HomeMy WebLinkAboutRes 1910 - 2018-2023 Transportation Improvement ProgramA RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF TUKWILA, WASHINGTON, ADOPTING A SIX-YEAR
TRANSPORTATION IMPROVEMENT PROGRAM (2018-
2023), AND DIRECTING THE SAME TO BE FILED WITH
THE STATE SECRETARY OF TRANSPORTATION AND
THE TRANSPORTATION IMPROVEMENT BOARD.
WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26, the
City Council of the City of Tukwila has previously adopted a Transportation
Improvement Program and thereafter periodically modified said Transportation
Improvement Program by resolution; and
WHEREAS, the City Council has reviewed the work accomplished under said
program, determined current and future City street and arterial needs and, based upon
these findings, has prepared a Six-Year Transportation Improvement Program for the
ensuing six calendar years (2018-2023); and
WHEREAS, on June 12, 2017, a public hearing was held regarding the City's Six-
Year Transportation Improvement Program-,
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. Program Adopted. A Six-Year Transportation Improvement Program
for the calendar years 2018 to 2023, attached hereto as Exhibit A, is hereby adopted.
Section 2. Filing of Program. The City Clerk is hereby authorized and directed to
file a copy of this resolution, together with the exhibit attached hereto, with the
Secretary of Transportation and the Transportation Improvement Board of the State of
Washington
WAWord Processing\Resolutions\TIP 2018-2023 5-17-17
CK:bjs Page 1 of 2
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON,
at a Regular Meeting thereof this ClItl day of 2017.
ATTEST/AUTH E NTI CATE D:
Christy O'Flaheffy, MMC, City Cler
F.11 a a 1000j: a 0.1" to] I ITQ all LVA I
101"�
Rachel B. Turpin, City Attorney
Dennis Robertson, Council President
Filed with the City Clerk: & - I q " 11)
Passed by the City Council:
Resolution Number:
Exhibit A: City of Tukwila Six-Year Transportation Improvement Program for 2018 to 2023
WAWord Processing\Resolutions\TIP 2018-2023 5-17-17
CK:bjs
Page 2 of 2
2018 -2023
TIP
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
2018 - 2023 TIP SUMMARY
PROJECT TITLE
42 -42nd Ave S (S 160 St - S 131 PI)
53rd Ave S (S 137th St - S 144th St)
ADA Improvements
APE /Minkler Blvd Intersection
Annual Bridge Inspections and Repairs
Annual Overlay and Repair Program
Beacon Ave Bridge Preventative Maintenance
BNSF Regional Center Access
Cascade View Safe Routes to School Phase 2
Frank Zepp Bridge Preventative Maintenance
Grady Way Bridge Preventative Maintenance
Multipurpose Trails
S 140th St Intersection Improvements
S 144th St Bridge Sidewalks
Strander Blvd /SW 27th St St Phase III
TUC/TOD Pedestrian Improvements
Walk & Roll Program
West Valley Highway
2017 CIP Project Costs in Thousands of Dollars
Page No. 2018 2019 2020 2021 2022 2023 TOTAL Federal
2 2,580 0 0 0 0 4360 6,940
3 2,610 0 0 0 0 0 2,610 900
20 200 200 200 200 200 200 1,200
27 0 0 144 1,570 0 0 1,714
19 335 335 335 405 405 405 2,220
18 1,400 1,400 1,730 1,740 1,800 1,800 9,870
12 1,741 0 0 0 0 0 1,741 1,741
23 100 0 0 0 0 0 100
4 814 0 0 0 0 814 714
12 2,535 0 0 0 0 0 2,535 2,535
12 198 0 0 0 0 0 198 198
32 62 0 0 0 0 150 212
22 0 75 675 0 0 0 750 675
17 0 200 1,210 0 0 0 1,410 1,220
13 3,000 3,000 18,300 14,200 0 0 38,500 28,941 5,000
25 0 0 0 0 0 4,250 4,250 3,400
- 0 0 0 0 0 0 0
26 482 2,070 0 0 0 1,400 3,952 627 2,554
June 12, 2017
FUNDING SOURCES
State/TIB Developer Unsecured City
6,940
1,710
1,200
1,714
2,220
9,870
0
100
100
0
0
212
75
190
2,215
850
0
250 521
TOTAL
PROJECTS REVISED FROM 2017 -2022 TIP
New:
S 140th St Intersection Improvements
16,057 7,280 22,594 18,115 2,405 12,565 79,016 39,376 9,129
Deleted:
Andover Park E /Industry Dr Intersection
Moved to Beyond
S 133rd St/SR 599 Intersection
Moved to Beyond
TUC - Pedstrian- Bicycle Bridge
Completed
Boeing Acces Rd Bridge Rehabilitation
Completed
250
27,917
Washington State
V// Department of Transportation
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
v
z
c
3
0
A. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
luawpuawy
ON uounlosaa
addl luawanoldwI
m
0
0
0
m
0
0
c.
