HomeMy WebLinkAboutSEPA E97-0032 - BOEING - 11 BUILDINGS DEMOLITIONE97-0032
BOEING SO. YARD
DEMOLITION
8123 E. Marginal Way S
r
City of Tukwila
•
John W. Rants, Mayor
Department of Community Development Steve Lancaster, Director
November 5, 1997
Keith Fareta
The Boeing Co.
P.O. Box 3707, M/S 19-35
Seattle, Wa 98134
Re: Request for amending of SEPA determination regarding demolition of
buildings at 8123 E. Marginal Way S. (E97-0032)
Dear Mr. Fareta:
We received your request to amend the SEPA determination, as referenced
above, to include a 9,800 square foot partial demolition of the annex and
mezzanine area of the 2-62 building at 8123 E. Marginal Way S. It would appear
that, based on your request and our subsequent review, the scope of work is
consistent with those authorized under the SEPA determination. Accordingly,
the determination is amended to include this demolition as well.
The application for this demolition, File No. MI97-0190, will continue to be
processed. I will notify Kelcie Petersen, the city's Permit Coordinator, that the
SEPA determination has been amended for this project.
Sincerely,
Michael Jenkins
Assistant Planner
cc: Larry.Allen
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431-3670 • Fax (206) 431-3665
RECEIVED
CITY OF TUKWILA
NOV 0't1997
PERMIT CENTER
1
Michael Jenkins
Assistant Planner City of Tukwila
6300 Southcenter Boulevard, Suite 100
Tukwila, WA 98188
Keith Faretra
The Boeing Co.
P.O. Box 3707 M/S 19-35
Seattle, WA 98134
RE: Additional information required for revision to SEPA determination, 2-62
building.
Dear Michael,
As was discussed with Larry Allen, the permit we have requested is for the partial
demolition of the 2-62 building. In order to complete the permitting process, we have
provided additional information about the buildings historical and future uses
gi2�
The 2-62 building is located on the west side of East Margin ay approximately 1500
feet south of the 16th Ave. bridge. The street address is $24 ast Marginal Way South
(Tax ID 000160-0020). The building is located approximately 1000 feet to the east of the
Duwamish waterway on zero degree sloping property. The site is zoned for heavy
industrial manufacturing.
The 8900 square foot area to be demolished is an annex of the 2-62 building. The annex
was constructed approximately 35 years ago. The siding and canopy of the annex is
metal. Inside the annex is a mezzanine that runs from east to west along the northwest
corner of the area to be demolished. There are no utilities in the annex or mezzanine.
The mezzanine will be demolished.
After demolition of the annex and mezzanine the site will be paved. If you have any
questions or need additional information please call Larry Allen at 544-1644.
Sincerely,
Keith Faretra
•
City of Tukwila
John W. Rants, Mayor
Department of Community Development Steve Lancaster, Director
October 24, 1997
Larry Allen
The Boeing Co.
P.O. Box 3707
M/S 19-35
Seattle, WA 98134
Re: Revision to SEPA determination concerning demolition of 11 structures
(E97-0032)
Dear Larry:
You had requested that the SEPA determination, as referenced above, be
amended to allow for the partial demolition of another building within the area
approved under the subject determination. Based upon our discussions and my
review of the proposed area indicated in Attachment A, we can issue an
Addendum to the original determination, under WAC 197-11-706.
To complete this process, please submit a letter explaining the changes that
includes the building name, its location and size, the area of demolition and other
related factors that are specific to this additional action. There will be no fee for
the amendment to your original SEPA checklist. Once this has been receive, the
determination can be amended accordingly. As we also discussed, a new
separate permit for this demolition must be obtained.
If you have any questions, feel free to contact me at 431-3685.
Sincerely,
Michael Jenkins
Assistant Planner
c:\msoffice... sepa\9732amen.doc
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431-3670 • Fax (206) 431-3665
PRELIMINARY
,
: 1 rzaz AP
2:1AP
ONSPINOSIM
rellinairalraillinillial - f
LEGEND
reA
INSIDE PARKING
OUTSIDE PARKING
1ST SHIFT
STALL COUNT
1,036
PERCENTAGE
Of TOTAL
24%
DISPERSED INSIDE
PARKING AREA
3.063 70% (lgilE) OUTSIDE PARKING,LOT 1
QUANTITY
OUTSIDE PARKING 248 6% INSIDE PARKING.LOT #
2ND SHIFT QUANTITY
96 TEMPORARY
STALLS
TOTAL SITE 4,347
150 600 1200
300
900 1500
NORTH BOEING FIELD
MASTER PLAN - 1990
EXISTING PARKING
INVENTORY
'FIGURE B.4
•
CITY OF TUKWILA
DETERMINATION OF NONSIGNIFICANCE (DNS)
DESCRIPTION OF PROPOSAL:
DEMOLITION OF
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
11 STRUCTURES AT PLANT 2:
#2-69
#2-70
#2-71
#2-77
#2-78
#2-82
#2-95
#2-106
#2-108
#2-282
#2-89
PROPONENT: LARRY ALLEN
LOCATION OF PROPOSAL, INCLUDING STREET ADDRESS,
ADDRESS: 8123 EAST MARGINAL WY S
PARCEL NO: 000160-0020
SEC/TWN/RNG:
LEAD AGENCY: CITY OF TUKWILA
The City has determined that the proposal does
significant adverse impact on the environment.
