Loading...
HomeMy WebLinkAboutPlanning 2017-06-22 Item 4 - Foster High School Expansion and Birth to Kindergarten - Attachment I: Tukwila Birth to K Traffice Impact AnalysisGibson Traffic Consultants 2813 Rockefeller Avenue Suite B Everett, WA 98201 425.339.8266 Tukwila Birth to K Traffic Impact Analysis Jurisdiction: City of Tukwila ATTACHMENT 1 February 2017 GTC #16 -178 153 Tukwila Birth to K Traffic Impact Analysis TABLE OF CONTENTS 1. DEVELOPMENT IDENTIFICATION 1 2. METHODOLOGY 1 3. TRIP GENERATION 4 3.1 Half -Day Pre - Kindergarten 5 4. TRIP DISTRIBUTION 6 5. INTERSECTION ANALYSIS 6 5.1 Level of Service Results 11 5.2 On -Site Operations 11 6. PARKING ANALYSIS 12 7. MITIGATION 12 8. CONCLUSIONS 13 LIST OF FIGURES Figure 1: Site Vicinity Map 2 Figure 2: Development Trip Distribution — AM (School PM) Peak 7 Figure 3: 2016 Existing Traffic Volumes 8 Figure 4: 2022 Baseline Traffic Volumes 9 Figure 5: 2022 Future with Development Traffic Volumes 10 LIST OF TABLES Table 1: Level of Service Criteria for Intersections 3 Table 2: Trip Generation Summary — Elementary Students 4 Table 3: Trip Generation Summary — Birth to Pre -K Students 4 Table 4: Trip Generation Summary — Total Trips 5 Table 5: Intersection Level of Service Summary 11 ATTACHMENTS Trip Generation Calculations A Traffic Volume Data and Calculations B Level of Service Calculations C Gibson Traffic Consultants February 2017 info @gibsontraffic.com i GTC #16 -178 154 Tukwila Birth to K Traffic Impact Analysis 1. DEVELOPMENT IDENTIFICATION Gibson Traffic Consultants, Inc. (GTC) has been retained to provide a traffic impact analysis for the proposed Birth to K school for the Tukwila School District. GTC is a professional traffic engineering consulting firm registered and licensed in the State of Washington. Brad Lincoln, responsible for this report and traffic analysis, is a licensed professional engineer (Civil) in the State of Washington and member of the Washington State section of ITE. The Birth to K school is located north of Showalter Middle School and is proposed to have access to S 142nd Street along the north side of Showalter Middle School and Foster High School. The school is proposed to consist of approximately 53,000 SF of school space for up to 440 students. Approximately 300 students will be kindergarten students and 140 will be birth to pre - kindergarten students. It is anticipated that as many as 75% of the kindergarten students will be bussed to the site. The start and end times for the different students, kindergarten, pre - kindergarten and infant /toddler, will be staggered by approximately 30 minutes. The site is proposed to have 80 parking spaces plus room for 6 busses. The school is expected to be built by the end of 2019. A site vicinity map has been included in Figure 1. 2. METHODOLOGY The trip generation calculations for the Tukwila Birth to K school have been performed based on data contained in the Institute of Transportation Engineer's (ITE) Trip Generation Manual. The calculations have been performed by using a combination of trip generation data for elementary school and daycare centers. The scope of the analysis contained in this report is based on the discussions with City of Tukwila staff. The analysis has been performed for the AM peak -hour and the school PM peak -hour to account for the two times when the school's trip generation is the highest. The following intersections have been analyzed as part of this report: 1. 42nd Avenue S at S 144th Street 2. 42nd Avenue S at S 142nd Street The analysis has been performed for the 2016 existing conditions, 2022 baseline conditions and 2022 future with development conditions. This time period has been utilized to account for a typical 6 -year horizon period; even though the school is anticipated to be completed by 2020. Gibson Traffic Consultants February 2017 info @gibsontraffic.com 1 GTC #16 -178 155 A Y r S 140TH ST S 144TH ST S 146TH ST a 0 co W 0 S 140TH ST S 142ND ST /ACCESS / / / / / / / / / / /// / / / / / / / /// / / / / / / /// • / / / / /// / OS S S \ • / / } TgK / \ \ \ \ v • /// / • / / / /// // CO GIBSON TRAFFIC CONSULTANTS TRAFFIC IMPACT STUDY GTC #16 -178 TUKWILA SCHOOL DISTRICT BIRTH TO K CAMPUS 440 STUDENTS CITY OF TUKWILA LEGEND DEVELOPMENT SITE FIGURE 1 SITE VICINITY MAP Tukwila Birth to K Traffic Impact Analysis Congestion at intersections is generally measured in terms of level of service (LOS). In accordance with Highway Capacity Manual: 2010 Edition (HCM) by the Transportation Research Board, road facilities and intersections are rated between LOS A and LOS F, with LOS A being free flow and LOS F being forced flow or over - capacity conditions. The level of service at signalized, roundabout and all -way stop - controlled intersections is based on the average delay of all approaches. The level of service for two -way stop - controlled intersections is based on average delays for the stopped approach with the highest delay. Geometric characteristics and conflicting traffic movements are taken into consideration when determining level of service values. A summary of the intersection level of service criteria is included in Table 1. Table 1: Level of Service Criteria for Intersections Level of 1 Service Expected Delay Intersection Control Delay (Seconds per Vehicle) Unsignalized Intersections Signalized Intersections A Little/No Delay 10 <10 B Short Delays >10 and <15 >10 and <20 C Average Delays >15 and <25 >20 and <35 D Long Delays >25 and <35 >35 and <55 E Very Long Delays >35 and <50 >55 and <80 F Extreme Delays2 >50 >80 The level of service threshold that has been applied to the study intersections in this report is LOS D, based on the surrounding uses and the descriptions identified in the City of Tukwila Comprehensive Plan. The level of service analysis has been performed utilizing the Synchro 9.1, Build 907 software. 1 Source: Highway Capacity Manual 2010. LOS A: Free -flow traffic conditions, with minimal delay to stopped vehicles (no vehicle is delayed longer than one cycle at signalized intersection). LOS B: Generally stable traffic flow conditions. LOS C: Occasional back -ups may develop, but delay to vehicles is short term and still tolerable. LOS D: During short periods of the peak hour, delays to approaching vehicles may be substantial but are tolerable during times of less demand (i.e. vehicles delayed one cycle or less at signal). LOS E: Intersections operate at or near capacity, with long queues developing on all approaches and long delays. LOS F: Jammed conditions on all approaches with excessively long delays and vehicles unable to move at times. 