Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
REG 2017-06-19 Item 4F - Resolution - 2018-2023 Transportation Improvement Program
COUNCIL AGENDA SYNOPSIS Aleeth 06 12 Date 17 Pre arel A : , BG Ala,' r'..f 'IV' ,I,', .. '4111 OloVICI wielP 06 19 17 BG ReJokition [] O,thIla 'Pe AIrg Orit,, &I ,lware A Ilg 11,11e MINI, 1 leanIN er El Other A Jig I>ate Alrg Dale 06/12/17 ,INO,714, MIA Owe 06/19/17 A kg I>dle 06/ 12/ 17 SN i\s,c At :oun4// LI A1ijor him Si i D.1) I 'inante I'm I..e,4,Il Y.-it Poltee 1112 SP( )Nott's The Transportation Improvement Program (TIP) is required by the RCW to be updated SUMM \RN' annually. The TIP is primarily a financial planning document for projects competing for federal and state grants. A Public Hearing is scheduled on June 12, 2017 for the 2018 - 2023 Six Year Transportation Improvement Program. After the Public Hearing, the TIP is adopted by City Resolution and is then incorporated into the Regional and State TIPs. 1 RI.V11 A\ 11 BY COW NItg. D c,\&p Uwe TJ F&,' (Ante El Arts Comm, E] Parks Comm. commriTLE CI IA IR: KATE Transportauon Cmte 0 Utilities Crme DATE: 5/23/17 0 Planning Comm. KRULLER ITEM INFORMATION ITEM No. 4.F. CAS NU \tui,R: Si \II Si q )NS( R. BOB GIBERSON 0Ri GIN u. AG' ,N.1) \ D \ 1 F: 6/12/17 2018 - 2023 AG1 NI ) \ 111 M TI'll F Resolution adopting the Six-Year Transportation Improvement Program CA i 1,A;t )R1 /)/it u 1 zoll • Aloiron ReJokition [] O,thIla 'Pe AIrg Orit,, &I ,lware A Ilg 11,11e MINI, 1 leanIN er El Other A Jig I>ate Alrg Dale 06/12/17 ,INO,714, MIA Owe 06/19/17 A kg I>dle 06/ 12/ 17 SN i\s,c At :oun4// LI A1ijor him Si i D.1) I 'inante I'm I..e,4,Il Y.-it Poltee 1112 SP( )Nott's The Transportation Improvement Program (TIP) is required by the RCW to be updated SUMM \RN' annually. The TIP is primarily a financial planning document for projects competing for federal and state grants. A Public Hearing is scheduled on June 12, 2017 for the 2018 - 2023 Six Year Transportation Improvement Program. After the Public Hearing, the TIP is adopted by City Resolution and is then incorporated into the Regional and State TIPs. 1 RI.V11 A\ 11 BY COW NItg. D c,\&p Uwe TJ F&,' (Ante El Arts Comm, E] Parks Comm. commriTLE CI IA IR: KATE Transportauon Cmte 0 Utilities Crme DATE: 5/23/17 0 Planning Comm. KRULLER RECOMMENDATIONS: SP( )NS( )R/ADNIIN. 0 )\1m1ITH. Public Works Unanimous Approval; Forward to Committee of he Whole & Public H COST IMPACT! FUND SOURCE EXPENDOURI, RkQuuth1) AMOUNT BUDGETED APPROPRIATION REQUIRED $0.00 $0.00 $0.00 -' Ind Source: :ontmelits; MTG. DATE RECORD OF COUNCIL ACTION 6/12/17 Forward to Cnncpnt Agtinda 6/19/17 MTG. DATE ATTACHMENTS 6 2/17 Informational Memorandum dated 05/19/17 (revised after 5/23/17 C Draft Resolution Draft 2018 — 2023 TIP Spreadsheet Current Adopted 2017 — 2022 TIP Minutes from the Transportation and Infrastructure Committee meeting of 05/23/17 6 19/ 7 RP 'on in final form 65 66 City of Tukwila Washington Resolution No. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM (2018- 2023), AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE TRANSPORTATION IMPROVEMENT BOARD. WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26, the City Council of the City of Tukwila has previously adopted a Transportation Improvement Program and thereafter periodically modified said Transportation Improvement Program by resolution; and WHEREAS, the City Council has reviewed the work accomplished under said program, determined current and future City street and arterial needs and, based upon these findings, has prepared a Six-Year Transportation Improvement Program for the ensuing six calendar years (2018-2023); and WHEREAS, on June 12, 2017, a public hearing was held regarding the City's Six- Year Transportation Improvement Program; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. Program