,000 as is obtained by dividing the actual principal amount of such
Bond by $5,000. In the event that only a portion of the principal sum of a Bond is
redeemed, upon surrender of such Bond at the designated office of the Bond Registrar
there shall be issued to the Registered Owner, without charge therefor, for the then
unredeemed balance of the principal sum thereof, at the option of the Registered
Owner, a Bond or Bonds of like maturity and interest rate in any of the denominations
herein authorized.
(d) Notice of Redemption.
(1) Official Notice. For so long as the Bonds are held by a depository, notice
of redemption shall be given in accordance with the operational arrangements of DTC
as then in effect, and neither the City nor the Bond Registrar shall provide any notice of
redemption to any beneficial owners. The notice of redemption may be conditional.
Thereafter (if the Bonds are no longer held by a depository), notice of redemption shall
be given in the manner hereinafter provided. Unless waived by any owner of Bonds to
be redeemed, official notice of any such redemption (which redemption may be
conditioned by the Bond Registrar on the receipt of sufficient funds for redemption or
otherwise) shall be given by the Bond Registrar on behalf of the City by mailing a copy
of an official redemption notice by first class mail at least 20 days and not more than
60 days prior to the date fixed for redemption to the Registered Owner of the Bond or
Bonds to be redeemed at the address shown on the Bond Register or at such other
address as is furnished in writing by such Registered Owner to the Bond Registrar.
All official notices of redemption shall be dated and shall state:
(A) the redemption date;
(B) the redemption price;
(C) if fewer than all outstanding Bonds are to be redeemed, the
identification by series and maturity (and, in the case of partial redemption, the
respective principal amounts) of the Bonds to be redeemed;
(D) any conditions to redemption;
(E) that unless conditional notice of redemption has been given and such
conditions have either been satisfied or waived, on the redemption date the redemption
price shall become due and payable upon each such Bond or portion thereof called for
redemption, and that interest thereon shall cease to accrue from and after said date;
and
(F) the place where such Bonds are to be surrendered for payment of the
redemption price, which place of payment shall be the designated office of the Bond
Registrar.
W: Word Processing\Ordinances\Bond issuance-Public Safety Plan 11 -9 -16 Page 9 of 16
PM:bjs
139
On or prior to any redemption date, unless such redemption has been
rescinded or revoked, the City shall deposit with the Bond Registrar an amount of
money sufficient to pay the redemption price of all the Bonds or portions of Bonds which
are to be redeemed on that date. The City retains the right to rescind any redemption
notice and the related optional redemption of Bonds by giving notice of rescission to the
affected registered owners at any time on or prior to the scheduled redemption date.
Any notice of optional redemption that is so rescinded shall be of no effect, and the
Bonds for which the notice of optional redemption has been rescinded shall remain
outstanding.
(2) Effect of Notice; Bonds Due. If notice of redemption has been given and
not rescinded or revoked, or if the conditions set forth in a conditional notice of
redemption have been satisfied or waived, the Bonds or portions of Bonds to be
redeemed shall, on the redemption date, become due and payable at the redemption
price therein specified, and from and after such date such Bonds or portions of Bonds
shall cease to bear interest. Upon surrender of such Bonds for redemption in
accordance with said notice, such Bonds shall be paid by the Bond Registrar at the
redemption price. Installments of interest due on or prior to the redemption date shall
be payable as herein provided for payment of interest. All Bonds which have been
redeemed shall be canceled by the Bond Registrar and shall not be reissued.
(3) Additional Notice. In addition to the foregoing notice, further notice shall
be given by the City as set out below, but no defect in said further notice nor any failure
to give all or any portion of such further notice shall in any manner defeat the
effectiveness of a call for redemption if notice thereof is given as above prescribed.
Each further notice of redemption given hereunder shall contain the information required
above for an official notice of redemption plus: (A) the CUSIP numbers of all Bonds
being redeemed; (B) the date of issue of the Bonds as originally issued; (C) the rate of
interest borne by each Bond being redeemed; (D) the series and maturity date of each
Bond being redeemed; and (E) any other descriptive information needed to identify
accurately the Bonds being redeemed. Each further notice of redemption may be sent
at least 20 days before the redemption date to each party entitled to receive notice
pursuant to Section 14 and the Continuing Disclosure Certificate and with such
additional information as the City shall deem appropriate, but such mailings shall not be
a condition precedent to the redemption of such Bonds.
(4) Amendment of Notice Provisions. The foregoing notice provisions of
this Section 5, including but not limited to the information to be included in redemption
notices and the persons designated to receive notices, may be amended by additions,
deletions and changes in order to maintain compliance with duly promulgated
regulations and recommendations regarding notices of redemption of municipal
securities.
Section 6. Form of Bonds. The Bonds shall be in substantially the form set forth
in Exhibit A, which is incorporated herein by this reference.
W: Word Processing\Ordinances\Bond issuance-Public Safety Plan 11-9-16 Page 10 of 16
PM:bjs
i El F8,
Section 7. Execution of Bonds. The Bonds shall be executed on behalf of the
City by the facsimile or manual signature of the Mayor and shall be attested to by the
facsimile or manual signature of the City Clerk, and shall have the seal of the City
impressed or a facsimile thereof imprinted, or otherwise reproduced thereon.
In the event any officer who shall have signed or whose facsimile signatures appear
on any of the Bonds shall cease to be such officer of the City before said Bonds shall
have been authenticated or delivered by the Bond Registrar or issued by the City, such
Bonds may nevertheless be authenticated, delivered and issued and, upon such
authentication, delivery and issuance, shall be as binding upon the City as though said
person had not ceased to be such officer. Any Bond may be signed and attested on
behalf of the City by such persons who, at the actual date of execution of such Bond
shall be the proper officer of the City, although at the original date of such Bond such
persons were not such officers of the City.
Only such Bonds as shall bear thereon a Certificate of Authentication manually
executed by an authorized representative of the Bond Registrar shall be valid or
obligatory for any purpose or entitled to the benefits of this ordinance. Such Certificate
of Authentication shall be conclusive evidence that the Bonds so authenticated have
been duly executed, authenticated and delivered hereunder and are entitled to the
benefits of this ordinance.
Section 8. Application of Bond Proceeds. The Finance Director is hereby
authorized to create a fund or account (the "Project Fund"), and subaccounts therein as
necessary, for the purposes set forth in this section. From the money derived from the
sale of the Bonds:
(a) Net premium (premium minus costs of issuance) shall be deposited in the Debt
Service Fund and/or the Project Fund and used to pay debt service on the Bonds
coming due on the next upcoming interest payment date or costs of the Project,
respectively; and
(b) The balance of the proceeds of the Bonds shall be deposited in the Project
Fund and shall be used solely to pay the allocable cost of issuing and selling the Bonds
and to finance costs of the Project as authorized by the Election Ordinance.
None of the proceeds of the Bonds shall be used for the replacement of equipment
or for other than a capital purpose. The Finance Director shall invest money in the
Project Fund and the subaccounts contained therein in such obligations as may now or
hereafter be permitted to cities of the State by law and which will mature prior to the
date on which such money shall be needed, but only to the extent that the same are
acquired, valued and disposed of at Fair Market Value.
Section 9. Tax Covenants. The City will take all actions necessary to assure the
exclusion of interest on the Bonds from the gross income of the owners of the Bonds to
the same extent as such interest is permitted to be excluded from gross income under
the Code as in effect on the date of issuance of the Bonds, including but not limited to
the following:
W: Word Processing\Ordinances\Bond issuance-Public Safety Plan 11-9-16 Page 11 of 16
PM:bjs
141
(a) Private Activity Bond Limitation. The City will assure that the proceeds of the
Bonds are not so used as to cause the Bonds to satisfy the private business tests of
Section 141(b) of the Code or the private loan financing test of Section 141(c) of the
Code.
(b) Limitations on Disposition of Project. The City will not sell or otherwise transfer
or dispose of (i) any personal property components of the Project other than in the
ordinary course of an established government program under Treasury Regulation
1.141-2(d)(4) or (ii) any real property components of the Project, unless it has received
an opinion of nationally recognized bond counsel to the effect that such disposition will
not adversely affect the treatment of interest on the Bonds as excludable from gross
income for federal income tax purposes.
(c) Federal Guarantee Prohibition. The City will not take any action or permit or
suffer any action to be taken if the result of such action would be to cause any of the
Bonds to be "federally guaranteed" within the meaning of Section 149(b) of the Code.
(d) Rebate Requirement. The City will take any and all actions necessary to
assure compliance with Section 148(f) of the Code, relating to the rebate of excess
investment earnings, if any, to the federal government, to the extent that such section is
applicable to the Bonds.
(e) No Arbitrage. The City will not take, or permit or suffer to be taken, any action
with respect to the proceeds of the Bonds which, if such action had been reasonably
expected to have been taken, or had been deliberately and intentionally taken, on the
date of issuance of the Bonds would have caused the Bonds to be "arbitrage bonds"
within the meaning of Section 148 of the Code.
(f) Registration Covenant. The City will maintain a system for recording the
ownership of each Bond that complies with the provisions of Section 149 of the Code
until all Bonds have been surrendered and canceled.
(g) Record Retention. The City will retain its records of all accounting and
monitoring it carries out with respect to the Bonds for at least three years after the
Bonds mature or are redeemed (whichever is earlier); however, if the Bonds are
redeemed and refunded, the City will retain its records of accounting and monitoring at
least three years after the earlier of the maturity or redemption of the obligations that
refunded the Bonds.
(h) Compliance with Federal Tax Certificate. The City will comply with the
provisions of the Federal Tax Certificate with respect to the Bonds, which are
incorporated herein as if fully set forth herein. The covenants of this Section will survive
payment in full or defeasance of the Bonds.
(i) Bank Qualification. The Finance Director is hereby authorized to designate the
Bonds as "qualified tax-exempt obligations" under Section 265(b)(3) of the Code for
investment by financial institutions if the City does not reasonably expect to issue more
than $10,000,000 of qualified tax-exempt obligations in the calendar year in which the
Bonds are issued.
