HomeMy WebLinkAboutSEPA E98-0012 - BOEING - BUILDING 2-18 DEMOLITIONBOEING BUILDING 2-18 DEMOLISH EXISTING BUILDING TO CONCRETE FLOOR 8123 EAST MARGINAL WAY S. E98-0012 •) STATE OF WASHINGTON a P R CEIVED JUL 31 1998 COMMUNITY DEVELOPMENT DEPARTMENT OF ECOLOGY Northwest Regional Office, 3190 - 160th Ave S.E. • Bellevue, Washington 98008-5452 • (425) 649-7000 July 30, 1998 Rick Ford The Boeing Company P.O. Box 3707 M/S 19-35 Seattle, WA 98124-2207 Dear Mr. Ford: Re: City of Tukwila Permit # L98-0027 THE BOEING COMPANY - Applicant Shoreline Substantial Development Permit # 1998 -NW -101111 The subject Shoreline Management Substantial Development Permit, to demolish existing 2,000 square -foot building near the Duwamish River, been filed with this office by the City of Tukwila on July 24, 1998. The development authorized by the subject permit may NOT begin until the end of the 21 -day appeal period, August 14, 1998. The Shorelines Hearings Board will notify you by letter if this permit is appealed. Other federal, state, and local permits may be required in addition to the subject permit. If this permit is NOT appealed, this letter constitutes the Department of Ecology's final notification of action on this permit. Sincerely, Alice Kelly, Shorelands Specialist Shorelands and Environmental Assistance Program AMK:amk SDP.DOC cc: Jack Pace, City of Tukwila Shore ne Management Act of 1971• PERMIT FOR SHORELINE MANAGEMENT SUBSTANTIAL DEVELOPMENT File Number: L98-0027 Status: APPROVED Aoolied: 04/24/1998 Approved: 07/22/1998 Expiration: 07/21/2000 Pursuant to RCW 90.58. a permit is hereby granted to: BOEING #2-13 to undertake the following development: DEMOLISH EXISTING 2000 SF BUILDING TO CONCRETE FLOOR upon the following property:' Address: 3123 EAST -MARGINAL WY S Parcel No: 00016.0-0020 Sec/Twn/Rnge: r - THE PROPOSED\PROJECT WILL BE' WITHIN THE AREA: OF THE GREEN RIVER AND ITS ASSOCIATED,WETLANDS. .WHICH IS A SHORELINE OF STATEWIDE SIGNIFICANCE, AND IS DESIGNATED AS AN URBAN. ENVIRONMENT The following master program provisions are applicable to-'thi's development: URBAN ENVIRONMENT SEE ATTACHED POLICY ANALYSIS Development pursuant to thisLpermit shall be undertaken pursuant to the attached terms and conditions,. This permit is 'granted pursuant to'• the - Shore 1-i:ne. Management Act . o -f 1971 an noth i na ;i'n thisr'> permit shall excuse -the _ap.p 1icant. f rom•;'coma l-i'ance with any other Federal,'State or local statute`s.. , or-d-inances or regulations appl icab-le to this o.roiect, but not inconsis•t.ent with'theTShore-l:ine Management Actr(Chapter~ 90.58 RCW).. This permit may be. rescinded pursuant to RCW^90.58.140.(-8) in_ -the event the permittee fails to comply with the terms or conn i t i ons? hereofi: CONSTRUCTION PURSUANT TO THIS PERMIT WILL NOT BEGIN OR'-,hS NOT AUTHORIZED UNTIL TWENTY-ONE7•(21) DAYS FROM -THE -DATE OF FILING WITW`THE DEPARTMENT OF ECOLOGY AS DEFINED.I-N RCW 90.53'.140(6). AND WAC 173;-1"4'-090. OR UNTIL ALL REVIEW PROCEEDINGS INITIATED WITHIN --TWENTY-ONE (24J -DAYS FROM THE DATE OF SUCH FILING HAVE TERMINATED..EXCEPTTAS PROVIDED:IN RCW 90.58.140(5)(a)(b)(c). Date: 131� 22� ISSN -64 , Steve Lancaster Director, Planning Department Construction or substantial progress toward construction must begin within two years from date of issuance. per WAC 173-14-060. AFFIDAVITOF Li Notice of Public Hearing O Notice of Public Meeting O Board of Adjustment Agenda Packet O Board of Appeals Agenda Packet fPlanning Commission Agenda Packet 0 Short Subdivision Agenda Packet LI Notice of Application for Shoreline Management Permit LJ Shoreline Management Permit DISTRIBUTION hereby declare that: Determination of Non- significance fJ Mitigated Determination of Nonsignificance _ Determination of Significance and Scoping Notice ❑ Notice of Action fl Official Notice 0 Other Other was mailed to each of the following addresses on - Q,�acXoc2: Name of Project 4 ob24/1 at Signature L<4AL File Number Egg -0 1D- • • CITY OF TUKWILA •DETERMINATION OF NONSIGNIFICANCE (DNS) DESCRIPTION OF PROPOSAL: DEMOLISH EXISTING 2000 SF BUILDING TO CONCRETE FLOOR PROPONENT: THE BOEING CO. LOCATION OF PROPOSAL. INCLUDING STREET ADDRESS. IF ANY: ADDRESS: 8123 EAST MARGINAL WY S PARCEL NO: 000160-0020 SEC/TWN/RNG: LEAD AGENCY: CITY OF TUKWILA FILE NO: E98-0012 The City has determined that the proposal does not have a probable significant adverse impact on the environment. An environmental impact statement (EIS) is not required under RCW 43.21c.030(2)(c). This decision was made after review of a completed environmental checklist and other information on file with the lead agency. This information is available to the public on request. •k•*•k*•k•k** k************************•k************ :k**** k******************** *** This DNS is issued under 197-11-340(2). comments must be submitted by .Solt 2,0 IS 18 . The lead agency will not act on this proposal for Pakdays from the date below. ly E� Steve Lancaster, Responsible Official City of Tukwila. (206) 431-3680 6300 Southcenter Boulevard Tukwila, WA 98188 Date Copies of the procedures for SEPA appeals are available with the Department of Community Development. • • MEMORANDUM June 30, 1998 To: Steve Lancaster, Director Fm: Carol Lumb, Associate Planner Re: Project File No. E98-0012: 2-18 Building Demolition Project Description: Demolish a 2,000 square foot building within 200 feet of the Duwamish River Proponent: The Boeing Company Location: 8123 East Marginal Way South Date prepared: April, 1998 Lead Agency: City of Tukwila, Department of Community Development Challenges to Document: None Other Agencies of Jurisdiction: None Recommendation: Determination of Non -Significance (DNS) SEPA Review - E98-0012 • 2-18 Building Demolition June 30, 1998 Comments