Adopted. A Six-Year Transportation Improvement Program for the calendar years 2018 to 2023, attached hereto as Exhibit A, is hereby adopted. Section 2. Filing of Program. The City Clerk is hereby authorized and directed to file a copy of this resolution, together with the exhibit attached hereto, with the Secretary of Transportation and the Transportation Improvement Board of the State of Washington WAWord Processing\Resolutions1TIP 2018-2023 5-17-17 CK:bjs Page 1 of 2 67 68 PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this day of , 2017. ATTEST/AUTHENTICATED: Christy °Flaherty, MMC, City Clerk Dennis Robertson, Council President APPROVED AS TO FORM BY: Filed with the City Clerk: Passed by the City Council: Resolution Number: Rachel B. Turpin, City Attorney Exhibit A: City of Tukwila Six-Year Transportation Improvement Program for 2018 to 2023 W:\Word ProcessingResolutionsITIP 2018-2023 5-17-17 CK:bis Page 2 of 2 2018 - 2023 TIP SUMMARY 2018-2023 TIP PROJECT TITLE 42-42nd Ave S (S 160 St - S 131 P 2 53rd Ave S (S 137th St - S 144th St) 3 ADA Improvements 4 APE/Minkler Blvd Intersection 5 Annual Bridge Inspections and Repairs 6 Annual Overlay and Repair Program 7 Beacon Ave Bridge Preventative Maintenance 8 BNSF Regional Center Access 9 Cascade View Safe Routes to School Phase 2 10 Frank Zepp Bridge Preventative Maintenance 11 Grady Way Bridge Preventative Maintenance 12 Multipurpose Trails 13 S 140th St Intersection Improvements 14 S 144th St Bridge Sidewalks 15 Strander Blvd/SW 27th St St Phase ill 16 TUC/TOD Pedestrian Improvements 17 Walk & Roll Program 18 West Valley Highway 2017 CIP Project Costs in Thousands of Dollars Page No. 2018 2019 2020 2021 2022 2 2.580 0 0 3 2,610 0 0 0 0 20 200 200 200 200 200 27 0 0 144 1,570 0 19 335 335 335 405 405 18 1,400 1,400 1,730 1,740 1,800 12 1,741 0 0 0 0 23 100 0 0 0 0 4 814 0 0 0 0 12 2,535 0 0 0 0 12 198 0 0 0 0 32 62 0 0 0 0 22 0 75 675 0 0 17 0 200 1,210 0 0 13 3,000 3,000 18,300 14,200 0 25 0 0 0 0 0 - 0 0 0 0 0 26 482 2,070 0 0 0 June 12, 2017 FUNDING SOURCES 023 TOTAL Federal a B Developer Unsecur 4360 6,940 0 2,610 900 200 1,200 0 1.714 405 2,220 1,800 9,870 O 1,741 1,741 O 100 814 714 0 2,535 2,535 O 198 198 150 212 0 750 675 O 1,410 1,220 O 38,500 28,941 5,000 4,250 4,250 3,400 O 0 1,400 3,952 627 2,554 250 6,940 1,710 1,200 1,714 2,220 9,870 0 10 100 0 212 75 190 2,215 850 0 521 TOTAL PROJECTS REVISED FROM 2017-2022 TIP New: S 140th St Intersection Improvements 16,057 7,280 22,594 Deleted: Andover Park E/Industry Dr Intersection Moved to Beyond $ 133rd St/SR 599 Intersection Moved to Beyond 18,115 2,405 12,565 79,016 39,376 9,129 TUC - Pedstrian-Bicycle Bridge Completed poeing Acces Rd Bridge Rehabilitation Completed 250 27,917 v O ink WWashington State I Department of Transportation Agency: Tukwila County: King NIPOIRTPO: PSRC Six Year Transportation Improvement Program From 2018 to 2023 Y Inside N Outside 0 17 2 3 g A. PIN/Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B, STIP ID G. Structure ID )u®urpUQWV '°N uopnIosaH a -4 a a 4'5t e 5 0. 40-42 Ave S (S 160 St - S 131 PL) S 160th Street to Southcenter Blvd Design end construct street improvements, underground aerial utilities, drainage. sidewalks, bike facilities, and driveway adjustments WA-07745 06/12/17 06/19/17 04 COOPS T W Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2016 2,465,000 2,455,000 P CN 2023 4,360,000 4,360,000 Totals 25,000 6,625,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 2,465.000 0 4,360.000 Totals 2,465.000 I 4,360,000 Report Date: May 24,2017 Page 1 Washington State VW Department of Trans Agency: Tukwila County: King MPOIRTPO: PSRC inside Six Year Transportation Improvement Program From 2018 to 2023 N Outside Functional Class Priority Number' A. PIN/Project No, B. ST1P ID C, Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID a Federal Fund Code Federal Funds Resolution No, State Funds c — 0 o o. 0, Total Length Environmental Type E. 17 0 WAOS6OI 5ard Avenue S S 137th St to S 144th St Design and construct urban residential street improvements that include curb, gutter, sidewalk . illumination and undergrounding. Street portion will coordinate with Water, Surface Water and Sewer capital improvement program proietis. 