Loading...
HomeMy WebLinkAboutTIC 2017-04-25 Item 2B - Bid Award - Active Construction for 42nd Avenue South Phase III / Gilliam Creek Culvert Replacement Allan Ekberg, Mayor INFO0������� ��0/�� � � N��U�x�� �����N� RMATIONAL m��m����� m�m��m�m��mm��m�����n�m TO: Transportation and Infrastructure CD i FROM: Bob Giberoon. Public��orbsDiygCto[.~�P��'~� BY: Cyndy Knighton, Senior Program Manager CC: Mayor Ekberg DATE: April 21'2O17 SUBJECT: 42nd Avenue S Phase III&Gilliam Creek Culvert Replacement Projects Project Nos. 99410303&99341208 Bid Award ISSUE Award the construction bid|O Active Construction, |nC` 8G the lowest responsive bidder for the 42»u Ave 8 Phase III Project. BACKGROUND A call for bids was advertised OO March 21 and March 28.2017. Three addenda were issued clarifying the bid documents. Seven bids were publicly opened Ek10:OU@00O April 11' 2017. The lowest bid was received from Active Construction, Inc. DISCUSSION The construction bids were reviewed and only minor irregularities were found. There were no mathematical errors iO the low bid. Minor irregularities iO the proposals were found iD three bidders,but the ranking Of the bidders did not change with the corrections. Active Construction, Inc. has been doing business since 1962 and has experience with projects UfSi0i|G[Size8OdSoupn.ASiv6 Construction does not have any exceptions and they have not been debarred from working on federally funded projects. FINANCIAL IMPACT The proposed bid, along with remaining known and estimated expenditures, is within the combined project bUdget3.The construction budget has been reduced from what is shown in the 2017 CIP as a design supplement used some funding. Bid Results Engineer's Estimate 2017 Budget Construction Contract $6,827,798.84 $6.789'508.20 $6.983'000.00 Gilliam Creek Culvert 1.008.000.00 Contingency(15%) 1,024,169.83 0.00 0.00 Total Funding Partners Bid Schedules City Residential Streets $3'528'430.04 Ch«Undoq]0UndiOg 1'229'054.00 Seattle City Light 755.214.00 City Surface Water 787.508.00 Valley View Sewer 329.947.20 Water District#125 Total RECOMMENDATION Council iS asked t0 award the contract to Active Construction, Inc, iD the amount Of$0.827.788.84 for the 42»uAve S Phase III and Gilliam Creek Culvert Replacement Projects 8OdConoid8rthi8it80ODthSCODS8Ot Agenda 81 the May 1.2O17Regular Meeting. Attachments: 201 C|P ua1no Bid Tabulation W:\PW Eng\PROJECTS\A-RW&RS Projects\42nd Ave S Phase 111(99410303 94-RS03)\Design\INFO MEMO Bid Award 042117 gl.docx CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2017 to 2022 PROJECT: 42nd Ave South Phase III Project No, 99410303 DESCRIPTION: Design and construct street improvements, drainage,sidewalks, bike facilities, and driveway adjustments. JUSTIFICATION: Provide pedestrian and vehicle safety, drainage, and neighborhood revitalization. STATUS: Phase 111(SIC Blvd(154th)-S 160 St),Design began in 2012,construction in 2017.Project No.99410303 Phase IV(S 139 St-S 131 PI)in beyond. Project No. 99410301 Phase 190-RW15(SIC Blvd(154)- 144 St)$3,796&Phase II 94-RS02(144-139)$1,850,both completed. MAINT.IMPACT: Reduce pavement, shoulder, and drainage work. COMMENT: Only Phase III is shown in active years. Project includes Surface Water's Gilliam Creek 42nd Ave S Culvert project for$1.3m and is part of the Walk&Roll Plan. Seattle City Light's funding is a 60/40 underground split. FINANCIAL Through Estimated (in$000'x) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL EXPENSES Phase IV Design 1,000 125 1,125 Land (R/W) 100 100 Const. Mgmt. 750 322 560 1,632 Construction 2,534 1,086 3,800 7,420 Undergrounding 2,467 1,057 3,524 TOTAL EXPENSES 1,000 125 5,851 1 2,465 1 01 01 01 01 4,360 1 13,801 FUND SOURCES Seattle City Light 1,077 462 1,539 Surface Water 144 4 148 Other Utilities 1 150 136 287 Bond 4,600 1,800 6,400 City Oper. Revenue 855 121 24 67 0 0 0 0 4,360 5,427 TOTAL SOURCES 1,000 125 5,851 2,465 0 0 0 0 4,360 13,801 Pro 3 1 t � '42, 2017-2022 Capital Improvement Program 2 8 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2017 to 2022 PROJECT: Gilliam Creek 42 Ave S Surface Water Culvert Project No. 99410303 99341208 DESCRIPTION: Design and replace the 36-inch surface water culvert under 42 Ave S/Gilliam Creek. Combining this project with the Residential Street Project 42nd Ave S Phase III. JUSTIFICATION: The existing concrete pipe sections are separating and cracked which could erode the 42 Ave S fill and lead to loss of roadway. STATUS: Project is currently under design with construction scheduled to begin in 2017. MAINT.IMPACT: Expected to decrease maintenance. COMMENT: State Fish&Wildlife hydraulic project approved(HPA)permit will be required. Replacement will require a fish passable structure. FINANCIAL Through Estimated (in$000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL EXPENSES Design 144 31 175 Land(R/W) 0 Const. Mgmt. 135 15 150 Construction 8 900 100 1,008 TOTAL EXPENSES 152 311 1,035 1 115 1 01 01 01 01 01 1,333 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 152 31 1,035 115 0 0 0 0 0 1,333 TOTAL SOURCES 152 31 1,035 115 0 1 0 0 1 0 0 1 1,333 Project I-ocation �;. A stsoi- �5 �:r1 " c S A 4 ifs f ry T $§ 141 { / ; t, ` ~ j.0 _L S 45f7 Stj 1, _ Ito at E q 1a8�9t /,yams f .x^•hy X41.. 2017-2022 Capital Improvement Program 100 9 10 Certified Bid Tab 40 -42nd Avenue S Phase!!! Project Engineer's Estimate Gary Merlino Construction Kiewit Infrastructure West Co. Active Construction Bld item No- Item ileseri tion Quantity Unit Unit Price Total Pri a Unit Price Totai Prise Unit Price Total Price Unit Pri a Total Pri e Schedule A - Roadway Al Mobilization 1 LS $ 366,500.00 $ 366,500.00 $ 752,000.00 $ 752,000.00 $ 706,000.00 $ 706,000.00 $ 618,423.04 $ 618,423.04 A2 Resolution of Utility Conflicts 1 FA $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 A3 Field Office Building 1 LS $ 20,000.00 $ 20,000.00 $ 12,000.00 $ 12,000.00 $ 75,000.00 $ 75,000.00 $ 25,000.00 $ 25,000.00 A4 Type B Progress Schedule, min. Bid $5,000.00 1 LS $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 10,000.00 $ 10,000.00 A5 Unexpected Site Changes 1 FA $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 A6 Record Drawings, min. Bid $5,000.00 1 LS $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 A7 Roadway Surveying 1 LS $ 15,000.00 $ 15,000.00 $ 60,000.00 $ 60,000.00 $ 50,000.00 $ 50,000.00 $ 55,000.00 $ 55,000.00 A8 Utility Potholing 1 FA $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 A9 Flaggers and Spotters, min. Bid $50.00 per hour 2200 HR $ 50.00 $ 110,000.00 $ 60.00 $ 132,000.00 $ 70.00 $ 154,000.00 $ 66.00 $ 145,200.00 A10 Other Traffic Control Labor, min. Bid $50.00 per hour 500 HR $ 50.00 $ 25,000.00 $ 60.00 $ 30,000.00 $ 70.00 $ 35,000.00 $ 66.00 $ 33,000.00 All Traffic Control Supervisor, min. Bid $50.00 per hour 320 HR $ 60.00 $ 19,200.00 $ 72.00 $ 23,040.00 $ 80.00 $ 25,600.00 $ 66.00 $ 21,120.00 Al2 Construction Signs Class A 250 SF $ 20.00 $ 5,000.00 $ 25.00 $ 6,250.00 $ 15.00 $ 3,750.00 $ 27.00 $ 6,750.00 A13 Sequential Arrow Sign 750 HR $ 3.00 $ 2,250.00 $ 2.00 $ 1,500.00 $ 4.50 $ 3,375.00 $ 2.00 $ 1,500.00 A14 Portable Changeable Message Sign 970 HR $ 3.50 $ 3,395.00 $ 3.00 $ 2,910.00 $ 17.00 $ 16,490.00 $ 4.00 $ 3,880.00 A15 Outside Agency Uniformed Police Flagging Labor 1 FA $ 3,000.00 $ 3,000.00 $ 3,000.00 $ 3,000.00 $ 3,000.00 $ 3,000.00 $ 3,000.00 $ 3,000.00 A16 Clearing and Grubbing 2.0 AC $ 15,000.00 $ 30,000.00 $ 30,000.00 $ 60,000.00 $ 9,000.00 $ 18,000.00 $ 45,000.00 $ 90,000.00 A17 Roadside Cleanup 1 FA $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 A18 Remove Existing Drainage Structure 18 EA $ 350.00 $ 6,300.00 $ 350.00 $ 6,300.00 $ 500.00 $ 9,000.00 $ 200.00 $ 3,600.00 A19 Remove Existing Storm Sewer Pipe 1800 LF $ 5.00 $ 9,000.00 $ 20.00 $ 36,000.00 $ 13.00 $ 23,400.00 $ 21.00 $ 37,800.00 A20 Removal of Structure and Obstructions 1 LS $ 25,000.00 $ 25,000.00 $ 7,000.00 $ 7,000.00 $ 25,000.00 $ 25,000.00 $ 75,000.00 $ 75,000.00 A21 Removal and Relocation of Existing Private Improvements 1 FA $ 8,000.00 $ 8,000.00 $ 8,000.00 $ 8,000.00 $ 8,000.00 $ 8,000.00 $ 8,000.00 $ 8,000.00 A22 Pavement Sawcutting 3810 LF $ 2.50 $ 9,525.00 $ 4.00 $ 15,240.00 $ 3.25 $ 12,382.50 $ 3.00 $ 11,430.00 A23 Remove Hydrant 2 EA $ 1,000.00 $ 2,000.00 $ 2,000.00 $ 4,000.00 $ 1,500.00 $ 3,000.00 $ 5,500.00 $ 11,000.00 A24 Roadway Excavation Incl. Haul 2600 CY $ 35.00 $ 91,000.00 $ 80.00 $ 208,000.00 $ 46.00 $ 119,600.00 $ 42.00 $ 109,200.00 A25 Gravel Borrow Incl. Haul 5050 CY $ 20.00 $ 101,000.00 $ 57.00 $ 287,850.00 $ 38.00 $ 191,900.00 $ 5.00 $ 25,250.00 A26 Gravel Backfill for Walls Incl. Haul 20 CY $ 150.00 $ 3,000.00 $ 100.00 $ 2,000.00 $ 62.00 $ 1,240.00 $ 275.00 $ 5,500.00 A27 Shoring or Extra Excavation Class B 16300 SF $ 3.00 $ 48,900.00 $ 2.60 $ 42,380.00 $ 1.50 $ 24,450.00 $ 0.35 $ 5,705.00 A28 Structure Excavation Class A Incl. Haul 270 CY $ 30.00 $ 8,100.00 $ 80.00 $ 21,600.00 $ 55.00 $ 14,850.00 $ 60.00 $ 16,200.00 A29 Temporary Structural Shoring for Detention Vault 1 LS $ 40,000.00 $ 40,000.00 $ 85,000.00 $ 85,000.00 $ 15,000.00 $ 15,000.00 $ 75,000.00 $ 75,000.00 A30 Construction Geotextile for Permanent Erosion Control 150 SY $ 6.00 $ 900.00 $ 2.00 $ 300.00 $ 7.00 $ 1,050.00 $ 5.00 $ 750.00 A31 Construction Geotextile for Separation 1120 SY $ 6.00 $ 6,720.00 $ 3.00 $ 3,360.00 $ 2.25 $ 2,520.00 $ 4.00 $ 4,480.00 A32 Construction Geotextile for Underground Drainage 240 SY $ 6.00 $ 1,440.00 $ 1.00 $ 240.00 $ 8.00 $ 1,920.00 $ 4.00 $ 960.00 A33 Crushed Surfacing Top Course 870 TON $ 25.00 $ 21,750.00 $ 56.00 $ 48,720.00 $ 65.00 $ 56,550.00 $ 40.00 $ 34,800.00 A34 Crushed Surfacing Base Course 2435 TON $ 25.00 $ 60,875.00 $ 40.00 $ 97,400.00 $ 43.00 $ 104,705.00 $ 36.00 $ 87,660.00 A35 Ballast 35 TON $ 20.00 $ 700.00 $ 150.00 $ 5,250.00 $ 66.00 $ 2,310.00 $ 111.00 $ 3,885.00 