to SEPA Checklist: Page 1. #6: Checklist estimates that demolition will occur in Spring, 1998; demolition will likely take place in mid- to late summer. Page 2. #8: The following environmental documents relate to the proposal: Duwamish Corridor Redevelopment EIS (1992) and related Mitigation Agreement (10/26/93); Resource Conservation and Recovery Act (RCRA) Consent Order for Corrective Action for Plant -2 (proposed demolition is within the RCRA Consent Order area). The site is also within the project area for the Tukwila Manufacturing/Industrial Center Integrated GMA Implementation Plan and Environmental Impact Statement. The Integrated Plan and Final EIS were completed in March, 1998. Both the Duwamish Corridor Redevelopment EIS and the Tukwila Manufacturing/Industrial Center Integrated GMA Implementation Plan and Environmental Impact Statement analyze the environmental impacts of a range of development and redevelopment alternatives on the Boeing properties along the Duwamish River corridor. Page 2. #10: The following permits and governmental approvals will be needed: demolition permit, shoreline substantial development permit, PSAPCA, and State Environmental Policy Act approval. Page 2-3. # 11: The applicant proposes to demolish to the concrete floor, the existing Boeing 2-18 building. This building is an old metal frame structure, closed on three sides and open on one, used as a storage building for miscellaneous items. The building is approximately 2000 square feet in size. After demolition, the site will continue to be used for storage of large containers. Page 3. # 12: The project site is located at 8123 East Marginal Way South, Boeing Plant 2 SW 1/4 Section 33, Township 24N, Range 4E Summary of Primary Impacts: Earth The site is generally flat and currently 100% impervious surface except for small landscape features around some of the buildings at Boeing Plant 2. The site will continue to be impervious surface when the project is complete. No disturbance of the 2 c:\caro I/2-18-bld/dns-rpt • . SEPA Review - E98-0012 • • 2-18 Building Demolition June 30, 1998 ground/soil is anticipated with the demolition of the building, as the existing concrete pad will be left -- only the three walls will be removed. Air During demolition, vehicle and construction equipment emissions and dust will be released. Dust and vehicular emission from construction is expected. A permit from the Puget Sound Air Pollution Control Agency (PSAPCA) will be obtained and must be presented prior to receiving a demolition permit from the City of Tukwila. Water. The project site is 30 feet east of the Duwamish River. A Shoreline Substantial Development Permit has been submitted (File Number L98-0027). The project does not lie within the floodplain. No dredging or filling of surface waters will occur. No diversions of surface water will occur. No ground water will be withdrawn nor will waste materials be discharged into the ground. Storm water runoff will be collected in the existing Plant 2 stormwater control system. No additional impervious surface or runoff will be created by the project. Plants As noted above, the site is 100% impervious surface with some landscaping features in the area. No vegetation will be removed or altered as a result of this project.. Animals The only birds that have been observed near the site are seagulls and crows; no mammals and fish in the Duwamish Waterway. Temporary erosion control will be used during demolition to prevent the discharge of any contaminants into the Waterway. Energy/Natural Resources Other than machinery needed to demolish the building, no energy will be used. Environmental Health Temporary noise impact due to construction are anticipated. Construction projects of this type typically produce noise levels which range from 68 to 98 dba at 50 feet from c:\carol/2-18-bld/dns-rpt 3 SEPA Review - E98-001 • 2-18 Building Demolition June 30, 1998 the specific equipment. Demolition will be limited to daylight hours to limit the effect of noise created by the demolition. Land/Shoreline Uses The storage shed is part of the Plant 2, Boeing airplane manufacturing facility along East Marginal Way South, which contains a number of buildings, some quite large for the manufacture of airplanes. The Duwamish River is adjacent on the west, with other aircraft manufacturing buildings on the north, south and east. The current zoning classification is MatTufacturing/Industrial Center - Heavy (MIC/H). The current Comprehensive Plan designation is also Manufacturing/Industrial Center - Heavy. After the removal of the building, the remaining concrete pad will continue to be used to store containers and other items. Mousing Not applicable. Aesthetics Not applicable . Light/Glare Not applicable. Recreation There is a large Boeing recreational facility in a nearby Plant 2 building. Historic/Cultural Preservation Not applicable. Transportation This portion of Plant 2 is served by East Marginal Way South and entrance Gate B-60. No parking will be eliminated or created due to the building demolition. There is a 4 c:\carol/2-18-bld/dns-rpt SEPA Review - E98-0012 2-18 Building Demolition June 30, 1998 METRO bus stop adjacent to Gate B-60, which serves the northern half of Plant 2 and the project site. No additional trips will be generated by the demolition. Public Services Not applicable. Utilities Utilities currently available at the site include electric, natural gas, water, refuse service, telephone, storm water and sanitary sewer. No additional utilities are anticipated to be needed as a result of the building demolition. Recommendation Determination of Nonsignificance 5 c:\caro l/2 -18-b l d/d ns -rpt 6200 Southcenter Boulevard • Tukwila, Washington 98188 NOTICE OF APPLICATION DATED