HomeMy WebLinkAboutTIC 2017-06-13 Item 2B - Bid Award - Razz Construction for Major Maintenance on 3 BridgesCity of Tukwila
Allan Ekberg, Mayor
Public Works Department - Bob Giberson, Director
INFORMATIONAL MEMORANDUM
TO: Transportation and Infrastructure Committee
FROM: Bob Giberson, Public Works Director ,
BY: Steve Carstens, Senior Program Manager
CC: Mayor Ekberg
DATE: June 9, 2017
SUBJECT: Major Maintenance on 3 Bridges Project
Project No. 91510406, 91510407, and 91510408
Bid Award
ISSUE
Award the construction bid to Razz Construction, Inc. (Razz) for the Major Maintenance on 3 Bridges.
BACKGROUND
The Major Maintenance on 3 Bridges includes the Grady Way Bridge, the Beacon Ave S Bridge, and the Frank Zepp
Bridge (S 180th St). Improvements include seismic retrofit (Zepp & Grady), bridge painting (Zepp & Beacon), and deck
and joint repairs (Zepp & Beacon). Construction bids were originally advertised in March 2017. Only one bid was
received that was significantly over the Engineer's Estimate and was subsequently rejected by Resolution No. 1907.
A second call for bids was advertised on May 3 and May 10, 2017 and two addenda were issued addressing
clarifications in the bid documents. Three bids were opened on May 31, 2017 and the apparent low bidder was Razz
Construction for $2,688,958.
DISCUSSION
The construction bids were reviewed and only one minor irregularity was found. There were no errors in the bid
submitted by Razz. WSDOT concurrence is required to award the bid for a federally funded project, including a review of
Disadvantaged Business Enterprise (DBE) requirements. WSDOT determined that the bidder does meet the DBE
requirements and WSDOT has provided concurrence to award the bid to Razz.
Razz has been doing business since 2005 in Washington and has experience with projects of similar size and scope.
Razz does not have any exceptions and has not been debarred from working on federally funded projects.
FISCAL IMPACT
Bid Results Eng Estimate Budget
Razz Construction $ 2,688,958.00 $ 2,696,215.00 $ 3,889,000.00
Contingency (15 %) 403,343.00
Total $ 3,092,301.00 $ 2.696.215.00 $3.889,000.00
RECOMMENDATION
Council is being asked to award the bid to Razz Construction, Inc. in the amount of $2,688,958.00 for the Major
Maintenance on 3 Bridges Project and consider this item on the Consent Agenda at the June 19, 2017 Regular Meeting.
Attachments: Page 12, 2017 CIP
Bid Tabulation
W PW Eng\PROJECTSW RW & RS Projectsâ– Major Maintenance an 3 Bridges (91510406;102 Funding and Finance Transportaton Committee\Info Memo Bid Award Rau 060917 gl -sm docx
25
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
91510406
PROJECT: Major Maintenance on 3 Bridges 2015 Project Nos. 91510407
91510408
DESCRIPTION: Perform Seismic Retrofit, Deck and Joint Repair, and Bridge Painting work under the Local Agency Bridge
Program on the Frank Zepp Bridge, Grady Way Bridge and the Beacon Avenue South Bridge.
The three bridges were identified as good candidates for federal funding under the Local Agency Bridge
JUSTIFICATION: Program administered by WSDOT. The proposed work will preserve the City owned infrastructure and
extend the service lives of the bridges.
STATUS: Federal grant funding was approved December 2014. Council budget amendment approved 8/3/15.
MAINT. IMPACT: Maintenance needs will be reduced once these three major maintenance projects are completed.
The three bridges were approved for grants under separate federal aid numbers but will be combined into
COMMENT: one for the design & construction contract. Grant funding requires a 10% match for the design phase;
projects that obtain construction authorization by 9/30/18 are eligible for 100% Federal construction funding.
FINANCIAL Through Estimated
(in $000's)
2015 2016 2017
2018
2019
2020
2021
2022
BEYOND TOTAL
EXPENSES
Design
421
445
866
Land (R /W)
0
Const. Mgmt.
300
293
593
Construction
2,886
1,003
3,889
TOTAL EXPENSES
421
445
3,186
1,296
0
0
0
0
0
5,348
FUND SOURCES
Fed BRAC Grant
379
401
3,186
1,296
5,262
Mitigation Actual
0
Mitigation Expected
0
City Oper. Revenue
42
44
0
0
0
0
0
0
0
86
TOTAL SOURCES
421
445
3,186
1,296
0
0
0
0
0
5,348
2017 - 2022 Capital Improvement Program
12
26
CITY OF TUKWILA - MAJOR MAINTENANCE OF THREE BRIDGES
FINAL BID LIST SUMMARY
May 31, 2017
SCHEDULE A - BEACON AVENUE S BRIDGE
1 2 3
Engineer's Estimate
Razz Construction
Road Construction Northwest, Inc.