W: Word Processing\Ordinances\Bond issuance-Public Safety Plan 11-9-16 Page 12 of 16
PM:bjs
142
Section 10. Debt Service Fund and Provision for Tax Levy Payments. The
City hereby authorizes the creation of a fund or account to be used for the payment of
debt service on the Bonds (the "Debt Service Fund"). No later than the date each
payment of principal of or interest on the Bonds becomes due, the City shall transmit
sufficient funds, from the Debt Service Fund or from other legally available sources, to
the Bond Registrar for the payment of such principal or interest. Money in the Debt
Service Fund may be invested in legal investments for City funds. Any interest or profit
from the investment of such money shall be deposited in the Debt Service Fund, but
only to the extent that the same are acquired, valued and disposed of at Fair Market
Value.
The City hereby irrevocably covenants that, unless the principal of and interest on
the Bonds are paid from other sources, it will make annual levies of taxes without
limitation as to rate or amount upon all of the property in the City subject to taxation in
amounts sufficient to pay such principal and interest as the same shall become due. All
of such taxes and any of such other money so collected shall be paid into the Debt
Service Fund. None of the money in the Debt Service Fund shall be used for any other
purpose than the payment of the principal of and interest on the Bonds.
The full faith, credit and resources of the City are hereby irrevocably pledged for the
annual levy and collection of such taxes and for the prompt payment of the principal of
and interest on the Bonds when due.
Section 11. Defeasance. In the event that the City, in order to effect the payment,
retirement or redemption of any Bond, sets aside in the Debt Service Fund or in another
special account, cash or noncallable Government Obligations, or any combination of
cash and/or noncallable Government Obligations, in amounts and maturities which,
together with the known earned income therefrom, are sufficient to redeem or pay and
retire such Bond in accordance with its terms and to pay when due the interest and
redemption premium, if any, thereon, and such cash and/or noncallable Government
Obligations are irrevocably set aside and pledged for such purpose, then no further
payments need be made into the Debt Service Fund for the payment of the principal of
and interest on such Bond. The owner of a Bond so provided for shall cease to be
entitled to any lien, benefit or security of this ordinance except the right to receive
payment of principal, premium, if any, -and interest from the Debt Service Fund or such
special account, and such Bond shall be deemed to be not outstanding under this
ordinance. The City shall give written notice of defeasance of the Bonds in accordance
with the Continuing Disclosure Certificate.
Section 12. Sale of Bonds.
(a) Bond Sale. The Council has determined that it would be in the best interest of
the City to delegate to the Designated Representative, for a limited time, the authority to
determine the method of sale for the Bonds and to approve the final interest rates,
maturity dates, redemption terms and principal maturities for the Bonds.
W: Word Processing\Ordinances\Bond issuance-Public Safety Plan 11-9-16 Page 13 of 16
PM:bjs
143
(b) Negotiated Bond Sale. If the Designated Representative determines that the
Bonds are to be sold by negotiated public sale, the Designated Representative shall
solicit proposals from one or more qualified underwriting firms and shall select the
Underwriter that submits the proposal that is in the best interest of the City. Such
Bonds shall be sold to the Underwriter pursuant to the terms of a Bond Purchase
Contract.
(c) Competitive Sale. If the Designated Representative determines that the Bonds
are to be sold at a competitive public sale, the Designated Representative shall:
(1) establish the date of the public sale; (2) establish the criteria by which the successful
bidder will be determined; (3) request that a good faith deposit accompany each bid; (4)
cause notice of the public sale to be given; and (5) provide for such other matters
pertaining to the public sale as he or she deems necessary or desirable. The
Designated Representative shall cause the notice of sale to be given and provide for
such other matters pertaining to the public sale as he or she deems necessary or
desirable. Such Bonds shall be sold to the Underwriter pursuant to the terms of a
Certificate of Award.
(d) Sale Parameters. Subject to the terms and conditions set forth in this Section
12, and subject further to certification of approval of the Bond Authorization, the
Designated Representative is hereby authorized to approve the method of sale and the
final interest rates, aggregate principal amount, principal maturities, and redemption
rights for the Bonds in the manner provided hereafter so long as:
(1) the aggregate principal amount of the Bonds does not exceed
$36,500,000;
(2) the final maturity date for the Bonds is no later than December 1, 2036;
(3) the aggregate purchase price for the Bonds shall not be less than 98% of
the aggregate stated principal amount of the Bonds, excluding any original issue
discount; and
(4) the true interest cost for the Bonds (in the aggregate) does not
exceed 4.50%.
Subject to the terms and conditions set forth in this section, the Designated
Representative is hereby authorized to execute the appropriate Sale Document on
behalf of the City.
Following the execution of the Sale Document, the Designated Representative
shall provide a report to the Council describing the final terms of the Bonds approved
pursuant to the authority delegated in this section. The authority granted to the
Designated Representatives by this Section 12 shall expire 180 days after the effective
date of this ordinance. If a Sale Document for the Bonds has not been executed within
180 days after the effective date of this ordinance, the authorization for the issuance of
the Bonds shall be rescinded, and the Bonds shall not be issued nor their sale approved
unless such Bonds are re-authorized by ordinance of the Council. The ordinance re-
authorizing the issuance and sale of such Bonds may be in the form of a new ordinance
W: Word Processing\Ordinances\Bond issuance-Public Safety Plan 11 -9 -16 Page 14 of 16
PM:bjs
144
repealing this ordinance in whole or in part or may be in the form of an amendatory
ordinance approving a Sale Document or establishing terms and conditions for the
authority delegated under this Section 12.
(e) Delivery of Bonds; Documentation. Upon the passage and approval of this
ordinance and execution of the Sale Document, the proper officials of the City, including
the Designated Representative, the City Administrator, the Mayor and the City Clerk,
are authorized and directed to undertake all action necessary for the prompt execution
and delivery of the Bonds to the Underwriter and further to execute all closing
certificates and documents required to effect the closing and delivery of the Bonds in
accordance with the terms of the Sale Document. Such documents may include, but
are not limited to, documents related to a municipal bond insurance policy delivered by
an insurer to insure the payment when due of the principal of and interest on all or a
portion of the Bonds as provided therein, if such insurance is determined by the
Designated Representative to be in the best interest of the City.
Section 13. Preliminary and Final Official Statements. The Designated
Representative is hereby authorized to deem final the preliminary Official Statement
relating to the Bonds for the purposes of the Rule. The Designated Representative is
further authorized to approve for purposes of the Rule, on behalf of the City, the Official
Statement relating to the issuance and sale of the Bonds and the distribution of the
Official Statement pursuant thereto with such changes, if any, as may be deemed by
him or her to be appropriate.
Section 14. Undertaking to Provide Ongoing Disclosure. The City covenants to
execute and deliver at the time of Closing a Continuing Disclosure Certificate. The
Designated Representative is hereby authorized to execute and deliver a Continuing
Disclosure Certificate upon the issuance, delivery and sale of the Bonds with such
terms and provisions as such officer shall deem appropriate and in the best interests of
the City.
Section 15. Lost, Stolen or Destroyed Bonds. In case any Bonds are lost,
stolen or destroyed, the Bond Registrar may authenticate and deliver a new Bond or
Bonds of like amount, date and tenor to the Registered Owner thereof if the owner pays
the expenses and charges of the Bond Registrar and the City in connection therewith
and files with the Bond Registrar and the City evidence satisfactory to both that such
Bond or Bonds were actually lost, stolen or destroyed and of his or her ownership
thereof, and furnishes the City and the Bond Registrar with indemnity satisfactory to
both.
Section 16. Severability; Ratification. If any one or more of the covenants or
agreements provided in this ordinance to be performed on the part of the City shall be
declared by any court of competent jurisdiction to be contrary to law, then such
covenant or covenants, agreement or agreements, shall be null and void and shall be
deemed separable from the remaining covenants and agreements of this ordinance and
shall in no way affect the validity of the other provisions of this ordinance or of the
Bonds. All acts taken pursuant to the authority granted in this ordinance but prior to its
effective date are hereby ratified and confirmed.
W: Word Processing\Ordinances\Bond issuance-Public Safety Plan 11-9-16 Page 15 of 16
PM:bjs
145
Section 17. Payments Due on Holidays. If an interest and/or principal payment
date for the Bonds is not a business day, then payment shall be made on the next
business day and no interest shall accrue for the intervening period.
Section 18. Corrections by City Clerk or Code Reviser. Upon approval of the
City Attorney and Bond Counsel, the City Clerk and the code reviser are hereby
authorized to make necessary corrections to this ordinance, including but not limited to
the correction of clerical errors; references to other local, state or federal laws, codes,
rules, or regulations; ordinance numbering and section/subsection numbering; and other
similar necessary corrections.
Section 19. Effective Date. This ordinance or a summary thereof shall be
published in the official newspaper of the City, and shall take effect and be in full force
five days after passage and publication as provided by law.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at
a Regular Meeting thereof this day of 12016.
ATTEST /AUTHENTICATED:
Christy O'Flaherty, MMC, City Clerk
1POMM-3
Pacifica Law Group LLP
Bond Counsel
Attachment: Exhibit A — Form of Bond
Allan Ekberg, Mayor
Filed with the City Clerk:
Passed by the City Council:
Published:
Effective Date:
Ordinance Number:
W: Word Processing\Ordinances\Bond issuance-Public Safety Plan 11-9-16
PM:bjs
146
Page 16 of 16
Exhibit A
Form of Bond
[DTC LANGUAGE]
UNITED STATES OF AMERICA
NO.
STATE OF WASHINGTON
CITY OF TUKWILA
9.5
UNLIMITED TAX GENERAL OBLIGATION BOND, 20L_j
INTEREST RATE: % MATURITY DATE: CUSIP NO.:
REGISTERED OWNER:
PRINCIPAL AMOUNT:
The City of Tukwila, Washington (the "City"), hereby acknowledges itself to owe
and for value received promises to pay to the Registered Owner identified above, or
registered assigns, on the Maturity Date identified above, the Principal Amount
indicated above and to pay interest thereon from - 1 20_, or the
most recent date to which interest has been paid or duly provided for until payment of
this bond at the Interest Rate set forth above, payable on 1, 20_,
and semiannually thereafter on the first days of each succeeding — and
. Both principal of and interest on this bond are payable in lawful
money of the United States of America. The fiscal agent of the State of Washington
has been appointed by the City as the authenticating agent, paying agent and registrar
for the bonds of this issue (the "Bond Registrar"). For so long as the bonds of this issue
are held in fully immobilized form, payments of principal and interest thereon shall be
made as provided in accordance with the operational arrangements of The Depository
Trust Company ("DTC") referred to in the Blanket Issuer Letter of Representations (the
"Letter of Representations") from the City to DTC.
