HomeMy WebLinkAboutReg 2017-08-07 Item 3E - Bid Award - ICON Materials for 2017 Annual Overlay and Repair Program for $659,441COUNCIL AGENDA SYNOPSIS
lnitia/s
Meeting Dale
Prepared by
Mayor's review
Council review
08/07/17
BG P4
A / (e
431.2
Award
08/07/17
• Public Hearm
❑ Other
AItg Date
Aftfg Date
AN Date
SPONSOR ❑ Council ❑ Mayor ❑ HR ❑ DCD ❑ Finance ❑ Firs ❑ FT
• PePR. ❑ Police Il PGV
SPoNs )R'S The 2017 Annual Overlay & Repair Program was re -advertised for bids on June 29 and July
SummAitV 6, 2017. Council approved Resolution No. 1909 that rejected the April bids as all bids were
over budget. Two bids were opened July 13, 2017 with the low bid of $659,441.00 from
Icon Materials. Six locations are scheduled for asphalt overlay throughout the City,
including a portion of the Fort Dent parking lot. Council is being asked to award the bid to
Icon Materials in the amount of $659,441.00.
RI:\'IIAVM B
• COW Mtg.
❑ CA&P Cmte ❑ F&S Cmte
Cmte ❑ Arts Comm. ❑ Parks Comm.
COMMITTEE CHAIR:
/1 Transportation
ITEM INFORMATION
ITEM No.
3.E.
CAS NUMBER: STAFF SPONSOR: BOB GIBERSON
ORIGINAL. AGENDA D:VFFI: 08/07/17
AGENDA ITEM TrnE 2017 Annual Overlay & Repair Program
Bid Award to Icon Materials
C.1`E'1?GORY ❑ Discussion
Arts Date
❑ Motion
Aftg Date
❑ Resolution
Aftq Date
❑ Ordinance
Aitg Date
/1 Bid
Award
08/07/17
• Public Hearm
❑ Other
AItg Date
Aftfg Date
AN Date
SPONSOR ❑ Council ❑ Mayor ❑ HR ❑ DCD ❑ Finance ❑ Firs ❑ FT
• PePR. ❑ Police Il PGV
SPoNs )R'S The 2017 Annual Overlay & Repair Program was re -advertised for bids on June 29 and July
SummAitV 6, 2017. Council approved Resolution No. 1909 that rejected the April bids as all bids were
over budget. Two bids were opened July 13, 2017 with the low bid of $659,441.00 from
Icon Materials. Six locations are scheduled for asphalt overlay throughout the City,
including a portion of the Fort Dent parking lot. Council is being asked to award the bid to
Icon Materials in the amount of $659,441.00.
RI:\'IIAVM B
• COW Mtg.
❑ CA&P Cmte ❑ F&S Cmte
Cmte ❑ Arts Comm. ❑ Parks Comm.
COMMITTEE CHAIR:
/1 Transportation
Cmte
❑ Utilities
DATE: 07/25/17
❑ Planning Comm.
KATE KRULLER
RECOMMENDATIONS.
SPONS()R/ADMIN•
COMMITTEE
Public Works
Unanimous Approval; Forward to Consent Agenda
COST IMPACT / FUND SOURCE
FAN ,,NDI'I"UR : REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$659,441.00 $365,000.00 $0.00
Fund Source: 104 ARTERIAL STREETS & 301 PARKS (PAGES 18 & 34, 201.7 CIP)
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
08/07/17
MTG. DATE
ATTACHMENTS
08/07/17
Informational Memorandum dated 07/21/17
Vicinity Map
Pages 18 & 34, 2017 CIP
Consultant Recommendation Letter
Bid Tabulation
Minutes from the Transportation & Infrastructure Committee meeting of 07/25/17
29
30
City of Tukwila
Allan Ekberg, Mayor
INFORMATIONAL MEMORANDUM
TO: Transportation and Infrastructure Committee
FROM: Bob Giberson, Public Works Director
BY: David Sorensen, Project Manager
DATE: July 21, 2017
CC: Mayor Ekberg
SUBJECT: 2017 Qverlav and Repair Program
Project No. 91610401
Bid Award
ISSUE
Award the bid for construction of the 2017 Overlay and Repair Program.
