HomeMy WebLinkAboutSpecial 2017-02-13 Item 2F - Contract Amendment #2 - 53rd Avenue South (South 137th -South 144th) with KPG for $79,858.20 COUNCIL AGENDA SYNOPSIS ' ----------------------------------Initials--------------------------------- ITEMNO. Meeting Date Prepared b Ma or's revieml I Council review • 02/13/17_-- BG C)L-& Spec F ITEM INFORMATION STAFF SPONSOR: BOB GIBERSON ORIGINAL AGENDA DATE: 02/06/17 AGENDA ITEM TITLE 53rd Ave S Improvement Project Right-of-Way Supplemental Agreement No. 2 with KPG CATEGORY ❑ Discussion ®Motion ❑ Resolution ❑ Ordinance ❑ BidAsvard ❑ Public Hearing ❑ Other Mtg Date Mtg Date 02106117 Mtg Date Mt Date Mtg Date Mt Date Mtg Date SPONSOR ❑ Council ❑Mayor ❑ HR ❑ DCD ❑Finance ❑ Fire ❑ IT ❑ P&R ❑ Police ® PW SPONSOR'S Contract No. 15-159 with KPG, Inc. provides design services for the 53rd Ave South SUMMARY Improvement Project. Now that the roadway layout has been determined, there are 19 locations where additional right-of-way or easements are needed. KPG's supplement will cover the services needed for the acquisitions. Council is being asked to approve KPG's Supplement No. 2 to Contract No. 15-159 in the amount of$79,858.20. REVIEWED BY ❑ COW Mtg. ❑ CA&P Crate ❑ F&S Cmte ®Transportation Cmte ❑ Utilities Cmte ❑Arts Comm. ❑ Parks Comm. ❑Planning Comm. DATE: 01/24/17 COMMITTEE CHAIR: KATE KRULLER RECOMMENDATIONS: SPONSOR/ADMIN. Public Works Department COMMITTEE Unanimous Approval; Forward to Consent Agenda COST IMPACT / FUND SOURCE EXPENDI"TURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $79,858.20 $98,000.00 $0.00 Fund Source: 103 ARTERIAL STREET FUND(PAGE 3, 2017 CIP) Comments: MTG. DATE RECORD OF COUNCIL ACTION 02/13/17 MTG. DATE ATTACHMENTS 02/13117 Informational Memorandum dated 01/20/17 KPG Supplement Agreement No. 2 to Contract No. 15-159 Minutes from the Transportation &Infrastructure Committee meeting of 01/24/17 319 320 City of Tukwila Allan Ekberg,Mayor Public Works Department-Bob Giberson,Director INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Committee FROM: Bob Giberson, Public Works Director`/ BY: Ryan Larson, Senior Program Manager CC: Mayor Ekberg DATE: January 20, 2017 SUBJECT: 53rd Ave South (S 137th St — S 144th SO Project No. 99110301, Contract No. 15-159 Amendment No. 2 ISSUE Approve Contract Amendment No. 2 to Contact No. 15-159 with KPG, Inc. for real estate acquisition services. BACKGROUND KPG's Consultant Agreement No. 15-159 consists of developing project plans, specifications, and cost estimates for the 53rd Ave S Project. The original agreement did not include real estate acquisition services since the preferred design layout had not been completed. The project is now at the 60% design level and real estate acquisition needs are now known. DISCUSSION The 60% design identified 19 locations where additional right-of-way or easements will be required. The additional right-of-way and easements will allow for radius returns, utility placement, retaining walls, sidewalk, and landscaping. Each acquisition is relatively minor. Staff, working with KPG, have developed a supplemental scope for the required acquisitions and easements for the 19 locations. The total fee for this additional work is $79,858.20. FINANCIAL IMPACT A total of$98,000 is budgeted for right-of-way acquisitions in the CIP. RECOMMENDATION Council is being asked to approve Supplement No. 2 to Contract No. 15-159 with KPG, Inc. in the amount of $79,858.20 for the 53rd Ave S Project and consider this item on the Consent Agenda at the February 6, 2017 Regular Meeting. Attachments:KPG Amendment No.2 W'.