Loading...
HomeMy WebLinkAboutRes 1703 - ATTACHMENT: 2010-2015 Financial Planning Model and Capital Improvement Program2010 -2015 FINANCIAL PLANNING MODEL AND CAPITAL IMPROVEMENT PROGRAM b57Re7s li do lNumber 1 703 City of Tukwila Washington 2010 — 2015 Financial Planning Model and Capital Improvement Program Adopted December 7, 2009 JIM HAGGERTON, MAYOR TUKWILA CITY COUNCIL Joan Hernandez, Council President Joe Duffle Dennis Robertson Kathy Hougardy Pamela Linder Verna Griffin De'Sean Quinn Population: 18,080 Assessed Valuation: $4,973,984,133 City of Tukwila 6200 Southcenter Boulevard Tukwila, Washington 98188 Jim Haggerton, Mayor To: City Council & Citizens From: Mayor Jim Haggerton Date: October 12, 2009 Subject: Proposed 2010 -2015 Financial Planning Model and Capital Improvement Program I am submitting for your review the six -year Financial Planning Model and Capital Improvement Program for 2010 - 2015. As we now have a biennial budget for 2009 -2010, we do not have to review the budget for 2010. The Financial Planning Model - Attachment A summarizes the general government revenues, operations & maintenance, debt and capital expenditures. Attachments B and C provide a greater level of detail for the anticipated operations and maintenance and capital expenditures respectively. GENERAL REVENUES The region and the state have seen dramatic declines in revenue from various sources in 2009. Consumer confidence still has not rebounded, and for the first time in a long time, people are saving more than they are spending. For cities like Tukwila, this has resulted in a decline in major sources of revenue. Sales Taxes — Sales tax is our largest revenue source. At this juncture in the year, 2009 sales tax collections are running 20.54% behind 2008 and 6.92% behind the 2007 revenue. The City has received nearly $1.3 million in sales tax mitigation from the Department of Revenue, which has offset some of the decline in sales tax receipts. We are projecting no growth in sales tax revenue for 2010, and a return to typical increases of 3.0% annually for 2011 -2015. The Streamlined Sales Tax Initiative (SSTI) continues to be a key issue. Although the City has received mitigation money, the timing of the start of SSTI occurred at the same time that we saw declines in sales tax receipts and overall consumer spending. As mentioned previously, the City has had a substantial decline in sales tax revenue this year. It has been difficult to isolate the decline in economic activity from declines related to SSTI. The City was projected by the Association of Washington Cities to be negatively impacted by more than $3 million. The mitigation we have received is significantly less than the AWC estimate. It appears the cause of the difference is a general decline in consumer spending at businesses within the City. Property Taxes — The 1% limitation is still the most revenue restrictive element of the general revenue base. The limitation has taken roughly $500,000 out of the City's coffers on an annual basis. Accordingly other revenue categories must make up the difference in order to achieve the overall 4% growth target. W: \Mayor Haggerton \CIP -2010 Mayors Budget Ltr.doc October 12, 2009 Proposed 2010 - 2015 Financial Planning Model and Capital Improvement Program Page 2 Combined with new construction as the foundation for annual growth, we are anticipating a growth rate of 2.5% for 2010 and a return to 3.0% for 2011 -2015. The expected increases related to increases in assessed values, as well as increases from new construction and tenant improvements. Utility Taxes — The utility tax rate is 6 %. The City recently enacted a solid waste utility tax in an effort to address revenue shortfalls in certain areas and unexpected costs in other areas. City Administration is also proposing a utility tax on the water, sewer and surface water funds. This item has not been considered by Council yet. Other Revenues - The remaining General revenues are gambling, permit fees, court fees, charges for services, and recreation program fees. Permit fees are expected to be rebound in 2010 as a result of various development projects. UTILITY REVENUES Water - Revenues continue to remain flat. Cascade Water Alliance has increased the cost of purchased water and administrative dues for 2010 by 5 %. We are proposing a 15% rate increase in 2010 to incorporate CWA's increases and the cost of the City's infrastructure. A 10% increase is proposed for years 2011, 2012, and 2014 with 15% increases in 2013 and 2015. These rate increases are necessary to keep the fund stable and incorporate CWA's capital costs in the future. Sewer - To maintain our current level of service, a 15% rate increase has been factored into the six -year Sewer Plan each year from 2010 through 2015. The capital program for the sewer fund continues to be severely reduced to build up reserves. King County Sewer Metro will not have a rate increase in 2010. Surface Water — The six -year plan requires several rate increases to compensate for rising costs. We did not have a rate increase in 2009 and there is a proposed rate increase of 20% in 2010 and 10% increases are proposed for years 2011 through 2015. A new Engineering position was added in 2009 to accommodate NPDES requirements. Our surface water fees remain significantly lower than neighboring jurisdictions. CAPITAL EFFORTS — GENERAL Below are the significant new elements of the Proposed 2010 -2015 CIP document. Bridges There is $245,000 programmed in 2010 for annual bridge repairs and inspections. We have also included design funds for the Boeing Access Rd Bridge if grant funding is successful. Arterial Streets The major changes are: 1. Southcenter Parkway Extension is scheduled to begin construction in 2010 through 2011. 2. Tukwila Urban Center Access (Klickitat) Project's LID formation began in 2009 with construction scheduled for 2010. W:IMayor Haggerton \CIP -2010 Mayors Budget Ltr.doc October 12, 2009 Proposed 2010 - 2015 Financial Planning Model and Capital Improvement Program Page 3 CAPITAL EFFORTS — GENERAL CONTINUED 3. Tukwila International Blvd Phase II and III from S 116th Way to S 138th is currently underway, on schedule and under budget. 4. Tukwila's contribution for the Strander Blvd Project is $2.9 million for 2009 and 2010. Parks & Recreation Codiga Park is currently under construction and will finish in 2010. Duwamish River Bend Hill Park and Duwamish Gardens are scheduled for improvements in 2010 and 2011. Facilities Tukwila Village development continues with Tarragon. The South County Regional Jail bond issue is scheduled for 2010. Emergency Mgmt The Howard Hanson Dam Flood Response Plan has taken precedence at a significant cost. Water A significant water line replacement project is planned for Andover Park E that now incorporates improvements for Christensen Rd. The update for the Water Comprehensive Plan is scheduled for 2010. Sewer Only minor sewer capital improvement projects are scheduled for 2010 along with the update to the Sewer Comprehensive Plan. Surface Water SUMMARY Projects include the ongoing Small Drainage Program, the adoption of some private storm systems, the GIS Inventory, and finalizing Storm Lift Station No. 18 and Gilliam Creek Basin improvements that began in 2009. Generally, we will be able to meet the operations and maintenance requirements of the City as well as the base capital needs. The outcome of the items listed below will have an impact on the general government as well as the enterprise funds ability to meet program goals. • Actual growth of the "Tukwila" economy. • Operations & maintenance cost exceeding 4% growth, i.e. controlling costs. • Ability to get Federal and State grants for the large infrastructure projects. • Successful resolution of the Streamline Sales Tax Initiative and the receipt of mitigation money to offset lost sales tax revenue. We have already factored in the six -year plan many of the items listed above. Finally, we are working on the items above that we can directly influence. W:1Mayor Haggerton \CIP -2010 Mayors Budget Ltr.doc CITY OF TUKWILA ADOPTED 2010 - 2015 FINANCIAL PLANNING MODEL & CAPITAL IMPROVEMENT PROGRAM TABLE OF CONTENTS Page Resolution 1703 - Adopting Planning Model and CIP for Period 2010 - 2015 I Capital Improvement Program Policies 11 Financial Policies IV Planning Model Summary, Attachment A Total Revenues & Expenditures Summary (General Government) VII Attachment B General Fund Operations & Maintenance Expenditures Summary XI Attachment C General Government Capital Projects Funding by City and Other Sources XII Attachment D Water Enterprise Fund Summary XVI Attachment E Sewer Enterprise Fund Summary XVIII Attachment F Surface Water Enterprise Fund Summary XX Attachment G Golf Enterprise Fund Summary XXII Capital Improvement Program General Government Residential Streets 103 Fund 1 Bridges 104.01 Fund 7 Arterial Streets 104.02 Fund 13 Parks & Trails /Fish 301 Fund 49 Facilities 302 Fund 75 General Improvements 303 Fund 81 Fire Improvements 304 Fund 85 Enterprise Funds Water Projects 401 Fund 91 Sewer Projects 402 Fund 119 Surface Water 412 Fund 143 Golf Course 411 Fund 167 Ci of Tukwila Washington Resolution No. 1 t7 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING THE 2010 -2015 FINANCIAL PLANNING MODEL AND THE CAPITAL IMPROVEMENT PROGRAM FOR GENERAL GOVERNMENT AND THE CITY'S ENTERPRISE FUNDS. WHEREAS, when used in conjunction with the biennial City budget, the Capital Improvement Program (CIP) and the Financial Planning Model for the period 2010 -2015 are resource documents to help plan directions the City will consider for the future; and WHEREAS, the Financial Planning Model and Capital Improvement Program are not permanent fixed plans, but are guidelines or tools to help reflect future goals and future resources at the time budgets are being planned; and WHEREAS, the commitment of funds and resources can only be made through the budget process; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. The City Council hereby adopts the 2010 -2015 Financial Planning Model and accompanying Capital Improvement Program, incorporated by this reference as if fully set forth herein. Section 2. A copy of the 2010 -2015 Financial Planning Model and accompanying Capital Improvement Program shall be kept on file in the City Clerk's Office. Section 3. The assumptions, revenues and expenditures will be reviewed and updated annually, or as necessary, by the City Council. Section 4. The detail of Capital Improvement Program projects will be reflected in the published Financial Planning Model and Capital Improvement Program 2010 - 2015. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, TUKWILA, WASHINGTON, at a Regular Meeting thereof this ,1--).1-14 day of - i t Q (' 1} r , 2009. ATTEST/ ALjTHENTICATED: l f Christy O'Flahe.ity, CMC, City Cl k APPROVED AS TO FORM BY: Joan Hernandez, Council President c- Filed with the City Clerk: Passed by the City Council: f - ),_- 7-e)c7 Resolution Number: ;10_ Attachment: Financial Planning Model and Capital Improvement Program 2010 -2015 W:\ Word Processing \ Resolutions \2010 -2015 Financial Planning Model & CIP.doc GL:ksn 11/30/2009 Page 1 of 1 CAPITAL IMPROVEMENT PROGRAM POLICIES 1) Utility rates should be structured to ensure adequate infrastructure development and replacement. 2) Late -comer agreements (where appropriate) shall be considered an acceptable means of funding capital projects, improvements and replacements, in whole or in part. 3) Infrastructure improvements such as water reuse should consider conservation of resources such as water and electricity. 4) For City - scheduled projects located on residential streets, the City will evaluate for inclusion the costs of undergrounding the overhead utilities that exist within the right -of -way. 5) Right -of -way agreements for cable and electrical services should be utilized to discourage excessive wiring throughout the City. 6) Donation of the property needed for rights -of -way and easements shall be pursued. 7) Residential street designs will follow basic designs for arterials, collectors, and local access streets. Designs to accommodate individual properties shall be avoided. 8) The City strongly encourages design of connecting streets. 9) Residential streets with safety issues, high traffic volumes, high pedestrian activity and poor roadway conditions will be considered the highest priority projects. 10) A majority of citizens on a street may petition the City to set up a Local Improvement District (LID) to pay for residential street improvement projects, sidewalks and undergrounding of utilities. The City will evaluate the possibility of paying for the design, preliminary engineering, construction engineering, and LID formulation. The residents will pay for undergrounding utilities in the street, undergrounding from the street to their house, the actual construction costs, and for any improvements on private property such as rockeries, paved driveways, or roadside plantings. 11) Capital improvements shall be coordinated, whenever feasible, with related improvements of other jurisdictions. 12) Capital Improvement Program (CIP) projects shall, whenever possible, take advantage of grants, loans or other financing external to the City. Staff shall obtain approval from the appropriate committee before applying for grants, and the Committee Chair shall report for approval the proposed applications to the full Council. Grant applications shall be made only for projects listed in the six -year Capital Improvement Program. Staff shall also get approval from the full Council before accepting grants. II Capital Improvement Program Policies continued 13) Current arterial street improvements determined in the six -year CIP may be funded through a LID or financing external to the City. The City may participate using operating revenues, grants or bonds based on health and safety needs or public benefit. The City may participate in the funding by financing the preliminary engineering design and professional service costs associated with planning and creating the LID. 14) Street and road improvement projects on slopes will include roadside plantings wherever feasible to help mitigate the land used for roadway and sidewalk improvements. 15) The first '/4 -cent real estate transfer tax shall be dedicated to park and open space land acquisition. The second 1A -cent tax shall be used for arterial streets along with the parking tax. 16) Non - transportation capital projects and improvements (i.e. new community center) shall be funded by operating revenues, grants or bonds as determined in the six - year Financial Planning Model. 17) A dedicated facility replacement fund will be used to help pay for future facilities. 18) Transportation improvements will be coordinated with related improvements such as utility, landscaping, sidewalks, etc. 19) No capital improvement projects located outside the city limits will be approved without specific City Council approval. 20) Policies will be reviewed annually and in concert with the adoption of growth management policies to ensure continuity. 21) Street and road improvement projects shall be evaluated for the inclusion of features that support the Walk and Roll Plan in order to encourage walking, bicycling, and transit use. 22) Transportation impact fees shall be collected so that "growth may pay for growth" and growth- caused improvements may be constructed. III CITY OF TUKWILA FINANCIAL POLICIES The policies are located within three major elements: • Debt Policies • Financial Planning Model Policies • General Policies Debt Policies The Debt Policies can be segregated into three areas: Legal Debt limits, Practical or Fiscal limits and General Debt policies. A. Legal Debt Limit — The Revised Code of Washington (RCW 39.36) establishes the legal debt limits for cities. Specifically, this RCW provides that debt cannot be incurred in excess of the following percentages of the value of the taxable property of the City: 1.5% without a vote of the people; 2.5% with a vote of the people; 5.0% with a vote of the people, provided the indebtedness in excess of 2.5% is for utilities; and 7.5% with a vote of the people, provided the indebtedness in excess of 5.0% is for parks or open space development. A sample schedule for the current 12 -year period is attached to demonstrate the impact certain projections would have on debt capacity limitations. Policy DP -1 - Prior to issuing any long -term bonds, the Administration must provide an impact analysis over the life of the new bonds. Bond issues must be approved by the City Council. B. Practical or Fiscal Limitations — More important than the legal limitations is the practical or fiscal limitations, i.e. ability to repay borrowed funds. Policy DP -2 — Long -term debt cannot be issued prior to reviewing the impact on the Six Year Financial Planning Model and its policy guidelines. The impact of other potential bond issues shall be considered. Policy DP -3 — Fiscal Policy for large developments. To be determined. C. General Debt Policies Policy DP -4 — The City will be cognizant of the criteria used by rating agencies to maintain the highest possible bond rating. Policy DP -5 — Assessment Debt (LID) shall be considered as an alternative to General Debt. Policy DP -6 — Debt issuance will conform to IRS regulations and avoid arbitrage consequences. IV CITY OF TUKWILA FINANCIAL POLICIES Financial Planning Model Policies The Six -Year Financial Planning Model and Capital Improvement Program is the primary financial policy document. It represents the culmination of all financial policies. Revenues Policy FP -1 — Revenues will be estimated on a conservative basis. Increases greater than inflation in Attachment A, Total Revenues and Expenditures, will require additional documentation. Policy FP -2 —Major revenue sources will require explanation in Attachment A -1, Notes to Revenues. Operations & Maintenance Expenditures Policy FP -3 — Expenditures for the General Fund operations (Attachment B, General Fund Operations & Maintenance Expenditures) will only include basic inflationary increases at the beginning of the budget preparation process. Proposed increases in programs or personnel will require an issues and options paper and Council approval before being added to the operations & maintenance expenditures estimate. Capital Expenditures Policy FP -4 — Project capital grants with local matching requirements can only be applied for with express approval by the City Council. Grant applications shall be made only for projects listed in the six -year Capital Improvement Program. Policy FP -5 — If the proposed grants or mitigation are either not funded or are reduced, the respective project will be re- evaluated on the basis of its value and priority level placement in the Capital Improvement Program. Policy FP -6 — The financing of limited benefit capital improvements (Le. private development) should be borne by the primary beneficiaries of the improvement. The principle underlying limited benefit is that the property is peculiarly benefited and therefore the owners do not in fact pay anything in excess of what they receive by reason of such improvement. Fund Balances Policy FP -7 — The General Fund will maintain a designated $1,100,000 "Rainy Day Fund" balance that is not included in Attachment A, Total Revenues & Expenditures, of the Six -Year Financial Planning Model. Furthermore, in order to assure a minimum cash flow scenario the Accumulated Totals within the Six -Year Financial Planning Model may not recede below $3,000,000 in Attachment A, Total Revenues & Expenditures. V CITY OF TUKWILA FINANCIAL POLICIES Policy FP -8 — If compliance with Policy FP -7 is at risk; the Administration will provide a list of revenue options, service level /program reductions or capital project deferrals for City Council consideration. Enterprise Funds Policy FP -9 — Each Enterprise Fund will be reviewed annually and it must have a rate structure adequate to meet its operations & maintenance and long -term capital requirements. Policy FP -10 — Rate increases should be small, applied frequently, and staggered to avoid an overly burdensome increase and undue impact in any given year. Policy FP -11 — Rate increases of external agencies (i.e. King County secondary wastewater treatment fees) will be passed through to the users of the utility. Other General Financial Policies Policy GF -1 — The City's various user charges and fees will be reviewed at least every three years for proposed adjustments based on services provided and comparisons with other jurisdictions. Policy GF -2 — The Finance Director will provide a financial status update at least quarterly. Policy GF -3 — Budget amendments during the year will be approved by budget motion until the end of the budget year, when a formal comprehensive budget amendment is submitted. Policy GF -4 — Interfund loans will be permissible if practical. Interest rates will be computed based on the annual average of the State Investment Pool earnings rate. Policy GF 5 — The City shall, whenever practical and advantageous, take advantage of grants, loans, or other external financing sources. With the exception of capital improvement program grants requiring a local match, staff shall report to and seek the approval of the appropriate council committee before finalizing the grant. VI ATTACHMENT A CITY OF TUKWILA TOTAL REVENUES & EXPENDITURES 2010 - 2015 Analysis in 000's REVENUES (see A -1) 2010 2011 2012 2013 2014 2015 Totals General Revenues Sales Tax 15,502 15,967 16,446 16,940 17,448 17,971 100,274 Property Taxes 12,400 12,710 13,028 13,353 13,687 14,029 79,207 Utility Taxes 4,747 4,889 5,036 5,187 5,343 5,503 30,705 New Revenue /Exp Reduction 3,000 3,075 3,152 3,231 3,311 3,394 19,163 Interfund Utility Taxes 2,600 900 900 0 (2,200) (2,200) - Gambling Taxes 2,099 2,162 2,227 2,294 2,362 2,433 13,577 Contract Agreement - SCL 1,976 2,035 2,096 2,159 2,224 2,291 12,781 Charges /Fees for Services 5,273 5,431 5,594 5,762 5,935 6,113 34,108 Transfers In - Other Funds 2,493 2,568 2,645 2,724 2,806 2,890 16,126 Intergovernmental Revenue 922 950 978 1,007 1,038 1,069 5,964 Other Taxes /Miscellaneous 1,640 1,689 1,740 1,792 1,846 1,901 10,608 Subtotal 52,652 52,376 53,842 54,449 53,800 55,394 322,513 Dedicated Revenues (Capital) 500 515 530 546 563 580 3,234 Real Estate Taxes Motor Vehicle Taxes 455 469 483 497 512 527 2,943 Investment Interest /Misc. 500 515 530 546 563 580 3,234 Property Taxes 130 130 130 130 130 130 780 Parking Taxes 140 140 140 140 140 140 840 Transfers from Golf Course 0 0 150 150 175 175 650 Subtotal 1,725 1,769 1,963 2,009 2,083 2,132 11,681 TOTAL REVENUE AVAILABLE 54,377 54,145 55,805 56,458 55,883 57,526 334,194 EXPENDITURES Operations & Maintenance: 45,376 49,654 51,680 54,220 56,900 59,174 317,004 (See Attachment B) Howard Hanson Dam Response 2,500 2,500 300 300 300 300 6,200 Debt Service 2,466 2,464 2,460 2,467 2,457 1,974 14,288 Admin /Engineering Overhead 300 309 318 328 338 348 1,941 Subtotal Available 3,735 (782) 1,047 (857) (4,112) (4,270) (5,239) Capital - Attachment C Residential Streets 0 0 0 0 150 300 450 Bridges 313 145 205 205 270 270 1,408 Arterial Streets 3,435 2,423 1,580 1,355 1,355 1,365 11,513 Parks & Trails 662 459 284 390 237 274 2,306 General Government Facilities 108 (2,177) (2,178) 0 110 140 (3,997) General Improvements 200 535 500 500 500 500 2,735 Fire Improvements (50) (50) 0 0 0 (55) (155) Subtotal Capital 4,668 1,335 391 2,450 2,622 2,794 14,260 Balance by Year (933) (2,117) 656 (3,307) (6,734) (7,064) (19,499) Carryover from 2009 22,639 0 0 0 0 0 22,639 Accumulated Totals 21,706 19,589 20,245 16,938 10,204 3,140 2010 - 2015 Financial Planning Model VII 01/09/2010 ATTACHMENT A -1 NOTES TO REVENUES GENERAL REVENUES Sales Tax The sales tax estimate for 2010 reflects a 20% reduction from 2008 actual receipts, plus approximately $1.3 million in mitigation money from the Department of Revenue. The annual expected increase for 2011 -2015 is 3% annually. Property Taxes Tax collections are projected to grow at a rate of 2.5% for 2010 -2015. The estimate is based on increases in assessed values, as determined by the King County Assessor's Office, and new construction and tenant improvements. Utility Taxes A utility tax was approved beginning in 2003 at an initial rate of 4% and increased to 5% in 2005. The tax applies to electric, natural gas, and communications sales. The tax rate increased to 6% in 2007. In 2009, Council adopted a 6% utility tax on solid waste collection in the City and also adopted an interfund utility tax on the water, sewer and surface water funds. Gambling Taxes Assuming all existing casinos continue operations, the estimates for City revenues is conservative. Contract Agreement — Seattle City Light (SCL) The City entered into a new contract agreement with SCL in 2003 that included a 4% contract payment. The rate was 5% in 2006 and increased to 6% in 2007. Charges /Fees for Services The amount includes Department of Community Development (DCD) revenues consisting of permits, licenses, fees, fines and forfeitures. After the completion of permit and building activities during 2008 for the mall expansion project, permit revenue is projected to return to a normal activity rate for 2010 and beyond. Transfers In — Other Funds Reflects the General fund support for Tukwila's other Capital and Enterprise funds; Residential Streets, Arterial Streets, Water, Sewer, Surface Water, Foster Golf Course, Land Acquisition, Parks & Trails and Equipment Rental funds. This is expected to have a growth rate of 3 %. 2010 — 2015 Financial Planning Model Viii ATTACHMENT A -1 continued Intergovernmental Revenue Includes regular on -going revenues such as motor vehicle excise taxes, liquor taxes and profits, emergency services (EMS) allocation and special non - recurring grants. Other Taxes /Miscellaneous Includes admission taxes, interest income, natural gas use tax, and developer contributions. Annual growth is projected at 2% for 2010 and 3% for 2011 -2015. DEDICATED REVENUES - CAPITAL Real Estate Taxes This revenue source fluctuates as it is driven by property sale transactions. Motor Vehicle Taxes Revenue estimates for 2010 -2015 are based on historical collections. Investment Interest Interest earnings have stabilized and we are projecting very little growth given the current economic outlook. Property Taxes Provides a revenue source for debt service on capital facility replacements. Parking Taxes The parking tax, which began in 1999, is being used for the arterial street program. The growth rate is projected to be flat at the present time. Transfers from Golf Course Reflects the repayment of the $650,000 interfund loan borrowed in 2004. Cash Carryover from 2009 Consists of the General Fund $4,500,000 and the Capital Funds: Streets $257,000, Arterial Streets $7,000,000, Land Acquisition and Parks $7,179,000, Facilities $2,124,000 and General Improvements $1,579,000 for a total of $22,639,000. Amounts after 2010 are only General Fund expenditure savings carryovers. Not included are the $1.1 million "Rainy Day" amount and the $878,418 in the Contingency Fund 105. 2010 — 2015 Financial Planning Model IX 2010 — 2015 Financial Planning Model X ATTACHMENT B City of Tukwila General Fund Operations & Maintenance Expenditures 2010 - 2015 Analysis in 000's EXPENDITURES 2010 2011 2012 2013 2014 2015 Totals City Council 283 307 319 332 345 359 1,945 Mayor, Boards 2,583 2,788 2,837 2,951 3,069 3,191 17,419 Administrative Services 571 621 646 672 698 726 3,934 Finance 1,743 1,891 1,967 2,045 2,127 2,212 11,985 City Attorney 481 513 534 555 577 600 3,260 Parks & Rec 3,465 3,733 3,882 4,037 4,199 4,367 23,683 Community Development 3,013 3,272 3,403 3,539 3,681 3,828 20,736 Municipal Court 1,124 1,219 1,268 1,318 1,371 1,426 7,726 Police 13,821 14,589 15,276 16,361 17,525 18,226 95,798 Fire 10,136 10,842 11,275 11,726 12,196 12,683 68,858 Information Technology 1,086 1,174 1,221 1,270 1,320 1,373 7,444 Public Works 3,980 4,313 4,485 4,664 4,851 5,045 27,338 Parks Maint 998 1,080 1,123 1,168 1,215 1,263 6,847 Street Maintenance 1,612 2,813 2,925 3,042 3,164 3,291 16,847 Dept. 20 Miscellaneous 480 499 519 540 562 584 3,184 TOTAL EXPENDITURES 45,376 49,654 51,680 54,220 56,900 59,174 317,004 Notes: A 4.0% increase is anticipated for the years 2011 -2015 due to the expected increases in healthcare, retirement rates, and general inflationary pressures. Most of the increases will be related to salaries and benefits. Moderate cost -of- living allowances (COLAS) are projected along with the normal annual step increases. The Rainy Day contingency and the estimated ending fund balances are not shown here as budgeted amounts because they are considered reserves to be used in emergencies. 2010 - 2015 Financial Planning Model Xi 01/09/2010 Attachment C hborhood Revitalization z (6 N N Q >- 0 O M O N N O N 0 N O O N U) L_ 0 co O co co O O N N O x- CO N V' O O 0 0 O O et- 0 0 co T r O O O O O O O T U T U) O O O T U 0 t 0 O O T U N Z N M V 10 a Residential Streets Neighborhood Traffic Calming Residential Improvements O M N 10 O Lo 10 co O 10 0 O 0 0 (2 O 0 ti O 0 i 0 N Q >- (6 O O O N O N M O N N O N 0 N O O N 4) L 0 O V 0) co M - O N M O N M 0) N' M N 0 0 0 O M O O 0) s 0 IN 0 • 0 T U 0) t O IN O 0 O 06 O N T U U) O O O N 0 LO O O O N O N N O 0 N 0 4) O O N. h O N O N. T U a L 0 rn rn T U M_ M O O O Annual Bridge Inspects. /Repairs Boeing Access Rd Bridge BNRR TUC Ped /Bicycle Bridge BNSF Reg. Center Access M M Subtotal by Source O M (0 O N (B CO N 0) (4 O 10 et- N 2 O co N M M ti SUBTOTAL XII * Park Impact Fee List Projects (project must be started within 6 years). ** Ongoing Projects Attachment C a+ C E O > co 0 () E O C O V W .k (n CC 0,0 To O H 0 N C ID N co O N o N O N O 0 N a) N d U O a i2 a) N 00)00 O O N N 4) 0 0 0 0 4) )- 0 0 (O R O 4) O O O O 4) L010-0 O _ O M h M O 0 o N O) O O N R M N O o 0 N h N Y- M 4) O O O O O M 7 4) O O O N O 4) N N Y- Y- N N Co R 00 n O 00 0 0 1- O O O Y- 4) 47 47 O O Yct 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10I ., R h 4) 0)10 0 4) h h N 4) M Ni- R CO 4) V co O) a"OSNN ,- N M m N LO W 0) 0 v 4) m N LO 03 N M 4) Ls-i N. _ ) o t a M N FD- 4) M W (O `O (`) to O 0 M N N O 4) M N 40 co M ■ a) 0 �l Q V- m 0 T U r O ,- co O) 4) co O 47 4) N. M N 47 O 4) O O O O O I� 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NO W M O N N )- O M 0 )- N M 0) NM M (O ,O M O o M 4 0 T Uy- D L_ O 0)1) co,- N 4) 4) CO e- 0 U a) L_ O 010 N •- O— 4) M ,-.-,52. 0 >, U L O 0 N ^ 4) O 4) CO 0 rn T .-. U N L 0 0 0 4) O M N N .