HomeMy WebLinkAboutREG 2017-06-19 Item 4H - Bid Award - Major Maintenance of 3 Bridges with Razz Construction for $2,688,958COUNCIL AGENDA SYNOPSIS
------------- ----------
Meeting Date
Prepared by
Ma or's review
Council review
06/19/17
BG
A 1 C
0 Resolution
Mtg Date
El Ordinance
Mtg Date
[X] Bid Award
Altg Date 06/19/17
Public Hearing
Mtg Date
E Other
Mtg. Date
SPONSOR Council Mayor L HR Ell DCD Finance Fire IT j P &R 11 Police Pr
SPONSOR'S The Major Maintenance on 3 Bridges Project was advertised for bids on May 3 and 10,
SUMMARY and three bids were opened on May 31. Razz Construction, Inc. was the apparent low
bidder and has experience with projects of similar scope and size. The project includes
improvements to the Grady Way Bridge, Beacon Ave S Bridge, and Frank Zepp Bridge
(South 180th St). Council is being asked to award the bid to Razz Construction in the
amount of $2,688,958.00.
2017
RimiAvi BY E COW Mtg. LI CA&P Cmte EI F&S Cmte
Utilities Cmte El Arts Comm. E Parks Comm. 11
DATE: 06/13/17 COMMITTEE CHAIR: KATE
Transportation
Cmte
ITEM INFORMATION
ITEM No.
4.H.
CAS NUMI 1.t:
STAFF SPONSOR: BOB GIBERSON
ORIGINAL AGENDA DATE: 06/19/17
AGENDA ITENI TITLE Major Maintenance on 3 Bridges
Bid Award to Razz Construction, Inc.
CATI,GORY L Discussion
Mtg Date
] Motion
Mtg Date
0 Resolution
Mtg Date
El Ordinance
Mtg Date
[X] Bid Award
Altg Date 06/19/17
Public Hearing
Mtg Date
E Other
Mtg. Date
SPONSOR Council Mayor L HR Ell DCD Finance Fire IT j P &R 11 Police Pr
SPONSOR'S The Major Maintenance on 3 Bridges Project was advertised for bids on May 3 and 10,
SUMMARY and three bids were opened on May 31. Razz Construction, Inc. was the apparent low
bidder and has experience with projects of similar scope and size. The project includes
improvements to the Grady Way Bridge, Beacon Ave S Bridge, and Frank Zepp Bridge
(South 180th St). Council is being asked to award the bid to Razz Construction in the
amount of $2,688,958.00.
2017
RimiAvi BY E COW Mtg. LI CA&P Cmte EI F&S Cmte
Utilities Cmte El Arts Comm. E Parks Comm. 11
DATE: 06/13/17 COMMITTEE CHAIR: KATE
Transportation
Cmte
Planning Comm.
KRULLER
RECOMMENDATIONS:
SPoNsoR/ADmIN.
COMMITTEE
Public Works
Unanimous Approval; Forward to Regular Consent Agenda
COST IMPACT / FUND SOURCE
EXPENDITURI: REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$2,688,958.00 $3,889,000.00 $0.00
Fund Source: 104 ARTERIAL STREETS (PAGE 12, 2017 CIP)
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
06/19/17
MTG. DATE
ATTACHMENTS
06/19/17
Informational Memorandum dated 06/09/17
Page 12, 2017 CIP
Bid Tabulation
Minutes from the Transportation & Infrastructure Committee meeting of 06/13/17
107
108
City of Tukwila
Allan Ekberg, Mayor
Public Works Department - Bob Giberson, Director
INFORMATIONAL MEMORANDUM
TO: Transportation and Infrastructure Committee
FROM: Bob Giberson, Public Works Director
BY:
CC:
Steve Carstens, Senior Program Manager
Mayor Ekberg
DATE: June 9, 2017
SUBJECT: Major Maintenance on 3 Bridges Project
Project No. 91510406, 91510407, and 91510408
Bid Award
ISSUE
Award the construction bid to Razz Construction, Inc. (Razz) lor the Major Maintenance on 3 Bridges.
