Loading...
HomeMy WebLinkAboutPermit D10-120 - IVANEK RESIDENCE - ADDITION (NO PLANS)IVANEK ADDITION 11926 INTERURBAN PL S EXPIRED 05/24/15 D10 -120 City -oPrukwila 1 Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Inspection Request Line: 206 - 431 -2451 Web site: http: / /www.TukwilaWA.gov DEVELOPMENT PERMIT Parcel No.: 7340600022 Address: 11926 INTERURBAN PL S TUKW Suite No: Project Name: IVANEK ADDITION Permit Number: D10 -120 Issue Date: 10/28/2011 Permit Expires On: 04/25/2012 Owner: Name: IVANEK BENJAMIN Address: 6004 12TH AVE S #4 , SEATTLE WA 98108 Contact Person: Name: BEN IVANEK Address: 11926 INTERURBAN PL S , TUKWILA WA 98168 Phone: 206 - 228 -7368 Contractor: Name: OWNER AFFIDAVIT - BENJAMIN E IVANEK Phone: Address: Contractor License No: Expiration Date: DESCRIPTION OF WORK: 229 SF ADDITION WITH 213 SF INTERIOR REMODEL: EXTEND FOUNDATION, FRAME NEW WALLS, STUCCO EXTERIOR, AND GWB INTERIOR. EXTEND FLOOR AND CEILING FRAMING AND INSTALL NEW ROOFING. PROJECT ON VALLEY VIEW SEWER. Value of Construction: $41,572.46 Fees Collected: $1,387.12 Type of Fire Protection: NONE International Building Code Edition: 2009 Type of Construction: V -B Occupancy per IBC: 22 Electrical Service Provided by: * *continued on next page ** doc: IBC -7/10 D10 -120 Printed: 10 -28 -2011 Public Works Activities: Channelization / Striping: N Curb Cut / Access / Sidewalk / CSS: N Fire Loop Hydrant: Flood Control Zone: Hauling: Land Altering: Landscape Irrigation: Moving Oversize Load: Sanitary Side Sewer: Sewer Main Extension: Storm Drainage: Street Use: N N Water Main Extension: Water Meter: N Permit Center Authorized Signature: I hereby certify that I have read and governing this work will be complie Number: 0 Size (Inches): 0 Start Time: Volumes: Cut 0 c.y. End Time: Fill 0 c.y. Start Time: End Time: Private: Profit: N Private: Date: Public: Non - Profit: N Public: ed this permit and know the same to be true and correct. All provisions of law and ordinances whether specified herein or not. The granting of this permit does not pre construction or the performance of work. to this permit e to e've authority to violate or cancel the provisions of any other state or local laws regulating thorized to sign and obtain this development permit and agree to the conditions attached Signature: Print Name: VET Jam`^ `JA-v-4 E-. This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431- 3670). 4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 5: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 6: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of doc: IBC -7/10 D10 -120 Printed: 10 -28 -2011 this requirement. 7: All construction noise to be in compliance with Chapter 8.22 of the City of Tukwila Municipal Code. A copy can be obtained at City Hall in the office of the City Clerk. 8: Ventilation is required for all new rooms and spaces of new or existing buildings and shall be in conformance with the International Building Code and the Washington State Ventilation and Indoor Air Quality Code. 9: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 10: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 11: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. doc: IBC -7/10 D10 -120 Printed: 10 -28 -2011 CITY OF TUKWILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 hup://www.ci.tuktvila.wa.us Building Permit No. t Mechanical Permit No. Plumbing/Gas Permit No. 1 O Public Works Permit No. Project No. (For office use only) Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** King Co Assessor's Tax No.: 3 4- OCo OO 2.'Z Site Address: t\ 926 it4T - tie.Sft-4i PL S Tenant Name: g6-t-1 + L ►J0 A IVAr ^� Property Owners Name: 0%■1 Q A i14t4 f Mailing Address: `% 2 % �i4 &) �-8 f L S Suite Number: Floor: New Tenant: ❑ Yes TvaLVJ t t_.e, City t,4.A. State Zip CONTACT PERSON - who do we con act when your permit is ready to be issued Name: (3l- r%1 Day Telephone: 20(0 2-2-8 736 8 Mailing Address: ‘1 210 r6 O A4 PL S E -Mail Address: S+ c oe-k ('At:,0„4- • ned+ TO tC ci f L.& City w A 98 \ ro$ State Zip Fax Number: GENERAL CONTRACTOR INFORMATION — (Contractor Information for Mechanical (pg 4) for Plumbing and Gas Piping (pg 5)) Company Name: Mailing Address: City Contact Person: Day Telephone: E -Mail Address: Fax Number: Contractor Registration Number: Expiration Date: State Zip ARCHITECT OF RECORD - All plans must be wet stamped by Architect of Record Company Name: Mailing Address: City State Zip Contact Person: Day Telephone: E -Mail Address: Fax.Number: S 1 L F- ENGINEER OF RECORD - All plans must be wet stamped by Engineer of Company Name: S E L F Mailing Address: City State Zip Contact Person: Day Telephone: E -Mail Address: Fax Number: H:\Applications\Porms- Applications On Line\2009 Applications \1 -2009 - Permit Application. doc Revised: 1-2009 bh 4age 1 of 6 BUILDING PERMIT INFORM' _ ION,:— 206- 431 -3670 Valuation of Project (contractor's bid price): $ 411 90o Existing Building Valuation: $ d C 1, 000 Scope of Work (please provide detailed information): �XrE�.D e7(),/Oti7lo4 4-'/ r) rr �O-sT fi c� r So rrH 0" 5w + S S1pbs or H- v>JSE 41 kJ-60 (,J4 s srvcco &-r ioe ,3 G / re7e -I o 2 . OCT .j Fcc v GE-7 L 1J G O l�f L 4 dew f&ooS /44- . DD 5 t eer-e t CA-L ecC -er 4 C t&-S s c,J rrCeie S 5 's Wi44 ccicoare ''L ✓.�.g,1l D +,� t f9.Jt' To JeeJ st l,� t. 1 cot,l, %- ►„JISH oa (As 4 , CArs�Jc-rs + L-M,t- Cb4GC.�6 ' Will there be new rack storage? ❑ Yes No No If yes, a separate permit and plan submittal will be required. Provide All Building Areas in Square Footage Below PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) 1498 *For an Accessory dwelling, provide the following: 2 Lot Area (sq ft): (ivy ('OO Floor area of principal dwelling: /6& J. -75 Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: 2. Compact: Will there be a change in use? ❑ Yes Pi( No If "yes ", explain: Handicap: FIRE PROTECTION /HAZARDOUS MATERIALS: ❑ Sprinklers ❑ Automatic Fire Alarm None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes No If 'yes', attach list of materials and storage locations on a separate 8-1/2" x 11 " paper including quantities and Material Sa ety ata Sheets. SEPTIC SYSTEM ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:\Applications\Forms- Applications On Line\2009 Applications \1-2009 - Permit Application.doc Revised: 1 -2009 bh Page 2 of 6 Existing Interior Remodel Addition to Existing Structure New Type of Construction per IBC Type of Occupancy per IBC 5t Floor /06,3.7 - 213 228 - 34- 2nd Floor 3rd Floor Floors thru Basement 6C-0 Accessory Structure* Attached Garage Detached Garage Attached Carport Detached Carport Covered Deck Uncovered Deck PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) 1498 *For an Accessory dwelling, provide the following: 2 Lot Area (sq ft): (ivy ('OO Floor area of principal dwelling: /6& J. -75 Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: 2. Compact: Will there be a change in use? ❑ Yes Pi( No If "yes ", explain: Handicap: FIRE PROTECTION /HAZARDOUS MATERIALS: ❑ Sprinklers ❑ Automatic Fire Alarm None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes No If 'yes', attach list of materials and storage locations on a separate 8-1/2" x 11 " paper including quantities and Material Sa ety ata Sheets. SEPTIC SYSTEM ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:\Applications\Forms- Applications On Line\2009 Applications \1-2009 - Permit Application.doc Revised: 1 -2009 bh Page 2 of 6 PUBLIC ' WORKS PERMIT INFORMATION — 206- 433 -017 Scope of Work (please provide