08112/17 06/19/17 Totals C 04 COOPS T W 0.420 CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2018 4th 0 TUB 900,000 1,710,000 2.810,000 Totals C 900,000 ,710,000 2,610,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 2,610,000 0 0 0 0 Totals 2,610,000 0 0 0 0 Report Date: May 24, 2017 Page 2 ��}}��' Washington State �// Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Six Year Transportation Improvement Program From 2018 to 2023 Y Inside N Outside A. PIN/Project No, C. Project Tale 0. Road Name or Number E. Begin & End Termini F, Project Description B. STIP ID G. Structure ID o 3 a y WA -05405 06/12/17 Americans with Disabilities ACI (ADA) Improvements Venous Iocalipn5 to Design and construct ADA Compliant upgrades to City infrastructure in conjunction with a City level ))bed plan, 06/19/17 Funding Status Phase Phase Start Year (VYVY) Federal Fund Code Federal €unds 1st Stale Fund Code State Funds Local Funds Total Funds s ALL 2018 ALL 0 204/000 0 1.200.000 1.2[)0,000 Totals 0 Totals 0 1,200,000 1,200,000 Expenditure Schedule Phase 1st 2nd 3rd '.. 4th 5th & 6th ALL 204/000 200,000 200,000 4 Totals 200,000 200.000 200,000 2 #€ # #i 400,000 Report Date: May 24. 2017 Page 3 Agency: Tukwila County: King MPOIRTPO: PSRC St Y Inside Six Year Transportation Improvement Program From 2018 to 2023 N Outside z a 6 A. PIN/Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description Andover Park ElMinkler Blvd lnteraection Andover Park E Minkler Blvd to Construct left turn lanes on Andover Park East and reconstruct traffic signal B. STIP ID G. Structure ID WA-07746 7 Funding Phase 1st Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds 134,000 0 2020 RW 0 0 0 134,000 134,000 ON 0 2020 0 0 0 0 10,000 10,099 144,000 1,570,000 2021 0 1,570,000 1,570,000 Totals 0 0 1,714,000 1,714,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 134,000 0 RW 0 0 10,000 0 0 ON 0 0 0 1,570,000 0 Totals 0 0 144,000 1,570,000 0 Report Date: May 24, 2017 Page 4 5th 8. 6th 810,000 8 1 0 , 0 0 0 I Wi Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2018 to 2023 N Outside 0 o. a A. PIN/Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID 0. 0 is 0. 3 3 0 ON UO91110E024 C C 0. ed(l le)uewu .0 C 14 Annual Bridge Inspections and Repairs Various City Street to Perform load ratings and bi-annual inspections as well as construct necessary repairs and maintenance WA-03731 06/12/17 06/19/17 No Funding Status Phase Phase Start Year (YYYY) r Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2018 0 2,220,000 2,220,000 To 220,000 2,220,000 Expenditure Schedule Phas let 2nd 335,000 338,000 3rd 335.000 335,000 4th 405,000 405,000 Report Date: May 24. 2017 Page 5 4.1h. Washington State Department of Transportation Agency: Tukwila County: King PAPO/FITPO: PSRC Y Inside Six Year Transportation Improvement Program From 2018 to 2023 N Outside 3 c• a A. PIN/Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. 511P ID C. Structure ID S 0. ON UORnlu. 