Loading...
HomeMy WebLinkAboutPermit L09-057 - FADDEN BOB / SEGALE PROPERTIES - SHORELINE SUBSTANTIAL DEVELOPMENTSEGALE PROPERTIES SHORELINE SUBSTANTIAL DEVELOPMENT SHORELINE MANAGEMENT 2 -STORY OFFICE BUILDING 18100 ANDOVER PARK W L09 -057 • City of Tukwila Department of Community Development NOTICE OF DECISION TO: Bob Fadden, Lance Mueller Architects, Applicant Steve Nelson, Segale Properties, Applicant Segale Properties, Owner King County Assessor, Accounting Division Washington State Department of Ecology Karen Walter, Muckleshoot Indian Tribe Fisheries Division Steve Bleifuhs, King County Water and Land Resources Division Tom Bean, King County Water and Land Resources Division This letter serves at a notice of decisibri ands is issued ursuant to TMC 18.104.170 on permit approval. I. PROJECT INFORMATION Jim Haggerton, Mayor Jack Pace, Director May 6, 2010 Br d- -t m rs h iirc(ra, the following project T anr/h d Project File Number: L09 -057 Applicant: Bob Fadden, Lance Mueller Architects; Steve Nelson, Segale Properties Type of Permit Applied for: Shoreline Management Shoreline Substantial Development Permit Project Description: Development of a two -story 57,518 square foot office building with 209 parking spaces, associated landscaping, frontage improvements along Andover Park West, and pedestrian connections. Location: 18100 Andover Park West, Tukwila, WA 98188 (parcel #352304 -9121) Associated Files: L10 -005 (Administrative Design Review); D10 -044 Development Permit Comprehensive Plan Tukwila South Overlay (TSO) Designation/Zoning District: II. DECISION SEPA Determination: The City SEPA Responsible Official has previously determined that the project, as part of the larger Tukwila South Project/overlay area, creates a probable significant environmental impact and required JR Page 1 of 2 05/05/2010 H: \Shoreline Permits\Segale Office Building\L09 -057 NOD.doc 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206 -431 -3670 • Fax: 206- 431 -3665 • . preparation of an Environmental Impact Statement (EIS) on the project. A Draft Environmental Impact Statement was completed in April 2005, and the Final Environmental Impact Statement was completed in July 2005 (see Tukwila land use file number E04 -015). There are no conditions of the Final EIS which apply to the current proposal. Decision on Substantive Permit: The City Community Development Director has determined that the application for a Shoreline Substantial Development Permit does comply with applicable City and state code requirements and has approved that application based on the findings and conclusions contained in the staff report, and subject to the following condition of approval: Subject to approval by the Corps of Engineers, plantings shall be added to the area at the back of the retaining wall, to include native groundcover and grasses such as Beach Strawberry (fragaria chiloensis) and Idaho Fescue (Roemerii). The landscape plan shall be revised to reflect this change as part of the building permit. The Decision on this Permit Application is a Type 2 decision pursuant to Tukwila Municipal Code §18.104.010. Other land use applications related to this project may still be pending. III. YOUR APPEAL RIGHTS One administrative appeal to the Shorelines Hearings Board of the Decision is permitted. Any person appealing to the Shorelines Hearings Board may raise certain SEPA issues as part of the appeal to the Shorelines Hearings Board. Appellants should consult the rules and procedures of the Shorelines Hearings Board for details. IV. PROCEDURES AND TIME FOR APPEALING The requirements and procedures for appeals to the Shorelines Hearings Board are set forth in RCW 90.58 and WAC 461.08. V. INSPECTION OF INFORMATION ON THE APPLICATION Project materials including the application, any staff reports, and other studies related to the Shoreline Substantial Development Permit are available for inspection at the Tukwila Department of Community Development, 6300 Southcenter Blvd., Suite 100, Tukwila, Washington 98188 from Monday through Friday between 8:30 a.m. and 5:00 p.m. The project planner is Jaimie Reavis, who may be contacted at 206 - 431 -3659 for further information. Property owners affected by this decision may request a change in valuation for their property tax purposes. Contact the King County Assessor's Office for further information regarding property tax valuation changes. The notice board must be removed at the expiration of the appeal period unless an appeal is filed. Department of Community Development City of Tukwila JR Page 2 of 2 H:\Shoreline Permits\Segale Office Building\L09- 057_NOD.doc 05/05/2010 10 ea* Department Of Community AFFIDAVIT of J uPIwi&a • Development OF DISTRIBUTION I, ._ JGJ. i441 e gwAi It S HEREBY DECLARE THAT: Project Number: LDq - 0 S 7 / Mailing requested by: ∎,.Joi jmi e R94. Vi S Notice of Public Hearing Determination of Non - Significance Notice of Public Meeting Mitigated Determination of Non - Significance Board of Adjustment Agenda Packet Determination of Significance as Scoping Notice Board of Appeals Agenda Packet Notice of Action Planning Commission Agenda Packet Official Notice Short Subdivision Agenda Notice of Application X Shoreline Mgmt Permit Nat- i c is i Notice of Application for Shoreline Mgmt Permit _ _ FAX To Seattle Times Classifieds Mail: Gail Muller Classifieds PO Box 70 - Seattle WA 98111 Other: Was mailed to each of the addresses listed/attached on this day of in the year 20 W: \USERS \TERIWFFIDAVIT OF DISTRIBUTION.DOC Project Name: 6(16 (40 2 - �� -i-�/ off, e,,,/,,,,,_, Project Number: LDq - 0 S 7 / Mailing requested by: ∎,.Joi jmi e R94. Vi S Mailer's signature: 6-i ,e -/ /i%i/filil -. - W: \USERS \TERIWFFIDAVIT OF DISTRIBUTION.DOC City ofiltukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206- 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us SHORELINE MANAGEMENT ACT OF 1971 PERMIT FOR SHORELINE MANAGEMENT SUBSTANTIAL DEVELOPMENT File Number: L09 -057 Applied: 12/08/2009 Approved: 05/06/2010 Expiration: 05/06/2012 A permit is hereby granted to: BOB FADDEN to: Construct a two story 57,518 square feet office building with 209 parking spaces. Upon the following property: Address: 18100 ANDOVER PK W TUKW Parcel Number: 3523049121 Section/Township/Range: 23N - 04E - 35 The following master program provisions are applicable to this development: City of Tukwila Shoreline Master Program Development under this permit shall comply with the following conditions. 1: Subject to approval by the Corps of Engineers, plantings shall be added to the area at the back of the retaining wall, to include native groundcover and grasses such as Beach Strawberry (fragaria chiloensis) and Idaho Fescue (Roemerii). The landscape plan shall be revised to reflect this change as part of the building permit. This permit is granted pursuant to the Shoreline Management Act of 1971 and nothing in this permit shall excuse the applicant from compliance with any other Federal, State or local statutes, ordinances or regulations applicable to this project, but not inconsistent with the Shoreline Management Act (Chapter 90.58 RCW). This permit may be rescinded pursuant to RCW 90.58.140(8) in the event the permittee fails to comply with the project as approved and any conditions thereof. CONSTRUCTION PURSUANT TO THIS PERMIT MAY NOT BEGIN AND IS NOT AUTHORIZED UNTIL TWENTY -ONE (21) DAYS FROM THE DATE OF FILING WITH THE DEPARTMENT OF ECOLOGY (D.O.E.) AS DEFINED IN RCW 90.58.140(6) AND WAC 173 -14 -090, OR UNTIL ALL REVIEW PROCEEDINGS INITIATED WITHIN TWENTY -ONE (21) DAYS FROM THE DATE OF SUCH FILING HAVE TERMINATED; EXCEPT AS PROVIDED IN RCW 90.58.140(5)(a)(b)(c). Pursuant to RCW 90.58.180 the decision by the City of Tukwila to issue this Shoreline Substantial Development Permit may only be appealed to the Shoreline Hearing Board. Appeals must be filed with the Shorelines Hearing Board within 21 -days from the filing of this permit with D.O.E. as defined in RCW 90.58.140. For more detail information on appeals, refer to RCW 90.58 and WAC 461.08. it ctor of Department of Community Development Construction or substantial progress toward construction must begin within two (2) years from the effective date of the permit (the date the permit is filed with D.O.E.), per RCW 90.58.143(4). • City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director MEMORANDUM DATE: May 5, 2010 TO: Jack Pace, Director, Department of Community Development FM:: , Jaimie Reavis, Assistant Planner RE: Shoreline Permit L09 -057: Segale 2 -Story Office Building 1. PROJECT DESCRIPTION: The project is to construct a two -story 57,518 square foot office building with 209 parking spaces, associated landscaping, frontage improvements along Andover Park West, and pedestrian connections. A small block wall and concrete ramada located on the northern area of the site will be demolished. The project site is 8.35 acres in size and is currently completely paved and used as a parking lot. A little more than half of the project site will be developed as part of this project; the area proposed for development will be separated from the undeveloped area through a short plat. The site is located just south of S 180th Street, at 18100 Andover Park West (parcel #352304- 9121). This parcel is included in the Tukwila South Project overlay area (TSO), a 512 -acre area extending from S 178 Street/S 180th. Street on the north side to S 204th Street on the south side, and bounded by Orillia Road and Interstate 5 on the west and the Green River on the east. New zoning regulations were adopted for the TSO in June 2009, along with a development agreement between the City of Tukwila and the property owner La Pianta, LLC /Segale Properties. A retaining wall constructed in 2008 as part of an emergency levee repair runs along the length of the eastern portion of the project site. The wall is approximately 11 feet tall, and consists of an 8 -foot retaining wall topped with a 3 -foot tall chain link fence. The concrete retaining wall serves to separate the site visually from the Green River, and physically separates the site from access to the Green River. The footing for the levee retaining wall extends 10 feet west of the wall, for which there is an associated 10 -foot access area where uses are restricted to protect the wall footing. The top of the levee is located at the top of the wall, where there is currently a gravel road planned to be paved in the future for a bicycle and pedestrian trail. The development, including the east side of the building and parking areas located to the north, east, and south of the proposed building, will be able to be seen from the future trail. Access to this trail will be available from S 180th to the north, an easement for levee maintenance to the south, and from future trail links to be built to the south of the project site within the Tukwila South Project area. Comments were received during the Notice of Application period from the King County Water and Land Resources Division and from Karen Walter of the Muckleshoot Indian Tribe Fisheries Division. Information on the comments is included in section 4 of the staff report below. JR Page 1 of 11 H: \Shoreline Permits \Segale Office Building\L09 -057 Segale 2 -Story Office Bldg ShorelineSR.doc 05/05/2010 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206 -431 -3670 Fax: 206 -431 -3665 • • 2. POLICIES OF THE SMA/SMP: The site is within the jurisdiction of the Tukwila Shoreline Management Program (SMP). This program was adopted in June, 1974 and amended March 16, 1982. The City's SMP was reviewed and approved by the State Department of Ecology as being consistent with the State Shoreline Management Act, adopted in 1971. The Shoreline Master Program establishes three management environments adjacent to the Green/Duwamish River: River Environment: An impact buffer area which provides for resource protection, flood control maintenance, pollution control and landscape enhancement. This zone includes the first 40 feet from the mean high water mark. Low Impact Environment: A transition area intended to minimize physical and visual impact on the river zone while accommodating shoreline development. This zone includes the next 60 feet from the mean high water mark. High Impact Environment: An area to provide for more intensive use of the shoreline resource. This zone includes the area from 100 feet to 200 feet from the mean high water mark. The applicable policies of the City's Shoreline Master Program are set forth below along with a discussion of the proposed project. City of Tukwila Shoreline Master Plan: Overall Goals: 1. Promote reasonable and appropriate use of the shorelines, which will promote and enhance public interest. 2. Protect against adverse effects against the public health, the land, its vegetation and wildlife and the waters and their aquatic life within Tukwila. 3. Protect public rights of navigation. 4. Recognize and protect private property rights consistent with public interest. 5. Maintain a high quality of environment along the shorelines of Tukwila. 6. Preserve and protect fragile natural resources and culturally significant features. 7. Provide safe and reasonable access for the public to the shorelines. 8. Recognize, protect, and improve aquatic habitats and spawning grounds of the Green River, which are invaluable natural resources. 9. Recognize, protect and improve those wildlife habitats, which are valuable natural resources of the State. 10. Encourage recreational activities unique to or dependent upon the use of the river which benefit the public interest. JR Page 2 of 11 H:\Shoreline Permits \Segale Office Building\L09- 057_Segale 2 -Story Office Bldg ShorelineSR.doc 05/05/2010 • Response: The subject property, located at 18100 Andover Park West, is within the Tukwila South Overlay (TSO) district. Office use is proposed for this project, and is a permitted use within the TSO district. Surrounding land uses include a similarly- designed office building to the north: a data center across the street and to the north; office and warehousing across the street to the west; and warehouse uses to the south. The Green River is located to the east. The Green River Trail, a multi -use trail, runs along the east side of the river across from the project site. To the east of the trail along the river are additional warehouses used for manufacturing, retail, and warehousing. In terms of impacts to the Shoreline Management Area including those associated with public health, the land, vegetation, wildlife, waters, and aquatic life, this project represents an improvement over existing conditions. Impervious surface area, compared with the previous use of the site, will be reduced with the addition of required landscaping. Landscaping within 200 feet of the mean high water mark will consist almost entirely of plants native to the Puget Sound area. Native plants will also be interspersed with ornamental plantings throughout all landscaping areas on site. The Green River Trail along the east side of the river can be accessed from a bridge on the south side of S 180th Street. A trail is planned for construction by the City of Tukwila along the top of the levee directly adjacent to the project site. Access to this new trail can be made from S 180th Street, as well as from the levee maintenance easement to the south of the project site. The river is not navigable in this section except by kayaks and canoes, and the project will not interfere with navigation of the river. There are no known culturally significant features on the site. However, the applicant shall follow all local, state, and federal regulations in the event that archaeological or paleontological resources are encountered. Economic Development Element Goals: 1. Encourage economic development along shorelines that will enhance the quality of life for the residents of Tukwila with minimum disruption of the environment. 2. Encourage economic development along shorelines that will result in long -term over short-term benefits for the river shoreline. 3. Recognize the quality of the existing economic activities along the river and discourage any future economic activities that may be of less quality. 4. Encourage inland location of development so that access along the shorelines is enhanced. 5. Encourage commercial development of public recreational facilities consistent with shoreline goals and policies. Response: Development of this site as a 57,518 office building will generate construction jobs. This development will provide office space for one or more large employers in the City of Tukwila, which will create spillover effects as workers at the site spend money on goods and services within the City. The project site is physically separated from the Green River by an 8 -foot high retaining wall, which acts to encourage inland location of development. JR Page 3 of 11 H: \Shoreline Permits \Segale Office Building\L09- 057_Segale 2 -Story Office Bldg ShorelineSR.doc 05/05/2010 • • Public Access Element Goals: 1. Encourage safe, convenient and diversified access for the public to the shorelines of Tukwila. 2. Assure that the intrusions created by public access will not endanger life, property or have adverse effects on fragile natural features. 3. Increase public access to publicly owned shorelines. 4. Encourage public access to privately owned shorelines, consistent with private property rights. 5. Encourage inland location of development so that access along shorelines is enhanced. Response: The goals of this section relate to providing public access to the river. There is a public trail system that runs the length of the Green River through Tukwila that is used by pedestrians, bike riders and runners. On this portion of the river, the trail is located on the opposite side of the river from the project site. The property owner has provided an easement to the City of Tukwila for construction of a trail on top of the levee on the east side of this site. Connections to this future trail can be provided from S 180th Street, as well as from an easement for levee maintenance located south of the project site. Additionally, as part of the development agreement between the City of Tukwila and La Pianta LLC/Segale Properties, La Pianta/Segale Properties will submit a plan to the City of Tukwila that will identify possible locations for eight 14 -foot wide pedestrian corridors and connections from the future trail through the Tukwila South Property. Circulation Element Goals: 1. Encourage a safe, convenient and diversified circulation system to assure efficient movement of persons during their daily and other activities with minimum disruption to the shoreline environment and minimum conflict between the different users. 2. Encourage a balanced system for transporting people and moving goods in existing corridors. Response: The Circulation Element of the City's Shoreline Master Program applies to the location of proposed major roads, transportation routes and other public facilities within the shoreline. The proposed project does not involve the location of any public roads or public facilities within the shoreline. Drive aisles and/or fire lanes are located around all sides of the proposed building, as is a sidewalk which wraps around all sides of the building. The sidewalk links up with pedestrian connections that provide access to the sidewalk along Andover Park West, the office building to the north, and the parking area to the south. Recreational Element Goals: 1. Encourage recreational activities and related facilities unique to or dependent upon the use of the river, which benefit the public interest. 2. Encourage diverse, convenient and adequate recreational opportunities along the shorelines for the local residents and a reasonable number of transient users. Response: As noted above, a public trail system runs along the Green River from Auburn to the City of Seattle, alternating sides of the river on which it is located. The presence of the levee and associated wall prevent direct access from the project site to the river for recreational purposes. However, a connection to the Green River is located nearby at S 180th Street. JR Page 4 of 11 H: \Shoreline Permits\Segale Office Building\L09- 057_Segale 2 -Story Office Bldg ShorelineSR.doc 05/05/2010 Shoreline Use Element Goals: 1. Encourage appropriate development in suitable locations without diminishing the quality of environment along the shorelines of the river. 2. Shoreline activities should be consistent with the overall goals for development along the river. Response: Proposed use of this site for office with associated required parking and landscaping is consistent with the zoning and comprehensive plan land use designation for the area, as well as the uses specified in the shoreline management environment designations. Native landscaping proposed for the project will improve the quality of the environment on the portion of the site located within the 200 foot buffer from the river. Conservation Element Goals: 1. Encourage preservation of unique, fragile and scenic elements, and of non - renewable natural resources; assure continued utilization of the renewable resources. 2. Encourage the preservation of as much as possible of the natural character of the river and its shoreline. 3. Encourage the preservation of resources and ecology of the river and its shoreline. 4. Water quality in the river should be sufficiently high to permit human use and provide a suitable use and habitat for desirable forms of aquatic life. Response: The natural character of the river in the area of the proposed project has been altered to a major extent due to the construction of the levee system that provides flood protection throughout the urban center. The repaired levee incorporated a bench mid -way up the slope of the levee that can be planted to improve the habitat of the river over the long term. The addition of landscaping within the project will reduce impervious surface area and provide native plantings to an area that is currently completely paved. 3. SHORELINE REGULATIONS: Following are the relevant review criteria as contained in the Tukwila Shoreline Regulations (Tukwila Municipal Code, Chapter 18.44) as applied by the City of Tukwila. A. TMC 18.44.110 General Shoreline Regulations All uses within the shoreline overlay district must conform to the following general regulations: 1. The use is in conformance with the regulations of the underlying zone district. Response: The project site is included in the Tukwila South Overlay zone. Office is a permitted use within the TSO zone. 2. The use does not conflict with the goals and policies of the shoreline master program or the provisions of the Shoreline Act and shoreline regulations. JR Page 5 of 11 H:\Shoreline Permits \Segale Office Building\L09- 057_Segale 2 -Story Office Bldg ShorelineSR.doc 05/05/2010 • • Response: Section 2, above is a discussion of the goals of the City's adopted Shoreline Management Program. The proposed project will be consistent with the City's adopted Shoreline Management Program. 3. No structures or accessory facilities shall be located over the river unless such structure protects or promotes the public interest. Response: No structures or accessory facilities are proposed to be located over the river as part of this project. 4. There shall be no disruption of existing trees or vegetation within the river environment unless necessary for public safety or flood control, or if allowed as part of an approved shoreline substantial development permit; Response: Currently there are no existing trees or vegetation within the river environment on the project site. Native landscaping will be added within the 200 -foot buffer of the river as part of the proposed project. S. No effluent shall be discharged into the Green River which exceeds the water quality classification as established by the State for the adjacent portion of the river. Response: No effluent will be discharged into the Green River as part of this project. 6. All State and federal water quality regulations shall be strictly complied with. Response: The project will comply with all State and federal water quality regulations. 7. Wildlife habitat in and along the river should be protected. Response: The addition of native plantings included in this project proposal will enhance the quality of wildlife habitat within the 200 foot buffer from the mean high water mark of the Green River. 8. All perimeters of landfills or other land forms susceptible to erosion shall be provided with vegetation, retaining walls or other satisfactory mechanisms for erosion prevention. Response: The applicant has prepared a temporary erosion and sediment control plan, which will be reviewed with the site construction permit to ensure necessary measures are employed to prevent erosion. 9. All necessary permits shall be obtained from federal, State, County or municipal agencies. Response: An NPDES permit is required, to be obtained by the applicant from the State Department of Ecology. Additionally, the State Department of Ecology will review the shoreline permit. 10. Dredging for purposes other than for navigational improvements or flood control is prohibited. Response: .No dredging is involved with this project. 11. Mining is prohibited along the river shoreline. JR Page 6 of 11 H: \Shoreline Permits \Segale Office Building \L09- 057_Segale 2 -Story Office Bldg ShorelineSR.doc 05/05/2010 • • Response: No mining is involved with this project. 12. Solid waste disposal is prohibited along the river shoreline. Response: Solid waste will not be disposed along the river 13. No property will be acquired for public use without dedication by or just compensation to the owner. Response: None of the property that is part of the project is proposed to be acquired for public use. 14. Landfilling is prohibited within the river channel unless such landfill is determined by the Planning Commission to protect or promote the public interest. Response: This project does not propose any landfilling within the river channel. 15. ... (R)emoval of any cottonwood tree within the river environment or the low impact environment, which tree is 12 inches or greater in diameter as measured 4.5 feet above grade, shall be subject to the requirements of TMC Chapter 18.54, Tree Regulations. Response: There are currently no trees located within the river environment or the low impact environment. B. TMC 18.44.130 Specific Shoreline Regulations — River Environment The river environment is a 40 -foot wide management zone, measured on a horizontal plane from the mean high water mark. This zone offers the highest level of environmental protection of all the management zones within the Shoreline Overlay District. Uses within this zone are limited to public access and recreation, pollution control, dikes for bank stabilization, signage, bridges, and access for fire and maintenance. Response: A small area of the site is located within the River Environment. Plans originally submitted for this project included a parking area and the dumpster /trash and recycling collection point within the River Environment. The survey for the project has been changed to remove the parking and dumpster from the 40 -foot River Environment. All other plans, including civil, architectural, and landscaping, will be revised as part of the building permit to reflect the site design changes shown on the survey submitted to the City on May 3, 2010. Uses within the River Environment on the project site will be limited to the retaining wall for the levee, and the 10 -foot easement area to the west of the retaining wall. The Specific Shoreline Regulations for the River Environment in section 18.44.130 (B) of the TMC require that areas where the riverbank has been reconstructed be landscaped with suitable plant material consistent with flood control measures, to include large hardy shade or fruit trees, groundcover at a maximum spacing of 18 inches on center, and natural grass. The landscape plan for the 10 -foot easement area on the west side of the levee retaining wall originally showed native plantings, including trees, shrubs, and groundcover. These plantings were removed from the 10 -foot levee easement area because the Corps of Engineers limits the types of plantings located on top of the retaining wall footing. Per the Corps of Engineers, no trees or shrubs are allowed within the 10 -foot easement area on the top of the retaining wall footing. The landscape plan currently shows washed rock within the 10 -foot levee easement area. As a condition of approval of the Shoreline Permit, JR Page 7of11 H:\Shoreline Permits\Segale Office Building\L09- 057_Segale 2 -Story Office Bldg ShorelineSR.doc 05/05/2010 • • groundcover shall be added to the area at the back of the retaining wall, to include native groundcover and grasses such as Beach Strawberry (Fragaria chiloensis) and Idaho Fescue (Roemerii), subject to approval by the Corps of Engineers. The landscape plan shall be revised to reflect this change as part of the building permit. C. TMC 18.44.140 Specific Use Regulations - Low - Impact Environment The low impact environment is a 60 -foot wide management zone, located between the river environment and 100 feet from the mean high water mark. This zone allows the same uses as within the river environment, as well additional uses including structures no taller than 35 feet, parking/loading and storage facilities that are adequately screened or landscaped, public and private roads, utilities, and signs. A driveway is an allowed use within the Low Impact Environment of the Shoreline Management Area. Response: A small portion of the building will be located within the Low Impact Environment, in which structures that do not exceed 35 feet in height, parking/loading and storage facilities adequately screened or landscaped, and utilities are among the uses allowed. The proposed building is 34 feet in height, with the exception of areas of the building where the mechanical equipment and associated screening are located, which bring the building height to 40 feet. Both mechanical equipment areas are located within the High Impact Environment, where the height limit is the same as the underlying zoning district; a maximum of 125 feet. D. 18.44.150 Specific Use Regulations — High Impact Environment The High Impact Environment is located between 100 feet and 200 feet from the mean high water mark. Within the High Impact Environment, allowed uses are the same as all of those uses allowed within the underlying zoning district. The largest portion of the project site located within the Shoreline Management Area is within the High Impact Environment. Office use of the site is a permitted use within the Tukwila South Overlay area. Response: Most of the proposed building and parking area for this project will be located in the High Impact Environment, the shoreline management zone located between 100 and 200 feet from the mean high water mark. Uses within this management zone are the same as those allowed within the underlying zoning designation. 