IF ANY:
FILE NO: E97-0032
not have a probable
An environmental
impact statement (EIS) is not required under RCW 43.21c.030(2)(c).
This decision was made after review of a completed environmental
checklist and other information on file with the lead agency. This
information is available to the public on request.
***********, *****,***************************-******************************
This determination is final and signed this 2,2_ . day of 6-r1,gi2
19 9 7 .
Steve Lancaster, Responsible Official
City of Tukwila, (206) 431-3670
6300 Southcenter Boulevard
Tukwila, WA 98188
Copies of the procedures for SEPA appeals are available with the
Department of Community Development.
CITY OF TUKWILA
DEPARTMENT OF COMMUNITY DEVELOPMENT
6300 Southcenter Boulevard, Tukwila, WA 98188
Telephone: (206) 431-3670
AFFIDAVIT OF INSTALLATION AND POSTING
OF PUBLIC INFORti1ATI01 SIGN (S)
RECEIVED
CITY OF TUKWILA
SEP 3 0 1B97
PERMIT CENTER
State of Washington
County of King
City of Tukwila
I ! 4 A-E PQIT7,E (Print Name) understand that Section 18.104.110 of the Tukwila Municipal
Code requires me to post the property no later than fourteen (14) days following the issuance of the Notice
of Completeness.
I certify that ons r o' /fq7 the Public Notice Board(s) in accordance with Section 18.104.110
and other applicable guidelines were posted on the property located at 812.5 E. MARIcIIiAL WAS S .
so as to be clearly seen from each right -of -way providing primary vehicular access to the property .for
application file number E 417 — 0032
Affiant (Applicant Signature)
SUBSCRIBED AND SWORN to before me this,A5 day of , 19 q�
A_611"nt-a--
NOTARY PUB iIC in and for the State of Washington
4 , 4 L '
residing at
My commission expires on nail ' . 23:141'91
Pawn: M. s:
CITY OF TUKWILA% ... 6300: Southcenter,Boulevard,.Tukwila, WA 98188
DEPARTMENT OF COMMUNITY DEVELOPMENT Telephone (206) 431-3670
AFFIDAVIT OF INSTAI,LA'TION AND POSTING
OF PUBLIC INF RMA SI S)
State of Washington
County of King
City of Tukwila
I gdOolgi. ?W rile (Print Nerve) understand that Section 18.104.110 of the Tukwila Municipal
Code requires me to post the property no later than fourteen (14) days following the issuance of the Notice
of Completeness. •
I certify that on SEPT c " I6197 the Public Notice Board(s) in accordance with Section 18.104.110
and other applicable guidelines were posted on the property located at 8I 23 MR17-610AL- Mt S.