The bonds of this issue are issued under and in accordance with the provisions of
the Constitution and applicable statutes of the State of Washington and Ordinance
No. duly passed by the City Council on November 21, 2016 (the "Bond
Ordinance"). Capitalized terms used in this bond have the meanings given such terms
in the Bond Ordinance.
This bond shall not be valid or become obligatory for any purpose or be entitled to
any security or benefit under the Bond Ordinance until the Certificate of Authentication
hereon shall have been manually signed by or on behalf of the Bond Registrar or its
duly designated agent.
A-1
W: Word ProcessingXOrdinances\Bond issuance-Public Safety Plan 11 -9 -16 147
This bond is one of an authorized issue of bonds of like date, tenor, rate of interest
and date of maturity, except as to number and amount in the aggregate principal
amount of $ and is issued pursuant to the Bond Ordinance to provide a
portion of the funds necessary (a) to implement its Public Safety Plan, which includes
replacing three fire stations, financing critical items such as fire trucks and other
life/safety equipment as necessary, and constructing a justice center to hold the Tukwila
Police Department and Municipal Court, as identified in Ordinance No. 2509 passed by
the City Council on August 1, 2016 and approved by the qualified electors of the City at
a special election held therein on November 8, 2016; and (b) to pay costs of issuance.
The bonds of this issue are subject to redemption prior to their stated maturities as
provided in the [Bond Purchase Contract/Certificate of Award].
The City has irrevocably covenanted with the owner of this bond that it will levy
taxes annually upon all the taxable property in the City without limitation as to rate or
amount and in amounts sufficient, together with other money legally available therefor,
to pay the principal of and interest on this bond when due. The full faith, credit and
resources of the City are irrevocably pledged for the annual levy and collection of such
taxes and the prompt payment of such principal and interest.
The pledge of tax levies for payment of principal of and interest on the bonds may
be discharged prior to maturity of the bonds by making provision for the payment
thereof on the terms and conditions set forth in the Bond Ordinance.
It is hereby certified that all acts, conditions and things required by the Constitution
and statutes of the State of Washington to exist and to have happened, been done and
performed precedent to and in the issuance of this bond exist and have happened,
been done and performed and that the issuance of this bond and the bonds of this
issue does not violate any constitutional, statutory or other limitation upon the amount
of bonded indebtedness that the City may incur.
IN WITNESS WHEREOF, the City of Tukwila, Washington, has caused this bond
to be executed by the manual or facsimile signatures of the Mayor and the City Clerk
and the seal of the City to be imprinted, impressed or otherwise reproduced hereon as
of this day of $ 20_.
[SEAL]
ATTEST:
Christy O'Flaherty, MMC, City Clerk
CITY OF TUKWILA, WASHINGTON
0
Allan Ekberg, Mayor
A-2
148 W: Word Processing\Ordinances\Bond issuance-Public Safety Plan 11-9-16
The Bond Registrar's Certificate of Authentication on the Bonds shall be in substantially
the following form:
CERTIFICATE OF AUTHENTICATION
Date of Authentication:
This bond is one of the bonds
and is one of the Unlimited Tax
Tukwila, Washington, dated
described in the within - mentioned Bond Ordinance
General Obligation Bonds, 20_, of the City of
.2016.
WASHINGTON STATE FISCAL AGENT,
as Bond Registrar
0
A-3
W: Word Processing\Ordinances\Bond issuance-Public Safety Plan 11-9-16 149
150
COUNCIL AGENDA S
---------------------------- - - - - -- Initials
Meetin
,g Date
Prepared by
Mayor' s review
Council review
11/14/16
LH
—
❑ Ordinance
llig Date
11/21/16
LH
❑ Other
Mtg Date
SPONSOR Z Council [:] Mayor ❑ FIR ❑ DCD 0 V'inance [:].Fire ❑ IT ❑ P&R ❑ Police ❑ PW1'
SPONSOR'S At its October 18 meeting, the Finance and Safety Committee requested the addition of a
SUMMARY new general financial policy. Council is requested to consider a resolution repealing 1839
and updating the general financial policies for inclusion in the final budget.
REVIEWED 13Y F-1 cow mtg. ❑ CA&P Cmte ❑ F&S Cmte ❑ Transportation Cmte
❑ Utilities Cmte ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
DATE: 10/18/16 COMMITTEE CHAIR: SEAL
RECOMMENDATIONS:
SPONSOR /ADMIN.
COMMII'I'Ell-' New policy proposed forwarded to C.O.W.
COST IMPACT / FUND SOURCE
Exi)j-,"ND I'I'UR H' REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$N/A $N/A $N/A
Fund Source:
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
11/14/16
ITEM INFORMATION
4.E.
151
SPONSOR: LAUREL HUMPHREY
I ORI(,INAi..,A(;[,.Nl)/\DA'1'F: 11/14/16
AGENDA ITEM Ti'i'j,i," A Resolution adopting updated policies relating to the financial planning model and
other general financial policies.
CATF,GORY Z Discussion
M1
,g Dale 11114116
❑ Motion
AItg Date
Z Resolution
Altg Date 11121116
❑ Ordinance
llig Date
R .Bid Award
11�g Date
❑ Public Hearing
MI g Date
❑ Other
Mtg Date
SPONSOR Z Council [:] Mayor ❑ FIR ❑ DCD 0 V'inance [:].Fire ❑ IT ❑ P&R ❑ Police ❑ PW1'
SPONSOR'S At its October 18 meeting, the Finance and Safety Committee requested the addition of a
SUMMARY new general financial policy. Council is requested to consider a resolution repealing 1839
and updating the general financial policies for inclusion in the final budget.
REVIEWED 13Y F-1 cow mtg. ❑ CA&P Cmte ❑ F&S Cmte ❑ Transportation Cmte
❑ Utilities Cmte ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
DATE: 10/18/16 COMMITTEE CHAIR: SEAL
RECOMMENDATIONS:
SPONSOR /ADMIN.
COMMII'I'Ell-' New policy proposed forwarded to C.O.W.
COST IMPACT / FUND SOURCE
Exi)j-,"ND I'I'UR H' REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$N/A $N/A $N/A
Fund Source:
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
11/14/16
Forward to the next Regular Meeting
11/21/16
I
----]
MTG. DATE
ATTACHMENTS
11/14/16
Informational Memorandumdated 11/8/16
Draft Resolution
Minutes from the Finance and Safety Committee meeting of 10/18/16
11/21/16
Resolution
151
152
City of Tukwila
Washington
Resolution No.
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF TUKWILA, WASHINGTON, ADOPTING UPDATED
POLICIES RELATED TO THE FINANCIAL PLANNING
MODEL AND OTHER GENERAL FINANCIAL
POLICIES; AND REPEALING RESOLUTION NO. 1839.
WHEREAS, the City Council and Mayor are committed to high standards of
financial management; and
WHEREAS, adopting and periodically updating and revising financial policies are
important steps toward ensuring consistent and rational financial management; and
WHEREAS, policies related to the Financial Planning Model and other general
financial policies are essential components of an overall financial management policy;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. Financial policies related to the Financial Planning Model and policies
of a general nature, as evidenced in Exhibit A, are adopted.
Section 2. The financial policies related to the Financial Planning Model and other
general financial policies shall be reviewed on a regular basis and updated as
necessary.
Section 3. Repealer. Resolution No. 1839 is hereby repealed.
WAWord ProcessingTinancial Planning Model policies and other general financial policies 11-1-16 Page 1 of 2
LH:bjs
153
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at
a Regular Meeting thereof this day of 2016.
ATTEST/AUTHENTICATED:
Christy O'Flaherty, MMC, City Clerk
Rachel B. Turpin, City Attorney
Joe Duffie, Council President
Filed with the City Clerk:
Passed by the City Council:
Resolution Number:
Attachment:
Exhibit A — Financial Planning Model Policies and Other General Financial Policies
W:\Word ProcessingTinancial Planning Model policies and other general financial policies 11-1-16 Page 2 of 2
LH:bjs
154
EXHIBIT A
City of Tukwila
Financial Planning Model Policies
The six-year "Financial Planning Model and Capital Improvement Program" is the primary
financial policy document. It represents the culmination of all financial policies.
Revenues
Policy FP-1: Revenues will be estimated on a conservative basis. Increases
greater than inflation in the schedule known as "Attachment A," Revenues and
Expenditures Governmental Funds, will require additional documentation. .
Policy FP -2: Major revenue sources will require explanation in the document known
as "Attachment A-1," Notes to Revenues, Expenditures and Fund Balance.
Operatinq Expenditures
Policy FP-3: Expenditures for the General Fund operations (schedule known as
"Attachment B," General Fund Operating Expenditures) will only include basic
inflationary increases at the beginning of the budget preparation process. Proposed
increases in programs or personnel will require an issues and options paper and
Council approval before being added to the operating expenditures estimate.
Capital Expenditures
Policy FP-4: Project capital grants with local matching requirements can only be
applied for with express approval by the City Council. Grant applications shall be
made only for projects listed in the six-year Capital Improvement Program.
Policy FP -5: If the proposed grants or mitigation are either not funded or are
reduced, the respective project will be reevaluated on the basis of its value and
priority level placement in the Capital Improvement Program.
Policy FP-6: The financing of limited benefit capital improvements (i.e. private
development) should be borne by the primary beneficiaries of the improvement.
The principle underlying limited benefit is that the property is peculiarly benefited
and therefore the owners do not in fact pay anything in excess of what they receive
by reason of such improvement.
Page 1 of 2
155
Financial Planning Model Policies (continued)
Enterprise Funds
Policy FP-7: Each Enterprise Fund shall be reviewed annually and it must have a
rate structure adequate to meet its operations and maintenance and long-term
capital requirements.
Policy FP -8: Rate increases shall bQ small, applied frequently, and staggered to
avoid an overly burdensome increase and undue impact in any given year.
Policy FP-9: Rate increases of external agencies (i.e. King County secondary
wastewater treatment fees) will be passed through to the users of the utility.
Other General Financial Policies
Policy GF-1: The City's various user charges and fees shall be reviewed at least every
three years for proposed adjustments based on services provided and comparisons with
other jurisdictions.