BACKGROUND
The Overlay and Repair Program preserves and maintains the street structure in a safe and
useable condition. Construction will include pavement repairs and an asphalt overlay at six
locations citywide. The original bid package was advertised in April 2017, but all four bids were
over budget and Council then rejected all of those bids by Resolution No. 1909.
ANALYSIS
A call for bids was re -advertised for the 2017 Overlay and Repair Program on June 29. 2017
and July 6, 2017 and two bids were opened on July 13. The Lowest apparent bidder was Icon
Materials with a bid of $659,441.00 with an Engineer's Estimate of $672,610.00. There were no
bidding errors_ Based on the bidding results, the project design consultant KPG concurred to
award the 2017 Overlay and Repair Program to the apparent low bidder, Icon Materials.
BUDGET AND BID SUMMARY (All amounts include sales tax)
Bid Results Estimate 2017 Budget
Bid Schedule "A" $551,071.00 $569,300.00 $765,000,00
Contingency (5%) 27,553.55
Bid Schedule "B" Fort Dent 108,370.00 103,310.00 100,000.00
Contingency (5%) 5,418.50 0.00 0.00
Total $= 413_05 $672,610100 $8Q5,9t20 Q
RECOMMENDATION
Council is being asked to award the construction contract for the 2017 Overlay and Repair
Program to Icon Materials in the amount of $659,441.00 and consider this item on the Consent
Agenda at the August 7, 2017 Regular Meeting.
Attachments: Vicinity Map
Pages 18 & 34, 2017 CIF
Consultant Recommendation
Bid Tabulation
W:IPW EndPRDJECTS A RW & RS ProjetWAnnual Overlay & Repalr Pr4Sroms12417 Overlay r iga5kri a Sid1AC And Awarp'1Gacs To TIC'Final Dees To T10.2017 Overlay Rebad AWrfd Doe
31
32
Kilarie
EIMPfrAIIPPI
IFEE
MMIZEI-111WNHE
'ti .-.
2017 Overlay Program
Vicinity Map
33
34
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: Annual Overlay and Repair Program Project No, 9xx10401
DESCRIPTION: Select, design and construct asphalt and concrete pavement overlays of arterial and residential Streets,
JUSTIFICATION; Preserve and maintain the street structure in a safe and useable state by resurfacing before failure which also
minimizes costs. Some individual sites may be coordinated with water, sewer, and surface water projects.
STATUS: Each year various sections of roadway throughout the City are designed and constructed for asphalt overlay.
MAINT. IMPACT: Reduces annual maintenance.
COMMENT: Ongoing project. Only one year actuals shown in first column.
FINANCIAL Through Estimated
In $000's
2016 2016 2017
2018
2019
2020
2021
2022
BEYOND TOTAL
EXPENSES
Design
123
135
150
150
175
175
200
200
200
1,508
Land (RMI)
0
Const. Mgmt.
275
175
200
200
225
225
250
250
275
2,076
Construction
1,28g
1,260
1,050
1,050
11330
1,340
1,350
1,350
1,375
11,394
TOTAL EXPENSES
1,688
1,570
1,400
1,400
1,730
1,740
1,800
1,800
1,850
14,978
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
City Oper. Revenue
1,688
1,570
1,400
1,400
1730
1,740
1,800
1,800
1,850
14,978
TOTAL SOURCES
1,688
1,570
1,400
1,400
1,730
1,740
1,800
1,800
1,850
14,978
2017 - 2022 capital Improvement Program
18
35
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: Fort Dent Park
DESCRIPTION:
JUSTIFICATION:
STATUS:
MAINT. IMPACT:
COMMENT:
Project Nos. 90330107
52 -acre regional park requires ongoing capital and maintenance improvements. Kng County transferred
Fort Dent Park to the City in 2003_ Concessionaire agreement with Starfire Sports to operate the complex.
City is responsible for maintenance of the picnic area, parking lot, trail, pond, and all major park
repairs and infrastructure.
Funding of approximately $125K per year through 2022 is for a phased approach to parking lot repairs
in conjunction with the City's Annual Overlay and Repair Program, curbs and drainage.
Approximately 1,750 staff hours per year.
1% Municipal Arts Fund for City funded construction costs to be included.