BACKGROUND
The Major Maintenance on 3 Bridges includes the Grady Way Bridge, the Beacon Ave S Bridge, and the Frank Zepp
Bridge (S 18091 St). Improvements include seismic retrofit (Zepp & Grady), bridge painting (Zepp & Beacon), and deck
and joint repairs (Zepp & Beacon). Construction bids were originally advertised in March 2017. Only one bid was
received that was significantly over the Engineer's Estimate and was subsequently rejected by Resolution No, 1907.
A second call for bids was advertised on May 3 and May 10, 2017 and two addenda were issued addressing
clarifications in the bid documents. Three bids were opened on May 31, 2017 and the apparent low bidder was Razz
Construction for $2,688,958.
DISCUSSION
The construction bids were reviewed and only one minor irregularity was found. There were no errors in the bid
submitted by Razz. WSDOT concurrence is required to award the bid for a federally funded project, including a review of
Disadvantaged Business Enterprise (DBE) requirements. WSDOT determined that the bidder does meet the DBE
requirements and WSDOT has provided concurrence to award the bid to Razz.
Razz has been doing business since 2005 in Washington and has experience with projects of similar size and scope.
Razz does not have any exceptions and has not been debarred from working on federally funded projects.
FISCAL IMPACT
Bid Results
Razz Construction $ 2,688,958.00
Contingency (15%) 403,343.00
Total $ 3,092,301.4.0
Eng Estimate Budget
$ 2,696,215.00 $ 3,889,000.00
$ 2,696.215.00
*IMO
RECOMMENDATION
Council is being asked to award the bid to Razz Construction, Inc. in the amount of $2,688,958.00 for the Major
Maintenance on 3 Bridges Project and consider this item on the Consent Agenda at the June 19, 2017 Regular Meeting.
Attachments: Page 12, 2017 CIP
Bid Tabulation
WPW EndPROJECTS'ik RW & RS ProiectstMaiev Macieniance nn 3 Bridges {9/51040002 Fund nd Funanee,Tianspodaten Corernreeednie Memo Be Awasd Razz 060517 gl-sns docr
109
110
PROJECT:
DESCRIPTION:
JUSTIFICATION:
STATUS:
MAINT, IMPACT:
COMMENT:
CITY OF TUKWI A CAPITAL PROJECT SUMMARY
2017 to 2022
Major Maintenance on 3 Bridges 2015
91510406
Project Nos, 91510407
91510408
Perform Seismic Retrofit, Deck and Joint Repair, and Bridge Painting work under the Local Agency Bridge
Program on the Frank Zepp Bridge, Grady Way Bridge and the Beacon Avenue South Bridge,
The three bridges were identified as good candidates for federal funding under the Local Agency Bridge
Program administered by VVSDOT The proposed work will preserve the City owned infrastructure and
extend the service lives of the bridges.
Federal grant funding was approved December 2014. Council budget amendment approved 8/3/15
Maintenance needs will be reduced once these three major maintenance projects are completed.
The three bridges were approved for grants under separate federal aid numbers but wit be combined into
one for the design & construction contract. Grant funding requires a 10% match for the design phase
projects that obtain construction authorization by 9/30/18 are eligible for 100% Federal construction funding,
FINANCIAL
(in $000's)
EXPENSES
Design
Land (RAN)
Const Mgmt.
Construction
TOTAL EXPENSES
FUND SOURCES
Fed BRAC Grant
Mitigation Actual
Mitigation Expected
City Oper. Revenue
TOTAL SOURCES
Through Estimated
2015 2016 2017
421
421
445
445
300
2,886
3,186
2.018 2019 2020 2021 2022 BEYOND TOTAL
293
1,003
1,296
0
0 0
866
0
593
3,889
5,348
379
42
421
401
44
445
3,186 1,296
0 0
1,296
3,186
0
0
0
0
0
0
0
0
0
0
5,262
0
0
86
5,348
roject Location
2017 - 2022 Capital improvement Program
12
111
112
CITY OF TUKWLA - MAJOR MAINTENANCE OF THREE BRIDGES
FINAL BID LIST SUMMARY
May 31, 2017
SCHEDULE A - BEACON AVENUE S BRIDGE
1 2 3
Engineer's Estimate
Razz Construction
Road Construction Northwest, inc,
Triton Marine Construction
itern No.
