Loading...
HomeMy WebLinkAboutTIC 2017-05-23 Item 2E - Resolution - 2018-2023 Transportation Improvement ProgramCity of Tukwila Allan Ekberg, Mayor INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Committ e FROM: Bob Giberson, Public Works Director 17 N BY: Cyndy Knighton, Senior Program Manager CC: Mayor Ekberg DATE: May 19, 2017 SUBJECT: Resolution for Six -Year Transportation Improvement Program (2018 -2023) ISSUE Approve a Resolution adopting the annual update of the Six -Year Transportation Improvement Program for 2018 -2023. BACKGROUND The Transportation Improvement Program (TIP) is updated annually as required by the Revised Code of Washington (RCW). The TIP is adopted by resolution after a public hearing at the local agency level and incorporated into regional and state TIPs. The TIP is primarily a financial planning document for projects competing for grants. Any project submitted for federal grant funding must be included in the local, regional and state adopted TIPs. The TIP is a rolling plan showing various funding sources: grants, developer and local funds. Projects "roll" as funds or stages occur (design report, final design and construction). Tukwila's TIP and Capital Improvement Program (CIP) list many of the same transportation - related projects. The TIP generally lists only those transportation - related projects planned within the next six years that are deemed regionally significant or that have grant funding awarded or expected. The TIP is required to be adopted by June 30 on an annual basis. ANALYSIS The attached spreadsheet is the "Draft" 2018 - 2023 TIP and was created by modifying the 2017 - 2022 TIP to add or remove projects and adjust project costs. No prioritization was assigned and the list of projects is presented in alphabetical order. Prioritization of projects is reflected in the 2017 CIP. One new project was added and five projects were deleted as they will have been completed by 2018 or have been moved beyond the six -year window of the TIP. Added: S 140th St Intersection Improvements Deleted: Andover Park East/Industry Dr. Intersection; S 133rd St/SR599 Intersection; Walk & Roll Program; Boeing Access Road Bridge Rehabilitation; TUC — Pedestrian /Bicycle Bridge FINANCIAL IMPACT None. RECOMMENDATION Council is being asked to approve the Resolution for the 2018 -2023 Six -Year Transportation Improvement Program and consider this item at the June 12, 2017 Committee of the Whole with a Public Hearing and subsequent June 19, 2017 Regular Meeting. Attachments: Draft Resolution Draft 2018 -2023 TIP Summary 2018 — 2023 "Draft" Transportation Improvement Program Current Adopted 2017 — 2022 TIP \ \pwstore \pw common$ \pw eng \projects \a - rw & rs projects \tip \info memo tip 2018.docx 55 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM (2018- 2023), AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE TRANSPORTATION IMPROVEMENT BOARD. WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26, the City Council of the City of Tukwila has previously adopted a Transportation Improvement Program and thereafter periodically modified said Transportation Improvement Program by resolution; and WHEREAS, the City Council has reviewed the work accomplished under said program, determined current and future City street and arterial needs and, based upon these findings, has prepared a Six -Year Transportation Improvement Program for the ensuing six calendar years (2018- 2023); and WHEREAS, on June 12, 2017, a public hearing was held regarding the City's Six - Year Transportation Improvement Program; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. Program Adopted. A Six -Year Transportation Improvement Program for the calendar years 2018 to 2023, attached hereto as Exhibit A, is hereby adopted. Section 2. Filing of Program. The City Clerk is hereby authorized and directed to file a copy of this resolution, together with the exhibit attached hereto, with the Secretary of Transportation and the Transportation Improvement Board of the State of Washington WAWord ProcessinglResolutions\TIP 2018 -2023 5 -17 -17 CK:bjs Page 1 of 2 PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this day of 12017. ATTEST /AUTHENTICATED: Christy O'Flaherty, MMC, City Clerk APPROVED AS TO FORM BY: Rachel B. Turpin, City Attorney Dennis Robertson, Council President Filed with the City Clerk:_ Passed by the City Council: Resolution Number: Exhibit A: City of Tukwila Six -Year Transportation Improvement Program for 2018 to 2023 W: \Word Processing \Resolutions \TIP 2018 -2023 5 -17 -17 CK:bjs Page 2 of 2 57 E2 <D -C3 <0 L.L- -i CV C14 4= C:, 7:3 co Z7M <D CS Qa O N C.03 OD L Li C14 N co C) co c" Lr . > C14 ILC.> C141 CL <D <D 's N cu n ILL- <1> S2 E2 <D -C3 <0 L.L- -i CV C14 4= C:, 7:3 co Z7M <D CS Qa O N !��? <231 –11 r- C114 r--L OD C14 N C141 co Lr . > C14 ILC.> C141 CL <D 's N cu n <1> S2 L3 <D 7:3 -Z--3 co C15 cp clo r -c -7 a> ��> OD 00 a7 00 Q�l on S-: to -52 42 CD Z7 CT7 -,C:3 CV Cll C57 C1} CU LU CiS L.0 CD r,rl -21 N N Cv r-I !�2 r-!- 'm O C-Ij C.0 !