JUNE 3, 1998 John W. Rants, Mayor The following applications have been submitted to the City of Tukwila Department of Community Development for review and decision. APPLICANT: LOCATION: FILE NUMBERS: PROPOSAL: The Boeing Company 8123 East Marginal Way South, Tukwila, WA E98-0012, L98-0027 To demolish a 2,000 square foot metal building, enclosed on three sides, down to the concrete floor. The concrete floor pad will be retained for use for large container staging and storage. OTHER REQUIRED PERMITS: Demolition Permit These files can be reviewed at the Department of Community Development, 6300 Southcenter Blvd., #100, Tukwila, WA. Please call (206) 431-3670 to ensure that the file(s) will be available. OPPORTUNITY FOR PUBLIC COMMENT You can submit comments on this application. You must submit your comments in writing to the Department of Community Development by 5:00 p.m. on Friday, July 3, 1998. A decision on this application will be made by the Director of the Department of Community Development. No public hearing will be scheduled, unless an appeal is received. Any person desiring to submit written comments concerning this application or desiring to receive notification of the fmal decision may submit written comments or requests for decisions to the Department of Community Development within thirty (30) days of the date of this notice. If you have questions about this proposal contact Carol Lumb, the Planner in charge of this file at 431-3661. Anyone who submits written comments will become parties of record and will be notified of any decision on this project. APPEALS You may request a copy of any decision by the Director of Community Development on a project or obtain information on your appeal rights by contacting the Department of Community Development at 431-3670. The decision of the Director of the Department of Community Development on the Shoreline Substantial Development Permit may be appealed to the State Shoreline Hearings Board. The decision of the Director on the environmental determination may be appealed to the Tukwila City Council or the King County Superior Court. DATE OF APPLICATION: " NOTICE OF COMPLETE APPLICATION: NOTICE OF APPLICATION POSTED: April 24, 1998 May 22, 1998 June 3, 1998 Phone: (206) 433-1800 • City Hall Fax (206) 433-1833 May 22, 1998 • • City of Tukwila la John W Rants, Mayor Department of Community Development Steve Lancaster, Director NOTICE OF COMPLETE APPLICATION DATED APRIL 24,1998 Mr. Rick Ford The Boeing Company P.O. Box 3707 M/S 19.39 Seattle, WA 98124 RE: Application for Demolition Permit: File #s E98-0012 and L98-0027 Dear Mr. Ford: Your application, on behalf of the Boeing Company, to demolish an existing 2,000 square foot building located at 8123 East Marginal Way South within 200 feet of the Duwamish River has been found to be complete on May 21, 1998 for the purposes of meeting state mandated time requirements. I will be the assigned planner for the project. The next step is for you to install the notice board on the site within 14 days of the date of this letter. You received information on how to install the sign with your application packet. If you need another set of those instructions, you may obtain them at the Department of Community Development (DCD). Also, you must obtain a laminated copy of the Notice of Application to post on the board. This notice is also available at DCD. After installing the sign with the laminated notice, you need to return the signed Affidavit of Posting to the our office. This determination of complete application does not preclude the ability of the City to require that you submit additional plans or information, if in our estimation such information is necessary to ensure the project meets the substantive requirements of the City or to complete the review process. I will be contacting you soon to discuss this project. If you wish to speak to me sooner, feel free to call me at 431- 3661. Sincerely, ""' 60441 Carol Lumb Associate Planner cc: Reviewing City Departments c:\Carol/2-18bIdg/complete 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431-3670 • Fax (206) 431-3665 CITY O0TUKWILA Department of Community Development 6300 Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431-3670 RECEIVED CITY OF TUKWILA APR 2 41998 PERMIT CENTER SEPA APPLICATION CHECKLIST FOR STAFF USE .ONLY Planner: Receipt; Number:. _Applicant°notified of incompletOpplication: File Number: ECf O - 12 Cross-reference files: Lpisc ca-. Applicant notified of complete `application: Notice of application, issued: A. NAME OF PROJECT/DEVELOPMENT: B. LOCATION OF PROJECT/DEVELOPMENT: (address and accessors parcel number(s)) 9/23 £ ,i.0 )26 iiviq C_ /4/4 k' ySe oao /4 p - oo Z-4 Quarter: Section: Township. 04 4/ Range: 4 (This information may be found on your tax statement) C. PROJECT DESCRIPTION: D. APPLICANT: RECEIVED CITY OF TUK CITY OF MKWILA APR 2 4 19 SHORELINE SUBSTANTIAL Department of Community Development 6300 Southcenter Boulevard, Tukwila, votEtfiggiTEDEVELOPMENT PERMIT Telephone: (206) 431-3670-- (P -SHORE)--- APPLICATION FOR:STAFFUSE'ONLY Planner rr ,t: -7"!%n t FileNumber - 00 Receipt umber. rojectFile#'3 0 Application completer(D;ate: , 0.1 Application incomplete 'pate: I. PROJECT BACKGROUND ,SEPAIFile. A. NAME OF PROJECT/DEVELOPMENT: BoB/,vG .1.3u/L p/,vc, 2-/g OE.Y,a./r/ON B. LOCATION OF PROJECT/DEVELOPMENT: STREET ADDRESS: 5/23 6. �!1 AR6/n//4 L ASSESSOR PARCEL NUMBER: 'QC / (r D - c:70 2D wr/ s. LEGAL DESCRIPTION: Quarter: Section: Township: 24A/ Range: 4E (This information may be found on your tax statement) C. CONTACT: (Primary contact regarding the application, and to whom all notices and reports shall be sent) NAME: /5 ie ,I ,2O — T//E 130EiNG Leo . ADDRESS: PO. t3ox .37D 7 /n/S / 9 - 3 5 .sE•9 rTc E 14/4 9)3/24 PHONE: ZOIo -9858 SIGNATURE: 1.1--2/ / DATE: 4- ZO -9 D. PROPERTY OWNER DECLARATION The undersigned makes the following statements based upon personal knowledge: 1. The Boeing Company is the current owner of the property which is the subject of this application. All statements contained in the application are true and correct to the best of my knowledge. 