4. COMMENTS: Comments were received during the Notice of Application period from representatives of the King County Water and Land Resources Division and from Karen Walter of the Muckleshoot Indian Tribe Fisheries Division. King County Water and Land Resources Division Comments from King County Water and Land Resources Division were submitted by Steve Bleifuhs, Manager of the Water and Land Resources Division on March 5, 2010 and were clarified by Tom Bean, Supervising Engineer for the Green River Basin through emails sent to the City of Tukwila on March 30, 2010 and April 26 2010. Both Tom Bean and Steve Bleifuhs explained that King County is in the process of conducting a risk - based study of alternative levee setback alignments and geometries. The section of the levee adjacent to the project site, though reconstructed in 2008, is included in the scope of the analysis. According to the letter from Steve Bleifuhs, the required width for levee rehabilitation and reconstruction, in general, would not exceed 110 feet landward from the aquatic edge of the river channel along each bank of the river. However, the letter noted JR Page 8 of 11 H:\Shoreline Permits\Segale Office Building\L09- 057_Segale 2 -Story Office Bldg ShorelineSR.doc 05/05/2010 • • that King County cannot at this time define the preferred levee alignment for the section of the levee adjacent to the project site. Response: The levee reconstruction project that occurred in 2008 was done by the Corps of Engineers, and includes an overall levee slope of 2.5:1 with a mid -slope bench. At the time of reconstruction, the design geometry complied with the King County Flood Control District requirements, with the exception being that a landward toe was not included. In this case, it was agreed upon by the Corps of Engineers, the City of Tukwila, and the King County Flood Control District to allow the land owner, Segale Properties, to construct a wall at the property owner's expense, and to require the property owner to provide the easements necessary for construction as well as an additional 10 -foot easement area per the Corps of Engineers requirements. Without having the results of the risk -based assessment at this time, and because the proposed building and site design meets current City of Tukwila setback requirements and was approved and reconstructed only two years ago, the City of Tukwila has no basis to require additional setbacks from the levee at this time. Muckleshoot Indian Tribe Fisheries Division Comments from Karen Walter of the Muckleshoot Indian Tribe Fisheries Division were submitted on March 19, 2010. Comments received on this date included a list of questions, and a request for additional information. The City of Tukwila forwarded to Karen Walter a copy of the applicant's response to the City of Tukwila Shoreline goals and policies, as well as the applicant's response to the design review criteria. Additional information and answers to Karen's questions were sent by email on March 30, 2010 (see attachment). Karen Walter sent a final set of comments related to the project on April 8, 2010. These comments related to a concern that lighting on the project site had the potential to add light to the Green River corridor during nighttime. She stated that nighttime lighting can provide salmon predators with visual advantages and result in increased predation. Nighttime lighting may also slow down outmigration of juvenile salmon and increase their exposure risk to predation. Karen Walter provided three different ways for the project to address the risk, including considerations for lighting fixture location, height, and orientation; use of shields to produce a direct downward beam with limited angle to avoid light spillage; and vegetation screening. Response: The survey submitted by the applicant on May 3, 2010 shows the lights to be located closest to the river will be at least 45 feet from the mean high water mark, with most of the lights on the eastern side of the site located at 60 to 80 feet from the mean high water mark. The height of the levee wall will help prevent light from spilling into the Green River corridor. Additionally, cut sheets for the lights to be installed on the project site, and a meeting held with the applicant on April 8, 2010 revealed that lights included in the project will include shields to direct light downward and prevent light from spilling over to the other side of the levee. 5. SEPA: A Determination of Significance was previously issued for the Tukwila South area in which this project is located; a Draft Environmental Impact Statement was completed in April 2005, and the Final Environmental Impact Statement was completed in July 2005 (see Tukwila land use file number E04 -015). There are-no, _ conditions of the Final EIS which apply to the current proposal. JR Page 9 of 11 H:\Shoreline Permits \Segale Office Building\L09- 057_Segale 2 -Story Office Bldg ShorelineSR.doc 05/05/2010 • • CONCLUSIONS 1. The use is in conformance with the regulations of the underlying zone district and the use is consistent with the goals and policies of the City's adopted Shoreline Management Program. 2. Public access is available on the Green River Trail located on the opposite site of the river from the project site. Access to the trail is available from S 180th Street to the north of the project site. Additionally, the property owner has provided the City of Tukwila an easement on top of the section of the levee adjacent to the project site for construction of a future trail which will be accessed from S 180th, as well as from a levee maintenance easement located south of the project site. 3. There are no known culturally significant features on the project site. 4. Development of the site with an office building will generate construction jobs, and will provide • office space for one or more employers, whose employees will spend money on goods and services within the City of Tukwila. 5. The project site is physically separated from the Green River by an 8 -foot tall retaining wall, which acts to encourage an inland development location. 6. Native plantings proposed within the 200 -foot shoreline buffer will enhance wildlife habitat in the area, and the addition of landscaping to the project site will decrease impervious surface area. 7. There will be no disruption of existing trees or vegetation within the river environment. 8. No structures or accessory facilities will be located over the river. 9. No effluent will be discharged into the Green River. 10. All necessary permits will be obtained for this project, and the applicant shall follow all local, state, and federal regulations. 11. The project does not involve any dredging or mining. 12. No landfilling is proposed within the river channel. 13. No property will be acquired for public use without dedication by or just compensation to the owner. 14. Plans originally submitted for the project included a parking area and the dumpster /trash and recycling collection point within the River Environment; the first 40 feet landward from the mean high water mark. Because . parking and service areas for trash collection are not permitted uses within the River Environment, the design of the project was changed to remove these elements from the River Environment. The survey for the project was changed to reflect removal of parking and the dumpster area from the 40 -foot River Environment. As a condition of approval of the Shoreline Permit, all other plans, including civil, architectural, and landscaping plans, shall be revised as part of the building permit to reflect the site design changes shown on the survey submitted to the City of Tukwila on May 3, 2010. 15. The Specific Shoreline Regulations for the River Environment in section 18.44.130 (B) of the TMC require that areas where the riverbank has been reconstructed be landscaped with suitable plant material consistent with flood control measures, to include large hardy shade or fruit trees, groundcover at a maximum spacing of 18 inches on center, and natural grass. The landscape plan for the 10 -foot easement area on the west side of the levee retaining wall currently shows washed rock. Per the Corps of Engineers, plantings are allowed to be located within the 10 -foot easement area on top of the retaining wall footing; however, no trees or shrubs are allowed. As a condition of approval of the Shoreline Permit, groundcover shall be added to the area at the back of the retaining wall, to include native groundcover and grasses such as Beach Strawberry (Fragaria JR Page 10 of 11 H: \Shoreline Permits \Segale Office Building\L09- 057_Segale 2 -Story Office Bldg ShorelineSR.doc 05/05/2010 • • • chiloensis) and Idaho Fescue (Roemerii), subject to approval by the Corps of Engineers. The landscape plan shall be revised to reflect this change as part of the building permit. 16. Comments were received from the King County Flood Control District and the Muckleshoot Indian Tribe during the Notice of Application period. 17. A Determination of Significance was previously issued for the Tukwila South area in which this project is located; a Draft Environmental Impact Statement was completed in April 2005, and the. Final Environmental Impact Statement was completed in July 2005 (see Tukwila land use file number E04 -015). There are no conditions of the Final EIS which apply to the current proposal. 6. RECOMMENDATION Approve the shoreline substantial development permit with the following conditions: 1. Subject to approval by the Corps of Engineers, plantings shall be added to the area at the back of the retaining wall, to include native groundcover and grasses such as Beach Strawberry (fragaria chiloensis) and Idaho Fescue (Roemerii). The landscape plan shall be revised to reflect this change as part of the building permit. Attachments: Site Plan Comments from Karen Walter and City of Tukwila response JR Page 11 of 11 H: \Shoreline Permits \Seeale Office Buildine \L09 -057 Seeale 2 -Story Office Bide ShorelineSR.doc 05/05/2010 King County Water and Land Resources Division Department of Natural Resources and Parks King Street Center 201 South Jackson Street, Suite 600 Seattle, WA 98104 -3855 206.296.6519 Fax 206.296.0192 TTY Relay: 711 March 5, 2009 Ms. Jaimie Reavis Department of Community Development City of Tukwila 6300 Southcenter Boulevard, Suite 100 Tukwila, WA 98188 -2545 Re: Segale Two -Story Office Building (L09 -057 and L10 -005) Dear Ms. Reavis: I am writing to comment on the proposal to establish a new two -story office building on Parcel 352304 -9121 at 18200 Andover Park West in Tukwila. My comments involve King County's continuing pursuit of important flood protection benefits in this same area ,I wish, to make certain that King .County's plans are understood and respected, to the extent that the City,of Tukwila can provide. Section 5.9.10 of King County's adopted Flood Hazard Management Plan (FHMP) makes the following statements of objectives and strategies for the Lower Green River: • A program of major levee rehabilitation and reconstruction is the single overarching need within the lower Green River. • In order to correct the structural deficiencies of the levee system in this reach, the slope geometry of the levees must be modified. • Additional easement area is frequently required in order to reconfigure damaged levee segments to meet even the minimum recommended slope geometry. • Generally speaking, the width required would not exceed 110 feet landward from the aquatic edge of the river channel along each bank. • Levee setbacks should also be required as a standard condition for future redevelopment of urban areas presently abutting oversteepened levees. The adopted FHMP proposed partial rehabilitation of the Segale levee, which adjoins and protects the subject development site. The King County Flood Control District's 6 -year Capital Improvement Project (CIP) includes a substantial allocation for this work, and a pending • revision to the CIP proposes yet more funds for this project (the project budget would increase to more than $5.1 million per the pending proposal). Ms. Jaimie Reavis March 5, 2009 Page 2 • • King County is in the process of directing consultants already under contract to begin a risk - based study of alternative levee setback alignments and geometries. The scope of this analysis includes both banks of the river, from the South 200th Street bridge to the South 180`" Street bridge. After this risk -based study enables selection of the preferred levee alignments, we will direct the consultants to proceed with final design. While we cannot define the preferred levee alignment in time to support the city's immediate need to respond to this land use application, we have shared what we do know now. Levee system improvements are planned, and additional land may be required to ensure minimum factors of safety are met. Our adopted plan states a general need for at least a 110 -foot right -of- way along each side of the river. In addition, our consultants' risk -based study may show need for additional width to ensure public safety concerns are met. I respectfully request that the City of Tukwila please give full consideration to these needs in the development review process. If you have comments or questions, please contact Supervising Engineer Tom Bean at 206 - 296 -8377 or tom.bean@kingcounty.gov. Sin Steve : 'eifuhs, Manager River and Floodplain Management Section cc: Bob Burns, Interim Director, Department of Natural Resources and Parks (DNRP) Joanna Richey, Assistant Division Director, Water and Land Resources Division (WLRD), DNRP Tom Bean, Supervising Engineer, RFMS, WLRD, DNRP City of Tukwila Notice of Application Segale Two -Story Office Building (Shoreline Permit and Design Review) Location: 18200 Andover Park West, parcel 14352304 -9121 File #'s: L09 -057 (Shoreline Permit), L10 -005 (Administrative Design Review) { L. Applicant: Bob Fadden, Lance Mueller Architects Property Owner: Se g ale Properties 9tmN51 Project Planner: Jaimie Reavis, 206 -431 -3659 Project Description: Shoreline Substantial Development Permit and Administrative Design Review for construction of a two -story, 58,000 square foot office building, with associ- ated parking and landscaping. A Determination of Signifi- cance was previously issued for development in the area in which this project is located; an Environmental Impact State- ment has been prepared under Tukwila land use file number E04 -015. Comments and Appeals: The application is available for review at the Department of Community Development (DCD), 6300 Southcenter blvd, Suite 100. Your written com- ments can be emailed to jreavis @ci.tukwila.wa.us, or deliv- ered to DCD at the address above, and must be received by 5:OOpm on March 5, 2010 for the Administrative Design Review application. Written comments and requests to receive notification of the final decision on the Shoreline Permit must be received within 30 days of the Notice of Application; that is by 5:OOpm on March 21, 2010. You may request a copy of any decision, information on hearings, and your appeal rights by calling 206 -431 -3659. ti • I 1 1 I • i You are receiving this notice because you are a property owner or tenant within 500ft of this project. City of Tukwila Notice of Application Segale Two -Story Office Building (Shoreline Permit and Design Review) li 1 Location: 18200 Andover Park West, parcel #352304 -9121 File #'s: L09 -057 (Shoreline Permit), L10 -005 (Administrative Design Review) Applicant: Bob Fadden, Lance Mueller Architects f 1 Jj I _ J Property Owner: Segale Properties Project Planner: Jaimie Reavis, 206 -431 -3659 Project Description: Shoreline Substantial Development Permit and Administrative Design Review for construction of a two -story, 58,000 square foot office building, with associ- ated parking and landscaping. A Determination of Signifi- cance was previously issued for development in the area in which this project is located; an Environmental Impact State- ment has been prepared under Tukwila land use file number E04 -015. ;411 Comments and Appeals: The application is available for 'r--n review at the Department of Community Development — Jl 1 (DCD), 6300 Southcenter blvd, Suite 100. Your written corn- / ments can be emailed to jreavis @ci.tukwila.wa.us, or deliv- 1/ ered to DCD at the address above, and must be received by 5.00pm on March 5, 2010 for the Administrative Design Review application. Written comments and requests to receive notification of the final decision on the Shoreline Permit must be received within 30 days of the Notice of Application; that is by 5:OOpm on March 21, 2010. You may request a copy of any decision, information on hearings, and your appeal rights by calling 206 -431 -3659. You are receiving this notice because you are a property owner or tenant within 500ft of this project. City of Tukwila Notice of Application Segale Two -Story Office Building (Shoreline Permit and Design Review) Location: 18200 Andover Park West, parcel #352304 -9121 1— f i j File #'s: L09 -057 (Shoreline Permit), L10 -005 t (Administrative Design Review) {.1 + •I J I\ Applicant: Bob Fadden, Lance Mueller Architects Property Owner: Segale Properties Project Planner: Jaimie Reavis, 206 -431 -3659 Project Description: Shoreline Substantial Development Permit and Administrative Design Review for construction of a two -story, 58,000 square foot office building, with associ- ated parking and landscaping. A Determination of Signifi- cance was previously issued for development in the area in which this project is located; an Environmental Impact State- ment has been prepared under Tukwila land use file number 1'ou are receiving this notice because you are a property owner or tenant within 500ft of this project. ' E04 -015. Comments and Appeals: The application is available for review at the Department of Community Development (DCD), 6300 Southcenter blvd, Suite 100. Your written com- ments can be emailed to jreavis @ci.tukwila.wa.us, or deliv- ered to DCD at the address above, and must be received by 5:OOpm on March 5, 2010 for the Administrative Design Review application. Written comments and requests to receive notification of the final decision on the Shoreline Permit must be received within 30 days of the Notice of Application; that is by 5:OOpm on March 21, 2010. You may request a copy of any decision, information on hearings, and your appeal rights by calling 206 -431 -3659. City of Tukwila Notice of Application Segale Two -Story Office Building (Shoreline Permit and Design Review) 1 Location: 18200 Andover Park West, parcel #352304 -9121 File #'s: L09 -057 (Shoreline Permit), L10 -005 (Administrative Design Review) Applicant: Bob Fadden, Lance Mueller Architects Jr r Property Owner: Segale Properties Project Planner: Jaimie Reavis, 206 -431 -3659 , Project Description: Shoreline Substantial Development Permit and Administrative Design Review for construction of 1 a two -story, 58,000 square foot office building, with associ- ated parking and landscaping. A Determination of Signifi- ,;; cance was previously issued for development in the area in which this project is located; an Environmental Impact State- r ment has been prepared under Tukwila land use file number E04 -015. _ Comments and Appeals: The application is available for review at the Department of Community Development (DCD), 6300 Southcenter blvd, Suite 100. Your written com- ments can be emailed to jreavis @ci.tukwila.wa.us, or deliv- ered to DCD at the address above, and must be received by 5:OOpm on March 5, 2010 for the Administrative Design Review application. Written comments and requests to receive notification of the final decision on the Shoreline Permit must be received within 30 days of the Notice of Application; that is by 5:OOpm on March 21, 2010. You may request a copy of any decision, information on hearings, and your appeal rights by calling 206 -431 -3659. You are receiving this notice because you are a property owner or tenant within 500ft of this project. City of Tukwila Department of Community Development 6300 Southcenter Blvd., Ste 100 Tukwila, WA. 98188 City of Tukwila Department of Community Development 6300 Southcenter Blvd., Ste 100 Tukwila, WA. 98188 City of Tukwila Department of Community Development 6300 Southcenter Blvd., Ste 100 Tukwila, WA. 98188 City of Tukwila Department of Community Development 6300 Southcenter Blvd., Ste 100 Tukwila, WA. 98188 Ohl Department Of Community AFFIDAVIT of .J uI wiea 11 Development OF DISTRIBUTION I, Teri Svedahl HEREBY DECLARE THAT: Notice of Public Hearing Determination of Non - Significance Notice of Public Meeting Mitigated Determination of Non - Significance Project Number: L09 -057 Board of Adjustment Agenda Packet Mailer's signature: Determination of Significance & Scoping Notice it)/ / Board of Appeals Agenda Packet Notice of Action Planning Commission Agenda Packet Official Notice Short Subdivision Agenda X Notice of Application Shoreline Mgmt Permit Notice of Application for Shoreline Mgmt Permit _ _ FAX To Seattle Times Classifieds Mail: Gail Muller Classifieds PO Box 70 - Seattle WA 98111 Other: Was mailed to each of the addresses listed /attached on this day of February in the year 2010 W: \USERS \TERIWFFIDAVIT OF DISTRIBUTION.DOC Project Name: Segale Two -Story Office Building Project Number: L09 -057 Mailing requested by: Jaimie Reavis Mailer's signature: 7 1 it)/ / / / / W: \USERS \TERIWFFIDAVIT OF DISTRIBUTION.DOC e'16- 62- 2 ' 5)TYy oiTa Bviidive9 a to - O 7, LID-00s- AGENCY LABELS US Corps of Engineers ( Federal HWY Admin ( ) Federal Transit Admin, Region 10 Dept of Fish & Wildlife Section 1 FEDERAL AGENCIES US Environmental Protection Agency (E.P.A.) NC) US Dept of HUD National Marine Fisheries Service Section ref Office of Archaeology ( ) Transportation Department (WSDOT NW) pc-f. Dept of Natural Resources ( ) Office of the Governor ,(>1 WA State Community Development (xf WA Fisheries & Wildlife 2 WASHINGTON STATE AGENCIES ( ) Dept of Social & Health Services (JDept of Ecology NW Regional Office, Shoreland Division 6.4 . Dept of Ecology, SEPA K); Office of Attorney General ( ) Office of Hearing Examiner ( ) KC Boundary Review Board ( ) Fire District # 11 ( ) Fire District # 2 KC Wastewater Treatment Div (7.1,KC Dept of Parks & Recreation _ky KC Assessor's Office Section 3 KING COUNTY AGENCIES ( ) Health Department (,) Port of Seattle (;KC Dev & Enviro Services -SEPA Info Center (>4. KC Metro Transit Div -SEPA Official, Environmental Planning (> KC Dept of Natural Resources (> ,KC Dept of Natural Resources, Andy Levesque ( ) Tukwila School District ( ) Tukwila Library ( ) Renton Library ( ) Kent Library ( ) Seattle Library Section 4 SCHOOLS /LIBRARIES ( ) Foster Library ( ) KC Public Library System ( ) Highline School District ( ) Seattle School District ( ) Renton School District () Westfield Mall Library Q f QWEST Communications ( ) Seattle City Light (Puget Sound Energy $ Highline Water District ( ) Seattle Planning &Dev /Water Dept (x Comcast Section 5 UTILITIES ( ) BP Olympic Pipeline ( ) Val -Vue Sewer District ( ) Water District # 20 ( ) Water District # 125 ( ) City of Renton Public Works ( ) Bryn Mawr - Lakeridge Sewer /Water Dist ( ) Seattle Public Utilities Allied Waste Services ( ) Tukwila City Departments ( ) Public Works ( ) Police ( ) Planning ( ) Parks & Rec ( ) City Clerk ( ) Fire ( ) Finance ( ) Building ( ) Mayor Section 6 CITY AGENCIES ( ) Kent Planning Dept ( ) Renton Planning Dept ( ) City of SeaTac ( ) City of Burien ( ) City of Seattle ( ) Strategic Planning *Notice of all Seattle Related Projects (X Puget Sound Regional Council SW KC Chamber of Commerce (?1 Muckleshoot Indian Tribe * (. Cultural Resources (> Fisheries Program pit lKe (>c) Wildlife Program ,(x). Duwamish Indian Tribe * Section 7 OTHER. LOCAL AGENCIES Puget Sound Clean Air Agency ( ) Sound Transit /SEPA N- Duwamish River Clean Up Coalition * (4:Washington Environmental Council J./NO People for Puget Sound * Futurewise * send notice of all applications on Green /Duwamish River . IMF dam,. ( ) Seattle Times ( ) South County Journal Section 8 MEDIA ( ) Highline Times ( ) City of Tukwila Website P:Admin \Admin Forms \Agency Che- t Public Notice Mailings For Permits SEPA MAILINGS Mail to: (comment period starts on date of mailing) Dept. of Ecology Environmental Review Section *Applicant *Other agencies as necessary (checked off on attached list) *Any parties of record * send only the staff report, site plan and the SEPA Determination KC Transit Division — SEPA Official would like to receive information about all projects that might affect transit demand Tribes — For any application on the Green /Duwamish River, send the checklist and a full set of plans with the Notice Of Application Send These Documents to DOE: SEPA Determination (3 -part from Sierra) Findings (staff report, usu. with MDNS) SEPA Checklist (filled out by applicant) Drawings /Plans of project (site plan, elevations, etc. from PMT's) Affidavit of Distribution (notice was mailed or sent to newspaper) SHORELINE MAILINGS: Notice of Application for a Substantial Development Permit must be mailed to owners and to property owners within 500 feet of subject property, comments are due 30 days after the notice of application is mailed /posted. The Notice of Application for Shoreline Substantial Development Permit must include a statement that any person desiring to submit written comments on the application or desiring to receive notification of the final decision on the application may do so within 30 days of the Notice of Application. If a hearing will be held on the application, the hearing notice must include the information that written comments may be submitted, or oral presentation made at the hearing. Notice is sent to Ecology's NW Regional Office Shorelands & Environmental Assistance Program. Shoreline Permit Notice of Decision: Mail to: (within 8 days of decision; 21 -day appeal period begins date received by DOE) Department of Ecology Shorelands Section, NW Regional Office State Attorney General *Applicant *Indian Tribes *Other agencies as necessary (checked off on attached list). *Any parties of record * send only the staff report, site plan and the SEPA Determination Send These Documents to DOE and Attorney General: Permit Data Sheet Shoreline Substantial Development Permit (3 -part from Sierra) Findings (staff report or memo) Shoreline Permit Application Form (filled out by applicant) Drawings /Plans of project (site plan, elevations, etc. from PMT's) Site plan, with mean high water mark & improvements — Cross- sections of site with structures & shoreline Grading Plan — Vicinity map SEPA determination (3 -part from Sierra) Findings (staff report or memo) SEPA Checklist (filled out by applicant) Any background studies related to impacts on shoreline Notice of Application Affidavit of Distribution (notice was mailed) P:Admin \Admin Forms \Agency Checkligh • • • NAME JAMES CAMPBELL COMPANY L L PACIFIC METAL COMPANY TUKWILA MEMBER TUKWILA MEMBER TUKWILA MEMBER KMBR LLC B TUKWILA MEMBER TUKWILA MEMBER TRI -LAND CORPORATION UNION PACIFIC RAILROAD TUKWILA MEMBER TUKWILA MEMBER TUKWILA MEMBER TUKWILA MEMBER TUKWILA MEMBER TUKWILA MEMBER TUKWILA MEMBER TUKWILA MEMBER TUKWILA MEMBER DANELLIE LLC TUKWILA MEMBER TUKWILA MEMBER TUKWILA MEMBER TUPPER,LYNN AMC FAMILY LLC LA PIANTA LLC ADDRESS 1001 KAMOKILA BLVD 10700 SW MANHASSET DR 1180 ANDOVER PARK W 1227 ANDOVER PARK E 1231 ANDOVER PARK W 1232 ANDOVER PARK W 1233 ANDOVER PARK E 1251 ANDOVER PARK W 1325 4TH AVE 1940 1416 DODGE ST 325 18000 ANDOVER PARK W 18125 ANDOVER PARK W 18235 OLYMPIC AVE S 18271 ANDOVER PARK W 18323 ANDOVER PARK W 18325 OLYMPIC AVE S 18375 OLYMPIC AVE S 18435 OLYMPIC AVE S 18500 SOUTHCENTER PKWY 4664 95TH AVE NE 6101 S 180TH ST 6540 S GLACIER ST 6750 S 180TH ST 8100 SW 10TH ST 4000 PO BOX 2720 PO BOX 88028 CITY ST KAPOLEI HI TUALATIN OR SEATTLE WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA SEATTLE WA OMAHA NE TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA YARROW POINT WA TUKWILA WA TUKWILA WA TUKWILA WA PLANTATION FL PORTLAND OR TUKWILA WA ZIP 96707 97062 98188 98188 98188 98188 98188 98188 98101 68179 98188 98188 98188 98188 98188 98188 98188 98188 98188 98004 98188 98188 98188 33324 97208 98138 February 5, 2010 City of Tukwila Jim Haggerton, Mayor 'Department of Community Development Jack Pace, Director Mr. Bob Fadden 130 Lakeside, Suite 250 Seattle, WA 98122 NOTICE OF COMPLETE APPLICATION Mr. Steve Nelson P.O. Box 88028 Tukwila, WA 98138 Subject: Segale Two -Story Office Building, 18200 Andover Park West (parcel #352304 -9121) L09 -057 (Shoreline Permit) L 10 -005 (Administrative Design Review) Dear Mr. Fadden and Mr. Nelson: Your applications for an Administrative Design Review and a Shoreline Substantial Development Permit are considered complete on February 5, 2010 for the purposes of meeting state mandated time requirements. This determination of complete application does not preclude the ability of the City to require that you submit additional plans or information, if in our estimation such information is necessary to ensure the project meets the substantive requirements of the City onto complete the review process. This notice of complete application applies only to the permits identified above. It is your responsibility to apply for and obtain all necessary permits issued by other agencies. I received notice from Mr. Nelson that the notice board has been installed. The City of Tukwila will be sending out the public notice mailing and posting the notice board with required information for the public notice within 14 days. Once the public notice board is posted, the public comment period for this project will be 14 days for the Administrative Design Review application, and 30 days for the Shoreline Substantial Development Permit Application. These notice periods will run concurrently. I will be contacting you soon to discuss this project. If you wish to speak to me sooner, feel free to call me at (206) 431 -3659. Sincerely, Jaimie Reavis Assistant Planner cc. L09 -057 dd. L10-005 JR Page 1 of 1 02/05/2010 H: \Shoreline Permits \Segale Office Building\L09 -057 L10 -005 Shoreline &ADR Complete Segale Office Bldg.doc 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax: 206 -431 -3665 r City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director NOTICE OF INCOMPLETE APPLICATION December 15, 2009 Mr. Bob Fadden 130 Lakeside, Suite 250 Seattle, WA 98122 RE: Shoreline Permit for Segale Two Story Office Building L09 -057 Dear Mr. Fadden: Your application for a Shoreline Substantial Development Permit for development of a two story office building at 18200 Andover Park West (tax parcel number 352304 -9121) in Tukwila has been found to be incomplete. The following must be submitted to the permit center in the Department of Community Development to make the application complete: 1) A written discussion of project consistency with the City of Tukwila Shoreline Regulations contained in Tukwila Municipal Code section 18.44.110. Please reference the goals and policies from the Tukwila Shoreline Management Plan that are applicable to your project. A list of goals and policies is available at the Tukwila Department of Community Development. 