HomeMy WebLinkAboutREG 2017-04-03 Item 4C - Contract Supplement #7 - South 144th Street Phase II Construction Management with KPG Inc for $299,988.75COUNCIL AGENDA S
Initials
Aleeliq I)ate Pre 1partd b,V Ma vrs remew Council rei�iov
04/03/17 BG" i)oz
ITEM NO.
4.C.
CAS "N1 , _7
-L A F' SPONSOR: BOB GIBERSON
I 01fl(;1N,\1, AGENDA DATFI: 04/03/17
A('&'1,,'G ),\ ITFNITI'llk South 144th Street Phase II Street Improvement Project
Construction Management Supplement No. 7 with KPG
�f2y F-1 Discussion
Mfg Date
E Motion
All
,g Dale 04103117
❑ Resolution
M(g Dale
❑ Ordinance
Alts; Dale
Bid.,Jivard
'Vtg Dale
E]Pudic Hewin
,g
Altg Dale
[:] Other
Aftg Date
SPONSOI ❑ Council ❑ Mayor ❑ HR ❑ DC-D ❑ Finance E] Vire ❑ IT ❑ P&RE] Police ❑ PIV
SPONSOW,S Council is being asked to approve the construction management Supplement No. 7 with
su'Nr%f)uRy KPG, Inc. for the South 144th St Phase II Project. KPG was selected from three consulting
firms and is the design consultant for the project. Construction management services will
include documentation, compliance, and inspection. The construction contract was
awarded to Marshbank Construction on 2/21/17. Council is being asked to approve KPG's
Supplement No. 7 for $299,988.75
Ri,'XiEW,'Ii) iiy ❑ cow mtg. ❑ CA&P Cmte ❑ F&S Cnite Transportation Cmte
❑ Utilities Cmte ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
DATJI?: 03/28/17 COMMITTEE-'CHAIR: KATE KRULLER
RECOMMENDATIONS:
SPONSOR/ADN,11N. Public Works
Co NIM Unanimous Approval; Forward to Regular Consent Agenda
COST IMPACT/ FUND SOURCE
AMOUNT BUDGETED APPROPRIATION REQUIRED
$299,988.75 $350,000.00 $0.00
Fund Source: 104 ARTERIAL STREETS (PAGE 14, 2017 CIP)
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
04/03/17
MTG. DATE
ATTACHMENTS
04/03/17
Informational Memorandum dated 03/24/17
page 14, 2017 CIP
Consultant Selection Scoring Matrix
KPG CM Supplement No. 7
65
W%
TO:
FROM
B"(:
CC:
DATE:
City of Tukwila Allan Ekberg, Mayor
Public Works Department - Bob Giberson, Director
Transportation and Infrastructure Commit lee
Bob Giberson, Public Works Director',%rq
Peter Lau, Senior Program Manager
Mayor Ekberg
March 24, 2017
SUBJECT: S 144"' St Phase 11 Project (42nd Ave S — TIB)
Project No. 99510402, Contract No. 14-103
Supplemental Agreement No. 7 with KPG, Inc.
ISSUE
Approve Supplemental Agreement No. 7 with KPG, Inc. (KPG) for construction management (CM)
services for the S 144th St Phase I I Project in the amount of $299,988.75.
M Tic
The S 144th St Phase 11 construction contract was awarded by Council on February 21, 2017 in the
amount of $1,883,895.03. The City solicited for CM services from three consultant firms —
AECOM, AKANA and KPG, and invited these firms for interviews. KPG was rated the highest by
the cumulative scores of the selection panel. Since KPG was also the design consultant firm for
the project, only a supplemental agreement to the design contract is needed for KPG to provide
CM services.
DISCUSSION & FISCAL IMPACT
Supplemental Agreement No. 7 will include construction engineering, inspection, documentation
compliance, surveying, geotechnical and material testing supports. The fee of $299,988.75 is
within budget for the scope of work provided by KPG for this project.