Policy GF-2: The Finance Director shall provide a financial status update at least
quarterly.
Policy GF-3: Budget amendments during the year may be approved by budget motion
until the end of the budget year, at which time a formal comprehensive budget
amendment is submitted.
PolicV...GF-4: The City shall, whenever practical and advantageous, take advantage of
grants, loans, or other external financial sources. With the exception of capital
improvement program grants requiring a local match, staff shall report to and seek the
approval of the appropriate Council Committee before finalizing the grant.
Policy GF-5: Funds exceeding the Mayor's allocated signature authority shall not be
moved between City departments without prior approval of the City Council.
Page 2 of 2
156
nitials
Meelin .Date
Pre by
Mayor or' .r review ew
review
11/14/16
SB
Z Resolution
Allig Dale 11121116
1:1 Ordinance
Mtg Dale
11/21/16
SB
❑ Other
,g Date
Mi
SPONSOR ❑ Council ❑ Major ❑ HR ❑ DCD [:].Finance E] Fire [:1 IT ❑ P& R ❑ Police ❑ PW'
SPONSOR'S The Council is being asked to consider adoption of a resolution that applies a 1.8% Cost of
SUMMARY Living Adjustment (COLA) increase to Non-Represented employees effective January 1,
2017.
Ri = X I ],,"WJ 3D BY ❑ cow Mtg. ❑ CA&P Cmte Z F&S Cmte ❑ Transportation Cmte
❑ I Utilities Cmte ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
DATE: 11/8/16 COMMITTEE CHAIR: SEAL
RECOMMENDATIONS:
SPONSOR/ADMIN. Human Resources Department
Comm"I"'FIE Forward to Committee of the Whole
COST IMPACT / FUND SOURCE
EXPE'NDITURF, RI "QU IRVID AMOUNT BUDGETED APPROPRIATION REQUIRED
Fund Source:
Coninient,v.-
MTG. DATE
RECORD OF COUNCIL ACTION
11/14/16
ITEM NO.
4.F.
157
SPONSOR: STEPHANIE BROWN—SMITH
�ORIGINAL A(,,j3NI)AD,\,i,i.,,: 11/14/16
A(-,, I ?NDA Prj,"m Non-Represented employees COLA Adjustment for 2017
CATEGORY Z Discussion
ATtg Date 11114116
❑ Motion
2vftg Dale
Z Resolution
Allig Dale 11121116
1:1 Ordinance
Mtg Dale
❑ BidAward
All
,g Dale
F-1 Public Hearing
111/,g Dale
❑ Other
,g Date
Mi
SPONSOR ❑ Council ❑ Major ❑ HR ❑ DCD [:].Finance E] Fire [:1 IT ❑ P& R ❑ Police ❑ PW'
SPONSOR'S The Council is being asked to consider adoption of a resolution that applies a 1.8% Cost of
SUMMARY Living Adjustment (COLA) increase to Non-Represented employees effective January 1,
2017.
Ri = X I ],,"WJ 3D BY ❑ cow Mtg. ❑ CA&P Cmte Z F&S Cmte ❑ Transportation Cmte
❑ I Utilities Cmte ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
DATE: 11/8/16 COMMITTEE CHAIR: SEAL
RECOMMENDATIONS:
SPONSOR/ADMIN. Human Resources Department
Comm"I"'FIE Forward to Committee of the Whole
COST IMPACT / FUND SOURCE
EXPE'NDITURF, RI "QU IRVID AMOUNT BUDGETED APPROPRIATION REQUIRED
Fund Source:
Coninient,v.-
MTG. DATE
RECORD OF COUNCIL ACTION
11/14/16
Forward to next Regular Meeting
MTG. DATE
ATTACHMENTS
11/14/16
Informational Memorandum dated November 2, 2016
Resolution in Draft Form
Attachment A-Draft 2017 Non-Represented Wage Schedule
Attachment B-Draft 2017 Non-Represented Schedule of Benefits
Attachment C-Draft 2017 Non-Represented Longevity Pay Schedule
Resolution #1796
11/21/16
gp, _inn
157
158
City of Tukwila
Washington
Resolution No.
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
TUKWILA, WASHINGTON, UPDATING AND CLARIFYING
THE NON - REPRESENTED EMPLOYEES' COMPENSATION
AND ADOPTING THE NON - REPRESENTED SALARY
SCHEDULE AND BENEFITS SUMMARY, EFFECTIVE
JANUARY 1, 2017.
WHEREAS, the Tukwila City Council adopted Resolution No. 1796 on June 3,
2013, which provided that a cost -of- living adjustment (COLA) be applied to the non -
represented employee wage schedule in odd - numbered calendar years; and
WHEREAS, the COLA has been based on 90% of the Consumer Price Index, All
Wage Earners (CPI -W) Seattle- Tacoma - Bremerton Area (June); and
WHEREAS, the CPI -W (June) for the above - stated period of time is 2.0 %; and
WHEREAS, 90% of CPI -W as stated above is 1.80 %; and
WHEREAS, City Administration recommends an increase of 1.80% to base wages
effective January 1, 2017 for non - represented employees;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. Non - Represented Wage Plan.
A. The 2017 wage schedule for non - represented employees shall be increased by
a rate of 1.80 %.
B. Longevity pay will continue to be a part of the plan.
C. Merit will continue to be eliminated from the plan, but may be considered as a
plan element in subsequent years.
W: \Word Processing \ResolutionsWon - Represented Employees Compensation -2017 11 -1 -16
sB:bjs Page 1 of 2
159
Section 2. Non - represented salary schedule, benefits summary and longevity
pay plan.
A. The "Non- Represented Salary Schedule — 2017," Attachment A hereto, shall
be approved, effective January 1, 2017.
B. The "Non- Represented Employee Benefits Summary — 2017," Attachment B
hereto, shall be approved, effective January 1, 2017.
C. The "Longevity Pay Plan for Non - Represented Employees — 2017," Attachment
C hereto, shall be approved, effective January 1, 2017.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON,
at a Regular Meeting thereof this day of , 2016.
ATTEST /AUTHENTICATED:
Christy O'Flaherty, MMC, City Clerk
Rachel B. Turpin, City Attorney
Attachments:
Joe Duffle, Council President
Filed with the City Clerk:
Passed by the City Council:
Resolution Number:
- Attachment A, Non - Represented Salary Schedule — 2017
- Attachment B, Non - Represented Employee Benefits Summary — 2017
- Attachment C, Longevity Pay Plan for Non - Represented Employees — 2017
W: \Word Processing \Resolutions \Non - Represented Employees Compensation -2017 11 -1 -16
Page 2 of 2
sl3:bjs
160
Attachment A (Page 1 of 3)
City of Tukwila
Non - Represented Salary Schedule - 2017
Classification Title Job Title Range
Office Technician Human Resources Technician B21
Office Specialist Assistant to the Chief B22
Administrative Assistant Deputy City Clerk B23
Assistant to the Director
Council Administrative Assistant
Executive Coordinator I Executive Coordinator I C41
Program Coordinator
Information Technology Systems Administrator
C41
Management Coordinator
City Clerk
C42
Management Analyst
Council Analyst
C42
Human Resources Analyst
Parks & Recreation Analyst
Public Works Analyst
Program Administrator
Economic Development Liaison
C43
Emergency Manager
Project Manager
Community Engagement Manager
C51
Program Manager
Building Official
D61
Communications/ Government Relations Manager
Senior Manager Support Operations
Administrative Manager
Maintenance Operations Manager
D62
Assistant Director
Deputy Community Development Director
D63
Deputy Finance Director
Deputy Public Works Director
Municipal Court Administrator
Department Manager
Assistant Fire Chief
D72
City Engineer
Department Administrator
Economic Development & Strategic Planning
E81
Manager
Deputy Police Chief
Deputy Police Chief
E82
161
Attachment A (Page 2 of 3)
City of Tukwila
Non - Represented Salary Schedule - 2017
Classification Title
Job Title
Range
Department Head
Human Resources Director
E83
DCD Director
Finance Director
IT Director
Parks & Recreation Director
Department Director
Fire Chief
E91
Police Chief
Public Works Director
City Administrator I City Administrator I F102
162
------------- - -(Page , - of -'
Non-Represented Salary Structure (Monthly) - 2017
DBM
In, mg
ling
IM
au
W.E.
Attachment B (Page 1 of 2)
Non - Represented Employee Benefits - 2017
Social Security (FICA): Social Security benefits shall be provided as contained in Section
2.52.010 of the Tukwila Municipal Code (TMC).
State -Wide Employee Retirement System (PERS): Retirement shall be provided as contained
in Section 2.52.020 of the TMC.
Holidays: Holidays shall be provided as contained in Section 2.52.030 of the TMC. An
additional floating holiday has been granted to each non- represented employee, for a total of 2
floating holidays. Regular part -time employees shall be entitled to benefits on a pro -rata basis.
Sick Leave: Sick leave shall be provided as contained in Section 2.52.040 of the TMC. Regular
part -time employees shall be entitled to benefits on a pro -rata basis.
Medical Insurance: The City shall pay 100% of the 2017 premium for regular full-time
employees and their dependents under the City of Tukwila self- insured medical /dental plan.
In the event the monthly premium increase is above 8% per year, the City's joint /labor
management committee, which includes a non - represented employee, shall meet and discuss
changes in the self- insured medical, dental vision and prescription plan benefit levels in an
effort to create plan savings so the premium costs do not exceed the 8 %. Regular part -time
employees shall be entitled to benefits on a pro-rata basis. Employees who choose coverage
under the Group Health Cooperative plan shall pay the difference between the City of Tukwila
plan full- family rate and the rate charged to them by Group Health.
Dental Insurance: The City shall provide 100% of the 2017 premium for the regular full-time
employees and all dependents under the City of Tukwila self - insured medical /dental plan for
dental coverage. Regular part -time employees shall be entitled to the same benefits on a pro -
rata basis.
Life Insurance: For regular full-tune employees, the City shall pay the premium for Plan C
(Multiple of annual earnings) or similar group life and accidental death and dismemberment
insurance policy. Said plan shall be at 100% of annual earnings rounded up to the next $1,000.
Regular part -time employees that work at least 20 hours per week shall be entitled to benefits
on a pro -rata basis (per insurance program requirements).
