HomeMy WebLinkAbout17-098 - Akana - 2016 Andover Park East RepairCity of Tukwila 6200 Southcenter Boulevard, Tukwila WA 98188 Agreement Number: 17-098(a) Contract Approval N/A CONTRACT FOR SERVICES Amendment #1 Between the City of Tukwila and Cooper Zietz Engineers, Inc. d/b/a AKANA That portion of Contract No. 17-098 between the City of Tukwila and Cooper Zietz Engineers, Inc. d/b/a AKANA is amended as follows: 1. Scope of Services. The Consultant agrees to continue Construction Management services indicated in the original agreement Exhibit "A" dated June 12, 2017. This supplement is to allow for additional administrative needs to close out the project. 2. Duration of Agreement; Time for Performance. This Agreement shall be in full force and effect for a period commencing upon execution and ending upon the new date of 31 January 2018 unless sooner termination under the provisions hereinafter specified. Work under this Agreement shall commence upon written notice by the City to the Consultant to proceed. The Consultant shall perform all services and provide all work product required pursuant to this Agreement no later than 31 January 2018 unless an extension of such time is granted in writing by the City. 3. Payment. The Consultant shall be paid by the City for completed work and for services rendered under this Agreement as follows: Payment for the work provided by the Consultant shall be supplemented with $3,025.00 for additional construction management services shown on the attached spreadsheet Exhibit "B" All other provisions of the contract shall remain in full force and effect. Dated this 04/qday of t UG,Y) r , 20 / % . CITY OF TUKWILA Allan Ekbe _, Mayor CONTRACTOR %/ eiGive, ry aunce, P.E. for Tim Oliver, P.E., Vice President City of Tukwila r Park East Sewer sesuedx mo 3 + mein leiol o LL 100 OS $0 IS0_ OS 00 « w sesuedx3 1e7o1 w».9'' Mss sa 22222 mws.ia ma00 "^ Wdnyieyr soak ww 222 w w$ w w w w w«$ 3 $$ w w w w » w 2 Us3ao p a a a a 2 diniieprQnS g 222'22 222 8i.4222 22222 w w w w$ H seAeyy I. N u W u %OC 6 Bed Pexin $ 22222 2 2 2 2 2 2 $»' » r 2 3i » w a R w w 2 a 1 SBSC'L HO r ^ w w$» w $$ w «$ 2,22" w w 22222 ii222rs w ii w ... WN IOQe'1 UIeLol E 4 4 x 2$ 222 22 $$ w$$ w 2 w w» A 222 w 74 w h 05 0 00 000 00 00000 00000 s000g0 lslsstl'u!W qPV y. 0 0 0 0 0 0 CO g m January 1, 2017 Rates Classification: Hourly Rate: Task 100 - Preconstruction Services Preconstruction Services Task Task 100 - Subtotal Task 200 - Construction Services Field Office Administration FA tracking Task 200 - Subtotal Task 300 - Construction Services Field Field Inspection Services FA Tracking Task 300 - Subtotal Task 400 - Materials m task Task Task 400 - Subtotal Task 500 - Project Completion Closeout Task Task Task Task 500 - Subtotal All Phases Total City of Tukwila 6200 Southcenter Boulevard, Tukwila WA 98188 Contract Number: 17 -098 Council Approval 6/5/17 CONSULTANT AGREEMENT FOR ENGINEERING SERVICES THIS AGREEMENT is entered into between the City of Tukwila, Washington, hereinafter referred to as "the City ", and Akana, hereinafter referred to as "the Consultant ", in consideration of the mutual benefits, terms, and conditions hereinafter specified. 1. Project Designation. The Consultant is retained by the City to perform Construction Management services in connection with the project titled "2016 Andover Park East Sewer Repair ". 2. Scope of Services. The Consultant agrees to perform the services, identified on Exhibit "A" attached hereto, including the provision of all labor, materials, equipment and supplies. 3. Duration of Agreement; Time for Performance. This Agreement shall be in full force and effect for a period commencing upon execution and ending December 31, 2017, unless sooner terminated under the provisions hereinafter specified. Work under this Agreement shall commence upon written notice by the City to the Consultant to proceed. The Consultant shall perform all services and provide all work product required pursuant to this Agreement no later than December 31, 2017 unless an extension of such time is granted in writing by the City. 4. Payment. The Consultant shall be paid by the City for completed work and for services rendered under this Agreement as follows: A. Payment for the work provided by the Consultant shall be made as provided on Exhibit "B" attached hereto, provided that the total amount of payment to the Consultant shall not exceed $58,869.00 without express written modification of the Agreement signed by the City. B. The Consultant may submit vouchers to the City once per month during the progress of the work for partial payment for that portion of the project completed to date. Such vouchers will