HomeMy WebLinkAboutRes 1912 - 2017-2018 Consolidated Permit Fee Schedule - Credit Card Surcharge (Repealed by Res 1947)
Cover page to Resolution 1912
The full text of the resolution follows this cover page.
Resolution 1912 was amended or repealed by the
following resolutions.
REPEALED
Section(s) Repealed Repealed by Res #
1947
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF TUKWILA, WASHINGTON, REPEALING RESOLUTION
NO. 1894 AND READOPTING THE CONSOLIDATED
PERMIT FEE SCHEDULE TO REVISE THE CREDIT CARD
SURCHARGE REQUIREMENTS.
WHEREAS, the City Council adopted Resolution No. 1894 in 2016, establishing the
City's current consolidated construction fee schedule; and
WHEREAS, the fee schedule included a waiver of the 3% credit card surcharge for
online permitting transactions in 2017 to incentivize use of the online application
process; and
WHEREAS, staff has determined that programming this waiver into the TRAK-iT
permit processing program and then removing it at the end of the year would require
excessive staff time and delay implementation of online permitting; and
WHEREAS, staff time would be better spent preparing eTRAK-iT for use by the
public-,
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. Repealer. Resolution No. 1894 is hereby repealed.
Section 2. For 2017 and 2018, the Technology Fee shall be set at 5% of the
applicable permit fee.
WAWord Processing\Resolutions\Consolidated permit fee schedule-credit card surcharge 6-9-17
NG:bjs Page 1 of 11
Section 3. Public Works fees will be charged according to the following schedule:
PUBLIC WORKS FEE SCHEDULE
PERMIT DESCRIPTION
FEE
Type A (Short-Term Non-profit)
$ 50.00 +Technology Fee
Type B (Short-Term Profit)
$100.00 + Technology Fee
Type C
$250.00 application base fee, Technology Fee, plus
(Infrastructure and Grading on Private Property
four components based on construction value:
and City Right-of-Way and Disturbance of City
1) Plan Review
Right-of-Way)
2) Construction Inspection
3) Pavement Mitigation
Appeal of Sign Code Decision
4) Grading Plan Review
$626
See Public Works Bulletin Al for fee schedule.
Type D (Long-Term)
$100.00 + Technology Fee
Type E (Potential Disturbance of
$100.00 + Technology Fee
Cit y Right-of-Wa y)
Type F (Blanket Permits)
$250.00 processing fee, plus $5,000.00 cash deposit,
$614
withdraw $100.00 per instance for inspection
Franchise — Telecommunications
$5,000.00 administrative fee
Franchise — Cable
$5,000.00 plus 5% of total revenue
Street Vacation
$1,200.00
Latecomer's Agreements
$500.00 processing fee, plus 17% administrative fee,
plus $500.00 segregation fee
Flood Zone Control Permit
$50.00 + Technology Fee
Section 4. Land use permit and processing fees will be charged according to the
following schedule:
LAND USE FEE SCHEDULE
All peer review fees will be passed through to the applicant per TMC Section 18.50.200.
Decision Type
2017
Fee
2018
Fee
Plus
Hearing
Examiner
Fees
Plus
Technology
Fee (TF)_
Appeal
Type 1, 2 and 4 Decisions
$614
$626
SEPA MDNS Appeal
$614
$626
Appeal of Sign Code Decision
$614
$626
Impact Fee Appeals:
Fire
$614
$626
Parks
$614
$626
Transportation
$614
$626
WAWord Processing\Resolutions\Consolidated permit fee schedule-credit card surcharge 6-9-17
NG:bjs Page 2 of 11
Decision Type
2017
Fee
2018
Fee
Plus
Hearing
Examiner
Fees
Plus
Technology
Fee (TF)
Sign Permit (TMC Chapter 19)
Permanent
$253
$258
+ TF
+ TF
Temporary
$40
$41
+ TF
+ TF
Pole /Banner Initial Application
$253
$258
+ TF
+ TF
