HomeMy WebLinkAboutReg 2017-03-06 Item 4E - Contract Supplement #16 - Baker Boulevard Non-Motorized Improvements with KPFF for $77,798.67COUNCIL AGENDA SYNOPSIS
lnifial,f
Meefil�g Date Pre ared b M Is reviOW Council review
03/06/17 BG
ITEMNO.
4.E.
45
STAFF SPONSOR: BOB GIBERSON
�OIZI(,INAI,A(;I?Ni),\D,\,i,i,": 03/06/17
I
A(;FIND. ITEM Trrj,j Baker Boulevard Non-Motorized Improvements
Supplemental Agreement No. 16 with KPFF Consulting Engineers
CXIT'GORY ❑ Discussion
Aft Date
Z Motion
Atg Date 03106117
❑ Resolution
Atg Date
❑ Ordinance
Mig Date
❑ Bid,,bvard
Mt g Dale
❑ Public hearing
At g Date
❑ Other
Jlltg Di,
SPONSOR ❑ Council ❑ Mayor ❑ I IR ❑ DCD [:] 1;inance [:] Fire [_1 IT [:] P& R [:] Police Z PIE"
SPONSOR'S Contract No. 07-123 with KPFF Consulting Engineers provided design for the TUC
SUMMARY Pedestrian/ Bicycle Bridge. Part of the design included the Green River Trail and new
sidewalks on Christensen Rd. With additional King County grant funds for Baker Blvd Non-
Motorized Improvements, the most cost effective way to design the additional work and
incorporate the existing design was to Supplement KPFFs contract. Council is being asked
to approve KPFFs Supplement No. 16 to Contract No. 07-123 in the amount of $77,798.67.
Rj,'1vii,'1wi,'1i) By ❑ cow mtg. ❑ CA&P Cmte [:] F&S Cmte Z Transportation Cmte
❑ Utilities Cmte ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
DATE: 02/28/17 COMMIT'17FE CHAIR: KATE KRULLER
RECOMMENDATIONS:
SPONSOR/Ai),MIN. Public Works Department
CoMm"f"T"I" Unanimous Approval; Forward to Consent Agenda
COST IMPACT / FUND SOURCE
Exi,i,"NDITURF Rj,"QUIRVID AMOUNT BUDGETED APPROPRIATION REQUIRED
$77,798.67 $100,000.00 $0.00
Fund Source: 104 ARTERIAL STREET FUND (PAGE 15, 2017 CIP)
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
03/06/17
MTG. DATE
ATTACHMENTS
03/06/17
Informational Memorandum dated 02/24/17
Page 15, 2017 CIP
KPFF Supplemental Agreement No. 16 to Contract No. 07-123
Minutes from the Transportation & Infrastructure Committee meeting of 02/28/17
45
.r.
City of Tukwila
Allan Ekberg, Mayor
TO: Transportation and Infrastructure Committee
FROM: Bob Gibermon, Public Works Director /0
BY: Cyndy Knighton, Senior Program Manager
CC: Mayor Ekberg
DATE: February 24, 2017
SUBJECT: Baker Boulevard Non-Motorized Improvements
Project No. 9161@4O9, Contract No. 07-123
Supplemental Agreement No. 16
ISSUE
Approve Supplemental Agreement No. 16 with KPFF for engineering design services for the Baker
Boulevard Non-Motorized Improvement Project.
BACKGROUND
KPFF has completed the design of the TUC e Bridge Project (Ped Bridge) and the
construction Uf the bridge iS underway. AS part Df the Pgd Bridge Project, deoignofMleGreenRivnrTn3i|8nd
new sidewalks on Christensen Road were completed. Due to funding limitations, construction along the trail
and the wide sidewalks on Christensen Road were removed from the construction bid documents.
