Loading...
HomeMy WebLinkAboutSEPA E97-0032 - BOEING - 11 BUILDINGS DEMOLITIONE97-0032 BOEING SO. YARD DEMOLITION 8123 E. Marginal Way S r City of Tukwila • John W. Rants, Mayor Department of Community Development Steve Lancaster, Director November 5, 1997 Keith Fareta The Boeing Co. P.O. Box 3707, M/S 19-35 Seattle, Wa 98134 Re: Request for amending of SEPA determination regarding demolition of buildings at 8123 E. Marginal Way S. (E97-0032) Dear Mr. Fareta: We received your request to amend the SEPA determination, as referenced above, to include a 9,800 square foot partial demolition of the annex and mezzanine area of the 2-62 building at 8123 E. Marginal Way S. It would appear that, based on your request and our subsequent review, the scope of work is consistent with those authorized under the SEPA determination. Accordingly, the determination is amended to include this demolition as well. The application for this demolition, File No. MI97-0190, will continue to be processed. I will notify Kelcie Petersen, the city's Permit Coordinator, that the SEPA determination has been amended for this project. Sincerely, Michael Jenkins Assistant Planner cc: Larry.Allen 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431-3670 • Fax (206) 431-3665 RECEIVED CITY OF TUKWILA NOV 0't1997 PERMIT CENTER 1 Michael Jenkins Assistant Planner City of Tukwila 6300 Southcenter Boulevard, Suite 100 Tukwila, WA 98188 Keith Faretra The Boeing Co. P.O. Box 3707 M/S 19-35 Seattle, WA 98134 RE: Additional information required for revision to SEPA determination, 2-62 building. Dear Michael, As was discussed with Larry Allen, the permit we have requested is for the partial demolition of the 2-62 building. In order to complete the permitting process, we have provided additional information about the buildings historical and future uses gi2� The 2-62 building is located on the west side of East Margin ay approximately 1500 feet south of the 16th Ave. bridge. The street address is $24 ast Marginal Way South (Tax ID 000160-0020). The building is located approximately 1000 feet to the east of the Duwamish waterway on zero degree sloping property. The site is zoned for heavy industrial manufacturing. The 8900 square foot area to be demolished is an annex of the 2-62 building. The annex was constructed approximately 35 years ago. The siding and canopy of the annex is metal. Inside the annex is a mezzanine that runs from east to west along the northwest corner of the area to be demolished. There are no utilities in the annex or mezzanine. The mezzanine will be demolished. After demolition of the annex and mezzanine the site will be paved. If you have any questions or need additional information please call Larry Allen at 544-1644. Sincerely, Keith Faretra • City of Tukwila John W. Rants, Mayor Department of Community Development Steve Lancaster, Director October 24, 1997 Larry Allen The Boeing Co. P.O. Box 3707 M/S 19-35 Seattle, WA 98134 Re: Revision to SEPA determination concerning demolition of 11 structures (E97-0032) Dear Larry: You had requested that the SEPA determination, as referenced above, be amended to allow for the partial demolition of another building within the area approved under the subject determination. Based upon our discussions and my review of the proposed area indicated in Attachment A, we can issue an Addendum to the original determination, under WAC 197-11-706. To complete this process, please submit a letter explaining the changes that includes the building name, its location and size, the area of demolition and other related factors that are specific to this additional action. There will be no fee for the amendment to your original SEPA checklist. Once this has been receive, the determination can be amended accordingly. As we also discussed, a new separate permit for this demolition must be obtained. If you have any questions, feel free to contact me at 431-3685. Sincerely, Michael Jenkins Assistant Planner c:\msoffice... sepa\9732amen.doc 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431-3670 • Fax (206) 431-3665 PRELIMINARY , : 1 rzaz AP 2:1AP ONSPINOSIM rellinairalraillinillial - f LEGEND reA INSIDE PARKING OUTSIDE PARKING 1ST SHIFT STALL COUNT 1,036 PERCENTAGE