2) Submit an Administrative Design Review application for this project. The proposed development is subject to design review as a Type II decision, as noted in your letter addressed to Nora Gierloff submitted with application materials, and dated December 3, 2009. An application for Administrative Design Review is attached — please note that the application fees will increase on January 1, 2010. Please include a written discussion of project consistency with the Tukwila South Design Criteria contained in TMC 18.41.080. The project will be reviewed for consistency with the Tukwila South Overlay District Design Manual and the Tukwila Comprehensive Plan. Upon receipt of these items, the City will re- review them for completeness and will mail you written notification of completeness or incompleteness within 14 days. These applications will expire if we do not receive the additional information within ninety days of the date of this letter unless an extension is granted pursuant to Section 18.104.070(E). If you have any questions with this matter you may call me at (206) 431 -3659. Sincerely, J. ie Reavis Assistant Planner cc. L09 -057 JR Page 1 of 1 12/14/2009 H: \Shoreline Permits \Segale Office Building\L09 -057 Shoreline Incomplete Segale Office Bldg.doc 6300 Southcenter Boulevard, Suite #100 • Tukwila. Washington 98188 • Phone 206 -431 -3670 • Far: 206- 431 -3665 Consistency to Goads of Tukwila Shoreline Master Plan 12 -28 -09 : The city of Tukwila shoreline Master Plan in Chapter 3 on page 3.1 lists seven elements to be considered when developing goals and policies for development within the shoreline zone. Those goals and policies are listed in Chapter 4 "Goals and Policies" on pages 4.2 to 4.8. Consistency to each element of the goals and policies results in compliance to the "Overall Goals of the Shoreline Master Plan" listed on page 4.1 of the "City of Tukwila Shoreline Master Plan ". Economic Development Element A. Goals 1. Encourage economic development along the shorelines that will enhance the quality of life for the residents of the city of Tukwila with minimum disruption of the environment. Response: Parts of the project site is located within the 200 shoreline, however no part of the site borders the river since an intervening lot separates the parcel from the river. Near the riverward boundary is it a levy stabilization wall that was constructed in 2009. The top of that wall is about 8 feet above the existing grade. The level area along the top of the levy is a maintenance road which is located within an easement granted to the city. East of the road is the "River Environment" which has recently been restored as part of the cities levy stabilization project. The project purposes redevelopment of the site within the high and low impact zone of the shoreline west of the stabilization wall- Redevelopment work consists of modifying existing parking areas and construction of at building envelope that complies with the permitted heights allowed. Consistency with the goal has been achieved because property owner has previously provided an easement that reduced the build able area of this site that has permitted the enhancement of the river environment and construction of the stabilization wall in 2009; the existing site is a paved parking area; and only a small amount of the building envelope (2,130 sf.) is placed within the low impact zone enhancement of the quality of life of the residents of Tukwila has occurred and a minimum disruption of the environment will occur. 2. Encourage economic development along shorelines that will result in long -term over short-term benefits for the river shoreline. Response: This property is located in the shoreline zone but is separated from the river by a separate parcel. As such receives no direct economic benefit from the river except for the view of the open space it creates. As a result the proposed development as a corporate • office building is the highest and best use of the property short term and long term bases. Consistency with the goal has been achieved because of its initial development as the highest use the long -term over short-term benefits for the river shoreline are being realized at this time. 3. Recognize the quality of the existing economic activities along the river and discourage any future economic activities that may be of less quality. Response: This property is located in the shoreline zone but is separated from the river by a separate parcel. As such it cannot support a water dependant use. North of the site adjoining the river parcel to the is a corporate office building. As a result the proposed development a second corporate office will be constructed. The use of an upland site adjacent in the urban shoreline in the short term and long term represents the highest and best use of this property. Consistency with the goal has been achieved because this development is the highest and best use it provides the highest quality of use and discourages any future economic activities that may be of less quality on this site. 4. Encourage inland location of development so that access along the shorelines is enhanced. Response: The proposed redevelopment area occurs is west of the levy stabilization wall constructed in 2009. This wall provides an eight foot high barrier to river access from the site. The building envelope is located, except an small area (2,130 sf.) within the high impact zone. This places the envelope 100 feet inland of the shoreline so the building location has no affect on access to the shoreline. The owner of the site however under city ordinance 2233 has agreed to dedicate the land between the levy stabilization wall and the river so the city can construct a bike /pedestrian trail which will provide access to the shoreline area from the public right of way along this portion of the river. Consistency is achieved because the redevelopment is inland of the river and enhanced access to the shoreline is achieved through construction of the future Bike /Pedestrian trail through dedication of a portion of the this property. 5. Encourage commercial development of public recreational facilities consistent with shoreline goals and policies. Response: The shoreline overlay zone designation for this parcel is "Urban ". Under the that designation commercial development in river environment is not outright permitted but allowed under conditional use permit only when a specific benefit to the public benefit can be demo • started. In addition this property is located within the Tukwila South Overlay District. This district permits under TMC 18.41.020 Commercial Indoor Recreational Facilities under section 47 & 48 in the low impact zone. Consistency with this goal cannot be achieved because of the underlying shoreline policies governing the use river environment in the "Urban" shoreline zone and the provision of the Tukwila South Overlay District that limit commercial recreational facilities indoor. B. Policies 1. Commercial /industrial development along the shorelines should not favor outside interests at the expense of the local population. Response: The redevelopment of this property doesn't require any special privileges. The project conforms to policy because it doesn't favor outside interests at the expense of the local population. 2. Locate commercial /industrial development in areas with low potential for recreation or other public uses. Response: This redevelopment project is located within a mature business park adjacent to a future Bike /Pedestrian trail. The project conforms to policy because by dedicating part of the property east of the levy wall has no impact on the potential for recreation or other public uses. 3. Preference should be given to commercial /industrial development that will provide an opportunity for a substantial number of people to enjoy the shoreline. Response: The proposed redevelopment from a parking lot to a corporate office results in an increase in employment within the Segale Business Park of up 200 people in a building within the shoreline zone. The project conforms to policy because it provide an opportunity for a substantial number of people to visually enjoy the shoreline in their work environment. 4. Determine and consider the visual impact that the commercial /industrial development will have on the surrounding area. Response: The project has been designed to conform to the design criteria for commercial and industrial building list in TMC section 18.60.050(A). A detailed analysis provided in the "Compliance to Design Review Criteria" document submitted with this application. The project conforms to policy because it conforms to design criteria in TMC 18.60.050(A) which requires design, consistency with surrounding structures. 5. Encourage provisions for public access; especially visual and pedestrian, as an integral part of commercial /industrial water front development. Response: Parts of the project site is located within the 200 shoreline, however no part of the site borders the river since an intervening lot separates the parcel from the river. Near the riverward boundary is it a levy stabilization wall that was constructed in 2009. The top of that wall is about 8 feet above the existing grade. The level area along the top of the levy is a maintenance road which is located within an easement granted to the city. East of the road is the "River Environment" which has recently been restored as part of the cities levy stabilization project. The ordinary water of the shoreline is approximately 15 feet from the top of the stabilization wall. Any view of the shoreline from Andover Park West (AKA Segale Drive A) street is blocked by the wall. The owner of the site however under city ordinance 2233 has agreed to dedicate the land between the levy stabilization wall and the river so the city can construct a bike /pedestrian trail which will provide visual access to the shoreline area from the pedestrian trail along this portion of the river. The project conforms to policy because the building envelope doesn't block a view of the shoreline from the street and public view of the shoreline will be achieved when the city constructs the Bike /Pedestrian Trail on the intervening parcel. 6. Design new commercial /industrial facilities and improve existing ones in such a way as to minimize wasteful use of the shoreline. Response: Parts of the project site is located within the 200 shoreline, however no part of the site borders the river since an intervening lot separates the parcel from the river. The project conforms to policy since it has not effect on the use of the shoreline. • 7. Encourage multiple use types of commercial /industrial development to provide ppblic access and promote round - the -clock utilization of the shorelines. Response: This redevelopment project is located within a mature business park adjacent to a future Bike /Pedestrian trail. Around the clock uses are unusual in this environment. The proposed redevelopment area occurs is west of the levy stabilization wall constructed in 2009. This wall provides an eight foot high barrier to river access from the site. The owner of the site however under city ordinance 2233 has agreed to dedicate the land between the levy stabilization wall and the river so • • the city can construct a bike /pedestrian trail which will provide access to the shoreline area from the public right of way along this portion of the river. Access to the shoreline after hours would be a security and safety concem and would require the city to Tight the Bike /Pedestrian trail. The project cannot conform to this policy since public access to the river is not reasonably feasible, after hour access represents a security and safety concern. 8. Short-term economic gain or convenience in developments should be evaluated in relation to Tong -term and potential impairments to the desirable biological features of the river and its shoreline. Response: Parts of the project site is located within the 200 shoreline, however no part of the site borders the river since an intervening lot separates the parcel from the river: Near the riverward boundary is it a levy stabilization wall that was constructed in 2009. The top of that wall is about 8 feet above the existing grade. The level area along the top of the levy is a maintenance road which is located within an easement granted to the city. East of the road is the "River Environment" which has recently been restored as part of the cities levy stabilization project. The project purposes redevelopment of the site within the high and low impact zone of the shoreline west of the stabilization wall: Redevelopment work consists of modifying existing parking areas and construction of at building envelope that complies with the permitted heights allowed. The building envelope is located,, except an small area (2,130 sf.) within the high impact zone. This places the envelope 100 feet inland of the shoreline so the building and parking area improvement have no impact on the river environment. The project conforms to policy because no potential long term impairments to the desirable biological features of the river and its shoreline. Public Access Element A. Goals 1 Encourage safe, convenient and diversified access for the public to the . shorelines of Tukwila. Response: Parts of the project site is located within the 200 shoreline, however no part of the site borders the river since an intervening lot separates the parcel from the river. Near the riverward boundary is it a levy stabilization wall that was constructed in 2009. The top of that wall is about 8 feet .above the existing grade: The level • • area along the top of the levy is a maintenance road which is located partially within an easement granted to the city. The owner of the site however under city ordinance 2233 has agreed to dedicate the land between this levy stabilization wall and the river so the city can construct a bike /pedestrian trail which will provide access to the shoreline area from the public right of way along this portion of the river. Because of the barrier created by the wall safe, convenient and diversified access for the through this parcel to the shoreline to the general public is not feasible. Consistency with the goal of safe, convenient and diversified access for the public to the shorelines of Tukwila will be achieved however through the construction of the bike /pedestrian trail in the future by the city. Assure that the intrusions created by public access will not endanger life, property or have adverse effects on fragile natural features. Response: Between the maintenance road and the shore is the river environment that a part of the levy stabilization project done by the city recently restored to a native habitat. Consistency with the goal is not affected by this project because no public access is proposed so no additional risk of intrusions that could endanger life, property or have adverse effects on fragile natural features will result because of the redevelopment of this parcel. 3. Increase public access to publicly owned shorelines. Response: Parts of the project site is located within the 200 shoreline, however no part of the site borders the river since an intervening lot separates the parcel from the river. Near the riverward boundary is it a levy stabilization wall that was constructed in 2009. The top of that wall is about 8 feet above the existing grade. The level area along the top of the levy is a maintenance road which is located partially within an easement granted to the city. The owner of the site however under city ordinance 2233 has agreed to dedicate a parcel of land between this levy stabilization wall and the river so the city can construct a bike /pedestrian trail which will provide access to the shoreline area from the public right of way along this portion of the river. Consistency with the goal of increasing public access to publicly owned shorelines is achieve through the dedication of land to the city. 4. Encourage public access to privately owned shorelines, consistent with private property rights. Response: Parts of the project site is located within the 200 shoreline, however no part of the site borders the river since an • intervening lot separates the parcel from the river. Near the riverward boundary is it a levy stabilization wall that was constructed in 2009. The top of that wall is about 8 feet above the existing grade. The level area along the top of the levy is a maintenance road which is located partially within an easement granted to the city. The owner of the site however under city ordinance 2233 has agreed to dedicate the land between the levy stabilization wall and the river so the city . can construct a bike /pedestrian trail which will provide access to the shoreline area from the public right of way along this portion of the river. Consistency with the goal of encouraging public access to privately owned shorelines is achieve through the dedication of land to the city. 5. Encourage inland location of development so that access along shorelines is enhanced. Response: The proposed redevelopment area occurs is west of the levy stabilization wall constructed in 2009. This wall provides an eight foot high barrier to river access from the site. East of the wall is a separate parcel that is not part of this development application on which an enhanced river environment was constructed as part of the stabilization wall project. The building envelope is located, except an small area (2,130 sf.) within the high impact zone. This places the envelope 100 feet inland of the shoreline so the building location has no affect on access to the shoreline environment. The owner of the site under city ordinance 2233 has agreed to dedicate a the land between the levy stabilization wall and the river so the city can construct a bike /pedestrian trail which will provide access to the shoreline area from the public right of way along this portion of the river. Consistency with the goal is achieved because the redevelopment is inland of the river and access along the shoreline is enhanced through this projects dedication of land for construction of the future Bike /Pedestrian B. Policies 1. Public access to and along the water's edge should be provided in new developments. a. Water- dependent economic activities should be designed to allow substantial public access to the shoreline. Response: Parts of the project site is located within the 200 feet shoreline, however no part of the site borders the river since an intervening lot separates the parcel from the river. Conformance to this policy is not appropriate for this site. b. For non -water dependent economic activities, where permitted the entire water's edge should be available for public access, consistent with private property rights. Response: Parts of the project site is located within the 200 feet shoreline, however no part of the site borders the river since an intervening lot separates the parcel from the river. Conformance to this policy is not appropriate for this site. c. For multi - family residential developments the water's edge should be kept free of buildings and fences with public access made possible. Response: The project consists of the development of a parking lot into an urban office building. Conformance to this policy is not appropriate for this site. d. For a new single- family dwelling unit, the water's edge should be kept free of buildings and fences. Response: Parts of the project site is located within the 200 feet shoreline, however no part of the site borders the river since an intervening lot separates the parcel from the river. Conformance to this policy is not appropriate for this site. e. For other non - specified development, the water's edge should be available for public access. Response: Parts of the project site is located within the 200 feet shoreline, however no part of the site borders the river since an intervening lot separates the parcel from the ever. Conformance to this policy is not appropriate for this site. f. All public shorelands, except as noted in other policies, should be available for public access to the water's edge. Response: Parts of the project site is located within the 200 feet shoreline, however no part of the site borders the river since an intervening lot separates the parcel from the river. The owner under city ordinance 2233 has agreed to dedicate the land between the levy stabilization wall and the river so the city can construct a bike /pedestrian trail which will provide access to the shoreline area from the public right of way along this portion of the river. Conformance to the policy of public access to the waters edge is achieved through the dedication of and to the city of land for construction of a Bike /Pedestrian trail along the shoreline. 2. Any modifications or extensions to existing development should be designed to allow public access. Response: The project consists of the conversion of portions of an existing parking lot in an urban office building. The area to be redeveloped is located occur west of the levy stabilization wall that was constructed in 2009. This wall provides an eight foot high barrier to river access from the site. East of the wall is a separate parcel that is not part of this development application on which an enhanced river environment was constructed as part of the stabilization wall project. Because of the barrier reasonably feasible public access through the site to the shoreline cannot be achieved; however the owner under city ordinance 2233 has agreed to dedicate the land between the levy stabilization wall and the river so the city can construct a bike /pedestrian trail which will provide access to the shoreline area from the public right of way along this portion of the river. Conformance to this policy of providing public access to the shoreline when a modification of an existing development made is achieved through the dedication of and to the city of land for construction of a Bike /Pedestrian trail along the shoreline. 3. A trail system should be developed along the river. a. Trails should be developed for linear access through public shoreline areas. Response: The proposed redevelopment area occurs is west of the levy stabilization wall constructed in 2009. This wall provides an eight foot high barrier to river access from the site. East of the wall is a separate parcel that is not part of this development application on which an enhanced river environment was constructed as part of the stabilization wall project. Consistency with the goal of providing a trail system along the river is achieved through the dedication of land to the city to for construction of a Bike /Pedestrian trail. Access points to and along the river should be linked by a system of trails. Response: The project consists of the conversion of portions of an existing parking lot in an urban office building. The area to be redeveloped is located west of the levy stabilization wall that was constructed in 2009. This wall provides an eight foot high barrier to river access from the site. Because of the barrier reasonably feasible public access through the site to the river trail cannot be achieved; however the owner under city ordinance 2233 has agreed to dedicate the land between the levy stabilization wall and the river so the city can construct a , bike /pedestrian trail which will provide access to the shoreline area from the public right of way along this portion of the river. Consistency with the goal of providing a link to the trail system along the is achieved through the dedication of land to the city for construction of a Bike /Pedestrian trail that will provide a link for the public to the trail from a nearby public way. c. The connection of other trails in the region to the shoreline trail system should be encouraged and developed. Response: The owner under city ordinance 2233 has agreed to dedicate the land between the levy stabilization wall and the river so the city can construct a bike /pedestrian trail which will be part of the trail system along the west side of the river. This trail when complete will Zink into the Green River Valley trail system through a Bike /Pedestrian bridge to be constructed over the river to Briscoe Park. Consistency to the policy of providing connection other trails in the region to the shoreline trail system is achieved through the dedication of land for the construction of the trail by the system and the contribution of $500,000 toward the construction of the Briscoe Bridge. d. To assist in developing a trail system, incentive should be offered to property owners for utilizing set -back areas. Response: As part of the stabilization, wall project the property owner under permit provided by the city was permitted to constructed a retaining wall within the100 foot low impact zone. The placement of this wall permits the future trial system to be located on top of the dike and east of the wall. As an incentive to the property owner the city is requested to approve a site design which will allow the area next to the wall to remain as previous so site parking and drive lanes behind the buildings are not by the due to the property dedication for the future trail. Consistency to the policy providing of incentives to property owners for assisting in the development of the trail system would be achieved by approval of the site development design currently submitted. III. Circulation Element The circulation element deals with location and extent of existing and proposed major thoroughfares, transportation routes, terminals and other public facilities . and correlating those facilities with the shoreline use elements. A. Goals 1. Encourage a safe, convenient and diversified circulation system to assure efficient movement of persons during their daily and other activities with minimum conflict between the different users. Response: The project design submitted is for a single user. Parking is placed around the building and a looped circulation drive encircles the it that connects to two separate access points to a local commercial street. Larger parking areas at the north and south are provided that connect to the main circulation drive to minimize cross traffic. The commercial street in front of the site connects to two different arterial routes that have sufficient capacity that traffic generated can quickly disperse into the public street system. Consistency with the goal is achieved because the design provide multiple exit and entry options, the site serves a single user so conflicts don't occur, and the circulation system on the site provides two choices for an exit or entry route from all location within. 2. Encourage a balanced system for transporting people and moving goods in existing corridors. Response: The proposed development is a single user corporate office building. The site is served from a commercial street which is has adequate width for the delivery trucks that service office building. Within the site adequate width drives are provided from the entry point to the loading and unloading area at the rear of the building. Loading area are placed away from the site entries, do not obstruct drive aisles, and are separated from parking area. Consistency with the goal of a balanced system for transporting people and moving goods in existing corridors is achieved because the site is served by a commercial street and loading areas have been separated from conflicting uses. B. Policies 1. Roadways adjacent to the shoreline should be designed primarily for slow- moving traffic that would provide for recreational activities. Response: This policy is not applicable to this project. 