Special Event
$110
$112
+ TF
Pole /Banner Annual Renewal
$55
$56
+ TF
New Billboard
$614
$626
+ TF
Master Sign Program —Admin
$2,260
$2,306
+ TF
Master Sign Program —BAR
$3,620
$3,692
+ TF
TUC Zone Modifications
Modification to TUC Corridor Standards
(TMC Section 18.28.130. C)
$614
$626
+ TF
Modification to TUC Open Space Regulations
(TMC Section 18. 28.250 D. 4. d
$614
$626
+ TF
Transit Reduction to Parking Requirements
(TMC Section 18.28.260. B. 5. b)
$614
$626
+ TF
Design Review (TMC Section 18.60.030)
Administrative
$2,327
$2,373
+ TF
Public Hearing
$4,168
$4,251
+ TF
Major Modification
$1,425
$1,453
+ TF
Minor Modification
$648
$661
+ TF
larking Variances and Special Permissions
Administrative Parking Variance
$614
$626
+ TF
(Type 2 —TMC Section 18.56.140)
Parking Variance
(Type 3 —TMC Section 18.56.140)
Parking Standard for use not specified
(TMC 18.28.250 D. 4. d.1 and TMC 18.56. 1(
Residential Parking Reduction
(TMC Section 18.56.065)
Shared, covenant, Complementary Parking
Reduction (TMC Section 18.56.070)
Parking Lot Restriping
(TMC Section 18.56.120)
$1,008 $1,028 + HE + TF
$603 $615 + TF
$614 $626 + TF
$614 $626 + TF
$614 $626 1 + TF
W: \Word Processing \Resolutions \Consolidated permit fee schedule- credit card surcharge 6 -9 -17
NG:bjs Page 3 of 11
Decision Type
2017
Fee
2018
Fee
Plus
Hearing
Examiner
Fees
Plus
Technology
Fee (TF)
Variances, Special Permissions and Site Plan Review
Variances
(TMC Section 18.72)
$2,940
$2,998
+ HE
+ TF
Environmentally Sensitive Areas Deviation,
Buffer Reduction (TMC Chapter 18.45)
Reduced fee for LDR homeowners, no
associated short plat
$1,556
$614
$1,587
$626
+ TF
Reasonable Use Exception
(TMC Section 18.45.180)
$3,111
$3,173
+ H E
+ TF
Exception from Single Family Design Standard
(TMC Section 18.50.050)
$614
$626
+ TF
Special Permission Cargo Container
(TMC Section 18.50.060)
$614
$626
+ TF
Landscape Perimeter Averaging
(TMC Section 18.52.060)
$614
$626
+ TF
Tree and Landscape Modification Permit and
Exceptions (TMC Chapter 18.54)
$109
$111
+ TF
Lot Creation and Consolidation
Boundary Line Adjustment
(TMC Chapter 17.08)
$1,744
$1,779
+ TF
Lot Consolidation
(TMC Chapter 17.08)
$648
$661
+ TF
Short Plat (2 -4 lots)
(TMC Chapter 17.12)
$3,971
$4,050
+ TF
Short Plat (5 -9 lots)
(TMC Chapter 17.12)
$4,520
$4,610
+ TF
Subdivision:
Preliminary Plat (10+ lots)
(TMC Section 17.14.020)
$5,187
$5,290
+ HE
+ TF
Final Plat (10+ lots)
(TMC Section 17.12.030)
$3,111
$3,173
+ TF
Binding Site Improvement Plan
(TMC Chapter 17.16)
$3,971
$4,050
+ TF
Planned Residential Development:
Administrative (TMC Section 18.46. 110)
$2,260
$2,306
+ TF
Public Hearing (TMC Section 18.46. 110)
$5,187
$5,290
+ TF
Minor Modification (TMC Section 18.46.130)
$614
$626
+ TF
Major Modification (TMC Section 18.46.130)
$2,522
$2,573
+ TF
W: \Word Processing \Resolutions \Consolidated permit fee schedule- credit card surcharge 6 -9 -17
NG:bjs Page 4 of 11
Decision Type
2017
Fee
2018
Fee
Plus
Hearing
Examiner
Fees
Plus
Technology
Fee(TF)
Wireless Communication Facility (TMC Chapter 18.58,050)
Administrative (Type 2)
$1,744
$1,779
+ TF
SEPA and Environmental
Checklist
$1,778
$1,813
+ TF
SEPA Planned Action
$614
$626
+ TF
SEPA Exemption Letter
$362
$369
+TF
Sensitive Area Master Plan Overlay
(TMC 18.45.160)
$5,187
$5,290
+ TF
Shoreline Permits
Substantial Development Permit (TMC Chapter 18.44)
Projectvalue: $5,000-$10,000
$1,229
$1,254
+TF
Permit Exemption Letter, Shoreline
Shoreline Permit Revision