Of TOTAL 24% DISPERSED INSIDE PARKING AREA 3.063 70% (lgilE) OUTSIDE PARKING,LOT 1 QUANTITY OUTSIDE PARKING 248 6% INSIDE PARKING.LOT # 2ND SHIFT QUANTITY 96 TEMPORARY STALLS TOTAL SITE 4,347 150 600 1200 300 900 1500 NORTH BOEING FIELD MASTER PLAN - 1990 EXISTING PARKING INVENTORY 'FIGURE B.4 • CITY OF TUKWILA DETERMINATION OF NONSIGNIFICANCE (DNS) DESCRIPTION OF PROPOSAL: DEMOLITION OF BUILDING BUILDING BUILDING BUILDING BUILDING BUILDING BUILDING BUILDING BUILDING BUILDING BUILDING 11 STRUCTURES AT PLANT 2: #2-69 #2-70 #2-71 #2-77 #2-78 #2-82 #2-95 #2-106 #2-108 #2-282 #2-89 PROPONENT: LARRY ALLEN LOCATION OF PROPOSAL, INCLUDING STREET ADDRESS, ADDRESS: 8123 EAST MARGINAL WY S PARCEL NO: 000160-0020 SEC/TWN/RNG: LEAD AGENCY: CITY OF TUKWILA The City has determined that the proposal does significant adverse impact on the environment. IF ANY: FILE NO: E97-0032 not have a probable An environmental impact statement (EIS) is not required under RCW 43.21c.030(2)(c). This decision was made after review of a completed environmental checklist and other information on file with the lead agency. This information is available to the public on request. ***********, *****,***************************-****************************** This determination is final and signed this 2,2_ . day of 6-r1,gi2 19 9 7 . Steve Lancaster, Responsible Official City of Tukwila, (206) 431-3670 6300 Southcenter Boulevard Tukwila, WA 98188 Copies of the procedures for SEPA appeals are available with the Department of Community Development. CITY OF TUKWILA DEPARTMENT OF COMMUNITY DEVELOPMENT 6300 Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431-3670 AFFIDAVIT OF INSTALLATION AND POSTING OF PUBLIC INFORti1ATI01 SIGN (S) RECEIVED CITY OF TUKWILA SEP 3 0 1B97 PERMIT CENTER State of Washington County of King City of Tukwila I ! 4 A-E PQIT7,E (Print Name) understand that Section 18.104.110 of the Tukwila Municipal Code requires me to post the property no later than fourteen (14) days following the issuance of the Notice of Completeness. I certify that ons r o' /fq7 the Public Notice Board(s) in accordance with Section 18.104.110 and other applicable guidelines were posted on the property located at 812.5 E. MARIcIIiAL WAS S . so as to be clearly seen from each right -of -way providing primary vehicular access to the property .for application file number E 417 — 0032 Affiant (Applicant Signature) SUBSCRIBED AND SWORN to before me this,A5 day of , 19 q� A_611"nt-a-- NOTARY PUB iIC in and for the State of Washington 4 , 4 L ' residing at My commission expires on nail ' . 23:141'91 Pawn: M. s: CITY OF TUKWILA% ... 6300: Southcenter,Boulevard,.Tukwila, WA 98188 DEPARTMENT OF COMMUNITY DEVELOPMENT Telephone (206) 431-3670 AFFIDAVIT OF INSTAI,LA'TION AND POSTING OF PUBLIC INF RMA SI S) State of Washington County of King City of Tukwila I gdOolgi. ?W rile (Print Nerve) understand that Section 18.104.110 of the Tukwila Municipal Code requires me to post the property no later than fourteen (14) days following the issuance of the Notice of Completeness. • I certify that on SEPT c " I6197 the Public Notice Board(s) in accordance with Section 18.104.110 and other applicable guidelines were posted on the property located at 8I 23 MR17-610AL- Mt S. so as to be clearly seen from each right -of -way providing primary vehicular access to the property,for application file number E 417 ' 0042 - Affiant (Applicant Signature) SUBSCRIBED AND SWORN to before me this415" —day ofe, 19 q c4h/rx.a• �0 - NOTARY PUB IC in and for the State of Washington residing at My commission expires on III I, AFFIDAVIT O Notice of Public Hearing O Notice of Public Meeting Board of Adjustment Agenda Packet Appeals Agenda []Planning Commission Agenda Packet OBoard of Packet OF DISTRIBUTION hereby declare that: Determination of Non- ignificance DMitigated Determination of Nonsignificance Determination of Significance and Scoping Notice ONotice of Action Official Notice O Short Subdivision Agenda fl Other Packet Notice of Application for []Other Shoreline Management Permit LIShoreline Management Permit was d to each of the following addresses on 1" -?