Loading...
HomeMy WebLinkAboutReg 2017-03-06 Item 2B - Presentation Shown at Meeting - The Loop Sewer Project UpdatePresentation to Tukwila City Council MARCH 6, 2017 "WORKING TOWARD A BETTER ENVIRONMENT" SEWER DISTRICT Agenda 1. History of The Loop Sewer Project 2. Funding Status 3. Project Status "WORKING TOWARD A BETTER ENVIRONMENT" ' F - 4 • F . • . F,1 • VifeirY Sewer Service Agreement "WORKING TOWARD A BETTER ENVIRONMENT" VALLEY VIEW SEWER I)ISTRICI' ANIS CITY OF TUKWILA SEWER SERVICE AGREEMENT THIS AGREEMENT is rande and entered into by and between VALLEY VIEW SEWER DISTRICT, King County, Washington ('District ") middle CI FY 010 TUKWILA, Washington ("City"), each a Washington municipal corporation (collectively the' Parries" and individually a "Party "). RECITALS A, The City, a non-charter code city operating under Title 35A RCW, and the District, a sewer district operating under Title 57 PC W, both own and operate sewer collection systems within their respective sewer service areas. B. Pursuant to RCW 35A. 11.040, RCW 35.67.300, RCW 57.08.005(12), and Chapter 39.34 RCW, the Parties are authorized to cooperate with each other to provide sewer services in a manner that will best satisfy the geographic, planning, economic, financing and development interests of the Parties. C. An urea of the City bounded generally by South 1600 Street, 42' Avenue South, State Route 518, and 5Iff Avenue South, and commonly referred to as the loop area ( "Loop Aloft"), currently is not served by a Dula is sewer system, The Loup Area is not within the boundaries of the District D. Pursuant to RCW 27.08. 005(5), the District is authorized to acquire, construct. maintain and operate sewer systems, both within the District and outside the District. Pursuant to this authority, the District has adopted a comprehensive plan that includes most of the Loop Area within its Sewer service area. E. The City is dossigning and planning a street project on 42'° Avenue South, in tam vicinity of the loop Arca, with construction anticipated in 2016. In conjunction with this street project, the District is designing and planning an eight -inch sewer pipe and a manhole; together with appurtenances, at approximately 42v° Avenue South and State Route 518 ( "District Project"). The District Project, combined with extensinno and facilities, would provide sewer service to Le Loop Area In contrast, the nearest City manhole to the Loop Area is approximately 2,000 feet East of the Loop Area, F. 'the Loop Area is within the City's current Sewer Comprehensive. Plan. However. construction of a sewer system in the Loop Area is a low priority for the City, as the native soils in the Loop Amu ate sufficient to infiltrate wastewater far a majority of the on -sire sewer systems in the Loop Area The City anticipates that several large lots within the Loop Area will he developed in the near Furore, before the City has constructed a sewer system in the Loop Area 45.030.915500091 0003 ,Ice/6/1/4-/-5 Sewer Service Agreement G The Dinned is wining to constntct tmd install the District Project, and to investigate and plan for sewer service Le the Loop Area, as long as the City supports the 3. District as Sewer Service Provider. Upon becoming the provider of sewer service for the Loop Area, the District shall have the sole responsibility, power and authority to construct, condemn, purchase, acquire, maintain and operate the sewer system, together with any additions, extensions and betterments thereto. The District further shall have the sole responsibility, power and authority to fix, alter, regulate and control the charges and rates. Any District work in the City streets or right -of -way shall be subject to City ordinances, rules and regulations. After the District has become the provider of sewer service, property owners who connect to the sewer system shall be District customers, and shall be subject to all District laws and regulations. "WORKING TOWARD A BETTER ENVIRONMENT" and regulations. 