A36 HMA Cl. 1/2 -inch PG 64 -22 1125 TON $ 92.00 $ 103,500.00 $ 115.00 $ 129,375.00 $ 105.00 $ 118,125.00 $ 106.00 $ 119,250.00 A37 HMA CI. 1 -inch PG 64 -22 1415 TON $ 92.00 $ 130,180.00 $ 97.00 $ 137,255.00 $ 88.00 $ 124,520.00 $ 100.00 $ 141,500.00 A38 Pavement Repair Excavation Incl. Haul 300 SY $ 12.00 $ 3,600.00 $ 52.00 $ 15,600.00 $ 13.00 $ 3,900.00 $ 33.00 $ 9,900.00 A39 HMA for Pavement Repair Cl. 1/2 -inch PG 64 -22 205 TON $ 150.00 $ 30,750.00 $ 150.00 $ 30,750.00 $ 135.00 $ 27,675.00 $ 150.00 $ 30,750.00 A40 Planing Bitumious Pavement 315 SY $ 10.00 $ 3,150.00 $ 25.00 $ 7,875.00 $ 20.00 $ 6,300.00 $ 20.00 $ 6,300.00 A41 Cement Concrete Pavement 40 CY $ 400.00 $ 16,000.00 $ 500.00 $ 20,000.00 $ 504.00 $ 20,160.00 $ 335.00 $ 13,400.00 A42 Single Sloped Concrete Barrier 150 LF $ 100.00 $ 15,000.00 $ 125.00 $ 18,750.00 $ 141.00 $ 21,150.00 $ 165.00 $ 24,750.00 A43 Gravel Backfill for Drain 30 CY $ 40.00 $ 1,200.00 $ 50.00 $ 1,500.00 $ 100.00 $ 3,000.00 $ 70.00 $ 2,100.00 City of Tukwila 42nd Ave S - Phase III Bid Tab 4/11/2017 Certified Bid Tab 40 -42nd Avenue S Phase!!! Project Engineer's Estimate Gary Merlino Construction Kiewit Infrastructure West Co. Active Construction Bld item No- Item ileseri tion Quantity Unit Unit Price Total Pri a Unit Price Totai Prise Unit Price Total Price Unit Pri a Total Pri e A44 Underdrain Pipe 6 In. Diam. 285 LF $ 25.00 $ 7,125.00 $ 3.00 $ 855.00 $ 8.00 $ 2,280.00 $ 14.00 $ 3,990.00 A45 Underdrain Pipe 8 In. Diam. 181 LF $ 30.00 $ 5,430.00 $ 25.00 $ 4,525.00 $ 9.00 $ 1,629.00 $ 21.00 $ 3,801.00 A46 Drain Pipe 6 In. Diam. 70 LF $ 30.00 $ 2,100.00 $ 87.00 $ 6,090.00 $ 8.00 $ 560.00 $ 33.00 $ 2,310.00 A47 Drain Pipe 8 In. Diam. 100 LF $ 35.00 $ 3,500.00 $ 65.00 $ 6,500.00 $ 9.00 $ 900.00 $ 35.00 $ 3,500.00 A48 Testing Storm Sewer Pipe 3352 LF $ 3.00 $ 10,056.00 $ 11.00 $ 36,872.00 $ 3.00 $ 10,056.00 $ 2.00 $ 6,704.00 A49 Corrugated polyethlyene Storm Sewer Pipe 8 In. Diam. 38 LF $ 30.00 $ 1,140.00 $ 50.00 $ 1,900.00 $ 100.00 $ 3,800.00 $ 45.00 $ 1,710.00 A50 Corrugated polyethlyene Storm Sewer Pipe 12 In. Diam. 942 LF $ 38.00 $ 35,796.00 $ 69.00 $ 64,998.00 $ 100.00 $ 94,200.00 $ 40.00 $ 37,680.00 A51 Corrugated polyethlyene Storm Sewer Pipe 18 In. Diam. 929 LF $ 45.00 $ 41,805.00 $ 95.00 $ 88,255.00 $ 110.00 $ 102,190.00 $ 55.00 $ 51,095.00 A52 Corrugated polyethlyene Storm Sewer Pipe 24 In. Diam. 927 LF $ 80.00 $ 74,160.00 $ 105.00 $ 97,335.00 $ 130.00 $ 120,510.00 $ 80.00 $ 74,160.00 A53 Cl. V Reinf. Conc. Storm Sewer Pipe 30 In. Diam. 36 LF $ 150.00 $ 5,400.00 $ 240.00 $ 8,640.00 $ 210.00 $ 7,560.00 $ 190.00 $ 6,840.00 A54 Ductile Iron Storm Sewer Pipe 8 In. Diam. 89 LF $ 65.00 $ 5,785.00 $ 96.00 $ 8,544.00 $ 130.00 $ 11,570.00 $ 55.00 $ 4,895.00 A55 Ductile Iron Storm Sewer Pipe 12 In. Diam. 316 LF $ 90.00 $ 28,440.00 $ 90.00 $ 28,440.00 $ 160.00 $ 50,560.00 $ 75.00 $ 23,700.00 A56 Ductile Iron Storm Sewer Pipe 18 In. Diam. 75 LF $ 120.00 $ 9,000.00 $ 135.00 $ 10,125.00 $ 210.00 $ 15,750.00 $ 110.00 $ 8,250.00 A57 Adjust Catch Basin 5 EA $ 400.00 $ 2,000.00 $ 400.00 $ 2,000.00 $ 900.00 $ 4,500.00 $ 750.00 $ 3,750.00 A58 Adjust Manhole 20 EA $ 500.00 $ 10,000.00 $ 600.00 $ 12,000.00 $ 900.00 $ 18,000.00 $ 950.00 $ 19,000.00 A59 Concrete Inlet 25 EA $ 1,000.00 $ 25,000.00 $ 1,650.00 $ 41,250.00 $ 2,200.00 $ 55,000.00 $ 1,400.00 $ 35,000.00 A60 Catch Basin Type 1 29 EA $ 1,200.00 $ 34,800.00 $ 2,000.00 $ 58,000.00 $ 2,500.00 $ 72,500.00 $ 1,200.00 $ 34,800.00 A61 Catch Basin Type 1 with Circular Frame and Cover 1 EA $ 1,500.00 $ 1,500.00 $ 2,500.00 $ 2,500.00 $ 2,500.00 $ 2,500.00 $ 1,300.00 $ 1,300.00 A62 Catch Basin Type 1L 6 EA $ 1,500.00 $ 9,000.00 $ 2,200.00 $ 13,200.00 $ 2,700.00 $ 16,200.00 $ 1,300.00 $ 7,800.00 A63 Catch Basin Type 2, 48In. Diam. 20 EA $ 2,300.00 $ 46,000.00 $ 5,100.00 $ 102,000.00 $ 4,500.00 $ 90,000.00 $ 3,000.00 $ 60,000.00 A64 Catch Basin Type 2, 54In. Diam. With Flow Restrictor 1 EA $ 6,500.00 $ 6,500.00 $ 18,000.00 $ 18,000.00 $ 6,000.00 $ 6,000.00 $ 6,300.00 $ 6,300.00 A65 Detention Vault 1 LS $ 100,000.00 $ 100,000.00 $ 150,000.00 $ 150,000.00 $ 130,000.00 $ 130,000.00 $ 100,000.00 $ 100,000.00 A66 Connection to Drainage Structure 12 EA $ 700.00 $ 8,400.00 $ 650.00 $ 7,800.00 $ 900.00 $ 10,800.00 $ 1,000.00 $ 12,000.00 A67 Structure Excavation Class B Incl. Haul 2800 CY $ 30.00 $ 84,000.00 $ 24.00 $ 67,200.00 $ 50.00 $ 140,000.00 $ 3.00 $ 8,400.00 A68 Abandon and Fill Pipe 310 LF $ 25.00 $ 7,750.00 $ 15.00 $ 4,650.00 $ 10.00 $ 3,100.00 $ 22.00 $ 6,820.00 A69 Through Curb Inlet 2 EA $ 300.00 $ 600.00 $ 500.00 $ 1,000.00 $ 1,200.00 $ 2,400.00 $ 1,225.00 $ 2,450.00 A70 Hydrant Assembly 5 EA $ 6,000.00 $ 30,000.00 $ 8,000.00 $ 40,000.00 $ 10,000.00 $ 50,000.00 $ 8,000.00 $ 40,000.00 A71 Resetting Existing Hydrant 4 EA $ 3,000.00 $ 12,000.00 $ 3,500.00 $ 14,000.00 $ 3,000.00 $ 12,000.00 $ 2,500.00 $ 10,000.00 A72 Stormwater Pre - Treatment Unit A 1 LS $ 45,500.00 $ 45,500.00 $ 56,000.00 $ 56,000.00 $ 50,000.00 $ 50,000.00 $ 40,000.00 $ 40,000.00 A73 Stormwater Treatment Unit B 1 LS $ 25,000.00 $ 25,000.00 $ 30,000.00 $ 30,000.00 $ 31,000.00 $ 31,000.00 $ 25,000.00 $ 25,000.00 A74 Stormwater Treatment UnitC 1 LS $ 25,000.00 $ 25,000.00 $ 30,000.00 $ 30,000.00 $ 31,000.00 $ 31,000.00 $ 25,000.00 $ 25,000.00 A75 SWPPP Preparation And General Permit Compliance 1 LS $ 18,000.00 $ 18,000.00 $ 10,000.00 $ 10,000.00 $ 5,000.00 $ 5,000.00 $ 20,000.00 $ 20,000.00 A76 Portable Storage Tank 1 LS $ 24,000.00 $ 24,000.00 $ 100,000.00 $ 100,000.00 $ 15,000.00 $ 15,000.00 $ 35,000.00 $ 35,000.00 A77 ESC Lead 45 DAY $ 110.00 $ 4,950.00 $ 50.00 $ 2,250.00 $ 1.00 $ 45.00 $ 1.00 $ 45.00 A78 Erosion/Water Pollution Control 1 FA $ 25,000.00 $ 25,000.00 $ 25,000.00 $ 25,000.00 $ 25,000.00 $ 25,000.00 $ 25,000.00 $ 25,000.00 A79 High Visibiliy Fence 1350 LF $ 4.00 $ 5,400.00 $ 4.00 $ 5,400.00 $ 5.50 $ 7,425.00 $ 3.00 $ 4,050.00 A80 Silt Fence 620 LF $ 5.00 $ 3,100.00 $ 6.00 $ 3,720.00 $ 6.00 $ 3,720.00 $ 6.00 $ 3,720.00 A81 Check Dam 168 LF $ 8.00 $ 1,344.00 $ 25.00 $ 4,200.00 $ 6.00 $ 1,008.00 $ 15.00 $ 2,520.00 A82 Inlet Protection 18 EA $ 90.00 $ 1,620.00 $ 110.00 $ 1,980.00 $ 130.00 $ 2,340.00 $ 70.00 $ 1,260.00 A83 Biodegrable Erosion Control Blanket 360 SY $ 10.00 $ 3,600.00 $ 4.00 $ 1,440.00 $ 6.00 $ 2,160.00 $ 8.00 $ 2,880.00 A84 Topsoil Type A (6" Depth) 0.6 ACRE $ 45,000.00 $ 27,000.00 $ 42,000.00 $ 25,200.00 $ 29,000.00 $ 17,400.00 $ 42,000.00 $ 25,200.00 A85 Topsoil Type A (12" Depth) 290 SY $ 20.00 $ 5,800.00 $ 18.00 $ 5,220.00 $ 16.00 $ 4,640.00 $ 18.00 $ 5,220.00 A86 SEED /SOD (MIX B) 0.6 ACRE $ 10,000.00 $ 6,000.00 $ 3,900.00 $ 2,340.00 $ 3,200.00 $ 1,920.00 $ 4,400.00 $ 2,640.00 A87 BARK OR WOOD CHIP MULCH (3" DEPTH) 321 SY $ 45.00 $ 14,445.00 $ 4.00 $ 1,284.00 $ 4.00 $ 1,284.00 $ 5.00 $ 1,605.00 N City of Tukwila 42nd Ave S - Phase III Bid Tab 4/11/2017 Certified Bid Tab 40 -42nd Avenue S Phase!!! Project Engineer's Estimate Gary Merlino Construction Kiewit Infrastructure West Co. Active Construction Marton No- Item ileseri tion Quantity Unit Unit Price Total Pri a Unit Price Totai Prise Unit Price Total Price Unit Pri a Total Pri e A88 PSIPE, PARTHENOCISSUS TRICUSPIDATA (4" POT) 54 EA $ 15.00 $ 810.00 $ 6.50 $ 351.00 $ 13.00 $ 702.00 $ 17.00 $ 918.00 A89 PSIPE, BERBERUS THUNBERGII'CRIMSON PYGMY' (#3) 102 EA $ 45.00 $ 4,590.00 $ 33.00 $ 3,366.00 $ 29.00 $ 2,958.00 $ 38.00 $ 3,876.00 A90 PSIPE, ROSA RUGOSA'SHOWY PAVEMENT ( #3) 90 EA $ 250.00 $ 22,500.00 $ 33.00 $ 2,970.00 $ 28.00 $ 2,520.00 $ 38.00 $ 3,420.00 A91 PSIPE, ACER CIRCINATUM(1.5" CALIPER) 5 EA $ 45.00 $ 225.00 $ 425.00 $ 2,125.00 $ 180.00 $ 900.00 $ 415.00 $ 2,075.00 A92 PSIPE, RHPHIOLEPIS X DEIACOURII'GEORGIA PETITE' ( #3) 73 EA $ 45.00 $ 3,285.00 $ 33.00 $ 2,409.00 $ 52.00 $ 3,796.00 $ 110.00 $ 8,030.00 A93 PSIPE, PHYSOCARPUS OPULIFOIUS 'PODARUS' ( #3) 60 EA $ 45.00 $ 2,700.00 $ 33.00 $ 1,980.00 $ 45.00 $ 2,700.00 $ 43.00 $ 2,580.00 A94 Cement Conc. Traffic Curb and Gutter 4312 LF $ 20.00 $ 86,240.00 $ 30.00 $ 129,360.00 $ 35.00 $ 150,920.00 $ 20.00 $ 86,240.00 A95 Extruded Curb, Type 6 176 LF $ 15.00 $ 2,640.00 $ 16.00 $ 2,816.00 $ 15.00 $ 2,640.00 $ 6.00 $ 1,056.00 A96 Integral Curb Wall 20 SF $ 25.00 $ 500.00 $ 90.00 $ 1,800.00 $ 175.00 $ 3,500.00 $ 55.00 $ 1,100.00 A97 Cement Conc. Driveway Entrance 770 SY $ 60.00 $ 46,200.00 $ 110.00 $ 84,700.00 $ 83.00 $ 63,910.00 $ 71.00 $ 54,670.00 A98 Raised Pavement Marker Type 1 16 Hundred $ 700.00 $ 11,200.00 $ 220.00 $ 3,520.00 $ 200.00 $ 3,200.00 $ 165.00 $ 2,640.00 A99 Raised Pavement Marker Type 2 5 Hundred $ 850.00 $ 4,250.00 $ 350.00 $ 1,750.00 $ 315.00 $ 1,575.00 $ 465.00 $ 2,325.00 A100 Raising Existing Beam Guardrail 38 LF $ 50.00 $ 1,900.00 $ 20.00 $ 760.00 $ 72.00 $ 2,736.00 $ 87.00 $ 3,306.00 A101 Black Vinyl Coated Chain Link Fence Type 3 110 LF $ 50.00 $ 5,500.00 $ 41.00 $ 4,510.00 $ 35.00 $ 3,850.00 $ 37.00 $ 4,070.00 A102 Black Vinyl Coated Chain Link Fence Type 4 266 LF $ 30.00 $ 7,980.00 $ 50.00 $ 13,300.00 $ 31.00 $ 8,246.00 $ 33.00 $ 8,778.00 A103 Black Vinyl Coated Double 14' Chain Link Gate 1 EA $ 1,500.00 $ 1,500.00 $ 1,300.00 $ 1,300.00 $ 1,500.00 $ 1,500.00 $ 925.00 $ 925.00 A104 Adjust Monument 2 EA $ 500.00 $ 1,000.00 $ 500.00 $ 1,000.00 $ 1,000.00 $ 2,000.00 $ 400.00 $ 800.00 A105 Cement Conc Sidewalk 2520 SY $ 32.00 $ 80,640.00 $ 57.00 $ 143,640.00 $ 67.00 $ 168,840.00 $ 55.00 $ 138,600.00 A106 Cement Conc Curb Ramp, Type A 2 EA $ 1,500.00 $ 3,000.00 $ 1,800.00 $ 3,600.00 $ 2,500.00 $ 5,000.00 $ 1,300.00 $ 2,600.00 A107 Cement Conc Curb Ramp Type Parallel A 8 EA $ 1,800.00 $ 14,400.00 $ 2,500.00 $ 20,000.00 $ 2,500.00 $ 20,000.00 $ 2,400.00 $ 19,200.00 A108 Paved Buffer Zone 290 SY $ 75.00 $ 21,750.00 $ 103.00 $ 29,870.00 $ 169.00 $ 49,010.00 $ 120.00 $ 34,800.00 A109 Quarry Spalls 25 TON $ 25.00 $ 625.00 $ 80.00 $ 2,000.00 $ 70.00 $ 1,750.00 $ 170.00 $ 4,250.00 A110 Mailbox Support, Type 1 8 EA $ 500.00 $ 4,000.00 $ 400.00 $ 3,200.00 $ 1,000.00 $ 8,000.00 $ 500.00 $ 4,000.00 A111 Mailbox Support, Type 2 3 EA $ 2,000.00 $ 6,000.00 $ 800.00 $ 2,400.00 $ 1,000.00 $ 3,000.00 $ 1,000.00 $ 3,000.00 A112 Illumination System Complete 1 LS $ 200,000.00 $ 200,000.00 $ 250,000.00 $ 250,000.00 $ 275,000.00 $ 275,000.00 $ 300,000.00 $ 300,000.00 A113 Permanent Signing 1 LS $ 12,500.00 $ 12,500.