Vision/Optical: Benefits provided to all non - represented regular full-time employees and their
dependents at the rate of $200 per person, to a maximum of $400 per family unit each year.
Regular part -time employees and their dependents shall be entitled to benefits on a pro -rata
basis.
Disability Insurance: The City shall provide 100% of the premium for regular full-time
employees for a comprehensive long -term disability policy. Regular part -time employees that
work at least 20 hours per week shall be entitled to benefits on a pro -rata basis (per insurance
program requirements).
Health Reimbursement Arrangement /Voluntary Employee Benefit Association (HRA/VEBA):
VEBA benefits shall be provided as contained in Resolution No. 1445 and as amended.
165
Attachment B (Page 2 of 2)
Non - Represented Employee Benefits - 2017
Vacation: Following the sixth month of continuous employment, annual vacation leave of six
full days (each day is calculated at eight hours, regardless of schedule worked) shall be granted.
Thereafter, an additional day of annual leave shall accrue each month, up to a total of 12 days.
Three additional days of annual leave shall be granted on the employees anniversary date after
the third, fourth and fifth years. After six years, the employee shall be granted one day per year
additional annual leave to a maximum of 24 days per year. The maximum number of accrued
hours is 384 or 48 days.
Years of Service
Vacation Accrual
Years of Service
Vacation Accrual
0 -1 years
12 days*
10 years
19 days
1 -2 years
12 days
11 years
20 days
3 -6 ears
15 da s
12 years
21 days
7 ears
16 days
13 years
22 days
$ years
17 days
14 years
23 days
9 years
18 days
15 years
1 24 days maximum
*Six full days will be granted following the sixth month of continuous employment.
(Days accrue at eight hours, regardless of schedule worked.) Regular part -time
employees shall be entitled to benefits on a pro -rata basis.
Uniform Allowance: An annual uniform allowance of $650 shall be granted to the following
employees: Fire Chief, Assistant Fire Chief, Police Chief, Deputy Police Chief, and Senior
Manager Support Operations.
166
Attachment C
Longevity Pay Plan for Non - Represented Employees - 2017
The monthly longevity flat rates shall be as follows for regular full -time employees after the
completion of the number of years of full time employment with the City set forth below.
Regular part-time employees shall receive longevity on a pro -rata basis.
Completion of 5 years
$75
Completion of 10 years
100
Completion of 15 years
125
Completion of 20 years
150
Completion of 25 years
175
Completion of 30 years
200
167
I •:
COUNCIL AGENDA SYNOPSIS
---------------------------- - - - - -- Initial r
Meeting Date
Prepared b y
Mayor's review
Coundl review
11/14/16
DCS
//10/c
❑ Ordinance
At g Date
11/21/16
DCS
❑ Other
Aft
,g Date
SPONSOR ❑ Council Z Mayor ❑ HR ❑ DCD ❑ Finance EjFire ❑ TS ❑ P&R ❑ Police ❑ PWI
SPONSOR'S City staff requests Council approval of a process to select a developer for the four parcels
SUMMARY of land the City owns at 14420, 14440, 14442, and 14452 Tukwila International Boulevard
(formerly the Great Bear Motel, Boulevard Motel, Spruce Motel, and Sam Smoke Shop.
RE'VIEWE'D BY [:] cow mtg. Z CA&P Cmte ❑ F&S Cmte ❑ Transportation Cmte
❑ Utilities Cmte ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
DATE: 11/14/16 COMMITTEE CHAIR: QUINN
RECOMMENDATIONS:
SPONSOR/ADMIN. Mayor's Office
COMMITTEE Scheduled for 11/14/16
COST IMPACT / FUND SOURCE
EXPENDITURE' REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
Fund Source: NOT APPLICABLE
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
11/14/16
ITEMNO.
I
169
STAFF SPONSOR: DEREK SPECK
I ORIGINAL, AGENDA DATE: 11/14/16_
AGENDA I'• m TITLE Developer Selection Process for Motel Site
CATEGORY Z Discussion
Mtg Date 111141167
Z Motion
Mt g Date 11121116
❑ Resolution
Mt g Date
❑ Ordinance
At g Date
❑ Bid Award
At g Date
❑ Public Hearing
At g Date
❑ Other
Aft
,g Date
SPONSOR ❑ Council Z Mayor ❑ HR ❑ DCD ❑ Finance EjFire ❑ TS ❑ P&R ❑ Police ❑ PWI
SPONSOR'S City staff requests Council approval of a process to select a developer for the four parcels
SUMMARY of land the City owns at 14420, 14440, 14442, and 14452 Tukwila International Boulevard
(formerly the Great Bear Motel, Boulevard Motel, Spruce Motel, and Sam Smoke Shop.
RE'VIEWE'D BY [:] cow mtg. Z CA&P Cmte ❑ F&S Cmte ❑ Transportation Cmte
❑ Utilities Cmte ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
DATE: 11/14/16 COMMITTEE CHAIR: QUINN
RECOMMENDATIONS:
SPONSOR/ADMIN. Mayor's Office
COMMITTEE Scheduled for 11/14/16
COST IMPACT / FUND SOURCE
EXPENDITURE' REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
Fund Source: NOT APPLICABLE
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
11/14/16
Forward to next Regular Meeting
MTG. DATE
ATTACHMENTS
11/14/16
Informational Memorandum dated 11/9/16
Map of properties
Letter from HealthPoint dated 11/24/16
Letter from El Centro dated 12/7/16
11/21/16
As above
i
169
170
City of Tukwila
Allan Ekberg, Mayor
INFORMATIONAL MEMORANDUM
TO: Community Affairs and Parks Committee
FROM: Derek Speck, Economic Development Administrator
CC: Mayor Ekberg
DATE: November 9, 2016
SUBJECT: Developer Selection Process for Motel Site
ISSUE
City staff is seeking Council approval of a process to select a developer for the four parcels of
land the City owns at 14420, 14440, 14442, and 14452 Tukwila International Boulevard.
BACKGROUND
In 2014 and 2015 the City purchased the Great Bear Motel, Boulevard Motel, Spruce Motel, and
Sam Smoke Shop properties located at 14420, 14440, 14442, and 14452 Tukwila International
Boulevard to reduce crime and revitalize the neighborhood. In 2016 the buildings were
demolished and the land is now vacant. At the time of the acquisition the City had planned to
sell the properties and currently has budgeted the sale to occur in 2018.
Recently the City received letters from two organizations, El Centro de la Raza and HealthPoint,
expressing interest in purchasing the properties. The letters are attached and provide a
description of the organizations' proposed development of the site. Both organizations have
expressed a desire to seek funding for their proposed development from Washington State in
the 2017 -18 biennium, which starts this January. HealthPoint anticipates the State funding
could be as much as $3 million. They believe that an organization would need to have been
selected by the City to begin negotiations in order to be competitive for State funding.
DISCUSSION
This staff report is not requesting a Council decision on whether to select either of the two
organizations. The key questions at this time are whether to start a developer selection process
and on what schedule. If the Council approves a developer selection process then staff would
invite statements of interest from all organizations, evaluate them, and bring them back to the
Council for a decision on whether to select one.
Even if the City starts a selection process, the Council is not required to select any of the
applicants. Further, even if the Council selects an application for negotiations, the City is not
required to enter into an agreement with the applicant. Of course, we do not want to conduct a
selection process and enter into negotiations if the Council is not willing to consider selling the
property.
In terms of whether to start a developer selection process, one key consideration is whether the
City wants to use the property for a new Justice Center to house the police department and
municipal court. We should note that this site is 1.7 acres and the facilities plan estimated the
Justice Center would need 5 acres. The City has not yet conducted a study of possible sites for
the Justice Center. If the Public Safety bond passes, it may take a few months to make a site
location decision which could risk the state funding opportunity.
171
INFORMATIONAL MEMO
Page 2
If the City wants to complete the selection process in time for the selected organization to
compete for State funding, we would need to proceed on the following schedule:
11/8/16 Finance and Safety Committee discussion (completed)
11/8/16 Briefing to Tukwila International Boulevard Action Committee (completed)
11/14/16 Community Affairs and Parks Committee discussion
11/14/16 Council COW discussion of process
11/17/16 First publication inviting statements of interest and qualifications
11/21/16 Council Regular meeting with vote approving process
11/24/16 Second publication
12/1/16 Third publication
12/5/16 Statements of interest and qualifications due by 12:00 PM
12/9/16 Staff analysis and Council agenda published for public review
12/12/16 Council COW discussion of statements, staff analysis and options
12/12/16 Council Special Meeting authorizing Mayor to enter into negotiations
12/19/16 Council Regular meeting (if a decision is not made on 12/12)
The opportunities for formal public input would be at the Council meetings on 11/17, 11/21, and
12/9, plus community members can always provide informal input through direct communication
with Council and staff. It is important to note that if a developer is selected, there will be
additional opportunities for public input as negotiations proceed and the City makes decisions
on what requirements to include as part of the land sale.
This schedule is very fast compared to the typical developer selection schedule. This is
reasonable because the City already has a wealth of public input in terms of the community
vision for the TIB neighborhood since the public has provided significant input through the
Tukwila International Boulevard Revitalization Plan, Tukwila Village, the Tukwila International
Boulevard Element of the Comprehensive Plan, and other community conversations.
Staff believes that both organizations are well respected, experienced, and have positive visions
for the community and the site and we don't want to miss an opportunity for a high quality
project to receive state funding. We recommend the Council approve a selection process as
outlined above.
FINANCIAL IMPACT
This item would have no financial or budget impact at this time. At some point the City will need
to decide whether to sell the property. If the City does not sell the property, it will need to
remove the revenue projection from the budget. If the City sells the property, it would receive
revenue.
RECOMMENDATION
The Council is being asked to pass a motion approving the developer selection process as
outlined in this memo and consider this item at the November 14, 2016 Committee of the Whole
meeting and subsequent November 21, 2016 Regular Meeting.
ATTACHMENTS
Map of properties
Letter from HealthPoint dated October 24, 2016
Letter from El Centro de la Raza dated November 7, 2016
172
Developer Selection Discussion
rir
1
uth 144t
si
Parcels Under Consideration
A: Great Bear Motel, 14420 TIB
..t& x B: Boulevard Motel, 14440 TIB
C: Spruce Motel, 14442 TIB
D: Sam Smoke Shop, 14452 TIB
v
W
Note: Parcel E, Travelers Choice Motel is not included in the developer
selection discussion.