-3- 1 -7 Name of Project 1O Signature File Number EC1- 5O3Z CITY OF TUKWILA DETERMINATION OF NONSIGNIFICANCE (DNS) DESCRIPTION OF PROPOSAL: DEMOLITION OF 11 STRUCTURES AT PLANT BUILDING #2-69 BUILDING #2-70 BUILDING #2-71 BUILDING #2-77 BUILDING #2-78" BUILDING #2'-`8.2 BUILDING'42-95 BUILDING•1#2- 106 BUILDING' BUILDING- ##2-.28' ' PROPONENT: —LARRY ALLEN, LOCATION J0FPROOSAL , INCLUDING STREET ADDRE`SS , ADDRESS:. 8123 EAST `MAR13INAL'' WY PARCELJ;;NO: , 0�001'6o-0020 `` =„='1i.1 SEC/TWN/RNG_ r •"'t ~', r LEAD AGENC'•(. • CIT' 0F� TU.t>:W.ILA� F �Q` fr ' ,✓ ILE NO: ' 9T:,00 2 The r. ,ty-i'has determined ,that the° opo.,al 'doesnot have `a pr obbabl,e i gn ; t 1'c.a'nt adverse i mp�3ct .on` .the en•v i r. onm'enti' An env i ronmenta l impact st'ateme.nt, (EIS) 1's not requi�r�'dttunrte'r:7R.CW~•R4'-1 212 0._30(2).(c) Thi_, decision-.Wa'_, made atter review .ot.--a"`;_compltetei, environmental check: ! i s;ti'ar-�d other information on t Ii 1 e ,}wi t'h,-th.e ,read agency This intor.mat i On i s, ava i lCab l e to the pub l i`c ort 'r�eque_.t�1- is `eft ,/t .} ' '.= i ,- , �s A kkkk•A A•kkk kk.s.kk:.k**kkk'kk:+r*kkkk****kk*.*****k;+:kk�kkik.,kk*kkk*kk kk kk***kkkk•**• **.*k .sr^ This determination 1: `final ,,and signed this 22 dau of Srs(6115..."862._ • 1997. Steve Lancaster, City of Tukwila, 6300 Southcenter Tukwila., 'WA 931L8 Responsi61 '=0f.t,icial (206) 43`1'-36711..:' Boulevard Copies of.the procedures for SEPA appeals are available with the Department of Community Development. r♦ • AFFIDAVIT • OF DISTRIBUTION I,\ \31).-DVCaL3AnTVArkkal hereby declare that: ONotice of Public Hearing Notice of Public Meeting Li Board of Adjustment Agenda Packet OBoard of Appeals Agenda Packet Planning Commission Agenda Packet 0 Short Subdivision Agenda Packet l]Notice of Application for Shoreline Management Permit 0 Shoreline Management Permit NDetermination of Non- significance 0 Mitigated Determination of Nonsignificance Determination of Significance and Scoping Notice Notice of Action Official Notice Other El Other was mailed to each of the following addresses on Name of Projecte 1AAA File Number eC-1(1-- Signatur CHECKLIST 4INVIRONMENTAL REVIEW/SHORELINE EIIT MAILINGS ( ) U.S. ARMY CORPS OF ENGINEERS ( ) FEDERAL HIGHWAY ADMINISTRATION ( ) DEPT OF FISH & WILDLIFE FEDERAL AGENCIES ( ) U.S.. ENVIRONMENTAL PROTECTION AGENCY ( ) U.S. DEPT OF H.U.D. WASHINGTON STATE AGENCIES OFFICE OF ARCHAEOLOGY TRANSPORTATION DEPARTMENT DEPT NATURAL RESOURCES OFFICE OF THE GOVERNOR DEPT OF COMMUNITY DEVELOPMENT DEPT OF FISHERIES & WILDLIFE ( ) DEPT OF SOCIAL & HEALTH SERV. ( ) DEPT OF ECOLOGY, SHORELANDS DIV ( DEPT OF ECOLOGY, SEPA DIVISION*- ( ) OFFICE OF ATTORNEY GENERAL * SEND CHECKLIST WITH DETERMINATIONS * SEND SITE MAPS WITH DECISION KING COUNTY AGENCIES K.C. PLANNING & COMMUNITY DEV. BOUNDARY REVIEW BOARD FIRE DISTRICT #11 FIRE DISTRICT #2 K.C. WATER POLLUTION CNTRL SEPA OFFCL ( ) S CENTRAL SCHOOL DISTRICT ( ) TUKWILA LIBRARIES ( ) RENTON LIBRARY ( ) KENT LIBRARY ( ) CITY OF SEATTLE LIBRARY ( ( U S WEST SEATTLE CITY LIGHT ) WASHINGTON NATURAL GAS HIGHLINE WATER DISTRICT SEATTLE WATER DEPARTMENT TCI CABLEVISION OLYMPIC PIPELINE ( ) K.C. DEPT OF PARKS ( ) HEALTH DEPT ( ) PORT OF SEATTLE ( ) BUILDING & LAND DEV DIV SEPA INFO CENTER ( ) K.C. TRANSIT DIVISION - SEPA OFFICIAL SCHOOLS/LIBRARIES UTILITIES CITY HIGHLINE SCHOOL DISTRICT K C PUBLIC LIBRARY SEATTLE MUNI REF LIBRARY SEATTLE SCHOOL DISTRICT RENTON SCHOOL DISTRICT PUGET SOUND POWER & LIGHT VAL-VUE SEWER DISTRICT WATER DISTRICT #20 WATER DISTRICT #125 CITY OF RENTON PUBLIC WORKS RAINIER VISTA ' SKYWAY AGENCIES KENT PLANNING DEPT TUKWILA CITY DEPARTMENTS: ( ) PUBLIC WORKS ( ) FIRE ( ) POLICE ( ) FINANCE ( ) PLANNING ( ) BUILDING ( ) PARKS & REC. ( ) MAYOR OTHER RENTON PLANNING DEPT CITY OF SEA -TAC CITY OF BURIEN TUKWILA PLANNING COMMISSION MEMBERS TUKWILA CITY COUNCIL MEMBERS CITY OF SEATTLE - SEPA INFO CENTER SEATTLE OFFICE OF MGMNT PLANNING LOCAL AGENCIES ( ) PUGET SOUND REGIONAL COUNCIL ( P.S. AIR POLLUTION CONTROL AGENCY ( ) SW K C CHAMBER OF COMMERCE ( ) MUCKLESHOOT INDIAN TRIBE ( ) DUWAMISH INDIAN TRIBE ( ) DAILY JOURNAL OF COMMERCE ( ) VALLEY DAILY NEWS 2/10/97 C:WP51DATA\CHKLIST (k) METRO ENVIRONMENTAL PLANNING DIV. OFFICE/INDUSTRIAL 5,000 GSF OR MORE RESIDENTIAL 50 UNITS OR MORE RETAIL 30,000 GSF OR MORE MEDIA (V--) )HIGHLINE TIMES Y� SEATTLE TIMES CITY OF TUKWILA DETERMINATION OF NONSIGNIFICANCE (DNS) DESCRIPTION OF PROPOSAL: - DEMOLITION OF 11 STRUCTURES AT PLANT 2: BUILDING *2-69 BUILDING #2-70 BUILDING #2-71 BUILDING #2-77 BUILDING #2-78: BUILDING #27'82'. BUILDING S#2 ,95 BUILDING.:,.