so as to be clearly seen from each right -of -way providing primary vehicular access to the property,for
application file number E 417 ' 0042 -
Affiant (Applicant Signature)
SUBSCRIBED AND SWORN to before me this415" —day ofe, 19 q
c4h/rx.a• �0 -
NOTARY PUB IC in and for the State of Washington
residing at
My commission expires on III
I,
AFFIDAVIT
O Notice of Public Hearing
O Notice of Public Meeting
Board of Adjustment Agenda
Packet
Appeals Agenda
[]Planning Commission Agenda
Packet
OBoard of
Packet
OF DISTRIBUTION
hereby declare that:
Determination of Non-
ignificance
DMitigated Determination of
Nonsignificance
Determination of Significance
and Scoping Notice
ONotice of Action
Official Notice
O Short Subdivision Agenda fl Other
Packet
Notice of Application for []Other
Shoreline Management Permit
LIShoreline Management Permit
was d to each of the following addresses on 1" -?-3- 1 -7
Name of Project 1O Signature
File Number EC1- 5O3Z
CITY OF TUKWILA
DETERMINATION OF NONSIGNIFICANCE (DNS)
DESCRIPTION OF PROPOSAL:
DEMOLITION OF 11 STRUCTURES AT PLANT
BUILDING #2-69
BUILDING #2-70
BUILDING #2-71
BUILDING #2-77
BUILDING #2-78"
BUILDING #2'-`8.2
BUILDING'42-95
BUILDING•1#2- 106
BUILDING'
BUILDING- ##2-.28' '
PROPONENT: —LARRY ALLEN,
LOCATION J0FPROOSAL , INCLUDING STREET ADDRE`SS ,
ADDRESS:. 8123 EAST `MAR13INAL'' WY
PARCELJ;;NO: , 0�001'6o-0020 `` =„='1i.1
SEC/TWN/RNG_ r •"'t ~', r
LEAD AGENC'•(. • CIT' 0F� TU.t>:W.ILA� F
�Q` fr ' ,✓ ILE NO: ' 9T:,00 2
The r. ,ty-i'has determined ,that the° opo.,al 'doesnot have `a pr obbabl,e
i gn ; t 1'c.a'nt adverse i mp�3ct .on` .the en•v i r. onm'enti' An env i ronmenta l
impact st'ateme.nt, (EIS) 1's not requi�r�'dttunrte'r:7R.CW~•R4'-1 212 0._30(2).(c)
Thi_, decision-.Wa'_, made atter review .ot.--a"`;_compltetei, environmental
check: ! i s;ti'ar-�d other information on t Ii 1 e ,}wi t'h,-th.e ,read agency This
intor.mat i On i s, ava i lCab l e to the pub l i`c ort 'r�eque_.t�1- is
`eft ,/t .} ' '.= i ,- , �s
A kkkk•A A•kkk kk.s.kk:.k**kkk'kk:+r*kkkk****kk*.*****k;+:kk�kkik.,kk*kkk*kk kk kk***kkkk•**• **.*k
.sr^
This determination 1: `final ,,and signed this 22 dau of Srs(6115..."862._
•
1997.
Steve Lancaster,
City of Tukwila,
6300 Southcenter
Tukwila., 'WA 931L8
Responsi61 '=0f.t,icial
(206) 43`1'-36711..:'
Boulevard
Copies of.the procedures for SEPA appeals are available with the
Department of Community Development.
r♦
•
AFFIDAVIT
•
OF DISTRIBUTION
I,\ \31).-DVCaL3AnTVArkkal hereby declare that:
ONotice of Public Hearing
Notice of Public Meeting
Li Board of Adjustment Agenda
Packet
OBoard of Appeals Agenda
Packet
Planning Commission Agenda
Packet
0 Short Subdivision Agenda
Packet
l]Notice of Application for
Shoreline Management Permit
0 Shoreline Management Permit
NDetermination of Non-
significance
0 Mitigated Determination of
Nonsignificance
Determination of Significance
and Scoping Notice
Notice of Action
Official Notice
Other
El Other
was mailed to each of the following addresses on
Name of Projecte 1AAA
File Number eC-1(1--
Signatur
CHECKLIST 4INVIRONMENTAL REVIEW/SHORELINE EIIT MAILINGS
( ) U.S. ARMY CORPS OF ENGINEERS
( ) FEDERAL HIGHWAY ADMINISTRATION
( ) DEPT OF FISH & WILDLIFE
FEDERAL AGENCIES
( ) U.S.. ENVIRONMENTAL PROTECTION AGENCY
( ) U.S. DEPT OF H.U.D.
WASHINGTON STATE AGENCIES
OFFICE OF ARCHAEOLOGY
TRANSPORTATION DEPARTMENT
DEPT NATURAL RESOURCES
OFFICE OF THE GOVERNOR
DEPT OF COMMUNITY DEVELOPMENT
DEPT OF FISHERIES & WILDLIFE
( ) DEPT OF SOCIAL & HEALTH SERV.
( ) DEPT OF ECOLOGY, SHORELANDS DIV
( DEPT OF ECOLOGY, SEPA DIVISION*-
( ) OFFICE OF ATTORNEY GENERAL
* SEND CHECKLIST WITH DETERMINATIONS
* SEND SITE MAPS WITH DECISION
KING COUNTY AGENCIES
K.C. PLANNING & COMMUNITY DEV.