3 a C) 0 2. a 431 a 3 a 16 Annual Overlay and Repair Program Various City Streets to Repair, rehabilitate, and overlay City its as needed in an annual program WA-03733 06112117 06/19/17 06 COOPS T W No Fund ng Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2018 4th 0 5th & 6th 0 10,320.000 10,320,000 Totals 1,730,000 10, 2 ,000 10,320,000 Esprsditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 1,400.000 1,730,000 1,740,000 1,800.000 3,600,000 Totals 1,400,000 1,730,000 1,7413,000 1.800,000 3,600,000 Report Date: May 24, 2017 Page 6 AWashington State VW Department of Transportation Agency: Tukwila County; King MPCPRTPG: PSRC Y Inside Six Year Transportation Improvement Program From 2018 to 2023 N Outside z 3 C. A. PIN/Project No, C. Project Title D. Road Name or Number E. Begin & End Temlint F. Project Description B. STIP ID G. Structure ID a 0 ON UOUOIOSON 3 a a a a 0 �l leluewuoMAu3 pealnbaN M12J 19 / 1320(004) Beacon Ave S Bridge Preventative Maintenance Project Beacon Avenue South over South Ryan Way S Victor SI to S 170th SI Remove and replace failed bridge deck and paint structural steel. TUK-57 06/12/17 06/16/17 14 0.010 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 018 STP(BR) 1,740,920 5th & 6th 0 0 t740,920 Totals 1,740,920 0 1,740,920 1 ture Schedule 1 Phase 1st 2nd 3rd 4th 5th & 6th ALL 1,740.920 0 0 Totals 1.740,920 0 0 Report Date: May 24. 2017 Page 7 411111■ Washington State Department of Transportation Agency: Tukwila County: King MPO!RTPO: PSRC Six Year Transportation Improvement Program From 2018 to 2023 Y Inside N Outside z 3 e 00 A. PINIProject No, C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure 10 0 /i20. 3 a a z 0 a a a. e ed�tl, leW WUOJenu3 WA05409 BNSF Regional Center Access New Facility to Construct a new access to the 8NSF Regional Distribution Center. relocating the 900+ daily truce trips from residential streets in Allentown. 06/12117 06/19/17 EIS N Funding Status Phase Phase Strt Year Federal Fund Code Federal Funds State Fund Coda State Funds Local Funds Total Funds P PE 2018 0 0 100,000 100,000 Totals 100000 100,000 Expenditure Schedule Phase 2nd - 4th 51h&bth PE 100000 , Totals 100.000 0 0 0 0 Report Date: May 24,2017 Page 8 Washington State Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2018 to 2023 N Outside z 3 A. PIN/Protect No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID 3 a 0. 3 a 0 Ct. a a is 3 C a / 1320(005) Cascade View Elementary Sale Routes to School Project - Phase 2 33rd Ave S and S 140th Street S. 144th at 34th Ave. S. to 140th St at 34th Ave. S. Concrete sidewalks are proposed on one side of 33rd Ave S (S 140th St to S 144th St) and on one side of S. 140th St (Military Road South to 34th Ave S) along with a standard curb and gutter separating the sidewalk horn the roadway. A traffic circle is proposed at the intersection of 33rd Ave S and S 140th St to assist in reducing vehicle speeds and increase yisiliffity and safety of pedestrians crossing the street. Curb bulb-outs and/or pedestrian refuge islands at the east entrance/exit to the traffic circle wriutd be constructed to improve the safely of creasing S 140th St at 33rd Ave S. There are currently no ADA facilities to conned to within the project limits. Minor Stem, water improvements will be added to the general action area. The new sidewalk along 33rd Ave S. will require reconstruction of the pavement cross section to establish proper crown slopes. TUK-561 06/12/17 06/19/17 28 0.510 CE Expenditure Schedule Phase 1.111131.111.11 Totals 1st 2nd 3rd 4th 5th & 6th 814,000 - 0 0 0 814,000 0 0 0 Report Date: May 24, 2017 0 Page 9 .Iw. V, Washington State Department of 1Ranaportatlon Agency: Tukwila County: King MPOIRTP ©: PSRC Y Inside Six Year Transportation Improvement Program From 2018 to 2023 N Outsid A. PINfProject No. C, Project Title D. Road Name or Number E. Begin & End Termini F. Project Description 11274(009) Frank Zepp Bridge Preventalive Maintenance Project S 180th Street over the Green River SR 181 - West Valley Highway to Sperry Drive S Paint the structural steel, overlay deck and replace the deck join Iecli B. STIP ID G. Structure ID nd install seismic m 7 14 0,040 CE No Funding Status Phase Phase Start Year (YYYYj Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2018 _.._ STP {BR) 2.534,812 _... 