2 When demand volume exceeds the capacity of the lane, extreme delays will be encountered with queuing which may cause severe congestion affecting other traffic movements in the intersection. Gibson Traffic Consultants February 2017 info @gibsontraffic.com 3 GTC #16 -178 157 Tukwila Birth to K Traffic Impact Analysis 3. TRIP GENERATION The trip generation for the Tukwila Birth to K school is based on a combination of the following ITE Land Use Codes: • ITE LUC 520 (Elementary School) — 300 students • ITE LUC 565 (Daycare Center) — 140 students The kindergarten students will most closely be associated with elementary school kids, especially with up to 75% of the students anticipated to ride the bus. The birth to pre - kindergarten students are most closely associated with daycare center type students since these students will almost certainly rely on parents dropping them off and picking them up. A daycare center usually includes a significant amount of reduction in new trips being generated since parents will typically utilize a daycare center along a route they already travel. These trips are identified as pass -by trips since they are not new trips to the street system. A 75% pass -by reduction has been approved by many jurisdictions in the Puget Sound region. This pass -by trip reduction has been identified in the trip generation calculations included in the attachments, but has not been applied to the trip generation calculations included in the text of this report or in the calculations utilized for the intersection level of service analysis. This results in all of the trips generated by the school being new trips to the system and results in a conservatively high analysis of the impacts of the school. The trip generation of the 300 elementary students is summarized in Table 2. Table 2: Trip Generation Summary — Elementary Students 300 Elementary Students Average Daily Trips AM Peak -Hour Trips School PM Peak -Hour Trips Inbound Outbound Total Inbound Outbound Total Inbound Outbound Total Generation Rate 1.29 trips per student 0.45 trips per student 0.28 trips per student Splits 50% 50% 100% 55% 45% 100% 45% 55% 100% Trips 194 193 387 74 61 135 38 46 84 The trip generation of the 140 birth to pre - kindergarten students are summarized in Table 3. Table 3: Trip Generation Summary — Birth to Pre -K Students 140 Birth to Pre -K Students Average Daily Trips AM Peak -Hour Trips School PM Peak -Hour Trips Inbound Outbound Total Inbound Outbound Total Inbound Outbound Total Generation Rate 4.38 trips per student 0.80 trips per student 0.81 trips per student Splits 50% 50% 100% 53% 47% 100% 47% 53% 100% Trips 307 306 613 60 52 112 53 58 113 Gibson Traffic Consultants info@gibsontraffic.com 158 4 February 2017 GTC #16 -178 Tukwila Birth to K Traffic Impact Analysis The total trip generation of the Tukwila Birth to K school is summarized in Table 4. Table 4: Trip Generation Summary — Total Trips Student Type Average Daily Trips AM Peak -Hour Trips School PM Peak -Hour Trips Inbound Outbound Total Inbound Outbound Total Inbound Outbound Total Elementary 300 students 194 193 387 74 61 135 38 46 84 Birth to Pre -K 140 students 307 306 613 60 52 112 53 60 113 Total 501 499 1,000 134 113 247 91 106 197 The trip generation calculations are included in the attachments. It is important to note that 75% of the kindergarten students are anticipated to ride the bus, which is higher than a typical elementary school. This level of bus ridership would likely reduce the trip generation for the 300 kindergarten kids. However, the mode split for the Tukwila Birth to K school is not known, but it is assumed to be similar to an elementary school for the 300 kindergarten students and similar to a daycare for the 140 birth to pre- kindergarten students. 3.1 Half -Day Pre - Kindergarten The Tukwila Birth to K is planned to have half -day pre- kindergarten with sessions in the morning and afternoon. The 440 students at the Tukwila Birth to K would represent the maximum number of students during either of these pre- kindergarten sessions. There are anticipated to be 77 pre- kindergarten students at one time. ITE Land Use Code 565, daycare, was utilized for the pre- kindergarten students since it is the most closely associated land use code. ITE does not identify if the data for this land use included morning and afternoon sessions. The worst case scenario would be to assume 154 additional daily trips for a full turnover of pre- kindergarten students and assuming all pre- kindergarten students are picked -up or dropped -off in a single vehicle. This does not account for students that may walk, carpool or utilize bus service. This would therefore represent an overly conservative assumption and would result in 1,154 average daily trips. The two half -day pre- kindergarten sessions are not anticipated to change the AM or school PM peak - hour trip generation of the site since the trip generation assumption of 1 vehicle per student is overly conservative. Gibson Traffic Consultants February 2017 info @gibsontraffic.com 5 GTC #16 -178 159 Tukwila Birth to K Traffic Impact Analysis 4. TRIP DISTRIBUTION The distribution of trips generated by the Tukwila Birth to K school is based on existing count data, surrounding uses and major roadways in the site vicinity. It is anticipated that 55% of the school's trips will travel along S 144th Street, forty -five percent to and from the west and ten percent to and from the east. Approximately 30% of the school's trips will travel to and from the south along 42nd Avenue S, south of S 144th Street. The remaining 15% of the school's trips are anticipated to travel to and from the north along S 42nd Street, north of the site. A detailed trip distribution is shown in Figure 2. The school is not anticipated to significantly impact 43rd Avenue S or S 140th Street since the majority of trips are anticipated to travel to and from the south. 5. INTERSECTION ANALYSIS The intersection analysis has been performed for the AM peak -hour and school PM peak -hour. Existing traffic volumes at the study intersections were collected by the independent count firm National Data and Surveying Solutions (NDS) near the end of September, 2016. The existing traffic volumes at the study intersections are shown in Figure 3. The 2022 baseline traffic volumes were calculations by applying a 3% annually compounding growth rate to the existing traffic volumes. This growth rate is higher than the typical 2% growth rate identified by the Puget Sound Regional Council (PSRC) and considerably higher than the growth rates identified in the City of Tukwila Background Report for the Transportation Element of the Comprehensive Plan Update. The 2022 baseline traffic volumes are shown in Figure 4. The 2022 future with development traffic volumes were calculated by adding the school's trips to the 2022 baseline traffic volumes. The 2022 future with development traffic volumes are shown in Figure 5. The existing count data and traffic volume calculations are included in the attachments. Gibson Traffic Consultants February 2017 info @gibsontraffic.com 6 GTC #16 -178 160 S 140TH ST S 144Th ST S 146TH ST A 15! 