HomeMy WebLinkAboutTIC 2017-02-28 Item 2C - Contract Supplement #16 - Baker Boulevard Non-Motorized Improvements with KPFFCi!y of Tukwila
Allan Ekberg, Mayor
TO:
n and Infrastructure Committee
FROM:
BohGiberaon" Public Works Qireotor�o
BY:
Cymdy Knighton, Senior Program Manager
CC:
Mayor Ekberg
[)ATE:
February 24~2O17
SUBJECT:
Baker Boulevard Non-Motorized Imlorovements
Project No. 91610409, Contract No. 07-123
Supplemental Agreement No. 1G
ISSUE
Approve Supplemental Agreement No. 16 with KPFF for engineering design services for the Baker
Boulevard Non-Motorized Improvement Project.
BACKGROUND
KPFF has completed the design of the TUC e Bridge Project (Ped Bridge) and the
construction of the bridge io underway. Aa part Of the Ped Bridge Project, deSignoftheGneenRiverTnai|and
new sidewalks on Christensen Road were completed. Due k)funding limitations, construction along the trail
and the wide sidewalks on Christensen Road were removed from the construction bid documents.
DISCUSSION
Design of Baker Boulevard to include bike lanes and reduce the travel lanes to one in each direction (Baker
Road Diet) was included in the initial design contract with KPFF,but the design was never advanced tothe
100% level as funding was reallocated to unexpected needs for the Ped Bridge design and permitting. At
the time the Ped Bridge project vv8Sne8ringdeaignoomnp|etion'KingCounh/PerkaandRoonaed|onDiviSion
approached Tukwila with $| million in County trail levee funds that could be used to design and construct
the Baker Road Diet and the sidewalk improvements along Christensen Road. The interagency agreement
between Tukwila and King County was approved by Council on December 5, 2016. A new project, Baher
Boulevard Non-Motorized Improvements, was created in the 2817'2022C|PtV encompass the
improvements into osingle project.
SupplennentaAorg8nnmrtNo.1GtoKPFF's Contract 07-123 was negotiated os the most cost effective and
expeditious way tohave the design completed on Baker Boulevard and incorporated with the design work
already completed for the Green River Trail and Christensen Road.
FINANCIAL IMPACT
The additional costs for the Baker Boulevard design work and the packaging into a bid-ready document is
$77,798.67 and is less than the $100,000 budgeted for design in the 2017 CIP.
RECOMMENDATION
Council is being asked to approve Supplemental Agreement No. 16 with KPFF for the Baker Boulevard
Non-Motorized Improvement Project in[hoarnourdof$77,7B8.678DdconaiderthiaitennontheCVnSHmk
Agenda 81 the March G'2O17 Regular meeting.
Attachments: Page 15.2017C|P
m=pp Supplemental Agreement No. 16
w:\p*eng\pnojoots\a-nw&mpnojents\buxe blvd non-motorized (n1s1n4ne)\imh memo xp*auppw1spen22417gl.doox 1e
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: Baker Blvd Non - Motorized Improvements Project No. 91610409
Design and construct non - motorized improvements on Baker Blvd from Andover Park West to Christensen Rd,
DESCRIPTION: including bike lanes with a proposed road diet. Project will also construct previously designed non - motorized
improvement on Christensen Rd from Baker Blvd to the Green River trail.
JUSTIFICATION: Improve non - motorized connections between the Tukwila Transit Center and Tukwila Station.
STATUS: New project for the 2017 - 2022 CIP.
MAINT. IMPACT: Minimal impact, project includes new sidewalk trail and pavement markings
COMMENT: Project is a component of the TUC/TOD Pedestrian Improvements. Grant funding by the King County Dept
of Natural Resources and Parks.
FINANCIAL Through Estimated
iin annn'.1 2n1r, 2n1R 2012 2n1R 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Project Locationazg
i 5015
IN I
Design
T
100
5 �
'E I
\;
100
Land(R /W)
i
0
Const. Mgmt.
120
120
Construction
780
780
TOTAL EXPENSES
1 0
0
1,000
1 0
01
01
01
01
01
1,000
FUND SOURCES
Awarded Grant
0
King County
1,000
1,000
Mitigation Actual
0
Traffic Impact Fees
0
City Oper. Revenue
0
0
0
0
0
0
0
0
0
0
TOTAL SOURCES
0
0
1,000
0
0
0
0
0
0
1,000
;.
