SPONSOR'S The Baker Blvd Non - Motorized Improvement Project was advertised for bids on June 6 and
SUMMARY 13, 2017 and two bids were opened on June 20. Road Construction Northwest was the
apparent low bidder and has experience with projects of similar scope and size. This street
project will install bike lanes, ADA ramps, and a road diet on Baker Blvd from Andover Park
West to Christensen Rd. Council is being asked to award the bid to Road Construction
Northwest in the amount of $799,143.00.
REVIEWED BY ❑ COW Mtg. ❑ CA &P Cmte ❑ F &S Cmte
❑ Utilities Cmte ❑ Arts Comm. ❑ Parks Comm.
DATE: 06/27/17 COMMITTEE CHAIR: KATE
/A Transportation
Cmte
❑ Planning Comm.
KRULLER
RECOMMENDATIONS:
SPONSOR /ADMIN.
COMMITTEE
ITEM INFORMATION
ITEM No.
4.D.
CAS NUMBER:
STAFF SPONSOR: BOB GIBERSON
ORIGINAL AGENDA DATE: 07/17/17
AGENDA ITEM TITLE Baker Blvd Non - Motorized Improvements
Bid Award to Road Construction Northwest
CATEGORY ❑ Discussion
Mtg Date
❑ Motion
Mtg Date
❑ Resolution
Mtg Date
❑ Ordinance
Mtg Date
1 Bid
Award
07/17/17
❑ Public Hearing
Mtg Date
❑ Other
Mtg Date
Mtg Date
SPONSOR ❑ Council ❑ Mayor ❑ HR ❑ DCD ❑ Finance ❑ Fire ❑ IT ❑ P&R ❑ Police 1'1 PW
SPONSOR'S The Baker Blvd Non - Motorized Improvement Project was advertised for bids on June 6 and
SUMMARY 13, 2017 and two bids were opened on June 20. Road Construction Northwest was the
apparent low bidder and has experience with projects of similar scope and size. This street
project will install bike lanes, ADA ramps, and a road diet on Baker Blvd from Andover Park
West to Christensen Rd. Council is being asked to award the bid to Road Construction
Northwest in the amount of $799,143.00.
REVIEWED BY ❑ COW Mtg. ❑ CA &P Cmte ❑ F &S Cmte
❑ Utilities Cmte ❑ Arts Comm. ❑ Parks Comm.
DATE: 06/27/17 COMMITTEE CHAIR: KATE
/A Transportation
Cmte
❑ Planning Comm.
KRULLER
RECOMMENDATIONS:
SPONSOR /ADMIN.
COMMITTEE
Public Works
Unanimous Approval; Forward to Regular Consent Agenda
COST IMPACT / FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$799,143.00 $882,000.00 $0.00
Fund Source: 104 ARTERIAL STREETS (PAGES 15 & 20, 2017 CIP)
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
07/17/17
MTG. DATE
ATTACHMENTS
07/17/17
Informational Memorandum dated 06/23/17
Pages 15 & 20, 2017 CIP
Bid Tabulation
Minutes from the Transportation & Infrastructure Committee meeting of 06/27/17
33
34
City of Tukwila
Allan Ekberg, Mayor
INFORMATIONAL MEMORANDUM
TO: Transportation and Infrastructure Committee,
FROM: Bob Giberson, Public Works Director
BY: Cyndy Knighton, Senior Program Manager
CC: Mayor Ekberg
DATE: June 23, 2017
SUBJECT: Baker Boulevard Non - Motorized Improvements Project
Project Nos. 91610409
Bid Award
ISSUE
Award the construction contract to Road Construction Northwest for the Baker Boulevard Non - Motorized Improvements Project.
BACKGROUND
Baker Blvd Non - Motorized improvements include bike lanes and a road diet on Baker Blvd from Andover Park West to
Christensen Rd. Reconstruction of sidewalk access ramps at the intersection of Andover Park East/Baker Blvd was a proposed
project as part of the City's Americans with Disabilities Act (ADA) Program and was included with this project in anticipation of
better bids and cost savings.
A call for bids was advertised on June 6 and June 13, 2017. One addendum was issued clarifying the bid documents. Two bids
were publicly opened at 10:00 am on June 20, 2017 and the lowest bid was received from Road Construction Northwest.
DISCUSSION
The construction bids were reviewed and no errors or irregularities were found. Road Construction Northwest has successfully
completed two recent construction projects for the City of Tukwila and has experience with projects of similar size and scope.
Road Construction Northwest does not have any exceptions and they have not been debarred from working on federally funded
projects.
