Loading...
HomeMy WebLinkAboutRes 1912 - 2017-2018 Consolidated Permit Fee Schedule - Credit Card Surcharge (Repealed by Res 1947) Cover page to Resolution 1912 The full text of the resolution follows this cover page. Resolution 1912 was amended or repealed by the following resolutions. REPEALED Section(s) Repealed Repealed by Res # 1947 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, REPEALING RESOLUTION NO. 1894 AND READOPTING THE CONSOLIDATED PERMIT FEE SCHEDULE TO REVISE THE CREDIT CARD SURCHARGE REQUIREMENTS. WHEREAS, the City Council adopted Resolution No. 1894 in 2016, establishing the City's current consolidated construction fee schedule; and WHEREAS, the fee schedule included a waiver of the 3% credit card surcharge for online permitting transactions in 2017 to incentivize use of the online application process; and WHEREAS, staff has determined that programming this waiver into the TRAK-iT permit processing program and then removing it at the end of the year would require excessive staff time and delay implementation of online permitting; and WHEREAS, staff time would be better spent preparing eTRAK-iT for use by the public-, NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. Repealer. Resolution No. 1894 is hereby repealed. Section 2. For 2017 and 2018, the Technology Fee shall be set at 5% of the applicable permit fee. WAWord Processing\Resolutions\Consolidated permit fee schedule-credit card surcharge 6-9-17 NG:bjs Page 1 of 11 Section 3. Public Works fees will be charged according to the following schedule: PUBLIC WORKS FEE SCHEDULE PERMIT DESCRIPTION FEE Type A (Short-Term Non-profit) $ 50.00 +Technology Fee Type B (Short-Term Profit) $100.00 + Technology Fee Type C $250.00 application base fee, Technology Fee, plus (Infrastructure and Grading on Private Property four components based on construction value: and City Right-of-Way and Disturbance of City 1) Plan Review Right-of-Way) 2) Construction Inspection 3) Pavement Mitigation Appeal of Sign Code Decision 4) Grading Plan Review $626 See Public Works Bulletin Al for fee schedule. Type D (Long-Term) $100.00 + Technology Fee Type E (Potential Disturbance of $100.00 + Technology Fee Cit y Right-of-Wa y) Type F (Blanket Permits) $250.00 processing fee, plus $5,000.00 cash deposit, $614 withdraw $100.00 per instance for inspection Franchise — Telecommunications $5,000.00 administrative fee Franchise — Cable $5,000.00 plus 5% of total revenue Street Vacation $1,200.00 Latecomer's Agreements $500.00 processing fee, plus 17% administrative fee, plus $500.00 segregation fee Flood Zone Control Permit $50.00 + Technology Fee Section 4. Land use permit and processing fees will be charged according to the following schedule: LAND USE FEE SCHEDULE All peer review fees will be passed through to the applicant per TMC Section 18.50.200. Decision Type 2017 Fee 2018 Fee Plus Hearing Examiner Fees Plus Technology Fee (TF)_ Appeal Type 1, 2 and 4 Decisions $614 $626 SEPA MDNS Appeal $614 $626 Appeal of Sign Code Decision $614 $626 Impact Fee Appeals: Fire $614 $626 Parks $614 $626 Transportation $614 $626 WAWord Processing\Resolutions\Consolidated permit fee schedule-credit card surcharge 6-9-17 NG:bjs Page 2 of 11 Decision Type 2017 Fee 2018 Fee Plus Hearing Examiner Fees Plus Technology Fee (TF) Sign Permit (TMC Chapter 19) Permanent $253 $258 + TF + TF Temporary $40 $41 + TF + TF Pole /Banner Initial Application $253 $258 + TF + TF Special Event $110 $112 + TF Pole /Banner Annual Renewal $55 $56 + TF New Billboard $614 $626 + TF Master Sign Program —Admin $2,260 $2,306 + TF Master Sign Program —BAR $3,620 $3,692 + TF TUC Zone Modifications Modification to TUC Corridor Standards (TMC Section 18.28.130. C) $614 $626 + TF Modification to TUC Open Space Regulations (TMC Section 18. 