detailed information): Call before you Dig: 1- 800 - 424 -5555 Please refer to Public Works Bulletin #1 for fees and estimate sheet Water District E...Tukwila ❑...Water District #125 ...Water Availability Provided Sewer District ❑ ...Tukwila ❑ ...Sewer Use Certificate t ...Valley View 0... Sewer Availability Provided ❑ .. Highline ❑ .. Renton ❑ .. Renton ❑ .. Seattle Septic System: ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. Submitted with Application (mark boxes which apply): ❑ ...Civil Plans (Maximum Paper Size — 22" x 34 ") ❑ ...Technical Information Report (Storm Drainage) ❑ ...Bond ❑ .. Insurance ❑ .. Easement(s) Proposed Activities (mark boxes that apply): ❑ ...Right -of -way Use - Nonprofit for less than 72 hours ❑ ...Right -of -way Use - No Disturbance ❑ ...Construction/Excavation/Fill - Right -of -way ❑ Non Right -of -way ❑ ❑ ...Total Cut ❑ ...Total Fill cubic yards cubic yards ❑...Sanitary Side Sewer ❑ ...Cap or Remove Utilities ❑ ...Frontage Improvements ❑ ...Traffic Control ❑ ...Backflow Prevention - Fire Protection Irrigation Domestic Water ❑ .. Geotechnical Report ❑ .. Maintenance Agreement(s) ❑...Traffic Impact Analysis ❑ ...Hold Harmless — (SAO) ❑ ...Hold Harmless — (ROW) ❑ .. Right -of -way Use - Profit for less than 72 hours ❑ .. Right -of -way Use — Potential Disturbance ❑ .. Work in Flood Zone ❑ .. Storm Drainage ❑ .. Abandon Septic Tank ❑ .. Curb Cut ❑ .. Pavement Cut ❑ .. Looped Fire Line ❑ ...Permanent Water Meter Size... ❑ ...Temporary Water Meter Size .. ❑ ...Water Only Meter Size ❑ ...Sewer Main Extension Public ❑ ...Water Main Extension Public ❑ .. Grease Interceptor ❑ .. Channelization ❑ .. Trench Excavation ❑ .. Utility Undergrounding WO # WO # WO # ❑...Deduct Water Meter Size Private ❑ Private ❑ FINANCE INFORMATION Fire Line Size at Property Line Number of Public Fire Hydrant(s) ❑ ... Water ❑ ...Sewer ❑ ...Sewage Treatment Monthly Service Billing to: Name: Day Telephone: Mailing Address: Water Meter Refund/Billing: Name: Mailing Address: City State Zip Day Telephone: City State Zip H:Upplications\Forms- Applications On Line \2009 Applications \1-2009 - Permit Application.doc Revised: 1-2009 bh Page 3 of 6 MECHANICAL PERMIT INF ATION X206 " = 431 -3670 MECHANICAL CONTRACTOR INFORMATION ' Company Name: �// Mailing Address: City State Zip Contact Person: Day Telephone: E -Mail Address: Fax Number: Contractor Registration Number: Expiration Date: Valuation of Mechanical work (contractor's bid price): $ Scope of Work (please provide detailed information): Use: Residential: New .... ❑ Replacement .... ❑ Commercial: New .... ❑ Replacement .... ❑ Fuel Type: Electric ❑ Gas .... Other: Indicate type of mechanical work being installed and the quantity below: Unit Type: Qty : Unit Type: Qty Unit Type: Qty . Boiler /Compressor: Qty Furnace <100K BTU Air Handling Unit >10,000 CFM Fire Damper 0 -3 HP /100,000 BTU Furnace >100K BTU Evaporator Cooler Diffuser 3 -15 HP /500,000 BTU Floor Furnace Ventilation Fan Connected to Single Duct Thermostat 15 -30 HP /1,000,000 BTU Suspended /Wall /Floor Mounted Heater Ventilation System Wood/Gas Stove 30 -50 HP /1,750,000 BTU Appliance Vent Hood and Duct Emergency Generator 50+ HP /1,750,000 BTU Repair or Addition to Heat/Refrig /Cooling System Incinerator - Domestic Other Mechanical ' Equipment Air Handling Unit <10,000 CFM Incinerator — Comm /Ind H:\ApplicationsWorms- Applications On Line\2009 Applications \1 -2009 - Permit Application.doc Revised: 1-2009 bh Page 4 of 6 PLUMBING AND GAS PIPINAPERMIT INFORMATION - .206.431- PLUMBING AND GAS PIPING CONTRACTOR INFORMATION Company Name: S E L P Mailing Address: City State Zip Contact Person: Day Telephone: E -Mail Address: Fax Number: Contractor Registration Number: - Expiration Date: Valuation of Project (contractor's bid price): $ SQO . 00 Scope of Work (please provide detailed information): w1oJ 1..4 61 611 l.. �►s o y-) A4 3A-S 11-6-1> ¢ tt0' To k* W t'r-at r t 6‘.A.) W ALA_ . Q C^e.ca vre 5 U P'P1 —`( A-' O W T E 0,4 ES t,JtrtA -t...t n! Et.J FLob L. JO t ST5 (26 ►,J STA- 1.L... A-.tTo 470—r . Building Use (per Int'l Building Code): R65 tl?&4T' L Occupancy (per Int'l Building Code): SIrS tF1A-"A l L-`1 Utility Purveyor: Water: C.,1t t TJYivJ t lAt Sewer: Vkt -L`f V 1 �•1 Indicate type of plumbing fixtures and /or gas piping outlets being installed and the quantity below: Fixture Type: Qty Fixture Type: Qty Fixture Type: Qty Fixture Type: • Qty Bathtub or combination bath/shower Bidet Clothes washer, domestic Dental unit, cuspidor Dishwasher, domestic, with independent drain Drinking fountain or water cooler (per head) Food -waste grinder, commercial Floor Drain Shower, single head trap Lavatory Wash fountain Receptor, indirect waste Sinks Urinals Water Closet Building sewer and each trailer park sewer Rain water system — per drain (inside building) Water heater and /or vent Industrial waste treatment interceptor, including trap and vent, except for kitchen type grease interceptors Each grease trap (connected to not more than 4 fixtures - <750 gallon capacity) Grease interceptor for commercial kitchen ( >750 gallon capacity) Repair or alteration of water piping and/or water treatment equipment 1 Repair or alteration of drainage or vent piping I Medical gas piping system serving 1 -5 inlets /outlets for a specific gas Each additional medical gas inlets /outlets greater than 5 Backflow protective device other than atmospheric -type vacuum breakers 2 inch (51 mm) diameter or smaller Backflow protective device other than atmospheric -type vacuum breakers over 2 inch (51 mm) diameter Each lawn sprinkler system on any one meter including backflow protection devices Atmospheric -type vacuum breakers not included in lawn sprinkler backflow protections (1 -5) Atmospheric -type vacuum breakers not included in Lawn sprinkler backflow protections over 5 Gas piping outlets H:\Applications\Forns- Applications On- Line\2009 Applications \I-2009 Permit Application.doc Revised: 1 -2009 bh Page 5 of 6 PERMIT APPLICATION NOTES - Applicable to all permits in this application Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. Building and Mechanical Permit The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). Plumbing Permit The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING I • R OR AUTHORIZED AGE Signature: Print Name: ME -r∎I J Av -%k..1 Mailing Address: \1926 rixt— E- e.c)e-erM•1 Pi- S Day Telephone: M KA.) I to City W iA' State Zip Date Application Accepted: Date Application Expires: Staff Initials: H: \Applications\Forms- Applications On Line\2009 Applications \1 - 2009 - Permit Application. doc Revised: 1 -2009 bh Page 6 of 6 Cif of Tukwila. • Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206-431-3665 Web site: http: //www. ci. tukwila. wa. us SET RECEIPT RECEIPT NO: R11 -02359 Initials: WER Payment Date: 10/28/2011 User ID: 1655 Total Payment: 1,020.95 Payee: LENORA IVANEK SET ID: 0726 SET NAME: IVANEK PERMITS SET TRANSACTIONS: Set Member D10 -120 EL10 -0347 PG10 -058 TOTAL: Amount 842.45 54.60 123.90 842.45 TRANSACTION LIST: Type Method Description Amount Payment Check 150 1,020.95 TOTAL: 1,020.95 ACCOUNT ITEM LIST: Description Account Code Current Pmts BUILDING - RES ELECTRICAL PERMIT - RES PLUMBING - RES STATE BUILDING SURCHARGE 000.322.100 000.322.101.00.0 000.322.103.00.0 640.237.114 TOTAL: 837.95 54.60 123.90 4.50 1,020.95 • City of Tukwila • Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us RECEIPT Parcel No.: Permit Number: D10-120 Address: 11926 INTERURBAN AV S TUKW Status: PENDING Suite