2. Parking facilities should be located upland with provisions for adding pedestrian access to the shoreline. Response: The project consists of the conversion of portions of an existing parking lot in an urban office building all of which is located upland of the shoreline. The area to be redeveloped is located west of the levy stabilization wall that was constructed in 2009. This wall provides an eight foot high barrier to river access from the site. Because of the barrier reasonably feasible public access through the site to the river trail cannot be achieved; however the owner under city ordinance 2233 has agreed to dedicate the land between the levy stabilization' wall and the river so the city can construct a bike /pedestrian trail which will provide access to the shoreline area from the public right of way along this portion of the river. Conformance to the policy of locating parking facilities should upland with of the shoreline is achieved since they are placed west of the levy stabilization wall away from the shore line environment. The goal of providing direct pedestrian access from parking on the site to the shoreline through the dedication of land to the city for construction of a Bike /Pedestrian trail that will provide a link for pedestrians from parking areas to the public to the trail from a nearby public way. 3. Public transportation should be designated to facilities access to and along the shoreline Response: This policy is not applicable to this project. Public access to the shoreline from the nearest transit stop will be provided from S. 180th Street as part of the city construction of a Bike /Pedestrian trail along the West shoreline of the river 4. Railroads should be encouraged to offer their rights -of -way for multiple use consistent with a shoreline location and with public safety. Response: This policy is not applicable to this project. IV. Recreational Element The recreational element deals with the preservation and expansion of the recreational opportunities through programs of acquisition, development and various means of less -than fee acquisition. A. Goals 1. Encourage recreational activities and related facilities unique to or dependent upon the use of the river which benefit the public interest. Response: Parts of the project site is located within the 200 feet shoreline, however no part of the site borders the river since an intervening lot separates the parcel from the river. The owner under city ordinance 2233 has agreed to dedicate the land between the -levy stabilization wall and the river so the city can construct a bike /pedestrian trail which will provide access to the shoreline area-from the public right of way along this portion of the river. • Consistency with_this goal is achieved through the dedication which then permits the city to develop and expand recreational opportunities . through programs of acquisition. 2. Encourage diverse, convenient and adequate recreational opportunities along the shorelines for the local residents and a reasonable number of transient users. Response: Parts of the project site is located within the 200 feet shoreline, however no part of the site borders the river since an intervening lot separates the parcel from the river. The owner under city ordinance 2233 has agreed to dedicate the land between the levy stabilization wall and the river so the city can construct a bike /pedestrian trail which will provide access to the shoreline area from the public right of way along this portion of the river. Consistency with the goal is achieved through the dedication which then permits the city to provide diverse, convenient and adequate recreational opportunities along the shorelines for the local residents and a reasonable number of transient users. B. Policies 1. Publicly owned recreational uses should be enhanced and, when feasible, enlarged. a. The public should have first option to buy shoreland as it becomes available for sale, based on an acquisition plan with clear public intent. Response: Parts of the project site is located within the 200 feet shoreline, however no part of the site borders the river since an intervening lot separates the parcel from the river. The owner under city ordinance 2233 has agreed to dedicate the land between the levy stabilization wall and the river so the city can construct a bike /pedestrian trail which will provide access to the shoreline area from the public right of way along this portion of the river. Conformance with the policy is achieved through the dedication which then permits the city to acquire ownership of the shoreline parcel for development of a public Bike /Pedestrian Trail. b. The opportunity for sport fishing in the river should be enhanced. Response: Parts of the project site is located within the 200 feet shoreline, however no part of the site borders the river since an intervening lot separates "the parcel from the river: The owner under city ordinance 2233 has agreed to dedicate the land between the levy stabilization wall and the river so the city can construct a bike /pedestrian trail which will provide access to the shoreline area from the public right of way along this portion of the river. Conformance with the policy is achieved through the dedication which then permits the city to acquire ownership of the shoreline parcel for development of a public Bike /Pedestrian Trail. This provides the city the opportunity to provide access points for sport fishing in the river. 2. Recreational uses should be incorporated with other shoreline activities. Response: Parts of the project site is located within the 200 feet shoreline, however no part of the site borders the river since an intervening lot separates the parcel from the river. The owner under city ordinance 2233 has agreed to dedicate the land between the levy stabilization wall and the river so the city can construct a bike /pedestrian trail which will provide access to the shoreline area from the public right of way along this portion of the river. Conformance with the policy is achieved through the dedication which then permits the city to acquire ownership of the shoreline parcel for development of a public Bike /Pedestrian Trail and other shoreline activities. 3. Those unique or fragile areas of the shoreline which cannot be maintained in a natural condition under human uses should be designed and maintained as open space for passive forms of recreation. Response: Parts of the project site is located within the 200 feet shoreline, however no part of the site borders the river since an intervening lot separates the parcel from the river. Within the intervening lot the city has constructed a river environment as part of the levy stabilization project which restores this area to a natural condition this area is not currently assessable because of the 8 foot height level wall. The owner under city ordinance 2233 has agreed to dedicate the land between the levy stabilization wall and the river so the city can construct a bike /pedestrian trail which will provide access to the shoreline area from the public right of way along this portion of the river. As part of that project the city will be responsible design and maintain as open space for passive forms of recreation in those unique or fragile areas of the shoreline which cannot be maintained in a natural condition under human uses . • • Conformance with the policy will be achieved by the city through design and maintenance of the open space for passive forms of . recreation in those unique or fragile areas of the shoreline which cannot be maintained in a natural condition under human uses. 4. Views of the shoreline and water from shoreline and upland areas should be preserved and enhanced. a. New shoreline development should not significantly obstruct view of the shoreline or the water. Response: Parts of the project site is located within the 200 feet shoreline, however no part of the site borders the river since an intervening lot separates the parcel from the river. Within the intervening lot the city has constructed a river environment as part of the levy stabilization project which restores this area to a natural condition this area is not currently assessable because of the 8 foot height level wall. The view of the shoreline because of the levy stabilization wall blocks the view or the shoreline which is about 15 feet lower than the upland area of the site. The river environment as currently developed along the shoreline area doesn't obstruct the view of the shoreline area from the second floor of the proposed building. Conformance with the policy is achieved because the current constructed river environment and future trail doesn't obstruct view of the shoreline and water from the adjacent upland areas and future trail. b. Enhancement of views shall not be construed to mean excessive removal of vegetation. Response: This policy is not,applicable. The project consists of the conversion of portions of an existing parking lot into an urban office building all of which is located upland of the shoreline. The area to be redeveloped is located west of the levy stabilization wall that was constructed in 2009. This places the development area entirely outside the river environment in which a new river environment has been constructed. The portions of the site that are located within the high and low impact shoreline_ zones currently are imperious. V. Shoreline Use Element The shoreline use element deals with the pattern of distribution and location requirements for the whole scope of human activities for all segments of the population. How the various uses should be distribute, which shorelines to what extent would be utilized for agriculture, residential development, industry and other uses. Again it should be remembered that the distribution and extent of the various uses along shorelines will be influenced to a great extent by the overall development within the City. A. Goal 1. Encourage appropriate development in suitable locations without diminishing the quality of environment along the shorelines of the river. Response: The project consists of the conversion of portions of an existing parking lot to an urban office building upland of the shoreline river environment. The area to be redeveloped is located west of the levy stabilization wall that was constructed in 2009. This wall provides an eight foot high barrier to river access from the site. The property is located within a mature business park and is within the Tukwila South Overlay District. The city comprehensive plan and the shoreline master plan intend that properties that are upland of the river environment be developed with the highest and best long term use such as urban office. Consistency with the goal is achieved through development of a outright permitted use that is the highest use of the land in a suitable locations that doesn't diminishing the quality of environment along the shorelines of the river. 2. Shoreline activities should be consistent with the overall goals for development along the river. Response: The project consists of the conversion of portions of an existing parking lot to an urban office building upland of the shoreline river environment. The area to be redeveloped is located west of the levy stabilization wall that was constructed in 2009. This wall provides an eight foot high barrier to river access from the site. The property is located within a mature business park and is within the Tukwila South Overlay District this area is intended do be developed with uses such as urban office in areas outside the river environment. This building envelope, except for a small area of (2130 sf.), is being located entirely outside of the river environment and low impact zone. As a result the redevelopment is consistent with the shoreline and comprehensive plan goals. The owner under city ordinance 2233 has agreed to dedicate the land between the levy stabilization wall and the river so the city can construct a bike /pedestrian trail which will provide access to the shoreline area from the public right of way along this portion of the river. The dedication of land from this project allows the city to develop the river environment of shoreline in a manor consistent with the overall goal for of "The Shoreline Master Program" for this site. The property is located within a mature business park and is within the Tukwila South Overlay District this area is intended do be developed with uses such as urban office in areas outside the river environment. Construction of this project provides a desirable activity and feature adjacent to the river environment along the river. The owner under city ordinance 2233 has agreed to dedicate the land between the levy stabilization wall and the river so the city can construct a bike /pedestrian trail which will provide access to the shoreline area from the public right of way along this portion of the river: The dedication of land from this project allows the city to develop the river environment of shoreline in a manor consistent with the overall goal for of "The Shoreline Master Program" for this site. The project conforms to policy because it provides a land use that is desirable in the shoreline, it provides land to the city which can be used to protect and enhance the desirable features of the river and property on which the city can provide public access to the shoreline. c. Shorelines particularly suited for a specific and appropriate use or activity should be planned for and designated. Response: The project consists of the conversion of portions of an existing parking lot to an urban office building upland of the shoreline river environment. The area to be redeveloped is located west of the levy stabilization wall that was constructed in 2009. This wall provides an eight foot high barrier to river access from the site. The owner under city ordinance 2233 has agreed to dedicate the land between the levy stabilization wall and the river so the city can construct a bike /pedestrian trail which will provide access to the shoreline area from the public right of way along this portion of the . river. This provides property that is particularly suited for the designated use under the shoreline master plan. The project conforms to policy because it provides shorelines property to the city that is particularly suited for a specific and appropriate use or activity that is be planned for and designated under the shoreline master plan. d. Multiple use of shorelines should be planned for locations where integration of compatible uses is feasible. Response: This redevelopment project is located within a mature business park adjacent to a future Bike /Pedestrian trail. Around the clock uses are unusual in this environment. Consistency with the overall goals for development along the river is achieved through development of project that has a building envelope largely with in the high impact zone, maintains the current low impact use in the low impact zone, that provides the best long term use of the property, and that provides access to the shoreline for the public. B. Policies 1. Shoreline activities identified as being appropriate shoreline , uses should be planned for and encouraged. a. Short-term economic gain or convenience in developments should be evaluated in relationship to long -term and potential impairments to the desirable biological and aesthetic features of the river and its shoreline. Response: Parts of the project site is located within the 200 shoreline, however no part of the site borders the river since an intervening lot separates the parcel from the river. Near the riverward boundary is it a levy stabilization wall that was constructed in 2009. The top of that wall is about 8 feet above the existing grade. The level area along the top of the levy is a maintenance road which is located within an easement granted to the city. East of the road is the "River Environment" which has recently been restored as part of the cities levy stabilization project. The project purposes redevelopment of the site within the high and low impact zone of the shoreline west of the stabilization wall. Redevelopment work consists of modifying existing parking areas and construction of at building envelope that complies with the permitted heights allowed. The building envelope is located, except an small area (2,130 sf.) within the high impact zone. This places the envelope 100 feet inland of the shoreline so the building and parking area improvement have no impact on the river environment. The project conforms to policy because no potential long term impairments to the desirable biological and aesthetic features of the river and its shoreline. b. Preference will be given to those activities which protect and enhance the desirable features of the river, . depend on a shoreline location, and /or provide public access to the shoreline. Response: The project consists of the conversion of portions of an existing parking lot to an urban office building upland of the shoreline river environment. The area to be redeveloped is located west of the levy stabilization wall that was constructed in 2009. This wall provides an eight foot high barrier to river access from the site. The proposed redevelopment area occurs is west of the levy stabilization wall constructed . in 2009. This wall provides an eight foot high barrier to river access from the site. The owner of the site however under city ordinance 2233 has agreed to dedicate the land between the levy stabilization wall and the riverso the city can construct a' bike /pedestrian trail which will provide access to the shoreline area from the public right of way along this portion of the river. Access to the shoreline after hours would be a security and safety concern and would require the city to Tight the Bike /Pedestrian trail. The project cannot conform to this policy since public access to the river environment of shoreline is not reasonably feasible and after hour access represents a security and safety concem. 2. Relocation of those activities identified as being inappropriate should be planned for and encouraged. Response: Conformance to this policy is not appropriate for this site 3. Aesthetic considerations should be encouraged when contemplating a new development, redevelopment of existing facilities or for general enhancement of shoreline areas. Response: The project has been designed to conform to the design criteria for commercial and industrial building list in TMC section 18.60.050(A). A detailed analysis provided in the "Compliance to Design Review Criteria" document submitted with this application. The project conforms to policy because it conforms to design criteria in TMC 18.60.050(A) which requires design consistency with surrounding structures. 4. Planning, zoning, capital improvements and other policy and regulatory standards should not tend to increase the density or intensity of activities on the shoreline. Response: Parts of the project site is located within the 200 shoreline, however no part of the site borders the river since an intervening lot separates the parcel from the river. Near the riverward boundary is it a levy stabilization wall that was constructed in 2009. The top of that wall is about 8 feet above the existing grade.. The level area along the top of the levy is a maintenance road which is located within an easement granted to the city. East of the road is the "River Environment" which has recently been restored as part of the cities levy stabilization project. The project purposes redevelopment of the site within the high . and low impact zone of the shoreline west of the stabilization wall. Redevelopment work consists of modifying existing parking areas and construction of at building envelope that complies with the permitted heights allowed. VI. Conservation Element The conservation element is intended for the preservation of the natural shoreline resources, considering such characteristics as scenic vistas, parkways, estuarine areas for fish and wildlife protection, beaches and other valuable or aesthetic features. A. Goals 1. Encourage preservation of unique, fragile and scenic elements, utilization of the renewable resources. Response: Parts of the project site is located within the 200 feet shoreline, however no part of the site borders the river since an intervening lot separates the parcel from the river. Within the intervening lot the city has constructed a river environment as part of the levy stabilization project which restored this area to a natural condition. This area is not currently assessable because of the 8 foot height level wall. The owner under city ordinance 2233 has agreed to dedicate the land between the levy stabilization wall and the river so the city can construct a bike /pedestrian trail which will provide access to the shoreline area from the public right of way along this portion of the river. As part of that project the city will be responsible design and maintain as open space for passive forms of recreation in those unique or fragile areas of the shoreline which cannot be maintained in a natural condition under human uses . Consistency with the goal will be achieved by the city through design and maintenance of the shoreline Bike /Pedestrian trail so preservation of unique, fragile and scenic elements in the shoreline will occur and renewable-resources will be maintained. 2. Encourage the preservation of as much as possible of the natural character of the ever and its shoreline. Response: Parts of the project site is located within the 200 shoreline, however no part of the site borders the river since an . intervening lot separates the parcel from the river. Near the riverward boundary is it a levy stabilization wall that was constructed in 2009. The top of that wall is about 8 feet above the existing grade. The level area along the top of the levy is a maintenance road which is located within an easement granted to the city. East of the road is the "River Environment" which has recently been restored as part of the ,cities levy stabilization project. The project purposes redevelopment of the site within the high and low impact zone of the shoreline west of the stabilization wall. • • Redevelopment work consists of modifying existing parking areas and construction of at building envelope that complies with the permitted heights allowed. Consistency with the goal on preserving as much as possible of the natural character of the river and its shoreline has already been achieved by the granting of and easement for shoreline restoration done in 2009 as part of the levy stabilization project and by the dedication of land to the city riverward of the wall according to ordinance 2233. 3. Encourage the protection of resources and ecology of the river and its shoreline. Response: Parts of the project . site is located within the 200 feet shoreline, however no part of the site borders the river since an intervening lot separates the parcel from the river. Within the intervening lot the city has constructed a river environment as part of the levy stabilization project which restored this area to a natural condition. This area is not currently assessable because of the 8 foot height level wall. The owner under city ordinance 2233 has agreed to dedicate the land between the levy stabilization wall and the river so the city can construct a bike /pedestrian trail which will provide access to the shoreline area from the public right of way along this portion of the river. As part of that project the city will be responsible design and maintain as open space for passive forms of recreation in those unique or fragile areas of the shoreline which cannot be maintained in a natural condition under human uses. Consistency with the goal will be achieved by the city through design and maintenance of the shoreline Bike /Pedestrian trail so the resource and ecology of the river and its shoreline is protected. 4. Water quality in the river should be sufficiently high to permit human use and provide a suitable use and habitat for desirable forms of aquatic life. Response: Prior to discharge a filtration system for all remaining parking areas will be installed which will result in a improvement in water quality discharged from this site to the public system. As a result of the redevelopment of the site will an overall increase in water quality in the river will occur. Consistency with the goal of providing Water quality in the river sufficiently high to permit human use and provide a suitable use and habitat for desirable forms of aquatic life will not be affected by this project. B. Policies 1. Determine and consider the visual impact a commercial /industrial development will have on the surrounding area. Response: The project has been designed to conform to the design criteria for commercial and industrial building list in TMC section 18.60.050(A). A detailed analysis provided in the "Compliance to Design Review Criteria" document submitted with this application. As part of this review visual impacts the development will have on the surrounding area have been determined and considered. The project conforms to policy because it conforms to design criteria in TMC 18.60.050(A) which requires design consistency with surrounding structures. 2. Develop regulations requiring the maintenance of a buffer of permanent vegetation between developed areas and associated water bodies to improve the aesthetic qualities of the river, retard surface run -off, maintain consistent water temperature, and reduce siltation. Response: Parts of the project site is located within the 200 shoreline, however no part of the site borders the river since an intervening lot separates the parcel from the river. Near the riverward boundary is it a levy stabilization wall that was constructed in 2009. The top of that wall is about 8 feet above the existing grade. The level area along the top of the levy is a maintenance road which is located within an easement granted to the city. East of the road is the "River Environment" which has recently been restored as part of the cities levy stabilization project. The project purposes redevelopment of the site within the high and low impact zone of the shoreline west of the stabilization wall. No work is propose that will affect a change in run off into the river. Redevelopment work consists of modifying existing parking areas and construction of at building envelope that complies with the permitted heights allowed. Drainage from the area east of the stabilization wall flows through the newly constructed river environment according to a design approved under that land use permit. All other site area west of the wall located in the shoreline zone is impervious and follows in to an underground drainage system which discharges into the public system in Andover Park West. The owner under city ordinance 2233 has agreed to dedicate the land between the levy stabilization wall and the river so the city can construct a bike /pedestrian trail which will provide access to the shoreline area from the public right of way along this portion of the river. As part of that project the city will be responsible for design of the buffer and open space between the stabilization wall and the shoreline. • • Conformance with the policy of the maintaining a buffer of permanent vegetation between developed areas and associated water bodies to improve the aesthetic qualities of the river, retard surface run -off, maintain consistent water temperature, and reduce siltation will be followed by the city during the design and construction the maintenance of a buffer of permanent vegetation between developed areas and associated water bodies to improve the aesthetic qualities of the river, retard . surface run -off, maintain consistent water temperature, and reduce siltation. 3. Promote linear shoreline access, especially pedestrian and other non - motorized types, in the areas close to population centers; such areas would also serve as buffer between water and developed areas. Response: Parts of the project site is located within the 200 feet shoreline, however no part of the site borders the river since an intervening lot separates the parcel from the river. The owner under city ordinance 2233 has agreed to dedicate the land between the levy stabilization wall and the river so the city can construct a bike /pedestrian trail which will provide access to the shoreline area from the public right of way along this portion of the river. Conformance with the policy is achieved through the dedication which then permits the city to acquire ownership of the shoreline parcel for development of a public Bike /Pedestrian Trail in the areas close to population centers. This area would also serve as buffer between water and developed areas. 