Item Decri.tion ' Qu nti
Unit
Unit Price Cost
Unit Price Cost
Unit Price Cost
Unit Price
1 Cost
Al
A2
UNEXPECTED SITE CHANGES 1
. FA
10000 10,000
10,000 1 10000
10,000 10.000
10000.
10,000
RESOLUTION OF UTILITY CONFLICTS 1
FA
5,000 • 5,000
5000 5000
5,000 5.000
5000t
5000
A3
SPCC PLAN 1
LS
2,000 2,000
3 000 3,000
900 900
1,2001
4,8001
1200 .
4800
A4
MOBILIZATION 1
LS
51,800 1 51.800
72000 72,000
83,000 83,000
AS
PROJECT TEMPORARY TRAFFIC CONTROL 1
LS
45,000 1 45,000
30,000 30000
37,500 37,500
20000
20000
AS
PEDESTRIAN TRAFFIC CONTROL 1
LS
5,000 1 5,000
6,000 6,000
2200. ,2200 ,
14 3 01
14,300
A7
FLAGGERS. min Bid $65.00 200
HR
65 13,000
651 13, 00
65 13,000
681
13,600
A8
REMOVING ASPHALT CONC_ PAVEMENT 180
SY
10 1.800
13 2.340
21i 3,780
44
7,920
A9
ROADWAY EXCAVATION INCL. HAUL 75
CY
50 3,750
30 2.250
50 3,750
72
5400
A10
I
TON
60 1500
64 1,600
70 1,750
140
3500
All
HroA CL 1/2 INCH PG 64-22 22
TON
200 1 4400
312 6,864
440 9,680
370
8 140
Al2
EROSION/WATER POLLUTION CONTROL 1
FA
5.000 5,000
5,000 5,000
5000 5000
5, 00
5000
A13
A4
A15
ESC LEAD 60
DAY
60 ' 3,600
80 4,800
90 5400
11
60
STORMWATER POLLUTION PREVENTION PLAN 1
LS
2000 , 2,000
3,000 3,000
900 900
8.5001
8,500
1
1400
TYPE B PROGRESS SCHEDULE 1
LS
1,500 • 1,500
5.000 5,000
1500 1500
11
1400
A16
ADA FEATURES SURVEYING 1
LS
2,000 2,000
2000:
2000 2000
A17
.
STRUCTURE SURVEYING . 1
LS
5,000 5,000
5.000: 5,000
3,500 3,500
6.400
6400
MB
WORK PLATFORM AND CONTAINMENT SYSTEM 1
LS
15,000 15,000
20,000, 20,000
32,200 32,200
15000
' 15.000
A19
La Mr " el lizitIZT , • . -: IUD 9
LS
20,000 1 20,000
20 000, 20,000
22,200 22.200
41000
41.000
29 678
7,098
A20
WEE
A22
EPDXY-COATED ST, REINF, BAR 14,200
LB
2 24,140
2 28,400
2 24,850
21
9
DRILL AND EPDXY DOWELS 182
EA
65 11,830
241 4.368
115 20,930
STRUCTURAL CARBON STEEL 1
LS
5,000 1 5,000
60,000 ; 60,000
57,800 57.800
60,000
60.000
12,800
58,800
CONC. CLASS 4000 FOR SIDEWALK 8
1 CY
850 6,800
750 6,000
730 5,840
IIMMEE4
1,400
A24
C0NC CLASS 4000D FOR BRIDGE 42
1 CY
1,000 42,000
900, 37,800
4,000 168,000
A25
SAWCUT EXPANSION JOINT 68
. LF
85 5,780
12 816
30 2,040
57
3,876
A26
CLEANING AND PAINTING 1
LS
LS
145,000 ' 145,000
160,000' 160,000
170.000 170,000
204,112
204,112
A27
CONTAINMENT OF ABRASIVES 1
50.000 50,000
20,000'
32,000, 32,000
39,000.