��? <231 –11 r- C114 r--L F- C=> Lr,> C3,> CC> =�- LQ- Lr> cljl Lr,> :)� <=> i c-:, clj cr- �l r` ti LLr7 cIt rn � cs Clil cxD. C'4 tx-> cno N cz=l O cz=l O N <=> N I-- cl"> C37 Lx-.> O 127 ilf7 clj clj (=F> cljl cc> -13- <-> <=> O LCD I=> <=> N ­r d- O <=, C=> LCD C=> (=, C=> C=> C=> 0 <=> 0 0 CZ> CZD P-- O —1- C=> C-4 LL-r7 -2- r-� cl,4- <=> <=> ­r LCD I=> O I=> c:D C=> cm> 0 Lr> 0 c--> <=> c=> <=> cl-3 cl:, r- O M r- cc> cl> O O c=> c=> c=> CO c=> Lr> c=> O O O c� P- 4= c� ir- c14 c---�- -3:- (=:�- <=> cl> c-IF CD � 127 C] " <=> 0 (=> <=) " O M CC) O CC> cli M C14 N N C";. CI'S Cllj CIQI CD C4 a> CJ CD C:L> Co Cis CK3 <D cc;ol Cu Cl> Cl> E C, C:) 0- -ea- ef-5 J- .— co — 2 Co - E-- -05 (5 Fp a> G;o -cc E 65 -98 — 13> 0- co co 213- 72 C:L> �3: D C-> co Co Q> a> C/3 =C:�', -R C5, t-- 45 a' -S -T- D CD CZ col ca ca n C C/3 2 CM- cz c m C:) d> C> 65 86 �a 0, co NI s -= a> <D -zc C/Do 2 2- am;, = cual :r Lf-> z�c -::Ic M 00 C-> LL- C.0 vo C/3 IF-- N M –v Lr7 <fl Imo- CO c77 �---> — N � � !;2 C2 Imo. tsi to O tsi to Lcl. NI Its NI CX31 -qr 4M. Lr:t C14 C141 6 C14- r- Lr— CIP cz::t to JI C> I-- C14 T-- C141 co Lr . > C14 ILC.> C141 F- C=> Lr,> C3,> CC> =�- LQ- Lr> cljl Lr,> :)� <=> i c-:, clj cr- �l r` ti LLr7 cIt rn � cs Clil cxD. C'4 tx-> cno N cz=l O cz=l O N <=> N I-- cl"> C37 Lx-.> O 127 ilf7 clj clj (=F> cljl cc> -13- <-> <=> O LCD I=> <=> N ­r d- O <=, C=> LCD C=> (=, C=> C=> C=> 0 <=> 0 0 CZ> CZD P-- O —1- C=> C-4 LL-r7 -2- r-� cl,4- <=> <=> ­r LCD I=> O I=> c:D C=> cm> 0 Lr> 0 c--> <=> c=> <=> cl-3 cl:, r- O M r- cc> cl> O O c=> c=> c=> CO c=> Lr> c=> O O O c� P- 4= c� ir- c14 c---�- -3:- (=:�- <=> cl> c-IF CD � 127 C] " <=> 0 (=> <=) " O M CC) O CC> cli M C14 N N C";. CI'S Cllj CIQI CD C4 a> CJ CD C:L> Co Cis CK3 <D cc;ol Cu Cl> Cl> E C, C:) 0- -ea- ef-5 J- .— co — 2 Co - E-- -05 (5 Fp a> G;o -cc E 65 -98 — 13> 0- co co 213- 72 C:L> �3: D C-> co Co Q> a> C/3 =C:�', -R C5, t-- 45 a' -S -T- D CD CZ col ca ca n C C/3 2 CM- cz c m C:) d> C> 65 86 �a 0, co NI s -= a> <D -zc C/Do 2 2- am;, = cual :r Lf-> z�c -::Ic M 00 C-> LL- C.0 vo C/3 IF-- N M –v Lr7 <fl Imo- CO c77 �---> — N � � !;2 C2 Imo. tsi to O tsi to Lcl. NI Its NI CX31 -qr 4M. Lr:t C14 C141 6 C14- r- Lr— CIP cz::t to JI C> I-- III C*11 VIA <= If., C110 G> EE N 0017 2 LL C> C" C" LU 58 co -C:3 fro CL (MI <1> S2 L3 <D 7:3 -Z--3 co C15 cp CD CD r -c -7 a> ��> OD 00 a7 00 Q�l on S-: to -52 42 CD III C*11 VIA <= If., C110 G> EE N 0017 2 LL C> C" C" LU 58 E12 Cll7 C= L3 <D 7:3 -Z--3 C> :::— a> �:— �:— a> ��> OD 00 a7 00 Q�l on to -52 42 -2 Z7 CT7 -,C:3 C Cll C57 C1} CU CiS -21 !�2 'm -::r- C.0 III C*11 VIA <= If., C110 G> EE N 0017 2 LL C> C" C" LU 58 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2018 to 2023 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m -, 2 Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 4th WA -07745 40 -42 Ave S (S 160 St - S 131 PL) S 160th Street to Southcenter Blvd Design and construct street improvements, underground aerial utilities, drainage, sidewalks, bike facilities, and driveway adjustments 06/12/17 06/19/17 2,465,000 2,465,000 04 C G O P S TW 2023 Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2018 4th 0 5th & 6th 0 2,465,000 2,465,000 P CN 2023 0 0 4,360,000 4,360,000 Totals 0 2,465,000 0 6,825,000 6,825,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 2,465, 000 0 0 0 4,360,000 Totals 2,465,000 0 0 0 4,360,000 Report Date: May 17, 2017 Page 1 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2018 to 2023 N Outside Jag w n ry Alpopd A. PIN/Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID x CD 0 luawpuawv .ory uonniosaN adAi luawanaidwi sapoo Alunn 416uai ieloi adAi ieluawucuvaig pai!nbaN AAN 17 53rd Avenue S S 137th St to S 144th St Design and construct urban residential street improvements that include curb, gutter, sidewalk, illumination and undergrounding. Street portion will coordinate with Water, Surface Water and Sewer capital improvement program projects. WA-06601 06/12/17 06/19/17 04 CGOPS T W 0.420 CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2018 0 TIB 900,000 1,710,000 2,610,000 Totals 0 2,610,000 900,000 1,710,000 2,610,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 2,610,000 0 0 0 0 Totals 2,610,000 0 0 0 0 Report Date: May 17, 2017 Page 2 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2018 to 2023 N Outside Jag w n ry Alpopd A. PIN/Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID x CD 0 luawpuawv .ory uonniosaN adAi luawanaidwi sapoo Alunn 416uai ieloi adAi ieluawucuvaig pai!nbaN AAN 00 Americans with Disabilities Act (ADA) Improvements Various locations to Design and construct ADA compliant upgrades to City infrastructure in conjunction with a City developed plan. WA-05405 06/12/17 06/19/17 06 No Funding Status Phase ALL Phase Start Year (YYYY) 2018 Federal Fund Code Totals Federal Funds 0 State Fund Code State Funds 0 0 Local Funds 1,200,000 1,200,000 Total Funds 1,200,000 1,200,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 200,000 200,000 200,000 200,000 400,000 Totals 200,000 200,000 200,000 200,000 400,000 Report Date: May 17, 2017 Page 3 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2018 to 2023 N Outside Jag w n ry Alpopd