DISCUSSION
Design of Baker Boulevard to include bike lanes and reduce the travel lanes to one in each direction (Baker
Road Diet) was included in the initial design contract with KPFF, but the design was never advanced to the
100% level as funding was reallocated to unexpected needs for the Ped Bridge design and permitting. At
the time the Ped Bridge project waaneahngdgSignCODlp|edion'KingCountvP@rhS8OdR8Cr8@1iOn[]iviSion
approached Tukwila with $1 million in County trail levee funds that could be used to design and construct
the Baker Road Diet and the sidewalk improvements along Christensen Road. The interagency agreement
between Tukwila and King County was approved by Council on December 5, 2016. A new project, Baker
Boulevard Non-Motorized Improvements, was created in the 2017-2022 CIP to encompass the
improvements into a single project.
Supplemental Agreement No. 16 to KPFF's Contract 07-123 was negotiated as the most cost effective and
expeditious way to have the design completed on Baker Boulevard and incorporated with the design work
already completed for the Green River Trail and Christensen Road.
FINANCIAL IMPACT
The additional costs for the Baker Boulevard design work and the packaging into a bid-ready document is
S77.798.67 and ie less than the $1OO.000 budgeted for design in the 2O17C|P.
RECOMMENDATION
Council is being asked to approve Supplemental Agreement No. 16 with KPFF for the Baker Boulevard
Non-Motorized Improvement Project inthgumountof$77.7S8.G7andconaiderthiaitemonthnConeard
Agenda 8[ the March 8.2017 Regular meeting.
Attachments: Pogo 15.2017 [xP
KPFF Supplemental Agreement No. 16
w:\pweng\pmjeom\a'nw&mprN*cts\baxo blvd non-motorized (9101O4oe)\info memo kp#ouppw1speU22^1rgl.donx
CITY OFTUKVVLA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: Baker Blvd Non-Motorized Improvements Project No. 91810*09
Design and construct non-motorized improvements on Baker Blvd from Andover Park West to Christensen Rd,
DESCRIPTION: including bike lanes with a proposed road diet. Project will also construct previously designed non-motorized
improvement on Christensen Rd from Baker Blvd 1n the Green River trail.
JUSTIFICATION: Improve non-motorized connections between the Tukwila Transit Center and Tukwila Station,
STATUS: New project for the 2017-2O22C|P.
MA|NT IMPACT: Minimal impuct, project includes new sidewalk trail and pavement markings.
Pn4e�ioa component of the TUC�OD Pedestrian |mpmveman�, Gmntfunding by the King Cnun�Dept
���x0�NT�
� of Natural Resources and Parks.
FINANCIAL Through Estimated
,.-°"""'-. ."~= vv^* v^17 vn^n ,o,n no»o 2o2i noxu usvomo TOTAL
EXPENSES
Design
100
100
Const, Mgmt.
120
120
Construction
780
780
TOTAL EXPENSES
01
01
1,000
1 0
1 01
01
01
01
01
1,000
FUND SOURCES
Awarded Grant
0
King County
1,000
1,000
Mitigation Actual
0
Traffic Impact Fees
0
TOTAL SOURCES
0
01
1,000
01
01
01
0
01
0
1 1,000
Project Location
2017 rncc Capital Improvement Program 15
We
50
iddlhk
"�` Washington State
A Department of Transportation
Supplemental Agreement
Organization and Address
KPFF Consulting Engineers
Number 16
1601 Fifth Avenue, Suite 1600
Seattle, WA 98101
Original Agreement Number
07 -123 (p)
Phone: (206) 622 -5822
Project Number
Execution Date
Completion Date
05 -RW03
December 31, 2017
Project Title
New Maximum Amount Payable
Tukwila Urban Center, Ped /Bicycle Bridge PSE
$ 2,153,200.32
Description of Work
PS &E for the Baker Boulevard Road Diet & Christensen Road Improvements.
The Local Agency of the City of Tukwila
desires to supplement the agreement entered into with KPFF Consulting Engineers
and executed on and identified as Agreement No. 07 -123
All provisions in the basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows:
Section 1, SCOPE OF WORK, is hereby changed to read:
See attached scope of work.
Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to chanae the number of calendar days for
completion of the work to read: Contract completion date remains as December 31, 2017.
III
Section V, PAYMENT, shall be amended as follows:
This supplement increases the contract value by $77,798.67, increasing the previously authorized maximum amount
payable to $2,153,200.32.
as set forth in the attached Exhibit A, and by this reference made a part of this supplement.