450 51 (48) <- -> 60 (41) 0 0 co W 0 S 140TH ST S 142ND ST /ACCESS \ \ OS1 -'S S\ N 02127/17 m 100 14(9)4 — X11(10) GIBSON TRAFFIC CONSULTANTS TRAFFIC IMPACT STUDY GTC #16 -178 TUKWILA SCHOOL DISTRICT BIRTH TO K CAMPUS 440 STUDENTS CITY OF TUKWILA LEGEND AWDT AM (SPM) <- -> PEAK NEW SITE TRAFFIC (DAILY /PEAK -HOUR) TRIP DISTRIBUTION % FIGURE 2 DEVELOPMENT TRIP DISTRIBUTION AM (SCHOOL PM) PEAK S 140TH ST S 144Th ST ?E. L) M X4(6) r 10 (3) S 140TH ST N 02127117 Mc_ CO 1-- O N U) C 33 (33) 123 (150) 27 (38) - S 146TH ST S 142ND ST /ACCESS \ \ \ \ \ \ \ OS1 -'S S\ \ \ \ \ \ \ \ \ \ GIBSON TRAFFIC CONSULTANTS TUKWILA SCHOOL DISTRICT BIRTH TO K CAMPUS 440 STUDENTS TRAFFIC IMPACT STUDY GTC #16 -178 CITY OF TUKWILA LEGEND XXX (XXX) - TURNING MOVEMENT VOLUME AM (SCHOOL PM) PEAK -HOUR FIGURE 3 2016 EXISTING TRAFFIC VOLUMES S 140TH ST S 144Th ST S 146TH ST N _M w N Q C•4 O Z 01 M 7,,z) 00 01 N S 140TH ST N 02127117 M 00 N M f0 39 (39) 147 (179) 32 (45) - 63 (53) --125 (214) 55 (70) r' .rn� M S 142ND ST /ACCESS \ \ \ \ \ \ \ OS1 -'S S\ \ \ \ \ \ \ \ \ \ GIBSON TRAFFIC CONSULTANTS TUKWILA SCHOOL DISTRICT BIRTH TO K CAMPUS 440 STUDENTS TRAFFIC IMPACT STUDY GTC #16 -178 CITY OF TUKWILA LEGEND XXX (XXX) - TURNING MOVEMENT VOLUME AM (SCHOOL PM) PEAK -HOUR FIGURE 4 2022 BASELINE TRAFFIC VOLUMES S 140TH ST S 144Th ST N M 9. f° 77 (62) c ° CO 125 (214) 55 (70) co _M W N F co N 0 N 02127117 S 140TH ST 99 (80) 147 (179) 32 (45) - S 146TH ST \/ \ \ \ \ \ \ Os1 -'s s\ \ \ \ \ \ \ S 142ND ST /ACCESS GIBSON TRAFFIC CONSULTANTS TUKWILA SCHOOL DISTRICT BIRTH TO K CAMPUS 440 STUDENTS TRAFFIC IMPACT STUDY GTC #16 -178 CITY OF TUKWILA LEGEND XXX (XXX) - TURNING MOVEMENT VOLUME AM (SCHOOL PM) PEAK -HOUR FIGURE 5 2022 FUTURE WITH DEVELOPMENT TRAFFIC VOLUMES Tukwila Birth to K Traffic Impact Analysis 5.1 Level of Service Results The intersection of 42nd Avenue S at S 144th Street is currently an all -way stop - controlled intersection that is planned to be improved to a signalized intersection. This intersection has therefore been analyzed as an all -way stop - controlled intersection for the 2016 existing conditions and as a signal for the 2022 baseline and 2022 future with development conditions. No other improvements have been included as part of the level of service analysis. The level of service analysis has been performed with the same parameters, including channelization, peak -hour factors and heavy vehicle factors as the existing conditions. The level of service results are summarized in Table 5. Table 5: Intersection Level of Service Summary Intersection Peak -Hour 2016 Existing Conditions 2022 Baseline Conditions 2022 Future w Development LOS Delay LOS Delay LOS Delay 1. 42' Avenue S at S 144th Street AM Peak -Hour B 12.0 sec B 11.6 sec B 14.6 sec School PM Peak B 12.6 sec B 11.7 sec B 13.7 sec 2. 42nd Avenue S at S 144th Street AM Peak -Hour C 10.7 sec B 11.2 sec C 17.3 sec School PM Peak A 9.9 sec B 10.4 sec C 19.2 sec The level of service analysis shows that the study intersections will operate at acceptable LOS C or better with the addition of the Tukwila Birth to K school. The level of service calculations are included in the attachments. The level of service analysis does not show any significant queue lengths at the study intersections during either the AM or school PM peak- hours. Additionally, queue lengths due to schools are typically short in duration and do not last as long as queue lengths associated with commuter trips. 5.2 On -Site Operations The on -site operations were evaluated qualitatively based on the anticipated operations of the site, which includes staggered arrival and dismissal times for kindergarten and pre- kindergarten students. The site is proposed to have separate bus and drop- off /pick -up loops, which provides for good separation between busses and parent vehicles. The site will have approximately 230 feet of dedicated drop- off /pick -up area, which can accommodate approximately 10 vehicles. There will be an additional 400 feet of storage area within the parking lot, which would provide storage for approximately 16 additional vehicles. The drop- off /pick -up area and parking lot are anticipated to have storage for 26 vehicles. Additionally, parents will be able to utilize open parking spaces to pick -up and drop -off students. The drive aisle through the parking lot and drop- off /pick -up area is wide enough to allow vehicles to pass stopped vehicles. The Tukwila Birth to K school is anticipated to have 80 parking spaces and 46 teachers and staff, which allows for 34 parking spaces for parents. The total number of parent pick -up /drop -off vehicles that can be accommodated within the pick -up /drop -off and parking lot is 60 vehicles. The peak demand of the school is anticipated to be 74 inbound vehicles, based on the elementary school AM peak -hour inbound trips. There are not anticipated to be 74 vehicles on the site at the same Gibson Traffic Consultants February 2017 info @gibsontraffic.com 11 GTC #16 -178 165 Tukwila Birth to K Traffic Impact Analysis time, especially since a portion of these trips will be teachers and staff arriving. Space for 60 pick- up /drop -off vehicles on the site at any one time should therefore be sufficient for the Tukwila Birth to K school. The staggered arrival and dismissal times, 80 parking spaces, separate bus and parent vehicle loops, dedicated drop- off /pick -up loop for 11 vehicles and space for 17 additional vehicles to queue should allow the site to adequate operate and handle the arrival and dismissal traffic. The school will also have emergency vehicle access so that emergency vehicles have an alternative access point if an emergency does occur during the AM or school PM peak- hours. 6. PARKING ANALYSIS The Tukwila Birth to K school is proposed to include 440 students and 80 parking spaces, which equates to a parking rate of 0.18 spaces per student. This parking rate was compared to parking data published by ITE in Parking Generation, 4th Edition (2010). ITE identifies an average parking demand of 0.17 parking spaces per student for an elementary school. The parking demand based on City of Tukwila standards is 1.5 spaces per teacher /staff. The 46 teachers /staff would result in 69 parking spaces being required. The proposed parking supply of 80 spaces would therefore satisfy the ITE parking demand and City of Tukwila parking demand. 7. MITIGATION The City of Tukwila has established transportation impact fees for several different land uses, including schools. The most applicable land in the City of Tukwila Traffic Impact Fee Schedule 2007, the most recent schedule still in effect, is elementary school. The Tukwila Birth to K school is located in Zone 3, which has a fee of $119.31 per student. The traffic impact fee for the Tukwila Birth to K school, based on 440 students, is $52,496.40. It is important to note that this fee mitigates for all students at the school. However, the 300 kindergarten students are currently at separate schools throughout the jurisdiction and should arguably not need to be mitigated. The 140 pre- kindergarten and infant /toddler students would represent a mitigation fee of $16,703.40. No other off -site mitigation should be required for the Tukwila Birth to K school since the traffic analysis showed the study intersections operating at acceptable LOS C or better during the AM and School PM peak - hours. Gibson Traffic Consultants February 2017 info @gibsontraffic.com 12 GTC #16 -178 166 Tukwila Birth to K Traffic Impact Analysis 8. CONCLUSIONS The Tukwila Birth to K school is proposed to consist of an approximately 56,000 