Loading...
HomeMy WebLinkAboutTIC 2017-05-23 Item 2C - Agreement - 42nd Avenue South Phase III (Southcenter Boulevard to South 160th Street) with King County Water District #125City of Tukwila Allan Ekberg, Mayor INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Committee FROM: Bob Giberson, Public Works Director - f BY: Cyndy Knighton, Senior Program Manager CC: Mayor Ekberg DATE: May 19, 2017 SUBJECT: 42nd Avenue S Phase III (Southcenter Blvd to S 160th St) Project No. 99410303 Interlocal Agreement with King County Water District #125 ISSUE Approve an Interlocal Agreement (ILA) with King County Water District #125 (KCWD #125) for reimbursement of costs for sewer relocation work to be constructed by Active Construction, Inc. for the 42nd Avenue S Phase III project. BACKGROUND In February 2012, CH2M Hill began design work on a project that combined the 42nd Ave S Phase III (Southcenter Blvd to S 160th St) roadway improvements and the Gilliam Creek culvert replacement project. The project included significant coordination with outside utility providers. KCWD #125 has designed water main relocations to accommodate the City's project and the project was bid with a separate schedule for the KCWD #125 work. ANALYSIS The 42nd Avenue S project has been awarded to Active Construction, Inc. and bid schedule E includes all the work designed by KCWD #125 for the required water main relocation. The attached ILA provides the necessary mechanism for Tukwila to complete the construction of the KCWD #125 work and get reimbursed for the costs. The ILA includes reimbursement to Tukwila for the actual construction work as well as a percentage of the construction cost (8 %) to offset construction management (CM) costs. The typical 8 -10% of CM costs is not used because Tukwila is not responsible for inspection of the water installation as KCWD #125 is providing staffing for inspections. FINANCIAL IMPACT Ultimately there is no financial impact to Tukwila for the ILA. The contractor will be paid using Tukwila funds, but the water main relocation costs are fully reimbursed to the City. Actual costs, once known, are what will be charged to KCWD #125 and not the estimated costs included in the agreement language. The anticipated maximum reimbursement to Tukwila is $289,841.33, which includes a 20% contingency. There are provisions for more should it become necessary, although KCWD #125 approval would be required. RECOMMENDATION Council is being asked to approve the Interlocal Agreement with King County Water District #125 for the 42nd Ave S Phase III Project and consider this item on the Consent Agenda at the June 5, 2017 Regular Meeting. Attachment: Interlocal Agreement between City of Tukwila and King County Water District #125 w:fpw eng\projects�a- rw & rs projects \42nd ave s phase iii (99410303 94 -rs03) \construction\ #.200 - correspondence \005 - utility & interlocal coordination \info memo - ila with kcwd sm.docx 25 INTERLOCAL AGREEMENT BETWEEN KING COUNTY WATER DISTRICT NO. 125 AND THE CITY OF TUKWILA REGARDING UTILITY RELOCATION THIS INTERLOCAL AGREEMENT ( "Agreement ") is made and entered into by and between King County Water District No. 125, a Washington municipal corporation ( "District "), and the City of Tukwila, a Washington municipal corporation ( "City "), (individually a "Party" and collectively the "Parties "). WHEREAS, the Tukwila City Council has authorized the 42nd Avenue South Phase III (Project No. 99410303) improvement/transportation project in an area with mixed zoning, both high and low density residential; and WHEREAS, the City intends to construct storm drainage improvements within the right of way of 42nd Avenue South as part of the Project; and WHEREAS, Tukwila has determined that its street improvement project is a public project and will necessitate the relocation and new construction of District utility infrastructure located within the boundaries of the project; and WHEREAS, the District has a water main and appurtenances located within the right of way of 42nd Avenue South that conflict with the planned alignment of the City project; and WHEREAS, the City requires that the District relocate existing utilities at District cost when planned City roadway infrastructure conflicts with District infrastructure; and WHEREAS, it is mutually beneficial to both Parties to have the utility relocation and project construction take place concurrently utilizing one contractor to reduce overall costs and traffic related impacts; and WHEREAS, the Parties desire to have the City serve as the lead agency for the project to provide final design, advertisement, award, construction, inspection, and contract administration for the project. NOW THEREFORE, in consideration of the terms and conditions contained herein, the Parties agree as follows: AUTHORITY This Agreement is entered into pursuant to Chapter 39.34 RCW, the Interlocal Cooperation Act. PURPOSE The Parties agree to engage in a joint project that will construct street, utility and culvert improvements along 42nd Avenue South as described generally in the plan set titled, "40th -42nd Avenue South — Phase III, Project No. 99410303 and 99341208, dated March 17, 2017" which are hereby incorporated herein by this reference and made part hereof ( "Project "). W: \PW Eng \PROJECTSW- RW & RS Projects \42nd Ave S Phase III (99410303 94 -RS03) \Design \90% \COT - KCWD #125 - Interlocal Agreement 42nd Ave S Final.docx -1- 26 DISTRICT RESPONSIBILITIES 3.1 The District shall provide the City engineered drawings, specifications, and any applicable construction standards for all work required by the District as described on Exhibit A attached hereto and made a part hereof ( "District Work "). The drawings shall show in detail the location, quantity, and size of each required component. 