TIC 2017-03-28 Item 2C - Bid Award - PCL Construction Services for Boeing Access Road over BNRR Bridge Rehabilitation
City of Tukwila is Allan Ekberg, Mayor Public Works Department - Bob Giberson, Director TO: Transportation and Infrastructure Committee FROM: Bob Giberson, Public Works Director BY: Steve Carstens, Senior Program Manager CC: Mayor Ekberg DATE: March 24, 2017 SUBJECT: Boeing Access Rd over BNRR Bridge Rehabilitation Project Project No. 99410408 Bid Award ISSUE Award the construction bid from PCL Construction Services, Inc. (PCL) as the lowest responsive and responsible bidder for the Boeing Access Rd over BNRR Bridge Rehabilitation Project. BACKGROUND A call for bids was advertised on February 15 and February 22, 2017. Two addenda were issued addressing clarifications in the bid documents. Five bids were received on March 15, 2017 and the lowest bid came from PCL. DISCUSSION The construction bids were reviewed and only one minor irregularity was found. There were no errors in the bid submitted by PCL. There was one bid protest received by the City. The protest was reviewed and has been denied by City staff. PCL has been doing business since 1991 (in Washington) and has experience with projects of similar size and scope. PCL does not have any exceptions and has not been debarred from working on federally funded projects. FISCAL IMPACT The budget for construction is broken down as follows: Boeing Access Road Bridge Rehabilitation Contract Cost Budget PCL Construction Contract 6,189,244.00 9,745,100.00 Railroad Costs 149,428.00 Contingency (25 %) 1,584,668.00 Total 7.923.340.00 9.745.100.00 RECOMMENDATION Council is being asked to award the bid to PCL Construction Services, Inc. in the amount of $6,189,244.00 and to consider this item on the Consent Agenda at the April 3, 2017 Regular Meeting. Attachments: Page 10, 2017 CIP Bid Tabs Debarred Contractors List SAM Search Results W: \PW Eng \PROJECTS\A- RW & RS Projects \Boeing Access Rd Bridge Rehab (99410408) \02 Funding and Finance \Transportation Committee\20170315 InfoMemo PCL contract sm.docx 6300 Building • 6300 Southcen ter Boulevard Suite 100 # Tukwila, WA 98188 # 206 - 433 -0179 Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206 - 433 -1800 • Website: TukwilaWA.gov El 11 FINANCIAL Through Estimated (in $000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL CITY (]FTUKVVLA CAPITAL PROJECT SUMMARY 2017 to 2022 PROJECT: Boeing Access Rd over BWRRBridge Rehabilitation Project No. S9410*o8 RohmbiU\amthe evisdngbhdQevdha34o' long con�e�o,s�e|br�goa�udure.UwiUbe5lanes � D���R|pngN� and have a sidewalk on one side, The existing bridge is structurally and seismically deficient. Several