FINANCIAL Through Estimated
in $000's
2015 2016 2017
2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
343
10
10
10
10
10
10
10
413
Land (RAN)
0
Const. Mgmt.
15
15
15
15
15
15
15
105
Construction
1,477
100
100
100
100
100
100
100
2,177
TOTAL EXPENSES
1,820
125
125
125
125
125
125
125
0
2,695
FUND SOURCES
Awarded Grant
694
694
Parking Taxes
50
1
50
Mitigation Actual
0
Mitigation Expected
0
REET 1 Funds
1,076
125
125
125
125
125
125
125
0
1,951
TOTAL SOURCES
1,820
125
125
125
125
125
125
125 '
0
2,695
2017 - 2022 Capita! improvement Program
36
34
c. P
Interdisciplinary Design
July 14, 2017
David Sorensen
City of Tukwila
6200 Southcenter Boulevard
Tukwila, WA 98188
RE: 2017 Overlay Program
Dear Mr. Sorensen,
As requested, ICPG has completed the verification for CPM Development Corporation DBA:
ICON Materials for the 2017 Overlay Program.
We have also checked the status of CPM Development Corporation DBA: ICON Materials on
the Washington State Labor and Industries web page to confirm they are currently insured,
bonded, and licensed. Additionally, no strikes or debarment records arose federally or statewide
regarding CPM Development Corporation DBA: ICON Materials and none of their
subcontractors are currently suspended.
It is KPG's recommendation that the 2017 Overlay Program be awarded to CPM Development
Corporation DI3A: ICON Materials
We have enclosed the contractor verification package for your review.
Sincerely,
KPG, Inc.
\ A s) „:
Nelson Davis, P.E.
cc:
Enclosures: CPM Development Corporation DEA: ICON Materials Verification Package
3131 Elliott Avenue, Suite 400 - Seattle, WA 98121 • Phone (206) 286-16410
2502 Jefferson Avenue ■ Tacoma, WA 98402 . Phone (253) 627-0720
23 South Wenatchee Avenue • Wenatchee, WA 98501 • Phone (509) 553-2711
www.kpg.com
37
38
CITY OF TUKWILA
DEPARTMENT OF PUBLIC WORKS
2017 Overlay
BID TABULATION
Tukwila Project # 90610401
T1
Low Bidder
July 13, 2017
Engineer's Estimate
CPM Development Corporation DBA:
ICON Materials
Lakeridge Paving Company, LLC
No.
Section No.
Item
Qty
Unit
Unit Cost
Total Cost
Unit Cost
Total Cost
Unit Cost
Total Cost
ROADWAY (SCHEDULE A) -
ROADWAY
1
_Jl
J
1-04
Unexpected Site Changes
1
FA
$ 10,000.00
$ 10,000.00
$ 10,000.00
$ 10,000.00
$
$ 10,000.00
1-07
Resolution of Utilit Conflicts
1
FA
$ 5,000.00
$ 5,000.00
$ 5,000.00
$ 5,000.00
_10,000.00
$ 5,000.00
$ 5,000.00
3
1-07
SPCC Plan
1
LS
$ 750.00
$ 750.00
$ 2,000.00
$ 2,000.00
$ 500.00
$ 500.00
4
1-09
Mobilization
1
LS
$ 66,000.00
$ 66,000.00
$ 50,000.00
$ 50,000.00
8 94,000.00
$ 94,000.00
5
1-10
Project Temporary Traffic Control
1
LS
$ 82,000.00
$ 82,000.00
$ 80,000.00
$ 80.000.00
$ 90,000.00
$ 90,000.00
6
2-02
Cement Conc. Sidewalk Removal Incl. Haul
110
SY