3.2 The District shall coordinate with the City and its consultants on the preparation of the plans and specifications and review the portion of the Project's final drawings and specifications for the District Work and shall provide the City written notice of approval and acceptance of the plans and specifications associated with the District Work. 3.3 The District shall participate in the bid process as follows: a. Accept or reject bids on bid items associated with the District Work. The District Work shall be included as a separate bid schedule in the Project contract. b. Within ten (10) days of receiving the Project bid tabulation from the City, the District shall notify the City in writing that the District either agrees to proceed with the District Work, or the District chooses to complete its work on its own as part of a separate project. If the District determines to complete the District Work on its own as a separate project, the District shall require its contractor to coordinate the District Work within the Project area with the City's contractor and with any contractors from other utilities and to not unreasonably interfere with or delay the City's contractor. 3.4 The District shall provide payment to the City to reimburse the City for its costs of constructing the District Work pursuant to Section 5 of this Agreement. 3.5 The District shall provide the inspection services needed for overseeing the proper installation of the District Work. The District's inspector will coordinate with the City's inspector and the City inspector will give all direction to the Contractor. 3.6 The District will notify its customers of the Project, perform any water system shut downs necessary for the District work, and notify its customers of any scheduled water service interruptions related to the Project. 3.7 The District shall pay any valid claims made by the Contractor relating to the District Work that are valid and proximately caused by the District, provided, the District at its sole expense shall have the right to defend any claims made by the Contractor relating to the District Work. Any such claims must comply with the definition and procedure regarding claims in the Project contract and must be verifiable or substantiated claims. 3.8 The District shall pay any additional expenses incurred in performing the District Work due to any over - excavation required or any other unforeseen conditions related to the District Work which reasonably require additional work and W: \PW Eng \PROJECTS\A- RW & RS Projects \42nd Ave S Phase III (99410303 94 -RS03) \Design \90% \COT - KCWD #125 - Interlocal Agreement 42nd Ave S Final.docx -2- 27 expense, including any additional trench width or depth attributable to errors in the District's design. Any changes to the District Work perceived as necessary by the Contractor and any required change orders must be approved in writing by the District in advance of such changes. 3.9 The District shall maintain continued coordination with the City regarding the performance of the District Work. This coordination shall include but not be limited to the following: a. The District will attend the Project pre- construction meeting. b. The City will provide the District a copy of the Contractor's proposed work schedule showing date, location, and extent of work to be performed. This schedule will be subject to change at any time. c. The District will attend weekly construction meetings that involve the District Work. 4. CITY RESPONSIBILITIES 4.1 The City shall be the lead agency for the Project with regard to design, construction, SEPA review, permitting, inspection, contract administration, funding and all other matters pertinent to accomplishment of the Project. 4.2 With the assistance of CH2M, the City shall prepare, advertise, and award the contract bid documents, which shall contain five bidding schedules, three for the City improvements, one for Valley View Sewer District sewer line relocation, and one for the District Work. The basis for Project award will be the total lowest responsible bid for the sum of all five bid schedules. Prior to advertisement, the City shall obtain the District's review and approval of the bid documents. The bid documents, and the advertisement of them, shall comply with City's bid statutes, ordinances and resolutions. 4.3 The City shall be responsible for providing all traffic control associated with the construction of the Project. 4.4 The City shall require the Contractor to install and perform the District Work in accordance with the Project's final plans, and the District's standards, specifications, and inspector's written direction. 4.5 The City will provide written notification to the District at least five (5) days prior to beginning construction of the District Work to allow for District scheduling of the on -site inspector. 4.6 The City will schedule and attend weekly construction meetings with the City's Contractor, District, and other franchise utilities involved in the Project. 