BOUNDARY REVIEW BOARD
FIRE DISTRICT #11
FIRE DISTRICT #2
K.C. WATER POLLUTION CNTRL SEPA OFFCL
( ) S CENTRAL SCHOOL DISTRICT
( ) TUKWILA LIBRARIES
( ) RENTON LIBRARY
( ) KENT LIBRARY
( ) CITY OF SEATTLE LIBRARY
(
(
U S WEST
SEATTLE CITY LIGHT
) WASHINGTON NATURAL GAS
HIGHLINE WATER DISTRICT
SEATTLE WATER DEPARTMENT
TCI CABLEVISION
OLYMPIC PIPELINE
( ) K.C. DEPT OF PARKS
( ) HEALTH DEPT
( ) PORT OF SEATTLE
( ) BUILDING & LAND DEV DIV SEPA INFO CENTER
( ) K.C. TRANSIT DIVISION - SEPA OFFICIAL
SCHOOLS/LIBRARIES
UTILITIES
CITY
HIGHLINE SCHOOL DISTRICT
K C PUBLIC LIBRARY
SEATTLE MUNI REF LIBRARY
SEATTLE SCHOOL DISTRICT
RENTON SCHOOL DISTRICT
PUGET SOUND POWER & LIGHT
VAL-VUE SEWER DISTRICT
WATER DISTRICT #20
WATER DISTRICT #125
CITY OF RENTON PUBLIC WORKS
RAINIER VISTA '
SKYWAY
AGENCIES
KENT PLANNING DEPT
TUKWILA CITY DEPARTMENTS:
( ) PUBLIC WORKS ( ) FIRE
( ) POLICE ( ) FINANCE
( ) PLANNING ( ) BUILDING
( ) PARKS & REC. ( ) MAYOR
OTHER
RENTON PLANNING DEPT
CITY OF SEA -TAC
CITY OF BURIEN
TUKWILA PLANNING COMMISSION MEMBERS
TUKWILA CITY COUNCIL MEMBERS
CITY OF SEATTLE - SEPA INFO CENTER
SEATTLE OFFICE OF MGMNT PLANNING
LOCAL AGENCIES
( ) PUGET SOUND REGIONAL COUNCIL
( P.S. AIR POLLUTION CONTROL AGENCY
( ) SW K C CHAMBER OF COMMERCE
( ) MUCKLESHOOT INDIAN TRIBE
( ) DUWAMISH INDIAN TRIBE
( ) DAILY JOURNAL OF COMMERCE
( ) VALLEY DAILY NEWS
2/10/97 C:WP51DATA\CHKLIST
(k) METRO ENVIRONMENTAL PLANNING DIV.
OFFICE/INDUSTRIAL 5,000 GSF OR MORE
RESIDENTIAL 50 UNITS OR MORE
RETAIL 30,000 GSF OR MORE
MEDIA
(V--)
)HIGHLINE TIMES
Y� SEATTLE TIMES
CITY OF TUKWILA
DETERMINATION OF NONSIGNIFICANCE (DNS)
DESCRIPTION OF PROPOSAL: -
DEMOLITION OF 11 STRUCTURES AT PLANT 2:
BUILDING *2-69
BUILDING #2-70
BUILDING #2-71
BUILDING #2-77
BUILDING #2-78:
BUILDING #27'82'.
BUILDING S#2 ,95
BUILDING.:,.#2=106, :,
BUILDINJ; #2-1'08'
BUILDING #2:-282
BUILDING, #2-"8.9
PROPONENT: LARRY ALLEN;;.
,r
LOCATION OF, PROPOSAL,oINCLUDING STREET ADDRESS,
fi r
ADDRESS: -81;23 ;EAST MARGINAL ;;WY
PARCEL.�.;NO: 000160-0020,,
SEC/TWN/rRNG:
, r
LEAD AGENCY: CITY' OF TUKWLLA i. .•
�,
..„„,FILE NO: E97-0932
S
,IF ANY:
J
The City1rhas detetrmined that •'the. proposa3l .doe`sV::not have a,,:probablek;:
significant adverse .impact `onthe environment ,,An\ env i ronmenta 1
impact st°atementc..(EIS) is not required under. RCW-43.21c.030(2) (c) .':
This decision wasmade after review o -F a'' completed..environmental
checklist 'and oth,er information on file with the, read agency.. This
information. 's available to the publ iycon request":,'#•�
************ *;�** ,***:** ****,��,********4****k****************,************
This determinationlis�'`final and�'signed, this;, 22f day of _6" -M G�2
1997.
Steve Lancaster, Responsible'Off.i_c:ia
City of Tukwila, (206) 431-3670
6300 Southcenter.Boulevard
Tukwila, WA 98188
Copies of the procedures for SEPA appeals are available with the
Department of Community Development.