17
40-42 Ave S (S 160 St - S 131 PL)
S 160th Street to Southcenter Blvd
Design and construct street improvements, underground aerial utilities, drainage,
sidewalks, bike facilities, and driveway adjustments
WA -07745
06/12/17
06/19/17
04
CGOPS
TW
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2018
0
0
2,465,000
2,465,000
P
CN
2023
0
0
4,360,000
4,360,000
Totals
0
0
6,825,000
6,825,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
2,465,000
0
0
0
4,360,000
Totals
2,465,000
0
0
0
4,360,000
Report Date: May 24, 2017
Page 1
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
-n
c
n=
DT g
a m
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
o
9
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
WA -06601
53rd Avenue S
S 137th St to S 144th St
Design and construct urban residential street improvements that include curb, gutter,
sidewalk , illumination and undergrounding. Street portion will coordinate with Water,
Surface Water and Sewer capital improvement program projects.
06/12117
06/19/17
04
C G O P S
TW
0.420
CE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2018
0
TIB
900,000
1,710,000
2,610,000
Totals
0
900,000
1,710,000
2,610,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
2,610,000
0
0
0
0
Totals
2,610,000
0
0
0
0
Report Date: May 24, 2017
Page 2
Agency: Tukwila
County: King
MPO /RTPO: PSRC
State
a# Transportation
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
r Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
WA -05405
Americans with Disabilities Act (ADA) Improvements
Various locations
to
Design and construct ADA compliant upgrades to City infrastructure in conjunction
with a City developed plan.
06/12/17
06/19/17
06
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2018
0
0
1,200,000
1,200,000
Totals
0
0
1,200,000
1,200,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
200,000
200,000
200,000
200,000
400,000
Totals
200,000
200,000
200,000
200,000
400,000
Report Date: May 24, 2017
Page 3
ANL
;Washington State
Department of Transportation
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
-n
c
r) _.
m g
H m
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
WA -07746
Andover Park E /Minkler Blvd Intersection
Andover Park E
Minkler Blvd to
Construct left turn lanes on Andover Park East and reconstruct traffic signal
06/12/17
06/19/17
03
C G O P S
TW
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2020
0
0
134,000
134,000
P
RW
2020
0
0
10,000
10,000
P
CN
2021
0
0
1,570,000
1,570,000
Totals
0
0
1,714,000
1,714,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
134,000
0
0
RW
0
0
10,000
0
0
CN
0
0
0
1,570,000
0
Totals
0
0
144,000
1,570,000
0
Report Date: May 24, 2017
Page 4
on State
ant of TYansportation
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
v
0
Q
z
c
W
A. PIN /Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
v
0.
0
0.
0
0
0
0
ad ;uawaAwdwI
0
0
N
1
0
m
r
0
0
CO
s
edh(j iquawuoJ!Au3
14
Annual Bridge Inspections and Repairs
Various City Street
to
Perform load ratings and bi- annual inspections as well as construct necessary
repairs and maintenance
WA -03731
06/12/17
06/19/17
06
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2018
0
0
2,220,000
2,220,000
Totals
0
0
2,220,000
2,220,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
335,000
335,000
335,000
405,000
810,000
Totals
335,000
335,000
335,000
405,000
810,000
Report Date: May 24, 2017
Page 5
Agency: Tukwila
County: King
MPO /RTPO: PSRC
State
of Transportation
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
n K
iu
q m
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
3
o
3
T
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
WA -03733
Annual Overlay and Repair Program
Various City Streets
to
Repair, rehabilitate, and overlay City streets as needed in an annual program
06/12/17
06/19/17
06
C G O P S
TW
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2018
0
0
10,320,000
10,320,000
Totals
0
0
10,320,000
10,320,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
1,400,000
1,730,000
1,740,000
1,800,000
3,600,000
Totals
1,400,000
1,730,000
1,740,000
1,800,000
3,600,000
Report Date: May 24, 2017
Page 6
Agency: Tukwila
County: King
MPO /RTPO: PSRC
s
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
19
/ 1320(004) TUK -57
Beacon Ave S Bridge Preventative Maintenance Project
Beacon Avenue South over South Ryan Way
S Victor St to S 170th St
Remove and replace failed bridge deck and paint structural steel.