#2=106, :, BUILDINJ; #2-1'08' BUILDING #2:-282 BUILDING, #2-"8.9 PROPONENT: LARRY ALLEN;;. ,r LOCATION OF, PROPOSAL,oINCLUDING STREET ADDRESS, fi r ADDRESS: -81;23 ;EAST MARGINAL ;;WY PARCEL.�.;NO: 000160-0020,, SEC/TWN/rRNG: , r LEAD AGENCY: CITY' OF TUKWLLA i. .• �, ..„„,FILE NO: E97-0932 S ,IF ANY: J The City1rhas detetrmined that •'the. proposa3l .doe`sV::not have a,,:probablek;: significant adverse .impact `onthe environment ,,An\ env i ronmenta 1 impact st°atementc..(EIS) is not required under. RCW-43.21c.030(2) (c) .': This decision wasmade after review o -F a'' completed..environmental checklist 'and oth,er information on file with the, read agency.. This information. 's available to the publ iycon request":,'#•� ************ *;�** ,***:** ****,��,********4****k****************,************ This determinationlis�'`final and�'signed, this;, 22f day of _6" -M G�2 1997. Steve Lancaster, Responsible'Off.i_c:ia City of Tukwila, (206) 431-3670 6300 Southcenter.Boulevard Tukwila, WA 98188 Copies of the procedures for SEPA appeals are available with the Department of Community Development. • } Catty of Mice& 1 John W. Rants, Mayor epartment of Community Development Steve Lancaster, Director MEMORANDUM To: Steve Lancaster From: Michael Jenkins Date: September 22, 1997 Re: E97-0032, SEPA review of application by The Boeing Co. Project Description: This SEPA review is for the demolition of 11 structures located at 8123 East Marginal Way S. The structures are: 2-89 12,600 square feet 2-69 3,734 2-70 2,877 2-108 8,880 2-282 2,776 2-106 1,689 2-95 1,177 2-82 5,137 2-77/78 4,644 2-71 1,000 Agencies with jurisdiction: None Comments to SEPA checklist: Pg. 5, section 2(a): A permit from PSAPCA will be required prior to issuing of demolitions permits. Pg. 17, section 16(a): A permit to cap water and sewer services will be required from Public Works Summary of Primary Impacts: • Earth Soils are primarily sand and silt with no significant slope. up to 30 cubic yards of fill may be used on voids left by demolitions. 100% of the sites will be turned into impervious surfaces 6300 Southcenter Boulevar4 Suite #100 ° Tukwila, Washington 98188 ° (206) 431-3670 0 Fay (206) 431-3665 E97-0032 SEPA Checklist - The Boeing Co. - Demolitions 8123 East Marginal Way S. September 22, 1997 • Air Some dust may be generated by demolitions activities. A permit from the Puget Sound Air Pollution Control Agency (PSAPCA) will be obtained and must be presented prior to receiving demolition permit from City of Tukwila. • Water Buildings are located directly East of the Duwamish River, outside the Shoreline Zone. No dredging or filling of surface waters will occur. No diversions of surface water will occur. Project is not in a 100 year floodplain. No ground water will be withdrawn nor will waste materials be discharged into the ground. Runoff will be accommodated in existing storm water system. • Plants No vegetation will be disturbed • Animals No known species or migration routes nearby. • Energy/Natural Resources Other than machinery needed to complete demolitions, no energy will be used. • Environmental Health No known environmental health hazards will occur as a result of demolitions. Demolition will be limited to daylight hours to limit affect of noise crated by demolitions. • Land/Shoreline Use Site is zoned Manufacturing Industrial Center High (MIC/H). Site is used as an airplane manufacturing facility. Structures to be demolished are listed above in project description. Site is not classified as environmentally sensitive. • Housing No housing is proposed nor will development reduce housing. • Aesthetics No impacts. E97-0032 • 1 SEPA Checklist - The Boeing Co. - Demolitions 8123 East Marginal Way S. September 22, 1997 • Light and Glare No impacts. • Recreation No impacts. • Historic/Cultural Preservation No known places or landmarks. • Transportation East Marginal Way S. is closest public street, within 100 feet of project. No parking spaces will be eliminated. No new streets will be required nor will trips be generated after project is completed. • Public Services Proposed demolitions will not impact or require specific public services. • Utilities Buildings currently have storm water and sewer services. A Public Works permit to cap utilities will be required. Recommendation: DNS CITY OF TUKWILA Departmenf Community Development 6300 Southcenter Boulevard, Tukwila, WA 9811%. Telephone: (206) 431-3670 NTER RECEIVED CITY OF TUKWILA SEP 1 9 1997 • _„1 SEPA APPLICATION CHECKLIST ..:-..1,,,i......