CM Expense Budget
KPG Supplement No. 7 $299,988.75 $350,000.00
RECOMMENDATION
Council is being asked to approve Supplemental Agreement No
$299,988.75 to provide CM services for the S 144th St Phase 11
the Consent Agenda at the April 3, 2017 Regular Meeting.
Attachments: CM Consultant Selection Scoring Sheet
Supplemental Agreement No. 7
. 7 with KPG in the amount of
Project and consider this item on
WAPW Eng\PROJECTS\A- RW & RS Prol-ts\S 144th St Phase 11 T18 - 42nd Ave S (99510402 95-RW02)\Construction\Consultant Seleclion\(005) - CM Consultant SelectiomInfo Memo For KPG CM Support, 3-16-17.Docx
67
CITY QFTUKVVLA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT:
S 144 St Phase U (42 Ave S -Tuhvvhm |nt'| Blvd) ° Project Nn. 93510402 Zone
Construct curb, gv8o� sidewu|k, bike lanes, pavement restoration, i||umina�on, drainage and utility
�
OE��R|PT|�N'
undon]rounding from Tukwila |nt'| Blvd to42ndAve S. Also odd a signal at 42nd Ave G.
JUSTIFICATION:
Provide pedestrian and vehicle safety, drainage and neighborhood revitalization.
Phase |' Tukwila |nd Blvd mMi|ito� Rd, pv�m�completed in20U7 for $3.1miUion with $1miUinningran�.
STATUS: '
Phase U -42Ave G0oTukwila International Blvd.
MA|NT IMPACT:
Reduce pavement, drainage repairs, and maintenance costs.
Awarded Tmnmpo�mion|mpmvemont Board's 8Ue,ia||mpmvemen1Pmgram(A|P) grant uf$1miUinn.
�O���NT�
Project is on Impact Fee list. Design and construction related to the Tukwila Village project.
FINANCIAL Through Estimated
EXPENSES
Design
345
97
442
Const. Mgmt.
350
350
Construction
2,248
2,248
TOTAL EXPENSES
376
135
2,598
01
01
01
01
01
0
1 3,109
FUND SOURCES
Awarded Grant
186
964
1,150
Sea City Light
29
206
235
Frontage/SSWM
781
781
Traffic Impact Fees
190
22
321
533
2017 2022 Capital Improvement Program 14
Construction Management (CM) Service Interviews: AKANA, AECOM and KPG were interviewed by the City, to compete for the
selection of CM Consultant for the South 144th Street Phase 2 Construction Project. Three evaluation criteria were used in the
interview process:
1. Qualifications of the proposed CM team, and available support from the Consultant firm - 50 %.
2. Demonstration of the Consultant's understanding for the construction project - 25 %.
3. Demonstration of the Consultant's understanding for the CM scope of work, including the flexibility of the inspection provision
and inspection partnership - 25 %.
Below are the ranking scores rated by the 3 Interview Panelists, based on the performances of these 3 firms:
Cyndy Knighton Scott Moore (Peter Lau
CM Consultant Candidates
Ranking
Summation
Finalized Ranking
AKANA ,,
2
2
1
5
2
AECOM
3
3
3
9
3
KPG
1
1
2
4
1
As a result, KPG was selected as the CM Consultant for the South 144th Street Phase 2 Construction Project.
SUPPLEMENTAL AGREEMENT No. 7
AGREEMENT No. 14-103
PROJECT N0.99510402
City of Tukwila KPG, Inc.
Public Works Department 3131 Elliot Ave Suite 400
6300 Southeenter Boulevard #100 Seattle, WA 98121
Tukwila, WA 98188
PROJECT: S 144t' Street Phase R — Construction Services
This SUPPLEMENTAL AGREEMENT NO. 7 is to supplement the agreement entered into with KPG,
Inc. and the City of Tukwila, which was executed on the 291h day of July, 2014.
All provisions in the basic agreement remain in effect, except as expressly modified as follows:
L,
Article 2, Scope of Services, shall be supplemented with the following:
The Consultant agrees to provide construction services in accordance with the scope of work included as
Exhibit A -7.