FINANCIAL IMPACT
The proposed bid is within the project budget. Funding for this project is from the $1 million grant funding from King County
Department of Natural Resources and Parks and the City's ADA Improvement Program. Design costs were approximately
$22,000 less than budgeted. Contingency is budgeted at 10 %.
Bid Results Engineer's Estimate 2017 Budget ,
Construction Contract $799,143.00 $737,729.00 $780,000.00
ADA Improvements 80,000.00
Unused Design funds 22,000.00
Contingency (10 %) 79,914.00 0.00 0.00
Total $879,057.00 $737,729.00 $882,000.00
RECOMMENDATION
Council is asked to award the construction contract to Road Construction Northwest in the amount of $799,143.00 for the Baker
Boulevard Non - Motorized Improvements Project and consider this item on the Consent Agenda at the July 17, 2017 Regular
Meeting.
Attachments: 2017 CIP, Pages 15 & 20
Bid Tabulation
WAPW Eng\PROJECTSW- RW 8 RS Pmlectsl8aker Bed Non•Motorized (91610409)t0esi9n\Info Memo Bid Award062317.docx
35
36
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: Baker Blvd Non - Motorized Improvements Project No. 91610409
Design and construct non - motorized improvements on Baker Blvd from Andover Park West to Christensen Rd,
DESCRIPTION: including bike lanes with a proposed road diet. Project will also construct previously designed non - motorized
improvement on Christensen Rd from Baker Blvd to the Green River trail.
JUSTIFICATION: Improve non - motorized connections between the Tukwila Transit Center and Tukwila Station.
STATUS: New project for the 2017 - 2022 CIP.
MAINT. IMPACT: Minimal impact, project includes new sidewalk trail and pavement markings.
COMMENT:
Project is a component of the TUC/TOD Pedestrian Improvements. Grant funding by the King County Dept
of Natural Resources and Parks.
FINANCIAL Through Estimated
(in $000's
2015 2016 2017
2018 2019 .2020 2021 2022 BEYOND TOTAL
EXPENSES
0 Project Location
midr
~- 1"" , .a`4 `.\:t = -
•
i
'
l,l
4111
Design
i
i ��0 3
100
S
7
i ?.
i N 6. u.... a
W 11'. S scm /
i: / T
100
Land (R/W)
g I 4
i
1
0
Const. Mgmt.
120
120
Construction
780
780
TOTAL EXPENSES
0
0
1,000
0
0
0
0
0
0
1,000
FUND SOURCES
Awarded Grant
0
King County
1,000
1,000
Mitigation Actual
0
Traffic Impact Fees
0
City Oper. Revenue
0
0
0
0
0
0
0
0
0
0
TOTAL SOURCES
0
0
1,000
0
0
0
0
0
0
1,000
2017 - 2022 Capital Improvement Program
15
37
0 Project Location
midr
~- 1"" , .a`4 `.\:t = -
•
i
'
l,l
4111
i
i ��0 3
S
7
i ?.
i N 6. u.... a
W 11'. S scm /
i: / T
�
ir--te,6o6.
l� �
S �i4
g I 4
i
1
2017 - 2022 Capital Improvement Program
15
37
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: Americans with Disabilities Act (ADA) Improvements Project No. 91210405
DESCRIPTION: Construct ADA compliant upgrades to City infrastructure in conjunction with a City developed plan.
JUSTIFICATION: The enforcement of ADA laws and standards was delayed pending legal challenges and studies. Recent
court rulings now mandate ADA compliance. The City must provide upgrades with most construction projects.
STATUS: 'Provide annual funding to construct improvements as necessary. Began the ADA Transition Plan in 2016 with
adoption in 2017. The goal is to resolve ADA compliance issues within a reasonable time period.
MAINT. IMPACT: Negligible.
COMMENT: Project will be ongoing until City facilities and infrastructure meet ADA requirements. This will also
include ADA compliance by utilities and private development.
FINANCIAL Through Estimated
in $000's
2015 2016 2017
2018
2019
2020
2021
2022
BEYOND TOTAL
EXPENSES
Design
116
28
25
25
25
25
25
25
25
319
Land (R/W)
0
Const. Mgmt.
