HomeMy WebLinkAboutTIC 2017-05-23 Item 2E - Resolution - 2018-2023 Transportation Improvement ProgramCity of Tukwila
Allan Ekberg, Mayor
INFORMATIONAL MEMORANDUM
TO: Transportation and Infrastructure Committ e
FROM: Bob Giberson, Public Works Director 17 N
BY: Cyndy Knighton, Senior Program Manager
CC: Mayor Ekberg
DATE: May 19, 2017
SUBJECT: Resolution for Six -Year Transportation Improvement Program (2018 -2023)
ISSUE
Approve a Resolution adopting the annual update of the Six -Year Transportation Improvement
Program for 2018 -2023.
BACKGROUND
The Transportation Improvement Program (TIP) is updated annually as required by the Revised Code
of Washington (RCW). The TIP is adopted by resolution after a public hearing at the local agency level
and incorporated into regional and state TIPs. The TIP is primarily a financial planning document for
projects competing for grants. Any project submitted for federal grant funding must be included in the
local, regional and state adopted TIPs. The TIP is a rolling plan showing various funding sources:
grants, developer and local funds. Projects "roll" as funds or stages occur (design report, final design
and construction).
Tukwila's TIP and Capital Improvement Program (CIP) list many of the same transportation - related
projects. The TIP generally lists only those transportation - related projects planned within the next six
years that are deemed regionally significant or that have grant funding awarded or expected. The TIP
is required to be adopted by June 30 on an annual basis.
ANALYSIS
The attached spreadsheet is the "Draft" 2018 - 2023 TIP and was created by modifying the 2017 -
2022 TIP to add or remove projects and adjust project costs. No prioritization was assigned and the
list of projects is presented in alphabetical order. Prioritization of projects is reflected in the 2017 CIP.
One new project was added and five projects were deleted as they will have been completed by 2018
or have been moved beyond the six -year window of the TIP.
Added: S 140th St Intersection Improvements
Deleted: Andover Park East/Industry Dr. Intersection; S 133rd St/SR599 Intersection; Walk & Roll
Program; Boeing Access Road Bridge Rehabilitation; TUC — Pedestrian /Bicycle Bridge
FINANCIAL IMPACT
None.
RECOMMENDATION
Council is being asked to approve the Resolution for the 2018 -2023 Six -Year Transportation
Improvement Program and consider this item at the June 12, 2017 Committee of the Whole with a
Public Hearing and subsequent June 19, 2017 Regular Meeting.
Attachments: Draft Resolution
Draft 2018 -2023 TIP Summary
2018 — 2023 "Draft" Transportation Improvement Program
Current Adopted 2017 — 2022 TIP
\ \pwstore \pw common$ \pw eng \projects \a - rw & rs projects \tip \info memo tip 2018.docx 55
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR
TRANSPORTATION IMPROVEMENT PROGRAM (2018-
2023), AND DIRECTING THE SAME TO BE FILED WITH
THE STATE SECRETARY OF TRANSPORTATION AND
THE TRANSPORTATION IMPROVEMENT BOARD.
WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26, the
City Council of the City of Tukwila has previously adopted a Transportation Improvement
Program and thereafter periodically modified said Transportation Improvement Program
by resolution; and
WHEREAS, the City Council has reviewed the work accomplished under said
program, determined current and future City street and arterial needs and, based upon
these findings, has prepared a Six -Year Transportation Improvement Program for the
ensuing six calendar years (2018- 2023); and
WHEREAS, on June 12, 2017, a public hearing was held regarding the City's Six -
Year Transportation Improvement Program;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. Program Adopted. A Six -Year Transportation Improvement Program
for the calendar years 2018 to 2023, attached hereto as Exhibit A, is hereby adopted.
Section 2. Filing of Program. The City Clerk is hereby authorized and directed to
file a copy of this resolution, together with the exhibit attached hereto, with the Secretary
of Transportation and the Transportation Improvement Board of the State of
Washington
WAWord ProcessinglResolutions\TIP 2018 -2023 5 -17 -17
CK:bjs Page 1 of 2
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at
a Regular Meeting thereof this day of 12017.
ATTEST /AUTHENTICATED:
Christy O'Flaherty, MMC, City Clerk
APPROVED AS TO FORM BY:
Rachel B. Turpin, City Attorney
Dennis Robertson, Council President
Filed with the City Clerk:_
Passed by the City Council:
Resolution Number:
Exhibit A: City of Tukwila Six -Year Transportation Improvement Program for 2018 to 2023
W: \Word Processing \Resolutions \TIP 2018 -2023 5 -17 -17
CK:bjs
Page 2 of 2
57
E2
<D
-C3
<0
L.L-
-i
CV
C14
4=
C:,
7:3
co
Z7M
<D CS
Qa
O
N
C.03
OD
L Li
C14
N
co
C)
co
c"
Lr . >
C14
ILC.>
C141
CL
<D
<D
's
N
cu
n
ILL-
<1>
S2
E2
<D
-C3
<0
L.L-
-i
CV
C14
4=
C:,
7:3
co
Z7M
<D CS
Qa
O
N
!��? <231 –11
r- C114 r--L
OD
C14
N
C141
co
Lr . >
C14
ILC.>
C141
CL
<D
's
N
cu
n
<1>
S2
L3 <D 7:3
-Z--3
co
C15
cp
clo
r
-c
-7
a> ��> OD
00 a7 00
Q�l
on
S-:
to
-52 42
CD
Z7 CT7 -,C:3
CV
Cll C57 C1}
CU
LU
CiS
L.0
CD
r,rl
-21
N
N
Cv
r-I
!�2
r-!-
'm
O
C-Ij
C.0
!��? <231 –11
r- C114 r--L
F- C=> Lr,>
C3,> CC> =�- LQ-
Lr> cljl
Lr,> :)� <=> i
c-:, clj cr-
�l
r` ti LLr7 cIt rn � cs
Clil cxD.