0 0 2.534.812 Totals' 2,534812 Totals 2,534812 tt 0 i1 2334,612 Expenditure Schedule - -- - Phase 1st 2nd 3rd 4th 5th S 6th CN 2.5'.£4,812 Totals 2,534812 0 0 0 0 Report Date: May 24. 2017 Page 10 411111h 1V, = Washington State 411, Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Six Year Transportation Improvement Program From 2018 to 2023 Y Inside N Outside -n z a It Fig 14 J gwnry Alpoµd A. PIN/Project No, C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description / 1288(005) Grady Way Bridge Preventative Maintenance Project Grady Way Bridge over BN and UP Railroads terurban Avenue S to Longacres Drive SW, Renton Retrofit existing bridge with seismic protection. B. STIP ID G. Structure ID TUK-56 3 a a. c a z a ft a a ft 06/12/17 06/19/17 14 .230 CE No Funding 111=31111111== Phase Start Year (YYYY) 2018 State Fund Code State Funds 0 0 0 0 Report Date: May 24, 2017 Page 11 Agency' Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2018 to 2023 N Outside A. PM/Project No, C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description EL STIP ID 0 3 a a 3 3 a 3 a nts to existing rail system infrastructi Funding 2018 2023 Federal Funds 11111M111111•1111 11111111111111111M1111111 0 1111=1111111Cii== 0 0 Local Funds 62,000 212,000 Total Funds 62,000 150,000 212,000 Expendrture Schedule Phase 1st 2nd 3rd 4th 5th & 6th 62,000 0 0 0 0 0 0 0 0 150,000 Totals 62,000 0 0 0 150.000 Report Date: May 24, 2017 Page 12 Department . Sa al tripod/Mon Agency; Tukwila County: King MPO/RTPO: PSRC JegwnN Alpp0 d A. PIN/Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F, Project Description y Inside S 1401h St Intersection Improvements S 140th Street Tukwila International Blvd to Design and construct a new traffic signal at the S 140th Street/Tukwila International Blvd intersection Six Year Transportation Improvement Program From 2018 to 2023 N Outside G. Structure ID WA-09873 a 06/12/17 06/19/17 11 3 -4 a 04 C 42. a a CGPST w a a 0.100 DCE Yes unding Expenditure Schedule Phase Phase Start Year (TYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds 1st 2019 0 Ped/Bika Program 67,000 8.000 75,000 5th & 6th 2020 0 Ped/Bike Program 40..000 10.000 50,000 2020 0 Red/Bike Program 568,000 57,000 625,000 Totals 0 675,000 75,000 750,000 Expenditure Schedule P has* 1st 2nd 3rd 4th 5th & 6th PE 0 75000 0 RW 0 50,000 0 CN 0 0 625,000 0 0 Totals 0 75,000 675,000 Report Date: May 24, 2017 Page 13 ink i7Z Washington State Air Department of Transportation Agency: Tukwila County: King MPOIRTPO: PSRC Six Year Transportation Improvement Program From 2018 to 2023 Y Inside N Outside 5 a A PIN/Project No, C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID 3 3 2 ad&i yuowoAoJdw1 a a e a a a 17 S 144th St Bridge Sidewalks S 144th Street 51st Ave S to 53rd Ave S Widen existing sidewalks on idge 5 between 51l Ave S rd Ave S WA03782 06/12117 9117 28 0.250 No Funding INITZMIWZZIIIIPhase Start Year (YYYY) Federal Funds State Fund Code 0 Local Funds Total Funds IMMallMERI 2019 0 173.000 1,210.000 27,.000 200,000 200,000 2019 1. 1,047,000 0 163000 1,220,000 0 190,000 1,410,000 nditure Schedule Phase 4th 5th & 6th 0 200000 0 0 1,210.000 0 200,000 1,210,000 0 Report Date: May 24, 2017 Page 14 Agency: Tukwila County: King MPOIRTPO: PSRC State Y Inside Six Year Transportation improvement Program From 2018 to 2023 N Outside State Fund Code Report Date: May 24, 2017 Page 15 Priority Number A. PIIJlProjecf No. B. STIP It) C. Project Title 0. Road Name or Number E. Begin & End Termini F- Project Description G, Structure ID s ti 2 r� x ; rS a Environmental Type RW Required 16 _ Tt1K-59 Strarufer 3dJSW 27th St Extension Strander Bh d JSW 27th St West Valley Highway to Niches Ave This project is Phase 3 of a multi-phase improvement that wit connect Strander BlvdJSW 271h St