25
8
25
25
25
25
25
25
550
733
Construction
87
50
150
150
150
150
150
150
4,000
5,037
TOTAL EXPENSES
228
86
200
200
200
200
200
200
4,575
6,089
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Traffic Impact Fees
0
City Oper. Revenue
228
86
200
200
200
200
200
200
4,575
6,089
TOTAL SOURCES
228
86
200
200
200
200
200
200
4,575
6,089
2017 - 2022 Capital Improvement Program
38
20
Certified Bid Tab
N
39
w
a
N
O
V)
S
S
A
Vi W V
$ `9,000.00
$ 150.00
$ 650000
$ 20,000.00
C 95 NN nn
3 S o
S
1 CO 01
co C
/ N N
S E
°
S0
O
1] o
W VI
$ `2,250.00
$ 13,500.00
i av ann nn
S E
OE3
N
N N
N 1�
a fA
E
c
•
VI
$ 3 78000
$ 37,520.00
$ 2 940 00
$ 38,400.00
$ 1 inn nn
5 4,000.00
6 1404 nn
1
S 0°°c
0
° O0
o O N 0
1000 O
of c f a
w w CA V.
0
0
D N
aD fV
w w
G
G
¢
w
$ 910.00
E 1150 nn
S S
G
p O
'
61 19
a
m
o
a
$ 5,000.001
5 5,040.001
+_
m
g S .0S
.. o
p,8A o
H
1p9 N to V) g
o
o
G
q K M
$ 20,000.00
S 35 000 00
S S 60066666
oa,o00m8
Q m N
M N V1 V)
1 1
'
19 N b g N q
a
V/
o So
q N
g�o�
M
19 b
S S
Y
d q
00 IT $
00'L $
005 $
00'009'£ S
S O
n
N W
C
d
W
$ 130.00
$ 350.0D
S 45000
0
O
o N
N
�a 0
M
now $
Road Construction Northwest
,
c S
O
N S
A y N•
W M 69 N
S O
0 O
N
- m
Vi M
B S
O t
N
69 69
$ 4,250.00
$ 7,500.00
$ 3.600.00
$ 22.800.00
S S 00 0 0
S p gES
.- N g0
O O V
N CI O m
W M M M H M
0
G
A
N
era
N
$ 34,840.00
$ 2.010.00
p
S
S S
19
ea
Vi
S S
S O
CO
r A
M N
N
d
a
O S S
pO m S
O m 7 N
N 0 7
e-
a q V1 .
D S
AO
CO
N N
to' N
N) V)
E S
A
O
Y b
N V)
$ 875.00 1
$ 3,150.00
$ 850.00
O O
O r
O e(
' O
. N
O
O
N O
Vl
$ 4,230.00
6
1 1 I 1
S 75,000.00
$ 7,500.00
$ 70.00
$ 20,000.00
$ 20,000.00
5 10,000.00
$ 1,200.00
$ 6,000.00
S O
O
j 11,.....i
VI ea
$ 25.00
$ 60.00
$ 60.00
$ 190.00
$ 85.00
$ 3,500.00
$ 35.00
$ 34.00
$ 750.00
5 700.00
O
O
Vl
O
N N0. I1
M w
$ 2,750.00
$ 1,500.00
$ 1,000.00
$ 300.00
$ 3,300.00
$ 4.50
5 6.75
$ 11.20
3 9.75
9 17.00 I
$ 325.00
O S S O
0 iV
CV v
to N N 49
S
0
0
19
S
O
S
50
5 47.00 I
Engineer's Estimate
1d
L.
km
O
l02
yl
to V)
$ 28,800.00
$ 14,920.00
$ 20,000.00
$ 15,000.00
$ 2,000.00
$ 6,552.00
$ 2,500.00
$ 23,000.00
$;if
5 3,750.00
$ 2,100.00
20,300.00
$ 2,750.00
$ 15,500.00
$ 49,500.00
_$ 13,275.00
$ 4,600.00
$ 1,000.00
4
0
e
$ 4.500.00
$ 58,825.00
0 0
Q N
iS m
m .-
b W
0 0
Q G
S Ei
r N
N b
0 0
C O
O 1°n
p b
O S S
OG O
O at O.-
10 01
Vi b b
,43,850.00
$ 5,950.00
S S
O C
v1 Oc0
O
Iw 19
$ 3,200.00
$ 1,400.00
00'0Z9'L0I $
00'000'9 $
$. 5,000.00
S
Vl
Ip
�
dl
$ 51,641.03
$ 7,500.00
$ 45.00
$ 14,920.00
S S
O oo
N H
ci N Vi
S O
g b
N N
W 49
$ 2,500.00
$ 23,000.00
8 10.00
$ 30.00
$ 36.00
$ 175.00
$ 110.00
$ 15,500.00
O S
N g
19 V) a, so
5 100.00
$ 87.50
$ 1,000.00
$ 1,408.25
$ 500.00
$ 2,000.00
$ 25.00
o° °
o
Q G --
cf1
a N H
o o
o:
/A 69
0 0 0
0 0 0
S
g g g
9 W 119
° ° o
0O
p
19 to 69
$ 5,000.00
S
p
6
Vi
o
0
19
Baker Boulevard Non - Motorized Improvements Project
NIi
J
W
= J
W J
J J
CO CO
co 6QJ
r r
J W Q
co
QQ
.
