Loading...
HomeMy WebLinkAboutTIC 2017-03-28 COMPLETE AGENDA PACKETCity of Tukwila Transportation and Infrastructure Committee • Kate Kruller, Chair • Joe Duffie • De'Sean Quinn AGENDA Distribution: R. Turpin K. Kruller Deputy Clerk J. Duffie Clerk File Copy D. Quinn 2 Extra D. Robertson Mayor Ekberg Place pkt pdf on Z: \Trans & D. Cline Infra Agendas L. Humphrey e-mail cover to: A. Le, B. Giberson C. O'Flaherty, K. Kruller, R. Tischmak D. Robertson, D. Almberg, G. Labanara B. Saxton, S. Norris, P. Brodin L. Humphrey TUESDAY, MARCH 28, 2017 — 5:30 PM FOSTER CONFERENCE ROOM — 6300 BUILDING Next Scheduled Meeting: Tuesday, April 11, 2017 SThe City of Tukwila strives to accommodate individuals with disabilities. Please contact the Public Works Department at 206- 433 -0179 for assistance. Item Recommended Action: Page 1. PRESENTATION(S) 2. BUSINESS AGENDA a) NPDES Program a) Information Only Pg. 1 2016 Annual Report and 2017 SWMP Plan b) S144 1h St Phase II Project (42nd Ave S — TIB) b) Forward to 4/3/17 Regular Pg. 33 Supplemental Agreement No. 7 with KPG, Inc. Consent Agenda c) Boeing Access Rd Over BNRR Bridge Rehabilitation Project c) Forward to 4/3/17 Regular Pg. 45 Bid Award Consent Agenda d) Presentation on the State of the City's Bridges d) Information Only Pg. 55 e) Bridge Replacement Advisory Committee (BRAC) e) Committee Approval Pg. 67 Applications — Approve Grant Submittal(s) 3. SCATBd 4. MISCELLANEOUS 5. ANNOUNCEMENTS Future Agendas: Next Scheduled Meeting: Tuesday, April 11, 2017 SThe City of Tukwila strives to accommodate individuals with disabilities. Please contact the Public Works Department at 206- 433 -0179 for assistance. City of Tukwila Allan Ekberg, Mayor Public Works Department - Bob Giberson, Director TO: Transportation and Infrastructure Committpe FROM: Bob Giberson, Public Works Director lio CC: Mayor Ekberg DATE: March 24, 2017 SUBJECT: NPDES Program Project No. 99341210 2016 Annual Report and 2017 Stormwater Management Program Plan ISSUE Review the City's 2016 National Pollutant Discharge Elimination System (NPDES) Annual Report and 2017 Stormwater Management Program (SWMP) Plan. BACKGROUND The NPDES Program requires that the City implement a comprehensive SWMP Plan that complies with the requirements outlined in the City's current NPDES Phase 11 permit. The permit requires that the City develop a SWMP Plan and submit annual reports to the Department of Ecology (DOE) outlining our progress in meeting permit requirements by March 31st of each year. The SWMP Plan document describes proposed activities for the current year training, procedural, and documentation requirements that the City must follow. The SWMP Plan is updated annually to reflect any required changes to our program and to provide greater detail as various programs are fully developed. Once the SWMP Plan is submitted to the DOE, it will be used to determine whether permit obligations are being met. DISCUSSION City staff completed the 2016 Annual Report, which reflects activities completed by the City in 2016. In addition, staff also updated the 2016 SWMP Plan to reflect permit requirements for 2017. All 2017 updates are printed in blue for reference. The 2016 Annual Report must be signed by the City Administrator and both documents electronically submitted to the DOE by the reporting deadline of March 31, 2017. RECOMMENDATION Information only. Attachments: 2016 Annual Report 2017 Stormwater Management Program Plan WAPW Eng\PROJECTS\A- DR Projects\NPDES Program (99341210)\Annual Reports and Surface Water Management ProgramI Annual Report & 2017 SWMP Plan\2017 SWMP 2016 Annual Report Package\lnfo Memo TIC sm.docx 1 3/21/2017 WQWebSubmittal Home WQWebSubmittal - Search WQWebSubmittal Category Name: General Obligations Number Permit Section Question 1 S5.A.2 Attach updated annual Stormwater Management Program Plan (SWMP Plan). (S5.A.2) Choose File ;? No file chosen Saved Document Name: 2017 SWMP Plan Final sm_1_03212017020455 2 S9.D.5 Attach a copy of any annexations, incorporations or boundary changes resulting in an increase or decrease in the Permittee's geographic area of permit coverage during the reporting period per S9.D.5. Choose File I No file chosen Not Applicable 3 S5.A.3 Implemented an ongoing program to gather, track, and maintain information per S5.A.3, including costs or estimated costs of implementing the SWMP. Yes No 4 S5.A.5.b Coordinated among departments within the jurisdiction to eliminate barriers to permit compliance. (S5.A.5.b) Yes No !Zack to Categories �A Save and Next 14 Save L-A Cancel 41 Ecology Home WQWebPertal Home 1 WQWebS, brn teal `some i He p I Release Notes 1 Contact Us Submittals (WQWebSubmittal) Version 1.4.01 Data Disclaimer I Privacy Policy Copyright O Washington State Department of Ecology 2017, All Rights Reserved. 2 https:// secureaccess. wa. gov/ ecy/ wgwebportal/ wgwebsubmittal /QuestionnaireCategory .aspx ?Categoryld= 26 &CategoryN am e= General %200bl i gations 1/1 3/21/2017 WQWebSubmittal Home Category Name: Public Outreach Number Permit Section Question WQWebSubmittal - Search WQWebSubmittal • 5 S5.C.1.a.i and ii Attach description of public education and outreach efforts conducted per S5.C.1.a.i and ii. Choose File i No file chosen Saved Document Name: 2016 Education and Outreach Ef_5_03212017020703 6 S5.C.1.b Created stewardship opportunities (or partnered with others) to encourage resident participation in activities such as those described in S5.C.1.b. t Yes I J No 7 S5.C.1.b Used results of measuring the understanding and adoption of targeted behaviors among at least one audience in at least one subject area to direct education and outreach resources and evaluate changes in adoption of targeted behaviors. (Required no later than February 2, 2016, S5.C.1.b) Yes No 7b S5.C.1.b Attach description of how this requirement was met. Choose File 1 No file chosen Saved Document Name: 2016 Meas Underst Adopt Targ B_7b_03212017020703 8 S5.C.2.a Describe the opportunities created for the public to participate in the decision making processes involving the development, implementation and updates of the Permittee's SWMP. (S5.C.2.a) Opportunities are provided at 9 S5.C.2.b Posted the updated SWMP Plan and latest annual report on your website no later than May 31. (S5.C.2.b) `Yes No Number Permit Section Ouestion 113 https:// secureaccess. wa. gov/ ecy/ wgwebportaUwgwebsubmittal /QuesfonnaireCategory .aspx ?Categoryld =28 1/2 3/21/2017 9-b- WQWebSubmittal - Search S5.C.2.b List the website address. http://www.tukwila.gov/pubw Back to Categories A Save and Previous Save and Next 4 Save Ld Cancel �X Ecology Home ! WQWebPortal Home ! WQWelsSubmittal Home Help I Release Notes i Contact Us Submittals (WQWebSubmittal) Version 1.4.0 1 Data Disclaimer 11 Privacy Policy Copyright @ Washington State Department of Ecology 2017. All Rights Reserved. 4 hftps://secureaccess.wa.gov/ecy/wqwebportalA,vqwebsubmittal/QuestonnaireCategory.aspx?Categoryld=28 2/2 3/21/2017 WQWebSubmittal Nome Category Name: IDDE WQWebSubmittal - Search WQWebSubmittal I - 9 6 Number Permit Section Question 10 S5.C.3.a.i - vi Maintained a map of the MS4 including the requirements listed in S5.C.3.a.i. -vi. Yes 'No 11 S5.C.3.b.v Implemented a compliance strategy, including informal compliance actions as well as enforcement provisions of the regulatory mechanism described in S5.C.3.b. (S5.C.3.b.v) !!,'Yes No 12 S5.C.3.b.vi Updated, if necessary, the regulatory mechanism to effectively prohibit illicit discharges into the MS4 per S5.C.3.b.vi. (Required no later than February 2, 2018) Yes ' No Not Applicable 13 S5.C.3.c.i Implemented procedures for conducting illicit discharge investigations in accordance with S5.C.3.c.i. Yes J No 13b S5.C.3.c.i Cite methodology Illicit Discharge Detection an 14 S5.C.3.c.i Percentage of MS4 coverage area screened in reporting year per S5.C.3.c.i. (Required to screen 40% of MS4 no later than December 31, 2017 (except no later than June 30, 2018 for the City of Aberdeen) and 12% on average each year thereafter. (S5.C.3) 15 15 S5.C.3.c.ii List the hotline telephone number for public reporting of spills and other illicit discharges. (S5.C.3.c.ii) 206 -431 -1860 I Number Permit Section Ouestion 115 https:// secureaccess. wa. gov/ ecy/ wgwebportal/ wgwebsubmittal /QuesbonnaireCategory .aspx ?Categoryld =29 1/3 a/2V2U7 WQWebGubmdtal-Search ` 15b S5.C.3.di Number of hotline calls received. � 28 16 S5.C.3.c.iii Implemented an ongoing illicit discharge training program for all municipal field staff per S5.C.3.c.iii. ��Yes No 17 S5.C.3.c.iv Informed public employees, businesses, and the general public of hazards associated with illicit discharges and improper disposal of waste. (S5.[3.c.iv) Yes -'No 17b S5.C.3.c.iv Describe the information sharing actions. (S5.C.3.c.iv) Information ohadng for public 18 S5.C.3.d Implemented an ongoing program to characterize, trace, and eliminate illicit discharges into the MS4 per S5.C.3.d. ,0 Yes �� No 19 S5.C.3.d.iv Number of illicit discharges, including illicit connections, eliminated during the reporting year. /S5.C.3.d.ivj 20 S6.C.3.d.iv Attach a summary of actions taken to characterize, trace and eliminate each illicit discharge found by or reported tothe perrnittee. For each illicit discharge, include a description of actions according to required timeline per S5.C.3.d.iv No file chosen Saved Document Name: 2016 Annual ReportIODE Sum mar2003212017020740 �_' Not Applicable 21 S5.C.3.e Municipal illicit discharge detection staff are trained to conduct illicit discharge detection and elimination activities as described in S5.C.3.e. Yes No Back to Categories -A Save and Previous � Save and Next save Cancel �X eodcgv Herne | WQWebPortn| Home ! WQWebSubmu�| *om� | *�p | mg���No�e | Contact 0 hftps://secumaccess i«al/Questionnaimcmegory.aspx?Category|d=29 2/3 3/21/2017 WQWebSubmittal Home Category Name: Runoff Controls WQWebSubmittal - Search WQWebSubmittal E Number Permit Section Question 22 S5.C.4.a 'Implemented an ordinance or other enforceable mechanism to address runoff from new development, redevelopment and construction sites per the requirements of S5.C.4.a. Yes No 23 S5.C.4.a.i -iii Revised ordinance or other enforceable mechanism to effectively address runoff from new development, redevelopment and construction sites per the requirements of S5.C.4.a.i -iii. (Required no later than December 31, 2016, except no later than June 30, 2017 for Permittees in Lewis and Cowlitz counties, and no later than June 30, 2018 for the City of Aberdeen) Yes ' No 23b S5.C.4.a.i -iii Cite code reference for revised ordinance or other enforceable mechanism to address runoff from new development, redevelopment and construction sites. Ordinance No. 2516, 2517 & Not Applicable 24 S5.C.4.a.i Number of exceptions granted to the minimum requirements in Appendix 1. (S5.C.4.a.i., and Section 6 of Appendix 1) 0 25 S5.C.4.a.i Number of variances granted to the minimum requirements in Appendix 1. (S5.C.4.a.i., and Section 6 of Appendix 1) 9 26 S5.C.4.b.i Reviewed Stormwater Site Plans for all proposed development activities that meet the thresholds adopted pursuant to S5.C.4.a.i. (S5.C.4.b.i) Yes No I I Number Permit Section Ouestion 1 1 7 https:// secureaccess. wa. gov/ ecy/ wgwebportal/ wgwebsubmittal /QuestionnaireCategory .aspx ?Categoryld =30 1/4 3/21/2017 WQWebSubmittal - Search 26b S5.C.4.b.i Number of site plans reviewed during the reporting period. 88 27 S5.C.4.b.ii Inspected, prior to clearing and construction, permitted development sites that have a high potential for sediment transport as determined through plan review based on definitions and requirements in Appendix 7 Determining Construction Site Sediment Damage Potential, or alternatively, inspected all construction sites meeting the minimum thresholds adopted pursuant to S5.C.4.a.i. (S5.C.4.b.ii) Yes No 27b S5.C.4.b.ii Number of construction sites inspected per S5.C.4.b.ii. 26 28 S5.C.4.b.iii Inspected permitted development sites during construction to verify proper installation and maintenance of required erosion and sediment controls. (S5.C.4.b.iii) Yes No 28b S5.C.4.b.iii Number of construction sites inspected per S5.C.4.b.iii. 26 29 S5.C.4.b.ii, iii and Number of enforcement actions taken during the reporting period (based on construction phase inspections at new development and redevelopment projects). (S5.C.4.b.ii, iii and v) 0 30 S5.C.4.b.iv Inspected all permitted development sites that meet the thresholds in S5.C.4.a.i upon completion of construction and prior to final approval or occupancy to ensure proper installation of permanent stormwater facilities. (S5.C.4.b.iv) Yes 'No 31 S5.C.4.b.ii -iv Achieved at least 80% of scheduled construction- related inspections. (S5.C.4.b.ii -iv) Yes No Number Permit Section Question II Ila https: // secureaccess. wa. gov/ ecy/ wgwebportal/ wgwebsubmittal/ QuesbonnaireCategory .aspx ?Categoryld =30 2/4 3/21/2017 WQWebSubmittal - Search 32 S5.C.4.b.iv Verified a maintenance plan is completed and responsibility for maintenance is assigned for projects. (S5.C.4.b.iv) Yes No 33 S5.C.4.c Implemented provisions to verify adequate long -term operation and maintenance (O &M) of stormwater treatment and flow control BMPs /facilities that are permitted and constructed pursuant to S5.C.4. a and b. (S5.C.4.c) Yes , No 34 S5.C.4.c.i and ii Updated provisions to verify long -term operation and maintenance of stormwater treatment and flow control BMPs /facilities that are permitted pursuant to S5.C.4.a and b. (Required no later than December 31, 2016, except no later than June 30, 2017 for Permittees in Lewis and Cowlitz counties, and no later than June 30 2018 for the City of Aberdeen, S5.C.4.c.i and ii Yes No 35 S5.C.4.c.iii Annually inspected stormwater treatment and flow control BMPs /facilities per S5.C.4.c.iii. -, Yes No 35b S5.C.4.c.iii If using reduced inspection frequency for the first time during this permit cycle, attach documentation per S5.C.4.c.iii Not