3. The application is being submitted with my knowledge and consent. 4. I understand that conditions of approval, which the City and applicant have jointly agreed may not be completed prior to final approval of the construction (e.g., final building permit approval) will be incorporated into an agreement to be executed and recorded against the property prior to issuance of any construction permits. declare under penalty of perjury under the laws of the State of Washington and the United States of America that the foregoing statement is true and correct. EXECUTED at t v V -w < <-►A (city), l .)7451 -It NGTV iv (state), on , 1998. Atz-D .. 1m o (Print Name) Pa Eio x 3707 ri) 1c .35 (Address) Zo( 4, 55 -c7 5 (Phone Number) Subscribed and s orn to before me this day of ,1998 Notary Public in and for thState of Washington, residing in . My Commission expires: nw. z6, /0Q E. CURRENT ZONING OF PROPERTY: f'/E11 i/_%/ M4j1UFA4 ry.e/A) F. PRESENT USE OF PROPERTY: A/24,014 FT AA4A AGTrA2/Aa., FAG/L/TY G. SHORELINE ENVIRONMENTAL DESIGNATION:._ -H .GENERAL DESCRIPTION -OF -SURROUNDING LAND_USES: ( thin_1,000_feet:in all directions -from the development • site.) A) 2 OP l t r AA Nu cd, 7v2/xl G f 42 /1--/ TY TO T/ -1E A/o z rN ..SO v r 4•45% 1711 /4, li5AI 2,j"f2 To THE L✓ 7-. I. TOTAL CONSTRUCTION COST & FAIR MARKET VALUE of the proposed development: (Include additional future phases of development contemplated but not included in current proposal.) 1" /" .0a J. BRIEF NARRATIVE DESCRIBING PROPOSED IMPROVEMENTS: OE,)/.04/4.v 6ai.s r/N6 ,2, OvlO S 4�• FT a viz P' v/ TD LO,v -2 TE FL 00/z . K. PORTION OF PROPOSED ACTIVITY ALREADY COMPLETED: (If any portion or phase of the proposed activity is already completed on subject site, indicate month and year of completion.) Non/E L. PROPOSED STARTING DATE: .s P/2 /99g . ESTIMATED COMPLETION DATE OF CONSTRUCTION ACTIVITY: SPR/NG /99B (If project will be constructed in stages, indicate dates:) M. TYPE AND EXTENT OF RECONSTRUCTION OF RIVERBANK (IF ANY) AND PROPOSED RIVERBANK VEGETATION: /VoNE N. IF PROPOSED ACTIVITY TO CAUSE FLOODING OR DRAINING OF WETLANDS, INDICATE IMPACTED AREA (acres): SSDPMT.DOC 7/3/76 O. TYPE AND EXTENT OF PUBUC ACCESS PROPOSED (if any): NoN . SETBACK OF PROPOSED PARKING/LOADING/STORAGE AREAS AND PROPOSED SCREENING::.(setback measured- from mean high watermark) !3w/cp//v v /6 App,eau.: /io A-0o.Y, - mEAA/ /// GH %iia rCR ill A 2K_ . Q. HEIGHT- AND SETBACK OF ALL PROPOSED BUILDINGS AND -STRUCTURES: -(height measured from -average -grade= leVel to the highest point of the structure, or mid point of pitched roof; setback measured from mean high water mark) R. MEASURES PROPOSED TO PROTECT WILDLIFE AND FISH HABITAT IN AND ALONG RIVER: £J7/L p -- 4-. .577N6 oA4 i/ Sr /2/+4 AV 14 PS 7-"A+-1 TD x17/771 rE- P yr/i¢L ZLWDfZ //19P,4L7 . SSDPMT.DOC 7/3/96 4 {Jit C_QMPLETEDIMLOCAL SHORELINE OFFICIAL _,T.., - A. .E NATURE OF EXISTING SHORELINE: (Describe type of shoreline, such as stream, lake, marsh, flood plain, floodway, delta; type of beach, such as erosion, high bank, low bank or dikettype of material, such as sand, gravel, mud, clay, rock, type of bulkheading, if any.) t v wo✓vr nKt/‘ .lAtti-eivi.dai -- bainK- s topes riprap; and extent and -6 A -I-OAt — l IN WIS V e1zi utiti c v; .pro as 5Q L v, l i ,.40CL. p / tU Um:7S t ,i ,n"tA a(;�t.esc 41. t (Loco✓ - „m, s zto 1 B. RESIDENTIAL VIEWS OBSTRUCTED BY STRUCTURES OVER 35' IN HEIGHT: (In the event that any proposed buildings or structures exceed a height of 35' above average grade, indicate the approximate location of, and number of, residential units, existing and potential, that will have views of the shoreline obstructed by the proposed development.) C. CONDITIONAL USE OR VARIANCE REQUIRED: (If a conditional use is required, state in full that portion of the Master Program which provides that the proposed use may be a conditional use, or, if a variance is required, that portion from the is being sought. which variance IS1A— SSDPMT.DOC 7/3/96 4 III. OTHER PERMITS REQUIRED FOR THIS PROJECT Indicate permits for which you have applied or will apply to the federal government, the State, City of --Tukwila-and=other agencies;=include_permit application date;_whether the -permit_ is -pending, approved or denied, and the permit number, _Tukwila Conditional.U.se_Permit Tukwila Variance Permit ❑ Tukwila SEPA Environmental Checklist SEPA Lead Agency: 7- SEPA SEPA decision date: ❑ Tukwila Design Review l Tukwila Preliminary Plat Approval ❑ Tukwila Flood Control Zone Permit (per Flood Ord. #1462) El Tukwila Storm Drainage Permit (per Ord. 1755) [� Tukwila Land Altering Permit (per Ord. 1591) ❑ Archaeological Excavation Permit (WA DCD/Office of Public Archaeology) Section 106 Review (WA DCD/Office of Public ❑ Archaeology) ❑ Coastal Zone Management Certification (WA Dept. of Ecology) ❑ Hydraulic Project Approval (HPA) (WA Dept. of Fish & Wildlife) ❑Approval to Allow Temporary Exceedance of Water Quality Standards (WA Dept. of Ecology) PERMIT# ❑ - National Pollutant Discharge Elimination System (NPDES) Permit (WA Dept. of Ecology) (Nationwide Permit) (WA Dept. of Ecology) ❑ Aquatic Lease (WA Dept. of Natural Resources) ri ❑ Section 401 Water Quality Certification Nationwide Permit (WA Dept. of Ecology) ❑ Section 404 or Section 10 Permit (Army Corps of Engineers) ❑ Other. SSDPMT.DOC 7/3/96 APPLICATION DATE DATE APPROVED ENVIRONMENTAL CHECKLIST RECEIVED -- - CITY- OF-TUKWILA APR 2 4 1998 PERMIT CENTER 2-18 Building Demolition City of Tukwila The Boeing Company P.O. Box 3707, M/S 19-35 Seattle, WA 98124-2207 April 1998 Rick Ford 206 655-9888 ENVIRONMENTAL CHECKLIST A. BACKGROUND 1. Name of proposed project, if applicable: 2-18 Building Demolition 2. Name of applicant: The Boeing Company P.O. Box 3707, M/S 19-35 Seattle, WA 98124-2207 3. Address and phone number of applicant and contact person: Rick Ford Facilities Asset Management Organization The Boeing Company P.O. Box 3707, M/S 19-35 Seattle, WA 98124-2207 4. Date checklist prepared: April 17, 1998 5. Agency requesting checklist: City of Tukwila 6. Proposed timing or schedule (including phasing, if applicable): Demolition: Spring 1998 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. Future additions, or expansions of the project are not anticipated at this time. ENVIRONMENTAL CHECKLIST C:\USER\AARICKS\2-18 demo checklist.doc 2-18 DEMOLITION 04/15/98 • • 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. Duwamish Corridor Redevelopment EIS (1992) and related Mitigation Agreement (10/26/93) A RCRA Consent order for Corrective Action has been completed for Plant 2. The proposed demolition is within the RCRA Consent Order area. 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? if yes, explain. None 10. List any government approvals or permits that will be needed for your proposal, if known. Federal: None known at this time State of Washington: None known at this time King County: None known at this time City of Tukwila/Local: State Environmental Policy Act Review/Approval Shoreline Substantial Development Permit (P -Shore) 11. Give brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description.) ENVIRONMENTAL CHECKLIST C:\USER\AARICKS\2-18 demo checklist.doc 2-18 DEMOLITION 2 04/15/98 To demolish, to the concrete floor, the existing Boeing 2-18 building. This building is an old metal frame structure closed on three sides and open on one, and used as a storage facility, the size is approximately 2000 sq. ft. (40'x50'). After demolishing the site will be used for large container staging and storage. 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. Site address: 8123 East Marginal Way South, Boeing Plant 2 Refer to drawings in Exhibit A, Location in Region; Vicinity Map; Site Plan and Topographic maps for exact location within Plant 2 Legal Description attached as Exhibit B B. ENVIRONMENTAL ELEMENTS 1. Earth a. General description of the site (circle one): Flat, rolling, hilly, steep slopes, mountainous, other Flat b. What is the steepest slope on the site (approximate percent slope)? 0% c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any prime farmland. Soil disturbance is not anticipated. ENVIRONMENTAL CHECKLIST 2-18 DEMOLITION 3 C:\USER\AARICKS\2-18 demo checklist.doc 04/15/98 d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. No e. Describe the purpose, type, and approximate quantities of any fi/ling or grading proposed. Indicate source of fill. None f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. No g. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? The site is currently a 100% impervious, paved surface and, except for small landscape features, will continue to be impervious when the project is complete. h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: None 2. Air a. What types of emissions to the air would result from the proposal (i.e., dust, automobile, odors, industrial wood smoke) during construction and when the project is. completed? If any, generally describe and give approximate quantities if known. During Demolition, vehicle and construction equipment emissions and dust will be released. b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. No ENVIRONMENTAL CHECKLIST C:\USER\AARICKS\2-18 demo checklist.doc 2-18 DEMOLITION 4 04/15/98 c. Proposed measures to reduce or control emissions or other impacts to air, if any: Mitigation measures will be implemented as required to meet or exceed all applicable standards as required by the Puget Sound Air Pollution Control Agency and the Department of Ecology. Additional potential mitigation measures to reduce emissions include ensuring that machines and equipment used during construction are well maintained 3. Water a. Surface: 1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wet/ands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. The project site is approximately 30 feet east of the Duwamish Waterway. 2) Will the project require any work over, in, or adjacent to (w/thin 200 feet) the described waters? If yes, please describe and attach available plans. Yes, the site is within 200 feet from the Duwamish Waterway 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wet/ands and indicate the area of the site that would be affected. Indicate the source of fill material. None 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. No ENVIRONMENTAL CHECKLIST C:\USER\AARICKS\2-18 demo checklist.doc 2-18 DEMOLITION 5 04/15/98 • • 5) Does the proposal lie within a 100 -year floodplain? If so, note location on the site plan. No. Exhibit C, FEMA, Flood Insurance Rate Map, King County 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. No b. Ground: 1) Will ground water be withdrawn, or will water be discharged to ground water? Give general description, purpose, and approximate quantities if known. No 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example: Domestic sewage; industrial, containing the following chemicals... ; agricultural; etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. None c. Water runoff (including storm -water): 1) Describe the source of runoff (including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. Storm water runoff will be collected in the existing Plant 2 storm - water control system. No additional impervious surface or runoff will be created by the project. 