39,000
A28
TESTING AND DISPOSAL OF CONTAINMENT WASTE . 1
FA
00 i
10,000 10,000
10.000 10,000
,
0
A29
REPAIR EXISTING STEEL BEAMS 1
FA
50.000 1 50,000
50,000 50,000
50,000 50,000
50,000.
50,000
A30
CORRUGATED METAL DECKING 2.500
SF
IERMIIIMIMMIIIMMIEEI
SY
12 30,000
17 42.500
23 57,500
15
37,500
A31
REMOVING CEMENT CONC, SIDEWALK '15
50 750
130
1,950
A32
HMA SIDEWALK 12
150 1,800
75 900
1,5001
18,000
A33
ROADSIDE CL NUP 1
1 FA
20,000 . 20,000
20.000 20,000
20,000' 20,000
20,0001
5,000
20,000
5,000
A34
PROPERTY RESTORATION . 1
FA
5,000 5,000
5,000' 5,000
5,000 5,000
SCHEDULE A TOTAL. 131D
605,075 666,007 868,870
729,035
SCHEDULE B SW GRADY WAY BRIDGE
1 2
3
Eflgifler' Estimate
Raz Conetruction
Road Constwction Northwest, Inc.
Triton Mrin
Constructiori
"
MEIN
UNEXPECTED SITE CHAWGES 1
1 FA
2,000 2,000
2,000 2,008
2,000 2,000
2,0001
2,000
62
SPCG PLAN 1
1 LS
1.500 1,508
3,000' 3,080
900 900
1.200
1200
63
MOBILIZATIQN 1
LS
26,700 ' 28,700
21.000, 21,000
45,000 45,000
3,400
3,400
NM
PROJECTTEMPORARY TRAFFIC CONTROL 1
1 LS
15,000 15,000
15,000' 15,000
37,500 37,580
10.000
10,008
65
65 6,500
65 6,508
65 6,500
68
6,800
07
REMOVAL OF STRUCTURES AND OBSTRUCTIONS 1
EROSION/WATER POLLUTION CONTROL 1
LS
1,000 1,000
7,500 7,500
7,200 7,200
iool
i,000i
190
1,000
FA
1,000 1 1,000
1,000, 1,000
1,000 1.000
ESC LEAD 10
i DAY
60 1 600
80 800
90 900
1
3,500
10
3,500
99
STORMWATER POLLUTION PREVENTION PLAN 1
1S
1,500 , 1,500
5,000 5.000
900 900
610
TYPE 8 PROGRESS SCHEDULE 1
I LS
2,000 2,000
2,500 2,500
1,500 1,500
1
1
811
CLEANING ABUTMENT BEARING SEAT 1
1 LS
3.000 3,000
1,000. 1,000
3,000 3,000
eIO[
150,000
810
150,000
812
STRUCTURAL CARBON STEEL 1
LS
200,000 1 200,000
122.000 122,000
280,000 260,000
813
RESIN BONDED ANCHORS 1
LS
50,000 ! 50,000
35,0001 3.5,000
1,5001 1,500
70,000 70,000
1,500 1,500
35,0001
1,5001
35,000
1,500
615
ROADSIDE ROADSFDECLEANUF 1
FA
1,500 . 1,500 ,
PROPER RESTORATION 1
1 FA
1.000 1 1.000
1,0001 1,000
1,000 1,080
1,0001
1,000
SCHEDULE B TOTAL BID
315,300 224,800 458,900
216,211
ftiidsitiseeigenkTUKA054000140700BLIDWitiBidding,i0711$iddingRecords%3 Bridges Certfiled Bid Taididatioit2017-0531,sisit
Page 1 of 3
114
CITY OF TUK LA - MAJOR MAINTENANCE OF THREE BRIDGES
FINAL BID LIST SUMMARY
May 31, 2017
thrvislkprojecikATUKA00000014107006L00710Bdchrigi071
18d wtoRecords13 Bridges Certified BEd isbutd4on20170531
Page 2 or 3
SCHEDULE C
C - FRANK ZEPP (S 180TH STREET)
1 .
.