Applicable 36 S5.C.4.c.iv Inspected new residential stormwater treatment and flow control BMPs /facilities and catch basins every 6 months per S5.C.4.c.iv to identify maintenance needs and enforce compliance with maintenance standards. Yes No - Not Applicable 37 S5.C.4.c.v Achieved at least 80% of scheduled inspections to verify adequate long -term O &M. (S5.C4.c.v) Yes No Not Applicable 38 S4.C.4.c.vi Verified that maintenance was performed per the schedule in S5.C.4.c.vi when an inspection identified an exceedance of the maintenance standard. Yes No Not Applicable Number Permit Section Question I I 38b S5.C.4.c.vi Attach documentation of anv maintenance delays. (S5.C.4.c.vi) 1 1 9 https:// secureaccess. wa. gov/ ecy/ wgwebportal/ wgwebsubmittal /QuesbonnaireCategory .aspx ?Categoryld =30 3/4 3/21/2017 WQWebSubmittal - Search Choose File 1 No file chosen i'i Not Applicable 39 S5.C.4.d Provided copies of the Notice of Intent for Construction Activity and Notice of Intent for Industrial Activity to representatives of proposed new development and redevelopment. (S5.C.4.d) Yes No 40 S5.C.4.e All staff responsible for implementing the program to control stormwater runoff from new development, redevelopment, and construction sites, including permitting, plan review, construction site inspections, and enforcement are trained to conduct these activities. (S5.C.4.e) Yes No 41 S5.C.4.f.i Reviewed, revised and made effective the low impact development - related enforceable documents per S5.C.4.f.i. (Required by December 31, 2016, except by June 30, 2017 for Permittees in Lewis and Cowlitz counties, and by June 30, 2018 for the City of Aberdeen) Yes No 41b S5.C.4.f.ii Attach a summary of the LID review and revision process that includes the requirements listed in S5.C.4.f.ii. (Required with annual report due no later than March 31, 2017, except no later than March 31, 2018 for Permittees in Lewis and Cowlitz counties, and with the Fifth Year annual report for the City of Aberdeen) I Choose File I No file chosen Saved Document Name: LID Code Update Final Summary _4lb_03102017012033 42 S5.C.4.g Participated and cooperated with the watershed -scale stormwater planning process led by a Phase I county. (S5.C.4.g) Yes No Not Applicable Back to Categories Sage and Previous Save and Next 41 Save 0 Cancel Ecology Home j WQWebPortail Horne i W WebSubmifta Horne HeIP, ! Rele=ase Notes Contact Lis Submittals (WQWebSubmittal) Version 1.4.0 ; Data Disclaimer I Privacy Policy Copyright @ Washington State Department of Ecology 2017, All Rights Reserved. 10 https:// secureaccess. wa .gov /ecylwgwebportal/wgwebsubm ittal /Quesb onnai reC ategory.aspx ?Categoryld =30 4/4 3/21/2017 ViWEWebSubmittal Name Category Name: O & M WQWebSubmittal - Search Wt Web ubmittal Number Permit Section Question 43 S5.C.5.a Updated and Implernented maintenance standards as protective, or more protective, of facility function as those specified in Chapter 4 of Volume V of the Stormwater Management Manual for Western Washington (as amended 2014). (Required no later than December 31, 2016, except no later than June 30, 2017 for Permittees in Lewis and Cowlitz counties, and no later than June 30, 2018 for the City of Aberdeen, S5.C.5.a). ' Yes No 44 S5.C.5.a Applied a maintenance standard that is not specified in the Stormwater Management Manual for Western Washington. Yes " No Not Applicable 45 S5.C.5.a.ii Performed timely maintenance per S5.C.5.a.ii. Yes No 46 S5.C.5.b Annually inspected all municipally owned or operated permanent stormwater treatment and flow control BMPs /facilities. (S5.C.5.b) Yes No 46b S5.C.5.b Number of known municipally owned or operated stormwater treatment and flow control BMPs /facilities. (S5.C.5.b) 47 46c S5.C.5.b Number of facilities inspected during the reporting period. (S5.C.5.b) 47 46d S5.C.5.b Number of facilities for which maintenance was performed during the reporting period. (S5.C.5.b) 20 I I Number Permit Section Ouestion ( (11 https:// secureaccess. wa. gov/ ecy/ wgwebportal/ wgwebsubmittal /QuestonnaireCategory .aspx ?Categoryld =31 1/3 3/21/2017 M EEO 49c lamans WQWebSubmittal - Search S5.C.5.b If using reduced inspection frequency for the first time during this permit cycle, attach documentation per S5.C.5.b. Choose File r No file chosen ✓Not Applicable S5.C.5.c Conducted spot checks and inspections (if necessary) of potentially damaged stormwater facilities after major storms as per S5.C.5.c. Yes No Not Applicable S5.C..5.d Inspected all municipally owned or operated catch basins and inlets as per S5.C.5.d, or used an alternative approach. (Required once no later than August 1, 2017 and every two years thereafter, except once no later than June 30, 2018 and every two years thereafter for the City of Aberdeen) �- Yes No Not Applicable S5.C.5.d Number of known catch basins. 5823 S5.C.5.d Number of catch basins inspected during the reporting period. 1582 S5.C.5.d Number of catch basins cleaned during the reporting period. 1582 50 S5.C.5.d.i -ii Attach documentation of alternative catch basin cleaning approach, if used. (S5.C.5.d.i or ii) Choose File ! No file chosen i Not Applicable 51 S5.C.5.f Implemented practices, policies and procedures to reduce stormwater impacts associated with runoff from all lands owned or maintained by the Permittee, and road maintenance activities under the functional control of the Permittee. (S5.C.5.f) Yes > No 52 S5.C.5.g Implemented an ongoing training program for Permittee employees whose primary construction, operations or maintenance job functions may impact stormwater quality. (S5.C.5.g.) Yes < No Number Permit Section Question I 1 1 112 https:// secureaccess. wa .gov /ecy/wgwebportal/wgwebsubm ittal/ QuesbonnaireCategory .aspx ?Categoryld =31 213 3/21/2017 WQWebSubmittal - Search 53 S5.C.5.h Implemented a Stormwater Pollution Prevention Plan for all heavy equipment maintenance or storage yards, and material storage facilities owned or operated by the Permittee in areas subject to this Permit that are not required to have coverage under an NPDES permit that covers stormwater discharges associated with the activity. (S5.C.5.h) Yes No Not Applicable Back to Categories Save and Previous Save and Next 4 Save La Cancel Ecology Home WQWebPortal Horne i WQWebSubmittal Hone i Help ' Release totes ; Contact Us Submittals (WQWebSubmittal) Version 1.4.0 i Data Disclaimer 1 Privacy Policy Copyright @ Washington State Department of Ecology 2017, All Rights Reserved. 13 https: / /secureaccess .wa.gov /ecy/wgwebportal/ wqwebsubmittal /QuesfonnaireCategory .aspx ?Categoryld =31 3/3 3/21/2017 WOWebSubmittai Horne C. ., l TMDL Number Permit Section Question WQWebSubmittal - Search WQ WebSubmitt l • - r 54 S7.A Complied with the Total Maximum Daily Load (TMDL)- specific requirements identified in Appendix 2. (S7,A) %Yes r No Not Applicable 55 S7.A For TMDLs listed in Appendix 2: Attach a summary of relevant SWMP and Appendix 2 activities to address the applicable TMDL parameter(s). (S7.A) Choose File No file chosen Not Applicable Back to Categories = Save and Previous Save and Next 4 Save Lh Cancel P Ecology Home i WQWebPortal Horne WQWebSubmittal Home i Helpp i Release Notes i Contact us Submittals (WQWWebSubmittal) Version 1.4.0 1 Data Disclaimer ( Privacy Policy Copyright Cc� Washington State Department of Ecology 2017. All Rights Reserved. 14 https:// secureaccess. wa. gov/ ecy/ wgwebportaUwgwebsubmittal /QuesbonnaireCategory .aspx ?Categoryld =32 1/1 3/21/2017 WQWebSubmittal Herne Category Name: Monitoring WQWebSubmittal - Search WQWeb ubmittal Number Permit Section Question 56 S8.A Attach a description of any stormwater monitoring or stormwater - related studies as described in S8.A. Choose File No file chosen °g.i Not Applicable 57 S8.13.1 Participated in cost - sharing for the regional stormwater monitoring program (RSMP) for status and trends monitoring. (S8.B.1) ` Yes No Not Applicable 58 S8.C.1 Participated in cost - sharing for the regional stormwater monitoring program (RSMP) for effectiveness studies. (S8.C.1) (Required to begin no later than August 15, 2014) Yes No 59 S8.D.1 Contributed to the RSMP for source identification and diagnostic monitoring information repository in accordance with S8.D.1. (Required to begin no later than August 15, 2014) `'Yes No 60 G3 Notified Ecology in accordance with G3 of any discharge into or from the Permittees MS4 which could constitute a threat to human health, welfare or the environment. (G3) Yes 1? No Not Applicable Sack to Categories A Save and Previous 07 Save and Next 4 Sage LJ Cancel i' Ecology ?°omne WQWebPortal Home WOWebSubrnittal Home He p Release Notes i Confact Us Submittals (WQWebSubmittal) Version 1.4.0 Data Disclaimer Privacy Policy Copyright O`cc Washington State Department of Ecology 2017. All Rights Reserved, 15 https:// secureaccess. wa. gov/ ecy/ wgwebportal/ wgwebsubmittal/ QuesbonnaireCategory .aspx ?Categoryld =33 1/2 3/21/2017 WQWebSubmittal - Search WQWebSubmittal WQWebSubmittal Home r_' TITIT MM Category Name: General Obligations 2 Number Permit Section Question 61 G3 Number of G3 notifications provided to Ecology. 9 62 G3.A Took appropriate action to correct or minimize the threat to human health, welfare, and /or the environment per G3.A. %Yes No Not Applicable 63 S4.F.1 Notified Ecology within 30 days of becoming aware that a discharge from the Permittee's MS4 caused or contributed to a known or likely violation of water quality standards in the receiving water. (S4.F.1) Yes No Not Applicable 64 S4.F.3.a If requested, submitted an Adaptive Management Response report in accordance with S4.F.3.a. Yes No Not Applicable 65 S4.F.3.d Attach a summary of the status of implementation of any actions taken pursuant to S4.F.3 and the status of any monitoring, assessment, or evaluation efforts conducted during the reporting period. (S4.F.3.d) Choose File,f No file chosen •! Not Applicable 66 G20 Notified Ecology of the failure to comply with the permit terms and conditions within 30 days of becoming aware of the non- compliance. (G20) Yes No Not Applicable I I Number Permit Section Ouestion 1 116 https:// secureaccess. wa. gov/ ecy/ wgwebportaf/ wgwebsubmittal /QuesbonnaireCategory .aspx ?Categoryld =27 1/2 3/21/2017 W., WQW&Sulbmittal - Search Number of non-compliance notifications (G20) provided in reporting year. 0 G20 List the permit conditions described in non-compliance notification(s). Not Applicable Back to Categories Save and Previous Save and Complete 4 Save 0 Cancel Ecology Hornre i WQWebPortal Home , WQWebSubmittal Home ; Help Release Notes i Contact Us Submittals (WQWebSubmittal) Version 1.4.0 ' Data Disclaimer I Privacy Policy Copyright @ Washington State Department of Ecology 2017, All Rights Reserved, 17 hftps://secureaccess.wa.gov/ecyAAtqwebportalA,vqwebsubmittal/QuesbonnaireCategory.aspx?Categoryld=27 2/2 2016 Education and Outreach Efforts The City of Tukwila has an active public educational and outreach program, regarding general impacts of stormwater on surface waters, using the following approaches and target audiences: • 3tOnmxvater topics were inserted into utility bill mailings and posted on the City's NPQE3 web page and brochures and flyers placed at strategic locations. Topics included Low Impact Development and Discharging Carpet Wastewater to a Storm Drain i3 Illegal. • The City conducted a Stormwater Survey and Assessment in 2015 which measured the public's understanding O[St0rnnvvater pollution and its effects on our creeks, river, and the Puget Sound. The City used the findings from 2015 and in 2016 targeted City residents and businesses by informing them of a priority 1 issue regarding impervious pavement, sediment, automotive fluid leaks, car wash soapy water runoff and pet waste. • In 2016, the City posted LID Code update findings, draft amendments to our City Development Codes and draft amendments to our City Infrastructure Design and construction Standards. The City also posted the 2OIG King County Surface Water D4esign Manual and 2OI6 King County StOrnoxvater Pollution Prevention Manual. The City's NPDE5 web page also posted an Illicit Discharge Detection & Elimination video that is available in English and Spanish and a Lost and (Puget) Sound 3tUrnnvx3t8r video directed 8t school aged children. • The City provided an NPDES Inspection Van that included interactive stornnvv8tert9sting at a City sponsored Touch a Truck event that is held annually. Interactive water sample testing was conducted with the public to promote water quality in Gilliam Creek, Riverton Creek, Southgate Creek, Johnson Creek, cottage Creek and the Green/DuvvarniyhRiver. • The City provided a SVVW1P booth at the annual Backyard Wildlife Festival. Staff promoted |ovx impact development by demonstrating how pervious concrete works and conducted e hands-on water sampling demonstration using a turbidity noe1Cr and pH test kits. Also, staff engaged with the children using a Child Passport Questionnaire regarding stOrnnvvaterquality. • A variety of brochures are made available, and are handed out during residential and business storm drainage inspections on LOvv Impact Development, Protecting Washington's Waters from 5tormnvv8t8r Pollution and Antifreeze Recycling. • The City uses government Channel 21 which was implemented a3a tool to provide updates and information. W:\PWEng\PROJECTSw- 1210wm"=nep,rts=msurf=°Water Management proorams\2oo Annual Report &umroww,pm"unromM,zm6Annual Report packaoe\2016sdu"ati" and Outreach sffo^s.do= �,. P 2016 Measuring the Understanding and Adoption of Targeted Behaviors The City conducts ongoing phone surveys to measure the general public's knowledge and practices regarding stormwater in the City of Tukwila. In addition, the research assesses Tukwila businesses stormwater practices and behaviors. The City uses the research for stormwater planning as well as educational outreach to improve the target audience's understanding of the stormwater impacts. For 2016 the City used the results of the 2015 survey which the following outcomes were identified: 1. Determined the overall public perception of the quality of surface water in Tukwila and compared it to the previous year' rating. 