SF school with a maximum occupancy of 440 students. The majority of the students, approximately 300, will be kindergarten students. It is anticipated that 75% of these kindergarten students will utilize the provided bus service. The school is anticipated to generate as many as 1,000 average daily trips with 247 AM peak -hour trips and 197 School PM peak -hour trips. The study intersections are anticipated to operate at LOS C or better in the future with the addition of these trips. The City of Tukwila traffic mitigation fee for the Tukwila Birth to K school will be $52,496.40, based on the 440 students. However, the mitigation fees would only be $16,703.40 if credit is applied for the 300 existing kindergarten students currently at separate schools within the district. No other off -site mitigation should be required. Gibson Traffic Consultants February 2017 info @gibsontraffic.com 13 GTC #16 -178 167 Trip Generation Calculations 168 Tukwila Birth -to -K GTC #16 -178 Trip Generation for: Development Peak Weekday (a.k.a.): Average Weekday Daily Trips (AWDT) NET EXTERNAL TRIPS BY TYPE IN BOTH DIRECTIONS DIRECTIONAL ASSIGNMENTS Gross Trips Internal Crossover TOTAL PASS -BY DIVERTED LINK NEW PASS -BY DIVERTED LINK NEW LAND USES VARIABLE ITE LU code Trip Rate % IN % OUT In +Out (Total) % of Gross Trips Trips In +Out (Total) In +Out (Total) _ % of Ext. Trips In +Out (Total) % of Ext. Trips In +Out (Total) In +Out (Total) In Out In Out In Out Elementary School 300 Stdt 1.29 50% 50% 387 0% 0 387 0% 0 f 0 387 0 0 0 0 194 193 Daycare Center 140 Stdt 4.38 50% 50% 613 0% 0 613 75% 460 0 153 230 230 0 0 77 76 Total 1,000 0 1,000 460 0 540 230 230 0 0 271 269 Tukwila Birth -to -K GTC #16 -178 Trip Generation for: Development Peak Weekday, Peak Hour of Adjacent Street Traffic, One Hour between 7 and 9 AM (a.k.a.): Weekday AM Peak Hour NET EXTERNAL TRIPS BY TYPE IN BOTH DIRECTIONS DIRECTIONAL ASSIGNMENTS Gross Trips Internal Crossover TOTAL PASS -BY DIVERTED LINK NEW PASS -BY DIVERTED LINK NEW LAND USES VARIABLE ITE LU code Trip Rate % IN % OUT In +Out (Total) % of Gross Trips Trips In +Out (Total) In +Out (Total) % of Ext. Trips In +Out (Total) % of Ext. Trips In +Out (Total) In +Out (Total) In Out In Out In Out Elementary School 300 Stdt 520 0.45 55% 45% 135 0% 0 135 0% 0 0% 0 135 0 0 0 0 74 61 Daycare Center 140 Stdt 565 0.80 53% 47% 112 0% 0 112 75% 84 0% 0 28 45 39 0 0 15 13 Total 247 0 247 84 0 163 45 39 0 0 89 74 Tukwila Birth -to -K GTC #16 -178 Trip Generation for: Development Peak Weekday, PM Peak Hour of Generator (a.k.a.): PM Peak Hour of Generator NET EXTERNAL TRIPS BY TYPE IN BOTH DIRECTIONS DIRECTIONAL ASSIGNMENTS Gross Trips Internal Crossover TOTAL PASS -BY DIVERTED LINK NEW PASS -BY DIVERTED LINK NEW LAND USES VARIABLE ITE LU code Trip Rate % IN % OUT In +Out (Total) % of Gross Trips Trips In +Out (Total) In +Out (Total) % of Ext. Trips In +Out (Total) % of Ext. Trips In +Out (Total) In +Out (Total) In Out In Out In Out Elementary School 300 Stdt 520 0.28 45% 55% 84 0% 0 84 0% 0 0% 0 84 0 0 0 0 38 46 Daycare Center 140 Stdt 565 0.81 47% 53% 113 0% 0 113 75% 85 0% 0 28 40 45 0 0 13 15 Total 197 0 197 85 0 112 40 45 0 0 51 61 Traffic Volume Data and Calculations 172 42nd Ave 5 1 S 144th St NS �`'� National Data & Surveying Services l;') Peak Hour Date: Tue, Sep 20, 2016 N v v Cr 0'6 CO 1 m N 0 0 4 L1L Count Period: Peak Hour: lV 144th St 7:00 AM to 7:15 AM to 101 9:00 AM 8:15 AM Ill ,- 1j 535 _; <a000ao 169 204 ! 279 in 33 105 0 0 TEV: 742 • o N n o PHF: 0.80 o 123 ^ 46 183 ♦ 242 d 4 y o 9 0 vrffill 27 0 S 144th St *n i 1 tc o m ti HV %: PHF f E B 2.7% 0.80 Cfqb WB 4.9% 0.75 NB 4.3% 0.88 T N SB 9.7% 0.65 r TOTAL 5.1% 0.80 Two -Hour Count Summaries Interval Start 5 144th St 5 144th St 42nd Ave S 42nd Ave S 15 -min Total Rolling One Hour Eastbound UT LT TH RT Westbound UT LT TH RT Northbound UT LT TH RT Southbound UT LT TH RT 7:00 AM 7:15 AM 7:30 AM 7:45 AM 8:00 AM 8:15 AM 8:30 AM 8:45 AM 0 5 17 2 0 7 24 6 0 9 40 8 0 9 31 9 0 8 28 4 0 4 21 4 0 2 21 7 0 3 16 4 0 5 7 7 0 11 21 10 0 12 28 18 0 18 35 15 0 5 21 10 0 8 11 4 0 11 20 4 0 11 19 5 0 8 39 9 0 13 24 13 0 10 26 19 0 9 34 17 0 4 31 10 0 7 23 19 0 9 22 9 0 8 25 4 0 14 8 2 0 6 4 7 0 29 16 6 0 22 24 10 0 3 13 5 0 5 12 4 0 10 13 7 0 6 19 12 123 146 221 233 142 122 135 132 0 0 0 723 742 718 632 531 Count Total 0 47 198 44 0 81 162 73 0 68 224 100 0 95 109 53 1254 0 Peak Hour 0 33 123 27 0 46 105 53 0 36 115 59 0 60 57 28 742 0 Note: Two -hour count summary volumes include heavy vehicles but exclude bicycles in overall count. Interval Start Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total _ EB WB NB SB Total _ East West North South Total 7:00 AM 7:15 AM 7:30 AM 7:45 AM 8:00 AM 8:15 AM 8:30 AM 8:45 AM 0 1 2 1 4 0 1 1 2 4 3 5 3 7 18 1 2 3 4 10 1 2 2 1 6 0 3 3 2 8 1 3 0 2 6 0 0 1 1 2 0 0 0 0 0 2 0 0 0 2 2 0 0 0 2 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 0 6 24 4 21 6 55 29 14 114 3 160 34 7 127 0 168 6 2 17 0 25 4 1 5 0 10 2 5 4 0 11 2 2 4 0 8 Count Total 6 17 15 20 58 4 1 0 0 5 101 35 298 9 443 Peak Hour 5 10 9 14 38 4 1 0 0 5 93 27 279 9 408 B-1 173 S 142nd St 42ndAvet 1\1- '� National Data & Surveying Services Peak Hour Date: Tue, Sep 20, 2016 N v a c a 0 '64j n o N 1 1 m m o 4 U Count Period: Peak Hour: l S142ndSt 7:00 AM to 7:30 AM to I 0 l 9:00 AM 8:30 AM ,- v 4 _; <a000ao 0 14 45 in ,..o 0 0 0 TEV: 360 0 • o N a o m PHF: 0.67 0 0 ., 10 o ,' \, o 0 ♦ 14 C 0 y0 24 0 0 0 S 142nd St vn 1 1 � ri- PHF 1 Cr; 2 .� a EB 0.0% 0.00 ry WB 14.3% 0.70 Cfqb NB 5.9% 0.73 SB 5.0% 0.62 TOTAL 5.8% 0.67 Two -Hour Count Summaries Interval Start 5 142nd St 5 142nd St 42nd Ave S 42nd Ave 5 15 -min Total Rolling One Hour Eastbound UT LT TH RT Westbound UT LT TH RT Northbound UT LT TH RT Southbound UT LT TH RT 7:00 AM 7:15 AM 7:30 AM 7:45 AM 8:00 AM 8:15 AM 8:30 AM 8:45 AM 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 2 0 2 0 0 0 1 0 0 0 3 0 1 0 3 0 2 0 2 0 1 0 2 0 0 0 1 0 1 0 2 0 0 0 2 44 1 0 0 32 2 0 0 38 2 0 0 61 3 0 0 51 2 0 0 25 4 0 0 23 1 0 0 29 1 0 1 22 0 0 0 11 0 0 0 55 0 0 2 63 0 0 1 22 0 0 0 17 0 0 0 27 0 0 0 31 0 74 46 99 134 79 48 54 65 0 0 0 353 358 360 315 246 Count Total 0 2 0 3 0 16 0 5 0 2 303 16 0 4 248 0 599 0 Peak Hour 0 0 0 0 0 10 0 4 0 0 175 11 0 3 157 0 360 0 Note: Two -hour count summary volumes include heavy vehicles but exclude bicycles in overall count. Interval Start Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB 513 Total _ EB WB NB SB Total _ East West North South Total 7:00 AM 7:15 AM 7:30 AM 7:45 AM 8:00 AM 8:15 AM 8:30 AM 8:45 AM 1 0 2 1 4 0 0 0 3 3 0 0 2 5 7 0 1 2 2 5 0 1 4 1 6 0 0 3 0 3 0 0 0 2 2 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 2 1 0 4 6 3 0 0 9 14 9 1 3 27 22 9 9 2 42 1 3 0 1 5 9 11 35 18 73 0 4 0 0 4 0 1 0 0 1 Count Total 1 3 13 14 31 0 0 0 0 0 53 42 46 24 165 Peak Hour 0 2 11 8 21 0 0 0 0 0 46 32 45 24 147 B-2 174 Synchro ID: 1 Existing Volumes Average Weekday AM Peak -Hour Year: 9/20/2016 Data Source: NDS 169 352 183 33 123 27 1 S 144th St at 42nd Ave S 145 I 346 201 28 I 57 I 60 c2 b 42nd Avenue S S 144th Street e;I 742 42nd Avenue S a 2 S 144th Street 130 t 340 36 1 115 I 59 210 53 105 46 204 446 242 T North