Project Locationazg
i 5015
IN I
T
5 �
'E I
\;
i
2017 - 2022 Capital Improvement Program 15
20
Washington
Department of Transportatil
Supplemental Agreement
Organization and Address
KPFF Consulting Engineers
Number 16
1601 Fifth Avenue, Suite 1600
Seattle, WA 98101
Original Agreement Number
07 -123 (p)
Phone: (206) 622 -5822
Project Number
Execution Date
Completion Date
05 -RW03
December 31, 2017
Project Title
New Maximum Amount Payable
Tukwila Urban Center, Ped /Bicycle Bridge PSE
$ 2,153,200.32
Description of Work
PS &E for the Baker Boulevard Road Diet & Christensen Road Improvements.
The Local Agency of the City of Tukwila
desires to supplement the agreement entered into with KPFF Consulting Engineers
and executed on and identified as Agreement No. 07 -123
All provisions in the basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows:
I
Section 1, SCOPE OF WORK, is hereby changed to read:
See attached scope of work.
II
Section IV, TIME FOR BEGINNING AND COMPLETION.. is amended to chanae the number of calendar days for
completion of the work to read: Contract completion date remains as December 31, 2017.
III
Section V, PAYMENT, shall be amended as follows:
This supplement increases the contract value by $77,798.67, increasing the previously authorized maximum amount
payable to $2,153,200.32.
as set forth in the attached Exhibit A, and by this reference made a part of this supplement.
If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces
below and return to this office for final action.
David K. McMullen, RE
By. KPFF Principal/Project Manager By. City of Tukwila
Consultant Signature Approving Authority Signature
DOT Form 140 -063 EF Date
Revised 9/2005 21
Baker Blvd Road Diet & Christensen Road Improvements
Plan, Specification and Cost Estimate (PSE)
Scope of Work
PROJECT DESCRIPTION & OBJECTIVES
KPFF is currently under contract with the City of Tukwila (City) for the Plans,
Specifications and Cost Estimate (PS&E) Phase of the Tukwila Urban Center
Pedestrian/ Bicycle Bridge project. This supplement provides additional services
related to:
• Creating a new set of Plans, Specifications and Cost Estimate (PS&E)
combining the following previously designed elements:
1. Sidewalk, landscaping and illumination improvements from the
intersection of the Green River Trail (GRT) and Christensen Rd
south toward and including the intersection of Baker Blvd and
Christensen Rd.
2. Channelization, roadway signing and striping work of Baker Blvd
from the intersection of Christensen Rd west toward the
intersection of Andover Park W including signal, and ITS
modifications at Andover Park E.
SCOPE OF WORK
The following is a scope of work for additional design services in support of this
project's PSE Phase.
Task No. 1.0 Project Management and Administration
Task No. 1.10 - Project Management, Coordination & Invoicing
Team members shall provide continuous internal project management and
project team coordination. Team members shall prepare monthly invoices for
work completed. KPFF shall compile the invoices into a single document to be
submitted to the City.
Task No. 1.20 —Tearn Meetings
Team members shall meet internally to discuss project reorganization and
design issues. Two meetings assumed.
PA
Page 2
Task No 2.0 Right -of -Way and Additional Survey Services:
Task No. 2.10 Review Title Reports & Update Easements
KPG shall provide a review of previous City construction projects to verify
easements for sidewalks along Baker and Andover Park E. Easements shall be
added to the base map. Files from the past projects showing easements shall
be provided by the City.
KPG shall update the existing base map to include new curb ramps for the
east/west directions at the intersection of Baker Blvd and Andover Park E that
are to be installed in conjunction with water main and sewer replacements
under a separate project. CADD files for this shall be provided by the City.
Note: With the exception of the new ramps, survey for Baker Blvd and
Christensen has been completed, including existing illumination, signal poles,
cabinets, and signal loops. No underground utilities have been located.
Underground utility locates are not anticipated under this task.
Deliverables
0 Updated Survey Project Base Map with sidewalk easements and updated
curb ramps.
Task No 3.0 Preparation of Contract Documents (PS&E)
Task No. 3.10 - Repackaging Plans & Incorporating Signal Modifications
KPFF and KPG shall assist the City in determining the Baker roadway striping,
including design of protected bicycle facilities, as outlined in the King County
Parks and Recreation and City of Tukwila, Mobility Connections Facilities
Agreement for Baker Blvd and Christensen Road, approved 12/05/16. North-
south curb ramps will be upgraded to current City standards
Work includes modification of existing signal design at the intersection of
Andover Park E and Baker Blvd, field review of existing signal
equipment/ conduit/wiring, video detection installation, loop abandonment,
APS push button installation, push button landing area compliance field
verification, coordination with City for new installation of East/West curb
ramps (associated with Andover Park E Water Main and Sewer replacement
project), countdown pedestrian heads, electrical wiring pole adjustments, ITS
raceway verification/design and signal controller upgrades. Work also includes
the redesign of current plans based on reuse of existing electrical service
cabinet at the intersection of Christensen Road and Green River Trail access
point. This does not include relocation modifications to the existing controller
service cabinets.