4.7 The City shall require the Contractor constructing the Project to have the District, its elected and appointed officers, agents and employees (collectively, the "District" for the purposes of this provision) named as an insured on all policies of W: \PW Eng \PROJECTSVA- RW & RS Projects \42nd Ave S Phase III (99410303 94- RS03) \Design\90% \COT - KCWD #125 - InterlocaI Agreement 42nd Ave S Final.docx -3- 28 insurance to be maintained by the Contractor under the terms of the Project contract, including the Contractor's Commercial General Liability Insurance, Commercial Automobile Insurance, and Umbrella coverage. The District shall be responsible to pay any additional cost incurred by the Contractor to name the District as an additional insured. If the District is included as an additional insured on such insurance, the Contractor shall provide the City with endorsement(s) to such insurance necessary to confirm the District is an additional insured on such policies /coverage. The City shall provide the District with copies of such endorsement(s) upon receipt of same by the City. The City shall also require the contractor building the Project to indemnify, defend, and save harmless the District and its elected and appointed officers, agents, or employees from any claim, damage, action, liability of proceeding brought or filed against the District or its officers, agents or employees alleging damage or injury arising out of the contractor's participation in the Project. The Contractor shall also be required to waive the Contractor's immunity under Washington's Industrial Insurance Act, RCW Title 51, as to the District solely for the purposes of the indemnification. 5. COMPENSATION 5.1 The estimated cost for the District work related to this Agreement, as described on Exhibit B is $223,643, including tax. Based on the estimated cost, the District shall pay the City $17,891.44 for construction administration costs plus actual contractor costs including tax for completed work, and /or services rendered under this Agreement according to the rate and method set forth on Exhibit B attached hereto and incorporated herein by this reference. The total amount to be paid by the District to the City, including the construction administration costs referenced above, shall not exceed $289,841.33 unless approved in writing by the District. The actual costs are subject to change based upon final bid review, award of all relevant Project work, and change orders. 5.2 The City shall invoice the District following completion of the Project work and acceptance by the District of the District Work. Payments are due within thirty (30) days of the District's receipt of an invoice from the City, except for any disputed amounts. 5.3 Payment as provided in this section shall be full compensation for work performed, services rendered, and for all materials, supplies, equipment and incidentals necessary to complete the work. 6. INDEMNIFICATION Each of the Parties shall defend, indemnify and hold the other Party, their officers, officials, employees and agents harmless from any and all costs, claims, judgment, and /or awards of damages, arising out of; or in any way resulting from that other Party's negligent acts or omissions in performing under this Agreement. No Party will be required to defend, indemnify or hold the other Party harmless if the claim, suit or action for injuries, death or damages is caused by the sole negligence of that Party. Where such claims, suits or actions result from the concurrent negligence of the Parties, the W: \PW Eng \PROJECTS\A- RW & RS Projects \42nd Ave S Phase III (99410303 94 -RS03) \Design \90 % \COT - KCWD #125 - Interlocal Agreement 42nd Ave S Final.docx -4- 29 indemnity provisions provided herein shall be valid and enforceable only to the extent of each party's own negligence. Each Party agrees that its obligations under this subparagraph include, but are not limited to, any claim, demand, and /or cause of action brought by, or on behalf of, any of its employees or agents. For this reason, each of the Parties, by mutual negotiation, hereby waives, with respect to the other Party only, any immunity that would otherwise be available against such claims under the Industrial Insurance provisions of Title 51 RCW. Further, the District shall defend, indemnify and hold the City, its officers, officials, employees and agents harmless from any and all claims brought by the Contractor relating to the District Work, including but not limited to project delay claims, subject to the provisions of Section 3 herein. 7. AUDITS AND INSPECTIONS The records and documents with respect to all matters covered by this Agreement shall be subject to inspection, review or audit by the City or the District at the requesting Party's sole expense during the term of this Agreement and three (3) years after expiration or termination. Such records shall be made available for inspection during regular business hours within a reasonable time of the request. 8. JOINT BOARD /SEPARATE LEGAL ENTITY It is not intended that a separate legal entity be established to conduct this cooperative undertaking. The City shall act as administrator of this Agreement. 9. FINANCE AND BUDGET No special budget or funds are anticipated, nor shall any be created. The Parties are each responsible for their own finances in connection with this Agreement, and nothing in this Agreement shall be deemed or construed otherwise. 10. PROPERTY ACQUISITION HOLDING AND DISPOSAL Following final payment by the District and final acceptance of the Project by the City, the water system improvements as depicted on Exhibit A shall become the property of the District. Upon final acceptance of the Project, the City shall transfer and assign any rights it may have under the Project contract relating to the District work to the District, including any warranty and maintenance obligations by the Contractor relating to the District work. The District's acceptance of the District work shall not constitute acceptance of any unauthorized or defective work or materials, nor a waiver of any manufacturer's, supplier's or contractor's warranties. The City shall also provide redline drawings of the District work to the District upon completion of the Project work, such redline drawings to be prepared at the District's expense. The District shall retain any rights, claims or demands the District may have against the Contractor relating to the District work under applicable statutes of limitation as a third party beneficiary under the City's contract with the Contractor. W: \PW Eng \PROJECTS\A- RW & RS Projects \42nd Ave S Phase III (99410303 94 -RS03) \Design \90% \COT - KCWD #125 - Interlocal Agreement 42nd Ave S Final.docx -5- M 11. DURATION: TERMINATION This Agreement shall be effective immediately after execution by both Parties, and shall remain in full force and effect until final acceptance of the Project and resolution of all issues relating to the Project. 