Article 4, Payment, shall be modified as follows:
Payment for work provided by Consultant shall be made as provided on Exhibit B-7, attached hereto,
provided that the total amount of payment to the Consultant far this work not exceed $299,988.75 without
express written modification of the Agreement signed by the City. The new total contract shall not exceed
$723,393.10 without express written modification of the Agreement signed by the City.
IN WITNESS WHEREOF, the parties hereto have set their hands and seals this day
of 2017.
APPROVED: APPROVED:
CITY OF TUKWILA KPG, INC.
Allan Ekberg
Nelson Davis, P.E.
Mayor Principal
Attested:
Christy O'Flaherty, City Clerk
71
EXHIBIT A-7
City of Tukwila
S 144th Street Phase If Project
42nd Avenue S to Tukwila International Boulevard
Supplement No. 7 — Construction Services
KPG
Scope of Work
February 24, 2017
This work will be to provide construction services for the construction contract to complete the S 144"'
Street Phase 11 Project (hereinafter called "Project"). These services will include project management,
construction inspection, materials testing, and construction documentation during the construction of the
project, as detailed below. KPG ("Consultant") will provide assistance to the City of Tukwila,
Washington ("City") staff assigned to the project to provided construction services as described below:
I. INTRODUCTION
The following scope of services and associated costs are based upon the assumptions outlined below.
Assumptions:
• The City will provide project management and between 2 and 6 months of full time inspection for the
Project.
The Consultant shall support the City project manager and inspector by providing construction
engineering services (submittal reviews, BFI's, etc.), preconstruction services, running weekly
construction meetings, pay estimate assistance, and setup and review of project files in accordance
with City requirements. The proposed consultant project team will include a part-time resident
engineer (2.5 day/week average), a part-time documentation specialist (3 day/week average), a partial
full time inspector (5 day/ week average for 17 weeks), utility/ developer coordination (I day/ week
average), design team engineering support during construction activities, necessary sub-consultants
to provide services for materials testing, and other supporting tasks as deemed necessary. The level
of services is based on project duration of approximately 6 months, or approximately 120 working
days for construction.
Services will be performed in accordance with the Local Agency Guidelines (LAG), the WSDOT
Construction Manual, and City of Tukwila standards.
Project Objectives
The objective and purpose of this Construction Services Agreement is for the Consultant to assist City
staff to successfully deliver the construction of the Project by ensuring that the construction work is of an
appropriate quality and the required Project documentation is accounted for.
S 144th Street — Phase //
72 Supp 7— Construction Services I of 7
KPG
February 24, 2017
EXHIBIT A-7
11. SCOPE OF WORK
TASK I — MANAGEMENT /COORDINATION /ADMINISTRATION
Provide overall project management, coordination with the City, monthly progress reports, and invoicing.
This effort will include the following elements.
• Organize and layout work for project staff. Prepare project Instructions on contract
administration procedures to be used during construction.
• Review monthly expenditures and CM team scope activities. Prepare and submit invoices
describing CM services provided each month. Prepare and Submit reporting required by funding
source(s), if any.
Deliverables
• Monthly invoices and progress reports
TASK 2 — PRECONSTRUCTION SERVICES
2.1 Prepare the Record of Materials (ROM): The Consultant shall prepare the ROM to aid
consultant, City and Contractor staff to track material submittals and testing throughout the
project.
2.2 Right of Entry Support: Develop a matrix of property owners that will document
commitments to each property owners, property restoration, and other related impacts. Assist
the City with any right of entry agreements that have not been previously secured.
2.3 File Setup: Attend meeting with City Project Manager to review standard Consultant and City
file systems and develop file structure for management of the project.
2.4 Field Review: Perform plans in hand field review with inspector and project engineer to
review the overall scope, identify challenging areas, and identify traffic concerns to be
addressed in the Contractors traffic control plans.