Printed: 11/9/16
74
T T 1�1- Y—�_ ^ 4
���[7C»�| ���lY�
~ �^ [ [
�� ^ �^� � ��^ �����
vww^ooltxpvmuhc"r»
October 24, 2016
Mayor Allan Ekberg
City ofTukwila
6ZO0SoothcenterBoulevard
Tukwila, WA 98188
Dear Mayor Ekberg,
Aom|w|STnxnum
ea Powell Avenue «w
Renton, WA 98057
m:m(425)Zn+»n
t'-11x (425) 277-1566
/ am writing this letter tnexpress Hea|thPoint'sfinn interest in purchasing the "motel" properties on
International Boulevard between 5.144m and S.14G*streets. VVe would like io purchase these
properties in order tn build a comprehensive health and wellness center.
HealthPoint's Tukwila Health and Wellness Resource Center is envisioned as a centrally located and well
integrated facility that would include comprehensive primary medical and dental care as well as a host
of other programs, services and resources that help the community get well and stay well. Hea|thPoint
would expand upon its work to develop an innovative model that extends the traditional health center —
a model that takes an active role in addressing community factors and the social conditions that impact
the health of individuals and the community.
HealthPoint has grown rapidly to meet increasing demand for affordable and accessible primary care,
but has also realized the need for a more comprehensive approach that addresses the many needs of a
community through collaborative partnerships and shared space. The Tukwila Health and Wellness
Resource Center Would engage and co-locate other partners working on important issues such as mental
health and substance abuse, economic development, housing, education and job training. We envision
a center with partners who work creatively and collaboratively to address the health needs of the
Tukwila community and promote wellness. Early conversations have included leaders from the
following organizations: Valley Cities Counseling, Nnvos, RAYS' LifeLon8' Global to Local, SHAG,
Providence, Salal Credit Union, the YMCA, and Bellwether Housing, and we continue to consider and
evaluate other potential partnerships. We recognize the pressures of affordable housing in today's
economy and are committed to exploring affordable housing as part of the development.
HealthPoint has been providing affordable quality health care to South King County residents for 4S
yea/s. Early clinic locations in Renton and 3eaTac provided care to Tukwila residents, and in December,
2011 we opened our first location in Tukwila in partnership with High|ine Hospital (at the old Riverton
Hospital ER) to provide better access to primary care for area residents. Today, at Hea|thPointTuhwi|a
on Military Road we are a health care home to almost 2,000 Tukwila residents, This fall vve opened our
adjacent dental clinic to provide better access to dental care for the community. While we are pleased
to provide services at this location (Cascade Medical Building) the space is limited and the location
continues tnbeachallenge. With a relatively short lease (4.5 years) we are ready to begin planning for
a greater presence and new development.
CLINIC LOCATIONS:
*whvm ^ Auburn North ' Bothell ' Federal Way ' xrm 'wid*a ' Redmond ' nromo ' Se^Tac 'Tukwila ' Evergreen Campus 'Tycc(amPm
We've been planning for the Tukwila Health and Wellness Resource Center for many years. Our original
planning for this started in 2012 when we were hoping to be a part of the Tukwila Village development.
As our plans grew it became apparent that we would not be able to fit within that site. The properties
adjacent to Tukwila Village would be a perfect location for this center, as our services would fit well with
this new senior housing development.
We are submitting this request now because there is an opportunity to approach the State Legislature in
January, 3017tn ask for funding during the 2O17-201Obiennium. VVe believe we have the opportunity
to receive as much as $3,000,000 to purchase the property and get the planning underway, In addition,
there will likely be funding for projects |ikethisdu/ingthe2019-J020biennium,sowewou|dgobackto
the Legislature with a second ask for help in construction of the center. We would like to best position
ourselves for these next two cycles of State funding that may be available to us, as the funding is critical
to executing a project like this.
We have been advised that in order to be selected for State funding we need the City to select us to
begin negotiations to purchase the property. VVe are ready now 10 begin those negotiations topurchase
the properties at market rates.
For many years HealthPoint has partnered with the City of Tukwila to better understand the unique
needs of this community and to bring services to the community. VVe have always planned tnbring
more comprehensive services to better address the needs and improve the health of individuals and
community. We believe we can do this with the development of HealthPoint's Tukwila Health and
Wellness Resource Center.
We are grateful for your consideration of this request and we look forward to hearing back from you
soon. in the meantime, please let us know if there is any additional information we can provide to you
with this request.
Since ely,
Thomas Trompeter
President and CEO
Programs & Services
With over z 6, 000 volunteer hours,
El Centro de /a Roza serves 16,072
ndividuals and 9,989 families through
the following programs and services:
Basic Healthcare Enrollment
Bebes! Infant Mortality Prevention
Cafe con El Centro
Cesar Chavez Demonstration Garden
College Readiness
Comadres
Community Meeting Space
Community Service
Crisis Advocacy
Cultural / Political / Social Events
DSHS People Point WA Connection
Economic Development
ECR Transitional Housing
El Patio Apartments
Employment Assistance
ESL Classes / Spanish Classes
Families & Education Levy Case
Management
Financial Empowerment
Food Bank
Foreclosure Counseling
Growing & Learning Together
Homeless Assistance
Healthy Cooking Classes /
Nuestras Comidas
Hope for Youth Poetry & Civil Rights
History Classes
HUD Housing Counseling
Immigrant/ Human /Civil Rights Social
Justice Advocacy
Jose Marti Child Development Center
Latino Hot Meal Program
Legal Clinic Site
Local, State, National & International
Coalition Building
Luis Alfonso Velasquez Flores
After School Program
Parent -Child Home Program
Plaza Roberto Maestas
Santos Rodriguez Memorial Park
Senior Nutrition & Wellness
Senior Home Delivered Meals
Smoking Cessation
Tax Prep Site
Transit Oriented Parking
Veteran's Services
Youth Case Management & Cultural
Enrichment
Youth Employment
Youth Technology Training
Youth Violence Prevention
WEQ, The Center for People of All Races
A voice and a hub for the Latino community
7, 2016 as we advocate on behalf of our people
and work to achieve social justice.
Mayor Allan Ekberg
City of Tukwila
6200 Southcenter Blvd.
Tukwila, WA 98188
Estimado Mayor Ekberg,
The intent of this letter is to inform the City of Tukwila of the interest of El
Centro de la Raza in the development of the properties at: 14420, 14440,
14442, and potentially 14452 Tukwila International Boulevard, Tukwila WA
98168. In addition, El Centro is interested in the potential development of
property in the Tukwila Transit Overlay Zone and other areas along Tukwila
International Blvd.
As an organization grounded in the Latino community, it is El Centro de la Raza's
mission to build unity across all racial and economic sectors; to organize,
empower and defend our most vulnerable and marginalized populations; and to
bring justice, dignity, equality, and freedom to all the peoples of the world. El
Centro de la Raza was founded in 1972, when a group of diverse community
members led a peaceful three -month occupation of the abandoned Beacon Hill
School to protest cuts in English as a Second Language classes.
Today, as a hub of the Latino community in Seattle and King County, El Centro
de la Raza provides 49 comprehensive programs and services that empower
members of the Latino community and other diverse and historically
underserved populations as fully participating members of society. El Centro de
la Raza responds to the broad range of community needs with culturally and
linguistically competent programs in areas of human and emergency services,
children and youth, asset - building and education, and housing and economic
development. Of the 16,072 individuals and 9,989 households served in 2015,
55% of participants were Latino, 91% were people of color, and 93% were low -
income.
Our vision for development would include a community inspired, mixed use
transit oriented development along Tukwila International Blvd., to include
affordable housing, retail space, and offices to support educational, asset
building, economic development, child care and human services programs.
In addition, our development would include a multicultural- community center space,
a commissary kitchen and public open space that would support the development of
small businesses and the establishment of an international style market.
Community Action Agency • United Way Agency • Affiliate of National Council of La Raza
252416th Avenue South, Seattle, WA 98144 • (2o6) 957-4634 tel • (2o6) 329 -0786 fax 177
www.eleentrodelaraza.org • 501(c)3 Nonprofit Tax ID: 91- o899927
El Centro hopes to expand its existing skills training and small business development services to the Tukwila
area. Finally, the model we have in mind would develop retail business space and community and office space
on the ground level and, affordable apartments in the upper floors. El Centro is open to partnerships with other
organizations to provide additional services from the site, such as health care providers who have experience
providing services to diverse communities and also led by communities of color.
This project would support several elements of the City of Tukwila Comprehensive Plan, particularly in the
Housing, TIB and Economic Development areas.
To support economic development, El Centro would provide programs to improve and support the opportunities
for education, skills training and job acquisition for Tukwila residents. By expanding our existing business
opportunity center that supports entrepreneurs to develop their own small businesses, we would encourage
and support aspiring local entrepreneurs, local startups and businesses to establish in Tukwila. An emphasis
would be placed on businesses owned by people of color, women and veterans.
With the inclusion of a commissary kitchen in the facility, the development will support food- related workforce
development and entrepreneurship training, creating small businesses and new jobs for residents.
A principal element of the development would be the creation of a significant number of high quality,
affordable housing apartments. The mixed use development would feature ground level commercial and office
space, and residences in the floors above street level. With a variety of educational and human services on site,
families would be supported to permanently improve their economic well- being.
El Centro de la Raza has a successful track record of working with affordable housing development consultants
and funders to successfully finance the type of mixed use development we are proposing in the form of tax
credits, fund development and other creative financing strategies.
In relation to the Tukwila Village, this development would constitute an expansion of mixed use development,
and an increase of local consumers living in the immediate area which will have a significant positive impact for
local merchants. The development would support the community's expressed desire for attractive, walkable,
locally- oriented activities that build on the Tukwila Village Project. The project would orient businesses along
Tukwila International Blvd. to support a more vibrant, walkable business district.
The project will provide public and private community gathering spaces for temporary events including food, art,
music, pop -ups and activities that leverage nearby assets, such as schools and the library, and would reflect the
international, multicultural character of the TIB area. Space and infrastructure will be provided to support
permitted food vendors, pop -ups, and a farmer's market where residents and visitors will gather and sample
multicultural flavor of the TIB area.