12. APPLICABLE LAW; VENUE; ATTORNEYS FEES This Agreement shall be subject to, and the Parties shall at all times comply with, all applicable federal, state and local laws, regulations, and rules, including the provisions of the City of Tukwila Municipal Code and ordinances of the City of Tukwila. In the event any suit, arbitration, or other proceeding is instituted to enforce any term of this Agreement, the Parties specifically understand and agree that venue shall be properly laid in King County, Washington. The prevailing party in any such action shall be entitled to its attorney's fees and costs of suit. Venue for any action arising from or related to this Agreement shall be exclusively in King County Superior Court. 13. SEVERABILITY AND SURVIVAL If any term, condition or provision of this Agreement is declared void or unenforceable or limited in its application or effect, such event shall not affect any other provisions hereof and all other provisions shall remain fully enforceable. The provisions of this Agreement, which by their sense and context are reasonably intended to survive the completion, expiration or cancellation of this Agreement, shall survive termination of this Agreement. 14. ENTIRE AGREEMENT; MODIFICATION This Agreement, together with attachments or addenda, represents the entire and integrated Agreement between the City and District and supersedes all prior negotiations, representations, or agreements written or oral. No amendment or modification of this Agreement shall be of any force or effect unless it is in writing and signed by the Parties. 15. NOTICES Notices to the City of Tukwila shall be sent to the following address: Cyndy Knighton City of Tukwila 6300 Southcenter Boulevard Tukwila, WA 98188 (206) 431 -2450 (Phone) cyndy.knighton @tukwilawa.gov W: \PW Eng \PROJECTS\A- RW & RS Projects \42nd Ave S Phase III (99410303 94 -RS03) \Design \90% \COT - KCWD #125 - Interlocal Agreement 42nd Ave S Final.docx -6- 31 Notices to the District shall be sent to the following address: Shane Young King County Water District No. 125 3460 S. 148th St #110 Tukwila, WA 98168 (206) 242 -9547 (phone) shaneyoung @waterdistrict125.com IN WITNESS WHEREOF, the Parties have executed this Agreement on the date last written below. KING COUNTY WATER DISTRICT NO. 125 By: Print Name, Title: DATE Approved as to Form: District Attorney DATE CITY OF TUKWILA By: Allan Ekberg, Mayor DATE Approved as to Form: City Attorney DATE Attest /Authenticated City Clerk, Christy O'Flaherty DATE VVAPW Eng \PROJECTS\A- RW & RS Projects \42nd Ave S Phase III (99410303 94 -RS03) \Design \90% \COT - KCWD #125 - Interlocal Agreement 42nd Ave S Final.docx -7- 32 Exhibit A ARV 13710 "6 • _5 TP 5. 11010 3 140th ST 142nd ST 42nd 3T 21,0' ST 4 +2nd 71. 1111h -501 - 46TH AVE s SHEET W9 (SET 2) 0 1461 1. 14111h ?r 171.11 ST 1481(1 3T 11 ;111 50 1811,. .7T__ - -_s _`148th ST 71 00. 1 -40th 5T'. 150th 5T. Id ST - S. I52nd PT. 5 15410 ST 1 PROJECT LOCATION 4- Issue PT SR 405 HI ST h ST T 10011, 05 . ZONE 2 SOURCE SEATTLE WATER HGL = 15341 ZONE 2 SOURCE SEATTLE WATER HGL = 12 525 GRAPHIC SCALE 500 0 250 500 1000 MI MI MI ( IN FEET 1 Inch = 500feet KING COUNTY WATER DISTRICT NO. 125 42ND AVE PHASE 111 PROJECT SCHEDULE E BOARD OF COMMISSIONERS: RENEA BLANCHETTE, COMMISSIONER JERRY THORNTON, COMMISSIONER JOHN THOMPSON, COMMISSIONER SHANE YOUNG, GENERAL MANAGER INDEX SHEET NO SHEET TITLE WD 125 WATER IMPROVEMENTS COVER SHEET WATER PLAN WATER PLAN WATER PLAN SPU METER SITE PLAN SPU METER DETAIL 7 NOTES & DETAILS DESIGNED DH DRAWN MM CHECKED DH SYM REVISION DATE BY APP'D 11255 Kirkland Way, Suite 300 / / /�/ //•►�' �\ Kirkland, WA 98033 ACE p. 425.827.2014 If 425.827.5043 `\�Civ31 Structural 1 Planning 'Survey An Engineering Services Company paceengrS.com King County Water District No. 125 DATE FEBRUARY 2017 SCALE AS NOTED 42ND AVE PHASE 111 COVER SHEET JOB NUMBER 13073.00 DWG NAME: P13073_CVR SHEET 1 OF 7 Page 1 of 8 Exhibit A STA 50 +57, 19.0'± LT. NEW SPU / WD 125 WATER VAULT. SEE SHEET 5. STA 52 +66.7, 26.5' LT. RELOCATE EXIST. FIRE HYDRANT ASSEMBLY 00 51 +00 EX. 12" DI W 42ND AVE S 52 +00 53 +00 SEE DETAIL SHEET 5 DETENTION VAULT 10 FT DEEP I r MIN 3 FT CLEARANCE / FROM WATER. 57 +01.1, 24.9' LT. 1 — FIRE HYDRANT ASSEMBLY, PER DISTRICT SIDS. 1 — 12"X6" TAPPING TEE 1 — 6" GATE VALVE, FLxRJ 1 — THRUST BLOCK MATCHLINE SEE ABOVE RIGHT STA 58 +84.0, 26.5° LT. 1 — FIRE HYDRANT ASSEMBLY, PER DISTRICT SIDS. 1 — 12 "X6' TAPPING TEE 1 — 6" GATE VALVE, FLxRJ 1 — THRUST BLOCK 54 +00 55 +00 EXIST. WATER SERVICE TO REMAIN. REPLACE 11¢" SERVICE. EXIST. WATER SERVICE TO REMAIN. REPLACE 1" SERVICE. GRAPHIC SCALE 20 0 10 20 40 M NI EN IIIII ( IN FEET ) 1 Inc❑ + 20 feet REPLACE 11¢" SERVICE. REMOVE AND SALVAGE EXISTING HYDRANT. 56 +00 57+00 REMOVE AND SALVAGE EXISTING HYDRANT. 