Conditional Use Permit, Shoreline
(TMC 18,44050)
Shoreline Tree Permit
(TMC Chapter 18.44)
Shoreline Environment Redeakgnadon
Noise Variance (TMC Section 8.22.120)
Type
Type 11
Type III
e Permits
Conditional Use Permit
(TMC Section 18.64.020)
Unclassified Use Permit
(TMC Chapter 18.66)
TSO Special Permission Use
(TMC Section Y{i41.080)
vV:\wurd permit fee schedule-credit card surcharge n-9-1r
NG:bjn Page 5of11
Decision Type
2017
Fee
2018
Fee
Plus
Hearing
Examiner
Fees
Plus
Technology
Fee (TF)
Comprehensive Plan Changes (TMC Chapter 18.84)
Rezone (Map Change)
$3,630
$3,703
$132.09 for the first $2,000, plus $19.99 for each additional $1,000, or
+ TF
Comprehensive Plan Amendment
$4,149
$4,232
+ TF
Zoning Code Text Amendment
$4,716
$4,811
fraction thereof, to and including $100,000, + Technology Fee
+ TF
Miscellaneous Services and Charges
Development Agreement
$2,075
$2,116
$5,004.43 for the first $500,000, plus $7.14 for each additional $1,000, or
+ TF
Code Interpretation (TMC Section 18.90.010)
$362
$369
+ TF
Zoning Verification Letter
$362
$369
thereof, + Technology Fee
+ TF
Legal Lot Verification
$581
$593
+ TF
Preapplication Meeting
$504
$514
+ TF
Mailing Fee to Generate Labels, per project
$476
$486
Public Notice Mailing Fee per address for each
mailing
$1
$1
Section 5. Building permit fees will be charged according to the following
schedule:
BUILDING PERMIT FEE SCHEDULE
Total Valuation
...... - -------- -
Building Permit Fees
$1 to $500
$66.30 + Technology Fee
. . . . .......
$501 to $2,000
$66.30 for the first $500, plus $4.39 for each additional $100, or fraction
thereof, to and including $2,000, + Technology Fee
............ . ....... .
$2,001 to $25,000
$132.09 for the first $2,000, plus $19.99 for each additional $1,000, or
fraction thereof, to and including $25,000, + Technology Fee
$25,001 to $50,000
$612.41 for the first $25,000, plus $15.61 for each additional $1,000, or
fraction thereof, to and including $50,000, + Technology Fee
$50,001 to $100,000
$1,002.92 for the first $50,000, plus $10.81 for each additional $1,000, or
fraction thereof, to and including $100,000, + Technology Fee
$100,001 to $500,000
$1,541.83 for the first $100,000, plus $8.67 for each additional $1,000, or
fraction thereof, to and including $500,000, + Technology Fee
$500,001 to $1,000,000
$5,004.43 for the first $500,000, plus $7.14 for each additional $1,000, or
fraction thereof, to and including $1,000,000, + Technology Fee
$1,000,001 to $5,000,000
$8,612.12 for the first $1,000,000, plus $4.79 for each additional $1,000,
or fraction thereof, to and including $5,000,000, + Technology Fee
$5,000,001 and up
$27,788.12 for the first $5,000.000, plus $4.59 for each $1,000 or fraction
thereof, + Technology Fee
WAWord Processing\Resolutions\Consolidated permit fee schedule-credit card surcharge 6-9-17
NG:bjs Page 6 of 11
A. Non-Structural Plan Review Fee. A non-structural plan review fee shall be
paid at the time of submitting plans and specifications for review. The non-structural
plan review fee shall be 65% of the calculated permit fee as set forth in the permit fee
schedule. The non-structural plan review fee specified herein is a separate fee from the
permit fee and is in addition to the permit fee.
B. Structural Plan Review Fee. Where a structural plan review is deemed
necessary, a structural plan review fee shall be charged. The structural plan review fee
shall be 35% of the calculated non-structural plan review fee.