06/12/17
06/19/17
14
0.010
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2018
STP(BR)
1,740,920
0
0
1,740,920
Totals
1,740,920
0
0
1,740,920
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
1,740,920
0
0
0
0
Totals
1,740,920
0
0
0
0
Report Date: May 24, 2017
Page 7
State
t of Transportation
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
m
0.
n _.
m =
m d
Priority Number
A. PIN /Project No. 8. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
WA05409
BNSF Regional Center Access
New Facility
to
Construct a new access to the BNSF Regional Distribution Center, relocating the
900* daily truck trips from residential streets in Allentown.
06/12/17
06/19/17
08
EIS
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2018
0
0
100,000
100,000
Totals
0
0
100,000
100,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
100,000
0
0
0
0
Totals
100,000
0
0
0
0
Report Date: May 24, 2017
Page 8
Agency: Tukwila
County: King
MPO /RTPO: PSRC
State
t of Trartsportati
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
-n
0
m g
m m
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
XI
A
o
o
o
Z
p
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
/ 1320(005) TUK -58
Cascade View Elementary Safe Routes to School Project - Phase 2
33rd Ave S and S 140th Street
S. 144th at 34th Ave. S. to 140th St at 34th Ave. S.
Concrete sidewalks are proposed on one side of 33rd Ave S (S 140th St to S 144th
St) and on one side of S. 140th St (Military Road South to 34th Ave S) along with a
standard curb and gutter separating the sidewalk from the roadway. A traffic circle is
proposed at the intersection of 33rd Ave S and S 140th St to assist in reducing
vehicle speeds and increase visibility and safety of pedestrians crossing the street.
Curb bulb -outs and /or pedestrian refuge islands at the east entrance /exit to the traffic
circe would be constructed to improve the safety of crossing S 140th St at 33rd Ave
S. There are currently no ADA facilities to connect to within the project limits. Minor
storm water improvements will be added to the general action area. The new
sidewalk along 33rd Ave S. will require reconstruction of the pavement cross section
to establish proper crown slopes.
06/12/17
06/19/17
28
0.510
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2018
SRTS
714,000
0
100,000
814,000
Totals
714,000
0
100,000
814,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
814,000
0
0
0
0
Totals
814,000
0
0
0
0
Report Date: May 24, 2017
Page 9
e
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Type
RW Required
16
/ 1274(009) TUK -55
Frank Zepp Bridge Preventative Maintenance Project
S 180th Street over the Green River
SR 181 - West Valley Highway to Sperry Drive S
Paint the structural steel, overlay deck and replace the deck joint, and install seismic
protection.
06/12/17
06/19/17
14
0.040
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2018
STP(BR)
2,534,812
0
0
2,534,812
Totals
2,534,812
0
0
2,534,812
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
2,534,812
0
0
0
0
Totals
2,534,812
0
0
0
0
Report Date: May 24, 2017
Page 10
Agency: Tukwila
County: King
MPO /RTPO: PSRC
i State
t of Transportation
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
0. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
A
m
o
oc
o
z
9
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
/ 1288(005) TUK -56
Grady Way Bridge Preventative Maintenance Project
Grady Way Bridge over BN and UP Railroads
Interurban Avenue S to Longacres Drive SW, Renton
Retrofit existing bridge with seismic protection.
06/12/17
06/19/17
14
0.230
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2018
STP(BR)
197,725
0
0
197,725
Totals
197,725
0
0
197,725
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
197,725
0
0
0
0
Totals
197,725
0
0
0
0
Report Date: May 24, 2017
Page 11
=1"4111111111. Washington State
WI Department of Thin
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
v
2
3
m
A. PIN /Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
3
IL
3
ID
uogniosaa
ad.tl ;uewanoidwl
J
ad (1 le3uawuonnu3
pennbaa M2i
00
Multipurpose Trails
to
Wide array of necessary trail improvements to existing trail system infrastructure
WA -03783
06/12/17
06/19/17
28
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2018
0
0
62,000
62,000
P
ALL
2023
0
0
150,000
150,000
Totals
0
0
212,000
212,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
62,000
0
0
0
0
ALL
0
0
0
150,000
Totals
62,000
0
0
0
150,000
Report Date: May 24, 2017
Page 12
Agency: Tukwila
County: King
MPO /RTPO: PSRC
State
of Transportation
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
Adopted
D
ili
c
3
?....