28.250 D. 4. d $614 $626 + TF Transit Reduction to Parking Requirements (TMC Section 18.28.260. B. 5. b) $614 $626 + TF Design Review (TMC Section 18.60.030) Administrative $2,327 $2,373 + TF Public Hearing $4,168 $4,251 + TF Major Modification $1,425 $1,453 + TF Minor Modification $648 $661 + TF larking Variances and Special Permissions Administrative Parking Variance $614 $626 + TF (Type 2 —TMC Section 18.56.140) Parking Variance (Type 3 —TMC Section 18.56.140) Parking Standard for use not specified (TMC 18.28.250 D. 4. d.1 and TMC 18.56. 1( Residential Parking Reduction (TMC Section 18.56.065) Shared, covenant, Complementary Parking Reduction (TMC Section 18.56.070) Parking Lot Restriping (TMC Section 18.56.120) $1,008 $1,028 + HE + TF $603 $615 + TF $614 $626 + TF $614 $626 + TF $614 $626 1 + TF W: \Word Processing \Resolutions \Consolidated permit fee schedule- credit card surcharge 6 -9 -17 NG:bjs Page 3 of 11 Decision Type 2017 Fee 2018 Fee Plus Hearing Examiner Fees Plus Technology Fee (TF) Variances, Special Permissions and Site Plan Review Variances (TMC Section 18.72) $2,940 $2,998 + HE + TF Environmentally Sensitive Areas Deviation, Buffer Reduction (TMC Chapter 18.45) Reduced fee for LDR homeowners, no associated short plat $1,556 $614 $1,587 $626 + TF Reasonable Use Exception (TMC Section 18.45.180) $3,111 $3,173 + H E + TF Exception from Single Family Design Standard (TMC Section 18.50.050) $614 $626 + TF Special Permission Cargo Container (TMC Section 18.50.060) $614 $626 + TF Landscape Perimeter Averaging (TMC Section 18.52.060) $614 $626 + TF Tree and Landscape Modification Permit and Exceptions (TMC Chapter 18.54) $109 $111 + TF Lot Creation and Consolidation Boundary Line Adjustment (TMC Chapter 17.08) $1,744 $1,779 + TF Lot Consolidation (TMC Chapter 17.08) $648 $661 + TF Short Plat (2 -4 lots) (TMC Chapter 17.12) $3,971 $4,050 + TF Short Plat (5 -9 lots) (TMC Chapter 17.12) $4,520 $4,610 + TF Subdivision: Preliminary Plat (10+ lots) (TMC Section 17.14.020) $5,187 $5,290 + HE + TF Final Plat (10+ lots) (TMC Section 17.12.030) $3,111 $3,173 + TF Binding Site Improvement Plan (TMC Chapter 17.16) $3,971 $4,050 + TF Planned Residential Development: Administrative (TMC Section 18.46. 110) $2,260 $2,306 + TF Public Hearing (TMC Section 18.46. 110) $5,187 $5,290 + TF Minor Modification (TMC Section 18.46.130) $614 $626 + TF Major Modification (TMC Section 18.46.130) $2,522 $2,573 + TF W: \Word Processing \Resolutions \Consolidated permit fee schedule- credit card surcharge 6 -9 -17 NG:bjs Page 4 of 11 Decision Type 2017 Fee 2018 Fee Plus Hearing Examiner Fees Plus Technology Fee(TF) Wireless Communication Facility (TMC Chapter 18.58,050) Administrative (Type 2) $1,744 $1,779 + TF SEPA and Environmental Checklist $1,778 $1,813 + TF SEPA Planned Action $614 $626 + TF SEPA Exemption Letter $362 $369 +TF Sensitive Area Master Plan Overlay (TMC 18.45.160) $5,187 $5,290 + TF Shoreline Permits Substantial Development Permit (TMC Chapter 18.44) Projectvalue: $5,000-$10,000 $1,229 $1,254 +TF Permit Exemption Letter, Shoreline Shoreline Permit Revision Conditional Use Permit, Shoreline (TMC 18,44050) Shoreline Tree Permit (TMC Chapter 18.44) Shoreline Environment Redeakgnadon Noise Variance (TMC Section 8.22.120) Type Type 11 Type III e Permits Conditional Use Permit (TMC Section 18.64.020) Unclassified Use Permit (TMC Chapter 18.66) TSO Special Permission Use (TMC Section Y{i41.080) vV:\wurd permit fee schedule-credit card surcharge n-9-1r NG:bjn Page 5of11 Decision Type 2017 Fee 2018 Fee Plus Hearing Examiner Fees Plus Technology Fee (TF) Comprehensive Plan Changes (TMC Chapter 18.84) Rezone (Map Change) $3,630 $3,703 $132.09 for the first $2,000, plus $19.99 for each additional $1,000, or + TF Comprehensive Plan Amendment $4,149 $4,232 + TF