A. PIN/Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID x CD 0 luawpuawv .ory uonniosaN adAi luawanaidwi sapoo Alunn 416uai ieloi adAi ieluawucuvaig pai!nbaN AAN 16 Andover Park E/Minkler Blvd Intersection Andover Park E Minkler Blvd to Construct left turn lanes on Andover Park East and reconstruct traffic signal WA-07746 06/12/17 06/19/17 03 CGOPS T W No Funding Status P P P Phase PE RW CN Phase Start Year (YYYY) 2020 2020 2021 Federal Fund Code Totals Federal Funds 0 0 0 State Fund Code State Funds 0 0 0 0 Local Funds 134,000 10,000 1,570,000 1,714,000 Total Funds 134,000 10,000 1,570,000 1,714,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 134,000 0 0 RW 0 0 10,000 0 0 CN 0 0 0 1,570,000 0 Totals 0 0 144,000 1,570,000 0 Report Date: May 17, 2017 Page 4 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2018 to 2023 N Outside Jag w n ry Alpopd A. PIN/Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID x CD 0 luawpuawv .ory uonniosaN adAi luawanaidwi sapoo Alunn 416uai ieloi adAi ieluawucuvaig pai!nbaN AAN 14 Annual Bridge Inspections and Repairs Various City Street to Perform load ratings and bi-annual inspections as well as construct necessary repairs and maintenance WA-03731 06/12/17 06/19/17 06 No Funding Status Phase ALL Phase Start Year (YYYY) 2018 Federal Fund Code Totals Federal Funds 0 State Fund Code State Funds 0 0 Local Funds 2,220,000 2,220,000 Total Funds 2,220,000 2,220,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 335,000 335,000 335,000 405,000 810,000 Totals 335,000 335,000 335,000 405,000 810,000 Report Date: May 17, 2017 Page 5 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2018 to 2023 N Outside Jag w n ry Alpopd A. PIN/Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID x CD 0 luawpuawv .ory uonniosaN adAi luawanaidwi sapoo Alunn 416uai ieloi adAi ieluawucuvaig pai!nbaN AAN 16 Annual Overlay and Repair Program Various City Streets to Repair, rehabilitate, and overlay City streets as needed in an annual program WA-03733 06/12/17 06/19/17 06 CGOPS T W No Funding Status Phase ALL Phase Start Year (YYYY) 2018 Federal Fund Code Totals Federal Funds 0 State Fund Code State Funds 0 0 Local Funds 10,320,000 10,320,000 Total Funds 10,320,000 10,320,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 1,400,000 1,730,000 1,740,000 1,800,000 3,600,000 Totals 1,400,000 1,730,000 1,740,000 1,800,000 3,600,000 Report Date: May 17, 2017 Page 6 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2018 to 2023 N Outside Jag w n ry Alpopd A. PIN/Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID x CD 0 luawpuawv .ory uonniosaN adAi luawanaidwi sapoo Alunn 416uai ieloi adAi ieluawucuvaig pai!nbaN AAN 19 /1320(004) Beacon Ave S Bridge Preventative Maintenance Project Beacon Avenue South over South Ryan Way S Victor St to S 170th St Remove and replace failed bridge deck and paint structural steel. TUK-57 06/12/17 06/19/17 14 0.010 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2018 STP(BR) 1,740,920 0 0 1,740,920 Totals 1,740,920 1,740,920 0 0 1,740,920 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 1,740,920 0 0 0 0 Totals 1,740,920 0 0 0 0 Report Date: May 17, 2017 Page 7 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2018 to 2023 N Outside Jag w n ry Alpopd A. PIN/Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID x CD 0 luawpuawv .ory uonniosaN adAi luawanaidwi sapoo Alunn 416uai ieloi adAi ieluawucuvaig pai!nbaN AAN 00 BNSF Regional Center Access New Facility to Construct a new access to the BNSF Regional Distribution Center, relocating the 900+ daily truck trips from residential streets in Allentown. WA05409 06/12/17 06/19/17 08 EIS No Funding Status P Phase PE Phase Start Year (YYYY) 2018 Federal Fund Code Totals Federal Funds 0 State Fund Code State Funds 0 0 Local Funds 100,000 100,000 Total Funds 100,000 100,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 100,000 0 0 0 0 Totals 100,000 0 0 0 0 Report Date: May 17, 2017 Page 8 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2018 to 2023 N Outside Jag w n ry Alpopd A. PIN/Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID x CD 0 luawpuawv .ory uonniosaN adAi luawanaidwi sapoo Alunn 416uai ieloi adAi ieluawucuvaig pai!nbaN AAN 00 /1320(005) Cascade View Elementary Safe Routes to School Project - Phase 2 33rd Ave S and S 140th Street S. 144th at 34th Ave. S. to 140th St at 34th Ave. S. Concrete sidewalks are proposed on one side of 33rd Ave S (S 140th St to S 144th St) and on one side of S. 140th St (Military Road South to 34th Ave S) along with a standard curb and gutter separating the sidewalk from the roadway. A traffic circle is proposed at the intersection of 33rd Ave S and S 140th St to assist in reducing vehicle speeds and increase visibility and safety of pedestrians crossing the street. Curb bulb-outs and/or pedestrian refuge islands at the east entrance/exit to the traffic circle would be constructed to improve the safety of crossing S 140th St at 33rd Ave S. There are currently no ADA facilities to connect to within the project limits. Minor storm water improvements will be added to the general action area. The new sidewalk along 33rd