Baseline Volumes Average Weekday AM Peak -Hour Year: 2022 Growth Rate = 3.0% Years of Growth = 6 Total Growth = 1.1941 201 419 218 39 147 32 173 412 1 239 33 I 68 I 72 42nd Avenue S S 144th Street 884 42nd Avenue S S 144th Street 43 I 137 I 70 155 1 405 250 63 125 55 243 532 289 T North Development Trips Average Weekday AM Peak -Hour 51 111 60 60 0 0 96 210 114 51 I 34 I 11 12 b 42nd Avenue S S 144th Street b 210 42nd Avenue S t'2 S 144th Street 34 1 74 0 I 40 I 0 40 14 0 0 14 25 11 T North Future w Dev. Volumes Average Weekday AM Peak -Hour 252 530 278 99 147 32 269 622 1 353 84 1 102 I 83 Lr b b Site Access S 144th Street 1,094 290 42nd Avenue S 43 I 177 I 70 189 1 479 S 144th Street 77 125 55 257 557 300 North B -3 175 Synchro ID: 2 Existing Volumes Average Weekday AM Peak -Hour Year: 9/20/2016 Data Source: NDS 2 S 142nd St at 42nd Ave S 0 0 0 0 0 0 60 t 239 0 j 57 J 3 r2 b 42nd Avenue S 260 42nd Avenue S 179 t1 S 142nd Street 67 1 253 0 1 175 I 11 186 4 0 10 14 28 14 North Baseline Volumes Average Weekday AM Peak -Hour Year: 2022 Growth Rate = 3.0% Years of Growth = 6 Total Growth = 1.1941 0 0 0 0 0 0 72 286 1 214 0 I 68 I 4 b 42nd Avenue S 311 42nd Avenue S L2 S 142nd Street 0 1 209 I 13 80 302 222 5 0 12 17 34 17 North Development Trips Average Weekday AM Peak -Hour 0 0 0 0 0 0 20 I 37 1 17 0 I 0 1 201 r? b b 42nd Avenue S 247 42nd Avenue S r2 S 142nd Street 0 J 0 I 114 96 1 210 114 17 0 96 113 247 134 T North Future w Dev. Volumes Average Weekday AM Peak -Hour 0 0 0 0 0 0 92 323 1 231 0 I 68 1 24 b b Site Access 558 42nd Avenue S ' I S 142nd Street 0 1 209 1 127 176 1 512 336 22 108 130 281 151 North 1 B -4 176 42nd Ave 5 1 S 144th St NS �`'� National Data & Surveying Services l;') Peak Hour Date: Tue, Sep 20, 2016 N v a a 0 ' N a m .N, 1 I yl m ■o °a o 4 Count Period: Peak Hour: 144th St 1:30 PM to 2:30 PM to 1 I 3:30 PM 3:30 PM ,- 445 _; <a000ao 265 282 ! 358 n «■y • 33 179 0 0 ■if TEV: 892 o N o PHF: 0.91 o 150 ^ 59 221 ♦ 248 C 1 y o 8 0 0 itild S 144th St38 *n 1 1 tc 1�rail a CO vai HV %: PHF 1 f N EB 1.8% 0.95 WB 1.4% 0.82 Cfqb NB 1.1% 0.75 TN SB 4.4% 0.71 r TOTAL 2.1% 0.91 Two -Hour Count Summaries Interval Start 5 144th St 5 144th St 42nd Ave S 42nd Ave S 15 -min Total Rolling One Hour Eastbound UT LT TH RT Westbound UT LT TH RT Northbound UT LT TH RT Southbound UT LT TH RT 1:30 PM 1:45 PM 2:00 PM 2:15 PM 2:30 PM 2:45 PM 3:00 PM 3:15 PM 0 3 21 9 0 5 24 9 0 9 28 15 0 7 22 11 0 9 35 11 0 7 38 7 0 9 39 8 0 8 38 12 0 7 24 12 0 5 19 11 0 6 33 6 0 3 31 15 0 9 29 14 0 20 53 13 0 14 50 8 0 16 47 9 0 8 28 9 0 12 19 10 1 9 19 12 0 14 14 18 0 13 17 15 0 10 12 10 0 8 24 14 0 18 28 15 0 6 21 7 0 4 21 11 0 5 14 5 0 11 14 6 0 14 20 6 0 16 37 4 0 11 41 20 0 3 26 7 155 150 162 166 192 227 246 227 0 0 0 633 670 747 831 892 Count Total 0 57 245 82 0 80 286 88 1 92 161 103 0 70 194 66 1525 0 Peak Hour 0 33 150 38 0 59 179 44 0 49 81 54 0 44 124 37 892 0 Note: Two -hour count summary volumes include heavy vehicles but exclude bicycles in overall count. Interval Start Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total EB WB NB SB Total East West North South Total 1:30 PM 1:45 PM 2:00 PM 2:15 PM 2:30 PM 2:45 PM 3:00 PM 3:15 PM 2 5 1 1 9 0 3 1 3 7 2 3 3 2 10 1 0 3 2 6 2 1 0 7 10 1 2 1 1 5 1 1 1 0 3 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 1 0 1 0 4 0 0 4 1 0 0 0 1 0 0 0 0 0 0 0 0 1 1 1 1 2 1 5 0 0 3 0 3 1 2 6 1 10 0 2 5 1 8 54 12 235 3 304 30 6 84 4 124 6 7 25 1 39 6 4 14 0 24 Count Total 9 15 10 17 51 1 5 1 1 8 98 34 374 11 517 Peak Hour 4 4 2 9 19 1 4 0 1 6 96 29 358 8 491 B-5 177 S 142nd St 42ndAvet 1\1- '� National Data & Surveying Services l..1 Peak Hour Date: Tue, Sep 20, 2016 N v -2,,- 0 P o0 o N yl tl m o �� Count Period: Peak Hour: S 14nd St 1:30 PM to 2:30 PM to o 1,,, 1 3:30 PM 3:30 PM ,� 6 - ; <a000ao 3 9 !' 16 4 FO P&, TEV: 366 0 • o N a o PHF: 0.87 0 3 16 0 y o ,' \, o 2 C 12 03 �r000011 1 0 S 142nd St vn 1 1 � o m rti ri- vHV %: PHF 1 � f N N a EB 0.0% 0.50 ry WB 0.0% 0.45 Cfqb NB 2.3% 0.91 SB 2.7% 0.79 TOTAL 2.5% 0.87 Two -Hour Count Summaries Interval Start 5 142nd St 5 142nd St 42nd Ave S 42nd Ave S 15 -min Total Rolling One Hour Eastbound UT LT TH RT Westbound UT LT TH RT Northbound UT LT TH RT Southbound UT LT TH RT 1:30 PM 1:45 PM 2:00 PM 2:15 PM 2:30 PM 2:45 PM 3:00 PM 3:15 PM 0 0 0 0 0 0 0 1 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 1 0 1 0 4 0 1 0 0 0 2 0 0 0 0 0 1 0 4 0 0 0 2 0 2 0 0 0 0 0 0 0 0 37 3 0 1 37 0 0 1 32 2 0 0 30 1 0 0 39 2 0 2 35 3 0 1 42 1 0 0 42 5 0 0 28 1 0 0 29 1 0 1 28 0 0 0 40 1 0 3 35 0 0 2 46 0 0 0 58 0 0 0 39 0 71 74 68 72 84 91 105 86 0 0 0 285 298 315 352 366 Count Total 0 3 0 2 0 8 0 10 0 5 294 17 0 6 303 3 651 0 Peak Hour 0 1 0 1 0 3 0 6 0 3 158 11 0 5 178 0 366 0 Note: Two -hour count summary volumes include heavy vehicles but exclude bicycles in overall count. Interval Start Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total EB WB NB SB Total East West North South Total 1:30 PM 1:45 PM 2:00 PM 2:15 PM 2:30 PM 2:45 PM 3:00 PM 3:15 PM 0 0 1 1 2 0 2 4 1 7 1 0 2 3 6 0 0 2 8 10 0 0 3 4 7 0 0 0 0 0 0 0 1 1 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 0 1 0 0 1 0 3 1 0 4 3 0 0 0 3 0 2 0 1 3 25 13 10 6 54 10 8 2 4 24 1 3 1 1 6 4 0 3 1 8 Count Total 1 2 13 18 34 0 0 1 2 3 43 30 17 13 103 Peak Hour 0 0 4 5 9 0 0 0 2 2 40 24 16 12 92 B -6 178 Synchro ID: 1 Existing Volumes Average Weekday School PM Peak Year: 9/20/2016 Data Source: NDS 265 486 221 33 150 38 1 S 144th St at 42nd Ave S 205 I 363 158 37 j 124 I 44 r2 b 42nd Avenue S S 144th Street 892 42nd Avenue S a S 144th Street 221 1 405 49 I 81 I 54 184 44 179 59 282 530 248 T North Baseline Volumes Average Weekday School PM Peak Year: 2022 Growth Rate = 3.0% Years of Growth = 6 Total Growth = 1.1941 317 580 263 39 179 45 245 434 1 189 44 1 148 I 53 b 42nd Avenue S S 144th Street 1,065 42nd Avenue S 263 I 483 S 144th Street 59 I 97 I 64 220 53 214 70 337 633 296 T North Development Trips Average Weekday School PM Peak 48 89 41 41 0 0 90 167 1 77 48 I 32 I 10 1z b :Si 42nd Avenue S S 144th Street b 167 42nd Avenue S S 144th Street 0 I 27 I 0 32 59 27 9 0 0 9 19 10 North Future w Dev. Volumes Average Weekday School PM Peak 365 669 304 80 179 45 335 601 I 266 92 1 180 I 63 Site Access S 144th Street 1,232 42nd Avenue S Q Q Z� 59 1 124 I 64 I 295 1 542 247 t2 S 144th Street 62 214 70 346 652 306 T North B -7 179 Synchro ID: 2 Existing Volumes Average Weekday School PM Peak Year: 9/20/2016 Data Source: NDS 2 S 142nd St at 42nd Ave S 0 0 0 0 0 0 183 347 164 0 178 5 b 42nd Avenue S 361 42nd Avenue S a S 142nd Street 0 158 11 181 350 169 6 0 3 9 25 16 North Baseline Volumes Average Weekday School PM Peak Year: 2022 Growth Rate = 3.0% Years of Growth = 6 Total Growth = 1.1941 0 0 0 0 0 0 219 415 1 196 0 1 213 I 6 b 42nd Avenue S 432 42nd Avenue S S 142nd Street 0 I 189 I 13 217 I 419 202 7 0 4 11 30 19 North Development Trips Average Weekday School PM Peak 0 0 0 0 0 0 14 I 30 I 0 J 0 J 14 b b 42nd Avenue S 197 42nd Avenue S 16 r2 S 142nd Street 0 J 0 I 77 90 1 167 77 16 0 90 106 197 91 T North Future w Dev. Volumes Average Weekday School PM Peak 0 0 0 0 0 0 233 I 445 0 1 213 I 20 b b Site Access 629 42nd Avenue S 