:s
Engineer's Estimate R
Razz Construction R
Road Construction Northwest, Inc. T
Triton Marine Construction
Item No _ ltm Descntti n Q
Quanti U
Unit U
Unit Price = C
Cost U
Unit Price . Cost U
Unit Price , C
Cost U
Unit Price I
I Cost
C1 UNEXPECTED SITE CHANGES 1
1 F
FA 1
10,000 1 1
10,000 1
10,000 10 000 1
10 . 000 ; 1
10,000 1
10,0001 0
0,000
C2 RESOLUTION OF UTILITY CONFLICTS 1
1 F
FA 5
5 000 5
5 000 5
5,000 5.000 5
5, 000 5
5 ,000 5
5 . 0 S
C3 REIMBURSEMENT FOR THIRD PARTY DAMAGE 1
1 E
EST 1
15,000 1
15,000 1
15,000 15,000 1
15000 1
C4 SPCC PLAN 1
1 L
LS 1
10,000 . 1
10,000 3
3,000 3.000 1
1,700 1
1.700 1
1 200 1
1 20
C5 MOBILIZATION 1
1 :
: LS 1
175,000 1 1
175.000 1
171,000 171,000 2
210,000 2
210,000 1
C6 FLAGGERS, min Bid 565.00 1
160 I
I HR 6
65 1
10,400 6
65 10,400 6
65 1
10 400 6
68 1
10,880
C7 PORTABLE ILLUMINATION I
I 4
3.000 12,000 4
4,500 1
18,000 3
3 ,3001 2
200
C8 FURNISHING TC DEVICES FOR 400 FT TRANSITIONS
4 E
EA 1
1.500 = 6
6,000 1
1 4 2
2, 10 9
9 ,200 2
C9 PORTABLE CHANGEABLE MESSAGE SIGN 4
4,000 1
1 HR 3
3 = 1
12,000 6
6!
. 24,000 5
5 1
19, 00 6
6: 2
24,64 0
C10 INSTALL ALTERNATE ROUTE SIGNING 1
1 :
: LS 2
29,250 2
29,250 5
50,000i 50,000 6
6 000 3
_
36,0001 0
000
cli PEDESTRIAN TRAFFIC CONTROL 1
5,000 5,000 4
4.500, 4
4 500 2
21, 000 2
21,000
C12 UNIFORMED POLICE OFFICER 5
50 H
HR 1
100 5
5,000 9
95 4,750 1
160. 8
8,000 1
C13 TYPE 3 BARRICADE 1
15 1
100 1
1,500 1
150 2,250 2
230: 3
3,450 2
2301 3
3,450
C14 CONSTRUCTION LIAISON 1
1 L
LS 2
20,000 1 2
20,000 5
50,000 50,000 1
10,000: 1
10,000 1
11 11,000 1
C15 OTHER TRAFFIC CONTROL LABOR, min Bid 860.00 2
50 1 1
1,500 7
75 1,875 6
65 1
1,625 1
C15 SEQUENTIAL ARROW SIGN 5
500 H
HR 5
5 2
2,250 7
7 3.500 1
13! 6
6,625 2
2, 1
1,000
C17 CONSTRUCTION SIGNS CLASS A 1
100 S
SF 2
25 2
32 3,200 4
40 4
4.000 4
42 4
018 TEMPORARY SIGNAL. MODIFICATION 1
1 L
LS 1
11,000 1
11.000 1
10.000, 10,000 4
45,000J 4
45,000 5
50,0001 5
50,
C19 SIGN COVERING 1
1 4
420 S
SF 1
10 4
4,200 3
3 1,260 5
5M1% ;
;1‘,N;4440 0
0 4
4,200
C20 CLEARING AND GRUBBING 1
1 1
15,000 1
15.000 3
3,000 3,000 6
C21 REMOVAL OF STRUCTURES AND OBSTRUCTIONS .