Triton Marine Construction
Item No.
Item Description
Quantity
Unit
Unit Price
Cost
Unit Price
Cost
Unit Price Cost
Unit Price Cost
Al
UNEXPECTED SITE CHANGES
1
FA
10,000
10,000
10,000
10,000
10,000
10,000
10,000
10,000
A2
RESOLUTION OF UTILITY CONFLICTS
1
FA
5,000
5,000
5,000
5,000
5,000
5,000
5,000
5,000
A3
SPCC PLAN
1
LS
2,000
2,000
3,000
3,000
900
900
1,200
1,200
A4
MOBILIZATION
1
LS
51,800
51,800
72,000
72,000
83,000
83,000
4,800
4,800
A5
PROJECT TEMPORARY TRAFFIC CONTROL
1
LS
45,000
45,000
30,000
30,000
37,500
37,500
20,000
20,000
A6
PEDESTRIAN TRAFFIC CONTROL
1
LS
5,000
5,000
6,000
6,000
2,200
2,200
14,300
14,300
A7
FLAGGERS, min Bid $65.00
200
HR
65
13,000
65
13,000
65
13,000
68
13,600
A8
REMOVING ASPHALT CONC. PAVEMENT
180
SY
10
1,800
13
2,340
21
3,780
44
7,920
A9
ROADWAY EXCAVATION INCL. HAUL
75
CY
50
3,750
30
2,250
50
3,750
72
5,400
Al0
CRUSHED SURFACING BASE COURSE
25
TON
60
1,500
64
1,600
70
1,750
140
3,500
All
HMA CL 1/2 INCH PG 64 -22
22
TON
200
4,400
312
6,864
440
9,680
370
8,140
Al2
EROSION/WATER POLLUTION CONTROL
1
FA
5,000
5,000
5,000
5,000
5,000
5,000
5,000
5,000
A13
ESC LEAD
60
DAY
60
3,600
80
4,800
90
5,400
1
60
A14
STORMWATER POLLUTION PREVENTION PLAN
1
LS
2,000
2,000
3,000
3,000
900
900
8,500
8,500
A15
TYPE B PROGRESS SCHEDULE
1
LS
1,500
1,500
5,000
5,000
1,500
1,500
1
1
A16
ADA FEATURES SURVEYING
1
LS
2,000
2,000
2,000
2,000
2,000
2,000
1,400
1,400
A17
STRUCTURE SURVEYING
1
LS
5,000
5,000
5,000
5,000
3,500
3,500
6,400
6,400
A18
WORK PLATFORM AND CONTAINMENT SYSTEM
1
LS
15,000
15,000
20,000
20,000
32,200
32,200
15,000
15,000
A19
REMOVAL OF EXISTING ASPHALT AND CORRUGATED METAL DECK
1
LS
20,000
20,000
20,000
20,000
22,200
22,200
41,000
41,000
A20
EPDXY- COATED ST. REINF. BAR
14,200
LB
2
24,140
2
28,400
2
24,850
2
29,678
A21
DRILL AND EPDXY DOWELS
182
EA
65
11,830
24
4,368
115
20,930
39
7,098
A22
STRUCTURAL CARBON STEEL
1
LS
5,000
5,000
60,000
60,000
57,800
57,800
60,000
60,000
A23
CONC. CLASS 4000 FOR SIDEWALK
8
CY
850
6,800
750
6,000
730
5,840
1,600
12,800
A24
CONC. CLASS 4000D FOR BRIDGE
42
CY
1,000
42,000
900
37,800
4,000
168,000
1,400
58,800
A25
SAWCUT EXPANSION JOINT
68
LF
85
5,780
12
816
30
2,040
57
3,876
A26
CLEANING AND PAINTING
1
LS
145,000
145,000
160,000
160,000
170,000
170,000
204,112
204,112
A27
CONTAINMENT OF ABRASIVES
1
LS
50,000
50,000
20,000
20,000
32,000
32,000
39,000
39,000
A28
TESTING AND DISPOSAL OF CONTAINMENT WASTE
1
FA
10,000
10,000
10,000
10,000
10,000
10,000
10,000
10,000
A29
REPAIR EXISTING STEEL BEAMS
1
FA
50,000
50,000
50,000
50,000
50,000
50,000
50,000
50,000
A30
CORRUGATED METAL DECKING
2,500
SF
12
30,000
17
42,500
23
57,500
15
37,500
A31
REMOVING CEMENT CONC. SIDEWALK
15
SY
25
375
35
525
50
750
130
1,950
A32
HMA SIDEWALK
12
SY
150
1,800
312
3,744
75
900
1,500
18,000
A33
ROADSIDE CLEANUP
1
FA
20,000
20,000
20,000
20,000
20,000
20,000
20,000
20,000
A34
PROPERTY RESTORATION
1
FA
5,000
5,000
5,000
5,000
5,000
5,000
5,000
5,000
SCHEDULE A TOTAL BID 605,075 666,007 868,870 729,035
SCHEDULE B - SW GRADY WAY BRIDGE
1 2 3
Engineer's Estimate
Razz Construction
Road Construction Northwest, Inc.