Zoning Code Text Amendment $4,716 $4,811 fraction thereof, to and including $100,000, + Technology Fee + TF Miscellaneous Services and Charges Development Agreement $2,075 $2,116 $5,004.43 for the first $500,000, plus $7.14 for each additional $1,000, or + TF Code Interpretation (TMC Section 18.90.010) $362 $369 + TF Zoning Verification Letter $362 $369 thereof, + Technology Fee + TF Legal Lot Verification $581 $593 + TF Preapplication Meeting $504 $514 + TF Mailing Fee to Generate Labels, per project $476 $486 Public Notice Mailing Fee per address for each mailing $1 $1 Section 5. Building permit fees will be charged according to the following schedule: BUILDING PERMIT FEE SCHEDULE Total Valuation ...... - -------- - Building Permit Fees $1 to $500 $66.30 + Technology Fee . . . . ....... $501 to $2,000 $66.30 for the first $500, plus $4.39 for each additional $100, or fraction thereof, to and including $2,000, + Technology Fee ............ . ....... . $2,001 to $25,000 $132.09 for the first $2,000, plus $19.99 for each additional $1,000, or fraction thereof, to and including $25,000, + Technology Fee $25,001 to $50,000 $612.41 for the first $25,000, plus $15.61 for each additional $1,000, or fraction thereof, to and including $50,000, + Technology Fee $50,001 to $100,000 $1,002.92 for the first $50,000, plus $10.81 for each additional $1,000, or fraction thereof, to and including $100,000, + Technology Fee $100,001 to $500,000 $1,541.83 for the first $100,000, plus $8.67 for each additional $1,000, or fraction thereof, to and including $500,000, + Technology Fee $500,001 to $1,000,000 $5,004.43 for the first $500,000, plus $7.14 for each additional $1,000, or fraction thereof, to and including $1,000,000, + Technology Fee $1,000,001 to $5,000,000 $8,612.12 for the first $1,000,000, plus $4.79 for each additional $1,000, or fraction thereof, to and including $5,000,000, + Technology Fee $5,000,001 and up $27,788.12 for the first $5,000.000, plus $4.59 for each $1,000 or fraction thereof, + Technology Fee WAWord Processing\Resolutions\Consolidated permit fee schedule-credit card surcharge 6-9-17 NG:bjs Page 6 of 11 A. Non-Structural Plan Review Fee. A non-structural plan review fee shall be paid at the time of submitting plans and specifications for review. The non-structural plan review fee shall be 65% of the calculated permit fee as set forth in the permit fee schedule. The non-structural plan review fee specified herein is a separate fee from the permit fee and is in addition to the permit fee. B. Structural Plan Review Fee. Where a structural plan review is deemed necessary, a structural plan review fee shall be charged. The structural plan review fee shall be 35% of the calculated non-structural plan review fee. Section 6. Mechanical permit fees will be charged according to the following schedule: MECHANICAL PERMIT FEE SCHEDULE Valuation of Work (Total Mechanical Permit Fee Contract Amount $33.15 for issuance of each permit (base fee) + Technology Fee $250 or less $66.30 + Technology Fee $251 to $500 $66.30 for first $250, plus $7.99 for each $100 or fraction thereof, to and including $500, + Technology Fee $501 to $1,000 $86.29 for the first $500, plus $8.87 for each $100 or fraction thereof, to and including $1,000, + Technology Fee $1,001 to $5,000 $130.66 for the first $1,000, plus $9.84 for each $1,000 or fraction thereof, to and including $5,000, + Technology Fee $5,001 to $50,000 $170.03 for the first $5,000, plus $10.25 for each $1,000 or fraction thereof, to and including $50,000, + Technology Fee - — ---------- $50,001 to $250,000 $651.98 for the first $50,000, plus $8.57 for each $1,000 or fraction thereof, to and including $250,000, + Technology Fee $250,001 to $1,000,000 $2,365.58 for the first $250,000, plus $7.55 for each $1,000 