2. Identified Priority 1, priority 2 and Priority 3 issues for Tukwila residents. This helps to determine what perceptions, behaviors, and practices need the most attention as well as provide direction for an educational outreach program. 3. Identified shifts and trends in Identified Priority 1, priority 2 and Priority 3 issues that occurred from previous years. 4. Identified Priority 1, priority 2 and Priority 3 issues for residents and property owners. The 2015 survey indicated there was a 20% drop in correct answers regarding the true or false statement "carpet shampoo wastewater can be safely added to a stormwater drain ". For this reason, the City chose to target the public and businesses by inserting a Discharging Carpet Wastewater to a Storm Drain is Illegal" information sheet into a surface water utility billing. W: \PW Eng \PROJECTSW- DR Projects \NPDES Program (99341210)\Annual Reports and Surface Water Management Programs\2016 Annual Report & 2017 SWMP Plan\2017 SWMP 2016 Annual Report Package\2016 Mess Underst Adopt Targ Behav Final.docx IF] City of Tukwila 2017 Update Stormwater Management Program Plan (SWMP) Plan Prepared By City of Tukwila Public Works Department 011 City of Tukwila Stormwater Management Program Plan TABLE OF CONTENTS INTRODUCTION......................................................................................... ..............................1 NPDES PHASE II PROGRAM COMPONENTS ..................................... ..............................2 1. Public Education and Outreach .............................................................. ..............................2 2. Public Involvement and Participation .................................................... ..............................4 3. Illicit Discharge Detection and Elimination .......................................... ..............................4 4. Controlling Runoff from New Development, Redevelopment, and Construction Sites ...... 6 5. l%,arr� (J pa] ()perr°atnanrr s aml l la'Jl tmarr�ce ................................................ ..............................7 6. Compliance with Total Maximum Daily Load Requirements ............... ..............................9 7. Monitoring and Assessment ................................................................... ..............................9 CONCLUSION............................................................................................ .............................10 041 The National Pollutant Discharge Elimination System (NPDES) permit program is a requirement of the federal Clean Water Act. The federal Environmental Protection Agency (EPA) has delegated permit authority to state environmental agencies. In Washington, the NPDES delegated permit authority is the Washington State Department of Ecology (DOE). The City of Fk.dl <wila prepared this dock:dment to meet the requirements for a Stormwater Management Program (SWMP) Plan as required by the NPDES Phase II Stormwater Permit issd:ded to the (';ity of ' kdl <.wila by [)0 E. The SWMP Plan was developed to reduce pollutant discharges from the City's Municipal Separate Storm Sewer System (MS4). Tukwila is defined as a Phase II community by DOE and, therefore, mandated to comply with the requirements of the NPDES Phase II Stormwater Permit. Phase II communities are those that: • Own and operate a storm drain system • Discharge to surface waters of the state • Are located in urbanized areas • Have a population of more than 1,000 Municipalities with a population of over 100,000 (as of the 2010 census) have been designated as Phase I communities and must comply with DOE's Phase I NPDES Municipal Stormwater Permit. Tukwila's population is below the 100,000 threshold and must comply with the Phase II Municipal Stormwater Permit. Approximately 100 other municipalities in Washington must now comply with the Phase II Permit, as operators of small "municipal separate storm sewer systems" (MS4). Ecology's Phase II Permit is available on Ecology's website at: http: / /www. ecy.wa. gov /programs /wq /stormwater/ municipal /phaseIIww /wwphiipennit.html Tukwila completed requirements of its initially issued NPDES Phase II Stormwater Permit which expired July 31, 2013. Tukwila applied to the Department of Ecology and was issued a new five -year term NPDES Phase II Stormwater Permit on August 1, 2012 with an effective date of August 1, 2013 and an expiration date of July 31, 2018. The Permit was then modified and reissued December 17, 2014 with an effective date of January 16, 2014 to further control the discharge of pollutants to protect surface water and ground water quality in Washington State The Permit allows discharge of stormwater runoff from municipal drainage systems into the state's water bodies (i.e., streams, rivers, lakes, wetlands, etc.) if municipalities implement programs to protect water quality by reducing the discharge of "non -point source" pollutants to the "maximum extent practicable" (MEP). In addition, the City must meet "all known and reasonable treatment" (AKART) through application of Permit specified "best management practices" (BMPs). The rmkjonity of T'ukwila's MS4 either drains to Riverton (..reek, Soddthgate (:'reel <:, Gilliam (.'reel <, John Creel< or directly to the (_ireen7 /[X�wadnish diver. The remaining areas infiltrate into the grod:d:n7d. PA The practices specified in the Permit are collectively referred to as the SWMP Plan and grouped under the following program components: • Public Education and Outreach • Public Involvement and Participation • Illicit Discharge Detection and Elimination • Controlling Runoff from New Development, Redevelopment, and Construction Sites • Mkmicipal Operation and Maintenance • Special condition, Total Maximum Daily Load Requirements • Special condition, Monitoring and Assessment The following sections describe requirements of each program component and the City's planned activities to meet the requirements. In general, the City of Tukwila is currently performing all previously required Permit activities and has programs in place to address the updated Permit requirements. 1. Public Education and Outreach 1.1 Permit Requirements The Permit (Section S5.C.1.) requires the City to: • Target and implement an educational and outreach program that will build general awareness to the general public, businesses, engineers, contractors, developers, development staff and land use planners and other City employees that will help to reduce and eliminate behaviors and practices that cause or contribute too adverse stormwater impacts. • Implement an outreach program that targets a selected audience with the purpose of improving their understanding and behaviors that impact surface water. • Create stewardship opportunities and /or partner with existing organizations to encourage residents to participate in activities such as stream teams, storm drain marking, volunteer monitoring, riparian plantings, and education activities. • Measure the understanding and adoption of the targeted behaviors for at least one selected audience and one selected topic. • Track and maintain records of public education and outreach activities. 1.2 Target Audiences and Activities The City's education and outreach program targets the following audiences; aJ.1pt,iblic,, Witt) an e1'YajPtl,1SiS oil School tg(,^ • C'onftuclol "S d� ^v� ^1����r� °s, carpet cleaning, landscapers, automotive /truck facilities, and general businesses, specifically restaurants. • Residents /homeowners and apartment managers /owners. • City development staff, land use planners, maintenance personnel and other City employees. 23 I The City k.dses the following resok.drces to help bk.ffld stormwater awareness: • Tukwila's government Channel 21, which was implemented as a tool to provide updates and various types of information to the public. • Tukwila Reporter, Hazelnut Newsletter, various brochures, handouts, and bulletin boards at various locations, * NPDES website where FnNic notices, meeting dates, edk.wational videos and cok.drse catalogs can be viewed, * Urban Watershed 1.-)isf)lay Boards at five strategic locations on the Grecn/lnterk. rban trail along the Grecnd.-X�wamish River, I The City implemented the following ok.areach activities: • Provide an outreach booth at the City's annual Backyard Wild Life Festival, giving exposure to the City's SWMP Plan and encouraging input to the Plan. This year the outreach booth will aga.Jn emphasize Low Impact Development and Illicit Discharge Detection and Elimination. In addition, target school age children by challenging them with stormwater quality questions. • 1.-)isf)lay an NPI.-)ES inspection tnwk and variok.ds If.-)I.-)E posters at the annkml City Tok.wh aTnwk event, * Partner with Environmental oalition of Sok.ah Seattle (E( IOSS) and provide a I spill kit, spill plan and training to 25 diverse bk.dsinesses throk.dgh EC Spill Kit Incentive Program, * This year the ity inserted information regarding sk.drface water rates, freqk.wntly--asked stormwater qk.wstions and keeping rivers/streams clean into its sk.drface water kAility billing which is mailed semi--annkmlly, I The City k.dses the following stewardship opporumities to engage with the FnNic: I I • The City partners with Forterra, Earth(..orf)s, and Friends of I-X wamish I-fill Preserve to provide stewardship training and restoration activities in City parks and shoreline areas, • The Green I'k.d<.wila 20-year Stewardship Plan is complete and site specific Stewardship Plans are being developed for three of f 7 variok.ds parks. These plans will be the gk.dideline for restoration and stewardship activities, I The City meask.dred the kmderstanding and adoption of the targeted behaviors of the following targeted ak.ddiences and topics: This year the ity phone sk.drvey program will target citizens, restak.drants, property owners/managers and maomotive companies in the sk.dbject areas of general impacts of stormwater on sk.drface waters and principles, The sk.drvey will be k.dsed to meask.dre the citizen's knowledge of proper stormwater practices, 24 2. PUBLIC INVOLEMENT AND PARTICIPATION 2.1 Permit Requirements The Permit (Section S5.C.2) requires the City to: • Provide ongoing opportunities for public involvement and participation through advisory councils, public hearings, watershed committees, participating in developing rate - structures, SWMP Plan development and implementation or other similar activities. • Make available and post the current SWMP Plan and annual report for the previous years on the City's website no later than May 31 of each year. Make available to the public all other documents to be submitted to DOE as required by the Permit. 2.2 Activities The City of Tukwila uses the following opportunities for Public Involvement and Participation: • The public is invited to all City Council, Committee of the Whole, aixi. V) "'ITI SIPoIlatioll aixi III Committee meetings including workshops where input on NPDES Phase II related topics is accepted. • Provide notices of upcoming workshops, in the Tukwila Reporter, City's NPDES website, and City cak,ixJaI•. In addition, notices will be posted at strategic locations such as City Hall, Public Works and Community Development area and the Tukwila Community Center. • The City maintains the most current SWMP Plan and Annual Report on its NPDES website. These documents are also made available to the public upon request. • Invite the public to participate in the decision making process involving proposed rate increases, and implementation and update of the annual SWMP Plan through advisory councils, public meetings, and watershed committees. • The City will make available and update its website with current NPDES information including the current SWMP Plan and Annual Report on its website: www.tukwilawa.gov/pubwks /npdes by May 31 of each year. 3. ILLICIT DISCHARGE DETECTION AND ELIMINATION 3.1 Permit Requirements The Permit (Section S5.C.3) requires the City to: • Implement an ongoing Illicit Discharge Detection and Elimination (IDDE) program designed to prevent, detect, characterize, trace and eliminate illicit connections and illicit discharges into our MS4. • Periodically update the City's municipal storm sewer system map. • Have an ordinance in place to effectively prohibit non - stormwater, illegal discharges, and dumping into the City's MS4, including locating priority areas likely to have illicit discharges. 041 • Implement a field screening methodology appropriate to the characteristics of the MS4 and water quality concerns. Complete field screening for at least 40% of the MS4 no later than December 31, 2017, and on average 12% each year thereafter. • Implement an ongoing program designed to detect, identify and address non - stormwater discharges, illicit connections, and spills. Inform public employees, businesses, and the general public of hazards associated with illegal discharges and improper waste disposal. • Provide training to appropriate City employees on IDDE. Document training events, staff attendance and maintain records of activities conducted to meet Permit requirements. Conduct follow -up training as necessary to address changes in procedures, techniques, requirements, or staffing. 