C'4
tx-> cno N cz=l O cz=l O N
<=> N I-- cl"> C37 Lx-.> O 127 ilf7
clj clj (=F> cljl cc> -13- <->
<=>
O LCD I=>
<=>
N r d-
O <=, C=> LCD C=> (=, C=> C=> C=> 0 <=> 0 0 CZ>
CZD P-- O —1- C=>
C-4 LL-r7 -2- r-� cl,4-
<=> <=> r LCD I=> O I=> c:D C=> cm> 0 Lr> 0 c--> <=> c=>
<=> cl-3 cl:, r- O M r- cc> cl>
O O c=> c=> c=> CO c=> Lr> c=> O O O
c� P- 4= c� ir-
c14 c---�- -3:- (=:�- <=>
cl> c-IF
CD � 127 C] " <=> 0 (=> <=) "
O M CC) O CC>
cli M
C14 N N C";. CI'S Cllj CIQI
CD C4 a>
CJ CD C:L>
Co Cis CK3
<D
cc;ol Cu
Cl> Cl> E
C,
C:) 0- -ea- ef-5 J-
.— co — 2
Co - E-- -05
(5 Fp a>
G;o -cc E
65 -98 —
13>
0-
co co
213- 72 C:L> �3:
D C-> co Co Q> a>
C/3 =C:�', -R C5,
t-- 45 a'
-S -T-
D CD CZ col ca
ca n
C C/3 2 CM- cz
c m C:) d> C> 65 86 �a
0, co NI s -= a> <D
-zc C/Do
2 2- am;, = cual
:r Lf-> z�c -::Ic M 00 C-> LL- C.0 vo C/3 IF--
N M –v Lr7 <fl Imo- CO c77 �---> — N � � !;2 C2 Imo.
tsi
to
O
tsi
to
Lcl.
NI
Its
NI
CX31
-qr
4M.
Lr:t
C14
C141
6
C14-
r-
Lr—
CIP
cz::t
to
JI
C>
I--
C14
T--
C141
co
Lr . >
C14
ILC.>
C141
F- C=> Lr,>
C3,> CC> =�- LQ-
Lr> cljl
Lr,> :)� <=> i
c-:, clj cr-
�l
r` ti LLr7 cIt rn � cs
Clil cxD.
C'4
tx-> cno N cz=l O cz=l O N
<=> N I-- cl"> C37 Lx-.> O 127 ilf7
clj clj (=F> cljl cc> -13- <->
<=>
O LCD I=>
<=>
N r d-
O <=, C=> LCD C=> (=, C=> C=> C=> 0 <=> 0 0 CZ>
CZD P-- O —1- C=>
C-4 LL-r7 -2- r-� cl,4-
<=> <=> r LCD I=> O I=> c:D C=> cm> 0 Lr> 0 c--> <=> c=>
<=> cl-3 cl:, r- O M r- cc> cl>
O O c=> c=> c=> CO c=> Lr> c=> O O O
c� P- 4= c� ir-
c14 c---�- -3:- (=:�- <=>
cl> c-IF
CD � 127 C] " <=> 0 (=> <=) "
O M CC) O CC>
cli M
C14 N N C";. CI'S Cllj CIQI
CD C4 a>
CJ CD C:L>
Co Cis CK3
<D
cc;ol Cu
Cl> Cl> E
C,
C:) 0- -ea- ef-5 J-
.— co — 2
Co - E-- -05
(5 Fp a>
G;o -cc E
65 -98 —
13>
0-
co co
213- 72 C:L> �3:
D C-> co Co Q> a>
C/3 =C:�', -R C5,
t-- 45 a'
-S -T-
D CD CZ col ca
ca n
C C/3 2 CM- cz
c m C:) d> C> 65 86 �a
0, co NI s -= a> <D
-zc C/Do
2 2- am;, = cual
:r Lf-> z�c -::Ic M 00 C-> LL- C.0 vo C/3 IF--
N M –v Lr7 <fl Imo- CO c77 �---> — N � � !;2 C2 Imo.
tsi
to
O
tsi
to
Lcl.
NI
Its
NI
CX31
-qr
4M.
Lr:t
C14
C141
6
C14-
r-
Lr—
CIP
cz::t
to
JI
C>
I--
III
C*11
VIA
<= If.,
C110
G>
EE
N 0017
2
LL
C>
C"
C"
LU
58
co
-C:3
fro
CL
(MI
<1>
S2
L3 <D 7:3
-Z--3
co
C15
cp
CD
CD
r
-c
-7
a> ��> OD
00 a7 00
Q�l
on
S-:
to
-52 42
CD
III
C*11
VIA
<= If.,
C110
G>
EE
N 0017
2
LL
C>
C"
C"
LU
58
E12
Cll7
C=
L3 <D 7:3
-Z--3
C>
:::— a> �:—
�:—
a> ��> OD
00 a7 00
Q�l
on
to
-52 42
-2
Z7 CT7 -,C:3
C
Cll C57 C1}
CU
CiS
-21
!�2
'm
-::r-
C.0
III
C*11
VIA
<= If.,
C110
G>
EE
N 0017
2
LL
C>
C"
C"
LU
58
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
-,
2
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
4th
WA -07745
40 -42 Ave S (S 160 St - S 131 PL)
S 160th Street to Southcenter Blvd
Design and construct street improvements, underground aerial utilities, drainage,
sidewalks, bike facilities, and driveway adjustments
06/12/17
06/19/17
2,465,000
2,465,000
04
C G O P S
TW
2023
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2018
4th
0
5th & 6th
0
2,465,000
2,465,000
P
CN
2023
0
0
4,360,000
4,360,000
Totals
0
2,465,000
0
6,825,000
6,825,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
2,465, 000
0
0
0
4,360,000
Totals
2,465,000
0
0
0
4,360,000
Report Date: May 17, 2017
Page 1
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
Jag w n ry Alpopd
A. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
x
CD
0
luawpuawv
.ory uonniosaN
adAi luawanaidwi
sapoo Alunn
416uai ieloi
adAi ieluawucuvaig
pai!nbaN AAN
17
53rd Avenue S
S 137th St to S 144th St
Design and construct urban residential street improvements that include curb, gutter,
sidewalk, illumination and undergrounding. Street portion will coordinate with Water,
Surface Water and Sewer capital improvement program projects.
