Date: March 2, 2017
Time: 6:30 PM
Location: Council Chambers
Present: Chair, Miguel Maestas; Vice Chair, Nhan Nguyen; Commissi
Hansen, Louise Strander, Dennis Martinez and Brooke Alforc
Staff: Minnie Dhaliwal, Planning Supervisor; Lindsay Brown, Assill
Bivens, Planning Commission Secretary
Commissioner Mann, the 2016 Planning Commission Chair passed on the dl
Commissioner Maestas, for 2017. Commissioner Nguyen will take over the rc
Chair Maestas called the public hearing to order.
Miscellaneous Agenda Item:
Mia Navarro, Community Engagement Manger,
information on her roles with the City: She will be
with liaisons that provide ethnic groups in the com
from the groups back to the City; she is a liaison b
working on in this role, is developing a.) ob share r
click, fix application that allows residents to report
example the Public Safety Plan event being held c
Commission a flyer. In addition, she is helping wit
also provided some information on her backgroun
Mann, Mike
and Wynetta
s of Chairman to
of the 2017 Vice - Chair.
itroduced herself to the Commission, and provided
nanaging the community connectors contract, a program
aunty with information from the City and bring information
Veen the City and the School District, one program she is
[ernship program; The Tukwila works program, this is a see,
)roblems in the community; Outreach for City events, for
March 18, 2017, for which Ms. Navarro provided the
communications work in general for the City. Ms. Navarro
prior to her employment with the City.
Commissioner Mann commented she and Ms. Navarro worked together with the TIBAC group, and that Ms.
Navarro is a welcome access to the City.
Adoption Commissioner Alford made a motion to adopt the October 27, 2016 minutes.
of minutes: Commissioner Strander seconded the motion. Five were in favor. Commissioner Mann
made the original motion to adopt the October 27, 2016 minutes but was not present at the
meeting and had to abstain her motion. Commissioner Maestas abstained from approval the
minutes due to his absence at the October 27, 2017 meeting.
Commissioner Mann made a motion to adopt the November 10, 2016 minutes.
Commissioner Strander made a motion to seconded the motion. All were in favor.
Chair Maestas swore in those wishing to provide testimony and opened the public hearing.
CASE NUMBER: L16 -0064
APPLICANT: Matt Laase, Jackson/Main Architecture
REQUEST: Design Review approval for development of a 14,395 ft' addition to the existing
49,511 ft' office building located at 5200 Southcenter Blvd. Project includes
1
Page 2
Public Hearing Minutes
March 2, 2017
demolishment of the structure at 5290 Southcenter Blvd.
LOCATION: 5200 and 5290 Southcenter Blvd, APN's 11572000013 and 11572000021
Minnie Dhaliwal, Planning Supervisor, Department of Community Development, introduced Lindsay Brown
the new Assistant Planner who worked on the Board of Review project being reviewed.
Lindsay Brown, Assistant Planner, Department of Community Development, gave the presentation for staff.
She asked each of the Commissioners the appearance of fairness questions. There were no disclosures and no
objections to the Commissioners hearing the case.
Staff provided, background information; site context; unique characteristics of the Property; administrative
approvals, and design review criteria on the proposed project. Following are some key points pertaining to the
project:
- It is a Type 4 project because the cost of approval exceeds 25%
and the building is larger than 10,000 square feet.
- There will be one vehicular ingress and two vehicular egresses.
- The proposal will increase the building size by 29 %.
- There were two administrative approvals, in February — 'Parkin
required number of parking spaces from 113 to 107 spaces; and
the buffer around the daylighted section of Gilliam Creek from
permission to re- landscape the buffer area with native plants. Th
mitigation monitoring plan program. It also includes approval to
the edge of the buffer.
- The perimeter is a Type 1 landscaping
- Landscaping in the bufferstream was ,I
Staff also went over design
Staff recommended
1. To update the l
candles in all nE
Matthew Laase, Jackson Main
design intent of the project was
consideration with the design o
Gilliam Creek; Creating a gardi
connecting a modern building t
criteria
of the building,
lecial permission to reduce the
�cnsitive areas permission to reduce
feet to 40 feet, it also granted
administratively
condition:
will mandate a 5 -year
setback of the building from
surface parking lot areas to ensure a lighting level of at least one foot-
,hitecturc, for the applicant, gave the presentation. Mr. Lasse said the
_end in with the environment. The following issues were taken into
proposed project: The location is an entrance into Tukwila; Respect of the
-a; orientation of the building; security, visibility, and the challenge of
a building built in the early 1980s.
Amber Mikluscak, Senior Landscape Architect, for the applicant, noted that the environment of the project is
complex. Following are some of the goals for landscaping, expanded space; modernizing the landscaping to
bring it up to the current code standards with a cohesive look that meets the current code requirements; a
healthy restored buffer; Reducing the buffer to 40 feet will improve water quality in Gilliam Creek expansion;
creating an amenity for the staff and restoring the area with native plantings. Ms. Mikluscak said they will
submit annual reports to the City to make sure that the restoration area is meeting its mitigation thresholds. She
also said, an ecological assessment was completed.
There was no public testimony.
Staff and the applicant responded to questions from the Commission.
2
Page 3
Public Hearing Minutes
March 2, 2017
Commissioner Nguyen expressed concern regarding impact to the traffic at 52' Ave Street during
construction. The applicant and Commissioner Mann responded to his concerns.
Commissioner Maestas asked staff to comment on a public comment letter received from Karen Walter
pertaining to the sensitive area buffer reduction request.
The public hearing was closed.
Motion:
Commissioner Mann moved to approve Case Number L16 -0064, Design
conclusions contained in the staff report, including the one condition recomr
Hansen seconded the motion. All were in favor.
Director's Report:
- Staff thanked the Commissioners who participated in th
Workshop.
- The next scheduled meeting, in April, will be the first T
transportation building on their bus parking lot, on East
- In June, the Foster High School expansion and the Bird
will come to Planning Commission for review.
- The Tree Code update will also come to Planning Corm
Adj ours
Submitt
on the findings and
Commissioner
Boulevard
hool District Project for a small
Way.
year.
Conditional Use Permit