HomeMy WebLinkAboutSEPA E97-0033 - UNION PACIFIC RAILROAD - BRIDGE REPLACEMENTUNION PACIFIC
RAILROAD BRIDGE 173.4
REPLACE EXISTING TIMBER
BRIDGE WITH REINFORCED
CONCRETE BRIDGE
BLACK RIVER &
GREEN RIVER
E97-0033
•
r-cc,T -r-p A i t_. (,CN D--0 !Z _ex i Gi Y / 4,- 73a 1 D6-
��u
Co tt i i y 1-i- l7 . - 11
• 2— Coo. y T VU-tc-70o�1
4).m P 7—
10. "f`S yt-• cam, IS -'
3. -
o CTI F (—e zVtt cz U / - , � et
:Lt-a�-d- % ` �—
tare',
GU ti -E41,1 t Gi JAR-P'A (fel,� r�
4001ir :47 e (210e4-4ustr4-01-E-ColecW 14(,)1ft" r A,,pa-cfz
l g _ k oz -a. "4"a -'t- ?(a-14 V�ri/ tu->, rf -
_t
otc c & rc Z� ,
City of Tukwila
John W. Rants, Mayor
Department of Community Development Steve Lancaster, Director
June 22, 1998
Terry Bowen
Boyle Engineering Co.
165 S. Union Blvd., Suite 200
Lakewood, Colorado 80228
Re: SEPA application for replacement of Union Pacific Railroad Bridge
(L97-0033)
Dear Mr. Bowen:
In my last letter to you on March 9, 1998, I had indicated that if I did not hear
from you by March 19, 1998 the file would be closed. You contacted me on or
around March 26, 1998 to indicate that you had received the letter and were
trying to compile the requested information from my October 21, 1997 letter.
Since I have not received any follow-up, I have closed this file.
If you chose to re -instate this application, there will be a new fee for the SEPA
application as well as fees for the required Substantial Shoreline Development
Permit.
Sincerely,
Michael Jenkins
Assistant Planner
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431-3670 • Fax (206) 431-3665
City of Tukwila
John W. Rants, Mayor
Department of Community Development Steve Lancaster, Director
March 9, 1998
Terry Bowen
Boyle Engineering
165 S. Union Blvd., Suite 200
Lakewood, CO 80228
Re: SEPA application for replacement of Union Pacific Railroad Bridge
Dear Mr. Bowen:
It has been over 3 months since my last letter concerning the status of your
application. As I have not been provided with any of the information requested in
my October 21, 1997 letter I will be closing this file in 10 days if I have not heard
from you.
Sincerely,
le -12A GeAV^
Michael Jenkins
Assistant Planner
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431-3670 • Fax (206) 431-3665
•
City of Tukwila
John W. Rants, Mayor
Department of Community Development Steve Lancaster, Director
December 31, 1997
Terry Bowen
Boyle Engineering Corporation
165 S. Union Blvd., Suite 200
Lakewood, CO 80228
Re: SEPA checklist application for construction of a new bridge, near the
confluence of the Black and Green Rivers (E97-0033)
Dear Mr. Bowen:
This letter is a follow-up to my October 21, 1997 letter indicating that your
original application was incomplete. Please let us know what the status is
concerning the submission of the outstanding items indicated in my earlier letter
and when you anticipate that these items will be provided.
Sincerely,
Michael Jenkins.
Assistant Planner
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431-3670 • Fax (206) 431-3665
•
King County
Department of Parks and Recreation
Luther Burbank Park
2040 84th Avenue S.E.
Mercer Island, WA 98040
(206) 296-4232
(206) 296-8686 FAX
October 22, 1997
Don Williams, Director
Parks and Recreation Department
City of Tukwila
6200 Southcenter Boulevard
Tukwila, WA 98188
•
RECEIVED
NOV 04 1997
Re: Union Pacific Railroad Bridge Replacement - SEPA Review
Dear Mr. )ilfiams:
COMMUNITY
DEVELOPMENT
This letter is to respond to information provided to us by your Department on October 20,
1997. While normally such a project as a railroad bridge replacement would not be noteworthy,
this particular one has some interest to us.
In particular, in answer to question 12 a. of the Environmental Checklist the sponsor indicates
that there are no recreational opportunities in the immediate vicinity. However, one hundred
feet away is Fort Dent Park. While there may be no impact on the park, we should at least be
assured that they recognize the park existence and that there would be no impacts on the park.
In addition, there is another recreational opportunity that should not be overlooked that may be
directly impacted by this project. In King County's adopted Regional Trail Plan, there is a trail
identified as a connector between the Green River Trail and the Cedar River Trail known as the
Black River Connector Trail. This follows a proposed route that takes it under this bridge as it
leads into Fort Dent Park. The Union Pacific Railroad could assist in the completion of this
project by a dedication of a trail easement under the bridge as part of this project or at least
acknowledge it as a recreational opportunity.
Thank you for the opportunity to comment on this project. If you have any questions, please
contact Tom Eksten, Trails Coordinator, at (206) 296-7808.
Sincerely,
Barbara Wright
Interim Administrator
cc: Tom Eksten, Trails Coordinator, Program Development and Land Management
•
City of Tukwila
John W. Rants, Mayor
Department of Community Development Steve Lancaster, Director
NOTICE OF INCOMPLETE APPLICATION
October 21, 1997
Terry Bowen
Boyle Engineering Corporation
165 S. Union Blvd., Suite 200
Lakewood, CO. 80228
RE: SEPA checklist application by Union Pacific Railroad for the construction of a bridge, near
the confluence of the Black River and Green River, Tukwila, WA (E97-0033)
Dear Mr. Bowen:
Your SEPA checklist application, as referenced above, has been found to be incomplete. In order
for this application to be determined as complete, the following must be submitted to the
Department of Community Development:
PUBLIC WORKS COMMENTS
A. Revised plans that show vertical datum per 1929 NGVD datum
B. An City of Tukwila Flood Control Zone (FCZ) permit must be completed, with
accompanying materials indicated on this application.