212 J S 142nd Street 0 1 189 J 90 307 1 586 279 23 0 94 117 227 110 North B -8 180 Level of Service Calculations 181 HCM 2010 AWSC 1: 42nd Avenue S & S 144th Street Tukwila School Birth to K Intersection Intersection Delay, s/veh 12 Intersection LOS B Movement EBU EBL EBT EBR WBU WBL WBT WBR NBU NBL NBT NBR Lane Configurations Traffic Vol, vehlh 0 33 123 27 0 46 105 53 0 36 115 59 Future Vol, veh/h 0 33 123 27 0 46 105 53 0 36 115 59 Peak Hour Factor 0.92 0.80 0.80 0.80 0.92 0.80 0.80 0.80 0.92 0.80 0.80 0.80 Heavy Vehicles, % 2 5 5 5 2 5 5 5 2 5 5 5 Mvmt Flow 0 41 154 34 0 58 131 66 0 45 144 74 Number of Lanes 0 0 1 0 0 0 1 0 0 0 1 0 Approach EB WB NB Opposing Approach WB EB SB Opposing Lanes 1 1 1 Conflicting Approach Left SB NB EB Conflicting Lanes Left 1 1 1 Conflicting Approach Right NB SB WB Conflicting Lanes Right 1 1 1 HCM Control Delay 11.9 12.2 12.4 HCM LOS B B B Lane NBLn1 EBLn1 WBLn1 SBLn1 Vol Left, % 17% 18% 23% 41% Vol Thru, % 55% 67% 51% 39% Vol Right, % 28% 15% 26% 19% Sign Control Stop Stop Stop Stop Traffic Vol by Lane 210 183 204 145 LT Vol 36 33 46 60 Through Vol 115 123 105 57 RT Vol 59 27 53 28 Lane Flow Rate 262 229 255 181 Geometry Grp 1 1 1 1 Degree of Util (X) 0.404 0.359 0.393 0.291 Departure Headway (Hd) 5.542 5.642 5.542 5.786 Convergence, Y/N Yes Yes Yes Yes Cap 646 634 645 618 Service Time 3.604 3.705 3.603 3.853 HCM Lane VIC Ratio 0.406 0.361 0.395 0.293 HCM Control Delay 12.4 11.9 12.2 11.2 HCM Lane LOS B B B B HCM 95th -tile Q 2 1.6 1.9 1.2 2016 Existing Conditions AM Peak -Hour Gibson Traffic Consultants, Inc. [BJL 16 -178] C -1 182 HCM 2010 AWSC 1: 42nd Avenue S & S 144th Street Tukwila School Birth to K Intersection Intersection Delay, s /veh Intersection LOS Movement SBU SBL SBT SBR Lane Configurations Traffic Vol, veh /h 0 60 57 28 Future Vol, veh /h 0 60 57 28 Peak Hour Factor 0.92 0.80 0.80 0.80 Heavy Vehicles, % 2 5 5 5 Mvmt Flow 0 75 71 35 Number of Lanes 0 0 1 0 Approach SB Opposing Approach NB Opposing Lanes 1 Conflicting Approach Left WB Conflicting Lanes Left 1 Conflicting Approach Right EB Conflicting Lanes Right 1 HCM Control Delay 11.2 HCM LOS B 2016 Existing Conditions AM Peak -Hour Gibson Traffic Consultants, Inc. [BJL 16 -178] C -2 183 HCM 2010 TWSC 2: 42nd Avenue S & S 142nd Street Tukwila School Birth to K Intersection Int Delay, s/veh 0.7 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 10 4 175 11 3 57 Future Vol, veh/h 10 4 175 11 3 57 Conflicting Peds, # /hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 - 0 Peak Hour Factor 70 70 73 73 62 62 Heavy Vehicles, % 14 14 6 6 5 5 Mvmt Flow 14 6 240 15 5 92 Major /Minor Minorl Majorl Major2 Conflicting Flow All 349 247 0 0 255 0 Stage 1 247 Stage 2 102 Critical Hdwy 6.54 6.34 4.15 Critical Hdwy Stg 1 5.54 Critical Hdwy Stg 2 5.54 Follow -up Hdwy 3.626 3.426 2.245 Pot Cap -1 Maneuver 625 763 1293 Stage 1 767 Stage 2 893 Platoon blocked, % - - Mov Cap -1 Maneuver 623 763 - - 1293 Mov Cap -2 Maneuver 623 - - - Stage 1 767 - - - Stage 2 889 Approach WB NB HCM Control Delay, s 10.7 0 HCM LOS B Minor Lane /Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) - 657 1293 - HCM Lane VIC Ratio - 0.03 0.004 HCM Control Delay (s) - 10.7 7.8 0 HCM Lane LOS - B A A HCM 95th %tile Q(veh) - 0.1 0 SB 0.4 2016 Existing Conditions AM Peak -Hour Gibson Traffic Consultants, Inc. [BJL 16 -178] C -3 184 Lanes, Volumes, Timings 1: 42nd Avenue S & S 144th Street Tukwila School Birth to K Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 39 147 32 55 125 63 43 137 70 72 68 33 Future Volume (vph) 39 147 32 55 125 63 43 137 70 72 68 33 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.980 0.965 0.962 0.974 Flt Protected 0.991 0.989 0.991 0.980 Satd. Flow (prot) 0 1757 0 0 1727 0 0 1725 0 0 1727 0 Flt Permitted 0.892 0.864 0.910 0.797 Satd. Flow (perm) 0 1582 0 0 1509 0 0 1584 0 0 1405 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 18 37 41 24 Link Speed (mph) 30 30 30 30 Link Distance (ft) 526 2207 379 654 Travel Time (s) 12.0 50.2 8.6 14.9 Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 Heavy Vehicles ( %) 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% Shared Lane Traffic ( %) Lane Group Flow (vph) 0 273 0 0 304 0 0 313 0 0 216 0 Turn Type Perm NA Perm NA Perm NA Perm NA Protected Phases 4 8 2 6 Permitted Phases 4 8 2 6 Detector Phase 4 4 8 8 2 2 6 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 22.5 22.5 22.5 22.5 22.5 22.5 22.5 22.5 Total Split (s) 30.0 30.0 30.0 30.0 30.0 30.0 30.0 30.0 Total Split ( %) 50.0% 50.0% 50.0% 50.0% 50.0% 50.0% 50.0% 50.0% Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All -Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 4.5 Lead /Lag Lead -Lag Optimize? Recall Mode None None None None Min Min Min Min Act Effct Green (s) 11.7 11.7 11.5 11.5 Actuated g/C Ratio 0.36 0.36 0.35 0.35 v/c Ratio 0.48 0.54 0.54 0.43 Control Delay 11.4 12.1 11.8 10.8 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 11.4 12.1 11.8 10.8 LOS B B B B Approach Delay 11.4 12.1 11.8 10.8 Approach LOS B B B B Queue Length 50th (ft) 29 31 32 22 Queue Length 95th (ft) 82 88 90 65 Internal Link Dist (ft) 446 2127 299 574 Turn Bay Length (ft) Base Capacity (vph) 1276 1221 1282 1135 2022 Baseline Conditions AM Peak -Hour Gibson Traffic Consultants, Inc. [BJL 16 -178] C -4 185 Lanes, Volumes, Timings 1: 42nd Avenue S & S 144th Street Tukwila School Birth to K Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.21 0.25 0.24 0.19 Intersection Summary Area Type: Other Cycle Length: 60 Actuated Cycle Length: 32.9 Natural Cycle: 45 Control Type: Actuated - Uncoordinated Maximum v/c Ratio: 0.54 Intersection Signal Delay: 11.6 Intersection Capacity Utilization 46.9% Analysis Period (min) 15 Splits and Phases: 1: 42nd Avenue S & S 144th Street Intersection LOS: B ICU Level of Service A 02 4 a s J pa's I $ 06 08 3s ] :gas I 2022 Baseline Conditions AM Peak -Hour Gibson Traffic Consultants, Inc. [BJL 16 -178] C -5 186 HCM 2010 TWSC 2: 42nd Avenue S & S 142nd Street Tukwila School Birth to K Intersection Int Delay, s/veh 0.7 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 12 5 209 13 4 68 Future Vol, veh/h 12 5 209 13 4 68 Conflicting Peds, # /hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 - 0 Peak Hour Factor 70 70 73 73 62 62 Heavy Vehicles, % 14 14 6 6 5 5 Mvmt Flow 17 7 286 18 6 110 Major /Minor Minorl Majorl Major2 Conflicting Flow All 418 295 0 0 304 0 Stage 1 295 Stage 2 123 Critical Hdwy 6.54 6.34 4.15 Critical Hdwy Stg 1 5.54 Critical Hdwy Stg 2 5.54 Follow -up Hdwy 3.626 3.426 2.245 Pot Cap -1 Maneuver 569 717 1240 Stage 1 729 Stage 2 874 Platoon blocked, % - - Mov Cap -1 Maneuver 566 717 - - 1240 Mov Cap -2 Maneuver 566 - - - Stage 1 729 - - - Stage 2 870 Approach WB NB HCM Control Delay, s 11.2 0 HCM LOS B Minor Lane /Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) - 603 1240 - HCM Lane VIC Ratio - 0.04 0.005 HCM Control Delay (s) - 11.2 7.9 0 HCM Lane LOS - B A A HCM 95th %tile Q(veh) - 0.1 0 SB 0.4 2022 Baseline Conditions AM Peak -Hour Gibson Traffic Consultants, Inc. [BJL 16 -178] C -6 187 Lanes, Volumes, Timings 1: 42nd Avenue S & S 144th Street Tukwila School Birth to K Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 99 147 32 55 125 77 43 177 70 83 102 84 Future Volume (vph) 99 147 32 55 125 77 43 177 70 83 102 84 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.984 0.960 0.967 0.958 Flt Protected 0.982 0.989 0.993 0.985 Satd. Flow (prot) 0 1749 0 0 1718 0 0 1738 0 0 1708 0 Flt Permitted 0.800 0.873 0.907 0.812 Satd. Flow (perm) 0 1424 0 0 1517 0 0 1587 0 0 1408 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 14 45 33 47 Link Speed (mph) 30 30 30 30 Link Distance (ft) 526 2207 379 654 Travel Time (s) 12.0 50.2 8.6 14.9 Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 Heavy Vehicles ( %) 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% Shared Lane Traffic ( %) Lane Group Flow (vph) 0 348 0 0 321 0 0 363 0 0 337 0 Turn Type Perm NA Perm NA Perm NA Perm NA Protected Phases 4 8 2 6 Permitted Phases 4 8 2 6 Detector Phase 4 4 8 8 2 2 6 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 22.5 22.5 22.5 22.5 22.5 22.5 22.5 22.5 Total Split (s) 30.0 30.0 30.0 30.0 30.0 30.0 30.0 30.0 Total Split ( %) 50.0% 50.0% 50.0% 50.0% 50.0% 50.0% 50.0% 50.0% Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All -Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 4.5 Lead /Lag Lead -Lag Optimize? Recall Mode None None None None Min Min Min Min Act Effct Green (s) 15.0 15.0 14.4 14.4 Actuated g/C Ratio 0.38 0.38 0.37 0.37 v/c Ratio 0.63 0.53 0.60 0.62 Control Delay 16.2 12.4 14.6 15.0 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 16.2 12.4 14.6 15.0 LOS B B B B Approach Delay 16.2 12.4 14.6 15.0 Approach LOS B B B B Queue Length 50th (ft) 50 38 50 43 Queue Length 95th (ft) 134 107 127 117 Internal Link Dist (ft) 446 2127 299 574 Turn Bay Length (ft) Base Capacity (vph) 1009 1084 1130 1008 2016 Future Conditions with Development AM Peak -Hour Gibson Traffic Consultants, Inc. [BJL 16 -178] C -7 188 Lanes, Volumes, Timings 1: 42nd Avenue S & S 144th Street Tukwila School Birth to K Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.34 0.30 0.32 0.33 Intersection Summary Area Type: Other Cycle Length: 60 Actuated Cycle Length: 39.3 Natural Cycle: 45 Control Type: Actuated - Uncoordinated Maximum v/c Ratio: 0.63 Intersection Signal Delay: 14.6 Intersection Capacity Utilization 60.7% Analysis Period (min) 15 Splits and Phases: 1: 42nd Avenue S & S 144th Street Intersection LOS: B ICU Level of Service B 02 4 a s J pa's I $ 06 08 3s ] :gas I 2016 Future Conditions with Development AM Peak -Hour Gibson Traffic Consultants, Inc. [BJL 16 -178] C -8 189 HCM 2010 TWSC 2: 42nd Avenue S & S 142nd Street Tukwila School Birth to K Intersection Int Delay, s/veh 4.5 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 108 22 209 127 24 68 Future Vol, veh/h 108 22 209 127 24 68 Conflicting Peds, # /hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 - 0 Peak Hour Factor 70 70 73 73 62 62 Heavy Vehicles, % 14 14 6 6 5 5 Mvmt Flow 154 31 286 174 39 110 Major /Minor Minorl Majorl Major2 Conflicting Flow All 560 373 0 0 460 0 Stage 1 373 Stage 2 187 Critical Hdwy 6.54 6.34 4.15 Critical Hdwy Stg 1 5.54 Critical Hdwy Stg 2 5.54 Follow -up Hdwy 3.626 3.426 2.245 Pot Cap -1 Maneuver 470 647 1085 Stage 1 671 Stage 2 817 Platoon blocked, % - - Mov Cap -1 Maneuver 452 647 - - 1085 Mov Cap -2 Maneuver 452 - - - Stage 1 671 - - - Stage 2 786 Approach WB NB HCM Control Delay, s 17.3 0 HCM LOS C Minor Lane /Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) - 476 1085 - HCM Lane VIC Ratio - 0.39 0.036 HCM Control Delay (s) - 17.3 8.4 0 HCM Lane LOS - C A A HCM 95th %tile Q(veh) - 1.8 0.1 SB 2.2 2016 Future Conditions with Development AM Peak -Hour Gibson Traffic Consultants, Inc. [BJL 16 -178] C -9 190 HCM 2010 AWSC 1: 42nd Avenue S & S 144th Street Tukwila School Birth to K Intersection Intersection Delay, s/veh 12.6 Intersection LOS B Movement EBU EBL EBT EBR WBU WBL WBT WBR NBU NBL NBT NBR Lane Configurations Traffic Vol, veh/h 0 33 150 38 0 59 179 44 0 49 81 54 Future Vol, veh/h 0 33 150 38 0 59 179 44 0 49 81 54 Peak Hour Factor 0.92 0.91 0.91 0.91 0.92 0.91 0.91 0.91 0.92 0.91 0.91 0.91 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 0 36 165 42 0 65 197 48 0 54 89 59 Number of Lanes 0 0 1 0 0 0 1 0 0 0 1 0 Approach EB WB NB Opposing Approach WB EB SB Opposing Lanes 1 1 1 Conflicting Approach Left SB NB EB Conflicting Lanes Left 1 1 1 Conflicting Approach Right NB SB WB Conflicting Lanes Right 1 1 1 HCM Control Delay 12.2 13.7 11.7 HCM LOS B B B Lane NBLn1 EBLn1 WBLn1 SBLn1 Vol Left, % 27% 15% 21% 21% Vol Thru, % 44% 68% 63% 60% Vol Right, % 29% 17% 16% 18% Sign Control Stop Stop Stop Stop Traffic Vol by Lane 184 221 282 205 LT Vol 49 33 59 44 Through Vol 81 150 179 124 RT Vol 54 38 44 37 Lane Flow Rate 202 243 310 225 Geometry Grp 1 1 1 1 Degree of Util (X) 0.325 0.381 0.478 0.363 Departure Headway (Hd) 5.792 5.651 5.556 5.801 Convergence, Y/N Yes Yes Yes Yes Cap 617 634 645 617 Service Time 3.869 3.723 3.624 3.875 HCM Lane VIC Ratio 0.327 0.383 0.481 0.365 HCM Control Delay 11.7 12.2 13.7 12.2 HCM Lane LOS B B B B HCM 95th -tile Q 1.4 1.8 2.6 1.7 2016 Existing Conditions School PM Peak Gibson Traffic Consultants, Inc. [BJL 16 -178] C -10 191 HCM 2010 AWSC 1: 42nd Avenue S & S 144th Street Tukwila School Birth to K Intersection Intersection Delay, s /veh Intersection LOS Movement SBU SBL SBT SBR Lane Configurations Traffic Vol, veh /h 0 44 124 37 Future Vol, veh /h 0 44 124 37 Peak Hour Factor 0.92 0.91 0.91 0.91 Heavy Vehicles, % 2 2 2 2 Mvmt Flow 0 48 136 41 Number of Lanes 0 0 1 0 Approach SB Opposing Approach NB Opposing Lanes 1 Conflicting Approach Left WB Conflicting Lanes Left 1 Conflicting Approach Right EB Conflicting Lanes Right 1 HCM Control Delay 12.2 HCM LOS B 2016 Existing Conditions School PM Peak Gibson Traffic Consultants, Inc. [BJL 16 -178] C -11 192 HCM 2010 TWSC 2: 42nd Avenue S & S 142nd Street Tukwila School Birth to K Intersection Int Delay, s/veh 0.6 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 3 6 158 11 5 178 Future Vol, veh/h 3 6 158 11 5 178 Conflicting Peds, # /hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 - 0 Peak Hour Factor 45 45 91 91 79 79 Heavy Vehicles, % 0 0 2 2 3 3 Mvmt Flow 7 13 174 12 6 225 Major /Minor Minorl Majorl Major2 Conflicting Flow All 418 180 0 0 186 0 Stage 1 180 Stage 2 238 Critical Hdwy 6.4 6.2 4.13 Critical Hdwy Stg 1 5.4 Critical Hdwy Stg 2 5.4 Follow -up Hdwy 3.5 3.3 2.227 Pot Cap -1 Maneuver 595 868 1382 Stage 1 856 Stage 2 806 Platoon blocked, % - - Mov Cap -1 Maneuver 592 868 - - 1382 Mov Cap -2 Maneuver 592 - - - Stage 1 856 - - - Stage 2 802 Approach WB NB HCM Control Delay, s 9.9 0 HCM LOS A Minor Lane /Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) - 751 1382 - HCM Lane VIC Ratio - 0.027 0.005 HCM Control Delay (s) - 9.9 7.6 0 HCM Lane LOS - A A A HCM 95th %tile Q(veh) - 0.1 0 SB 0.2 2016 Existing Conditions School PM Peak Gibson Traffic Consultants, Inc. [BJL 16 -178] C - 12 193 Lanes, Volumes, Timings 1: 42nd Avenue S & S 144th Street Tukwila School Birth to K Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 39 179 45 70 214 53 59 97 64 53 148 44 Future Volume (vph) 39 179 45 70 214 53 59 97 64 53 148 