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 A114 Plastic Stop Line 50 LF $ 7.50 $ 375.00 $ 8.50 $ 425.00 $ 7.00 $ 350.00 $ 7.00 $ 350.00 A115 Plastic Line (4 ") 2523 LF $ 3.00 $ 7,569.00 $ 1.50 $ 3,784.50 $ 1.25 $ 3,153.75 $ 1.00 $ 2,523.00 A116 Plastic Bicycle Lane Symbol 10 EA $ 400.00 $ 4,000.00 $ 130.00 $ 1,300.00 $ 120.00 $ 1,200.00 $ 400.00 $ 4,000.00 A117 Plastic Crosswalk Line 110 SF $ 8.00 $ 880.00 $ 5.00 $ 550.00 $ 4.00 $ 440.00 $ 4.00 $ 440.00 A118 Plastic Traffic Arrow 2 EA $ 80.00 $ 160.00 $ 125.00 $ 250.00 $ 110.00 $ 220.00 $ 55.00 $ 110.00 A119 Plastic Sharrow Symbol 12 EA $ 400.00 $ 4,800.00 $ 400.00 $ 4,800.00 $ 350.00 $ 4,200.00 $ 400.00 $ 4,800.00 A120 Temporary Pavement Markings 4000 LF $ 0.40 $ 1,600.00 $ 1.10 $ 4,400.00 $ 0.25 $ 1,000.00 $ 1.00 $ 4,000.00 A121 Rock for Rock Wall 340 TON $ 120.00 $ 40,800.00 $ 165.00 $ 56,100.00 $ 160.00 $ 54,400.00 $ 171.00 $ 58,140.00 A122 Backfill for Rock Wall 130 CY $ 55.00 $ 7,150.00 $ 45.00 $ 5,850.00 $ 68.00 $ 8,840.00 $ 55.00 $ 7,150.00 A123 Compacted Till 70 CY $ 50.00 $ 3,500.00 $ 40.00 $ 2,800.00 $ 100.00 $ 7,000.00 $ 21.00 $ 1,470.00 A124 Adjust Valve Box to Grade 20 EA $ 200.00 $ 4,000.00 $ 500.00 $ 10,000.00 $ 100.00 $ 2,000.00 $ 325.00 $ 6,500.00 A125 Adjust Meter Box to Grade 10 EA $ 300.00 $ 3,000.00 $ 300.00 $ 3,000.00 $ 100.00 $ 1,000.00 $ 125.00 $ 1,250.00 Subtotal Schedule A $ 2,878,750.00 $ 4,404,144.50 $ 4,212,486.25 $ 3,526,430.04 Schedule B - Gilliam Creek Culvert B1 Unexpected Site Changes 1 FA $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 B2 Clearing and Grubbing 0.4 AC $ 15,000.00 $ 6,000.00 $ 10,000.00 $ 4,000.00 $ 30,000.00 $ 12,000.00 $ 50,000.00 $ 20,000.00 B3 Remove Existing Pipe 94 LF $ 45.00 $ 4,230.00 $ 20.00 $ 1,880.00 $ 25.00 $ 2,350.00 $ 15.00 $ 1,410.00 B4 Roadway Excavation Incl. Haul 4200 CY $ 35.00 $ 147,000.00 $ 33.00 $ 138,600.00 $ 65.00 $ 273,000.00 $ 35.00 $ 147,000.00 w City of Tukwila 42nd Ave S - Phase III Bid Tab 4/11/2017 Certified Bid Tab 40 -42nd Avenue S Phase!!! Project Engineer's Estimate Gary Merlino Construction Kiewit Infrastructure West Co. Active Construction Bid Item. No. Item D scri ption u Uni Unit Pric Total Pri Unit Pri Totai Pilsej Unit Pric Total Pri Unit Fri i Total Pri B5 Gravel Borrow Incl. Haul 3700 CY 20.00 $ 74,000.00 61.00 $ 225,700.00 44.00 $ 162,800.00 $ 74,000.00 B6 Temporary Structural Shoring for Culvert Footing LS $ 96,000.00 $ 96,000.00 $ 60,000.00 $ 60,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00 B7 Conc. Class 4000 for Culvert Footing 170 CY $ 600.00 $ 102,000.00 $ 400.00 $ 68,000.00 1.00 $ 170.00 $ 500.00 $ 85,000.00 B8 St Reinf. Bar for Culvert Footing 24000 LBS $ 1.50 $ 36,000.00 1.50 $ 36,000.00 0.01 $ 240.00 2.00 $ 48,000.00 B9 St Str. Plate Arch 10 Gage 16 ft. Span 146 LF $ 515.00 $ 75,190.00 $ 1,060.00 $ 154,760.00 $ 1,900.00 $ 277,400.00 $ 1,350.00 $ 197,100.00 B10 Steambed Boulders - One Man 88 TON $ 45.00 $ 3,960.00 $ 120.00 $ 10,560.00 $ 140.00 $ 12,320.00 $ 115.00 $ 10,120.00 B11 Steambed Boulders - Two Man 88 TON $ 90.00 $ 7,920.00 $ 120.00 $ 10,560.00 $ 140.00 $ 12,320.00 $ 103.00 $ 9,064.00 B12 Steambed Cobbles 675 TON $ 45.00 $ 30,375.00 85.00 $ 57,375.00 38.00 $ 25,650.00 52.00 $ 35,100.00 B13 Coarse Band 3 EA $ 2,000.00 $ 6,000.00 $ 2,500.00 $ 7,500.00 $ 1,600.00 $ 4,800.00 $ 1,750.00 $ 5,250.00 B14 Temporary Stream Diversion LS $ 55,000.00 $ 55,000.00 $ 105,000.00 $ 105,000.00 $ 90,000.00 $ 90,000.00 $ 40,000.00 $ 40,000.00 B15 High Visibiliy Fence 250 LF $ 4.00 $ 1,000.00 4.00 $ 1,000.00 5.25 $ 1,312.50 3.00 $ 750.00 B16 Topsoil Type A (4" Depth) 0.20 ACRE $ 30,000.00 $ 6,000.00 $ 23,000.00 $ 4,600.00 $ 18,000.00 $ 3,600.00 $ 30,000.00 $ 6,000.00 B17 Seed, Fertilize & Mulching (Native Seed Mix A) 0.20 ACRE $ 10,000.00 $ 2,000.00 $ 3,800.00 $ 760.00 $ 4,000.00 $ 800.00 $ 5,000.00 $ 1,000.00 B18 Fine Compost (3" depth) 0.20 ACRE $ 15,500.00 $ 3,100.00 $ 18,000.00 $ 3,600.00 $ 18,000.00 $ 3,600.00 $ 35,000.00 $ 7,000.00 B19 PSIPE, SALIX LASIANDRA ( #3) 4 EA $ 45.00 180.00 33.00 $ 132.00 25.00 $ 100.00 21.00 $ 84.00 B20 PSIPE, SALIX SCOULERIANA ( #3) 4 EA $ 45.00 180.00 33.00 $ 132.00 25.00 $ 100.00 30.00 $ 120.00 B21 PSIPE, BETULA PAPYRIFERA ( #3) 4 EA $ 45.00 180.00 33.00 $ 132.00 31.00 $ 124.00 30.00 $ 120.00 B22 PSIPE, FRAXINUS LATIFOLIA ( #3) 4 EA $ 45.00 180.00 33.00 $ 132.00 25.00 $ 100.00 30.00 $ 120.00 B23 PSIPE, THUJA PLICATA ( #3) 4 EA $ 45.00 180.00 33.00 $ 132.00 31.00 $ 124.00 30.00 $ 120.00 B24 PSIPE, TSUGA HETEROPHYLLA ( #3) 4 EA $ 45.00 180.00 33.00 $ 132.00 38.00 $ 152.00 30.00 $ 120.00 B25 PSIPE, ALNUS RUBRA ( #3) 4 EA $ 45.00 180.00 33.00 $ 132.00 29.00 $ 116.00 30.00 $ 120.00 B26 PSIPE, ACER CIRCINATUM ( #3) 4 EA $ 45.00 180.00 33.00 $ 132.00 25.00 $ 100.00 30.00 $ 120.00 B27 PSIPE, ACER MACROPHYLLUM ( #3) 4 EA $ 45.00 180.00 33.00 $ 132.00 25.00 $ 100.00 30.00 $ 120.00 B28 PSIPE, PSEUDOTSUGA MENZIESII ( #3) 4 EA $ 45.00 180.00 33.00 $ 132.00 29.00 $ 116.00 30.00 $ 120.00 B29 PSIPE, PINUS CONTORTA ( #3) 4 EA $ 45.00 180.00 33.00 $ 132.00 38.00 $ 152.00 30.00 $ 120.00 B30 PSIPE, CORNUS SERICEA ( #3) 21 EA $ 45.00 945.00 33.00 $ 693.00 25.00 $ 525.00 30.00 $ 630.00 B31 PSIPE, SAMBUCUS RACEMOSA ( #3) 21 EA $ 45.00 945.00 33.00 $ 693.00 28.00 $ 588.00 30.00 $ 630.00 B32 PSIPE, MYRICA CALIFORNICA ( #3) 21 EA $ 45.00 945.00 33.00 $ 693.00 42.00 $ 882.00 30.00 $ 630.00 B33 PSIPE, RIBES SANGUINEUM ( #3) 23 EA $ 45.00 $ 1,035.00 33.00 $ 759.00 25.00 $ 575.00 30.00 $ 690.00 B34 PSIPE, HOLODISCUS DISCOLOR ( #3) 24 EA $ 45.00 $ 1,080.00 33.00 $ 792.00 29.00 $ 696.00 30.00 $ 720.00 B35 PSIPE, SYMPHORICARPOS ALBUS ( #3) 21 EA $ 45.00 945.00 33.00 $ 693.00 29.00 $ 609.00 30.00 $ 630.00 B36 Temporary Irrigation System LS $ 35,000.00 $ 35,000.00 $ 16,000.00 $ 16,000.00 $ 6,950.00 $ 6,950.00 $ 16,500.00 $ 16,500.00 B37 Settlement Monitoring LS $ 16,000.00 $ 16,000.00 $ 30,000.00 $ 30,000.00 $ 15,000.00 $ 15,000.00 $ 10,000.00 $ 10,000.00 B38 Remove and Reset Streambank Boulders LS $ 5,000.00 $ 5,000.00 $ 15,000.00 $ 15,000.00 $ 13,000.00 $ 13,000.00 $ 3,000.00 $ 3,000.00 B39 Fish Exclusion FA $ 1,000.00 $ 1,000.00 $ 1,000.00 $ 1,000.00 $ 1,000.00 $ 1,000.00 $ 1,000.00 $ 1,000.00 Subtotal Schedule B $ 729,650.00 $ 972,670.00 $ 988,471.50 $ 787,508.00 Schedule C -- Power and Communications Undergrounding C1 Unexpected Site Changes 1 FA $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 C2 Franchise Utility Coordination 1 FA $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 C3 Utility Potholing 1 FA $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 Joint Communications Ductbank C4 Structure Excavation Class B Incl. Haul for Joint Trench 2200 CY 35.00 $ 77,000.00 90.00 $ 198,000.00 55.00 $ 121,000.00 65.50 $ 144,100.00 C5 Shoring or Extra Excavation Class B for Joint Trench 24000 SF 2.00 $ 48,000.00 1.00 $ 24,000.00 1.00 $ 24,000.00 0.30 $ 7,200.00 C6 Joint Trench Pipe Zone Bedding, Including Haul 400 CY $ 35.00 $ 14,000.00 40.00 $ 16,000.00 65.00 $ 26,000.00 38.30 $ 15,320.00 a City of Tukwila 42nd Ave S - Phase III Bid Tab 4/11/2017 Certified Bid Tab 40 -42nd Avenue S Phase!!! Project Engineer's Estimate Gary Merlino Construction Kiewit Infrastructure West Co. Active Construction Bid Item No. Item D scri ption u Uni Unit Pric Total Pri Unit Pri Total Pivsej Unit Pric Total Pri UnitPri Total Pri C7 Joint Trench Backfill 1520 CY 25.00 $ 38,000.00 42.00 $ 63,840.00 65.00 $ 98,800.00 $ 74,936.00 C8 Install 444 -LA Vault - Comcast 18 EA $ 800.00 $ 14,400.00 $ 600.00 $ 10,800.00 $ 2,800.00 $ 50,400.00 $ 1,200.00 $ 21, 600.00 C9 Install Conduit Pipe 4 In. Diam. - Comcast 5300 LF 6.00 $ 31,800.00 9.00 $ 47,700.00 9.00 $ 47,700.00 4.00 $ 21,200.00 C10 Conduit Riser, 4 -inch - Comcast 4 EA $ 400.00 $ 1,600.00 $ 1,950.00 $ 7,800.00 $ 1,800.00 $ 7,200.00 $ 1,175.00 $ 4,700.00 C11 Install H1730H Handhole - CenturyLink 8 EA $ 600.00 $ 4,800.00 $ 200.00 $ 1,600.00 $ 1,400.00 $ 11,200.00 $ 575.00 $ 4,600.00 C12 Install 264 -TA - CenturyLink 4 EA $ 1,500.00 $ 6,000.00 $ 600.00 $ 2,400.00 $ 4,000.00 $ 16,000.00 $ 500.00 $ 2,000.00 C13 Install Conduit Pipe 4 In. Diam. - CenturyLink 3550 LF $ 6.00 $ 21,300.00 9.50 $ 33,725.00 9.00 $ 31,950.00 4.00 $ 14,200.00 C14 Core Drill of Existing Vault - CenturyLink 14 EA $ 400.00 $ 5,600.00 $ 550.00 $ 7,700.00 $ 500.00 $ 7,000.00 $ 250.00 $ 3,500.00 C15 Install 444 -LA Vault - Zayo 3 EA $ 800.00 $ 2,400.00 $ 600.00 $ 1,800.00 $ 3,500.00 $ 10,500.00 $ 1,200.00 $ 3,600.00 C16 Install Conduit Pipe 4 In. Diam. -Zayo 1550 LF 6.00 $ 9,300.00 9.50 $ 14,725.00 9.00 $ 13,950.00 4.00 $ 6,200.00 SCL Electrical Ductbank C17 Structure Excavation Class B Incl. Haul for SCL Duct Bank 3080 CY $ 200.00 $ 616,000.00 $ 240.00 $ 739,200.00 $ 55.00 $ 169,400.00 $ 60.00 $ 184,800.00 C18 Shoring or Extra Excavation Class B for SCL Duct Bank 28000 SF $ 2.00 $ 56,000.00 $ 6.00 $ 168,000.00 $ 1.50 $ 42,000.00 $ 1.50 $ 42,000.00 C19 Handhole, 233-LA - SCL 3 EA $ 3,000.00 $ 9,000.00 $ 2,100.00 $ 6,300.00 $ 4,500.00 $ 13,500.00 $ 2,850.00 $ 8,550.00 C20 Vault, 444-LA - SCL 6 EA $ 4,000.00 $ 24,000.00 $ 3,500.00 $ 21,000.00 $ 7,000.00 $ 42,000.00 $ 3,700.00 $ 22,200.00 C21 Vault, 507-LA - SCL 3 EA $ 6,000.00 $ 18,000.00 $ 5,300.00 $ 15,900.00 $ 10,000.00 $ 30,000.00 $ 4,350.00 $ 13,050.00 C22 Vault, 577-LA - SCL 7 EA $ 8,000.00 $ 56,000.00 $ 9,000.00 $ 63,000.00 $ 14,000.00 $ 98,000.00 $ 6,650.00 $ 46,550.00 C23 Vault, 712-LA - SCL 1 EA $ 35,000.00 $ 35,000.00 $ 20,000.00 $ 20,000.00 $ 31,000.00 $ 31,000.00 $ 14,500.00 $ 14,500.00 C24 Vault, 712-CLX - SCL 2 EA $ 35,000.00 $ 70,000.00 $ 23,000.00 $ 46,000.00 $ 33,000.00 $ 66,000.00 $ 14,500.00 $ 29,000.00 C25 Vault, Pad 10 - SCL 1 EA $ 6,000.00 $ 6,000.00 $ 2,100.00 $ 2,100.00 $ 4,500.00 $ 4,500.00 $ 2,150.00 $ 2,150.00 C26 Conduit, PVC, 4 Inch - SCL 12250 LF $ 15.00 $ 183,750.00 $ 25.00 $ 306,250.00 $ 23.00 $ 281,750.00 $ 10.00 $ 122,500.00 C27 Conduit, Fiberglass, 5 Inch -SCL 6960 LF $ 25.00 $ 174,000.00 $ 31.00 $ 215,760.00 $ 28.00 $ 194,880.00 $ 15.50 $ 107,880.00 C28 Conduit Bend, RGS, 4 Inch, Misc. Degree, 144" or 150" Radius - SCL 150 EA $ 800.00 $ 120,000.00 $ 720.00 $ 108,000.00 $ 650.00 $ 97,500.00 $ 650.00 $ 97,500.00 C29 Conduit Bend, RGS, 4 Inch, Misc. Degree, 48 " Radius -SCL 3 EA $ 400.00 $ 1,200.00 $ 550.00 $ 1,650.00 $ 500.00 $ 1,500.00 $ 350.00 $ 1,050.00 C30 Conduit Riser, 4 -inch 8 EA $ 400.00 $ 3,200.00 $ 2,300.00 $ 18,400.00 $ 2,100.00 $ 16,800.00 $ 1,500.00 $ 12,000.00 C31 Conduit Riser, 5 -inch 4 EA $ 750.00 $ 3,000.00 $ 2,700.00 $ 10,800.00 $ 2,500.00 $ 10,000.00 $ 1,500.00 $ 6,000.00 C32 Core Drill of Existing Vault- SCL 14 EA $ 400.00 $ 5,600.00 $ 550.00 $ 7,700.00 $ 500.00 $ 7,000.00 $ 250.00 $ 3,500.00 C33 High Strength-FTB - SCL 390 CY $ 250.00 $ 97,500.00 $ 160.00 $ 62,400.00 $ 600.00 $ 234,000.00 $ 150.00 $ 58,500.00 C34 Low Strength-FTB - SCL 2626 CY $ 150.00 $ 393,900.00 $ 115.00 $ 301,990.00 $ 135.00 $ 354,510.00 $ 185.00 $ 485,810.00 C35 Guard Post(Bollard) 2 EA $ 300.00 $ 600.00 $ 600.00 $ 1,200.00 $ 1,000.00 $ 2,000.00 $ 575.00 $ 1,150.00 Private Service Joint Utility Trench C36 Install Conduit Pipe 2 In. Diam. - Comcast Private Service 1820 LF 3.00 $ 5,460.00 19.00 $ 34,580.00 17.00 $ 30,940.00 4.00 $ 7,280.00 C37 Install Conduit Pipe 2 In. Diam - Century Link Private Service 1750 LF 3.00 $ 5,250.00 19.00 $ 33,250.00 17.00 $ 29,750.00 4.00 $ 7,000.00 C38 Conduit Pipe 3 In. Diam - Seattle City Light Private Service 1930 LF $ 10.00 $ 19,300.00 21.00 $ 40,530.00 20.00 $ 38,600.00 10.00 $ 19,300.00 C39 Private Service Address 15857 LS $ 1,500.00 $ 1,500.00 $ 6,900.00 $ 6,900.00 $ 6,000.00 $ 6,000.00 $ 4,000.00 $ 4,000.00 C40 Private Service Address 15837 LS $ 5,000.00 $ 5,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 4,000.00 $ 4,000.00 C41 Private Service Address 15827 LS $ 5,000.00 $ 5,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 4,000.00 $ 4,000.00 C42 Private Service Address 15819 LS $ 5,000.00 $ 5,000.00 $ 10,000.00 $ 10,000.00 $ 9,000.00 $ 9,000.00 $ 4,000.00 $ 4,000.00 C43 Private Service Address 4066 LS $ 5,000.00 $ 5,000.00 $ 9,500.00 $ 9,500.00 $ 9,000.00 $ 9,000.00 $ 4,000.00 $ 4,000.00 C44 Private Service Address 15645 LS $ 5,000.00 $ 5,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 4,000.00 $ 4,000.00 C45 Private Service Address 15625 LS $ 1,000.00 $ 1,000.00 $ 8,000.00 $ 8,000.00 $ 7,000.00 $ 7,000.00 $ 4,000.00 $ 4,000.00 C46 Private Service Address 15603 LS $ 3,000.00 $ 3,000.00 $ 9,500.00 $ 9,500.00 $ 8,500.00 $ 8,500.00 $ 4,000.00 $ 4,000.00 C47 Private Service Address 15854 LS $ 2,000.00 $ 2,000.00 $ 9,600.00 $ 9,600.00 $ 8,500.00 $ 8,500.00 $ 4,000.00 $ 4,000.00 C48 Private Service Address 15838 LS $ 5,000.00 $ 5,000.00 $ 12,000.00 $ 12,000.00 $ 11,000.00 $ 11,000.00 $ 4,000.00 $ 4,000.00 City of Tukwila 42nd Ave S - Phase III Bid Tab 4/11/2017 Certified Bid Tab 40 -42nd Avenue S Phase!!! Project Engineer's Estimate Gary Merlino Construction Kiewit Infrastructure West Co. Active Construction Bidrltem No- Item Deseri tion Quantity Unit Unit Price Total Pri a Unit Price Totai Prise Unit Price Total Price Unit Pri a Total Pri e C49 Private Service Address 15826 1 LS $ 5,000.00 $ 5,000.00 $ 10,000.00 $ 10,000.00 $ 9,000.00 $ 9,000.00 $ 4,000.00 $ 4,000.00 C50 Private Service Address 15820 1 LS $ 5,000.00 $ 5,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 4,000.00 $ 4,000.00 C51 Private Service Address 15660 1 LS $ 5,000.00 $ 5,000.00 $ 11,000.00 $ 11,000.00 $ 10,000.00 $ 10,000.00 $ 4,000.00 $ 4,000.00 C52 Private Service Address 15654 1 LS $ 5,000.00 $ 5,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 4,000.00 $ 4,000.00 C53 Private Service Address 15650 1 LS $ 5,000.00 $ 5,000.00 $ 9,000.00 $ 9,000.00 $ 8,000.00 $ 8,000.00 $ 4,000.00 $ 4,000.00 C54 Private Service Address 15646 1 LS $ 3,000.00 $ 3,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 4,000.00 $ 4,000.00 C55 Private Service Address 15642 1 LS $ 3,000.00 $ 3,000.00 $ 9,000.00 $ 9,000.00 $ 8,000.00 $ 8,000.00 $ 4,000.00 $ 4,000.00 C56 Private Service Address 15638 1 LS $ 500.00 $ 500.00 $ 9,000.00 $ 9,000.00 $ 8,000.00 $ 8,000.00 $ 4,000.00 $ 4,000.00 C57 Private Service Address 15460 1 LS $ 500.00 $ 500.00 $ 9,000.00 $ 9,000.00 $ 8,000.00 $ 8,000.00 $ 4,000.00 $ 4,000.00 C58 Private Service Address 15458 1 LS $ 2,000.00 $ 2,000.00 $ 13,000.00 $ 13,000.00 $ 12,000.00 $ 12,000.00 $ 4,000.00 $ 4,000.00 C59 Private Service Address 15436 1 LS $ 2,000.00 $ 2,000.00 $ 9,000.00 $ 9,000.00 $ 8,500.00 $ 8,500.00 $ 4,000.00 $ 4,000.00 C60 Property Restoration for Private Services 1 FA $ 65,000.00 $ 65,000.00 $ 65,000.00 $ 65,000.00 $ 65,000.00 $ 65,000.00 $ 65,000.00 $ 65,000.00 Subtotal $ 2,355,460.00 $ 2,963,600.00 $ 2,556,830.00 $ 1,804,426.00 Sales Tax 10% 10.0% $ 235,546.00 $ 296,360.00 $ 255,683.00 $ 180,442.60 Subtotal Schedule C $ 2,591,006.00 $ 3,259,960.00 $ 2,812,513.00 $ 1,984,868.60 Schedule D -- Valley View Sewer D1 Traffic Control 1 LS $ 25,000.00 $ 25,000.00 $ 4,000.00 $ 4,000.00 $ 23,000.00 $ 23,000.00 $ 8,500.00 $ 8,500.00 D2 Shoring & Trench Safety Systems 433 LF $ 2.00 $ 866.00 $ 1.00 $ 433.00 $ 35.00 $ 15,155.00 $ 1.00 $ 433.00 D3 Temporary Erosion and Sedimentation Control 1 LS $ 7,000.00 $ 7,000.00 $ 3,000.00 $ 3,000.00 $ 2,500.00 $ 2,500.00 $ 250.00 $ 250.00 D4 Dewatering 1 LS $ 2,000.00 $ 2,000.00 $ 5,000.00 $ 5,000.00 $ 20,000.00 $ 20,000.00 $ 5,000.00 $ 5,000.00 D5 Potholing 5 EA $ 900.00 $ 4,500.00 $ 1,000.00 $ 5,000.00 $ 1,000.00 $ 5,000.00 $ 650.00 $ 3,250.00 D6 Landscape and Misc. Restoration 1 LS $ 7,000.00 $ 7,000.00 $ 1,000.00 $ 1,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 D7 Gilliam Temporary Wastewater Bypass 1 LS $ 9,500.00 $ 9,500.00 $ 25,000.00 $ 25,000.00 $ 25,000.00 $ 25,000.00 $ 12,500.00 $ 12,500.00 D8 Other Temporary Wastewater Bypasses 1 LS $ 10,000.00 $ 10,000.00 $ 7,000.00 $ 7,000.00 $ 35,000.00 $ 35,000.00 $ 2,500.00 $ 2,500.00 D9 60 -inch Saddle Manhole (E17 -77) 1 LS $ 7,000.00 $ 7,000.00 $ 16,000.00 $ 16,000.00 $ 8,000.00 $ 8,000.00 $ 7,000.00 $ 7,000.00 D10 48 -inch Standard Manhole (F17 -21, F17 -22) 2 EA $ 7,000.00 $ 14,000.00 $ 11,000.00 $ 22,000.00 $ 8,000.00 $ 16,000.00 $ 5,000.00 $ 10,000.00 D11 72 -inch Standard Manhole with Extra Channeling Work (E17 -51) 1 LS $ 15,000.00 $ 15,000.00 $ 13,000.00 $ 13,000.00 $ 11,000.00 $ 11,000.00 $ 9,500.00 $ 9,500.00 D12 72 -inch Standard Manhole (E17 -53) 1 LS $ 8,000.00 $ 8,000.00 $ 26,000.00 $ 26,000.00 $ 26,000.00 $ 26,000.00 $ 26,000.00 $ 26,000.00 D13 60 -inch Shallow Manhole (E17 -76) 1 LS $ 7,000.00 $ 7,000.00 $ 12,000.00 $ 12,000.00 $ 15,000.00 $ 15,000.00 $ 13,000.00 $ 13,000.00 D14 72 -inch Shallow Manhole (E17 -49, E17 -52) 2 EA $ 8,000.00 $ 16,000.00 $ 22,000.00 $ 44,000.00 $ 25,000.00 $ 50,000.00 $ 27,000.00 $ 54,000.00 D15 8 -inch SDR 35 PVC Pipe 172 LF $ 110.00 $ 18,920.00 $ 83.00 $ 14,276.00 $ 140.00 $ 24,080.00 $ 146.00 $ 25,112.00 D16 8 -Inch AWWA C900 DR 25 PVC Pipe 45 LF $ 120.00 $ 5,400.00 $ 200.00 $ 9,000.00 $ 180.00 $ 8,100.00 $ 178.00 $ 8,010.00 D17 18 -inch SDR 35 PVC Pipe 32 LF $ 200.00 $ 6,400.00 $ 137.00 $ 4,384.00 $ 180.00 $ 5,760.00 $ 178.00 $ 5,696.00 D18 30 -inch class 52 Ductile Iron Pipe with Ceramic Epoxy Lining 184 LF $ 330.00 $ 60,720.00 $ 295.00 $ 54,280.00 $ 350.00 $ 64,400.00 $ 340.00 $ 62,560.00 D19 Controlled Density Fill Pipe Encasement 110 CY $ 150.00 $ 16,500.00 $ 160.00 $ 17,600.00 $ 180.00 $ 19,800.00 $ 38.00 $ 4,180.00 D20 Crushed Surfacing Top Course Compacted Trench Backfill 1283 LF $ 6.00 $ 7,698.00 $ 5.00 $ 6,415.00 $ 1.00 $ 1,283.00 $ 1.00 $ 1,283.00 D21 Crushed Surfacing Base Course Compacted Trench Backfill 1283 LF $ 6.00 $ 7,698.00 $ 8.00 $ 10,264.00 $ 1.00 $ 1,283.00 $ 1.00 $ 1,283.00 D22 "°uani Udeen uossing uusnea aunaung i op �.ouise �.onipauea i ienui Rnr4fill 995 LF $ 6.00 $ 5,970.00 $ 3.00 $ 2,985.00 $ 8.00 $ 7,960.00 $ 1.00 $ 995.00 D23 Foundation Material 356 TON $ 25.00 $ 8,900.00 $ 60.00 $ 21,360.00 $ 100.00 $ 35,600.00 $ 40.00 $ 14,240.00 D24 Gravel Driveway Restoration 1 LS $ 1,400.00 $ 1,400.00 $ 4,000.00 $ 4,000.00 $ 4,000.00 $ 4,000.00 $ 3,000.00 $ 3,000.00 D25 10 -inch HMA Patch with 8 -inch Crushed Rock Base 144 SY $ 60.00 $ 8,640.00 $ 140.00 $ 20,160.00 $ 190.00 $ 27,360.00 $ 115.00 $ 16,560.00 D26 Record Drawings and Post Construction Survey 1 LS $ 4,000.00 $ 4,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 100.00 $ 100.00 Subtotal $ 285,112.00 $ 353,157.00 $ 461,281.00 $ 299,952.00 Sales Tax 10% 10.0% $ 28,511.20 $ 35,315.70 $ 46,128.10 $ 29,995.20 rn City of Tukwila 42nd Ave S - Phase III Bid Tab 4/11/2017 Certified Bid Tab 40 -42nd Avenue S Phase 111 Project Engineer's Estimate Gary Merlino Construction Kiewit Infrastructure West Co. Active Construction Biditem No. Item Deseri tion Quantity Unit Unit Price Total Pri a Unit Price Totai Prise Unit Price Total Price Unit Pri a Total Pri e Subtotal Schedule D $ 313,623.20 $ 388,472.70 $ 507,409.10 $ 329,947.20 Schedule E -- King County Water District No. 125 El Trench Safety 1 LS $ 1,500.00 $ 1,500.00 $ 1,000.00 $ 1,000.00 $ 12,000.00 $ 12,000.00 $ 500.00 $ 500.00 E2 12" Gate Valve and Box 2 EA $ 4,000.00 $ 8,000.00 $ 2,800.00 $ 5,600.00 $ 4,500.00 $ 9,000.00 $ 2,300.00 $ 4,600.00 E3 Remove & Dispose of Ex. 12" D.I. Pipe 185 LF $ 15.00 $ 2,775.00 $ 27.00 $ 4,995.00 $ 40.00 $ 7,400.00 $ 30.00 $ 5,550.00 E4 Remove & Dispose of Ex. 8" D.I. Pipe 45 LF $ 12.00 $ 540.00 $ 23.00 $ 1,035.00 $ 60.00 $ 2,700.00 $ 30.00 $ 1,350.00 E5 12" CL 52 D.I. Pipe & Fittings 200 LF $ 100.00 $ 20,000.00 $ 158.00 $ 31,600.00 $ 215.00 $ 43,000.00 $ 123.00 $ 24,600.00 E6 8" CL 52 D.I., Restrained Joint Pipe & Fittings 40 LF $ 100.00 $ 4,000.00 $ 350.00 $ 14,000.00 $ 370.00 $ 14,800.00 $ 165.00 $ 6,600.00 E7 Connect to Ex. Water Main 4 EA $ 3,500.00 $ 14,000.00 $ 3,600.00 $ 14,400.00 $ 2,000.00 $ 8,000.00 $ 2,700.00 $ 10,800.00 E8 Remove and Abandon Ex. SPU Meter Vault 1 LS $ 5,000.00 $ 5,000.00 $ 4,000.00 $ 4,000.00 $ 2,000.00 $ 2,000.00 $ 1,150.00 $ 1,150.00 E9 Construct New SPU Meter Vault 1 LS $ 80,000.00 $ 80,000.00 $ 27,000.00 $ 27,000.00 $ 27,000.00 $ 27,000.00 $ 20,000.00 $ 20,000.00 El0 Remove and Salvage Existing Fire Hydrant 5 EA $ 750.00 $ 3,750.00 $ 1,500.00 $ 7,500.00 $ 1,000.00 $ 5,000.00 $ 1,600.00 $ 8,000.00 Ell Extend /Relocate Ex. Fire Hydrant Assy. 1 EA $ 2,000.00 $ 2,000.00 $ 3,500.00 $ 3,500.00 $ 4,500.00 $ 4,500.00 $ 4,000.00 $ 4,000.00 E12 Install New Fire Hydrant Assy. 7 EA $ 5,500.00 $ 38,500.00 $ 9,700.00 $ 67,900.00 $ 10,000.00 $ 70,000.00 $ 8,000.00 $ 56,000.00 E13 Replace 1" Long Side Water Service 1 EA $ 1,500.00 $ 1,500.00 $ 4,700.00 $ 4,700.