If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces
below and return to this office for final action.
David K. McMullen, P.E
By. KPFF Principal /Project Manager By: City of Tukwila
Consultant Signature
DOT Form 140 -063 EF
Revised 9/2005
Approving Authority Signature
Date
51
Baker Blvd Road Diet & Christensen Road Improvements
Plan, Specification and Cost Estimate (PSE)
Scope of Work
PROJECT DESCRIPTION & OBJECTIVES
KPFF is currently under contract with the City of Tukwila (City) for the Plans,
Specifications and Cost Estimate (PS&E) Phase of the Tukwila Urban Center
Pedestrian /Bicycle Bridge project. This supplement provides additional services
related to:
• Creating a new set of Plans, Specifications and Cost Estimate (PS&E)
combining the following previously designed elements:
1. Sidewalk, landscaping and illumination improvements from the
intersection of the Green River Trail (GRT) and Christensen Rd
south toward and including the intersection of Baker Blvd and
Christensen Rd.
2. Channelization, roadway signing and striping work of Baker Blvd
from the intersection of Christensen Rd west toward the
intersection of Andover Park W including signal, and ITS
modifications at Andover Park E.
SCOPE OF WORK
The following is a scope of work for additional design services in support of this
project's PSE Phase.
Task No. 1.0 Project Management and Administration
Task No. 1.10 - Project Management, Coordination & Invoicing
Team members shall provide continuous internal project management and
project team coordination. Team members shall prepare monthly invoices for
work completed. KPFF shall compile the invoices into a single document to be
submitted to the City.
Task No. 1.20 — Team Meetings
Team members shall meet internally to discuss project reorganization and
design issues. Two meetings assumed.
52
Task No 2.0 Right-of-Way and Additional Survey Services:
Task No. 2.10 Review Title Reports & Update Easements
KPG shall provide a review of previous City construction projects to verify
easements for sidewalks along Baker and Andover Park E. Easements shall be
added to the base map. Files from the past projects showing easements shall
be provided by the City.
KPG shall update the existing base map to include new curb ramps for the
east/west directions at the intersection of Baker Blvd and Andover Park E that
are to be installed in conjunction with water main and sewer replacements
under a separate project. CARD files for this shall be provided by the City.
Note: With the exception of the new ramps, survey for Baker Blvd and
Christensen has been completed, including existing illumination, signal poles,
cabinets, and signal loops. No underground utilities have been located.
Underground utility locates are not anticipated under this task.
Deliverables
Updated Survey Project Base Map with sidewalk easements and updated
curb ramps.
Task No 3.0 Preparation of Contract Documents (PS&E)
Task No. 3.10 - Repackaging Plans & Incorporating Signal Modifications
KPFF and KPG shall assist the City in determining the Baker roadway striping,
including design of protected bicycle facilities, as outlined in the King County
Parks and Recreation and City of Tukwila, Mobility Connections Facilities
Agreement for Baker Blvd and Christensen Road, approved 12/05/16. North-
south curb ramps will be upgraded to current City standards
Work includes modification of existing signal design at the intersection of
Andover Park E and Baker Blvd, field review of existing signal
equipment/conduit/wiring, video detection installation, loop abandonment,
APS push button installation, push button landing area compliance field
verification, coordination with City for new installation of East/West curb
ramps (associated with Andover Park E Water Main and Sewer replacement
project), countdown pedestrian heads, electrical wiring pole adjustments, ITS
raceway verification/ design and signal controller upgrades. Work also includes
the redesign of current plans based on reuse of existing electrical service
cabinet at the intersection of Christensen Road and Green River Trail access
point. This does not include relocation modifications to the existing controller
service cabinets.
53
Page 3
54
KPFF and KPG shall repackage current design plans incorporating any
aforementioned modifications into a complete set of Plans for submittal to the
City.
Task No. 3.20 - Update Quantities, Cost Estimate & Specifications
KPFF and KPG shall update and/or calculate bid item quantities for the work
shown in the Plans. An updated cost estimate shall be provided based upon
these quantities and review of current bid tabulations provided by the City. A
summary of quantities and a cost estimate shall be provided to the City for the
Draft Final and Final/Bid PS&E packages (see Task 3.30).