$ 60.00
$ 6,600.00
$ 96.00
$ 10,560.00
$ 60.00
$ 6,600.00
7
2-02
Cement Conc. Curb Removal Incl. Haul -
190
LF
$ 30,00
$ 5,700.00
$ 25.00
$ 4,750.00
$ 30.00
$ 5,700.00
8
2-02
Removal of Structure and Obstruction
1
LS
$ 5,000.00
$ 5,000.00
$ 1,200.00
$ 1,200.00
$ 16,000.00
_
$ 16,000.00
9
2-03
Roadway Excavation Incl, Haul -
620
CY
$ 85.00
$ 52,700.00
$ 90.00
$ 55,800.00
$ 90.00
$ 55,800.00
10
2-03
Unsuitable Foundation Excavation Inc!. Haul
40
CY
$ 100,00
$ 4,000.00
$ 78.00
$ 3,120.00
$ 90.00
$ 3,600.00
11
4-04
Crushed Surfacing Top Course
710
TON
$ 60.00
$ 42,600.00
$ 46.00
$ 32,660.00
$ 65.00
$ 46,150.00
12
5-04
Pavement Repair Excavation Incl. Haul
_ 150
CY
$ 100.00
$ 15,000.00
$ 75.00
$ 11,250.00
$ 90.00
$ 13,500.00
13
5-04
HMA Cl. 1/2" PG 64-22
1,510
TON
$ 105.00
$ 158,550.00
$ 100.00
$ 151,000.00
$ 115.00
$ 173,650.00
14
- 5-04
HMA for Pavement Repair Cl. 112" PG 64-22
90
TON
5 150.00
$ 13,500.00
$ 225.00
$ 20,250.00
$ 175.00
$ 15,750.00
15
5-04
Thickened Ed•e
180
LF
$ 2.00
$ 360.00
$ 3.50
$ 630.00
$ 3.00
$ 540.00
16
5-04
Planing Bituminous Pavement
1,160
SY
$ 25.00
5 29,000.00
5 20.00
$ 23,200.00
$ 30.00
$ 34,800.00
17
5-04
Joint/Crack Sealing
1
FA
$ 1,000.00
$ 1,000.00
$ 1,000.00
$ 1,000.00
$ 1,000.00
5 1,000.00
18
7-12
Adjust Water Valve -
11
EA
$ 450.00
$ 4,950.00
$ 800.00
5 8,800.00
$ 500.00
$ 5,500.00
19
8-01
Erosion/ Water Pollution Cantrol
1
FA
$ 5,000.00
$ 5,000.00
$ 5,000.00
$ 5,000.00
$ 5,000.00
$ 5,000.00
20
8-01
Inlet Protection
18
EA
$ 80.00
$ 1,440.00
$ 60.00
$ 1,080.00
$ 50.00
$ 900.00
21
8-04
Cement Conc. Traffic Curb and Guile r
190
LF
$ 50.00
$ 9500.00
$ 30.00
5 5,700,00
5 50.00
$ 9,500.00
22
8-13
Adjust Monument Case and Cover
1
EA
$ 700.00
$ 700.00
$ 800.00
$ 800.00
_
$ 500.00
$ 500.00
SIDEWALK (SCHEDULE
A)
23
8-14
Cement Conc. Sidewalk
120
SY
$ 70.00
$ 8,400.00
$ 80.00
$ 9,600.00
8 70,00
$ 8,400.00
24
8-14
Cement Conc. Curb Ramp
6
EA
$ 2,700.00
$ 16,200.00
$ 3,500.00
$ 21,000.00
_
$ 2,700.00
$ 16,200.00
STORM SEWER (SCHEDULE
A)
25
7-05
Adjust Catch Basin
12
EA
$ 600,00
$ 7,200.00
$ 1,000.00
$ 12,000.00
$ 700.00
$ 8,400.00
26
7-05
Storm Drain Marker
11
EA
$ 20.00
$ 220.00
$ 50.00
$ 550.00
$ 20.00
$ 220.00
SANITARY SEWER (SCHEDULE
A)
27 7-05
Adjust Manhole
7
EA
$ 600.00
$ 4,200.00
$ 1,000.00
$ 7,000.00
$ 625.00
$ 4,375.00
TRAFFIC CONTROL
(SCHEDULE A)
28
8-09
Raised Pavement Marker Type 1
1
HUND
$ 500.00
$ 500.00
$ 400.00
$ 400.00
$ 625.00
$ 625.00
29
8-09
Raised Pavement Marker Type 2
1
HUND
$ 500.00
$ 500.00
5 600.00
$ 600.00
$ 875.00
$ 875.00
30
8-22
Plastic Stop Line
20
LF
$ 10.00
$ 200.00
$ 75.00
$ 1,500.00
$ 40.00
5 800.00
31
8-22
Painted Line, 4Inch
200
LF
$ 1.25
$ 250.00
$ 5.00
$ 1,000.00
$ 4.0.0
$ 800.00
ROADSIDE
DEVELOPMENT