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 E14 Replace 1" Short Side Water Service 3 EA $ 1,200.00 $ 3,600.00 $ 5,000.00 $ 15,000.00 $ 6,000.00 $ 18,000.00 $ 2,500.00 $ 7,500.00 E15 Replace 1 1/2" Short Side Water Service 4 EA $ 2,500.00 $ 10,000.00 $ 3,000.00 $ 12,000.00 $ 1,200.00 $ 4,800.00 $ 3,000.00 $ 12,000.00 E16 Adjust Valve box to Grade 12 EA $ 300.00 $ 3,600.00 $ 350.00 $ 4,200.00 $ 1,000.00 $ 12,000.00 $ 350.00 $ 4,200.00 E17 Plug & Block Ex. Main 2 EA $ 750.00 $ 1,500.00 $ 2,600.00 $ 5,200.00 $ 1,000.00 $ 2,000.00 $ 500.00 $ 1,000.00 E18 CSTC 225 TN $ 25.00 $ 5,625.00 $ 21.00 $ 4,725.00 $ 55.00 $ 12,375.00 $ 36.00 $ 8,100.00 Subtotal $ 205,890.00 $ 228,355.00 $ 259,575.00 $ 180,950.00 Sales Tax 10% 10.0% $ 20,589.00 $ 22,835.50 $ 25,957.50 $ 18,095.00 Subtotal Schedule E $ 226,479.00 $ 251,190.50 $ 285,532.50 $ 199,045.00 TOTAL CONSTRUCTION BID $6,739,508.20 $9,276,437.70 $8,806,412.35 $6,827,798.84 Errors in Contractor Bid Proposals: 1 Total price for these bid items was incorrectly shown on the proposal sheet. The error did not carry through to the final schedule or project proposal amount. 2 Individual bid item totals are correct but the subtotal for Schedule C was $2,455,990.00 which is $5,000 more than the calculated total. This error carries through to the Schedule C subtotal and the total proposal. The proposal as submitted ($7,270,001.29) is $5,500 above what the actual calculated bid amount. 3 Proposal amount for this bid item is $33,125 which is $7500 more than the calculated amount. This carries through to the Schedule A subtotal, which is also $7500 above the calculated amount. 4 The proposal amount is $7533.88 more than the calculated amount. The $7500 error in #3 is carried through but a new error of an additional $33.88 is introduced in the final proposal amount. Certified by Cynd City of Tukwila 42nd Ave S - Phase III gram Manager Date Apri111, Bid Tab 4/11/2017 Certified Bid Tab 4O -42nd Avenue S Phase 111 Project Marshbank Construction, Inc JR Hayes Corporation Northwest Cascade Inc. Ceccanti Eiltl,ltem No- Item pescriptio r Quantity Unit ; Unit Prise Total Pri ce Unit Price Total Price Unit Prise Total Pri ce Unit Price To Price Schedule A - Roadway Al Mobilization 1 LS $ 250,000.00 $ 250,000.00 $ 180,000.00 $ 180,000.00 $ 516,100.00 $ 516,100.00 $ 630,000.00 $ 630,000.00 A2 Resolution of Utility Conflicts 1 FA $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 A3 Field Office Building 1 LS $ 35,000.00 $ 35,000.00 $ 20,000.00 $ 20,000.00 $ 22,500.00 $ 22,500.00 $ 12,000.00 $ 12,000.00 A4 Type B Progress Schedule, min. Bid $5,000.00 1 LS $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 A5 Unexpected Site Changes 1 FA $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 A6 Record Drawings, min. Bid $5,000.00 1 LS $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 A7 Roadway Surveying 1 LS $ 47,000.00 $ 47,000.00 $ 50,000.00 $ 50,000.00 $ 57,550.00 $ 57,550.00 $ 75,000.00 $ 75,000.00 A8 Utility Potholing 1 FA $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 A9 Flaggers and Spotters, min. Bid $50.00 per hour 2200 HR $ 52.00 $ 114,400.00 $ 55.00 $ 121,000.00 $ 50.00 $ 110,000.00 $ 50.00 $ 110,000.00 A10 Other Traffic Control Labor, min. Bid $50.00 per hour 500 HR $ 57.00 $ 28,500.00 $ 55.00 $ 27,500.00 $ 60.00 $ 30,000.00 $ 50.00 $ 25,000.00 All Traffic Control Supervisor, min. Bid $50.00 per hour 320 HR $ 70.00 $ 22,400.00 $ 75.00 $ 24,000.00 $ 78.00 $ 24,960.00 $ 100.00 $ 32,000.00 Al2 Construction Signs Class A 250 SF $ 23.00 $ 5,750.00 $ 25.00 $ 6,250.00 $ 21.50 $ 5,375.00 $ 20.00 $ 5,000.00 A13 Sequential Arrow Sign 750 HR $ 3.00 $ 2,250.00 $ 15.00 $ 11,250.00 $ 6.00 4,500.00 $ 2.00 1,500.00 A14 Portable Changeable Message Sign 970 HR $ 8.00 $ 7,760.00 $ 50.00 $ 48,500.00 $ 8.50 $ 8,245.00 $ 4.00 $ 3,880.00 A15 Outside Agency Uniformed Police Flagging Labor 1 FA $ 3,000.00 $ 3,000.00 $ 3,000.00 $ 3,000.00 $ 3,000.00 $ 3,000.00 $ 3,000.00 $ 3,000.00 A16 Clearing and Grubbing 2.0 AC $ 18,000.00 $ 36,000.00 $ 6,000.00 $ 12,000.00 $ 12,500.00 $ 25,000.00 $ 11,000.00 $ 22,000.00 A17 Roadside Cleanup 1 FA $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 A18 Remove Existing Drainage Structure 18 EA $ 450.00 $ 8,100.00 $ 1,000.00 $ 18,000.00 $ 415.00 $ 7,470.00 $ 200.00 $ 3,600.00 A19 Remove Existing Storm Sewer Pipe 1800 LF $ 15.00 $ 27,000.00 $ 20.00 $ 36,000.00 $ 7.50 $ 13,500.00 $ 12.00 $ 21,600.00 A20 Removal of Structure and Obstructions 1 LS $ 9,000.00 $ 9,000.00 $ 35,000.00 $ 35,000.00 $ 117,500.00 $ 117,500.00 $ 100,000.00 $ 100,000.00 A21 Removal and Relocation of Existing Private Improvements 1 FA $ 8,000.00 $ 8,000.00 $ 8,000.00 $ 8,000.00 $ 8,000.00 $ 8,000.00 $ 8,000.00 $ 8,000.00 A22 Pavement Sawcutting 3810 LF $ 3.00 $ 11,430.00 $ 6.00 $ 22,860.00 $ 3.50 $ 13,335.00 $ 5.00 $ 19,050.00 A23 Remove Hydrant 2 EA $ 600.00 $ 1,200.00 $ 1,200.00 $ 2,400.00 $ 535.00 $ 1,070.00 $ 500.00 $ 1,000.00 A24 Roadway Excavation Incl. Haul 2600 CY $ 66.00 $ 171,600.00 $ 35.00 $ 91,000.00 $ 38.50 $ 100,100.00 $ 48.00 $ 124,800.00 A25 Gravel Borrow Incl. Haul 5050 CY $ 42.00 $ 212,100.00 $ 48.50 $ 244,925.00 $ 52.50 $ 265,125.00 $ 37.00 $ 186,850.00 A26 Gravel Backfill for VValls Incl. Haul 20 CY $ 47.00 $ 940.00 $ 50.00 $ 1,000.00 $ 68.00 $ 1,360.00 $ 37.00 $ 740.00 A27 Shoring or Extra Excavation Class B 16300 SF $ 0.50 $ 8,150.00 $ 0.50 $ 8,150.00 $ 0.25 $ 4,075.00 $ 1.00 $ 16,300.00 A28 Structure Excavation Class A Incl. Haul 270 CY $ 35.00 $ 9,450.00 $ 28.00 $ 7,560.00 $ 52.00 $ 14,040.00 $ 37.00 $ 9,990.00 A29 Temporary Structural Shoring for Detention Vault 1 LS $ 28,000.00 $ 28,000.00 $ 200,000.00 $ 200,000.00 $ 86,000.00 $ 86,000.00 $ 100,000.00 $ 100,000.00 A30 Construction Geotextile for Permanent Erosion Control 150 SY $ 2.00 $ 300.00 $ 12.00 $ 1,800.00 $ 4.50 $ 675.00 $ 2.00 $ 300.00 A31 Construction Geotextile for Separation 1120 SY $ 3.00 $ 3,360.00 $ 1.90 $ 2,128.00 $ 2.00 $ 2,240.00 $ 2.00 $ 2,240.00 A32 Construction Geotextile for Underground Drainage 240 SY $ 2.00 $ 480.00 $ 1.50 $ 360.00 $ 5.00 $ 1,200.00 $ 2.00 $ 480.00 A33 Crushed Surfacing Top Course 870 TON $ 38.00 $ 33,060.00 $ 22.00 $ 19,140.00 $ 34.00 $ 29,580.00 $ 40.00 $ 34,800.00 A34 Crushed Surfacing Base Course 2435 TON $ 23.00 $ 56,005.00 $ 30.00 $ 73,050.00 $ 27.00 $ 65,745.00 $ 40.00 $ 97,400.00 A35 Ballast 35 TON $ 160.00 $ 5,600.00 $ 58.00 $ 2,030.00 $ 72.00 $ 2,520.00 $ 80.00 $ 2,800.00 A36 HMA Cl. 1/2 -inch PG 64 -22 1125 TON $ 91.00 $ 102,375.00 $ 132.00 $ 148,500.00 $ 103.00 $ 115,875.00 $ 118.00 $ 132,750.00 A37 HMA CI. 1 -inch PG 64 -22 1415 TON $ 91.00 $ 128,765.00 $ 110.00 $ 155,650.00 $ 101.00 $ 142,915.00 $ 98.00 $ 138,670.00 A38 Pavement Repair Excavation Incl. Haul 300 SY $ 32.00 $ 9,600.00 $ 32.00 $ 9,600.00 $ 35.00 $ 10,500.00 $ 40.00 $ 12,000.00 A39 HMA for Pavement Repair Cl. 1/2 -inch PG 64 -22 205 TON $ 125.00 $ 25,625.00 $ 160.00 $ 32,800.00 $ 135.00 $ 27,675.00 $ 150.00 $ 30,750.00 A40 Planing Bitumious Pavement 315 SY $ 15.00 $ 4,725.00 $ 30.00 $ 9,450.00 $ 14.00 $ 4,410.00 $ 27.00 $ 8,505.00 A41 Cement Concrete Pavement 40 CY $ 415.00 $ 16,600.00 $ 440.00 $ 17,600.00 $ 436.00 $ 17,440.00 $ 400.00 $ 16,000.00 A42 Single Sloped Concrete Barrier 150 LF $ 150.00 $ 22,500.00 $ 165.00 $ 24,750.00 $ 160.00 $ 24,000.00 $ 164.00 $ 24,600.00 A43 Gravel Backfill for Drain 30 CY $ 120.00 $ 3,600.00 $ 55.00 $ 1,650.00 $ 86.00 $ 2,580.00 $ 40.00 $ 1,200.00 w City of Tukwila 42nd Ave S - Phase III Bid Tab 4/11/2017 Certified Bid Tab 4O -42nd Avenue S Phase 111 Project Marshbank Construction, Inc JR Hayes Corporation Northwest Cascade Inc. Ceccanti Eiltl,ltem No- Item pescriptio r Quantity Unit ; Unit Prise Total Pri ce Unit Price Total Price Unit Prise Total Pri ce Unit Price To Price A44 Underdrain Pipe 6 In. Diam. 285 LF $ 10.00 $ 2,850.00 $ 15.00 $ 4,275.00 $ 8.50 $ 2,422.50 $ 28.00 $ 7,980.00 A45 Underdrain Pipe 8 In. Diam. 181 LF $ 12.00 $ 2,172.00 $ 25.00 $ 4,525.00 $ 30.00 $ 5,430.00 $ 32.00 $ 5,792.00 A46 Drain Pipe 6 In. Diam. 70 LF $ 16.00 $ 1,120.00 $ 20.00 $ 1,400.00 $ 27.00 $ 1,890.00 $ 40.00 $ 2,800.00 A47 Drain Pipe 8 In. Diam. 100 LF $ 18.00 $ 1,800.00 $ 20.00 $ 2,000.00 $ 28.50 $ 2,850.00 $ 40.00 $ 4,000.00 A48 Testing Storm Sewer Pipe 3352 LF $ 2.00 $ 6,704.00 $ 3.50 $ 11,732.00 $ 1.50 $ 5,028.00 $ 2.00 $ 6,704.00 A49 Corrugated polyethlyene Storm Sewer Pipe 8 In. Diam. 38 LF $ 60.00 $ 2,280.00 $ 58.00 $ 2,204.00 $ 61.00 $ 2,318.00 $ 44.00 $ 1,672.00 A50 Corrugated polyethlyene Storm Sewer Pipe 12 In. Diam. 942 LF $ 60.00 $ 56,520.00 $ 75.00 $ 70,650.00 $ 48.00 $ 45,216.00 $ 46.00 $ 43,332.00 A51 Corrugated polyethlyene Storm Sewer