2) Could waste materials enter ground or surface waters? If so, generally describe. No ENVIRONMENTAL CHECKLIST C:\USER\AARICKS\2-18 demo checklist.doc 2-18 DEMOLITION 6 04/15/98 • • d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any: Utilize existing onsite storm water system to mitigate potential runoff water impacts. Appropriate mitigation measures will be initiated during demolition to reduce and control surface water runoff impacts. 4. Plants a. Check or circle types of vegetation found on the site: deciduous tree: alder, maple, aspen, other evergreen tree: fir, cedar, pine, other shrubs, grass, pasture, crop or grain, wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other water plants: water lily, eelgrass, milfoil other types of vegetation None b. What kind and amount of vegetation will be removed or altered? None c. List threatened or endangered species known to be on or near the site. None d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: None 5. Animals a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the site: Birds and animals which have been observed on or near the site are listed below: birds: seagulls, crows ENVIRONMENTAL CHECKLIST C:\USER\AARICKS\2-18 demo checklist.doc 2-18 DEMOLITION 7 04/15/98 mammals: fish: none observed in the nearby Duwamish Waterway b. List any threatened or endangered species known to be on or near the site. None c. Is the site part of a migration route? If so, explain. Unknown d. Proposed measures to preserve or enhance wildlife, if any: Utilize temporary erosion, long term storm water and hazardous materials control systems and best management practices to prevent contaminated discharges into the Duwamish Waterway. 6. Energy and natural resources a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. None b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. No c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: None 7. Environmental Health a. Are there any environmental health hazards, including exposure to ENVIRONMENTAL CHECKLIST C:\USER\AARICKS\2-18 demo checklist.doc 2-18 DEMOLITION 8 04/15/98 • • toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. Usual oils, greases, fuel and solvents will be present during demolition. 1) Describe special emergency services that might be required. No special emergency services will be required. The hazardous materials involved are commonly used and are reasonably expected to be within the capability of existing emergency service operations. 2) Proposed measures to reduce or control environmental health hazards, if any: No b. Noise 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? None 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hours noise would come from the site. Temporary noise impacts during construction are anticipated. Construction projects of this type typically produce noise levels which range from 68 to 98 dba at 50 feet from the specific equipment. 3) Proposed measures to reduce or control noise impacts, if any: None. The site is not near residential uses. ENVIRONMENTAL CHECKLIST C:\USER\AARICKS\2-18 demo checklist.doc 2-18 DEMOLITION 9 04/15/98 • • 8. Land and shoreline use a. What is the current use of the site and adjacent properties? The site is fully developed as an airplane manufacturing facility. b. Has the site been used for agriculture? If so, describe. No c. Describe any structures on the site. Plant 2 is a large airplane manufacturing facility, consisting of many buildings and ancillary uses. The project site is within Plant 2. d. Will any structures be demolished? If so, what? Yes, the 2-18 building. e. What is the current zoning classification of the site? Heavy Manufacturing f. What is the current comprehensive plan designation of the site? Manufacturing Industrial Center (MIC) g. If applicable, what is the current shoreline master program designation of the site? N/A h. Has any part of the site been classified as an "environmentally sensitive" area? If so, specify. No i. Approximately how many people would reside or work in the completed project? None ENVIRONMENTAL CHECKLIST C:\USER\AARICKS\2-18 demo checklist.doc 2-18 DEMOLITION 10 04/15/98 • • j. Approximately how many people would the completed project displace? None k. Proposed measures to avoid or reduce displacement impacts, if any: None 1. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: None 9. Housing a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income housing. None b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-income housing. None c. Proposed measures to reduce or control housing impacts, if any: None 10. Aesthetics a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? Not applicable b. What views in the immediate vicinity would be altered or obstructed? None ENVIRONMENTAL CHECKLIST C:\USER\AARICKS\2-18 demo checklist.doc 2-18 DEMOLITION 11 04/15/98 • c. Proposed measures to reduce or control aesthetic impacts, if any: None 11. Light and glare a. What type of light or glare will the proposal produce? What time of day would it mainly occur? Not applicable. b. Could light or glare from the finished project be a safety hazard or interfere with views? No c. What existing off-site sources of light or glare may affect your proposal? None anticipated. d. Proposed measures to reduce or control light and glare impacts, if any: None 12. Recreation a. What designated and informal recreational opportunities are in the immediate vicinity? There is a large Boeing recreational facility in a nearby Plant 2 building. In addition, the proposed building will be located approximately one mile north of the main Boeing Oxbow