WA-06601
06/12/17
06/19/17
04
CGOPS
T W
0.420
CE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2018
0
TIB
900,000
1,710,000
2,610,000
Totals
0
2,610,000
900,000
1,710,000
2,610,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
2,610,000
0
0
0
0
Totals
2,610,000
0
0
0
0
Report Date: May 17, 2017
Page 2
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
Jag w n ry Alpopd
A. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
x
CD
0
luawpuawv
.ory uonniosaN
adAi luawanaidwi
sapoo Alunn
416uai ieloi
adAi ieluawucuvaig
pai!nbaN AAN
00
Americans with Disabilities Act (ADA) Improvements
Various locations
to
Design and construct ADA compliant upgrades to City infrastructure in conjunction
with a City developed plan.
WA-05405
06/12/17
06/19/17
06
No
Funding
Status
Phase
ALL
Phase Start Year (YYYY)
2018
Federal Fund Code
Totals
Federal Funds
0
State Fund Code
State Funds
0
0
Local Funds
1,200,000
1,200,000
Total Funds
1,200,000
1,200,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
200,000
200,000
200,000
200,000
400,000
Totals
200,000
200,000
200,000
200,000
400,000
Report Date: May 17, 2017
Page 3
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
Jag w n ry Alpopd
A. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
x
CD
0
luawpuawv
.ory uonniosaN
adAi luawanaidwi
sapoo Alunn
416uai ieloi
adAi ieluawucuvaig
pai!nbaN AAN
16
Andover Park E/Minkler Blvd Intersection
Andover Park E
Minkler Blvd to
Construct left turn lanes on Andover Park East and reconstruct traffic signal
WA-07746
06/12/17
06/19/17
03
CGOPS
T W
No
Funding
Status
P
P
P
Phase
PE
RW
CN
Phase Start Year (YYYY)
2020
2020
2021
Federal Fund Code
Totals
Federal Funds
0
0
0
State Fund Code
State Funds
0
0
0
0
Local Funds
134,000
10,000
1,570,000
1,714,000
Total Funds
134,000
10,000
1,570,000
1,714,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
134,000
0
0
RW
0
0
10,000
0
0
CN
0
0
0
1,570,000
0
Totals
0
0
144,000
1,570,000
0
Report Date: May 17, 2017
Page 4
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
Jag w n ry Alpopd
A. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
x
CD
0
luawpuawv
.ory uonniosaN
adAi luawanaidwi
sapoo Alunn
416uai ieloi
adAi ieluawucuvaig
pai!nbaN AAN
14
Annual Bridge Inspections and Repairs
Various City Street
to
Perform load ratings and bi-annual inspections as well as construct necessary
repairs and maintenance
WA-03731
06/12/17
06/19/17
06
No
Funding
Status
Phase
ALL
Phase Start Year (YYYY)
2018
Federal Fund Code
Totals
Federal Funds
0
State Fund Code
State Funds
0
0
Local Funds
2,220,000
2,220,000
Total Funds
2,220,000
2,220,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
335,000
335,000
335,000
405,000
810,000
Totals
335,000
335,000
335,000
405,000
810,000
Report Date: May 17, 2017
Page 5
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
Jag w n ry Alpopd
A. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
x
CD
0
luawpuawv
.ory uonniosaN
adAi luawanaidwi
sapoo Alunn
416uai ieloi
adAi ieluawucuvaig
pai!nbaN AAN
16
Annual Overlay and Repair Program
Various City Streets
to
Repair, rehabilitate, and overlay City streets as needed in an annual program
WA-03733
06/12/17
06/19/17
06
CGOPS
T W
No
Funding
Status
Phase
ALL
Phase Start Year (YYYY)
2018
Federal Fund Code
Totals
Federal Funds
0
State Fund Code
State Funds
0
0
Local Funds
10,320,000
10,320,000
Total Funds
10,320,000
10,320,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
1,400,000
1,730,000
1,740,000
1,800,000
3,600,000
Totals
1,400,000
1,730,000
1,740,000
1,800,000
3,600,000
Report Date: May 17, 2017
Page 6
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
Jag w n ry Alpopd
A. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
x
CD
0
luawpuawv
.ory uonniosaN
adAi luawanaidwi
sapoo Alunn
416uai ieloi
adAi ieluawucuvaig
pai!nbaN AAN
19
/1320(004)
Beacon Ave S Bridge Preventative Maintenance Project
Beacon Avenue South over South Ryan Way
S Victor St to S 170th St
Remove and replace failed bridge deck and paint structural steel.