be checked by the City and, upon approval thereof, payment shall be made to the Consultant in the amount approved. C. Final payment of any balance due the Consultant of the total contract price earned will be made promptly upon its ascertainment and verification by the City after the completion of the work under this Agreement and its acceptance by the City. D. Payment as provided in this section shall be full compensation for work performed, services rendered, and for all materials, supplies, equipment and incidentals necessary to complete the work. E. The Consultant's records and accounts pertaining to this Agreement are to be kept available for inspection by representatives of the City and the state of Washington for a period of three (3) years after final payments. Copies shall be made available upon request. d1 o? /6 //U9S 5. Ownership and Use of Documents. All documents, drawings, specifications and other materials produced by the Consultant in connection with the services rendered under this Agreement shall be the property of the City whether the project for which they are made is executed or not. The Consultant shall be permitted to retain copies, including reproducible copies, of drawings and specifications for information, reference and use in connection with the Consultant's endeavors. The Consultant shall not be responsible for any use of the said documents, drawings, specifications or other materials by the City on any project other than the project specified in this Agreement. 6. Compliance with Laws. The Consultant shall, in performing the services contemplated by this Agreement, faithfully observe and comply with all federal, state, and local laws, ordinances and regulations, applicable to the services rendered under this Agreement. 7. Indemnification. The Consultant shall defend, indemnify and hold the City, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or resulting from the acts, errors or omissions of the Consultant in performance of this Agreement, except for injuries and damages caused by the sole negligence of the City. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Consultant and the City, its officers, officials, employees, and volunteers, the Consultant's liability hereunder shall be only to the extent of the Consultant's negligence. It is further specifically and expressly understood that the indemnification provided herein constitutes the Consultant's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement. 8. Insurance. The Consultant shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Consultant, its agents, representatives, or employees. Consultant's maintenance of insurance as required by the agreement shall not be construed to limit the liability of the Consultant to the coverage provided by such insurance, or otherwise limit the City's recourse to any remedy available at law or in equity. A. Minimum Amounts and Scope of Insurance. Consultant shall obtain insurance of the types and with the limits described below: 1. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of $1,000,000 per accident. Automobile Liability insurance shall cover all owned, non - owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. CA revised : 1 -2013 (« Page 2 2. Commercial General Liability insurance with limits no less than $1,000,000 each occurrence, $2,000,000 general aggregate. Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, independent contractors and personal injury and advertising injury. The City shall be named as an insured under the Consultant's Commercial General Liability insurance policy with respect to the work performed for the City. 3. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of Washington. 4. Professional Liability with limits no less than $1,000,000 per claim and $1,000,000 policy aggregate limit. Professional Liability insurance shall be appropriate to the Consultant's profession. B. Other Insurance Provision. The Consultant's Automobile Liability and Commercial General Liability insurance policies are to contain, or be endorsed to contain that they shall be primary insurance with respect to the City. Any Insurance, self - insurance, or insurance pool coverage maintained by the City shall be excess of the Consultant's insurance and shall not be contributed or combined with it. C. Acceptability of Insurers. Insurance is to be placed with insurers with a current A.M. Best rating of not less than A:VII. D. Verification of Coverage. Consultant shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the insurance requirements of the Consultant before commencement of the work. Certificates of coverage and endorsements as required by this section shall be