44 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.977 0.979 0.961 0.976 Flt Protected 0.993 0.990 0.987 0.989 Satd. Flow (prot) 0 1807 0 0 1805 0 0 1767 0 0 1798 0 Flt Permitted 0.905 0.872 0.862 0.879 Satd. Flow (perm) 0 1647 0 0 1590 0 0 1543 0 0 1598 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 23 21 40 21 Link Speed (mph) 30 30 30 30 Link Distance (ft) 526 2207 379 654 Travel Time (s) 12.0 50.2 8.6 14.9 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Shared Lane Traffic ( %) Lane Group Flow (vph) 0 289 0 0 370 0 0 242 0 0 269 0 Turn Type Perm NA Perm NA Perm NA Perm NA Protected Phases 4 8 2 6 Permitted Phases 4 8 2 6 Detector Phase 4 4 8 8 2 2 6 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 22.5 22.5 22.5 22.5 22.5 22.5 22.5 22.5 Total Split (s) 32.0 32.0 32.0 32.0 28.0 28.0 28.0 28.0 Total Split ( %) 53.3% 53.3% 53.3% 53.3% 46.7% 46.7% 46.7% 46.7% Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All -Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 4.5 Lead /Lag Lead -Lag Optimize? Recall Mode None None None None Min Min Min Min Act Effct Green (s) 13.1 13.1 11.0 11.0 Actuated g/C Ratio 0.39 0.39 0.33 0.33 v/c Ratio 0.44 0.59 0.46 0.50 Control Delay 9.8 12.4 11.4 13.0 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 9.8 12.4 11.4 13.0 LOS A B B B Approach Delay 9.8 12.4 11.4 13.0 Approach LOS A B B B Queue Length 50th (ft) 30 42 25 31 Queue Length 95th (ft) 91 125 87 103 Internal Link Dist (ft) 446 2127 299 574 Turn Bay Length (ft) Base Capacity (vph) 1377 1330 1155 1191 Starvation Cap Reductn 0 0 0 0 2022 Baseline Conditions School PM Peak Gibson Traffic Consultants, Inc. [BJL 16 -178] C -13 194 Lanes, Volumes, Timings 1: 42nd Avenue S & S 144th Street Tukwila School Birth to K Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.21 0.28 0.21 0.23 Intersection Summary Area Type: Other Cycle Length: 60 Actuated Cycle Length: 33.7 Natural Cycle: 45 Control Type: Actuated - Uncoordinated Maximum v/c Ratio: 0.59 Intersection Signal Delay: 11.7 Intersection Capacity Utilization 53.1% Analysis Period (min) 15 Splits and Phases: 1: 42nd Avenue S & S 144th Street Intersection LOS: B ICU Level of Service A 02 XD4 28s I 32s I lir Aso 08 28s ] 32s I 2022 Baseline Conditions School PM Peak Gibson Traffic Consultants, Inc. [BJL 16 -178] HCM 2010 TWSC 2: 42nd Avenue S & S 142nd Street Tukwila School Birth to K Intersection Int Delay, s/veh 0.6 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 4 7 189 13 6 213 Future Vol, veh/h 4 7 189 13 6 213 Conflicting Peds, # /hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 - 0 Peak Hour Factor 45 45 91 91 79 79 Heavy Vehicles, % 0 0 2 2 3 3 Mvmt Flow 9 16 208 14 8 270 Major /Minor Minorl Majorl Major2 Conflicting Flow All 500 215 0 0 222 0 Stage 1 215 Stage 2 285 Critical Hdwy 6.4 6.2 4.13 Critical Hdwy Stg 1 5.4 Critical Hdwy Stg 2 5.4 Follow -up Hdwy 3.5 3.3 2.227 Pot Cap -1 Maneuver 534 830 1341 Stage 1 826 Stage 2 768 Platoon blocked, % - - Mov Cap -1 Maneuver 530 830 - - 1341 Mov Cap -2 Maneuver 530 - - - Stage 1 826 - - - Stage 2 763 Approach WB NB HCM Control Delay, s 10.4 0 HCM LOS B Minor Lane /Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) - 688 1341 HCM Lane VIC Ratio - 0.036 0.006 HCM Control Delay (s) - 10.4 7.7 0 HCM Lane LOS - B A A HCM 95th %tile Q(veh) - 0.1 0 SB 0.2 2022 Baseline Conditions School PM Peak Gibson Traffic Consultants, Inc. [BJL 16 -178] C - 15 196 Lanes, Volumes, Timings 1: 42nd Avenue S & S 144th Street Tukwila School Birth to K Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 80 179 45 70 214 62 59 124 64 63 180 92 Future Volume (vph) 80 179 45 70 214 62 59 124 64 63 180 92 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.980 0.976 0.965 0.963 Flt Protected 0.987 0.990 0.988 0.991 Satd. Flow (prot) 0 1802 0 0 1800 0 0 1776 0 0 1778 0 Flt Permitted 0.844 0.879 0.867 0.889 Satd. Flow (perm) 0 1541 0 0 1598 0 0 1558 0 0 1595 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 19 24 34 37 Link Speed (mph) 30 30 30 30 Link Distance (ft) 526 2207 379 654 Travel Time (s) 12.0 50.2 8.6 14.9 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Shared Lane Traffic ( %) Lane Group Flow (vph) 0 334 0 0 380 0 0 271 0 0 368 0 Turn Type Perm NA Perm NA Perm NA Perm NA Protected Phases 4 8 2 6 Permitted Phases 4 8 2 6 Detector Phase 4 4 8 8 2 2 6 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 22.5 22.5 22.5 22.5 22.5 22.5 22.5 22.5 Total Split (s) 32.0 32.0 32.0 32.0 28.0 28.0 28.0 28.0 Total Split ( %) 53.3% 53.3% 53.3% 53.3% 46.7% 46.7% 46.7% 46.7% Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All -Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 4.5 Lead /Lag Lead -Lag Optimize? Recall Mode None None None None Min Min Min Min Act Effct Green (s) 14.5 14.5 13.7 13.7 Actuated g/C Ratio 0.38 0.38 0.36 0.36 v/c Ratio 0.56 0.61 0.47 0.62 Control Delay 13.3 14.1 12.0 14.9 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 13.3 14.1 12.0 14.9 LOS B B B B Approach Delay 13.3 14.1 12.0 14.9 Approach LOS B B B B Queue Length 50th (ft) 43 50 32 48 Queue Length 95th (ft) 135 155 109 155 Internal Link Dist (ft) 446 2127 299 574 Turn Bay Length (ft) Base Capacity (vph) 1181 1225 1061 1087 Starvation Cap Reductn 0 0 0 0 2022 Future Conditions with Development School PM Peak Gibson Traffic Consultants, Inc. [BJL 16 -178] C -16 197 Lanes, Volumes, Timings 1: 42nd Avenue S & S 144th Street Tukwila School Birth to K Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.28 0.31 0.26 0.34 Intersection Summary Area Type: Other Cycle Length: 60 Actuated Cycle Length: 38 Natural Cycle: 45 Control Type: Actuated - Uncoordinated Maximum v/c Ratio: 0.62 Intersection Signal Delay: 13.7 Intersection Capacity Utilization 55.1% Analysis Period (min) 15 Splits and Phases: 1: 42nd Avenue S & S 144th Street Intersection LOS: B ICU Level of Service B 02 XD4 28s I 32s I lir Aso 08 28s ] 32s I 2022 Future Conditions with Development School PM Peak Gibson Traffic Consultants, Inc. [BJL 16 -178] C - 17 198 HCM 2010 TWSC 2: 42nd Avenue S & S 142nd Street Tukwila School Birth to K Intersection Int Delay, s/veh 6 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 94 23 189 90 20 213 Future Vol, veh/h 94 23 189 90 20 213 Conflicting Peds, # /hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 - 0 Peak Hour Factor 45 45 91 91 79 79 Heavy Vehicles, % 0 0 2 2 3 3 Mvmt Flow 209 51 208 99 25 270 Major /Minor Minorl Majorl Major2 Conflicting Flow All 577 257 0 0 307 0 Stage 1 257 Stage 2 320 Critical Hdwy 6.4 6.2 4.13 Critical Hdwy Stg 1 5.4 Critical Hdwy Stg 2 5.4 Follow -up Hdwy 3.5 3.3 2.227 Pot Cap -1 Maneuver 482 787 1248 Stage 1 791 Stage 2 741 Platoon blocked, % - - Mov Cap -1 Maneuver 470 787 - - 1248 Mov Cap -2 Maneuver 470 - - - Stage 1 791 - - - Stage 2 723 Approach WB NB HCM Control Delay, s 19.2 0 HCM LOS C Minor Lane /Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) - 510 1248 - HCM Lane VIC Ratio - 0.51 0.02 HCM Control Delay (s) - 19.2 7.9 0 HCM Lane LOS - C A A HCM 95th %tile Q(veh) - 2.9 0.1 SB 0.7 2022 Future Conditions with Development School PM Peak Gibson Traffic Consultants, Inc. [BJL 16 -178] C - 18 199