TUK-57
06/12/17
06/19/17
14
0.010
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2018
STP(BR)
1,740,920
0
0
1,740,920
Totals
1,740,920
1,740,920
0
0
1,740,920
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
1,740,920
0
0
0
0
Totals
1,740,920
0
0
0
0
Report Date: May 17, 2017
Page 7
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
Jag w n ry Alpopd
A. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
x
CD
0
luawpuawv
.ory uonniosaN
adAi luawanaidwi
sapoo Alunn
416uai ieloi
adAi ieluawucuvaig
pai!nbaN AAN
00
BNSF Regional Center Access
New Facility
to
Construct a new access to the BNSF Regional Distribution Center, relocating the
900+ daily truck trips from residential streets in Allentown.
WA05409
06/12/17
06/19/17
08
EIS
No
Funding
Status
P
Phase
PE
Phase Start Year (YYYY)
2018
Federal Fund Code
Totals
Federal Funds
0
State Fund Code
State Funds
0
0
Local Funds
100,000
100,000
Total Funds
100,000
100,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
100,000
0
0
0
0
Totals
100,000
0
0
0
0
Report Date: May 17, 2017
Page 8
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
Jag w n ry Alpopd
A. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
x
CD
0
luawpuawv
.ory uonniosaN
adAi luawanaidwi
sapoo Alunn
416uai ieloi
adAi ieluawucuvaig
pai!nbaN AAN
00
/1320(005)
Cascade View Elementary Safe Routes to School Project - Phase 2
33rd Ave S and S 140th Street
S. 144th at 34th Ave. S. to 140th St at 34th Ave. S.
Concrete sidewalks are proposed on one side of 33rd Ave S (S 140th St to S 144th
St) and on one side of S. 140th St (Military Road South to 34th Ave S) along with a
standard curb and gutter separating the sidewalk from the roadway. A traffic circle is
proposed at the intersection of 33rd Ave S and S 140th St to assist in reducing
vehicle speeds and increase visibility and safety of pedestrians crossing the street.
Curb bulb-outs and/or pedestrian refuge islands at the east entrance/exit to the traffic
circle would be constructed to improve the safety of crossing S 140th St at 33rd Ave
S. There are currently no ADA facilities to connect to within the project limits. Minor
storm water improvements will be added to the general action area. The new
sidewalk along 33rd Ave S. will require reconstruction of the pavement cross section
to establish proper crown slopes.
TUK-58
06/12/17
06/19/17
28
0.510
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2018
SRTS
714,000
0
100,000
814,000
Totals
714,000
0
100,000
814,000
Expenditure Schedule
Phase
ALL
Totals
1st
814,000
814,000
2nd
0
0
3rd
0
0
4th
0
0
5th & 6th
0
0
Report Date: May 17, 2017
Page 9
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
Jag w n ry Alpopd
A. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
x
CD
0
luawpuawv
.ory uonniosaN
adAi luawanaidwi
sapoo Alunn
416uai ieloi
adAi ieluawucuvaig
pai!nbaN AAN
16
/1274(009)
Frank Zepp Bridge Preventative Maintenance Project
S 180th Street over the Green River
SR 181 - West Valley Highway to Sperry Drive S
Paint the structural steel, overlay deck and replace the deck joint, and install seismic
protection.
TUK-55
06/12/17
06/19/17
14
0.040
CE
No
Funding
Status
Phase
CN
Phase Start Year (YYYY)
2018
Federal Fund Code
STP(BR)
Totals
Federal Funds
2,534,812
2,534,812
State Fund Code
State Funds
0
0
Local Funds
0
0
Total Funds
2,534,812
2,534,812
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
2,534,812
0
0
0
0
Totals
2,534,812
0
0
0
0
00
Report Date: May 17, 2017
Page 10
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
Jag w n ry Alpopd
A. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
x
CD
0
luawpuawv
.ory uonniosaN
adAi luawanaidwi
sapoo Alunn
416uai ieloi
adAi ieluawucuvaig
pai!nbaN AAN
14
/1288(005)
Grady Way Bridge Preventative Maintenance Project
Grady Way Bridge over BN and UP Railroads
Interurban Avenue S to Longacres Drive SW, Renton
Retrofit existing bridge with seismic protection.