� 10 co M N W 10 N 00 CO (O O) N O W 4) ._ N 0) N T U N L O 00070 O 47 O N CO N N 4) V *- O N. O n M R (O (.) O) (\ 06 (V (V N M N V N NO co 05 M T U O Z M Y- i y !Q Z' Q Y- M 0) 40 O 47 O R M N (O O (O I. N.000070 IN O N )- N 0 )- 0)0) N M M MO , V 0) (0 1- 07 O) O N M V 4) (0 r 00 O) O N M V 4) (0 I- 00 O) O N M .7 0) (0 1- N N N N N N N N N N M M M M M M M M M M V 7 V 7 V 7 V 7 'a O O ,co co .0 o O O N >T N ›. _ 'O a m E y_ N N U (O M H En rn 'D a) ' U `- 5 a) d ry 4- O O O O O '27-- a o 3 _ in ? E N co m E 0 cD a") () Q E a` co o 0) m O _v .... m N a Y c N G m L i a) ❑> c @ 1) o❑ a) 'O a) 0)-0 Y E>-5< 02 O_, O 3 (n a) i ,_ c 01 . > C m (n - - c �� a v c� �rnmti a � '-'6 n Em °) mw U L L N N T (n a) H (0 W O `- 2 (n ❑ 4) >. M- d m c "6 .- U O — �i "O d (c0 d a. L L (6 V O d c0 . O) W> �' d' (0 O Q m O`) (n . a) > O co N _O "> 16 d d m@ 'N Y— q. X .5 Y y U .... d O lj ! a) i5_ T a) U d c co m O D m m (n (n O f- (L d 2' W E a T "0 U c a) ❑ m m C m CO N a �. �.. O @ C C 4 'C a7 (6 H > '6 d -O -O > m - "6 'E .O O N C _0 O C '_' > > C CO CO (n c 5 Y= Y C c O -O Y C a) O -O > W (6 a) U [= Y j Y (0 in U N 00 co (O D � D (n (n ¢ c 0 c 0) t0 c 0 (n W - 0 D n H (n ct ) (n (n (n (n 4) M R M a) E 3 (�) T N S 3 Cn XIII Traffic Impact Fee List Projects (project must be started within 6 years). " Ongoing Projects 01/08/2010 Attachment C XIV * Park Impact Fee List Projects (project must be started within 6 years). City Lo N x • + O o U) N tM 3 LL) (2 r LO W Q) O O N M 7 Project Parks & Trails (Parks & Trails L C m J o a) CO Y (`p d E LL a) O 0 Y a) a j "O c Ca E y E N 0 O O d a) 3 O 0 a O O CL a) 7 _1 J l0 0 O c 3 H d 1)C 0 LL N is F a) y a. a 7 .0 O 0 p U C U 3 ~ > Y m a0 O .N C — W Y CO a co > Q L � a) d a) d fn c d O c) 03 rn a Y m = 2 w "O l0 0 N 5 E -al m 2 Southgate Park Improvements Hand Boat Launches Log House Park Gilliam Crk Fish Barrier Removal XIV * Park Impact Fee List Projects (project must be started within 6 years). Attachment C Government 0) 0) 0 O O 0 O O 0 O 0 C5 ▪ N 10 • 0 0 O 0 CO 0 CO 00 ( 0 0 0 0 • O N N O O O CO CO 0) O O (0 O O O 0 CO N N O N O N 0 O N 1) s O O W N O CO N ("1 A- N▪ " O 00 10 CO O • • O 0 L() (0 N- co 0) O Z N- N- N- N. IN CO O m 0 Tukwila Village Permanent EOC Facility South County Regional Jail City Maintenance Facility Community Justice Center CO O Subtotal by Source O O O 10 N op M 0) N FO- 7E0 O R 0 k- 00 O CO R SUBTOTAL X_ i 0 (0 a) 0 N N O N 0 N O O N 0 U) 0 O O O O O M N (0 N O T 0 O O O O O 0 O T U 0) s O O O O O O O O O 10 4) O O O 0 0) O O 0) O T U 0) 0 O M O O O O N N • (0 Z 0) co 0 ral Improvem C7 0 E E a O O N Subtotal by Source O N O k- O 10 N ti SUBTOTAL CO N N 0 0 N O O O O R O 4) N T U 0) L_ O 0 0 0 O O O O 4) 0 (C) O O N. O 0 O N M' 0 0) 0 0 0) O O O O O O O O T U ro 0 O O 10 O O O O O O O (0 O (0 O 0) (0 N M (0 ti O O O T 0 0) 0 • (() (0 N- O 0) (0 Z co 0o 0o m o0 a r re Improveme 0) ■ LL w 0 0) cated FS 51 New Aid Car R ire Station 54 New Engine for Relocate Station 52 O ed within 6 years). Fire Impact Fee List Proje XV O O N O O N V' (O N 0) W N. (V CO O N CO CO (0 FO- 4) O R (0 I CO n N CO N w O O 0) (V rt O M CO 0 O CO CO (() CO CO 1 0) N O M cd 2 O O M M I u) O On -going Projects ATTACHMENT D City of Tukwila WATER ENTERPRISE FUND 2010 -2015 Analysis in 000's REVENUES 2010 2011 2012 2013 2014 2015 Totals Monthly Water Charges (1) +15% +10% +10% +15% +10% +15% Cascade Water Alliance (CWA) 1,940 1,980 2,037 2,240 2,352 2,470 13,019 Regular City Water 2,756 2,893 3,038 3,342 3,509 3,860 19,398 Other Miscellaneous Revenue (2) 215 275 315 320 325 325 1,775 Regional Grant 28 0 0 0 0 0 28 Water Connection Fees (3) 25 25 75 80 85 90 380 Total Revenues 4,964 5,173 5,465 5,982 6,271 6,745 34,600 EXPENDITURES CWA Purchased Water (4) 1,940 1,980 2,037 2,240 2,352 2,470 13,019 Water Operations & Maintenance(5) 1,787 1,876 1,970 2,048 2,151 2,237 12,069 Debt Service (6) 554 554 555 553 555 550 3,321 Interfund Utility Tax (7) 900 300 300 (750) (750) 0 Engineering Labor (9) 75 79 82 85 88 90 499 Subtotal 5,256 4,789 4,944 4,926 4,396 4,597 28,908 Water Capital - CIP Program (9) 1,670 1,050 691 1,174 1,180 1,295 7,060 Total Expenditures 6,926 5,839 5,635 6,100 5,576 5,892 35,968 Cash Flow Year by Year (1,962) (666) (170) (118) 695 853 (1,368) Carryover from 2009 6,151 0 0 0 0 0 6,151 Accumulated Totals 4,189 3,523 3,353 3,235 3,930 4,783 2010 - 2015 Financial Planning Model XV I 01/07/2010 ATTACHMENT D -1 NOTES TO WATER ENTERPRISE FUND 1) As water consumption is reduced each year through conservation, our revenue is flat. Rates reflect increases of 15% for 2010, 2013 and 2015 and 10% increases in 2011, 2012, and 2014. These rate increases are essential to sustain our reserve balance and cover any possible increases from Cascade Water Alliance (CWA). We will continue to review the annual rate model to confirm that the proposed increases are necessary. Future water purchased at additional costs will be passed on to ratepayers. We have identified Cascade Water Alliance's revenues and expenditures to better reflect the actual water charges and the respective increases. CWA has proposed rate increases of 7.3% in 2010. 2) Includes interest income, hydrant rental and other charges. 3) Connection fees are estimated for the Allentown /Foster Point and Duwamish projects. 4) Cascade Water Alliance is split out to identify the actual costs of purchased water. CWA has significant capital projects scheduled in this six -year planning model that will affect our water rates. 5) This includes all regular operational and maintenance costs. 6) Debt schedule includes Public Works Trust Fund (PWTF) loans and Bonds. Water Debt Service includes: 1995 E Marginal Bond 2003 PWTF Duwamish (20 %) 2004 PWTF Allentown (26 %) 2006 Bond Allentown (26 %) Expires 2010 2/1/15 388,846.50 7/1/21 15,321.50 7/1/24 86,672.40 12/31/26 63,375.00 Total $554,215.40 2011 388,592.50 15,249.23 86,269.27 63,427.00 $553,538.00 7) An Interfund Utility Tax was approved by Council in October 2009 for the water, sewer and surface water utilities. Gross revenues will be taxed 15% from December 31, 2008 through April 31, 2010 and taxed 10% from May 1, 2010 through December 31, 2012. The 2010 — 2015 Financial Planning Model (Attachment A) has the enterprise funds being refunded in full for these taxes in 2013 and 2014. 8) The Senior Water /Sewer Engineer's salary and benefits are split evenly between the water department and the sewer department. 9) Total Capital Improvement Program including other sources contributions. Water Enterprise Fund The City's Enterprise Funds account for utility operations that are self- supported through user charges. The utilities are financed and operated like a private business enterprise which requires periodic determination of revenues earned; expenses incurred, and net income for capital maintenance, public policy, management control and accountability. The Water Fund accounts for operations and capital improvements to provide water to a portion of City residents. King County Water District 125 and Highline Water District also supply water to City residents. 2010 — 2015 Financial Planning Model XVII ATTACHMENT E City of Tukwila SEWER ENTERPRISE FUND 2010 - 2015 Analysis in 000's REVENUES 2010 2011 2012 2013 2014 2015 Totals Monthly Sewer Charges King County Metro Sewer (1) 3,572 4,036 4,439 4,795 4,843 4,891 26,576 Regular City Sewer (2) 1,272 1,463 1,683 1,936 2,226 2,558 11,138 Other Misc. Revenue (3) 102 107 150 175 200 200 934 Sewer Connection Fees (4) 120 120 150 200 200 250 1,040 Total Revenues 5,066 5,726 6,422 7,106 7,469 7,899 39,688 15% 15% 15% 15% 15% 15% EXPENDITURES Sewer Operations & Maintenance King County Metro Sewer (5) 3,572 4,036 4,439 4,795 4,843 4,891 26,576 Regular City Sewer (6) 1,053 1,095 1,139 1,184 1,231 1,281 6,983 Debt Service (7) 358 357 356 355 354 352 2,132 Interfund Utility Tax (8) 1,000 400 400 (900) (900) 0 Engineering Labor (9) 75 77 79 82 84 87 484 Subtotal 6,058 5,965 6,413 6,416 5,612 5,711 36,175 Sewer Capital - CIP Program (10 523 725 625 429 700 1,030 4,032 Total Expenditures 6,581 6,690 7,038 6,845 6,312 6,741 40,207 Cash Flow Year by Year (1,515) (964) (616) 261 1,157 1,158 (519) Carryover from 2009 2,348 0 0 0 0 0 2,348 Accumulated Totals 833 (131) (747) (486) 671 1,829 2010 - 2015 Financial Planning Model XV I I I 01/07/2010 ATTACHMENT E -1 NOTES TO SEWER ENTERPRISE FUND 1) King County Metro sewer and Tukwila's sewer have been split out to present the revenues separately. Metro increases will be passed through to the sewer ratepayers. There are no increases scheduled for King County Metro sewer fees in 2010 but we have factored in the proposed increases for 2011 through 2015. 2) A 15% rate increase is proposed for Tukwila sewer in 2010 and 15% every year thereafter. We will continue with the annual rate model review to confirm that the proposed increases are necessary. 3) Includes interest income and other charges. 4) Sewer connection fees for Allentown Phase land Allentown /Foster Point Phase 11. 5) King County Metro Sewer treatment fees are passed through to ratepayers. 6) City's basic operation and maintenance costs. An additional Maintenance and Operations Specialist position is needed in the Sewer department, but this new position has been delayed indefinitely in order to build up the Sewer fund's reserves. 7) Includes the Public Works Trust Fund (PWTF) Loan and the 2006 Bond for the Allentown /Foster Point Phase 11 Sewer Improvement Project. Sewer Debt Service includes: Expires 2010 2011 2004 PWTF Allentown (62 %) 7/1/24 $206,680.34 $205,719.03 2006 Bond Allentown (62 %) 12/31/26 151,125.00 151,249.00 Total $357,805.34 $356,968.03 8) An Interfund Utility Tax was approved by Council in October 2009 for the water, sewer and surface water utilities. Gross revenues will be taxed 15% from December 31, 2008 through April 31, 2010 and taxed 10% from May 1, 2010 through December 31, 2012. The 2010 — 2015 Financial Planning Model (Attachment A) has the enterprise funds being refunded in full for these taxes in 2013 and 2014. 9) The Senior Water /Sewer Engineer's salary and benefits are split evenly between the water department and the sewer department. 10) Total Capital Improvement Program including other sources contributions. The remaining unsewered areas are scheduled beyond 2014. Sewer Enterprise Fund The City's Enterprise Funds account for utility operations that are self - supported through user charges. The utilities are financed and operated like a private business enterprise which requires periodic determination of revenues earned; expenses incurred, and net income for capital maintenance, public policy, management control and accountability. The Sewer Fund accounts for operations and capital improvements to provide sanitary sewer to a portion of City residents. Valley View Sewer District also provides sewer in the City. 2010 — 2015 Financial Planning Model X I X ATTACHMENT F City of Tukwila SURFACE WATER ENTERPRISE FUND 2010 - 2015 Analysis in 000's REVENUES 2010 2011 2012 2013 2014 2015 Total +20% +10% +10% +10% +10% +10% Annual Billings (Current) (1) 3,042 3,346 3,681 4,049 4,454 4,899 23,471 Other Revenues (2) 75 75 100 110 115 120 595 Grants /Bond Proceeds (3) 94 44 44 44 44 44 314 Total Revenues 3,211 3,465 3,825 4,203 4,613 5,063 24,380 EXPENDITURES Operations & Maintenance (4) 1,393 1,448 1,506 1,581 1,645 1,727 9,300 Debt Service (5) 380 370 318 316 315 313 2,012 Interfund Utility Tax (6) 700 200 200 (550) (550) Engineering Labor (7) 316 325 335 345 356 366 2,043 Subtotal 2,789 2,343 2,359 2,242 1,766 1,856 13,355 SSWM Capital - CIP Program (8) 1,668 1,085 849 1,300 1,384 1,123 7,409 Total Expenditures 4,457 3,428 3,208 3,542 3,150 2,979 20,764 Cash Flow Year by Year (1,246) 37 617 661 1,463 2,084 3,616 Carryover from 2009 1,656 0 0 0 0 0 1,656 Accumulated Totals 410 447 1,064 1,725 3,188 5,272 2010 - 2015 Financial Planning Model XX 01/07/2010 ATTACHMENT F -1 NOTES TO SURFACE WATER ENTERPRISE FUND 1) Reflects proposed rate increases of 20% in 2010, and 10% for 2011 through 2015. We will continue with the annual rate model review to confirm that the proposed Surface Water rate increases are necessary. The National Pollution Discharge Elimination System (NPDES) permit required by the State Department of Ecology is having a significant impact on the Surface Water fund. 2) Includes miscellaneous charges and interest income. 3) Potential grants and /or bond revenue. Included is the estimated annual grant funding of $44,000.00 from King County Flood Control Zone District. 4) This includes the City's basic operations and maintenance costs. 5) Debt schedule includes PWTF loans and the 2006 Bond. Debt Service includes: 1990 PWTF Segale Levee 1991 PWTF Fostoria Storm 2004 PWTF Duwamish (15 %) 2004 PWTF Cascade View Const. 2004 PWTF Allentown (12 %) 2006 Bond Allentown (12 %) Expires 2010 2011 7/01/10 $ 7,736.86 $ 0.00 7/01/11 51,910.63 51,401.69 7/01/21 12,292.39 12,234.41 7/01/24 238,804.95 237,694.23 7/01/24 40,002.65 39,816.58 12/31/26 29,250.00 29,274.00 Total $379,997.48 $370,420.91 6) An Interfund Utility Tax was approved by Council in October 2009 for the water, sewer and surface water utilities. Gross revenues will be taxed 15% from December 31, 2008 through April 31, 2010 and taxed 10% from May 1, 2010 through December 31, 2012. The 2010 — 2015 Financial Planning Model (Attachment A) has the enterprise funds being refunded in full for these taxes in 2013 and 2014.Cost of engineering to support capital projects, NPDES and operation efforts in- house. 7) Total Capital Improvement Program including other sources contributions. Surface Water Enterprise Fund The City's Enterprise Funds account for utility operations that are self - supported through user charges. The utilities are financed and operated like a private business enterprise which requires periodic determination of revenues earned; expenses incurred, and net income for capital maintenance, public policy, management control and accountability. The Surface Water Enterprise Fund accounts for operations and capital improvements for the City's storm drainage and surface water management function. Surface Water projects are required to meet Federal, State and local mandates. The largest contributor to the surface water enterprise fund is the City of Tukwila. 2010 — 2015 Financial Planning Model XXI ATTACHMENT G City of Tukwila GOLF ENTERPRISE FUND 2010 - 2015 Analysis in 000's REVENUES 2010 2011 2012 2013 2014 2015 Total Green Fees (1) 1,300 1,300 1,350 1,375 1,400 1,450 8,175 Concession Proceeds 78 90 100 120 120 120 628 Merchandise Sales 170 170 170 175 180 185 1,050 Sales Tax (2) 230 230 300 450 450 230 1,890 Power Cart Rentals 180 186 190 190 195 195 1,136 Other Revenue (3) 36 36 40 55 60 65 292 Beginning Working Capital 228 0 0 0 0 0 228 Total Revenues EXPENDITURES 2,222 2,012 2,150 2,365 2,405 2,245 13,399 Operations & Maintenance 1,614 1,657 1,675 1,725 1,777 1,830 10,278 Debt Service (4) 378 400 400 400 400 400 2,378 Payback to General Fund (5) 0 0 150 150 175 175 650 Subtotal 1,992 2,057 2,225 2,275 2,352 2,405 13,306 Golf Capital - CIP Program 10 10 10 10 10 10 60 Total Expenditures Cash Flow Year by Year 2,002 2,067 2,235 2,285 2,362 2,415 13,366 220 (55) (85) 80 43 (170) 33 Accumulated Totals 220 165 80 160 203 33 2010 - 2015 Financial Planning Model xx I I 10/12/2009 ATTACHMENT G -1 NOTES TO GOLF ENTERPRISE FUND 1) The Green Fees are expected to increase modestly as a function of both increased players' participation and periodic greens fee increases. 2) A portion of the City's total sales tax revenue is allocated to pay the Golf Course's share of the 2003 Bond. See also note (4). 3) Other revenue includes golf instruction, equipment rental, and interest. 4) The debt service on the 2003 Bond Issue, see also note (2). 5) This is the proposed payback schedule for the $650,000 borrowed in 2004. Golf Enterprise Fund The City's Enterprise Funds account for operations that are self - supported through user charges. The funds are financed and operated like a private business enterprise which requires periodic determination of revenues earned, expenses incurred, and net income for capital maintenance, public policy, management control and accountability. The Golf Enterprise Fund accounts for operation, maintenance, debt service and improvements of the municipal golf facility. The difference between the other utility enterprise funds is that Golf has voluntary users as opposed to involuntary users of the water, sewer, and surface water funds. 2010 — 2015 Financial Planning Model XXI I I 2010 — 2015 Financial Planning Model XXIV City of Tukwila CAPITAL IMPROVEMENT PROGRAM for 2010 - 2015 RESIDENTIAL STREETS 103 Fund CIP * *Other After Six Page # PROJECT TITLE 2010 2011 2012 2013 2014 2015 TOTAL Sources Years 2 40 -42 Ave South (S 160 St - S 131 PL) 0 0 0 0 150 300 450 0 4,000 3 Small Roadway & Safety Improvements 0 0 0 0 0 0 0 0 100 4 Neighborhood Traffic Calming Program 0 0 0 0 0 0 0 0 0 5 Residential Improvements 0 0 0 0 0 0 0 0 1,623 Grand Total Changes from 2009 to 2010 CIP: No new additions. 2010 - 2015 Capital Improvement Program 0 0 0 0 150 300 450 0 5,723 ** Denotes other funding sources, grants, or mitigation. 1 10/12/2009 PROJECT: DESCRIPTION: JUSTIFICATION: STATUS: MAINT. IMPACT: COMMENT: CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 40 -42 Ave South (S 160 St - S 131 PL) LINE ITEM: 103.01.595. . .41 PROJECT NO. Varies Design and construct street improvements, drainage, undergrounding, and driveway adjustments. Provide pedestrian & vehicle safety, drainage, and neighborhood revitalization. Phase III (S /C Blvd (154th) - S 160 St) $3m, Design in 2009/2010, construction in beyond. Project No. 94 -RS03 Phase I (S /C Blvd (154) - S 144 St) $3,796, Completed. Project No. 90 -RW15 Phase II (S 144 St - S 139 St) $1,850, Completed. Project No. 94 -RS02 Phase IV (S 139 St - S 131 PI) $1m in beyond. Project No. 94 -RS01 Reduce pavement, shoulder, and drainage work. Design of Phase III is now scheduled to begin in 2014. FINANCIAL (in $000's) Through Estimated 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 1,235 150 300 100 1,785 Land (R /W) 27 100 127 Const . Mgmt. 0 Construction 4,246 3,800 8,046 TOTAL EXPENSES 5,508 0 0 0 0 0 150 300 4,000 9,958 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 City Oper. Revenue 5,508 0 0 0 0 0 150 300 4,000 9,958 TOTAL SOURCES 5,508 0 0 0 0 0 150 300 4,000 9,958 2010 - 2015 Capital Improvement Program 2 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Small Roadway and Safety Improvements LINE ITEM: 103.01.595. . .30 PROJECT NO. Varies DESCRIPTION: Programmatic approach to addressing small roadway and safety concerns through a variety of methods. Addresses needs not included in general maintenance, traffic calming, or other approaches. JUSTIFICATION: Increasing public demand on staff time. Local access streets in residential neighborhoods may need minor roadway or safety improvements that can not be addressed with any other City program. STATUS: MAINT. IMPACT: Minimal. COMMENT: Program is only feasible if Public Works adds a Traffic Engineer to staff (same position as Traffic Calming). FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 0 Land (R /W) 0 Const. Mgmt. 0 Construction 0 TOTAL EXPENSES 0 0 0 0 0 0 0 0 0 0 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 City Oper. Revenue 0 0 0 0 0 0 0 0 0 0 TOTAL SOURCES 0 0 0 0 0 0 0 0 0 0 2010 - 2015 Capital Improvement Program 3 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Neighborhood Traffic Calming Program LINE ITEM: 103.01.595. . .16 PROJECT NO. 90210301 Programmatic approach to addressing neighborhood traffic concerns through a variety of methods. DESCRIPTION: Striping, improved signage, roadway improvements, traffic calming devices, and educational approaches are applied as needed to reduce speeding and improve safety. JUSTIFICATION: Increasing public demand on staff time. Local access streets in residential neighborhoods may use treatments not typically used on larger roadways. Treatments to 'calm' traffic are used worldwide. STATUS: Traffic calming will be added to citywide projects. MAINT. IMPACT: Varies, depends on treatment(s) used. COMMENT: Program feasibility is dependent upon Public Works adding a Traffic Engineer to existing staff. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 0 Land (R /W) 0 Const. Mgmt 0 Construction 0 TOTAL EXPENSES 0 0 0 0 0 0 0 0 0 0 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 City Oper. Revenue 0 0 0 0 0 0 0 0 0 0 TOTAL SOURCES 0 0 0 0 0 0 0 0 0 0 2010 - 2015 Capital Improvement Program 4 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Residential Improvements LINE ITEM: 103.01.595. . .66 PROJECT NO. Varies DESCRIPTION: Select, design and construct residential streets and /or water and /or sewer projects. JUSTIFICATION: Neighborhood revitalization by improving residential streets. STATUS: MAINT. IMPACT: Reduce maintenance. COMMENT: 37th Ave S (135- Tuk Int'I Blvd), 53rd Ave S (137 -144), S 132nd St (Tuk Int'I Blvd - Military Road), and S 150th St (42 -TIB) are prioritized future candidates. Program is project oriented to specific residential streets that require quick design and construction. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 410 410 Land (R /W) 0 Const. Mgmt. 0 Construction 1,213 1,213 TOTAL EXPENSES 0 0 0 0 0 0 0 0 1,623 1,623 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 City Oper. Revenue 0 0 0 0 0 0 0 0 1,623 1,623 TOTAL SOURCES 0 0 0 0 0 0 0 0 1,623 1,623 2010 - 2015 Capital Improvement Program 5 2010 - 2015 Capital Improvement Program 6 City of Tukwila CAPITAL IMPROVEMENT PROGRAM for 2010 - 2015 BRIDGES 104.01 Fund CIP **Other After Six Page # PROJECT TITLE 2010 2011 2012 2013 2014 2015 TOTAL Sources Years 8 Annual Bridge Inspections and Repairs 313 145 205 205 270 270 1,408 0 270 9 Boeing Access Rd Bridge Replacement 0 1,750 1,750 13,617 13,617 0 30,734 30,734 0 10 Tukwila Urban Center- Ped Bridge * 19 0 500 100 1,400 0 2,019 2,019 0 11 BNSF Regional Center Access 0 0 0 0 0 0 0 0 0 Grand Total Changes from 2009 to 2010 CIP: No new additions. 2010 - 2015 Capital Improvement Program 332 1,895 2,455 13,922 15,287 270 34,161 32,753 270 * Park Impact Fee List Projects (project must be started within 6 years). ** Denotes other funding sources, grants, or mitigation. 7 01/05/2010 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Annual Bridge Inspections and Repairs LINE ITEM: 104.01.595. . .26 PROJECT NO. Varies DESCRIPTION: Ongoing program of bi- annual inspections, repairs, painting and rehabilitation of the 20 City bridges. Federally required program identifies safety or repair needs in the early stages to minimize hazards and JUSTIFICATION: costs. The number of bridge inspections necessary each year can vary between 3 and 8 bridges. Inspection frequencies vary from bridge to bridge and WSDOT provides some inspection services. STATUS: Construction projects will be determined from inspection reports and noted deficiencies /problems. MAINT. IMPACT: Reduces maintenance costs. COMMENT: Ongoing project, only one year actuals are shown in the first column. Macadam Bridge spelling began in 2009. Tukwila Int'I Blvd Bridge graffiti removal is scheduled for 2010. FINANCIAL Through Estimated in $000's 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 8 7 43 25 30 30 40 40 40 263 Land (R /W) 0 Const. Mgmt. 37 5 35 20 25 25 30 30 30 237 Construction 151 30 235 100 150 150 200 200 200 1,416 TOTAL EXPENSES 196 42 313 145 205 205 270 270 270 1,916 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 City Oper. Revenue 196 42 313 145 205 205 270 270 270 1,916 TOTAL SOURCES 196 42 313 145 205 205 270 270 270 1,916 Project Location: Entire System 2010 - 2015 Capital Improvement Program 8 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Boeing Access Rd over BNRR Bridge Replacement LINE ITEM: 104.01.595. . .51 PROJECT NO. 99410408 Replace the existing bridge with a 340' long concrete or steel bridge structure. It will be 110' wide curb to curb and have sidewalks on both sides. DESCRIPTION: JUSTIFICATION: STATUS: MAINT. IMPACT: COMMENT: The existing bridge is structurally and seismically deficient. Several pedestals are leaning, have concrete spalls, exposed rusty anchor bolts and reinforcements and some cracks. The existing railings do not meet standards. Type, size, and location draft report (specifically required for bridges) was completed in 2005. Federal grant application was submitted in 2008. City will continue to submit application for funding as federal bridge funds are made available. Maintenance will be reduced. New bridge will be constructed in phases to allow continued traffic use. Construction of projects over $10 million are only funded at 80% for federal funding. A Bond issue will be required for the City match. FINANCIAL Through Estimated in $000's 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 52 1,750 1,750 3,552 Land (R/W) 0 Const. Mgmt. 1,602 1,602 3,204 Construction 12,015 12,015 24,030 TOTAL EXPENSES 52 0 0 1,750 1,750 13,617 13,617 0 0 30,786 FUND SOURCES Awarded Grant 0 Proposed Grant 1,400 1,400 10,894 10,894 24,588 Bond 350 350 2,723 2,723 6,146 Mitigation Expected 0 City Oper. Revenue 52 0 0 0 0 0 0 0 0 52 TOTAL SOURCES 52 0 0 1,750 1,750 13,617 13,617 0 0 30,786 2010 - 2015 Capital Improvement Program 9 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Tukwila Urban Center - Pedestrian /Bicycle Bridge LINE ITEM: 104.01.595. . .23 PROJECT NO. 90510403 DESCRIPTION: Construct a new pedestrian /bicycle bridge over the Green River. JUSTIFICATION: Pedestrian /bicycle connection between Tukwila's Urban Center "core" and commuter rail /Amtrak station. Supports local and regional goals and policies regarding land use and transportation in Urban Center. STATUS: Pedestrian System Report has identified the optimal location for bridge crossing to be south of the Best Western Hotel. Type, Size and Location Report began in 2007 with completion in 2010. MAINT. IMPACT: To be determined. State Enhancement design grant for $190,000 and Transit Oriented Development (TOD) planning grant COMMENT: of $55,000. Proposed earmark grants next available in 2011. Project is on Park Impact Fee list with funding of $2 million with an 80 %/20% split. FINANCIAL Through Estimated in $000's 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES , Project Location s► -e. • 816 5r Mill � Design 219 7 19 s n wias 500 , j St 1 111' 1 li.1711t1 N IT. 745 Land (R /W) 1{ R II 1 + 88081 100 c i jy f0 qF • 100 Const. Mgmt. 300 300 Construction 1,100 1,100 TOTAL EXPENSES 219 7 19 0 500 100 1,400 0 0 2,245 FUND SOURCES Awarded Grant 219 7 19 245 Proposed Grant 100 20 280 400 Mitigation Actual 0 Park Impact Fees Expected 400 80 1,120 1,600 City Oper. Revenue 0 0 0 0 0 0 0 0 0 0 TOTAL SOURCES 219 7 19 0 500 100 1,400 0 0 2,245 2010 - 2015 Capital Improvement Program 10 , Project Location s► -e. • 816 5r Mill � 8 180 St ■ "":‘'°.11 l I L s n wias vkw,. ..: , j St 1 111' 1 li.1711t1 N IT. uai r,n or rel Tr.and or 1{ R II 1 + 88081 c i jy f0 qF • 2010 - 2015 Capital Improvement Program 10 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: BNSF Regional Center Access LINE ITEM: 104.01.595. . .58 PROJECT NO. 99510409 DESCRIPTION: Construct a new access to the BNSF Regional Distribution Center. JUSTIFICATION: Relocate the 900+ truck trips /day from residential streets in Allentown, increase efficiency of truck access between BNSF Facility and freeways, freeway traffic and regional freight movement. STATUS: At least two alternatives have been identified, yet no cost estimates have been determined. MAINT. IMPACT: To be identified. COMMENT: This will have a major positive impact on the Allentown neighborhood. Seeking grant funding through FAST Corridor, yet no funding is available at this time. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location , If iti l / Design 133 U7, \ 401 .... ,„:::,,,. l IIIIIIIIk- 133 Land (R /W) 0 Const. Mgmt. 0 Construction 0 TOTAL EXPENSES 133 0 0 0 0 0 0 0 0 133 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 City Oper. Revenue 133 0 0 0 0 0 0 0 0 133 TOTAL SOURCES 133 0 0 0 0 0 0 0 0 133 2010 - 2015 Capital Improvement Program 11 Project Location , If iti l / ti , 0 U7, \ 401 .... ,„:::,,,. l IIIIIIIIk- GIS ° i• I. §e. reff Inenillii 2010 - 2015 Capital Improvement Program 11 2010 - 2015 Capital Improvement Program 12 CIP Page # PROJECT TITLE City of Tukwila CAPITAL IMPROVEMENT PROGRAM for 2010 - 2015 ARTERIAL STREETS 104.02 Fund * *Other After Six 2010 2011 2012 2013 2014 2015 TOTAL Sources Years 14 Southcenter Pkwy (S 180 - S 200 St) 7,176 27,353 0 0 0 0 34,529 34,458 0 15 Tukwila Urban Center Access (Klickitat) * 19,782 0 0 0 0 0 19,782 18,474 0 16 Tukwila Int'I Blvd Phase 11 (116 - 132) 3,637 0 0 0 0 0 3,637 2,648 0 17 Tukwila Intl Blvd Phase III (132 - 138) 3,412 0 0 0 0 0 3,412 2,677 0 18 S 144th St Phase 1 (TIB - Military Rd) 300 0 0 0 0 0 300 0 0 19 S 144th St Phase II (42 Ave S - TIB) 0 68 0 0 0 0 68 68 1,750 20 Annual Overlay and Repair Program 75 1,250 1,250 1,250 1,250 1,250 6,325 0 1,250 21 Annual Traffic Signal Program 100 100 100 105 105 115 625 0 115 22 Tukwila Urban Center - Transit Center 314 1,150 1,150 0 0 0 2,614 1,497 4,300 23 Andover Pk W (Tuk Pkwy - Strander) * 123 1,461 0 0 0 0 1,584 981 0 24 Walk & Roll Plan 12 0 0 0 0 0 12 0 0 25 Transportation Element of Comp Plan 385 0 0 0 0 0 385 0 0 26 Strander Blvd Extension to SW 27 St 1,906 0 0 0 0 0 1,906 2,906 2,500 27 Macadam Rd & S 144 St Intersection * 17 0 0 0 0 0 17 1 610 28 APE /Minkler Blvd Intersection * 0 75 0 0 0 0 75 55 602 29 W Valley Hwy/ S 156 St Intersection * 0 75 0 0 0 0 75 75 1,032 30 APE /Industry Dr Intersection * 75 0 0 0 0 0 75 75 575 31 S 133 St/SR599 Intersection * 0 20 0 0 0 0 20 20 630 32 E Marginal Way (BAR - S 112 St) * 0 50 0 0 0 0 50 50 3,300 33 Interurban Ave S (S 143 - Fort Dent) 41 0 0 0 0 0 41 34 11,100 34 TUC /TOD Pedestrian Improvements 0 0 0 0 0 0 0 0 1,100 35 Minkler Blvd (APW - S/C Pkwy) * 0 0 0 0 0 0 0 0 425 36 Tukwila Int'I Blvd Phase IV * 0 0 0 0 0 0 0 0 4,591 37 Traffic Signal Interconnect Program * 0 0 0 0 0 0 0 0 3,000 38 Southcenter Blvd (1 -5 - 61st Ave Br) 0 0 0 0 0 0 0 0 20,000 39 Tukwila Intl Blvd /S 116th Wy /SR599 0 0 0 0 0 0 0 0 4,675 40 S 168 St (S /C Pkwy - APE) 0 0 0 0 0 0 0 0 23,244 41 West Valley Hwy (1 -405 - Strander Blvd) 0 0 0 0 0 0 0 0 630 42 Rockery Replacement Program 0 0 0 0 0 0 0 0 525 43 Nelsen PI (S 158 St - S 156 St) 0 0 0 0 0 0 0 0 200 44 S 180 St/Andover Pk W Intersection 0 0 0 0 0 0 0 0 210 45 S 143 St (Interurban - Duwamish) 0 0 0 0 0 0 0 0 100 46 S 134 St (S 133 St - 48 Ave S) 0 0 0 0 0 0 0 0 100 47 S 144th St Bridge - Sidewalks 0 0 0 0 0 0 0 0 25 Grand Total 37,355 31,602 2,500 1,355 1,355 1,365 75,532 64,019 86,589 Changes from 2009 to 2010 CIP: New: No new additions. 2010 - 2015 Capital Improvement Program * Traffic Impact Fee List Projects (project must be started within 6 years). ** Denotes other funding sources, grants, or mitigation. 