No: Applied Date: 05/07/2010 Applicant: IVANEK RESIDENCE Issue Date: Receipt No.: R10 -00802 Initials: User ID: WER 1655 Payment Amount: $544.67 Payment Date: 05/07/2010 04:06 PM Balance: $842.45 Payee: BEN IVANEK TRANSACTION LIST: Type Method Descriptio Amount Payment Credit Crd VISA Authorization No. 770585 ACCOUNT ITEM LIST: Description 544.67 Account Code Current Pmts PLAN CHECK - RES 000.345.830 544.67 Total: $544.67 PAYMENT RECEIVED doc: Receipt -06 Printed: 05 -07 -2010 41.1 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION C/41 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206).431 -3670 Permit Inspection Request Line (206) 438 -9350 DO /1,0 Project: q q rte► tV , J{ L 4o/Y. t t�1Aj Typ .of Inspection:: rA --JOE? 1C1.A.Z.'V . t M;i ,S LL' k r 14-N) ',JAM s u (4- (,\)DA Address: ` o ?6 �e urbfkiv Date Called: R.0i3F- s(,,0 X. Speiiil Instructions; Date Wanted: a.m. Requester: i Q 0tJ Cn(f .T, -,fl Aopl- V Phone No: "Approved per applicable codes. Corrections required prior to approval COMMENTS: t M;i ,S LL' k r 14-N) ',JAM s u (4- (,\)DA 1 19-r t- (:46 j 'iiSd(. (A-7; 4 6 k Fra l&e_ u.'e.c... `r` 2e.7 f i Q 0tJ Cn(f .T, -,fl Aopl- V Ufr-. /441r- G i ' `7'41S , oiiit (.. 'r f,1 A ,-, \ 4 - 0!,,e G 2,t) 0,0 , k (t)0F. $ e.A-e, `_n r ..- o { mik cy er , \ r , Ate. icNe 6K WA-11 _Sii ,. ( Insp Date: ettar REINSPECTION FEE RE REQ Prior to next inspection. fee must be' paid 0(6300 Southcenter Blvd.. Suite,100. Call to schedule reinspection. INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 „ (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 t ' ' INSPECTION RECORD Retain a copy with permit J7Ic_ — IZ.C� PERMIT NO. Project: T \1/1A) ( -I n;)i--) ;i'�� Type of Inspection: FZAn' \I,,,Q % - Add es��s:� // Ci 7 (n _ •._ ( 1. -k d u.. V bA-t Date Called: ,\ (n.-) 4 f 1 (-NISI- Special Instructions: 1 Date Wanted: I— (L a.m. Cpit Requester: Q1.) — j-_vi i,Q..JL Phone No: /. • Approved per applicable codes. QCorrections required prior to approval. COMMENTS: 1- n'i..N.,) l_i.) A ■k c„ --:. ())3 I i-( �� 1 ice: l <� ( �., Lk.. ‘-A ((c _ _ \ (, I lk) A ( 1 ; OS LL IA-1 , k A. n. V,AJ /. I'r5pec\rf l� A \7.1 n R NSPECTION FEE RE4UIRED. Prior.to �xt inspection, fee must be paid at 6300 Southcenter 'Blvd., Suite 100. all to schedule reinspection. Date: INSPECTION RECORD Retain a copy with: permit C 0.1 I Z/ INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION_ 6300 Southcenter Blvd., #100, Tukwila. WA 98188 :. • ".- - (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451, Projec _ ,Type of Inspectio Addres . ti L ' TA`?fL)r...Ii / Date ailed: r&M\nb Special Instructions:: Date Wanted: ` 1 2, f' a.m. 5 Requester: Phone No: ElApproved per applicable codes.. , Corrections required prior to approval. COMMENTS: s N& ('% f C .o `S\ t'_ P WQ I'. 1 R 2..\:-t( of (J 1 • Z- iU A, IS, IAM A PJ's f -c1`S • 0 (A id I of- S� L -r--A e/ ILOo LM 1 -s�^ nr r v Inspec or: V)Ceek� e LA).A )off:. CA: e c7171)4 !1 Rl�t REINSPECTION FEE'REQUIRED Prior to next inspection, fee must be paid at 6300 Southcenter Blvd.; Suite 100. Call to schedule. reinspection. INSPECTION RECORD Retain a copy with permit at INSPECTION N0. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION C—"-. 6300 Southcenter Blvd., #100, Tukwila. WA 9818.8 (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 Project: ��/ir r. ' it- i f \ A0'3 ; Ii � , v,(/ Type of Inspection: () AAf- I FE 0 o it.. Pf,: P --e_f-- t* kOL ke ,m ( i sy kthIE Address: f (t c) ? (e, -=wit -e-r 0 /bmi Date Called: - Te_ JD -tr e_kre c: t ( c k 74FrP 6A' :-1-0 e , A i v 0 A *FT, 04:: ,),x\/ ' A ( 9-v) . r - d ' JP Special In trucfions: . Date Wanted: ( ( _ - / 3 a.m. 4r m. Requester: (MA( Phone No: 219,,,4,1= 22g 3 (es) Approvedper applicable codes. Corrections required prior to approval. COMMENTS: xl ,s` �- \(..-,` Q de usM v Pf,: P --e_f-- t* kOL ke ,m ( i sy kthIE 1-) ^ , U t='_ 7o A A PAC ` , [ /\ ' .3 A_ W-. 0 - Te_ JD -tr e_kre c: t ( c k 74FrP 6A' :-1-0 e , A i v 0 A *FT, 04:: ,),x\/ ' A ( 9-v) . r - d ' JP A k le- t‘, ppt p ,01,. Rh- tr-\ _cri) mac- f'!X;,5 i c-:ApiP LA) A -I( /0 iD O c, ).A ^ PAI Q J,4-K" \IT 00 i 0 c...-NMpIoM s A-Ac,T;''0A -- e..e --.Srii eJ it (A.1 f/k r',ofr ( ,',.on (MA( In ' • ector: Date: I (-- -4 I n II REINSPECTION FEE REO� ED. -rior to next inspection. fee must be paid at 6300 Southcenter(Blvd.. Suite 100. Call to schedule reinspection. INSPECTION N0. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION G 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 ,D140 --120 INSPECTION RECORD Retain a copy with permi t Project: �JAil d- 6: T,10 Type of Inspection: , 0T—: /l6_6‘ Address: I L 2e .!Ar�lJrittN�(A-_P Date Called: Special Instructions: Date Wanted: n A. Requester: Phone No: 2 .73ik Approved >per applicable codes. 11 Corrections required prior to approval. COMMENTS: Inspector: Date: REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -367 Permit Inspection Request Line (206) 431 -2451 Project: L-EvA- EI M-M 6r1`: DA, Type of-Inspection: ...___T, ._r 0 3 ,J o '- ( (0),./ Address: _ 1 i. 9 Via J.�t ?i of (° g-iti Date Called: Special Instructions: Date Wanted:......? _ / 2 .^ / J (a":�m. m. Requester: " Phone No: 7Approvedrper applicable codes. ElCorrections required prior to approval. COMMENTS: A Inspe�o�, -G� J� Date: 3 n REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain .a copy with permit INSP CTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 'ii (206) 431 -367 Permit Inspection Request Line (206) 431 -2451. Project: 1.. UAi J( Aoo 1a' Type of Inspect_io_p,:. D( ,4 Address: reivfj Date Called: --� II 21, Special Instructions: Date Wanted: 7 a.m. —f3 7 p.m. Requester: Phone No: Approved per applicable codes. Corrections required prior to approval.. COMMENTS: F'"k' In(sOector: Dater q- 3 REINSPECTION FEE tEQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 )g, (206) 431 -367 Permit Inspection Request Line (206) 431 -2451 Project: Type of Inspection: r Ad1 to 2(p `el'J rG4N Date Called: Special Instructions: Date Wanted:. - a.m. 4- 22- -13 Requester: Pho6 ��7 ---7J Gal JApproved, per applicable codes. ElCorrections required prior to approval. COMMENTS: illy i 1A-- () f f- el . .D/ a. \ f\ 64 E_ 'ht) 4 (-07ciL JApproved, per applicable codes. ElCorrections required prior to approval. COMMENTS: illy i 1A-- () f f- el . .D/ a. \ f\ 64 E_ 'ht) 4 (-07ciL Inspector: Date: REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila: WA 98188 (206)-43:1 - 3.670, Permit Inspection Request Line (206) 431 -2451 Project: r VA x,/ I INIVN Mink) Type of Inspection: P—QC-jri- L' , .. Address: 1 I g 2 (- T krr 5: In (f't (taw PL Date Called: S Special Instructions: . ,. Date Wanted:. ih - ?Z-IZ a.m. m- Requester: Phone No: ApprovedFper applicable codes. Corrections required,prior:to approval. COMMENTS: r r . P - - k A , 0 Inspect U t n REINSPECTION FEE REQUIRED. Prior to next inspection : _fee. must:be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule;reinspection. cc'R g 0 no, sow s 0 • " _ 4u CORRECTION z 0 ET) w cc • RECEIVED JUL 27 2011 PERM1TCENTER 0 ,z..-. 