3.2 Activities The City of Tukwila has an ongoing IDDE program in place that include the following activities: • The City conducts residential, commercial, and industrial storm drainage inspections of permit issued projects. In addition, the City has an ongoing business inspection program that targets businesses with potential pollution generating activities. • The City maintains a geographic (GIS) mapping program of its stormwater drainage system which is used to conduct IDDE investigations. These males are available to the public and interested parties k1pon regk.wst. • The City has an ordinance and program in place that prohibits non - stormwater, illegal discharges, and dumping into the City's MS4, including locating priority areas likely to have illicit discharges. The ordinance also provides for escalating enforcement. • The City has an active IDDE inspection program that includes both private and public stormwater facilities using methods indicated in the illicit Connection and Illicit l:)ischal ge Fiel.d. Screening and Sod rce lTracing Gk.: idance Mankml.. • FIX,, City iS LICAM,,, With 114 1d1 ofall a c 4,ssibl4;" StO➢'TMW1tCA OQ.AE111S, • The City's Maintenance Department provides ongoing video inspection of the 1,nNic stormwater conveyance system. In addition., ongoing inspections of catch basin /manholes, ditches and stormwater BNIPs are conduxted, • The City has an advertised reporting phone number, (206) 433 -1860, where illegal dumping, illicit discharges and spills can be reported. Also, the City initiated 1'k.d<wila Works where online reporting is available, • Appropriate training is provided to City employees, including new hires on IDDE into the City's MS4. • Provide and make available various brochures to help increase public awareness of the City's stormwater issues. Continue to provide public outreach videos on the City's NPDES website. • The City provides information regarding the hazards associated with illegal discharges and improper waste disposal to the general public, businesses, and public employees. 0111 • The City has a Suds Safe Car Wash Program that makes car wash kits available to Tukwila citizens for fund raising events held within Tukwila city limits. 4. CONTROLLING RUNOFF FROM NEW DEVELOPMENT, REDEVLOPMENT AND CONSTRUCTION SITES 4.1 Permit Requirements The Permit (Section S5.C.4) requires the City to: • Implement and enforce an ordinance or other mechanism that addresses stormwater runoff and pollutant generating activities to its MS4 from any new development, redevelopment, and construction site activities. This applies to both private and public development, including roads. • Have in place a permitting process for residential and commercial site plan review, inspection, and enforcement capability necessary to implement the requirements of the Permit. • Have provisions in place to verify adequate long -term operation and maintenance (O &M) of new stormwater treatment and flow control BMPs /facilities permitted and constructed. Establish maintenance standards that are as protective as those in Chapter 4 of Volume V of the 2012 Stogy inwater Management Manual for Western Washington by December 31, 2016. • Make available as applicable copies of the "Notice of Intent for Construction Activity" and copies of the "Notice of Intent for Industrial Activity" to representatives of proposed new development and redevelopment. • Ensure proper staff is trained to conduct inspection and enforcement as necessary and provide follow -up training as needed to address changes in procedures, techniques, or staffing. Record and maintain records of training provided and a list of staff that have been trained. • Review and revise the City's development codes, standards, and specifications to incorporate and require Low Impact Development (LID) principles and LID best management practices (BMPs) as the preferred method for development by December 31, 2016. • Participate in watershed -scale stormwater planning under condition S5.C.5.c of the Phase I Municipal Stormwater General Permit if required. 4.2 Activities The City has an active program to reduce pollutants in stormwater runoff from new development, redevelopment, and construction sites that includes the following: • V lx,', C,ity a�::lopk, "d aixi ii,n1pk,,,i,n(,,,iAs th(, 2016 King County Surface Water Design Manual (KCSWDM) as direction to address stormwater runoff and water quality for both public and private projects, including roads. fC ^ViC',W 1YK,,C,tiT1 S L (^ a;oiln l to 'IPIP1ic ilts Pt.ok,,,ct plaii stlbi,nitt l Will. stalyd aaJs, PAIA • All construction sites are inspected prior to start, during, and post construction. This includes annual post - construction of all commercial and residential treatment and flow control BMPs /facilities whereby maintenance responsibility, standards and inspection procedures are addressed. • The City has a long term Operations and Maintenance (O&M) program for host._ constnxtion stormwater facilities and BMI1s that incftn de inspection, review, and dock.dmentation. • The City directs representatives of proposed new development and redevelopment to the Department of Ecology's construction stormwater website: http: / /www.ecy.wa.�4ov /programs /wq /stonuwater /construction /enoi.html and if applicable make available to the representatives a "Notice of Intent (NOI) for Industrial Activity ". • Stiff' ( ^slpoiisibl(^ for innslir( ^a°tioTI any^ fillly and receive ongoing training in erosion control, low impact development, stoi'TMA/atC,r, anrd nllirdated innsliC,C,ti0nn t� ^a °lnnniga,n s. If s,,,cords oftnainninn ; any^ rnainntain( ^d and available,,, nllpon regal�st. • Document and maintain records of all new development and redevelopment and construction site activities, including inspections and enforcement actions. • 1 lne City innco lino ate ^d into its a;o d( s, I�.l k S, standards, and ^nr(l:�n °a ^able doc1JITIC1ets, l,MA/ lrnaliM,"t Il)(, ^v(, ^loJP1,na(,;,nrt (V.11l:_ and IB(, ^nnt Mannag( ^rna( ^nnt r naa °tia �,�u (IBMIPs) rnal(inn , V,III:_ and II: MIPs t1n(^ lirn( ^l nn( ^d na(,thod. Jlon dev( °Jolp1'Ylcnnt. • Tlne City Will to train 1pentinr( ^nnt ( ^rn 1ploy(enn oil and IBMIps, In addition, host 1...,11:: trraining events on the City'S W(,,,,b i e. • C';n: rrently, King County has not selected Tukwila as a participant in the watershed -scale stormwater planning process, consegk.wntly, no action regk.4ed, 5. M UN 11011 PAI., 0 PIERATI O S AND M I NTIENAN CIE 5.1 Permit Requirements The Permit (Section S5.C.5) requires the City to: • Implement an operations and maintenance program with the ultimate goal of preventing or reducing pollutant runoff from the MS4 and municipal operations. • Implement maintenance standards that are as or more protective, of facility functions than those specified in Chapter 4 of Volume V of the 2012 Stogy inwater Management Manual for Western Washington by December 31, 2016. • Conduct annual inspections of all municipally owned or operated permanent stormwater treatment and flow control BMPs /facilities, and conduct necessary maintenance actions that will meet City adopted standards. • Conduct spot checks, of City owned flow control and water quality facilities after major storm events, and repair if needed or perform any necessary maintenance. • Inspect all City owned catch basins and inlets at least once no later than August 1, 2017 and every two years thereafter. Clean catch basins if needed to comply with maintenance standards. • Maintain compliance with an established inspection program designed to inspect all sites, achieving at least 95% of inspections per requirements of the Permit. • Implement an operations and maintenance (O &M) program with the ultimate goal of preventing or reducing pollutant runoff from all lands owned or maintained by 28 the City, including but not limited to, streets, parking lots, roads, highways, buildings, parks, open space, road right -of -ways, maintenance yards, and stormwater treatment and flow control BMPs /facilities. • Conduct ongoing training for employees whose primary construction operations or maintenance job functions may impact stormwater. Document and maintain records of training provided and the staff trained. • Training public works personnel including field staff, new employees, development review and planning department personnel relating to Low Impact Development (LID) principals and LID Best Management Practices (BMPs). • Provide a Stormwater Pollution Prevention Plan (SWPPP) for all City owned or operated heavy equipment maintenance or storage yards and material storage yards. A schedule for implementation of structural BMPs and periodic inspections shall be included in the SWPPP. • Maintain ongoing records of inspections, maintenance, or repairs conducted to meet performance measures. • Maintain records of inspections and maintenance or repair activities. 5.2 Activities The City of Tukwila's Operations & Maintenance (O &M) program includes the following: • Adoption of the 2016 King C ,direly 5 "17r °f w Wal r° Design Mannal (KC ,.S'WDM) in December 2W6 which is k.dsed to implement ok.:r OEM program redkxing and preventing poll. Gant rkmoff from inkmicipal operations. • Adoption of the .016 King C Oili a(y S'lor °vnwal r° llolha ion Nevenlion h!lannal (KC,.S7111M) in l:)ecember 2016 which is k.dsed as a maintenance standard gk.dideline for indkmrial., commercial, and mk.06- family and residential properties. • Catch basins and conveyance system including flow and water quality facilities are inspected, cleaned, and maintained on a circuit based program and as necessary. • C:'ondkxt street sweeping activities in skdpport of catch basin cleaning. • Staff maintains a list of potential problem areas that are monitored and maintained . prior to, dk.dring and after major storm events. Additional inspections occk.dr at the discretion of the sk.drface water department. • Annkmlly inspect and provide necessary maintenance of all water quality and flow control facilities, including catch basins owned and operated by the City. • Continue with the City's street sweeping program helping to reduce the amount of sediment and associated waste from entering the storm drainage system. • Provide necessary training for City employees whose job functions may impact stormwater. • The City has in place a SWPPP for each of its maintenance and storage yards that is reviewed annkml.l.y to determine if kdpdates are needed. In addition, records are kept ofrok.aine inspections of these facilities and their 13Mt1s. • The City maintains records of its circk.dit based storm drainage system inspection, cleaning, and repair activities and street sweeping. f4 *] 6. COMPLIANCE WITH TOTAL MAXIMUM DAILY LOAD REQUIREMENTS "Fite Permit (Special Condition Section S7 requirements- The Permit (Section S7) requirements apply if an applicable Total Maximum Daily Load (TMDL) is approved for stormwater discharges from MS4s owned or operated by the Permittee. Applicable TMDLs are TMDLs which have been approved by EPA on or before the issuance date of this Permit or prior to the date that Ecology issues coverage under this permit, whichever is later. A TMDL is a calculation of the maximum amount of a pollutant that a water body can receive and still safely meet water quality standards. The DOE determines the reduction of pollutant discharge needed to be compliant with water quality standards. 6.1 Activities • A TMDL has not been established for the City of Tukwila at this time, consequently no action needed. 7. MONITORING AND ASSESSMENT "Fite Permit (Special Condition Section SS) requires the City to— Notify DOE of its choice to independently conduct Status and Trends Monitoring and Effectiveness Studies, or participate by paying annually into the Regional Stormwater Monitoring Program (RSMP) that will be conducted by DOE. Pay into the RSMP to implement the Source Identification Information Repository (SIDR) element of the RSMP. Track and Document additional monitoring conducted and summarize in the 2016 Annual Report. 7.1 Current Activities • The City paid a fee of $4.444,00 into the RSMP to have l -)Ole, condm:dct the Stata:ds and Trends Monitoring. • The City paid a fee of $7,405.00 into the RSMP to have l -)Ole, condm:dct the Effectiveness Sta:ddies. • The City paid a fee of $687.00 into the RSMP to have l: -)Ole, condm:dct the Sok.dree ll:-) and l:)iagnostic Monitoring. The total fee of $ 12,536 is dm:de each year by Ak.dgm:dst Q 5 "' m:dm7til the permit expiration date of am:dly 31, 201, Mll On August 1, 2013, the City of Tukwila's new 5 -year term NPDES Phase II permit went into effect and was modified January 16, 2014. This Stormwater Management Program Plan has been prepared to demonstrate compliance with the requirements of this current NPDES Phase II Permit. This SWMP Plan will be a working document with updates annually until the permit expires on July 31, 2018. LID and monitoring requirements are the significant changes to the new Permit. The City's Public Education and Outreach Program is an extension of the previous permit term and will continue to grow with the planned activities. The City of Tukwila will continue to reach out and encourage public involvement and participation in the City's SWMP Plan with the existing notification process. The City's IDDE Program is in place, which includes a spill hotline, and will be reviewed periodically to ensure performance measures are met. The City adopted the 2016 KC S'WDM, KC°V'I'M and revised its standards and codes to inclndde l,ll: and BNIPs as the preferred method for development in l: -)ecember 2016, and k.dses it for controlling n°kmoff from new development, redevelopment, and constrk.wtion sites. The City of Tukwila's Operations & Maintenance (O &M) is very active in all areas of permit compliance. It should be noted; The 2016 KC "SYDM & KC ",5"I'I'M have new maintenance standards that O &M will follow. Coordination efforts will continue with neighboring jurisdictions and be reviewed to determine where improvements are needed to remove jurisdictional barriers. Total Maximum Daily Load requirements in Tukwila have not been determined by DOE to date. However, the City will prepare for this requirement if and when it comes due. The City chose to participate in the RSMP collective fund and have DOE administer and conduct the Monitoring and Assessment for this Permit term. Additional information on the City's NPDES program can be found online at http: / /www.tukwilawa.gov/pubwks /npdes.html. The public is encouraged to participate in the development of the SWMP Plan. Please contact Greg Villanueva of the City of Tukwila's Public Works Department with questions, comments, or ideas at: Mail: Greg Villanueva, NPDES Coordinator Department of Public Works City of Tukwila 6300 Southcenter Blvd, Suite 100 Tukwila, WA 98188 -8548 Phone: 206 - 431 -2442 Email: greR.villanueva(&tukwilawa.Rov Website: www. tukwilawa .2ov /bubwkds.nbdes.html W:\PW Eng\•RO,..rs \A- DR Projects \NPDES Program (99341210)\Amual Reports and Surface Water Management Programs\2016 Annual Report & 2017 SWMP Plan\2017 SWMP Plan Final TIC.doc 451 �c�a TO: FROM BY: CC: DATE: City of Tukwila Public Works Department - Bob Giberson, Director Transportation and Infrastructure Commit;ee Bob Giberson, Public Works Director 4o Peter Lau, Senior Program Manager Mayor Ekberg March 24, 2017 SUBJECT: S 144th St Phase 11 Project (42nd Ave S — TIB) Project No. 99510402, Contract No. 14-103 Supplemental Agreement No. 7 with KPG, Inc. Allan Ekberg, Mayor ISSUE Approve Supplemental Agreement No. 7 with KPG, Inc. (KPG) for construction management (CM) services for the S 144th St Phase 11 Project in the amount of $299,988.75. BACKGROUND The S 144th St Phase 11 construction contract was awarded by Council on February 21, 2017 in the amount of $1,883,895.03. The City solicited for CM services from three consultant firms — AECOM, AKANA and KPG, and invited these firms for interviews. KPG was rated the highest by the cumulative scores of the selection panel. Since KPG was also the design consultant firm for the project, only a supplemental agreement to the design contract is needed for KPG to provide CM services. DISCUSSION & FISCAL IMPACT Supplemental Agreement No. 7 will include construction engineering, inspection, documentation compliance, surveying, geotechnical and material testing supports. The fee of $299,988.75 is within budget for the scope of work provided by KPG for this project. CM Expense Budget KPG Supplement No. 7 $299,988.75 $350,000.00 IN:191*11MITil I, • Council is being asked to approve Supplemental Agreement No. 7 with KPG in the amount of $299,988.75 to provide CM services for the S 144th St Phase 11 Project and consider this item on the Consent Agenda at the April 3, 2017 Regular Meeting. Attachments: CM Consultant Selection Scoring Sheet Supplemental Agreement No. 7 WAPVV Eng\PROJECTS\A- RW & RS Projects\S 144th St Phase 11 TIB - 42nd Ave S (99510402 95-RW02)\Construction\Consultant Selection\(005) - CM Consultant SelectionnIne Memo For KPG CM Support, 3-16-17.Doox 33 Construction Management (CM) Service Interviews: AKANA, AECOM and KPG were interviewed by the City, to compete for the selection of CM Consultant for the South 144th Street Phase 2 Construction Project. Three evaluation criteria were used in the interview process: 1. Qualifications of the proposed CM team, and available support from the Consultant firm - 50 %. 2. Demonstration of the Consultant's understanding for the construction project - 25 %. 3. Demonstration of the Consultant's understanding for the CM scope of work, including the flexibility of the inspection provision and inspection partnership - 25 %. Below are the ranking scores rated by the 3 Interview Panelists, based on the performances of these 3 firms: Cyndy Knighton Scott Moore Peter Lau CM Consultant Candidates Ranking Summation Finalized Ranking AKANA 2 2 1 5 2 AECOM 3 3 3 9 3 KPG 1 2 4 1 As a result, KPG was selected as the CM Consultant for the South 144th Street Phase 2 Construction Project. SUPPLEMENTAL AGREEMENT No. 7 AGREEMENT No. 14 -103 PROTECT No. 99510402 City of Tukwila KPG, Inc. Public Works Department 3131 Elliot Ave Suite 400 6300 Southcenter Boulevard #100 Seattle, WA 98121 Tukwila, WA 98188 PROTECT: S 144`h Street Phase II Construction Services This SUPPLEMENTAL AGREEMENT NO. 7 is to supplement the agreement entered into with KPG, Inc. and the City of Tukwila, which was executed on the 29th day of July, 2014. All provisions in the basic agreement remain in effect, except as expressly modified as follows: Article 2, Scope of Services, shall be supplemented with the following: The Consultant agrees to provide construction services in accordance with the scope of work included as Exhibit A -7. Article 4, Payment, shall be modified as follows: Payment for work provided by Consultant shall be made as provided on Exhibit B -7, attached hereto, provided that the total amount of payment to the Consultant for this work not exceed $299,988.75 without express written modification of the Agreement signed by the City. The new total contract shall not exceed $723,393.10 without express written modification of the Agreement signed by the City. IN WITNESS WHEREOF, the parties hereto have set their hands and seals this _ day of , 2017. r_1UU ;z• CITY OF TUKWILA Allan Ekberg Mayor Attested: r:110� : • KPG, INC. Nelson Davis, P.E. Principal �c�7 EXHIBIT A -7 City of Tukwila S 144th Street Phase II Project 42nd Avenue S to Tukwila International Boulevard Supplement No. 7 — Construction Services KPG Scope of Work February 24, 2017 This work will be to provide construction services for the construction contract to complete the S 140 Street Phase II Project (hereinafter called "Project "). These services will include project management, construction inspection, materials testing, and construction documentation during the construction of the project, as detailed below. KPG ( "Consultant ") will provide assistance to the City of Tukwila, Washington ( "City ") staff assigned to the project to provided construction services as described below: I. INTRODUCTION The following scope of services and associated costs are based upon the assumptions outlined below. Assumptions: • The City will provide project management and between 2 and 6 months of full time inspection for the Project. The Consultant shall support the City project manager and inspector by providing construction engineering services (submittal reviews, RFI's, etc.), preconstruction services, running weekly construction meetings, pay estimate assistance, and setup and review of project files in accordance with City requirements. The proposed consultant project team will include a part -time resident engineer (2.5 day /week average), a part -time documentation specialist (3 day /week average), a partial full time inspector (5 day/ week average for 17 weeks), utility/ developer coordination (1 day/ week average), design team engineering support during construction activities, necessary sub - consultants to provide services for materials testing, and other supporting tasks as deemed necessary. The level of services is based on project duration of approximately 6 months, or approximately 120 working days for construction. • Services will be performed in accordance with the Local Agency Guidelines (LAG), the WSDOT Construction Manual, and City of Tukwila standards. Project Objectives The objective and purpose of this Construction Services Agreement is for the Consultant to assist City staff to successfully deliver the construction of the Project by ensuring that the construction work is of an appropriate quality and the required Project documentation is accounted for. S 144th Street — Phase tl er 7— Construction Services I of KPG 36 February 24, 2017 EXHIBIT A -7 II. SCOPE OF WORK TASK 1— MANAGEMENT /COORDINATION /ADMINISTRATION Provide overall project management, coordination with the City, monthly progress reports, and invoicing. This effort will include the following elements. • Organize and layout work for project staff. Prepare project instructions on contract administration procedures to be used during construction. • Review monthly expenditures and CM team scope activities. Prepare and submit invoices describing CM services provided each month. Prepare and submit reporting required by funding source(s), if any. Deliverables • Monthly invoices and progress reports TASK 2 — PRECONSTRUCTION SERVICES 2.1 Prepare the Record of Materials (ROM): The Consultant shall prepare the ROM to aid consultant, City and Contractor staff to track material submittals and testing throughout the project. 2.2 Right of Entry Support: Develop a matrix of property owners that will document commitments to each property owners, property restoration, and other related impacts. Assist the City with any right of entry agreements that have not been previously secured. 2.3 File Setup: Attend meeting with City Project Manager to review standard Consultant and City file systems and develop file structure for management of the project. 2.4 Field Review: Perform plans in hand field review with inspector and project engineer to review the overall scope, identify challenging areas, and identify traffic concerns to be addressed in the Contractors traffic control plans. 2.5 Preconstruction Conference: The Consultant will prepare an agenda for, distribute notices of, and conduct a preconstruction conference in the City's offices. The Consultant's project manager, project engineer, document control specialist, and inspector will attend the preconstruction conference. The Consultant will prepare a written record of the meeting and distribute copies of the minutes to all attendees and affected agencies, staff, etc. At the Pre - construction conference, the Consultant shall facilitate discussions with the Contractor concerning the plans, specifications, schedules, and issues with utilities, unusual conditions, local requirements, EEO, and any other items that will result in better project understanding among the parties involved. Deliverables • Record of Materials (ROM) • Preconstruction conference agenda with meeting minutes S 1440 Street -Phase li KPG 37 Supp 7— Construction Services 2 of 7 February 24, 2017 EXHIBIT A -7 TASK 3 — CONSTRUCTION SERVICES A. FIELD SERVICES 3.1 Inspection staff will perform the following duties as a matter of their daily activities: i. Observe technical conduct of the construction, including providing day -to -day contact with construction contractor, City, utilities, and other stakeholders, and monitor for adherence to the Contract Documents. ii. Observe material, workmanship, and construction areas for compliance with the Contract Documents and applicable codes, and notify construction contractor of noncompliance. iii. Document all material delivered to the job site in accordance with the LAG Manual, WSDOT Construction Manual, and the Project Specifications. iv. Prepare daily inspection reports, recording the construction contractor's operations as actually observed by the Consultant; includes quantities of work placed that day, contractor's equipment and crews, and other pertinent information. All daily inspection reports will adhere to WSDOT Local Agency Guidelines. V. Resolve questions which may arise as to the quality and acceptability of material furnished, work performed, and rate of progress of work performed by the construction contractor. vi. Establish communications with adjacent property owners. Respond to questions from property owners and the general public. vii. Coordinate with permit holders on the Project to monitor compliance with approved permits, if applicable. viii. Prepare field records and documents to help assure the Project is administered in accordance with funding agency requirements (Construction Manual 10- 2.113). The inspector will provide measurement and payment information to the consultant for development of monthly pay estimates. ix. Collect and calculate delivery tickets and scalesman's daily reports of aggregate. All tickets will be initialed with correct bid item and stationing identified. X. Attend and actively participate in regular on -site meetings. xi. Take periodic digital photographs during the course of construction. xii. Coordinate with the City's maintenance personnel. The Resident Engineer shall support the inspector as follows: i. Provide periodic site visits to respond to questions or unanticipated conditions. Advise the City of any non - conforming work observed during site visits. ii. Interpret Contract Documents in coordination with City. 3.2 Materials Testing: Provide materials testing sub - consultants for construction services, who will provide materials testing services as required, up to $15,000. The City inspector shall coordinate the work of the materials testing technicians and testing laboratories in the observation and testing of materials used in the construction. The Consultant shall document and evaluate results of testing; and address deficiencies. Frequency of testing shall be as prescribed in the WSDOT S 144m Street— Phase II KPG 38 Supp 7— Construction Services 3 of 7 February 24, 2017 EXHIBIT A -7 Construction Manual and LAG manual for the following materials: structural concrete, roadway asphalt, roadway surfacing, roadway base material, and structural grout and any other testing as prescribed within the project Specifications and WSDOT Standard Specifications 2016. Assumptions: It is assumed that day to day coordination of testing services will be by the inspector. The Consultant shall assist with evaluation of any deficiencies noted. 3.3 Substantial Completion: Upon substantial completion of work, coordinate with the City and other affected agencies, to perform a project inspection and develop a comprehensive list of deficiencies or ` punchlist' of items to be completed. A punchlist and Certificate of Substantial Completion will be prepared by the Consultant and issued by the City. Deliverables Punch List, Certificate of Substantial Completion Review test reports for compliance B. OFFICE SERVICES 3.4 Document Control: Original documentation will be housed at the Consultant's office, and filed in accordance with standard filing protocol to meet City Requirements. A copy of working files will be maintained in the field office. Document Control also consists of preparing Final Project Reports for City acceptance and includes: ■ Final Estimate (Approving Authority File) ■ Final Records as identified in WSDOT LAG (Approving Authority File) ■ Record of Material Samples and Tests ■ Materials Certification ■ Affidavit of Wages Paid ■ Release for the Protection of Property Owners and General Contractor 3.5 Plan Interpretations: Provide technical interpretations of the drawings, specifications, and contract documents, and evaluate requested deviations from the approved design or specifications. Coordinate with City for resolution of issues involving scope, schedule, and/or budget changes. 