Resolution No
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
WA -09873
S 140th St Intersection Improvements
S 140th Street
Tukwila International Blvd to
Design and construct a new traffic signal at the S 140th Street/Tukwila International
Blvd intersection
06/12/17
06/19/17
04
C G P S T
W
0.100
DCE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2019
0
Ped /Bike Program
67,000
8,000
75,000
P
RW
2020
0
Ped /Bike Program
40,000
10,000
50,000
P
CN
2020
0
Ped /Bike Program
568,000
57,000
625,000
Totals
0
675,000
75,000
750,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
75,000
0
0
0
RW
0
0
50,000
0
0
CN
0
0
625,000
0
0
Totals
0
75,000
675,000
0
0
Report Date: May 24, 2017
Page 13
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
-n
c
T
ci rx
ET 3
m 8.
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
°
m'
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
WA03782
S 144th St Bridge Sidewalks
S 144th Street
51st Ave S to 53rd Ave S
Widen existing sidewalks on bridge over 1 -5 between 51st Ave S and 53rd Ave S
06112/17
06/19/17
28
0.250
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2019
SRTS
173,000
0
27,000
200,000
P
CN
2019
SRTS
1,047,000
0
163,000
1,210,000
Totals
1,220,000
0
190,000
1,410,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
200,000
0
0
0
CN
0
0
1,210,000
0
0
Totals
0
200,000
1,210,000
0
0
Report Date: May 24, 2017
Page 14
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
lEnvironmental Type
RW Required
16
TUK -59
Strander Blvd. /SW 27th St Extension
Strander Blvd. /SW 27th St
West Valley Highway to Naches Ave
This project is Phase 3 of a multi -phase improvement that will connect Strander
Blvd. /SW 27th St between West Valley Hwy in Tukwila and Oakesdale Ave in
Renton. This project will complete the design, right -of -way and construction phases
for the roadway segment between West Valley Hwy and Naches Ave. Project
components include a railroad bridge for the Union Pacific RR to provide grade
separation, a new 4/5 lane roadway segment east of West Valley Hwy, roadway
widening of two lanes for a portion of the project segment, a separated joint -use trail,
a new trail bridge for the Interurban Trail (including new trail connections to Strander
Blvd.), a new flyover bridge connection to the Tukwila Station, and a new traffic
signal serving the Tukwila Station. Current funding will complete the preliminary
engineering and right -of -way phases. Construction will be funded as part of a future
phase.
06/12/17
06/19/17
01
0.300
DCE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2018
STP(UL)
3,892,500
0
607,500
4,500,000
S
RW
2018
STP(UL)
1,254,300
0
195,700
1,450,000
P
CN
2020
TIGER
13,794,000
TIB
5,000,000
706,000
19,500,000
P
CN
2020
FMSIB
5,000,000
0
0
5,000,000
S
CN
2020
Discretionary
5,000,000
0
0
5,000,000
P
CN
2020
0
0
706,000
706,000
Totals
28,940,800
5,000,000
2,215,200
36,156,000
Report Date: May 24, 2017
Page 15
Agency: Tukwila
County: King
MPO /RTPO: PSRC
State
of 7Yansportation
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
2,500,000
2,000,000
0
0
0
RW
450,000
1,000,000
0
0
0
CN
50,000
0
18,300,000
14,200,000
0
Totals
3,000,000
3,000,000
18,300,000
14,200,000
0
Report Date: May 24, 2017
Page 16
*7.tftas#tngttxt State
40 De„ tt of Transportation
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
T
c
0
-o
Z
c
3
0
A. PIN /Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
0
m
D
0
0
a
C.
;uewpuawy
0
0
ad i auaweA wdwJ
c
n
0
N
1
m
r
0
0
adAi peyuawu
0
c
17
TUC/TOD Pedestrian Improvements
Baker Blvd (if extended)
Andover Park W to E City Limits
Construct bike /pedestrian connection between the Tukwila Urban Center (TUC) and
Tukwila Station, with service by Amtrak Sounder Commuter Rail/Transit Oriented
Development (TOD) area.
WA -03772
06/12/17
06/19/17
28
0.750
CE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
ALL
2023
STP(E)
3,400,000
0
650,000
4,250,000
Totals
3,400,000
0
850,000
4,250,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
0
0
0
4,250,000
Totals
0
0
0
0
4,250,000
Report Date: May 24, 2017
Page 17
on state
Ott of Transportation
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
0
0
Z
c
3
0
A. PIN /Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
x
0
;uawpuewy
0
N
200.-
0
adAl ;uawanoidwl
c
n
0
0.
H
0 w
r
m
edi j ie;uewuonnu3
pannbed MH
00
Walk & Roll Plan (Nonmotorized Transportation Plan)
Various City Streets
to
Evaluate deficiencies and create a prioritized list of projects and recommended
design standards.