For over four decades El Centro de la Roza has provided services and opportunities to immigrant, refugee,
English Language Learners, low income, communities of color and other historically under - represented
communities.
In relation to affordable housing, El Centro's experience includes the development and management of
affordable housing over the last 20 years. Our largest and most recent development is Plaza Roberto Maestas,
Community Action Agency - United Way Agency - Affiliate of National Council of La Raza
178 252416th Avenue South, Seattle, WA 98144 - (206) 957 -4634 tel • (2o6) 329 -0786 fax
www.elcentrodelaraza.org - 501(03 Nonprofit Tax ID: 91- 0899927
which is a new development at El Centro de la Raza, adjacent to the Beacon Hill Light Rail Station. This $45
million development, which was completed in the summer of 2016, has a total of 110 units of affordable housing
available to individuals and families who earn between 30 % -60% of Area Median Income.
This project was completed on time and under budget and also includes a new 9,200 square foot child
development center. 3,200 square feet of Retail Restaurant space, a 570 square foot commercial kitchen, 4,500
square feet of office space and a beautiful 12,000 square foot public plaza. This development is a five over one
design with the ground floor consisting of retail office and classroom space, and the top five floors consisting of
affordable housing on the ground floor, and one, two and three bedroom apartments on the top five floors.
El Centro de la Raza is interested in a partnership with the City of Tukwila that will support the creation of the
development described above that will serve the residents of Tukwila for decades to come. We would look to
negotiate a fair purchase price for the property, that makes this development affordable and mutually beneficial.
In summary, with quality affordable housing, economic and retail development, job creation and educational and
human services, this development will directly impact the quality of life for residents, help alleviate and eliminate
poverty and offer amenities that support the social and economic health and vitality of the City of Tukwila and its
residents.
We appreciate your consideration and look forward to hearing back from you.
Mil Gracias,
Estela Ortega
Executive Director
El Centro de la Raza
Community Action Agency • United Way Agency • Affiliate of National Council of La Raza
252416th Avenue South, Seattle, WA 98144 • (206) 957 -4634 tel • (2o6) 329 -0786 fax 79
www.elcentrodelaraza.org • 5o1(c)3 Nonprofit Tax ID: 91- 0899927
:1
COUNCIL AGENDA SYNOPSIS
---------------------------- - - - - -- Initials
Meeizq Date 11repared by Mayor's revieik Council re
11/21/16 LH
ITEM INFORMATION
ITEM NO.
61
181
ISTAFF SPONSOR: LAUREL HumPHREY
I 0RI(,INAj..A(,,F.NI)ADATE: 11/21/16
lTF1MTJTLF A Resolution reaffirming the City's commitment to diversity, tolerance and inclusion.
CATE(-,0RY F-] Discussion
Mig Dale
❑ motion
Alt ,g Date
❑ Resolution
Mtg Date 11121116
❑ Ordinance
MIg Date
❑ BidAxard
Mt g Date
❑ Public Hearing
All
,g Date
Ej Olber
Mt
,g Date
SPONSOR Z Coundl ❑ Mayor ❑ HR ❑ DCD ❑ Finance ❑ Fire ❑ 17' ❑ P&R [:]Police OPIV
SPONSOR'S On November 14, 2016 the City Council requested that a resolution embracing diversity
Summ'\RY and promoting tolerance and inclusion be drafted for consideration. Staff submits the
attached draft and requests review and modifications as desired.
REVIEWED BY ❑ cow Mtg. ❑ CA&P Cmte ❑ F&S Cmte ❑ Transportation Cmte
F-1 Utilities Cmte ❑ Arts Comm. [:] Parks Comm. ❑ Planning Comm.
DATE: COMMITTEE C1-1AIR:
RECOMMENDATIONS:
SP0Ns(.)R/Ai)mIN.
CO N11\411M �1 I,"
COST IMPACT / FUND SOURCE
EXPENDITURE Rl,"(2UIRIIJ) AMOUNT BUDGETED APPROPRIATION REQUIRED
$N/A $N/A $N/A
Fund Source:
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
11/21/16
MTG. DATE
ATTACHMENTS
11/21/16
Draft Resolution
181
182
D11 1 2 1 � V
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF TUKWILA, WASHINGTON, REAFFIRMING
ITS COMMITMENT TO BEING A DIVERSE,
TOLERANT AND INCLUSIVE CITY.
WHEREAS, the City of Tukwila is a beautifully diverse community of
neighborhoods, residents, businesses and visitors; and
WHEREAS, the City of Tukwila considers this diversity to be one of its greatest
assets and prioritizes the value of inclusiveness; and
WHEREAS, the City Council adopted Resolution No. 1614 in 2006 reaffirming its
commitment to being an inclusive community as a fundamental value; and
WHEREAS, the City of Tukwila promotes civility and strives for a culture where
tolerance and solidarity overcome fear and division; and
WHEREAS, the City of Tukwila does not tolerate bias, harassment, or
discrimination based on race, religion, ancestry, national origin, immigration status,
gender, gender identity, sexual orientation, disability, age, housing status or status with
regard to public assistance; and
WHEREAS, we advance the principles of non - violence, tolerance, religious
freedom, trust and safety, and recognize that these principles are valued by all
communities in our City; and
WHEREAS, all of Tukwila's residents deserve to live in a safe environment free of
hate, discrimination and fear;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES ITS COMMITMENT TO EQUALITY AND
INCLUSIVENESS FOR ALL RESIDENTS AND VISITORS TO OUR CITY AND,
FURTHERMORE, WE RESOLVE TO:
W: \Word Processing \Resolutions \Diverse - tolerant - inclusive city 11 -15 -16
LH:bjs
Page 1 of 2
183
1. Prioritize and promote a welcoming environment for all in our community.
2. Commit to pursuing a policy agenda that affirms civil and human rights.
3. Engage with individuals and community groups to promote education and
dialogue among all community members.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at
a Regular Meeting thereof this day of 7 2016.
ATTEST /AUTHENTICATED:
Christy O'Flaherty, MMC, City Clerk
Rachel B. Turpin, City Attorney
Joe Duffie, Council President
Filed with the City Clerk:
Passed by the City Council:
Resolution Number:
WAWord Processing\Resolutions\Diverse-tolerant-inclusive city 11-15-16
LH:bjs
WA
Page 2 of 2
l Ekberg, Mayor
/�
0
Mayor's 1 David Cline, City Administrator
The City of opportunity, the community of choice
TO: Mayor Ekberg
Councilmembers
FROM: David Cline, City Administrator
DATE: November 16, 2016
SUBJECT: Report for November 21, 2016 Regular Council Meeting
The City Administrator Report is meant to provide the Council, staff and community an update
on the activities of the City and on issues that concern Tukwila. Please let me know if you have
any questions or need additional information about any of the following items.
I. Intergovernmental Update
• Meeting with A Regional Coalition for Housing (ARCH): On October 25 Mayor Ekberg
attended a South King County Region Affordable Housing meeting with Arthur Sullivan,
Program Manager for A Regional Coalition for Housing.
• Veteran Ft Human Services Community Conversation: On November 1 Mayor Ekberg
attended a Veteran 8t Human Services Community Conversation hosted by King County at
the Auburn Senior Center.
• King County City Managers /City Administrators Monthly Meeting: City Administrator
David Cline attended the King County City Managers /City Administrators monthly meeting
on November 2 in Renton where Cabot Dow and Associates gave a presentation about
Bargaining Trends, Forterra presented on Growth Values, and SCA provided an update.
• South King County Region Affordable Housing Forum: On November 4 Mayor Ekberg
attended a South King County Region Affordable Housing Forum hosted by Mayor Backus
and the City of Auburn where local cities met with State Senators Joe Fain and Pam
Roach and State Representatives Pat Sullivan and Joan McBride to discuss key legislative
opportunities and challenges for the upcoming legislative session, Affordable Housing
considerations, housing preservation opportunities and challenges and homelessness.
• Seattle Southside Regional Tourism Authority Sports Advisory Committee: Marlus
Francis, Fitness and Athletic Coordinator was appointed to the Seattle Southside Regional
Tourism Authority Sports Advisory Committee. The main goal is to maintain a strong
partnership with the Seattle Sports Commission and to complement regional sales efforts
to better position Seattle Southside partners to receive the benefit of local sporting
events. Efforts will be focused on recruiting, growing and retaining sports events in the
area, and continuing to expand the visibility of Seattle Southside as a premier athletic
destination, especially in the youth sports market.
• Port of Seattle Flight Corridor Safety Program Public Meeting: On November 1 DCD
staff attended a Port of Seattle public meeting on the proposed removal of up to 3,000
trees over the next three years as part of its Flight Corridor Safety Program. Port staff
provided information on why the trees are proposed for removal. The first phase
addresses trees on Port and Washington State Department of Transportation property
185
City Administrator's Report
November 16, 2016
Page 2
(primarily trees on the unimproved extension of SR 509). The trees are viewed as
"obstructions" and "dangers" to flight safety. The Port has already issued environmental
review (SEPA) for the first phase.
Meet the Cities Event: On October 25 Economic Development staff, in conjunction with
the International Conference of Shopping Centers, hosted a networking reception at
Starfire Sports called Meet the Cities. 20 Puget Sound cities joined retailers, commercial
brokers, and leasing agents to learn about retail opportunities in the Puget Sound region.
Brandon Miles, Business Relations Manager, is the co -chair of ICSC's Public - Private
Alliance for Washington State.
Presentation on Public /Private Partnerships: Derek Speck, Economic Development
Administrator gave a presentation on public /private partnerships to a citizen task force
sponsored by the City of Maple Valley focused on developing a plan for a 40 acre,
undeveloped site owned by Maple Valley.
Association of Washington Cities Regional Meetings: City Administrator David Cline
attended the AWC Regional Meeting on November 10 at the Federal Way Community
Center. More than 40 elected and appointed officials attended from the region. The
meeting focused on discussing AWC's Legislative priorities, the upcoming Legislative
discussion, and hearing from other cities about their current community and budget
issues.
II. Community Events
• Decide the Future of your Community Potluck and Conversation: On November 3 Marlus
Francis, Fitness and Athletic Coordinator and Evie Boykan, Human Services Manager
attended the Decide the Future of your Community Potluck and Conversation hosted by
Global to Local. The premise was to help build leadership and advocacy for social justice
opportunities for our community.