Section 6. Mechanical permit fees will be charged according to the following
schedule:
MECHANICAL PERMIT FEE SCHEDULE
Valuation of
Work (Total
Mechanical Permit Fee
Contract Amount
$33.15 for issuance of each permit (base fee) + Technology Fee
$250 or less
$66.30 + Technology Fee
$251 to $500
$66.30 for first $250, plus $7.99 for each $100 or fraction thereof, to
and including $500, + Technology Fee
$501 to $1,000
$86.29 for the first $500, plus $8.87 for each $100 or fraction thereof, to
and including $1,000, + Technology Fee
$1,001 to $5,000
$130.66 for the first $1,000, plus $9.84 for each $1,000 or fraction
thereof, to and including $5,000, + Technology Fee
$5,001 to $50,000
$170.03 for the first $5,000, plus $10.25 for each $1,000 or fraction
thereof, to and including $50,000, + Technology Fee
- — ----------
$50,001 to $250,000
$651.98 for the first $50,000, plus $8.57 for each $1,000 or fraction
thereof, to and including $250,000, + Technology Fee
$250,001 to $1,000,000
$2,365.58 for the first $250,000, plus $7.55 for each $1,000 or fraction
thereof, to and including $1,000,000, + Technology Fee
$1,000,001 and up
$8,026.58 for the first $1,000,000, plus $6.83 for each $1,000 or
fraction thereof, + Technology Fee
WAWord Processing\Resolutions\Consolidated permit fee schedule-credit card surcharge 6-9-17
NG:bjs Page 7 of 11
Section 7. Plumbing permit fees will be charged according to the following
schedule:
Permit Issuance—Issuance of each permit (base fee)
$33.15 + Technology Fee
Unit Fee Schedule (in addition to base fee above:
For one plumbing fixture (a fixture is a sink, toilet, bathtub, etc.)
$66.30 + Technology Fee
For each additional fixture
$14.28 + Technology Fee
For each building sewer and each trailer park sewer
$25.30 + Technology Fee
Rain water system – per drain (inside building)
$14.28 + Technology Fee
For each water heater and/or vent
$14.28 + Technology Fee
For each industrial waste pretreatment interceptor, including its
$28.56 + Technology Fee
trap and vent, except for kitchen type grease interceptors
For each grease interceptor for commercial kitchens
$29.68 + Technology Fee
For each repair or alteration of water piping and/or water treating
$14.28 + Technology Fee
equip ent, each occurrence
For each repair or alteration of drainage or vent piping, each
$14.28 + Technology Fee
fixture
For each medical gas piping system serving one to five
$83.64 + Technology Fee
inlets/outlets for aspecific_gas
For each additional medical gas inlets/outlets
$16.52 + Technology Fee
For each lawn sprinkler system on any one (1) meter including
$29.68 + Technology Fee
backflow protection devices therefor.
For atmospheric-type vacuum breakers not included in lawn
--- ----
sprinkler backflow protection:
1 to 5 ........$14.00 + Technology Fee
Over 5.......$14.00 for first 5 plus $3.25 for each additional
+ Technology Fee
For each backflow protective device other than atmospheric type
. .. ..... ...... ...
vacuum breakers:
2-inch diameter and smaller ....... $29.10 + Technology Fee
Over 2-inch diameter: ................ $32.25 t_Te Technology Fee
. . ..... ......... .
Section 8. Fuel Gas Piping permit fees will be charged according to the following
schedule:
FUEL GAS PIPING PERMIT FEE SCHEDULE
Permit Issuance
For issuing each permit (base fee): ($0 if permit is in conjunction with
a plumbing permit for an appliance with both plumbing and gas
connection.)
.15 + Technology Fee
Unit Fee Schedule
For each gas piping system of one to five outlets
$66.30 + Technology Fee
. . .............