11 tin In 7 '--- i0__ ' `-`- '3) I j _j -- 0 t 4u CORRECTION z 0 ET) w cc • RECEIVED JUL 27 2011 PERM1TCENTER 7 I I t a 0 S u) 3 0 v Li L) 7 oe o Z o (� j RECEIVED JUL 27 2011 PERMIT CENTER 009 IRC (GUIDELINES FOR STUCCO INSTALLATION) R703.6.3 Water- resistive barriers. Water- resistive barriers shall be installed as required in Section R703.2 and, where applied over wood - based sheathing, shall include a water - resistive vapor - permeable barrier with a performance at least equivalent to two layers of Grade D paper. Exception: Where the water - resistive barrier that is applied over wood -based sheathing has a water resistance equal to or greater than that of 60 minute Grade D paper and is separated from the stucco by an intervening, substantially nonwater- absorbing layer or designed drainage space. R703.6.4 Application. Each coat shall be kept in a moist condition for at least 48 hours prior to application of the next coat. Exception: Applications installed in accordance with ASTM C 926. R703.6.5 Curing. The finish coat for two -coat cement plaster shall not be applied sooner than seven days after application of the first coat. For three -coat cement plaster, the second coat shall not be applied sooner than 48 urs after application of the first coat. The finish coat for three -coat cement plaster shall not be plied sooner than seven days after application of the second coat. a REVIEWED FOR CODE COMPLIANCE APPROVED AUG 0 8 2011 City of Tukwila BUILDING DIVISION Fob NDA T\ 0.1 L P LL DeT"A I y ,h or.ste_44-0e_ sQJ 4�YL 01,1 t "z-£9 (A s H 1j pt st u- P LAt flo( -1-% s GEC) 4' ° c - rn PE-2 9-cTL fl J , t /CI ) Bove S —i_ ,, t5 1/1._ e"?v0 (2} #i 4- CortruJ.)auS (S "vsro s . uau. co 1' iL gLAc va-Po 2 g PrOuR 4" LU, L'{a Jov �1 • F0oNt OAT \o 4 Co 4 GCT 1O1.? DETAIL 4'(2. &(S - (NEW) (ot_o) 27' • gr i o •f Elart CA 1, 3 nC2 STuC.C.o o &TA ( L (oN The of '/2o&) BASA-Lrrt. APE S CE-rol 1 (-s) ec -+3sr2 setr w -* QC-NI(S ' 3 REVIEWED FOR CODE COMPLIANCE I APPROVED AUG 08 2011 City of Tukwila BUILDING DIVISION RECEIVED JUL 2 7 2011 PERMIT C NTER klUnt9Pt -notj STUCCO 06-T A 1 I—S l .-__06, L E 1 2_" = 1 Sc D-1- 14-6-e_ c./1 c. E e.I �i) U.-1l 3 oc 9 SuFETS iy4„1 s 1 cc --icE ec•' -700e s/ (c I (0 Regis '7 /tS /l! fr00.4 oA-T t e a CE- GM + ,4ATES @ "2 " P4-eov —42 - C Fob A'GC --ss 0°02 FO L) \ ToP \f t J 16 0, 8 V tS, se -r -e rX ,J Ta of F-00,.10/ ---n orJ — 4 STA, as or To 1 = eNA Ttt•S.4 sTikt2S o t_D xx re-tc1 o 2 t.jA-Lt. 4- Doo 2 -Ca 26-,n art.+t 4LsP-ACE vEN rs FoVNDAT \ON T- tZhn-4 TeS A-1 Ct'2 -A4' rU R EXre10tz. Da02 "0.40 CRA"3 t_ SPA-GS-7 . 6 s t- or-s 4e_Al)C g.00.04C AP-4A =i L 50 i; E sE oC- a oo . JoiSTS. -o /z. (o: ToQ of I • • -I - - - - - - — , -1 - tEQ f)r SAS6 OP $otu G4 AL)SPACF R-2e-o*S FOt)Nfl/� t o 4 S.��E YI C �1 F o-n tv 4 2 a S Too I L_ Fl Et. 0 ( „' moo.-: Po n RA.f EL GC)e,f G`QC C KAJG!_ Tb C, Re vE Focrn(46 )2 Rsot,►.pilTia,,) 4 "pA 47ac P% o,.l Tvf• ter 2 "Ge os vt sD RoC-Y- REVIEWED FOR CQD�PpRO!!ED CE AUG 0 8 2011 City of Tukwila BUILDING DIVISION goc,4 DA-Tt o,--1 v 1 e W S R.xxT 717-14 9 Pri r P6--CA IL_ 1 , c- LC : 4" -,il s te,,-1 _ t! 4 RECEI JUL 2 7 PERMIT CE 4- OF 9 H Er- ; 5 I VA-,454 !zCs ID c -•/GE- r loDet_. 7 / /2 /!1 VED 2011 gNTER sruc rEck rev "E� Mb S�> \tn -Pb2 eo e.ek.ce Fca- su..SC:t . r tom! o2Ti -1 T �a 2voE APP%-ta,o 0. Lae LQR 'ix Ca \ Jst k..t_ C J ST21JCTc o .J l(9 O. C , a-z WSvutTco.-1 R./ -10.A-7\ o Q3 g 1.3sv tAT, of De. 8 CO l,J4/20oF F¢A1A-. ,,..16,- \6" `LDo,C , A w\ A i Fo 2 ?A- 2-A PE TZ 3C) o.J 17/ P,ca-t- 2_,c\ r(.402 SvsT I" T Pc,`I ,0o 5 9 , Z > JoI SAS @ tco 6.c. , Ce_oss k3e.t 1)14 ,17J D 1)1-00.4.t 4 REVIEWED FOR CODE COMPLIANCE APPROVED AUG 0 8 2011 City of Tukwila BUILDING DIVISION FRAMtf C 2E TA SGT I_e 1 /Z" RepoF �a�a PET RECEIVED JUL 27 2011 P RM TCENTER c,F 9 skee 15 1\14 • rt 2Cs t7 c r- QCEL Si &/10 e_EJts& i /l. /►% 5T ;j V(L —W 1 ti c z to R;r1, Jot T N s-T t c� ,JAcL.ED SDUT -3 id )E VIEkJ t 2x.8 R Jo(s T 17 %L0 JC is T S Toe ni Art L.0 -o -70 StLL � J! 4 KLL fl r �is-f NEvJ 14 -E-A4 C� x \G.4) 2 X10 _Jo \Srs Toe 4ttitLE,j ;1..\-ro StLt_ (Zx tfo��: Ego ,J.6,_E -co NEt,JttEAve-2.No\ x 1(o Z) $¢acxE nc ST.-1 C.; EtG-Q� uorS+ -wso,-1 Lys 3o%41- t-t 6,EtzS Coe 6-62.0WAt,E,,ST i l St_ eN C; 2/1-t>'s (STo (;E%�EC•s S�o2S) 2-24 .aOE MhtLEfl ('s'Co e)(1 t ..1 4 Zx 4- Lt -' LC \ A L Uova-fa oo2 ..lo■st5 s+ Lt_ PC A -.0 ArrfirCM 11.16'w Fes t.k 1o/+'C t o ".4 (S t tz• (L,. . spot--I.:y1 FAS'iV4jele -s' 5101 REVIEWED FOR CODE COMPLIANCE APPROVED AUG 0 8 2011 City of Tukwila BUILDING DIVISION RECEIVED JUL 27 2011 PERMIT CENTER F-toc F p- 4 6 Derek t LS 2 6 of % 51.\ EE T'S \st A J %L IzESbG –oJ(L Q— mooL- 7// S/► t V Fen cA't Psi To (" ri o J gooF 1.41., "1 Co(...0 js7� -y E OSTIa� 2 0. t• JO S G" n'So ‘i R-o ©F 44G l &14 i A-CrU A-L erpoP Li rs E LL PtP1,-.14 tJ4l.t. evt.aJE saes PEt!'Ct V e-41 TG DS - ; �" .f& C Qiy �T tt iq i i t i+ 1 e CAST fic.t0 Ces, ,� 6kireLl ..3/ 5%+v i t vR-L-:l l:5 Co of ede { Q -t-D ?CISTr-36 pl OLD Pt Pie4 ) 2 LAA -CC, Gds G -CI O i e t s -n i 6 u -r Pt REVIEWED FOR CODE COMPLIANCE APPROVED AUG 0 8 2011 City of Tukwila BUILDING DIVISION RECEIVED JUL 27 2011 PERMIT CENTER LV vvv t r -i 6 26-neat 1 L S NOT TO t t- 1E CeJ(stbJ 42, 1 7 v r g s tt e -rs /V i , jE) s 10 Ge- eevt-± D.D ! -7/ «– /I( (G.J■ru, (A-4u_ ISIPIPS0.4 - L.-Su . . I (son+ ,1c, i 1 • . . . . , 2 X t eAVTFP...S 4 (DXS Ekoktn it-nei.o.4 1-‘15 j .r 1.4-tft-144:64-s CgOr‘+' e--74c1s) Ban+ SRA-4S) F r- REVIEWED FOR CODE COMPLIANCE APPROVED AUG 08 2011 City of Tukwila BUILDING DIVISION 14 - frJTh e•--stc-r, F4'" t6 e.okcIA RECEIVED JUL 27 2011 PERMIT CENTER I L. r-2_41-vv-i "J r2.6-A I LS 2 K( , 51)PeoeT'S eredzs S i(ocL g0. LJACL Lfr.16, A-rTA -rc "-I /--r pe. 74 ?3. Qc 4_t 4-7 NA-r■1€71/-- S‘r)e-r■1 OC)C. L- -10'; 0 .1( S Ty(2/C-A-t- ) Drvi 6-#4 o Co e.4-12 A -7- ,a6 - c A sr 7 REVIEWED FOR. CODE COMPLIANCE APPROVED ' AUG 08 2011 City of Tukwila BUILDING DIVISION P (Z_G P s-c CoUc J (..0 4_ 1-D u t F-E-A-ru ° ■--kee-05 RECEIVED JUL 27 2011 PERMIT CENTER I v Izes 4/1/2015 City of Tukwila Department of Community Development BEN IVANEK 11926 INTERURBAN PL S TUKWILA, WA 98168 RE: Permit No. D10 -120 IVANEK ADDITION 11926 INTERURBAN PL S Dear Permit Holder: Jim Haggerton, Mayor Jack Pace, Director In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and /or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 5/24/2015. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206 - 438 -9350 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and /or receive an extension prior to 5/24/2015, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, Bill Rambo Permit Technician File No: D10 -120 )6xAk 6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206 - 431 -3670 • Fax 206 - 431 -3665 03 -05 -2013 :Iiiii.Ha ertonf gdyor lepartment o Co nmuntty .Development Jack Pace; Director BEN IVANEK 11926 INTERURBAN PL S TUKWILA WA 98168 RE: Permit No. D10 -120 IVANEK ADDITION 11926 INTERURBAN PL S TUKW Dear Permit Holder: In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and /or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 04/21/2013. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven (7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 04/21/2013, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, File: r Marshall Technician Permit File No. D10 -120 6300 SOUthcehter, Bouleyard 84ite• #100;• Tukwila. Washing'fon 98188 • Phone 20¢431 -3670 % Fcrx 206- 431 -36¢5 09 -04 -2012 • City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director BEN IVANEK 11926 INTERURBAN PL S TUKWILA WA 98168 RE: Permit No. D10 -120 IVANEK ADDITION 11926 INTERURBAN PL S TUKW Dear Permit Holder: In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 10/22/2012. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206 -431 -2451 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- Submit a written request for permit extension to the Permit Center at least seven (7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 10/22/2012, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, Bill Rambo Permit Technician File: Permit File No. D10 -120 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206 -431 -3670 • Fax 206 -431 -3665 • City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director April 18, 2012 Benjamin Ivanek 11926 Interurban PI S Tukwila, WA 98168 RE: Request for Permit Extension #1 Permit Numbers D10 -120, PG10 -058, and EL10 -0347 Ivanek Addition —11926 Interurban P1 S Dear Mr. Ivanek, This letter is in response to your written request for an extension to Permit Numbers D10 -120, PG10 -058, and EL10 -0347. The Building Official has reviewed your letter and considered your request to extend the above referenced permits. The City of Tukwila Building Division will be extending your permits an additional 180 days from the date of expiration, through October 22, 2012. If you should have any questions, please contact our office at (206) 431 -3670. Sincerely, AAN4-Pittt? all cian File: Permit No. D10 -120, PG10 -058, & EL10 -0347 W:\Pennit Center\Extension Letters \Pennits\2010\D10 -120 Permit Extension.doc 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 Department of Community Development City of Tukwila 6300 Southcenter Boulevard, Suite #100 Tukwila, 98188 Apri112th, 2012 To whom it may concern, I am writing in regards to permits D10 -120, PG10 -058, and EL10 -0347. The permits are set to expire on April 25th, 2012. Though I am aware that any further extension is unusual, I am still petitioning the department for just that. We have put considerable time, effort, and funds into the project already, and are quite committed to seeing its completion. My primary motivation to extend the timeline is the wish not to open up the envelope of the house until June. While certainly it is possible to protect ongoing construction against wet weather, we feel that the task will be much facilitated by putting off the necessary demolition until a dryer time. I am confident that once September rolls around we will be finishing off the exterior work, well before the wet weather sets in again. Additionally, we have had unforeseeable family and economic issues that are impacting our progress. We would benefit from an extension to allow additional time to focus on these. Particularly, we have been dealing with the unexpected terminal illness of my father and would like to direct our energy and attention to that right now. I know that this is late notice to request this extension, but again I stress that we are completely committed to seeing through the vision we have for our house. This is a community we are deeply attached to and have every intention of remaining in. Please do not hesitate to contact me if there are any questions or information that would be of service. Tha you for your consideratio Benjamin Ivanek 11926 Interurban PI S Tukwila, Wa 98168 206 - 763 -3299 (H) 206 - 228 -7368 (C) studioek @comcast.net o, /4, 40 .///Ertel 4/17�2o1Z st4k444 101 )1 IL RECEIVED WV OF TUKWILA APR X1.3 20121 PERMIT CENTER City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director BEN IVANEK 11926 INTERURBAN PL S TUKWILA WA 98168 RE: Permit No. D10 -120 IVANEK ADDITION 11926 INTERURBAN PL S TUKW Dear Permit Holder: In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 04/25/2012. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven (7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 04/25/2012, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, Bill Rambo Permit Technician File: Permit File No. D10 -120 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 09 -01 -2011 • City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director BEN IVANEK 11926 INTERURBAN PL S TUKWILA WA 98168 RE: Permit Application No. D10 -120 11926 INTERURBAN PL S TUKW Dear Permit Applicant: In reviewing our current application files, it appears that your permit applied for on 05/07/2010, has not been issued by the City of Tukwila Permit Center. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and /or National Electrical Code every permit application not issued within 180 days from the date of application shall expire and become null and void. Your permit application will expire on 10/31/2011. If you still plan to pursue your project, a written request for extension of your application must be submitted to the Permit Center at least seven (7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit application. If it is determined that an extension is granted, your application will be extended for an addtional 90 days from the expiration date and you will be notified by mail. In the event that we do not receive your written request for extension or request was denied, your permit application will expire, become null and void and your project will require a new permit application, plans and specifications, and associated fees. Thank you for your cooperation in this matter. Sincerely, Bill Rambo Permit Technician File: Permit File No. D10 -120 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 July 29, 2011 City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director Benjamin Ivanek 11926 Interurban P1 S Tukwila, WA 98168 RE: Request for Application Extensions #3 Ivanek Addition —11926 Interuban PI S Dear Mr. Ivanek, This letter is in response to your written request for extension to Permit Application Numbers D10 -120, EL10 -0347, and PG10 -058. The Building Official has reviewed your letter and considered your request. It has been determined that the City of Tukwila will extend the permit application expiration dates an additional 90 days, through October 31, 2011. If you should have any questions, please contact our office at (206) 431 -3670. File: Permit No. D10 -120, EL10 -0347 & PG10 -058 W:\Perntit Center\Extension Letters\Applications\2010\D10 -120 Application Extension #3.doc 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 City of Tukwila Permit Department In re: permit # D1 o - ►20 To whom it may concern, c►nReC ruinitil JUL 2 6 2011 pERM�T CEivrEA My building permit, D io 1 2_O , is up to expire on the 1st of August. I am dropping off revised drawings today, the 26th of July. In my focus to finish the drawings, I inadvertently allowed this deadline to approach closer than I have been advised. I would like to request a further extension to the above permit. The drawings have been corrected to address those issues that the permit center has brought to my attention, and I would like to be able to move forward with construction as soon as possible. I apologize for the lack of timeliness for this petition, and hope that it can still be considered. Thank you very much, anek 11926 Interurban PL S Tukwila, WA. 98168 206 - 228 -7368 96 WW1 61,p �4�ot�11 47/2.0e/l 10131111 06 -30 -2011 • City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director BEN IVANEK 11926 INTERURBAN PL S TUKWILA WA 98168 RE: Permit Application No. D10 -120 11926 INTERURBAN PL S TUKW Dear Permit Applicant: In reviewing our current application files, it appears that your permit applied for on 05/07/2010, has not been issued by the City of Tukwila Permit Center. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and /or National Electrical Code every permit application not issued within 180 days from the date of application shall expire and become null and void. Your permit application will expire on 08/01/2011. If you still plan to pursue your project, a written request for extension of your application must be submitted to the Permit Center at least seven (7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit application. If it is determined that an extension is granted, your application will be extended for an addtional 90 days from the expiration date and you will be notified by mail. In the event that we do not receive your written request for extension or request was denied, your permit application will expire, become null and void and your project will require a new permit application, plans and specifications, and associated fees. Thank you for your cooperation in this matter. Sincerely, Bill Rambo Permit Technician File: Permit File No. D10 -120 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 May 2, 2011 • • City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director Benjamin Ivanek 11926 Interurban P1 S Tukwila, WA 98168 RE: Request for Application Extensions #2 Ivanek Addition —11926 Interuban P1 S Dear Mr. Ivanek, This letter is in response to your written request for extension to Permit Application Numbers D10 -120, EL10 -0347, and PG10 -058. The Building Official has reviewed your letter and considered your request. It has been determined that the City of Tukwila will extend the permit application expiration dates an additional 90 days, through August 1, 2011. If you should have any questions, please contact our office at (206) 431 -3670. Sincerely, ifer Marshall it Technician File: Permit No. D10 -120, EL10 -0347 & PG10 -058 W:\Permit Center\Extension Letters \Applications\2010\D10 -120 Application Extension #2.doc 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 • • 04 -10 -2011 Building Official City of Tukwila RE: Permit Application No. D10 -120 To Whom It May Concern: CIT RECEIVED TUKINIU1, APR 202011 I would like to request an additional extension to my permit application. While I am still very much planning on taking the project forward, circumstances have not allowed for the completion of the necessary changes to the project plans. In my last letter I indicated an intention to begin construction by the spring. This is not possible. I am nearly finished with the corrections to the prints, and am now looking at an August/September start. The prints should be ready for submittal within the next two weeks. Thank you for your attention and continued consideration. Please let me know if there is further information you require, or anything that I may do to facilitate continuing the permitting process. Thank you, Benjamin Ivanek 2-O - 11-'6-73475 ,4/4. eivotaii 9a ‘/Qaef 04/ZZ /ZO /( -64f\ok 04 -01 -2011 • City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director BEN IVANEK 11926 INTERURBAN AV S TUKWILA WA 98168 RE: Permit Application No. D10 -120 11926 INTERURBAN PL S TUKW Dear Permit Applicant: In reviewing our current application files, it appears that your permit applied for on 05/07/2010, has not been issued by the City of Tukwila Permit Center. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and /or National Electrical Code every permit application not issued within 180 days from the date of application shall expire and become null and void. Your permit application will expire on 05/02/2011. If you still plan to pursue your project, a written request for extension of your application must be submitted to the Permit Center at least seven (7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit application. If it is determined that an extension is granted, your application will be extended for an addtional 90 days from the expiration date and you will be notified by mail. In the event that we do not receive your written request for extension or request was denied, your permit application will expire, become null and void and your project will require a new permit application, plans and specifications, and associated fees. Thank you for your cooperation in this matter. Sincerely, Bill Rambo Permit Technician File: Permit File No. D10 -120 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 • City of O, Tukwila • Jim Haggerton, Mayor Department =sf Comm nity Development October 25, 2010 Benjamin Ivanek 11926 Interurban P1 S Tukwila, WA 98168 RE: Request for Application Extensions Ivanek Addition —11926 Interuban PI S Dear Mr. Ivanek, Jack Pace, Director This letter is in response to your written request for extension to Permit Application Numbers 'D)1031120 EL10 -0347, and PG10 -058. The Acting Building Official has reviewed your letter and considered your request. It has been determined that the City of Tukwila will extend the permit application expiration dates an additional 180 days, through May 2, 2011. If you should have any questions, please contact our office at (206) 431 -3670. Sincerely, arshall it Tekhnician File: Permit No. D10 -120, EL10 -0347 & PG10 -058 W:\Perrnit Center\Extension Letters\Applications\2010\D10 -120 Application Extension.doc 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 10 -20 -2010 Building Official City of Tukwila cm.otA RE: Permit Application No. D10-120 1 E(A Q — 023 -�'� � Q(40-1%,) OCT 2 1 2010 To Whom It May Concern: PERMIT CEivrEA I would like to request an extension to my permit application. While I am still very much planning on taking the project forward, circumstances have not allowed for the completion of your department's requested changes. My wife has just finished medical school, and the time demands of being a working parent as well as support for a spouse in school, have proven too much for me to schedule in the necessary permit work as well. Our intention is to be able to start this construction in the early spring. With my wife's recent graduation our schedule has opened up considerably, and I anticipate the permit changes to be completed before the end of the year. Thank you for your attention and continued consideration. Please let me know if there is further information you require, or anything that I may do to facilitate continuing the permitting process. Thank you, gamin Ivanek Au,N tio 024 ed(Ani / 00 Cz(y3 jL 0 City of Tukwila D epartment of Communit y -D e ve r o 10 -01 -2010 pment BEN IVANEK 11926 INTERURBAN AV S TUKWILA WA 98168 RE: Permit Application No. D10 -120 11926 INTERURBAN PL S TUKW Dear Permit Applicant: Jim Haggerton, Mayor Jack Pace, Director In reviewing our current application files, it appears that your permit applied for on 05/07/2010, has not been issued by the City of Tukwila Permit Center. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and /or National Electrical Code every permit application not issued within 180 days from the date of application shall expire and become null and void. Your permit application will expire on 11/03/2010. If you still plan to pursue your project, a written request for extension of your application must be submitted to the Permit Center at least seven (7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit application. If it is determined that an extension is granted, your application will be extended for an addtional 90 days from the expiration date and you will be notified by mail. In the event that we do not receive your written request for extension or request was denied, your permit application will expire, become null and void and your project will require a new permit application, plans and specifications, and associated fees. Thank you for your cooperation in this matter. Sincerely, Bill Rambo Permit Technician File: Permit File No. D10 -120 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 .t June 2, 2010 • • City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director Ben Ivanek 11926 Interurban