W
_.
J V)
V O
J w W
0
WV) ? 7
W
1E
IC
7
u
CO
A CV N
S b m N
o N
V 0
CO N
.-
N
O N
7 CD
N
S D
O CO
er
0 N l0
1-
Is. O1 N
.-
r
S
IBId,Item,N1i Item Description
onenWAV
MOBILIZATION
RESOLUTION OF UTILITY CONFLICTS
TRAFFIC CONTROL LABOR, MIN. BID $ 35 PER HOUR
PROJECT TEMPORARY TRAFFIC CONTROL
UNEXrtG I tU SITt CHANGES
ROADWAY SURVEYING
SPCC PLAN
CLEARING AND GRUBBING
REMOVAL OF STRUCTURE AND OBSTRUCTION
ROADWAY EXCAVATION INCL. HAUL
GRAVEL BORROW INCL. HAUL
CRUSHED SURFACING BASE COURSE
CRUSHED SURFACING TOP COURSE
HMA CI. 1/2 In. PG 64-22
INLET PROTECTION
EROSIONANATER POLLUTION CONTROL
CEMENT CONC. TRAFFIC CURB AND' GUTTER
CEMENT CONC. PEDESTRIAN CURB
ADJUST CATCH BASIN /MANHOLE TO GRADE
ADJUST EXISTING UTILITY TO GRADE
!
I
I
i
1
CEMENT GUN:. DRIVEWAY ENTRANCE
CEMENT CONC. SIDEWALK
Ut:URA I IVE CEMENT CONC. FINISH TYPE 2
CEMENT CONC.CURB RAMP
INSTALL OWNER- PROVIDED BIKE RACK
NON -SKID SURFACE TREATMENT
ICJ
w
o
w I
w
Q I
TROL DEVICES
REMOVING PAVEMENT MARKINGS
PLASTIC LINE
PLASTIC 6 IN LINE
PLASTIC GREEN LINE
PLASTIC CROSSWALK LINE
PLASTIC STOP LINE
PLASTIC BICYCLE LANE SYMBOL
PLASTIC TRAFFIC ARROW
PLASTIC TRAFFIC LETTER
RAISED PAVEMENT MARKER TYPE 1
RAISED PAVEMENT MARKER TYPE 2
2
2
[?
C7)
~
Z
Y O. I
:VELOPMENT - I
PROPERTY RESTORATION
a
w
a
CO
`7-
N CO
O
N tp 1�
m
Ol O
N lh Q h O
A CO CO O
J
1
CI
y
21
22
23
24
9Z
9Z
1
1,. 1
Y ;
1
9 0'
Y N c
I 31
32
+i V)
I7
I 36
37
38
I
Cn
:7 1
1
Q
N
39
•
40
IActive Construction
.
_
d_
6-
O
I-
. 8
n.SZNi
'-
g q
0 8
N
q q
8 8
m
q EA
$ 693.00
S 2.02500
;g8
i$ �
I.
q fA
I$ 780.00
S 42000
∎°Oe8g
I0gg§;
f N
N
r g w
N fD
N n
q q
g
Egg
q
8 8
n
q q
$ 1.800,00I
S 1.670.00
:$o°go
°gg
gA
co
• . g q
g m
o
q q
...
°
n
O
q
go88888
$g
N N
g q
°o
°OOg
r N
q q
O8
0 Q
q q
m
H
q
$ 75,000.00
$ 65000.00
$ 140,000.00
$892,892.00
4
d6-
•
C
8
O'
D
g q
8 88.
V- CI
q w
8
q q
8 S8
CV
q q
8g8g
CO q
N
6-
q q
$ 12.00
$ 25,000.00
$ 25.000.00
.
00
r∎
O
g q
0
8
n
r
q q
0
m
14
$ 230.00 I
5 1,100.00
g
q
o
Q
(9
gggggg
g o
N 16:
69 !A
O CO
f7
q q
N
q
gg
g
Ili
n
w
S
VI
CO
q
Road Construction Northwest
I Total Price,
5 1,250.00
$ 110.00
5 2,800.00
$ 578.00
$ 978.50
$ 832.50
$ 742.50
$ 2,106.00
8 2,137.50
$ 560.00
$ 1,170.00
$ 472.50
$ 4,387.50
$ 12,000.00
$ 9,000.00
S 1,900.00
$ 500.00 1
8gQ
q
N
q
S 8,750.00
$ 3,000.00
S 2,500.00
g
g
q
$$88888
g gSgggm
o '
co .
g q
ac V I
q q
M v
q CO
g
H
q
$ 89,000.00
8 78,000.00
$ 165,000.00
$799,143.00
y5888
.:
a.