pedestals are leaning, have concrete JUSTIFICATION: spalls, exposed rusty anchor bolts and reinforcements and some cracks. The existing railings do not meet 104 current bridge standards. Type, size, and location draft report (specifically required for bridges) was completed in 2005. Federal STATUS: grant applications were submitted in 2008 and 2010 and the bridge rehabilitation was successful for funding in 2012 for federal bridge funds. A Public Works Trust Fund (PWTF) loan was rescinded in 2013. MA|NT.]MPAoT: Maintenance will boreduced. Bhdgewill berehabi|imuedin phases toaUow continued �afficuse. Federal bhdgegrant of$g.74o.GUO ������T� requires e2oY6 local match. * bond issue for the City match was issued in2015 with the Interurban Ave 8. FINANCIAL Through Estimated (in $000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL EXPENSES Design 1,249 104 1,353 Land (RW 100 100 Const. Mgmt 1,124 1,124 Construction 9,745 9,745 FUND SOURCES Awarded Grant 905 163 8,677 9,745 Proposed Grant 0 Fund Balance-Bond 344 41 2,192 2,577 Mitigation 0 oo,r-xoc2 Capital Improvement Program We �111 Boeing Access Road Bridge Rehabilitation City Project No. 99410408 Bid Tab - Estimated Construction Costs PCL CONSTRUCTION SB STRUCTURES, LLC FLATIRON WEST, INC. CECCANTI ITEM NO. SECTION ITEM QUANTITY PAY UNIT UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE ROADWAY UNIT PRICE I TOTAL PRICE 1 1 04 Unexpected Ste Changes 1 EST $ 30,000.00 $ 30,000 $ 30,000.00 $ 30,000.00 $ 30,000.00 $ 30,000.00 $ 30,000.00 $ 30,000.00 $ 30,000.00 $ 30,000.00 $ 30,000.00 $ 30,000.00 2 1-05 Contractor Surveying 1 LS $ 36,040.00 $ 36,000 $ 17,000.00 ''; $ 17,000.00 $ 30,000.00 $ 30,000.00 $ 20,000.00 $ 20,000.00 $ 85,000.00 $ 85,000.00 $ 35,000.00 $ 35,000.00 3 1 -05 Record Drawings 1 LS $ 12,000.00 $ 12,000 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000 .00 $ 10,000.00 $ 3,000.00 $ 3,000,00 4 1 -07 Training 800 HR $ 35.00 $ 28,000 $ loo $ 800.00 $ 20.00:. $ 16,000.00 $ 5.00 $ 4,000.00 $ 5.00 $ 4,000.00 $ 1.00 S 800.00 5 1 -07 SPCC Plan 1 LS $ 5,000.00 $ 5,000 $ 1,000.00 $ 1,000.00 $ 1,000.00 $ 1,000.00 $ 5,000.00 $ 5,000.00 $ 3,500.00 $ 3,500.00 $ 2,500.00 $ 2,500.00 6 1 -08 Type B Progress Schedule 1 LS $ 5,000.00 $ 5,000 $ 1,000.00 ; $ 1,000.00 $ 5,000.00 $ 5,000.00 $ 10,000.00 $ 10,000.00 $ 2,500.00 $ 2,500.00 $ 20,000.00 $ 20,000.00 7 1-09 Mobilization 1 LS $ 648,000.04 $ 648,000 $ 600,000.00 $ 600,000.00 $ 675,000.00 ! $ 675,000.00 $ 690,000.00 $ 690,000.00 $ 1,000,000.00 $ 1,000,000.00 $ 1,000,000.00 $ 1,000,000.00 8 1-10 Project Temporary Traffic Control 1 LS $ 150,000.00 $ 150,000 $ 20 000.00 , $ 20,000.00 $ 80,000.00 $ 80,000.00 $ 200,000.00 $ 200,000.00 $ 400,000.00 $ 400,000.00 $ 150,000.00 $ 150,000.00 9 1 -10 Traffic Control Supervisor 1 LS $ 18,000.00 $ 18,000 $ 2,500.00 ! $ 2,500.00 $ 30,000.00 $ 30,000.00 $ 25,000.00 $ 25,000.00 $ 65,000.00 $ 65,000.00 $ 150,000.00 $ 150,000.00 10 1 -10 Portable Changeable Message Sign 1,280 HR $ 11.00 $ 14,080 $ 6m; $ 7,680.00 5 10.00 $ 12,800.00 $ 4.00 $ 5,120,00 $ 12.00 $ 15,360.00 $ 4.00 $ 5,120.00 11 2 -01 Clearing and Grubbing 1 LS $ 3,000.00 $ 3,000 $ 7,000.00 $ 7,000.00 $ 5,000.00 $ 5,000.00 $ 10,000.00 $ 10,000.00 $ 100,000.00 5 100,000.00 5 25,000.00 $ 25,000.00 12 2 -01 Roadside Cleanup 1 EST $ 5,000.00 $ 5,000 $ 5,000.0o $ 5,000.00 $ 5,000.00' $ 5,00000 $ 5,000.00 I S 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 13 2 -02 Removal of Pavement 580 SY $ 18.00 $ 10,440 $ 27.00 $ 15,660.00 $ 15.00 $ 8,700.00 $ 15.00 S 8,700.00 $ 29.00 $ 16,820.00 S 30.00 $ 17,400.00 14 2 -02 Removal of Traffic Island 70 SY $ 1 8.00 $ 1,260 $ 59.00 $ 4,130.00 $ 20.00 $ 1,400.00 $ 15.00 $ 1,050.00 $ 40.00 $ 2,800.00 $ 30.00 $ 2,100.00 15 2 -02 Removal of Precast Concrete Barrier 320 LF $ 10.00 $ 3,200 $ 2.50 $ 800.00 $ 10.00 ; $ 3,200.00 $ 10.00 $ 3,200.00 $ 50.00 $ 16,000.00 $ 24.00 $ 7,680.00 16 2 -02 Removal of Conc. Rail, Sidewalk, and Slab 1,965 SF $ 65.00 $ 127,725 $ 100.00 $ 196,500.00 $ 60.00 $ 117,900.00 $ 55.00 $ 108,075.00 $ 400.00 $ 786,000.00 $ 460.00 $ 903,900.00 17 4 -04 Crushed Surfacing Top Course 170 TON $ 40.00 $ 6,800 $ 58.00 $ 9,860.00 $ 65.00 ; $ 11,050.00 $ 40.00 $ 6,800.00 $ 250.00 $ 42,500.00 5 50.00 $ 8,500.00 18 5-04 HMA CL 1/2" PG 64-22 210 TON $ 105.00 $ 22,050 $ 160.00 $ 33,600.00 200.00 $ 42,000.00 $ 180.00 $ 37,800.00 $ 180.00_ $ 37,800.00 $ 215.00 $ 45,150.00 19 5-04 Planing Bituminous Pavement 1,150 SY $ 10.00 $ 11,500 $ 13.00 $ $ 14,950.00 _5 $ 8.00 $ 9,200.00 $ 10.00 $ 11,500.00 $ 14.00 $ 16,100.00 $ 16.00 $ 18,400.00 20 6 -10 Single Slope Concrete Barrier 278 LF $ 120.00 $ 33,360 $ 66.00 $ 18,348.00 $ 125.00 $ 34,750.00 $ 115.00 $ 31,970.00 $ 110.00 $ 30,580.00 $ 240.00 $ 66,720.00 21 8 -04 Cement Conc. Traffic Curb and Gutter 202 LF $ 65.00 $ 13,130 $ 44.00 $ 8,888.00 $ 45.00 ; $ 9,090.00 $ 55.00 $ 11110.00 $ 05.00 $ 9,090 .00 $ 40.00 $ 8,080.00 22 8-04 Dement Conc. Traffic Curb 172 LF $ 60.00 $ 10,320 $ 45.00 $ 7,740.00 $ 05.00 ii $ 7,740.00 $ 60.00 $ 10,320.00 $ 05.00 $ 7,740.00 $ 40.00 I $ 6,880.00 23 8-04 Dual -Faced Cement Conc. Traffic Curb 916 LF $ 30.00 $ 27,480 $ 27.00 $ 24,732.00 $ 25.00 $ 22,900.00 $ 30.00 $ 27,480.00 $ 25.00 $ 22,900.00 $ 40.00 $ 36,640.00 24 8 -06 Cement Conc. Driveway Entrance Type 3 50 SY $ 100.00 $ 5,000 $ 166.00 $ 8,300.00 $ 200.00 $ 10,000.00 $ 200.00 $ 10,000.00 $ 170.00 $ 8,500.00 $ 100.00 