\PW Eng\PROJECTS\A-RW&AS ProjectsWrd Ave S(99110301)\Design Consultant Selection\Info Memo Amendment 2.docx 321 322 City of Tukwila Agreement Number: • 6200 Southcenter Boulevard, Tukwila WA 98188 CONTRACT FOR SERVICES Amendment#2 Between the City of Tukwila and KPG Inc. That portion of Contract No. 15-159 between the City of Tukwila and KPG Inc. is amended as follows: Article 2, Scope of Services, shall be supplemented with the following: The Consultant agrees to provide right of way services in accordance with the scope of work included as Exhibit A. . Article 4, Payment, shall be modified as follows: Payment for work provided by Consultant shall be made as provided on Exhibit B, attached hereto, provided that the total amount of payment to the Consultant for this work not exceed $79,858.20 without express written modification of the Agreement signed by the City. The new total contract shall not exceed $655,589.69 without express written modification of the Agreement signed by the City. All other provisions of the contract shall remain in full force and effect. Dated this day of 120 CITY OF TUKWILA CONTRACTOR Allan Ekberg, Mayor Printed Name: ATTEST/AUTHENTICATED APPROVED AS TO FORM Christy O'Flaherty, MMC, City Clerk City Attorney Page 1 of 1 323 EXHIBIT A City of Tukwila 53rd Avenue South S144 th Street to S 137th Street Supplement No. 2 — Property Acquisition Services KPG Scope of Work January 9, 2017 PURPOSE: This supplement is provided to provide right of way and easement acquisition services for the 531 Avenue S project. Following completion of the selected roadway alternative, it has been determined that additional property rights are needed on 19 parcels along the project corridor in order to accommodate required retaining walls, luminaires, utility vaults, and curb returns. Work includes obtaining additional title reports that were not anticipated in original scope, administrative offer summaries to determine value, property:negotiations, and closing for required easements and right of way as described herein. City of Tukwila Page 1 of 2 KPG 324 53'd Avenue South 11912017 SCOPE OF WORK: Task 8 Right of Way Calculations 8.4 Right of way acquisition services will be provided by RES Group Northwest under subcontract to the Consultant in accordance with the scope of work, assumptions, and deliverables included as Attachment 1. School district negotiations will be performed by the City and is not included in this scope of work. The level of effort for negotiation of each parcel is lower than is typical for this type of project in order to meet project budget constraints based on the assumption that this will be a straight forward acquisition with minimal negotiations required. Additional Services The City may require additional services of the Consultant in order to advance all or portions of the project corridor through final design and construction. This work may include items identified in the current task authorizations as well other items, which may include, but are not necessarily limited to the following: ♦ Obtaining title reports and providing final right of way / easement legal descriptions and exhibits beyond the quantity estimated in the scope (19 parcels) ♦ Providing additional property appraisals and negotiations ♦ Providing additional permitting or environmental studies ♦ Providing additional design services ♦ Providing construction services These services will be authorized under a future contract supplement if necessary. At the time these services are required, the Consultant shall provide a detailed scope of work and an estimate of costs. The Consultant shall not proceed with the work until the City has authorized the work and issued a notice to proceed. City of Tukwila Page 2 of 2 KPG 53`d Avenue South 11912017 325 W HOUR AND FEE ESTIMATE Project: City of Tukwila 53rd Avenue South Supplement No. 2 - Property Acquistion Services EXHIBIT B PE IP c • Architecture • Landscape Architecture • Civil. Engineering • Task Task 8 - Right of Way Calculations Description "Labor;:Hour,.Estimate. Project" - Manager $ 18'4.79 Senior Engineer $ .157.13' Project. • Engineer 113.12 Design Eng /LA ;$- 100..57 Technician $ 81.72 Survey Crew. $ A5166 Senior Adrnin $• 106 :86 Office Adrnin $ 71.96 Total - Budget • 'Budget 8.4 Support property negotiations by RES Group 0 0 4 0 0 0 2 0 $ 666.20 Title Reports (7 parcels) $ 3,500.00 Valuation, negotiations, and closing - RES Group $ 75,692.00 Reproduction $ - Task Total 0 0 4 0 0 0 2 0 $ 79,858.20 Total Estimated Fee: $ 79,858.20 1/9/2017 a. Group Northwest Acquisition and Relocation Services January 17, 2017 SCOPE OF WORK AND COST ESTIMATE: KPG Inc., City of Tukwila, 53rd Avenue South PROJECT OVERVIEW AND