For each additional gas piping system outlet, per outlet
$14.28 + Technology Fee
WAWord Processing\Resolutions\Consolidated permit fee schedule-credit card surcharge 6-9-17
NG:bjs Page 8 of 11
Section 9. Electrical permit fees will be charged according to the following
schedule:
ELECTRICAL PERMIT FEE SCHEDULE
NEW SINGLE - FAMILY DWELLINGS
New single - family dwellings (including a garage)
$155.91 + Technology Fee
Garages, pools, spas and outbuildings
$83.54 + Technology Fee
Low voltage systems
$61.05 + Technology Fee
2. SINGLE - FAMILY REMODEL AND SERVICE CHANGES
Service change or alteration —no added /altered circuits
$83.54 + Technology Fee
�. -- — ------- ... ..... _ .......... ._.....—
Service change $83.54 with added /altered circuits, plus $12.00 for
- -- --
$83.54 + Technology Fee
each added circuit maximum permit fee $156.00)
Circuits added /altered without service change (includes up to
$55.69 + Technology Fee
5 circuits
$66.30 for the first $250 plus $4.39 for each $100 or fraction thereof, to and
_
Circuits 55.69 added /altered without service change (more than
$55.69 + Technology Fee
5 circuits); $7.65 for each added circuit (maximum permit fee $100.00
$98.94 for the first $1,000 plus $22.03 for each $1,000 or fraction thereof, to
+ Technology Fee)
and including $5,000, + Technology Fee
Meter /mast repair
$69.62 + Technology Fee
Low voltage systems
$61.05 + Technology Fee
MULTI - FAMILY AND COMMERCIAL (including low voltage)
Valuation of
Work (Total
Permit Fee
Contract Amount)
$250 or less
$66.30 + Technology Fee
$251 - $1,000
$66.30 for the first $250 plus $4.39 for each $100 or fraction thereof, to and
including $1,000, + Technology Fee
$1,001 - $5,000
$98.94 for the first $1,000 plus $22.03 for each $1,000 or fraction thereof, to
and including $5,000, + Technology Fee
$5,001 - $50,000
$186.97 for the first $5,000 plus $18.05 for each $1,000 or fraction thereof, to
and including $50,000, + Technology Fee
$50,001 - $250,000
$998.73 for the first $50,000 plus $13.16 for each $1,000 or fraction thereof, to
and including $250,000, + Technology Fee
$250,001 - $1,000,000
$3,638.54 for the first $250,000 plus $9.33 for each $1,000 or fraction thereof,
to and including $1,000,000, + Technology Fee
Over $1,000,000
$10,649.51 plus 0.5% of cost over $1,000,000, + Technology Fee
W: \Word Processing \Resolutions \Consolidated permit fee schedule- credit card surcharge 6 -9 -17
NG:bjs Page 9 of 11
4. MISCELLANEOUS ELECTRICAL PERMIT FEES
Temporary service (residential)
$66.30 + Technology Fee
Temporary service/generators
$82.52 + Technology Fee
Manufactured/mobile home parks and RV park sites, each service and
feeder
$87.98 + Technology Fee
C–arnivals:
• Base fee
. . ........ . ...
$82.21 + Technology
• Each concession fee
_Fee
$11.02 + Technology Fee
• Each ride and generator truck
$11.02 + Technology Fee
Inspections or plan review not specified elsewhere (one-half hour
minimum). SafetV inspections, plan revisions.
$67.83/hour
Adult family home inspection (paid at the time of scheduling the
inspection)
$67.83
Disaster recovery emergency repair permit (residential structures only)
.
$20.00
. ... . .........
Section 10. Other inspections and fees will be charged according to the following
schedule:
OTHER INSPECTIONS AND FEES
Inspections outside of normal business hours (three hour minimum charge)
$102.00/hour
Re-inspection fee .... .
$67.83/hour
.. ........ .
Inspection for which no fee is specifically indicated– --investigations or safety
$67.83/hour
Additional plan review required by changes, additions, or revisions to approved
$67.83/hour
plans (minimum charge one-half hour)
Work commencing before permit issuance shall be subject to an investigation fee
100% of the permit fee
equal to 100% of the permit fee.
Plan review fee—Mechanical, Plumbing, Fuel Gas Piping and Electrical: The fee
for review shall be 25% of the total calculated permit fee. The plan review fee is a
separate fee from the permit fee and is required when plans are required in order
to document compliancewith the code. —
-- -------- ---- ....... ...
Work covered without inspection or work not ready at the time of inspection may
be charged a re-inspection fee of $66.50.
Expired permit final – includes two inspections
$133.00
Expired permit final – each additional inspection
$67.83
Minor residential remodel plan review and permit (projects up to $20,000)
. . . . ......
$20.00
Section 11. Credit Card Surcharge. If payment is made by credit card, a
processing fee of 3% will be added to the total order.
WAVVord Processing\Resolutions\Consolidated permit fee schedule-credit card surcharge 6-9-17
NG:bjs Page 10 of 11
PASSED BY THE CITY CUUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a
Special Meeting thereof this - --- .,- _r4_j day of 2017.
ATTEST /AUTHENTICATED:
Christy O'FlalYerty, MMIC, City CIE
Rachel B. Turpin, City Attorney
Dennis Robe n, bbun'cil President
Filed with the City Clerk: 6-, J-0
Passed by the City Council: to-�
Resolution Number: I q ) �A
WAWord Processing\Resolutions\Consolidated permit fee schedule-credit card surcharge 6-9-17
NG:bjs Page 11 of 11