42ND AVE S 58 +00 59 +00 60 +00 61 +00 MATCHLINE SEE SHEET 3 EXIST. WATER SERVICES TO REMAIN. EXIST. WATER SERVICE TO REMAIN. STA 60 +71.6, 33.7' LT. 1 — FIRE HYDRANT ASSEMBLY, PER DISTRICT STDS. 1 — 12 "X6" TAPPING TEE 1 — 6" GATE VALVE, FLxRJ 1 — THRUST BLOCK 2/23/17 DESIGNED DH DRAWN MM CHECKED DH SYM REVISION DATE BY APP'0 PACE An Engineering Services Company 11255 Kirkland Way, Suite 300 Kirkland, WA 98033 p. 425.827.2014 i f. 425.827.5043 Civil } Structural i Planning i Survey paceengrs.com King County Water District No. 125 DATE FEBRUARY 2017 SCALE 1 " =20' 42ND AVE PHASE 111 WATER PLAN JOB NUMBER 13073.00 DWG NAME: P13073_WA SHEET 2 OF 7 Page 2 of 8 Exhibit A MATCHLINE SEE SHEET 2 REPLACE 2 -1h" SVCS UG REMOVE AND SALVAGE — EXISTING HYDRANT. REPLACE 1" SVC STA 63 +40.3, 23.5' LT. 1 — FIRE HYDRANT ASSEMBLY, PER DISTRICT STDS. 1 — 12 "X6" TAPPING TEE 1 — 6" GATE VALVE, FLxRJ 1 — THRUST BLOCK lr-r 7, STA 65 +55.9, 25.0' LT. 1 — FIRE HYDRANT ASSEMBLY, PER DISTRICT STDS. 1 — 12 "X6" TAPPING TEE 1 — 6" GATE VALVE, FLxRJ 1 — THRUST BLOCK 62.00 63 +00 64400 65.00 66 +00 42ND AVE -.S ;. 6 EXIST. WATER SERVICE TO REMAIN, GRAPHIC SCALE 20 0 10 20 40 NM MI IN IN IM ( IN FEET ) 1 inch = 20 feet REPLACE 1" SVC EXIST. WATER SERVICE TO REMAIN. DESIGNED DRAWN CHECKED DH MM DH SYM REVISION DATE BY APP'D PACE An Engineenng Services Company 11255 Kirkland Way, Suite 300 Kirkland, WA 98033 p. 425.827.2014 1f 425.827.5043 Civil !Structural 1 Planning 1 Survey paceengrs.com King County Water District No. 125 DATE FEBRUARY 2017 SCALE 1" = 20' 42ND AVE PHASE 111 WATER PLAN JOB NUMBER 13073.00 DWG NAME: P13O73_WA SHEET 3 OF 7 Page 3 of 8 STA 67 +07.4, 24.0' LT. 1 - FIRE HYDRANT ASSEMBLY, PER DISTRICTS SIDS. 1 - 12 "86" TAPPING TEE 1 - 6" GATE VALVE, FLxMJ 1 - THRUST BLOCK REPLACE 1" SVC 68 +00 GRAPHIC SCALE 20 0 10 20 40 ( IN FEET 1 inch = 20 feet REMOVE AND SALVAGE EXISTING HYDRANT. STA 68 +74.1, 13.9' LT. 1 - 12" GATE VALVE, FLxRJ 1 - 12" 45' BEND, FLxRJ Exhibit A REMOVE AND SALVAGE EXISTING HYDRANT. STA 1 - 70 +29.0, 22.5' LT. FIRE HYDRANT ASSEMBLY, PER DISTRICT'S SIDS. 12 "X6" TEE, FL 12" GATE VALVE, FLxMJ 6" GATE VALVE, FLxMJ 12" ADAPTER, FLxMJ THRUST BLOCK 69 +00 149±LF 12" D.I. 70 +00 STA 68 +80.0, 8.0' LT. 1 - 45' BEND, RJ PROPOSED CULVERT TEMPORARY PLUG & BLOCK FOR CULVERT INSTALLATION. REMOVE AND REPLACE 12" D.I. AS NECESSARY FOR CULVERT INSTALLATION. 3011 C 71 +00 42ND AVE S 72 +00 M STA 70 +55.3, 13.3' LT. 1 - 12" 45' BEND, RJ STA 7D +50.0, 8.0' LT. 1 - 12" 45' BEND, RJ 73 +00 DESIGNED DH DRAWN MM CHECKED DH SYM REVISION DATE BY APP'D An Engineering Services Company 11255 Kirkland Way, Suite 300 Kirkland, WA 98033 p. 425.827.20141(. 425.827.5043 Civil 1 Structural 'Planning 1 Survey paceengrs.com Page of King County Water District No. 125 DATE FEBRUARY 2017 SCALE AS NOTED 42ND AVE PHASE 111 WATER PLAN JOB NUMBER 13073.00 DWG NAME: P13073_WA SHEET 4 OF 7 Exhibit A 1 v) 50 +00 POTHOLE TO VERIFY DEPTH. 1 -6" 90' BEND, MJxFL 1 -8 "x6" REDUCER, FLxFL 1 -8" GATE VALVE, FLxRJ 1— THRUST BLOCK REMOVE EXISTING METER AND VAULT. INSTALL 8" VERT. BENDS, RJ, AS NEEDED TO ACHIEVE GRADE AND LEVEL PIPE THROUGH VAULT. REMOVE /ABANDON EXIST. WATER AS NECESSARY. INSTALL 3 -8" 45' VERT. BENDS, RJ, AS NECESSARY FOR GRADE. PROPOSED RETAINING WALL 1- 12 " -90' BEND, RJ 1- THRUST BLOCK 30±LF 8" DI, RJ IC 3Ir3 1[3 8±LF 12" DI, RJ TEMPORARY PLUG AND BLOCK. PRESSURE TEST TO INCLUDE 90' BEND. MAKE FINAL CONNEC).QN TO 12" D.I.—WITH 12- SPOOL —_... AND RJ COUPLING AFTER TEST' TEMP. PLUG AND BLOCK. PRESSURE TEST TO INCLUDE 90' BEND. PROVIDE 6" SPOOL & MJ COUPLING. SHORE AND LEAVE OPEN FOR FINAL CONNECTION BY SPU. 2 -8" 45' BENDS, RJxRJ 2— THRUST BLOCKS 0 0 4" D.I. DRAIN TO CB. IE 407.5 0 1 -12" RJ SLEEVE NEW SPU METER VAULT. SEE SHEET 6. PLACE VAULT SO BACK OF HATCH IS 1 FOOT FROM BACK OF SIDEWALK. 6" SPU SUPPLY MAIN TO KCWD #125 42ND AVE S CLOSE VALVE IN EXIST. VAULT FOR DURATION OF METER INSTALLATION WORK. 51 +00 NOTES FOR SPU SUPPLY MAIN: 1. PROTECT MAIN FROM CONTAMINATION AND FROM DEBRIS WHILE PIPE IS EMPTY. 2. MAIN TO BE EMPTY 14 DAYS MAX. 3. THERE MAY BE SOME LEAKAGE PAST VALVE IN EXIST. VAULT OFF OF 60" MAIN. 4. SPU TO PROVIDE 6" METER, CONTRACTOR TO INSTALL. TAKE PRECAUTIONS TO AVOID DAMAGE TO METER. 5. COORDINATE METER ACQUISITION AND FINAL CONNECTION WITH ROGER COX OF SPU, 206- 399 -2496. PROPOSED RETAINING WALL 5 GRAPHIC SCALE 0 2.5 5 OMEN I• DESIGNED DH DRAWN MM CHECKED DH SYM REVISION DATE BY APP,D i PACE An Engineering Services Company 11255 Kirkland Way, Suite 300 Kirkland, WA 98033 p. 425.827.2014 7.425.827.5043 Civil I Structural Planning I Survey paceengrs.com King County Water District No. 125 DATE FEBRUARY 2017 SCALE AS NOTED 42ND AVE PHASE III SPU METER SITE PLAN JOB NUMBER 13073.00 DWG NAME: P13073_WA SHEET 5 OF 7 Page 5 of 8 Exhibit A NOTES: 1. CONSTRUCT VAULT WITH 18" SQUARE KNOCKOUTS, LOCATED WHERE SHOWN. 2. APPLY7 TRENTON WAX TAPE #1 OR TWO COATS OF MASTIC PAINT TO SHACKLE ROD ENDS, BOLTS, NUTS, WASHERS, AND OTHER BARE METAL. 3. PLACE CONCRETE BLOCKS AND SHIMS TO SUPPORT BOTH BENDS. 4. INTENTIONALLY LEFT BLANK. 5. TAP AIR VENT CORP ON TOP OF PIPE AND A FLUSHING CORP ON BOTTOM OF PIPE, JUST UPSTREAM OF BYPASS GATE VALVE. - 11040 006 -060. 7. MAINTAIN 24" VERTICAL CLEARANCE BETWEEN VAULT LI AND TT M II RIZ NTAL X 24" VERTICAL CLEAR ARCA CTWCCN ACK F CURD AND C RR SI N PR TCCTI N N TES: IS CATH ICALLY SERVICE PPOTECTEB. PR- TCCTCDLSUPPLY MAIN, TI IC Jl V PIPING SHALL BE PROVIDED WITH A MATCHING C ATING SYSTEM AN THE JOINTS SHALL DC D NDCD AND C RR 0I 0 PR TCCTI N MEASURES SHALL CONFORM TO THE RELATED CORROSION PROTECTION STANDARD PLANS. TIIC MATERIALS LIST AD VE }�OAWG 409.5 (TYP) (TYP) (TYP) (TYP) 4 D.I. TO CB IE 407.5 — DOUBLE DOOR HATCH NOTE 5 1 L- i ■I VAULT & HATCH 6" ') CONC. BLOCKS & SHIMS ARE NOT SHOWN SLOPE TO MATCH EX. GRADE (SLOPE SHALL BE FIELD DETERMINED) 412.8± 412.2± NOTE 1 NOTE 11— 11�r 41..1 ■ 0e< 3' 6" X 4' -0" OPENING IN TOP CONC. COVER SLAB OUTLINE NOTE 3 5' 6" CONC. BLOCKS & SHIMS ARE NOT SHOWN PLAN SLAB & HATCH 12 "x6" RED. RJxFL TOP OF WALK 414± I c °a I I I I I I I r ° < FREESTANDING ALUMINUM LADDER'' WI H LADDER -UP ACCESSORY ATTACHED TO THE SIDE OF HATCH AND FLOOR. HA H 000NT 3' -6" 0 408.0 1 0 Ir 00 00000 0® (TYP) (TYP) (TYP) (TYP) (TYP) (TYP) 