1 $ 5,000.00 25 2-02 Removal of Guard Rail and Posts 165 LF $ 20.00 $ 3,300 $ 9.00 $ 1,485.00 $ 30.00 $ 4,950.00 $ 25.00 $ 4,125.00 $ 30.00 $ 4,950.00 $ 20.00 $ 3,300.00 Bid Tab - Estimated Construction Costs PCL CONSTRUCTION STELLAR J SB STRUCTURES, LLC FLATIRON WEST, INC. CECCANTI ITEM NO. SECTION ITEM QUANTITY PAY UNIT UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE SIDEWALK 26 6 -13 Structural Earth Wall 1,395 SF $ 80.00 $ 111,600 $ 50.00 s 69,750.00 $ 65.00 $ 90,675.00 $ 25.00 $ 34,875.00 $ 65.00 $ 90,675.00 $ 48.00 $ 66,960.00 27 8 -14 Cement Conc. Sidewalk 510 SY $ 70.00 $ 35,700 $ 53.00 $ 78,030.00 $ 200.00 $ 102,000.00 $ 140.00 $ 71,400.00 $ 160.00 $ 81,600.00 $ 40.00 $ 20,400.00 28 8 -14 Cement Conc. Curb Ramp Type Perpendicular 1 EA $ 2,500.00 $ 2,500 $ 2,300.00 $ 2,300.00 $ 2,500.00 $ 2,500.00 $ 2,500,00 $ 2,500.00 $ 2,400.00 $ 2,400.00 $ 3,500.00 5 3,500.00 29 8 -14 Pedestrian Safety Railing 273 LF $ 75.00 $ 20,475 $ 55.00 ' $ 15,015,00 $ 175.00 $ 47,775.00 $ 125.00 $ 34,125.00 $ 20.00 $ 5,460.00 $ 70.00 $ 19,110.00 30 8 -14 Bollard Type 2 2 EA $ 800.00 $ 1,600 $ 2,040.00 , $ 4,080.00 $ 200.00 $ 400,00 $ 150.00 $ 300.00 $ 2,250.00 $ 4,500.00 $ 50.00 $ 100.00 31 8 -15 Quarry Spalls 2 TON $ 170.00 $ 340 $ 2,170.00. $ 4,340.00 5 1,000.00: $ 2,000.00 $ 2,400.00 $ 4,800.00 $ 2,200.00 $ 4,400.00 $ 750.00 $ 1,500.00 BRIDGE 32 6 -01 Work Access 1 LS $ 40,000.00 $ 40,000 $ 350,000.00 $ 350,000.00 5 450,000.00 $ 450,000.00 $ 40,000.00, $ 40,000,00 $ 100,000.00 $ 100,000,00 $ 640,000.00 $ 640,000.00 33 6 -02 Epansion Joints Modification and Longitudinal Joint Repair 1 LS $ 250,000.00 $ 250,000 $ 100,000.00 $ 100,000.00 $ 80,000,00 $ 80,000.00 $ 90,750,00 $ 90,750.00 $ 90,000.00 5 90,000.00 s 150,000.00 $ 150,000.00 34 6 -02 Seismic Retrofit and Bridge Rehabilitation 1 LS $ 1,650,000.00 $ 1,650,000 $ 1,260,000.00 $ 1,260,000.00 $ 1,600,000,00 $ 1,600,000.00 $ 2,040,000.00 $ 2,040,000.00 $ 1,300,000.00 $ 1,300,000.00 $ 1,560,000,00 $ 1,560,000.00 35 6 -02 Sidewalk Widening 1 LS $ 638,000.00 $ 638,000 $ 1,015,000.00 5 1,015,000.00 $ 600,000.00 $ 600,000.00 $ 802,500.00 $ 802,500.00 $ 1,100,000.00 $ 1,100,000.00 $ 650,000.00 $ 650,000.00 36 6 -02 Steel Corrosion Repair 1 LS $ 100,000.00 $ 100,000 $ 150,000.00 $ 150,000.00 5 100,000.00 $ 100,000.00 $ 75,000.00 $ 75,000.00 $ 160,000.00 $ 160,000.00 $ 300,000.00 $ 300,000.00 37 6 -03 Heat Shield Removal 1 LS $ 20,000.00 $ 20,000 $ 15,000.00 $ 15,000.00 $ 3,000.00 $ 3,000.00 $ 7,500.00 $ 7,500.00 $ 15,000.00 $ 15,000.00 $ 59,000.00 $ 59,000.00 38 6 -07 Cleaning and Painting - Steel Girders 1 LS $ 340,000.00 $ 340,000 5 290,000,00 $ 290,000.00 $ 300,000.00 $ 300,000.00 $ 615,000.00 $ 615,000.00 $ 575,000.00 $ 575,000.00 $ 420,000.00 5 420,000.00 39 6 -09 Further Deck Preparation For Type 1 Deck Repair 1,416 SF $ 60.00 $ 84,960 $ 17.00 $ 24,072.00 $ 35.00 $ 49,560.00 $ 75.00 $ 106,200.00 $ 100.00 $ 141,600.00 $ 51.00 $ 72,216.00 40 6 09 Further Deck Preparation For Type 2 Deck Repair 702 SF $ 125.00 $ 87,750 $ 43,00 $ 30,186.00 $ 60.00 $ 42,120.00 $ 110.00 $ 77,220.00 $ 150,00 $ 105,300.00 $ 59.00 5 40,716.00 41 6 09 Force Account Forms For Full Depth Deck Repair 1 EST $ 50,000.00 $ 50,000 $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00 42 6 -09 Scarifying Concrete Surface 2,059 SY $ 60.00 $ 123,540 $ 10,00. $ 20,590.00 $ 20.00 $ 41,180.00 $ 12.00 r $ 24,708.00 $ 80.00 $ 164,720.00 $ 52.00 $ 107,068.00 43 6 -09 Removing Existing ACP on Bridge Deck 564 SY $ 40.00 $ 22,560 $ 7.00 $ 3,948.00 $ 30.00 $ 16,920.00 $ 12.00 $ 6,768,00 $ 15,00 $ 8,460.00 $ 24.00 $ 13,536.00 44 6 -09 Modified Concrete Overlay 3,584 CF $ 90.00 $ 322,560 $ 12.00 $ 43,008.00 $ 10.00 $ 35,840.00 $ 10.00 $ 35,840.00 $ 80.00 $ 286,720.00 $ 105.00 $ 376,320.00 45 6 -09 Furnishing and Curing Modified Concrete Overla 2,622 SY $ 110.00 $ 288,420 $ 40.00 $ 104,880.00 $ 50.00 $ 131,100.00 $ 35.00 $ 91,770.00 $ 30.00 $ 78,660.00 $ 52.00 $ 136,344.00 6 -10 :. 674 LF $ 250.00 $ 168,500 $ 300.00 $ 202,200.00 $ 300.00 $ 202,200.00 $ 210.00 $ 141,540.00 $ 250.00 $ 168,500.00 $ 400.00 $ 269,600.00 6 -10 Temporary Conc. Barrier 1,940 LF $ 25.00 $ 48,500 $ 20.00 $ 38,800.00 $ 15.00 $ 29,100.00 $ 18.00 $ 34,920.00 $ 30,00 $ 58,200.00 $ 26.00 $ 50,440.00 48 6 -19 Soil Excavation for Shaft Including Haul 105 CY $ 1,500.00 $ 157,500 $ 3,400.00 $ 357,000.00 $ 4,000.00 $ 420,000.00 $ 3,600.00 $ 378,000.00 $ 8,000.00 $ 840,000.00 $ 3,600.00 $ 378,000.00 49 6 -19 Shoring or Extra Excavation Cl. A 1 LS $ 100,000.00 $ 100,000 $ 75,000.00 $ 75,000.00 $ 10.00 $ 10.00 $ 130,000.00 $ 130,000.00 $ 75,000.00 $ 75,000.00 $ 1,430,000.00 $ 1,430,000.00 50 IBE 6 -19 Conc. Class 4000P for Shaft 105 CY $ 600.00 $ 63,000 $ 710.00 $ 74,550.00 $ 1,000.00 $ 105,000.00 $ 760.00 $ 79,800.00 $ 800.00 $ 84,000.00 $ 800.00 $ 84,000.00 6 -19 St. Reinf. Bar for Shaft 57,591 LB $ 1.50 $ 86,387 $ 2.00 $ 115,182.00 $ 3.00 $ 172,773.00 $ 1.65 $ 95,025.15 $ 3,00 $ 172,773,00 $ 2.00 $ 115,182.00 6-19 CSL Access Tube 1,800 LF $ 12.00 $ 21,600 $ 7.00 $ 12,600.00 S 10.00 $ 18,000.00 $ 8A0 $ 14,400.00 1 $ 12.00 $ 21,600,00 $ 14.00 $ 25,200.00 ® 6 -19 Removing Shaft Obstructions 1 EST $ 46,000.00 $ 45,000 $ 45,000.00 $ 45,000.00 $ 45,000.00 $ 45,000,00 $ 45,000.00 $ 45,000.00 $ 45,000.00 $ 45,000.00 $ 45,000.00 $ 45,000.00 Etill 6 -19 CSL Test 12 EA $ 1,500.00 $ 18,000 $ 875.00 $ 10,500.00 $ 1,500.00 $ 18,000.00 $ 1,900.00 $ 22,800.00 $ 500.00 f $ 6,000.00 $ 1,000.00 $ 12,000 00 6-20 Epoxy Crack Injection 105 LF $ 250.00 $ 26,250 $ 20.00 $ 2,100.00 $ 50.00 $ 5,250.00 $ 116.00 $ 12,180.00 $ 125.00 $ 13,125.00 $ 150.00 = $ 15,750.00 ` 03 LL1 LZ/E :8120 Je6Euen w8J6OJd '3d 'sua;sJ2O ata1S 1e101 Pa;e!no!eo 1En;oe woi) Aq pau6!S ' ;oaJJOO aq 0; pa ;!uao s! uo!;einge; p!q 5!41 !p 1Esodoi+ u! paglwgns Ia ;01 'JOJJa uo! ;!ppe ue sa;ouap r JEpaIS J0; p81 u! Ie ;o; ,. 00 ?0£`956`01. $ 00 "Z0E`95t+`0L $ 00'9 L01 L6Z`6 $ OO9LO`16Z`6 $ S6'990`996'9 $ 56'!#90`986`9 $ 00 E69'££S`9 00'899`951`9 $ OO Pti `691•`9 $ OOEiiI `681`9 $ 600` LE 142. 600`1£1`1 $ sie}ol ;<so0 uo13anJ }sud3 pa}Ewns3 IEnY3 ' Sx uoiss!wgnS Iesodoid p18 Aed -1500 NOLLOnH1SNOO 03.LVLN11S3'11/101 00'008`21 $ 001 $ 00'089'L $ 09'0 $ 00'09S'Z $ OZ'O 5 00'Otr8'E $ OE '0 $ 00'088'Ot $ WO $ 0017'9 $ 05'0 $ d] 04$'31 6up!JE!nl ;wawanEd AmOdwa1 £Z-8 0$ 00'008 $ 00'00t $ 00'0zL $ 00 06 $ 00'9LE $ 00'Ltr $ 00'OOt' $ 0O'OS 5 00'009 5 00'S1 $ 096 $ 00'03 L $ V3 $ Jal;a 1 �! 1 SE oI eJ 01 1 Id ZZ-8 6L OO'oaz $ 00'001 $ OQ'OOZ $ 00'002 $ 001, $ 00'LS 5 00'05t 5 OO'SL $ 00'OEE $ 00'591 $ 041' $ 00'003 $ V3 Z MOJJV °IJ4 Jj O1 1Said 33 8 $L oo'ooz's $ 00 oz $ 00'040'1 $ 001' $ Ot t St t $ 7tr't' $ 00'00£'1 $ 00'S $ 00'OZ8I $ 0 $ 009`3 $ 00'04 $ dS 093 au!-1)11EMSSOJO 0!iseid Z3 $ LL O0'00L $ 00 OZ 5 00'SL8 5 00 $ OO'80E $ 08'8 $ 00 OS $ ! 00'0 I $ O0'SZS $ 00'55 $ 052 $ 00'01. $ dl 5E aun do ;S 0!ISe1d 33-8 9L woo 'Z $ 00'91 $ 00'00L $ 0o'v $ OS '?EE 5 06'1 5 00 SZS $ 00'E $ 00'OSL1 $ 00'01 $ 518 $ 40'5 $ di 5L 4 our 1 ap!M a! ;sEld ZZ $ 5L OO "011'1 $ oo-T $ 00'011'1 $ 00'1 $ 06'Z£tr $ LE'O $ 00'0LI'I $ 00 "i $ 00'5511 5 OS'i $ 829` L $ 4tr' I. $ di OL L' L au1 j mad 3z-9 IxL 00'000 "oz $ oo'000`oz $ QO'OOS'S $ OO'Dos's $ 00.00S'z $ 00'005'? $ 00•000'? $ 00'000'Z 5 00'0051 $ 00'0051 $ 000`2 $ 00'000'E $ Si L 61.111.161S;UBUEWJ8d 1.3-$ EL Oo'oo0`oz $ oo'000'oz $ 00'00S'L $ 00'00S'L $ 00'000'9 5 00'000'9 $ 00 000'S $ 'i 00'000'5 $ 00 000'E $ 00'000'E $ 045`2 $ 40'449'£ $ V3 L uo>;ng ysnd puE !EU6iS uelJ ;sapad a ;eooiaa 4Z -9 ZL OO'QOO'LZ $ OO'000'LZ $ 00'000'SE $ 00'000'SE $ 00'OSL'ZE $ 100'OSL'Z£ $ 00'000'SE $ 00'000'5£ $ OO'00o'SZ $ 00'000'5? $ 005`34 $ 00'049'34 $ b3 L Jo ;Enuayy ;oedwI1U9UBWJad LL $ LL oo.aoo`DZ $ 00'000'9 $ 00 0001/E $ 00'005'E $ 00'00021 $ 00'OOO'£ $ 00'000'tri $ ! 04'005'£ $ 00'000'0Z $ 00'000'5 $ 000't I. $ 00'009'£ $ V3 Jo ;enua0y Ioedwl riJEJOdwa1 LL 8 4L 00'000'1 $ 00'000'L $ 00'008'9 $ 00'0089 $ 00'009'9 $ 00'0099 $ 00'0001 $ 00'000'L $ 00'000'5 $ 00'000'5 5 003`2 $ 00'40?'