. 1
1 L
LS 2
20,000 2
20,000 1
10,000; 10,000 3
3,000 3
3,000 4
46,000 4
C22 REMOVING ASPHALT CONC. PAVEMENT ;
; 1
190 S
SY 2
25 4
4/50 3
301 5,700 2
21 3
3,990 1
12 2
2 280
,
C23 HMA FOR APPROACH CL. 1/2 IN PG 64-22 2
22 T
TON 1
150 3
3,300 3
3121 5,854 3
330 7
7,260 3
C24 CRUSHED SURFACING BASE COURSE 1
14 C
Cy 1
100 1
1,400
1001 1,400 1
125J 1
1,750 2
2701 3
3,780
C25 ADJUST MANHOLE 1
1 E
EA 1
1,000 1
500j 500 a
awl 8
800 1
1,100; 1
1,100
C2a EROSION/WATER POLLUTION CONTROL 1
15,000 1
15,000 1
15,000- 15,000 1
15,000; 1
15,000 1
15 , 1
15,000
C27 HIGH VISIBILITY SILT FENCE 4
400 L
LF 5
5 1 2
2.000 4
4 1.600 4
4 1
1,500 1
121 4
4,800
C28 TYPE B PROGRESS SCHEDULE '
' 1
1 L
LS 5
5,000 5
5,000 5
5,000' 5.000 3
3 000'
. 3
3,000 1
1 1
1
C29 HEALTH AND SAFETY PLAN .
. ,
,
; LS 1
10,000 1
10,000 5
5.000, 5,000 9
900 9
900 5
,
5000 ,
L.30 NO TRESPASSING SIGN ,
, 2
2 '
' EA 5
500 1
1.000 1
150, 300 7
700 1
1A00 2
200; 4
400
C31 FA-SITE CLEANUP OF BIO. AND PHYSICAL HAZARDS .
. 1
1 F
FA 1
10000 1 1
10,000 1
10.000 10,000 1
10 1
10.000 1
10. 0 ,
10,000
C32 STRUCTURE SURVEYING :
: 1
1 L
LS 4
40,000 1 4
40,000 1
10,000! 10,000 1
12,000, 1
12,000 1
14 , 000 1
14,000
STRUCTURE EXCAVATION CLA S A INCL. HAUL 8
85 C
CY 3
30
2=580 M
100: 8
8,600 1
100 8
8600
C34 W RK PLATFORM AND CONTAINMENT SYSTEM L
150000. 150,000 4
440.000, 4
440,000 1
10 , 000 1
108 ,000
C35 BRIDGE APPROACH SLAB 2
200 2
250 5
50,000 3
330 66,000 3
385! 7
77,000 3
C36 SEISMIC RETROFIT - FRANK ZEPP 1
LS 4
425,000 4
425,000 2
255,000 255.000 3
395,000 3
395,000 4
457 726 4
IIIMEPDXY CRP.CK SEALING 1
160 L
LF 6
60 ' 9
9,600 1
105 16,800 1
110 1
17,600 1
160 ' 2
25,600
IBM CONCRETE SPALL REPAIR 1
12 1
1 SF 5
500 1 6
6.000 3
326 3,912 3
325 3
3,900 2
2001 2
2,400
C39 EXPANSION JOINT SYSTEM STRIP SEAL - SUPERSTR 1
1 1
1 LS 4
48.000 4
48.000 7
75.000! 75,000 7
73,500 7
73,500 9
93 , 000 0
000
_
C40 EXPANSION JOINT SYSTEM COMPRESSION SEAL - SUPERSTR 1
1 L
LS 1
14 000 , 1
14,000 2
20,000= 20,000 1
15,500' 1
15,500 7
7.0001 7
7,000
C41 CLEANING AND PAINTING RAILING 1
1 0
0.000 1
10,000 5
55,000' 55,000 8
80,500 6
60,500 9
96,000 9
96,000
C42 TESTING AND DISPOSAL OF CONTAINMENT WASTE 1
1 F
FA 1
10.000 : 1
10,000 1
10,000 10,000 1
10.0001 1
10,000 1
10 , 0_, 1
10000
CLEANING AND EPDXY SEALING ;
; 1
1 L
LS 2
220,000 [ 2
220,000 6
60,000 60,000 1
117,200: 1
117,200 1
140,000 1
140,000
C44 POLYESTER CONCRETE OVERLAY 1
1 L
LS 2
225,000 2
225,000 3
38 000 398,000 2
281.600, 2
281,600 4
438,0001 4
438,000
C45 SCARIFYING CONC. SURFACE 1
1,580 S
SY 3
30 4
47,400 7
77 121,660 5
57 8
89,270 8
80 1
C46 FURTHER DECK PREPARATION FOR TYPE 2 DECK REPAIR 4
400 S
SF 1
180 , 7
72000 6
60 24.000 7
70 2
28,000 8
81! 3
32,400
C47 FLEXIBLE GUIDE POST 1
10 E
EA 4
40 I 4
400 1
150 1,500 1
145 1
1,450 1
180F 1
1.800
C48 PLASTIC TRAFFIC ARROW 4
4 E
EA 3
300 1
1,200 2
212' 848 2
200 8
800 3
320[ 1
1.280
49 PLASTIC TRAFFIC LETTER 8
8 E
EA 1
150 1
1.200 1
142 1,136 1
125 1
1,000 1
180 , 1
1,440
C50 PLASTIC STOP LINE 6
60 L
LF 1
16 9
960 1
14, 840 1
14 8
855 3
3 1 2
2,100
TEMPORARY STRIPING 1
1 3
LF 4
4 9
9,000 2
3i .