or fraction thereof, to and including $1,000,000, + Technology Fee $1,000,001 and up $8,026.58 for the first $1,000,000, plus $6.83 for each $1,000 or fraction thereof, + Technology Fee WAWord Processing\Resolutions\Consolidated permit fee schedule-credit card surcharge 6-9-17 NG:bjs Page 7 of 11 Section 7. Plumbing permit fees will be charged according to the following schedule: Permit Issuance—Issuance of each permit (base fee) $33.15 + Technology Fee Unit Fee Schedule (in addition to base fee above: For one plumbing fixture (a fixture is a sink, toilet, bathtub, etc.) $66.30 + Technology Fee For each additional fixture $14.28 + Technology Fee For each building sewer and each trailer park sewer $25.30 + Technology Fee Rain water system – per drain (inside building) $14.28 + Technology Fee For each water heater and/or vent $14.28 + Technology Fee For each industrial waste pretreatment interceptor, including its $28.56 + Technology Fee trap and vent, except for kitchen type grease interceptors For each grease interceptor for commercial kitchens $29.68 + Technology Fee For each repair or alteration of water piping and/or water treating $14.28 + Technology Fee equip ent, each occurrence For each repair or alteration of drainage or vent piping, each $14.28 + Technology Fee fixture For each medical gas piping system serving one to five $83.64 + Technology Fee inlets/outlets for aspecific_gas For each additional medical gas inlets/outlets $16.52 + Technology Fee For each lawn sprinkler system on any one (1) meter including $29.68 + Technology Fee backflow protection devices therefor. For atmospheric-type vacuum breakers not included in lawn --- ---- sprinkler backflow protection: 1 to 5 ........$14.00 + Technology Fee Over 5.......$14.00 for first 5 plus $3.25 for each additional + Technology Fee For each backflow protective device other than atmospheric type . .. ..... ...... ... vacuum breakers: 2-inch diameter and smaller ....... $29.10 + Technology Fee Over 2-inch diameter: ................ $32.25 t_Te Technology Fee . . ..... ......... . Section 8. Fuel Gas Piping permit fees will be charged according to the following schedule: FUEL GAS PIPING PERMIT FEE SCHEDULE Permit Issuance For issuing each permit (base fee): ($0 if permit is in conjunction with a plumbing permit for an appliance with both plumbing and gas connection.) .15 + Technology Fee Unit Fee Schedule For each gas piping system of one to five outlets $66.30 + Technology Fee . . ............. For each additional gas piping system outlet, per outlet $14.28 + Technology Fee WAWord Processing\Resolutions\Consolidated permit fee schedule-credit card surcharge 6-9-17 NG:bjs Page 8 of 11 Section 9. Electrical permit fees will be charged according to the following schedule: ELECTRICAL PERMIT FEE SCHEDULE NEW SINGLE - FAMILY DWELLINGS New single - family dwellings (including a garage) $155.91 + Technology Fee Garages, pools, spas and outbuildings $83.54 + Technology Fee Low voltage systems $61.05 + Technology Fee 2. SINGLE - FAMILY REMODEL AND SERVICE CHANGES Service change or alteration —no added /altered circuits $83.54 + Technology Fee �. -- — ------- ... ..... _ .......... ._.....— Service change $83.54 with added /altered circuits, plus $12.00 for - -- -- $83.54 + Technology Fee each added circuit maximum permit fee $156.00) Circuits added /altered without service change (includes up to $55.69 + Technology Fee 5 circuits $66.30 for the first $250 plus $4.39 for each $100 or fraction thereof, to and _ Circuits 55.69 added /altered without service change (more than $55.69 + Technology Fee 5 circuits); $7.65 for each added circuit (maximum permit fee $100.00 $98.94 for the first $1,000 plus $22.03 for each $1,000 or fraction thereof, to + Technology Fee) and including $5,000, + Technology