Ave S. will require reconstruction of the pavement cross section to establish proper crown slopes. TUK-58 06/12/17 06/19/17 28 0.510 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2018 SRTS 714,000 0 100,000 814,000 Totals 714,000 0 100,000 814,000 Expenditure Schedule Phase ALL Totals 1st 814,000 814,000 2nd 0 0 3rd 0 0 4th 0 0 5th & 6th 0 0 Report Date: May 17, 2017 Page 9 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2018 to 2023 N Outside Jag w n ry Alpopd A. PIN/Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID x CD 0 luawpuawv .ory uonniosaN adAi luawanaidwi sapoo Alunn 416uai ieloi adAi ieluawucuvaig pai!nbaN AAN 16 /1274(009) Frank Zepp Bridge Preventative Maintenance Project S 180th Street over the Green River SR 181 - West Valley Highway to Sperry Drive S Paint the structural steel, overlay deck and replace the deck joint, and install seismic protection. TUK-55 06/12/17 06/19/17 14 0.040 CE No Funding Status Phase CN Phase Start Year (YYYY) 2018 Federal Fund Code STP(BR) Totals Federal Funds 2,534,812 2,534,812 State Fund Code State Funds 0 0 Local Funds 0 0 Total Funds 2,534,812 2,534,812 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 2,534,812 0 0 0 0 Totals 2,534,812 0 0 0 0 00 Report Date: May 17, 2017 Page 10 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2018 to 2023 N Outside Jag w n ry Alpopd A. PIN/Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID x CD 0 luawpuawv .ory uonniosaN adAi luawanaidwi sapoo Alunn 416uai ieloi adAi ieluawucuvaig pai!nbaN AAN 14 /1288(005) Grady Way Bridge Preventative Maintenance Project Grady Way Bridge over BN and UP Railroads Interurban Avenue S to Longacres Drive SW, Renton Retrofit existing bridge with seismic protection. TUK-56 06/12/17 06/19/17 14 0.230 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2018 STP(BR) 197,725 0 0 197,725 Totals 197,725 197,725 0 0 197,725 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 197,725 0 0 0 0 Totals 197,725 0 0 0 0 cs) Report Date: May 17, 2017 Page 11 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2018 to 2023 N Outside Jag w n ry Alpopd A. PIN/Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID x CD 0 luawpuawv .ory uonniosaN adAi luawanaidwi sapoo Alunn 416uai ieloi adAi ieluawucuvaig pai!nbaN AAN 00 Multipurpose Trails to Wide array of necessary trail improvements to existing trail system infrastructure WA-03783 06/12/17 06/19/17 28 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds CN 2018 0 0 62,000 62,000 P ALL 2023 0 150,000 150,000 Totals 0 0 212,000 212,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 62,000 0 0 0 0 ALL 0 0 0 0 150,000 Totals 62,000 0 0 0 150,000 Report Date: May 17, 2017 Page 12 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2018 to 2023 N Outside Jag w n ry Alpopd A. PIN/Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID x CD luawpuawv .ory uonniosaN adAi luawanaidwi sapoo Alunn 416uai ieloi adAi ieluawucuvaig pai!nbaN AAN 14 S 140th St Intersection Improvements S 140th Street Tukwila International Blvd to Design and construct a new traffic signal at the S 140th Street/Tukwila Blvd intersection nterna onal WA-09873 06/12/17 06/19/17 04 CGPST 0.100 DCE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2019 Ped/Bike Program 67,000 8,000 75,000 P RW 2020 Ped/Bike Program 40,000 10,000 50,000 P CN 2020 0 Ped/Bike Program 568,000 57,000 625,000 Totals 0 675,000 75,000 750,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 75,000 0 0 0 RW 0 0 50,000 0 0 CN 0 0 625,000 0 0 Totals 0 75,000 675,000 0 0 Report Date: May 17, 2017 Page 13 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2018 to 2023 N Outside Jag w n ry Alpopd A. PIN/Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID x CD 0 luawpuawv .ory uonniosaN adAi luawanaidwi sapoo Alunn 416uai ieloi adAi ieluawucuvaig pai!nbaN AAN 17 S 144th St Bridge Sidewalks S 144th Street 51st Ave S to 53rd Ave S Widen existing sidewalks on bridge over 1-5 between 51st Ave S and 53rd Ave S WA03782 06/12/17 06/19/17 28 0.250 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2019 SRTS 173,000 0 27,000 200,000 P CN 2019 SRTS 1,047,000 0 163,000 1,210,000 Totals 1,220,000 0 190,000 1,410,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 200,000 0 0 0 CN 0 0 1,210,000 0 0 Totals 0 200,000 1.210.000 0 0 Report Date: May 17, 2017 Page 14 Agency: la County: King MPO/RTPO: PSRC Y Inside Six ���� Transportation Improvement U��������� ~-^ Year ^ ^~~^^~~n~~~^~~~~^~~^^ ^^^^n~^~~~~~^^^~~^^~ Program From 2018 to 2023 N Outside cn tn Jag w n ry Alpopd A. PlNlProject No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID CD 0 luawpuawv .ory uonniosaN adAi luawanaidwi sapoo Alunn 416uai ieloi adAi ieluawucuvaig pai!nbaN AAN 16 mranderewu./SW 27th St Extension otrenue,ewu./SWzrmm West VaIIey Highway to NJaches Ave This project is Phase 3 of a multi-phase improvement that will connect Strander o|vu/ovvurmot between West VaIIey Hwy in Tukwila and Oakesdale Ave in Renton. This project will complete the design, right-of-way and construction phases for the roadway segment between West VaIIey Hwy and Naches Ave. Project components