2 2
2000 , 2
2,830
C52 RAISED PAVEMENT MARKER TYPE 1 '
' 4
4 H
HUND 2
250 1
1000 5
500 2,000 5
500- 2
2,000 6
60 2
2,560
C53 RAISED PAVEMENT MARKER TYPE 2 1
1 1
1 HUND 4
450 4
450 6
600 500 0
00 1
1.100 1
1100
C54 R ADSIDE C EANUP 1
1 F
FA 1
10000 1
10000 1
10,000 10,000 1
10.000 1
10,000 1
10,000! 1
10,000
18d wtoRecords13 Bridges Certified BEd isbutd4on20170531
Page 2 or 3
a)
CJTY OF TUKWILA = MAJOR MAINTENANCE OF THREE BRIDGES
FINAL BID LIST SUMMARY
May 31, 2017
SCHEDULE C TOTAL BID 1,764,840 1,734,151 ;7,7---L7:77----- 2,099,507
RCN's total 2,111,075
Difference due to RCN cat error for Item C19
SCHEDULE D . FRANK
ZEPP (S 180TH STREET) NON-FEDERAL PARTICIPATION
1 2 3
Engineer's Estimate
Razz Construction
Road Construction Northwest, Inc,
Triton Marine Construction
Item No. Item Descri ition
Quantity 1 Unit
1 1 LS
' Unit Price 1 Cost
1.000 1 1,000
Unit Price Cost
Unit Price Cost
3,300 3,300
Una Price Cost
01 1 MOBILIZATION
3,000 3,000
1'
02 LLUMINATION SYSTEM -TRAIL LS
10000 10000
61.000 61,000
37.500 37,500
40,000 i 40,000
SCHEDULE D TOTAL BID 11,000 64,000 40,800 40,001
SCHEDULE A
SCHEDULE B
SCHEDULE C
SCHEDULE D
GRAND
TOTAL BID
TOTAL BID
TOTAL BID
TOTAL BID
TOTAL
_Ii.gineer's Estimate
Razz Construction
Road Construction Norjnwest, Inc
Triton Marine Construction
J 605,075
666007
868,870
729,035
1 315,300
224600
458, 00
216211
1 1,764,840
1,Th4151
2,112,675
2,099,507
11,000
64,000
40.600
40,001
2,696,215
2,68 ,95
3,084,754
RCN's total 3,479,645
Difference due to RCN calc error for item C19
Certified by Date June 1, 2017
r ,i d , P.E.
P . yid Evans and Assoeat . Inc_
ttkalvis11projentiaTLIKA001)0t)014W7LI05LD1071EIBidding107118iddingRecordst.3 !adages Certified Bid Tabulation2011.0531.xlsx
Page 3 of 3
City Council Transportation & Infrastructure Committee
TRANSPORTATION & INFRASTRUCTURE COMMITTEE
Meeting Minutes
June 13,2017- 5:30 p.m. - Foster Conference Room, 6300 Building
Councilmembers: Kate Kruller, Chair; Joe Duffie, De'Sean Quinn
Staff: David Cline, Bob Giberson, Robin Tischmak, P
Larson, David Sorensen, Steve Carstens, Moira Bi
Guests: Julien Loh, Tom MacLean, & Heather Mulligan, Pt
CALL TO ORDER: Chair Kruller called the meeting to order at 5:30 p.m.