2.5 Preconstruction Conference: The Consultant will prepare an agenda for, distribute notices
of, and conduct a preconstruction conference in the City's offices. The Consultant's project
manager, project engineer, document control specialist, and inspector will attend the
preconstruction conference. The Consultant will prepare a written record of the meeting and
distribute copies of the minutes to all attendees and affected agencies, staff, etc.
At the Pre-construction conference, the Consultant shall facilitate discussions with the
Contractor concerning the plans, specifications, schedules, and issues with utilities, unusual
conditions, local requirements, EEO, and any other items that will result in better project
understanding among the parties involved.
Deliverables
• Record of Materials (ROM)
• Preconstruction conference agenda with meeting minutes
S 144th Street — Phase // KPH
Supp 7— Construction Services 2 of 7 February 24, 2017 73
EXHIBIT A-7
TASK 3 — CONSTRUCTION SERVICES
A. FIELD SERVICES
3.1 Inspection staff will perform the following duties as a matter of their daily activities:
i. Observe technical conduct of the construction, including providing day-to-day contact
with construction contractor, City, utilities, and other stakeholders, and monitor for
adherence to the Contract Documents.
ii. Observe material, workmanship, and construction areas for compliance with the Contract
Documents and applicable codes, and notify construction contractor of noncompliance.
iii. Document all material delivered to the job site in accordance with the LAG Manual,
WSDOT Construction Manual, and the Project Specifications.
iv. Prepare daily inspection reports, recording the construction contractor's operations as
actually observed by the Consultant; includes quantities of work placed that day,
contractor's equipment and crews, and other pertinent information. All daily inspection
reports will adhere to WSDOT Local Agency Guidelines.
V. Resolve questions which may arise as to the quality and acceptability of material
furnished, work performed, and rate of progress of work performed by the construction
contractor.
Vi. Establish communications with adjacent property owners. Respond to questions from
property owners and the general public.
vii. Coordinate with permit holders on the Project to monitor compliance with approved
permits, if applicable.
viii. Prepare field records and documents to help assure the Project is administered in
accordance with funding agency requirements (Construction Manual 10-2.113). The
inspector will provide measurement and payment information to the consultant for
development of monthly pay estimates.
ix. Collect and calculate delivery tickets and scalesman's daily reports of aggregate. All
tickets will be initialed with correct bid item and stationing identified.
X. Attend and actively participate in regular on-site meetings.
xi. Take periodic digital photographs during the course of construction.
xii. Coordinate with the City's maintenance personnel.
The Resident Engineer shall support the inspector as follows:
L Provide periodic site visits to respond to questions or unanticipated conditions. Advise
the City of any non-conforming work observed during site visits.
ii, Interpret Contract Documents in coordination with City.
3.2 Materials Testing: Provide materials testing sub-consultants for construction services, who will
provide materials testing services as required, up to $15,000. The City inspector shall coordinate
the work of the materials testing technicians and testing laboratories in the observation and
testing of materials used in the construction. The Consultant shall document and evaluate results
of testing; and address deficiencies. Frequency of testing shall be as prescribed in the WSDOT
S 144th Street — Phase // KPG
74 Supp 7— Construction Services 3 of 7 February 24, 2017
EXHIBIT A-7
Construction Manual and LAG manual for the following materials: structural concrete, roadway
asphalt, roadway surfacing, roadway base material, and structural grout and any other testing as
prescribed within the project Specifications and WSDOT Standard Specifications 2016.
Assumptions:
It is assumed that day to day coordination of testing services will be by the inspector. The
Consultant shall assist with evaluation of any deficiencies noted.
3.3 Substantial Completion: Upon substantial completion of work, coordinate with the City and
other affected agencies, to perform a project inspection and develop a comprehensive list of
deficiencies or 'punchlist' of items to be completed. A punchlist and Certificate of Substantial
Completion will be prepared by the Consultant and issued by the City.
Deliverables
• Punch List, Certificate of Substantial Completion
• Review test reports for compliance
I -w
11-9m to
3.4 Document Control: Original documentation will be housed at the Consultant's office, and filed
in accordance with standard filing protocol to meet City Requirements. A copy of working files
will be maintained in the field office.