(SCHEDULE A)
32
8-02
Edge Restoration
1.370
LF
$ 4.00
$ 5,480.00
$ 3.30
$ 4,521.00
$ 5.00
$ 6,850.00
33
8-02
Property Restoration
_ 1
FA
$ 5,000.00
$ 5,000.00
$ 5,000.00
$ 5,000.00
_
$ 5,000,00
$ 5,000.00
FRANCHISE UTILITY ITEMS (SCHEDULE A)
34
8-19
Adjust Franchise Utility ManholeNault
1
EA
$ 800.00
$ 800.00
$ 2,500.00
$ 2,500.00
$ 750.00
$ 750.00
35
8-19
Adjust Gas Valve
2
EA
$ 500.00
$ 1,000.00
$ 800.00
$ 1,600.00
5 500.00
$ 1,000.00
TOTAL
SCHEDULE A
$ 569,300.00
TOTAL
SCHEDULE A
551,071.00
TOTAL
SCHEDULE A
$ 648,285.00
1 oft
O
CITY OF TUKWILA
DEPARTMENT OF PUBLIC WORKS
2017 Overlay
BID TABULATION
Tukwila Project # 90610401
S r r LI . I 1,1, :01.1 A
Low Bidder
July 13,
2017
Engineer's Estimate
CPM Development Corporation DBA:
ICON Materials
-
Lakeridge Paving Company, LLC
No.
ROADWAY
Section No.
(SCHEDULE
Item
B)
Qtv
Unit
Unit Cost
Total Cost
Unit Cost
Total Cost
Unit Cost
Total Cost
36
1-04
Unexpected Site Changes
1
FA
$ 500.00
$ 500.00
$ 500,00
$ 500.00
$ 500.00
$ 500.00
37
1-07
SPCC Plan
1
LS
$ 400,00
$ 400.00 '
$ 2,000.00
$ 2,000.00
$ 250.00
$ 250.00
38
1-09
Mobilization
1
LS
$ 10,000.00
$ 10,000.00
$ 8,000.00
$ 8,000.00
$ 20,000.00
$ 20,000.00
39
1-10
Project Temporary Traffic Control
1
LS
$ 10,000,00
$ 10,000.00
$ 3,000.00
$ 3,000.00
$ 12,500.00
$ 12,500.00
40
2-02
Cement Conc. Sidewalk Removal Incl. Haul
25
SY
$ 60.00
$ 1,500.00
$ 120.00
$ 3,000.00
$ 60.00
$ 1,500.00
41
2-02
Cement Conc. Curb Removal Incl. Haul
40
LF _
$ 35.00
$ 1,400.00
$ 65.00
$ 2,600.00
$ 30.00
$ 1,200.00
42
2-03
Roadway Excavation Incl. Haul
210
CY
$ 80.00
$ 16,800.00
$ 140.00
$ 29,400.00
$ 90.00
$ 18,900.00
43
2-03
Unsuitable Foundation Excavation Incl, Haul
20
CY
$ 90.00
$ 1,800.00
$ 78.00
$ 1,560.00
$ 90.00
$ 1,800.00
44
4-04
Crushed Surfacing Top Course
10
TON
$ 65.00
$ 650.00
$ 66.00
$ 660.00
$ 65.00
$ 650.00
45
5-04
_HMA Cl. 112" PG 64-22
390
TON
$ 105.00
$ 40,950.00
$ 100.00
$ 39,000.00
$ 115.00
$ 44,850.00
46
8-01
Inlet Protection
6
EA
$ 80.00
$ 480.00
$ 60.00
$ 360.00
$ 50.00
$ 300.00
47
8-04
Cement Conc. Traffic Curb and Gutter
40
LF
$ 60.00
$ 2,400.00
$ 30.00
$ 1,200.00
$ 60.00
$ 2,400.00
48
8-04
Cement Conc. Traffic Curb
190
- LF
$ 42.00
$ 7,980.00
$ 30.00
$ 5,700.00
$ 40.00
$ 7,600.00
49
8-04
Cement Conc. Extruded Curb Type 6
130
LF
$ 15.00
$ 1,950.0.0
$ 15,00
$ 1,950.00
$ 12.5D
$ 1,625.00
SIDEWALK (SCHEDULE B)
T
50
8-14
Cement Conc. Sidewalk
30
SY
5 75.00
$ 2,250.00
$ 80.00
$ 2,400.00
$ 75.00
$ 2,250.00
51
8-14
Cement Conc. Curb Ramp _
1
EA
$ 2,500.00
$ 2,500.0.9
$ 3,500.00
$ 3,500.00
$ 2,900.00
$ 2,900.00
STORM SEWER (SCHEDULE B)
52 I 7-05
Adjust Catch Basin
2
EA
$ 600.00
$ 1,200.00
5 1,000.00
$ 2,000.00
$ 625.00
$ 1,250.00
TRAFFIC CONTROL DEVICES (SCHEDULE B)
53 8-22 Plastic Line, 4 inch