4. SCWCT Connection Otdin c Lpun refit est of the Di strict, the City shill present to the Tukwila City Comet! an ordinals. that requires the owners ofproperty and buildings in the Loop Area to a xmecl l0 the DISu5ief's sewer system and to pay the Dtsstric s sewer connection charges, in accordance with terms and c.onditiono that ate similar to Tukwila Ordinance No_ 21107 at Exhibit C hue that ate established by the District. 5. Efletive Date. The effective date of this Agreement shall he the date on which the last person of both Parties has executed this Agreement. l'he teen of this Agreement shall be aaomsslos =ws coo_ -2- 500 CFU /100 m 10/13/15 290 CFU /100 mL 10/13/15 Gilliam Creek Outfall to Green River 1700 CFU /100 mL 10/5/15 4500 CFU /100 mL 10/13/15 500 CFU /100 m 10/13/15 4900 CFU /100 mL 10/13/15 230 CFU /100 mL 10/13/15 320 CFU /100 m ,I 4/9/15 h Funding Applied for State Revolving Fund /Centennial Clean Water Fund money in 2015 Public meetings held on: July 15, 2015 (at Valley View) August 31 , 2015 (at Valley View) September 10, 2015 (at Valley View) October 12th, 2015 (Tukwila Council chambers) July 20, 2016 (at Valley View) Ongoing one -on -one meetings with property owners as part of the design process "WORKING TOWARD A BETTER ENG'IRONMENT" 00 Funding Top Three State Revolving Fund /Centennial Clean Water Fund Applications (out of 155) Rank Score Agency Project Cost 945.0 Valley View (MRS /Hilltop) $2,166,000 2 942.5 City of Toppenish $1,246,000 3 927.5 Valley View (The Loop) $4,779,200* *funding offered as a 0.10% loan "WORKING TOWARD A BETTER ENVIRONMENT" Funding 2017 Supplemental Budgets District 33 Legislators: Senator Karen Keiser Representative Mia Gregerson Representative Tina Orwell "WORKING TOWARD A BETTER ENVIRONMENT" '° Funding Top Three State Revolving Fund /Centennial Clean Water Fund Applications (out of 155) Rank Score Agency Project Cost 945.0 Valley View (MRS /Hilltop) $2,166,000 2 942.5 City of Toppenish $1,246,000 3 927.5 Valley View (The Loop) $4,779,200* *funding offered as a 0.10% loan "WORKING TOWARD A BETTER ENVIRONMENT" Funding 2017 -2019 Biennial Budget Senator Karen Keiser, District 33, Ways and Means Committee District 11 Legislators Senator Bob Hasegawa Representative Zack Hudgins Representative Steve Bergquist "WORKING TOWARD A BETTER ENVIRONMENT" Funding Governor's Proposed Budget Released December 2016 NEW SECTION. Sec. 3066. FOR THE DEPARTMENT OF ECOLOGY 2017 -19 Centennial Clean Water Program (30000705) Appropriation: 2017 $25,000,000 2018 $25,000,000 Total Biennia $50,000,000 Source of Funds State Building Construction Account "WORKING TOWARD A BETTER ENVIRONMENT" . $250,000,000 Additional Non - Construction Costs King County Treatment Capacity Charge currently $8,912.91 Valley View General Facility charge $4,033 "WORKING TOWARD A BETTER ENVIRONMENT" Additional Non - Construction Costs 2016 CDBG Capital Applications for 2017 Funds Proposal Title Performance Measures Request Minimum Request Recommen ded Award Ranking JRC Approved South Sub - Region - Estimated Funds Available $803,919 Diocese of Olympia — New Roots 60 People $ 60,000 $ 32,000 $ 60,000 1 $60,000 Tukwila Minor Home 65 Repair * ** Households $125,000 $100,000 $125,000 2 $125,000 Valley View Sewer District 20 Special Assessments *, ** Households $301,080 $ 0 $280,919 3 $280,919 Highline StartZone Microenterprise 92 Persons $110,000 $92,000 $110,000 4 $110,000 Burien Lakeview Park 2,116 Playground & ADA accessibility Persons $228,195 $208,195 $228,000 5 $228,000 Sub - Region Total $824,275 $803,919 $803,919 * If available funds are higher than projected this project will receive additional funding up to the maximum request. ** If available funds are lower than projected, this project will be reduced. * ** Any remaining additional funds will go to Tukwila Minor Home Repair. "WORKING TOWARD A BETTER ENVIRONME Project Construction Status Current plan for construction in 2018 dependent on: Funding: may not know until July of 2017, or until State Budget is approved. Sewer District Commissioners' decision on moving forward after further discussions with project area residents. Finalizing design and easement acquisition. Permitting through the City of Tukwila, Fisheries, WSDOT, Army Corps of Engineers. "WORKING TOWARD A BETTER ENVIRONMENT" Questions? "WORKING TOWARD A BETTER ENVIRONMENT" SEWER DISTRICT