4" D.I. DRAIN ELEVATION f1' -4" 51-2' 2' -10" Ammo GROUT TO DRAIN 0 - 0" • e I • TEMPORARY DISINFECTION ASSEMBLY 6" PEA GRAVEL 6" DOMESTIC SERVICE MATERIAL LIST ITEM QTY UNIT SIZE STOCK NUMBER DESCRIPTION XY TAPPING TC G) 1 1 CA 0 X G" Cf SLEEVE (N NOT USED TAPING VALVE, TAP FLC X MJ 2 1 CA C" 01 531 C CATC (NOT USED 3 4+ EA 6" 814 - 102 -061 WEDGE RESTRAINER GLAND (MEGALUG FOLLOWER) 4 3 EA 10LB PAIL #1408 450- 145 -050 JET PLUG COMPOUND 5 A.N. 6" 826- 005 -061 DUCTILE IRON PIPE, MJ, CL 53, CEM. LINED 6 9 SF 2" THICK 825- 125 -020 ETHAFOAM MATERIAL 7 1 EA 6" 820- 116 -060 HUB & FLANGE, MJ X FLG 8 2 EA 6" X 6" X 4" 836 - 255 -060 TEE, DI, 6" MJ X 6" FLG X 4" FLG 9 2 EA 6" 840 -504 -060 RW GATE VALVE, CL 125 FLG X CL 125 FLG 10 1 EA 4" 809 - 069 -040 BEND, 90 °, DI, CL 125 FLG X MJ 12 12A CA CA G" 070 0 1 0 METR 0 Of CCTRUIvl 44 G" C" x15" SPOOL WITH TEST f RT 0 R SPECTRUM 440 C" 2 EA 6" 879 002 -060 6" SENSUS ACCUMAG METER W/ ENCODED OUTPUT FOR AMR 12A EA 6 "x20" 811- 005 -060 SPOOL WITH TEST PORT FOR ENDURO 2000 13 2 EA 3/4" X 3/4" 840- 357 -007 CORP STOP, AWWA COMP 16 2 SACK 60 LBS 210 - 300 -015 PREMIX CONCRETE 17 A.N. EA 2" X 4" X 8" 210- 200 -001 BRICK OR CONC. RISER 18 1 CA #2 22 ST VALVE X LI NOT USED 10 1 CA #2 022 1 STD VALVE D X T f NOT USED 20 1 CA #2 022 1 1 STD VALVE D X 0 TT M NOT USED 21 1 EA ST 825 11 0 CTIIAF AM RING NOT USED 22 1 EA 4' -4" X 8' -4" INSIDE 210 - 410 -484 CONCRETE VAULT 4484 W/ SHORT MIDDLE SECTION AND NO -SLIP COATING ON HATCH 23 A.N. EA 4 "X8 "X16" 210- 100 -002 CONCRETE BLOCK 24 4 EA 1/4" X 12" X 12" 827- 100 -120 STEEL PLATE 4 EA 3/4" X 1 - 1/4" X 6" 400 -540 -122 STEEL WEDGE 4 EA 5 "X1 "x1/2" 400-540-125 STEEL RAISING WEDGE 26 1 EA 6" X 2" 813 -527 -110 REDUCING FLANGE, DI, CL 125 FLG X FIPT 27 1 EA 2" 810- 269 -200 90° STREET ELBOW, CALV 28 1 EA 2" 828- 500 -020 PIPE PLUG, MIPT, GALV STL, SQUARE HEAD 29 1 EA 6" -840- 270 -060 WAFER CHK VALVE 30 1 EA 4" 840 -504 -040 RW GATE VALVE, CL 125 FLG X CL 125 MJ 31 A.N. 4" 826- 005 -041 DUCTILE IRON PIPE, MJ, CL 53 CEM. LINED 32 2 EA 4" 814- 102 -041 WEDGE RESTRAINER GLAND ( MEGALUG FOLLOWER) 7 EA 6" X 11" 813- 099 -015 6" RUBBER GASKET (RED) 56 EA 3/4" 420- 410 -020 HEX NUT 16 EA 3/4" X 3" 420- 215 -228 HEX BOLT 24 EA 3/4 "X3 -1/2" 420- 215 -232 BOLT 8 EA 3/4 "87" 420- 235 -061 STUD BOLT 33 1 EA 2" 840- 050 -020 BALL VALVE, BRASS 1/4 TURN EA 2" 824- 120 -001 CLOSED NIPPLE IPT, BRASS 1 EA 2" 828- 150 -020 BRASS PLUG IPT 1 EA 4" 809- 049 -040 4" BEND, 90° DI, CL 125, FLGxFLG "X9" 3 CA 4 013 00 S 1" RU DER CASKET (RED) NOT USED 96" 24 CA x374" 42 210 102 0 LT NOT USED 24 CA V 42 41 1C I ICX NUT NOT USED NOT USED 512 1 3 2 2" MIPT X CTS RASS C tvlf RC00I 0 FITTING 35 1 CA NOT USED 012 1 2 2 2" CPT X CTS DRASS C Mf GCSSI N FITTING 36 10 LF 826- 003 -020 2" CALV. PIPE, HI PT 37 1 EA 813- 050 -060 INSULATION FLANGE KIT A.N. = AS NEEDED GRAPHIC SCALE 0 0,5 1 2 ( IN FEET ) 1 inch = 1 feet DESIGNED DRAWN CHECKED DH MM DH SYM REVISION DATE BY APP'D An Engineenng Services Company 11255 Kirkland Way, Suite 300 Kirkland, WA 98033 p. 425.827.20141f. 425.827.5043 Civil 1 Structural 1 Planning 1Survey paceengrs.com King County Water District No. 125 DATE FEBRUARY 2017 SCALE AS NOTED 42ND AVE PHASE III SPU METER DETAIL JOB NUMBER 13073.00 DWG NAME:P13073_DET SHEET OF 7 Page 6 of 8 Exhibit A Page 7 of 8 R/W R/W / \ 1',1 CITY STANDHFDPER i GUARD POST T't1 i1/� 4' -0" MIN. OF LEVEL HYDRANT RADIUS GROUND FlRE ANGLE METER STOP COPPER FLARE NUT x METER SWIVEL NUT MUELLER H -14255 (COMPRESSION FITTING ALLOWED) MASTER RADIO READ METER (CUBIC FEET) TO BE SUPPLIED BY DISTRICT HOPE METER BOX W/ D.I. READER ANGLE DUAL CHECK VALVE LID. USE SOLID LID N TRAFFIC AREAS. MIDSTATES PLASTICS W/ METER SWIVEL NUTxF.I.P. (MUELLER H -14244 MOUSE HOLES, 12" DEEP MODEL BCE 1324 -12XL D.I, LID W/ READER m 5" STORK' FIRE HYDRANT TO BE PAINTED WITH TWO GOATS OF FARN£ST PAINT, CASE YELLOW, M% -]672. HYDRANTS ARE TO EQUAL MkH 929. OR MUELLER A -423. III HYDRANTS SHALL CONFORM To A.wW A. SPECIFICATIONS c 502 -54; SHALL BE COMPRESSION TYPE ANO SHALL HAVE A TWO PIECE BREAKING FLANGE WITH BOILING DRY THIMBLE AT THE GROUND LINE OR STEM; SHALL HAVE A SELF - OILING DRY BONNET WITH FACTORY FILLED RESERVOIR 1O ,t ^ �� n V ' ANGLE METER STOP F.I.P. x METER FLANGE MASTER RADIO READ MUELLER H -16286 METER (CUBIC FEET) TO BE SUPPLIED BY DISTRICT HOPE METER USE W/ D.I. READER LID. USE SOLID LID ANGLE DUAL CHECK IN TRAFFIC AREAS MIDSTATES VALVE METER PLASTICS (CARSON) WITH IFLANGExF.I.P. MOUSEH 0-12 12' DEEP MODEL MUELLER H -14244 BEF READER 6 1730 D.I. LID W/ READER BC1730R m� FINISH GRADE el al ��\� L . L • 4' MIN. DIII • 18" 2' MIN I I 6" MA %.�- HOLDING APPROXIMATELY 8 OUNCES OF OIL. OIL RESERVOIR SHALL BE So DESIGNED AS TO GIVE A COMPLETE WBRICASHA OF STEMS EACH 11ME THE HYDRANT IS OPERATED. THE UPPER STEM SHALL HAVE A BRASS SLEEVE. SIDEWALK PER TUKWILA /SEATAL/ KING COUNTY STANDARDS CURB k GUTTER FINISHED PAVEMENT. 6 \ \ - /' 11 yU II 1 �� O ,=.' n ' VALVE MARKER POST LJ MODEL BC 1324RL FINISH GRADE PROVIDE THRUST BLOCK �{I- -- tIh �!' ry _ _ COMPRESSION CONNECTION, MUELLER 110 x M.I.P. H -15428 90' ELBOW ry x E.I.P. DOUBLE STAINLESS , ___ SEE VALVE BO% DETAIL 6" RESILIENT WEDGE GATE VALVE CAST IRON w o U ,.I" It-'- • o EI OVATION PLAN SHALL BE CONCRETE (MIN. SHALL BE ]FEET CENTER OF INC HYDRANT NOT BE IN DIRECT LINE PORTS. POSTS FEET LONG; 3_3 1/2 FEET PAINTED FINISH SAME AS FOR HYDRANTS. POST EOGTITE OR APPROVED AS SPECIFIED FOR HYDRANTCONNECTION PAINT DISTANCE FROM THE VALVE THE VALVE N THE POST WITH BLACK USING 2" HIGH NUMERALS. Do■-; ..If' 42 IP SAND TII IF.I.P. SAND CUT f 4 MIN. "1 _ - 3 PRIVATE "K" SERVICE PIPE _ STEEL STRAP SADDLE. * SMITH GLAIR OR ROMAC / ���� �� L PRIVATE • 4.