Fee Meter /mast repair $69.62 + Technology Fee Low voltage systems $61.05 + Technology Fee MULTI - FAMILY AND COMMERCIAL (including low voltage) Valuation of Work (Total Permit Fee Contract Amount) $250 or less $66.30 + Technology Fee $251 - $1,000 $66.30 for the first $250 plus $4.39 for each $100 or fraction thereof, to and including $1,000, + Technology Fee $1,001 - $5,000 $98.94 for the first $1,000 plus $22.03 for each $1,000 or fraction thereof, to and including $5,000, + Technology Fee $5,001 - $50,000 $186.97 for the first $5,000 plus $18.05 for each $1,000 or fraction thereof, to and including $50,000, + Technology Fee $50,001 - $250,000 $998.73 for the first $50,000 plus $13.16 for each $1,000 or fraction thereof, to and including $250,000, + Technology Fee $250,001 - $1,000,000 $3,638.54 for the first $250,000 plus $9.33 for each $1,000 or fraction thereof, to and including $1,000,000, + Technology Fee Over $1,000,000 $10,649.51 plus 0.5% of cost over $1,000,000, + Technology Fee W: \Word Processing \Resolutions \Consolidated permit fee schedule- credit card surcharge 6 -9 -17 NG:bjs Page 9 of 11 4. MISCELLANEOUS ELECTRICAL PERMIT FEES Temporary service (residential) $66.30 + Technology Fee Temporary service/generators $82.52 + Technology Fee Manufactured/mobile home parks and RV park sites, each service and feeder $87.98 + Technology Fee C–arnivals: • Base fee . . ........ . ... $82.21 + Technology • Each concession fee _Fee $11.02 + Technology Fee • Each ride and generator truck $11.02 + Technology Fee Inspections or plan review not specified elsewhere (one-half hour minimum). SafetV inspections, plan revisions. $67.83/hour Adult family home inspection (paid at the time of scheduling the inspection) $67.83 Disaster recovery emergency repair permit (residential structures only) . $20.00 . ... . ......... Section 10. Other inspections and fees will be charged according to the following schedule: OTHER INSPECTIONS AND FEES Inspections outside of normal business hours (three hour minimum charge) $102.00/hour Re-inspection fee .... . $67.83/hour .. ........ . Inspection for which no fee is specifically indicated– --investigations or safety $67.83/hour Additional plan review required by changes, additions, or revisions to approved $67.83/hour plans (minimum charge one-half hour) Work commencing before permit issuance shall be subject to an investigation fee 100% of the permit fee equal to 100% of the permit fee. Plan review fee—Mechanical, Plumbing, Fuel Gas Piping and Electrical: The fee for review shall be 25% of the total calculated permit fee. The plan review fee is a separate fee from the permit fee and is required when plans are required in order to document compliancewith the code. — -- -------- ---- ....... ... Work covered without inspection or work not ready at the time of inspection may be charged a re-inspection fee of $66.50. Expired permit final – includes two inspections $133.00 Expired permit final – each additional inspection $67.83 Minor residential remodel plan review and permit (projects up to $20,000) . . . . ...... $20.00 Section 11. Credit Card Surcharge. If payment is made by credit card, a processing fee of 3% will be added to the total order. WAVVord Processing\Resolutions\Consolidated permit fee schedule-credit card surcharge 6-9-17 NG:bjs Page 10 of 11 PASSED BY THE CITY CUUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Special Meeting thereof this - --- .,- _r4_j day of 2017. ATTEST /AUTHENTICATED: Christy O'FlalYerty, MMIC, City CIE Rachel B. Turpin, City Attorney Dennis Robe n, bbun'cil President Filed with the City Clerk: 6-, J-0 Passed by the City Council: to-� Resolution Number: I q ) �A WAWord Processing\Resolutions\Consolidated permit fee schedule-credit card surcharge 6-9-17 NG:bjs Page 11 of 11