WA -03761
06/13/17
06/20/17
28
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2021
0
0
1
1
Totals
0
0
1
1
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
1
Totals
0
0
0
0
Report Date: May 24, 2017
Page 18
Agency: Tukwila
County: King
MPO /RTPO: PSRC
State
of Transportation
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
0
Ic
o
mg
N
Jagwnry A3IJ0ud
A. PIN /Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
3uawpuawy
adR13uawanoJdwI
c
n
0
0
N
1
v
0
paAnbaa Ma
14
West Valley Highway
SR 181/West Valley Highway
I -405 to Strander Blvd
Design and construct completion of 7 lane sections of West Valley Highway with
sidewalks, curbs, gutters, storm drainage, lighting, and traffic control, including safety
and capacity improvements at the S 156th St intersection.
WA03779
06/12/17
06/19/17
03
0.500
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2018
STP
189,000
0
38,000
227,000
P
PE
2018
0
TIB
155,000
0
155,000
S
RW
2018
0
0
100,000
100,000
S
CN
2019
STP
438,000
0
62,000
500,000
P
CN
2019
0
TIB
2,389,000
582,000
2,971,000
Totals
627,000
2,544,000
782,000
3,953,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
382,000
0
0
0
150,000
RW
100,000
0
0
0
100,000
CN
0
2,070,000
0
0
1,150,000
Totals
482,000
2,070,000
0
0
1,400,000
Federal Funds
State Funds
Local Funds
Total Funds
Grand Totals for Tukwila
39,375,257
9,119,000
28,513,201
77,007,458
Report Date: May 24, 2017
Page 19
Christy O'Flaherty
From: Christy O'Flaherty
Sent: Tuesday, June 20, 2017 9:36 AM
To: I millarr@wsdot.wa.gov'
Cc: Bob Giberson
Subject: Tukwila Transportation Improvement Program 2018-2023
Importance: High
June 20, 2017
TO: WASHINGTON STATE DEPT OF TRANSPORTATION
RE: CITY OF TUKWILA 2018-2023 TRANSPORTATION IMPROVEMENT PROGRAM
Following is a link to City of Tukwila Resolution #1910 passed June 19, 2017, adopting the Transportation
Improvement Program for 2018-2023.
Res 1910 - 2018-2023 Transportation Improvement
Program: httr): //records.tu kwi I awa. q ov/Webl-i n k8/DocView. aspx? id=287926&paqe= 1 &d bid= 1
Please contact me with any questions at 206 433-1855.
Please respond to this email to ensure it was received satisfactorily. Thank you.
Sincerely yours,
Christy O'Flaherty, MMC
City Clerk
Attachment
xc: Bob Giberson, Public Works Director
Christy O'Flaherty
From:
Christy O'Flaherty
Sent:
Tuesday, June 20, 2017 9:35 AM
To:
'Andi Markley'
Cc:
Bob Giberson
Subject:
Tukwila Transportation Improvement Program 2018-2023
Importance: High
June 20, 2017
TO: PUGET SOUND REGIONAL COUNCIL
RE: CITY OF TUKWILA 2018-2023 TRANSPORTATION IMPROVEMENT PROGRAM
Following is a link to City of Tukwila Resolution #1910 passed June 19, 2017, adopting the Transportation
Improvement Program for 2018-2023.
Res 1910 - 2018-2023 Transportation Improvement
Program: http://records.tukwilawa. qovMebLink8/DocView. aspx?id=287926&paqe= 1 &d bid= 1
Please contact me with any questions at 206 433-1855.
Please respond to this email to ensure it was received satisfactorily. Thank you.
Sincerely yours,
Christy O'Flaherty, MMC
City Clerk
Attachment
xc: Bob Giberson, Public Works Director
Christy O'Flaherty
From: Christy O'Flaherty
Sent: Tuesday, June 20, 2017 9:36 AM
To: 'GregA@TIB.wa.gov'
Cc: Bob Giberson
Subject: Tukwila Transportation Improvement Program 2018-2023
Importance: High
June 20, 2017
TO: TRANSPORTATION IMPROVEMENT BOARD
RE: CITY OF TUKWILA 2018-2023 TRANSPORTATION IMPROVEMENT PROGRAM
Following is a link to City of Tukwila Resolution #1910 passed June 19, 2017, adopting the Transportation
Improvement Program for 2018-2023.
Res 1910 - 2018-2023 Transportation Improvement
Program: http: //records tu kwi lawa, q ov/Webl-i nk8/DocView. as px? id =287926& iDaqe= 1 &d bid= 1
Please contact me with any questions at 206 433-1855.
Please respond to this email to ensure it was received satisfactorily. Thank you.
Sincerely yours,
Christy O'Flaherty, MMC
City Clerk
Attachment
xc: Bob Giberson, Public Works Director