£ $ V3 L !eUtwJa ei UO ;g edJ( !EJ 1En w88 1 Id N 1 l P J 8 4 4-8 69 00'081 $ 00'06 $ 00'009 $ 00'00E $ 00'08 $ 00'0t' $ 00'008 $ 00'00t' $ 00'00Z $ 00'001 $ 000' 4 $ 00'005 $ V3 Z Z edJ(1 J8)1J8 AJ ;uawaned pas!ed 60-9 89 00•0t'? $ 00'08 $ 00'00Z1 5 00'00tr $ 00'06 $ 00'0E $ 00'00ZI $ `, 00'00t' $ 00'00E $ 00'001 $ OQZ' I. $ 00'40b $ V3 E L adA1 J0)!J8 AJ ;uawaned pas!ea 60-8 L9 I S331A30 10111NO3 OIddYH) 00'00t'Z $ 00'09 $ 00'000'E $ 00'51 $ 00'009'? $ QO'S9 $ 00'OOtr'Z $ 00'09 $ 00'0001, $ L 00'001 $ 0017'3 $ 00'09 $ AO Otr tl edh 1 !IOSd01 Z0-8 99 00'000'?? $ 00'000'?? $ 00'000'22 $ 00'000'ZI $ 001100'ZI 5 00'000'21 $ 00'000'ZI $ , 00'000'ZI $ 00'000'ZI $ 00'000'ZI $ 000'Z t. $ 00 000`31 $ 153 L is ;uo0 uoi ;npod Ja ;e uo!saJ3 1.0-8 99 1N3 Jd013A3a 3a1savOH 00005'01 $ 00'0051 00'00S'St $ 00'005'9 $ ' 00'009ZI 008'I $ 00'000'L 00'0001 ; 00'000'tr1 $ 04'000'z $ 009'3 L $ 4404$ 1 1. ed(1 usee o ;Ea 50 L 9 00'000'9 $ 00'00Z $ 00'0512? $ 00'SZtr $ 00'005'tr 5 00'051 $ 00'OSZ'S 5 00'SLI $ 00'00£'9 $ 00'0?? $ o93`? $ 00'9L $ d'1 0E 'we!0 'u! ZL ad!d JBMBS WJO ;S l0 Z9 65210 VO -L E9 00'005'2£ 5 00'011 5 00'051'58 $ 00'SVZ $ 00'005'12 $ 00'06 $ 00 000'S 5 00'001 $ 00'000'8? $ 00'08 5 000' 43 $ 00'09 $ di 092 'wen 'u1 3; adid JaMas wJ01S OAd ITEM PIIOS VO-L Z9 3JVNIVHa WH01S 00'000'05 $ 00'000'05 $ 00.000'11 $ 00'000'11 $ 00`000'0D $ 00'000'0i' $ 00 000'0 $ 00'000`Otr $ 00'000'0i $ 00'000'01 $ 000'05 $ 04'000`09 $ Si L 6UU0IUO !r wawamaS 93-9 49 00'000'0£ $ 00'000'OE $ 00'000'0E $ 00 000'0E $ 00'000'0E $ 00'000'0E $ 00'000'0E $ `, 00'000'0E $ 00'000'0E $ 00'00 'OE $ 000'0£ $ 00'000`0£ $ 153 L 1!e { pJEnO ap!sul 9z-9 09 00'000'002 $ 00'000'00? $ 00'000'00? $ 00'OOO'OOZ $ 00•000'58 $ 00'000'58 $ 00 000'00i $ 00'000'00I $ 00'000'8t'1 $ 00'000'8trT $ 000'913 $ 04'400`513 $ Si L 6u! ;nOJO uol ;oedwoO t -9 69 00'000'00? 5 00•000'00? $ 00'000'5ZI $ 00'000'SZI $ 00'000'SOI $ 00'000'501 $ 00'SZZ S 00'SZZ $ 00'000'OLI $ 00'000'OLI $ 000`901 $ 04 000`S44 $ si l 6u1ua ;6UOJ ;S �!oa0 pue Ja JI a6 IJ y p .0 P. 8 d>dd0 E3 -9 99 00'00L'tOI $ 00'051 $ 00'00L'IOI $ 00'051 $ 00'009'SEI $ 00'00Z $ 00'00Z'ILZ $ 00'00tr 5 00'085't'L $ 00'011 $ 09L178 $ 00'934 $ di 8L9 eouad and ;oaloJd ZZ 9 L9 00'000'SI $ i I 00'05? 5 00 005.0-1 $ 00'5LT $ 00'008'01 $ 00'081 $ 00'000'51 $ 00'05Z $ 00'009'6 $ 00'091 5 000'0£ $ 00'009 dS 09 sJ!eda a Ied S !e011a A pus P Ea y J8A O 3-9 99 331Hd'IVIOL 11NV33 33IHd 11Nf1 3 3318d 1Vi01 'ONI 1S3M NOHi1Vid 3318d 11Nn 33111d 1V101 33IHd 11Nn 311 `S3Hn10nUis SS 33lHd 1V101 33!1:id _LINn r tin s 33111d 1V1O1 NOI10fb1SN0313d 3318d Inc 331Hd 1V101 � 331Hd.INn 11Nn AVd SIso3 A111NVnO uoijanajsuoO 1A1311 palew s3 N0113 3S - gel ON IN 11 pie 679 '+rDC Trades Licensing Debarred Contractors List A debarred coat presented below, Company Name; WA UBI umber: License Number, ctor may not bid on, or have a bid considered on, any public works contract. You can search and l'II onstructon s Apply F nets Reset Prncp From: Penalty Due; All YYYY In the options Wage Due:. Dow oad al debarment data There ecords that match your s+e rch triter SAM Search Results List of records matching your search for Search Term pcl* AM, u---- A Q*-+.