13 01/08/2010 PROJECT: DESCRIPTION: JUSTIFICATION: STATUS: MAINT. IMPACT: COMMENT: CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 Southcenter Pkwy (S 180 St - S 200 St) LINE ITEM: 104.02.595. . .60 PROJECT NO. 98410437 Extend 5 -lane Southcenter Pkwy to 200th St and include curbs, gutters, sidewalks, drainage, and sewer improvements. Southwest access needed for commercial business district (CBD) and development of adjoining area. Design and Right -of -Way to be completed in 2009 with construction scheduled for 2010/2011. Additional street, sewer and surface water maintenance. Federal STP grant of $196k and $150k State AIP for design. State Economic grant of $10m and TIB grant of $5m. Federal (Earmark) grants of $3,550,928. Costs include $3m in sewer improvements. The City is expecting Puget Sound Energy, Highline Water District and La Pianta to pay for a portion of costs. City Bond of $8.25m. FINANCIAL in $000's) Through Estimated 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES .1 Project Location s■■11 15 • Design 782 229 171 1,182 Land (R /W) 4 f ._ 1g4t � 75 *At, It* UpArt 7lm Or 79 Const. Mgmt. .......,•. 2,506 4,103 I' GIS 6,609 Construction 4,424 23,250 27,674 TOTAL EXPENSES 786 229 7,176 27,353 0 0 0 0 0 35,544 FUND SOURCES Awarded Grant 346 300 2,603 15,645 18,894 Bonds 8,250 8,250 Mitigation Actual 12 12 Mitigation Expected 4,502 3,458 7,960 City Oper. Revenue 428 (71) 71 0 0 0 0 0 0 428 TOTAL SOURCES 786 229 7,176 27,353 0 0 0 0 0 35,544 2010 - 2015 Capital Improvement Program 14 .1 Project Location s■■11 15 • I .,east }1 � } ,-,J m Inkier f ._ 1g4t � *At, It* UpArt 7lm Or .10 474 ,Vio ,:rifil' .......,•. I' GIS 2010 - 2015 Capital Improvement Program 14 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Tukwila Urban Center Access (Klickitat -S \C Pkwy) * LINE ITEM: 104.02.595. . .20 PROJECT NO. 98410419 DESCRIPTION: Improve traffic flow on Southcenter Parkway, Klickitat Drive and Strander Boulevard by constructing an underpass for the southbound lane on Southcenter Pkwy. Coordinate with WSDOT on 1 -5 on- ramps. JUSTIFICATION: Provide needed future traffic capacity, safety improvements and reduce accidents. STATUS: Design Report completed in 2005, design in 2006 & 2007, and LID formation in 2009. Proposed Southcenter Pkwy /Klickitat road closure for duration of construction will save a significant amount of costs. MAINT. IMPACT: Overlay on a 10 -20 year cycle. Project is on impact Fee List under Lone 1. Federal design tunas tor $3.2bm. VVesttield Mall mitigation $b /9K cash COMMENT: and $846k ROW, Boeing (Longacres) mitigation is $65k, ACME Bowling $112k. Construction grants; State TIB $5m, Federal STP $3m, and State funds $250k. Local Improvement District (LID) is a range from $6.5 to $10.5 million. FINANCIAL Through Estimated in $000's 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES ‘1111111 Silk ''11 V , Design 3,188 108 555 ITI' Upirpa r.�w.,, or Tr. De 1.07,;‘,...., .: , ,,,,, 3,851 LID Expenses 135 55 260 450 Land (R /W) 858 1,550 2,408 Const. Mgmt. 2,272 2,272 Construction 15,145 15,145 TOTAL EXPENSES 4,181 163 19,782 0 0 0 0 0 0 24,126 FUND SOURCES Awarded Fed Grant 974 3,000 3,974 Earmark (& future) 1,675 123 477 2,275 Awarded State Grant 5,250 5,250 LID 9,747 9,747 ROW Donation 846 846 Mitigation Actual 759 759 Impact Fees 310 25 335 City Oper. Revenue (383) 15 1,308 0 0 0 0 0 0 940 TOTAL SOURCES 4,181 163 19,782 0 0 0 0 0 0 24,126 2010 - 2015 Capital Improvement Program 15 ‘1111111 Silk ''11 V , s- , 1N •- W .Il? ITI' Upirpa r.�w.,, or Tr. De 1.07,;‘,...., .: , ,,,,, •S ! sns .I Y ray 2010 - 2015 Capital Improvement Program 15 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Tukwila Int'I Blvd Phase II (S 116 Wy - S 132 St) LINE ITEM: 104.02.595. . .18 PROJECT NO. 99510433 DESCRIPTION: Upgrade roadway with curbs, gutters, sidewalks, and landscaping. Continuation of improvements to Tukwila International Blvd. Phase II and III are being constructed together. JUSTIFICATION: Pedestrian safety, access control, vehicle accidents, lighting and drainage improvements needed. STATUS: Design report complete; plan, specifications and engineering design began in 2002 with completion in 2008. Construction began in 2009 with completion in 2010. MAINT. IMPACT: Negligible. Design grants are Federal Hwy TEA -21 of $436,000 and State TPP of $630,158. Construction grants include Federal TEA -21 for $3,681,663 and State TIB grant of $3,515,238. Project also includes Surface Water High Flow Bypass with a transfer of $250,000 from the 412 Surface Water Fund. Water District 125 & Valley View Sewer District will pay for their improvements included in project. COMMENT: FINANCIAL Through Estimated in $000's 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design Land (R /W) Const. Mgmt. Construction TOTAL EXPENSES 1,046 43 174 6 1,269 3 512 4,431 4,946 613 3,024 3,637 0 0 0 0 0 0 1,049 43 1,299 7,461 9,852 FUND SOURCES Awarded Fed Grant Awarded TIB Grant Transfer from 412 Utilities Coordin Ags City Oper. Revenue TOTAL SOURCES 522 630 250 27 (160) 1,269 3,349 1,150 40 407 4,946 241 2,365 42 989 3,637 0 0 0 0 0 0 0 0 0 0 0 4,112 4,145 250 109 1,236 9,852 2010 - 2015 Capital Improvement Program 16 Project Location ti,,..., , s ` ' ?; V,N, I. i 0 "1114 ta, 1 Villick 11 11111111> } 2010 - 2015 Capital Improvement Program 16 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Tukwila Int'I Blvd Phase III (S 132 St - S 138 St) DESCRIPTION: International Blvd. Phase II and III are being constructed together. JUSTIFICATION: Pedestrian safety, access control, vehicle accidents, lighting and drainage improvements needed. LINE ITEM: 104.02.595. . .19 PROJECT NO. 99510404 Upgrade roadway with curbs, gutters, sidewalks, and landscaping. Continuation of improvements to Tukwila STATUS: Construction began in 2009 with completion in 2010. MAINT. IMPACT: Negligible. COMMENT: Awarded four Federal STP grants; Regional $2.645 million, King Co $349,559, V King (various agencies) $288,227 & another Regional for $142,835. State WSDOT Nickel Package for $2.848 million. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 535 2 537 Land (R /W) 168 168 Const. Mgmt. 7 336 359 702 Construction 3,634 3,053 6,687 TOTAL EXPENSES 710 3,972 3,412 0 0 0 0 0 0 8,094 FUND SOURCES Awarded Grant 5 2,732 680 3,417 WSDOT Nickel 142 709 1,997 2,848 Mitigation Actual 0 Utilities Coordin Ags 18 18 City Oper. Revenue 545 531 735 0 0 0 0 0 0 1,811 TOTAL SOURCES 710 3,972 3,412 0 0 0 0 0 0 8,094 2010 - 2015 Capital Improvement Program 17 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: S 144 St Phase 1 (Tukwila Intl Blvd - Military Rd) LINE ITEM: 104.02.595. . .03 PROJECT NO. 99510301 DESCRIPTION: Construct curb, gutter, sidewalk, bike lanes, pavement restoration, illumination, drainage and utility undergrounding from Military Road to Tukwila International Blvd. JUSTIFICATION: Provide pedestrian and vehicle safety, drainage and neighborhood revitalization. STATUS: Phase I - Tukwila Int'l Blvd to Military Rd, design and right -of -way finished in 2004 and construction in 2007. Undergrounding costs are budgeted in 2010. See next page for Phase II. MAINT. IMPACT: Reduce pavement, drainage repairs, and maintenance costs. COMMENT: Awarded State Arterial Improvement Program (AIP) Grant for $1,016,000 for construction. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 270 270 Land (R /W) 169 169 Const. Mgmt. 283 283 Construction 2,083 300 2,383 TOTAL EXPENSES 2,805 0 300 0 0 0 0 0 0 3,105 FUND SOURCES Awarded Grant 1,002 1,002 WD 125 Payments 31 31 Mitigation Actual 9 9 Impact Fees 0 City Oper. Revenue 1,763 0 300 0 0 0 0 0 0 2,063 TOTAL SOURCES 2,805 0 300 0 0 0 0 0 0 3,105 2010 - 2015 Capital Improvement Program 18 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: S 144 St Phase II (42 Ave S - Tukwila Intl Blvd) * LINE ITEM: 104.02.595. . .03 PROJECT NO. 99510402 DESCRIPTION: Construct curb, gutter, sidewalk, bike lanes, pavement restoration, illumination, drainage and utility undergrounding from Tukwila Intl Blvd to 42nd Ave S. Also add a signal at 42nd Ave S. JUSTIFICATION: Provide pedestrian and vehicle safety, drainage and neighborhood revitalization. STATUS: Phase I - Tukwila Intl Blvd to Military Rd, construction completed in 2007, see preceding page. Phase II - 42 Ave S to Tukwila International Blvd. MAINT. IMPACT: Reduce pavement, drainage repairs, and maintenance costs. COMMENT: Proposed Transportation Improvement Board's Arterial Improvement Program (AIP) grant of $1 million. Project is on Impact Fee list. Design and construction related to the Tukwila Village project. FINANCIAL Through Estimated in $000's 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 68 230 298 Land (R /W) 40 40 Const. Mgmt. 180 180 Construction 1,300 1,300 TOTAL EXPENSES 0 0 0 68 0 0 0 0 1,750 1,818 FUND SOURCES Awarded Grant 0 Proposed Grant 1,000 1,000 Mitigation Actual 0 Impact Fees 63 20 68 151 City Oper. Revenue (63) (20) 0 0 0 0 0 0 750 667 TOTAL SOURCES 0 0 0 68 0 0 0 0 1,750 1,818 2010 - 2015 Capital Improvement Program 19 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Annual Overlay and Repair Program LINE ITEM: 104.02.595. . .85 PROJECT NO. Varies DESCRIPTION: Select, design and construct asphalt and concrete pavement overlays of arterial and residential streets. JUSTIFICATION: minimize costs. Some individual sites may be coordinated with water, sewer and surface water projects. STATUS: 2009/2010 combined into one program and completed in 2009. MAINT. IMPACT: Reduces annual maintenance. COMMENT: Ongoing project. Only one year actuals shown in first column. Preserve and maintain the street structure in a safe and useable state by resurfacing before failure, to FINANCIAL Through Estimated in $000's 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 100 144 75 100 100 100 100 100 100 919 Land (R /W) 0 Const. Mgmt. 36 236 150 150 150 150 150 150 1,172 Construction 722 1,930 1,000 1,000 1,000 1,000 1,000 1,000 8,652 TOTAL EXPENSES 858 2,310 75 1,250 1,250 1,250 1,250 1,250 1,250 10,743 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 376 376 Impact Fees 0 City Oper. Revenue 482 2,310 75 1,250 1,250 1,250 1,250 1,250 1,250 10,367 TOTAL SOURCES 858 2,310 75 1,250 1,250 1,250 1,250 1,250 1,250 10,743 2010 - 2015 Capital Improvement Program 20 CITY OF TUKWILA CAPITAL PROJECT SUMMARY PROJECT: Annual Traffic Signal Program DESCRIPTION: JUSTIFICATION: STATUS: MAINT. IMPACT: 2010 to 2015 LINE ITEM: 104.02.595. . .31 PROJECT NO. 98910409 Design and construct traffic signal upgrades and repairs of signals that exceed routine maintenance work; loop replacement; head replacement and controllers. Replace direct bury cable for existing lighting system. City is adding traffic signals to inventory every year. New traffic control center will warrant an additional staff person to be fully operational. LEDs are on a 4 to 5 year replacement cycle. Work includes adding additional signal heads, luminaires, loop repairs, and controller upgrades. Reduces maintenance costs. Preventative maintenance on every traffic signal is required to be completed quarterly. COMMENT: Ongoing project, only one year actuals shown in first column. FINANCIAL Through Estimated in $000's 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 0 Land (R/W) 0 Const. Mgmt. 0 Construction 98 100 100 100 100 105 105 115 115 938 TOTAL EXPENSES 98 100 100 100 100 105 105 115 115 938 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Impact Fees 0 City Oper. Revenue 98 100 100 100 100 105 105 115 115 938 TOTAL SOURCES 98 100 100 100 100 105 105 115 115 938 Project Location: Entire System 2010 - 2015 Capital Improvement Program 21 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Tukwila Urban Center - Transit Center LINE ITEM: 104.02.595. . .22 PROJECT NO. 90610402 DESCRIPTION: Design and construct a transit center for the Tukwila Urban Center (TUC). High transit ridership and bus operations warrant conversion of the existing bus stops on Andover Park West JUSTIFICATION: to a transit center. The current facilities are inadequate in size and location to serve Metro operations and transit riders. City policy encourages the use of transit, and mitigation dollars and parking supply decisions have been made based upon the expected improvements to the transit center. STATUS: Design began in 2006. Construction dependent on funding. The west side of Andover Park West is scheduled to coincide with the Transit Center and the east side of Andover Park West is in the beyond years. MAINT. IMPACT: Minimal to moderate, depends on final maintenance agreement with King County Metro. COMMENT: TOD grant of $577,651.00. Mitigation from Westfield S/C Mall of $500,000 for parking variance. Proposed state and federal grants of $4.6m. FINANCIAL Through Estimated in $000's 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location B " ` � Ikek illik low s,so:t Design 182 82 314 N �— W �, �.N. E TIL N 0 i uprna o> nnrdr. . ,-...... 4,4 / "4 0 di ii 578 Land (R /W) _�.. L. m 1,000 1,000 Const. Mgmt. 150 150 300 600 Construction 1,000 1,000 3,000 5,000 TOTAL EXPENSES 182 82 314 1,150 1,150 0 0 0 4,300 7,178 FUND SOURCES Awarded Grant 577 577 Proposed Grant 920 3,700 4,620 Mitigation Actual 500 500 Impact Fees 0 City Oper. Revenue (318) 82 314 573 230 0 0 0 600 1,481 TOTAL SOURCES 182 82 314 1,150 1,150 0 0 0 4,300 7,178 2010 - 2015 Capital Improvement Program 22 Project Location B " ` � Ikek illik low s,so:t �1 s I N �— W �, �.N. E TIL N 0 i uprna o> nnrdr. . ,-...... 4,4 / "4 0 di ii S sieos� _�.. L. m 2010 - 2015 Capital Improvement Program 22 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Andover Park West (Tukwila Pkwy - Strander Blvd) * LINE ITEM: 104.02.595. . .47 PROJECT NO. 98810404 DESCRIPTION: Study and implement revised channelization. JUSTIFICATION: Revising left turn lanes will reduce accidents and lessen congestion. STATUS: Major portion of Andover Park W at intersections are complete. Next phase is to revise turn lanes along length of project. To be coordinated with the development of the Tukwila Urban Center Transit Center. MAINT. IMPACT: Negligible. COMMENT: Project is on impact fee list and goal is to begin project by 2011. Design report completed in 1991 updated in 2009. ACME Bowling mitigation of $111k and Westfield Mall of $205k in 2007. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES [� ,/� ,/� /� "� 1111 Alt II 11111 a le St Ill' Design 4 73 123 rr W +R /.. ucrr+e or. 200 Land (R /W) % b to 656 a $ 4� Ea I 656 Const. Mgmt. 105 105 Construction 700 700 TOTAL EXPENSES 4 73 123 1,461 0 0 0 0 0 1,661 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 316 316 Impact Fees 981 981 City Oper. Revenue (312) 73 123 480 0 0 0 0 0 364 TOTAL SOURCES 4 73 123 1,461 0 0 0 0 0 1,661 2010 - 2015 Capital Improvement Program 23 [� ,/� ,/� /� "� 1111 Alt II 11111 a le St Ill' rr W +R /.. ucrr+e or. % b to a a $ 4� Ea I 2010 - 2015 Capital Improvement Program 23 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Walk & Roll Plan (Nonmotorized Transportation Plan) LINE ITEM: 104.02.595. . .32 PROJECT NO. 90710404 DESCRIPTION: Select, design, and construct non - motorized projects including bike lanes, sidewalks, and trails. JUSTIFICATION: Enhance bicycle, pedestrian, and vehicle safety, provide missing link connections to the City and the region's non - motorized transportation network and encourage use of walking and biking as an alternative. Walk & Roll Plan was adopted in 2009. A Design Report for sidewalks and bicycle routes started in 2009. Bike STATUS: lanes were added to S 112th St and E Marginal Wy S as part of the 2009/2010 Overlay & Repair Program and school zone flashing beacon signs were installed on S 135th St. MAINT. IMPACT: Striping will have to be maintained. COMMENT: Ongoing program, funding available as street improvement projects, new development and /or as other opportunities arise. Next update is scheduled in 2015. FINANCIAL Through Estimated in $000's 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 50 12 62 Land (R /W) 0 Const. Mgmt. 28 28 Construction 70 70 TOTAL EXPENSES 0 148 12 0 0 0 0 0 0 160 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Impact Fees 0 City Oper. Revenue 0 148 12 0 0 0 0 0 0 160 TOTAL SOURCES 0 148 12 0 0 0 0 0 0 160 VA ' UMW ....41= a , ' : -4 1 'V' '.ttf� mm.:1I.s it O'S,�. r. Pk . lip it .. ,i ll -m mil 2010 - 2015 Capital Improvement Program 24 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Transportation Element of Comprehensive Plan DESCRIPTION: JUSTIFICATION: STATUS: MAINT. IMPACT: COMMENT: LINE ITEM: 104.02.595. .10 PROJECT NO. 90810406 Update Transportation Element of the Comprehensive Plan to include updated traffic model and street network plan. Growth Management Act transportation concurrency and traffic impact mitigations need updated traffic and capital planning. Adoption by 2011 required by Community Trade and Economic Development (CTED). Transportation Element will be coordinated with updates to Comprehensive Plan by the Department of Community Development. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 15 385 400 Land (R /W) 0 Const. Mgmt. 0 Construction 0 TOTAL EXPENSES 0 15 385 0 0 0 0 0 0 400 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Impact Fees 0 City Oper. Revenue 0 15 385 0 0 0 0 0 0 400 TOTAL SOURCES 0 15 385 0 0 0 0 0 0 400 2010 - 2015 Capital Improvement Program 25 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Strander Blvd Extension to SW 27 St (Oaksdale) LINE ITEM: 104.02.595. . .57 PROJECT NO. 98610403 DESCRIPTION: Renton to design and construct arterial improvements for a new roadway extending Strander Blvd from West Valley Highway to SW 27th St. JUSTIFICATION: East /west capacity between 1 -405 and S 180 St is needed to serve Tukwila and Renton access. McLeod land was purchased by the City of Tukwila in 2002. Tukwila's share of project costs is listed below and STATUS: will be bonded. Renton was not successful in obtaining UPRR approval to relocate tracks, so additional work will be done to study Strander overpass vs. underpass or Longacres Way connection to SW 27th St. MAINT. IMPACT: New street. Project partners include the City of Renton, Boeing, WSDOT, Sound Transit, Metro, Amtrak, and BNSF COMMENT: and UP Railroads. Tukwila's project share includes McLeod land for wetland mitigation and storm mitigation site related to the S 180th St Grade Separation project (completed by Tukwila in 2004). FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location a< ■ ,va 2 -- ►`d • `1 �� Design 27 1 A. i N f. upi C. m.n De 28 Land (R /W) 104 S 11100 104 Const. Mgmt. 0 Tukwila's Share 1,000 1,906 2,500 5,406 TOTAL EXPENSES 131 1,001 1,906 0 0 0 0 0 2,500 5,538 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Bond 2,906 2,500 5,406 Impact Fees 0 City Oper. Revenue 131 1,001 (1,000) 0 0 0 0 0 0 132 TOTAL SOURCES 131 1,001 1,906 0 0 0 0 0 2,500 5,538 2010 - 2015 Capital Improvement Program 26 Project Location a< ■ ,va 2 -- ►`d • `1 �� A. i N f. upi C. m.n De r l f If S 11100 2010 - 2015 Capital Improvement Program 26 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Macadam Rd & S 144th St Intersection Improvements * LINE ITEM: 104.02.595. . .36 PROJECT NO. 90610405 DESCRIPTION: Design and construct intersection improvements on Macadam Road (east of 1 -5). In order to meet the Council adopted concurrency standard, this intersection needs additional capacity JUSTIFICATION: to accommodate expected growth. Improvements to be studied include potential signalization or channelization modifications. STATUS: Project was added in 2007, name changed from Left Turn Pocket to Intersection Improvements in 2008. MAINT. IMPACT: Minimal to moderate, depends on the final improvement selected.. COMMENT: Project is on the impact fee list for design and goal is to start project by 2011. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 17 90 107 Land (R /W) 90 90 Const. Mgmt. 60 60 Construction 370 370 TOTAL EXPENSES 0 0 17 0 0 0 0 0 610 627 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Impact Fees 16 1 17 City Oper. Revenue (16) 0 16 0 0 0 0 0 610 610 TOTAL SOURCES 0 0 17 0 0 0 0 0 610 627 2010 - 2015 Capital Improvement Program 27 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Andover Park E /Minkler Blvd Intersection * LINE ITEM: 104.02.595. . .35 PROJECT NO. 90310405 DESCRIPTION: Design and construct left turn lanes on Andover Park East and reconstruct traffic signal. JUSTIFICATION: Improve safety and provide needed capacity. STATUS: Design Report will identify costs. MAINT. IMPACT: Annual signal re- tamping and routine operations. COMMENT: Project is on impact fee list and goal is to start project by 2011. FINANCIAL Through Estimated in $000's 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location S'Illls �ag 1). I `'� 31805[ Design I 5 Inklar � BhM ;r a� i 75 '''' h . A upland or Mldientl .r Trilarrff Dr 75 Land (R /W) 1 816081 f 0 • GIS 23 23 Const. Mgmt. 67 67 Construction 512 512 TOTAL EXPENSES 0 0 0 75 0 0 0 0 602 677 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 20 20 Impact Fees 55 55 City Oper. Revenue (20) 0 0 20 0 0 0 0 602 602 TOTAL SOURCES 0 0 0 75 0 0 0 0 602 677 2010 - 2015 Capital Improvement Program 28 Project Location S'Illls �ag 1). I `'� 31805[ __ ... I 5 Inklar � BhM ;r a� i '''' h . A upland or Mldientl .r Trilarrff Dr �� ^Vfffala,.. 4P3 'XI ill; Cd 1 816081 f 0 • GIS 2010 - 2015 Capital Improvement Program 28 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: West Valley Hwy /S 156 St Intersection * LINE ITEM: 104.02.595. . .43 PROJECT NO. 99310410 DESCRIPTION: Design and construct safety and capacity improvements at intersection; add northbound left turn lane for HOV and transit. JUSTIFICATION: Vehicle and pedestrian safety and capacity improvement needed. STATUS: Will submit grant application to Puget Sound Regional Council when funding available. MAINT. IMPACT: Primarily state; minimal change. COMMENT: Project is on impact fee list and goal is to start project by 2011. Developer contributions and proposed federal PSRC grant of $440,000. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES ( Project Location ' �i ,;_lii_wio °- MI 89 -4 I it S � Design 75 � e 50 125 Land (R /W) y ^r pp 0 Const. Mgmt. 102 102 Construction 880 880 TOTAL EXPENSES 0 0 0 75 0 0 0 0 1,032 1,107 FUND SOURCES Awarded Grant 0 Proposed Grant 440 440 Mitigation Actual 0 Impact Fees 75 75 City Oper. Revenue 0 0 0 0 0 0 0 0 592 592 TOTAL SOURCES 0 0 0 75 0 0 0 0 1,032 1,107 2010 - 2015 Capital Improvement Program 29 ( Project Location ' �i ,;_lii_wio °- MI 89 -4 I it S � � e r y ^r pp ri yyar GI 2010 - 2015 Capital Improvement Program 29 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Andover Park East /Industry Dr Intersection * LINE ITEM: 104.02.595. . .99 PROJECT NO. 99110405 DESCRIPTION: Design and construct traffic signal with Andover Park East left turn lanes and crosswalks. JUSTIFICATION: Signal control and left turn lanes will improve safety and provide needed capacity. STATUS: Commercial Business District (CBD) sidewalk, widening, north to south left turn lanes, and railroad signal completed in 1996. MAINT. IMPACT: Annual signal re- tamping and routine operations. COMMENT: Project is on impact fee list and goal is to start project by 2011. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES } Project Location 'a'S'.n661 -70- _, °-4 �•- II) 111.1:1 IlitEI ilk 6 16 St �4 I w,m :, ■ - Inkier 86,3 Design N �- Al "IX upl.ne Or Mid on TAand 6r 75 rill yr ! ❑ i +1 , ► 015 75 Land (R /W) 0 Const. Mgmt. 75 75 Construction 500 500 TOTAL EXPENSES 0 0 75 0 0 0 0 0 575 650 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Impact Fees 75 75 City Oper. Revenue 0 0 0 0 0 0 0 0 575 575 TOTAL SOURCES 0 0 75 0 0 0 0 0 575 650 2010 - 2015 Capital Improvement Program 30 } Project Location 'a'S'.n661 -70- _, °-4 �•- II) 111.1:1 IlitEI ilk 6 16 St �4 I w,m :, ■ - Inkier 86,3 N �- Al "IX upl.ne Or Mid on TAand 6r rill yr ! ❑ i +1 , ► 015 2010 - 2015 Capital Improvement Program 30 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: S 133 St/SR599 Southbound Intersection * LINE ITEM: 104.02.595. . PROJECT NO. 99510405 DESCRIPTION: Design and construct intersection improvements including signalization, lighting, crosswalks and drainage. JUSTIFICATION: Traffic is increasing, improvements will provide increased safety and capacity. STATUS: Traffic Study and design report will identify costs. WSDOT approvals are needed within limited access as well as coordination with the Interurban signals. MAINT. IMPACT: Annual signal lamping and routine operations. COMMENT: Proposed Federal TEA -21 grant of $460,000. Project is on impact fee list and goal is to start project by 2011. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES } Project Location -ti NIL ®Il�� ■a �Jr � y� rf 4 Rf r: sv�♦ Design nall 20 b At. 60 80 Land (R /W) 1M ...igille s,�st ., � I .. 0 0 Const. Mgmt. ,� am k ,,,,,. ' 4 allitiiiiiit 11 - A- iek4 .08, 60 60 Construction 510 510 TOTAL EXPENSES 0 0 0 20 0 0 0 0 630 650 FUND SOURCES Awarded Grant 0 Proposed Grant 460 460 Mitigation Actual 0 Impact Fees 14 4 20 38 City Oper. Revenue (14) (4) 0 0 0 0 0 0 170 152 TOTAL SOURCES 0 0 0 20 0 0 0 0 630 650 2010 - 2015 Capital Improvement Program 31 } Project Location -ti NIL ®Il�� ■a �Jr � y� rf 4 Rf r: sv�♦ nall IP NI il b At. ;�IF 1 4 01 1M ...igille s,�st ., � I .. 0 NA, \ $'7 ss s. ,� am k ,,,,,. ' 4 allitiiiiiit 11 - A- iek4 .08, 2010 - 2015 Capital Improvement Program 31 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: E Marginal Way (BAR - S 112 St) * LINE ITEM: 104.02.595. . .29 PROJECT NO. 98910405 DESCRIPTION: Design and construct curb, gutter, drainage, lighting, turn lanes, and traffic control. JUSTIFICATION: Safety, capacity, and drainage items needed to serve this area of increasing vehicle and pedestrian traffic. STATUS: Design report needed. Project will include improvements in conjunction with the proposed Sound Transit Light Rail. MAINT. IMPACT: Reduction in maintenance. COMMENT: Project is on impact fee list for only the design costs to start in 2011. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES CDProject Location S a I N 1 ii e . ' ' :AI VI; 'Jr 1ii Design likak,....., tit, T • It. ..." k* 50 ti i .. ' • _y. 11111111►: 'his ,. `s. 170 220 Land (R /W) l GIS 50 _ 700 700 Const. Mgmt. 280 280 Construction 2,150 2,150 TOTAL EXPENSES 0 0 0 50 0 0 0 0 3,300 3,350 FUND SOURCES Awarded Grant 0 Proposed Grant 1,300 1,300 Mitigation Actual 0 Impact Fees 7 50 990 1,047 City Oper. Revenue (7) 0 0 0 0 0 0 0 1,010 1,003 TOTAL SOURCES 0 0 0 50 0 0 0 0 3,300 3,350 2010 - 2015 Capital Improvement Program 32 CDProject Location S a I N 1 ii e . ' ' :AI VI; 'Jr 1ii i. U/L_ likak,....., tit, T • It. ..." k* ti i .. ' • _y. 11111111►: 'his ,. `s. l GIS 50 _ 2010 - 2015 Capital Improvement Program 32 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Interurban Ave S (S 143 St - Fort Dent Way) LINE ITEM: 104.02.595. . .14 PROJECT NO. 90310402 DESCRIPTION: Design and construct sidewalks, pavement restoration, drainage and lighting. JUSTIFICATION: Pedestrian traffic is forced to walk in traveled way, lighting is substandard, drainage is poor and pavement failure is accelerating. STATUS: Design to be completed in 2010. Federal STP construction grant submitted in 2009 was unsuccessful and State TIB did not issue a call for projects in 2009. MAINT. IMPACT: Reduce annual pavement repairs and increase pedestrian safety. COMMENT: Federal Hwy STP Grant of $389,000 for design only. Proposed grants are Federal and State TIB. FINANCIAL Through Estimated in $000's 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 370 40 41 250 701 Land (R /W) 150 150 Const. Mgmt. 1,300 1,300 Construction 9,400 9,400 TOTAL EXPENSES 370 40 41 0 0 0 0 0 11,100 11,551 FUND SOURCES Awarded Grant 320 35 34 389 Proposed Grant 5,000 5,000 Mitigation Actual 0 Impact Fees 0 City Oper. Revenue 50 5 7 0 0 0 0 0 6,100 6,162 TOTAL SOURCES 370 40 41 0 0 0 0 0 11,100 11,551 2010 - 2015 Capital Improvement Program 33 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: TUC/TOD Pedestrian Improvements LINE ITEM: 104.02.595. . PROJECT NO. 90710405 DESCRIPTION: Construct bike /pedestrian connection between the Tukwila Urban Center (TUC) and the Tukwila Station at the Sounder Commuter Rail Station /Transit Oriented Development (TOD) area. Connecting the TUC to the Tukwila Station is needed to increase pedestrian mobility, improve access, and support JUSTIFICATION: more urban levels of development within walking distance of the Tukwila Station. The connection involves a pedestrian path extending from Baker Blvd via the planned TUC Ped Bridge and a pedestrian tunnel under the UPRR track embankment. Additional phases will extend the corridor to the mall. STATUS: See Tukwila Urban Center - Pedestrian /Bicycle Bridge on page 10. MAINT. IMPACT: COMMENT: Applying for $3 million in Regional Mobility Grant funds in 2010 for the pedestrian tunnel. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 300 300 Land (R /W) 100 100 Const. Mgmt. 0 Construction 700 700 TOTAL EXPENSES 0 0 0 0 0 0 0 0 1,100 1,100 FUND SOURCES Awarded Grant 0 Proposed Grant 500 500 Mitigation Actual 0 Impact Fees 0 City Oper. Revenue 0 0 0 0 0 0 0 0 600 600 TOTAL SOURCES 0 0 0 0 0 0 0 0 1,100 1,100 2010 - 2015 Capital Improvement Program 34 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Minkler Blvd (Andover Park W - Southcenter Pkwy) LINE ITEM: 104.02.595. . .72 PROJECT NO. 98410407 Widen Minkler Blvd from Andover Park West to Southcenter Parkway. Add third lane and curb, gutter, and sidewalk on the south side. DESCRIPTION: JUSTIFICATION: Accommodate anticipated future development frontal improvements to complete three lane street section. Completed construction of "half street" and opened road to Southcenter Pkwy with two lanes and sidewalks STATUS: on one side with water, sewer and drainage improvements in 1995. North side of Minkler completed by Southcenter Square frontage improvements in 2008. MAINT. IMPACT: Minor addition for maintenance. COMMENT: Project is on impact fee list only for the work already completed by the City. Remaining improvements on south side of Minkler are anticipated to occur with future redevelopment. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location ``��'�"1`- 5166 er \� * ` L 7.-- -, i. Ilk I 8 18081 ��� / Pkwy ' ; Design 460 11).... - 35 495 Land (R /W) 27 618015 L GIS 27 Const. Mgmt. 40 40 Construction 732 350 1,082 TOTAL EXPENSES 1,219 0 0 0 0 0 0 0 425 1,644 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 425 425 City Oper. Revenue 1,219 0 0 0 0 0 0 0 0 1,219 TOTAL SOURCES 1,219 0 0 0 0 0 0 0 425 1,644 2010 - 2015 Capital Improvement Program 35 Project Location ``��'�"1`- 5166 er \� * ` L 7.-- -, i. Ilk I 8 18081 ��� / Pkwy ' ; ■ 11).... - Art WA fel 618015 L GIS 2010 - 2015 Capital Improvement Program 35 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Tukwila Intl Blvd (Boeing Access Rd - S 116 Wy) Phase IV * LINE ITEM: 104.02.595. . .48 PROJECT NO. 99010405 DESCRIPTION: Design and construct curb, gutter, sidewalk, drainage, and street lighting improvements. JUSTIFICATION: Pedestrian sidewalks and lighting will improve safety; widening needed for capacity. STATUS: Design report was completed in 1994 and will need to be updated. MAINT. IMPACT: Negligible. COMMENT: Project is on impact fee list. Proposed State Transportation Improvement Board grant for $3.5m. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES 0 Project Location � r 1 TI • �- w Ai _ 7 rj Design 83 t ti oll \ ÷ St,..,,,k., 444 Q / _ t :r4, s 11111111 ►r„ \' 271 354 Land (R /W) 0 Const. Mgmt. 370 370 Construction 3,950 3,950 TOTAL EXPENSES 83 0 0 0 0 0 0 0 4,591 4,674 FUND SOURCES Awarded Grant 0 Proposed Grant 3,500 3,500 Mitigation Actual 0 Impact Fees 216 216 City Oper. Revenue 83 0 0 0 0 0 0 0 875 958 TOTAL SOURCES 83 0 0 0 0 0 0 0 4,591 4,674 2010 - 2015 Capital Improvement Program 36 0 Project Location � r 1 TI • �- w Ai _ 7 rj ' (1' 4 t ti oll \ ÷ St,..,,,k., 444 Q / _ t :r4, s 11111111 ►r„ \' LI WRIT St . 2010 - 2015 Capital Improvement Program 36 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Traffic Signal Interconnect Program * LINE ITEM: 104.02.595. . .01 PROJECT NO. 98810402 Design and construct hard wire interconnect to coordinate and operate traffic signals using a signal master and cameras at intersections that provide remote operations. Also construct a Traffic Operations Center. DESCRIPTION: JUSTIFICATION: STATUS: MAINT. IMPACT: COMMENT: Interconnecting the 31 commercial business district (CBD) signals provide coordination and traffic progression. System will enhance traffic flow during peak hours and emergency situations. Commercial Business District (CBD) was completed in 2007 along with the Traffic Operations Center (TOC). Future phases to include Tukwila Int'I Blvd, Interurban Ave S, E Marginal Way, and residential areas. TOC will require an additional staff person and approximately $35,000 for annual operations and maintenance budget. Signal timing maintenance will be reduced. Future grants will be pursued and project is on impact fee list. FINANCIAL Through Estimated in $000's 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES -- Prof+ect Location iwp. - '�$,a.S, i,l 110.--- � ' N \ 7 Ni tili AlltPilijSr I ' i Design 261 pi �N � �a�ne n. Thin. Cr COrtrirliSiffillA ,r „G 300 561 Land (R /W) � w .. j rV4 0 Const. Mgmt. 484 300 784 Construction 1,778 2,400 4,178 TOTAL EXPENSES 2,523 0 0 0 0 0 0 0 3,000 5,523 FUND SOURCES Awarded Grant 1,379 1,379 Proposed Grant 1,200 1,200 Mitigation Actual 0 Impact Fees 0 City Oper. Revenue 1,144 0 0 0 0 0 0 0 1,800 2,944 TOTAL SOURCES 2,523 0 0 0 0 0 0 0 3,000 5,523 2010 - 2015 Capital Improvement Program 37 -- Prof+ect Location iwp. - '�$,a.S, i,l 110.--- � ' N \ 7 Ni tili AlltPilijSr I ' i pi �N � �a�ne n. Thin. Cr COrtrirliSiffillA ,r „G � w .. j rV4 2010 - 2015 Capital Improvement Program 37 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Southcenter Blvd Widening (1 -5 - 61 Ave S Bridge) LINE ITEM: 104.02.595. . PROJECT NO. 90410406 DESCRIPTION: Design and construct additional traffic lanes on Southcenter Blvd from 1 -5 to the 61st Ave S Bridge. JUSTIFICATION: Improve safety and provide needed capacity. STATUS: MAINT. IMPACT: Negligible. COMMENT: Transportation Model and Tukwila Urban Center subarea plan indicate this as a high priority project to accommodate growth in the area. In conjunction with and dependent on the future 1 -405 Widening Project. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location :' rent/ m-- 1 N 111,E E PA Design ZU ILI IREIPIPIII WPM um ar 1,700 1,700 Land (R /W) ' nr INIE 111110 1,400 1,400 Const. Mgmt. P 1 + i 8158 St '�� ' i {.ate +.. �� AN 8 i80 $t OfibmiiiiiiT 4r- 1,700 1,700 Construction 15,200 15,200 TOTAL EXPENSES 0 0 0 0 0 0 0 0 20,000 20,000 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Impact Fees 0 City Oper. Revenue 0 0 0 0 0 0 0 0 20,000 20,000 TOTAL SOURCES 0 0 0 0 0 0 0 0 20,000 20,000 2010 - 2015 Capital Improvement Program 38 Project Location :' rent/ m-- 1 N 111,E E PA ZU ILI IREIPIPIII WPM um ar ' nr INIE 111110 P 1 + i 8158 St '�� ' i {.ate +.. �� AN 8 i80 $t OfibmiiiiiiT 4r- 2010 - 2015 Capital Improvement Program 38 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Tukwila Intl Blvd /S 116th Wy /SR599 On -ramp DESCRIPTION: southbound left turn lane and no pedestrian signalization. JUSTIFICATION: Southbound left turn queue has extended to and beyond S 112th Street. LINE ITEM: 104.02.595. . PROJECT NO. 99210421 Provide dual southbound left turn lanes, pedestrian signalization and lighting. Currently there is a single STATUS: Developer funding obligated. Pursue both Federal ISTEA and State TIB grants. MAINT. IMPACT: Negligible. COMMENT: Will continue to monitor and reassess need. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location 0 \ . . Boo _;(lose Jay.. , ef Y Mt; ,re; NI p, Ala 4 Design ®,i \\,.- -- -____Jiai ..k,,, te , 1 Qiillh % $uimm C \� 450 450 Land (R /W) 0 Const. Mgmt. 800 800 Construction 3,425 3,425 TOTAL EXPENSES 0 0 0 0 0 0 0 0 4,675 4,675 FUND SOURCES Awarded Grant 0 Proposed Grant 1,900 1,900 Mitigation Actual 0 Impact Fees 0 City Oper. Revenue 0 0 0 0 0 0 0 0 2,775 2,775 TOTAL SOURCES 0 0 0 0 0 0 0 0 4,675 4,675 2010 - 2015 Capital Improvement Program 39 Project Location 0 \ . . Boo _;(lose Jay.. , ef Y Mt; ,re; NI p, Ala 4 ®,i \\,.- -- -____Jiai ..k,,, te , 1 Qiillh % $uimm C \� 2010 - 2015 Capital Improvement Program 39 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: S 168 St (Southcenter Pkwy - Andover Park E) LINE ITEM: 104.02.595. . .49 PROJECT NO. 98410408 DESCRIPTION: Design and construct street providing additional east /west vehicle and pedestrian capacity. JUSTIFICATION: East /west capacity is limited. The warehouses are converting to retail and other development increasing the need for additional east /west capacity. STATUS: Update the project design identifying alternatives and costs in conjunction with Tukwila Urban Center Master Plan. Alignment for road is currently between Macy's Warehouse and Tukwila Pond. MAINT. IMPACT: Overlay on a 10 to 20 year cycle. An alternate alignment could be the extension of Wig Blvd. Proposed development may contribute right -of -way (shown as Mitigation Expected). The Transportation Model and the Tukwila Urban Center Subarea Plan indicate this as a high priority project to accommodate growth in the area. Project could be funded through mitigation fees, grants, and possible LID or other bond source. COMMENT: FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location ��r - ....... - , 0, t $. 1114 �•f Design i - ,Ii.. Or 1,372 1,372 Land (R /W) ag 7,500 7,500 Const. Mgmt. 1,372 1,372 Construction 13,000 13,000 TOTAL EXPENSES 0 0 0 0 0 0 0 0 23,244 23,244 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Impact Fees 5,300 5,300 City Oper. Revenue 0 0 0 0 0 0 0 0 17,944 17,944 TOTAL SOURCES 0 0 0 0 0 0 0 0 23,244 23,244 2010 - 2015 Capital Improvement Program 40 Project Location ��r - ....... - , 0, t $. 1114 �•f i - ,Ii.. Or ag 2010 - 2015 Capital Improvement Program 40 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: West Valley Hwy (1 -405 - Strander Blvd) LINE ITEM: 104.02.595. . .08 PROJECT NO. 98410431 DESCRIPTION: Design and construct completion of 7 lane sections of West Valley Hwy with curbs, gutters, storm drainage, lighting and traffic control. JUSTIFICATION: Portions have been completed by development. Safety and capacity items need completion. STATUS: Continuing work with development. MAINT. IMPACT: Reduction of maintenance. COMMENT: FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES ,, Project Location �� 9 15q Bi �!I _. a, yT TtAwlia . F Design � mwera�«d x ;gyp ka h ri f UpPand 1:31' Mimeo rimnd or 60 60 Land (R /W) S. stlasi GS 0 Const. Mgmt. 70 70 Construction 500 500 TOTAL EXPENSES 0 0 0 0 0 0 0 0 630 630 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Impact Fees 530 530 City Oper. Revenue 0 0 0 0 0 0 0 0 100 100 TOTAL SOURCES 0 0 0 0 0 0 0 0 630 630 2010 - 2015 Capital Improvement Program 41 ,, Project Location �� 9 15q Bi �!I _. a, yT TtAwlia . F l � mwera�«d x ;gyp ka h ri f UpPand 1:31' Mimeo rimnd or pp ! - �• S. stlasi GS 2010 - 2015 Capital Improvement Program 41 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Rockery Replacement Program LINE ITEM: 104.02.595. . .06 PROJECT NO. 99410413 DESCRIPTION: Prepare and construct rockery repairs and replacements. JUSTIFICATION: Correct for liability and safety issues of falling rockeries. STATUS: Design memorandum with alternatives for S 144th St (56 to 58th Ave S) completed in 1997. MAINT. IMPACT: Reduce maintenance. COMMENT: Street department assesses status of rockeries citywide on their normal rounds. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES ct Proje Location: OeSYstern 9 -5 R -5 sia' o- ,. - 5'� t Design 91 42 133 Land (R /W) 0 Const. Mgmt. 58 58 Construction 38 425 463 TOTAL EXPENSES 129 0 0 0 0 0 0 0 525 654 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Impact Fees 0 City Oper. Revenue 129 0 0 0 0 0 0 0 525 654 TOTAL SOURCES 129 0 0 0 0 0 0 0 525 654 2010 - 2015 Capital Improvement Program 42 ct Proje Location: OeSYstern 9 -5 R -5 sia' o- ,. - 5'� t 1 Eig 2010 - 2015 Capital Improvement Program 42 CITY OF TUKWILA CAPITAL PROJECT SUMMARY PROJECT: Nelsen PI (S 158 St - S 156 St) DESCRIPTION: JUSTIFICATION: STATUS: MAINT. IMPACT: COMMENT: 2010 to 2015 LINE ITEM: 104.02.595. . .80 PROJECT NO. 98410413 Design and construct to eliminate flooding, provide sidewalks, trail access, lighting, pavement restoration and access. Flooding reduces to one lane, no sidewalks, pavement is failing due to drainage. Project provides safety during rains. Preliminary survey made; design report needed. Reduce pavement and drainage work. Project will be dependent on the Sounder Rail Commuter Station at Longacres and Transit Oriented Development (TOD). FINANCIAL Through Estimated in $000's 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location — - nik.. 5'The SC a\ � 71 � , -1-4,- • y r • g r 11.11 Nii Design $ lij lik 1 iN -97V i uvrene w mma Dr 20 20 Land (R /W) $ 1 Shea Sr ,f " t + __ GIS 0 Const. Mgmt. 25 25 Construction 155 155 TOTAL EXPENSES 0 0 0 0 0 0 0 0 200 200 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Impact Fees 0 City Oper. Revenue 0 0 0 0 0 0 0 0 200 200 TOTAL SOURCES 0 0 0 0 0 0 0 0 200 200 2010 - 2015 Capital Improvement Program 43 Project Location — - nik.. 5'The SC a\ � 71 � , -1-4,- • y r • g r 11.11 Nii - +, $ lij lik 1 iN -97V i uvrene w mma Dr Wm"; :•00: 0 $ 1 Shea Sr ,f " t + __ GIS 2010 - 2015 Capital Improvement Program 43 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: S 180 St /Andover Pk W Intersection LINE ITEM: 104.02.595. . PROJECT NO. 98410424 DESCRIPTION: Widen for north /south left turn lanes. JUSTIFICATION: Increase capacity and safety. Signal phasing was split so north /south traffic was separated for safety. STATUS: Design report will identify costs for possible grant application. MAINT. IMPACT: None. COMMENT: FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES CD Project Location r- '` I 1 71VILN Design ; �. l o 1 . 1 E� A. 4�► E upland or Dr rniann ., 35 35 Land (R /W) al,"/ IA ...I S s�� .1011, f 4. 4 El 15 15 Const. Mgmt. 0 Construction 160 160 TOTAL EXPENSES 0 0 0 0 0 0 0 0 210 210 FUND SOURCES Awarded Grant 0 Proposed Grant 100 100 Mitigation Actual 0 Impact Fees 30 30 City Oper. Revenue 0 0 0 0 0 0 0 0 80 80 TOTAL SOURCES 0 0 0 0 0 0 0 0 210 210 2010 - 2015 Capital Improvement Program 44 CD Project Location r- '` I 1 71VILN III ; �. l o 1 . 1 E� A. 4�► E upland or Dr rniann ., � ,......4t ... al,"/ IA ...I S s�� .1011, f 4. 4 El 2010 - 2015 Capital Improvement Program 44 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: S 143 St (Interurban - Duwamish) LINE ITEM: 104.02.595. . PROJECT NO. 98410425 DESCRIPTION: Design and construct curb, gutter, sidewalk, drainage, paving, lighting and traffic control improvements. JUSTIFICATION: The 18 feet of paving provides no place for pedestrians. Drainage and lighting are also needed. STATUS: Design report is first step; identify costs and funding. MAINT. IMPACT: Significant maintenance reduction. COMMENT: Coordinate with S 143 St Drainage Project. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 100 100 Land (R /W) 0 Const. Mgmt. 0 Construction 0 TOTAL EXPENSES 0 0 0 0 0 0 0 0 100 100 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Impact Fees 0 City Oper. Revenue 0 0 0 0 0 0 0 0 100 100 TOTAL SOURCES 0 0 0 0 0 0 0 0 100 100 2010 - 2015 Capital Improvement Program 45 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: S 134 St (S 133 St - 48 Ave S) LINE ITEM: 104.02.595. . PROJECT NO. 98410427 DESCRIPTION: Design and construct curb, gutter, sidewalk, drainage, street lighting and traffic control improvements. JUSTIFICATION: No sidewalks for pedestrians; lighting does not meet standards, drainage, flooding and maintenance impacts. STATUS: Design report will identify costs and funding sources. MAINT. IMPACT: Significant reduction in maintenance. COMMENT: FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 100 100 Land (R /W) 0 Const. Mgmt. 0 Construction 0 TOTAL EXPENSES 0 0 0 0 0 0 0 0 100 100 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Impact Fees 0 City Oper. Revenue 0 0 0 0 0 0 0 0 100 100 TOTAL SOURCES 0 0 0 0 0 0 0 0 100 100 2010 - 2015 Capital Improvement Program 46 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: S 144th St Bridge - Sidewalks LINE ITEM: 104.02.595. . .21 PROJECT NO. 90310404 DESCRIPTION: Widen existing sidewalks on bridge over I -5 between 51st Ave S and 53rd Ave S. JUSTIFICATION: Improve pedestrian safety particularly for school route. STATUS: Design report needed to determine feasibility. MAINT. IMPACT: Minimal for additional sidewalk width. COMMENT: Coordination with WSDOT and Sound Transit required. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 100 100 Land (R /W) 0 Const. Mgmt. 0 Construction 0 TOTAL EXPENSES 0 0 0 0 0 0 0 0 100 100 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Impact Fees 0 City Oper. Revenue 0 0 0 0 0 0 0 0 100 100 TOTAL SOURCES 0 0 0 0 0 0 0 0 100 100 2010 - 2015 Capital Improvement Program 47 2010 - 2015 Capital Improvement Program 48 City of Tukwila CAPITAL IMPROVEMENT PROGRAM for 2010 - 2015 PARKS & RECREATION 301 Fund CIP * *Other After Six Page # PROJECT TITLE 2010 2011 2012 2013 2014 2015 TOTAL Sources Years Parks and Trails 50 Codiga Park 115 0 0 0 0 0 115 10 276 51 Duwamish River Bend Hill Park * 451 0 0 0 0 250 701 353 2,750 52 City of Tukwila Pool 25 362 75 75 75 75 687 0 75 53 City of Tukwila Leisure Pool Addition * 0 0 0 0 0 0 0 0 1,500 54 Tukwila Pond * 32 0 200 253 250 50 785 215 2,700 55 Fort Dent Park 9 200 0 0 0 0 209 100 1,600 56 Greenbelt & Multipurpose Trails 63 64 65 43 0 0 235 191 0 57 Black River Trail Connector * 23 0 0 0 0 83 106 33 917 58 57th Ave S Park Extension 0 25 0 0 0 0 25 0 150 59 Parks, Recreation & Open Space Plan 0 0 0 75 0 0 75 0 0 60 Ryan Hill Park 0 0 0 0 0 0 0 0 2,500 61 Macadam Winter Garden 0 0 0 0 0 0 0 0 500 62 Southgate Park Improvements 0 0 0 0 0 0 0 0 1,000 63 Hand Boat Launches 0 0 0 0 0 0 0 0 750 64 Log House Park 0 0 0 0 0 0 0 0 200 65 Wilcox River Park 0 0 0 0 0 0 0 0 150 66 Open Space at 5800 S 152nd St 0 0 0 0 0 0 0 0 1,000 Related to Fish Habitat 67 WRIA 9 Watershed Planning 11 11 12 12 12 12 70 0 12 68 Duwamish Gardens 196 1,100 0 0 0 0 1,296 1,219 0 69 Riverton Creek Flap Gate Removal 45 578 0 0 0 0 623 500 0 70 Gilliam Creek Fish Barrier Removal 0 0 0 0 0 0 0 0 675 71 Nelson Salmon Habitat Side Channel 0 0 0 0 0 0 0 0 645 72 Foster Golf Course Riverbank 0 0 0 0 0 0 0 0 434 73 Lower Gilliam Creek Channel 0 0 0 0 0 0 0 0 248 Grand Total Changes from 2009 to 2010 CIP: New: 66 Open Space at 5800 S 152nd St 2010 - 2015 Capital Improvement Program 970 2,340 352 458 337 470 4,927 2,621 18,082 * Park Impact Fee List Projects (project must be started within 6 years). ** Denotes other funding sources, grants, or mitigation. 49 01/08/2010 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Codiga Park & Hand Boat Launch LINE ITEM: 301.00.594.760. .50 PROJECT NO. 99830106 DESCRIPTION: Develop a neighborhood park on the uplands of the side channel located at Codiga Park property. JUSTIFICATION: This park will complete the side channel project started by the US Army Corps of Engineers in 2004. Barn demolished in 2003. Side channel completed in 2004. Partnership with US Corps of Engineers has STATUS: been completed and no additional Corps money is available. The remaining Park development will be completed by the City in 2010. MAINT. IMPACT: Approximately 200 staff hours per year to maintain vegetation and collect trash. Park will include an observation platform with interpretive signage, a canoe /kayak hand boat launch, trail access COMMENT: to the sandbar, 5 free standing picnic tables, and parking lot. Grant is Washington State Community Trade and Economic Development (CTED) for $10,000. Hand boat launch is now scheduled in beyond. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location ' .,s. Engineering 108 4 lit. .44 $,..„ 4.4., L 112 Land (R /W) 0 Const. Mgmt. 0 Construction 649 215 115 276 1,255 TOTAL EXPENSES 757 219 115 0 0 0 0 0 276 1,367 FUND SOURCES USACE 560 560 Actual Grant 10 10 20 Contribution 5 5 Mitigation Expected 0 City Oper. Revenue 197 214 105 0 0 0 0 0 266 782 TOTAL SOURCES 757 219 115 0 0 0 0 0 276 1,367 2010 - 2015 Capital Improvement Program 50 Project Location ' .,s. i( PI 9 r;14 i lit. .44 $,..„ 4.4., L 2010 - 2015 Capital Improvement Program 50 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Duwamish River Bend Hill Park LINE ITEM: 301.00.594.760. .69 PROJECT NO. 90330109 DESCRIPTION: Land development for this 8.6 acre parcel will preserve open space and allow future restoration for this passive public park at 3800 S 115 St. (Also known as Poverty Hill and Grandmother's Hill.) JUSTIFICATION: Meets the Parks and Open Space Plan providing cultural and historical value along the City's shoreline. Phase I development began in 2008. Seeking grant funds in a partnering effort with the Cascade Land STATUS: Conservancy and the Friends of the H i l l citizen's group. Phase I I funding is dependent on grant funding and Park Impact fees. MAINT. IMPACT: Approximately 200 staff hours per year. COMMENT: Phase II is on Park Impact Fee list for $2 million with an 80 %/20% split. Sound Transit mitigation of $313k for construction site. Grant for $220,000 from Recreation Conservation Office (RCO). FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location -rat A. --,11; 1-.9› 0 .. ..., t, , q Engineering 143 45 18 1111111116„ ,,, ,,, 250 50 506 Land (R /W) 975 450 1,425 Construction 18 433 2,250 2,701 TOTAL EXPENSES 1,118 63 451 0 0 0 0 250 2,750 4,632 FUND SOURCES Awarded Grant 1,040 220 1,260 Proposed Grant 150 150 Mitigation 313 313 Park Impact Fees 133 1,467 1,600 City Oper. Revenue (235) 63 231 0 0 0 0 117 1,133 1,309 TOTAL SOURCES 1,118 63 451 0 0 0 0 250 2,750 4,632 2010 - 2015 Capital Improvement Program 51 Project Location -rat A. --,11; 1-.9› 0 .. ..., t, , q , , %,,,, -4,.. lye'^ 1111111116„ ,,, ,,, s uo st % \�. 2010 - 2015 Capital Improvement Program 51 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: City of Tukwila Pool LINE ITEM: 301.00.594.760. .68 PROJECT NO. N/A DESCRIPTION: Ongoing capital repairs and maintenance for the Tukwila City Pool. King County transferred the pool to the City of Tukwila in 2003 and contributed a total of $100,000 in 2004 and 2005. JUSTIFICATION: Swimming pool was built in 1973 and requires ongoing repairs and maintenance for continued use. STATUS: Projects include a new pool liner and bulk head and upgrading for handicap (ADA) access. MAINT. IMPACT: Projects will be dependent upon negotiating an extension of the lease with the Tukwila School District that is due to expire in 2011. COMMENT: Ongoing project, only one year actuals shown in first column. Pool's Leisure Addition Project is the next page. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Engineering 40 10 50 Land (R /W) 0 Construction (2) 25 322 65 75 75 75 75 710 TOTAL EXPENSES (2) 0 25 362 75 75 75 75 75 760 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 City Oper. Revenue (2) 0 25 362 75 75 75 75 75 760 TOTAL SOURCES (2) 0 25 362 75 75 75 75 75 760 2010 - 2015 Capital Improvement Program 52 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: City of Tukwila Leisure Pool Addition LINE ITEM: 301.00.594.760. PROJECT NO. 90830102 DESCRIPTION: Leisure Pool will expand features at the City of Tukwila Pool that may include water slides, lazy rivers and water spray pool equipment. JUSTIFICATION: Swimming pool was built in 1973 and requires new apparatus for the benefit and growth of the community. STATUS: Project is currently under review and is included in the Park, Recreation and Open Space Plan. MAINT. IMPACT: Project will be dependent upon negotiating an extension of the lease with the Tukwila School District that is due to expire in 2011. COMMENT: Project is on Park Impact Fee list for $500,000 with an 80 %/20% split. See previous page for pool maintenance. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location k ronsti-- vvir '.► .. Engineering mu lapel IN 150 150 Construction Mgmt Aspfa lmwv®IC._�� 4=4 S 75Q St v� _ Eh 225 225 Construction �, `I� 47 �i�1R °y 1,125 1,125 TOTAL EXPENSES 0 0 0 0 0 0 0 0 1,500 1,500 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Park Impact Fees 400 400 City Oper. Revenue 0 0 0 0 0 0 0 0 1,100 1,100 TOTAL SOURCES 0 0 0 0 0 0 0 0 1,500 1,500 2010 - 2015 Capital Improvement Program 53 Project Location k ronsti-- vvir '.► .. mu lapel IN Aspfa lmwv®IC._�� 4=4 S 75Q St v� _ Eh `], lir Ali �, `I� 47 �i�1R °y #.111 lign $ no st Tukwila Pkny ..I • 2010 - 2015 Capital Improvement Program 53 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Tukwila Pond LINE ITEM: 301.00.594.760. .52 PROJECT NO. 90330110 Phase 1-111 90930101 Phase IV The Tukwila Pond Concept Plan Phase I identified development to extend viewing platforms, construct trail DESCRIPTION: and boardwalk and other amenities. Phase II included a 50% design for park amenities, and a feasibility study and design for water quality improvements (completed in 2008). Phase III will include final design of park improvements, water quality monitoring, buffer enhancement along JUSTIFICATION: Andover Park West, and construction of the water quality treatment system (alum injection and aeration). Phase IV and beyond will include final design and construction of park amenities. STATUS: Phase I completed 2006, Phase II completed in 2009. Bid and construct water quality treatment system in 2011. MAINT. IMPACT: Water quality treatment system: $9,982 annualized over 50 years (annual alum purchase & maintenance). Wetland mitigation of $86,000 from WIG Properties and was used for the water quality studies. King County grant received in 2008 for buffer enhancement. Seeking partial grant funding for constructing water quality improvements and park amenities. Phase IV is on Park Impact Fee list for $3 million with an 80 %/20% split and the goal is to start the project by 2014. COMMENT: FINANCIAL Through Estimated in $000's 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Froject Location ■ �� + g Vogt mil '41-0-r—sa f „,,,, CIL,. `'■ . .,, __ ri. i Engineering 146 51 32 anarge‘A,defl ,,,,, 75 250 50 a ¢ L 604 Land (R /W) 0 Construction 200 178 2,700 3,078 TOTAL EXPENSES 146 51 32 0 200 253 250 50 2,700 3,682 FUND SOURCES Awarded Grant 8 8 Proposed Grant 150 150 Mitigation Actual 86 86 Park Impact Fees 18 18 Park Impact Fees Expected 15 20 25 25 100 30 2,170 2,385 City Oper. Revenue 60 25 17 (20) 175 228 150 20 380 1,035 TOTAL SOURCES 146 51 32 0 200 253 250 50 2,700 3,682 2010 - 2015 Capital Improvement Program 54 Froject Location ■ �� + g Vogt mil '41-0-r—sa f „,,,, CIL,. `'■ . .,, __ ri. i it f!i j ►r ,,..� a anarge‘A,defl ,,,,, a ¢ L / 2010 - 2015 Capital Improvement Program 54 CITY OF TUKWILA CAPITAL PROJECT SUMMARY PROJECT: Fort Dent Park DESCRIPTION: JUSTIFICATION: STATUS: MAINT. IMPACT: COMMENT: 2010 to 2015 LINE ITEM: 301.00.594.760. .71 PROJECT NO. 90330107 04 -SW02 Regional park of 52 acres requires ongoing capital and maintenance improvements. The City has assumed major park repairs and maintenance for the picnic area, parking lot, one soccer field, trail, pond and all major infrastructure. A new mini playground was installed next to the large playground in 2008. Construction of a new 250 space parking lot and repaving the existing lot (in beyond) will cost approximately $1,600,000. Ongoing effort from all departments involved; Parks, Streets, Water, Sewer, and Surface Water. King County transferred the park to the City of Tukwila in 2003. Concessionaire agreement with Starfire Sports Complex. King County contribution of $250,000 and State Earmark of $444,375 in 2007 for sewer. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Engineering 275 300 575 Land (R /W) 0 Construction 1,202 26 9 200 1,300 2,737 TOTAL EXPENSES 1,477 26 9 200 0 0 0 0 1,600 3,312 FUND SOURCES Awarded Grant 694 694 Proposed Grant 100 100 Mitigation Actual 0 Mitigation Expected 0 City Oper. Revenue 783 26 9 100 0 0 0 0 1,600 2,518 TOTAL SOURCES 1,477 26 9 200 0 0 0 0 1,600 3,312 2010 - 2015 Capital Improvement Program 55 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Greenbelt & Multipurpose Trails LINE ITEM: 301.00.594.760. .37 PROJECT NO. 99930104 DESCRIPTION: Several foot trails could be developed using WSDOT lands, City rights -of -way, and easements. Additional trails fronting the Green River could also be developed. JUSTIFICATION: Funds would provide planning /design in several areas each with pedestrian access that could provide safer and immediate connections other than driving a car. From the Park & Open Space Plan, routes are being developed to make new connections from the Tukwila STATUS: Light Rail Station to the Green River Trail. Also working with the City of SeaTac to connect a route from the Tukwila Community Center to the SeaTac Community Center. MAINT. IMPACT: To be determined. COMMENT: Funding is now available through the King County Parks Division Capital Expansion Levy for 2008 through 2013. Funds for 2009 will also be applied to the Black River Trail Connector. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Engineering 12 63 64 65 43 247 Land (R /W) 0 Construction 0 TOTAL EXPENSES 0 12 63 64 65 43 0 0 0 247 FUND SOURCES Awarded Grant 22 49 63 42 43 43 262 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 City Oper. Revenue (22) (37) 0 22 22 0 0 0 0 (15) TOTAL SOURCES 0 12 63 64 65 43 0 0 0 247 Project Location: Entire System 2010 - 2015 Capital Improvement Program 56 CITY OF TUKWILA CAPITAL PROJECT SUMMARY PROJECT: Black River Trail Connector LINE ITEM: 301.00.594.760. .38 PROJECT NO. 90730101 Trail connection providing a link from the Green River Trail in Fort Dent Park to Monster Road in the City of Renton. Most of this area is currently Union Pacific Railroad property. Extend the City's and the region's trail system by 1/4 mile, in partnership with the City of Renton, to provide a safe, convenient, and attractive non - motorized connection between the two cities. DESCRIPTION: JUSTIFICATION: STATUS: MAINT. IMPACT: COMMENT: 2010 to 2015 Funding is now available through the King County Parks Division Capital Expansion Levy for 2008. An informal trail currently exists along this alignment. King County regional trail staff is also working with the City. Project is on Park Impact Fee list for $500,000 with an 80 %/20% split. Easement agreements or property acquisition may be needed in order to construct a trail on this property. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Engineering 23 83 17 123 Land (R /W) 300 300 Construction 600 600 TOTAL EXPENSES 0 0 23 0 0 0 0 83 917 1,023 FUND SOURCES Awarded Grant 23 23 Proposed Grant 0 Mitigation Actual 0 Park Impact Fees 33 400 433 City Oper. Revenue (23) 0 23 0 0 0 0 50 517 567 TOTAL SOURCES 0 0 23 0 0 0 0 83 917 1,023 2010 - 2015 Capital Improvement Program 57 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: 57th Ave S Park Extension LINE ITEM: 301.00.594.760. .72 PROJECT NO. 90430101 DESCRIPTION: Acquisition of riverfront land next to the 57th Ave S Mini Park in the Foster Point neighborhood. JUSTIFICATION: The property next to the mini -park became available which provides the opportunity to expand the passive riverfront park. STATUS: Acquisition of property was completed in 2007. Mini Park address will be 13300 57th Ave S. Construction of the park in 2011 will include a small play structure and park benches. MAINT. IMPACT: Approximately 100 staff hours per year. COMMENT: King County Conservation Futures grant awarded for $75,000. There was a $192,500 match as a land donation from the property seller. The remaining balance came from extra REET funds collected in 2007. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location , rinemr r ' r ti 111! WOO Engineering 2 Ailli 111 14 mill t 25 27 Land (R /W) 197 s taa St S 7 6D St _ L Alreilmakt el S6 St 197 Construction 25 125 150 TOTAL EXPENSES 199 0 0 25 0 0 0 0 150 374 FUND SOURCES Awarded Grant 75 75 Proposed Grant 0 Donation 0 Mitigation Expected 0 City Oper. Revenue 124 0 0 25 0 0 0 0 150 299 TOTAL SOURCES 199 0 0 25 0 0 0 0 150 374 2010 - 2015 Capital Improvement Program 58 Project Location , rinemr r ' r ti 111! WOO Ailli 111 14 mill t ;� ,, .•,## 4,,t, 2a . s taa St S 7 6D St _ L Alreilmakt el S6 St � -4 11x' i Aw { \�` 0-0,---- P-,- , 2010 - 2015 Capital Improvement Program 58 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Parks, Recreation & Open Space Plan LINE ITEM: 301.00.594.760. .73 PROJECT NO. Varies DESCRIPTION: Prepare a citywide Parks, Recreation and Open Space Plan. JUSTIFICATION: A current six -year Open Space Plan is required to be eligible to apply for any state and federal park grants. STATUS: Current Plan adopted in 2008. Next update will be in 2013. MAINT. IMPACT: COMMENT: A planning tool to assist with the entire parks and recreation system. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Engineering 43 75 118 Land (R /W) 0 Construction 0 TOTAL EXPENSES 43 0 0 0 0 75 0 0 0 118 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 City Oper. Revenue 43 0 0 0 0 75 0 0 0 118 TOTAL SOURCES 43 0 0 0 0 75 0 0 0 118 2010 - 2015 Capital Improvement Program 59 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Ryan Hill Park LINE ITEM: 301.00.594.760. .32 PROJECT NO. 90630104 DESCRIPTION: Land will need to be purchased and a neighborhood park built in this somewhat isolated northeast part of the City. JUSTIFICATION: To provide a park in a neighborhood that lacks open space and recreation areas. STATUS: The 2008 Park and Open Space Plan identified the needed land area for purchase of a park in the Ryan Hill neighborhood as a City priority. MAINT. IMPACT: To be determined. COMMENT: Funds were used to purchase open space land in November 2008, however the 2009 budget was not revised. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Protect Location ■ � i \l, icce -\y • t ' R. rar, r 16 Engineering { +# 't "l Irroka Ili ■ 1 S \k 250 250 Land (R /W) 750 750 Construction 1,500 1,500 TOTAL EXPENSES 0 0 0 0 0 0 0 0 2,500 2,500 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Park Impact Fees 0 City Oper. Revenue 0 0 0 0 0 0 0 0 2,500 2,500 TOTAL SOURCES 0 0 0 0 0 0 0 0 2,500 2,500 2010 - 2015 Capital Improvement Program 60 Protect Location ■ � i \l, icce -\y • t ' R. rar, r 16 { +# 't "l Irroka Ili ■ 1 S \k + GIS -,5L1 2010 - 2015 Capital Improvement Program 60 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Macadam Winter Garden LINE ITEM: 301.00.594.760. .70 PROJECT NO. 03 -PK08 A small winter garden area on the north end of this 11 acre site with educational exhibits related to the DESCRIPTION: wetland was completed in 2007. Entire site purchased with 1989 King County Open Space funds with habitat cleanup recommended. JUSTIFICATION: To utilize this preserved area to educate and provide a small garden area to improve the wetland area. STATUS: Phase I developed .75 acres in 2007. Phase II to include park boardwalk trail system with kiosks. MAINT. IMPACT: Approximately 200 staff hours and 200 volunteer hours per year. COMMENT: Received a $15,000 grant from Starbucks in 2005 and Home Street Bank contributed $2,500 in 2008 for signage. The remaining balance from Phase I came from extra REET funds collected in 2007. FINANCIAL Through Estimated in $000's 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Engineering 50 50 Land (R /W) 0 Construction 374 500 874 TOTAL EXPENSES 424 0 0 0 0 0 0 0 500 924 FUND SOURCES Awarded Grant 18 18 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 City Oper. Revenue 406 0 0 0 0 0 0 0 500 906 TOTAL SOURCES 424 0 0 0 0 0 0 0 500 924 2010 - 2015 Capital Improvement Program 61 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Southgate Park Improvements LINE ITEM: 301.00.594.760. .55 PROJECT NO. 99030103 DESCRIPTION: Acquire land and develop a trail from Tukwila International Blvd through Southgate Park. JUSTIFICATION: Keep the park as a greenbelt park /open space. STATUS: Currently a greenbelt area with few improvements. Some stream bank stabilization may be considered as part of the trail system. MAINT. IMPACT: To be determined. COMMENT: FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location �` i `. vt, iVI:l j o st 03 Engineering viirAN XU 11111 j •ti 100 100 Land (R /W) Eh rii fit:! mummilic IEN M �. � ar 300 300 Construction Il�t S.1513 31 41i_. St r°r4 !�GIS 1\11.110( S 16S St f Tukwila Pkwy f f � ... ,•, 600 600 TOTAL EXPENSES 0 0 0 0 0 0 0 0 1,000 1,000 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Park Impact Fees 0 City Oper. Revenue 0 0 0 0 0 0 0 0 1,000 1,000 TOTAL SOURCES 0 0 0 0 0 0 0 0 1,000 1,000 2010 - 2015 Capital Improvement Program 62 Project Location �` i `. vt, iVI:l j o st 03 viirAN XU 11111 j •ti wti � , S. I P' -.r �3 F/ Eh rii fit:! mummilic IEN M �. � ar I R1 iPL 70 Il�t S.1513 31 41i_. St r°r4 !�GIS 1\11.110( S 16S St f Tukwila Pkwy f f � ... ,•, 2010 - 2015 Capital Improvement Program 62 CITY OF TUKWILA CAPITAL PROJECT SUMMARY PROJECT: Hand Boat Launches DESCRIPTION: JUSTIFICATION: STATUS: MAINT. IMPACT: COMMENT: LINE ITEM: 2010 to 2015 301.00.594.760. PROJECT NO. 90830101 Construction of boat launches which will provide access to the Green River for non - motorized craft. Launches will be constructed at Christianson Road, Fort Dent Park, and the Log House Park. The Parks, Recreation and Open Space Plan and the Shoreline Master Plan promote and encourage additional public access to the Green River. FINANCIAL (in $000's) Through Estimated 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Engineering 63 63 Land (R /W) 0 Const. Mgmt. 140 140 Construction 547 547 TOTAL EXPENSES 0 0 0 0 0 0 0 0 750 750 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Donation 0 Park Impact Fees 0 City Oper. Revenue 0 0 0 0 0 0 0 0 750 750 TOTAL SOURCES 0 0 0 0 0 0 0 0 750 750 2010 - 2015 Capital Improvement Program 63 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Log House Park LINE ITEM: 301.00.594.760. PROJECT NO. 99930102 DESCRIPTION: Propose this site as a riverfront park and provide a picnic shelter. Funding listed is for park construction only. JUSTIFICATION: Adds to riverfront /river access. STATUS: Land purchased with 1989 King County Bond funds with a cabin on the river shore. Cabin was demolished in 2009 due to Howard Hanson Dam Flood Response Plan. MAINT. IMPACT: 100 staff hours currently, could increase to 200 hours with improvements. COMMENT: Site has potential as river shoreline park and rest stop for river trail. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES 0 Project Location rotrar"- 305[ E i ° irrpto , Engineering Ni ` t r. s WilliMU ■l1 30 30 Land (R /W) � Aymr _S ,st i50 St 0 Construction ...S lir :44 170 170 TOTAL EXPENSES 0 0 0 0 0 0 0 0 200 200 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 City Oper. Revenue 0 0 0 0 0 0 0 0 200 200 TOTAL SOURCES 0 0 0 0 0 0 0 0 200 200 2010 - 2015 Capital Improvement Program 64 0 Project Location rotrar"- 305[ E i ° irrpto , Ni ` t r. s WilliMU ■l1 � Aymr _S ,st i50 St deg ...S lir :44 S4 IalS 2010 - 2015 Capital Improvement Program 64 CITY OF TUKWILA CAPITAL PROJECT SUMMARY PROJECT: Wilcox River Park LINE ITEM: 2010 to 2015 301.00.594.760. PROJECT NO. 90630103 DESCRIPTION: To develop a small riverfront park extension and picnic area along the Duwamish River. Isolated site in the Foster Point neighborhood will provide public view of the river and golf course. JUSTIFICATION: To develop a passive riverfront park. STATUS: Open space greenbelt with limited public access. MAINT. IMPACT: Approximately 100 staff hours per year plus minor utilities. COMMENT: Land for the park is from 4 donated lots on Pamela Drive and is 5 lots south of the 57th Ave S Mini Park. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Engineering 25 25 Land (R /W) 0 Construction 125 125 TOTAL EXPENSES 0 0 0 0 0 0 0 0 150 150 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Donation 0 Mitigation Expected 0 City Oper. Revenue 0 0 0 0 0 0 0 0 150 150 TOTAL SOURCES 0 0 0 0 0 0 0 0 150 150 2010 - 2015 Capital Improvement Program 65 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Open Space at 5800 S 152nd St LINE ITEM: 301.00.594.760. PROJECT NO. 90930102 Acquisition of land to preserve open space or park land for future generations. To provide open space that provides linkage from a densely populated area to Tukwila Elementary School and a recreation area for the neighborhood. DESCRIPTION: JUSTIFICATION: STATUS: MAINT. IMPACT: COMMENT: Acquisition of the 1.75 acre parcel was completed in November 2008. Future trails throughout this open space may be considered. Approximately 100 staff and 100 volunteer hours per year. New CIP Project for 2010 - 2015. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Engineering 100 100 Land (R /W) 146 146 Construction 900 900 TOTAL EXPENSES 0 146 0 0 0 0 0 0 1,000 1,146 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 City Oper. Revenue 0 146 0 0 0 0 0 0 1,000 1,146 TOTAL SOURCES 0 146 0 0 0 0 0 0 1,000 1,146 2010 - 2015 Capital Improvement Program 66 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: WRIA 9 Watershed Planning LINE ITEM: 301.00.594.760. .53 PROJECT NO. 90030104 DESCRIPTION: City participation in an Interlocal Agreement with WRIA 9 jurisdictions and administered by King County. Endangered Species Act (ESA) related project. Services provided by King County Dept. of Natural JUSTIFICATION: Resources (KCDNRP) under an Interlocal agreement between participating jurisdictions in Water Resource Inventory Area (WRIA) and King County. City's contribution is estimated at $12,000 per year. STATUS: Interlocal Agreement has been adopted by all cities with an extension through 2015. MAINT. IMPACT: Policies and recommendations will impact maintenance. COMMENT: Ongoing project, only one year actuals are shown in the first column. City parcels are assessed King Conservation District fees directly on their property taxes, approximately $24,000 each year for the City. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location: Entire System 1 i ia+a'- 1-5 rT s' Engineering 10 11 11 11 12 12 12 12 12 103 Land (R /W) 0 Construction 0 TOTAL EXPENSES 10 11 11 11 12 12 12 12 12 103 FUND SOURCES King Conservation District 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 City Oper. Revenue 10 11 11 11 12 12 12 12 12 103 TOTAL SOURCES 10 11 11 11 12 12 12 12 12 103 2010 - 2015 Capital Improvement Program 67 Project Location: Entire System 1 i ia+a'- 1-5 rT s' 2010 - 2015 Capital Improvement Program 67 CITY OF TUKWILA CAPITAL PROJECT SUMMARY PROJECT: Duwamish Gardens LINE ITEM: 301.00.594.760. .35 PROJECT NO. 90630102 Purchase and restore site as a salmon estuary and passive park. This project is included in the WRIA 9 Salmon Recovery Plans efforts to acquire and restore 20 -acres within the Duwamish estuary. First phase is acquisition only in 2008. Second phase will create an off - channel salmon habitat and passive park. DESCRIPTION: JUSTIFICATION: STATUS: MAINT. IMPACT: COMMENT: 2010 to 2015 Once site is restored, approximately 100 staff hours per year. Grants includes State Salmon Recovery Funding Board (SRFB) $311,000, WRIA 9 King Conservation District $15,000 & $225,000, KC Conservation Futures 2006 & 2007 $700,000, WA State Aquatic Lands $457,521, and WA State Earmark $394,000. Proposed grants include State & Federal habitat grants. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 31 101 90 100 322 Land (R /W) 1,979 1,979 Const. Mgmt. 200 200 Construction 106 800 906 TOTAL EXPENSES 2,010 101 196 1,100 0 0 0 0 0 3,407 FUND SOURCES Awarded Grant 925 1,163 2,088 Proposed Grant 1,219 1,219 Mitigation Actual 0 Mitigation Expected 0 City Oper. Revenue 1,085 (1,062) 196 (119) 0 0 0 0 0 100 TOTAL SOURCES 2,010 101 196 1,100 0 0 0 0 0 3,407 Project Location s �, ,11 ,� eoe�. , A. s nu s WA1 V ____A____.... . ilk „,11,4 lei ,� 3o St �� `� 2010 - 2015 Capital Improvement Program 68 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Riverton Creek Flap Gate Removal DESCRIPTION: install trail bridge over new channel, restore /revegetate 200 feet of creek channel and 450 ft of pond shoreline. JUSTIFICATION: Increase available salmonid rearing habitat and increase flood refuge in lower Duwamish River. Improve fish access to Riverton Creek and enhance salmon rearing and resting area. STATUS: City received a Salmon Recovery Funding Board grant of $42,500 and $30,000 from People for Puget Sound. MAINT. IMPACT: Annual maintenance could be $1,000 to $2,000 for vegetation and in- stream structures. COMMENT: Proposed grants include State & Federal habitat grants. LINE ITEM: 301 / 00.594.760. .61 PROJECT NO. 99830103 Remove two culverts and flapgates at Duwamish River; install pipe arch, create open channel confluence, FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location . ice..... x„59' �_ a. r t - - p _ S , ile. � Engineering 'V��. i. 77 45 78 Illillliil► �4f GIS ■ Cpl 200 Land (R /W) 0 Construction 500 500 TOTAL EXPENSES 0 77 45 578 0 0 0 0 0 700 FUND SOURCES Awarded Grant 72 72 Proposed Grant 500 500 Mitigation Actual 0 Mitigation Expected 0 City Oper. Revenue 0 5 45 78 0 0 0 0 0 128 TOTAL SOURCES 0 77 45 578 0 0 0 0 0 700 2010 - 2015 Capital Improvement Program 69 Project Location . ice..... x„59' �_ a. r t - - p _ S , ile. � 'V��. i. ! ( -Iro\ f.. .... /he "14 I ..... 41,,, iiyi� Illillliil► �4f GIS ■ Cpl 113.5411 4, 2010 - 2015 Capital Improvement Program 69 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Gilliam Creek Fish Barrier Removal LINE ITEM: 301.00.594.760. .64 PROJECT NO. 99830105 DESCRIPTION: Construct fish ladder leading to existing flap gate location and replace flap gate with self - regulating tide gate to accommodate salmonid passage. JUSTIFICATION: Enable fish access to lower Gilliam Creek under wider range of flow conditions. STATUS: Analysis of lower Gilliam Creek may be conducted to determine best solution for fish passage and to address potential flooding. MAINT. IMPACT: COMMENT: WSDOT may include this project in the 1 -405 improvements. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Location ;; iTP T. • —•ri y NI II .4. Engineering — ' �:I i { 3--� Ranh ce existing Cep IV Mtn flan passage facility gate 202 202 Land (R /W) 11 R is I 0 Construction 473 473 TOTAL EXPENSES 0 0 0 0 0 0 0 0 675 675 FUND SOURCES Awarded Grant 0 Proposed Grant 367 367 Mitigation Actual 0 Mitigation Expected 0 City Oper. Revenue 0 0 0 0 0 0 0 0 308 308 TOTAL SOURCES 0 0 0 0 0 0 0 0 675 675 CDProject Location ;; iTP T. • —•ri y NI II .4. — ' �:I i { 3--� Ranh ce existing Cep IV Mtn flan passage facility gate , ' .4. ' Li k 11 R is I 2010 - 2015 Capital Improvement Program 70 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Nelson Salmon Habitat Side Channel LINE ITEM: 301.00.594.760. PROJECT NO. 90330104 DESCRIPTION: Construct new side channel to connect remnant river channel to the Duwamish River. The project will also need to reconstruct flood control levee to protect nearby motel. JUSTIFICATION: Increase habitat diversity and juvenile salmonid rearing productivity. STATUS: Pending WSDOT I -405 expansion project. MAINT. IMPACT: COMMENT: Project to minimize removal of existing mature trees. A new setback levee will be needed to the east. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES 1 , , , .,.---,......, -� .%..� fM1stinry tmna --- - � �. ttameztead Studio Slit. tt 11, tirk,. -� ll in CrCe Ewan d Ines .--. Engineering can** oat* bitVle — —_ Best Western r_= c 45 45 Land (R /W) � 100 100 Construction 500 500 TOTAL EXPENSES 0 0 0 0 0 0 0 0 645 645 FUND SOURCES Awarded Grant 0 Proposed Grant 250 250 Mitigation Actual 0 Mitigation Expected 0 City Oper. Revenue 0 0 0 0 0 0 0 0 395 395 TOTAL SOURCES 0 0 0 0 0 0 0 0 645 645 Project Location 1 , , , .,.---,......, -� .%..� fM1stinry tmna --- - � �. ttameztead Studio Slit. tt 11, tirk,. -� ll in CrCe Ewan d Ines .--. — TnkwMn Pkwy. can** oat* bitVle — —_ Best Western r_= c 4 ar 41 � 2010 - 2015 Capital Improvement Program 71 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Foster Golf Course Riverbank LINE ITEM: 301 / 00.594.760. PROJECT NO. 90330106 DESCRIPTION: Habitat restoration and enhancement of the riverbank environment for ESA listed species. Includes the placement of woody debris and revegetation using native species. JUSTIFICATION: ESA listed species habitat restoration. STATUS: MAINT. IMPACT: None. COMMENT: Project extends along most of golf course riverfront. New planting survival requires eradication of invasive species. Requires cooperation and assistance of golf maintenance. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Engineering 22 22 Land (R /W) 0 Construction 412 412 TOTAL EXPENSES 0 0 0 0 0 0 0 0 434 434 FUND SOURCES Awarded Grant 0 Proposed Grant 150 150 Mitigation Actual 0 Mitigation Expected 0 City Oper. Revenue 0 0 0 0 0 0 0 0 284 284 TOTAL SOURCES 0 0 0 0 0 0 0 0 434 434 2010 - 2015 Capital Improvement Program 72 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Lower Gilliam Creek Channel Improvements LINE ITEM: 301 / 00.594.760. PROJECT NO. 90330116 DESCRIPTION: Widen stream channel downstream of 1 -5 crossing, install large woody debris and reparian vegetation, and increase habitat complexity. JUSTIFICATION: Increase habitat diversity and juvenile Coho rearing productivity. STATUS: MAINT. IMPACT: Significant reduction in maintenance activities in this area. WSDOT 1 -405 improvements may impact the reparian area at this site and the project layout. The Corps of COMMENT: Engineers plan improvements to lower Gilliam Creek that includes this area. The project concept and funding are linked to the Corps' plans. FINANCIAL Through Estimated in $000's 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES _ x -�v -- ++ + t + Alden anal Increase i . enhance chann ' = _ sinuosity. � -^ rF ` Goner to river SI 1 Engineering 32 32 Land (R /W) PS; it b 0 Construction 216 216 TOTAL EXPENSES 0 0 0 0 0 0 0 0 248 248 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 City Oper. Revenue 0 0 0 0 0 0 0 0 248 248 TOTAL SOURCES 0 0 0 0 0 0 0 0 248 248 Project Location _ x -�v -- ++ + t + Alden anal Increase i . enhance chann ' = _ sinuosity. � -^ rF ` Goner to river SI 1 PS; it b 2010 - 2015 Capital Improvement Program 73 2010 - 2015 Capital Improvement Program 74 City of Tukwila CAPITAL IMPROVEMENT PROGRAM for 2010 - 2015 FACILITIES 302 Fund CIP **Other After Six Page # PROJECT TITLE 2010 2011 2012 2013 2014 2015 TOTAL Sources Years 76 Tukwila Village 108 0 0 0 0 0 108 4,355 0 77 Permanent EOC Facility 0 0 0 0 110 1,140 1,250 1,000 0 78 South County Regional Jail 8,000 0 0 0 0 0 8,000 8,000 0 79 City Maintenance Facility 0 0 0 0 0 0 0 0 10,000 80 Community Justice Center 0 0 0 0 0 0 0 0 18,000 Grand Total Changes from 2009 to 2010 CIP: No new additions. 8,108 0 0 0 110 1,140 9,358 13,355 28,000 2010 - 2015 Capital Improvement Program ** Denotes other funding sources, grants, or mitigation. 75 01/07/2010 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Tukwila Village LINE ITEM: 302.00.594.190. .01 PROJECT NO. 90030222 DESCRIPTION: The City owned property at Tukwila International Boulevard and South 144th Street is intended for a mixed - use development including a police neighborhood resource center, library, plaza, housing and other amenities. JUSTIFICATION: Need to develop a city presence and community gathering place to encourage quality economic development. City owns 5.76 acres and is negotiating with a developer. The project may develop in phases. The first phase STATUS: of negotiating construction has an estimated start in 2011 pending retailer demand, housing, and credit market stabilization. MAINT. IMPACT: COMMENT: Land sale proceeds assume half of property sold in 2011 and remainder in 2012. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Engineering 1,571 26 60 1,657 Land (R /W) 7,576 7,576 Construction 197 25 48 270 TOTAL EXPENSES 9,344 51 108 0 0 0 0 0 0 9,503 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Land Sale 2,177 2,178 4,355 Bonds 5,550 5,550 City Oper. Revenue 3,794 51 108 (2,177) (2,178) 0 0 0 0 (402) TOTAL SOURCES 9,344 51 108 0 0 0 0 0 0 9,503 2010 - 2015 Capital Improvement Program 76 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Permanent Emergency Operation Center Facility LINE ITEM: 302.00.594.190. .41 PROJECT NO. 90830201 DESCRIPTION: Construct a new Emergency Operation Center (EOC) facility to support emergency response and recovery coordination. The EOC located at the Golf Maintenance Shop cannot accommodate all anticipated personnel needed to JUSTIFICATION: manage a disaster event. The new EOC will house the City's computer and phone equipment and will have emergency backup power to support the City's Continuity of Operations Plan (COOP). STATUS: Department of Homeland Security has grant applications with a period of performance of 24 months from date of award. We were not successful 2008 but will reapply as grant funding is available. MAINT. IMPACT: General building maintenance of a new structure. COMMENT: Site to be determined, with the back parking lot of the 6300 Building as an option. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Engineering 100 100 Land (R /W) 10 10 Const. Mgmt. 140 140 Construction 1,000 1,000 TOTAL EXPENSES 0 0 0 0 0 0 110 1,140 0 1,250 FUND SOURCES Awarded Grant 0 Proposed Grant 1,000 1,000 Mitigation Actual 0 Mitigation Expected 0 City Oper. Revenue 0 0 0 0 0 0 110 140 0 250 TOTAL SOURCES 0 0 0 0 0 0 110 1,140 0 1,250 Site to be determined. 2010 - 2015 Capital Improvement Program 77 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: South County Regional Jail LINE ITEM: 302.00.594.190. .39 PROJECT NO. 90730206 DESCRIPTION: Tukwila's participation in constructing a 500 bed jail facility with potential for expansion to 750 beds. JUSTIFICATION: Decreasing availability in the King County jail. In coordination with Auburn, Burien, Des Moines, Federal Way, Renton, and SeaTac, the work group is South Correctional Entity (SCORE) and is based on the Valley Corn model. Potential site has been determined and due diligence on the property is in process. Interlocal agreement approved STATUS: by Council December 15, 2008. MAINT. IMPACT: COMMENT: City non -voted bond issue will have an annual debt service of principal and interest payments for 20 years. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Feasibility Study 9 149 158 Land (R /W) 288 288 Const. Mgmt. 0 Construction 8,000 8,000 TOTAL EXPENSES 9 437 8,000 0 0 0 0 0 0 8,446 FUND SOURCES Awarded Grant 0 Bond 8,000 8,000 Mitigation Actual 0 Mitigation Expected 0 City Oper. Revenue 9 437 0 0 0 0 0 0 0 446 TOTAL SOURCES 9 437 8,000 0 0 0 0 0 0 8,446 Site location to be determined. 2010 - 2015 Capital Improvement Program 78 CITY OF TUKWILA CAPITAL PROJECT SUMMARY PROJECT: City Maintenance Facility LINE ITEM: 2010 to 2015 302.00.594.190. PROJECT NO. 90630213 DESCRIPTION: Construct a new City maintenance and operations center combining all operational functions efficiently at one location. Existing operations and maintenance areas have inadequate space. Current area for staging dirt and JUSTIFICATION: vactor materials is only temporary. Sell both Minkler and George Long to acquire the real estate to build an equipment operations center that meets current codes. STATUS: Analyzing space requirements and determining an appropriate site. MAINT. IMPACT: Improves efficiency for maintenance operations. COMMENT: FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Engineering 1,000 1,000 Land (R /W) 5,000 5,000 Const. Mgmt. 500 500 Construction 3,500 3,500 TOTAL EXPENSES 0 0 0 0 0 0 0 0 10,000 10,000 FUND SOURCES Awarded Grant 0 Proposed Sale of Land 5,000 5,000 Mitigation Actual 0 Mitigation Expected 0 City Oper. Revenue 0 0 0 0 0 0 0 0 5,000 5,000 TOTAL SOURCES 0 0 0 0 0 0 0 0 10,000 10,000 Site location to be determined. 2010 - 2015 Capital Improvement Program 79 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Community Justice Center LINE ITEM: 302.00.594.190. PROJECT NO. 90630215 DESCRIPTION: Construct a new Community Justice Center that combines Police and Municipal Court. JUSTIFICATION: Existing Police and Municipal Court facilities have inadequate space and are not properly located to respond to the City's needs. STATUS: Analyzing space requirements and determining an appropriate site. MAINT. IMPACT: Existing facilities require extensive maintenance, costs will be reduced. COMMENT: Former name was Life - Safety Facility. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Engineering 1,000 1,000 Land (R /W) 5,000 5,000 Const. Mgmt. 2,000 2,000 Construction 10,000 10,000 TOTAL EXPENSES 0 0 0 0 0 0 0 0 18,000 18,000 FUND SOURCES Awarded Grant 0 Proposed Sale of Land 0 Mitigation Actual 0 Mitigation Expected 0 City Oper. Revenue 0 0 0 0 0 0 0 0 18,000 18,000 TOTAL SOURCES 0 0 0 0 0 0 0 0 18,000 18,000 Site location to be determined. 2010 - 2015 Capital Improvement Program 80 CIP Page # PROJECT TITLE City of Tukwila CAPITAL IMPROVEMENT PROGRAM for 2010 - 2015 GENERAL IMPROVEMENTS 303 Fund * *Other After Six 2010 2011 2012 2013 2014 2015 TOTAL Sources Years 83 Facility Improvements 200 535 500 500 500 500 2,735 0 1,940 Grand Total Changes from 2009 to 2010 CIP: No new additions. 2010 - 2015 Capital Improvement Program 200 535 500 500 500 500 2,735 0 1,940 ** Denotes other funding sources, grants, or mitigation. 81 10/13/2009 2010 - 2015 Capital Improvement Program 82 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Facility Improvements LINE ITEM: 303.00.594.190. PROJECT NO. Various DESCRIPTION: Yearly improvements and required maintenance to City facilities. JUSTIFICATION: Maintenance of existing facilities and required updating and improvements. Replacement of the citywide phone system is estimated to cost $1 million. STATUS: Ongoing. MAINT. IMPACT: None. COMMENT: Ongoing project, only one year actuals are shown in first column. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Engineering 346 50 60 40 40 40 40 400 1,016 Land (R /W) 0 Construction 334 885 200 475 460 460 460 460 1,540 5,274 TOTAL EXPENSES 680 935 200 535 500 500 500 500 1,940 6,290 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 City Oper. Revenue 680 935 200 535 500 500 500 500 1,940 6,290 TOTAL SOURCES 680 935 200 535 500 500 500 500 1,940 6,290 2010 - 2015 Capital Improvement Program 83 2010 - 2015 Capital Improvement Program 84 City of Tukwila CAPITAL IMPROVEMENT PROGRAM for 2010 - 2015 FIRE IMPROVEMENTS 304 Fund CIP "Other After Six Page # PROJECT TITLE 2010 2011 2012 2013 2014 2015 TOTAL Sources Years 86 Relocate Fire Station 51 * 0 0 1,000 3,250 7,750 0 12,000 12,155 87 New Aid Car for Relocated FS 51 * 0 0 0 0 0 0 0 0 185 88 New Engine for Fire Station 54 * 0 0 0 0 0 0 0 0 750 89 Relocate Fire Station 52 * 0 0 0 0 0 0 0 0 3,545 Grand Total Changes from 2009 to 2010 CIP: 0 0 1,000 3,250 7,750 0 12,000 12,155 4,480 * Fire Impact Fee List Projects (project must be started within 6 years). ** Denotes other funding sources, grants, or mitigation. New: 87 Changed Name of New Aid Car for "Relocated" FS 51 2010 - 2015 Capital Improvement Program 85 10/13/2009 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Relocate Fire Station 51 LINE ITEM: 304.00.594.190. PROJECT NO. 90830402 DESCRIPTION: Construct 25,000 square foot Fire Station 51 with only 5,000 sf due to additional growth. JUSTIFICATION: Fire Station 51 will be relocated due to expected growth in the Tukwila Urban Center and Tukwila South. Land is donated by Tukwila South Project. The new fire station will include bays for ladder truck and new aid car. STATUS: Land donation is expected in 2009. MAINT. IMPACT: COMMENT: Project is on Fire Impact Fee list for $2 million with a 90 %/10% split and the goal is to start the project by 2014. Full funding is $14.5 million and includes the land donation. Design and Bond scheduled for 2012. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 1,000 1,000 Land (R /W) 2,500 2,500 Const. Mgmt. 250 750 1,000 Construction 3,000 7,000 10,000 TOTAL EXPENSES 0 2,500 0 0 1,000 3,250 7,750 0 0 14,500 FUND SOURCES Proposed Bond 950 3,200 7,700 11,850 Land Donation 2,500 2,500 Fire Impact Fees 13 13 Fire Impact Fees Expected 50 50 50 50 50 55 1,490 1,795 City Oper. Revenue 0 (13) (50) (50) 0 0 0 (55) (1,490) (1,658) TOTAL SOURCES 0 2,500 0 0 1,000 3,250 7,750 0 0 14,500 Site location to be determined. 2010 - 2015 Capital Improvement Program 86 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: New Aid Car for Relocated FS 51 DESCRIPTION: JUSTIFICATION: STATUS: MAINT. IMPACT: COMMENT: LINE ITEM: 304.00.594.190. PROJECT NO. 90830403 Purchase a new aid car based on the relocation of Fire Station 51. The Fire Master Plan states that a new aid car is needed at the relocated Fire Station 51 due to anticipated growth. Apparatus is on Fire Impact Fee list for $185,000 with a 90 %/10% split. Fire Impact Fees will be designated to the Relocated Fire Station 51 until construction. All remaining Fire Impact Fee Projects are in Beyond. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 0 Land (R /W) 0 Const. Mgmt. 0 Construction 185 185 TOTAL EXPENSES 0 0 0 0 0 0 0 0 185 185 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Fire Impact Fees 0 Fire Impact Fees Expected 153 153 City Oper. Revenue 0 0 0 0 0 0 0 0 32 32 TOTAL SOURCES 0 0 0 0 0 0 0 0 185 185 Capital Equipment purchase. 2010 - 2015 Capital Improvement Program 87 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: New Engine for Fire Station 54 LINE ITEM: 304.00.594.190. PROJECT NO. 90830404 DESCRIPTION: Purchase fire engine for Station 54 to replace aerial ladder truck, when it is moved to relocated Station 51. Moving the ladder truck to relocated Fire Station 51 puts it where it will serve the need and the taller buildings JUSTIFICATION: located at the Tukwila Urban Center. An engine is needed to replace the ladder truck and will be the response apparatus at Fire Station 54. STATUS: MAINT. IMPACT: COMMENT: Apparatus is on Fire Impact Fee list for $750,000 with a 90 %/10% split. Fire Impact Fees will be designated to the Relocated Fire Station 51 until construction. All remaining Fire Impact Fee Projects are in Beyond. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 0 Land (R /W) 0 Const. Mgmt. 0 Construction 750 750 TOTAL EXPENSES 0 0 0 0 0 0 0 0 750 750 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Fire Impact Fees 0 Fire Impact Fees Expected 675 675 City Oper. Revenue 0 0 0 0 0 0 0 0 75 75 TOTAL SOURCES 0 0 0 0 0 0 0 0 750 750 Capital Equipment purchase. 2010 - 2015 Capital Improvement Program 88 CITY OF TUKWILA CAPITAL PROJECT SUMMARY PROJECT: Relocate Fire Station 52 DESCRIPTION: JUSTIFICATION: STATUS: MAINT. IMPACT: COMMENT: LINE ITEM: 2010 to 2015 304.00.594.190. PROJECT NO. 90830405 Purchase land and relocate Fire Station 52 after evaluation of need based on relocation of Fire Station 51. The Fire Master Plan states that Fire Station 52 may need to be relocated to provide adequate service coverage if Fire Station 51 is relocated. Project is on Fire Impact Fee list for $3.5 million with a 90 %/10% split. Fire Impact Fees will be designated to the Relocated Fire Station 51 until construction. All remaining Fire Impact Fee Projects are in Beyond. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 0 Land (R /W) 545 545 Const. Mgmt. 0 Construction 3,000 3,000 TOTAL EXPENSES 0 0 0 0 0 0 0 0 3,545 3,545 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Fire Impact Fees 0 Fire Impact Fees Expected 3,191 3,191 City Oper. Revenue 0 0 0 0 0 0 0 0 354 354 TOTAL SOURCES 0 0 0 0 0 0 0 0 3,545 3,545 Site location to be determined. 2010 - 2015 Capital Improvement Program 89 2010 - 2015 Capital Improvement Program 90 CIP Page # PROJECT TITLE City of Tukwila CAPITAL IMPROVEMENT PROGRAM for 2010 - 2015 WATER ENTERPRISE FUND 401.02 " "Other After Six 2010 2011 2012 2013 2014 2015 TOTAL Sources Years 92 Interurban Water Reuse 30 0 25 25 25 25 130 28 0 93 Andover Park E Water Main Replacement 1,465 0 0 0 0 0 1,465 0 0 94 Andover Park W /Strander New Water Main 25 1,050 0 0 0 0 1,075 0 0 95 Water Comprehensive Plan 150 0 0 0 0 180 330 0 0 96 Martin Luther King Jr Way S Waterline 0 0 399 0 0 0 399 0 0 97 Minkler Blvd Water Looping 0 0 267 206 0 0 473 0 0 98 Macadam Rd S Water Upgrade 0 0 0 675 0 0 675 0 0 99 58 Ave S Water Main Replacement (142 -144) 0 0 0 268 0 0 268 0 0 100 Southcenter Pkwy Water Upgrade 0 0 0 0 575 0 575 0 0 101 S 180th St & West Valley Loop /Renton Water 0 0 0 0 390 350 740 0 0 102 53rd Ave S Water Main (S 137th - S 139th St) 0 0 0 0 190 0 190 0 0 103 West Valley Hwy East Side Water Looping 0 0 0 0 0 740 740 0 0 104 Foster Playfield Water Upgrade 0 0 0 0 0 0 0 0 600 105 West Valley Deep Water Main Replacement 0 0 0 0 0 0 0 0 360 106 65th Ave S (Southcenter Blvd to S 151st St) 0 0 0 0 0 0 0 0 920 107 49th Ave S (S 107th St to S 114th St) 0 0 0 0 0 0 0 0 690 108 S 180th St (east of APE) 0 0 0 0 0 0 0 0 462 109 Southcenter Blvd (Green River to 65th Ave S) 0 0 0 0 0 0 0 0 215 110 Macadam Rd S (S /C Blvd to S 152nd St) 0 0 0 0 0 0 0 0 157 111 Evans Black Dr (west of APE) 0 0 0 0 0 0 0 0 70 112 53rd Ave S (S 139th St to S 140th St) 0 0 0 0 0 0 0 0 31 113 52nd Ave S (Interurban Ave S to 53rd Ave S) 0 0 0 0 0 0 0 0 30 114 S 112 St Water Looping 0 0 0 0 0 0 0 0 309 115 S 153rd St (east of 65th Ave S) 0 0 0 0 0 0 0 0 64 116 Minkler Blvd (east of Industry Dr) 0 0 0 0 0 0 0 0 64 117 Corporate Dr S (west of APW) 0 0 0 0 0 0 0 0 60 118 Poverty Hill - Water Revitalization 0 0 0 0 0 0 0 0 300 Grand Total Changes from 2009 to 2010 CIP: New: No new additions. 