• }
Catty of Mice&
1
John W. Rants, Mayor
epartment of Community Development Steve Lancaster, Director
MEMORANDUM
To: Steve Lancaster
From: Michael Jenkins
Date: September 22, 1997
Re: E97-0032, SEPA review of application by The Boeing Co.
Project Description:
This SEPA review is for the demolition of 11 structures located at 8123 East Marginal Way S.
The structures are:
2-89 12,600 square feet
2-69 3,734
2-70 2,877
2-108 8,880
2-282 2,776
2-106 1,689
2-95 1,177
2-82 5,137
2-77/78 4,644
2-71 1,000
Agencies with jurisdiction:
None
Comments to SEPA checklist:
Pg. 5, section 2(a): A permit from PSAPCA will be required prior to issuing of demolitions
permits.
Pg. 17, section 16(a): A permit to cap water and sewer services will be required from Public
Works
Summary of Primary Impacts:
• Earth
Soils are primarily sand and silt with no significant slope. up to 30 cubic yards of fill may be
used on voids left by demolitions. 100% of the sites will be turned into impervious surfaces
6300 Southcenter Boulevar4 Suite #100 ° Tukwila, Washington 98188 ° (206) 431-3670 0 Fay (206) 431-3665
E97-0032
SEPA Checklist - The Boeing Co. - Demolitions
8123 East Marginal Way S.
September 22, 1997
• Air
Some dust may be generated by demolitions activities. A permit from the Puget Sound Air
Pollution Control Agency (PSAPCA) will be obtained and must be presented prior to
receiving demolition permit from City of Tukwila.
• Water
Buildings are located directly East of the Duwamish River, outside the Shoreline Zone. No
dredging or filling of surface waters will occur. No diversions of surface water will occur.
Project is not in a 100 year floodplain. No ground water will be withdrawn nor will waste
materials be discharged into the ground. Runoff will be accommodated in existing storm
water system.
• Plants
No vegetation will be disturbed
• Animals
No known species or migration routes nearby.
• Energy/Natural Resources
Other than machinery needed to complete demolitions, no energy will be used.
• Environmental Health
No known environmental health hazards will occur as a result of demolitions. Demolition
will be limited to daylight hours to limit affect of noise crated by demolitions.
• Land/Shoreline Use
Site is zoned Manufacturing Industrial Center High (MIC/H). Site is used as an airplane
manufacturing facility. Structures to be demolished are listed above in project description.
Site is not classified as environmentally sensitive.
• Housing
No housing is proposed nor will development reduce housing.
• Aesthetics
No impacts.
E97-0032 • 1
SEPA Checklist - The Boeing Co. - Demolitions
8123 East Marginal Way S.
September 22, 1997
• Light and Glare
No impacts.
• Recreation
No impacts.
• Historic/Cultural Preservation
No known places or landmarks.
• Transportation
East Marginal Way S. is closest public street, within 100 feet of project. No parking spaces
will be eliminated. No new streets will be required nor will trips be generated after project is
completed.
• Public Services
Proposed demolitions will not impact or require specific public services.
• Utilities
Buildings currently have storm water and sewer services. A Public Works permit to cap
utilities will be required.
Recommendation:
DNS
CITY OF TUKWILA
Departmenf Community Development
6300 Southcenter Boulevard, Tukwila, WA 9811%.
Telephone: (206) 431-3670
NTER
RECEIVED
CITY OF TUKWILA
SEP 1 9 1997
• _„1
SEPA APPLICATION CHECKLIST
..:-..1,,,i......• --,.e..._:=: ' ".:z•f�<.,. .. FOR:STAFFUSEONLY' :.:. .
a1.;.1e.'
,Planner< ° ,Fry. t ,1' `
; �
•v T'' :— - .
FhIeNumber:
ReceTpt,NumbeCp ,-.A . ••• � ,, i
Across reference files r c f,:
> AP i'S" fli
•
ENVIRONMENTAL CHECKLIST
Control No.
Epic All No.
Fee $ 325 Receipt No.
A. BACKGROUND
1. Name of proposed project, if applicable: Plant II -- South Yard Demolitions
2. Name of applicant: The Boeing Company; BCAG West Region FAMO
3. Address and phone number of applicant and contact person: Larry E. Alien
P.O. Box 3707 M/S 19-35, Seattle, WA 98124-2207; 544-1644, 949-2565
4. Date checklist prepared:. _ September 18, 1997
5. Agency requesting Checklist: City of Tukwila
6. Proposed timing or schedule (including phasing, if applicable):
Demolitions Will begin in the Fall of 1997
7. Do you have any plans for future additions, expansion, or further activity
related to or connected with this proposal? If yes, explain.
