HomeMy WebLinkAboutCOW 2011-06-27 Item 4A - Shoreline Master Program - Ordinance - Attachment A.15: Appeals 15. APPEALS
Any appeal of a decision by the City on a Shoreline Substantial Development Permit,
Shoreline Conditional Use, Unclassified Use or Shoreline Variance must be appealed to
the Shoreline Hearing Board.
16. ENFORCEMENT AND PENALTIES
16.1 Violations
The following actions shall be considered violations of the Master Program:
A. To use, construct or demolish any structure, or to conduct clearing, earth- moving,
construction or other development not authorized under a Substantial Development
Permit, Conditional Use Permit or Variance Permit, where such permit is required by the
Master Program.
B. Any work which is not conducted in accordance with the plans, conditions, or other
requirements in a permit approved pursuant to the Master Program, provided that the
terms or conditions are stated in the permit or the approved plans.
C. To remove or deface any sign, notice, complaint or order required by or posted in
accordance with the Master Program.
D. To misrepresent any material fact in any application, plans or other information
submitted to obtain any shoreline use or development authorization.
E. To fail to comply with the requirements of the Master Program.
16.2 Enforcement
It shall be the duty of the Director to enforce the Master Program subject to the terms and
conditions of TMC Chapter 8.45.
16.3 Inspection Access
A. For the purpose of inspection for compliance with the provisions of a permit or the
Master Program, authorized representatives of the Director may enter all sites for which a
Permit has been issued.
C. 162 06/21/2011 9:49 AM
W: \Shoreline \Council Review \\Document \Council Adopted SMP- Revised per Ecology Required Changes
178