include a railroad bridge for the Union Pacific RR to provide grade separation. a new 4/5 lane roadway segment east of West VaIIey Hwy. roadway widening of two lanes for a portion of the project segment, a separated joint-use t,ei|, a new trail bridge for the Interurban Trail (including new trail connections to Strander BIvd.), a new flyover bridge connection to the Tukwila Station, and a new traffic signal serving the Tukwila Station. Current funding will complete the preliminary engineering and right-of-way phases. Construction will be funded as part of a future phase. TUK-59 06/12/17 06/19/17 01 0 300 DCE Yes Funding Status n n p p n p Phase PE RW cw cw cw cw Phase Start Year (YYYY) 2018 2018 2020 2020 2020 2020 Federal Fund Code STP(UL) STP(UL) TIGER FMSIB Discretionary Totals Federal Funds 3 892 500 1,254.300 13,794,000 5,000,000 5,000,000 0 28,940,800 State Fund Code TIB State Funds 0 0 5,000,000 0 0 0 5,000,000 Local Funds 607,500 195,700 706,000 0 0 706,000 2,r/5,om Total Funds 4,500,000 1,450,000 19,500,000 5,000,000 5,000,000 706,000 36.156,000 Report Date: May 17, 2017 Page 15 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2018 to 2023 NJ Outside Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 2,500,000 2,000,000 0 0 0 RW 450,000 1,000,000 0 0 0 CN 50,000 0 18,300,000 14,200,000 0 Totals 3,000,000 3,000,000 18,300,000 14,200,000 0 Report Date: May 17, 2017 Page 16 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2018 to 2023 N Outside Jag w n ry Alpopd A. PIN/Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID x CD 0 luawpuawv .ory uonniosaN adAi luawanaidwi sapoo Alunn 416uai ieloi adAi ieluawucuvaig pai!nbaN AAN 17 TUC/TOD Pedestrian Improvements Baker Blvd (if extended) Andover Park W to E City Limits Construct bike/pedestrian connection between the Tukwila Urban Center (TUC) and Tukwila Station, with service by Amtrak Sounder Commuter Rail/Transit Oriented Development (TOD) area. WA-03772 06/12/17 06/19/17 28 0.750 CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2023 STP(E) 3,400,000 0 850,000 4250000 , Totals 3.400000 0 850,000 4,250,000 Expenditure Schedule Phase ALL Totals 1st 0 0 2nd 0 0 3rd 0 0 4th 0 0 5th & 6th 4,250,000 4,250,000 Report Date: May 17, 2017 Page 17 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2018 to 2023 N Outside Jag w n ry Alpopd A. PIN/Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID x CD 0 luawpuawv .ory uonniosaN adAi luawanaidwi sapoo Alunn 416uai ieloi adAi ieluawucuvaig pai!nbaN AAN 14 West Valley Highway SR 181/West Valley Highway 1-405 to Strander Blvd Design and construct completion of 7 lane sections of West Valley Highway with sidewalks, curbs, gutters, storm drainage, lighting, and traffic control, including safety and capacity improvements at the S 156th St intersection. WA03779 06/12/17 06/19/17 03 0.500 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds PE 2018 STP 189,000 0 38,000 227,000 P PE 2018 0 TIB 155,000 0 155,000 RW 2018 0 0 100,000 100,000 CN 2019 STP 438 000 0 62,000 500,000 P CN 2019 0 TIB 2,389,000 582,000 2,971,000 Totals 627,000 2,544,000 782,000 3,953,000 Expenditure Schedule Phase PE RW CN Totals 1st 382,000 100,000 0 482,000 2nd 0 0 2,070,000 2,070,000 3rd 0 0 0 0 4th 0 0 0 0 5th & 6th 150,000 100,000 1,150,000 1,400,000 Federal Funds State Funds Local Funds Total Funds Grand Totals for Tukwila 39,375,257 9,119,000 26,050,780 74,545,037 Report Date: May 17, 2017 Page 18 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2017 to 2022 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m -, 2 Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 4th WA -07745 40 -42 Ave S (S 160 St - S 131 PL) S 160th Street to Southcenter Blvd Design and construct street improvements, underground aerial utilities, drainage, sidewalks, bike facilities, and driveway adjustments 06/13/16 06/20/16 6,868,000 1882 04 C G O P S TW 2021 Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2017 4th 0 5th & 6th 0 6,868,000 6,868,000 P CN 2021 0 0 4,360,000 4,360,000 Totals 0 4,807,000 0 11,228,000 11,228,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 4,807,000 2,031,000 0 0 4,360,000 Totals 4,807,000 2,031,000 0 0 4,360,000 Report Date: June 21, 2016 Page 1 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2017 to 2022 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m -, La m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 WA -06601 53rd Avenue S S 137th St to S 144th St Design and construct urban residential street improvements that include curb, gutter, sidewalk , illumination and undergrounding. Street portion will coordinate with Water, Surface Water and Sewer capital improvement program projects. 