No
8. List any environmental information you know about that has been prepared, or will
be prepared, directly related to this proposal.
A RCRA Conscent Order for Corrective Action has heen Completed for Plant II.
The subject buildings are within the RCRA Consent order area_ Any identification,
corrective mesaures, and implementation actions needed will be pp d-4c—part.
of the RCRA process.
9.. Do you know whether applications are pending for governmental approvals of other
proposals directly affecting the property covered by your proposal? If yes,
explain. See #8 above
-2-
• •
10. List any government approvals or permits that will be needed for your proposal.
Demolition Permits
11. Give brief, complete description of your proposal, including the proposed uses
and the size of the project and site. There are several questions later in this
checklist that ask you to describe certain aspects of your proposal. You do not
need to repeat .those answers on this page. Section E requires a complete
description of the objectives and alternatives of your proposal and should not be
summarized here.
Demolish several small buildings in the South Yard area of .Plant TT Patrh
paving ana concrete where footings and foundations are r moved- The entire
area is imperviousnow and will continue to be impervious after the demolitions
are completed .
Refer t� attachment for buildin
.114- .14
. - •S .4-
12. Location of the proposal. Give sufficient information for a person to understand
the precise location of your proposed project, including a street address, if
any, and section, township, and range, if known. If a proposal would occur over
a range of area, provide the range or boundaries of the site(s). Provide a legal
description, site plan, vicinity map, and topographic map, if reasonably
available. While you should submit any plans required by the agency, you are not
required to duplicate maps or detailed plans submitted with any permit applica-
tions related to this checklist.
_Location: 8123 Fast Marginal Way South
- 1 .1 1 1 1 11
Lcgal.
13. Does the proposal lie within an area designated on the City's Comprehensive Land
Use Policy Plan Map as environmentally sensitive?
No ..
-3-
• •
Plant II — South Yards Demolitions
Environmental Checklist Attachment
Page 3, Question #11
Buildings to be demolished:
Building # 2-89 12,600 square feet
2-69 3,734
2-70 2,877
2-108 8,880
2-282 2,776
2-106 1,689
2-95 1,177
2-82 5,137
2-77/78 4,644
2-71 1,000
TO BE COMPLETED BY APPLICA Evaluation for
• Agency Use Only
B. ENVIRONMENTAL ELEMENTS
1. Earth
a. General description of the site (circle one): Flat,
rolling, hilly, steep slopes, mountainous, other
Flat
b. What is the steepest slope on the site (approximate
percent slope)? 0%
c. What general types of soils are found on the site
(for example, clay, sand, gravel, peat, muck)? If
you know the classification of agricultural soils,
specify them and note any prime farmland.
Sand and silt
d. Are there surface indications or history of unstable
soils in the immediate vicinity? If so, describe.
No
e. Describe the purpose, type, and approximate quanti-
ties of any filling or grading proposed. Indicate
source of fill.
Up to 30 yards of fill (rlPan) could be used to fill
voids created by demolitinn of footings and equit.
f. Could erosion occur as a result of clearing,
construction, or use? If so, generally describe.
No
g.
About what percent of the site will be covered with
impervious surfaces after project construction (for
example, asphalt or buildings)?
100%
-4-
Evaluation for
• 0 Agency Use Only
h. Proposed measures to reduce or control erosion, or
other impacts to the earth, if any:
Complete patching and paving work quickly_
2. Air
a. What types of emissions to the air would result from
the proposal (i.e., dust, automobile odors,
industrial wood smoke) during construction and when
the project is completed? If any, generally
describe and give approximate quantities if known.
A small amount of dust could be generated by demolition
activities.
b. Are there any off-site sources of emissions or odor
that may affect your proposal? If so, generally
describe.
No
c. Proposed measures to' reduce or control emissions or
other impacts to air, if any:
Compliance with PSAPCA guide fines, ie: wetting of.
construction debris.
3. Water
a. Surface:
1) Is there any surface water body on or in the
immediate vicinity of the site (including year-
round and seasonal streams, saltwater, lakes,
ponds, wetlands)? If yes, describe type and
provide names. If appropriate, state what
stream or river it flows into.
The buildings to be demolished are east of the Duwamish
waterway wnich flows into Piaget Sound.
-5-
Evaluation for
• Agency Use Only
2) Will the project require any work over, in, or
adjacent to (within 200 feet) the described
waters? If yes, please describe and attach
available plans.