delivered to the City within fifteen (15) days of execution of this Agreement. E. Notice of Cancellation. The Consultant shall provide the City with written notice of any policy cancellation, within two business days of their receipt of such notice. F. Failure to Maintain Insurance. Failure on the part of the Consultant to maintain the insurance as required shall constitute a material breach of contract, upon which the City may, after giving five business days notice to the Consultant to correct the breach, immediately terminate the contract or, at its discretion, procure or renew such insurance and pay any and all premiums in connection therewith, with any sums so expended to be repaid to the City on demand, or at the sole discretion of the City, offset against funds due the Consultant from the City. 9. Independent Contractor. The Consultant and the City agree that the Consultant is an independent contractor with respect to the services provided pursuant to this Agreement. Nothing in this Agreement shall be considered to create the relationship of employer and employee between the parties hereto. Neither the Consultant nor any employee of the Consultant shall be entitled to any benefits accorded City employees by virtue of the services provided under this Agreement. The City shall not be responsible for withholding or otherwise deducting federal income tax or social security or for contributing to the state industrial insurance program, otherwise assuming the duties of an employer with respect to the Consultant, or any employee of the Consultant. CA revised : 1 -2013 Page 3 &`4 10. Covenant Against Contingent Fees. The Consultant warrants that he has not employed or retained any company or person, other than a bonafide employee working solely for the Consultant, to solicit or secure this contract, and that he has not paid or agreed to pay any company or person, other than a bonafide employee working solely for the Consultant, any fee, commission, percentage, brokerage fee, gifts, or any other consideration contingent upon or resulting from the award or making of this contract. For breach or violation of this warrant, the City shall have the right to annul this contract without liability, or in its discretion to deduct from the contract price or consideration, or otherwise recover, the full amount of such fee, commission, percentage, brokerage fee, gift, or contingent fee. 11. Discrimination Prohibited. The Consultant, with regard to the work performed by it under this Agreement, will not discriminate on the grounds of race, religion, creed, color, national origin, age, veteran status, sex, sexual orientation, gender identity, marital status, political affiliation or the presence of any disability in the selection and retention of employees or procurement of materials or supplies. 12. Assignment. The Consultant shall not sublet or assign any of the services covered by this Agreement without the express written consent of the City. 13. Non - Waiver. Waiver by the City of any provision of this Agreement or any time limitation provided for in this Agreement shall not constitute a waiver of any other provision. 14. Termination. A. The City reserves the right to terminate this Agreement at any time by giving ten (10) days written notice to the Consultant. B. In the event of the death of a member, partner or officer of the Consultant, or any of its supervisory personnel assigned to the project, the surviving members of the Consultant hereby agree to complete the work under the terms of this Agreement, if requested to do so by the City. This section shall not be a bar to renegotiations of this Agreement between surviving members of the Consultant and the City, if the City so chooses. 15. Applicable Law; Venue; Attorney's Fees. This Agreement shall be subject to, and the Consultant shall at all times comply with, all applicable federal, state and local laws, regulations, and rules, including the provisions of the City of Tukwila Municipal Code and ordinances of the City of Tukwila. In the event any suit, arbitration, or other proceeding is instituted to enforce any term of this Agreement, the parties specifically understand and agree that venue shall be properly laid in King County, Washington. The prevailing party in any such action shall be entitled to its attorney's fees and costs of suit. Venue for any action arising from or related to this Agreement shall be exclusively in King County Superior Court. } 16. Severability and Survival. If any term, condition or provision of this Agreement is declared void or unenforceable or limited in its application or effect, such event shall not affect any other provisions hereof and all