4. Develop regulations for site coverage, building height, set -backs and density to insure visual access to water, promote interesting development and prevent encroachment over water. Response: Parts of the project site is located within the 200 shoreline, however no part of the site borders the river since an intervening lot separates the parcel from the river. Near the riverward boundary is it a levy stabilization wall that was constructed in 2009. The top of that wall is about 8 feet above the existing grade. The level area along the top of the levy is,a maintenance road which is located within an easement granted to the city. East of the road is the "River Environment" which has recently been restored as part of the cities levy stabilization project. The project purposes redevelopment of the site within the high and low impact zone of the shoreline west of the stabilization wall. Redevelopment work consists of modifying existing parking areas and construction of at building envelope that complies with the permitted heights allowed. No work under this permit is proposed between the stabilization wall and the river environment so no encroachment over water will occur. Views of the river from the street on at ground level of the river, which is 15 feet below the site, are blocked by the levy wall. The property owner has previously provided an easement in 2009 that reduced the build able area of this site that has permitted the enhancement of the river environment and construction of the stabilization wall in 2009. This dedication dictated that the site be developed with a linier building parallel with the shoreline. This design results maximizes view of the river from the second floor. The building located in the high impact zone a 100 feet from the shoreline except for a small part of the building envelope. (2,130 sf.) which is in within the low impact zone. This location maximizes visual access to the river corridor. The site is designed with a two story building to minimize lot coverage as a result the length of the building along the shoreline is minimized and views of the down the river corridor are available from the second floor. The building structure as designed is articulated and provides and interesting facade along the river face that has an equal importance as the street facade. The building and site design conforms to policies developed because it follows already developed regulations for site coverage, building height, set -backs and density to insure visual access to water, provides an interesting design and consistent design, and doesn't encroachment over water. 5. Provide facilities for intensive recreational activities where the sewage disposal and vector control can be accomplished to meet public health standards without adversely altering the natural features attractive for recreational uses. Response: This policy is no applicable to this project. 6. Evaluate the effect of proposed recreational developments on environmental quality and natural resources of an area. Response: The proposed Bike /Pedestrian trail project is not part of the this application. Evaluation of the effect is of this project is not appropriate as part of this application. 7. Develop standards for preservation and enhancement of scenic views and vistas. Response: Parts of the project site is located within the 200 shoreline, however no part of the site borders the river since an intervening lot separates the parcel from the river. Near the riverward boundary is it a levy stabilization wall that was constructed in 2009. The top of that wall is about 8 feet above the existing grade. The level area along the top of the levy is a maintenance road which is located within an easement granted to the city. East of the road is the "River Environment" which has recently been restored as part of the cities levy stabilization project. The project purposes redevelopment of the site within the high and low impact zone of the shoreline west of the stabilization wall: Redevelopment work consists of modifying existing parking areas and construction of at building envelope that complies with the permitted heights allowed. The building located in the high impact zone a 100 feet from the shoreline except for, a small part of the building envelope (2,130 sf.) which is in within the low impact zone. This location maximizes visual access to the river corridor and enhances vistas along the river corridor. The project as proposed is designed to reflect existing standards established in the shoreline master program for the urban environment. The building and site design conforms to policies developed because it complies to allowed height in the low and high impact zone along the shoreline setback, minimizes development above the existing grade in the low impact zone, is ,set back as fair as feasible from the river environment and future recreational trail. 8. Outfalls and surface run -offs should be controlled to minimize adverse effects on the river. Response: Parts of the project site is located within the 200 shoreline, however no part of the site borders the river since an intervening lot separates the parcel from the river.. Near the riverward boundary is it a levy stabilization wall that was constructed in 2009. The top of that wall is about 8 feet above the existing grade. The level area along the top of the levy is a maintenance road which is located within an easement granted to the city. East of the road is the "River Environment" which has recently been restored as part of the cities levy stabilization project. The owner under city ordinance 2233 has agreed to dedicate the land between the levy stabilization wall and the river so the city can construct a bike /pedestrian trail which will provide access to the shoreline area from the public right of way along this portion of the river. As part of that project the city will be responsible design of a water quality system for this project that will not impact the river environment. Drainage from the area east of the stabilization wall flows through the newly constructed river environment according to a design approved under that land use permit. All other site area west of the wall located in the shoreline zone is impervious an follows in to an underground drainage system which discharges into the public system in Andover Park West. Consistency with the goal of minimizing adverse effects on the river by controlling outfalls and surface run -offs as result of the Bike /Pedestrian Trail construction by the responsibility of the city. This project as proposed achieves constancy because it has no new run off to the river environment of the shoreline. 9. Open space should be distributed along the river. Response: The proposed redevelopment area occurs is west of the levy stabilization wall constructed in 2009. This wall provides an eight foot high barrier to river access from the site. East of the wall is a separate parcel that is not part of this development application on which an enhanced river environment was constructed as part of the stabilization Wall project. The owner under city ordinance 2233 has agreed to dedicate the land between the levy stabilization wall and the river so the city can construct a bike /pedestrian trail which will provide continuous open space along the river Consistency with the goal of providing open space distributed along the river will be achieved when construction of trail system along the river is constructed by the city as a result of the dedication of land. VII. Historical /Cultural Elements A. Goals 1. Protect or restore areas having historic, cultural, educational or scientific values. Response: The site is an existing private parking lot that was constructed to provide parking temporary Simulcast facility that has been relocated to Aubum. It has no historic, cultural, educational, or scientific values. Consistency with this goal is not applicable 2. The long -term effects upon the river must be considered over short- term benefits, economic or otherwise. Response: This property is located in the shoreline zone but is separated from the river by a separate parcel. As such receives no direct economic benefit from the river except for the view of the open space it creates. As a result the proposed development as a corporate office building is the highest and best use of the property short term and Tong term bases. Conformance with the policy has been achieved because of its initial development as the highest use the long -term over short-term benefits for the river shoreline are being realized at this time. B. Policies 1. Protect and restore areas having historical, cultural, educational or scientific values. Response: Application of this policy is not appropriate 2 Access to such sites should be made available to the general public. Response: Application of this policy is not appropriate 3. Visitors should be provided with clear identification and interpretation of historical /cultural sites. Response: Application of this policy is not appropriate 4. Public and private cooperation should be encouraged in site preparation and protection. Response: Application of this policy is not appropriate 5. Suspected significant sites should be retained. Response: The property was filled and graded under a prior site development permit. No evidence of Historical /Cultural elements was found during that environmental review. Conformance to this policy has already been demonstrated under prior land use actions. 6. Newly discovered sites should be kept free from other intrusions until their value is determined. Response: The river environment of the shoreline adjacent to the property was modified under a 2009 land use action and the original dike constructed many years ago. The property being redeveloped is west of the river environment and separated by the levy stabilization wall. The proposed project will have no new intrusions into the river environment, however excavation below the fill already on the site may our which in the past has resulted in no evidence of Historical /Cultural elements. Conformance to this policy has will befollowed if materials are encountered indicate evidence of Historical /Cultural elements. Consistency to Goals of Tukwila Shoreline Master Plan.doc DEC 0 8 2009 C;;,p� MUNiT' °! .oE1i L �t;Ei�T Proje E description for Segale Two Story Office Building 12 -3 -09 General Project Description: The project consists of constructing a two story office structure of approximately 57,518 square feet with associated site improvements within a site that is currently a paved parking lot located on Lot 4 of the Segale Business Park. The area of the existing site to be redeveloped is 190,244 square feet. Site Location: The site is located at 18200 Andover Park West within the Segale Business Park between the Green River and east of Segale Drive A (Andover Park West) about 380 feet south of South 180th Street. This places the site within the Tukwila South Overlay District. Shoreline Zone: The site is located near the Green River which places part of the proposed development in the shoreline zone. Between the lot and the river is a separate legal parcel D that is not part of this project area. The proposed project is permitted by ordinance to be developed according to the regulations of each impact zone. For this site, about 60 feet of the redevelopment area is located in the low impact zone and 100 feet of the site in the high impact zone. The shoreline environment has recently been modified by the city as part of a levy stabilization project. As part of that project, a levy stabilization wall was constructed on private property that allowed the river cross section to be modified. All proposed redevelopment work is west of that wall. Located to the east of the wall is a maintenance road and the reconstructed river cross section. Within that area a new shoreline environment has been constructed by the city. Prior Uses: This site was improved when the Off -Track Simulcast Building was constructed to provide parking for that facility. At that time a land use permit for accessory parking and shoreline development were approved. A construction permit was issued for the 1 improvements and the parking lot was constructed to meet the water quality and detention requirement of the city at that time. Since that time, the Simulcast facility has been relocated to Emerald Downs and the land is no longer needed for off -site parking. Environmental Review: The impacts of the development of this property have been evaluated as part of the Environmental Impact Statement prepared by the City for the Tukwila South Project EIS which includes all of the Segale ownership. The "Project Envelope" for this development is within the parameters of the final Tukwila South Final EIS so it according to the "Development Agreement" no environmental review is required. Mitigation for the impacts of the development will be provided according to the TMC and the development agreement. Site Conditions: The site is currently paved and has an underground drainage system which connects to the existing system in the street. This system flows north to the city detention system. Along the street frontage is an existing walk and mature street trees that are in poor condition. Behind the side walk is a landscape area that currently buffers the view of the parking area. At the east boundary of the site is the Green River. Between the river and the river environment is a certified river dike which is located in an easement within the Segale Business Park Property. This dike provides flood protection for the development. Site Environment: The site is surrounded by developed properties and is in a mature business park. Many of the surrounding buildings have a natural concrete finishes and feature in their design concrete board form textures or aggregate surfaces. Directly to the north is an office building that flanks the park entry which has a distinctive architectural design. West of the site, across the street is also an office building which is constructed in the same style as the entry office building. South of the project will be a parcel of undeveloped land that will be developed at a future time. Beyond that area is a warehouse structure with a board form texture on the exterior surface. 2 Building Use: The purposed building is intended to be used for Corporate Offices (IBC occupancy group B, A -3, & S -1) that will support warehouse, and manufacturing operations fora tenant that is located within the Segale Business Park. From a land use stand point, its use is most similar to ITE group 714 (Corporate Office Building). Building Information: The purposed building will be a two story structure constructed as an IBC type IIB with sprinklers. Under the provisions of the code the ground floor area allowed is to be 35,625 sf. This construction type permits a maximum area in excess of the proposed area. The building at this time is proposed to be supported by conventional spread footings. The ground floor will be a non structural slab on grade with the upper floor constructed of a concrete slab on metal deck supported by bar joists and girders. No fire rating for the structure will be required based on the construction type. The building roof will be a single ply mechanically attached system of a light color over R -30 rigid insulation place over a metal deck. The decking will be supported by bar joists and steel girders. The building will be constructed as a site cast precast building. All building elements will be constructed on site or in a nearby yard. This will facilitate the construction process, control the quality of the finishes, and allow the building to be completed on schedule. At this time the building permit application will be for a shell with life safety systems in place. Tenant improvements will be done under separate permits. Site Fill and Grade: The site according to the existing drawing, slopes up from the west to the east. At the west edge of the paving the existing surface is around 25.5 feet and rises up to around 30 feet at the east project limit line. In order to provide drainage the elevation at the west edge of paving will be raised to about elevation 27. The grade at the eastern lot line will remain at the existing elevation which is about 30. Civil Design: The finish floor elevation is driven by the drainage design and low impact construction practices. It is set so a minimum amount of excavation is needed to achieve the necessary bearing values at the footings, high enough to allow water quality vaults to function, at a level that will minimize export of preload after the initial soils consolidation occurs, and at an elevation that will have no impact on the dike stabilization wall along the river. The purposed storm drainage design provides two water quality vaults prior to discharge to the street system and is based on utilizing the existing city detention system. The roof water will be discharged to the city storm system. Street Design: The streets within the Segale Business Park are private streets that were originally designed to city standard. These streets have not been dedicated to the city. As part of the work, the existing sidewalk and street trees will be replaced. The new sidewalk will comply with public works standards. Building and Site Layout: The shape and orientation of the building has been determined by the dimensions of the site, the project program, functional requirements, and good design practices. The building is designed with a central entry that connects to the building core and two independent egress stairs. This enables the building to be subdivided into multiple tenant spaces if needed and the core to be accessed from each side. The building is located towards the north end of the site This allows the visitor parking, employee parking, and service activities to be separated and minimizes the size of each parking area. The building design and site layout create a direct access route between the main entry and public way. As a result the main building entry can be easily indentified at a pedestrian and vehicular level from the street. The site is designed so that existing access points are utilized and employee parking is distributed around the building, loading and unloading occur in the rear yard and pedestrian access pathways are provided from the employee parking areas as well. In addition, an outside employee break area is provided. Site Landscaping: All of the existing site landscaping will be removed. New landscaping will be provided that meets and exceeds the area requirements of the current code. This work includes front yard, parking lot, and building base landscaping. As a result over 40,000 sf. of new pervious area will be provided on the site. Landscaping will be provided within the legal lot, along Segale Drive A, and at all pervious surface areas. The shoreline area located in the adjacent tract D has previously been improved as part of the levy stabilization project. The site landscaping scheme has been developed to compliment the building design, buffer the parking areas, and provide safe pedestrian routes. Building Design: The building is designed to be compatible with the existing structures and present a corporate image. Its design follows the theme of the other neighboring office buildings and uses similar colors and materials. Like the adjoining buildings, the second floor steps back several feet from the roof line above. The stepping of the floor out modulates the surface and provides shading of the windows for the floor below. It also results in a generous area of landscaping around the building base between the pedistrian walkway and the building. The overall building is designed in a classic manor. At the top and base there are concrete spandrel elements that are connected together with columns that support the floor structure beyond. The exterior materials consist primarily of concrete and glass. These two materials enclose the building envelope. The concrete spandrels and columns are an integral part of the building structure. The overall design has strong linear lines that visually mitigates the height of the building. This design features continuous bands of glazing and vertical elements that visually modulate those lines, express the building structure, and connect the building to the ground. Between the glazing bands, at the building base, each floor, and at the roof is a concrete spandrel that is both a design and structural element. These surfaces are articulated with board form texture to emulate the design of the surrounding buildings. • The building at this time is purposed to have a sealed concrete finish, bronze tinted glass, and dark bronze aluminum sash. This will?make the building visually compatible with the neighboring office buildings. Mechanical: The building as proposed will have two large mechanical units on the roof and one smaller unit. The large units will be located near the exit stairs and the smaller unit near the core. The units would be installed as part of the shell construction and the final distribution would be part of the tenant improvements, however, the smaller unit that serves the core would be permitted with the shell and installed with that work. Electrical: Core, site, and lobby lighting would be part of the shell permit along with emergency egress lighting. The lighting within the tenant areas would be under the tenant improvement permit; however, lighting power budget calculations would be submitted with the shell permit and allowed watts shown on the shell drawings for administrative purposes. Design Development: The site development drawings provided are 30% working drawings. The documents will be amended and additional materials provided for the building permit application. The landscape design drawings are complete except for irrigation. These will be modified as based on final design and included in the building permit package. The architectural document set includes the drawings that will be filed with the building permit application. These drawings include existing condition drawings, site plans, site cross sections, building floor plans, building elevations, and building cross sections. 1 RECEIVED DEC 0 8.2009 COMMUNITY DEVELOPMENT • • DESIGN REVIEW CRITERIA 12 -3 -09 CRITERIA FOR COMMERCIAL AND LIGHT INDUSTRIAL DEVELOPMENTS (TMC 18.60.050(A)). Applies to all projects requiring design review except: multifamily, hotel and motel development and developments in the Tukwila International Boulevard corridor (see TMC 18.60.060(C)). Projects located within 200' of Green /Duwamish River must meet additional criteria in the Shoreline Substantial Development Permit Application. 1. Relationship of Structure to Site a. The site should be planned to accomplish a desirable transition with the streetscape and to provide for adequate landscaping and pedestrian movement. Response: The site design provides between the sidewalk along the street and the off street parking area 15 feet of type II landscaping that screens the view of the vehicles from the private street, Segale Drive A. At the building entry a landscaped pathway is provided between the street sidewalk that leads you to the entry of the main building. Within the parking areas and around the building are pedestrian walkways that provide a pathway to the building entries. These routes are landscaped and the parking areas have an alternate paving treatment than at the drive isles to signify a pedestrian crossing. These design elements along with the replacement of all of the street . trees provide a desirable transition at the streetscape and adequate landscaping treatment along the pathways where pedestrian movements occur. . b. Parking and service areas should be located, designed and screened to moderate the visual impact of large paved areas. Response: The site is designed so loading areas and drop off areas are located behind the building. The dumpster enclosure is located in the rear of the site so it is well screened from public view. Parking located in front of the building is screened from the street by 15 feet of type II landscaping. All parking areas located within the site have landscape islands at the end of the rows and intermediate islands within - the area to break up the rows of parking. The site design meets the design criteria because the service areas are located so they are screened and the parking areas are designed to moderate the visual impact of large paved areas. c. The height and scale of each building should be considered in relation to its site. 1 • Response: Building height of surrounding office buildings in Segale Business Park are approximately 34 feet and other industrial buildings along Andover Park West are 30 to 35 feet. Some of these buildings are this height at the property set back lines. Building lengths and depths at surrounding office buildings are between 150 to 160 feet long and 90 to 110 feet deep. Industrial buildings are 300 to 350 feet long and 150 to 180 feet deep. The length of, the industrial buildings along the street frontage exceeds 300 feet and their side yard set backs are 60 feet or less. These buildings are large .scale structures that provide a higher ratio of visual density along the street than the adjoining office buildings. The underlying industrial zoning permits a building height of 65 feet at the set back line. In addition, it permits mechanical screens and penthouses to exceed that height. The overlaying shoreline zone has two different height restrictions depending on whether it is the "low Impact" or "height impact" zone. This height in the high impact zone is 125 feet and the low impact zone is 35 feet. Because of the modification of the river environment recently done by the city the location of the low impact zone moves west ward into the site further and a small part of the NE corner of the building is located in that zone The purposed building will have a height of 34 feet and will be set back from the street and the north and south lot lines by 90 feet. These setbacks result in substantial separation from adjoining properties and mitigate the effects of shade and shadow on surrounding uses. The height and scale of the building was carefully considered and determined the relationship of the building and the site boundaries. 2. Relationship of Structure and Site to Adjoining Area a. Harmony in texture, line and masses is encouraged. Response: The proposed building uses surface textures similar to its neighbors, building lines that are comparable with its neighbors, and massing that relates to the scale of the surrounding buildings. The design as presented is .harmonious with the surrounding area and industrial park. b. Appropriate landscape transition to adjoining properties should be provided. Response: The site design provides landscape transitions at each boundary: the street, between parking areas, landscaping within the parking area, and the building. The extensive use of landscaping provides successful transitions at the lot lines, street, parking areas, and at the building. c. Public buildings and structures should be consistent with the established neighborhood character. ; Response: This project is located within an industrial park and away from commercial development that requires design review. It is located near a shoreline that has no public access. This building can be viewed from the public trail which is on the opposite side of the river, over 300 feet away. Within that area there are no buildings or structures. d. Compatibility of vehicular and pedestrian circulation patterns and loading facilities in terms of safety, efficiency, and convenience should be encouraged. Response: The site provides a main vehicle circulation path from each driveway entry around the building to loading and service areas in the rear of the lot. It provides passenger vehicle access to these areas from the main drive and to the visitor and employee parking. Pedestrian pathways are provided from parking areas north and south of the building, around the building, and from the street. Cross walks are provided at street intersections where they cross the traffic routes. The site design provides compatibility of vehicular and pedestrian circulation patterns and loading facilities that are safe, efficient and convenient. e. Compatibility of on -site vehicular circulation with street circulation should be encouraged. Response: The site design utilizes the current curb cuts that provide access to the site. The on -site design provides drive width and turning radiuses that allow fire truck and delivery vehicle to move freely through the main access drives. Compatibility of on -site vehicular circulation with street circulation is provided through the utilization of existing access points and coordination of those points with on -site circulation patterns. 