KPFF and KPG shall provide a complete Specifications package including
Divisions 1 through 10 and front end proposal documents. The specifications
shall be per the 2016 WSDOT Standard Specifications including any necessary
City special provisions. The City shall provide a specification and proposal
boilerplate for and any required forms associated with state and/or federal
funding.
Specifications shall be provided to the City for the Draft Final and Final/Bid
PS&E packages (see Task 3.30).
Task 3.30 - Submittal Preparation (Draft Final & Final/Bid)
KPFF and KPG shall prepare and submit a Draft Final and Final/Bid PS&E
package described above to the City. The Draft Final submittal shall be
prepared and submitted to the City for review and comment. Comments
received shall be discussed and responses to comments shall be generated for
City review and agreement. The Draft Final PS&E package shall be modified as
required based upon these comments and a Final/Bid submittal shall be
generated
The Final/Bid PS&E package shall be stamped, sealed and submitted to the
City for inclusion in the bid package.
Assumptions
• No additional storm drainage report work is included. The Storm Drainage
Report for the Tukwila Urban Center Bicycle/Bridge Project is assumed to
be adequate for permitting approval for this construction package.
• WSDOT MEF documentation for curb ramp layout is not included.
• No additional permitting effort is included.
• No additional right-of-way acquisition is included at this time. Additional
acquisition may be necessary for ideal curb ramp layout at the intersection
of Baker Blvd and Andover Park E.
Deliverables
• Plans and details to be included in Draft Final and Final/Bid level
submittal set (3 hardcopies, I electronic).
Page 4
0
• Cover Sheet & Index
• Legend and abbreviations (1) sheet
• Horizontal control (1) plan sheet
• TESC (4) plan and detail sheets
• Site prep (3) plan sheets
• Typical section (3) sheets
• Roadway plan/profile (3) sheets
• Roadway details (3) sheets
• Drainage and utility (2) plan sheets
• Channelization and signing (3) plan sheets
• Channelization and signing (1) detail sheet
• Pedestrian detour (1) plan sheet
• Signal/Illumination (6) plan and detail sheets
• Urban design (5) plan and detail sheets
• Planting design (3) plan and detail sheets
• Irrigation (3) plan and detail sheets
Quantities and Cost Estimate to be included in Draft Final and Final/Bid
submittals (3 hardcopies, I electronic)
Project Specifications to be included in Draft Final and Final/Bid submittal
(Electronic copies for Draft Final and Final/Bid, 3 hardcopies for Final/Bid)
55
EXHIBIT E-1
KPFF Consulting Engineers
CONSULTANT FEE DETERMINATION
SUMMARY OF COST
Tukwila Urban Center Package #1: Baker & Christensen Improvements
Classification Total Hours X Rate = Cost
Principal / Tech. Specialist
Project Manager
Senior Engineer
Design Engineer
Prof. Land Surveyor
Project Surveyor
Survey Crew
CADD Technician
Coordinator / Admin
Overhead (OH) Cost
OH Rate x DSC of
Fixed Fee (FF)
FF Rate x DSC of
Reimbursables
Mileage
Reprographics
Subcontract
(Blank)
Subtotal
8.00
X
$64.43 =
$515.44
96.00
X
$58.20 =
$5,587.20
0.00
X
$45.00 =
$0.00
152.00
X
$38.08 =
$5,788.16
0.00
X
$42.00 =
$0.00
0.00
X
$32.00 =
$0.00
0.00
X
$65.00 =
$0.00
89.00
X
$33.00 =
$2,937.00
12.00
X
$27.30 =
$327.60
DSC Subtotal
$15,155.40
137.52%
X
$15,155.40 =
$20,841.71
30.00%
X
$15,155.40 =
$4,546.62
(## Miles x $0.565/mile)
(## Sheets x $X.xx/sheet)
(Sub Name & Task)
(Allowance)
$0.00
Subconsultant Costs (See Exhibit G)
$37,254.95
IGRAND TOTAL: $77,798.67
56
COST ESTIMATE: Tukwila Urban Center Package #1: Baker & Christensen Improvements
57
EXHIBIT G-1
KPG
CONSULTANT FEE DETERMINATION
SUMMARY OF COST
Tukwila Urban Center Package #1: Baker & Christensen Improvements
Classification Total Hours X Rate = Cost
Senior E/LA
Project E/S
LA/Eng
Design Technician
Survey Crew
Office Admin.