other provisions shall remain fully enforceable. The provisions of this Agreement, which by their sense and context are reasonably intended to survive the completion, expiration or cancellation of this Agreement, shall survive termination of this Agreement. CA revised : 1 -2013 Page'4 17. Notices. Notices to the City of Tukwila shall be sent to the following address: City Clerk City of Tukwila 6200 Southcenter Boulevard Tukwila, WA 98188 Notices to Consultant shall be sent to the following address: Akana Lincoln Executive Center 3800 146th Place SE, Suite 105 Bellevue, WA 98007 18. Entire Agreement; Modification. This Agreement, together with attachments or addenda, represents the entire and integrated Agreement between the City and the Consultant and supersedes all prior negotiations, representations, or agreements written or oral. No amendment or modification of this Agreement shall be of any force or effect unless it is in writing and signed by the parties. DATED this 12 " day of "-- ��-- CITY OF WILA Allan E b Wig, Mayor Attest/Authenticated: CONSULTANT By G Printed Name: 'i im Oliver /a( vPG'i ,20 !'7. Title: Vice President Approved as to Form: (0t-telQA City , Chri s , O F aherty . Office of the City Attorney CA revised : 1 -2013 " Page 5 Exhibit "A" City of Tukwila 6200 Southcenter Boulevard, Tukwila WA 98188 Scope of Services Construction Management Services Tukwila 2016 Andover Park East Sewer Repairs Contract Number: Akana (CONSULTANT) will provide professional Construction Management (CM) Services for the City of Tukwila (CITY). These services will include CM, contract administration, field observation, documentation, and reporting as required during the "2016 Andover Park East Sewer Repairs project ". All services will be provided in accordance with the Washington State Department of Transportation's (WSDOT) Local Agency Guidelines, Construction Manual and City of Tukwila standards. Consultant will be providing Jeff Faunce, Mindy Corey, on a Part time basis and Jeremy Privett on a full time basis to the project. No subconsultants have been assigned to assist in the performance of the duties listed below. Project Description The project includes construction of 435 feet of Sewer repairs within the right of way of Andover Park East between 180`h and 1074 north of 180th. Including but not limited to replacing asbestos cement sewer main with PVC and other work necessary to complete the work as specified and shown in the contract documents. Work Breakdown Structure by Tasks 100 Pre - Construction Services: 101 CONSULTANT will review bid documents to become familiar with the project. 102 CONSULTANT will take pre - construction photographs and burn them to a disc to include in hard -copy files. 103 CONSULTANT will conduct a site visit to become acquainted with the project site. 104 CONSULTANT will prepare hard -copy and electronic files for project documentation. 105 CONSULTANT will prepare Project Templates for: A. Design Changes B. Change Orders and Change Order Justifications C. Case Log and Case Log Files D. Pay Estimates, including Ledger E. Coordination Meeting Agendas, Minutes and Sign -In Sheets 106 CONSULTANT will prepare Project Logs for tracking: A. Contract Changes B. Requests for Information(RFI) C. Submittals D. Materials on Hand (will correlate with Pay Estimates) E. Employment Documentation 107 CONSULTANT will prepare for, and conduct, a Pre - Construction meeting. Duties will include: A. Preparing an agenda draft and sending it to the CITY for review /comments. B. Developing an attendees list with input from CITY. C. Conducting the meeting. D. Preparing Meeting Minutes, sending them to CITY for review /comments, revising them per comments and distributing them to attendees and affected stakeholders. 108 CONSULTANT will review the Contractor's initial Schedule against allowable Working Days. CONSULTANT will also review schedule sequencing and activity duration to check that they are reasonable. Any discrepancies, conflicts or unreasonable work durations will be brought to the attention of the Contractor and the CITY will be notified. 109 CONSULTANT will prepare a monthly CONSULTANT progress invoices for CITY review and payment. Under the provisions of this contract a total of 2 invoices shall be prepared and presented to the CITY. 110 CONSULTANT will use the City's provided electronic filing system for this construction project. 200 Construction Management Administration: 201 CONSULTANT will prepare a Progress Pay Estimates for work performed by Contractor. Under the provisions of this contract up to a total (3) invoices shall be prepared. These will be completed once CONSULTANT and Contractor have reached agreement on estimate quantities. 