SCOPE OF WORK KPG Inc., is the (PRIME) consultant with RES GROUP NW (RESGNW) serving as a sub-consultant on the project for City of Tukwila. The City of Tukwila, 53rd Avenue South Project will impact approximately 15 properties, preliminary review identified 15 single family residential properties. It is anticipated that 4 out of 15 properties owners will dedicate the right of way needed for the project to the City. These will be strip take acquisition for the purposes of residential street improvements to include curb, gutter, sidewalk, and illuminations. This scope and fee is based on limited information provided by the Prime dated 1/4/2017 and may be adjusted in the fixture. The project is currently fielded with TIB (Transportation Improvement Board) funds from State of Washington. All right of way acquisition cost will be funded with City finds only. RESGNW's comprehensive knowledge of the state and federal law and administrative regulation, coupled with our experience on complex projects, enables us to work cooperatively with agency staff to find simple and cost-effective ways to accomplish City's objectives. Priorities will be based on the City's plan schedule, level of impact,acquisition time, and complexities. Preliminary Right-of-Way Services TITLE REVIEW, CLEARING AND CLOSING RESGNW will review Prime supplied title reports for affected parcel and provide Title Review Memos identifying all potential encumbrances to project team members. It is anticipated that all strip take acquisitions for this project will be under$10,000 and will not require partial conveyances from deeds of trusts nor a waiver from the property owners. RESGNW will assist in facilitating in-house closing on low impact parcel or manage closing through escrow should those services become necessary. Valuation Services TRUE COST ESTIMATE Following review of the right-of-way plan, RESGNW will prepare a True cost estimate parcel work sheets and (AOS)Administrative Offer summaries for the impacted parcels. Project Management Services RESGNW staff management will review all documents, files, maps, title reports, legal descriptions and other information provided. Staff manager will prepare project schedule or the right of way phase. Monitor and update the schedule as needed, report on progress reports including identification of work performed and discuss of potential problems that may rise, including issues of resolution. Staff manager will keep constant quality in coordination with the Prime's Project Manager. 1913 6th Street, Kirkland,WA 98033-624 S Lander Street#202,Seattle,WA 98134- ■ ph.206-457-5681 ■ www.resgnw.com 327 ® Group Northwest Acquisition and Relocation Services Acquisition Services RIGHT-OF-WAY DOCUMENTATION,NEGOTIATIONS AND CLOSING RESGNW will assist the City in developing all right-of-way documents/offer letters in accordance with the City's right-of-way procedures manual for acquisition of impacted properties. RESGNW will draft the acquisition documents using City approved forms or QC any forms that are created directly by City staff for pre-acquisition review,before any offers are made to property owners. RESGNW agents will act in good faith at all times and never coerce owners in an attempt to settle the parcel. All negotiations will start with an in-person presentation of all offers when feasible. We will identify property owner issues, concerns and differences early on and document that information in the individual parcel negotiation diary. RESGNW will work with City staff throughout the negotiation process with the property owner until settlement is reached. Cost Estimate Payment to RESGNW for its professional services is not dependent upon outcome, the amount or terms of any agreement reached for the property, or on any contractual arrangement between the Prime and any third party. Prime agrees to compensate RESGNW for actual professional services rendered as follows: Our fees for services are calculated based upon the applicable hourly rates for those professional who perform the work-at-hand. The ICR billing rate is $109.00 per hour for all tasks performed under this agreement. In addition,necessary