recreational facility, which includes a shoreline trail. b. Would the proposed project displace any existing recreational uses? If so, describe. No ENVIRONMENTAL CHECKLIST 2-18 DEMOLITION C:\USER\AARICKS\2-18 demo checklist.doc 12 04/15/98 • • c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: None 13. Historic and cultural preservation a. Are there any places or objects listed on, or proposed for, national, state, or local preservation registers known to be on or next to the site? If so, generally describe. No b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site. None have been identified on the project site. c. Proposed measures to reduce or control impacts, if any: Although previous excavations have disclosed no indications of archeological significance, if artifacts are uncovered, work in that area will be halted pending notification and response from appropriate agencies. 14. Transportation a. Identify public streets and highways serving the site, and describe proposed access to the existing street system. Show on site plans, if any. This portion of Plant 2 is served by East Marginal Way South and entrance Gate B-60. b. Is site currently served by public transit? If not, what is the approximate distance to the nearest transit stop? Yes, there is a Targe Metro bus stop adjacent to Gate B-60, which serves the northern half of Plant 2 and the project site. ENVIRONMENTAL CHECKLIST C:\USER\AARICKS\2-18 demo checklist.doc 2-18 DEMOLITION 13 04/15/98 c. How many parking spaces would the completed project have? How many would the project eliminate? None, and no parking stalls will be eliminated by the proposal. d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including driveways? If so, generally describe (indicate whether public or private). No e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. No f. How many vehicular trips per day would be generated by the completed project? if known, indicate when peak volumes would occur. No additional trips will be generated g. Proposed measures to reduce or control transportation impacts, if any: None. 15. Public Services a. Would the project result in an increased need for public services (for example: fire protection, police protection, health care, schools, other)? If so, generally describe. None is anticipated. b. Proposed measures to reduce or control direct impacts on public services, if any. None ENVIRONMENTAL CHECKLIST C:\USER\AARICKS\2-18 demo checklist.doc 2-18 DEMOLITION 14 04/15/98 16. Utilities a. Circle utilities currently available at the site: electricity, natural gas, water, refuse service, telephone, sanitary sewer, septic system, other. Electricity, natural gas, domestic water, refuse service, telephone, sanitary sewer and storm sewerage are currently available. b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. None C. SIGNATURE The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to make its decision. Signature: Richard Ford Date Submitted: G'—UP — ENVIRONMENTAL CHECKLIST C:\USER\AARICKS\2-18 demo checklist.doc 2-18 DEMOLITION 15 04/15/98 • • Exhibit A LOCATION IN REGION ISSAQUAH PROJECT SITE SCALE: NONE KENT ua AUBURN TO TA •MA ) AUBURN 1 1 Magt VERTICAL DATUM I NATIONAL GEODETIC VERTICAL DATUM (1929) SEA LEVEL DATUM 1 1 i ' i I i\ s 1 \ • DUWAMISH COMMERCIAL WATERWAY . , s ,\` r 1 (76... \\ e::::::-1 " 1 ,v i_� i .6 `ISE ` O®\\ w • \ ,w i :;� • ,, MS % \\ I 2-41 41 \ \\ 1 , \ \ ,\• , >v 1i1 1y \ \ 41...\ O 9`\ \ \\ \ • :� I\ , m 10 0 to 40 00 \ �- W , I 7GlL IN FEET \\ ``�. � I C17 CO CIJ CD C12 C11 CIO �\./ 1 m m a CD @ 01 CD Cif CU I• 1 • v I @ C 4 @ @ OI CM Ct CO CO 1 •' , ON W OU 011COCa D CO CI ' / ---------------_...m5Terr�.l:lmmraa�irrrrsr—'•--------= -ow ---- i1Ipd�- -. 1 S - - x-17 TWO MO SURVEY - C 4 gams COWL@ 2 PLANT EMI - we Oa IMEM 01 W 2 t•- 170-014 W 1 1�Ya1Ya tie W W ! • / 1 f♦♦� 1 1 2-10 Iw oa1a o.0 4se 11/4 \ W 1 $ 1 / 1' i 1 i 1 1 1 • % Ill •/♦♦ t. w \.. W • • O i�i i i i ♦ i i i -- -1. --1-1-1--14-4-1-1-1- ♦i 1 1 1 I 1 f1U. 1' 1 I I I L I I I LJ 11 I ��rfl i 1 i I 1 I 1 I 1 1 1 1 1 ttlt • 1 1 ` 11 1 1 1 1 1 ♦ ♦/ �♦ /♦♦ ♦ 1 I 1 to IJ 1 1 1 w \; 1 1 1' 1 1 1 1 1 \t • \\\ N/ W ) O \\t v� 1 1 1 1 \ ` v1�111L 1 1 1 1 / /♦�� e \ `ttw4 1 lit♦ 11 IAA \ \ • 1 1, \\•�W J ��` \ \ Y /), \ \ \ W\ \ \ \ \ \ \ \ \ )))11 h.2 Y ♦ �_� 1] 1-.1/�r.J \ \ \ • \\ •\o ■■■ ^ \ \ \ vi \ \ t ! �__1.._1_1__L1-_Lt. I \ \ \ \ %.,..2,_ \ \ \ �__L_a_t__y \ \ Y A P. i `\ \ ‘..._1;:.:4, —C t i J__a__ lu yZ �i \\ W 0 ;v sem , , , , ; n 1 11 , ..•..L. , 1 ,e• , li w\ \ a I '• \ \�\\ \� ° 3W . \\ �1y1 2-15 1 ` W \\\ \ \ e 211i i' F-. `, ° ` `i \\ 0 \. 1 1 \ _,/ . �4'• `•\ �\ ° ge `_ \ VERTICAL DATUM 1 i • " ` \•• �` `\` " \"e m 1a o ao a eo 1 NATIONAL GEUDETIC VERTICAL DATUM (1929) • 2/01/1 p FELT �` `\ 32 `\ .` o SEA LEVEL DATUM ( X17 a. ns as CU at 01 CIO \ 1 W ° \ � �,S, : - % ` e • 1 m Gf C!1 m en � 0o CIS CM . 2-30 : ♦ 1••`\ • `\ 1 m W m m OI m m 0 CO / W `\` \ W • ON W d! co d0 m O m O. \ � \�w� ` �. t -, " ,� x..:>✓Gs.z. , warp -- - ���- t t. .'•1;Eemrt -- -a-- — - •�- . e'er - - IMM ' 'tom - "1 tttta TOPO MD SURVEY IPM tar lt• • _ -R-- w w - /Q C21 Arialelgalar PLANT 2 -. -°- ..'.. Ott •R1111 Di RI 1 k.'"' L10-01 -------------IMOD--IMOD -----IMOD--IMOD IMOD —--------------IMOD---- 1 1 1 I 1 1 tMIX _ `_..—..�_..— IMOD —t ..____ _•• _.. .. 1 v ..t 3 -Y F AMISH COMMERCIAL WATERWAY w ti L BASE FLOOD ELEVATION = 8.0 FEET .. 00000000001t&000000000000000000000000000000 _, a u � 1 J1 /J/ - ' _VERTICAL DATUM 1 CONSTRUCTION Nom. /j NEW° 1 i ■ NATIONAL GEODETIC VERTICAL DATUM (1929) SEA LEVEL DATUM i I2-09 SIT BLDG 2-18 I 11,4Ma}' 2-09 i 2-10 1• 1 1 104i MO r'^ fr 4j J'1 i 1 20 10 0 20 40 00 1 1 lY • 1 WILE N FEET d �• I 07 CO C10 CK 02 01 CIO s CM GS 0f/ m 02 CH CM CIO CIO 1 lY 1 0604010001000110402 114 OK W Oft ON 010 01 0 CO 00 W SU --------IMOD--IMOD—IMOD--- --IMOD-- - mgr rmrs. m.