06/13/16 06/20/16 2,565,600 1882 04 C G O P S TW 0.420 CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2017 0 TIB 2,141,400 2,565,600 4,707,000 Totals 0 2,353,500 2,141,400 2,565,600 4,707,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 2,353,500 2,353,500 0 0 0 Totals 2,353,500 2,353,500 0 0 0 co Report Date: June 21, 2016 Page 2 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2017 to 2022 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m -, La m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 4th WA -05405 Americans with Disabilities Act (ADA) Improvements Various locations to Design and construct ADA compliant upgrades to City infrastructure in conjunction with a City developed plan. 06/13/16 06/20/16 1,200,000 1882 06 0 200,000 0 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2017 4th 0 5th & 6th 0 1,200,000 1,200,000 Totals 0 200,000 0 1,200,000 1,200,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 200,000 200,000 200,000 200,000 400,000 Totals 200,000 200,000 200,000 200,000 400,000 `0 Report Date: June 21, 2016 Page 3 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2017 to 2022 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m -, 2 Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -03766 Andover Park E /Industry Drive Signal Andover Park E Industry Drive to Design and construct a traffic signal and intersection improvements 06/13/16 06/20/16 75,000 1882 05 C G O P S TW 0.190 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2017 0 0 75,000 75,000 P RW 2017 0 0 10,000 10,000 P CN 2018 0 10,000 0 657,000 657,000 Totals 0 0 0 742,000 742,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 75,000 0 0 0 0 RW 10,000 0 0 0 0 CN 0 657,000 0 0 0 Totals 85,000 657,000 0 0 0 co Report Date: June 21, 2016 Page 4 op Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2017 to 2022 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m -, 2 Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -07746 Andover Park E /Minkler Blvd Intersection Andover Park E Minkler Blvd to Construct left turn lanes on Andover Park East and reconstruct traffic signal 06/13/16 06/20/16 134,000 134,000 03 C G O P S TW 2017 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2017 0 0 134,000 134,000 P RW 2017 0 0 10,000 10,000 P CN 2018 0 10,000 0 1,570,000 1,570,000 Totals 0 0 0 1,714,000 1,714,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 134,000 0 0 0 0 RW 10,000 0 0 0 0 CN 0 1,570,000 0 0 0 Totals 144,000 1,570,000 0 0 0 Report Date: June 21, 2016 Page 5 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2017 to 2022 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m -, La m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 4th WA -03731 Annual Bridge Inspections and Repairs Various City Street to Perform load ratings and bi- annual inspections as well as construct necessary repairs and maintenance 06/13/16 06/20/16 1,945,000 1882 06 0 335,000 0 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2017 4th 0 5th & 6th 0 1,945,000 1,945,000 Totals 0 335,000 0 1,945,000 1,945,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 270,000 335,000 335,000 335,000 670,000 Totals 270,000 335,000 335,000 335,000 670,000 co ti Report Date: June 21, 2016 Page 6 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2017 to 2022 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m -, La m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 4th WA -03733 Annual Overlay and Repair Program Various City Streets to Repair, rehabilitate, and overlay City streets as needed in an annual program 06/13/16 06/20/16 10,280,000 1882 06 C G O P S TW 1,670,000 0 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2017 4th 0 5th & 6th 0 10,280,000 10,280,000 Totals 0 1,670,000 0 10,280,000 10,280,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 1,650,000 1,670,000 1,725,000 1,730,000 3,505,000 Totals 1,650,000 1,670,000 1,725,000 1,730,000 3,505,000 co w Report Date: June 21, 2016 Page 7 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2017 to 2022 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m -, La m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 19 STP(BR) / 1320(004) TUK -57 Beacon Ave S Bridge Preventative Maintenance Project Beacon Avenue South over South Ryan Way S Victor St to S 170th St Remove and replace failed bridge deck and paint structural steel. 06/13/16 06/20/16 0 1882 14 1,740,920 0.010 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2017 STP(BR) 1,740,920 0 0 1,740,920 Totals 1,740,920 1,740,920 0 0 1,740,920 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 1,740,920 0 0 0 0 Totals 1,740,920 0 0 0 0 co Report Date: June 21, 2016 Page 8 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2017 to 2022 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m -, La m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 FMSIB WA05409 BNSF Regional Center Access New Facility to Construct a new access to the BNSF Regional Distribution Center, relocating the 900+ daily truck trips from residential streets in Allentown. 