Triton Marine Construction
Item No.
Item Description
Quantity
Unit
Unit Price
Cost
Unit Price
Cost
Unit Price
Cost
Unit Price
Cost
B1
UNEXPECTED SITE CHANGES
1
FA
2,000
2,000
2,000
2,000
2,000
2,000
2,000
2,000
B2
SPCC PLAN
1
LS
1,500
1,500
3,000
3,000
900
900
1,200
1,200
B3
MOBILIZATION
1
LS
28,700
28,700
21,000
21,000
45,000
45,000
3,400
3,400
B4
PROJECT TEMPORARY TRAFFIC CONTROL
1
LS
15,000
15,000
15,000
15,000
37,500
37,500
10,000
10,000
B5
FLAGGERS, min Bid $65.00
100
HR
65
6,500
65
6,500
65
6,500
68
6,800
B6
REMOVAL OF STRUCTURES AND OBSTRUCTIONS
1
LS
1,000
1,000
7,500
7,500
7,200
7,200
190
190
B7
EROSION/WATER POLLUTION CONTROL
1
FA
1,000
1,000
1,000
1,000
1,000
1,000
1,000
1,000
B8
ESC LEAD
10
DAY
60
600
80
800
90
900
1
10
B9
STORMWATER POLLUTION PREVENTION PLAN
1
LS
1,500
1,500
5,000
5,000
900
900
3,500
3,500
B10
TYPE B PROGRESS SCHEDULE
1
LS
2,000
2,000
2,500
2,500
1,500
1,500
1
1
B11
CLEANING ABUTMENT BEARING SEAT
1
LS
3,000
3,000
1,000
1,000
3,000
3,000
610
610
B12
STRUCTURAL CARBON STEEL
1
LS
200,000
200,000
122,000
122,000
280,000
280,000
150,000
150,000
B13
RESIN BONDED ANCHORS
1
LS
50,000
50,000
35,000
35,000
70,000
70,000
35,000
35,000
B14
ROADSIDE CLEANUP
1
FA
1,500
1,500
1,500
1,500
1,500
1,500
1,500
1,500
B15
PROPERTY RESTORATION
1
FA
1,000
1,000
1,000
1,000
1,000
1,000
1,000
1,000
SCHEDULE B TOTAL BID 315,300 224,800 458,900 216,211
\ \blvfsl\ project\ t\ TUKA00000014 \0700BLD \0710Bidding \0711 BiddingRecords \3 Bridges Certified Bid Tabulation_2017- 0531.xlsx
Page 1 of 3
CITY OF TUKWILA - MAJOR MAINTENANCE OF THREE BRIDGES
FINAL BID LIST SUMMARY
May 31, 2017
SCHEDULE
C - FRANK ZEPP (S 180TH STREET)
1 Z s
Engineer's Estimate
Razz Construction
Road Construction Northwest, Inc.