220
LF
$ 2.50
$ 550.00
$ 7.00
$ 1,540.00
$ 5.00
$ 1,100.00
TOTAL
SCHEDULE B
$ 103,310.00
TOTAL
SCHEDULE B
108,370.00
TOTAL
SCHEDULE B
$ 121,575.(10
VITAL
ESTIMATE
$ 672,610.00
TOTAL BID
$ 659,441.00
TOTAL BID
$ 769,860.00
2 of 2
42
City of Tukwila
City Council Transportation & Infrastructure Committee
TRANSPORTATION & INFRASTRUCTURE COMMITTEE
Meeting Minutes
July25, 2017 - 5:30 p.m. - Foster Conference Room, 6300 Building
Councilmembers: Kate Kruller, Chair; Joe Duffie, De'Sean Quinn
Staff: Bob Giberson, Robin Tischmak, Pat Brodin, Gail Labanara, Dave Sorensen, Peter
Lau, Laurel Humphrey
CALL TO ORDER: Chair Kruller called the meeting to order at 5:30 p.m.
I. PRESENTATIONS
II. BUSINESS AGENDA
A. Project Completion: Tukwila International Boulevard and South 144th Street Midblock Crossing
Staff is seeking Council approval of project completion and release of the retainage bond to
Westwater Construction Co. in the amount of $78,722.27 for the TIB and South 144th Street
Midblock Crossing Project. This project installed a rectangular rapid flashing beacon system
and associated signage and curb ramp improvements and was completed on February 27, 2017.
UNANIMOUS APPROVAL. FORWARD TO AUGUST 7, 2017 REGULAR CONSENT AGENDA.
B. Supplemental Agreement: Baker Boulevard Non -Motorized Improvements Project
Staff is seeking Council approval of Supplemental Agreement No. 17 to Contract No. 07-123 with
KPFF in the amount of $119,680.98 for construction management and inspection services for
the Baker Boulevard Non -Motorized Improvement Project. KPFF designed this project as well
as the Pedestrian Bridge currently under construction and this contract will provide a cost-
effective way to have construction management support and inspection services on Baker
Boulevard incorporated with design work completed for the Green River Trail and Christensen
Road. UNANIMOUS APPROVAL. FORWARD TO AUGUST 7, 2017 REGULAR CONSENT AGENDA.
C. Bid Award: 2017 Overlay and Repair Program
*Staff is seeking Council approval to award a bid to Icon Materials in the amount of $659,441.00
for construction of the 2017 Overlay and Repair Program. Icon Materials was the low bidder of
two, and the project design consultant, KPG, has concurred with this award. UNANIMOUS
APPROVAL. FORWARD TO AUGUST 7, 2017 REGULAR CONSENT AGENDA.
D. Supplemental Agreement: 2017 Overlay and Repair Program
Staff is seeking Council approval of Supplemental Agreement No. 2 to Contract No. 16-109 with
KPG, Inc. in the amount of $159,233.76 for construction management services for the 2017
Overlay and Repair Program. KPG, Inc. also designed the program. UNANIMOUS APPROVAL.
FORWARD TO AUGUST 7, 2017 REGULAR CONSENT AGENDA.
43