3. Landscape and Site Treatment a. Where existing topographic patterns contribute to beauty and utility of a development, they should be recognized, preserved and enhanced. Response: The site is paved and slopes gently to the west to a narrow band of landscaping that is non - conforming in width to current code. The condition of those materials is poor and aged. The existing site has no topographic patterns that contribute to the beauty that should be recognized, preserved and /or enhanced. The proposed project recognizes the lack of value of these materials and will enhance the streetscape and the site with new planting materials that will cover over 15% of the project area. b. Grades of walks, parking spaces, terraces and other paved areas should promote safety and provide an inviting and stable appearance. • • Response: The slopes of walks on the site conform with accessibility requirements as well as accessible parking stalls. Other areas are designed with 2 to 3% slopes so they drain well and provide gentle slopes that enable easy access. All surfaces for walking are broomed or decorative concrete so that pedestrian pathways are always recognizable. All parking areas are asphaltic concrete and have landscaping located within them so they are inviting and feel safe. The overall site design provides grades at the walks, parking spaces, terraces and other paved areas that result in a safe and inviting environment that has stable surfaces and appearance. c. Landscape treatment should enhance . architectural features, strengthen vistas and important axis, and provide shade. Response: Landscaping at the parking areas have been designed to provide . shade and visually buffer the view of the building and vehicles. Planting at the base of the building provides a soft transition between the building and the ground. Landscape materials have been placed so they create visual windows to the building facades and entry canopies which are visually identified on and off the site. The design utilizes landscaping that enhances architectural features, strengthen vistas and important axis, and provides shade. d. In locations where plants will be susceptible to injury by pedestrian or motor traffic, mitigating steps should be taken. Response: All planting adjacent to parking areas is set back 24 inches from the curb to prevent damage. Where trees are planted next to parking areas or driveways, they are setback from the edge of paving four feet to avoid interference. Trees are set back two to four feet and shrubs two feet from sidewalks. In locations where trees, shrubs, and ground cover could be damaged by pedestrian or motor traffic, the potential for damage has been mitigated by appropriate placement of the plants. A traffic area curb has been provided to prevent vehicle intrusion. e. Where building sites limit planting, the placement of trees or shrubs in paved areas is encouraged. Response: The site design provides fully landscaped parking islands that contain trees shrubs and ground cover that are no more than 90 feet apart and at the end of all parking rows. In addition, landscaping is provided at lot line, street frontage, and the base of the building. The site design meets and exceeds the code requirement and the design goal of having trees and shrubs in the parking area. 4 • f. Screening of service yards and other places, which tend to be unsightly should be accomplished by the use of walls, fencing, planting or combinations of these. Screening should be effective in winter and summer. Response: All service functions are located in the rear yard. Loading and delivery areas are screened from the street by the building. The trash enclosure is located in the rear yard as well and is constructed with concrete walls and has metal gates. Each side of the dumpster has a, 10 foot landscape island that buffers the view of the enclosures' walls. The materials used to screen the dumpster perform that function during all seasons. g. Service yards and other places that tend to be unsightly are screened by the use of walls, fencing, planting or combinations thereof with materials that will be effective in winter and summer. In areas where general planting will not prosper, other materials such as fences, walls, and paving of wood, brick, stone or gravel may be used. Response: In areas such as car overhangs, below canopies, and where existing footings at the dike stabilization wall are too close to the surface for plants to prosper, decorative concrete paving, stone, and gravel are used. The use of decorative concrete paving, stone, or gravel is consistent with the design goals and principals. h. Exterior lighting, when used, should enhance the building design and the adjoining landscape. Lighting standards and fixtures should be of a design and size compatible with the building and adjacent area. Lighting should be shielded, and restrained in design. Excessive brightness and brilliant colors should be avoided. Response: Exterior building lighting consists of soffit lighting at the canopies and within each bay between vertical fins. The soffit lighting at the canopies provides a warm glow that makes this area feel safe and secure after dusk. The other soffit lighting illuminates the building facade so the detail and texture can be seen along with landscaping around the building base. The site lighting consists of pole lights that are designed to light parking areas and pedestrian pathways. These fixtures are a shoe box type that are on 30 foot or less bronze anodized poles, have tense diffusers, and are shielded to prevent glare. 4. Building Design a. Architectural style is not restricted and evaluation of a project should be based on quality of design and relationship to surroundings. Response: The project is . designed according to the style and materials of the surrounding office buildings and industrial buildings in the park. This insures the quality is maintained and a strong relationship continue. 5 • b. Buildings should be to appropriate scale and be in harmony with permanent neighboring developments. Response: The length, height and width of each building facade has been selected so the scale is appropriate and in harmony with existing neighboring office and industrial buildings. c. Building components, such as windows, doors, eaves, and parapets, should have good proportions and relationship to one another. Building components and ancillary parts shall be consistent with anticipated life of the structure. Response: The exterior materials consist of glass, concrete, stucco, and anodized aluminum. All of these components have consistent life spans with each other and the structure. The building has been designed with uniform steps so the windows are shaded, and shielded from the rain. Detailing of ancillary parts such as the window sills and cornice at the parapet has been updated so they shed water freely to avoid future surface stains. The height of the window band has been selected so they visually balance with the depth of the spandrel below. These bands are the same height at each level so they have a relationship to each other to give the building as much functional window area as practical. Cantilevered spandrels are provided at the corners to accentuate the horizontal appearance of the building that visually reduces the scale. This feature allows the bands of windows to flow from one facade to another. The building facade is composed of a lattice work of vertical fins and horizontal spandrels. Each unit element has similar detailing and scale. Within each part of the lattice consists of elements that have good proportions and a relationship to another which achieves the design goals and guidelines. d. Colors should be harmonious, with right or brilliant colors used only for accent. Response: The building color will be natural concrete and sealed. Building glazing will be energy efficient, bronze in a bronze sash. Building copings will be bronze to match the building window systems. Mechanical screen color will be light brown so the color is consistent with the other metal materials on the building. These colors are consistent with neighboring buildings, harmonious with each other, and use accent colors appropriately. e. Mechanical equipment or other utility hardware on roof, ground or buildings should be screened from view. Response: The building has a three foot parapet which will screen all small pieces of equipment from view. Larger mechanical units are located at the north and south ends of the building and are enclosed by a free standing mechanical screen. The building and site as designed provides screening of mechanical equipment and other hardware from view. f Exterior lighting should be part of the architectural concept. Fixtures, standards and all exposed accessories should be harmonious with building design. Response: The parking lot lighting fixtures selected are rectilinear so they are on character with the building and have the same finish color as other metal building components. The bases for the poles are concrete in color and match the building. g. Where bollard lights are provided they employ concrete in the design so they can be architecturally finished to match the aggregate walk surfaces. Monotony of design in single or multiple building projects should be avoided. Variety of detail, form and fitting should be used to provide visual interest. Response: The purposed building is part of an industrial park. The industrial building vary in design detail but commonly employ natural finish that are smooth, have a board form texture or are aggregate. All of the buildings have common details but some features that are unique to themselves. The existing office buildings have similar character but individual details and features set them apart. The new building . has different proportions than the adjacent office buildings as well as increased base landscaping. The design as proposed avoids monotony and has a variety of detail and form that provides visual interest. 5. Miscellaneous Structures and Street Furniture a. Miscellaneous structures and street furniture should be designed to be part of the architectural concept of design and landscape. Materials should be compatible with buildings, scale should be appropriate, colors should be in harmony with buildings and surroundings, and proportions should be to scale. Response: Miscellaneous structures consist of the entry and drop off canopies; dumpster enclosure and employee break area. The canopy structures are designed so they integrate the building design components at an appropriate scale. The dumpster enclosure wall designs employ the same wall finish as used on the building spandrels. The metal gate color will match the metal finishes on the building. Under the main entry canopy decorative concrete finishes are used. These finishes will be used at the employee break area. Stone benches will be provided at the break area and will be used under the building canopies. Miscellaneous structures and furniture are designed to be part of the architectural concept and landscaping design. • b. Lighting in connection with miscellaneous structures and meet the guidelines applicable to site, landscape and build Response: Lighting will be provided at the canopies. integrated into the building soffits and meet the design warm, safe and secure feeling area. Consistency with adopted plans and regulations (TMC18.100.030) street. furniture should ings. This lighting will be criteria of providing a 6. Demonstrate the manner in which the proposal is consistent with, carries out and helps implement applicable state laws and the regulations, policies, objectives and goals of the City of Tukwila Comprehensive Plan, the City of Tukwila's Development Regulations and other official laws, policies and objectives of the City of Tukwila. A. Comprehensive Plan: This project is located in an area designated in the comprehensive plan as "The Tukwila South Overlay District ". The goals of the overlay district for this area are: i. The redevelopment of under - utilized areas and development of Campus Office, Urban Office, Retail, and Light Industrial ; and ii. Protection and restoration of natural environment features Response: The development of a third office building facilitates the goal of developing urban office. The property owner previously provided an easement on this parcel which allowed the shoreline environment on the adjacent property to be restored. B. Shoreline Regulations: This project is located within the 200 foot setback of the shoreline zone. The goals of the Comprehensive plan are: i. The redevelopment of under- utilized areas and development of intensive commercial and industrial activities; and ii. Protection and restoration of natural environment features and riverbank characteristics. Response: The conversion of this site from a parking lot to a office building meets the redevelopment goal of providing a more intensive use. The property owner previously provided an easement on this parcel which allowed the shoreline environment on the adjacent property to be restored. C. Transportation: The proposed facility will mitigate transportation impacts through payment of the city mitigation fee required by ordinance. D. Water Quality: Drainage from this project is into the city system. Drainage from this site flows into the P -17 regional storm water basin that was constructed as part of the City of Tukwila Andover Park Drainage Plan. NK-CD-1/SEGALE-OFF-DES-REV.doc 8 LANCE MUELLER • & ASSOCIATES A R C H I T E C TS Memorandum A I A Date: 12 -3 -09 To: Nora Gierloff CC: Steve Nelson From: Bob Fadden— Lance Mueller & Associates RE,CEI`IED IOEC 0 8 2009 DEVELOPMENT Job No. 09 -236 Re: Segale Office Building — Shoreline Permit Nora, In spring 2008 we had an pre - application meeting for the Segale Office building located in the Segale Business. After a delay of a year the project is ready to move ahead. The purposed building has the same foot print and a similar design to the one reviewed during the pre - application meeting but is two stories instead of three. This results in a smaller area of the lot being redeveloped. Recently the Tukwila South Overlay District has been implemented which included this property by ordinance 2235. Developments in this overlay are governed by the Development Agreement dated June 10, 2009 and the Tukwila South Overlay District Design Manual. The site plan provided complies with section 18.41.090, "Basic Development Standards" listed in the ordinance. According to the development agreement with the city SEPA is not required unless the scope of the develop is outside of the "Project Envelope ". This project as presented falls well within that envelope as described in section 6.2 Further SEPA Review Limited. Design Review within the "Tukwila South Overlay District" is to be conducted according to TMC 18.41.080. This review is for consistency with the "Tukwila South Overlay District Design Manual" only. Under the ordinance Land Use decisions, such as a shoreline permit is are TYPE II as described in TMC 18.108. Based on the requirements for shoreline permit application provided in checklist we are furnishing the materials below except for those waived by the city since services already are provided to the site. In addition we are providing other materials that provide clarification and understanding of the project and its design. Materials Attached: Application Checklist annotated Application Form 130 Lakeside Ave. • Suite 250 • Seattle, WA • 98122 • (206) 325 -2553 • Fax (206) 328 -0554 SEPA addendum Concurrency Test Notices Surface Water Certificate of Water Availability Traffic Concurrency Certificate Application Affidavit of Ownership and Hold Harmless Permission to Enter Property Major Materials Board La Pinata LLC contractor license 5 - Photo Exhibit Booklets 5 — Site Lighting Fixture Cuts 8 — 11 x 17 colored site plans 8 — 11 X 17 colored elevations 8 - 11 x 17 perspectives (B & W) 8 Drawing Sets AO Cover Sheet A1.0 Existing Conditions Drawing A1.1 Site Plan A1.2 Site Section A1.3 Site Sections A1.4 Site Sections A1.5 Site Lighting Plan A2.1 First Floor Plan A2.2 Second Floor Plan A2.3 Roof Plan A3.1 Exterior Elevations A4.1 Building Section L1.1 Landscape Plan L1.2 Landscape Plan. If after reviewing this materials you find that additional copies or information is needed please contact me or Steve Nelson. Cordially ei.LARJ_e Bob Fadden 130 Lakeside Ave. • Suite 250 • Seattle, WA • 98122 • (206) 325 -2553 • Fax (206) 328 -0554 • • Addendum I. SEPA Full environmental review has been conducted for the Tukwila South Project pursuant to the State Environmental Policy Act (SEPA) and the Tukwila SEPA Ordinance. A Draft Environmental Impact Statement was prepared and published on April 5, 2005. A Final Environmental Impact Statement was prepared and published on July 7, 2005. The EIS included technical appendices and reviewed all impacts relating to the proposal, including traffic, drainage, and wetland impacts, among others. The EIS was part of the record before the City's Planning Commission and City Council in the process of project review for the Tukwila South Development Agreement ( "DA "), dated June 10, 2009, between the City of Tukwila and La Pianta. The City Council determined that all environmental impacts of the project and its alternatives were fully identified and evaluated in the EIS. La Pianta entered into the DA with the City of Tukwila to memorialize the permit review of, and development standards and mitigation for, the full build -out of the Tukwila South project. The DA provides, at Section 6, that with very limited exceptions, no further SEPA review shall be required for implementation of the Tukwila South project. Because the permit being sought for this particular project is an "Implementing Approval" that does not exceed the Project Envelope, and no substantial changes have been made to the Tukwila South project, no exception to this rule is applicable. Accordingly, the EIS satisfies all SEPA requirements for this particular project application. The current proposal for development of 18200 Andover Park West at Tukwila South conforms to the conditions and criteria of the approved DA. No modifications to the DA are being sought for this development, and as such, no new threshold determination under SEPA is required. 11. Design Review Pursuant to the provisions of TMC 18.41.080, design review of the project shall be a Type II administrative decision. The review shall be limited to the confirmation of consistency between the proposed design of the project and the provisions of the "Tukwila South Overlay district Design Manual." RECtilveo DEC 0 8 ?009 DCLDPAlaiT rnrr mss l� .sirsss.��.rarrww�rssrsa�rrarw� ycs��r...r,.+asw DEPARTMENT OR LABOR. AND,'INIUSTRIES REGISTERED AS PROVIDED BY LAW AS, CoNST CONT ; ..GENERAL 02- 06 -'08 12:06 FROM- publicworks /dcd 2064313665 CITY OF TUKWILA Public Works Department Permit Center 6300 Sauthcenter Blvd., Suite 100 Tukwila, WA 98188 ntto llwwvw. cl. tukwh'a, wa us t laic k r� , h,E� '-�' C:7iaiits"tUN'ir T -965 P002/005 F -211 PermitNo. C/0 -0 /'_)N Project No. P/ D - Oa? 7 ( ' / ... oc ) (Per once :tse only) TRAFFIC CONCURRENCY CERTIFICATE APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** SITE LOCATION i King Co. Assessor's Tax No.: 35 2 304 --9121 Site Address: 18200 Andover Park West Tenant Name: Segale Properties PropertyOwnersName: La Pianta LLC Mailing Address: PO Box 88028 Tukw i 1 a, Suite Number: Type of Existing Use: None WA 98138 Is existing building vacant? DNA City • Size of Existing Use: _ None For how long? DNA State zip CONTACT PERSON - Who do we contact when your concurrency certificate Is ready to be Issued Name: Steve Nelson Day Telephone: (206•) 575 -2000 Mailing Address: PO Box 88028 Tukwila , WA 98138 E•MailAddress: snelson@sega1epro2erties . corn city stalo Fax Number: (206) 575 -1662 Zip Scope of Work (please provide detailed information): Construction of a 2 story office building with an ITE gross area of 57,446 square feet with 229 on site parking stalls. Type of work: ® New 0 Addition ❑ Change of use Type of Proposed Use: Corporate off ice PERMIT APPLICATION DOTES - ❑ Remodel [] Tenant Improvement Size ofPtoposedUse; 57, 446 square feet Exptratlon - The concurrency test notice shall expire 90 days after issuance unless the applicant submits a SEPA or other documentation pursuant to TMC 21.04. If the submittal is made within 90 days, the test notice shall be valid for one calendar year from the date of issuance of the notice. Once the associated development permit or building permit is approved, the final concurrency certificate shall be valid for 2 years or as long as the developer possesses a valid building permit for the development. Extensions may be granted in accordance with TMC 9.50. Transferability —A certificate of concurrency is not transferable to other land, but may be transferred to new owners of the original land. A certificate of concurrency shall apply only to the specific land use, density, and intensity described in the application for a development permit or building permit. 1 HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OP PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT_ PROPERTY • o R AUTHOR tD • e N Signature: 4 �� PrintName: Steven R. Nelson Mailing Address; PO Box 88028 Tukwila , WA 98138 Date: 12/03/09 Day Telephone: City Date Application Accepted: 0 Slate Zip City of Tukwila Development Application Fees for Concurrency Analysis Fees for Residential Use Fees for Non - Residential Use Unit All Types of Residential' Gross Floor Area Industrial 2 Office 3 Retail 4 Eatery 5 Institutional & Ports All Other Uses Between 1 and 3 $300 Less than 5,000 $1,000 $1,800 $2,700 $5,400 $500 $1,500 Between 4 and 5 $600 Between 5,001 and 10,000 $1,500 $2,700 $4,050 $8,100 $1,000 $2,000 Between 6 and 10 $1,200 Between 10,001 and 20,000 $2,000 $3,600 $5,400 $10,800 $1,500 $2,500 Between 11 and 15 $2,000 Between 20,001 and 30,000 $3,000 $5,400 $8,100 $10,800 $2,000 $2,500 Between 16 and 20 $3,500 Between 30,001 and 40,000 $4,000 $7,200 $10,800 $10,800 $2,500 $2,500 Between 21 and 25 $5,000 Between 40,001 and 50,000 $5,000 $9,000 $13,500 $10,800 $3,000 $2,500 Between 26 and 30 $6,500 Between 50,001 and 70,000 $6,000 $10,800 $16,200 $10,800 $4,000 $2,500 Between 31 and 40 $8,000 Between 70,001 and 90,000 $7,000 $12,600 $18,900 $10,800 $5,000 $2,500 Between 41 and 60 $10,000 Between 90,001 and 150,000 $8,000 $14,400 $21,600 $10,800 $6,000 $2,500 Greater than 60 $12,000 Between 150,001 and 200,000 $9,000 $16,200 $24,300 $10,800 $7,000 $2,500 Greater than 200,000 $10,000 $18,000 $24,300 $10,800 $8,000 $2,500 1 All residential uses defined by the ITE Trip Generation Manual Land Use Codes 200 -299, including single family, multi- family, mobile home parks, and shared housing 2 All industrial/agricultural uses defined by the ITE Trip Generation Manual Land Use Codes 100-199, induding light and heavy industrial, manufacturing, and warehousing 3 All office, medical, and service related uses defined by the ITE Trip Generation Manual Land Use Codes 600 -699, 700 -799, and 900 -999, including general office, medical facilities, and banks 4 All retail and recreation uses defined by the ITE Trip Generation Manual Land Use Codes 400 -499, 800 -830 and 837 -899, including retail sales, rental sales, athletic clubs, and theaters 5 All food service uses defined by the ITE Trip Generation Manual Land Use Codes 831 -836, excluding accessory (stand - alone) drive- through espresso stands (or similar) under 250sf which are assessed $300 6 All institutional and transportation uses defined by the ITE Trip Generation Manual Land Use Codes 000 -099 and 500 -599, including schools, places of worship, day care, terminals, and transit Concurrency Application Fee TableFees Page 2 of 2 Recording Requested By And When Recorded Mail To: The City of Tukwila Department of Public Works 6300 Southcenter Blvd, Suite 100 Tukwila, Washington 98188 Attn: Ryan Larson CONFORMED COPY 20080604000332 WLR -ONRP ERS 0.00 PAGE001 OF 015 06/04/2008 09:46 KING COUNTY, WA EASEMENT AGREEMENT Grantor(s): La Pianta LLC, a Washington Limited Liability Company Grantee(s): The City of Tukwila, a municipal corporation of the State of Washington, and The King County Flood Control Zone District, a quasi municipal corporation of the State of Washington Legal Description (abbreviated): Ptn. of Lot 4, BLA 93 -0085, Recording No. 9311301961; Parcel B, BLA L99 -0008, Recording No. 9906099010; and Parcels A, D & E, BLA L02 -029, Recording No. 20021007900001 Additional legal description on page 10, hereinafter called Exhibit A. Assessor's Tax Parcel ID #: 3523049015, 3523049018, 3523049019, and 3523049121 Project: Tukwila -205 Levee THIS EASEMENT AGREEMENT (this "Agreement ") is made as of the 3o day of al AI , 2008, by and among La Pianta LLC, a Washington limited liability company, hereinafter called "Grantor ", and The City of Tukwila, a municipal corporation of the State of Washington, and The King County Flood Control Zone District, a quasi - municipal corporation of the State of Washington, each hereinafter called a Grantee and both hereinafter collectively called "Grantees ". RECITALS A. Grantees have certain legal responsibilities with respect to the repair, maintenance and reconstruction of the Tukwila 205 Flood Control Project located in the City of Tukwila, Washington (the "Project "). B. Grantor owns certain real property located adjacent to the Project. C. The parties desire to enter into an agreement to create certain easements for the inspection, repair, maintenance and reconstruction of the Project as described and subject to the terms and conditions set forth below. AGREEMENT NOW THEREFORE, for good and valuable consideration, the receipt and sufficiency of which are acknowledged, the parties agree as follows: 1. Grant of Easements Grantor hereby grants and conveys to the Grantees, their successors and assigns easements (the "Easements "), subject to the terms and conditions set forth in this Agreement, under, over and upon those limited portions of the real property described in Exhibit A (the "Property ") which are more particularly described in Exhibits B, C, and D attached hereto and by this reference made a part hereof, situated in King County, Washington, all for the specific and limited purposes set forth below: EASEMENT PAGE 1 99999-2033/LEGAL 143 1 666 5.1 • 1. Flood Protection Easement. A perpetual right and easement in favor of Grantees in the land described in Exhibit B to construct, maintain, repair, operate, patrol and replace a flood control structure, including all appurtenances thereto ( "Flood Protection Easement "); reserving, however, to Grantor, its successors and assigns, all such rights and privileges as may be used without interfering with or abridging the rights and easement hereby acquired. 2. Access Road Easement. A perpetual easement and right - of -way in favor of the Grantees for ingress and egress for the sole purposes of inspection, repair and maintenance of the Flood Control Project in, on, over and across the land described in Exhibit C (the "Access Road Easement "); together with the right to trim, cut, fell, and remove therefrom all trees, underbrush, and other vegetation, obstructions, structures, or obstacles within the limits of the easement and right -of -way; reserving however, to Grantor, its successors and assigns, all such rights and privileges as may be used without interfering with or abridging the rights and easement hereby acquired; this grant of easement being subject, however, to all easements, reservations, covenants, conditions and restrictions of record. Grantees acknowledge that the Access Road Easement Area, as described in (b) below, is currently paved to within a few feet of the Flood Control Project and is used for ingress and egress for nearby commercial buildings. Accordingly, Grantees and their employees, contractors and agents, shall not park vehicles or store equipment on the Access Road Easement Area. (a) Grantor reserves the right to relocate the Access Road Easement from time to time so long as the substituted site is of reasonably comparable size and is suitable for the purposes of this easement. (b) Except in cases of emergency, Grantees shall give written notice to Grantor of its intent to enter onto the Access Road Easement Area (as that term is defined below) no less than forty -eight (48) hours prior to each entry in order to allow Grantor sufficient time to remove any vehicles and other property of Grantor or its tenants that may be present within the easement area. In cases of emergency Grantees shall give such notice as may be reasonable under the circumstances. (c) The Access Road Easement shall be located in the area of land described and depicted in Exhibit C (the "Access Road Easement Area "). (d) Promptly after the exercise of this right to enter onto and use the Access Road Easement, Grantees, and each of them, and their respective employees, contractors and agents, shall restore the surface of the Access Road Easement to the condition existing prior to the entry, shall repair any damage occasioned by its or their entry onto and use of the Easement, and shall leave the Access Road Easement Area in good, neat, clean and safe condition. 3. Temporary Work Area Easement. A temporary easement and right of way in favor of Grantees in, on, over and across the land described in Exhibit D from the date of this Easement Agreement through December 31, 2008, which date may be extended as mutually agreed to by the parties to allow completion of the levee rehabilitation repair construction for Project Job No. GRE -3 -07, for the purpose of a work area (the "Temporary Work Area Easement "), including the right to EASEMENT PAGE 2 99999 -2033 /LEGAL 14316665.1 • temporarily stockpile fill and waste material thereon, move, store and remove equipment and supplies, erect and remove temporary structures on the land and to perform any other work necessary and incident to the construction of improvements to the Flood Control Project, together with the right to trim, cut, fell, and remove therefrom all underbrush, obstructions, structures, or obstacles within the limits of the Temporary Work Area Easement excepting, however, trees, which Grantees shall not disturb, injure, move, remove or damage; reserving however, to Grantor, its successors and assigns, all such rights and privileges as may be used without interfering with or abridging the rights and easement hereby acquired; this grant of easement being subject, however, to all easements, reservations, covenants, conditions and restrictions of record. (a) The Temporary Work Area Easement shall be located in the area of land described in Exhibit D (the "Temporary Easement Area "). Grantees shall maintain the Temporary Easement Area in good, neat, clean and safe condition. (b) Promptly after the exercise of this right to enter onto and use the Temporary Work Area Easement, Grantees, and each of them, and their respective employees, contractors and agents, shall remove all stockpiled material and all equipment and personal property of Grantees, or either of them, and of their respective employees, contractors and agents, clean the surface of the Temporary Work Area Easement of any waste, restore the surface of the Temporary Work Area Easement to the condition existing prior to the entry, and repair any damage occasioned by its or their entry onto and use of the Easement. 2. Security for Road Access Easement No later than December 31, 2008, Grantees shall place and install locked bollards across the Road Access Easement at the toe of the Flood Control Project where it meets the Road Access Easement Area, and, if the Road Access Easement is relocated, shall promptly place and install locked bollards at the same relative location in the new Road Access Easement Area. Immediately upon installation of the bollards, Grantees shall provide to Grantor a key or combination to open the bollards, and shall ensure that Grantor has one or more keys, and /or an accurate combination or combinations, at all times so that Grantor has the ability at all times to open the bollards. The bollards shall be reasonably designed and placed so as to minimize any interference with use of the Road Access Easement Area by Grantor and its tenants. 