• --,.e..._:=: ' ".:z•f�<.,. .. FOR:STAFFUSEONLY' :.:. . a1.;.1e.' ,Planner< ° ,Fry. t ,1' ` ; � •v T'' :— - . FhIeNumber: ReceTpt,NumbeCp ,-.A . ••• � ,, i Across reference files r c f,: > AP i'S" fli • ENVIRONMENTAL CHECKLIST Control No. Epic All No. Fee $ 325 Receipt No. A. BACKGROUND 1. Name of proposed project, if applicable: Plant II -- South Yard Demolitions 2. Name of applicant: The Boeing Company; BCAG West Region FAMO 3. Address and phone number of applicant and contact person: Larry E. Alien P.O. Box 3707 M/S 19-35, Seattle, WA 98124-2207; 544-1644, 949-2565 4. Date checklist prepared:. _ September 18, 1997 5. Agency requesting Checklist: City of Tukwila 6. Proposed timing or schedule (including phasing, if applicable): Demolitions Will begin in the Fall of 1997 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. No 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. A RCRA Conscent Order for Corrective Action has heen Completed for Plant II. The subject buildings are within the RCRA Consent order area_ Any identification, corrective mesaures, and implementation actions needed will be pp d-4c—part. of the RCRA process. 9.. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. See #8 above -2- • • 10. List any government approvals or permits that will be needed for your proposal. Demolition Permits 11. Give brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat .those answers on this page. Section E requires a complete description of the objectives and alternatives of your proposal and should not be summarized here. Demolish several small buildings in the South Yard area of .Plant TT Patrh paving ana concrete where footings and foundations are r moved- The entire area is imperviousnow and will continue to be impervious after the demolitions are completed . Refer t� attachment for buildin .114- .14 . - •S .4- 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applica- tions related to this checklist. _Location: 8123 Fast Marginal Way South - 1 .1 1 1 1 11 Lcgal. 13. Does the proposal lie within an area designated on the City's Comprehensive Land Use Policy Plan Map as environmentally sensitive? No .. -3- • • Plant II — South Yards Demolitions Environmental Checklist Attachment Page 3, Question #11 Buildings to be demolished: Building # 2-89 12,600 square feet 2-69 3,734 2-70 2,877 2-108 8,880 2-282 2,776 2-106 1,689 2-95 1,177 2-82 5,137 2-77/78 4,644 2-71 1,000 TO BE COMPLETED BY APPLICA Evaluation for • Agency Use Only B. ENVIRONMENTAL ELEMENTS 1. Earth a. General description of the site (circle one): Flat, rolling, hilly, steep slopes, mountainous, other Flat b. What is the steepest slope on the site (approximate percent slope)? 0% c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any prime farmland. Sand and silt d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. No e. Describe the purpose, type, and approximate quanti- ties of any filling or grading proposed. Indicate source of fill. Up to 30 yards of fill (rlPan) could be used to fill voids created by demolitinn of footings and equit. f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. No g. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? 100% -4- Evaluation for • 0 Agency Use Only h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: Complete patching and paving work quickly_ 2. Air a. What types of emissions to the air would result from the proposal (i.e., dust, automobile odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities if known. A small amount of dust could be generated by demolition activities. b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. No c. Proposed measures to' reduce or control emissions or other impacts to air, if any: Compliance with PSAPCA guide fines, ie: wetting of. construction debris. 