1,670 1,050 691 1,174 1,180 1,295 7,060 28 4,332 ** Denotes other funding sources, grants, or mitigation. Deleted: Christensen Rd Waterline Extension combined with Andover Park E Water Main Replacement. 2010 - 2015 Capital Improvement Program 91 01/05/2010 CITY OF TUKWILA CAPITAL PROJECT SUMMARY PROJECT: Interurban Water Reuse LINE ITEM: 401.02.594.34. .21 PROJECT NO. 99240106 Develop water reuse along the Interurban corridor with Class A treated wastewater from the Eastside Reclamation Facility for irrigation, sewer flushing, sweeping, dust control, and other non - potable uses. DESCRIPTION: JUSTIFICATION: STATUS: MAINT. IMPACT: COMMENT: 2010 to 2015 Using reclaimed water is an element of the City's Water Conservation Plan as well as the Cascade Water Transmission and Supply Plan. King County Department of Natural Resources (KCDNR) and the City are currently completing the assessment of crossing the river through an old 6" line in order to serve Baker Commodities. Future maintenance and operation of the new meters, tracking and preventing cross - connections. KC Dept of Natural Resources funded the construction portion of the installation of the reuse water line to the Foster Golf Course pond in 2009. City was responsible for design and construction management. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 3 25 25 25 25 103 Land (R /W) 0 Const. Mgmt. 2 2 4 Construction 13 82 28 123 TOTAL EXPENSES 16 84 30 0 25 25 25 25 0 230 FUND SOURCES Awarded Grant 82 28 110 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 16 2 2 0 25 25 25 25 0 120 TOTAL SOURCES 16 84 30 0 25 25 25 25 0 230 ® Project Location 2010 - 2015 Capital Improvement Program 92 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Andover Park E Water Main Replacement LINE ITEM: 401.02.594.34 . .19 PROJECT NO. 99940103 DESCRIPTION: Design and construct 2,200 LF of new 16" ductile iron pipe along Andover Park East from Tukwila Pkwy to Strander Blvd and 900 LF of 10" DIP in Christiansen Rd. JUSTIFICATION: Aging cast iron system has suffered frequent and spectacular failures. STATUS: Survey is complete. In -house design is 70% complete with construction scheduled for 2010. MAINT. IMPACT: A new pipe will significantly reduce impact on crews from the risk of cataclysmic events. COMMENT: FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location ,�� s+sasr - ��r�i ®E � 611'``°� sir _- '�ij :��'� g w inkier 9Ay s ►��l �fY 4 is S P le : s � stso Design 11 31 32 uWend Or Tniarwor 74 Land (R /W) i to i E2 0 Const. Mgmt. 132 132 Construction 1,301 1,301 TOTAL EXPENSES 11 31 1,465 0 0 0 0 0 0 1,507 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 11 31 1,465 0 0 0 0 0 0 1,507 TOTAL SOURCES 11 31 1,465 0 0 0 0 0 0 1,507 2010 - 2015 Capital Improvement Program 93 Project Location ,�� s+sasr - ��r�i ®E � 611'``°� sir _- '�ij :��'� g w inkier 9Ay s ►��l �fY 4 is S P le : s � stso sx.IF, • I. rw' J. ?r:,a AI �V��E 74.1 N1.1 lit uWend Or Tniarwor ,,,,,..iffo --4W41,1 .10 00; A e/464 IW ial j i to i E2 2010 - 2015 Capital Improvement Program 93 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Andover Park W /Strander New Water Main LINE ITEM: 401.02.594.34. .25 PROJECT NO. 99840105 DESCRIPTION: Design and construct 2,100 LF of a 12" pipe along Andover Park West from Tukwila Pkwy to Strander Blvd. JUSTIFICATION: Aging cast iron pipe and deficiencies under fire flow conditions. STATUS: Needs to be coordinated with Transit Center, Andover Park West street improvements, and future sewer and surface water projects. MAINT. IMPACT: Improved service would reduce maintenance liability. COMMENT: FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES �• Project Location 1 X5 ,+1 + , k4 OK -5 518,59 at u5 Design 961:1.8 IN 25 20 tit OJ1g +W / upearw Dr Kfttlercl Or Triland Of 45 Land (R /W) 5 j ' s reo - gEI 0 Const. Mgmt. 95 95 Construction 935 935 TOTAL EXPENSES 0 0 25 1,050 0 0 0 0 0 1,075 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 25 1,050 0 0 0 0 0 1,075 TOTAL SOURCES 0 0 25 1,050 0 0 0 0 0 1,075 2010 - 2015 Capital Improvement Program 94 �• Project Location 1 X5 ,+1 + , k4 OK -5 518,59 at u5 S 961:1.8 IN — Misr El tit OJ1g +W / upearw Dr Kfttlercl Or Triland Of MR! ` ,,,,, ,,,,„,, ,,,,. 5 j ' s reo - gEI 2010 - 2015 Capital Improvement Program 94 CITY OF TUKWILA CAPITAL PROJECT SUMMARY PROJECT: Water Comprehensive Plan DESCRIPTION: JUSTIFICATION: STATUS: MAINT. IMPACT: COMMENT: 2010 to 2015 LINE ITEM: 401.02.594.34. .22 PROJECT NO. 90440101 Prepare the new Water Comprehensive Plan incorporating any regulatory or new Growth Management Act Comprehensive Plan issues related to running the water utility. Plan needs to be consistent with City's Comprehensive Plan and the Department of Health requires the plan to be updated every 5 years. Last update was completed in 2005, next update will be in 2010. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location: Entire System I5 .n 03 ~.f.r 1•S Design 105 150 180 435 Land (R /W) 0 Const. Mgmt. 0 Construction 0 TOTAL EXPENSES 105 0 150 0 0 0 0 180 0 435 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 105 0 150 0 0 0 0 180 0 435 TOTAL SOURCES 105 0 150 0 0 0 0 180 0 435 2010 - 2015 Capital Improvement Program 95 Project Location: Entire System I5 .n 03 ~.f.r 1•S 2010 - 2015 Capital Improvement Program 95 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Martin Luther King Jr Way S Waterline LINE ITEM: 401.02.594.34 . .37 PROJECT NO. 90640102 DESCRIPTION: Design and construct replacement of 800 LF of 12" water line and hydrants. JUSTIFICATION: During the construction of Sound Transit light rail along Martin Luther King Jr Way South, the existing 12" D.I.P. waterline was found to be heavily covered with corrosion. STATUS: MAINT. IMPACT: A new pipe will reduce the risk of failure. COMMENT: FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location , �� N . ..... _ , BO®I ice -- ■ ∎ .. If i .1i Design 1 Nkk 5‘.....\s. Illt 1 I I I I I I I I I , q 1 25 = It 1 11111111 26 Land (R /W) 0 Const. Mgmt. 47 47 Construction 327 327 TOTAL EXPENSES 1 0 0 0 399 0 0 0 0 400 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 1 0 0 0 399 0 0 0 0 400 TOTAL SOURCES 1 0 0 0 399 0 0 0 0 400 2010 - 2015 Capital Improvement Program 96 Project Location , �� N . ..... _ , BO®I ice -- ■ ∎ .. If i .1i I. Nkk 5‘.....\s. Illt 1 I I I I I I I I I , q 1 , • = It 1 11111111 a `O ►a '�, 1 2010 - 2015 Capital Improvement Program 96 CITY OF TUKWILA CAPITAL PROJECT SUMMARY PROJECT: Minkler Blvd Water Looping DESCRIPTION: JUSTIFICATION: STATUS: 2010 to 2015 LINE ITEM: 401.02.594.34. .27 PROJECT NO. 99440101 Design and construct 900 LF of 12" ductile iron pipe to interconnect Southcenter Square with Andover Park West. Improvement in fire flow with a corresponding decrease in pressure fluctuations. Brings in a secondary feed in case of Southcenter Parkway shutdowns. MAINT. IMPACT: Better redundancy and service for critical business customers. COMMENT: FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location i Milo- ,. Design '� +'. F 30 30 60 Land (R /W) upww Yreane Or �i►�F '�����j Ar.� k4.1 i, 0 Const. Mgmt. rb 35 25 60 Construction 202 151 353 TOTAL EXPENSES 0 0 0 0 267 206 0 0 0 473 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 267 206 0 0 0 473 TOTAL SOURCES 0 0 0 0 267 206 0 0 0 473 2010 - 2015 Capital Improvement Program 97 Project Location i Milo- ,. ■ '� +'. F .a.111:1 ti F i upww Yreane Or �i►�F '�����j Ar.� k4.1 i, � span al rb 2010 - 2015 Capital Improvement Program 97 CITY OF TUKWILA CAPITAL PROJECT SUMMARY PROJECT: Macadam Rd S Water Upgrade LINE ITEM: 2010 to 2015 401.02.594.34. PROJECT NO. 90440105 DESCRIPTION: Design and construct 2,700 LF of 8" waterline in Macadam Rd S from S 144th St to S 152nd St. JUSTIFICATION: Improve fire and water quality to the north side of Tukwila hill. STATUS: MAINT. IMPACT: The new waterline will eliminate crew maintenance time for flushing the dead end line. COMMENT: FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 50 50 Land (R /W) 0 Const. Mgmt. 85 85 Construction 540 540 TOTAL EXPENSES 0 0 0 0 0 675 0 0 0 675 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 675 0 0 0 675 TOTAL SOURCES 0 0 0 0 0 675 0 0 0 675 2010 - 2015 Capital Improvement Program 98 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: 58th Ave S Water Main Replacement LINE ITEM: 401.02.594.34. PROJECT NO. 90440104 DESCRIPTION: Design and construct 700 LF of 8" ductile iron waterline to replace the old cast iron waterline in 58th Ave S from S 142nd St to S 144th St. JUSTIFICATION: The existing waterline is cast iron and is subject to cracking and breaking apart with age. STATUS: MAINT. IMPACT: The new waterline will significantly reduce impact on crews from the risk of failure. COMMENT: FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 15 15 Land (R /W) 0 Const. Mgmt. 33 33 Construction 220 220 TOTAL EXPENSES 0 0 0 0 0 268 0 0 0 268 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 268 0 0 0 268 TOTAL SOURCES 0 0 0 0 0 268 0 0 0 268 2010 - 2015 Capital Improvement Program 99 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Southcenter Pkwy Water Upgrade (Minkler to S 180th St) LINE ITEM: 401.02.594.34. .34 PROJECT NO. 90440103 DESCRIPTION: Design and construct 12" waterline in Southcenter Pkwy from Minkler Blvd to South 180th St. JUSTIFICATION: Coordinate with installation of sanitary sewer line in Southcenter Pkwy. STATUS: MAINT. IMPACT: Improved service will reduce maintenance liability. COMMENT: May coordinate with development in Tukwila South Project. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location 5 x 1156 Bi _. ii it itird 7-1 81668t Design 58 32 ��N �- V"lX p land Or Of 4 dt 90 Land (R /W) + G S / 0 Const. Mgmt. 75 75 Construction 500 500 TOTAL EXPENSES 58 32 0 0 0 0 575 0 0 665 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 58 32 0 0 0 0 575 0 0 665 TOTAL SOURCES 58 32 0 0 0 0 575 0 0 665 2010 - 2015 Capital Improvement Program 100 Project Location 5 x 1156 Bi _. ii it itird 7-1 81668t �. `` + _ � P�.ry � ��N �- V"lX p land Or Of 4 dt + G S / 2010 - 2015 Capital Improvement Program 100 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: S 180th St & West Valley Loop /Renton Water Turnover DESCRIPTION: JUSTIFICATION: STATUS: LINE ITEM: 401.02.594.34. PROJECT NO. 99940104 Loop the main on S 180th St to West Valley Hwy system currently owned by Renton. This system would provide a future potential connection south along West Valley Hwy for an alternate supply to Southcenter South. Better service and coordination within the City of Tukwila. Alternative source for back -up to Southcenter South. Also improves southerly supply option link with the City of Kent. Renton's LID 312 has been paid in full, so acquisition is possible. MAINT. IMPACT: Eliminates flushing and water quality complaints. COMMENT: FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES ' Project Location .I.i ,a� � 1� .`, _, 4 Imo, Design 1� S 40 40 Land (R /W) �� � / Mltll., er (k miwa �I r V/114 0 Const. Mgmt. _ av . __° IS 50 50 100 Construction 300 300 600 TOTAL EXPENSES 0 0 0 0 0 0 390 350 0 740 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 0 390 350 0 740 TOTAL SOURCES 0 0 0 0 0 0 390 350 0 740 2010 - 2015 Capital Improvement Program 101 ' Project Location .I.i ,a� � 1� .`, _, 4 Imo, 1� S �� � / Mltll., er (k miwa �I r V/114 ti s MOS _ av . __° IS 2010 - 2015 Capital Improvement Program 101 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: 53rd Ave S Water Main (S 137th - S 139th St) LINE ITEM: 401.02.594.34. PROJECT NO. 90540114 DESCRIPTION: Install approximately 635 LF of new 8" line along 53rd Ave S from S 137th St to S 139th St. JUSTIFICATION: This provides needed loop within the distribution system and will improve water service and fire flows to the north side of Tukwila Hill. STATUS: MAINT. IMPACT: COMMENT: FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location room.- ` T �3 51 AM 0111 dN' . .... .4,-- , , V 1 won ,,,,,J, 14 Millifir Design ' 4° A .— ti s 739 - i`t 4 Vi, �%It � 15 y IR 15 Land (R /W) VIIIIIIM `t_ p /■ 1 i_ far �/� 0 Const. Mgmt. AlgrUcMa Nil s B605{ ` 25 25 Construction 150 150 TOTAL EXPENSES 0 0 0 0 0 0 190 0 0 190 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 0 190 0 0 190 TOTAL SOURCES 0 0 0 0 0 0 190 0 0 190 2010 - 2015 Capital Improvement Program 102 Project Location room.- ` T �3 51 AM 0111 dN' . .... .4,-- , , V 1 won ,,,,,J, 14 Millifir inl ' 4° A .— ti s 739 - i`t 4 Vi, �%It � s e s ." 9 +iA y IR VIIIIIIM `t_ p /■ 1 i_ far �/� f AlgrUcMa Nil s B605{ ` 2010 - 2015 Capital Improvement Program 102 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: West Valley Hwy East Side Water Looping DESCRIPTION: JUSTIFICATION: STATUS: MAINT. IMPACT: COMMENT: LINE ITEM: 401.02.594.34 . Design and construct 2,000 linear feet of 10" south to the Stoneway facility. Improvements are needed for fire protection, Renton system turnover. PROJECT NO. 99940101 line along east side of West Valley Hwy from Strander Blvd service redundancy, and coordination with the future Coordinate with S 180th St & West Valley Loop /Renton Water Turnover Project. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location 'a s . Si 111111 .'Isms' kle. '; SISO 8t ■ Design r r `� 50 50 Land (R /W) Mdmr6 ! a F T� �i f E ■ Uplwnd Dr Mltlla • (N -Mood a jjj }� _ A re !gyp 0 Const. Mgmt. fal /gyI OA _ r k M t� Gs 90 90 Construction 600 600 TOTAL EXPENSES 0 0 0 0 0 0 0 740 0 740 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 0 0 740 0 740 TOTAL SOURCES 0 0 0 0 0 0 0 740 0 740 2010 - 2015 Capital Improvement Program 103 Project Location 'a s . Si 111111 .'Isms' kle. '; SISO 8t ■ • 1 } r r `� Mdmr6 ! a F T� �i f E ■ Uplwnd Dr Mltlla • (N -Mood a jjj }� _ A re !gyp S 9 8 SO8 fal /gyI OA _ r k M t� Gs 2010 - 2015 Capital Improvement Program 103 CITY OF TUKWILA CAPITAL PROJECT SUMMARY PROJECT: Foster Playfield Water Upgrade LINE ITEM: 2010 to 2015 401.02.594.34. . PROJECT NO. 90840101 DESCRIPTION: Upgrade 1,800 LF of existing 8" water piping. Area was part of Water District 125 turnover in 2007. JUSTIFICATION: The existing 2" to 6" pipe is cast iron and in need of repair. STATUS: MAINT. IMPACT: COMMENT: FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 25 25 Land (R /W) 0 Const. Mgmt. 50 50 Construction 525 525 TOTAL EXPENSES 0 0 0 0 0 0 0 0 600 600 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 0 0 0 600 600 TOTAL SOURCES 0 0 0 0 0 0 0 0 600 600 2010 - 2015 Capital Improvement Program 104 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: West Valley Deep Water Main Replacement DESCRIPTION: JUSTIFICATION: Aging system with difficulty repairing leaks or breaks and complicated by depth. STATUS: MAINT. IMPACT: Eliminates difficult maintenance due to the depth of the water main. COMMENT: LINE ITEM: 401.02.594.34. PROJECT NO. 90340102 Design and construct 700 LF of waterline to replace aging cast iron system buried too deep from Strander Blvd to Cedar River pipeline #4 in West Valley Hwy. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 30 30 Land (R /W) 0 Const. Mgmt. 50 50 Construction 280 280 TOTAL EXPENSES 0 0 0 0 0 0 0 0 360 360 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 0 0 0 360 360 TOTAL SOURCES 0 0 0 0 0 0 0 0 360 360 2010 - 2015 Capital Improvement Program 105 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: 65th Ave S (Southcenter Blvd to S 151st St) LINE ITEM: 401.02.594.34. PROJECT NO. 90540103 DESCRIPTION: Replace approximately 1,985 LF of existing 8" line with a 16" line. JUSTIFICATION: This replacement will improve fire flows to the east side of Tukwila Hill (Canyon Estates). STATUS: MAINT. IMPACT: COMMENT: FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 0 Land (R /W) 0 Const. Mgmt. 120 120 Construction 800 800 TOTAL EXPENSES 0 0 0 0 0 0 0 0 920 920 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 0 0 0 920 920 TOTAL SOURCES 0 0 0 0 0 0 0 0 920 920 2010 - 2015 Capital Improvement Program 106 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: 49th Ave S (S 107th St to S 114th St) LINE ITEM: 401.02.594.34. PROJECT NO. 90540101 DESCRIPTION: Install approximately 2,000 LF of new 8" line along 49th Ave S from S 107th St to S 114th St. JUSTIFICATION: This extension will close a loop. STATUS: MAINT. IMPACT: COMMENT: Developer driven, with late- comers fees for subsequent connections. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location AN • la i, J ' a Cr 1 CG6' �� r i� I t v; .fir Design \:\ N s vrtook,„ 1, o 0 Land (R /W) 1 : 5L: `; r GIS cf 0 Const. Mgmt. 90 90 Construction 600 600 TOTAL EXPENSES 0 0 0 0 0 0 0 0 690 690 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 0 0 0 690 690 TOTAL SOURCES 0 0 0 0 0 0 0 0 690 690 2010 - 2015 Capital Improvement Program 107 Project Location AN • la i, J ' a Cr 1 CG6' �� r i� I t v; .fir *Ray01 44 ...... , , .,,, k. \:\ N s vrtook,„ 1, o L� 9 12: ^, 1 : 5L: `; r GIS cf 2010 - 2015 Capital Improvement Program 107 CITY OF TUKWILA CAPITAL PROJECT SUMMARY PROJECT: S 180th St (east of APE) LINE ITEM: 2010 to 2015 401.02.594.34. PROJECT NO. 90540105 DESCRIPTION: Replace approximately 880 LF of existing 10" line with a 12" line in S 180th St, east of Andover Park East. JUSTIFICATION: This replacement will improve fire flows to the area. STATUS: MAINT. IMPACT: COMMENT: FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES { Project Location . tia -_ ve ,r s',bas - -P • ` 816051 �■� Design lq 'Y w i • i r i . 13 icier Blvd r„ 50 50 Land (R /W) ni r GIS lv� r 0 Const. Mgmt. 60 60 Construction 352 352 TOTAL EXPENSES 0 0 0 0 0 0 0 0 462 462 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 0 0 0 462 462 TOTAL SOURCES 0 0 0 0 0 0 0 0 462 462 2010 - 2015 Capital Improvement Program 108 { Project Location . tia -_ ve ,r s',bas - -P • ` 816051 �■� lq 'Y w i • i r i . 13 icier Blvd r„ a 4 N z:Iy usmmo sr THlantl Cr ni r GIS lv� r 2010 - 2015 Capital Improvement Program 108 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Southcenter Blvd (Green River to 65th Ave S) DESCRIPTION: JUSTIFICATION: STATUS: MAINT. IMPACT: COMMENT: LINE ITEM: 401.02.594.34. PROJECT NO. 90540104 Replace approximately 400 LF of existing 8" line with a 10" line in Southcenter Blvd from the Green River Bridge to 65th Ave S. This replacement will improve water service and fire flows to the areas around City Hall and the residential area north of Southcenter Blvd. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES 0 Project Location Vr'�`�� 30 St �, ■ • � 1 NS r.. IP g Design 14 15 15 Land (R /W) s ,...,,_,,, re raast 0 Const. Mgmt. WANNER t 47 R 40 40 Construction 7 160 160 TOTAL EXPENSES 0 0 0 0 0 0 0 0 215 215 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 0 0 0 215 215 TOTAL SOURCES 0 0 0 0 0 0 0 0 215 215 2010 - 2015 Capital Improvement Program 109 0 Project Location Vr'�`�� 30 St �, ■ • � 1 NS r.. IP g 14 Arvir mu s ,...,,_,,, re raast 1 rp, \ WANNER t 47 R Si i5'', .. 1 s "a G IS 7 2010 - 2015 Capital Improvement Program 109 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Macadam Rd S (Southcenter Blvd to S 152nd St) LINE ITEM: 401.02.594.34. PROJECT NO. 90540108 DESCRIPTION: Install approximately 1,335 LF of new 8" line along Macadam Rd S from Southcenter Blvd to S 152nd St. JUSTIFICATION: This provides needed loop within the distribution system and will improve water service and fire flows to the north side of Tukwila Hill. STATUS: MAINT. IMPACT: COMMENT: FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES 0 Project Location G s, . writ.; 'It' Design Mill 't 14 0 Land (R /W) UM 4 0 Const. Mgmt. j 2 err ,, I 26 26 Construction 131 131 TOTAL EXPENSES 0 0 0 0 0 0 0 0 157 157 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 0 0 0 157 157 TOTAL SOURCES 0 0 0 0 0 0 0 0 157 157 2010 - 2015 Capital Improvement Program 110 0 Project Location G s, . writ.; 'It' Mill 't 14 Atil UM 4 Wirmist =_r elEI5St SS j 2 err ,, I �tigm_ 2010 - 2015 Capital Improvement Program 110 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Evans Black Dr (west of APE) LINE ITEM: 401.02.594.34. PROJECT NO. 90540109 DESCRIPTION: Replace approximately 540 LF of existing 8" line with a 10" line along Evans Black Dr, west of Andover Pk E. JUSTIFICATION: This replacement will improve fire flows to this area. STATUS: MAINT. IMPACT: COMMENT: FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location r , �,'• *V Amain ,, rea . 'y Design 11 ` ai r y .ir.4..,.e.a1i` iN r- W�i`i�E unr�+d rx Tm+flaw i1 , 1,0,4 k "ff1 r gel 0 Land (R /W) . na l 0 Const. Mgmt. 5 5 Construction 65 65 TOTAL EXPENSES 0 0 0 0 0 0 0 0 70 70 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 0 0 0 70 70 TOTAL SOURCES 0 0 0 0 0 0 0 0 70 70 2010 - 2015 Capital Improvement Program 111 Project Location r , �,'• *V Amain ,, rea . 'y Q 11 ` ai r y .ir.4..,.e.a1i` iN r- W�i`i�E unr�+d rx Tm+flaw i1 , 1,0,4 k "ff1 r gel $ i aea_ Q . na l 2010 - 2015 Capital Improvement Program 111 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: 53rd Ave S (S 139th St to S 140th St) LINE ITEM: 401.02.594.34. PROJECT NO. 90540106 DESCRIPTION: Replace approximately 300 LF of existing 6" line along 53rd Ave S with an 8" line. JUSTIFICATION: This replacement will improve water service and fire flows to the north side of Tukwila Hill. STATUS: MAINT. IMPACT: COMMENT: FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES 0 Project Location tiriti ligreilip \` N, x,11 , ��,� E I� 1 VP Design Wail XII •ti b me vilijoi wirimMilli NPR k 0 Land (R /W) \ .‘„ ; . rodr ''',.), u,/4 ss 0 Const. Mgmt. 1 ' 1 F A • ay GIS 3 3 Construction y 1ilia-' 28 28 TOTAL EXPENSES 0 0 0 0 0 0 0 0 31 31 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 0 0 0 31 31 TOTAL SOURCES 0 0 0 0 0 0 0 0 31 31 2010 - 2015 Capital Improvement Program 112 0 Project Location tiriti ligreilip \` N, x,11 , ��,� E I� 1 VP Wail XII •ti b me vilijoi wirimMilli NPR k - \ .‘„ ; . rodr ''',.), u,/4 ss RE e 1 ' 1 F A • ay GIS A■ s 1 6 sr `rO y 1ilia-' 2010 - 2015 Capital Improvement Program 112 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: 52nd Ave S (Interurban Ave S to 53rd Ave S) LINE ITEM: 401.02.594.34 . PROJECT NO. 90540107 DESCRIPTION: Replace approximately 280 LF of existing 6" line along 52nd Ave S with an 8" water line. JUSTIFICATION: Replacement will improve fire flows to the north side of Tukwila hill. STATUS: MAINT. IMPACT: COMMENT: FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 0 Land (R /W) 0 Const. Mgmt. 3 3 Construction 27 27 TOTAL EXPENSES 0 0 0 0 0 0 0 0 30 30 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 0 0 0 30 30 TOTAL SOURCES 0 0 0 0 0 0 0 0 30 30 2010 - 2015 Capital Improvement Program 113 CITY OF TUKWILA CAPITAL PROJECT SUMMARY PROJECT: S 112 St Water Looping LINE ITEM: 2010 to 2015 401.02.594.34. PROJECT NO. 99440106 DESCRIPTION: Design and construct approximately 1,500 ft of 12" ductile iron waterline between Tukwila Int'l Blvd and East Marginal Way. JUSTIFICATION: Create a looped system for fire flow redundancy and water quality needs. STATUS: Depends on new development along S 112 St (right -of -way belongs to Seattle Public Utilities). MAINT. IMPACT: System would reduce the need for flushing maintenance. COMMENT: FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES 61 Project Location c , Ili .t _ ,` Atrintio ' 4137? Ili, 411,' v., c li.1.1,4 _ 1...,,,,... 1 AN Design ., \\71111■14--------■___Am `Vrt, Aii, 1 `y $:1 s s 25 25 Land (R /W) GIS 0 Const. Mgmt. 14 14 Construction 270 270 TOTAL EXPENSES 0 0 0 0 0 0 0 0 309 309 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 40 40 Utility Revenue 0 0 0 0 0 0 0 0 269 269 TOTAL SOURCES 0 0 0 0 0 0 0 0 309 309 2010 - 2015 Capital Improvement Program 114 61 Project Location c , Ili .t _ ,` Atrintio ' 4137? Ili, 411,' v., c li.1.1,4 _ 1...,,,,... 1 AN w ., \\71111■14--------■___Am `Vrt, Aii, 1 `y $:1 s s a L si2 ` aif 5L+ Met ' GIS 2010 - 2015 Capital Improvement Program 114 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: S 153rd St (east of 65th Ave S) LINE ITEM: 401.02.594.34. PROJECT NO. 90540110 DESCRIPTION: Replace approximately 490 LF of existing 8" line with a 10" line along S 153rd St. JUSTIFICATION: This replacement will improve fire flows to the east side of Tukwila Hill (Canyon Estates). STATUS: MAINT. IMPACT: COMMENT: FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 0 Land (R /W) 0 Const. Mgmt. 4 4 Construction 60 60 TOTAL EXPENSES 0 0 0 0 0 0 0 0 64 64 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 0 0 0 64 64 TOTAL SOURCES 0 0 0 0 0 0 0 0 64 64 2010 - 2015 Capital Improvement Program 115 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Minkler Blvd (east of Industry Dr) LINE ITEM: 401.02.594.34. PROJECT NO. 90540111 DESCRIPTION: Replace approximately 490 LF of existing 8" line with a 10" line along Minkler Blvd, east of Industry Dr. JUSTIFICATION: This replacement will improve fire flows to the area. STATUS: MAINT. IMPACT: COMMENT: FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location tit a �`� Ill ' .. S reo SP Q. Design 9 16 . hj 1— ON g, - SR 1 lar 13 up+arw or ru MA Tolland br ; ;41 I °' 0 Land (R /W) ay j 0 Const. Mgmt. 4 4 Construction 60 60 TOTAL EXPENSES 0 0 0 0 0 0 0 0 64 64 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 0 0 0 64 64 TOTAL SOURCES 0 0 0 0 0 0 0 0 64 64 2010 - 2015 Capital Improvement Program 116 Project Location tit a �`� Ill ' .. S reo SP Q. � 9 16 . hj 1— ON g, - SR 1 lar 13 up+arw or ru MA Tolland br ; ;41 I °' ay j 2010 - 2015 Capital Improvement Program 116 CITY OF TUKWILA CAPITAL PROJECT SUMMARY PROJECT: Corporate Dr S (west of APW) LINE ITEM: 2010 to 2015 401.02.594.34. PROJECT NO. 90540112 DESCRIPTION: Replace approximately 460 LF of existing 8" line with a 10" line along Corporate Dr S west of Andover Pk W. JUSTIFICATION: This replacement will improve fire flows to the area. STATUS: MAINT. IMPACT: COMMENT: FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location r ■0 VC ii lit .2..0100 11 'MI It 1111 3160,61 Design s i IlL nr 41 ,PA . � 4r!Itv. 1^r f � 0 Land (R /W) 1 e • 7 4 0 Const. Mgmt. 5 5 Construction 55 55 TOTAL EXPENSES 0 0 0 0 0 0 0 0 60 60 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 0 0 0 60 60 TOTAL SOURCES 0 0 0 0 0 0 0 0 60 60 2010 - 2015 Capital Improvement Program 117 Project Location r ■0 VC ii lit .2..0100 11 'MI It 1111 3160,61 -- j s i IlL nr 41 ,PA . � 4r!Itv. 1^r f � ll 1 e • 7 4 2010 - 2015 Capital Improvement Program 117 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Poverty Hill- Neighborhood Water Revitalization LINE ITEM: 401.02.594.34 . PROJECT NO. 90140103 DESCRIPTION: Design and construct 1,000 LF of replacement waterlines including fire hydrants. JUSTIFICATION: System is old and failing, fire flows are deficient, and new connections are not allowed. STATUS: MAINT. IMPACT: Significantly reduces leak potential and repair liability. COMMENT: Part of the overall improvements in the Allentown area. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location Ai-- I . 1 _ _ Design 1 wo 0:1 ii. 1 ` Voilka \i'tk , , 25 25 Land (R /W) — 11 r 11111111 r q SLw Firm 0 Const. Mgmt. 20 20 Construction 255 255 TOTAL EXPENSES 0 0 0 0 0 0 0 0 300 300 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 0 0 0 300 300 TOTAL SOURCES 0 0 0 0 0 0 0 0 300 300 2010 - 2015 Capital Improvement Program 118 Project Location Ai-- I . 1 _ _ _ _ Pit 1 wo 0:1 ii. 1 ` Voilka \i'tk , , Itt, ill P 7 � — 11 r 11111111 r q SLw Firm 4- i' GIS 2010 - 2015 Capital Improvement Program 118 CIP Page # PROJECT TITLE City of Tukwila CAPITAL IMPROVEMENT PROGRAM for 2010 - 2015 SEWER ENTERPRISE FUND 402.02 *Other After Six 2010 2011 2012 2013 2014 2015 TOTAL Sources Years 120 Interurban Ave S Gravity Sewer 150 0 0 0 0 0 150 0 0 121 Gravity Sewer under 1 -405 to Tuk Pkwy 100 0 0 0 0 0 100 0 3,000 122 Annual Sewer Repair Program 73 75 75 75 75 75 448 0 75 123 Andover Park W Sewer Main Capacity 50 650 550 0 0 0 1,250 0 0 124 Sewer Comprehensive Plan 150 0 0 0 0 180 330 0 0 125 Sewer Repair at 1227 Andover Park E 0 0 0 230 0 0 230 0 0 126 Sewer Manhole at 341 Andover Park E 0 0 0 69 0 0 69 0 0 127 55th Ave S Sanitary Sewer Line Repair 0 0 0 55 0 0 55 0 0 128 Sewer Repair at 1075 Andover Park E 0 0 0 0 550 0 550 0 0 129 Southcenter Blvd Sewer Upgrade 0 0 0 0 75 775 850 0 475 130 GIS Inventory of Sewer System 0 0 0 0 0 0 0 0 500 131 Sewer Repair West of Strander Blvd Bridge 0 0 0 0 0 0 0 0 80 132 Sewer Lift Stations Nos. 3& 4 0 0 0 0 0 0 0 0 930 133 Sewer Replacement at 14025 Interurban Ave 0 0 0 0 0 0 0 0 900 134 Sewer Lift Station No. 2 Mixing Pump & Slab 0 0 0 0 0 0 0 0 92 135 South City Limits Sewer Extension 0 0 0 0 0 0 0 0 9,050 136 Abandon Sewer Lift Station No. 9 0 0 0 0 0 0 0 0 605 137 Sewer Repair at 5700 Southcenter Blvd 0 0 0 0 0 0 0 0 125 138 Sewer Replacement near S 140th St 0 0 0 0 0 0 0 0 75 139 Sewer Lift Station No. 12 0 0 0 0 0 0 0 0 3,600 140 APW Sewer connection to KC Metro 0 0 0 0 0 0 0 0 150 141 Poverty Hill - Sewer Revitalization 0 0 0 0 0 0 0 0 1,230 142 Ryan Hill - Sewer Revitalization 0 0 0 0 0 0 0 0 1,105 Grand Total 523 725 625 429 700 1,030 4,032 0 21,992 ** Denotes other funding sources, grants, or mitigation. Changes from 2009 to 2010 CIP: New: 122 Changed name from Sewer Infiltration and Inflow to Annual Sewer Repair Program Deleted: Sewer Manhole near 13730 56th Ave S, completed in 2009. Sewer Repair at 17555 Southcenter Pkwy, completed in 2009. Sewer Lift Station Locations Lift Station No. 1 - Master Telemetry Panel 600 Minkler Blvd. - Shops Lift Station No. 2 - Backup Dialer 1105 Andover Pk W (at Minkler Blvd) Lift Station No. 3 550 Minkler Blvd Lift Station No. 4 6790 Todd Blvd - Southcenter South Lift Station No. 5 6830 Fort Dent Way (entrance to Park) Lift Station No. 6 6820 Fort Dent Way (in Park) Lift Station No. 7 14601 Interurban - Teamster's Bldg Lift Station No. 8 13359 56th Ave S - Foster Point (new in 2007) Lift Station No. 9 12638 Interurban - Suburban Propane Lift Station No. 10 12218 51st PI S - Allentown (new in 2007) Lift Station No. 11 Future Lift Station No. 12 255 Andover Park W - Key Bank parking lot at mall 2010 - 2015 Capital Improvement Program 119 01/05/2010 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Interurban Ave S Gravity Sewer LINE ITEM: 402.02.594.35 . .30 PROJECT NO. 90440208 DESCRIPTION: Install new pumps, control system and valves for the existing Lift Station #7 located at 14675 Interurban Ave S. JUSTIFICATION: The 42 -year old pump station is near the end of its life cycle. STATUS: Pump replacement is much more economical than installing a new gravity sewer line to the area. MAINT. IMPACT: COMMENT: FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 18 18 Land (R /W) 0 Const. Mgmt 0 Construction 150 150 TOTAL EXPENSES 0 18 150 0 0 0 0 0 0 168 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 18 150 0 0 0 0 0 0 168 TOTAL SOURCES 0 18 150 0 0 0 0 0 0 168 2010 - 2015 Capital Improvement Program 120 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Gravity Sewer under 1 -405 to Tukwila Parkway LINE ITEM: 402.02.594.35 . .23 PROJECT NO. 99740205 DESCRIPTION: Design and construct approximately 700 LF of gravity sewer including a 450 ft micro - tunnel bore under 1 -405 west of 65th Ave S near Xerox to Tukwila Parkway. JUSTIFICATION: Existing line is undersized and has a severe sag. Increased development on the North Hill exacerbates the deficiency. STATUS: In -house design that will be coordinated with WSDOT and Seattle Public Utilities. MAINT. IMPACT: Less flushing maintenance to clear debris from sag and from the improved HOV manhole alignment. COMMENT: Other alternatives are being reviewed due to WSDOT requirements. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES „..„... ,,, Project t oca tion �' ,6 se ill ��a i >�° , ___ Design 68 . 50 " 1 500 618 Land (R /W) Gri & S,eosi i m 200 200 Const. Mgmt 300 300 Construction 50 2,000 2,050 TOTAL EXPENSES 68 0 100 0 0 0 0 0 3,000 3,168 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 68 0 100 0 0 0 0 0 3,000 3,168 TOTAL SOURCES 68 0 100 0 0 0 0 0 3,000 3,168 2010 - 2015 Capital Improvement Program 121 „..„... ,,, Project t oca tion �' ,6 se ill ��a i >�° , ___ �■ . I " 1 ..� 1 til • ANA `. w i":40 - InkbrEP Vplantl Dr Midi .. p rnrs.w trr Gri & S,eosi i m e El I 2010 - 2015 Capital Improvement Program 121 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Annual Sewer Repair Program LINE ITEM: 402.02.594.35 . .05 PROJECT NO. Varies Reduce sewer line infiltration and inflow (I & I) through groundwater intrusion or storm events as a DESCRIPTION: result of damaged deteriorating systems or unopposed connections. Include small repairs and capital maintenance. JUSTIFICATION: Decrease treatment, discharge, and pumping costs. STATUS: Annual program is determined after pipeline TV inspection reports are completed. MAINT. IMPACT: Less maintenance costs through rehabilitation of aging system. COMMENT: Ongoing project, only one year actuals shown in first column. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 0 Land (R /W) 0 Const. Mgmt 0 Construction 25 80 73 75 75 75 75 75 75 628 TOTAL EXPENSES 25 80 73 75 75 75 75 75 75 628 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 25 80 73 75 75 75 75 75 75 628 TOTAL SOURCES 25 80 73 75 75 75 75 75 75 628 Project Location: Entire System 2010 - 2015 Capital Improvement Program 122 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Andover Park W Sewer Main Capacity Upgrade DESCRIPTION: LINE ITEM: 402.02.594.35 . .33 PROJECT NO. 99740206 Design and construct replacement line to handle capacity problems resulting from the increased commercial and multi - family development on the North Hill. Includes 200 LF of 18" pipe with bypass pumping. JUSTIFICATION: The infrastructure is aging and does not have the necessary capacity. STATUS: MAINT. IMPACT: Reduces maintenance. COMMENT: Coordinate with Andover Park West street and storm improvements. This project may begin sooner based on WSDOT and requirements from the 1 -405 Widening Project. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location . ' ate ~w , .rte : Design gib ~' +la 50 50 ...-,� Ilk 4 100 Land (R /W) 4 i A4 avensI r � Vs o GIS 0 Const. Mgmt 100 50 150 Construction 500 500 1,000 TOTAL EXPENSES 0 0 50 650 550 0 0 0 0 1,250 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 50 650 550 0 0 0 0 1,250 TOTAL SOURCES 0 0 50 650 550 0 0 0 0 1,250 2010 - 2015 Capital Improvement Program 123 Project Location . ' ate ~w , .rte : gib ~' +la 111 MI ...-,� Ilk 4 Wised Or 4 i A4 avensI r � Vs o GIS 2010 - 2015 Capital Improvement Program 123 CITY OF TUKWILA CAPITAL PROJECT SUMMARY PROJECT: Sewer Comprehensive Plan DESCRIPTION: JUSTIFICATION: STATUS: MAINT. IMPACT: COMMENT: 2010 to 2015 LINE ITEM: 402.02.594.35 . .22 PROJECT NO. 98840201 Prepare new Sewer Comprehensive Plan incorporating any new or regulatory Growth Management Act Comprehensive Plan issues related to sewer. Sewer Comprehensive Plan needs to be consistent with City Comprehensive Plan, Department of Ecology and Department of Health. Update is required every 5 years. Last update was completed in 2005, next update is due in 2010. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 99 150 180 429 Land (R /W) 0 Const. Mgmt 0 Construction 0 TOTAL EXPENSES 99 0 150 0 0 0 0 180 0 429 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 99 0 150 0 0 0 0 180 0 429 TOTAL SOURCES 99 0 150 0 0 0 0 180 0 429 2010 - 2015 Capital Improvement Program 124 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Sewer Repair at 1227 Andover Park E LINE ITEM: 402.02.594.35 . PROJECT NO. 90740205 DESCRIPTION: The existing 12" sanitary sewer in Andover Park E is asbestos concrete pipe. The pipe is soft and ready to collapse. The pipe can be relined with little impact to the pavement. JUSTIFICATION: If the pipe collapses, the street will have to be excavated and the cost of the project will rise significantly. STATUS: MAINT. IMPACT: Reduced maintenance costs. COMMENT: The limits of the project are from South 180th St to 700' south of Minkler Blvd. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location oca tiorrr ,.., ` .li►, -r ` e,te s,L� ltk slit Design II 10 N •- WinE Alin �.!�I uplentl or Tana pr i� 10 Land (R /W) s I 6, ®•8 . i it llh ! pis 0 Const. Mgmt 30 30 Construction 190 190 TOTAL EXPENSES 0 0 0 0 0 230 0 0 0 230 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 230 0 0 0 230 TOTAL SOURCES 0 0 0 0 0 230 0 0 0 230 2010 - 2015 Capital Improvement Program 125 Project Location oca tiorrr ,.., ` .li►, -r ` e,te s,L� ltk slit II Ur N •- WinE Alin �.!�I uplentl or Tana pr i� '..f,fri,4,,, ' s I 6, ®•8 . i it llh ! pis 2010 - 2015 Capital Improvement Program 125 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Sewer Manhole at 341 Andover Park E LINE ITEM: 402.02.594.35 . PROJECT NO. 90540210 DESCRIPTION: Design and construct a new sewer manhole on the existing gravity sewer at 341 Andover Park E. JUSTIFICATION: The existing manholes are too far apart to maintain adequately. STATUS: MAINT. IMPACT: The new manhole will allow current maintenance equipment to be used to clear existing main. COMMENT: FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location,.e. g, NI �, gory 4 s.\ Design 8, St �� } 1i 1 ii J�.�.1 u § .. older a � 31 � {r ry t 1 0 Land (R /W) 1' uplmid 6r Midland or Tfwend Dr 9�� i 4� it 8,80 0 Const. Mgmt IIJJJ!!f // , a 9 9 Construction 60 60 TOTAL EXPENSES 0 0 0 0 0 69 0 0 0 69 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 69 0 0 0 69 TOTAL SOURCES 0 0 0 0 0 69 0 0 0 69 2010 - 2015 Capital Improvement Program 126 Project Location,.e. g, NI �, gory 4 s.\ 8, St �� } 1i 1 ii J�.�.1 u § .. older a � 31 � {r ry t 1 Nell �j '� 1' uplmid 6r Midland or Tfwend Dr 9�� i 4� it 8,80 IIJJJ!!f // , a 2010 - 2015 Capital Improvement Program 126 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: 55th Ave S Sanitary Sewer Line Repair LINE ITEM: 402.02.594.35 . PROJECT NO. 90640203 DESCRIPTION: Repair existing 8" sanitary sewer line that has collapsing pipe in 55th Ave South. JUSTIFICATION: The repair is needed to prevent the line from complete failure. STATUS: MAINT. IMPACT: If line collapses, sewer will be plugged and back up, causing property damage. COMMENT: Sewer line is down 15+ feet in paved street. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 0 Land (R /W) 0 Const. Mgmt 5 5 Construction 50 50 TOTAL EXPENSES 0 0 0 0 0 55 0 0 0 55 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 55 0 0 0 55 TOTAL SOURCES 0 0 0 0 0 55 0 0 0 55 2010 - 2015 Capital Improvement Program 127 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Sewer Repair at 1075 Andover Park E LINE ITEM: 402.02.594.35 . PROJECT NO. 90540207 DESCRIPTION: Replace 864 LF of 12" sewer line between Andover Park E and Andover Park W at 1075 Andover Park E. JUSTIFICATION: The existing line has significant sags in it. STATUS: MAINT. IMPACT: Reduced maintenance costs. COMMENT: Bypass pumping required for project. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location fr19e s1 11.-- We ---..`-. Or----810.4:,......- '44 M. Design - 25 25 Land (R /W) •� • N 1• �, 41N E 11� 'mill i‘ lb lower JNM. 0 Const. Mgmt ill,.'� j S 190 $1 60 60 Construction 465 465 TOTAL EXPENSES 0 0 0 0 0 0 550 0 0 550 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 0 550 0 0 550 TOTAL SOURCES 0 0 0 0 0 0 550 0 0 550 2010 - 2015 Capital Improvement Program 128 Project Location fr19e s1 11.-- We ---..`-. Or----810.4:,......- '44 M. - •� • N 1• �, 41N E 11� 'mill i‘ lb lower JNM. upl Mldl-:�. • Frfle.9 Or� +� ill,.'� j S 190 $1 2010 - 2015 Capital Improvement Program 128 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Southcenter Blvd Sewer Upgrade DESCRIPTION: JUSTIFICATION: STATUS: LINE ITEM: 402.02.594.35 . PROJECT NO. 99840202 Upgrade 2,500 LF of 8" to a larger capacity 12" system from Macadam Rd to the 1 -405 undercrossing on Southcenter Blvd. Flows have greatly increased with additional connections to the basin from the North Hill apartment buildings causing the system to be deficient in terms of capacity for peak discharges. MAINT. IMPACT: Improved service would reduce maintenance liability. COMMENT: Coordinate with 1 -405 improvements to Southcenter Blvd. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location - . s,fes 8E CJ,i UL41 'i'--„■ w►,.1 - ', 8 .. at 1.1 'R I + II Design S c. • V Of Mar 2Nd a 75 75 it 150 Land (R /W) A f lig 0 Const. Mgmt 75 50 125 Construction 625 425 1,050 TOTAL EXPENSES 0 0 0 0 0 0 75 775 475 1,325 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 0 75 775 475 1,325 TOTAL SOURCES 0 0 0 0 0 0 75 775 475 1,325 2010 - 2015 Capital Improvement Program 129 Project Location - . s,fes 8E CJ,i UL41 'i'--„■ w►,.1 - ', 8 .. at 1.1 'R I + II S c. • V Of Mar 2Nd a 4msns ii! it f A f lig 2010 - 2015 Capital Improvement Program 129 CITY OF TUKWILA CAPITAL PROJECT SUMMARY PROJECT: GIS Inventory of Sewer System DESCRIPTION: JUSTIFICATION: STATUS: MAINT. IMPACT: The survey will provide staff with up -to -date information on the location of manholes for the sanitary sewers. 2010 to 2015 LINE ITEM: 402.02.594.35 . .14 PROJECT NO. 90540202 GIS (Geographic Information Systems) inventory of sanitary sewer system in the central business district to provide better as -built drawings of the underground piping. GIS mapping of the sewers will provide information on the sewer system in a format that is easily addressable by the public. In 2007, the Commercial Business District (CBD) was surveyed for GIS mapping. Due to lack of funds, all remaining GIS inventory projects are on hold. COMMENT: Other areas of the City will follow. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location ... �� °�'.� �► 4ni�+ ■ +I + rwse t Design 60 45 � JN �- i1. IA. �� E of .r • 500 605 Land (R /W) l 4 • 0 Const. Mgmt 0 Construction 0 TOTAL EXPENSES 60 45 0 0 0 0 0 0 500 605 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 60 45 0 0 0 0 0 0 500 605 TOTAL SOURCES 60 45 0 0 0 0 0 0 500 605 2010 - 2015 Capital Improvement Program 130 Project Location ... �� °�'.� �► 4ni�+ ■ +I + rwse t � JN �- i1. IA. �� E of .r • it Upld,a or tl Mlle .. OR. �ntla l 4 • 2010 - 2015 Capital Improvement Program 130 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Sewer Repair West of Strander Blvd Bridge LINE ITEM: 402.02.594.35 . PROJECT NO. 90840203 DESCRIPTION: Repair cracked sewer line west of Strander Blvd bridge. JUSTIFICATION: Line was damaged during installation of storm drain in 2004. STATUS: MAINT. IMPACT: The new manhole will allow current maintenance equipment to be used to clear existing main. COMMENT: FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES .;" Project Location -• r — i•ll q j� s;•6 1 - =- Design " Tr' 1 . r N`- 9 ►. 1 1,77 riprr 0 Land (R /W) £ s 1 111141,, •.. o. Mello p[ 711...7 Dr 0 Const. Mgmt Mg• 10 10 Construction 70 70 TOTAL EXPENSES 0 0 0 0 0 0 0 0 80 80 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 0 0 0 80 80 TOTAL SOURCES 0 0 0 0 0 0 0 0 80 80 2010 - 2015 Capital Improvement Program 131 .;" Project Location -• r — i•ll q j� s;•6 1 - =- " Tr' 1 . r N`- 9 ►. 1 1,77 riprr £ s 1 111141,, •.. o. Mello p[ 711...7 Dr 5' 1 ' 61.0 SI Mg• 2010 - 2015 Capital Improvement Program 131 CITY OF TUKWILA CAPITAL PROJECT SUMMARY PROJECT: Sewer Lift Stations Nos. 3 & 4 DESCRIPTION: JUSTIFICATION: STATUS: MAINT. IMPACT: COMMENT: LINE ITEM: 2010 to 2015 402.02.594.35 . PROJECT NO. 90440206 Sewer Lift Stations No. 3 & 4 are at the end of their life cycles and need to be rebuilt. Aging system requires the replacement of motors, pump and controls at two older lift stations to reduce maintenance. New pumps will reduce the liability of the existing pumps failing. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 10 10 Land (R /W) 0 Const. Mgmt 120 120 Construction 800 800 TOTAL EXPENSES 0 0 0 0 0 0 0 0 930 930 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 0 0 0 930 930 TOTAL SOURCES 0 0 0 0 0 0 0 0 930 930 2010 - 2015 Capital Improvement Program 132 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Sewer Replacement at 14025 Interurban Ave S DESCRIPTION: LINE ITEM: 402.02.594.35 . PROJECT NO. 90540209 Replace 1,500 LF of 8" sewer line at 14025 Interurban Ave S from the Golden Nugget to the Foster Green Apartments. JUSTIFICATION: The existing main has sags and is undersized. STATUS: MAINT. IMPACT: Reduced maintenance costs. COMMENT: FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES 0 Project Location `.e r In ostbur W. Design magi' win Mae * 50 50 Land (R /W) ,N N \ ri WPM Airileinfisi tae Sth` S'7 56 St m e 0 Const. Mgmt y 4 "star '... i twIGIS .. SA6o St irr7ukw1a 100 100 Construction 750 750 TOTAL EXPENSES 0 0 0 0 0 0 0 0 900 900 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 0 0 0 900 900 TOTAL SOURCES 0 0 0 0 0 0 0 0 900 900 2010 - 2015 Capital Improvement Program 133 0 Project Location `.e r In ostbur W. magi' win Mae * ,N N \ ri WPM Airileinfisi tae Sth` S'7 56 St m e y 4 "star '... i twIGIS .. SA6o St irr7ukw1a 2010 - 2015 Capital Improvement Program 133 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Sewer Lift Station No. 2 Mixing Pump & Slab LINE ITEM: 402.02.594.35 . .26 PROJECT NO. 90440205 DESCRIPTION: The installation of the mixing pump will prevent grease and fats from caking in the wet well of the lift station. The second phase would install a new concrete base slab for the generator. The mixing pump will keep the grease suspended in solution with the sewage. The existing concrete generator JUSTIFICATION: pad is sinking at the rate of 1" per year. If the sinking continues, the electrical connection to the lift station will be broken. STATUS: Dependent on Tukwila South Project. MAINT. IMPACT: Reduce liability if the existing slab breaks the power connection. COMMENT: FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location �� .111-4:\i" t Design 5 PkAy ----,41111 Si E 5 Land (R /W) 10,4 ii rE 5 SBOR1 1 m a ter! r �� .. . zo 0 Const. Mgmt 12 12 Construction 80 80 TOTAL EXPENSES 5 0 0 0 0 0 0 0 92 97 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 5 0 0 0 0 0 0 0 92 97 TOTAL SOURCES 5 0 0 0 0 0 0 0 92 97 2010 - 2015 Capital Improvement Program 134 Project Location �� .111-4:\i" t PkAy ----,41111 Si E lit■ ., Up Midland . rnrer,a o. 10,4 ii rE 5 SBOR1 1 m a ter! r �� .. . zo 2010 - 2015 Capital Improvement Program 134 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: South City Limits Sewer Extension LINE ITEM: 402.02.594.35 . .11 PROJECT NO. 98640204 DESCRIPTION: Design and construct 13,000 LF of sewer line from Minkler Blvd to S 200th St along Southcenter Pkwy. Project follows Lift Station No. 2 upgrade and new force main. JUSTIFICATION: Project is completely dependent on development and /or a ULID. STATUS: Future project depends on development and the Southcenter Pkwy street design and construction project along with Tukwila South annexation. MAINT. IMPACT: Increased man -hours to service new system. COMMENT: See Southcenter Pkwy Extension project in arterial streets for $3,000,000 in sewer improvements. Sewer costs will be reimbursed through sewer connection fees over 10 years. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location '$ a;�, 51 ' 4..= -- Design 50 9 !,, d am Mldlarxf, 1/Iferld Dr P� 3 ‘11114 1 hi i. N �- li, 50 100 Land (R /W) largyo, J.,7:j r. . it F . S1430 St GIS 0 Const. Mgmt 1,500 1,500 Construction 7,500 7,500 TOTAL EXPENSES 50 0 0 0 0 0 0 0 9,050 9,100 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 50 0 0 0 0 0 0 0 9,050 9,100 TOTAL SOURCES 50 0 0 0 0 0 0 0 9,050 9,100 2010 - 2015 Capital Improvement Program 135 Project Location '$ a;�, 51 ' 4..= -- Ablim. Bt.. SE � I 9 !,, d am Mldlarxf, 1/Iferld Dr P� 3 ‘11114 1 hi i. N �- li, { largyo, J.,7:j r. . it F . S1430 St GIS 2010 - 2015 Capital Improvement Program 135 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Abandon Sewer Lift Station No. 9 LINE ITEM: 402.02.594.35 . PROJECT NO. 90540208 DESCRIPTION: Install 900 LF of 8" gravity sewer from the Lift Station No. 9 to the existing Metro main in Interurban Ave S. JUSTIFICATION: The existing Metro sewer in Interurban Ave South was designed to service the area that is also currently served by Lift Station No. 9. STATUS: MAINT. IMPACT: Staff will not have to maintain Lift Station on private property. COMMENT: FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES 'p Project Location. ��� 50eln_LArcoe- • I. Y 1 Ali, MR. MIAli Design Illk 4.14 1F1 .4, II1i1111► 1. • 4 ,, ii 6 30 30 Land (R /W) 0 Const. Mgmt 75 75 Construction 500 500 TOTAL EXPENSES 0 0 0 0 0 0 0 0 605 605 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 0 0 0 605 605 TOTAL SOURCES 0 0 0 0 0 0 0 0 605 605 2010 - 2015 Capital Improvement Program 136 'p Project Location. ��� 50eln_LArcoe- • I. Y 1 Ali, MR. MIAli Illk 4.14 1F1 .4, II1i1111► 1. • 4 ,, ii 6 2010 - 2015 Capital Improvement Program 136 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Sewer Repair at 5700 Southcenter Blvd LINE ITEM: 402.02.594.35 . PROJECT NO. 90540211 DESCRIPTION: Replace 100 LF of 8" sewer line and manhole at 5700 Southcenter Blvd near Denny's Restaurant due to roots in the sewer line. JUSTIFICATION: Tree roots have grown into the sewer main. STATUS: MAINT. IMPACT: Reduced maintenance costs. COMMENT: FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location i'-- ■"11,\ ► � \,. , . viii, ,�.. dijimi Design g i N �• � �`� `� 'tom upitmd or Wall • d. TMertl Dr + lor b r ii, 10 10 Land (R /W) 1 7a.L... ■ 0 Const. Mgmt 15 15 Construction 100 100 TOTAL EXPENSES 0 0 0 0 0 0 0 0 125 125 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 0 0 0 125 125 TOTAL SOURCES 0 0 0 0 0 0 0 0 125 125 2010 - 2015 Capital Improvement Program 137 Project Location i'-- ■"11,\ ► � \,. , . viii, ,�.. dijimi x era, . g i N �• � �`� `� 'tom upitmd or Wall • d. TMertl Dr + lor b r ii, 1 7a.L... ■ 2010 - 2015 Capital Improvement Program 137 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Sewer Replacement near S 140th St LINE ITEM: 402.02.594.35 . PROJECT NO. 90540212 DESCRIPTION: Replace 50 LF of 8" sewer line near S 140th St and 55th Ave S due to tree roots in the pipe. JUSTIFICATION: Tree roots have grown into the sewer main. STATUS: MAINT. IMPACT: Reduced maintenance costs. COMMENT: FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 5 5 Land (R /W) 0 Const. Mgmt 10 10 Construction 60 60 TOTAL EXPENSES 0 0 0 0 0 0 0 0 75 75 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 0 0 0 75 75 TOTAL SOURCES 0 0 0 0 0 0 0 0 75 75 2010 - 2015 Capital Improvement Program 138 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Sewer Lift Station No. 12 LINE ITEM: 402.02.594.35 . PROJECT NO. 90440207 DESCRIPTION: Design and construct a new lift station to serve the northeast corner of the Commercial Business District. JUSTIFICATION: Lift Station No. 12 is at capacity due to its limited wetwell size. If substantial growth occurs in the basin due to the expansion of the mall or other large projects, the existing lift station will need to be upgraded. STATUS: MAINT. IMPACT: None at this time. COMMENT: A Bond issue is proposed to cover financing of this project. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location ' g1. £m AIIIIP- *elk Design r:. se ■ I r ifilk1L 0 Land (R /W) goer s .70,, WO 0 Const. Mgmt ro 300 300 Construction 3,300 3,300 TOTAL EXPENSES 0 0 0 0 0 0 0 0 3,600 3,600 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Bonds 3,600 3,600 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 0 0 0 0 0 TOTAL SOURCES 0 0 0 0 0 0 0 0 3,600 3,600 2010 - 2015 Capital Improvement Program 139 Project Location ' g1. £m AIIIIP- *elk s r:. se ■ I r ifilk1L N � .A 1.4 uai.w pr MICI.,. Dr goer s .70,, WO ro 2010 - 2015 Capital Improvement Program 139 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Andover Pk W Sewer Connection to KC Metro LINE ITEM: 402.02.594.35 . PROJECT NO. 90540213 The connection to the existing 36" King County Metro line in Strander Blvd and Andover Park W from Lift Station No. 12 and the City of Tukwila's 12" gravity sewer causes a backwater condition in the City's sewer line. DESCRIPTION: JUSTIFICATION: 12" gravity sewer traps grease in sewer during a backwater condition. STATUS: MAINT. IMPACT: Reduction in staff time flushing 12" sewer of grease. COMMENT: Engineering study will determine potential solution. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location '- .�0� r - Design II PIII- :31 10 10 Land (R /W) 1 • Inkier BAd Upland Dr Welland ay erq®r � Y=��� ..,,,,, 04 0 Const. Mgmt .. .__ pis 20 20 Construction 120 120 TOTAL EXPENSES 0 0 0 0 0 0 0 0 150 150 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 0 0 0 150 150 TOTAL SOURCES 0 0 0 0 0 0 0 0 150 150 2010 - 2015 Capital Improvement Program 140 Project Location '- .�0� r - II PIII- :31 1 . tili st 1 • Inkier BAd Upland Dr Welland ay erq®r � Y=��� ..,,,,, 04 894$1 .. .__ pis 2010 - 2015 Capital Improvement Program 140 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Poverty Hill - Neighborhood Sewer Revitalization LINE ITEM: 402.02.594.35 . PROJECT NO. 90140203 DESCRIPTION: Design and construct sewers in 40th Ave S, S 113th St, S 114th St and S 115th St. JUSTIFICATION: Existing septic systems are old and failing. STATUS: MAINT. IMPACT: Increased man -hours for flushing new sewer lines. COMMENT: This is part of the Allentown neighborhood revitalization improvement program. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES 0 Project Location +.,, j Al��JYCCe��. M Design a li IL \ 100 100 Land (R /W) °.\ Ili te (r'-'',71■ * UMWsiditil s 0 Const. Mgmt 130 130 Construction 1,000 1,000 TOTAL EXPENSES 0 0 0 0 0 0 0 0 1,230 1,230 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 0 0 0 1,230 1,230 TOTAL SOURCES 0 0 0 0 0 0 0 0 1,230 1,230 2010 - 2015 Capital Improvement Program 141 0 Project Location +.,, j Al��JYCCe��. M a li IL \ AMIL t °.\ Ili te (r'-'',71■ * UMWsiditil s 2010 - 2015 Capital Improvement Program 141 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Ryan Hill - Neighborhood Sewer Revitalization LINE ITEM: 402.02.594.35 . PROJECT NO. 99940201 DESCRIPTION: Design and construct sewers from S Ryan Way south to S 113th St. Design Report will help determine connection fees. JUSTIFICATION: Existing septic systems are failing and creating public health hazards. STATUS: MAINT. IMPACT: Increased man -hours for flushing new sewer mains. COMMENT: FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location ti , A Jam' ti l HIM Design Flj3 t IkeVP 114111 / i 1 70 70 Land (R /W) s f1Z 0 Const. Mgmt 135 135 Construction 900 900 TOTAL EXPENSES 0 0 0 0 0 0 0 0 1,105 1,105 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 0 0 0 1,105 1,105 TOTAL SOURCES 0 0 0 0 0 0 0 0 1,105 1,105 2010 - 2015 Capital Improvement Program 142 Project Location ti , A Jam' ti l HIM i i /.r/y. w' Flj3 t IkeVP 114111 / i 1 11111111►a �. L,�j s f1Z 2010 - 2015 Capital Improvement Program 142 CIP Page # City of Tukwila CAPITAL IMPROVEMENT PROGRAM for 2010 - 2015 SURFACE WATER ENTERPRISE FUND 412.02 * *Other After Six PROJECT TITLE 2010 2011 2012 2013 2014 2015 TOTAL Sources Years 144 Annual Small Drainage Program 536 625 625 625 665 685 3,761 264 685 145 Private Storm System Adoption 469 300 0 0 0 0 769 0 0 146 Storm Lift Station No. 18 Improvements 210 0 0 0 0 0 210 0 0 147 GIS Inventory 150 150 0 0 0 0 300 50 0 148 NPDES Program 33 10 150 150 150 150 643 0 150 149 Surface Water Comprehensive Plan 150 0 0 0 0 0 150 0 0 150 53rd Ave S Storm Drain System 0 0 74 500 0 0 574 0 0 151 Gilliam Creek Basin Stormwater Overflow 120 0 0 0 0 0 120 0 0 152 Christensen Rd Pipe Replacement 0 0 0 25 120 0 145 0 510 153 Andover Park W 48 -inch Drain Rehabilitation 0 0 0 0 449 0 449 0 0 154 Gilliam Creek 42 Ave S Culvert 0 0 0 0 0 288 288 0 0 155 Tukwila Parkway Drainage 0 0 0 0 0 0 0 0 232 156 Soils Reclamation Facility 0 0 0 0 0 0 0 0 1,340 157 S 146th St Pipe & 35th Ave S Drainage 0 0 0 0 0 0 0 0 550 158 S 143rd Street Storm Drain System 0 0 0 0 0 0 0 0 757 159 Nelsen PI /Longacres - Phase I I 0 0 0 0 0 0 0 0 544 160 Minkler Blvd Culvert Replacement 0 0 0 0 0 0 0 0 464 161 Northwest Gilliam Storm Drainage System 0 0 0 0 0 0 0 0 1,382 162 Property for Riverton Creek Sediment Trap 0 0 0 0 0 0 0 0 425 163 Duwamish Rvrbk Stabilization at S 104th St 0 0 0 0 0 0 0 0 595 164 Duwamish Rvrbk Stabilization near S 115th S 0 0 0 0 0 0 0 0 285 165 Treatment Pond for Gilliam Creek 0 0 0 0 0 0 0 0 274 166 Retrofit Storm Water Treatment at 51st Ave S 0 0 0 0 0 0 0 0 1,009 Grand Total 1,668 1,085 849 1,300 1,384 1,123 7,409 314 9,202 ** Denotes other funding sources, grants, or mitigation. Changes from 2009 to 2010 CIP: No new additions. Surface Water Lift Station Locations Lift Station No. 15 Lift Station No. 16 Lift Station No. 17 Lift Station No. 18 Lift Station No. 19 5880 S 180th St - Claim Jumper 7420 S 180th St (underpass) 530 Strander Blvd - Bicentennial Park 4225 S 122nd St - Allentown Fort Dent Park 2010 - 2015 Capital Improvement Program 143 01/06/2010 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Annual Small Drainage Program LINE ITEM: 412.02.594.38 . .09 PROJECT NO. Varies DESCRIPTION: Select, design, and construct small drainage projects throughout the City. JUSTIFICATION: Provide drainage corrections for existing /ongoing drainage problems throughout the City, including culvert replacements, drain extensions, and pavement upgrades. STATUS: Annual program is taken from Small Drainage Project List. MAINT. IMPACT: Reduces maintenance. COMMENT: Ongoing project, only one year actuals shown in first column. Construction expenses may occur over two calendar years. King County Flood Control Zone District (KCFCZD) average allocation of $44,000.00. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location: 0 Entire System I -5 eo I s Design 64 60 50 60 60 60 60 80 80 574 Land (R /W) 0 Const. Mgmt. 35 15 65 65 65 80 80 80 485 Construction 265 360 471 500 500 500 525 525 525 4,171 TOTAL EXPENSES 329 455 536 625 625 625 665 685 685 5,230 FUND SOURCES Awarded Grant 88 88 Proposed Grant 44 44 44 44 44 44 264 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 329 367 492 581 581 581 621 641 685 4,878 TOTAL SOURCES 329 455 536 625 625 625 665 685 685 5,230 2010 - 2015 Capital Improvement Program 144 Project Location: 0 Entire System I -5 eo I s 2010 - 2015 Capital Improvement Program 144 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Private Storm System Adoption and Rehabilitation Program LINE ITEM: 412.02.594.38 . .30 PROJECT NO. 90641203 DESCRIPTION: Adopt and repair existing piped private systems throughout the City that convey public stormwater. JUSTIFICATION: Numerous private drainage systems exist that connect to the City's system. Failure of these private systems may lead to flooding and property loss that would be the City's responsibility. STATUS: Maintenance has surveyed existing private systems and developed a list of 25 sites that need to be adopted and repaired. Some of these storm drain pipes are located under structures. MAINT. IMPACT: Additional storm systems will require additional maintenance, however the City will have a more reliable system and rerouting the existing sites will improve maintenance access. COMMENT: These projects will be combined with the Small Drainage Program. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 97 30 96 223 Land (R /W) Easement 35 0 Const. Mgmt. 25 25 Construction 373 275 648 TOTAL EXPENSES 97 65 469 300 0 0 0 0 0 896 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 City Oper. Revenue 97 65 469 300 0 0 0 0 0 931 TOTAL SOURCES 97 65 469 300 0 0 0 0 0 931 Project Location: Entire System 2010 - 2015 Capital Improvement Program 145 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Storm Lift Station No. 18 Improvements LINE ITEM: 412.02.594.38 . .36 PROJECT NO. 90741203 DESCRIPTION: Upgrade Storm Lift Station No. 18 to add an additional automated backup pump. Since its installation in 1997, the Allentown area has seen an increase in redevelopment, infill, and expansion JUSTIFICATION: of the City's drainage system. In addition, the station only has one pump and must be manually activated during the flood season. Flooding may result in the event of a power or pump failure. STATUS: Construction contract was awarded in September, 2009 with closeout in 2010. MAINT. IMPACT: Manually operating of flood gates and emergency responses will be decreased. COMMENT: FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES {¢ Project Location ti 5 N 'lit i �� ^ �: < se Design 79 r vietio \Al* i ir Illai 11 lit ma, ) , 1 ilks) i„&,, I irk `ft L'i.,,, 79 Land (R /W) 20 20 Const. Mgmt. 39 30 69 Construction 203 180 383 TOTAL EXPENSES 0 341 210 0 0 0 0 0 0 551 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 City Oper. Revenue 0 341 210 0 0 0 0 0 0 551 TOTAL SOURCES 0 341 210 0 0 0 0 0 0 551 2010 - 2015 Capital Improvement Program 146 {¢ Project Location ti 5 N 'lit i �� ^ �: < se r vietio \Al* i ir Illai 11 lit ma, ) , 1 ilks) i„&,, I irk `ft L'i.,,, __�1III I 2010 - 2015 Capital Improvement Program 146 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: GIS Inventory LINE ITEM: 412.02.594.38 . .22 PROJECT NO. 90241201 DESCRIPTION: The GIS inventory will establish citywide as -built drawings for public drainage systems. JUSTIFICATION: State NPDES requirements include provisions for permitted jurisdictions to compile accurate drainage system maps for all outfalls 24" or greater. STATUS: GIS (Geographic Information Systems) mapping; Area #1 completed in 2003, Area #2 in 2005, Area #3 in 2006, Area #4 in 2008, and Area #5 in 2009. Area #6 began in 2009 with completion in 2010. MAINT. IMPACT: GIS information will allow maintenance to better track storm facility maintenance needs. COMMENT: National Pollution Discharge Elimination System (NPDES). GIS is expected to be completed in 2011. A Department of Ecology grant of $50,000.00 will offset costs of Area #6 in 2010. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 833 128 150 150 1,261 Land (R/W) 0 Const. Mgmt. 0 Construction 0 TOTAL EXPENSES 833 128 150 150 0 0 0 0 0 1,261 FUND SOURCES Awarded Grant 50 50 Proposed Grant 0 Mitigation Actual 100 100 Mitigation Expected 0 Utility Revenue 733 128 100 150 0 0 0 0 0 1,111 TOTAL SOURCES 833 128 150 150 0 0 0 0 0 1,261 Project Location: Entire System 2010 - 2015 Capital Improvement Program 147 CITY OF TUKWILA CAPITAL PROJECT SUMMARY PROJECT: NPDES Program DESCRIPTION: JUSTIFICATION: STATUS: MAINT. IMPACT: 2010 to 2015 LINE ITEM: 412.02.594.38 . .22 PROJECT NO. 99341210 Provide programmatic implementation requirements of NPDES. The Master Drainage Program will develop a NPDES reporting and action plan for City compliance. Tukwila Stream Team will be in conjunction with the Department of Community Development who will manage the program. State NPDES requirements include an annual report, public education and outreach, illicit discharge detection and illumination, approved technical standards, staff training, inspections of public and private systems, and drainage system maps. Master Drainage Plan began in 2007 using $75,000 Department of Ecology grant. Tukwila Stream Team to be implemented in 2010. Additional cleaning and documentation will require added staff resources. GIS information will allow maintenance to better track storm facility maintenance needs. COMMENT: National Pollution Discharge Elimination System (NPDES). Additional NPDES requirements will be ongoing. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 58 52 33 10 150 150 150 150 150 903 Land (R /W) 0 Const. Mgmt. 0 Construction 0 TOTAL EXPENSES 58 52 33 10 150 150 150 150 150 903 FUND SOURCES Awarded Grant 75 75 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue (17) 52 33 10 150 150 150 150 150 828 TOTAL SOURCES 58 52 33 10 150 150 150 150 150 903 Project Location; Entire System 2010 - 2015 Capital Improvement Program 148 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Surface Water Comprehensive Plan DESCRIPTION: JUSTIFICATION: STATUS: MAINT. IMPACT: COMMENT: LINE ITEM: 412.02.594.38 . .34 PROJECT NO. 99341203 Periodically revise and update the adopted Surface Water Comprehensive Plan to: 1) Incorporate the latest requirements of the National Pollution Discharge Elimination System (NPDES) and Endangered Species Act (ESA); 2) Update Capital Improvement Projects to reflect current needs and completed projects; 3) Include GIS based basin and system maps as they become available; and 4) Revise Storm Water ordinance as needed. The latest requirements from regulatory agencies as well as newly identified City needs must be included in a regularly updated Surface Water Comprehensive Plan. The current Surface Water Comprehensive Plan was completed in 2003. Future updates are planned on a 7 -year cycle with the next update in 2010. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 191 150 341 Land (R /W) 0 Const. Mgmt. 0 Construction 0 TOTAL EXPENSES 191 0 150 0 0 0 0 0 0 341 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 191 0 150 0 0 0 0 0 0 341 TOTAL SOURCES 191 0 150 0 0 0 0 0 0 341 2010 - 2015 Capital Improvement Program 149 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: 53rd Ave S Storm Drainage System LINE ITEM: 412.02.594.38 . PROJECT NO. 90341213 Replace existing storm drainage system. Provide bioswales along 53rd Ave S and a water quality structure DESCRIPTION: at the downstream end of the system to treat storm water runoff. Purchase right -of -way, if required for bioswale construction and provide asphalt overlay. New conveyance system will reduce flooding on right -of -way and private property. Existing system is in poor condition and street runoff flows onto private property. JUSTIFICATION: STATUS: MAINT. IMPACT: COMMENT: Combine with future roadway project. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES C) Project Location __ -: r. E:orrn la Design Provide WO i Trealmenl Mahpl0 .� .. g - — 74 _ .,. r a S ra8 4;1.11611111411111M.' — .._ .\ \,� —_ \ 74 Land (R /W) Ife, jq, Ilag:' i _�� �, •. �'� ._, Pepiacc Em mg Sloan Ominaae Sysien• - P+orda Asphai ❑ la, and E rarr9 c:,7 :41 &Mk* t . -7 — I q— 4 i 0 Const. Mgmt. 50 50 Construction 450 450 TOTAL EXPENSES 0 0 0 0 74 500 0 0 0 574 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 74 500 0 0 0 574 TOTAL SOURCES 0 0 0 0 74 500 0 0 0 574 2010 - 2015 Capital Improvement Program 150 C) Project Location __ -: r. E:orrn la Provide WO i Trealmenl Mahpl0 .� .. g - — L F' I ps Fie a F !1 nonal Park. 51 h S! _ .,. r a S ra8 4;1.11611111411111M.' — .._ .\ \,� —_ \ Ife, jq, Ilag:' i _�� �, •. �'� ._, Pepiacc Em mg Sloan Ominaae Sysien• - P+orda Asphai ❑ la, and E rarr9 c:,7 :41 &Mk* t . -7 — I q— 4 i IIiW ...c t 7 sa 2010 - 2015 Capital Improvement Program 150 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Gilliam Creek Basin Stormwater Overflow LINE ITEM: 412.02.594.38 . .12 PROJECT NO. 90341209 DESCRIPTION: Provide storm drainage system to route Gilliam Creek basin outflow to the new Strander Boulevard storm drainage pump, when the flap gates are closed at the Gilliam Creek outlet. JUSTIFICATION: Reduces flooding at downstream properties by providing a method to drain the Gilliam Creek basin during high river events. STATUS: Construction contract was awarded in September, 2009 with closeout in 2010. MAINT. IMPACT: Decreases need for emergency pumping. COMMENT: Will reduce likelihood of roadway flooding at intersection of Andover Park East and Tukwila Parkway. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location `m Gekem Creek Y N °� c�. I 1 I Existing Storm i Drainage System Design 63 II �i � a. 63 Land (R/W) Existing Storm Drainage System 4 <t_ -__ = '' StrandedBlvd 0 Const. Mgmt. 43 20 Existing Gate Valve 63 Construction 344 100 444 TOTAL EXPENSES 0 450 120 0 0 0 0 0 0 570 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 450 120 0 0 0 0 0 0 570 TOTAL SOURCES 0 450 120 0 0 0 0 0 0 570 2010 - 2015 Capital Improvement Program 151 Project Location `m Gekem Creek Y N °� c�. I 1 I Existing Storm i Drainage System II �i � a. Provide New Overflow Pipe _ l a> .a c Existing Storm Drainage System 4 <t_ -__ = '' StrandedBlvd 110.- - ro P mp SI d Existing Gate Valve 751707S W08100900008A. OO.M08xm oM OG11.01 or 2010 - 2015 Capital Improvement Program 151 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Christensen Rd Pipe Replacement LINE ITEM: 412.02.594.38 . PROJECT NO. 98941202 DESCRIPTION: Design and construct 200' of 18" storm pipe. JUSTIFICATION: Existing 12" pipe is collapsing and could lead to flooding. STATUS: Portable emergency pumps are brought in to alleviate flooding. MAINT. IMPACT: Eliminate emergency pumping operation. COMMENT: Replaced pipe will tie into the Strander Blvd system. The Strander Blvd Pump Station No. 17 along with the conveyance system eliminated the need for a new pump station on Christensen Rd. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES OProject Location '� s ;, ■ _ _dill ,I AM S ieu Se. .. kler Alrp Design .1r g In - ,Al ai Upbnd br kW br Trllentl ®r 25 / 4yyy((( 1 1 ii ii 80 105 Land (R /W) C ' 9 me : +3 I H Q.. piS { 0 Const. Mgmt. 20 20 Construction 100 430 530 TOTAL EXPENSES 0 0 0 0 0 25 120 0 510 655 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 25 120 0 510 655 TOTAL SOURCES 0 0 0 0 0 25 120 0 510 655 2010 - 2015 Capital Improvement Program 152 OProject Location '� s ;, ■ _ _dill ,I AM S ieu Se. .. kler Alrp .1r g In - ,Al ai Upbnd br kW br Trllentl ®r / 4yyy((( 1 1 ii ii v �.j�ry �J�p^/ / so C ' 9 me : +3 I H Q.. piS { 2010 - 2015 Capital Improvement Program 152 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Andover Park W 48 -inch Drain Rehabilitation DESCRIPTION: JUSTIFICATION: STATUS: MAINT. IMPACT: COMMENT: LINE ITEM: 412.02.594.38 . PROJECT NO. 98641217 Remove sediment from approximately 2,000 LF of existing 48" pipe, running from Strander Blvd to Tukwila Parkway. Locate outfall to Gilliam Creek farther to the east to create positive flow. Reduces potential for flooding along Andover Park W by increasing hydraulic capacity of the storm drainage system and by providing a positive slope at the system outfall. Future project; continue monitoring. Reduced silt accumulation and cleaning. Maintenance will video inspect and remove silt /debris in catch basins. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES t ` , n ...—_- uhWifa a . I 7 > a W. - -=� Design 0 1111_......1 N Abandon Existing Pipe _ 44 Provide New Outlet Pipe 44 Land (R /W) ail \ ` f ((( Clean Sediment Out of Existing Pipe from Strander Blvd toTukwilaParkway I 0 Const. Mgmt. h-- SP? Trail - ---- -_ -_ - er Blvd - 30 30 Construction 'Y a 375 N it 375 TOTAL EXPENSES 0 0 0 0 0 0 449 0 0 449 FUND SOURCES t 1160TOT8e1 WOerOoeo,SOA e4RR11 um.M1IW,v.m sr Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 0 449 0 0 449 TOTAL SOURCES 0 0 0 0 0 0 449 0 0 449 Project Location t ` , n ...—_- uhWifa a . I 7 > a W. - -=� !�! 1111_......1 N Abandon Existing Pipe _ - Provide New Outlet Pipe I ail \ ` f ((( Clean Sediment Out of Existing Pipe from Strander Blvd toTukwilaParkway I j I __ h-- SP? Trail - ---- -_ -_ - er Blvd - Ba 'Y a UJ 'gym a N it O IN` r t 1160TOT8e1 WOerOoeo,SOA e4RR11 um.M1IW,v.m sr 2010 - 2015 Capital Improvement Program 153 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Gilliam Creek 42 Ave S Culvert LINE ITEM: 412.02.594.38 . .23 PROJECT NO. 99341208 DESCRIPTION: Design and replace the 36 -inch culvert under 42 Ave S /Gilliam Creek. JUSTIFICATION: The existing concrete pipe sections are separating and cracked which could erode the 42 Ave S fill and lead to loss of roadway. Trenchless repair techniques were reviewed as part of the 2005/2006 Small Drainage Design and are not STATUS: feasible due to the structural deficiencies of the pipe. A complete pipe replacement will be required. Recent video inspection revealed that the pipe's cracking to be about the same as when this project was identified in 1993. The pipe will continue to be monitored and replaced as part of the future 42nd Ave S street project. MAINT. IMPACT: Will reduce monitoring when complete. COMMENT: State Fish & Wildlife hydraulic project approved (HPA) permit will be required. Replacement will require a fish passable structure. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES T In - rp Design ReFeace Exrtrng Culver) f L r :se e fgrade RPmWro B G Sedsnan and ex wee. Prwda log control. 0 25 "OrjAvfr, h' 25 Land (R /W) 6 i71 7 i I 0 Const. Mgmt. ..„. .mMem„ nsmn.....ae.eese a 19 19 Construction 8 244 252 TOTAL EXPENSES 8 0 0 0 0 0 0 288 0 296 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 8 0 0 0 0 0 0 288 0 296 TOTAL SOURCES 8 0 0 0 0 0 0 288 0 296 Project Location T In - rp ReFeace Exrtrng Culver) f L r :se e fgrade RPmWro B G Sedsnan and ex wee. Prwda log control. 0 "OrjAvfr, h' 6 i71 7 i I rrJ ;' ..„. .mMem„ nsmn.....ae.eese a 2010 - 2015 Capital Improvement Program 154 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Tukwila Parkway Drainage LINE ITEM: 412.02.594.38 . PROJECT NO. 90341205 DESCRIPTION: Replace 30" outlet pipe from manhole located at the northwest access to Mall at Tukwila Parkway to Gilliam Creek. JUSTIFICATION: Reduces maintenance and flooding potential by providing an outlet to Gilliam Creek with a positive slope. STATUS: Maintenance crew will continue to monitor and clean pipe as needed. MAINT. IMPACT: Reduces maintenance. COMMENT: FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location ,�,p 1 P d id 9011111.7 ir Design ��p a ¢QgF lo- T*I011\ i -- ` /Aim Creek iriv b 1, * /00 e 35 35 Land (R /W) Replace Existing Outlet Pipe j ) (` Southeenter Mall ii 1 0 Const. Mgmt. 20 20 Construction 177 177 TOTAL EXPENSES 0 0 0 0 0 0 0 0 232 232 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 0 0 0 232 232 TOTAL SOURCES 0 0 0 0 0 0 0 0 232 232 2010 - 2015 Capital Improvement Program 155 Project Location ,�,p 1 P d id 9011111.7 ir f 1.0 ��p a ¢QgF lo- T*I011\ i -- ` /Aim Creek iriv b 1, * /00 e Existing Storm Drainage System Y Replace Existing Outlet Pipe j ) (` Southeenter Mall ii 1 2010 - 2015 Capital Improvement Program 155 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Soils Reclamation Facility LINE ITEM: 412.02.594.38 . .96 PROJECT NO. 99441202 DESCRIPTION: Construct soils reclamation facility to handle, treat, dispose and /or reuse non - hazardous street sweepings and catch basin cleanings, etc (formerly named DrainageNactor Waste Facility). JUSTIFICATION: To meet State regulations, City needs facilities to treat & dispose of waste materials resulting from cleaning/ maintenance activities, including street sweepings and vactor truck wastes. STATUS: Project currently on hold. Temporary site being used at Nelsen Place. MAINT. IMPACT: Reduce maintenance costs for waste disposal. COMMENT: May be combined with future location of City Maintenance Facility. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 49 40 89 Land (R /W) 561 500 1,061 Const. Mgmt. 0 Construction 800 800 TOTAL EXPENSES 610 0 0 0 0 0 0 0 1,340 1,950 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 610 0 0 0 0 0 0 0 1,340 1,950 TOTAL SOURCES 610 0 0 0 0 0 0 0 1,340 1,950 Note: Site Location is still under consideration. 2010 - 2015 Capital Improvement Program 156 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: S 146th St Pipe and 35th Ave S Drainage System LINE ITEM: 412.02.594.38 . PROJECT NO. 90341214 DESCRIPTION: Replace existing storm drainage system on S 146th St and provide new storm drainage system for 35th Ave S. Provide asphalt overlay and extruded asphalt curb for both streets. JUSTIFICATION: Reduce right -of -way and private property flooding by increasing the capacity of the storm drainage system. STATUS: Maintenance is monitoring area during storm events. MAINT. IMPACT: Expanded system will require additional maintenance. COMMENT: FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location — JJ ,,. _ r` — _ 11 1 1 -- S�aawSt -_ r '' 1 1 r 1 r' r r 1 r 1 Design 1 1 II SysOem1 1 Drainage System 83 83 Land (R /W) Replace Exist ng Storm Drainage System. Provide Asphalt Overlay and Extruded Asphalt Curb 4R+airfage r iJ 11 t - i 1 1 X71 1 � 1 ■ ' -c/ t 1-r1 — - 9=c S td6lh S1 1 1 __ ir .... 0 Const. Mgmt. — — fir_ r! 1i _— r+ f f 1 r 1I r 1 � .•, r 1 it a y 40 40 Construction 1+ I 1 Existing Storm `---__fti /1' Drainage System i / 1! PritiN 427 427 TOTAL EXPENSES 0 0 0 0 0 0 0 0 550 550 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 0 0 0 550 550 TOTAL SOURCES 0 0 0 0 0 0 0 0 550 550 2010 - 2015 Capital Improvement Program 157 Project Location — JJ ,,. _ r` — _ 11 1 1 -- S�aawSt -_ r '' 1 1 r 1 r' r r 1 r 1 1 1 II SysOem1 1 Drainage System � Replace Exist ng Storm Drainage System. Provide Asphalt Overlay and Extruded Asphalt Curb 4R+airfage r iJ 11 t - i 1 1 X71 1 � 1 ■ ' -c/ t 1-r1 — - 9=c S td6lh S1 1 1 __ ir .... — — fir_ r! 1i _— r+ f f 1 r 1I r 1 � .•, r 1 it a y - F I 1+ I 1 Existing Storm `---__fti /1' Drainage System i / 1! PritiN / , . dlte. W .'3 or 2010 - 2015 Capital Improvement Program 157 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: S 143rd Street Storm Drain System LINE ITEM: 412.02.594.38 . PROJECT NO. 98641222 Design and construct closed pipe drainage along S 143rd St and S 143rd PI. Provide water quality manhole and a flap gate at the outlet. Convert existing drainage ditch, located on private property, to a bioswale. DESCRIPTION: JUSTIFICATION: STATUS: New conveyance system will reduce flooding in right -of -way and private property. Bioswale will treat surface water before it is routed to the Duwamish River. Flap gate will help prevent flooding at high levels. Interim pipe and pavement installed is directing drainage from road and reducing ponding. MAINT. IMPACT: Significantly reduces maintenance. COMMENT: Re- evaluate this project based on current need. Interim solution installed and appears to be working adequately for long term goal. Coordinate with S 143 St. Project (Interurban - Duwamish). FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Y Project Location / `" _ - —„: +,. �A4' \� Convert Ditch ` Co Bioswale Provide Storm Drainage System, Asphalt Overlay. Curb and Gutter. and Sidewalk Design ,,, ---... �l III Provide Flap Gate �... ` -. r \\ II -- li/ f, j I trJi FI' d � 76 76 Land (R /W) IIProvide j r as 77 ' U .2? \ _ \ ' el }a .,� ,,,; Drainage System, Asphalt Overlay, and Extruded Asphalt Curb _$b 40\ 1761711 TS DI 0 Const. Mgmt. 60 60 Construction 621 621 TOTAL EXPENSES 0 0 0 0 0 0 0 0 757 757 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 0 0 0 757 757 TOTAL SOURCES 0 0 0 0 0 0 0 0 757 757 2010 - 2015 Capital Improvement Program 158 Y Project Location / `" _ - —„: +,. �A4' \� Convert Ditch ` Co Bioswale Provide Storm Drainage System, Asphalt Overlay. Curb and Gutter. and Sidewalk ,,, ---... �l III Provide Flap Gate �... ` -. r \\ II -- li/ f, j I trJi FI' d � t.....ii-ininer-_____A 1'—_._...t.._.z.1441IL \\,\. i 1 W QMenhdl r \ t Provide Stem , IIProvide j r as 77 ' U .2? \ _ \ ' el }a .,� ,,,; Drainage System, Asphalt Overlay, and Extruded Asphalt Curb _$b 40\ 1761711 TS DI 2010 - 2015 Capital Improvement Program 158 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Nelsen PI /Longacres - Phase II LINE ITEM: 412.02.594.38 . .66 PROJECT NO. 98741202 DESCRIPTION: Provide 48 -inch interceptor pipe under BNRR tracks, connecting upstream interceptor to recently built P -1 interceptor through Renton. JUSTIFICATION: This project provides the final link of the P -1 interceptor line serving Nelsen PI /Longacres drainage basin. STATUS: It is anticipated that Sound Transit will build Nelsen PL /Longacres interceptor crossing under BNRR when permanent station is constructed. MAINT. IMPACT: Provide needed interceptor to drain basin and reduce local flooding. COMMENT: Funding provided by development mitigation through Sound Transit. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design Land (R /W) Const. Mgmt. Construction TOTAL EXPENSES 168 168 0 0 0 0 0 0 0 82 40 422 544 82 0 40 590 712 FUND SOURCES Awarded Grant Proposed Grant Mitigation Actual Mitigation Expected Utility Revenue TOTAL SOURCES 168 168 0 0 0 0 0 0 0 0 0 0 0 0 0 157 387 544 0 0 0 157 555 712 Project Location x �� aP i,°9'_. Provide Storm @rainege Pipe to P -1 Interceptor / _,r.7 3. 1�` - ' 111 IV 1� j 1��. ` �I i 1 Dusting mage System (Pl lnterpePt00 tarty of Renton 41•111111 ill a 4 i I Eiag p a■age Swale% I -- j 8136111 6t _~ al4, l 2 I .R )1 ti 6 p /� r, *,. J III ti 4p�— RUe�YJ1+ "�'�� I r 2010 - 2015 Capital Improvement Program 159 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Minkler Blvd Culvert Replacement LINE ITEM: 412.02.594.38 . PROJECT NO. 90341208 DESCRIPTION: Replace undersized culvert across Andover Park E and existing storm lines in the P -17 canal. JUSTIFICATION: Reduces flooding at upstream properties by providing a culvert with increased hydraulic capacity. STATUS: Redevelopment at Southcenter Pkwy /Minkler Blvd eliminated upstream flooding. Maintenance will monitor to determine if project is still needed. MAINT. IMPACT: None. COMMENT: Project will reduce the potential for flooding along Minkler Blvd. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location w it oI Existing Sturm Oraanage system Design - t Storm r €Ming Storm Drain Line 64 64 Land (R /W) Pmovide New Storm Drainage System Outlet Minlder Blvd — . __.._ . --..-=-.-_,.----- 0 Const. Mgmt. 0 44 Replace Exieging GuMM l fl 50 50 Construction l 350 350 TOTAL EXPENSES 0 0 0 0 0 0 0 0 464 464 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 0 0 0 464 464 TOTAL SOURCES 0 0 0 0 0 0 0 0 464 464 2010 - 2015 Capital Improvement Program 160 Project Location w it oI Existing Sturm Oraanage system - t Storm r €Ming Storm Drain Line Q l I l Pmovide New Storm Drainage System Outlet Minlder Blvd — . __.._ . --..-=-.-_,.----- 0 44 Replace Exieging GuMM l fl Existing 5tnrm Drainage System l 2010 - 2015 Capital Improvement Program 160 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Northwest Gilliam Basin Storm Drainage System LINE ITEM: 412.02.594.38 . PROJECT NO. 90341206 Upgrade existing storm drainage system. Provide water quality treatment manholes at the downstream end of the retrofitted drainage systems. Provide asphalt overlay and extruded asphalt curb for all streets. DESCRIPTION: JUSTIFICATION: STATUS: Reduces right -of -way and private property flooding by increasing the hydraulic capacity of the existing storm drainage system. Water quality manholes remove sediment and oil from street runoff. MAINT. IMPACT: Decreases cleaning of system. COMMENT: Will combine with future overlay project. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES 0 Project Location -_ S.,61hst _ ` - rt- Existing Storm Drainage System 1 + /.r 1 '\,. H 1' 0 1 Design �.. i j 1' — it �, Replace Existing Starm 6remaga System - Preside WO -- Treatment Manhole 138 138 Land (R /W) m! t�_ ill .. - _... �,- �� _ 0 Const. Mgmt. ,k Ai _ � „it Ill "^'I� I Existing Storm Drainage System -_ _ CI 0 Construction 111111fifil ,, ing ;, I- ' ': �' 't -. Prvwide WO Treaenmamas fro mamas f i ...1 .' i.n rut0. 1,244 1,244 TOTAL EXPENSES 0 0 0 0 0 0 0 0 1,382 1,382 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 0 0 0 1,382 1,382 TOTAL SOURCES 0 0 0 0 0 0 0 0 1,382 1,382 2010 - 2015 Capital Improvement Program 161 0 Project Location -_ S.,61hst _ ` - rt- Existing Storm Drainage System 1 + /.r 1 '\,. H 1' 0 1 �.. i j 1' — it �, Replace Existing Starm 6remaga System - Preside WO -- Treatment Manhole t iaPtn t h` m! t�_ ill .. - _... �,- �� _ ,k Ai _ � „it Ill "^'I� I Existing Storm Drainage System -_ _ CI 1 +` Replace Westing Storm Drainge Syste 1. Proalde Asphalt OMIT" 111111fifil ,, ing ;, I- ' ': �' 't -. Prvwide WO Treaenmamas fro mamas f i ...1 .' i.n rut0. 11 ..1111 /rye' FBI If '�I .Ml 2010 - 2015 Capital Improvement Program 161 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Property Acquisition for Riverton Creek Sediment Trap LINE ITEM: 412.02.594.38 . PROJECT NO. 90341211 Purchase former fish hatchery that contains pools, weirs and stream flow diversion for use as a sediment trapping facility. High storm flows from extensive impervious surfaces cause erosion. Trapping sediments in stream flow would improve water quality and habitat conditions in the lower reaches of Riverton Creek. Reduce frequency of sediment removal from downstream storm system. DESCRIPTION: JUSTIFICATION: STATUS: MAINT. IMPACT: COMMENT: Reevaluate after completion of high flow bypass to see if project is still warranted. Current purchase price of proposed location is too high. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design Project Location 8 �I I 126th St - Land (R /W) A Er Altdwilll 76 \ `S. L( 425 425 Const. Mgmt. l 1. 0 Construction 0 TOTAL EXPENSES 0 0 0 0 0 0 0 0 425 425 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 0 0 0 425 425 TOTAL SOURCES 0 0 0 0 0 0 0 0 425 425 2010 - 2015 Capital Improvement Program 162 Project Location 8 �I I 126th St i �.. __ Property acquisition I /r I • A Er Altdwilll 76 \ `S. L( % , s1301 l 1. 2010 - 2015 Capital Improvement Program 162 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Duwamish Riverbank Stabilization at S 104th St LINE ITEM: 412.02.594.38 . .94 PROJECT NO. 99441205 Stabilize the eroding and failing riverbank adjacent to E Marginal Wy S between Boeing Access Rd and S 104 St. This alternative abandons the road, regrades the riverbank and restores riparian vegetation for 400 LF. DESCRIPTION: JUSTIFICATION: Riverbank failures subject adjacent streets to sloughing and create the potential for utility failures. STATUS: Monitoring. MAINT. IMPACT: Reduction of maintenance if sloughing is controlled. COMMENT: Another alternative would cost $74,000 for bioengineering approach, see Surface Water Comprehensive Plan for additional information. Right -of -way issues need to be resolved. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Project Location Design 31 mos, 41 i. Ve Iv 4pf f S `'t.. 5✓ a it 149 180 Land (R /W) 0 Const. Mgmt. 0 Construction 446 446 TOTAL EXPENSES 31 0 0 0 0 0 0 0 595 626 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 31 0 0 0 0 0 0 0 595 626 TOTAL SOURCES 31 0 0 0 0 0 0 0 595 626 2010 - 2015 Capital Improvement Program 163 Project Location mos, 41 i. Ve Iv 4pf f S `'t.. 5✓ a it ilit 214 1 Bestrode and stabBfze 466 Peel or Wog Ifver, aed aWrW ling.. roadway. \\111)\ ,, , 2010 - 2015 Capital Improvement Program 163 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Duwamish Riverbank Stabilization near S 115th St LINE ITEM: 412.02.594.38 . .97 PROJECT NO. 99441209 Stabilize the sloughing riverbank sections adjacent to S 115 St between 42 Ave S & East Marginal Way S and DESCRIPTION: adjacent to 42nd Ave S from S 115 St to Interurban Ave S. The Flood District carried out approximately 300 LF of repairs in 1997 due to the 1996/1997 winter storm event with FEMA & Flood District monies. JUSTIFICATION: Prevent street damage and protect the river from deposition of eroded material. King County Flood Control Zone District (KCFCZD) is aware of this project and continues to monitor. Due to STATUS: funding limitations, this project is not currently programmed by KCFCZD. City seed money may be used to move this project up on the priority list. MAINT. IMPACT: Eliminates ongoing emergency slough repair projects. COMMENT: Total bank length is 4,900 LF. Approximately 1,200 LF would be stabilized. Other sections would be regraded and stabilized using bioengineering techniques while retaining native, mature trees and shrubs. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 57 57 Land (R /W) 0 Const. Mgmt. 0 Construction 228 228 TOTAL EXPENSES 0 0 0 0 0 0 0 0 285 285 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 0 0 0 285 285 TOTAL SOURCES 0 0 0 0 0 0 0 0 285 285 S 107 St 108 S Rainier Golf R. Country Club S 116 St 09 PROJECT LOCATION S Wanace St r S 121 S 124 2010 - 2015 Capital Improvement Program 164 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Treatment Pond for Gilliam Creek LINE ITEM: 412.02.594.38 . PROJECT NO. 90341207 DESCRIPTION: Create wet pond on vacant property adjacent to confluence of southwest and northwest tributaries to Gilliam Creek, east of apartment complex near the south end of 40th Ave S. JUSTIFICATION: Provides water quality improvement in Gilliam Creek by treating runoff from a subbasin area in the City. STATUS: MAINT. IMPACT: Pond would require additional maintenance. COMMENT: Requires acquisition of one parcel of property. Requires installation of a flow splitter to direct low flows from northwest tributary into wet pond, via a pipe trenched beneath apartment access driveway. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES { Project Location II, St. p — I Design �/ sciu •�--' Flow sKtaw rc f • • s pm rrihulary alto pond 82 82 Land (R /W) 72 72 Const. Mgmt. 0 Construction 120 120 TOTAL EXPENSES 0 0 0 0 0 0 0 0 274 274 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 0 0 0 274 274 TOTAL SOURCES 0 0 0 0 0 0 0 0 274 274 2010 - 2015 Capital Improvement Program 165 { Project Location II, St. p — I 41e1 pond with 115' X 1115' drone nsians 1i5' % 115' �/ sciu •�--' Flow sKtaw rc f • • s pm rrihulary alto pond —_- ___— - - /' �— i/ �� a 1 11I,?_sY r -- 2010 - 2015 Capital Improvement Program 165 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Retrofit Storm Water Treatment at 51st Ave S LINE ITEM: 412.02.594.38 . PROJECT NO. 90341210 DESCRIPTION: Construct water treatment and /or detention pond on vacant property on 51st Ave S adjacent to Southcenter Boulevard and 52nd Ave S. JUSTIFICATION: Reduced peak flows and /or improved water quality in lower Gilliam Creek. STATUS: A portion of the site is currently being used by Sound Transit as a storm pond. MAINT. IMPACT: COMMENT: According to King County Assessor's data, 5 parcels comprise the site and are expensive to purchase. The pond would not be capable of treating significant flows in Gilliam Creek. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES CDProject Location : from 52nd Ave. If posal6le I. i ioo Q. & 4yRavtr runoff Wo into pond �4 Design \ Route rd doff from 1 Slat Axe. S into pond l \� "`� .' - - -� I•� -, p�a� t 4 —�/ I. h� �n y 4� it �'y l L__� , ____, ` �'y j t t ,9...,". , j,,,,,..„ 252 252 Land (R /W) 8 ■l`t 500 500 Const. Mgmt. 0 Construction 257 257 TOTAL EXPENSES 0 0 0 0 0 0 0 0 1,009 1,009 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 0 0 0 1,009 1,009 TOTAL SOURCES 0 0 0 0 0 0 0 0 1,009 1,009 2010 - 2015 Capital Improvement Program 166 CDProject Location : from 52nd Ave. If posal6le I. i ioo Q. & 4yRavtr runoff Wo into pond �4 1 , - \ Route rd doff from 1 Slat Axe. S into pond l \� "`� .' - - -� I•� -, p�a� t 4 —�/ I. h� �n y 4� it �'y l L__� , ____, ` �'y j t t ,9...,". , j,,,,,..„ Cant tt ratm rod d! -- - -� - detentio pond with epp fOe lee ote `.t dim elude, rya of 100' X 200 f 8 ■l`t 2010 - 2015 Capital Improvement Program 166 City of Tukwila CAPITAL IMPROVEMENT PROGRAM for 2010 - 2015 GOLF COURSE ENTERPRISE FUND 411 CIP **Other Page # PROJECT TITLE 2010 2011 2012 2013 2014 2015 TOTAL Sources 169 Foster Golf Links General Improvements 10 10 10 10 10 10 60 0 Grand Total Changes from 2009 to 2010 CIP: No new additions. 2010 - 2015 Capital Improvement Program 10 10 10 10 10 10 60 0 *" Denotes other funding sources, grants, or mitigation. 167 10/13/2009 2010 - 2015 Capital Improvement Program 168 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Foster Golf Links General Improvements LINE ITEM: 411.00.594.760. .05 PROJECT NO. Varies DESCRIPTION: Provide annual improvements to the golf course greens, tees, drainage and irrigation as provided by golf revenues after operation costs and debt service payments are reconciled. JUSTIFICATION: Improvements are part of the plan to improve the playability of the course. STATUS: Capital projects will be limited for 2010 throught 2015. MAINT. IMPACT: Better year round play with improved course conditions, reduced maintenance, and increased safety. COMMENT: Ongoing project, only one year actuals shown in first column. With completion of the new clubhouse, funding provides resources for in -house labor to complete on -going major maintenance projects. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Engineering 10 10 Land (R /W) 0 Construction 51 40 10 10 10 10 10 10 10 161 TOTAL EXPENSES 51 50 10 10 10 10 10 10 10 171 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Golf Revenue 51 50 10 10 10 10 10 10 10 171 TOTAL SOURCES 51 50 10 10 1 10 10 10 10 10 171 MT 14- Irruirar- lig 104:0 ■ 1 1111jim41 sous= APIPIA 11( laiS 2010 - 2015 Capital Improvement Program 169 2010 - 2015 Capital Improvement Program 170