I. PRESENTATIONS
in, Gail Labanara, Ryan
nergy
Representatives from Puget Sound Energy briefed the Committee on the Green Direct program,
which is a voluntary long term renewable energy option for large commercial and municipal
entities. PSE is moving to renewable energy and Green Direct would be a 20 -year power
purchase agreement contract with PSE for a privately developed wind farm in Lewis County.
Numerous corporations and adjoining municipalities have already joined Green Direct. The
Committee requested thatstaff analyze the cost impacts to the City's 71 PSE accounts and to
reach out to other cities: Committee would like PSE to give the presentation to the full Council.
UNANIMOUS RECOMMENDATION FOR PSE PRESENTATION TO FORWARD TO JUNE 26, 2017
COMMITTEE OF THE WHOLE.
II. BUSINESSAGENDA
A.
Staff is seeking Council approval to award a construction bid to Hoffman Construction in the
amount of $1,412,889.25 for the Cascade View Safe Routes to School Phase II Project. Hoffman
writhe low bidder of six, and exceeds the engineer's estimate of $1,237,646. This is happening
consistently in the region due to an extremely competitive bidding climate. Extra funds for this
project are available from the Residential Street ending fund balance. Committee
recommended a sign be placed at the project site listing the funding partners. Committee are
also interested in a ribbon cutting for this residential street improvement project. UNANIMOUS
APPROVAL. FORWARD TO JUNE 19, 2017 REGULAR CONSENT AGENDA.
B. Bid Award: Maior Maintenance on 3 Bridges
Staff is seeking Council approval to award a construction bid to Razz Construction, Inc. for
$2,688,958.00 for the Major Maintenance on 3 Bridges project. Razz was the low bidder, has
experience with similar projects, and WSDOT has provided concurrence for this federal funded
bridge project. As this is the second call for bids, Committee asked what had changed in the
scope of work and was informed that the Frank Zepp Bridge (S 180th St) will be closed for nine
Transportation & Infrastructure Committee Minutes ................................................................ ............................... June 13, 2017
calendar days for the repair work. Staff is working with communications for outreach on the
bridge closure. APPROVAL. FORWARD TO JUNE 19, 2017 REGULAR CONSENT AGENDA.
C. Bid Award: 2017 Small Drainage Program
Staff is seeking Council approval to award Schedule A of the construction contract to McCann
Construction Enterprises, Inc. in the amount of $451,823.75 for the 2017 Annual Small Drainage
Program. Since the overall bid was higher than the available funding, the alternative site 4,
South 150t" Street Gilliam Creek Inlet Overflow Structure, is recommended to be delayed.
Construction of the three projects as Schedule A of the bid (4811 Avenue South between South
160th and South 162nd Streets, Strander Boulevard Sidewalk, and 58t1 Avenue South, 14423-
14425) is within budget and McCann is the low bidder. UNANIMOUS APPROVAL. FORWARD TO
JUNE 19, 2017 REGULAR CONSENT AGENDA.
D. Resolution: Surplus City Equipment for 2017
Staff is seeking Council approval of a resolution that would authorize the sale of 26 pieces of
surplus equipment at auction. All are fully depreciated and currently valued at $12,715.00.
Proceeds from the sale go to the General Fund. UNANIMOUS APPROVAL. FORWARD TO JUNE
19, 2017 REGULAR CONSENT AGENDA.
lip
Staff is seeking Committee approval to purchase a Kuntze Multi- Channel Water Monitoring
System in the amount of $7,704.40. This will enable automated 24/7 monitoring and data
logging of chlorine residual within the City's water distribution system as required by the
Washington State Department of Health. The purchase is within the Water Fund's 2017 capital
machinery and equipment budget of $25,000. COMMITTEE UNANIMOUS APPROVAL.
III. SCATBd
IV. M
The Transp
EOUS
n Committee Meeting adjourned at 6:25 p.m.
Committee Chair Approval
Minutes by GL, reviewed by BG