TUK-56
06/12/17
06/19/17
14
0.230
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2018
STP(BR)
197,725
0
0
197,725
Totals
197,725
197,725
0
0
197,725
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
197,725
0
0
0
0
Totals
197,725
0
0
0
0
cs)
Report Date: May 17, 2017
Page 11
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
Jag w n ry Alpopd
A. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
x
CD
0
luawpuawv
.ory uonniosaN
adAi luawanaidwi
sapoo Alunn
416uai ieloi
adAi ieluawucuvaig
pai!nbaN AAN
00
Multipurpose Trails
to
Wide array of necessary trail improvements to existing trail system infrastructure
WA-03783
06/12/17
06/19/17
28
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
CN
2018
0
0
62,000
62,000
P
ALL
2023
0
150,000
150,000
Totals
0
0
212,000
212,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
62,000
0
0
0
0
ALL
0
0
0
0
150,000
Totals
62,000
0
0
0
150,000
Report Date: May 17, 2017
Page 12
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
Jag w n ry Alpopd
A. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
x
CD
luawpuawv
.ory uonniosaN
adAi luawanaidwi
sapoo Alunn
416uai ieloi
adAi ieluawucuvaig
pai!nbaN AAN
14
S 140th St Intersection Improvements
S 140th Street
Tukwila International Blvd to
Design and construct a new traffic signal at the S 140th Street/Tukwila
Blvd intersection
nterna
onal
WA-09873
06/12/17
06/19/17
04
CGPST
0.100
DCE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2019
Ped/Bike Program
67,000
8,000
75,000
P
RW
2020
Ped/Bike Program
40,000
10,000
50,000
P
CN
2020
0
Ped/Bike Program
568,000
57,000
625,000
Totals
0
675,000
75,000
750,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
75,000
0
0
0
RW
0
0
50,000
0
0
CN
0
0
625,000
0
0
Totals
0
75,000
675,000
0
0
Report Date: May 17, 2017
Page 13
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
Jag w n ry Alpopd
A. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
x
CD
0
luawpuawv
.ory uonniosaN
adAi luawanaidwi
sapoo Alunn
416uai ieloi
adAi ieluawucuvaig
pai!nbaN AAN
17
S 144th St Bridge Sidewalks
S 144th Street
51st Ave S to 53rd Ave S
Widen existing sidewalks on bridge over 1-5 between 51st Ave S and 53rd Ave S
WA03782
06/12/17
06/19/17
28
0.250
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2019
SRTS
173,000
0
27,000
200,000
P
CN
2019
SRTS
1,047,000
0
163,000
1,210,000
Totals
1,220,000
0
190,000
1,410,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
200,000
0
0
0
CN
0
0
1,210,000
0
0
Totals
0
200,000
1.210.000
0
0
Report Date: May 17, 2017
Page 14
Agency: la
County: King
MPO/RTPO: PSRC
Y Inside
Six ���� Transportation Improvement U���������
~-^ Year ^ ^~~^^~~n~~~^~~~~^~~^^ ^^^^n~^~~~~~^^^~~^^~ Program
From 2018 to 2023
N Outside
cn
tn
Jag w n ry Alpopd
A. PlNlProject No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
CD
0
luawpuawv
.ory uonniosaN
adAi luawanaidwi
sapoo Alunn
416uai ieloi
adAi ieluawucuvaig
pai!nbaN AAN
16
mranderewu./SW 27th St Extension
otrenue,ewu./SWzrmm
West VaIIey Highway to NJaches Ave
This project is Phase 3 of a multi-phase improvement that will connect Strander
o|vu/ovvurmot between West VaIIey Hwy in Tukwila and Oakesdale Ave in
Renton. This project will complete the design, right-of-way and construction phases
for the roadway segment between West VaIIey Hwy and Naches Ave. Project
components include a railroad bridge for the Union Pacific RR to provide grade
separation. a new 4/5 lane roadway segment east of West VaIIey Hwy. roadway
widening of two lanes for a portion of the project segment, a separated joint-use t,ei|,
a new trail bridge for the Interurban Trail (including new trail connections to Strander
BIvd.), a new flyover bridge connection to the Tukwila Station, and a new traffic
signal serving the Tukwila Station. Current funding will complete the preliminary
engineering and right-of-way phases. Construction will be funded as part of a future
phase.
TUK-59
06/12/17
06/19/17
01
0 300
DCE
Yes
Funding
Status
n
n
p
p
n
p
Phase
PE
RW
cw
cw
cw
cw
Phase Start Year (YYYY)
2018
2018
2020
2020
2020
2020
Federal Fund Code
STP(UL)
STP(UL)
TIGER
FMSIB
Discretionary
Totals
Federal Funds
3 892 500
1,254.300
13,794,000
5,000,000
5,000,000
0
28,940,800
State Fund Code
TIB
State Funds
0
0
5,000,000
0
0
0
5,000,000
Local Funds
607,500
195,700
706,000
0
0
706,000
2,r/5,om
Total Funds
4,500,000
1,450,000
19,500,000
5,000,000
5,000,000
706,000
36.156,000
Report Date: May 17, 2017
Page 15
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
NJ Outside
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
2,500,000
2,000,000
0
0
0
RW
450,000
1,000,000
0
0
0
CN
50,000
0
18,300,000
14,200,000
0
Totals
3,000,000
3,000,000
18,300,000
14,200,000
0
Report Date: May 17, 2017
Page 16
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
Jag w n ry Alpopd
A. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
x
CD
0
luawpuawv
.ory uonniosaN
adAi luawanaidwi
sapoo Alunn
416uai ieloi
adAi ieluawucuvaig
pai!nbaN AAN
17
TUC/TOD Pedestrian Improvements
Baker Blvd (if extended)
Andover Park W to E City Limits
Construct bike/pedestrian connection between the Tukwila Urban Center (TUC) and
Tukwila Station, with service by Amtrak Sounder Commuter Rail/Transit Oriented
Development (TOD) area.
WA-03772
06/12/17
06/19/17
28
0.750
CE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
ALL
2023
STP(E)
3,400,000
0
850,000
4250000
,
Totals
3.400000
0
850,000
4,250,000
Expenditure Schedule
Phase
ALL
Totals
1st
0
0
2nd
0
0
3rd
0
0
4th
0
0
5th & 6th
4,250,000
4,250,000
Report Date: May 17, 2017
Page 17
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
Jag w n ry Alpopd
A. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
x
CD
0
luawpuawv
.ory uonniosaN
adAi luawanaidwi
sapoo Alunn
416uai ieloi
adAi ieluawucuvaig
pai!nbaN AAN
14
West Valley Highway
SR 181/West Valley Highway
1-405 to Strander Blvd
Design and construct completion of 7 lane sections of West Valley Highway with
sidewalks, curbs, gutters, storm drainage, lighting, and traffic control, including safety
and capacity improvements at the S 156th St intersection.