Overhead (OH) Cost
OH Rate x DSC of
Fixed Fee (FF)
FF Rate x DSC of
Reimbursables
Mileage
Reprographics
Subcontract
(Blank)
Subtotal
70.00
X
$56.97 =
$3,987.90
100.00
X
$44.59 =
$4,459.00.
-
56.00
X
$40.38 =
$2,261.28.
104.00
X
$26.44 =
$2,749.76
8.00
X
$47.12 =
$376.96
3.00
X
$31.25 =
$93.75.
0.00
X
=
$0.00
0.00
X
=
$0.00.
DSC Subtotal
$13,928.65
136.21%
X
$13,928.65 =
$18,972.70
30.00%
X
$13,928.65 =
$4,178.60
(## Miles x $0.565/mile)
(## Sheets x $X.xx/sheet)
(Sub Name & Task)
(Allowance)
$175.00
ISubconsultant Total: $37,254.95
11
y
COST ESTIMATE: Tukwila Urban Center Package #1: Baker & Christensen Improvements
February 21 2017
KPG
L KPG
Tukwila Urban Center Package #1:
Senior
Design
Survey Office 1
E /LA
Piclect E /5;
LNEng
,Technician
Grew Admin.
0.00
0.00
Baker & Christensen Improvements
MULTIPLIER:
Item I SCOPE OF WORK
$56.97
$44.59; $40.38 $26.44 'i. $47.12 $31.25
$0.00
',, $0.00
2.6621
1 Project Management and Administration
1.10 Management, Coordination & Invoicing
10
'.. 3
$1,766
1.20 'Team Meetin gs
12
$1,820
Labor Subtotal:
22
0
0
0
0 3
0
0
$3,586
2 Right-of-Way and Additional Sume Services
210 IRReviZ Title Reports and update easements for Baker Blvd & Andover
a
8
8
$2,173
Labor Subtotal:
4
0
0
8
8 i 0
0
0
$2,173
.=63
$100
3 Preparation of Contract Documents PS &E
3.10 Repackaging Current Plans with Signal Modifications
32
80
40
80
$24280
3.20 Update Quantities, Cost Estimate & Specifications -
8
16
12
$4 403
3.30 Submittal Pre amtion (Draft Final &Final /Bid)
4
4
a
1s
$2,638
Labor Subtotal:
44
100
56
96
0 0
0
0
$31,321
sum:
Sum:
59
MI, 1,
Transportation & Infrastructure Committee Minutes ......................................................... ............................... February 28, 2017
relating to new Federal Highway Administration requirements, Bridge Replacement Advisory
Committee grant applications, and maintenance on the South 119' Street Pedestrian Bridge.
UNANIMOUS APPROVAL. FORWARD TO MARCH 6, 2017 REGULAR CONSENT AGENDA.
D. Supplemental Agreement: Baker Boulevard Non - Motorized Improvements
Staff is seeking Council approval of Supplemental Agreement No. 16 with KPFF Consulting
Engineers in the amount of $77,798.67 for engineering design services for the Baker Boulevard
Non- Motorized Improvement Project. KPFF designed the TUC Pedestrian /Bicycle Bridge
Project and construction is underway. $1 million in grant funding from King County will allow
the Cityto complete the originally planned bike lanes and road diet on Baker Boulevard as well
as sidewalk improvements on Christensen Road, which had been eliminated from the
Pedestrian Bridge Project due to lack of funding. This supplement will allow KPFF to
incorporate the new Baker Blvd improvements with the existing design. UNANIMOUS
APPROVAL. FORWARD TO MARCH 6, 2017 REGULAR CONSENTAGENDA.
III. SCATBd
IV. MISCELLANEOUS
The Transportation
61