• The Homestretch: Evie Boykan Human Services Manager and Mary Hulvey Code
Enforcement Officer attended the film screening of The Homestretch the first, off -
campus showing of the University of Washington's Master's in Education Policy
documentary series on current social issues. The film screening was hosted by the Tukwila
School District at the Foster High School Performing Arts Center.
• City of Tukwila Veterans Day Ceremony: On November 10 the City held its second
annual Veterans Day Ceremony at the Tukwila Community Center. They event was
organized by Council President Duffie and Mayor Ekberg. Councilmembers Robertson and
Hougardy and several City staff members were in attendance. Alex Zuniga, an 8th grader
at Showalter Jr. High, performed the National Anthem, Lt. Colonel William Blakey was
the guest speaker and the Teamsters Local 117 provided lunch for all attendees.
• Museum of Flight Veterans Day Program: Mayor Ekberg offered welcoming remarks at
the Museum of Flight's annual Veterans Day program on November 11. Council President
Duffie participated in the presentation of the colors and Councilmembers Robertson and
Kruller were in attendance. Deputy Police Chief and Brigadier General Bruce Linton
offered the keynote address.
III. Staff Updates
Public Safety
Phone: 2416- 433 - 1800 + Email, ayor TukwilaWA.gov + Website: T"ukwilaWA.gov
W.
City Administrator's Report
November 16, 2016
Page 3
• The International Associations of Chief of Police Annual Conference: In October Chief
Villa attended the International Associations of Chief of Police annual conference in San
Diego. Every year, the IACP Annual Conference and Exposition brings together educational
programs, renowned keynote speakers, community- building special events and the largest
collection of tactical equipment and technology solutions available for law enforcement.
Attendees are professionals from federal, state, county, local and tribal agencies.
Community Meeting: On November 2 Mayor Ekberg, Councilmember Robertson, Deputy
Chief Rick Mitchell, Detective Randy Rusness, Officer Matt Valdez, Community Oriented
Policing Coordinator Chris Partman and Code Enforcement Officer Mary Hulvey
participated in a community meeting with approximately 12 homeowners from McMicken
Heights.
Safety Training: On November 2 Community Oriented Policing Coordinator Chris Partman
provided safety training for doctors and their staff at the Tahoma Clinic
Proiect Updates
• Southcenter Pedestrian /Bicycle Bridge: The rebar cage is complete and concrete is
being poured for the Pier 2 cap (west side of Green River). Abutment 1 (west side of
Green River) is in progress and another concrete pour is anticipated next week. Work has
started on the rebar cage for the Pier 3 cap (east side of Green River).
• S 119th St Pedestrian Bridge: As of November 8 all the wood members on the bridge
were sanded and sealed. County crews need a stretch of clear weather to install the new
deck surface.
• Andover Park East Water /Sewer: The new sewer line from Strander Blvd to the
Washington Place development has been completed and they are currently working to
activate a portion of the system prior to the winter shut down. We anticipate they will be
off the road in time for the holiday road closure moratorium.
• Crystal Springs Emergency Surface Water Repair: The project is scheduled to be
completed November 23.
• Duwamish Gardens: Contractor poured new sidewalk and a driveway and paved the
parking area. They are also installing the Focal Point at the west end of the project site.
• BAR Bridge Rehab: BNSF forwarded the final overpass agreement and occupancy permit
to the city. Staff can now begin the process of certifying ROW and applying for
construction grant funding through the state. Advertising for construction management
services commenced on November 9. It is anticipated that construction bids will be
advertised in early 2017.
• Tukwila Village: Construction continues on the foundations for the senior apartments on
the south side of 144th. The shape of the plaza building, which will house a cafe,
community meeting room, and commercial kitchen, is now fully visible. The Library
District and developer are evaluating a plan for temporary parking to be in place in time
for the Library opening in early 2017.
• Motels Site: The City has received letters from two organizations interested in purchasing
the four parcels previously owned by the Great Bear Motel, Boulevard Motel, Spruce
Motel, and Sam Smoke Shop. This item will be discussed at the City Council meeting on
November 14.
• Tukwila Station Sound Transit has budgeted for the removal of the illegal dirt pile on
their site and expects to issue a contract by March 2017. The permit for the Station
Phone: 2416- 433 - 1800 + Email: ayor TukwilaWA.gov + Website: T"ukwilaWA.gov
:A
City Administrator's Report
November 16, 2016
Page 4
expired prior to a completion of the all the work and resolution of that code violation.
The permit will need to be reactivated and a final inspection conducted.
Phone: 206-433-1800 + Email; ayor TukwilaWA.gov + Website; T"ukwilaWA.gov
Upcoming Meetings & Events
November/December 2016
21st (Monday)
22nd (Tuesday)
23rd ednesda
24th ffhursday)
25th (Friday)
26th (Saturday)
➢ Transportation
➢ Finance &
Thanksgiving
City offices and
Tukwila Int'l.
Cmte,
Safety Cmte,
Day
Tukwila
Blvd. Action
5:30 PM
5:30 PM
City offices and
Community
Cmte's
(Foster
(Hazelnut
Tukwila
Center closed.
Trash Pickup
Conference
Conference
Community
Day
Room)
Room)
Center closed.
9:00 -10:00 AM
r
➢ City Council
Regular Mtg.,
For location or
7:00 pm
information contact
(Council
Sharon Mann
Chambers)
206 - 200 -3616
28th (Monday)
29th (Tuesday)
30th (Wednesday)
1st (Thursday)
2nd (Friday)
3rd (Saturday)
➢ Community
➢ Utilities Cmte,
➢ Equity &
2016 Tukwila
Earth Corps
Affairs & Parks
5:30 PM
Diversity
Holiday Lights
Volunteer Work
Party at
Cmte,
(Foster
Commission,
Contest entry
Codiga Park
5:30 PM
Conference
5:15 PM
forms due at
9:30 AM- 2:00 PM
(Hazelnut
Room)
(Hazelnut
Noon.
Visit earthcorps.org/
Conference
Conference
More information
volunteer.php
Room)
Room)
available at
www.tukwilawa.
➢ City Council
Committee of
the Whole Mtg.,
7:00 PM
(Council
Chambers)
➢ Arts Commission: 3rd Weds., 5:00 PM, Tukwila Community Center. Contact Dave Johnson at 206 - 767 -2308.
➢ Civil Service Commission: 1 st Mon., 5:00 PM, Hazelnut Conf Room. Contact Sara Valdez at 206 - 431 -2187
➢ Community Affairs & Parks Committee: 2nd & 4th Mon., 5:30 PM, Hazelnut Conf. Room.
➢ COPCAB (Community Oriented Policing Citizens Adv. Board): 2nd Thurs., 6:30 PM, Duwamish Conference Room.
Contact Chris Partman at 206- 431 -2197
➢ Equity & Diversity Commission: 1 st Thurs., 5:15 PM, Hazelnut Conf. Room, Contact Cheryl Thompson at 206 - 433 -1850.
➢ Finance & Safety Committee: 1st & 3rd Tues., 5:30 PM, Hazelnut Conf. Room. (A) A contract with Summit Strategies for lobbying
services. (B) An agreement with Total Destination marketing for branding for the City's day marketing campaign. (C) A contract
with Kenyon Disend for City Attorney services. (D) A contract with Kirshenbaum & Goss for public defender services. (E) A lease
agreement with Alliance One. (F) a non - binding statement of intent to enter into an Interlocal Agreement with Regional Animal
Services of King County (RASKC). (G) 2016 31 Quarter financial report.
➢ Park Commission: 2nd Wed., 5:30 PM, Community Center. Contact Robert Eaton at 206 - 767 -2332.
➢Planning Commission/Board of Architectural Review: 41 Thurs., 6:30 PM, Council Chambers at City Hall. Contact Wynetta
Bivens at 206-431-3670
➢ Transportation Committee: 1 st & 3rd Mon., 5:30 PM, Foster Conf. Room (A) ADA Transition Plan update. (B) ADA Transition
Plan Design Services Supplemental Agreement No. 1 with Transpo Group. (C) Baker Blvd. Non - Motorized Improvements
Interagency Agreement with King County. (D) 2016 Overlay and Repair Program Project Completion and Acceptance. (E) King
County Metro Alternative Services Pilot Participation Application.
➢ Tukwila Historical Society: 3rd Thurs., 7:00 PM, Tukwila Heritage & Cultural Center, 14475 591 Avenue S.
Contact Louise Jones -Brown at 206 - 244 -4478.
➢Tukwila Int'l. Blvd. Action Cmte: 2nd Tues., 7:00 PM, Valley View Sewer District. Contact Chief Villa at 206 - 433 -1815.
➢Utilities Committee: 2nd & 4th Tues., 5:30 PM, Foster Conf. Room.
We
Tentative Agenda Schedule
MONTH ; ,
MEE'T'ING 1— -
MEETING 2 -
MEETING 3 -`
MEETING 4
REGULAR
C.O.W.
REGULAR
C.O.W:
November
7
14
21
28
See agenda packet
Public Hearing:
cover sheet for this
Code changes relating to
week's agenda
Low Impact Development
(November 212016
requirements (TMC Titles
Regular Meeting).
8,14,16 and 18).
Special Issues:
-An ordinance updating
regulations related to
surface water manage-
ment (TMC Title 14).
-An ordinance
implementing Low
Impact Development
requirements (TMC Title
16).
-An ordinance
implementing Low
Impact Development
requirements in the
design and review of
surface water drainage on
development projects
(TMC Titles 8 and 18).
-A non - binding statement
of intent to enter into an
Interlocal Agreement
with Regional Animal
Services of King County
(RASKC).
-A resolution adopting the
Green Tukwila
20 -year plan.
-A resolution accepting a
land donation.
-An ordinance updating
the rental license
requirements to match
the fee resolution and
require proactive pest
control.
-A resolution authorizing
study of the Landscape
Conservation and Local
Infrastructure (LCLIP)
program
- Affordable Housing
Legislation.
- Interagency agreement
between King County
Parks and Recreation and
City of Tukwila for Baker
Boulevard and
Christensen Road
Improvements for Bikes
and Pedestrians.
- Budget Legislation.
190