3. No Rights Created in Public Nothing in this grant shall be deemed to be to be a gift or dedication of land to the public, or a grant of access to the general public or for recreational uses. The scope of this grant is expressly limited to Grantees, for their use and for the use of their employees and contractors, for the limited purposes described in this Agreement. 4. Grantees' Indemnification of Grantor Grantees, and each of them, and their respective successors and assigns, shall protect, indemnify, defend and hold Grantor, and its successors and assigns, harmless from and against any and all loss, costs, claims, suits, liabilities, causes of action and expenses of any kind or nature (including reasonable attorneys' fees) arising out of, related to, or incurred by reason of the exercise of the easement rights EASEMENT PAGE 99999 - 2033 /LEGAL 1431 6665.1 • granted hereunder. Without limiting the generality of the foregoing, Grantees, and each of them, shall protect, indemnify, defend, and hold harmless Grantor, and its successors and assigns, from and against any and all loss, costs, claims, suits, liabilities, causes of action and expenses of any kind or nature (including reasonable attorneys' fees) arising out of, related to, resulting from or incurred by reason of or based upon, the release onto or from Grantor's property by Grantees, or either of them, or any of their respective employees, agents, contractors and /or licensees, of any hazardous or toxic materials or substances, or the violation by any such party of any law or laws regulating the handling, treatment, storage, disposal, release, or transport of any hazardous or toxic materials or substances. 5. Insurance Each Grantee shall maintain and keep in full force and effect a policy of general liability insurance in an amount not less than One Million Dollars per occurrence, and shall provide Grantor with a certificate of insurance or self insurance from time to time upon Grantor's request, and will name Grantor, its successors and assigns as Additional Insureds in the event one or both of the Grantees should choose not to self- insure. Each Grantee may self- insure its obligations hereunder. Except to the extent of any gross negligence on the part of Grantor, each Grantee shall indemnify and hold Grantor, its successors and assigns harmless from all claims, damages or causes of action, including attorneys' fees and court costs, arising from that Grantee's use of the Easements. 6. Binding on Successors and Assigns; Limited Right to Assign The rights, conditions, covenants and provisions contained in this Agreement shall inure to the benefit of and be binding on the parties hereto and their respective heirs, administrators, executors, successors and assigns and shall run with the land. Grantees and each of them shall have the right to assign their rights and interests under this Agreement to any one or more governmental entities that are created and then - existing under the laws of the State of Washington that have legal responsibilities in connection with the inspection, maintenance, repair, rehabilitation and replacement of the Flood Control Project. 7. Eminent Domain If any part of any easement area is taken by any governmental agency in the exercise of its power of eminent domain, the award granted under such proceedings, or any settlement in lieu thereof, for the taking of such property shall be wholly payable to Grantor. If less than all of the easement area is taken, the easement granted herein shall continue in full force and effect with respect to the portion of the easement area not taken. If all of any easement area is taken, the easement granted herein shall terminate and the obligations hereunder of Grantor and Grantee shall automatically cease and terminate as to that easement area when possession is transferred to the condemning agency except with respect to any obligations with respect to events occurring prior to the termination of the easement. 8. Grantor's Reserved Use Notwithstanding anything in this Agreement to the contrary, Grantor reserves the right to engage in any uses that are compatible with the full enjoyment by Grantees of the rights granted in this Agreement. 9. Miscellaneous (a) In the event of any action or arbitration by any party to this Agreement for breach of or to enforce any provisions or rights hereunder, the reasonable costs and expenses incurred by the substantially prevailing party in such action, including, EASEMENT PAGE4 99999- 2033/LEGAL 1 4316665.1 • but not limited to, such substantially prevailing party's reasonable attorneys' fees, shall be paid by the other party or parties to such action or arbitration. (b) Neither this Agreement nor any acts of any party shall be deemed or construed by the parties hereto, or any of them, or by any third person, to create the relationship of principal and agent, or of partnership, or of joint venture, or of any association. (c) Any modification, waiver, amendment, discharge or change of this Agreement shall be valid only if the same is in writing and signed and acknowledged by all of the parties, and an original thereof is recorded in the real property records of King County, Washington. (d) In the event any term, covenant, condition, provision, or easement contained in this Agreement is held to be invalid, voided or otherwise unenforceable, by any court of competent jurisdiction, such holding shall in no way affect the validity or enforceability of any other term, covenant, condition, provision, or easement contained in this Agreement. (e) Paragraph captions are inserted as a matter of convenience and for reference and in no way define, limit, extend or describe the scope of this Agreement or any of its provisions. 10. Completion of Agreement This Agreement shall not be binding on Grantor until (i) it has been executed and acknowledged by all parties, and (ii) a copy of the fully executed and acknowledged Agreement has been delivered to Grantor. EASEMENT PAGE 99999-2033/LEGAL 14316665.1 Entered into as of the day and year first above written. GRANTOR: LA PIANTA LLC, a Washington limited liability company EASEMENT 99999 - 2033 /LEGAL 14316665.1 By: Metro Land !Development, Inc. Its: Manager GRANTEE: . Segale, Vide President THE CITY OF TUKWILA, a municipal corporation of the State of Washington By: me: 2411111 • Title: 41/4-(or GRANTEE: DISTRICT KING COUNTY FLOOD CONTROL ZONE a quasi municipal corporation By: Acting pursuant to Resolution No. FCZD2008 -01.2 of said Grantee Name: Title: of Kinq County PAGE 6 1 • • STATE OF WASHINGTON ) ) ss. COUNTY OF KING On this 304t'`day of May, 2008, before me, the undersigned, a Notary Public in and for the State of Washington, duly commissioned and sworn, personally appeared Mark A. Segale to me known to be the person who signed as Vice President of the Manager of La Pianta LLC, a Washington limited liability company that executed the within and foregoing instrument, and acknowledged said instrument to be the free and voluntary act and deed of said Limited Liability Company for the uses and purposes therein mentioned, and on oath stated that he /she was duly elected, qualified and acting as said officer of the corporation, and that he /she was authorized to execute said instrument and that the seal affixed, if any, is the corporate seal of said corporation. IN WITNESS WHEREOF I have hereunto set my hand and official seal the day and year first above written. SUSAN A. THOMAS Notary Public State of Washington My Commisslon Expires May Ol , 2010 EASEMENT 99999 - 2033 /LEGA L l 4316665.1 Print Klanie: Sal Notary Public in n. for the State of Washington, residing at: .4!/L11f My commission expires: S -Ab /D PAGE STATE OF WASHINGTON ) ) ss. COUNTY OF KING ) On this 30t-day of 11,1 c ( , 2008, before me, the undersigned, a Notary Public in and for the State of Washington, duly commissioned and sworn, personally appeared "'r; Y■ k-t ' 3 , to me known to be the person who signed as rh City of Tukwila, a municipal corporation of the State of Washington, that executed the within and foregoing instrument, and acknowledged said instrument to be the free and voluntary act and deed of said corporation for the uses and purposes therein mentioned, and on oath stated that was duly elected, qualified and acting as said officer of the corporation, that h was authorized to execute said instrument and that the seal affixed, if any, is the corporate seal of said corporation. IN WITNESS WHEREOF I have hereunto set my hand and official seal the day and year first above written. Cant& -I- Print Name:f)a.a - ,4 ,4 -IV►1 he - (�idGor� Notary Public in and for the State of Washington, residing at: i a eoryt, c� My commission expires: i p.. /1 EASEMENT PAGE 8 99999- 2033/LEGAL 14316665. I • • STATE OF WASHINGTON ) ) ss. COUNTY OF KING I certify that I know or have satisfactory evidence that is the person who appeared before me, and said person acknowledged that _he signed this instrument, on oath stated that _he is authorized to execute the instrument and acknowledged it as the of King County, acting on behalf of the King County Flood Control Zone District pursuant to Resolution FCZD2008 -01.2 of said District to be the free and voluntary act of such party for the uses and purposes mentioned in the instrument. Dated: Print Name: Notary Public in and for the State of Washington, residing at: My appointment expires: EASEMENT PAGE 9 99999- 2033/LEGA 1.143 1 6665. I EXHIBIT A UNDERLYING PROPERTY PARCEL(S) LEGAL DESCRIPTION Lot 4 as shown on Boundary Line Adjustment No. 93 -0085 recorded under recording number 9311301961. Also, Parcels A, D and E shown on Boundary Line Adjustment No. L02 -029, recorded under recording number 20021007900001. Also, Parcel B shown on Boundary Line Adjustment No. L99 -0008, recorded under recording number 9906099010. EASEMENT 99999- 2033/LEGAL 14316665.1 PAGE 10 EXHIBIT B FLOOD CONTROL EASEMENT AREA LEGAL DESCRIPTION ALL THOSE PORTIONS OF LAND DESCRIBED AS LOT 4 AS SHOWN ON BOUNDARY LINE ADJUSTMENT NO. 93 -0085 RECORDED UNDER KING COUNTY AUDITOR'S FILE NO. 9311301961, AND LAND DESCRIBED AS PARCEL "D" ON BOUNDARY LINE ADJUSTMENT NO. L02 -029, RECORDED UNDER KING COUNTY AUDITOR'S FILE NO. 20021007900001, LYING WESTERLY OF THE ORDINARY HIGH WATER MARK ON THE LEFT BANK OF THE GREEN RIVER AND EASTERLY OF THE FOLLOWING DESCRIBED LINE: BEGINNING AT THE NORTHEASTERLY CORNER OF THE AFOREMENTIONED LOT 4; THENCE WESTERLY ALONG THE NORTH LINE OF SAID LOT 4 ALONG A CURVE CONCAVE TO THE NORTH THE RADIAL CENTER OF WHICH BEARS NORTH 20° 20'04 "WEST A DISTANCE OF 336.00 FEET; THENCE ALONG SAID CURVE THROUGH A CENTRAL ANGLE OF 00° 44'43" AN ARC LENGTH OF 4.37 FEET; THENCE LEAVING SAID NORTH LINE SOUTH 53° 36'41 "WEST 91.03 FEET TO A TANGENT CURVE TO THE LEFT HAVING A RADIUS OF 27.83 FEET; THENCE ALONG SAID CURVE THROUGH A CENTRAL ANGLE OF 23° 59'08" AN ARC LENGTH OF 11.65 FEET; THENCE SOUTH 29° 37'33 "WEST 91.54 FEET TO A TANGENT CURVE TO THE LEFT HAVING A RADIUS OF 117.83 FEET; THENCE ALONG SAID CURVE THROUGH A CENTRAL ANGLE OF 05° 31'44 ", AN ARC LENGTH OF 11.73 FEET; THENCE SOUTH 24° 05'49 "WEST 88.46 FEET; THENCE SOUTH 22° 34'48 "WEST 71.63 FEET; THENCE SOUTH 18° 39'07 "WEST 97.03 FEET TO A TANGENT CURVE TO THE LEFT HAVING A RADIUS OF 37.83 FEET; THENCE ALONG SAID CURVE THROUGH A CENTRAL ANGLE OF 21° 09'15" AN ARC LENGTH OF 13.97 FEET; THENCE SOUTH 02° 30'07 "EAST 59.72 FEET; THENCE SOUTH 01° 02'09 "EAST 103.01 FEET TO A TANGENT CURVE TO THE RIGHT HAVING A RADIUS OF 102.17 FEET; THENCE ALONG SAID CURVE THROUGH A CENTRAL ANGLE OF 05° 28'08" AN ARC LENGTH OF 9.75 FEET; THENCE SOUTH 04° 25'59 "WEST 166.45 FEET; THENCE SOUTH 02° 54'29 "WEST 84.06 FEET; THENCE SOUTH 05° 08'41 "WEST 253.64 FEET, MORE OR LESS, TO INTERSECT THE EASTERLY BOUNDARY OF THE AFOREMENTIONED LOT 4, AND BEING THE TERMINUS OF THIS LINE. ALL SITUATE IN THE EAST HALF OF SECTION 35, TOWNSHIP 23 NORTH, RANGE 4 EAST OF THE W.M., CITY OF TUKWILA, KING COUNTY, WASHINGTON. EASEMENT PAGE 11 99999- 2033/LEGAL 14316665.1 • EXHIBIT B FLOOD CONTROL EASEMENT AREA SITE DEPICTION • t) DELTA - 23'59'08' �\-/ RADIUS - 27.83' LENGTH - 1165' 2 DELTA - 0631'44' RADIUS - 117.83' LENGTH -1137 ODELTA • 2t09'15' RADIUS - 37.83' LENGTH -13.97 ODELTA • 0628'08' RADIUS -102.17 LENGTH - 925' DELTA - 00'44'43' v RADIUS • 336.00' LENGTH • 4.37' EASEMENT' 99999- 2033/LEG AL 14316665.1 PAGE 12 • • EXHIBIT C ACCESS ROAD EASEMENT AREA LEGAL DESCRIPTION AN INGRESS AND EGRESS EASEMENT OVER SEGALE PARK DRIVE "A" AS SHOWN ON CITY OF TUKWILA BOUNDARY LINE ADJUSTMENT AS RECORDED UNDER KING COUNTY RECORDERS NO. 9906099010 AND ITS EXTENSION SOUTHERLY TO INTERSECT THE SOUTH LINE OF PARCEL "A" OF TUKWILA BOUNDARY LINE ADJUSTMENT AS RECORDED UNDER KING COUNTY RECORDERS NO. 20021007900001. ALSO A 20 FOOT WIDE INGRESS AND EGRESS EASEMENT OVER A PORTION OF PARCELS "D" AND "E" OF CITY OF TUKWILA BOUNDARY LINE ADJUSTMENT AS RECORDED UNDER KING COUNTY RECORDERS NO. 20021007900001 AND OVER A PORTION OF PARCEL "B" OF CITY OF TUKWILA BOUNDARY LINE ADJUSTMENT AS RECORDED UNDER KING COUNTY RECORDERS NO. 9906099010, SAID 20 FOOT WIDE EASEMENT BEING DESCRIBED AS FOLLOWS: COMMENCING AT THE NORTHWEST CORNER OF THE AFOREMENTIONED PARCEL "E "; THENCE SOUTH 66° 31'27 "EAST ALONG THE NORTH LINE OF SAID PARCEL "E" A DISTANCE OF 992.96 FEET TO AN ANGLE POINT ON SAID NORTH LINE, ALSO BEING THE POINT OF BEGINNING FOR THIS DESCRIPTION; THENCE SOUTH 54° 15'07 "EAST 207.68 FEET; THENCE SOUTH 66° 34'09 "EAST 87.00 FEET; THENCE NORTH 23° 25'51 "EAST 20.00 FEET; THENCE NORTH 66° 34'09 "WEST 84.84 FEET; THENCE NORTH 54° 15'07 "WEST 207.80 FEET TO THE EAST LINE OF PARCEL "A" OF SAID BOUNDARY LINE ADJUSTMENT AS RECORDED UNDER KING COUNTY RECORDERS NO. 20021007900001; THENCE SOUTH 29° 14'17 "WEST ALONG SAID EAST LINE 20.13 FEET TO THE POINT OF BEGINNING. EASEMENT 99999.2033 /LEGAL 14 316665.1 PACE 13 • • n EXHIBIT — Cn ACCESS ROAD EASEMENT SOUTH 180th STREET EASEMENT 99999 -2033 /LEGAL 14316665.1 I'AGE 14 • EXHIBIT D TEMPORARY WORK AREA EASEMENT SITE DEPICTION 5 TEMPORARY WORK AREA EASEMENT 99999 -2033 /LEGAL 1531666 5.1 PAGE 15 CITY OF TUKWILA Department of Community Development 6300 Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431 -3670 FAX (206) 431 -3665 E -mail: tukplan(ir)ci.tukwila.wa.us AFFIDAVIT OF OWNERSHIP AND HOLD HARMLESS PERMISSION TO ENTER PROPERTY STATE OF WASHINGTON ss COUNTY OF KING The undersigned being duly sworn and upon oath states as follows: 1. I am the current owner of the property which is the subject of this application. 2. All statements contained in the applications have been prepared by me or my agents and are true and correct to the best of my knowledge. 3. The application is being submitted with my knowledge and consent. 4. Owner grants the City, its employees, agents, engineers, contractors or other representatives the right to enter upon Owner's real property, located at Andover Park West & Segale Park Drive D RECEI VED DEC 0 8 2009 CMuNOY DEVELOPMENT for the purpose of application review, for the limited time necessary to complete that purpose. 5. Owner agrees to hold the City harmless for any loss or damage to persons or property occurring on the private property during the City 's entry upon the property , unl ess the loss or damage is the result of the sole negligence of the City. 6. Non - responsiveness to a City information request fo r ninety (90) or more day s, shall be cause to cancel the application(s) without refund of fees. EXECUTED at Tukwila (city), Print Name Address Phone Number WA (state) on November 30 ,2009 Mario A. Segale PO Box 88028, Tukwila, WA 98138 206 -575 -2000 Signature On this day personally appeared before me M ci ri 0' -4. Seol n 1 to me known to be the individual who executed the foregoing instrument and acknowledged that he /she signed the sam e as his/her voluntary act and deed for the uses and purposes mentioned therein. SUBSCRIBED AND SWORN TO BEFORE ME ON THIS 3 Cr DAY OF N AV e . ba /' 20 O 9 BRIAN R. COOMBS NOTARY PUBLIC STATE OF WASHINGTON COMMISSION EXPIRES DECEMBER 15, 2011 TARY PUBLIC in and for the State of Washington . esiding at / is 1 , IA' A hf Commission expires on I2- / ir/2o I• ix — :.& .tee 11 4lh1 Loz 4 ■..re.lW.■1.1... •Hur,l■ ibilil ■ IN ..,1 28 ... I A al l y4- w M11 • 1+ U! • ow Ran I. EMI' ��� EMI: HIS I ) I, u 1.. .o MIA M�P1 MI: •"111!1. en mi MAIRIOP11111•11111:1SMIMEIN Emu. 1,- 1;IF1!E1 II to S.F. PER ST X 15S..- .F. RECUR SITE PLAN SEGALE 2 STORY, OFFICE BUILDING o. �-238 ob no.. sheet A1.1 • LANCE MUELLER S ASSOCIATES A R C H I T ■ C T a' A I A 130 LAKESIDE • SEATTLE. WA 98122 • 206 325 2553 d1'. l oer LAND n I ..._......... I2 -3-09 SHORELINE PERO 12 -3-09 date no. revision date. 18200 ANDOVER PARK WEST TUKPAU` WA a A 0 of c O3At33 J tel Ila 0 cn m SOUTIH_180th STREET • O •r a 'I 1'. Arr ,j'i; I , I 1' 11 I 11i1 I I�`I 1 1 1111 11 )1,; 11111 111 ,11111 �1'! II'11 �l 111 I ,,I I. II !I1)II1'T '-1:11 11(,11 IPII i1�,111 II4I Ii111 111111'1) li I�1'i111' I II(,11�, 111 X111 I 1SI I III I II W111111I 1 1 111 ;1i 1;1 1 1 :11111111i I I 11 LII�i II lil;�;llll 1 11111111 lli 1111:1111 •�li1111 II1i1I111i11 ,I111jI'1! �lll II' 11' 111!1')11111 +I 111+ _:, • 5 F. LANDSCAPING,, PER STALL 0 �yyyyy((((((A4.6 % 15 SF. Ij,Q$0. 5 r RE01.1IRE0 PER SIALL 4 156 STALLS % 10 Sr 1.560 ST REQUIRED 100' ' 1 HIGI1 IMPACT ZONE I ' 125. HEIGHT LIMIT Ih 5 4 A SITE 5F.'CTIONId 11•1'1,' 1 11} I 1 I1um �` Ii !` ;'�1�1'1!1'1'1 I 1 506 SECNON1 OJ�A1 +3= 'I�1,ll ;llr I, 1 ' 1 y , 111;11111 II 1 II11.1111I11 I ;, SITE SECTIf1N10 qtr II I t� li 111 111;111 11 �I I SITE SECTON V;�I 11 111111 I 11111(1,1,; 111 I11111�11�IP�. f: SITE SEC110Ni:EI,�41.�11 ■} 1,'11;1 1I'111�1 I SITE SECTIOd1UMhI 1 1 [ I { 1! 1 1111 111 l�ffllIll l I SITE SECTION '1'1111777-k Iil4; llllil�llil 1 SITE SECTTNI 0A11.2 M •1 II :''I'1 ' m III I I 1 1' 1 Z III�III1,1 , }r�t SITE SE 0 1 Al 2 I 1 . ,11 11'4 1 ' I r =- 111 1, 1 111 111111111 1 ll1l1' 1' 11 iillf 1'1!11 I �! II�I11!►;l I ;, �11,1.1 111 I 1 1Iiill 1 ltIi11,1j1 iii. lir,. II ',;Alit! 11 1'111 IiiII�1.II 1,11 Hi, Iill;llll I i 1 1, III! I 1111111 I11i 1 11111'11' II 11;'11 111'' I'ii;11! 1111 1 1 1 I'q_L`+• ' I ; 11' ll /L'1 ; 1+11;1%'1 I SITE PLAN SEGALE 2 STORY OFFICE BUILDING 09-236 job no. LANCE MUELLER 6 ASSOCIATES A R C H I T E C TS • A I A 130 LAKESIDE • SEATTLE. WA 98122 • 206 325 2553 drawn �uae1 RASA ARCHITECT ,11 l� /su P. MUELLER LANCE P uufUR checked UPDATED DRAWINGS PROGRESS 1 -7 -10 OREIJNE P RMR 1213 -04 18200 ANDOVER PARK WEST TUKWILA, WA. 12 -3 -09 dote no. revision date EL 70 EL 60 • • 100-0• • • 01. 30 _ _ _ • _ _ _ _ _ _ _ - _ _ _ EL g) - _ EXISTING GRAVEL ROAD _ _ _ _ _ EL 413 EL 20 GREEN RIVER EL 1_0 EL. 70 PROPERTY LINE PROJECT LIMIT EXISTING 1 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ LOW IMPACT SETBACK _ 2_4 /7-- 9000 CFS MEAN HIGH WATER EL 30 —1- EL 20 WALL _ _ _EL 60 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 5c) EXISTING GRAVEL ROAD EL 40 _ OSECTION 1- = 20.-0" PROPERTY LINE PROJECT LIMIT 1 _ 150_ EL 30 0_ 20 El.. 70 _ _ _ EL 60 • _ _ _ • PROPERTY UNE EL 50 I EL 20 RETAINING WALL LOW IMPACT 9000 CFS mary HIGH WATER EXISTING GRAVEL ROAD SECTION = 20'-0" 9000 CFS MEAN HIGH WATER _ EL 30 _ EL EL. 70 EL. 60 EL 50 EL 40 _ EL N EL 20 _GREEN RNER _ EL NS _ _ _ _ _ EL 7 – — 6(6-TNICGTAZ=Twio EL 0 SECTION I- = _ _EL 40 _ _EL N APR 21' 20101 COMMUNITY DEVELOPVtENT 9...2 . I., –, , 0 -c, g i. 0 c 8 ■ 1 .2 ,,,, -6 -0 i' ' • 1114111116, w w ... ... sheet A 1 . 2 1 EL 70 60_ 50 _ _ _ _ _ _ _ _ _ _ _ _ • PROPERTY UNE • EL 30 EL 20 EL 10_ _ _ _ EL 60 ' PROPERTY UNE EL 50 _ _ _ __I_ _ _ _ _ _ _ — I 111. 30 EL. 20 101X-0. SETBACK EXISTING GRAVEL R • • 9000 CFS MEAN HIGH WATER zo - - - _ - - - - - - - - - - - - _ _EL 50 __EL 00 _ - _ _EL N - _ _EL 24 _ OSECTION 1- 103.-0. LOW IMPACT SETBACK PROJECT UMIT z-9000CFS MEAN HIGH WATER GREEN RIVER _EL 50 _IL ED „„A„„,m,_ _ _ _ _ 7 _ _ _ _ _ _ _ _ _ _ _ __El- _ _IL N _ __EL - _ _EL 20 EXISTING _REIANNO _ WALL fLJO_ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ GREEN RNER _ _ _ _ _ _ _ _ _ L W [ I PROPERTY UNE _ _ _ _ _ _ _ _ _ _ _ _ _ EL 60 EL 50 EL 30 — - — - — - - EL 20 _ I EL 10 - 1- 1 BU- ILD7NG EL —29.71 — SECTION 1- = ar-O" PROJECT UNIT \ _ _ RETAINING EXISTING WALL — LOW IMPACT 40.-0" ' PROPERTY UNE 1 EL 7G_ _ _ _ _ _ _ _ _ _ _ _ _ _ EL 60 EL 20 _ _ _ __I_ _ _ _ _ _ 1 EL 1° SECTION SETBACK EMSTING GRAVEL ROAD _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _EL N NEW 9000 CFS MEAN HIGH WATER 9000 CFS MEAN HIGH WATER - __EL 79 _ _ _ _EL 50 _EL 50 _ SECTION. 1001-0" PROJECT UMff -\\ , NT, ____ I _ 0(101190 096501. 9090) 0(151190 . 9000 CFS MEAN HIGH WATER EL 30 _ __EL N GREN RIVER EL 10 = 20.-0' _ 7Q_ _EL 50_ - --REM-141E9-Q - N GREE RIVER _ _ 'APR 0_EL LE, _ 21 210 COMMUNITY DEVELOPMENT . '.-1-K1 o „.. '6 g r. 0 0 .2. - iP e t w NI1110,,, sheet A 1 . 3 • 1 i PROPERTY UNE EL 70 _ _ EL 60 EL 40 _— _ _ — _ — EL 30 EXISNNG GRAVEL ROAD _ — _ _ — _ — _ — _ — _ — _ — _ — _ — _ — _ — _ — _ — _ — _ — _ — _ — _ — _ — _ X49 _— __EL.74— _— _ _EL 29— 9000 CFS MEAN HIGH WATER _— _ _EL 79— _EL k4 ------------ -------- -- _E1.50_ BUILDING EL 29.71 EL 10 ---- _ — _ — _ EL 70 _ _— EL 60 I EL 50 _ _ _ EL 40 EL 30 _ _ _ _ _ _ PROJECT UMR I EXISTING RETAINING _ — _ — _ — _ — _ _ — _ — _ — _W,h - _— _— _— _— _— _— _— _ —_ —_ —_ GREEN RIVER _— _— _— _— _— _— _— _— _— _— __1L19 SECTION 1" = 20•: -0" 100 --0" LOW IMPACT 9000 CFS MEAN HIGH WATER _— ____EL-Z9— _ _ _EL 00 — _ — _ _ — _ — _ — _ _ — _ — _ — _ — _ _ _ — _ — _ — _ _ — _ — _ _EL 59 — DI1STING GRAVEL ROAD- _ _ — _ — _ — _ — _ — _ — _ — _ _ — _ — _ — _ — _ — _ — _ — _ — _ — _ — _ — _ — _ _EL. 49 — _—__EL i4— _ _ __FL 20 — EL 10 — _ — _ — GREEN RNER t4 PROPERTY UNE EL 70 fi EL 6O EL 50_ _ _ _ L _ _ _ _ _ _ _ _ EL 40 EL 30 EL 10_—_—_— SECTION 1- = 20• -0- 9000 CIS MEAN HIGH WATER EXISTING GRAVEL ROAD L/-' PROPERTY EL 70 OSECTION L r = 20._0. 100' -0" PROJECT UMIT LOW IMPACT 40 -0" SETBACK 9000 CFS MEAN HIGH WATER 70_ EL GO EL50_— _ —_ —_-II-_ _— _— _— _—_— _I_ — _— _— _—__—_ EXISTING i / EXISTING GRAVEL R000 EL 40 RETAINNG _ —_— _ —_ _I— _ —_ —_ —_ —WALE- EL 30 GREEN RIVER —El- 20 — 10 _F - _50 — __EL30_ - _ _EL ,30— - - —a' 1G— — _EL 10_ EL 20- -_ - - -- EL 10 — _ —_ —_ — _ _ — _ — _ — _ — _ _ -� – RCE-1VED — _ — _ — _ — _ — _ — _ — _ _ — _ — _ — _ _ — _ GREEN RNER _ — _ — _ — _ _ — _ — _ — _ _ _ _EL . -iQ- APR 21 2010' SECTION 1- = 20' -0• COMMUNITY DEVELOPMENT oo$ .4.!, m o c 0 m O c o I a $s $ n m 1 a sheet A1.4 N7ld t)NI.NV7d I 1 2 STORY OFFICE BUILDING 1 CO (—) 0 /////// /////// \ \ \ \\\ \ m 7- gig •"' i vOita ila .■01111110141" 114 -41/47-tri;74 if, 0.44.115! 61 rli v4400 il P ,.41_,,,-4) _.. ratle.srirlia*:17.4..1211 " 111 in= iE ,r4-1 . s mo NA lc& NN. r` Hr i P-11 El m , ■• l'4,011 IN& lik.. k IIMIffij II ill VI Mr - Hi Horgki. iI H: a um \ 18 • oi tfp HIM -- IMATCH I !1- TAMA 111,....■ LANDSCAPE PLANS LINE Na-pit ENONNEMINIMININNEELEMENSENINNININ II: 1 II NAM ' 0 MATCH LINE KEN LARGE SEGALE BUSINESS PARK Landscape Architect 21803 NE 1716 [to•t hrsr Sammarnish, W. 98074 PO 508 88028 • Tama. WA. 081.111.2028 5811 5288a P. Dela •C• • Tana, WA. 08158.4798 tea... POP 575-20173 • Fa* POO 5754857 Office: 425:836-4578, Ca 206-396-7617 &mot klIa@comatstnet FAX: 425-898-8923 RECEIVED ,APR 21. 2010 COMMUNITY DEVELOPMENT • • 11111111111"1"11111111111 11111111111111111111111' 111111111111111111111111111111111111111111 1111111111111111 11111111, .1, 11111111111111111111111111111111111111111111111111111 III 1 11111111111111111111 fi r • A. DU ni...011110DAL.L 711 • ' , •-• WEST ELEVATION 1111111111111111111111 '11111 '111111111111 111 11111111 111 1111 r;;- a EllE 70. _ I 1 • • ••••.. SOUTH ELEVATION 111111101H 11111111111111 11111111111111111111111111111111111111 111.1 VII: 11111 111110 1111111111111111111111111" ii 111111111 11111111111111" "I IP 1111111 1111111 1111111111111110111111 111111111111111/1 1111 IIIIIIIIIH 1111111111 11111111111111111 LI -i,,..., .4 ,., .,.., . 2I 11 ,? __ -...._ , - -,-.._-.3, .,e•:--t-.—.---:,:-TT--:,---e--,...,---:--,-T<;---..--,--7—e--72. ,..7--,..--,-,-;,c,..,?::.;),,,...-::;,.-qc.,,;,,,.in alocatin4r-....;___-:,:.: 11111111111111111111111111111111111111111111!:'' 1111111111111111111111111111111111111111111 Di 11 11 1L-, 4 III 1 '0" • • -.;" -- A - • NORTH ELEVATION "111111111111111111111111114" 11111111111111111 111111111111111111111111111111111 11111111111111111111111111141111111 111111111111111 111111111011 PECFnfifF0 FEB 0 1 2010 coNvar ';-Tv Dt.-VLLoi-4LNT EAST ELEVATION SEGALE 2 STORY OFFICE BUILDING 18200 ANDOVER PARK WEST TUKWILA, WASHINGTON LANCE MUELLER & ASSOCIATES 1.,■/■/■ A ACM11'1301'8 • A1A 130 LAKESIDE • SEATTLE. WA 98122 - 206 325 2553 GREEN RIVER MINNIM MOEN / ///////// \ �Q a DD :VG� .k1/ /t t %n� \,< cn SEGALE 2 STORYOF FICE BUILDING FEB ®1 18200 ANDOVER PARK WEST tivimry�0IUKWILA, WASHINGTON ANDOVER PARK WEST (SEGALE DRIVE A) 1. 1 ..�3 r -.6 LANCE MUELLER & ASSOCIATES A R C H I T E I C T8 • A I A 130 LAKESIDE • SEATTLE, WA 98122 • 206 325 2553 nx:\ A 20101 Trt 7,3:16_117- 2 QUANTITY, IrrEZZI 37 ", ' • '..- ' '''. '' ' .-:-.77-7:71,,L.-:. '1,,' 1 ,''',•,7.-},- '77 ABEL .1.4... ABELIA &PANDIFLORA 5 9 AU-ON CAN 17 ACERK ACER RUBRUM FAIRVIEW FLAME FAIRVIEW FLAME MAPLE r riper 10-12' bib 15 ALAN ACANTHUS MCVAY 82485 8988114 1 GALLON CAN 11 ACAM ACER CAMPESTRE 148068 184818 2.5. CALIPER 6 ACE88 ACER PALMATUN GREEN FORM JAPANESE MAPLE &V MULTI-TRUNKED BIB 22 ACERC ACER CIRCINATUM VINE MAPLE 11-10 MULTI•TRUNKE0 WEI 248 ANNAN ANNUALS IN SEASON AT END OF PLANTING OPERATIONS 1 GALLON LAN 657 AlAl ARCTOSTAPHYLOS UV A IASI/ KINNINNICK 1 GALLON CAN 33 SERB FERMIS 714.1195211612 ATROPURPUREA/ BARBERRY 2 GALLON CAN 20 BERM 88888515 ROSE/ GLOW 1 GALLON CAN 15 BUXK BUXUS 1884282 668914 15411- 6/8 FLU ROUNDED 30 CAL CALLUNA ALLEGRO 1641.1014 CAN 13 CALL CALMAGROS17.5 KARL FOERSTER 16451014 CAN 140 CALW CALLUNA FIPEFLY 1 GALLON CAN 5 CARS CAREX TEST ACEA/ ORANGE SECGE 1 GALLON CAN 22 CEAN CEANOTHUS VICTORIA 5 GALLON CAN 23 CPIOIS CP4OISVA TERNATA/ MEXICAN ORANGE 5 GALLON CANI 4 CORN CORNUS HOUSA CHINENSI 5 CHINESE DOGWOOD 6-8' 8/11 MULTI TM/PIKED 162 COTE COTGNEASTER DAMMERI 4. POTS 88 DAB DABOCIA PGLIFCLIA 4- POTS 81 EAC EUONYMUS ALATUS COMPACT A 5 6 M.LON CAN 42 151I1I5 ERICA DARLEYENSIS 1 GALLON CAN 107 ERICP ERICA PATRICK 1 GALLON CAN PLANT LIST 2511u 20 2010 4 120 4' :1 l' . .I1.47 F. '1 J. 6,14°1:" ' ''''''.-1.611-114 WHITE PERFECTION P28885 908851 FLAPAE 56 ESC 651 411(9884 NEWPORT DWARF 1 G ALLOW CAN 13 WON EUON'IMUS FORTUNIIHARLEQUIN 4 POTS 10 RIPKA 608.60801.4 451684101865 1 GALLON CAN 37 628561 608408824 8088411 1 6/LLCM CAN 24 MPH EUPPORB/A RGEMIAE 1 GALLON CAN 32 GAR GARRYA ELLTPTICA SILK TASSEL BUSH 5 SALON CAN 12 GINK GINO, BILOBA 407518/4 6018 8141.968 264 GSH GAULTHERIA SHALLON SALAL 9? POTS 15. TRI SPACING — 1 8 ALICiie461 46 HMG HERE SLAUCIFOLL4 15 HEIMIC 1086 18188414 1 GALLON CAN 22 ITE TWA HENRYS GARNET 2 GALLON CAN 27 JUN JUNDERUS BUFFALO 1 GMA.ON CAN 44 LO) LEUCOTHOE CATESBE/I 269.1841414 MO LIR LIRCPE MUSCARK 1.11.1 7085 1 G ALLON CAN 32 MAW 1841401104 AQU/FOLIUM COMPACT A — 5 CALL ,0P4 CAN 131 MAIN 18.41401104 8854145/ CREEPING MAHONIA 1 G &LON C AN 25 LOW GosCANTHUS SINEWS 1 GALLON CAN 101 NAN NOMMNA 1801255 688 HEAVENLY BAMBOO 26412.88414.14 27 ....-- NANSINA PLUM PASSCON 5 GALLON CAN 118 NOOTK 1205A NOOTYATENSIS NOOTKA ROSE 'GALLON CAN 2 TRI SPACED 131 PACH PACK/SANDRA TERMTNALLS GROUND SPURGE 4. POTS 49 PENNV PENNISETUM LITTLE BUNNY 1 GALLON CAN 4 _ P1408 P4851551 880896 NEW MALANG FLAX 2 GALLON CAN '3k\ , • / 7777. 5 4 lair4.0,„..... ,t.'111111b,ira adnil irb --- -- r--- ------------- -....-• ES0110111115tEIIESitillirriginfaillEMEIMEEIBIIIIMMEtagrakiMENIMEEMRAMEN e,-.. 119r_.' *XX* .:,-. 6,-------11:: -' olom• J-,.._ ,e7E---'-' ' .... . , . „,, .0,11D6r;61,90=6....6. _ - :,6 -,111•111111166111 ...NJ, ,,,,,T5it '• ii ti lam El CI ,Illial Glill ).1/21/2,•''''-,1811 BF ' IS,. lo 1 filtj ,. :',. 5%1111111ar IBIP.11- CI Elk/tit , NIP l.,- nuit.....-7.71,:iza; - Mtn'. 4'nfirra9----5, ,----,,C.7.- 1 . e— --,—,-;-.7, \T—r.::--- 4.•‘.1m, `11/irtV.!• c-....s.....,-. l' ':i EREILTMSBNINVIVIV6i1Eflitiiitilill2211111m1116-gi_24iiiiiiiariiiiidillibiPaaalL213 ,7 I 1 1 (,) , 1 iiii- 1 miamoral I 1 ma LJIJ J-41141 TW' PRi.")f='0,E1) 2 SIOF-{ 57,446 ((1 /2 2 3 IN) I I 6 frar ------ 7- - 1-- HII I 4 _Ig 5 PLANTING PLAN SCALE: 1. = 30' 6 STATE OF WASHINGTON REGISIERED ARCM II1A 141:5604 GERIVIGATh 5301 —4, I431112 P28885 908851 FLAPAE 564.1(941414 11 PIER P MMUS P601008 5 GALLON LAN 135 51.0 PRUNUS 4 0AN6444,1 / OTTOLUYKENLAU90. 8815. ht and lAkIth b/b 24 POLVB POLYSTICHUM PCLMILEHARUA1 TASSEL 89164 1 6 A1LON CAN 64 PCIVIA PCLYSTICHUM muxrrum SWOPS, II884 1 GALLON CAN 15 POT POTENTILLA P. ABBOTT5W000 (wKETE) 1 GALLON C AN 266 FRUN415 PRU815 LAUROCERACUS MT. VERNON 1 G ALLON CAN 4 PSE PSEUDOTSUG A MENZEISII DOUGLAS FIR 105/8 54 RAPH 1148619OLEP515CLARA/ 4E00 INIWT1408N 2 GALLON CAN 43 RIO RIBES SAWAUIPEUM CURRENT 2 GALLON CAN 106 ROM ROSEMARY OFFICINALIS 1 GALLON CAN 256 RUB RUBUS CALYCINOMES BRAMILE V POTS 46 VAC SARCOLOCCA RUSQFOLIA 1 GAU_ON CAN 1 SPEC SPECS/AIN LPNAT ROTC 129 SPIRS SFIRAEA 60113MOUND 2 6 ALLON C AN 53 SMPIP SPIRAEA LITRE PRINCESS 1 GALLON CAN 97 SWAP SYMPHLOCAPPUS ALDUS SNOWBEPRY 1 GALLON CAN 8 - - 121 - — 518 — - TAX SYPINSA VUL5ARIS CRIMES JOLLY 14.41 15 GOLLOP1 CAN TAM 10W 6888N SPREADER 269.1014 CAN 103 TAXAU TAXUS AUREAOLA 15818 5.8 and 91,416 b/b 10 114117 THUJA MICATA HOGAN 6.18/5 6 TSUEM TSUGA MERTENSIANA MGUNT/AN PIEMLOCK 7 - 8 25 VAC VACCIIIIUM OVATUM 8589685814 14.110.888081 16411014 CAN 163 85/ 5185 VIBUPNUM DAVIDII &GALLON CAN 4 lair4.0,„..... ,t.'111111b,ira adnil irb --- -- r--- ------------- -....-• ES0110111115tEIIESitillirriginfaillEMEIMEEIBIIIIMMEtagrakiMENIMEEMRAMEN e,-.. 119r_.' *XX* .:,-. 6,-------11:: -' olom• J-,.._ ,e7E---'-' ' .... . , . „,, .0,11D6r;61,90=6....6. _ - :,6 -,111•111111166111 ...NJ, ,,,,,T5it '• ii ti lam El CI ,Illial Glill ).1/21/2,•''''-,1811 BF ' IS,. lo 1 filtj ,. :',. 