23
Page 3
KPFF and KPG shall repackage current design plans incorporating any
aforementioned modifications into a complete set of Plans for submittal to the
City.
Task No. 3.20 - Update Quantities, Cost Estimate & Specifications
KPFF and KPG shall update and/or calculate bid item quantities for the work
shown in the Plans. An updated cost estimate shall be provided based upon
these quantities and review of current bid tabulations provided by the City. A
summary of quantities and a cost estimate shall be provided to the City for the
Draft Final and Final/Bid PS&E packages (see Task 3.30).
KPFF and KPG shall provide a complete Specifications package including
Divisions 1 through 10 and front end proposal documents. The specifications
shall be per the 2016 WSDOT Standard Specifications including any necessary
City special provisions. The City shall provide a specification and proposal
boilerplate for and any required forms associated with state and/or federal
funding.
Specifications shall be provided to the City for the Draft Final and Final/Bid
PS&E packages (see Task 3.30).
Task 3.30 - Submittal Preparation (Draft Final & Final/Bid)
KPFF and KPG shall prepare and submit a Draft Final and Final/Bid PS&E
package described above to the City. The Draft Final submittal shall be
prepared and submitted to the City for review and comment. Comments
received shall be discussed and responses to comments shall be generated for
City review and agreement. The Draft Final PS&E package shall be modified as
required based upon these comments and a Final/Bid submittal shall be
generated
The Final/Bid PS&E package shall be stamped, sealed and submitted to the
City for inclusion in the bid package.
Assumptions
• No additional storm drainage report work is included. The Storm Drainage
Report for the Tukwila Urban Center Bicycle/Bridge Project is assumed to
be adequate for permitting approval for this construction package.
• WSDOT MEF documentation for curb ramp layout is not included.
• No additional permitting effort is included.
• No additional right-of-way acquisition is included at this time. Additional
acquisition may be necessary for ideal curb ramp layout at the intersection
of Baker Blvd and Andover Park E.
Deliverables
• Plans and details to be included in Draft Final and Final/Bid level
submittal set (3 hardcopies, I electronic).
24
0
• Cover Sheet & Index
• Legend and abbreviations (1) sheet
• Horizontal control (1) plan sheet
• TESC (4) plan and detail sheets
• Site prep (3) plan sheets
• Typical section (3) sheets
• Roadway plan/profile (3) sheets
• Roadway details (3) sheets
• Drainage and utility (2) plan sheets
• Channelization and signing (3) plan sheets
• Channelization and signing (1) detail sheet
• Pedestrian detour (1) plan sheet
• Signal/Illumination (6) plan and detail sheets
• Urban design (5) plan and detail sheets
• Planting design (3) plan and detail sheets
• Irrigation (3) plan and detail sheets
Quantities and Cost Estimate to be included in Draft Final and Final/Bid
submittals (3 hardcopies, 1 electronic)
Project Specifications to be included in Draft Final and Final/Bid submittal
(Electronic copies for Draft Final and Final/Bid, 3 hardcopies for Final/Bid)
041
EXHIBIT E-1
KPFF Consulting Engineers
CONSULTANT FEE DETERMINATION
SUMMARY OF COST
Tukwila Urban Center Package #1: Baker & Christensen Improvements
Classification
Principal / Tech. Specialist
Project Manager
Senior Engineer
Design Engineer
Prof. Land Surveyor
Project Surveyor
Survey Crew
CADD Technician
Coordinator / Admin
Overhead (OH) Cost
OH Rate x DSC of
Fixed Fee (FF)
FF Rate x DSC of
Reimbursables
Mileage
Reprographics
Subcontract
(Blank)
Subtotal
Total Hours
X
Rate =
Cost
8.00
X
$64.43 =
$515.44
96.00
X
$58.20 =
$5,587.20
0.00
X
$45.00 =
$0.00
152.00
X
$38.08 =
$5,788.16
0.00
X
$42.00 =
$0.00
0.00
X
$32.00 =
$0.00
0.00
X
$65.00 =
$0.00
89.00
X
$33.00 =
$2,937.00
12.00
X
$27.30 =
$327.60
DSC Subtotal
$15,155.40
137.52%
X
$15,155.40 =
$20,841.71
30.00%
X
$15,155.40 =
$4,546.62
(## Miles x $0.565/mile)
(## Sheets x $X.xx/sheet)
(Sub Name & Task)
(Allowance)
Subconsultant Costs (See Exhibit G)
$0.00
$37,254.95
IGRAND TOTAL: $77,798.6
0111
COST ESTIMATE: Tukwila Urban Center Package #1: Baker & Christensen Improvements
February 21, 2017
1
KPFF Consulting Enqineers
KPFF
Tukwila Urban Center Package #1:
Baker & Christensen Improvements
Prindpol Y Project Senior
Tech.