PI S Tukwila, WA 98168 RE: Correction Letter #1 Development Permit Application Number D10 -120 Ivanek Addition —11926 Interurban PI S Dear Mr. Ivanek, This letter is to inform you of corrections that must be addressed before your development permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the Building Department. At this time the Fire, Planning, and Public Works Departments have no comments. Building Department: Allen Johannessen at 206 - 433 -7163 if you have questions regarding the attached memo. Please address the attached comments in an itemized format with applicable revised plans, specifications, and /or other documentation. The City requires that four (4) sets of revised plans, specifications and /or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a `Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections /revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, please contact me at (206) 431 -3670. Sincerely, Bill Rambo Permit Technician encl File No. D10 -120 W:\Permit Center \Correction Letters\2010'D10 -120 Correction Letter # 1.DOC 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 .7. • Tukwila Building Division Allen Johannessen, Plan Examiner Building Division Review Memo Date: May 18, 2010 Project Name: Ivanek Addition Permit #: D10 -120 Plan Review: Allen Johannessen, Plans Examiner The Building Division conducted a plan review on the subject permit application. Please address the following comments in an itemized format with revised plans, specifications and /or other applicable documentation. (GENERAL NOTE) PLAN SUBMITTALS: (Min. size 11x17 to maximum size of 24x36; all sheets shall be the same size). (If applicable) Structural Drawings and structural calculations sheets shall be original signed wet stamped, not copied.) 1. Provide a foundation detail that specifies the method of providing a positive connection to the existing foundation. Specify epoxy with number of bolts or reinforcing bars with sizes and lengths. 2. Plan shows an auto -vent (Studor Vent) specified for the new plumbing vent. These are not allowed. Show the plumbing vent extending through the roof. Indicate vent size. 3. Specify 3" x 3" x'' /4" square washers for the foundation detail. 4. Show the crawl space height dimensions. Show continuous foundation footing drainage with footing drain detail. Footing drain shall tie into the existing footing drains. Show vapor barrier placed in the crawl space. Identify on the plan access to the crawl space. Show crawl space ventilation on the plan view. Specify number of vents and vent sizes. 5. Provide more clarification for the storage area. Is this part of the interior or is it accessed from the outside? Show a landing at the exterior with any necessary steps. Does the interior wall continue or is that a lower landing with an outside door? Provide all necessary framing details including elevation framing details. 6. Provide framing details to show the attachment of the floor and roof ledgers including beams attached to the existing exterior building. Identify all mechanical fasteners with spacing. 7. Provide a plan view of framing members for the roof and floor that show the span with sizes of all framing members. Show all dimensions. 8. Show an installation detail specifically for the stucco exterior. Should there be questions concerning the above requirements, contact the Building Division at 206 -431- 3670. No further comments at this time. re PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: D10 -120 PROJECT NAME: IVANEK ADDITION DATE: 07 -27 -11 SITE ADDRESS` 11926 INTERURBAN AV S _ Original Plan Submittal X Response to Correction Letter # 1 Response to Incomplete Letter # Revision # After Permit Issued DEPARTMENTS: ullding Division Public Works ❑ Fire Prevention Structural n Planning Division n Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Incomplete ❑ DUE DATE: 07 -28 -11 Not Applicable Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES/THURS ROUTING: Please Route Structural Review Required No further Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved n Approved with Conditions Notation: DUE DATE: 08 -25 -11 Not Approved (attach comments) n REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents /routing slip.doc 2 -28 -02 PERMIT CQORD COPY PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: D10 -120 PROJECT NAME: IVANEK ADDITION DATE: 05/07/10 SITE ADDRESS: 11926 INTERURBAN PL S X Original Plan Submittal Response to Correction Letter # Response to Incomplete Letter # Revision # after Permit Issued DEPART ENTS uI D 'ev1iV Y ding (vision Public Wor s 4viA � A- ire Preve ion Structural Hp M Planning Division Permit Coordinator n DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete IR- Comments: Incomplete n DUE DATE: 05/11/10 Not Applicable n Permit Center Use Only INCOMPLETE LETTER MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: LETTER OF COMPLETENESS MAILED: TUES /THURS ROUTING: Building Please Route REVIEWER'S INITIALS: Structural Review Required n No further Review Required n DATE: APPROVALS OR CORRECTIONS: Approved n Approved with Conditions Notation: REVIEWER'S INITIALS: DUE DATE: 06/08/10 Not Approved (attach comments) DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents/routing slip.doc 2 -28 -02 City of Tukwila REVISION SUBMITTAL Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Web site: http: //www.ci.tukwila.wa.us Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax etc. Date: -7/2_ Cv /Zo t l l Plan Check/Permit Number: D t .0. 12- 0 ❑ Response to Incomplete Letter # fig Response to Correction Letter # ❑ Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner Project Name: tV A--vEK tolil Project Address: \\ `} 2-6, Ifs Tett J teAs S TJ LA 913, t % g Contact Person: eer-1 Ste`^' \ Pct EK . Phone Number: 20(2- 22-S-736 g Summary of Revision: S€ A-ri-AC1•t 26J C--' W t E-wi p # ' f 1 : S E C 5 3 Foy F0,1.10A--C 1 of i Cors,SE C- t p r.l -1 : See s —r 7 Foe New \! .SY" Des (fps 4 3 sc-e Svieer 3 rb t.Ec-c pan- ev,,.#teE 65 wen 6,1 s .. 4- • sGe Q- To APPe55 Ce L. s e1 ce Dt mss► v,.I S `)'c S iker 4- fob 1 OO1ii ,.1 G D id.l DC.-rA t t_ size s alEe 4-{{ Fbe vE�ro-16; -�- C 2 A w t-6 fAC�. Arc.ce -S s - S cSEC- S Hee -r `-- + 6 Fog. STD A— G, A-11 C 1 Pte—r 3 t* C0 S si `� . £ {- S Fa 4. �Zo ab e �— �v e Arrr,C N *-7 -� 5 t-EC—T Cp + S foe_ f-c.o De .t- �o - r a E3 ,4t o S #-g {' �Itc� 3 X12 STcsCCc, 9&r * (L RECEIVED V OF TUKV Sheet Number(s): 3 a' ) 5- , 4 ) -7 ) Cloud" or highlight all areas of revision including date o Received at the City of Tukwila Permit Center by: Entered in Permits Plus on •)-% HMppI1erdions1Folms- AppIic lions on Une0010 Application s17-2010 - Revision SubmlthlAoc Created: 8-13 -2004 Revised 7 -2010 PERMY CENTER CITY OF TUKWILA Department of Community Development 6300 Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431 -367o FAX (206) 431 -3665 E -mail: tukplanPci.tukwila.wa.us Permit Center /Building Division 206 431 -3670 Public Works Department 206 433 -0179 Planning Division 206 431 -3670 AFFIDAVIT IN LIEU OF CONTRACTOR REGISTRATION STATE OF WASHINGTON) ) ss. COUNTY OF KING ) B E� J,a -vv∎ ► �I 1 �!A-+J �lC [please print name] , states as follows: PERMIT NO: dip -058 1. -I have made application for a.permit from the City of Tukwila, Washington. 2. I understand that state law requires that all building construction contractors be registered with the State of Washington. The exceptions to this requirement are stated under Section 18.27.090 of the Revised Code of Washington, a. copy of which is printed on the reverse side of this Affidavit. I have read or am familiar with RCW 18.27.090. 