------------------IMOD--IMOD ®— .. MOM I •� — - TOPO MD SURVEY • (' ..M1'/• awaguppur"� "' ..Ism C13 F PLANT 2 4111I.- Oil 1161L11 ax — t L 214-013 - Exhibit B - • • LEGAL DESCRIPTION APN: 000160-0020, A TRACT OF LAND BETWEEN THE DUWAMISH WATERWAY AS ESTABLISHED BY COMMERCIAL WATERWAY DISTRICT #1 OF KING COUNTY, WASHINGTON & E. MARGINAL WAY , IN SECTION 33, TOWNSHIP 24 NORTH, RANGE 4 EAST W.M., AND IN THE JOHN BUCKLEY DONATION CLAIM NO. 42; SAID TRACT ALSO BEING THE SOUTHERLY PORTION OF A LARGER TRACT COMMONLY CALLED THE BOEING COMPANY'S PLANT NUMBER TWO SITE, DESCRIBED AS FOLLOWS: BEGINNING AT THE SECTION CORNER COMMON TO SECTIONS 28, 29, 32 AND 33; THENCE SOUTH 88 08'07" EAST ALONG THE NORTH LINE OF SAID SECTION 33, A DISTANCE OF 982.00 FEET TO AN INTERSECTION WITH THE SOUTHWESTERLY MARGIN OF EAST MARGINAL WAY; THENCE SOUTH 47 51'53" EAST ALONG SOUTHWESTERLY MARGIN 684.62 FEET TO THE TRUE POINT OF BEGINNING OF THE TRACT HEREIN DESCRIBED; THENCE SOUTH 42 25'24" WEST 1215.02 FEET MORE OR LESS TO A POINT ON THE NORTHEASTERLY MARGIN OF SAID DUWAMISH WATERWAY, SAID POINT BEING ON A CURVE FROM WHENCE THE CENTER BEARS SOUTH 42 16'23" WEST 1969.12 FEET; THENCE SOUTH- EASTERLY ALONG SAID CURVE, A DISTANCE OF 397.99 FEET TO THE POINT OF INTERSECTION WITH A LINE LYING 825.00 FEET SOUTH, AS MEASURED AT RIGHT ANGLES, OF THE NORTH LINE OF THE JOHN BUCKLEY DONATION LAND CLAIM NO. 42; THENCE SOUTH 89 09'36" EAST ALONG SAID LINE, PARALLEL WITH THE NORTH LINE OF SAID DONATION LAND CLAIM NO. 42, A DISTANCE OF 1387.45 FEET j0 THE WESTERLY MARGIN OF EAST MARGINAL WAY; THENCE NORTH 22 32'15" WEST 160.30 FEET, FOLLOWING SAID WESTERLY MARGIN TO THE POINT OF CURVATURE OF A CURVE HAVING A RADIUS 2828.00 FEET; THENCE NORTHWESTERLY ALONG SAID CURVE, A DISTANCE OF 1250.10 FEET TO THE POINT OF TANGENCY OF SAID CURVE; THENCE NORTH 47 51'53" WEST 76.82 FEET TO THE POINT OF BEGININNING; THIS TRACT CONTAINING AN AREA OF 1,162,188.74 FEET, MORE OR LESS. VICINITY MAP DETAIL DUWAMISH WATERWAY BOUNDARY LEGAL SURVEY Exhibit C Q ZONE X 2 D N Q' ogQ 5 3(1(1X9 9 ,i SOUT MYRTLE Srrtt rr N \ �\ ZONE X • \;\ \\. CITY OF SEAT 530089'';' / ZONE X STREET STREET SOUTHERN PROJECT SITE Ci KING COUNTY I INTERNATIONAL to c AIRPORT ZONE AE Z N SOUTH 16t11 AVE S SOUTH \ DONOVAN STREET O v SOUTH w 32 HENDERSIN DIRECTOR STRL-ET co �\ORPORATE LIMITS 1- SOUTH CITY OF SEATTI.E 530089 CITY OF SEA "TLE KING COUN fY 96TH 961„StREEt sinr.rt ZONE X NATIONAL FLOOD INSUnCE PROGRAM FIRM FLOOD INSURANCE RATE MAP KING COUNTY, WASHINGTON AND INCORPORATED AREAS PANEL 640 OF 1125 (SEE MAP INDEX FOR PANELS NOT PRINTED) CONTAINS: COMMUNITY KING COUNTY. UNINCORPORATED AREAS SEATTLE. CITY OF TUKWILA. CITY OF NUMBER PANEL SUFFIX 530071 0640 530089 0640 530091 0640 F MAP NUMBER 53033C0640 F MAP REVISED: MAY 16,1995 Federal Emergency Management Agency • NATINAL FLOOD INSURANCE PROGRAM FIRM FLOOD INSURANCE RATE MAP KING COUNTY, WASHINGTON AND INCORPORATED AREAS PANEL 645 OF 1125 (SEE MAP INDEX FOR PANELS NOT PRINTED) CONTAINS: COMMUNITY KING COUNTY. • UNINCORPORATED AREAS SEATTLE. CITY OF TUKWILA. CITU OF NUMBER PANEL SUFFIX 530071 0645 530089 0645 530091 0645 F F F MAP NUMBER 53033C0645 F MAP REVISED: MAY 16,1995 Federal Emergency Management Agency ELEVATION REFERENCE MARKS REFERENCE ELEVATION MARK (FEET NGVD( RM126 RM140 DESCRIPTION OF LOCATION 14.93 A chiseled square on concrete footingof southwest corner of cyclone fence around Boeing Development Center. 16.97 A chiseled cross on top concrete footing of southeast leg of steel tower for power line; 500 feet west of State Route 99 and 1,000 feet north of Duwamish Drive -In Theatre. RM142 26.27 A chiseled cross on top of left downstream end of concrete pier of steel highway bridge. Exhibit- -D PGM: ATR043 JOB- MCI040 218500-0475-09 CUSTOMER NO. ACTIVE HALVORSEN M C ELWARD 10002 AURORA AVE N #5546 SEATTLE WA 829999 98133 COMMENTS 218500-0495-05 CUSTOMER NO. 218500-0505-03 CUSTOMER N0. ACTIVE MARDEN JOHN D 1206 SE SOUTHERN ST SEATTLWA`:• ACTIVE TEMPLETON SCOTT F 1202 S SOUTHERN ST SEATTLE: WA 609999 98108 673736 98108 COMMENTS COMMENTS 218500-0520-04 ACTIVE CUSTOMER NO. STONE TRAVIS K 8108 12TH AVE S SEATTLE ::WA 218500-0685-05 CUSTOMER NO. ACTIVE MOBERG CECIL J 1240 S ROSE ST • SEATTLE WA 98.108 COMMENTS 218500-0695-03 CUSTOMER NO. ACTIVE HMH L.L.0 221 SW 153RD STE 224 SEATTLE WA' 719999 98166 COMMENTS 218500-0705-01 CUSTOMER NO. ACTIVE SAND LELAND R 1232 S ROSE ST SEATTLE.::WA' 769999 :-98108 COMMENTS 218500-0895-01 CUSTOMER NO. ACTIVE SOUTH PARK MARINA LTD PARTN359999 8604 DALLAS AVE S SEATTLE WA :_.:. 98108 COMMENTS 322404-9002-09 CUSTOMER NO. ACTIVE LONG T M PO BOX C-81435 SEATTLE WA, . • 751066 98108 COMMENTS PGM: ATR043 JOB:• MCT040 322404-9003-08 CUSTOMER NO. ACTIVE CHILDERS GEORGE M 1040 S ELMGROVE SEATTLE- WA 322404-9004-07 CUSTOMER NO. ACTIVE LONG TYRNN M & ANNE L 17520 SE 60TH ST BELLEVUE. WA `• F0176 98108 530554 98006 COMMENTS COMMENTS 322404-9037-08 ACTIVE LONG ANNE L 17520 SE 60TH ST SEATTLEWA CUSTOMER NO. 741465 98006 COMMENTS PGM.-: ATRO43 JOB:° MC1040 E- A`:L' "`P: U •S •T '0 :.M E` 03/25/98 • PAGE;. 000160-0023-09 ACTIVE CUSTOMER NO. JORGENSEN FORGE CORP C/O DOUG JAMES 8531 E. MARGINAL WAY S SEATTLE`. WA 76A030 COMMENTS 000160-0044-04 CUSTOMER NO. DUWAMISH PROPERTIES PO 8OX:.,1'72:47' Parer LANO OR :• 774245 COMMENTS 000160-0049-09 CUSTOMER ACTIVE KING COUNTY • 0500 KC•.ADMIN 'BLDG . SEATTLE WA: COMMENTS 218500-0005-08 CUSTOMER'NO., ACTIVE THE BOEING COMPANY PO BOX 3703 M/S*. #1f 09 S aTrL wa• 650035 • 98124.. COMMENTS 218500-0860-02 +CiJSTY HER NO` ACTIVE RENN COMPANY INC N5205 '>3:161 'ELLIOT.! &VE 'SEATTLS 218560-0070-05 ACTIVE SOUTH PARK MARINE LTD PARTN359999 • 8604 GALLAS' AVE s SEATTLE:: WA 98006 • • Exhibit E •