Document Control also consists of preparing Final Project Reports for City acceptance and
includes:
■ Final Estimate (Approving Authority File)
■ Final Records as identified in WSDOT LAG (Approving Authority File)
■ Record of Material Samples and Tests
■ Materials Certification
■ Affidavit of Wages Paid
■ Release for the Protection of Property Owners and General Contractor
3.5 Plan Interpretations: Provide technical interpretations of the drawings, specifications, and
contract documents, and evaluate requested deviations from the approved design or
specifications. Coordinate with City for resolution of issues involving scope, schedule, and/or
budget changes.
3.6 Weekly Meetings: Lead weekly meetings, including preparation of agenda, meeting minutes,
and distribution of minutes to attendees. Outstanding issues to be tracked on a weekly basis.
3.7 Initial Schedule Review: Perform detailed schedule review of contractor provided CPM for
conformance with the contract documents.
3.8 Lump Sum Breakdown: Evaluate construction contractors' Schedule of Values for lump sum
items. Review the Contract Price allocations and verify that such allocations are made in
accordance with the requirements of the Contract Documents. Lump Sum Breakdowns for
payment each month will be calculated with detailed data per WSDOT LAG Requirements.
S 144th Street — Phase It
Supp 7— Construction Services 4 of 7
KPG
February 24, 2017 75
EXHIBIT A-7
3
3.9 Monthly Pay Requests: Assist City with monthly requests for payment, review with the City
and contractor and approve, as pen-nitted. Utilize City provided format for pay estimates, or
Consultant format. The Utilities to provide quantities for payment for work associated with
Utility Schedules.
3.10 Certified Payroll: Process and track all certified payroll per WSDOT Highways &
Local Program Requirements. This includes verifying 30% of all payrolls submitted and tracking
payroll each week. Payroll and payroll logs will adhere to WSDOT LAG requirements.
3.11 Weekly Statement of Working Days: Prepare and issue weekly statement of working
day report each week.
3.12 Subcontractor Documentation: Process / approve all required subcontractor
documentation per WSDOT Highways & Local Program Requirements. This includes checking
System Award Management System (SAMS), verifying OM/WBE, verifying business licensing,
reviewing insurance documentation, verifying city business licensing, Intent to Pay Prevailing
Wage and Affidavit of Wages Paid. All subcontractor documentation will be logged into
WSDOT's subcontractor logs.
C. SUBMITTAL/RFI PROCESSING
3.13 Submittals: Coordinate review process for shop drawings, samples, traffic control
plans, test reports, and other submittals from the Contractor for compliance with the contract
documents. Key submittals to be transmitted to the City for their review and approval.
Submittals shall be logged and tracked.
3.14 Request for Information (RFI): Review and respond to BFI's. BFI's shall be logged
and tracked.
3.15 Record of Materials (ROM): With assistance from the inspector, utilize and maintain
the ROM according to WSDOT Highways & Local Program Requirements. The ROM will track
all of the materials delivered to the site including manufacturer/supplier, approved RAM's, QPL
items, material compliance documentation, and all other required documentation.
Deliverables
• Submittal log
• RFI Log
• Completed Record of Material for Material Certification
D. CHANGE MANAGEMENT
3.16 Change Orders: Develop change orders per Highway & Local Programs Guidelines
and City Standards, provide technical assistance to negotiate change orders, and assist in
resolution of disputes which may occur during the course of the project. A total of 40 hours have
been included in the cost for services. Each change order will be executed in accordance with
WSDOT Local Agency Guidelines and City Standards, and contain the following:
• Change order
• Independent Cost Estimate
• Time Impact Analysis
• Contractor's Pricing
• Verbal Approval Memo
• Change Order Checklist (LAG Manual)
S 144th Street — Phase //
76 Supp 7— Construction Services 5 of 7
KPG
February 24, 2017
EXHIBIT A-7
• Change Order Request Form
• Back up documentation
3.17 Field Work Directives: Prepare field work directives as necessary to keep the contractor
on schedule.
