Loading...
HomeMy WebLinkAboutCOW 2017-06-12 Item 4C - Powerpoint Presentation Shown at Meeting - Public Safety Plan: Fire Station Programming and Budget ImplicationsTFD Fire Station Cost Estimates 0 J Tukwila Fire Department Facilities Options, We J9Q FIRE STATION NUMBER: 51 52 54 New Construction (square feet): 17,950 6,56 8,228 Site improvements (acres): 2.50 1.5 1.75 Construction Costs New Construction $300 /sf $5,385,000 $1,970,10 $2,468,400 Major Remodel $240 /sf $0 $0 Minor Remodel $125/sf $0 $0 Site Improvements $479,160/acr $1,197,900.00 $718,740.0 $838,530.00 Total Estimated Construction Costs $6,582,900 $2,688,84 $3,306,930 Project Expenses Washington State Sales Tax 9.50% $625376 $255,440 $314,158 Architect & Engineering Fees 12% $789,948 $322,660.80 $396,831.60 Other Consultant Expenses 10% $658,290 $268,884.00 $330,693.00 Permits / Miscellaneous Fees 3% $197,487.00 $80,665.20 $99,207.90 Land Acquisition $435,600 0 $653,400 $762,300 Furnishing and Equipment 10% $658,290 $268,884 $330,693 Total Estimated Project Expenses $2,929,391 $1,849,934 $2,233,884 Total Est. Construction and Project Expenses $9,512,291 $4,538,774 $5,540,814 Project Contingency 12% $1,141,474.86 $444,652,86 $664,897.66 Total Estimated Project Budget What was in the bond: • 1 HQ station with three bays • 2 stations with two bays each • Sufficient space to grow to 2040 • Admin space What was not in the bond: • Community rooms • Equipment storage • Training tower • Space for future crews • Space for fire marshal Program Verification BUNK BUNK 125 sqn 125 sgfl BUNK BUNK 125 sqn 125 sgfl BUNK BUNK 125 sqn 125 sgfl APPARATUS BAY 3757 sgfl NK BUNK 125 sgfl 125 sgfl APPARATUS BAY 3757235 WEINSTEINA +U ARCHITECTS + URBAN DESIGNERS YEAR Project OF EXPENDITURE UTGO (voter- approved) (YOE) Impact Fees SUMMARY General Fund Enterprise Funds TOTAL Fire Stations 18,824 4,750 858 - 24,432 Justice Center 28,629 - - - 28,629 Public Works Shop - - 14,747 14,746 29,493 Facilities Total 47,453 4,750 15,605 14,746 82,554 Fire Apparatus /Equipment 29,932 - - - 29,932 Public Safety Plan Total $77,385 $4,750 $15,605 $14,746 $112,486 Fire Station Program - Project Category INITIAL BUDGET FS51 17,950 sf ESTIMATE FS 52 6,567 sf FS 54 8,228 sf TOTAL 32,745 sf A/E Services (both design & CA) 731 356 464 1,551 Land Acquisition - 653 862 1,515 Permits /Fees 255 89 116 460 Construction (pre -con, const, tax) 7,809 3,278 4,273 15,360 Construction Related Costs (incl bond) 1,047 438 551 2,036 PM Services (incl other prof svcs) 460 297 397 1,154 Contingency (incl Construction & Proj) 1,145 546 665 2,356 TOTAL $11,446 $5,657 $7,329 $24,432 1 Funding sources included in Public Safety Plan Initial budget estimate Fire Station Program - REVISED Project Category BUDGET ESTIMATE FS51 1 9,426 sf (as FS 52 1 15,068 sf of 5/23/17) FS 54 9,287 sf TOTAL 33,781 sf FUNDING GAP A/E Services (both design & CA) 635 1,052 626 2,314 763 Land Acquisition 653 - 862 1,516 1 Permits /Fees 166 301 164 631 172 Construction (pre -con, const, tax) 6,324 9,547 6,233 22,105 6,744 Construction Related Costs (incl bond) 657 1,184 709 2,550 514 PM Services (incl other prof svcs) 300 576 305 1,181 28 Contingency (incl Construction & Proj) 749 1,094 765 2,608 252 TOTAL $9,486 $13,755 $9,665 $32,906 $8,474 Revised budget estimate Costs • Cost escalation and market conditions unprecedented • Fire station costs in the region have increased from $375 to $575 per square foot in the last three years • Bids throughout the region coming in significantly higher than estimates Options for Council • Option A: Programming: Direct the architects to fulfill the 2040 program outlined in Attachment B, to include program and estimated costs for the three "a la carte" items (Storage Facility, Training Tower and Additional Bays). Funding: The City address the funding gap through revision of impact fees and careful cash flow management as described above. • Option B: Programming: Direct the architects to fulfill the 2040 program outlined in Attachment B, to include program and estimated costs for the three "a la carte" items (Storage Facility, Training Tower and Additional Bays). Funding: review options on funding at a future date. • Option C: Programming: The Council provides consensus on programming only for Fire Station 51 and the `a la carte' items and will review the full program and funding at a future date. • Option D : The Council will review its options for programming and funding at a future date, acknowledging that additional costs may result.