WA03779
06/12/17
06/19/17
03
0.500
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
PE
2018
STP
189,000
0
38,000
227,000
P
PE
2018
0
TIB
155,000
0
155,000
RW
2018
0
0
100,000
100,000
CN
2019
STP
438 000
0
62,000
500,000
P
CN
2019
0
TIB
2,389,000
582,000
2,971,000
Totals
627,000
2,544,000
782,000
3,953,000
Expenditure Schedule
Phase
PE
RW
CN
Totals
1st
382,000
100,000
0
482,000
2nd
0
0
2,070,000
2,070,000
3rd
0
0
0
0
4th
0
0
0
0
5th & 6th
150,000
100,000
1,150,000
1,400,000
Federal Funds
State Funds
Local Funds
Total Funds
Grand Totals for Tukwila
39,375,257
9,119,000
26,050,780
74,545,037
Report Date: May 17, 2017
Page 18
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2017 to 2022
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
-,
2
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
4th
WA -07745
40 -42 Ave S (S 160 St - S 131 PL)
S 160th Street to Southcenter Blvd
Design and construct street improvements, underground aerial utilities, drainage,
sidewalks, bike facilities, and driveway adjustments
06/13/16
06/20/16
6,868,000
1882
04
C G O P S
TW
2021
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2017
4th
0
5th & 6th
0
6,868,000
6,868,000
P
CN
2021
0
0
4,360,000
4,360,000
Totals
0
4,807,000
0
11,228,000
11,228,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
4,807,000
2,031,000
0
0
4,360,000
Totals
4,807,000
2,031,000
0
0
4,360,000
Report Date: June 21, 2016
Page 1
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2017 to 2022
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
-,
La m
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
WA -06601
53rd Avenue S
S 137th St to S 144th St
Design and construct urban residential street improvements that include curb, gutter,
sidewalk , illumination and undergrounding. Street portion will coordinate with Water,
Surface Water and Sewer capital improvement program projects.
06/13/16
06/20/16
2,565,600
1882
04
C G O P S
TW
0.420
CE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2017
0
TIB
2,141,400
2,565,600
4,707,000
Totals
0
2,353,500
2,141,400
2,565,600
4,707,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
2,353,500
2,353,500
0
0
0
Totals
2,353,500
2,353,500
0
0
0
co
Report Date: June 21, 2016
Page 2
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2017 to 2022
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
-,
La m
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
4th
WA -05405
Americans with Disabilities Act (ADA) Improvements
Various locations
to
Design and construct ADA compliant upgrades to City infrastructure in conjunction
with a City developed plan.
06/13/16
06/20/16
1,200,000
1882
06
0
200,000
0
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2017
4th
0
5th & 6th
0
1,200,000
1,200,000
Totals
0
200,000
0
1,200,000
1,200,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
200,000
200,000
200,000
200,000
400,000
Totals
200,000
200,000
200,000
200,000
400,000
`0 Report Date: June 21, 2016
Page 3
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2017 to 2022
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
-,
2
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
WA -03766
Andover Park E /Industry Drive Signal
Andover Park E
Industry Drive to
Design and construct a traffic signal and intersection improvements
06/13/16
06/20/16
75,000
1882
05
C G O P S
TW
0.190
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2017
0
0
75,000
75,000
P
RW
2017
0
0
10,000
10,000
P
CN
2018
0
10,000
0
657,000
657,000
Totals
0
0
0
742,000
742,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
75,000
0
0
0
0
RW
10,000
0
0
0
0
CN
0
657,000
0
0
0
Totals
85,000
657,000
0
0
0
co
Report Date: June 21, 2016
Page 4
op
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2017 to 2022
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
-,
2
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
WA -07746
Andover Park E /Minkler Blvd Intersection
Andover Park E
Minkler Blvd to
Construct left turn lanes on Andover Park East and reconstruct traffic signal
06/13/16
06/20/16
134,000
134,000
03
C G O P S
TW
2017
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2017
0
0
134,000
134,000
P
RW
2017
0
0
10,000
10,000
P
CN
2018
0
10,000
0
1,570,000
1,570,000
Totals
0
0
0
1,714,000
1,714,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
134,000
0
0
0
0
RW
10,000
0
0
0
0
CN
0
1,570,000
0
0
0
Totals
144,000
1,570,000
0
0
0
Report Date: June 21, 2016
Page 5
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2017 to 2022
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
-,
La m
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
4th
WA -03731
Annual Bridge Inspections and Repairs
Various City Street
to
Perform load ratings and bi- annual inspections as well as construct necessary
repairs and maintenance
06/13/16
06/20/16
1,945,000
1882
06
0
335,000
0
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2017
4th
0
5th & 6th
0
1,945,000
1,945,000
Totals
0
335,000
0
1,945,000
1,945,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
270,000
335,000
335,000
335,000
670,000
Totals
270,000
335,000
335,000
335,000
670,000
co
ti Report Date: June 21, 2016
Page 6
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2017 to 2022
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
-,
La m
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
4th
WA -03733
Annual Overlay and Repair Program
Various City Streets
to
Repair, rehabilitate, and overlay City streets as needed in an annual program
06/13/16
06/20/16
10,280,000
1882
06
C G O P S
TW
1,670,000
0
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2017
4th
0
5th & 6th
0
10,280,000
10,280,000
Totals
0
1,670,000
0
10,280,000
10,280,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
1,650,000
1,670,000
1,725,000
1,730,000
3,505,000
Totals
1,650,000
1,670,000
1,725,000
1,730,000
3,505,000
co
w Report Date: June 21, 2016
Page 7
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2017 to 2022
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
-,
La m
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
19
STP(BR)
/ 1320(004) TUK -57
Beacon Ave S Bridge Preventative Maintenance Project
Beacon Avenue South over South Ryan Way
S Victor St to S 170th St
Remove and replace failed bridge deck and paint structural steel.