3. Water a. Surface: 1) Is there any surface water body on or in the immediate vicinity of the site (including year- round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. The buildings to be demolished are east of the Duwamish waterway wnich flows into Piaget Sound. -5- Evaluation for • Agency Use Only 2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. No, The'buildings proposed for demnlitinn are not within 200 feet of the shoreline. 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. None 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quan- tities, if known. No 5) Does the proposal lie within a 100 -year floodplain? If so, note location on the site plan. No 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. No -6- Evaluation for. . Agency Use Only b. Ground: 1) Will ground water be withdrawn, or will water be discharged to ground water? Give general description, purpose, and approximate quan- tities, if known. No 2) Describe waste materials that will be discharged into the ground from septic tanks or other sour- ces, if any (for example: Domestic sewage; industrial, containing the following chemicals...; agricultural; etc.) Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or .the number of animals or humans the system(s) are expected to serve. None c. Water Runoff (including storm water): 1) Describe the source of runoff (including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. Runoff will be handled by existing storm water system. -7- • 411 Evaluation for Agency Use Only 2) Could waste materials enter ground or surface waters? If so, generally describe. No d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any: None 4. Plants a. Check or circle types of vegetation found site: None deciduous tree: alder, maple, aspen, other evergreen tree: fir, cedar, pine, other shrubs grass pasture crop or grain wet soil plants: cattail, skunk cabbage, other water plants: water lily, other types of vegetation on the buttercup, bullrush, eelgrass, milfoil, other b. 'What kind and amount of vegetation or altered? None will be removed c. List threatened or endangered species known to be on or near the site. None -8- • • Evaluation for Agency Use Only d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: None 5. Animals a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the site: None birds: hawk, heron, eagle, songbirds, other: mammals: deer, bear, elk, beaver, other: fish: bass, salmon, trout, herring, shellfish, other: b. List any threatened or endangered species known to be on or near the site; None c. Is the site part of a migration route? If so, explain. Unknown d. Proposed measures to preserve or enhance wildlife,, if any: None -9- • Evaluation for • Agency Use Only 6. Energy and Natural Resources a. What kinds of energy (electric, natural gas, oil, wood stove, solor) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. Nohe b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. No c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: None 7. Environmental Health a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. No 1) Describe special emergency services that might be required. None 2) Proposed measures to reduce or control environ- mental health hazards, if any: None -10- Evaluation for • • Agency Use Only b. Noise 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? Nnnp 2) What types and levels of noise would be created by or associated with the project on a short- term or a long-term basis (for example: traf- fic, construction, operation, other)? Indicate what hours noise would come from the site. Daytime noise during demolition. 