mileage will be billed at$0.535 per mile(2017 IRS mileage rate) TRUE COST ESTIMATE PARCEL WORKSHEETS AND AOS Senior Acquisition Agent: .40 hours @$109 per hours=$ 4,360 NEGOTIATION Senior Acquisition Agents: R/W Acquisition 45 hours per parcel x 11 495 hours @$109 per hours=$53,955 Donation/Dedication 15 hours per parcel X 4 60 hours @ $109 per hours=$ 6,540 PROJECT MANAGEMENT Project Manager: 4 hours per parcel x 15 60 hours @$109.00 per hour=$ 6,540 TITLE REVIEW AND CLEARANCE/CLOSING Senior Acquisition Agents: 3 hours per parcel x 11 33 hours @ $109 per hours=$ 3,597 ODC/Other Direct Cost(mileage and postage) $ 700 TOTAL ESTIMATED COST: $75,692 1913 6th Street, Kirkland,WA 98033-624 S Lander Street#202,Seattle,WA 98134- IN ph. 206-457-5681 IN www.resgnw.com 328 mo � Group sk Northwest Acquisition and Relocation Services KPG Inc. RES GROUP NW 1913 6m Street, Kirkland,WA 98033-624 S Lander Street#202,Seattle,WA 98134- ■ ph.206-457-5681 ■ www.resgnw.com 329 TransportationCommittee Minutes.....................................................................................................................January24,2017 C. Contract Amendment: 53rd Avenue South (South 137'Street through South 144th Street) Staff is seeking Council approval of Supplement 2 to Contract 15-159 with KPG, Inc. in the amount of$79,858.20 for real estate acquisition services for the 53rd Avenue South Project. The design is now at 60% and 19 locations were identified where minor additional right-of-way or easements are required. The total budget for right-of-way acquisitions is$98,000. UNANIMOUS APPROVAL. FORWARD TO FEBRUARY 6,2017 REGULAR CONSENT AGENDA. D. Project Update on South 160th Street Speed Cushion Pilot Project Staff updated the committee on a plan to pilot the installation of speed cushions on South 160tH Street from 42nd Avenue South to 51St Avenue South. Speed cushions/re humps or tables that include wheel cutouts for emergency vehicles. Speed data vdl be collected both before and after installation to assess the impact of the pilot project4ng`j ost for the cushions and signs is $33,197.40 which will come from the $75,000 Traffic Ga budget."Staff plans to conduct outreach with impacted residents to notify the fri o� the pilot and\request feedback. Councilmember Quinn noted that traffic calms g.*s requested by residents cit: de and asked that there be strong,defensible rationale for the locations of pilot projects such as this. Staff is purchasing two more mobile radar speed units to asss needs around the-city. Chair Kruller also noted that there are speed issues aroir d'th�" y,�particularly near schools, and is interested in piloting the cushions i other areas as soon as practical. DISCUSSION ONLY. E. Purchase of Water Hydrant Saver Staff is seeking Committee approval of a Stan ey Hy rant Saver in the amount of $6,022.50, funded from the Water division's small tooIs and2rnor. quiment budget. This is a hydraulic impact wrench that will make fire hydran1t vval�seat removal.more cost effective and safer for the operator. COM'4IT>TEE UNANIMOUS APPROVAL. Closeout 2015 Centra)B')Jness Distnct Sanita Sewer Rehabilitation F. Contract ry Staff is seeking Council approval-of contract completion and release of retainage to the Michels Corpor ion in the mount off$509,310.8-9-for-4e 2015 Commercial Business District Sanitary Sewer Rehabs i al tion'Prolee This project installed approximately 6,510 lineal feet of cured-in- plaace'liner within th-e r gh -of- `twa`yof Andover Park East, Industry Drive, Minkler Boulevard and private easements. UNANIMOU SAPPPROVAL. FORWARD TO FEBRUARY 6, 2017 REGULAR CONSENT AGENDA. G. Contract Closeout: C st t S rings Emergency Surface Water Repair Staff is seeking Council approval of contract completion and release of retainage to the Frank Coluccio Consttrction�Company in the amount of $164,093.54 for the Crystal Springs Emergency Surface eater Repair Construction Project. This project constructed emergency repair of a collapsed surface water pipe, pavement and sinkhole in Crystals Springs Park and 51St Avenue South. UNANIMOUS APPROVAL. FORWARD TO FEBRUARY 6, 2017 REGULAR CONSENT AGENDA. 330