Triton Marine Construction
Item No. Item Description
Quantity
Unit
Unit Price
Cost
Unit Price
Cost
Unit Price
Cost
Unit Price
Cost
C1
UNEXPECTED SITE CHANGES
1
FA
10,000
10,000
10,000
10,000
10,000
10,000
10,000
10,000
C2
RESOLUTION OF UTILITY CONFLICTS
1
FA
5,000
5,000
5,000
5,000
5,000
5,000
5,000
5,000
C3
REIMBURSEMENT FOR THIRD PARTY DAMAGE
1
EST
15,000
15,000
15,000
15,000
15,000
15,000
15,000
15,000
C4
SPCC PLAN
1
LS
10,000
10,000
3,000
3,000
1,700
1,700
1,200
1,200
C5
MOBILIZATION
1
LS
175,000
175,000
171,000
171,000
210,000
210,000
16,000
16,000
C6
FLAGGERS, min Bid $65.00
160
HR
65
10,400
65
10,400
65
10,400
68
10,880
C7
PORTABLE ILLUMINATION
4
EA
1,350
5,400
3,000
12,000
4,500
18,000
3,300
13,200
C8
FURNISHING TC DEVICES FOR 400 FT TRANSITIONS
4
EA
1,500
6,000
1
4
2,300
9,200
23,000
92,000
C9
PORTABLE CHANGEABLE MESSAGE SIGN
4,000
HR
3
12,000
6
24,000
5
19,000
6
24,640
C10
INSTALL ALTERNATE ROUTE SIGNING
1
LS
29,250
29,250
50,000
50,000
6,000
6,000
36,000
36,000
C11
PEDESTRIAN TRAFFIC CONTROL
1
LS
1,600
1,600
5,000
5,000
4,500
4,500
21,000
21,000
C12
UNIFORMED POLICE OFFICER
50
HR
100
5,000
95
4,750
160
8,000
110
5,500
C13
TYPE 3 BARRICADE
15
EA
100
1,500
150
2,250
230
3,450
230
3,450
C14
CONSTRUCTION LIAISON
1
LS
20,000
20,000
50,000
50,000
10,000
10,000
11,000
11,000
C15
OTHER TRAFFIC CONTROL LABOR, min Bid $60.00
25
HR
60
1,500
75
1,875
65
1,625
100
2,500
C16
SEQUENTIAL ARROW SIGN
500
HR
5
2,250
7
3,500
13
6,625
2
1,000
C17
CONSTRUCTION SIGNS CLASS A
100
SF
25
2,500
32
3,200
40
4,000
42
4,200
C18
TEMPORARY SIGNAL MODIFICATION
1
LS
11,000
11,000
10,000
10,000
45,000
45,000
50,000
50,000
C19
SIGN COVERING
420
SF
10
4,200
3
1,260
5
2,100
10
4,200
C20
CLEARING AND GRUBBING
1
LS
15,000
15,000
3,000
3,000
6,000
6,000
16,000
16,000
C21
REMOVAL OF STRUCTURES AND OBSTRUCTIONS
1
LS
20,000
20,000
10,000
10,000
3,000
3,000
46,000
46,000
C22
REMOVING ASPHALT CONC. PAVEMENT
190
SY
25
4,750
30
5,700
21
3,990
12
2,280
C23
HMA FOR APPROACH CL. 1/2 IN. PG 64 -22
22
TON
150
3,300
312
6,864
330
7,260
370
8,140
C24
CRUSHED SURFACING BASE COURSE
14
CY
100
1,400
100
1,400
125
1,750
270
3,780
C25
ADJUST MANHOLE
1
EA
1,000
1,000
500
500
800
800
1,100
1,100
C26
EROSION/WATER POLLUTION CONTROL
1
FA
15,000
15,000
15,000
15,000
15,000
15,000
15,000
15,000
C27
HIGH VISIBILITY SILT FENCE
400
LF
5
2,000
4
1,600
4
1,600
12
4,800
C28
TYPE B PROGRESS SCHEDULE
1
LS
5,000
5,000
5,000
5,000
3,000
3,000
1
1
C29
HEALTH AND SAFETY PLAN
1
LS
10,000
10,000
5,000
5,000
900
900
5,000
5,000
C30
NO TRESPASSING SIGN
2
EA
500
1,000
150
300
700
1,400
200
400
C31
FA -SITE CLEANUP OF 810. AND PHYSICAL HAZARDS
1
FA
10,000
10,000
10,000
10,000
10,000
10,000
10,000
10,000
C32
STRUCTURE SURVEYING
1
LS
40,000
40,000
10,000
10,000
12,000
12,000
14,000
14,000
C33
STRUCTURE EXCAVATION CLASS A INCL. HAUL
86
CY
30
2,580
32
2,752
100
8,600
100
8,600
C34
WORK PLATFORM AND CONTAINMENT SYSTEM
1
LS
150,000
150,000
150,000
150,000
440,000
440,000
108,000
108,000
C35
BRIDGE APPROACH SLAB
200
SY
250
50,000
330
66,000
385
77,000
390
78,000
C36
SEISMIC RETROFIT - FRANK ZEPP
1
LS
425,000