06/13/16
06/20/16
0
1882
14
1,740,920
0.010
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2017
STP(BR)
1,740,920
0
0
1,740,920
Totals
1,740,920
1,740,920
0
0
1,740,920
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
1,740,920
0
0
0
0
Totals
1,740,920
0
0
0
0
co
Report Date: June 21, 2016
Page 8
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2017 to 2022
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
-,
La m
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
FMSIB
WA05409
BNSF Regional Center Access
New Facility
to
Construct a new access to the BNSF Regional Distribution Center, relocating the
900+ daily truck trips from residential streets in Allentown.
06/08/15
06/15/15
300,000
1882
08
CN
2021
EIS
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2021
FMSIB
950,000
5th & 6th
0
300,000
1,250,000
P
CN
2021
FMSIB
10,812,500
0
1,687,500
12,500,000
Totals
11,762,500
0
0
1,987,500
13,750,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
12, 500,000
CN
0
0
0
0
1,250,000
Totals
0
0
0
0
13,750,000
co
oi
Report Date: June 21, 2016
Page 9
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2017 to 2022
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
-,
La m
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
STP(BR)
/ 1380(003) TUK -52
06/13/16
06/20/16
2,220,000
1882
14
8,625,600
0.200
DCE
Yes
10,845,600
Boeing Access Road Bridge Rehabilitation
Totals
10,845,600
0
0
0
0
Boeing Access Road
Interstate 5 to Airport Way South
Rehabilitate the existing Boeing Access Road bridge structure over the Burlington
Norther and Union Pacific Railroads. Work will include rehabilitation of the bridge
sub - structure, seismic retrofit, and construction of a new bridge deck including
pedestrian /bicycle amenities.
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2017
STP(BR)
8,625,600
0
2,220,000
10,845,600
Totals
8,625,600
0
2,220,000
10,845,600
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
10,845,600
0
0
0
0
Totals
10,845,600
0
0
0
0
co
c' Report Date: June 21, 2016
Page 10
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2017 to 2022
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
-,
La m
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
SRTS
/ 1320(005) TUK -58
06/13/16
06/20/16
83,353
1882
28
699,745
0.510
CE
No
783,098
0
Cascade View Elementary Safe Routes to School Project - Phase 2
0
0
Totals
783,098
0
0
33rd Ave S and S 140th Street
0
0
S. 144th at 34th Ave. S. to 140th St at 34th Ave. S.
Concrete sidewalks are proposed on one side of 33rd Ave S (S 140th St to S 144th
St) and onone side of S. 140th St (Military Road South to 34th Ave S) along with a
standard curb and gutter separating the sidewalk from the roadway. A traffic circle is
proposed at the intersection of 33rd Ave S and S 140th St to assist inreducing
vehicle speeds and increase visibility and safety of pedestrians crossing the street.
Curb bulb -outs and /or pedestrian refuge islands at the east entrance /exit to the traffic
circle would be constructed to improve the safety ofcrossing S 140th St at 33rd Ave
S. There are currently no ADA facilities to connect to within the project limits. Minor
storm water improvements will be added to the general action area.
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2017
SRTS
699,745
0
83,353
783,098
Totals
699,745
783,098
0
83,353
783,098
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
783,098
0
0
0
0
Totals
783,098
0
0
0
0
co
Report Date: June 21, 2016
Page 11
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2017 to 2022
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
-,
La m
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
STP(BR)
/ 1274(009) TUK -55
Frank Zepp Bridge Preventative Maintenance Project
S 180th Street over the Green River
SR 181 - West Valley Highway to Sperry Drive S
Paint the structural steel, overlay deck and replace the deck joint, and install seismic
protection.
06/13/16
06/20/16
0
1882
14
2,534,812
0.040
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2017
STP(BR)
2,534,812
0
0
2,534,812
Totals
2,534,812
2,534,812
0
0
2,534,812
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
2,534,812
0
0
0
0
Totals
2,534,812
0
0
0
0
co
co
Report Date: June 21, 2016
Page 12
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2017 to 2022
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
-,
La m
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
STP(BR)
/ 1288(005) TUK -56
Grady Way Bridge Preventative Maintenance Project
Grady Way Bridge over BN and UP Railroads
Interurban Avenue S to Longacres Drive SW, Renton
Retrofit existing bridge with seismic protection.
06/13/16
06/20/16
0
1882
14
148,574
0.230
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2017
STP(BR)
148,574
0
0
148,574
Totals
148,574
148,574
0
0
148,574
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
148,574
0
0
0
0
Totals
148,574
0
0
0
0
co
`0 Report Date: June 21, 2016
Page 13
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2017 to 2022
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
-,
La m
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
4th
WA -03783
Multipurpose Trails
to
Wide array of necessary trail improvements to existing trail system infrastructure
06/13/16
06/20/16
520,000
1882
28
0
60,000
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2017
4th
0
5th & 6th
0
520,000
520,000
Totals
0
60,000
0
520,000
520,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
60,000
60,000
60,000
60,000
280,000
Totals
60,000
60,000
60,000
60,000
280,000
Report Date: June 21, 2016
Page 14
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2017 to 2022
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
-,
2
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
WA -07748
S 133 St/SR599 Southbound Intersection
S 133rd Street
SR 599 Southbound Ramps to S 134th PI
Construct intersection improvements including signalization or roundabout, lighting,
crosswalks, and drainage.