3. I understand that prior to issuance of a permit for work which is to be done by any contractor, the City of Tukwila must verify either that the contractor is registered by the State of Washington, or that one of the exemptions stated under RCW 18.27.090 applies. 4. In order to provide verification to the City of Tukwila of my compliance with this requirement, I hereby attest that after reading the exemptions from the registration requirement of RCW 18.27.090, I consider the work authorized under this permit to be exempt under number /5, and will therefore not be performed by a registered contractor. 5. I understand that the licensing provision of RCW 19.28.161 through 19.28.271 shall not apply to persons making electrical installations on their own property or to regularly employed employees working on the premises of their employer. The proposed electrical work is not for the construction of a new building for rent, sale or lease. I understand that I may be waiving certain rights that I might otherwise have under state law in any decision to engage an unregistered contractor to perform construction work. ms � Signed and sworn to�before me this ,/ day of ► (,� , 20 4 � � ) £2 ( NOT ' Y PUBLIC in and for the State of Washington Residing at Airyla , County ACLUI/1 , - Jer /e �. Name as commissioned: My commission exnires• - 0;-9 / () 18.27.090 Exemptions. The reg1i ation provisions of this 1. An authorized representative of the United States government, the state of Washington, or any incorporated city, town, county, township, irrigation district, reclamation district, or other municipal or political corporation or subdivision of this state; 2. Officers of a court when they are acting within the scope of their office; 3. Public utilities operating under the regulations of the utilities and transportation commission in construction, maintenance, or development work incidental to their own business; 4. Any construction, repair, or operation incidental to the discovering or producing of petroleum or gas, or the drilling, testing, abandoning, or other operation of any petroleum or gas well or any surface or underground mine or mineral deposit when performed by an owner or lessee; 5. The sale of any finished products, materials, or articles of merchandise that are not fabricated into and do not become a part of a structure under the common law of fixtures; 6. Any construction, alteration, improvement, or repair of personal property performed by the registered or legal owner, or by a mobile /manufactured home retail dealer or manufacturer licensed under chapter 46.70 RCW who shall warranty service and repairs under chapter 46.70 RCW; 7. Any construction, alteration, improvement, or repair carried on within the limits and boundaries of any site or reservation under the legal jurisdiction of the federal government; 8. Any person who only furnished materials, supplies, or equipment without fabricating them into, or consuming them in the performance of, the work of the contractor; 9. Any work or operation on one undertaking or project by one or more contracts, the aggregate contract price of which for labor and materials and all other items is less than five hundred dollars, such work or operations being considered as of a casual, minor, or inconsequential nature. The exemption prescribed in this subsection does not apply in any instance wherein the work or construction is only a part of a larger or major operation, whether undertaken by the same or a different contractor, or in which a division of the operation is made into contracts of amounts less than five hundred dollars for the purpose of evasion of this chapter or otherwise. The exemption prescribed in this - subsection does not apply to a person who advertises or puts out any sign or card or other device which might indicate to the public that he or she is a contractor, or that he or she is qualified to engage in the business of contractor; io. Any construction or operation incidental to the construction and repair of irrigation and drainage ditches of regularly constituted irrigation districts or reclamation districts; or to farming, dairying, agriculture, viticulture, horticulture, or stock or poultry raising; or to clearing or other work upon land in rural districts for fire prevention purposes; except when any of the above work is performed chapter do not apply • to: by a registered contractor; 11. An owner* who contracts for a project with a registered contractor, except that this exemption shall not deprive the owner of the protections of this chapter against registered and unregistered contractors. The exemption prescribed in this subsection does not apply to a person who performs the activities of a contractor for the purpose of leasing or selling improved property he or she has owned for less than twelve months; 12.* Any person working on his or her own property, whether occupied by him or her or not, and any person working on his or her personal residence, whether owned by him or her or not but this exemption shall not apply to any person who performs the activities of a contractor on his or her own property for the purpose of selling, demolishing, or leasing the property; 13. An owner* who performs maintenance, repair, and alteration work in or upon his or her own properties, or who uses his or her own employees to do such work; 14. A licensed architect or civil or professional engineer acting solely in his or her professional capacity, an electrician certified under the laws of the state of Washington, or a plumber certified under the laws of the state of Washington or licensed by a political subdivision of the state of Washington while operating within the boundaries of such political subdivision. The exemption provided in this subsection is applicable only when the person certified is operating within the scope of his or her certification; 15. Any person who engages in the activities herein regulated as an employee of a registered contractor with wages as his or her sole compensation or as an employee with wages as his or her sole compensation; 16. Contractors on highway projects who have been prequalified as required by RCW 47.28.070, with the department of transportation to perform highway construction, reconstruction, or maintenance work; 17. A mobile /manufactured home dealer or manufacturer who subcontracts the installation, set -up, or repair work to actively registered contractors. This exemption only applies to the installation, set -up, or repair of the mobile /manufactured homes that were manufactured or sold by the mobile /manufactured home dealer or manufacturer; '18. An entity who holds a valid electrical contractor's license under chapter 19.28 RCW that employs a certified journeyman electrician, a, certified residential specialty electrician, or an electrical trainee meeting the requirements of chapter19.28 RCW to perform plumbing work that is incidentally; directly,'and immediately appropriate to the like -in -kind replacement of a household appliance or other small household utilization equipment that requires limited electric power and limited waste and /or water connections. An electrical trainee must be supervised by a certified electrician while performing plumbing work. • Per Washington State Department of Labor and Industries, lessee has been interpreted to be equivalent to owner for the purpose of these exemptions.