3.6 Weekly Meetings: Lead weekly meetings, including preparation of agenda, meeting minutes, and distribution of minutes to attendees. Outstanding issues to be tracked on a weekly basis. 3.7 Initial Schedule Review: Perform detailed schedule review of contractor provided CPM for conformance with the contract documents. 3.8 Lump Sum Breakdown: Evaluate construction contractors' Schedule of Values for lump sum items. Review the Contract Price allocations and verify that such allocations are made in accordance with the requirements of the Contract Documents. Lump Sum Breakdowns for payment each month will be calculated with detailed data per WSDOT LAG Requirements. S 144th Street - Phase II KPG 39 Supp 7— Construction Services 4 of 7 February 24, 2017 EXHIBIT A -7 3.9 Monthly Pay Requests: Assist City with monthly requests for payment, review with the City and contractor and approve, as permitted. Utilize City provided format for pay estimates, or Consultant format. The Utilities to provide quantities for payment for work associated with Utility Schedules. 3.10 Certified Payroll: Process and track all certified payroll per WSDOT Highways & Local Program Requirements. This includes verifying 30% of all payrolls submitted and tracking payroll each week. Payroll and payroll logs will adhere to WSDOT LAG requirements. 11 Weekly Statement of Working Days: Prepare and issue weekly statement of working day report each week. 3.12 Subcontractor Documentation: Process / approve all required subcontractor documentation per WSDOT Highways & Local Program Requirements. This includes checking System Award Management System (SAMS), verifying OM/WBE, verifying business licensing, reviewing insurance documentation, verifying city business licensing, Intent to Pay Prevailing Wage and Affidavit of Wages Paid. All subcontractor documentation will be logged into WSDOT's subcontractor logs. C. SUBMITTAL/RFI PROCESSING 3.13 Submittals: Coordinate review process for shop drawings, samples, traffic control plans, test reports, and other submittals from the Contractor for compliance with the contract documents. Key submittals to be transmitted to the City for their review and approval. Submittals shall be logged and tracked. 3.14 Request for Information (RFI): Review and respond to RFI's. RFI's shall be logged and tracked. 3.15 Record of Materials (ROM): With assistance from the inspector, utilize and maintain the ROM according to WSDOT Highways & Local Program Requirements. The ROM will track all of the materials delivered to the site including manufacturer /supplier, approved RAM's, QPL items, material compliance documentation, and all other required documentation. Deliverables • Submittal log • RFI Log • Completed Record of Material for Material Certification D. CHANGE MANAGEMENT 3.16 Change Orders: Develop change orders per Highway & Local Programs Guidelines and City Standards, provide technical assistance to negotiate change orders, and assist in resolution of disputes which may occur during the course of the project. A total of 40 hours have been included in the cost for services. Each change order will be executed in accordance with WSDOT Local Agency Guidelines and City Standards, and contain the following: • Change order • Independent Cost Estimate • Time Impact Analysis • Contractor's Pricing • Verbal Approval Memo • Change Order Checklist (LAG Manual) S 1440 Street - Phase II KPG 40 Supp 7- Construction Services 5 of 7 February 24, 2017 EXHIBIT A -7 • Change Order Request Form • Back up documentation 3.17 Field Work Directives: Prepare field work directives as necessary to keep the contractor on schedule. 3.18 Force Account: The inspector will track contractor force account labor, equipment and materials. Provide payment according to WSDOT requirements. All force account calculations will be verified by the engineer and double checked by the documentation specialist per WSDOT LAG Manual. Deliverables • Change Order(s) • Case Management Log • RFI Log • Minor Change Order(s) • Force Account Records TASK 4 — CLOSEOUT / RECORD DRAWING SERVICES 4.1 Record Drawings: Review record drawings prepared by the Contractor, and prepare a conformed set of project record drawings based on Contractor provided information and from inspection notes. Record drawings to be verified on a monthly basis, as part of the progress payment to the Contractor. Upon project completion, contractor provided markups will be verified for completeness and supplemented with inspection information. The Consultant will prepare record drawings in AutoCAD format based on construction records provided by the Contractor. Electronic and full size mylar record drawings will be provided to the City. 4.2 Punchlist oversight: Attend final walk through review with City staff. Field observation of punchlist items will be by the City. 4.3 Physical Completion Letter: Following completion of all punchlist work, prepare physical completion letter to the contractor, and recommend that City and /or Utilities accept the project. Field observation of punchlist items will be by the City if Consultant budget is no longer available. 4.4 Project Closeout: Transfer all project documents to the City for permanent storage. • Meeting agendas and notes • Monthly Pay Estimates • WSDOT Reporting • Subcontractor Packets • Physical Completion Letter • Final Project Documents S 144fh Street - Phase II KPG 41 Supp 7— Construction Services 6 of 7 February 24, 2017 EXHIBIT A -7 ADDITIONAL SERVICES The services described under this task, and any other additional services requested by the City, will be performed only when authorized by the City. Authorization to perform additional services will be in the form of a supplement to this agreement, specifying the work to be performed, and basis of payment. • Provide any additional services resulting from changes in scope or design of the project. Changes include, but are not limited to, changes in size, complexity, the schedule, character of construction, or method of financing. • Provide claims analysis and assistance in resolving claims that are protracted in nature and beyond the scope of the change order process described herein. • Media Relations: Produce and distribute periodic press releases at key milestones about the project and its progress. Meet with press to help develop stories about the project. • Other activities deemed necessary by the City. III. TO BE PROVIDED BY CITY: 1. Postage to be provided by the City for any mass mailings. S 1441h Street — Phase tt KPG 42 Supp 7— Construction Services 7 of 7 February 24, 2017 HOUR AND FEE ESTIMATE Project: City of Tukwila S 144th Street Phase II Supplement No. 7 - CM Services ask Task \ \\ \\\ Res \ Ident \ , \ Descrd tion \ \ EXHIBIT B -7 G • Architecture • Lundscupe Architecture • Civil Engineering • 1 - Management, Coordination, Administration (Estimated duration 29 weeks) Weekly level of effort by Classification 4 0 or our Estim 710P.N Technician Ins 65\ Surve Document � �Spedalist Total Bud et 0 0 0 0 0 0 2 Preconstruction Budget Estimate 116 0 0 0 0 0 0 0 58 2 - Preconstruction Services (Estimated duration 2 weeks) Weekly level of effort by Classification $ 21,569.58 20 0 0 12 0 0 0 24 0 Preconstruction Budget Estimate 40 0 0 24 0 0 0 48 0 $ 12,975.81 3 - Construction Services (Estimated duration 25 weeks Weekly level of effort by Classification 16 0 0 16 0 0 1 24 0 Inspection (17weeks) 40 Construction Period Budget Estimate 400 0 0 400 0 680 25 600 0 $ 225,321.50 4 - Closeout/Record Dwg Services (Estimated duration 2 weeks) Weekly level of effort by Classification 16 0 0 16 24 40 0 24 0 Closeout / Record Dwg Budget Estimate 32 0 0 32 48 80 0 48 0 $ 24,121.85 \� \ \� \\ Xbtot or,\ \.x ..... 5$ a\ ; SE Reimbursables & Subconsultants Material Testing / Geotechnical Allowance $ 15,000.00 Construction Vehicle $ Miscellaneous - Mileage, Repro, Field Supplies $ 1,000.00 \SU oa , \ ` \t \ \ \ TotaL P \ _ \ � \ � r0 Ct Bud t \. ._ � \ \ .. \ 9 A,, ..y. A. yy�. � y__.....�. .�.. ..� �.vy�.., � .... A�,y_ .y y yv yv. vy .A �A\ �A,.$ „vy \yA299,988.75 2/28/2017 44 City of Tukwila is Allan Ekberg, Mayor Public Works Department - Bob Giberson, Director TO: Transportation and Infrastructure Committee FROM: Bob Giberson, Public Works Director BY: Steve Carstens, Senior Program Manager CC: Mayor Ekberg DATE: March 24, 2017 SUBJECT: Boeing Access Rd over BNRR Bridge Rehabilitation Project Project No. 99410408 Bid Award ISSUE Award the construction bid from PCL Construction Services, Inc. (PCL) as the lowest responsive and responsible bidder for the Boeing Access Rd over BNRR Bridge Rehabilitation Project. BACKGROUND A call for bids was advertised on February 15 and February 22, 2017. Two addenda were issued addressing clarifications in the bid documents. Five bids were received on March 15, 2017 and the lowest bid came from PCL. DISCUSSION The construction bids were reviewed and only one minor irregularity was found. There were no errors in the bid submitted by PCL. There was one bid protest received by the City. The protest was reviewed and has been denied by City staff. PCL has been doing business since 1991 (in Washington) and has experience with projects of similar size and scope. PCL does not have any exceptions and has not been debarred from working on federally funded projects. FISCAL IMPACT The budget for construction is broken down as follows: Boeing Access Road Bridge Rehabilitation Contract Cost Budget PCL Construction Contract 6,189,244.00 9,745,100.00 Railroad Costs 149,428.00 Contingency (25 %) 1,584,668.00 Total 7.923.340.00 9.745.100.00 RECOMMENDATION Council is being asked to award the bid to PCL Construction Services, Inc. in the amount of $6,189,244.00 and to consider this item on the Consent Agenda at the April 3, 2017 Regular Meeting. Attachments: Page 10, 2017 CIP Bid Tabs Debarred Contractors List SAM Search Results W: \PW Eng \PROJECTS\A- RW & RS Projects \Boeing Access Rd Bridge Rehab (99410408) \02 Funding and Finance \Transportation Committee\20170315 InfoMemo PCL contract sm.docx 6300 Building • 6300 Southcen ter Boulevard Suite 100 # Tukwila, WA 98188 # 206 - 433 -0179 Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206 - 433 -1800 • Website: TukwilaWA.gov El 11 FINANCIAL Through Estimated (in $000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL CITY (]FTUKVVLA CAPITAL PROJECT SUMMARY 2017 to 2022 PROJECT: Boeing Access Rd over BWRRBridge Rehabilitation Project No. S9410*o8 RohmbiU\amthe evisdngbhdQevdha34o' long con�e�o,s�e|br�goa�udure.UwiUbe5lanes � D���R|pngN� and have a sidewalk on one side, The existing bridge is structurally and seismically deficient. Several pedestals are leaning, have concrete JUSTIFICATION: spalls, exposed rusty anchor bolts and reinforcements and some cracks. The existing railings do not meet 104 current bridge standards. Type, size, and location draft report (specifically required for bridges) was completed in 2005. Federal STATUS: grant applications were submitted in 2008 and 2010 and the bridge rehabilitation was successful for funding in 2012 for federal bridge funds. A Public Works Trust Fund (PWTF) loan was rescinded in 2013. MA|NT.]MPAoT: Maintenance will boreduced. Bhdgewill berehabi|imuedin phases toaUow continued �afficuse. Federal bhdgegrant of$g.74o.GUO ������T� requires e2oY6 local match. * bond issue for the City match was issued in2015 with the Interurban Ave 8. FINANCIAL Through Estimated (in $000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL EXPENSES Design 1,249 104 1,353 Land (RW 100 100 Const. Mgmt 1,124 1,124 Construction 9,745 9,745 FUND SOURCES Awarded Grant 905 163 8,677 9,745 Proposed Grant 0 Fund Balance-Bond 344 41 2,192 2,577 Mitigation 0 oo,r-xoc2 Capital Improvement Program We �111 Boeing Access Road Bridge Rehabilitation City Project No. 99410408 Bid Tab - Estimated Construction Costs PCL CONSTRUCTION SB STRUCTURES, LLC FLATIRON WEST, INC. CECCANTI ITEM NO. SECTION ITEM QUANTITY PAY UNIT UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE ROADWAY UNIT PRICE I TOTAL PRICE 1 1 04 Unexpected Ste Changes 1 EST $ 30,000.00 $ 30,000 $ 30,000.00 $ 30,000.00 $ 30,000.00 $ 30,000.00 $ 30,000.00 $ 30,000.00 $ 30,000.00 $ 30,000.00 $ 30,000.00 $ 30,000.00 2 1-05 Contractor Surveying 1 LS $ 36,040.00 $ 36,000 $ 17,000.00 ''; $ 17,000.00 $ 30,000.00 $ 30,000.00 $ 20,000.00 $ 20,000.00 $ 85,000.00 $ 85,000.00 $ 35,000.00 $ 35,000.00 3 1 -05 Record Drawings 1 LS $ 12,000.00 $ 12,000 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000 .00 $ 10,000.00 $ 3,000.00 $ 3,000,00 4 1 -07 Training 800 HR $ 35.00 $ 28,000 $ loo $ 800.00 $ 20.00:. $ 16,000.00 $ 5.00 $ 4,000.00 $ 5.00 $ 4,000.00 $ 1.00 S 800.00 5 1 -07 SPCC Plan 1 LS $ 5,000.00 $ 5,000 $ 1,000.00 $ 1,000.00 $ 1,000.00 $ 1,000.00 $ 5,000.00 $ 5,000.00 $ 3,500.00 $ 3,500.00 $ 2,500.00 $ 2,500.00 6 1 -08 Type B Progress Schedule 1 LS $ 5,000.00 $ 5,000 $ 1,000.00 ; $ 1,000.00 $ 5,000.00 $ 5,000.00 $ 10,000.00 $ 10,000.00 $ 2,500.00 $ 2,500.00 $ 20,000.00 $ 20,000.00 7 1-09 Mobilization 1 LS $ 648,000.04 $ 648,000 $ 600,000.00 $ 600,000.00 $ 675,000.00 ! $ 675,000.00 $ 690,000.00 $ 690,000.00 $ 1,000,000.00 $ 1,000,000.00 $ 1,000,000.00 $ 1,000,000.00 8 1-10 Project Temporary Traffic Control 1 LS $ 150,000.00 $ 150,000 $ 20 000.00 , $ 20,000.00 $ 80,000.00 $ 80,000.00 $ 200,000.00 $ 200,000.00 $ 400,000.00 $ 400,000.00 $ 150,000.00 $ 150,000.00 9 1 -10 Traffic Control Supervisor 1 LS $ 18,000.00 $ 18,000 $ 2,500.00 ! $ 2,500.00 $ 30,000.00 $ 30,000.00 $ 25,000.00 $ 25,000.00 $ 65,000.00 $ 65,000.00 $ 150,000.00 $ 150,000.00 10 1 -10 Portable Changeable Message Sign 1,280 HR $ 11.00 $ 14,080 $ 6m; $ 7,680.00 5 10.00 $ 12,800.00 $ 4.00 $ 5,120,00 $ 12.00 $ 15,360.00 $ 4.00 $ 5,120.00 11 2 -01 Clearing and Grubbing 1 LS $ 3,000.00 $ 3,000 $ 7,000.00 $ 7,000.00 $ 5,000.00 $ 5,000.00 $ 10,000.00 $ 10,000.00 $ 100,000.00 5 100,000.00 5 25,000.00 $ 25,000.00 12 2 -01 Roadside Cleanup 1 EST $ 5,000.00 $ 5,000 $ 5,000.0o $ 5,000.00 $ 5,000.00' $ 5,00000 $ 5,000.00 I S 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 13 2 -02 Removal of Pavement 580 SY $ 18.00 $ 10,440 $ 27.00 $ 15,660.00 $ 15.00 $ 8,700.00 $ 15.00 S 8,700.00 $ 29.00 $ 16,820.00 S 30.00 $ 17,400.00 14 2 -02 Removal of Traffic Island 70 SY $ 1 8.00 $ 1,260 $ 59.00 $ 4,130.00 $ 20.00 $ 1,400.00 $ 15.00 $ 1,050.00 $ 40.00 $ 2,800.00 $ 30.00 $ 2,100.00 15 2 -02 Removal of Precast Concrete Barrier 320 LF $ 10.00 $ 3,200 $ 2.50 $ 800.00 $ 10.00 ; $ 3,200.00 $ 10.00 $ 3,200.00 $ 50.00 $ 16,000.00 $ 24.00 $ 7,680.00 16 2 -02 Removal of Conc. Rail, Sidewalk, and Slab 1,965 SF $ 65.00 $ 127,725 $ 100.00 $ 196,500.00 $ 60.00 $ 117,900.00 $ 55.00 $ 108,075.00 $ 400.00 $ 786,000.00 $ 460.00 $ 903,900.00 17 4 -04 Crushed Surfacing Top Course 170 TON $ 40.00 $ 6,800 $ 58.00 $ 9,860.00 $ 65.00 ; $ 11,050.00 $ 40.00 $ 6,800.00 $ 250.00 $ 42,500.00 5 50.00 $ 8,500.00 18 5-04 HMA CL 1/2" PG 64-22 210 TON $ 105.00 $ 22,050 $ 160.00 $ 33,600.00 200.00 $ 42,000.00 $ 180.00 $ 37,800.00 $ 180.00_ $ 37,800.00 $ 215.00 $ 45,150.00 19 5-04 Planing Bituminous Pavement 1,150 SY $ 10.00 $ 11,500 $ 13.00 $ $ 14,950.00 _5 $ 8.00 $ 9,200.00 $ 10.00 $ 11,500.00 $ 14.00 $ 16,100.00 $ 16.00 $ 18,400.00 20 6 -10 Single Slope Concrete Barrier 278 LF $ 120.00 $ 33,360 $ 66.00 $ 18,348.00 $ 125.00 $ 34,750.00 $ 115.00 $ 31,970.00 $ 110.00 $ 30,580.00 $ 240.00 $ 66,720.00 21 8 -04 Cement Conc. Traffic Curb and Gutter 202 LF $ 65.00 $ 13,130 $ 44.00 $ 8,888.00 $ 45.00 ; $ 9,090.00 $ 55.00 $ 11110.00 $ 05.00 $ 9,090 .00 $ 40.00 $ 8,080.00 22 8-04 Dement Conc. Traffic Curb 172 LF $ 60.00 $ 10,320 $ 45.00 $ 7,740.00 $ 05.00 ii $ 7,740.00 $ 60.00 $ 10,320.00 $ 05.00 $ 7,740.00 $ 40.00 I $ 6,880.00 23 8-04 Dual -Faced Cement Conc. Traffic Curb 916 LF $ 30.00 $ 27,480 $ 27.00 $ 24,732.00 $ 25.00 $ 22,900.00 $ 30.00 $ 27,480.00 $ 25.00 $ 22,900.00 $ 40.00 $ 36,640.00 24 8 -06 Cement Conc. Driveway Entrance Type 3 50 SY $ 100.00 $ 5,000 $ 166.00 $ 8,300.00 $ 200.00 $ 10,000.00 $ 200.00 $ 10,000.00 $ 170.00 $ 8,500.00 $ 100.00 1 $ 5,000.00 25 2-02 Removal of Guard Rail and Posts 165 LF $ 20.00 $ 3,300 $ 9.00 $ 1,485.00 $ 30.00 $ 4,950.00 $ 25.00 $ 4,125.00 $ 30.00 $ 4,950.00 $ 20.00 $ 3,300.00 Bid Tab - Estimated Construction Costs PCL CONSTRUCTION STELLAR J SB STRUCTURES, LLC FLATIRON WEST, INC. CECCANTI ITEM NO. SECTION ITEM QUANTITY PAY UNIT UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE SIDEWALK 26 6 -13 Structural Earth Wall 1,395 SF $ 80.00 $ 111,600 $ 50.00 s 69,750.00 $ 65.00 $ 90,675.00 $ 25.00 $ 34,875.00 $ 65.00 $ 90,675.00 $ 48.00 $ 66,960.00 27 8 -14 Cement Conc. Sidewalk 510 SY $ 70.00 $ 35,700 $ 53.00 $ 78,030.00 $ 200.00 $ 102,000.00 $ 140.00 $ 71,400.00 $ 160.00 $ 81,600.00 $ 40.00 $ 20,400.00 28 8 -14 Cement Conc. Curb Ramp Type Perpendicular 1 EA $ 2,500.00 $ 2,500 $ 2,300.00 $ 2,300.00 $ 2,500.00 $ 2,500.00 $ 2,500,00 $ 2,500.00 $ 2,400.00 $ 2,400.00 $ 3,500.00 5 3,500.00 29 8 -14 Pedestrian Safety Railing 273 LF $ 75.00 $ 20,475 $ 55.00 ' $ 15,015,00 $ 175.00 $ 47,775.00 $ 125.00 $ 34,125.00 $ 20.00 $ 5,460.00 $ 70.00 $ 19,110.00 30 8 -14 Bollard Type 2 2 EA $ 800.00 $ 1,600 $ 2,040.00 , $ 4,080.00 $ 200.00 $ 400,00 $ 150.00 $ 300.00 $ 2,250.00 $ 4,500.00 $ 50.00 $ 100.00 31 8 -15 Quarry Spalls 2 TON $ 170.00 $ 340 $ 2,170.00. $ 4,340.00 5 1,000.00: $ 2,000.00 $ 2,400.00 $ 4,800.00 $ 2,200.00 $ 4,400.00 $ 750.00 $ 1,500.00 BRIDGE 32 6 -01 Work Access 1 LS $ 40,000.00 $ 40,000 $ 350,000.00 $ 350,000.00 5 450,000.00 $ 450,000.00 $ 40,000.00, $ 40,000,00 $ 100,000.00 $ 100,000,00 $ 640,000.00 $ 640,000.00 33 6 -02 Epansion Joints Modification and Longitudinal Joint Repair 1 LS $ 250,000.00 $ 250,000 $ 100,000.00 $ 100,000.00 $ 80,000,00 $ 80,000.00 $ 90,750,00 $ 90,750.00 $ 90,000.00 5 90,000.00 s 150,000.00 $ 150,000.00 34 6 -02 Seismic Retrofit and Bridge Rehabilitation 1 LS $ 1,650,000.00 $ 1,650,000 $ 1,260,000.00 $ 1,260,000.00 $ 1,600,000,00 $ 1,600,000.00 $ 2,040,000.00 $ 2,040,000.00 $ 1,300,000.00 $ 1,300,000.00 $ 1,560,000,00 $ 1,560,000.00 35 6 -02 Sidewalk Widening 1 LS $ 638,000.00 $ 638,000 $ 1,015,000.00 5 1,015,000.00 $ 600,000.00 $ 600,000.00 $ 802,500.00 $ 802,500.00 $ 1,100,000.00 $ 1,100,000.00 $ 650,000.00 $ 650,000.00 36 6 -02 Steel Corrosion Repair 1 LS $ 100,000.00 $ 100,000 $ 150,000.00 $ 150,000.00 5 100,000.00 $ 100,000.00 $ 75,000.00 $ 75,000.00 $ 160,000.00 $ 160,000.00 $ 300,000.00 $ 300,000.00 37 6 -03 Heat Shield Removal 1 LS $ 20,000.00 $ 20,000 $ 15,000.00 $ 15,000.00 $ 3,000.00 $ 3,000.00 $ 7,500.00 $ 7,500.00 $ 15,000.00 $ 15,000.00 $ 59,000.00 $ 59,000.00 38 6 -07 Cleaning and Painting - Steel Girders 1 LS $ 340,000.00 $ 340,000 5 290,000,00 $ 290,000.00 $ 300,000.00 $ 300,000.00 $ 615,000.00 $ 615,000.00 $ 575,000.00 $ 575,000.00 $ 420,000.00 5 420,000.00 39 6 -09 Further Deck Preparation For Type 1 Deck Repair 1,416 SF $ 60.00 $ 84,960 $ 17.00 $ 24,072.00 $ 35.00 $ 49,560.00 $ 75.00 $ 106,200.00 $ 100.00 $ 141,600.00 $ 51.00 $ 72,216.00 40 6 09 Further Deck Preparation For Type 2 Deck Repair 702 SF $ 125.00 $ 87,750 $ 43,00 $ 30,186.00 $ 60.00 $ 42,120.00 $ 110.00 $ 77,220.00 $ 150,00 $ 105,300.00 $ 59.00 5 40,716.00 41 6 09 Force Account Forms For Full Depth Deck Repair 1 EST $ 50,000.00 $ 50,000 $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00 42 6 -09 Scarifying Concrete Surface 2,059 SY $ 60.00 $ 123,540 $ 10,00. $ 20,590.00 $ 20.00 $ 41,180.00 $ 12.00 r $ 24,708.00 $ 80.00 $ 164,720.00 $ 52.00 $ 107,068.00 43 6 -09 Removing Existing ACP on Bridge Deck 564 SY $ 40.00 $ 22,560 $ 7.00 $ 3,948.00 $ 30.00 $ 16,920.00 $ 12.00 $ 6,768,00 $ 15,00 $ 8,460.00 $ 24.00 $ 13,536.00 44 6 -09 Modified Concrete Overlay 3,584 CF $ 90.00 $ 322,560 $ 12.00 $ 43,008.00 $ 10.00 $ 35,840.00 $ 10.00 $ 35,840.00 $ 80.00 $ 286,720.00 $ 105.00 $ 376,320.00 45 6 -09 Furnishing and Curing Modified Concrete Overla 2,622 SY $ 110.00 $ 288,420 $ 40.00 $ 104,880.00 $ 50.00 $ 131,100.00 $ 35.00 $ 91,770.00 $ 30.00 $ 78,660.00 $ 52.00 $ 136,344.00 6 -10 :. 674 LF $ 250.00 $ 168,500 $ 300.00 $ 202,200.00 $ 300.00 $ 202,200.00 $ 210.00 $ 141,540.00 $ 250.00 $ 168,500.00 $ 400.00 $ 269,600.00 6 -10 Temporary Conc. Barrier 1,940 LF $ 25.00 $ 48,500 $ 20.00 $ 38,800.00 $ 15.00 $ 29,100.00 $ 18.00 $ 34,920.00 $ 30,00 $ 58,200.00 $ 26.00 $ 50,440.00 48 6 -19 Soil Excavation for Shaft Including Haul 105 CY $ 1,500.00 $ 157,500 $ 3,400.00 $ 357,000.00 $ 4,000.00 $ 420,000.00 $ 3,600.00 $ 378,000.00 $ 8,000.00 $ 840,000.00 $ 3,600.00 $ 378,000.00 49 6 -19 Shoring or Extra Excavation Cl. A 1 LS $ 100,000.00 $ 100,000 $ 75,000.00 $ 75,000.00 $ 10.00 $ 10.00 $ 130,000.00 $ 130,000.00 $ 75,000.00 $ 75,000.00 $ 1,430,000.00 $ 1,430,000.00 50 IBE 6 -19 Conc. Class 4000P for Shaft 105 CY $ 600.00 $ 63,000 $ 710.00 $ 74,550.00 $ 1,000.00 $ 105,000.00 $ 760.00 $ 79,800.00 $ 800.00 $ 84,000.00 $ 800.00 $ 84,000.00 6 -19 St. Reinf. Bar for Shaft 57,591 LB $ 1.50 $ 86,387 $ 2.00 $ 115,182.00 $ 3.00 $ 172,773.00 $ 1.65 $ 95,025.15 $ 3,00 $ 172,773,00 $ 2.00 $ 115,182.00 6-19 CSL Access Tube 1,800 LF $ 12.00 $ 21,600 $ 7.00 $ 12,600.00 S 10.00 $ 18,000.00 $ 8A0 $ 14,400.00 1 $ 12.00 $ 21,600,00 $ 14.00 $ 25,200.00 ® 6 -19 Removing Shaft Obstructions 1 EST $ 46,000.00 $ 45,000 $ 45,000.00 $ 45,000.00 $ 45,000.00 $ 45,000,00 $ 45,000.00 $ 45,000.00 $ 45,000.00 $ 45,000.00 $ 45,000.00 $ 45,000.00 Etill 6 -19 CSL Test 12 EA $ 1,500.00 $ 18,000 $ 875.00 $ 10,500.00 $ 1,500.00 $ 18,000.00 $ 1,900.00 $ 22,800.00 $ 500.00 f $ 6,000.00 $ 1,000.00 $ 12,000 00 6-20 Epoxy Crack Injection 105 LF $ 250.00 $ 26,250 $ 20.00 $ 2,100.00 $ 50.00 $ 5,250.00 $ 116.00 $ 12,180.00 $ 125.00 $ 13,125.00 $ 150.00 = $ 15,750.00 ` 03 LL1 LZ/E :8120 Je6Euen w8J6OJd '3d 'sua;sJ2O ata1S 1e101 Pa;e!no!eo 1En;oe woi) Aq pau6!S ' ;oaJJOO aq 0; pa ;!uao s! uo!;einge; p!q 5!41 !p 1Esodoi+ u! paglwgns Ia ;01 'JOJJa uo! ;!ppe ue sa;ouap r JEpaIS J0; p81 u! Ie ;o; ,. 00 ?0£`956`01. $ 00 "Z0E`95t+`0L $ 00'9 L01 L6Z`6 $ OO9LO`16Z`6 $ S6'990`996'9 $ 56'!#90`986`9 $ 00 E69'££S`9 00'899`951`9 $ OO Pti `691•`9 $ OOEiiI `681`9 $ 600` LE 142. 600`1£1`1 $ sie}ol ;<so0 uo13anJ }sud3 pa}Ewns3 IEnY3 ' Sx uoiss!wgnS Iesodoid p18 Aed -1500 NOLLOnH1SNOO 03.LVLN11S3'11/101 00'008`21 $ 001 $ 00'089'L $ 09'0 $ 00'09S'Z $ OZ'O 5 00'Otr8'E $ OE '0 $ 00'088'Ot $ WO $ 0017'9 $ 05'0 $ d] 04$'31 6up!JE!nl ;wawanEd AmOdwa1 £Z-8 0$ 00'008 $ 00'00t $ 00'0zL $ 00 06 $ 00'9LE $ 00'Ltr $ 00'OOt' $ 0O'OS 5 00'009 5 00'S1 $ 096 $ 00'03 L $ V3 $ Jal;a 1 �! 1 SE oI eJ 01 1 Id ZZ-8 6L OO'oaz $ 00'001 $ OQ'OOZ $ 00'002 $ 001, $ 00'LS 5 00'05t 5 OO'SL $ 00'OEE $ 00'591 $ 041' $ 00'003 $ V3 Z MOJJV °IJ4 Jj O1 1Said 33 8 $L oo'ooz's $ 00 oz $ 00'040'1 $ 001' $ Ot t St t $ 7tr't' $ 00'00£'1 $ 00'S $ 00'OZ8I $ 0 $ 009`3 $ 00'04 $ dS 093 au!-1)11EMSSOJO 0!iseid Z3 $ LL O0'00L $ 00 OZ 5 00'SL8 5 00 $ OO'80E $ 08'8 $ 00 OS $ ! 00'0 I $ O0'SZS $ 00'55 $ 052 $ 00'01. $ dl 5E aun do ;S 0!ISe1d 33-8 9L woo 'Z $ 00'91 $ 00'00L $ 0o'v $ OS '?EE 5 06'1 5 00 SZS $ 00'E $ 00'OSL1 $ 00'01 $ 518 $ 40'5 $ di 5L 4 our 1 ap!M a! ;sEld ZZ $ 5L OO "011'1 $ oo-T $ 00'011'1 $ 00'1 $ 06'Z£tr $ LE'O $ 00'0LI'I $ 00 "i $ 00'5511 5 OS'i $ 829` L $ 4tr' I. $ di OL L' L au1 j mad 3z-9 IxL 00'000 "oz $ oo'000`oz $ QO'OOS'S $ OO'Dos's $ 00.00S'z $ 00'005'? $ 00•000'? $ 00'000'Z 5 00'0051 $ 00'0051 $ 000`2 $ 00'000'E $ Si L 61.111.161S;UBUEWJ8d 1.3-$ EL Oo'oo0`oz $ oo'000'oz $ 00'00S'L $ 00'00S'L $ 00'000'9 5 00'000'9 $ 00 000'S $ 'i 00'000'5 $ 00 000'E $ 00'000'E $ 045`2 $ 40'449'£ $ V3 L uo>;ng ysnd puE !EU6iS uelJ ;sapad a ;eooiaa 4Z -9 ZL OO'QOO'LZ $ OO'000'LZ $ 00'000'SE $ 00'000'SE $ 00'OSL'ZE $ 100'OSL'Z£ $ 00'000'SE $ 00'000'5£ $ OO'00o'SZ $ 00'000'5? $ 005`34 $ 00'049'34 $ b3 L Jo ;Enuayy ;oedwI1U9UBWJad LL $ LL oo.aoo`DZ $ 00'000'9 $ 00 0001/E $ 00'005'E $ 00'00021 $ 00'OOO'£ $ 00'000'tri $ ! 04'005'£ $ 00'000'0Z $ 00'000'5 $ 000't I. $ 00'009'£ $ V3 Jo ;enua0y Ioedwl riJEJOdwa1 LL 8 4L 00'000'1 $ 00'000'L $ 00'008'9 $ 00'0089 $ 00'009'9 $ 00'0099 $ 00'0001 $ 00'000'L $ 00'000'5 $ 00'000'5 5 003`2 $ 00'40?'£ $ V3 L !eUtwJa ei UO ;g edJ( !EJ 1En w88 1 Id N 1 l P J 8 4 4-8 69 00'081 $ 00'06 $ 00'009 $ 00'00E $ 00'08 $ 00'0t' $ 00'008 $ 00'00t' $ 00'00Z $ 00'001 $ 000' 4 $ 00'005 $ V3 Z Z edJ(1 J8)1J8 AJ ;uawaned pas!ed 60-9 89 00•0t'? $ 00'08 $ 00'00Z1 5 00'00tr $ 00'06 $ 00'0E $ 00'00ZI $ `, 00'00t' $ 00'00E $ 00'001 $ OQZ' I. $ 00'40b $ V3 E L adA1 J0)!J8 AJ ;uawaned pas!ea 60-8 L9 I S331A30 10111NO3 OIddYH) 00'00t'Z $ 00'09 $ 00'000'E $ 00'51 $ 00'009'? $ QO'S9 $ 00'OOtr'Z $ 00'09 $ 00'0001, $ L 00'001 $ 0017'3 $ 00'09 $ AO Otr tl edh 1 !IOSd01 Z0-8 99 00'000'?? $ 00'000'?? $ 00'000'22 $ 00'000'ZI $ 001100'ZI 5 00'000'21 $ 00'000'ZI $ , 00'000'ZI $ 00'000'ZI $ 00'000'ZI $ 000'Z t. $ 00 000`31 $ 153 L is ;uo0 uoi ;npod Ja ;e uo!saJ3 1.0-8 99 1N3 Jd013A3a 3a1savOH 00005'01 $ 00'0051 00'00S'St $ 00'005'9 $ ' 00'009ZI 008'I $ 00'000'L 00'0001 ; 00'000'tr1 $ 04'000'z $ 009'3 L $ 4404$ 1 1. ed(1 usee o ;Ea 50 L 9 00'000'9 $ 00'00Z $ 00'0512? $ 00'SZtr $ 00'005'tr 5 00'051 $ 00'OSZ'S 5 00'SLI $ 00'00£'9 $ 00'0?? $ o93`? $ 00'9L $ d'1 0E 'we!0 'u! ZL ad!d JBMBS WJO ;S l0 Z9 65210 VO -L E9 00'005'2£ 5 00'011 5 00'051'58 $ 00'SVZ $ 00'005'12 $ 00'06 $ 00 000'S 5 00'001 $ 00'000'8? $ 00'08 5 000' 43 $ 00'09 $ di 092 'wen 'u1 3; adid JaMas wJ01S OAd ITEM PIIOS VO-L Z9 3JVNIVHa WH01S 00'000'05 $ 00'000'05 $ 00.000'11 $ 00'000'11 $ 00`000'0D $ 00'000'0i' $ 00 000'0 $ 00'000`Otr $ 00'000'0i $ 00'000'01 $ 000'05 $ 04'000`09 $ Si L 6UU0IUO !r wawamaS 93-9 49 00'000'0£ $ 00'000'OE $ 00'000'0E $ 00 000'0E $ 00'000'0E $ 00'000'0E $ 00'000'0E $ `, 00'000'0E $ 00'000'0E $ 00'00 'OE $ 000'0£ $ 00'000`0£ $ 153 L 1!e { pJEnO ap!sul 9z-9 09 00'000'002 $ 00'000'00? $ 00'000'00? $ 00'OOO'OOZ $ 00•000'58 $ 00'000'58 $ 00 000'00i $ 00'000'00I $ 00'000'8t'1 $ 00'000'8trT $ 000'913 $ 04'400`513 $ Si L 6u! ;nOJO uol ;oedwoO t -9 69 00'000'00? 5 00•000'00? $ 00'000'5ZI $ 00'000'SZI $ 00'000'SOI $ 00'000'501 $ 00'SZZ S 00'SZZ $ 00'000'OLI $ 00'000'OLI $ 000`901 $ 04 000`S44 $ si l 6u1ua ;6UOJ ;S �!oa0 pue Ja JI a6 IJ y p .0 P. 8 d>dd0 E3 -9 99 00'00L'tOI $ 00'051 $ 00'00L'IOI $ 00'051 $ 00'009'SEI $ 00'00Z $ 00'00Z'ILZ $ 00'00tr 5 00'085't'L $ 00'011 $ 09L178 $ 00'934 $ di 8L9 eouad and ;oaloJd ZZ 9 L9 00'000'SI $ i I 00'05? 5 00 005.0-1 $ 00'5LT $ 00'008'01 $ 00'081 $ 00'000'51 $ 00'05Z $ 00'009'6 $ 00'091 5 000'0£ $ 00'009 dS 09 sJ!eda a Ied S !e011a A pus P Ea y J8A O 3-9 99 331Hd'IVIOL 11NV33 33IHd 11Nf1 3 3318d 1Vi01 'ONI 1S3M NOHi1Vid 3318d 11Nn 33111d 1V101 33IHd 11Nn 311 `S3Hn10nUis SS 33lHd 1V101 33!1:id _LINn r tin s 33111d 1V1O1 NOI10fb1SN0313d 3318d Inc 331Hd 1V101 � 331Hd.INn 11Nn AVd SIso3 A111NVnO uoijanajsuoO 1A1311 palew s3 N0113 3S - gel ON IN 11 pie 679 '+rDC Trades Licensing Debarred Contractors List A debarred coat presented below, Company Name; WA UBI umber: License Number, ctor may not bid on, or have a bid considered on, any public works contract. You can search and l'II onstructon s Apply F nets Reset Prncp From: Penalty Due; All YYYY In the options Wage Due:. Dow oad al debarment data There ecords that match your s+e rch triter SAM Search Results List of records matching your search for Search Term pcl* AM, u---- A Q*-+.