06/13/16
06/20/16
310,000
1882
04
C G O P S
TW
2018
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2018
0
0
310,000
310,000
P
RW
2018
0
0
25,000
25,000
P
CN
2019
0
0
0
2,064,000
2,064,000
Totals
0
0
0
2,399,000
2,399,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
310,000
0
0
0
RW
0
25,000
0
0
0
CN
0
0
2,064,000
0
0
Totals
0
335,000
2,064,000
0
0
Report Date: June 21, 2016
Page 15
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2017 to 2022
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
-,
2
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
STP(BR)
WA03782
S 144th St Bridge Sidewalks
S 144th Street
51st Ave S to 53rd Ave S
Widen existing sidewalks on bridge over 1 -5 between 51st Ave S and 53rd Ave S
06/13/16
06/20/17
243,800
1882
28
975,200
0.250
0
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
ALL
2021
STP(BR)
975,200
5th & 6th
0
243,800
1,219,000
Totals
975,200
0
0
243,800
1,219,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
0
0
0
0
1,219,000
Totals
0
0
0
0
1,219,000
ti Report Date: June 21, 2016
Page 16
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2017 to 2022
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
-,
La m
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
STP
WA -05410
Strander Blvd /SW 27th St Phase III
Strander Boulevard
E City Limits to West Valley Hwy /SR 181
Design and construct arterial improvements for a new roadway extending Strander
Boulevard /SW 27th St from West Valley Highway to Oaksdale Ave
06/13/16
06/20/16
607,500
1882
01
RW
2018
EIS
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2017
STP
3,892,500
5th & 6th
0
607,500
4,500,000
P
RW
2018
STP
1,254,250
0
195,750
1,450,000
P
CN
2022
FMS I B
5,000,000
0
1,000,000
6,000,000
P
CN
2022
TIGER III
20,000,000
0
25,000,000
45,000,000
Totals
30,146,750
5,100, 000
0
26,803,250
56,950,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
5,000,000
0
0
0
RW
0
0
1,450, 000
0
0
CN
0
0
0
0
5,100, 000
Totals
0
5,000,000
1,450,000
0
5,100,000
w Report Date: June 21, 2016
Page 17
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2017 to 2022
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
-,
La m
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
STP(E)
WA -03772
TUC/TOD Pedestrian Improvements
Baker Blvd (if extended)
Andover Park W to E City Limits
Construct bike /pedestrian connection between the Tukwila Urban Center (TUC) and
Tukwila Station, with service by Amtrak Sounder Commuter Rail/Transit Oriented
Development (TOD) area.
06/13/16
06/20/16
68,580
1882
28
RW
0.750
CE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2017
STP(E)
439,420
0
0
68,580
508,000
P
RW
2020
STP(E)
173,000
1,725,000
0
27,000
200,000
S
CN
2017
0
0
1,000,000
1,000,000
P
CN
2018
STP(E)
2,699,000
0
286,000
2,985,000
Totals
3,311,420
0
1,381,580
4,693,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
283,000
0
0
225,000
0
RW
0
0
0
200,000
0
CN
1,000,000
1,260,000
0
0
1,725,000
Totals
1,283,000
1,260,000
0
425,000
1,725,000
Report Date: June 21, 2016
Page 18
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2017 to 2022
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
-,
La m
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
/ 1320(002) TUK -50
Tukwila Urban Center Pedestrian /Bicycle Bridge over Green River
New bridge over the Green River, approximately between Baker Blvd (if extended)
and Longacres Way (if extended)
Baker Boulevard to West Valley Highway
Construct a new pedestrian /bicycle bridge over the Green River
06/13/16
06/20/16
896,000
1882
28
0
0.640
DCE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2017
0
OTHER
5,289,000
896,000
6,185,000
Totals
0
6,185,000
5,289,000
896,000
6,185,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
6,185,000
0
0
0
0
Totals
6,185,000
0
0
0
0
oi
Report Date: June 21, 2016
Page 19
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2017 to 2022
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
-,
La m
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
4th
WA -03761
Walk & Roll Plan (Nonmotorized Transportation Plan)
Various City Streets
to
Evaluate deficiencies and create a prioritized list of projects and recommended
design standards.
06/08/15
06/15/15
175,000
1882
28
0
0
0
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2021
4th
0
5th & 6th
0
175,000
175,000
Totals
0
0
0
175,000
175,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
175,000
Totals
0
0
0
0
175,000
Report Date: June 21, 2016
Page 20
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2017 to 2022
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
-,
La m
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
RW
WA03779
West Valley Highway
SR 181 /West Valley Highway
1 -405 to Strander Blvd
Design and construct completion of 7 lane sections of West Valley Highway with
sidewalks, curbs, gutters, storm drainage, lighting, and traffic control, including safety
and capacity improvements at the S 156th St intersection.
06/13/16
06/20/16
340,000
1882
03
RW
0.500
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2020
RW
0
0
0
340,000
340,000
P
RW
2020
0
0
2,484,000
0
400,000
400,000
P
CN
2021
0
TIB
1,792,000
542,000
2,334,000
Totals
0
1,792,000
1,282,000
3,074,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
174,000
150,000
RW
0
0
0
200,000
200,000
CN
0
0
0
0
2,484,000
Totals
0
0
0
374,000
2,834,000
Report Date: June 21, 2016
Page 21
Federal Funds
State Funds
Local Funds
Total Funds
Grand Totals for Tukwila
59,945,521
9,222,400
67,666,083
136,834,004
Report Date: June 21, 2016
Page 21