- A -+..,- City: TAMPA ZIP Code: 33624-1873 Vince: FLORIDA UNITED STATES Cit LEANDRO 94577-1534 State/Province: CALIFORNIA Country: UNITED STATES PCL CONSTRUCTION SERVICES, INC Status:Active DUNS: 153549191 +4: CAGE Code: 5JYK2 DoDAAC: Expiration Date: Feb 28, 2018 Has Active Exclusion?: No Delinquent Federal Debt?: No Address: 12200 NICOLLETE AVE S City: BURNSVILLE State/Province: MINNESOTA ZIP Code: 55337-1652 Country: UNITED STATES IENTITY' : :77]PCL CONSTRUCTION SERVICES, INC Status:Active DUNS: 130856909 +4: CAGE Code: OGGP7 DoDAAC: Expiration Date: Dec 5, 2017 Has Active Exclusion?: No Delinquent Federal Debt?: No Address: 2000 S COLORADO BLVD STE 2- 500 City: DENVER State/Province: COLORADO ZIP Code: 80222-7928 Country: UNITED STATES 52 RA-k 41Z 0047' -2A ORA ENTITY PCL Construction, Inc. Status:Active DUNS: 825171908 +4: CAGE Code: 53XH1 DoDAAC: Expiration Date: Jul 15, 2017 Has Active Exclusion ?: No Delinquent Federal Debt ?: No Address: 1711 W Greentree Dr Ste 201 City: Tempe State /Province: ARIZONA ZIP Code: 85284 -2717 Country: UNITED STATES E%LTCTY 7jPCL CONSTRUCTION SERVICES, INC Status :Active DUNS: 926363276 +4: CAGE Code: 4LWDO DoDAAC: Expiration Date: Nov 21, 2017 Has Active Exclusion ?: No Delinquent Federal Debt ?: No Address: 6675 WESTWOOD BLVD STE 200 City: ORLANDO State /Province: FLORIDA ZIP Code: 32821 -6015 Country: UNITED STATES EITIY PCL CONSTRUCTION SERVICES, INC. Status :Active DUNS: 015974629 +4: CAGE Code: 5MKR7 DoDAAC: Expiration Date: Apr 12, 2017 Has Active Exclusion ?: No Delinquent Federal Debt ?: No Address: 500 N BRAND BLVD STE 1500 City: GLENDALE State /Province: CALIFORNIA ZIP Code: 91203 -3938 Country: UNITED STATES ENTITY" ' PCL CONSTRUCTION SERVICES, INC. Status :Active DUNS: 618500610 +4: CAGE Code: 5L8X5 DoDAAC: Expiration Date: Apr 26, 2017 Has Active Exclusion ?: No Delinquent Federal Debt ?: No Address: 4350 EXECUTIVE DR STE 270 City: SAN DIEGO State /Province: CALIFORNIA I oe:91 -12 Cutr: T DSAE ENTITY" PCL CONSTRUCTION SERVICES, INC. Status:Active DUNS: 877512285 +4: CAGE Code: OXY77 DoDAAC: Expiration Date: Sep 9, 2017 Has Active Exclusion ?: No Delinquent Federal Debt ?: No Address: 3650 131 STAVE SE City: BELLEVUE State /Province: WASHINGTON ZIP Code: 98006 -1395 Country: UNITED STATES 53 h/1 - 1, 1 t; ')nl7 'x•zn pnn Pana ? of 3 54 nAnrnM 1F Or)l 7 I-IA ORA