3) Proposed measures to reduce or control noise impacts, if any: None 8. Land and Shoreline Use a. What is the current use of the site and adjacent properties? Industrial b. Has the site been used for agriculture? If so, describe. No c. Describe any structures on the site. The site is fully developed airplane manufacturing facility. -11- Evaluation for • • Agency Use Only d. Will any structures be demolished? If so, what? Yes, refer to list of structures in question,#, attachment. tll e. What is the current zoning classification of the site? Heavy Manufacturing f. What is the current comprehensive plan designation of the site? Heavy Manufacturing g. If applicable, what is the current shoreline master program designation of the site? N/A h. Has any part of the site been classified as an "environmentally sensitive" area? If so, specify. No i. Approximately how many people would reside or work in the completed project? None j. Approximately how many people would the completed project displace? None k. Proposed measures to avoid or reduce displacement impacts, if any: None 1. Proposed measures to ensure the proposal is com- patible with existing and projected land uses and plans, if any: None -12- Evaluation for • • Agency Use Only 9. Housing a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income housing? N/A b. Approximately how many units, if any, would be eli- minated? Indicate whether high, middle, or low- income housing. N/A c. Proposed measures to reduce or control housing impacts, if any: None 10. Aesthetics a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? N/A b. What views in the immediate vicinity would be altered or obstructed? None c. Proposed measures to reduce or control aesthetic impacts, if any: None -13- Evaluation for • • Agency Use Only 11. Light and Glare a. What type of light or glare will the proposal produce? What time of day would it mainly occur? None b. Could light or glare from the finished project be a safety hazard or interfere with views? No c. What existing off-site sources of light or glare may affect your proposal? None d. Proposed measures to reduce or control light and glare impacts, if any: None 12. Recreation a. What designed and informal recreational oppor- tunities are in the immediate vicinity? None b. Would the proposed project displace any existing recreational uses? If so, describe. No c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: None -14- • 13. Historic and Cultural Preservation •Evaluation for Agency Use Only a. Are there any places or objects listed on, or pro- posed for, national, state, or local preservation registers known to be on or next to the site? If so, generally describe. _ No b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site. N/A c. Proposed measures to reduce or control impacts, if any: None 14. Transportation a. Identify public streets and highways serving the site, and describe proposed accss to the existing street system. Show on site plans, if any. East Marginal Way South b. Is the site currently served by public transit? If not, what is the approximate distance to the nearest transit stop? Yes, approximately 1,000 feet away on East Marg -55T -Way South. c. How many parking spaces would the completed project have? How many would the project eliminate? None -15- Evaluation for • • Agency Use Only d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including driveways? If so, generally describe (indicate whether public or private). No e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. No f. How many vehicular trips per day would be generated by the completed project? If known, indicate when peak volumes would occur. g. Proposed measures to reduce or control transpor- tation impacts, if any: None 15. Public Services a. Would the project result in an increased need for public services (for example: fire protection, police protection, health care, schools, other)? If so, generally describe. No b. Proposed measures to reduce or control direct impacts on public services, if any. None -16- Evaluation for • • Agency Use Only 16. Utilities a. Circle utilities currently available at the site: ricit efuse service e ep on sanitary sewer septic sys em, other. b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. None C. Signature The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to make its decision. Signature: Date Submitted: 9/j9 PLEASE CONTINUE TO THE NEXT PAGE. -17- • • CO c0 N 0 co 801-Z N 8 - sF L 1 0 5P FoJtJ Ort _:.i �L 0 \0 0 0 0 Z-78 Z-71 z -gZ 2-615• Z_- --7 Z - 0 0 l z, LQOo 4 5, 324 0 • (ii/ //// 'A �r/fi.A I I Tr'�/� ± L 0 • • • 0 CON 3 734 bf N taY sx'o,.:x 'TIP":~* ' -• we - 0 7 c:13 coN RECEIVED CITY OF TUKWILA SEP 1 9 1997 PERMIT CENTER 0 0 1