Pipe 18 In. Diam. 929 LF $ 78.00 $ 72,462.00 $ 85.00 $ 78,965.00 $ 69.00 $ 64,101.00 $ 54.00 $ 50,166.00 A52 Corrugated polyethlyene Storm Sewer Pipe 24 In. Diam. 927 LF $ 87.00 $ 80,649.00 $ 105.00 $ 97,335.00 $ 92.00 $ 85,284.00 $ 74.00 $ 68,598.00 A53 Cl. V Reinf. Conc. Storm Sewer Pipe 30 In. Diam. 36 LF $ 165.00 $ 5,940.00 $ 220.00 $ 7,920.00 $ 206.00 $ 7,416.00 $ 180.00 $ 6,480.00 A54 Ductile Iron Storm Sewer Pipe 8 In. Diam. 89 LF $ 75.00 $ 6,675.00 $ 80.00 $ 7,120.00 $ 58.00 $ 5,162.00 $ 54.00 $ 4,806.00 A55 Ductile Iron Storm Sewer Pipe 12 In. Diam. 316 LF $ 97.00 $ 30,652.00 $ 85.00 $ 26,860.00 $ 76.00 $ 24,016.00 $ 74.00 $ 23,384.00 A56 Ductile Iron Storm Sewer Pipe 18 In. Diam. 75 LF $ 130.00 $ 9,750.00 $ 120.00 $ 9,000.00 $ 116.00 $ 8,700.00 $ 100.00 $ 7,500.00 A57 Adjust Catch Basin 5 EA $ 350.00 $ 1,750.00 $ 600.00 $ 3,000.00 $ 400.00 $ 2,000.00 $ 450.00 $ 2,250.00 A58 Adjust Manhole 20 EA $ 350.00 $ 7,000.00 $ 600.00 $ 12,000.00 $ 500.00 $ 10,000.00 $ 450.00 $ 9,000.00 A59 Concrete Inlet 25 EA $ 1,100.00 $ 27,500.00 $ 1,800.00 $ 45,000.00 $ 1,025.00 $ 25,625.00 3 $ 1,100.00 $ 27,500.00 A60 Catch Basin Type 1 29 EA $ 1,200.00 $ 34,800.00 $ 1,875.00 $ 54,375.00 $ 1,000.00 $ 29,000.00 $ 1,000.00 $ 29,000.00 A61 Catch Basin Type 1 with Circular Frame and Cover 1 EA $ 1,300.00 $ 1,300.00 $ 1,890.00 $ 1,890.00 $ 1,425.00 $ 1,425.00 $ 1,300.00 $ 1,300.00 A62 Catch Basin Type 1L 6 EA $ 1,400.00 $ 8,400.00 $ 1,950.00 $ 11,700.00 $ 1,300.00 $ 7,800.00 $ 1,300.00 $ 7,800.00 A63 Catch Basin Type 2, 481n. Diam. 20 EA $ 3,800.00 $ 76,000.00 $ 3,850.00 $ 77,000.00 $ 3,150.00 $ 63,000.00 $ 3,400.00 $ 68,000.00 A64 Catch Basin Type 2, 541n. Diam. With Flow Restrictor 1 EA $ 7,200.00 $ 7,200.00 $ 9,000.00 $ 9,000.00 $ 6,850.00 $ 6,850.00 $ 6,800.00 $ 6,800.00 A65 Detention Vault 1 LS $ 115,000.00 $ 115,000.00 $ 200,000.00 $ 200,000.00 $ 148,500.00 $ 148,500.00 $ 200,000.00 $ 200,000.00 A66 Connection to Drainage Structure 12 EA $ 600.00 $ 7,200.00 $ 2,500.00 $ 30,000.00 $ 700.00 $ 8,400.00 $ 390.00 $ 4,680.00 A67 Structure Excavation Class B Incl. Haul 2800 CY $ 35.00 $ 98,000.00 $ 23.00 $ 64,400.00 $ 2.00 $ 5,600.00 $ 24.00 $ 67,200.00 A68 Abandon and Fill Pipe 310 LF $ 13.00 $ 4,030.00 $ 25.00 $ 7,750.00 $ 16.50 $ 5,115.00 $ 12.00 $ 3,720.00 A69 Through Curb Inlet 2 EA $ 1,000.00 $ 2,000.00 $ 1,900.00 $ 3,800.00 $ 1,150.00 $ 2,300.00 $ 1,350.00 $ 2,700.00 A70 Hydrant Assembly 5 EA $ 6,700.00 $ 33,500.00 $ 6,000.00 $ 30,000.00 $ 7,000.00 $ 35,000.00 $ 5,500.00 $ 27,500.00 A71 Resetting Existing Hydrant 4 EA $ 2,000.00 $ 8,000.00 $ 2,800.00 $ 11,200.00 $ 2,000.00 $ 8,000.00 $ 1,500.00 $ 6,000.00 A72 Stormwater Pre- Treatment Unit A 1 LS $ 41,000.00 $ 41,000.00 $ 55,000.00 $ 55,000.00 $ 44,500.00 $ 44,500.00 $ 42,000.00 $ 42,000.00 A73 Stormwater Treatment Unit B 1 LS $ 26,000.00 $ 26,000.00 $ 35,000.00 $ 35,000.00 $ 23,500.00 $ 23,500.00 $ 22,000.00 $ 22,000.00 A74 Stormwater Treatment Unit C 1 LS $ 26,000.00 $ 26,000.00 $ 35,000.00 $ 35,000.00 $ 25,000.00 $ 25,000.00 $ 24,000.00 $ 24,000.00 A75 SVVPPP Preparation And General Permit Compliance 1 LS $ 600.00 $ 600.00 $ 3,000.00 $ 3,000.00 $ 6,100.00 $ 6,100.00 $ 2,500.00 $ 2,500.00 A76 Portable Storage Tank 1 LS $ 9,000.00 $ 9,000.00 $ 30,000.00 $ 30,000.00 $ 30,000.00 $ 30,000.00 $ 1,200.00 $ 1,200.00 A77 ESC Lead 45 DAY $ 200.00 $ 9,000.00 $ 150.00 $ 6,750.00 $ 100.00 $ 4,500.00 $ 50.00 $ 2,250.00 A78 ErosionNVater Pollution Control 1 FA $ 25,000.00 $ 25,000.00 $ 25,000.00 $ 25,000.00 $ 25,000.00 $ 25,000.00 $ 25,000.00 $ 25,000.00 A79 High Visibiliy Fence 1350 LF $ 3.00 $ 4,050.00 $ 5.00 $ 6,750.00 $ 3.00 $ 4,050.00 $ 2.00 $ 2,700.00 A80 Silt Fence 620 LF $ 4.00 $ 2,480.00 $ 7.00 $ 4,340.00 $ 5.00 $ 3,100.00 $ 5.00 $ 3,100.00 A81 Check Dam 168 LF $ 11.00 $ 1,848.00 $ 25.00 $ 4,200.00 $ 13.50 $ 2,268.00 $ 11.00 $ 1,848.00 A82 Inlet Protection 18 EA $ 50.00 $ 900.00 $ 65.00 $ 1,170.00 $ 65.00 $ 1,170.00 $ 100.00 $ 1,800.00 A83 Biodegrable Erosion Control Blanket 360 SY $ 6.00 $ 2,160.00 $ 6.30 $ 2,268.00 $ 5.50 $ 1,980.00 $ 2.00 $ 720.00 A84 Topsoil Type A (6" Depth) 0.6 ACRE $ 33,000.00 $ 19,800.00 $ 35,900.00 $ 21,540.00 $ 32,600.00 $ 19,560.00 $ 30,000.00 $ 18,000.00 A85 Topsoil Type A (12" Depth) 290 SY $ 17.00 $ 4,930.00 $ 15.90 $ 4,611.00 $ 18.00 $ 5,220.00 $ 15.00 $ 4,350.00 A86 SEED /SOD (MIX B) 0.6 ACRE $ 3,400.00 $ 2,040.00 $ 4,200.00 $ 2,520.00 $ 3,600.00 $ 2,160.00 $ 4,000.00 $ 2,400.00 A87 BARK OR WOOD CHIP MULCH (3" DEPTH) 321 SY $ 5.00 $ 1,605.00 $ 4.10 $ 1,316.10 $ 5.00 $ 1,605.00 $ 4.00 $ 1,284.00 8 City of Tukwila 42nd Ave S - Phase III Bid Tab 4/11/2017 Certified Bid Tab 4O -42nd Avenue S Phase 111 Project Marshbank Construction, Inc JR Hayes Corporation Northwest Cascade Inc. Ceccanti Bltl,ltem No- Item pescriptio , Quantity Unit ; Unit Prise Total Pri ce Unit Price Total Price Unit Prise Total Pri ce Unit Price To Price A88 PSIPE, PARTHENOCISSUS TRICUSPIDATA (4" POT) 54 EA $ 14.00 $ 756.00 $ 7.00 $ 378.00 $ 15.00 $ 810.00 $ 10.00 $ 540.00 A89 PSIPE, BERBERUS THUNBERGII 'CRIMSON PYGMY' ( #3) 102 EA $ 30.00 $ 3,060.00 $ 32.00 $ 3,264.00 $ 33.00 $ 3,366.00 $ 30.00 $ 3,060.00 A90 PSIPE, ROSA RUGOSA'SHOWY PAVEMENT ( #3) 90 EA $ 30.00 $ 2,700.00 $ 32.00 $ 2,880.00 $ 32.00 $ 2,880.00 $ 30.00 $ 2,700.00 A91 PSIPE, ACER CIRCINATUM(1.5" CALIPER) 5 EA $ 190.00 $ 950.00 $ 440.00 $ 2,200.00 $ 205.00 $ 1,025.00 $ 420.00 $ 2,100.00 A92 PSIPE, RHPHIOLEPIS X DEIACOURII 'GEORGIA PETITE ( #3) 73 EA $ 55.00 $ 4,015.00 $ 35.00 $ 2,555.00 $ 59.00 $ 4,307.00 $ 30.00 $ 2,190.00 A93 PSIPE, PHYSOCARPUS OPULIFOIUS'PODARUS' ( #3) 60 EA $ 50.00 $ 3,000.00 $ 35.00 $ 2,100.00 $ 51.00 $ 3,060.00 $ 30.00 $ 1,800.00 A94 Cement Conc. Traffic Curb and Gutter 4312 LF $ 16.00 $ 68,992.00 $ 20.00 $ 86,240.00 $ 21.00 $ 90,552.00 $ 30.00 $ 129,360.00 A95 Extruded Curb, Type 6 176 LF $ 5.50 $ 968.00 $ 17.00 $ 2,992.00 $ 6.00 $ 1,056.00 $ 6.00 $ 1,056.00 A96 Integral Curb Wall 20 SF $ 125.00 $ 2,500.00 $ 105.00 $ 2,100.00 $ 104.00 $ 2,080.00 $ 70.00 $ 1,400.00 A97 Cement Conc. Driveway Entrance 770 SY $ 60.00 $ 46,200.00 $ 98.00 $ 75,460.00 $ 65.00 $ 50,050.00 $ 85.00 $ 65,450.00 A98 Raised Pavement Marker Type 1 16 Hundred $ 155.00 $ 2,480.00 $ 235.00 $ 3,760.00 $ 165.00 $ 2,640.00 $ 165.00 $ 2,640.00 A99 Raised Pavement Marker Type 2 5 Hundred $ 450.00 $ 2,250.00 $ 365.00 $ 1,825.00 $ 475.00 $ 2,375.00 $ 470.00 $ 2,350.00 A100 Raising Existing Beam Guardrail 38 LF $ 80.00 $ 3,040.00 $ 85.00 $ 3,230.00 $ 81.00 $ 3,078.00 $ 80.00 $ 3,040.00 A101 Black Vinyl Coated Chain Link Fence Type 3 110 LF $ 35.00 $ 3,850.00 $ 35.00 $ 3,850.00 $ 38.00 $ 4,180.00 $ 37.00 $ 4,070.00 A102 Black Vinyl Coated Chain Link Fence Type 4 266 LF $ 32.00 $ 8,512.00 $ 35.00 $ 9,310.00 $ 34.00 $ 9,044.00 $ 34.00 $ 9,044.00 A103 Black Vinyl Coated Double 14' Chain Link Gate 1 EA $ 900.00 $ 900.00 $ 1,000.00 $ 1,000.00 $ 950.00 $ 950.00 $ 1,000.00 $ 1,000.00 A104 Adjust Monument 2 EA $ 550.00 $ 1,100.00 $ 250.00 $ 500.00 $ 450.00 $ 900.00 $ 500.00 $ 1,000.00 A105 Cement Conc Sidewalk 2520 SY $ 40.00 $ 100,800.00 $ 58.00 $ 146,160.00 $ 46.00 $ 115,920.00 $ 28.00 $ 70,560.00 A106 Cement Conc Curb Ramp, Type A 2 EA $ 1,400.00 $ 2,800.00 $ 1,500.00 $ 3,000.00 $ 2,150.00 $ 4,300.00 $ 3,500.00 $ 7,000.00 A107 Cement Conc Curb Ramp Type Parallel A 8 EA $ 2,000.00 $ 16,000.00 $ 2,000.00 $ 16,000.00 $ 2,700.00 $ 21,600.00 $ 3,500.00 $ 28,000.00 A108 Paved Buffer Zone 290 SY $ 70.00 $ 20,300.00 $ 80.00 $ 23,200.00 $ 75.50 $ 21,895.00 $ 100.00 $ 29,000.00 A109 Quarry Spalls 25 TON $ 78.00 $ 1,950.00 $ 75.00 $ 1,875.00 $ 100.00 $ 2,500.00 $ 50.00 $ 1,250.00 A110 Mailbox Support, Type 1 8 EA $ 500.00 $ 4,000.00 $ 225.00 $ 1,800.00 $ 200.00 $ 1,600.00 $ 120.00 $ 960.00 A111 Mailbox Support, Type 2 3 EA $ 600.00 $ 1,800.00 $ 225.00 $ 675.00 $ 350.00 $ 1,050.00 $ 220.00 $ 660.00 A112 Illumination System Complete 1 LS $ 245,000.00 $ 245,000.00 $ 220,000.00 $ 220,000.00 $ 258,715.00 $ 258,715.00 $ 270,000.00 $ 270,000.00 A113 Permanent Signing 1 LS $ 8,000.00 $ 8,000.00 $ 8,500.00 $ 8,500.00 $ 19,800.00 $ 19,800.00 $ 10,000.00 $ 10,000.00 A114 Plastic Stop Line 50 LF $ 6.50 $ 325.00 $ 9.00 $ 450.00 $ 7.00 $ 350.00 $ 7.00 $ 350.00 A115 Plastic Line (4 ") 2523 LF $ 1.25 $ 3,153.75 $ 1.50 $ 3,784.50 $ 2.00 $ 5,046.00 $ 2.00 $ 5,046.00 A116 Plastic Bicycle Lane Symbol 10 EA $ 380.00 $ 3,800.00 $ 135.00 $ 1,350.00 $ 400.00 $ 4,000.00 $ 400.00 $ 4,000.00 A117 Plastic Crosswalk Line 110 SF $ 3.20 $ 352.00 $ 5.30 $ 583.00 $ 4.00 $ 440.00 $ 4.00 $ 440.00 A118 Plastic Traffic Arrow 2 EA $ 53.00 $ 106.00 $ 130.00 $ 260.00 $ 57.00 $ 114.00 $ 56.00 $ 112.00 A119 Plastic Sharrow Symbol 12 EA $ 380.00 $ 4,560.00 $ 410.00 $ 4,920.00 $ 400.00 $ 4,800.00 $ 400.00 $ 4,800.00 A120 Temporary Pavement Markings 4000 LF $ 0.20 $ 800.00 $ 0.40 $ 1,600.00 $ 0.20 $ 800.00 $ 0.20 $ 800.00 A121 Rock for Rock Wall 340 TON $ 90.00 $ 30,600.00 $ 200.00 $ 68,000.00 $ 135.00 $ 45,900.00 $ 175.00 $ 59,500.00 A122 Backfill for Rock Wall 130 CY $ 65.00 $ 8,450.00 $ 58.00 $ 7,540.00 $ 82.00 $ 10,660.00 $ 54.00 $ 7,020.00 A123 Compacted Till 70 CY $ 65.00 $ 4,550.00 $ 22.00 $ 1,540.00 $ 30.00 $ 2,100.00 $ 20.00 $ 1,400.00 A124 Adjust Valve Box to Grade 20 EA $ 350.00 $ 7,000.00 $ 175.00 $ 3,500.00 $ 400.00 $ 8,000.00 $ 250.00 $ 5,000.00 A125 Adjust Meter Box to Grade 10 EA $ 250.00 $ 2,500.00 $ 175.00 $ 1,750.00 $ 185.00 $ 1,850.00 $ 250.00 $ 2,500.00 Subtotal Schedule A $ 3,034,411.75 $ 3,585,600.60 $ 3,483,114.50 3 $ 3,671,819.00 Schedule B - Gilliam Creek Culvert B1 Unexpected Site Changes 1 FA $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 B2 Clearing and Grubbing 0.4 AC $ 22,000.00 $ 8,800.00 $ 6,000.00 $ 2,400.00 $ 27,000.00 $ 10,800.00 $ 11,000.00 $ 4,400.00 B3 Remove Existing Pipe 94 LF $ 19.00 $ 1,786.00 $ 15.00 $ 1,410.00 $ 18.00 $ 1,692.00 $ 12.00 $ 1,128.00 B4 Roadway Excavation Incl. Haul 4200 CY $ 55.00 $ 231,000.00 $ 27.00 $ 113,400.00 $ 10.00 $ 42,000.00 $ 48.00 $ 201,600.00 No City of Tukwila 42nd Ave S - Phase III Bid Tab 4/11/2017 N Certified Bid Tab 4O -42nd Avenue S Phase III Project Marshbank Construction, Inc JR Hayes Corporation Northwest Cascade Inc. Ceccanti Bid Item No. Item Description uan Ui Unit Pri Total Pri g Unit Pric Total Pri Unit Pri Total Pri g Unit Pric To Prir B5 Gravel Borrow Incl. Haul 3700 CY 40.00 $ 148,000.00 55.00 $ 203,500.00 12.00 $ 44,400.00 37.00 $ 136,900.00 B6 Temporary Structural Shoring for Culvert Footing LS $ 170,000.00 $ 170,000.00 $ 185,000.00 $ 185,000.00 $ 208,500.00 $ 208,500.00 $ 143,000.00 $ 143,000.00 B7 Conc. Class 4000 for Culvert Footing 170 CY $ 540.00 $ 91,800.00 $ 600.00 $ 102,000.00 $ 600.00 $ 102,000.00 $ 400.00 $ 68,000.00 B8 St. Reinf. Bar for Culvert Footing 24000 LBS 2.00 $ 48,000.00 1.00 $ 24,000.00 1.86 $ 44,640.00 1.00 $ 24,000.00 B9 St. Str. Plate Arch 10 Gage 16 ft. Span 146 LF $ 810.00 $ 118,260.00 $ 1,300.00 $ 189,800.00 $ 1,652.00 $ 241,192.00 $ 800.00 $ 116,800.00 B10 Steambed Boulders - One Man 88 TON $ 140.00 $ 12,320.00 $ 150.00 $ 13,200.00 $ 152.00 $ 13,376.00 68.00 $ 5,984.00 B11 Steambed Boulders - Two Man 88 TON $ 130.00 $ 11,440.00 $ 150.00 $ 13,200.00 $ 138.00 $ 12,144.00 $ 68.00 $ 5,984.00 B12 Steambed Cobbles 675 TON $ 60.00 $ 40,500.00 85.00 $ 57,375.00 61.00 $ 41,175.00 $ 34.00 $ 22,950.00 B13 Coarse Band 3 EA $ 3,800.00 $ 11, 400.00 $ 4,500.00 $ 13,500.00 $ 2,400.00 $ 7,200.00 $ 2,700.00 $ 8,100.00 B14 Temporary Stream Diversion LS $ 31,000.00 $ 31,000.00 $ 125,000.00 $ 125,000.00 $ 25,600.00 $ 25,600.00 $ 200,000.00 $ 200,000.00 B15 High Visibiliy Fence 250 LF 3.00 $ 750.00 4.00 $ 1,000.00 3.00 $ 750.00 2.00 $ 500.00 B16 Topsoil Type A (4" Depth) 0.20 ACRE $ 20,000.00 $ 4,000.00 $ 26,000.00 $ 5,200.00 $ 21,100.00 $ 4,220.00 $ 23,000.00 $ 4,600.00 B17 Seed, Fertilize & Mulching (Native Seed Mix A) 0.20 ACRE $ 4,600.00 $ 920.00 $ 4,500.00 $ 900.00 $ 4,850.00 $ 970.00 $ 4,000.00 $ 800.00 B18 Fine Compost (3" depth) 0.20 ACRE $ 20,000.00 $ 4,000.00 $ 20,000.00 $ 4,000.00 $ 21,100.00 $ 4,220.00 $ 18,000.00 $ 3,600.00 B19 PSIPE, SALIX LASIANDRA ( #3) 4 EA $ 27.00 $ 108.00 30.00 $ 120.00 28.00 $ 112.00 30.00 $ 120.00 B20 PSIPE, SALIX SCOULERIANA ( #3) 4 EA $ 27.00 $ 108.00 30.00 $ 120.00 28.00 $ 112.00 30.00 $ 120.00 B21 PSIPE, BETULA PAPYRIFERA ( #3) 4 EA $ 33.00 $ 132.00 30.00 $ 120.00 35.00 $ 140.00 $ 30.00 $ 120.00 B22 PSIPE, FRAXINUS LATIFOLIA ( #3) 4 EA $ 27.00 $ 108.00 30.00 $ 120.00 28.00 $ 112.00 $ 30.00 $ 120.00 B23 PSIPE, THUJA PLICATA ( #3) 4 EA $ 33.00 $ 132.00 30.00 $ 120.00 35.00 $ 140.00 30.00 $ 120.00 B24 PSIPE, TSUGA HETEROPHYLLA ( #3) 4 EA $ 41.00 $ 164.00 30.00 $ 120.00 43.00 $ 172.00 30.00 $ 120.00 B25 PSIPE, ALNUS RUBRA ( #3) 4 EA $ 31.00 $ 124.00 30.00 $ 120.00 33.00 $ 132.00 30.00 $ 120.00 B26 PSIPE, ACER CIRCINATUM ( #3) 4 EA $ 27.00 $ 108.00 30.00 $ 120.00 28.00 $ 112.00 $ 30.00 $ 120.00 B27 PSIPE, ACER MACROPHYLLUM ( #3) 4 EA $ 27.00 $ 108.00 30.00 $ 120.00 28.00 $ 112.00 30.00 $ 120.00 B28 PSIPE, PSEUDOTSUGA MENZIESII ( #3) 4 EA $ 31.00 $ 124.00 30.00 $ 120.00 33.00 $ 132.00 30.00 $ 120.00 B29 PSIPE, PINUS CONTORTA ( #3) 4 EA $ 41.00 $ 164.00 30.00 $ 120.00 43.00 $ 172.00 30.00 $ 120.00 B30 PSIPE, CORNUS SERICEA ( #3) 21 EA $ 27.00 $ 567.00 30.00 $ 630.00 28.00 $ 588.00 $ 30.00 $ 630.00 B31 PSIPE, SAMBUCUS RACEMOSA ( #3) 21 EA $ 30.00 $ 630.00 30.00 $ 630.00 32.00 $ 672.00 $ 30.00 $ 630.00 B32 PSIPE, MYRICA CALIFORNICA ( #3) 21 EA $ 45.00 $ 945.00 30.00 $ 630.00 47.00 $ 987.00 30.00 $ 630.00 B33 PSIPE, RIBES SANGUINEUM ( #3) 23 EA $ 27.00 $ 621.00 30.00 $ 690.00 28.00 $ 644.00 30.00 $ 690.00 B34 PSIPE, HOLODISCUS DISCOLOR ( #3) 24 EA $ 31.00 $ 744.00 30.00 $ 720.00 33.00 $ 792.00 30.00 $ 720.00 B35 PSIPE, SYMPHORICARPOS ALBUS ( #3) 21 EA $ 27.00 $ 567.00 30.00 $ 630.00 28.00 $ 588.00 $ 30.00 $ 630.00 B36 Temporary Irrigation System LS $ 7,500.00 $ 7,500.00 $ 10,000.00 $ 10,000.00 $ 7,850.00 $ 7,850.00 $ 12,000.00 $ 12,000.00 B37 Settlement Monitoring LS $ 20,000.00 $ 20,000.00 $ 6,000.00 $ 6,000.00 $ 34,000.00 $ 34,000.00 $ 15,000.00 $ 15,000.00 B38 Remove and Reset Streambank Boulders LS $ 4,000.00 $ 4,000.00 $ 10,000.00 $ 10,000.00 $ 10,600.00 $ 10,600.00 $ 2,500.00 $ 2,500.00 B39 Fish Exclusion FA $ 1,000.00 $ 1,000.00 $ 1,000.00 $ 1,000.00 $ 1,000.00 $ 1,000.00 $ 1,000.00 $ 1,000.00 Subtotal Schedule B $ 986,930.00 $ 1,102,135.00 $ 879,048.00 $ 999,096.00 Schedule C -- Power and Communications Undergrounding C1 Unexpected Site Changes FA $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 C2 Franchise Utility Coordination FA $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 C3 Utility Potholing FA $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 Joint Communications Ductbank C4 Structure Excavation Class B Incl. Haul for Joint Trench 2200 CY $ 90.00 $ 198,000.00 35.00 $ 77,000.00 43.50 $ 95,700.00 $ 80.00 $ 176,000.00 C5 Shoring or Extra Excavation Class B for Joint Trench 24000 SF 3.50 $ 84,000.00 0.50 $ 12,000.00 0.25 $ 6,000.00 1.00 $ 24,000.00 C6 Joint Trench Pipe Zone Bedding, Including Haul 400 CY $ 50.00 $ 20,000.00 $ 120.00 $ 48,000.00 62.00 $ 24,800.00 40.00 $ 16,000.00 City of Tukwila 42nd Ave S - Phase III Bid Tab 4/11/2017 Certified Bid Tab 4O -42nd Avenue S Phase 111 Project Marshbank Construction, Inc JR Hayes Corporation Northwest Cascade Inc. Ceccanti Bitl,ltem No- Item pescriptio r Quantity Unit ; Unit Prue Total Pri ce Unit Price Total Price Unit Prue Total Prue Unit Price To Price C7 Joint Trench Backfill 1520 CY $ 50.00 $ 76,000.00 $ 80.00 $ 121,600.00 $ 49.00 $ 74,480.00 $ 40.00 $ 60,800.00 C8 Install 444 -LA Vault - Comcast 18 EA $ 1,600.00 $ 28,800.00 $ 1,000.00 $ 18,000.00 $ 750.00 $ 13,500.00 $ 800.00 $ 14,400.00 C9 Install Conduit Pipe 4 In. Diam. - Comcast 5300 LF $ 9.35 $ 49,555.00 $ 9.50 $ 50,350.00 $ 9.85 $ 52,205.00 $ 2.00 $ 10,600.00 C10 Conduit Riser, 4-inch - Comcast 4 EA $ 1,850.00 $ 7,400.00 $ 1,900.00 $ 7,600.00 $ 2,026.00 $ 8,104.00 $ 250.00 $ 1,000.00 C11 Install H1730H Handhole - CenturyLink 8 EA $ 1,100.00 $ 8,800.00 $ 450.00 $ 3,600.00 $ 350.00 $ 2,800.00 $ 400.00 $ 3,200.00 C12 Install 264 -TA - CenturyLink 4 EA $ 1,600.00 $ 6,400.00 $ 850.00 $ 3,400.00 $ 750.00 $ 3,000.00 $ 400.00 $ 1,600.00 C13 Install Conduit Pipe 4 In. Diam. - CenturyLink 3550 LF $ 9.35 $ 33,192.50 $ 9.90 $ 35,145.00 $ 10.00 $ 35,500.00 $ 2.00 $ 7,100.00 C14 Core Drill of Existing Vault- CenturyLink 14 EA $ 550.00 $ 7,700.00 $ 550.00 $ 7,700.00 $ 562.00 $ 7,868.00 $ 800.00 $ 11,200.00 C15 Install 444 -LA Vault - Zayo 3 EA $ 1,600.00 $ 4,800.00 $ 1,650.00 $ 4,950.00 $ 750.00 $ 2,250.00 $ 800.00 $ 2,400.00 C16 Install Conduit Pipe 4 In. Diam. - Zayo 1550 LF $ 9.35 $ 14,492.50 $ 9.90 $ 15,345.00 $ 10.00 $ 15,500.00 $ 2.00 $ 3,100.00 SCL Electrical Ductbank C17 Structure Excavation Class B Incl. Haul for SCL Duct Bank 3080 CY $ 68.00 $ 209,440.00 $ 23.00 $ 70,840.00 $ 44.60 $ 137,368.00 $ 100.00 $ 308,000.00 C18 Shoring or Extra Excavation Class B for SCL Duct Bank 28000 SF $ 3.50 $ 98,000.00 $ 0.25 $ 7,000.00 $ 0.28 $ 7,840.00 $ 1.00 $ 28,000.00 C19 Handhole, 233-LA - SCL 3 EA $ 2,200.00 $ 6,600.00 $ 2,350.00 $ 7,050.00 $ 1,310.00 $ 3,930.00 $ 2,300.00 $ 6,900.00 C20 Vault, 444-LA - SCL 6 EA $ 3,600.00 $ 21,600.00 $ 3,800.00 $ 22,800.00 $ 2,900.00 $ 17,400.00 $ 3,200.00 $ 19,200.00 C21 Vault, 507-LA - SCL 3 EA $ 5,800.00 $ 17,400.00 $ 5,100.00 $ 15,300.00 $ 3,500.00 $ 10,500.00 $ 5,000.00 $ 15,000.00 C22 Vault, 577-LA - SCL 7 EA $ 8,000.00 $ 56,000.00 $ 7,500.00 $ 52,500.00 $ 5,900.00 $ 41,300.00 $ 7,200.00 $ 50,400.00 C23 Vault, 712-LA - SCL 1 EA $ 13,500.00 $ 13,500.00 $ 13,000.00 $ 13,000.00 $ 11,025.00 $ 11,025.00 $ 14,200.00 $ 14,200.00 C24 Vault, 712 -CLX -SCL 2 EA $ 16,000.00 $ 32,000.00 $ 15,000.00 $ 30,000.00 $ 13,575.00 $ 27,150.00 $ 16,600.00 $ 33,200.00 C25 Vault, Pad 10 - SCL 1 EA $ 1,900.00 $ 1,900.00 $ 275.00 $ 275.00 $ 1,650.00 $ 1,650.00 $ 2,300.00 $ 2,300.00 C26 Conduit, PVC, 4 Inch - SCL 12250 LF $ 25.00 $ 306,250.00 $ 26.00 $ 318,500.00 $ 26.00 $ 318,500.00 $ 6.00 $ 73,500.00 C27 Conduit, Fiberglass, 5 Inch -SCL 6960 LF $ 30.00 $ 208,800.00 $ 30.00 $ 208,800.00 $ 31.00 $ 215,760.00 $ 8.00 $ 55,680.00 C28 Conduit Bend, RGS, 4 Inch, Misc. Degree, 144" or 150" Radius - SCL 150 EA $ 700.00 $ 105,000.00 $ 735.00 $ 110,250.00 $ 732.00 $ 109,800.00 $ 650.00 $ 97,500.00 C29 Conduit Bend, RGS, 4 Inch, Misc. Degree, 48" Radius - SCL 3 EA $ 550.00 $ 1,650.00 $ 565.00 $ 1,695.00 $ 563.00 $ 1,689.00 $ 400.00 $ 1,200.00 C30 Conduit Riser, 4 -inch 8 EA $ 2,250.00 $ 18,000.00 $ 2,200.00 $ 17,600.00 $ 2,420.00 $ 19,360.00 $ 2,000.00 $ 16,000.00 C31 Conduit Riser, 5 -inch 4 EA $ 2,650.00 $ 10,600.00 $ 2,500.00 $ 10,000.00 $ 2,870.00 $ 11,480.00 $ 2,000.00 $ 8,000.00 C32 Core Drill of Existing Vault- SCL 14 EA $ 550.00 $ 7,700.00 $ 564.70 $ 7,905.80 $ 562.00 $ 7,868.00 $ 800.00 $ 11,200.00 C33 High Strength -FTB - SCL 390 CY $ 170.00 $ 66,300.00 $ 150.00 $ 58,500.00 $ 292.00 $ 113,880.00 $ 200.00 $ 78,000.00 C34 Low Strength-FTB - SCL 2626 CY $ 120.00 $ 315,120.00 $ 130.00 $ 341,380.00 $ 132.00 $ 346,632.00 $ 150.00 $ 393,900.00 C35 Guard Post (Bollard) 2 EA $ 3,300.00 $ 6,600.00 $ 575.00 $ 1,150.00 $ 800.00 $ 1,600.00 $ 700.00 $ 1,400.00 Private Service Joint Utility Trench C36 Install Conduit Pipe 2 In. Diam. - Comcast Private Service 1820 LF $ 18.00 $ 32,760.00 $ 19.00 $ 34,580.00 $ 24.00 $ 43,680.00 $ 2.00 $ 3,640.00 C37 Install Conduit Pipe 2 In. Diam - Century Link Private Service 1750 LF $ 18.00 $ 31,500.00 $ 19.00 $ 33,250.00 $ 24.00 $ 42,000.00 $ 2.00 $ 3,500.00 C38 Conduit Pipe 3 In. Diam - Seattle City Light Private Service 1930 LF $ 21.00 $ 40,530.00 $ 22.00 $ 42,460.00 $ 27.00 $ 52,110.00 $ 2.00 $ 3,860.00 C39 Private Service Address 15857 1 LS $ 6,400.00 $ 6,400.00 $ 6,800.00 $ 6,800.00 $ 7,000.00 $ 7,000.00 $ 6,000.00 $ 6,000.00 C40 Private Service Address 