3.18 Force Account: The inspector will track contractor force account labor, equipment and
materials. Provide payment according to WSDOT requirements. All force account calculations
will be verified by the engineer and double checked by the documentation specialist per WSDOT
LAG Manual.
Deliverables
• Change Order(s)
• Case Management Log
• RF1 Log
• Minor Change Order(s)
• Force Account Records
TASK 4 — CLOSEOUT / RECORD DRAWING SERVICES
4.1 Record Drawings: Review record drawings prepared by the Contractor, and prepare a
conformed set of project record drawings based on Contractor provided information and from
inspection notes. Record drawings to be verified on a monthly basis, as part of the progress
payment to the Contractor. Upon project completion, contractor provided markups will be
verified for completeness and supplemented with inspection information. The Consultant will
prepare record drawings in AL1toCAD format based on construction records provided by the
Contractor. Electronic and full size mylar record drawings will be provided to the City.
4.2 Punchlist oversight: Attend final walk through review with City staff. Field observation of
punchlist items will be by the City.
4.3 Physical Completion Letter: Following completion of all punchlist work, prepare physical
completion letter to the contractor, and recommend that City and/or Utilities accept the project.
Field observation of punchlist items will be by the City if Consultant budget is no longer
available.
4.4 Project Closeout: Transfer all project documents to the City for permanent storage.
• Meeting agendas and notes
• Monthly Pay Estimates
• WSDOT Reporting
• Subcontractor Packets
• Physical Completion Letter
• Final Project Documents
S 1441h Street — Phase //
Supp 7— Construction Services 6 of 7
KPH
February 24, 2017 77
EXHIBIT A-7
ADDITIONAL SERVICES
The services described under this task, and any other additional services requested by the City, will be
performed only when authorized by the City. Authorization to perform additional services will be in the
form of a supplement to this agreement, specifying the work to be performed, and basis of payment.
• Provide any additional services resulting from changes in scope or design of the project.
changes Changes include, but are not limited to, es in size, complexity, the schedule, character of
C) C,
construction, or method of financing.
• Provide claims analysis and assistance in resolving claims that are protracted in nature and
beyond the scope of the change order process described herein.
• Media Relations: Produce and distribute periodic press releases at key milestones about the
project and its progress. Meet with press to help develop stories about the project.
• Other activities deemed necessary by the City.
111. TO BE PROVIDED BY CITY:
1. Postage to be provided by the City for any mass mailings.
S 144th Street — Phase // KPG
78 Supp 7— Construction Services 7 of 7 February 24, 2017
21,569.58
HOUR AND FEE ESTIMATE
Project: City of Tukwila
S 144th Street Phase I1
Supplement No. 7 - CM Services
EXHIBIT B -7
KPG
• Architecture •
Landscape Architecture
♦ Civil Engineering •
1 - Management, Coordination, Administration (Estimated duration 29 weeks)
Weekly level of effort by Classification
4
0
0 0
0
2
Preconstruction Budget Estimate
116
0
0
0
0
0
0 0
58
2 - Preconstruction Services (Estimated duration 2 weeks)
Weekly level of effort by Classification
20
0
12 0
24
Preconstruction Budget Estimate 40
0
0 ! 24
0
0
0 48
3 - Construction Services (Estimated duration 25 weeks)
0 $ 12,975.81
Weekly level of effort by Classification
Inspection (17weeks)
16 0
16
0
40
24 0
Construction Period Budget Estimate 400
0
0
400
0
680
25
600
0
4 - Closeout/Record Dwg Services (Estimated duration 2 weeks)
Weekly level of effort by Classification 16
225,321.50
16 24 40
24
Closeout / Record Dwg Budget Estimate 32
0
0
32
48
80
0
48
0
24,121.85
21
Reimbursables & Subconsultants
Material Testing / Geotechnical Allowance $
Construction Vehicle $
Miscellaneous - Mileage, Repro, Field Supplies $
15,000.00
1,000.00
u
00.1
ludget
,299;98
2/28/2017