* COPPER TUBING SERVICE PIPE COMPRESSION CONNECTION, DUCTILE IRON MUELLER 110 x M.I.P. H -15428 WATERMAIN CLASS 52 90' BRASS ELBOW CORP. STOP F.I.P. x F.I.P. TAPER BY M.I.P. MUELLER H -9969 CLOSE NIPPLE, OR FORD EQUAL BRASS \ M'. 3' k Mox. 50' CEMENT LINEOJ FL -MJ X MJ % GL. 1 ' �-MECHANICAL JOINT �, 30' MAX. TYPE /� ?�� COPPER TUBING v DUCTILE IRON WATERMAIN CLASS 52 CORP. STOP CC BY FLARE OR COMPRESSION, MUELLER "CC" H- 15000. DIRECT TAP TO NEW OR EXISTING MAIN. MAY USE DOUBLE STRAP SADDLE W/ CC THREAD. IN II MAIN 'III it NOTES, GUARD POST e" DIA.). POSTS I� FROM THE l 1/2 YD. PEA GRAVEL OR 2 -3/4' ! ") ASPHA T COATED WASHED ROCK (3/B" TO 3 STEEL SH CKLE 1 CONC. BLOCKING RODS. SEE BLOCKING DIM. 1'X1' %3" DETAIL / fi' DIA. DUCTILE UNDISTURBED UNDISTURBED IRON PIPE SOIL SOIL FLANGE JOINT PROVIDE SHACKLE RODS OR MEGALUCS NOTES: PER LOCAL JURISDICTION A. HYDRANTS SHALL BE EQUIPPED WITH TWO 2 1/2' N S.T. HOSE PORTS AND ONE 5" STORTZ PUMPER DISCHARGE PORT, ANO SHALL HAVE A 1 1/a" PENTAGON OPEN -LIFT OPERATING NUT. HYDRANTS SHALL HAVE A 6" M J. BOTTOM AND 5 1/4" MAIN VALVE OPENING, AND SHALL HAVE 18" ABOVE GRADE LEVEL TO THE CENTER OF THE PUMPER DISCHARGE PORT. B. WHERE NO CURB k GUTTER IS INSTALLED, FIRE HYDRANT SHALL BE LOCATED (IN RELATION TO STREET CENTER LINE) CLOSE TO PROPERTY LINE. C. HYDRANT INSTALLATIONS TO BE PER THIS STANDARD PLAN AND REQUIREMENTS OF WKWHA MUNICIPAL CODE 14.24 ANO Cltt ORDINANCE OR CITY OF SEATAL REQUIREMENTS. 6 AND SHALL WITH ANY DISCHARGE SHALL BE 6 SHALL BE BURIED. / / SHALL BE THE VALVE MARKET EQUAL. PAINT GUARD POST. MARKER TO all / / ENAMEL PAINT. / / FILL ONLY IIFT�EXISTING MAIN IS D.I. OTHERWISE USE SADDLE W/ CC THREAD STD. DETAIL No. 1 STD. DETAILL No. 2 • 41/4" NST CITIES OF SEATAL AND TUKMILA R." SST KING COUNTY STD. DETAIL No. 3 HYDRANT IN CUT/FILL AREA STD. DETAILL No. 4 4l--'7�11.C/� sere ul Cont 3/4' 8 1' DOMESTIC SERVICE DETAIL o 4�M King County Water District No. 125 T i-1--'-- v"e Consulting 1 -1/2' 8 2' DOMESTIC SERVICE DETAIL o d gl Kin g County Water Dist No. 125 Ete.ee..g °° Consulta, FIRE HYDRANT ASSEMBLY DETAIL d 4n VALVE MARKER / GUARD POSTS a 0B °1O1 OAIE BEi03X00 ePAN1 VS es oeNi 0,3 /09 V ME � pg..,,, o1s„ °PRaLEO ` 0"" 0sXO3Xw BS � oNA 01W °PRBWB Kin g Count y a07 0 X03/ O DEP. a .x Pa oa «iRO wsRc, ,P.RDED Kin g County Water District t No. 125 PLOT SCALE -\CADXcILSXwaIS Xw\ RR 0 „E ,PPnO <0 NTS ...,13,0,3 4.0. AVE PHASE III _OP °LOTS LX c ,BX,I,,sXWONXVS:DN OrtPPRD Water District No. 125 .ne co....... cO :La PLO, s4 OMEN E X Cxosce �Ls\0Sr.IC,s\.5\SWOT RN TTROLED B BLIND A A FLANGE �II�II ',In �I'.,II B NOTES: NEW SECTIONS OF WATER MAIN THAT SEPARATED FROM THE EXISTING SYSTEM. SAMPLING HAS BEEN COMPLETED, THE THE CHLORINE CONCENTRATION N USED NON- POTABLE. AN APPROVED BACKFLOW PREVENTION THE NEW WATER MAIN DURING DISINFECTION PIPING MUST BE REMOVED DURING HYDROSTATIC AFTER SATISFACTORY BACTERIOLOGICAL OF CONNECTING PIPE MUST BE INSTALLED INTERIORS OF ALL PIPE AND FITTINGS AVAILABLE CHLORINE SOLUTION. APPROVED PREVENTION 8255, 2" OR - 1 _ 111• •i �ry�l.ti1t HYDRANT METER. RENT FROM DISTRICT ARE INSTALLED WHEN EXPANDING A DISTRIBUTION UNTIL SATISFACTORY FLUSHING, DISINFECTION NEW WATER MAIN ROSE CONMIM FOR DISINFECTION PROCEDURES (MINIMUM ASSEMBLY MUST BE USED ON THE SUPPLYING AND FLUSHING. THE BACKFLOW PRESSURE TESTING OF THE SAMPLE RESULTS ARE OBTAINED FROM BETWEEN IT AND THE EXISTING SYSTEM. USED TO MAKE THE CONNECTION MUST B ASSEMBLY, FEBCO MODEL APPROVED EQUAL NEW i'�1 (14G. NYORANi O f ell HYDRANT iIZ O Ili SYSTEM MUST BE AND BACTERIOLOGICAL CONTAMINATED. IN ADDITION, 25 mg /I) MAKES WATER WATER LINE WHEN FILLING PREVENTION ASSEMBLY AND SUPPLY NEW WATER MAIN. THE NEW WATER MAIN, SECTIONS BEFORE INSTALLATION, THE BE SWABBED OR SPRAYED WITH A 15 FLUSHING / DISCHARGE ALTERNATIVES \ VALVE BOX TO BE OLYMPIC FOUNDRY OR EQUAL EARS TO BE ALIGNED WITH PIPE LINE 3'x3'x2" ASPHALT PAD DIA. MIN. METAL STOCK SCREW. MEASUREMENT. EXTENSION • �I'�,I� VERTICAL BLOCKING OR 11 v: - 221' - 30' BENDS GALVANIZED(OR ASPHALT COATED STEEL), THREADED ROOS AND PIPE CLAMPS BLIND P0S 18" 2" SQUARE OPERATING NUT I FLANGE A II CAPPED CROSS 90' BEND TEE W/ PLUG TEE W/0 PLUG THRUST BLOCK -TABLE Min. Bearing Area Against Undisturbed Soil BLIND FLANGE OR SMALLER PIPE SIZE (Inches) v. B. (degrees) Cu. FT. A (feet) D (iacnes) L (feel) SEE DETAIL ./ 4 6 e 10_12 t5 16 -20 225 30 111 221/4 30 K 221/4 J1D1 22'A 30 111 221 30 11N 301 I1 V. 221 30 iB 1l 11 25 41 16 70 33 88 132 70 184 275 91 330 0 320 BO 2.2 26 2.2 2.9 3.5 2.5 3.6 3.2 45 5.1 1 5.7 6.5 45 6.9 5.0 6.B 7.9 4: n Y, k TA 1N 1. TA 1>t 1>f lit 2.0 2.0 2.0 00 3.0 3.0 4.0 34.0, 45 3.5 4.5 55 1/3 TOTAL LENGTH Pipe Size A (It T) BC ((t 2) (fly DE (Its (ft� 1 SIZE PIPE G G 4" 6' 10" 12" HP i6" 18" 20" 24" 30" 3 11 16 22 29 436 5 64 101 10 14 19 25 31 39 56 87 1 1 I 2 2 3 1 5 2 1 1 -I,1 CAP B =� ; 'MIS , _ 4" MIN. OVERLAP i 1 4 1 {4' 1 1 THICKNESS C T 1 NI 1" SOLID p % // VB / L UNDISTURBED EARTH ON EXISTING ■,■ WATER MAIN jl� jljlj NOTES: I 1. BEARING AREA OF CONCRETE THRUST -BLEAK BASED ilup �I,•I� ON 200 P51 PRESSURE AND SAFE SOIL BEARING LOAD 1 . 1 / OF A MINIMUM PER SQUARE FOOT. ! 2 AREA MUST BE A PRESSURES AND SOIL CONDITIONS. 3. CONCRETE POUNDS OJU5100 FOR OTHER PIPE SIZES. % CRETE BLOCKING SHALL BE CAST IN PLACE AND 45' BEND 22 1/2' BEND OF I/4 SOU ARE FOOT BEARING AGAINST THE FITTING. 4. BLOCK SHALL BEAR AGAINST FITTINGS ONLY AND SHALL BE CLEAR OF JOINTS TO PERMIT TAKING UP TE OR DISMANTLING OF JOINT. 