06/08/15 06/15/15 300,000 1882 08 CN 2021 EIS No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2021 FMSIB 950,000 5th & 6th 0 300,000 1,250,000 P CN 2021 FMSIB 10,812,500 0 1,687,500 12,500,000 Totals 11,762,500 0 0 1,987,500 13,750,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 12, 500,000 CN 0 0 0 0 1,250,000 Totals 0 0 0 0 13,750,000 co oi Report Date: June 21, 2016 Page 9 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2017 to 2022 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m -, La m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 STP(BR) / 1380(003) TUK -52 06/13/16 06/20/16 2,220,000 1882 14 8,625,600 0.200 DCE Yes 10,845,600 Boeing Access Road Bridge Rehabilitation Totals 10,845,600 0 0 0 0 Boeing Access Road Interstate 5 to Airport Way South Rehabilitate the existing Boeing Access Road bridge structure over the Burlington Norther and Union Pacific Railroads. Work will include rehabilitation of the bridge sub - structure, seismic retrofit, and construction of a new bridge deck including pedestrian /bicycle amenities. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2017 STP(BR) 8,625,600 0 2,220,000 10,845,600 Totals 8,625,600 0 2,220,000 10,845,600 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 10,845,600 0 0 0 0 Totals 10,845,600 0 0 0 0 co c' Report Date: June 21, 2016 Page 10 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2017 to 2022 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m -, La m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 SRTS / 1320(005) TUK -58 06/13/16 06/20/16 83,353 1882 28 699,745 0.510 CE No 783,098 0 Cascade View Elementary Safe Routes to School Project - Phase 2 0 0 Totals 783,098 0 0 33rd Ave S and S 140th Street 0 0 S. 144th at 34th Ave. S. to 140th St at 34th Ave. S. Concrete sidewalks are proposed on one side of 33rd Ave S (S 140th St to S 144th St) and onone side of S. 140th St (Military Road South to 34th Ave S) along with a standard curb and gutter separating the sidewalk from the roadway. A traffic circle is proposed at the intersection of 33rd Ave S and S 140th St to assist inreducing vehicle speeds and increase visibility and safety of pedestrians crossing the street. Curb bulb -outs and /or pedestrian refuge islands at the east entrance /exit to the traffic circle would be constructed to improve the safety ofcrossing S 140th St at 33rd Ave S. There are currently no ADA facilities to connect to within the project limits. Minor storm water improvements will be added to the general action area. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2017 SRTS 699,745 0 83,353 783,098 Totals 699,745 783,098 0 83,353 783,098 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 783,098 0 0 0 0 Totals 783,098 0 0 0 0 co Report Date: June 21, 2016 Page 11 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2017 to 2022 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m -, La m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 STP(BR) / 1274(009) TUK -55 Frank Zepp Bridge Preventative Maintenance Project S 180th Street over the Green River SR 181 - West Valley Highway to Sperry Drive S Paint the structural steel, overlay deck and replace the deck joint, and install seismic protection. 06/13/16 06/20/16 0 1882 14 2,534,812 0.040 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2017 STP(BR) 2,534,812 0 0 2,534,812 Totals 2,534,812 2,534,812 0 0 2,534,812 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 2,534,812 0 0 0 0 Totals 2,534,812 0 0 0 0 co co Report Date: June 21, 2016 Page 12 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2017 to 2022 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m -, La m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 STP(BR) / 1288(005) TUK -56 Grady Way Bridge Preventative Maintenance Project Grady Way Bridge over BN and UP Railroads Interurban Avenue S to Longacres Drive SW, Renton Retrofit existing bridge with seismic protection. 06/13/16 06/20/16 0 1882 14 148,574 0.230 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2017 STP(BR) 148,574 0 0 148,574 Totals 148,574 148,574 0 0 148,574 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 148,574 0 0 0 0 Totals 148,574 0 0 0 0 co `0 Report Date: June 21, 2016 Page 13 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2017 to 2022 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m -, La m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 4th WA -03783 Multipurpose Trails to Wide array of necessary trail improvements to existing trail system infrastructure 06/13/16 06/20/16 520,000 1882 28 0 60,000 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2017 4th 0 5th & 6th 0 520,000 520,000 Totals 0 60,000 0 520,000 520,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 60,000 60,000 60,000 60,000 280,000 Totals 60,000 60,000 60,000 60,000 280,000 Report Date: June 21, 2016 Page 14 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2017 to 2022 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m -, 2 Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -07748 S 133 St/SR599 Southbound Intersection S 133rd Street SR 599 Southbound Ramps to S 134th PI Construct intersection improvements including signalization or roundabout, lighting, crosswalks, and drainage. 