5%1111111ar IBIP.11- CI Elk/tit , NIP l.,- nuit.....-7.71,:iza; - Mtn'. 4'nfirra9----5, ,----,,C.7.- 1 . e— --,—,-;-.7, \T—r.::--- 4.•‘.1m, `11/irtV.!• c-....s.....,-. l' ':i EREILTMSBNINVIVIV6i1Eflitiiitilill2211111m1116-gi_24iiiiiiiariiiiidillibiPaaalL213 ,7 I 1 1 (,) , 1 iiii- 1 miamoral I 1 ma LJIJ J-41141 TW' PRi.")f='0,E1) 2 SIOF-{ 57,446 ((1 /2 2 3 IN) I I 6 frar ------ 7- - 1-- HII I 4 _Ig 5 PLANTING PLAN SCALE: 1. = 30' 6 STATE OF WASHINGTON REGISIERED ARCM II1A 141:5604 GERIVIGATh 5301 Segale Two Story Office Building 18200 Andover Park West Tukwila, Washington RECEIVED DEC 0 8 2009 COMMUNITY DEVELOPMENT VOIMM r ,ova l }" • cA\7\\\ 1///////// ANDOVER PARK WEST (SEGALE DRIVE A) SEGALE 2 STORY OFFICE BUILDING 18200 ANDOVER PARK WEST TUKWILA, WASHINGTON LANCE MUELLER B ASSOCIATES A A C M I T S C TB • A I A 130 LAKESIDE • SEATTLE, WA 98122 • 208 325 2553 DEC 0 8 2009 COMMUNITY DEVELOPMENT P.L 84 -99 LEVEE REHABILITATION TUKWILA2O5: SITES 3 & 5, GREENRIVER B R I T I S H C O L U M B I A` BELLINGHAM MT. VERNON SEATTLE WASHINGTON o WALLA WALLA 0 I POT PEIGLETO° VICINITY MAP NOT TO SCALE w o. 0 O cc O DRAWING INDEX SHEET PLATE TITLE NO. NO. 1 G-001 TITLE, DRAWING INDEX, VICINITY AND AREA MAPS, 2 C -001 CONSTRUCTION NOTES 3 C -101 TUKWILA 205 — SITE 5 GENERAL SITE PLAN 4 C -102 TUKWILA 205 — SITE 3 GENERAL SITE PLAN 5 C -103 TUKWILA 205 — SITE 5 SITE PLAN 1 6 C -104 TUKWILA 205 — SITE 5 SITE PLAN 2 7 C -105 TUKWILA 205 — SITE 3 SITE PLAN 1 8 C -106 TUKWILA 205 — SITE 3 SITE PLAN 2 9 C -301 TUKWILA 205 — SITE 5 TYPICAL SECTION 1 10 C -302 TUKWILA 205 — SITE 5 TYPICAL SECTION 2 II C -303 TUKWILA 205 — SITE 3 TYPICAL SECTION 12 C -304 SITE 3 CROSS SECTIONS 13 C -305 SITE 5 CROSS SECTIONS 14 C -501 DETAILS 1 15 C -502 DETAILS 2 16 C -503 DETAILS 3 PN C1972 FY 08 GRE -3 -07 1111111 1111111 1 1111111 '111111, j11" � I�I1IIII' ' o. FINAL SUBMITTAL 100% 1111111 11111 BUl NOT ALL UTILITIES SHOWN ON PLANS CALL 2 WORKING DAYS BEFORE YOU DIG 1- 800 - 424 -5555 IF SHEET MEASURES LESS THAN 22'X34' IT IS A REDUCED PRINT. REDUCE SCALE ACCORDINGLY. Plate number: Sheet 1 of 16 Imm 2 (1) PRELIMINARY CLEARING AND GRUBBING, STAGING AREAS AND CONSRUCTION ACCESS RAMP 1. ESTABLISH CONSTRUCTION STAGING AREAS, AS SHOWN ON PLANS. 2. INSTALL TEMPORARY EROSION CONTROL MEASURES FOR PHASES OF WORK TO BE CONDUCTED. WORKING AS CONSTRUCTION ADVANCES, CONTINUE TO INSTALL SILT FENCING ALONG FULL LENGTH OF DISTURBED AREAS OF THE PROJECT SITE. INSTALL EROSION CONTROL MEASURES AS NEEDED TO PREVENT THE DISCHARGE OR ACCUMULATION OF SEDIMENT INTO THE RIVER, ADJACENT SWALES, CATCH BASINS AND STORM DRAINS AND OFF -SITE. ACCUMULATION OF SEDIMENT IN ADJACENT SWALES OR STORM DRAINS WILL BE MONITORED DAILY AND CLEANED TO ENSURE CONTINUED SERVICE THROUGHTOUT CONSTRUCTION. 3. CLEAR AND GRUB PROJECT SITE AND AREAS N VICINITY OF CONSTRUCTION ACCESS RAMP, INCLUDING REMOVAL OF EXISTING TREES NEEDED TO FACILITATE ACCESS RAMP CONSTRUCTION. DISPOSE OF VEGETATION AND OTHER UNSUITABLE MATERIALS IN AN APPROVED AND PERMITTED OFFSITE LOCATION. (2) RESTORATION, TRAIL RESURFACING, AND TEMPORARY CONSTRUCTION WORK AREAS. L CONSTRUCT GRAVEL TRAIL ALONG TOP OF LEVEE AT SITE 5. CONSTRUCT ASPHALT PAVED TRAIL ALONG TOP OF LEVEE AT SITE 3 AND RESTORE ASPHALT ON ALL DISTURBED AREAS, INCLUDING TEMPORARY CONSTRUCTION WORK AREAS. 2. HYDROSEED ALL DISTURBED SITE AREAS. 3. RESTORE TEMPORARY WORK AREAS TO PRE - CONSTRUCTION CONDITION. REPLACE ANY DAMAGED CURBS, PAINT STRIPES, ETC. IN KIND. 4. RESTORE ACCESS ROAD CONDITIONS AND FEATURES (FENCING, GATES, ETC...) TO PRE CONSTRUCTION CONDITIONS. GENERAL CONSTRUCTION NOTES 1. ALL IN -WATER PROJECT WORK SHALL BE COMPLETED DURING THE FISH WINDOW JULY 1ST - SEPTEMBER 15TH. 2. THE LIMITS OF THE STAGING AREA WILL BE DELINEATED IN THE FIELD BEFORE THE START OF CONSTRUCTION. FOLLOWING CONSTRUCTION, CONSTRUCTION MATERIALS WILL BE REMOVED AND ANY DISTURBED BARE SOIL IN ANY UNPAVED PORTION OF THE STAGING AREA WILL BE HYDROSEEDED. 3. HEAVY EQUIPMENT WILL OPERATE EITHER FROM THE TOP OF BANK, OR FROM THE MID-SLOPE BENCH WELL ABOVE THE WATERLINE. THE EXCAVATOR BUCKET WILL ENTER THE WATER ONLY TO EXCAVATE MATERIAL TO ALLOW PLACEMENT OF ROCK AND LOG STRUCTURES. 4. ALL GAS AND OIL CONTAINERS FOR SMALL EQUIPMENT SHALL BE SAFELY AND SECURELY STORED IN UTILITY VEHICLES. 5. CONTRACTOR MAY PROPOSE AN ALTERNATIVE LWD ANCHORING METHOD TO THE GOVERNMENT FOR APPROVAL (SEE SPECIFICATIONS). 6. PERMANENT ACCESS RAMPS DOWN TO MID SLOPE BENCH SHALL MEET REQUIREMENTS OF EM 385 -1 -1. EROSION CONTROL AND VEGETATION NOTES 1. VEGETATION TO BE PRESERVED AND CLEARING LIMITS WILL BE FLAGGED IN THE FIELD PRIOR TO THE START OF CONSTRUCTION BY THE PROJECT ENGINEER OR THE PROJECT ECOLOGIST. 2. EROSION CONTROL HYDROSEED MIX WILL BE USED TO ESTABLISH INITIAL GROUND COVER ON ALL DISTURBED AREAS, USING WASHINGTON STATE DEPARTMENT OF TRANSPORTATION HYDROSEED MIX. CONCRETE RETAINING WALL CONSTRUCTION NOTES 1. MINIMUM CONCRETE COMPRESSIVE STRENGTH - 4,000 PSI AT 28 DAYS. SEE SPECIFICATIONS FOR ADDITIONAL INFO. 2. STEEL REINFORCEMENT SHALL CONFORM TO ASTM A615, GRADE 60. 3. DESIGN DATA EQUIVALENT FLUID PRESSURE - 53 PCF SATURATED SOIL UNIT WT - 130 PCF EQUIVALENT PASSIVE SOIL PRESSURE - 317 PCF COEFFICIENT OF FRICTION ASSUMED - 0.31 SURCHARGE LOAD EOUIVALENT TO 3 FEET OF SOIL ALLOWABLE SOIL BEARING - 2000 PSF 3 1 4 ABBREVIATIONS AC ASPHALTIC CONCRETE ALIGN ALIGNMENT APPROX APPROXIMATELY AT CENTERLINE CF CUBIC FEET CFS CF PER SECOND DBH DIAMETER BREAST HEIGHT E EAST EL, ELEV ELEVATION EXIST EXISTING FT, ' FEET GA KCFS LWD N NTS OHW PC PI POB POE PT R RM S STA TYP U/S WSEL INCHES THOUSAND CFS LARGE WOODY DEBRIS NORTH NOT TO SCALE ORDINARY HIGH WATER POINT OF CURVATURE POINT OF INTERSECTION POINT OF BEGINNING POINT OF END POINT OF TANGENCY RADIUS RIVER MILE SOUTH STATION TYPICAL UPSTREAM WATER SURFACE ELEVATION W WEST 5 NOT ALL UTILITIES SHOWN ON PLANS, CALL 2 WORKING DAYS BEFORE YOU DIG 1- 800 - 424 -5555 IF SHEET MEASURES LESS THAN 22' X 34- IT IS A REDUCED PRINT. REDUCE SCALE ACCORDINGLY. US Army Corps of Engineers Seattle ITistrict 1 e 0 O z N s N w aw w t3 z 0 rw aw c J CONSTRUCTION NOTES WASHINGTON rn a KING COUNTY Plote number: C -001 Sheet 2 of 16 z 0 z 0 m 0 0 0 J N a w w w J m N CC CC w 0 > U 0 rn f 19- JUN -2008 09.32 Plote number. C -101 Sheet 3 of 16 ..�i\ 4 t _ r +PROPOSED STAGING AREA ,: (TEMPORARY WORK stk AREA EASEMENT) 5 NOTES, 1. MAPPING COMPILED FROM FEBRUARY 2006 AERIAL PHOTOS. MAPPING BY 3Di WEST FOR KING COUNTY DNR AND PARKS. MAP SCALE, 1" -100', CONTOUR INTERVAL 2 FOOT. HORIZONTAL DATUM, NAD83 /91(HARN) WA STATE PLANE NORTH ZONE (FEET). VERTICAL DATUM, NAVD 88. MAP HAS NOT BEEN COMPREHENSIVELY VERIFIED BY FIELD CHECKS. 2. ALL REAL ESTATE REOUIREMENTS AND UTILITY RELOCATIONS NECESSARY FOR PROJECT CONSTRUCTION SHALL BE OBTAINED /PERFORMED BY CITY OF TUKWILA PRIOR TO CONSTRUCTION. 3. TEMPORARY WORK AREA EASEMENT EXTENDS 30'RIVERWARD FOR LWD PLACEMENT ALONG TOE DURING CONSTRUCTION. /� ACCESS PROPOSED STAGING AREA (TEMPORARY WORK AREA EASEMENT) ACCESS ROAD TEMPORARY WORK AREA EASEMENT PROJECT FOOTPRINT 80' 40' 0 80' 1" • 80 I H 160' IF SHEET MEASURES LESS THAN 22' X 34' IT IS A REDUCED PRINT. REDUCE SCALE ACCORDINGLY. 1 aa US Army Corps of Enpiroxs Seattle Metrics • 1 • • • i m 0 z CO N 4 W a3 z 0 I' J w J • N r 41 W Z N O O Z W rr L.' 0 Z N Z K ▪ 0 > U • LC) W Z Q (/) t W u O //1 (N Q W ` W WASHINGTON N r a KING COUNTY U z 0 0 0 w w w — w J m Q J CO" Q S W W w J CO m m N w W z 0 W • E 18- JUN -2008 15,33 O W 0 a — a O S. 180TH ST. 2 ■_) �._ Li 1 0 '' - 1 1 Q 5.18OTH ST. C 3 ;;7 4 S. 180T1-1 ST. '1 0 0 1 N =- 3T _- CREATE _ACCESS '_RAMP TO LEVEE ACCESS —II i1 1 / 1 N 163,800 PROPOS D STAGIN EA (TEMPORARY WORK- AREA EASEMENT) I; �fm• TIE %INTO EXISTING -� 11' 'r � r ASPHALT PATH + y r• to < \t i � 1.t it • 1 PROJECT FOOTPRINT ' 1 . .' 1 III 1 1 ' 1 1, � ACCESS WITHIN EXISTING PERMANENT.` '1LEVEE EASEMENT PROJECT FOOTPRINT 2 BENCH N-163,200 • 5 NOTES 1. MAPPING COMPILED FROM FEBRUARY 2006 AERIAL PHOTOS. MAPPING BY 3Di WEST FOR KING COUNTY DNR AND PARKS. MAP SCALE 1" -100', CONTOUR INTERVAL 200 FOOT. HORIZONTAL DATUMS NAD83/91 (HARN) WA STATE PLANE NORTH ZONE (FEET). VERTICAL DATUM, NAVD 88. MAP HAS NOT BEEN COMPREHENSIVELY VERIFIED BY FIELD CHECKS. 2. ALL REAL ESTATE REQUIREMENTS AND UTILITY RELOCATIONS NECESSARY FOR PROJECT CONSTRUCTION SHALL BE OBTAINED /PERFORMED BY CITY OF TUKWILA PRIOR TO CONSTRUCTION. 3. TEMPORARY WORK AREA EASEMENT EXTENDS 30'RIVERWARD FOR LWD PLACEMENT ALONG TOE DURING CONSTRUCTION. /// ACCESS PROPOSED STAGING AREA (TEMPORARY WORK AREA EASEMENT) EXISTING PERMANENT LEVEE EASEMENT TEMPORARY WORK AREA EASEMENT PROJECT FOOTPRINT 50' 25' 0 50 ItirixHr -r 50' 100' IF SHEET MEASURES LESS THAN 22' X 34' IT IS A REDUCED PRINT. REDUCE SCALE ACCORDINGLY. I US Army Corps of Enpivers Seattle Millet 1 1 rn N N N w 1- a3 z 0 o J WASHINGTON 0+ a KING COUNTY Plote number, C -102 Sheet 4 of 16 z 0 0 w N m 1- CC 0 w w w m N s m CCz x w w w J CO N CC W m z w w m U 1• E. N w Q 18- JUN -2008 15,34 2 0 w N 163,500 N 163.200 R 150.00' L 3.99' T2..00' De1aa 1 °31'32" Do" 38° 11'50" A R 120.00' L 11.46' T 5.73' Delta 5 °28'1 Dc 07 °44'47" 3 MATCH LINE TO PLATE C -104 E 1,288,955.71 10' ACCESS. CENTERLINE OF LEVEE N 163.457 89 E 1,288,942.42 PROJECT FOOTPRINT N 163 3 3.83 E 1,288,938.15 R 150.00' L 5.85' T 2.93' Delta 2 °14'05" Dc 38 °11'50" EXISTING LEVEE TO RETAINING WALL TRANSITION, SEE PLAN AND PROFILE DETAILS ON PLATE C -503 4 BENCH 1 0 E 1,289.300 BEGIN SITE 5 TYPICAL SEC,TION1(LAYBACK WITH LWD), SEE PLATE 1 C- 3D);• (ST AT ION : 1.30) TEMPORARY• WORK AREA EASEMENT N 163 154.05 E 1,288,921.84 BEGIN RETAINING WALL AT STATION 0.00, SEE PLATE C-502, RETAINING WALL BETWEEN STATION 0.00 AND 8.50 OPTIONAL BID ITEM • t.\ ! t AT, STATION :_Q.00 e•: ' I TRANSITION FOR 130'. FROM EXISTING. LEVEE PRISM INTO. $ITE 5 TYP SECTION "1,.SEE: PLATE C-301 (NO LWD FOR 130') 5 NOTES: 1. MAPPING COMPILED FROM FEBRUARY 2006 AERIAL PHOTOS. MAPPING BY 3Di WEST FOR KING COUNTY DNR AND PARKS. MAP SCALE' 1" -100', CONTOUR INTERVAL: 2 FOOT. HORIZONTAL DATUM: NAD83/91 (HARN) WA STATE PLANE NORTH ZONE (FEET). VERTICAL DATUM: NAVD 88. MAP HAS NOT BEEN COMPREHENSIVELY VERIFIED BY FIELD CHECKS. 2. FOR SITE 5 STAGING AND ACCESS, SEE PLATE C -101. 3. LEVEE TOP ELEVATION AT THE UPSTREAM AND DOWNSTREAM ENDS OF THE PROJECT SHALL MATCH THE EXISTING GRADE ELEVATIONS. A CONTINUOUS SLOPE BETWEEN THE UPSTREAM AND DOWNSTREM END ELEVATIONS SHALL BE CONSTRUCTED FOR THE FINAL GRADE OF THE LEVEE BASED ON THE CENTERLINE OF THE LEVEE. 30' 15' 0 1" - 30' IHH1 -tHt -) 30' 60' IF SHEET MEASURES LESS THAN 22' X 34' IT IS A REDUCED PRINT. REDUCE SCALE ACCORDINGLY. US Army Corps of Enyiroers Se.n% Oinrict 1 8 0 0 z N n N .w • aW z ° W J SEATTLE. WASHINGTON WASHINGTON ry 0 0 0. KING COUNTY Plote number. C -103 Sheet 5 of 16 0 0 0 u w --0 CV m 0 m a 0 W W J 0 0 0 N w Cr U N 2 w J z 0 0 18-JUN -2008 15e35 E 1.288.700 2 S. 180TH ST. l m 0' —c 3 —,p1y/2o i PROPOSED �.ACCESS -. • F.L FROM 180TH / n "to'? L70E FACE COe 28.1' TOE OF L TOP OF 4 TOP FACE OF CURD , • SEE GENERAL .' 28.1' PLAN FOR CONTINUATION OF ACCESS _ TCV7 ACE CQNC RETYW / o' -.. 1' • - CO •�-� TOP Of kkVEE — —. -END WING :WALL N 164,181 25 E.1,289,133.43 :. -. - WALL:. DETAILS, PLATE C -502 BEGIN. WING WALL :4- '164187.35 E. 1,289,158 89 _- -SEE RETAINING WALL DETAILS, PLATE C -502. r.:; EDGE 131' PROTECT 1`— EXISTING i OUTFALL YATERNEG R ;100.00' L 7.,34' T367•' .Delta 4 °12'11" Dc '57 °- 1''95 RETAINING WALL OPTIONAL BID ITEM, STATION 0.00 TO 8.50. SEE PLATE C -502 N 1. .47 N 1.4 1 E 1,289,096'8 N 164,215.60 1, 289, 209.34 E R 10.00' . L 4.01:.... De1to —22 °58".1; 'Dc. 212° 7'.28';' E :1,289,048 16 R 100.00' L 2.64' T 1.32' DeI -ta ., 1° -0,47" D'c N 1.3 96 14 E 1.289.010 17 • BEGIN TRANSITION BACK TO EXISTING ,LEVEE PRISM WITH RETAINING WALL (NO LWD). TRANSITION 'LENGTH ALONG BENCH - 130', SEE PLATE C-302, (STATION 9.60) TEMPORARY / WORK AREA EASEMENT R 50.,.00' L• T 1.72' Delta '3°5453" Dc 114°-35'30" 10' ACCESS 7 .1:1P CAF t E BENCH E 1,288.982.99 2sa CENTERLINE OF LEVEE SEE NOTE 4 (TYP.). TOE OF LE N 163.800 1 R 20.00' T 3.73' Delta 21 °09'01" Dc 286 °28'44" N E 1,288,950.96 R 150.00' L 3.82' T 1.91' A Delta 1 °27'39" Dc 38 °11'50" BEGIN SITE 5 TYPICAL SECTION 2 (LAYBACK WITH • RETAINING WALL, NO LWD), SEE PLATE ,C-302, (STATION 6.95) N 1. 7 7 E 1,288,953.74 1 BEGIN TRANSITION BETWEEN SITE . -5 TYPICAL' SECTION ;1 AND: TYPICAL' SECTION 2.'NO LWD, MINIMUM TRANSITION LENGTH 100' SEE , PLATES •C- 3011ND C-302 . • 1 (STATION 5.70) • r, MATCH LINE TO PLATE C -103 j 5 1 NOTES: 1. MAPPING COMPILED FROM FEBRUARY 2006 AERIAL PHOTOS. MAPPING BY 3Di WEST FOR KING COUNTY DNR AND PARKS. MAP SCALE: 1" -100', CONTOUR INTERVAL: 2 FOOT. HORIZONTAL DATUM: NAD83/91 (HARN) WA STATE PLANE NORTH ZONE (FEET). VERTICAL DATUM: NAVD88. MAP HAS NOT BEEN COMPREHENSIVELY VERIFIED BY FIELD CHECKS. 2. FOR SITE 5 STAGING AND ACCESS, SEE PLATE C -101. 3. LEVEE TOP ELEVATION AT THE UPSTREAM AND DOWNSTREAM ENDS OF THE PROJECT SHALL MATCH THE EXISTING GRADE ELEVATIONS. A CONTINUOUS SLOPE BETWEEN THE UPSTREAM AND DOWNSTREAM END ELEVATIONS SHALL BE CONSTRUCTED FOR THE FINAL GRADE OF THE LEVEE BASED ON THE CENTERLINE OF THE LEVEE. 4. SURVEY CROSS SECTIONS BASED ON MAPPING COMPILED FROM FIELD SURVEY PERFORMED FEB- MAR 2008. SURVEY BY DAVID EVANS & ASSOCIATES. MAP SCALE: 1 -40'. HORIZONTAL DATUM: NAD 83/91, WA STATE PLAN N. ZONE. VERTICAL DATUM: NAVD '88 (FEET). 30' 15' 0 30' 60' 1" - 30' LFJ HNHa IF SHEET MEASURES LESS THAN 22- X 34- IT IS A REDUCED PRINT. REDUCE SCALE ACCORDINGLY. I lia US Army Corps of Enpiroers seo+xa Oimict 1 t i 0) 0 z m N N . r1- aN a3 z o 0 w j J a: -o a 8V) w �• tr, r 0' Ow Fc Z co Z s w 0� w� z W 0 r0 0 0 WASHINGTON 0 0 KING COUNTY Plate number: C -104 Sheet 6 of 16 z 0 m m 0 w --w J N 3 m 0' N > w 0 U N 2 18- JUN -2008 15.36 N 163.600 1 E 1,290,400 2 E 1,290,600 '~REMOVE - --- FENCE 3 MATCH E 1,290,800 LINE w TO p ATE 0 !, ` L C .1 6 —232 -. - -- 25.1' N 163,493.44 E 1,290, 779.69 CENTERLINE OF LEVEE R 297.00' L 224.24'. T 117.77'. Delta 43 °15'31" Dc 19 °17'29 i TO/ OF LE 4 1 R 317.00' L 177.05''1 1..90.90' Delta 32 °00'00" Dc 18°04'28'1" 163 404.15 E 1,290,702.89 '10' ACCESS N 1 N 163,400 -. 1 • 1,290,634.12 N 163 330 75 E 1.290,544 30 / • • TOP•OF 1.EVEEE SEE NOTE 3 ,(TYP:) • 1 _ • 246'r.Il -24 BENCH 0 / AT STATION 0.00 TRANSITION FOR 130' FROM EXISTING LEVEE :PRISM INTO SITE 3 TYP. 4., SECTION:SEE PLATE C -303 N 163J6W3 tw0 FOR. 130') 12_2 TEMP011ARY WORK AREA EASEMENT ./. , BEGIN SITE 3 TYPICAL SECTION (LAYBACK WITH LWD), SEE PLATE C -303, (STATION 1.30) 5 NOTES: 1. MAPPING COMPILED FROM FEBRUARY 2006 AERIAL PHOTOS. MAPPING BY 3Di WEST FOR KING COUNTY DNR AND PARKS. MAP SCALE: 1" -100', CONTOUR INTERVAL= 2 FOOT. HORIZONTAL DATUM: NAD83/91 (HARN) WA STATE PLAN NORTH ZONE (FEET). VERTICAL DATUM: NAVD 88. MAP HAS NOT BEEN COMPREHENSIVELY VERIFIED BY FIELD CHECKS. 2. LEVEE TOP ELEVATION AT THE UPSTREAM AND DOWNSTREAM ENDS OF THE PROJECT SHALL MATCH THE EXISTING GRADE ELEVATIONS. A CONTINUOUS SLOPE BETWEEN THE UPSTREAM AND DOWNSTREAM END ELEVATIONS SHALL BE CONSTRUCTED FOR THE FINAL GRADE OF THE LEVEE BASED ON THE CENTERLINE OF THE LEVEE. 3. SURVEY CROSS SECTIONS BASED ON MAPPING COMPILED FROM FIELD SURVEY PERFORMED FEB- MAR 2008. SURVEY BY DAVID EVANS & ASSOCIATES. MAP SCALE: 1 -40'. HORIZONTAL DATUM: NAD 83/91, WA STATE PLAN N. ZONE. VERTICAL DATUM: NAVD '88 (FEET). 30' 15' 0 1" • 30 30' 60' IF SHEET MEASURES LESS THAN 22- X 34- IT IS A REDUCED PRINT. REDUCE SCALE ACCORDINGLY. I U5 Army Corps of Engineers Seattle Cronin 1 8 1 W J Q w 0 U W 0 O N z W W Z 0 a z w 0 > U vi 6 SEATTLE, WASHINGTON WASHINGTON KING COUNTY Plote number: C -105 Sheet 7 of 16 z 0 LEI 0 m r CC 0 0 w — w cc m J w W J m cc z 0 0 E w 0 N 0 UN -2008 15.37 0 0 O a E — a 9, 0 N 164,000 r N 163,800 9 N 163,600 E 1,290,600 R 997:00' T 44.72' Delta ' 5° 08' 1 Dc 5° 44449:1 2 3 E 1,291,000 TIE \INi0 EXISTING ASPHALT PATH N 163,936.16 E 1,290,762.92 •` • ♦ OP OF LEVEE `♦ .6 !TOP OF LEVEE 1344' 29 1' .. 1 1 TOE (FiEVEE • 26 N 163 770.71 % 1' .♦ ■ co *in _.< --I D: K m r1 i 0 N 1 M 1 r I _ ... . END OF SITE 3 TYPICAL SECTION (LAYBACK SECTION WITH LWD). n BEGIN. TRANSITION BACK TO '.'EXISTING LEVEE PRISM (NO LWD). (STATION 6.70) EDGE OF VWATF1UVEv� 11.8' PROJECT • -FOOTPRINT • • N .163.681.40 N E-1,29.0,775. 7 E i5 LEVEE 24.9' 22.4' X10' ACCESS 28 4' 1..... SEE NOTE 3 ,(,TYP ') MATCH E �.r. �N T _ -.120' PLATE 4 NOTES: 5 1. MAPPING COMPILED FROM FEBRUARY 2006 AERIAL PHOTOS. MAPPING BY 3Di WEST FOR KING COUNTY DNR AND PARKS. MAP SCALE: 1" -100', CONTOUR INTERVAL: 2 FOOT. HORIZONTAL DATUM: NAD83 /91 (HARN) WA STATE PLAN NORTH ZONE (FEET). VERTICAL DATUM: NAVD 88. MAP HAS NOT BEEN COMPREHENSIVELY VERIFIED BY FIELD CHECKS. 2. LEVEE TOP ELEVATION AT THE UPSTREAM AND DOWNSTREM ENDS OF THE PROJECT SHALL MATCH THE EXISTING GRADE ELEVATIONS. A CONTINUOUS SLOPE BETWEEN THE UPSTREAM AND DOWNSTREAM END ELEVATIONS SHALL BE CONSTRUCTED FOR THE FINAL GRADE OF THE LEVEE BASED ON THE CENTERLINE OF THE LEVEE. 3. SURVEY CROSS SECTIONS BASED ON MAPPING COMPILED FROM FIELD SURVEY PERFORMED FEB- MAR 2008. SURVEY BY DAVID EVANS & ASSOCIATES. MAP SCALE: 1.40'. HORIZONTAL DATUM: NAD 83/91, WA STATE PLAN N. ZONE. VERTICAL DATUM: NAVD '88 (FEET). 30' 15' 0 1" • 30 I i- 30' 60' IF SHEET MEASURES LESS THAN 22" X 34- IT IS A REDUCED PRINT. REDUCE SCALE ACCORDINGLY. I US Army Corps of Engineers S..nM °eerie 'o 0 Z 00 o° N N •w 1- N a3 Z 0 J • 0 3 KING COUNTY Plote number: C -106 Sheet 8 of 16 0 z 0 N m 0) w w — w J N m J 7 m w J m w w U U w LL N 0 18 -JUN -2008 15.37 w 0 a — a w 0 FENCE Q 14' I 2 SEE TRAIL RESTORATION TYPICAL SECTION, SEE PLATE C -501 101' 3 4 5 HYDROSEED (TYP) EL 36' ( APPROX.) EL 36' ( APPROX.) EXISTING GROUND SURFACE (APPROX.) Z.0 0 SATISFACTORY COMPACTED FILL o- RETAINING n. EL 30' ]a CAPPROX.-)- ., WALL (SEE -- __- D €TAI6 -FL- -ATE -- C -502) ',p 16 10' ACCESS SPALLS UP TO ELEV. 28' 9,000 CFS ELEV. APPROX. TUKWILA 205 - SITE 5 TYPICAL SECTION 1 NOT TO SCALE SATISFACTORY COMPACTED FILL 6,000,CFS EL 24' COIR WRAP (TYW, WILLOWS PLACED 'EVERY 6" ON CENTER (TYP) . Y. d \20.%i�i��wu m �� M QUARRY—/ SPALLS 1' THICK TOPSOIL (TYP) OHW 'E1, 16' 2,0 AtileAr CLASS IV RIPRAP LAUNCHABLE TOE ANCHOR ROCK, 5' DIAM. EL 10' WSEL 30 EL 8' CFS (APPROX.) LWD W /ROOTBALL, ANCHORED TO BOULDER, ANGLED DOWNSTREAM (WSEL 300 CFS APPROX.), SEE DETAIL PLATE C -501 IF SHEET MEASURES LESS THAN 22' X 34' IT IS A REDUCED PRINT. REDUCE SCALE ACCORDINGLY. I US Army Corps of Engneer: Suitele Wain t 1 ro O z ro N w rN '3 z O a J W a VI N cc c7 c7 w Z ■0 z 0W cc O z N Z W 0 • 0 N WASHINGTON b rn 0 o. KING COUNTY Plote number C -301 Sheet 9 of 16 z 0 N m 0) LC 0 u w - J 0 Q J 3 NC wCC cr- w J m i z La W 0 0 N LT; 0 z 0 18-JUN-2008 15.24 0 0 a La 1- r 0 W O 1 1 2 AC PAVEMENT EL 27' ( APPROX.) T 3 SEE TRAIL RESTORATION TYPICAL SECTION. SEE PLATE C -501 97' 4 5 FENCE HYDROSEED (TYP) EL 36' (APPROX.1 EXISTING GROUND SURFACE ( APPROX.) SATISFACTORY COMPACTED FILL RETAINING " n WALL_ (SEE EL 26' ( APPROX.) -BETAItPLATE W L 9.000 C S C -502) EL. 24' ( APPROX.) WSEL 6,000 .CFS WILLOWS , IN SOIL, WILLOWS 'PLACED EVERY 6" ON 16' 10' ACCESS TUKWILA 205 - SITE 5 TYPICAL SECTION 2 SATISFACTORY COMPACTED FILL NOT TO SCALE `"CR ///.07 OXI'�/w1ii-RC�i.,Clii .iN .IG n =°n"`a�.'i , V OHW EL. 16' WSEL (APPROX.) 2.000 CFS QUARRY SPALLS 1' THICK TOPSOIL (TYP) EL 10' WSEL 300 CFS (APPROX.) EL 8' y ( APPROX.) CLASS IV RIPRAP LAUNCHABLE TOE. CLASS IV RIPRAP IF SHEET MEASURES LESS THAN 2T X 34' IT IS A REDUCED PRINT. REDUCE SCALE ACCORDINGLY. 1 US Army Caps of Engineers Sean. trumim • • • e i 0 z N N N w " 3 Z 0 c J • KING COUNTY Plate number C -302 Sheet 10 of 16 (7 z 0 N (n N m Q u — w 1) x w w w w J m D > z u 0 N U i 2008 15.25 1 2 1 3 T 4 1 SEE TRAIL TYPICAL RESTORATION SECTION, SEE PLATE C -502 110' 12' 14' 24' EL 35' ( APPROX. ) EL 29' ' APPROX. I 10' X 0 a: 0 2 ACCESS SATISFACTORY COMPACTED FILL EL 27' SPALLS UP TO ELEVATION 27' 9,000 CFS 2 �1 HYDROSEED (TYP) 15 EXISTING GROUND SURFACE (APPROX.) W41" 30' COIR FABRIC WRAPS (TYP) 6,000 CFS EL 23' 5 SATISFACTORY COMPACTED FILL QUARRY SPALLS Ti \... .f MOCROmaon.�m . �a 1' THICK TOPSOIL (TYP) TUKWILA 205 - SITE 3 TYPICAL SECTION NOT TO SCALE WILLOWS WITH COIR FABRIC -.SOIL LIFTS, WILLOWS PLACED EVERY 6" ON CENTER (TYP) N CLASS IV RIPRAP V Dl-(W EL 15 2,000 CF 400 EL 10' Co r WSEL 300 / <u EL 8' v) (APPROX.) LAUNCHABLE TOE, CLASS IV RIPRAP ANCHOR ROCK, 5' DIAM. CFS ( APPROX.) LWD W /ROOTBALL, ANCHORED TO BOULDER, ANGLED DOWNSTREAM (WSEL 300 CFS APPROX.), SEE DETAIL PLATE C -501 IF SHEET MEASURES LESS THAN 22' X 34' IT IS A REDUCED PRINT. REDUCE SCALE ACCORDINGLY. 1 US Anny Corps of Eng ,ears Seattle (5001ot t N n w t- z 0 a J w U I m E LA 0 0 U O Z w a w 0 w O z zw O } U WASHINGTON U z KING COUNTY Plate number, C -303 Sheet 11 of 16 z 0 0 VI ('7 0 0 w — w m N 5 J m ictix > w J m w z w w 0 U 0 0 18- JUN -2008 15,26 O 0 0 O a W 0 w - 0 ELEVATION (FT) 45 40 35 30 25 20 15 10 5 0 45 40 35 = 30 w z 25 0 c 20 w w 15 10 5 0 40 35 30 - 25 oz 20 a - 15 -J 10 5 0 1 2 3 fl1stAt"tE'VE EXISTING GROUND -50 -25 STATION 7 +45 0 SCALE 1H:1V It 25 DISTANCE (FT) 50 75 100 FINAL LEVEE EXISTING GROUND -50 -25 0 25 DISTANCE (FT) STATION 4 +58 SCALE 1H:1V FINAL LEVEE 50 75 100 EXISTING GROUND • -50 -25 0 STATION 2 +23 SCALE 1H:1V 25 50 75 100 DISTANCE (FT) 45 40 35 30 25 20 15 10 5 0 45 40 35 30 25 20 15 10 5 0 40 35 30 25 20 15 10 5 0 4 NOTE: 1. EXISTING GROUND BASED ON MAPPING COMPILED FROM FIELD SURVEY PERFORMED FEB -MAR 2008. SURVEY BY DAVID EVANS S. ASSOCIATES. MAP SCALE: 1 "=40'. HORIZONTAL DATUM: NAD 83/91, WA STATE PLANE N. ZONE. VERTICAL DATUM: NAVD '88 (FEET). DATA BELOW EDGE OF WATER BASED ON MOST RECENT FLOOD INSURANCE STUDY DATA PROVIDED BY KING COUNTY. 2. NEW LEVEE ELEVATION BASED ON MAPPING COMPILED FROM FEBRUARY 2006 AERIAL PHOTOS. SEE NOTE 1 ON PLATES C -105 AND C -106 FOR SPECIFIC INFORMATION REGARDING THE 2006 SURVEY. THERE IS AN ELEVATION DISCREPANCY BETWEEN THE 2008 EXISTING GROUND SURVEY CROSS SECTIONS AND THE 2006 AERIAL SURVEY. THE INTENT IS NOT TO RAISE THE OVERALL CURRENT LEVEE TOP ELEVATION. SEE NOTE 2 ON PLATES C -105 AND C -106. LEVEE TOP ELEVATION AT THE UPSTREAM AND DOWNSTREAM ENDS OF THE PROJECT SHALL MATCH THE EXISTING GRADE ELEVATIONS. A CONTINUOUS SLOPE BETWEEN THE UPSTREAM AND DOWNSTREAM END ELEVATIONS SHALL BE CONSTRUCTED FOR THE FINAL GRADE OF THE LEVEE BASED ON THE CENTERLINE OF THE LEVEE. IF SHEET MEASURES LESS THAN 22' X 34' IT IS A REDUCED PRINT. REDUCE SCALE ACCORDINGLY. I US Anny Corps of Engineers Searle ISn'in 0 z c N .W 3 H 1- w rr CC cm 0 ° z,.; o w 1) ( taa z D- O amm ccw L : r / N w 0 W LL- J 0 ww >0 v) I— (n d JU5 � N Cr) � < Q O 8 'y X D U WASHINGTON KING COUNTY Plote number, C -304 Sheet 12 of 16 z 0 0 0 m ro 0 w w J a s w J m N CC z w w 0 U U N i 18-JUN -2008 15.26 0 0 a r 0 z --a 0 ELEVATION (FT) ELEVATION (FT) 40 35 30 25 20 15 10 5 0 2 L 3 EX'IST'IICG- GROUND FINAL LEVE -50 -25 0 25 50 STATION 11+32 SCALE 1H:1V 45 40 35 30 25 20 15 10 5 0 DISTANCE (FT) 75 r 100 F'THAL LEVEE EXISTING GROUND 1 1 F -50 -25 STATION 7 +05 0 SCALE 1H:1V 25 DISTANCE (FT) 50 75 100 40 35 30 25 20 15 10 5 0 45 40 35 30 25 20 15 10 5 0 4 NOTE: 1. EXISTING GROUND BASED ON MAPPING COMPILED FROM FIELD SURVEY PERFORMED FEB -MAR 2008. SURVEY BY DAVID EVANS & ASSOCIATES. MAP SCALE: 1 "=40'. HORIZONTAL DATUM: NAD 83/91. WA STATE PLANE N. ZONE. VERTICAL DATUM: NAVD '88 (FEET). DATA BELOW EDGE OF WATER BASED ON MOST RECENT FLOOD INSURANCE STUDY DATA PROVIDED BY KING COUNTY. 1 2. NEW LEVEE ELEVATION BASED ON MAPPING COMPILED FROM FEBRUARY 2006 AERIAL PHOTOS. SEE NOTE 1 ON PLATES C -103 AND C -104 FOR SPECIFIC INFORMATION REGARDING THE 2006 SURVEY. THERE IS AN ELEVATION DISCREPANCY BETWEEN THE 2008 EXISTING GROUND SURVEY CROSS SECTIONS AND THE 2006 AERIAL SURVEY. THE INTENT IS NOT TO RAISE THE OVERALL CURRENT LEVEE TOP ELEVATION. SEE NOTE 3 ON PLATES C -103 AND C -104. LEVEE TOP ELEVATION AT THE UPSTREAM AND DOWNSTREAM ENDS OF THE PROJECT SHALL MATCH THE EXISTING GRADE ELEVATIONS. A CONTINUOUS SLOPE BETWEEN THE UPSTREAM AND DOWNSTREAM END ELEVATIONS SHALL BE CONSTRUCTED FOR THE FINAL GRADE OF THE LEVEE BASED ON THE CENTERLINE OF THE LEVEE. IF SHEET MEASURES LESS THAN 2T X 34. IT IS A REDUCED PRINT. REDUCE SCALE ACCORDINGLY. 1 US Army Caps of Engineers S.ot& District e 0 Z 1 N r 3.3 d � 4- 1- w .co w 0 0 N a 36 r N CC rW W r ? Z 8E W m w W 0 z za Z cc 0 } U SEATTLE, WASHINGTON WASHINGTON KING COUNTY Plate number, C -305 `Sheet 13 of 16 0 0 N U c� w > — w J N J 3 m W Id > a z 0 0 U N Y W J w z 0 "8 18-JUN -2008 15.27 0 0 a w z 0 W 0 LANDWARD SIDE OF LEVEE 14' 4" TOP COURSE 4" BASE COURSE — 2X SLOPE COMPACTED SUBGRADE- 2 1 3 1 4 RIVERWARD SIDE ._„..i OF LEVEE TRAIL RESTORATION TYPICAL SECTION - SITE 5 NOT TO SCALE EXISTING GROUND SURFACE (APPROX.) LWD CONIFER (TYP) - TIGHT CONNECTION < 0.33 FT OF CHAIN ANCHOR POINT 1 FT. ABOVE BED 2 5' DIAM. QUARRY STONE ANCHOR ROCK, 50X BURIED IN RIVERBED TIGHT CONNECTION < 1 FT OF CHAIN SINGLE, TIGHT WRAP SUMMER WATER SURFACE ELEV. (APPROX. 300 CFS) TYPICAL LOG PLACEMENT (SECTION VIEW) 1/2" DIAM NOTCH LOGS CHAIN (TYP) 3" DEEP, TYP NOT TO SCALE GREEN RIVER 30' Mom 41651111111 Ail. III IPI S.. 23' RIPRAP (TYP) TYPICAL LOG PLACEMENT EVERY 10 LOGS (PLAN VIEW) NOT TO SCALE NOTCH LOGS 3" DEEP, TYP r i 1/2" DIAM. CHAIN (TYP) GREEN RIVER 5 1 NOTE: FOR ADDITIONAL LWD REQUIREMENTS (SEE SPECIFICATIONS) 2 QUARRY STONE, NO ROOT WAD AT UPSTREAM END 5' DIAM. QUARRY STONE ANCHOR (TYP) UPSTREAM END LOG PLACEMENT (PLAN VIEW) 1/2" DIAM NOTCH LOGS CHAIN (TYP) 3" DEEP, TYP GREEN RIVER 3' (MIN) 30' 5' DIAM. QUARRY STONE ANCHOR (TYP) • tllr:�)I`.�� %� I )-'dui RIPRAP (TYP) 23' TYPICAL LOG PLACEMENT (PLAN VIEW) NOT TO SCALE 1 5' DIAM. QUARRY STONE ANCHOR (TYP) IF SHEET MEASURES LESS THAN 2Y X 34" IT IS A REDUCED PRINT. REDUCE SCALE ACCORDINGLY. I US Army Corps of Engineers Seattle District l co 0 z OD CV N • w w a0 °cam D: O Z 0 ow WASHINGTON rn a KING COUNTY Plate number. C -501 Sheet 14 of 16 z 0 0 0 0, u 0 0 W — w J s D 0 2 W K w w -J 0 0 m i CC w 0 V N s -J z u_ N 0 18- JUN -2008 15.28 0 0 a r 0 z — a 0 NOTE: 1 1. AT APPROXIMATELY STATION 6.90, THERE IS AN APPROXIMATELY 3 FOOT CHANGE IN THE EXISTING GRADE ON THE LANDWARD SIDE OF THE RETAINING WALL. RETAINING WALL SECTION DEPICTS APPROX. LOWER LANDWARD EXISTING GRADE ELEVATION. WHERE EXISTING GRADE IS HIGHER ALONG THE LANDWARD SIDE OF THE WALL, THE TOP ELEVATION OF THE BACKFILL MATERIAL SHALL BE ADJUSTED UPWARD AND MATCH EXISTING GRADE WHERE INDICATED ON DETAIL. WEEP HOLE LOCATIONS SHALL BE ADJUSTED UPWARD WHERE BACKFILL HEIGHT IS ADJUSTED TO MAINTAIN VERTICAL DISTANCES ABOVE GRADE AS SHOWN IN DETAIL. BOTTOM OF FOOTING (BOF) AND TOP OF FOOTING ELEVATION SHALL REMAIN AS SHOWN IN DETAIL. EL 36' 1T/I)P Z 2 GALV RAIL 2y " DIA GALV SCH �'-0" O.C. W /END LNKN FENCE c .�9 GA GALV WIRE MESH E EMBEI a co TOP OF LEVEE (SEE PLANS AND NOTES REGARDING TOP OF LEVEE ELEVATION) MIN 1' GRAVEL BACKFILL FULL HEIGHT (TYP) GEOTEXTILE BEHIND DRAINAGE GRAVEL •9 6 12 ", OC GEOTEXTILE AT EACH WEEP HOLE •9 6 12" '/IIi\\m%In \ \\ -J 2' 3" CLR — VAN RCJ CLR 4 -1/2" DIA. GROUT HOLE 2" CLR •5 6 2' -0" •3 6 1' -0" •4 6 1' -0" 3" DIA WEEP HOLES 6 10' MAX STAGGERED z EL 26.25 CAPS 3 2" AC 4" BASE COURSE i COMPACTED SUBGRADE TYPICAL AC TRAIL PAVEMENT SECTION NOT TO SCALE BACKFILL ON TOP OF WALL FOOTING TO MEET EXISTING GRADE WITH SATISFACTORY FILL MATERIAL AND A SIX INCH THICK (6 ") MINIMUM GRAVEL TOP COURSE 2% SLOPE • • • • •5 f? 12" 3" CLR — BOF EL 24.25 COMPACTED SUBGRADE •9 DOWEL LAPPED W /VERT REINF MATCH BAR SIZE .5 TYP "„liaMa KEY TYPICAL RETAINING WALL SECTION NOT TO SCALE CUT ALTERNATING HORIZ REINF MOM /2" 13'4" 2 IM FRONT FACE TYPICAL VERTICAL CONTROL JOINT NOT TO SCALE 1. MAXIMUM SPACING OF CONTROL /CONSTRUCTION JOINTS IS 25' -0 ". 2. CONTROL JOINTS NOT REQUIRED IN FOOTING. 3. HORIZONTAL REINFORCEMENT IS CONTINUOUS THROUGH FOOTING. T 90° STANDARD MATCH HOOK EXISTING GRADE •4 X 2' -0" LAPPED W/ HORIZ REINF 3/4" PREMOLDED EXP. JT mggg= SEALANT D51" DIA X 9" SMOOTH STEEL OWEL 6 1' -6" VERT (LIGHTLY GREASE DOWEL) FRONT FACE OF WALL VARIES TYPICAL CORNER DETAIL NOT TO SCALE EXPANSION • TYPICAL VERTICAL EXPANSION JOINT NOT TO SCALE 1. MAXIMUM SPACING OF EXPANSION JOINT IS 100 FEET. 2. EXPANSION JOINTS NOT REQUIRED IN FOOTING. JOINT SEALANT BACKER ROD 6 CONTROL JOINTS CRACK 1/2" 4 RIVERWARD SIDE OF LEVEE ASPHALT LOW EDGE 1" ABOVE FINISH GRADE REINF CONT THRU JOINT TYPICAL SLAB -ON -GRADE CONTROL JOINT DETAIL . NOT TO SCALE 2 1� 5 14' 5H :1V MAX. 9' AC PATH 2% 5H:1V MAX. In\ 4" BASE COURSE COMPACTED SUBGRADE 2" ASPHALT PAVING (AC) LANDWARD SIDE OF LEVEE TRAIL RESTORATION TYPICAL SECTION - SITE 3 NOT TO SCALE WING WALL EXISTING LEVEE ACCESS RAMP RETAINING WALL EL •1- 31' WALL FOOTING WING WALL (RETAINING WALL) CONCEPT DETAIL NOT TO SCALE NOTE- MAX CONTROL JOINT SPACING IS 25 FEET IF SHEET MEASURES LESS THAN 2Y X 34- IT IS A REDUCED PRINT. REDUCE SCALE ACCORDINGLY I US Army Corps of Engineers Seettis amid S O z 00 0) N N . w H bJ w a3 ax ° Y (.2 z Z 0 z .00 w o` J tn '- L_ SEATTLE, WASHINGTON DETAILS 2 WASHINGTON rn a KING COUNTY Plate number: C -502 Sheet 15 of 16 LL z 0 0 18- JUN -2008 15130 DT m 0m m m -o z fn m r ny cn mg x � 1 6 =_ 2y O PL 84 -99 LEVEE REHABILITATION TUKWILA 205. SITES 3 & 5, GRE -3 -07 DETAILS 3 KING COUNTY PN C1972 WASHINGTON 31VOS 01 ION X DU) r-� zr rl -< om z O Dm D z z 0 mm *Z rn rm mA <Z mm 0 m RIVERWARD SIDE OF LEVEE m STATION 0.00 r-tr F10. <P1 m 0 mof 0 om mx rN mZ m0 m 0 0 U.S.ARMY ENGINEER DISTRICT,SEATTLE CORPS OF ENGINEERS SEATTLE, WASHINGTON Designed by: WEST Data 18 JUN 08 brown by LEJON F,Ie E -12 -7 -229 Prepared bye Checked byt FISCHER Rev. 31VDS 01 ION -T1 CO 00 01 O m X Du) r-� —1z 700 Dr zn O m z � O Om F> rnz vz 0 *23-1 zo zo Zm 0 STATION 0.00 pl-X m0tn 002 mr0 <O%O P1 m %m 0 w DATE AND TIME PLOTTED. 18- JUN -2008 15.30 DESIGN FILE. 1. \MISC \CIV \GREEN RIVER \2008 LEVEE REHA8\TUKWILA 205 LEVEE \GRTMC -503D03.DGN • /1 `Synto Description Date ppr. Syrnboi Description • w DATE AND TIME PLOTTED. 18- JUN -2008 15.30 DESIGN FILE. 1. \MISC \CIV \GREEN RIVER \2008 LEVEE REHA8\TUKWILA 205 LEVEE \GRTMC -503D03.DGN