7
N N g
g q q q
$ 31.50
$
22.50
$ 22.50
$ 28.00
$ 22.50
5 18.00
$ 18.00
$ 13.50
egg
e. g
g
O O
N CO
61 q q
•
ga
O
q w
$ 1,350.00
$ 800.00
$ 225.00
$ 185.00
$ 150.00
$ 1,000.00
$ 2,500.00
$ 550.00
$ 1,000.00
gN gOg
g
fp f.1
g q
gg
S
q q
$ 89.000.001
$ 78,000.00
Engineers Estimate
Total Price
$ 1,732.50
$ 137.50
$ 3,150.00
5 478.00
808
CO
mm
g q q q
$ 420.001
$ 780.00
$_ 420.00
$ 3,900.00
$ 12,000.00
$ 10,000.00
$ 1,000.00
8 2,500.00
$ 13,500.00
8'. 500.00
$ 1,500.00
$" 5,080.00
8 6,750.00
$gu
e- N
q q
o
q
$ 3,500.00I
$ 150.00
gS
§§
N 11
19 q
$ • . 1,050.00I
$ • 2,250.00
o
^
q
S
g§
A g ■
q q
Subtotal $ 152,000.00
TOTAL CONSTRUCTION BID $737,729.03
Unit Price
$ 52.50
$ 2.50
$ 450.00
$ 28.00
$ 28.00
$ 22.00
5 22.00
S 22.00
$ 22.00
$ 12.00
$ 12.00
12.00
8 12.00
$ 12,000.00
$ 10,000.00
$888888
§§ g g g g$
Nr
69 g q q q q q
8 500.00
is 2,000.00
8888
gggd g
q q
o$
ra
4* q
$ 150.001
$ 150.00
88
8 08
S' O8
q q
evard Non - Motorized Improvements Project
E W
W W W W
W W W
6 ti ti
QQ W
W W
W Q
J J
" CO m r
1.. (964
• q
a
r f7 N
M f.1 f7 m 0
N N m V) r r
M m f7 N+f
/
616-01N00069.--
''
N .-
.- .-
m CO
Item DescriptIon.
BARK OR WOOD CHIP MULCH
SEEDED LAWN INSTALLATION
PSIPE Fraxinus Iatifolia/Oregon Ash; 2.5" Cal., 12' -14' HL
Huckleberry 18" HL & Sp.
PSIPE Spiraea betulifola'Tar'/ Tor Birchleaf Spirea; 18" Ht & Sp.
Dogwood; 2 Gal. Cont
PSIPE Gaultheria shallon/ Salal; 2 Gal. Cont
PSIPE Mahonia nervosa/ Cascade Oregon Grape; 2 Gal. Cont.
PSIPE Polystichum munitum/ Sword Fern; 2 Gal. Cont.
PSIPE Iris tenax; 1 Gal. Cont.
PSIPE Asarum caudatuml Wild Ginger; 1 Gal. Cont.
PSIPE Arctostaphylos uva -ursi/ Kinnikinnick; 1 Gal. Cont.
PSIPE Fragaria chiloensis! Beach Strawberry, 1 Gal. Cont.
AUTOMATIC IRRIGATION SYSTEM, COMPLETE
WAYFINDING SIGN
ilAGE
REMOVING DRAINAGE STRUCTURE
TRENCH SAFETY SYSTEMS
CATCH BASIN TYPE 1
SOLID COVER
DUCTILE IRON STORM SEWER PIPE 8 IN. DIAM. '
SCHEDULE A STORM SEWER PIPE 12 IN. DIAM.
CONTROLLED DENSITY FILL
CONNECTION TO DRAINAGE STRUCTURE
ROTATE MANHOLE ACCESS
ADJUST VALVE BOX
REMOVE HYDRANT ASSEMBLY
HYDRANT ASSEMBLY
SERVICE CONNECTION 3/4 IN. DIAM.
DUCTILE IRON PIPE FOR WATER MAIN 61N. DIAM.
DUCTILE IRON PIPE FOR WATER MAIN 8 IN. DIAM.
AND SIGNAL SYSTEM
ILLUMINATION MODIFICATIONS, CHRISTENSEN RD, COMPLETE
COMPLETE
Bid Item No.
42
43
44
45
46
47 .
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
I64
85
CO r
mmmm..
CO Of
71
• 70
72
73
O
d
C