06/13/16 06/20/16 310,000 1882 04 C G O P S TW 2018 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2018 0 0 310,000 310,000 P RW 2018 0 0 25,000 25,000 P CN 2019 0 0 0 2,064,000 2,064,000 Totals 0 0 0 2,399,000 2,399,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 310,000 0 0 0 RW 0 25,000 0 0 0 CN 0 0 2,064,000 0 0 Totals 0 335,000 2,064,000 0 0 Report Date: June 21, 2016 Page 15 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2017 to 2022 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m -, 2 Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 STP(BR) WA03782 S 144th St Bridge Sidewalks S 144th Street 51st Ave S to 53rd Ave S Widen existing sidewalks on bridge over 1 -5 between 51st Ave S and 53rd Ave S 06/13/16 06/20/17 243,800 1882 28 975,200 0.250 0 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2021 STP(BR) 975,200 5th & 6th 0 243,800 1,219,000 Totals 975,200 0 0 243,800 1,219,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 0 0 1,219,000 Totals 0 0 0 0 1,219,000 ti Report Date: June 21, 2016 Page 16 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2017 to 2022 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m -, La m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 STP WA -05410 Strander Blvd /SW 27th St Phase III Strander Boulevard E City Limits to West Valley Hwy /SR 181 Design and construct arterial improvements for a new roadway extending Strander Boulevard /SW 27th St from West Valley Highway to Oaksdale Ave 06/13/16 06/20/16 607,500 1882 01 RW 2018 EIS No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2017 STP 3,892,500 5th & 6th 0 607,500 4,500,000 P RW 2018 STP 1,254,250 0 195,750 1,450,000 P CN 2022 FMS I B 5,000,000 0 1,000,000 6,000,000 P CN 2022 TIGER III 20,000,000 0 25,000,000 45,000,000 Totals 30,146,750 5,100, 000 0 26,803,250 56,950,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 5,000,000 0 0 0 RW 0 0 1,450, 000 0 0 CN 0 0 0 0 5,100, 000 Totals 0 5,000,000 1,450,000 0 5,100,000 w Report Date: June 21, 2016 Page 17 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2017 to 2022 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m -, La m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 STP(E) WA -03772 TUC/TOD Pedestrian Improvements Baker Blvd (if extended) Andover Park W to E City Limits Construct bike /pedestrian connection between the Tukwila Urban Center (TUC) and Tukwila Station, with service by Amtrak Sounder Commuter Rail/Transit Oriented Development (TOD) area. 06/13/16 06/20/16 68,580 1882 28 RW 0.750 CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2017 STP(E) 439,420 0 0 68,580 508,000 P RW 2020 STP(E) 173,000 1,725,000 0 27,000 200,000 S CN 2017 0 0 1,000,000 1,000,000 P CN 2018 STP(E) 2,699,000 0 286,000 2,985,000 Totals 3,311,420 0 1,381,580 4,693,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 283,000 0 0 225,000 0 RW 0 0 0 200,000 0 CN 1,000,000 1,260,000 0 0 1,725,000 Totals 1,283,000 1,260,000 0 425,000 1,725,000 Report Date: June 21, 2016 Page 18 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2017 to 2022 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m -, La m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 / 1320(002) TUK -50 Tukwila Urban Center Pedestrian /Bicycle Bridge over Green River New bridge over the Green River, approximately between Baker Blvd (if extended) and Longacres Way (if extended) Baker Boulevard to West Valley Highway Construct a new pedestrian /bicycle bridge over the Green River 06/13/16 06/20/16 896,000 1882 28 0 0.640 DCE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2017 0 OTHER 5,289,000 896,000 6,185,000 Totals 0 6,185,000 5,289,000 896,000 6,185,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 6,185,000 0 0 0 0 Totals 6,185,000 0 0 0 0 oi Report Date: June 21, 2016 Page 19 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2017 to 2022 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m -, La m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 4th WA -03761 Walk & Roll Plan (Nonmotorized Transportation Plan) Various City Streets to Evaluate deficiencies and create a prioritized list of projects and recommended design standards. 06/08/15 06/15/15 175,000 1882 28 0 0 0 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2021 4th 0 5th & 6th 0 175,000 175,000 Totals 0 0 0 175,000 175,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 175,000 Totals 0 0 0 0 175,000 Report Date: June 21, 2016 Page 20 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2017 to 2022 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m -, La m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 RW WA03779 West Valley Highway SR 181 /West Valley Highway 1 -405 to Strander Blvd Design and construct completion of 7 lane sections of West Valley Highway with sidewalks, curbs, gutters, storm drainage, lighting, and traffic control, including safety and capacity improvements at the S 156th St intersection. 06/13/16 06/20/16 340,000 1882 03 RW 0.500 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2020 RW 0 0 0 340,000 340,000 P RW 2020 0 0 2,484,000 0 400,000 400,000 P CN 2021 0 TIB 1,792,000 542,000 2,334,000 Totals 0 1,792,000 1,282,000 3,074,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 174,000 150,000 RW 0 0 0 200,000 200,000 CN 0 0 0 0 2,484,000 Totals 0 0 0 374,000 2,834,000 Report Date: June 21, 2016 Page 21 Federal Funds State Funds Local Funds Total Funds Grand Totals for Tukwila 59,945,521 9,222,400 67,666,083 136,834,004 Report Date: June 21, 2016 Page 21