Loading...
HomeMy WebLinkAbout2017-05-02 - Application - 42nd Avenue South Special PermissionPROJECT INFORMATION The City of Tukwila has filed an application for special permission to perform work in sensitive areas are part of the 42 Avenue S. reconstruction project. The planned street improvements will modify the existing watercourse, Gilliam Creek, and its buffer and remove significant trees within the sensitive areas adjacent to the street. Street improvement includes sidewalks, street illumination, undergrounding overhead utility lines, storm drainage facilities and culvert replacement containing Gilliam Creek. The existing culvert is a non -fish passable, 92400t long, 3 -foot diameter concrete pipe & will be replaced with a 146 -foot long, 16-foot wide by 8 -foot, corrugated metal fish passable culvert. Projects applied for include: Special Permission L16-ooss Other known required permits include: Environmental Review (SEPA) E14 -001o; WA State Hydraulics permit, Army Corps Nationwide Permit Studies Submitted with the Application: Wetland and Stream Assessment, prepared by Jeffery S. Jones, May 7, 2013, Reasonable Use Exception Buffer Mitigation Planting Plan, revised April 24, 2014. An environmental checklist has been submitted with the studies identified above. FILES AVAILABLE FOR PUBLIC REVIEW The applications are available for review at the City of Tukwila, Department of Community Development (DCD), located at 6300 Southcenter Blvd #soo. M -F 8:3o a.m. — 5 p.m. OPPORTUNITY FOR PUBLIC COMMENT Your written comments on the project are requested. They must be delivered to DCD at the address above or postmarked no later than 5:oo P.M., May 2, 2017. APPEALS You may request a copy of any decision and your appeal rights by calling DCD at (2o6) 431-3670. For further information on this proposal, contact Moira Bradshaw at (2o6) 431-3651, moira.bradshaw@tukwilawa.gov or visit our offices at 6300 Southcenter Boulevard, Suite #soo, Monday through Friday, 8:3o a.m. to 5:00 p.m. Application Filed: March 3, 2oz6 Notice of Completeness Issued: April 5, 2017 Notice of Application Issued: April 1.9, 2017