202 CONSULTANT will prepare up to (6) Weekly Statement of Working Day reports. 203 CONSULTANT will monitor Contractor and Sub - Contractor's employment documentation for adherence to contract requirements. Monitoring will include: A. Maintaining Employment Documentation Log. B. Collecting, reviewing and approving (or rejecting) Requests to Sublet. C. Collecting Certified Payrolls to verify that they meet contract wage requirements. D. Collecting Statements of Intent to pay prevailing wages. E. Collecting Affidavits of Wages Paid. 204 CONSULTANT will review and respond to Requests for Information (RFIs) submitted by the Contractor. Responses will include technical interpretations of the drawings, specifications, and Contract Documents. The CONSULTANT will update the RFI Log as RFIs are submitted and resolved. 205 CONSULTANT will monitor issues that may eventually have impacts to the project budget or schedule. These issues will be documented. Information included in the Log will be: A. An assigned number that will be used to track each issue separately. B. The date the issue became known. C. A description of the issue. D. An estimate of the lowest cost necessary to resolve the issue. If resolution creates an overall decrease to the budget, this amount would be negative. E. An estimate of the highest cost necessary to resolve the issue. F. An estimate of the issue's impact on Working Days. G. A summary of project documents that relate to the issue. H. Comments relating to the issue. 206 CONSULTANT will prepare Change Orders and will include the CITY in the process of Change Order negotiation and preparation. Items tracked using the Issue Log may eventually become Change Orders. CONSULTANT Change Order work will include: A. Scheduling and conducting negotiation meetings. The CONSULTANT will create and distribute meeting agendas and minutes. B. Preparation of independent Engineer's Estimates. C. Compilation of Change Order back -up. This will include, but is not limited to: i. Engineer's Estimates ii. E -mail correspondence iii. Extra Work Orders from Contractor iv. Design Change Documents v. Meeting Minutes D. Preparation of Change Order Justifications. (1 change order included in cost) Justifications will include: i. A description of the change. ii. An evaluation of what is required by the Contract. iii. An explanation as to why a Change Order is necessary. iv. Descriptions of considered alternatives to a Change Order. v. The reasons for entitlement; why the work cannot be paid for under the existing contract. vi. The names of those that approved the Change Order. vii. An evaluation of impact to Working Days. viii. Change Order back -up. E. Writing the Change Orders and providing them to CITY for edits and/or concurrence. F. Obtaining the necessary signatures for execution once concurrence has been given by the CITY. G. Maintaining the Change Order Log. CA revised : 1 -2013 Page 7 300 Construction Services - Field: Working Days 30. CONSULTANT will provide full time Inspection consisting of a senior inspector depending on the skill sets needed for the days operation to assist and observe day -to -day conduct of construction. This will include acting as the project hub for communications, monitoring Contractor adherence to Contract Documents and documentation of Contractor's work progress for payment. Work will include the following: 301 CONSULTANT will request and review the Contractor's breakdowns of lump -sum items for accuracy and payment purposes. Breakdowns will be used to evaluate construction progress of these items for pay estimates. 302 CONSULTANT will prepare Field Note Records that detail Contractor's completed work for inclusion in monthly Pay Estimates. Field Note Records will internally be checked for accuracy prior to being entered into Pay Estimates. 303 Prior to monthly Pay Estimate completion, the CONSULTANT will coordinate with each of the Contractors to reach agreement on the Pay Estimate quantities. 304 CONSULTANT will review the materials delivered to the project site to ensure they are the approved construction materials. This will be done by checking them against the approved Submittals and noting materials delivered on Inspector Daily Reports (IDR). 305 The CONSULTANT Inspector(s) will prepare up to 30 Inspector's Daily Reports, using the City's provided IDR form. If there is more than one Inspector, each will prepare an individual report. IDRs will include: A. Weather information. B. Contractor and Subcontractors working that date, as well as the on -site representative for each. C. A work activity summary. D. Bid items worked on. E. Equipment and employees utilized and hours used/worked. F. A diary to be used as a narrative of the day's events. G. Photos. H. Materials used. 306 CONSULTANT will take photos of construction progress and will maintain them electronically in an orderly fashion. Upon completion of the project, these photos will be burned to discs that will be included in the hard -copy files. 