425,000
255,000
255,000
395,000
395,000
457,726
457,726
C37
EPDXY CRACK SEALING
160
LF
60
9,600
105
16,800
110
17,600
160
25,600
C38
CONCRETE SPALL REPAIR
12
SF
500
6,000
326
3,912
325
3,900
200
2,400
C39
EXPANSION JOINT SYSTEM STRIP SEAL - SUPERSTR
1
LS
48,000
48,000
75,000
75,000
73,500
73,500
93,000
93,000
C40
EXPANSION JOINT SYSTEM COMPRESSION SEAL - SUPERSTR
1
LS
14,000
14,000
20,000
20,000
15,500
15,500
7,000
7,000
C41
CLEANING AND PAINTING RAILING
1
LS
10,000
10,000
55,000
55,000
80,500
80,500
96,000
96,000
C42
TESTING AND DISPOSAL OF CONTAINMENT WASTE
1
FA
10,000
10,000
10,000
10,000
10,000
10,000
10,000
10,000
C43
CLEANING AND EPDXY SEALING
1
LS
220,000
220,000
60,000
60,000
117,200
117,200
140,000
140,000
C44
POLYESTER CONCRETE OVERLAY
1
LS
225,000
225,000
398,000
398,000
281,600
281,600
438,000
438,000
C45
SCARIFYING CONC. SURFACE
1,580
SY
30
47,400
77
121,660
57
89,270
80
126,400
C46
FURTHER DECK PREPARATION FOR TYPE 2 DECK REPAIR
400
SF
180
72,000
60
24,000
70
28,000
81
32,400
C47
FLEXIBLE GUIDE POST
10
EA
40
400
150
1,500
145
1,450
180
1,800
C48
PLASTIC TRAFFIC ARROW
4
EA
300
1,200
212
848
200
800
320
1,280
C49
PLASTIC TRAFFIC LETTER
8
EA
150
1,200
142
1,136
125
1,000
180
1,440
C50
PLASTIC STOP LINE
60
LF
16
960
14
840
14
855
35
2,100
C51
TEMPORARY STRIPING
1,000
LF
4
4,000
3
2,500
2
2,000
3
2,830
C52
RAISED PAVEMENT MARKER TYPE 1
4
HUND
250
1,000
500
2,000
500
2,000
640
2,560
C53
RAISED PAVEMENT MARKER TYPE 2
1
HUND
450
450
600
600
600
600
1,100
1,100
C54
ROADSIDE CLEANUP
1
FA
10,000
10,000
10,000
10,000
10,000
10,000
10,000
10,000
\ \blvfs1\ project\ t\ TUKA00000014 \0700BLD \0710Bidding \0711 BiddingRecords \3 Bridges Certified Bid Tabulation_2017- 0531.xlsx
Page 2 of 3
CITY OF TUKWILA - MAJOR MAINTENANCE OF THREE BRIDGES
FINAL BID LIST SUMMARY
May 31, 2017
SCHEDULE C TOTAL BID 1,764,840 1,734,151 2,112,675 2,099,507
RCN's total 2,111,075
Difference due to RCN calc error for Item C19
SCHEDULE D - FRANK
ZEPP (S 180TH STREET) NON - FEDERAL PARTICIPATION
1 2 3
Engineer's Estimate
Razz Construction
Road Construction Northwest, Inc.
Triton Marine Construction
Item No.
I Item Description
Quantity
Unit Unit Price
I Cost
Unit Price
Cost
Unit Price
Cost
Unit Price Cost
D1
MOBILIZATION
1
1
LS
LS
1,000
10,000
1,000
3,000
3,000
3,300
37,500
3,300
1
40,000
1
D2
ILLUMINATION SYSTEM - TRAIL
10,000
61,000
61,000
37,500
40,000
SCHEDULE D TOTAL BID 11,000 64,000 40,800 40,001
SCHEDULE A
SCHEDULE B
SCHEDULE C
SCHEDULE D
GRAND
TOTAL BID
TOTAL BID
TOTAL BID
TOTAL BID
TOTAL
Engineer's Estimate
Razz Construction
Road Construction Northwest, Inc.
Triton Marine Construction
605,075
666,007
868,870
729,035
315,300
224,800
458,900
216,211
_
1,764,840
1,734,151
2,112,675
2,099,507
11,000
64,000
40,800
40,001
2,696,215
2,688,958
3,481,245
3,084,754
RCN's total 3,479,645
Difference due to RCN calc error for Item C19
Certified by
-
e.
/ Date June 1, 2017
. . d-, P.E.
vid Evans and Associates, Inc.
\ \blvfsl\ project\ t\ TUKA00000014 \0700BLD \0710Bidding \0711 BiddingRecords \3 Bridges Certified Bid Tabulation_2017- 0531.xlsx
Page 3 of 3