- A -+..,- City: TAMPA ZIP Code: 33624-1873 Vince: FLORIDA UNITED STATES Cit LEANDRO 94577-1534 State/Province: CALIFORNIA Country: UNITED STATES PCL CONSTRUCTION SERVICES, INC Status:Active DUNS: 153549191 +4: CAGE Code: 5JYK2 DoDAAC: Expiration Date: Feb 28, 2018 Has Active Exclusion?: No Delinquent Federal Debt?: No Address: 12200 NICOLLETE AVE S City: BURNSVILLE State/Province: MINNESOTA ZIP Code: 55337-1652 Country: UNITED STATES IENTITY' : :77]PCL CONSTRUCTION SERVICES, INC Status:Active DUNS: 130856909 +4: CAGE Code: OGGP7 DoDAAC: Expiration Date: Dec 5, 2017 Has Active Exclusion?: No Delinquent Federal Debt?: No Address: 2000 S COLORADO BLVD STE 2- 500 City: DENVER State/Province: COLORADO ZIP Code: 80222-7928 Country: UNITED STATES 52 RA-k 41Z 0047' -2A ORA ENTITY PCL Construction, Inc. Status:Active DUNS: 825171908 +4: CAGE Code: 53XH1 DoDAAC: Expiration Date: Jul 15, 2017 Has Active Exclusion ?: No Delinquent Federal Debt ?: No Address: 1711 W Greentree Dr Ste 201 City: Tempe State /Province: ARIZONA ZIP Code: 85284 -2717 Country: UNITED STATES E%LTCTY 7jPCL CONSTRUCTION SERVICES, INC Status :Active DUNS: 926363276 +4: CAGE Code: 4LWDO DoDAAC: Expiration Date: Nov 21, 2017 Has Active Exclusion ?: No Delinquent Federal Debt ?: No Address: 6675 WESTWOOD BLVD STE 200 City: ORLANDO State /Province: FLORIDA ZIP Code: 32821 -6015 Country: UNITED STATES EITIY PCL CONSTRUCTION SERVICES, INC. Status :Active DUNS: 015974629 +4: CAGE Code: 5MKR7 DoDAAC: Expiration Date: Apr 12, 2017 Has Active Exclusion ?: No Delinquent Federal Debt ?: No Address: 500 N BRAND BLVD STE 1500 City: GLENDALE State /Province: CALIFORNIA ZIP Code: 91203 -3938 Country: UNITED STATES ENTITY" ' PCL CONSTRUCTION SERVICES, INC. Status :Active DUNS: 618500610 +4: CAGE Code: 5L8X5 DoDAAC: Expiration Date: Apr 26, 2017 Has Active Exclusion ?: No Delinquent Federal Debt ?: No Address: 4350 EXECUTIVE DR STE 270 City: SAN DIEGO State /Province: CALIFORNIA I oe:91 -12 Cutr: T DSAE ENTITY" PCL CONSTRUCTION SERVICES, INC. Status:Active DUNS: 877512285 +4: CAGE Code: OXY77 DoDAAC: Expiration Date: Sep 9, 2017 Has Active Exclusion ?: No Delinquent Federal Debt ?: No Address: 3650 131 STAVE SE City: BELLEVUE State /Province: WASHINGTON ZIP Code: 98006 -1395 Country: UNITED STATES 53 h/1 - 1, 1 t; ')nl7 'x•zn pnn Pana ? of 3 54 nAnrnM 1F Or)l 7 I-IA ORA 0 LA"Ity of Tukwila Allan Ekberg, Mayor Public Works Department - Bob Giberson, Director TO: Transportation and Infrastructure Committee FROM: Bob Giberson, Public Works Director BY: Steve Carstens, Senior Program Manager CC: Mayor Ekberg DATE: March 24, 2017 SUBJECT: Presentation on the State of the City's Bridges ISSUE Provide the Transportation and Infrastructure Committee with information about the entire City bridge inventory and program. This will show the overall condition of the City's bridges as well as steps we can take for future projects and maintenance. The Federal Highways Administration (FHWA) and Washington State Department of Transportation (WSDOT) require regularly scheduled inspections of all the City's traffic carrying bridge structures. The City also extends this effort to its pedestrian bridges. This requirement allows for continuity in reporting as well as the opportunity to identify and potentially fund bridges in need of replacement and rehabilitation. DISCUSSION The City currently has 23 bridges owned by the City (16 traffic bearing and 7 pedestrian). Of those, two are jointly owned jurisdictional bridges with shared ownership between the City of Renton (Grady Way) and the City of Kent (1 96th/200). The structure types very from Steel Truss, pre-cast concrete girders, cast-in-place concrete girders, steel girder, wood girder, and steel tied arch spans. This discussion will focus on why the City inspects its bridges, where the City stands with respect to the state and the country, and recommendations for additional steps that can be taken to address known issues. RECOMMENDATION, Discuss, with the Transportation and Infrastructure Committee, the state of the City's bridge program and address any issues the committee may have. Attachments: State of the City's Bridges Presentation W:\PW Eng\OTHER\Bridge\z - bridge City Eng report\2017-03-28 info memo TIC insp rpt sm.docx 6300 Building # 6300 Southcen ter Boulevard Suite 100 # Tukwila, WA 98188 • 206-433-0179 Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 Website: TukwilaWA.gov 55 State of the City's Bridges Why do we inspect bridges? • 1967 Silver Bridge Collapse • Rush hour Traffic • 46 people lost their lives • Prompted 1968 Federal Highway Act requiring inspection of bridges and inspector training on Stan ards Why do we inspect bridges? • Guidelines go back to 1971 • Minimum training hours required for inspectors • Creates a consistent standard for inspectors to meet. • Ranks bridges from 0 to 100 • Requires inspections to be performed on a regular basis. CITY OF TUKWILA CI ENGINEER'S BRIDGE INSPECTION REPORT FEBRUARY 2017 • City Engineer's Bridge Report lists all of the City's 23 bridges • Gives reader key information on each structure • Lets you know if a bridge is structurally deficient or functionally obsolete. • Allows you to gauge the health of the structure. • Keeps you and the public informed of the state of our most expensive assets! What are the conditions of our bridges? t Quick Definitions • Structurally Deficient (SD) = If key load carrying elements are found to be in poor condition (deterioration /damage) • Functionally Obsolete (FO) = certain items do not meet current design criteria (geometry, load capacity, clearance, etc) • Sufficiency Rating (SR) = way to quantify the structure using a numbering system. You can also think of it as the age left before a structure is not able to carry vehicles (or people). • Number of total Traffic bridges: • Number of Pedestrian bridges: • Number of SD bridges: • Number of FO bridges: • Average SR: • Average Age: • Our Overall Grade = • WA Average: Percent of SD bridges = • National average: percent of SD bridges = *from Transportation for America, 2013 * *from ASCE 2017 Report Card for America's Infrastructure Show me the numbers! 16 7 (includes TUC Ped Bridge) 3 or (18 %), it will soon be 2, or (13 %) 4 or (25 %) 69.22 37 years (design life = 50 years, service life = 75 years) C to D (based on grading method from ASCE report) 5 %, Grade = C -* 9 %, Overall grade = C + ** BRAC Candidates • There are 2 potential candidates for the Bridge Replacement Advisory Committee (BRAC) grant which we would ask permission to submit for: • 42nd Avenue South Bridge (Tuk #14) Replacement Candidate • South Boeing Access Road (over Airport Way — Tuk #11) Seismic Upgrade Candidate 42nd Ave South • SR 19.76 and SD. Built in 1949. • Paint System is failing • Structural issues with load carrying ability —may be required to place load restrictions on it soon. • Rehabilitation could run $6 million (higher maintenance costs) • Replacement could run $10 - $12 million (lower maintenance costs). Need to determine location of new structure • Costs of either option are paid 80% federal, 20% city. Boeing Access over Airport Way • SR 56.50 and SD. Built in 1952. • Only meets requirement for seismic grant • Major access route from 1 -5 to major commercial areas • Seismic rehabilitation could run $4 million. Construction costs 100% reimbursed by Federal Grant. Design costs are 80% federal share and 20% city. • No work on deck, limited to substructure. Therefore limited impact to BAR traffic on deck. • Future funding to install sidewalk or repair deck would still be available • Public Works /Engineering is requesting permission from the Transportation Infrastructure Committee to submit applications for the 2017 BRAC grant cycle. Specifically: • Submit an application for the replacement of 42nd Avenue South. • Submit an application for the seismic upgrade of South Boeing Access Road (over Airport Way). What are we asking for? Questions? 1 City of Tukwila Allan Ekberg, Mayor Public Works Department -Bob Giberson Director Transportation and Infrastructure Committee BobGibemamn, Public Works Director -M Steve Carstens, Senior Program Manager Mayor Ekberg March 24, 2017 SUBJECT:,Bridge Replacement Advisory Committee (BRAC) Applications ISSUE Authorize the submittal of grant application(s) for funding from the Federal Highway Bridge (BRAC) BACKGROUND The Washington State Department of Transportation has issued 8 Call for Projects to compete for approximately $8O million UfBRACfunding. Tukwila currently has only two (2) bridges that qualify for funding during this call. The Boeing Access Road Bridge over Airport Way is structurally deficient and iS not seismically protected. -[h842» « Avenue South Bridge over the [}UYV8DliSh River iSstructurally deficient and is eligible for [ep|8C8Dl8DL Neither project iGCU[[8Dt|yprOgr8[DOO8d iO the City's 6-ye8[ T[8DSpOrt8dOD Improvement Program /UP\O[ the Capital Improvement Program (C|P). DISCUSSION Grant applications are due bv April 3.2O17. • Apre|i0iDary grant application totaling $12'330,00 has been prepared for the 42 ndAveDUe South Bridge. The Call for Projects indicates that 20%iOmatching design and construction funds should be assumed for this project, RDdm0U|dn3qUir8S2.330.00OiD|OC8| matching funds. • A preliminary grant application totaling (8pp[0xinm8t8|«)$2'323,OOO has been prepared for the Boeing Access Road Bridge. The Call for Projects iDdiC8t8Sth8i2Oq6iD0GtChiDgdeSi funds should b8 assumed for the project, and would require approximately $120,000 in local matching funds. The grant applications assume the construction start date would b8 anticipated [O begin iO2O2Ofor each project. RECOMMENDATION Discuss the decision tO authorize the submittal Of@ grant application fO[dl888iS0iCUpg[8deOfth8 Boeing Access Road Bridge and/or replacement of the 42 nd Avenue South Bridge. Staff is requesting Transportation Infrastructure Committee provide direction and approval to pursue the grant Attachments: BRAC Call for Projects vv:\pW RW&RS Pnojocm\Bhuga Inspection pmgmmu\BnUga Inspections xn17(91o1n4ns)\2n17BRAC\2o1r*neninfo BRAC memo TIC sm.docx 6300 + 6300Southcen ter Boulevard Suite I00 ^ Tukwila, N<A98289 206'433'0179 Tukwila City Hall ^G200 Southcenter Boulevard ^Tukwila, WA 98188^206-433-1800 "Website: TukwilaWA.gop 67 Washing-tan State Call for Projects - Federal Highways Bridge Program On This Page Application Due Date April ],2O17 ° Eligible Applicants | ° Submittal Process WSDOT is announcing the availability of $60 million of FHWA funding for improvements of local agency bridges. The purpose of the Federal Local Bridge program is to improve the condition of local agency bridges while ensuring no more than 1096 of the National Highway System (NHS) bridge deck area is on structurally deficient bridges. The local bridge program funds maybe utilized for replacement, rehabilitation and preventative maintenance. Preventative maintenance is defined as steel bridge painting, scour mitigation, seismic retrofit and deck repair. For Replacement and Rehabilitation projects, VVSDOT is focusing on funding local agency bridges that are classified as structurally deficient and meet the following criteria: • Structurally deficient bridges with a sufficiency rating of less than 40 for replacement candidates. • Structurally deficient bridges with a sufficiency rating of less than 80 for rehabilitation candidates. Preventative Maintenance projects must be submitted as an individual application and meet one of the following four categories: • Bridge painting projects- only structures that have greater than two percent of total paint area in a condition state 3 are eligible. • Scour mitigation projects - priority will be given to structures that are scour critical based on the submitted documentation. • Seismic retrofit projects priority will be given tostructures in higher risk seismic zones based on the submitted documentation. • Deck resurfacing and repair only structures that have a total area of two percent or greater of patches and spa||s in the deck surface (condition state J plus condition state 3) are eligible, Eligible Applicants All local agencies who currently own a bridge that meets the above criteria are eligible to apply. Funding A total of $60 million of federal funds is available. The maximum individual project funding from the program is limited to$12 million. Match requirement Replacement and rehabilitation projects require a 20 percent local match. Projects that proceed to construction by 2021 are eligible for a lower local match requirement of 13.5 percent. Preventative maintenance projects are limited to a maximum of $3 million in federal funds per bridge and will require 13.5 percent local match; projects that proceed toconstruction by 2021 are eligible for 100 percent federal funding for eligible costs. Program requirements Applicants are required to report quarterly on the status and expenditure plan of each project award. 68 Project Applications Pnjectapp|icatonsshaUbesubmittedon|ineath|pgrants@wsdotwa.gov Electronic copies of the following are tobe included in the submittal: • Latest inventory and |OSp8[ti0O reports for all project applications • Latest O[newly updated |Odd ratings for replacement O[rehabilitation project applications only • E/e[t[UDiC photos (640 X 480 pixels Dl|D|rOUDl . pg) for all project applications • Current bridge scour evaluation and any preliminary hydraulic analysis and supporting documentation for scour mitigation project Dppl|COt|UOG • Preliminary seismic evaluation and supporting documentation for seismic retrofit project applications • Bridge Program Application /pdf 1.9 rOh\ CdO he edited by Adobe Reader Submittal Process Submittals must be sent by e-mail (paper and CD submittals will not be accepted). Project proposals must be received by midnight April 3, 2017. Project proposals must be sent by e-mail to hlpgrants@wsdot.wa.gov Program Contacts Region Local Program Engineers or John Hoat36O-7O5'73O3orRoman Peralta at 360-705-7870. Selection Process All proposals will be reviewed to ensure that they are complete and eligible for funding. An advisory group will evaluate the proposals and make recommendations. VVSDOT Local Programs Director will announce the final selections by Fall of2017. Copyright WSDOTI 2017 69