307 CONSULTANT will assist the CITY regarding Public Information by assisting the CITY with responding to project related questions from property owners and the general public. 308 CONSULTANT will review the Contractor's As -Built drawings. Drawings will be checked for accuracy and to determine if they reflect as- constructed conditions. 400 Materials: Consultant shall perform a preliminary review of submittals and coordinate getting technical engineering reviews. Materials that do not require testing will be rejected, approved or conditionally approved per the requirements of the City and the Contract provisions. Materials that require testing will be rejected, approved or conditionally approved per results of field evaluation materials testing is through city supplied testing agency. The Contractor will be notified immediately of any unapproved materials or failed test results. 401 CONSULTANT will update the Submittal list as submittals are rejected, approved, or conditionally approved by the city as well as when test results are obtained. 402 CONSULTANT will inspect the Pipe and backfill materials for adherence to Contract requirements. 403 CONSULTANT will inspect installation of earthwork and Hot Mix Asphalt for adherence to Contract requirements. Formal testing will be performed by City materials testing agency. 500 Project Completion: Assist the CITY with the close -out of the project. Items of work include the following: 501 CONSULTANT will coordinate with the CITY, and the Contractor to resolve outstanding project issues. This includes up to . (1) Project Closeout Meetings. The CONSULTANT will prepare and distribute the agendas and minutes. 502 CONSULTANT will prepare a Letter of Substantial Completion for issuance by the city. This letter will include punchlist items for both Physical and Final completion. 503 CONSULTANT will coordinate with the Contractor to obtain all outstanding project documentation. CA revised : 1 -2013 Page 8 504 CONSULTANT will prepare a Punch List of work items for the Contractor. This list will be created with input from the CITY. Creation of the list will include 1 initial project walkthrough and up to 1 follow -up walkthroughs to ensure Punch List work is complete. The list may still be revised after it has been issued to the Contractor. 505 CONSULTANT will take photos of completed project and will maintain them electronically in an orderly fashion. Upon completion of the project, these photos will be burned to discs that will be included in the hard -copy files. 506 City's Engineering Firm will backdraft the As- Builts to create a Record Drawings for city records upon issuance of Physical Completion and the CONSULTANT will perform a review of the drawings for accuracy. 507 CONSULTANT will prepare the Final Pay Estimate and Voucher. Prior to being issued to the Contractor, drafts of these items will be routed to the CITY for review /approval. 508 CONSULTANT will review the project records to verify that they are complete. This will be a last check before hard -copy files are transferred to the CITY. 509 Attend a wrap up meeting with the CITY. 600 Survey: Consultant shall coordinate with PM and Construction Contractor (CC) as needed to require compliance with and verify that the construction survey work completed by the CC for the Project is in conformance with the approved plans, specifications and applicable laws. Consultant shall perform QA review of the Contractor's Surveyor's calculations, of the above described elements, in accordance with established Agency policies and procedures. Calculations must be sufficient to establish the correct position, orientation, and elevation of the work within required tolerances from control stations. 