between West Valley Hwy in Tukwila and Oakesdale Ave in Renton_ This project wit complete the design, right-of-way and construction phases for the roadway segment between West Valley Hwy and Hashes Ave, Project components include a railroad bridge for the Union Pacific RR to provide grade separation, a new 4/5 taste roadway segment east of West Valley Hwy. roadway widening of hvo lanes for a portion of the project segment, a separated joint -use trail, a new trait bridge for the Interurban Trail (inducting new trail connections to Strander Blvd,), a new flyover bridge connection to the Tukwila Station, and a new traffic signal serving the Tukwila Station, Current funding will complete the preliminary engineering and right -of -way phases. Construction will be funded as part of a future phase. 06/12i17 06/19/17 01 0300 DCE Yes State Fund Code Report Date: May 24, 2017 Page 15 AIM Washington State W, Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation improvement Program From 2018 to 2023 N Outside i xpendtture Schedute Phase 1st 2nd 3rd 4th 5th & 6th PE 2,500,000 2,000,000 0 0 0 RW 450,000 1,000,000 0 0 0 C N 50,000 0 10,300,000 14,200,000 0 Totals 3,000,000 3,000,000 18,300,000 14,200,000 0 Page 16 Report Date: May 24, 2017 77-'41111t Washington State V/ Department of TransportatIon Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2018 to 2023 N Outside 4'7 A. PIN/Project No. z C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID 3 a. 3 3 p .ipnbea Mb 17 TUCITOD Pedestrian Improvements Baker Blvd (if extended) Andover Park W to E City Limits Construct bike/pedestrian connection between the Tukwila Urban Center (TUC) and Tukwila Station, with service by Amtrak Sounder Commuter Rail/Transit Oriented Development (TOO) area WA-03772 06/12/17 06/19/17 28 0.750 CE Yes Funding u I Status Phase Phase Start Year Federal Fund Code Federal Funds State Fund Code State Funds 2nd Local Funds 3rd Total Funds .-- P ALL 2023 STP(E) 3,400,000 0 0 850.000 4.250,000 Totals 3,400,000 4,250.000 0 850,000 t 4,250,000 Expenditure u Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 0 4,250.000 Totals 0 0 0 0 4,250,000 Report Date: May 24, 2017 Page 17 Anils Washington State Vair Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2018 to 2023 N Outside z 5 g A. PIN/Project No, C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B, STIP ID 0 a G. Structure ID Walk & Roll Plan (Nonmotorized Transportation Plan) Various City Streets to Evaluate deficiencies and create a prioritized list of projects and recommended design standards. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds P PE 2021 Totals IEnditwe Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 11 Totals 0 0 0 0 1, Report Date: May 24, 2017 Local Funds Page 18 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2018 to 2023 N Outside -0 g- z A. PIN/Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID X a S. 0. 0 0. yuewpuawy a a a 0. a a a C 0 3 a 14 West Valley Highway SR 181/West Valley Highway 1-405 to SO-ander Blvd Design and construct completion of 7 lane sections of West Valley Highway with sidewaks, curbs. gutters, storm drainage, lighting, and traffic control, including safety and capadly improvements at the S 156th St intersection, WA03779 08/12/17 06/19/17 03 0, 00 CE No Funding =MI 1=1==i1M •1111111111=1=111 M=111•31M11 Phase Phase St Year (YYTY) 2018 2018 2018 2019 2019 Federal Fund Code STP 189,000 STP 438,000 State Fund Code T1B State Funds 155,000 2,544,000 38.000 100,000 62,000 582,000 782,000 Total Funds 227,000 155,000 100,000 500,000 2,971,000 3,953,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 382,000 0 0 0 150,000 RW 100,000 0 0 0 100,000 0 2,070,000 0 I) - 1,150,000 Totals 482.000 2,070,000 0 0 1,400,000 Local Funds 28,513,201 Total Funds 77,007,458 Report Date: May 24, 2017 Page 19