5. CONTRACTOR SHALL INSTALL BLOCKING ADEQUATE TO CONINUOD FULL TEST PRESSURE IO WELL AS TO ERN ALL CONTINUOUSLY V4THSTAND S OPERATION PRESSURE UNDER ALL CONDITIONS OF sERNCE. fi. THRUST BLOCK IS CONSIOEREO TO ACT AS A SPREAD S�I,,, FOOLING; THEREFORE HEIGHT OF BLOCK MUST BE EQUAL '.r TO OR LESS THAN 1/2 THE DEP. FROM THE GROUND SURFACE TO THE BLOCK'S BASE. 11 1/4' BEND 7. THE QUANTITY OF CONCRETE DEPENDS UPON THE DISTANCE BETWEEN THE PIPE AND THE UNDISTURBED SOIL. 8. PROVDE RESTRAINED JOINT BENDS AND PIPE IN LIEU OF BLOCKS IF THERE ARE SPACE CONFLICTS OR VERTICAL BLOCKING FOR 45' BENDS L A O NEW HYDRANT MAY BE bI�I� 2" PHAVE i 4 6 B 12 16 20 24 45 30 23 123 232 478 560 820 3.1 50 fi.t 7.8 8.2 9.4 Y, iN 1V 1% 2.o 2.5 4.0 4.5 • .1� TEMPORARY TEST BLOCKING I 2h" LENGTH TEMPORARY AS - WSE DISCHARGE SUPPLY HOSE USED IN 41 ll FOR FLUSHING / IF TEE IS 10' OF 1HE END OF PIPE II I I , �..-- 3/8" SET PLUG �_, 2 1/4" SQUARE INSIDE 1/8" MIN. THICKNESS VALVE OPERATING NUT EX. X MAIN III Illl _ I 1� _ or i I�III III A OCR (CAL 1,0%1T G FOR 11 V:, 2214' NOTE: 30', 45', BENDS CONCRETE BLOCKING BA5E0 ON 200 PSI PRESSURE AND 2500 PSI CONCRETE, ANO 2000 PSF MIN SOIL BEARING CAPACITY •90' VERTICAL BENDS NOT ALLOWED ON PIPE LARGER THAN 8 INCHES DIA. _ _J 10' MA % NEW WATER MAIN HYDRANT TEE TEMPORARY CAP NOTES: 1. EXTENSIONS ARE REQUIRED WHEN THE VALVE NUT IS MORE THAN 5 FEET BELOW FINISHED GRADE. 2, ONLY ONE EXTENSION, MINIMUM OF 3 FEET LONG, TO BE USED PER VALVE. }, MAXIMUM DISTANCE BETWEEN OPERATING NUT OF EXTENSION AND FINISH GRADE TO BE 2 FEET, 4. ALL EXTENSIONS ARE TO BE MADE OF STEEL AND PAINTED WITH TWO COATS OF METAL PAINT, 5 31/43'x2" ASPHALT PAD REQUIRED IF VALVE BOX IS SET IN UNPAVED SURFACE. ryp, OR PLUG TEMPORARY TEST BLOCKING BEARING AREA HAS BEEN DISTURBED. STD, DETAIL No. 5 STD. DETAIL No. 6 STD. DETAIL No, 7 STD. DETAIL No. 8 $13 WASyT n qe Li A1Is ��ISr � C � S'ONAL �yG 2/23/17 HORIZONTAL THRUST BLOCKING DETAIL 8 TABLE o ^ Ana �� • VERTICAL THRUST BLOCKING DETAIL 8 TABLE o Ru>S�P King County Water District No. 125 �' ^�E WATER MAIN FILLING DETAIL e, 4:I wag King County Water District No. 125 _ -. ee C i a VALVE EXTENSION DETAIL o 4r.1 NAT King County Water District No. 125 1Re0.ae PLOT 041E 0Ei03X0E OP .WN DESIGN aECNED PO Pa BS.,xos °swot APPROVED King County Pw, oATE BEiD3A00 OR,vm ces.N+ o1EaED H,4 Pr4 Po «iRDS Dsm OT .PPROwEO Lg Ho, 0,1E DRWWH OEM N 5050550 Wx, Pa BEHALDS DSm CI- P.PPOvE0 °L, DATE o DA OP DES. CM D es Dax /ROS R5R0.wPROWo co :into. PLOTS SCALE me 4 RENCAONOETAILSNO10TRIRTSS ..D0xs05E00T5 O,rz APPW04ED Water District No. 125 PS...Rss ea ewuoe PLOT NTS nN Ao 00000CST.ILnDIS1R,e,sswrzso 000so o „E A °PROWSO Planning e0 ..Rig 00iO3XOE NTS nm NLL NC0NOET AIL,PS11«S,SNW01z0N51EODn o „E ,PPRONn PLOT Nis n wE LsC,O\OLIAI 50s,Nlc,sswl0ssslsrole -REV DATE APPROVED DESIGNED DH 11255 Kirkland Way, Suite 300 PACE � Kirkland, WA 98033 �� p. 425.827.2014IL425.827.5043 Civil I Structural I Planning I Survey An Engineering Services Company paceengrs.com 9�tri King County ,�r• Water District : No. 125 DATE FEBRUARY 2017 42ND AVE PHASE 111 NOTES & DETAILS JOB NUMBER 13073.00 DRAWN MM DWG NAME: P13073_DET SCALE AS NOTED SHEET 7 OF 7 CHECKED DH SYM REVISION DATE BY APP'D Page 7 of 8 Exhibit A KING COUNTY WATER DISTRICT NO. 125 42ND AVENUE SOUTH, PHASE III WATER MAIN RELOCATION BID SCHEDULE E CONSTRUCTION COST ESTIMATE 9- Feb -17 ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL AMOUNT E1 Trench Safety 1 LS $1,500 $1,500 E2 12" Gate Valve and Box 2 EA $4,000 $8,000 E3 Remove & Dispose of Existing 12" DI Pipe 175 LF $15 $2,625 E4 Remove & Dispose of Existing 8" DI Pipe 45 LF $12 $540 E5 12" DI Pipe and Fittings 185 LF $100 $18,500 E6 8" DI Pipe and Fittings 40 LF $100 $4,000 E7 Connect to Existing Water Main 4 EA $3,500 $14,000 E8 Remove /Abandon Existing SPU Meter Vault 1 EA $5,000 $5,000 E9 Construct New SPU Meter Vault 1 EA $80,000 $80,000 E10 Remove and Salvage Existing Fire Hydrant 5 EA $750 $3,750 E11 Extend /Relocate Existing Fire Hydrant 1 EA $2,000 $2,000 E12 Install New Fire Hydrant 7 EA $5,500 $38,500 E13 Replace 1" Short Side Water Service 3 EA $1,200 $3,600 E14 Replace 1" Long Side Water Service 1 EA $1,500 $1,500 E15 Replace 1 -1/2" Short Side Water Service 4 EA $2,500 $10,000 E16 Adjust Valve Box to Grade 12 1 EA 1 $3001 $3,600 E17 Plug & Block Existing Main 2 EA $750 $1,500 E18 Crushed Surfacing Top Course 225 TN 25 $5,625 Construction Subtotal $204,240 Washington State Sales Tax - 10% $20,424 Project Total $224,664 Page 8 of 8 40 EXHIBIT B 40th -42nd Avenue South — Phase III, Project No. 99410303 and 99341208 March 17, 2017 Revision Construction Management Fees for King County Water District 125 Water Construction (Bid Schedule E) Construction management costs assignable to King County Water District 125 (District) are calculated as 8% of the construction cost (with sales tax) to construct Bid Schedule E. Water District 125 will provide a full -time inspector during underground water construction. The District will require the assistance of the City for the following construction management activities: 1. Scheduling and management of the preconstruction conference. 2. Handling and forwarding of submittals and shop- drawings pertaining to Bid Schedule E work to the District and returning District - reviewed submittals to the Contractor. Handling and forwarding of Requests for Information (RFI) from the Contractor concerning Schedule E work to the District and returning District responses to the Contractor. 3. Primary responsibility for processing pay requests. The District will verify the Bid Schedule E quantities requested for payment by the Contractor and will relay this information to the City. 4. Notification and inclusion of District staff in construction progress meetings pertaining to Bid Schedule E work. 5. Processing of change orders completed by the District and the Contractor. The District will prepare documentation supporting District - related change orders and will negotiate change order compensation with the Contractor. 6. Collection and transmittal of record drawing information gathered by the Contractor to the District. 41