No, The'buildings proposed for demnlitinn are not
within 200 feet of the shoreline.
3) Estimate the amount of fill and dredge material
that would be placed in or removed from surface
water or wetlands and indicate the area of the
site that would be affected. Indicate the
source of fill material.
None
4) Will the proposal require surface water
withdrawals or diversions? Give general
description, purpose, and approximate quan-
tities, if known.
No
5) Does the proposal lie within a 100 -year
floodplain? If so, note location on the site
plan. No
6) Does the proposal involve any discharges of
waste materials to surface waters? If so,
describe the type of waste and anticipated
volume of discharge. No
-6-
Evaluation for.
. Agency Use Only
b. Ground:
1) Will ground water be withdrawn, or will water be
discharged to ground water? Give general
description, purpose, and approximate quan-
tities, if known. No
2) Describe waste materials that will be discharged
into the ground from septic tanks or other sour-
ces, if any (for example: Domestic sewage;
industrial, containing the following
chemicals...; agricultural; etc.) Describe the
general size of the system, the number of such
systems, the number of houses to be served (if
applicable), or .the number of animals or humans
the system(s) are expected to serve.
None
c. Water Runoff (including storm water):
1) Describe the source of runoff (including storm
water) and method of collection and disposal, if
any (include quantities, if known). Where will
this water flow? Will this water flow into
other waters? If so, describe.
Runoff will be handled by existing storm water
system.
-7-
•
411 Evaluation for
Agency Use Only
2) Could waste materials enter ground or surface
waters? If so, generally describe.
No
d. Proposed measures to reduce or control surface,
ground, and runoff water impacts, if any:
None
4. Plants
a. Check or circle types of vegetation found
site: None
deciduous tree: alder, maple, aspen, other
evergreen tree: fir, cedar, pine, other
shrubs
grass
pasture
crop or grain
wet soil plants: cattail,
skunk cabbage, other
water plants: water lily,
other types of vegetation
on the
buttercup, bullrush,
eelgrass, milfoil, other
b. 'What kind and amount of vegetation
or altered? None
will be removed
c. List threatened or endangered species known to be on
or near the site. None
-8-
• • Evaluation for
Agency Use Only
d. Proposed landscaping, use of native plants, or other
measures to preserve or enhance vegetation on the
site, if any: None
5. Animals
a. Circle any birds and animals which have been
observed on or near the site or are known to be on
or near the site: None
birds: hawk, heron, eagle, songbirds, other:
mammals: deer, bear, elk, beaver, other:
fish: bass, salmon, trout, herring, shellfish,
other:
b. List any threatened or endangered species known to
be on or near the site;
None
c. Is the site part of a migration route? If so,
explain. Unknown
d. Proposed measures to preserve or enhance wildlife,,
if any: None
-9-
•
Evaluation for
• Agency Use Only
6. Energy and Natural Resources
a. What kinds of energy (electric, natural gas, oil,
wood stove, solor) will be used to meet the
completed project's energy needs? Describe whether
it will be used for heating, manufacturing, etc.
Nohe
b. Would your project affect the potential use of solar
energy by adjacent properties? If so, generally
describe. No
c. What kinds of energy conservation features are
included in the plans of this proposal? List other
proposed measures to reduce or control energy
impacts, if any: None
7. Environmental Health
a. Are there any environmental health hazards,
including exposure to toxic chemicals, risk of fire
and explosion, spill, or hazardous waste, that could
occur as a result of this proposal? If so,
describe. No
1) Describe special emergency services that might
be required. None
2) Proposed measures to reduce or control environ-
mental health hazards, if any: None
-10-
Evaluation for
• • Agency Use Only
b. Noise
1) What types of noise exist in the area which may
affect your project (for example: traffic,
equipment, operation, other)? Nnnp
2) What types and levels of noise would be created
by or associated with the project on a short-
term or a long-term basis (for example: traf-
fic, construction, operation, other)? Indicate
what hours noise would come from the site.
Daytime noise during demolition.
3) Proposed measures to reduce or control noise
impacts, if any: None
8. Land and Shoreline Use
a. What is the current use of the site and adjacent
properties? Industrial
b. Has the site been used for agriculture? If so,
describe. No
c. Describe any structures on the site.
The site is fully developed airplane manufacturing
facility.
-11-
Evaluation for
• • Agency Use Only
d. Will any structures be demolished? If so, what?