Specialist manager Engineer
S
Design
En
Engineer
Prof. Lord
Surveyor
U,
Project
Surveyor
Survey
C—
1AID
-hro, ,
� Coordinate
I-nrim
MULTIPLIER:
7m7 SCOPE OF WORK
$64,48 $58.20 $45.00
$38.08
$42.00
1 $32.00
1 $65.00
$33.00
1 $27.30
2.6752
I Project Management and Administration
1.10
�Ll 2.
Management, Coordination _&_ Invoicing — --- - ----- ----- -
Team Meetin gs
-- --- 2 ---
3
a
6
4
$1,452
$1,128
Labor Subtotal:1
5 1 0 1 0
1 14 0 11 0
1 0
0 4
$0
2 Right-of-Way and Additional SurveyServices
2.10 Review Title Reports and update easements for Baker Blvd & Andover
Pprk g
Labor Subtotal:
0 1 0 1 0
0
0
0 a
$0
ww
3 Preparation of Contract Documents (PS&E)
3.10
3.30 J
R,pa,kagl g Current Plans with Signal Modifications
Update Quantities, Cost Estimate & 6p,;off-ic--a-fkrms---
Submittal Preparation (Draft Final & Final/Bid)
44
32 --
3 20
50
4 - 0 -- -----
48
61
--l- 4 --- --1-- 4
24 4
$17,32.9
$9,702 ... ...
$10,932
Labor Subtotal:
3 96 1 0
1 138 1 0 0
0
1 89 8
$37,964
747
$0
Labor Sum:
Reimbursable Sum:
8 1 96 0 152 0 0
0
JKPFF
89 12
SUBTOTAL:
$40,544
$0
$40,544
PAIR
EXHIBIT G-1
KPG
CONSULTANT FEE DETERMINATION
SUMMARY OF COST
Tukwila Urban Center Package #1: Baker & Christensen Improvements
Classification
Senior E/LA
Project E/S
LA/Eng
Design Technician
Survey Crew
Office Admin.
Overhead (OH) Cost
OH Rate x DSC of
Fixed Fee (FF)
FF Rate x DSC of
Reimbursables
Mileage
Reprographics
Subcontract
(Blank)
Subtotal
Total Hours
X
Rate =
Cost
70.00
X
$56.97 =
$3,987.90
100.00
X
$44.59 =
$4,459.00
56.00
X
$40.38 =
$2,261.28
104.00
X
$26.44 =
$2,749.76
8.00
X
$47.12 =
$376.96
3.00
X
$31.25 =
$93.75
0.00
X
=
$0.00
0.00
X
=
$0.00
DSC Subtotal
$13,928.65
136.21%
X
$13,928.65 =
$18,972.70
30.00%
X
$13,928.65 =
$4,178.60
(## Miles x $0.565/mile)
(## Sheets x $Xxx/sheet)
(Sub Name & Task)
(Allowance)
$175.00
ISubconsultant Total: $37,254.95
28
COST ESTIMATE: Tukwila Urban Center Package #1: Baker & Christensen Improvements
February 21, 2017
KPG
KPG
Tukwila Urban Center Package #1:
Baker 8, Christensen Improvements
Senior
E/LA
I Proj�t E/S' LAJErg Design Survey
i I Tenhnician Cre.
i
Offin.
Admin.
000 1: 0.00
MULTIPLIER:
Item f SCOPE OF WORK
$56.97 $44.59 $40.38 $26.44 i $41,12
$31.25
$0.00 $0.00
2.6621
1 Project Management and Administration
1.10 Management, Coordination& Invoicing
1.20 Team Meetings
10
12
3
$1,766
$1,820
Labor Subtotal:
l 22
0 0 0 0
3
0 0
$3,586
2 Right-of-Way and Additional SurveyServices
Review Title Reports and update easements for Baker Blvd & Andover
8 8
$2,173
Labor Subtotal:
4
0 0 8 a
a
0 0
$2,173
3 Preparation of Contract Documents (PS&E)
3.10 Repackaging Current Plans with Signal Modifications
3.20 Update Quantities, Cost Estimate & Specifications
------------
3.30 :Submittal Preearation (Draft Final & Final/Bid)
32
8
4
80 40 80
16 1
4 4 is
------$24,280
$4,403
------ ----
$2,638
Labor Subtotal:
44
100 56 96 a
0
0 0
$31,321
Labor Sum: 70
100 56 104 8
3
KPG
MON
0 0
SUBTOTAL:
$50
$37,080
-- $1 - 7 - 5
04*1