15837 1 LS $ 9,900.00 $ 9,900.00 $ 10,500.00 $ 10,500.00 $ 10,500.00 $ 10,500.00 $ 6,000.00 $ 6,000.00 C41 Private Service Address 15827 1 LS $ 9,850.00 $ 9,850.00 $ 10,500.00 $ 10,500.00 $ 10,400.00 $ 10,400.00 $ 6,000.00 $ 6,000.00 C42 Private Service Address 15819 1 LS $ 9,500.00 $ 9,500.00 $ 10,000.00 $ 10,000.00 $ 10,050.00 $ 10,050.00 $ 6,000.00 $ 6,000.00 C43 Private Service Address 4066 1 LS $ 9,100.00 $ 9,100.00 $ 9,600.00 $ 9,600.00 $ 9,600.00 $ 9,600.00 $ 6,000.00 $ 6,000.00 C44 Private Service Address 15645 1 LS $ 10,000.00 $ 10,000.00 $ 10,700.00 $ 10,700.00 $ 10,650.00 $ 10,650.00 $ 6,000.00 $ 6,000.00 C45 Private Service Address 15625 1 LS $ 7,500.00 $ 7,500.00 $ 7,900.00 $ 7,900.00 $ 7,800.00 $ 7,800.00 $ 6,000.00 $ 6,000.00 C46 Private Service Address 15603 1 LS $ 9,100.00 $ 9,100.00 $ 9,600.00 $ 9,600.00 $ 9,850.00 $ 9,850.00 $ 6,000.00 $ 6,000.00 C47 Private Service Address 15854 1 LS $ 9,300.00 $ 9,300.00 $ 9,900.00 $ 9,900.00 $ 9,850.00 $ 9,850.00 $ 6,000.00 $ 6,000.00 C48 Private Service Address 15838 1 LS $ 11,750.00 $ 11,750.00 $ 12,500.00 $ 12,500.00 $ 12,400.00 $ 12,400.00 $ 6,000.00 $ 6,000.00 City of Tukwila 42nd Ave S - Phase III Bid Tab 4/11/2017 Certified Bid Tab 4O -42nd Avenue S Phase 111 Project Marshbank Construction, Inc JR Hayes Corporation Northwest Cascade Inc. Ceccanti EiltlItem No. Item Descriptio r Quantity Unit ; Unit Prue Total Pri ce Unit Price Total Price Unit Prue Total Prue Unit Price To Price C49 Private Service Address 15826 1 LS $ 9,900.00 $ 9,900.00 $ 10,500.00 $ 10,500.00 $ 10,500.00 $ 10,500.00 $ 6,000.00 $ 6,000.00 C50 Private Service Address 15820 1 LS $ 10,000.00 $ 10,000.00 $ 10,500.00 $ 10,500.00 $ 10,650.00 $ 10,650.00 $ 6,000.00 $ 6,000.00 C51 Private Service Address 15660 1 LS $ 10,300.00 $ 10,300.00 $ 10,900.00 $ 10,900.00 $ 10,875.00 $ 10,875.00 $ 6,000.00 $ 6,000.00 C52 Private Service Address 15654 1 LS $ 10,000.00 $ 10,000.00 $ 10,700.00 $ 10,700.00 $ 10,650.00 $ 10,650.00 $ 6,000.00 $ 6,000.00 C53 Private Service Address 15650 1 LS $ 8,500.00 $ 8,500.00 $ 9,100.00 $ 9,100.00 $ 9,050.00 $ 9,050.00 $ 6,000.00 $ 6,000.00 C54 Private Service Address 15646 1 LS $ 10,300.00 $ 10,300.00 $ 10,900.00 $ 10,900.00 $ 10,850.00 $ 10,850.00 $ 6,000.00 $ 6,000.00 C55 Private Service Address 15642 1 LS $ 8,700.00 $ 8,700.00 $ 9,200.00 $ 9,200.00 $ 9,150.00 $ 9,150.00 $ 6,000.00 $ 6,000.00 C56 Private Service Address 15638 1 LS $ 8,900.00 $ 8,900.00 $ 9,500.00 $ 9,500.00 $ 9,450.00 $ 9,450.00 $ 6,000.00 $ 6,000.00 C57 Private Service Address 15460 1 LS $ 8,700.00 $ 8,700.00 $ 9,200.00 $ 9,200.00 $ 9,200.00 $ 9,200.00 $ 6,000.00 $ 6,000.00 C58 Private Service Address 15458 1 LS $ 12,800.00 $ 12,800.00 $ 13,500.00 $ 13,500.00 $ 14,000.00 $ 14,000.00 $ 6,000.00 $ 6,000.00 C59 Private Service Address 15436 1 LS $ 9,100.00 $ 9,100.00 $ 9,600.00 $ 9,600.00 $ 10,000.00 $ 10,000.00 $ 6,000.00 $ 6,000.00 C60 Property Restoration for Private Services 1 FA $ 65,000.00 $ 65,000.00 $ 65,000.00 $ 65,000.00 $ 65,000.00 $ 65,000.00 $ 65,000.00 $ 65,000.00 Subtotal $ 2,450,990.00 2 $ 2,126,125.80 $ 2,201,704.00 $ 1,786,980.00 Sales Tax 10% $ 245,099.00 2 $ 212,612.58 $ 220,170.40 $ 178,698.00 Subtotal Schedule C $ 2,696,089.00 2 $ 2,338,738.38 $ 2,421,874.40 $ 1,965,678.00 Schedule D -- Valley View Sewer D1 Traffic Control 1 LS $ 6,700.00 $ 6,700.00 $ 5,000.00 $ 5,000.00 $ 4,800.00 $ 4,800.00 $ 2,500.00 $ 2,500.00 D2 Shoring & Trench Safety Systems 433 LF $ 3.00 $ 1,299.00 $ 2.00 $ 866.00 $ 2.00 $ 866.00 $ 1.00 $ 433.00 D3 Temporary Erosion and Sedimentation Control 1 LS $ 12,000.00 $ 12,000.00 $ 20,000.00 $ 20,000.00 $ 2,350.00 $ 2,350.00 $ 500.00 $ 500.00 D4 Dewatering 1 LS $ 52,000.00 $ 52,000.00 $ 1,000.00 $ 1,000.00 $ 1,500.00 $ 1,500.00 $ 500.00 $ 500.00 D5 Potholing 5 EA $ 400.00 $ 2,000.00 $ 1,900.00 $ 9,500.00 $ 460.00 $ 2,300.00 $ 250.00 $ 1,250.00 D6 Landscape and Misc. Restoration 1 LS $ 20,000.00 $ 20,000.00 $ 15,000.00 $ 15,000.00 $ 1,925.00 $ 1,925.00 $ 1,200.00 $ 1,200.00 D7 Gilliam Temporary VVastewater Bypass 1 LS $ 13,000.00 $ 13,000.00 $ 32,000.00 $ 32,000.00 $ 13,450.00 $ 13,450.00 $ 17,600.00 $ 17,600.00 D8 Other Temporary VVastewater Bypasses 1 LS $ 14,000.00 $ 14,000.00 $ 30,000.00 $ 30,000.00 $ 11,600.00 $ 11,600.00 $ 3,500.00 $ 3,500.00 D9 60 -inch Saddle Manhole (E17 -77) 1 LS $ 7,700.00 $ 7,700.00 $ 15,000.00 $ 15,000.00 $ 6,150.00 $ 6,150.00 $ 6,000.00 $ 6,000.00 D10 48 -inch Standard Manhole (F17 -21, F17 -22) 2 EA $ 7,000.00 $ 14,000.00 $ 7,600.00 $ 15,200.00 $ 4,750.00 $ 9,500.00 $ 4,700.00 $ 9,400.00 D11 72 -inch Standard Manhole with Extra Channeling Work (E17 -51) 1 LS $ 9,100.00 $ 9,100.00 $ 12,500.00 $ 12,500.00 $ 9,050.00 $ 9,050.00 $ 9,600.00 $ 9,600.00 D12 72 -inch Standard Manhole (E17 -53) 1 LS $ 21,000.00 $ 21,000.00 $ 26,500.00 $ 26,500.00 $ 22,300.00 $ 22,300.00 $ 20,000.00 $ 20,000.00 D13 60 -inch Shallow Manhole (E17 -76) 1 LS $ 12,000.00 $ 12,000.00 $ 12,700.00 $ 12,700.00 $ 14,150.00 $ 14,150.00 $ 10,000.00 $ 10,000.00 D14 72 -inch Shallow Manhole (E17 -49, E17 -52) 2 EA $ 20,000.00 $ 40,000.00 $ 25,000.00 $ 50,000.00 $ 22,800.00 $ 45,600.00 $ 20,000.00 $ 40,000.00 D15 8 -inch SDR 35 PVC Pipe 172 LF $ 54.00 $ 9,288.00 $ 68.00 $ 11,696.00 $ 69.00 $ 11,868.00 $ 42.00 $ 7,224.00 D16 8 -Inch AVVVVA C900 DR 25 PVC Pipe 45 LF $ 160.00 $ 7,200.00 $ 250.00 $ 11,250.00 $ 161.00 $ 7,245.00 $ 65.00 $ 2,925.00 D17 18 -inch SDR 35 PVC Pipe 32 LF $ 155.00 $ 4,960.00 $ 90.00 $ 2,880.00 $ 167.00 $ 5,344.00 $ 120.00 $ 3,840.00 D18 30 -inch class 52 Ductile Iron Pipe with Ceramic Epoxy Lining 184 LF $ 200.00 $ 36,800.00 $ 250.00 $ 46,000.00 $ 272.00 $ 50,048.00 $ 210.00 $ 38,640.00 D19 Controlled Density Fill Pipe Encasement 110 CY $ 105.00 $ 11,550.00 $ 140.00 $ 15,400.00 $ 167.00 $ 18,370.00 $ 110.00 $ 12,100.00 D20 Crushed Surfacing Top Course Compacted Trench Backfill 1283 LF $ 7.60 $ 9,750.80 $ 6.00 $ 7,698.00 $ 3.00 $ 3,849.00 $ 0.01 $ 12.83 D21 Crushed Surfacing Base Course Compacted Trench Backfill 1283 LF $ 7.60 $ 9,750.80 $ 6.00 $ 7,698.00 $ 3.00 $ 3,849.00 $ 0.01 $ 12.83 D22 Uuuani l_.ieen k_.iossing l_.iusneo aunaung i op �.ouise �.onipaueo i ienc,n Rlir4fill 995 LF $ 8.00 $ 7,960.00 $ 10.00 $ 9,950.00 $ 3.00 $ 2,985.00 $ 0.01 $ 9.95 D23 Foundation Material 356 TON $ 33.00 $ 11,748.00 $ 65.00 $ 23,140.00 $ 42.00 $ 14,952.00 $ 25.00 $ 8,900.00 D24 Gravel Driveway Restoration 1 LS $ 4,000.00 $ 4,000.00 $ 7,000.00 $ 7,000.00 $ 2,400.00 $ 2,400.00 $ 1,500.00 $ 1,500.00 D25 10 -inch HMA Patch with 8 -inch Crushed Rock Base 144 SY $ 75.00 $ 10,800.00 $ 125.00 $ 18,000.00 $ 153.00 $ 22,032.00 $ 100.00 $ 14,400.00 D26 Record Drawings and Post Construction Survey 1 LS $ 2,200.00 $ 2,200.00 $ 2,000.00 $ 2,000.00 $ 4,200.00 $ 4,200.00 $ 1,000.00 $ 1,000.00 $ 350,806.60 $ 407,978.00 $ 292,683.00 $ 213,047.61 Sales Tax 10 %I $ 35,080.66 _ $ 40,797.80 $ 29,268.30 _ $ 21,304.76 City of Tukwila 42nd Ave S - Phase III Bid Tab 4/11/2017 Certified Bid Tab 40 -42nd Avenue S Phase III Project Marshbank Construction, Inc JR Hayes Corporation Northwest Cascade Inc. Ceccanti Eiltl,ltem No. Item Descriptio , Quantity Unit ; Unit Prue Total Prue Unit Price Total Price Unit Prue Total Prue Unit Price To Price Subtotal Schedule D $ 385,887.26 $ 448,775.80 $ 321,951.30 $ 234,352.37 Schedule E -- King County Water District No. 125 El Trench Safety 1 LS $ 300.00 $ 300.00 $ 1,000.00 $ 1,000.00 $ 1,500.00 $ 1,500.00 $ 500.00 $ 500.00 E2 12" Gate Valve and Box 2 EA $ 2,000.00 $ 4,000.00 $ 1,990.00 $ 3,980.00 $ 2,500.00 $ 5,000.00 $ 2,000.00 $ 4,000.00 E3 Remove & Dispose of Ex. 12" D.I. Pipe 185 LF $ 3.65 $ 675.25 $ 82.00 $ 15,170.00 $ 14.00 $ 2,590.00 $ 12.00 $ 2,220.00 E4 Remove & Dispose of Ex. 8" D.I. Pipe 45 LF $ 14.00 $ 630.00 $ 19.00 $ 855.00 $ 28.00 $ 1,260.00 $ 12.00 $ 540.00 E5 12" CL 52 D.I. Pipe & Fittings 200 LF $ 105.00 $ 21,000.00 $ 115.00 $ 23,000.00 $ 80.00 $ 16,000.00 $ 140.00 $ 28,000.00 E6 8" CL 52 D.I., Restrained Joint Pipe & Fittings 40 LF $ 205.00 $ 8,200.00 $ 100.00 $ 4,000.00 $ 142.00 $ 5,680.00 $ 130.00 $ 5,200.00 E7 Connect to Ex. Water Main 4 EA $ 2,300.00 $ 9,200.00 $ 3,000.00 $ 12,000.00 $ 3,350.00 $ 13,400.00 $ 500.00 $ 2,000.00 E8 Remove and Abandon Ex. SPU Meter Vault 1 LS $ 1,200.00 $ 1,200.00 $ 1,000.00 $ 1,000.00 $ 7,200.00 $ 7,200.00 $ 1,800.00 $ 1,800.00 E9 Construct New SPU Meter Vault 1 LS $ 20,000.00 $ 20,000.00 $ 44,000.00 $ 44,000.00 $ 21,250.00 $ 21,250.00 $ 27,000.00 $ 27,000.00 El0 Remove and Salvage Existing Fire Hydrant 5 EA $ 1,100.00 $ 5,500.00 $ 1,560.00 $ 7,800.00 $ 425.00 $ 2,125.00 $ 400.00 $ 2,000.00 Ell Extend /Relocate Ex. Fire Hydrant Assy. 1 EA $ 1,500.00 $ 1,500.00 $ 5,000.00 $ 5,000.00 $ 1,950.00 $ 1,950.00 $ 1,000.00 $ 1,000.00 E12 Install New Fire Hydrant Assy. 7 EA $ 6,300.00 $ 44,100.00 $ 8,000.00 $ 56,000.00 $ 6,350.00 $ 44,450.00 $ 4,800.00 $ 33,600.00 E13 Replace 1" Long Side Water Service 1 EA $ 4,000.00 $ 4,000.00 $ 2,000.00 $ 2,000.00 $ 3,000.00 $ 3,000.00 $ 1,250.00 $ 1,250.00 E14 Replace 1" Short Side Water Service 3 EA $ 1,200.00 $ 3,600.00 $ 4,000.00 $ 12,000.00 $ 1,775.00 $ 5,325.00 $ 850.00 $ 2,550.00 E15 Replace 1 1/2" Short Side Water Service 4 EA $ 1,800.00 $ 7,200.00 $ 2,500.00 $ 10,000.00 $ 2,200.00 $ 8,800.00 $ 1,100.00 $ 4,400.00 E16 Adjust Valve box to Grade 12 EA $ 350.00 $ 4,200.00 $ 500.00 $ 6,000.00 $ 420.00 $ 5,040.00 $ 250.00 $ 3,000.00 E17 Plug & Block Ex. Main 2 EA $ 1,000.00 $ 2,000.00 $ 3,900.00 $ 7,800.00 $ 675.00 $ 1,350.00 $ 300.00 $ 600.00 E18 CSTC 225 TN $ 41.00 $ 9,225.00 $ 20.00 $ 4,500.00 $ 35.00 $ 7,875.00 $ 24.00 $ 5,400.00 $ 146,530.25 $ 216,105.00 $ 153,795.00 $ 125,060.00 Sales Tax 10% $ 14,653.03 $ 21,610.50 $ 15,379.50 $ 12,506.00 Subtotal Schedule E $ 161,183.28 $ 237,715.50 $ 169,174.50 $ 137,566.00 TOTAL CONSTRUCTION BID $7,264,501.29 2 $7,712,965.28 $7,275,162.704 $7,008,511.37 a City of Tukwila 42nd Ave S - Phase III Bid Tab 4/11/2017