Yes, refer to list of structures in question,#, attachment.
tll
e. What is the current zoning classification of the
site? Heavy Manufacturing
f. What is the current comprehensive plan designation
of the site? Heavy Manufacturing
g. If applicable, what is the current shoreline master
program designation of the site? N/A
h. Has any part of the site been classified as an
"environmentally sensitive" area? If so, specify.
No
i. Approximately how many people would reside or work
in the completed project? None
j. Approximately how many people would the completed
project displace? None
k. Proposed measures to avoid or reduce displacement
impacts, if any: None
1. Proposed measures to ensure the proposal is com-
patible with existing and projected land uses and
plans, if any: None
-12-
Evaluation for
• • Agency Use Only
9. Housing
a. Approximately how many units would be provided, if
any? Indicate whether high, middle, or low-income
housing? N/A
b. Approximately how many units, if any, would be eli-
minated? Indicate whether high, middle, or low-
income housing. N/A
c. Proposed measures to reduce or control housing
impacts, if any: None
10. Aesthetics
a. What is the tallest height of any proposed
structure(s), not including antennas; what is the
principal exterior building material(s) proposed?
N/A
b. What views in the immediate vicinity would be
altered or obstructed? None
c. Proposed measures to reduce or control aesthetic
impacts, if any: None
-13-
Evaluation for
• • Agency Use Only
11. Light and Glare
a. What type of light or glare will the proposal
produce? What time of day would it mainly occur?
None
b. Could light or glare from the finished project be a
safety hazard or interfere with views?
No
c. What existing off-site sources of light or glare may
affect your proposal?
None
d. Proposed measures to reduce or control light and
glare impacts, if any:
None
12. Recreation
a. What designed and informal recreational oppor-
tunities are in the immediate vicinity?
None
b. Would the proposed project displace any existing
recreational uses? If so, describe.
No
c. Proposed measures to reduce or control impacts on
recreation, including recreation opportunities to be
provided by the project or applicant, if any:
None
-14-
•
13. Historic and Cultural Preservation
•Evaluation for
Agency Use Only
a. Are there any places or objects listed on, or pro-
posed for, national, state, or local preservation
registers known to be on or next to the site? If
so, generally describe. _
No
b. Generally describe any landmarks or evidence of
historic, archaeological, scientific, or cultural
importance known to be on or next to the site.
N/A
c. Proposed measures to reduce or control impacts, if
any: None
14. Transportation
a. Identify public streets and highways serving the
site, and describe proposed accss to the existing
street system. Show on site plans, if any.
East Marginal Way South
b. Is the site currently served by public transit? If
not, what is the approximate distance to the nearest
transit stop? Yes, approximately 1,000 feet away
on East Marg -55T -Way South.
c. How many parking spaces would the completed project
have? How many would the project eliminate?
None
-15-
Evaluation for
• • Agency Use Only
d. Will the proposal require any new roads or streets,
or improvements to existing roads or streets, not
including driveways? If so, generally describe
(indicate whether public or private).
No
e. Will the project use (or occur in the immediate
vicinity of) water, rail, or air transportation? If
so, generally describe.
No
f. How many vehicular trips per day would be generated
by the completed project? If known, indicate when
peak volumes would occur.
g. Proposed measures to reduce or control transpor-
tation impacts, if any:
None
15. Public Services
a. Would the project result in an increased need for
public services (for example: fire protection,
police protection, health care, schools, other)? If
so, generally describe.
No
b. Proposed measures to reduce or control direct
impacts on public services, if any.
None
-16-
Evaluation for
• • Agency Use Only
16. Utilities
a. Circle utilities currently available at the site:
ricit efuse service
e ep on sanitary sewer septic sys em, other.
b. Describe the utilities that are proposed for the
project, the utility providing the service, and the
general construction activities on the site or in
the immediate vicinity which might be needed.
None
C. Signature
The above answers are true and complete to the best of
my knowledge. I understand that the lead agency is
relying on them to make its decision.
Signature:
Date Submitted:
9/j9
PLEASE CONTINUE TO THE NEXT PAGE.
-17-
• •
CO
c0
N
0
co
801-Z
N
8 - sF
L 1
0
5P
FoJtJ Ort _:.i �L
0
\0
0
0
0
Z-78
Z-71
z -gZ
2-615•
Z_-
--7
Z -
0
0
l z, LQOo
4 5, 324
0
•
(ii/ //// 'A
�r/fi.A
I
I
Tr'�/�
±
L
0
•
•
•
0
CON
3 734 bf N taY sx'o,.:x 'TIP":~*
'
-• we -
0
7
c:13
coN
RECEIVED
CITY OF TUKWILA
SEP 1 9 1997
PERMIT CENTER
0
0
1