700 Optional Field Services: Upon written approval from the CITY, the CONSULTANT shall provide engineering services beyond the work identified above. Services may include the addition of new tasks; additional working days added to the contract or increasing the work effort of the engineering services as directed by the CITY. Such work shall be specified in a written Supplement to this Agreement. Additional work elements for consideration and recommended by the Consultant include: Materials testing- compaction of bedding and backfill, testing of Hot Mix Asphalt (HMA) Optional services may include: additional work caused by extension of contract time due to Non - Working Days or schedule delays, additional project meetings, additional testing due to failing tests, additional surveying and mapping, additional geotechnical analysis, additional environmental documentation, document printing and overtime due to the contractor working weekends. Assumptions Cont: • This scope and fee does not include construction support services during non- working days. A Non - Working Day is defined in the WSDOT Standard Specifications as "...unworkable because of weather or conditions caused by the weather that prevents satisfactory and timely performance of the work shown on the critical path of the Contractor's approved schedule." If the contract amount under this agreement is exceeded, the CONSULTANT may request a supplement to cover the costs incurred from work completed on Non - Working Days. • Construction will take no more than 30 working days. • The Contractor will be responsible for environmental documentation requirements. • No Overtime has been estimated. • Assume the contractor will work from 7:00 am to 4:OOpm, working a 40 hour week, 8 hours a day, 1 shift. • No office space for Consultant will be provided. • Consultant will provide vehicle and fuel, cell phone, standard safety wear and laptop computer. • Mileage for PPM, PM/RE, inspector and CA, assume 24 cm/ca x trips @ 80 miles + 35 insp x trips *80 round trip (includes anticipated on -site daily mileage). CA revised : 1 -2013 Page 9 Deliverables by Task: • 100 Pre - Construction Services o 102 Disc of pre - construction photographs o 104 Prepare hard copy and electronic file for project documentation o 105 Prepare Project Templates (Design Changes, Change orders, Case Logs, Pay Estimates and ledger, Forecasted cost of Completion) o 106 Prepare Project Logs (Design Changes, Change orders, RFI's, Submittals, Materials on Hand, Employment) o 107 Pre - construction meeting agenda, sign -in sheet and minutes o 109 (2) CONSULTANT Progress Invoices • 200 Construction Management Administration o 201 Up to (2) Pay Estimates o 202 Up to (6) Weekly Statement of Working Days o 203 Employment documentation and tracking log for Contractor and Sub - Contractors o 204 RFI responses and RFI Log o 205 Issue Log o 206 (1) Change Orders (CO), a CO Log and CO justifications with back -up • 300 Construction Services — Field o 301 Review of lump -sum breakdowns o 302 Field Note Records o 305 Inspector's Daily Reports o 306 Disc of construction progress photos • 400 Materials o none • 500 Project Completion o 501 Meeting agendas, sign -in sheets and minutes for up to (2) close -out meetings o 504 Final Punch List o 505 Prepare Letter of Physical Completion o 506 Disc of completed project photos o 507 Contractor produced As- Builts (Record Drawings) o 508 Final Pay Estimate and Voucher o 509 Hard - copies of project files o 510 Attend Wrap up meeting • 600 Survey o Contractor shall provide. • 700 Additional Services CA revised : 1 -2013 Page 10 Contract Number: 6200 Southcenter Boulevard, Tukwila WA 98188 Exhibit "B" Project Budget City of Tukwila aesuedx3 + 1OQel lelol » LL ,�- s « 8 » w s « i, w gessag 5 5 w» 9 s w eJ » ^I 1 w w M e m sasuadx3leiol g« w w w 8 w R »» w R w 8« w W. w w „, .« .°1 s w w s 3 w g II dn>Nely 0 spa° 5300 o Q °S i seAein .o N Ya£ eej pexiA gi S89C'l O @H0 II loge, o Imo! . '^ LL ___ » W 8 ___S' < .. 00 pr w= � w $ w� J ' s_a`_a_ $ 0•_0_0 w 2 ,___ 3 « w w w `O » w _ w _ _r___- w r w ym 21 « w w S _- .qi w �r ,-- 2' _ow 2 ' .__J_- -5? __J_�_i 22 4i -«- 2 w ._____________________ w .____,- w « b « n w w w, _r____,___ o « 4 7., s « « w $ w ., « w « $ -a--d. __ t _ _ 2 m « S w o__r w w ri s « « __ _« » « « ------ --s w $ __ « -s _H w $ ____ « S r ____ » $ « « _o « S « __t_ 2 & h� _J__? j i f I I Ri � $ .4 $ _h $ 2 w _ .4-i w w __ » __ « N � R 021,028' $29,327; 08,028; S0. S0; S0; 01,805: S80 f x A. $ o r o m1 o e e° 3 ualul •lslssy'ulwpy ulwPtlPaA Apps Jeu61sa0 3 e ,,, F, 0 o 0 0 0 0 0 0 o , I I I 0 o 0 0 o 30/V0 ioioadsu1 1457S Jeteueyl .fad ---. ,e„ w o e - o __ r--' —r o - _ 0 o 1 i 0 0 $ e1m°ossyJS iapienuai eouned Mar w » o - m l 24: 0! 01 r��_, a o - -r—, o o o I m` 11 January 1, 2011 Rates Classification: Hourly Rata: Task 100 - Preconstruction Services Preconstruction Services Task _Task 100. - Subtotal) Task 200 - Construction Services Field Office Administration ---- -_� –_- FA hacking Task 200 - Subtotal Task 300 - Construction Services Field Field Inspection Services FA Tracking Task l _ _ __ _ _ Task 300- Subtotal ) Task 000 - Materials Materiak Task Task Task L° 0 a` m i0 h 0 v O 6 Ei H I 51 i s "' H Y 01 f F Task S00- Subtotal) All Phases Total