C. A copy of the approved JARPA application must be submitted
I have also included a copy of a memorandum from JoAnna Spencer of the Public Works
Department (433-0179) detailing the scope of items that need additional information or further
clarity.
DEPARTMENT OF COMMUNITY DEVELOPMENT COMMENTS:
A. A Substantial Shoreline Development Permit, with accompanying application materials,
must be submitted and determined to be complete. A copy is enclosed
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431-3670 • Fax (206) 4313665
• •
October 21, 1997
Terry Bowen
Re: SEPA checklist application - Union Pacific Railroad Bridge
Page Two
Upon receipt of these items, the City will re -review them for completeness and will mail you
written notification of completeness or incompleteness within 14 days. Your application will
expire if we do not receive the additional information within ninety days of the date of this letter
unless an extension is granted pursuant to Section 18.105.070(E). If you have any questions, my
telephone number is (206) 431-3685.
Sincerely,
Michael Jenkins
Assistant Planner
cc: Reviewing city departments
c:\msoffice...SEPA\9733 incm.doc
4OCT.21.1997 11:08AM
KC.PARK,CULT&NAT RES NO.825 P.2/3
• •
King County
Department of Parks and Recreation
Luther Burbank Park
2040 84th Avenue S.E.
Mercer Island, WA 98010
(206) 296-4232
(206) 296-8686 FAX
October 20, 1997
Michael Jenkins, Planner
VIA: Don Williams, Director
Parks and Recreation Department
City of Tukwila
6200 Southcenter Boulevard
Tukwila, WA 98188
Re: Union Pacific Railroad Bridge Replacement - SEPA Review
Dear Mr. Jenkins:
This letter is to respond to information provided to us by the Tukwila Parks Department
on 10/20/97. While normally such a project as a railroad bridge replacement would not
be noteworthy, this particular one has some interest to us.
In particular, in answer to question 12 a, of the Environmental Checklist the sponsor
indicates that there are no recreational opportunities in the immediate vicinity.
However, one hundred feet away is Fort Dent Park. While there may be no impact on the
park, we should at least be assured that they recognize the parks existence and that there
would be no impacts on the park.
In addition, there is another recreational opportunity that should not be overlooked that
may be directly impacted by this project. In King county's adopted Regional Trail Plan
there is a trail identified as a connector between the Green River Trail and the Cedar
River Trail known as the Black River Connector Trail. This follows a proposed route
that takes it under this bridge as it leads into Fort Dent Park. The Union Pacific Railroad
could assist in the completion of this project by a dedication of a trail, easement under the
bridge as part of this project or at least acknowledge it as a recreational opportunity.
OCT.21.1997 11:08RM
KC. PARK, CULT°MAT RES
• •
NO.825 P.3/3
Thank you for the opportunity to comment on this project. If you have any questions,
please call Inc at (206) 296-7808.
Sincerely,
Tom Eksten
Trails Coordinator
cc: Barbara Wright, Interim Administrator, Program. Development and Land
Management
Jesse Tanner, Mayor
CITIOF RENTON
Community Services
Sam Chastain, Administrator
Via Facsimile
(Original Via U.S. Mail)
October 14, 1997.
Don Williams, Director
Parks & Recreation Department
City of Tukwila
6200 Southcenter Boulevard
Tukwila WA 98188
Re: Union Pacific Railroad Bridge Replacement
Environmental Review Comments
Dear Don:
This letter is a follow-up to the information faxed to me last week regarding the Union
Pacific Bridge Replacement project. In particular, I would like to respond to question a,
under Recreation (specifically, "What designated and informal recreational opportunities
are in the immediate vicinity?)
Response
The proposed ,bridge replacement is located in the vicinity of Renton's
Springbrook Valley Trail and Tukwila's Interurban Trail. Future plans for
these trail systems include connecting these two trails for a regional trail
system. As part of the bridge replacement, provisions for connecting these
two trail systems need to be included with a dedicated trail easement.
I also discussed this connection with Sharon Claussen of King County. She has
requested a copy of this letter and she will forward it to Tom Eksten of King County for
input.
If you have any questions please call me at (425) 277-5549.
Sincerely,
Leslie A. Betlach
Parks Director
LAB / dlf
cc: Sam Chastain, Community Services Administrator
Terry Higashiyama, Recreation Director
Sharon Claussen, King County
97-529DF.DOC
RECEIVED
CITY OF TUKWILA
OCT 2 0 1997.
. PERMIT CENTER
200 Mill Avenue South - Renton, Washington 98055
® This paper contains 50% recycled material, 20% post consumer
• •
MEMORANDUM
DATE: October 13, 1997
TO: Michael Jenkins, Planning
FROM: Joanna Spencer, Public Works
RE: Public Works Comments
SEPA - E97-0033
Replacement of Union Pacific Railroad Bridge
CC: N/A
The following are Public Works review comments:
1. Applicant shall clarify why the proposed bridge is shorter than the existing
bridge.
2. Figure 3 plan received with SEPA application is different from the same plan
Department of Community Development received by mail on August 4, 1997 as
part of the letter addressed to the US Army Corps of Engineers and the
Department of Fisheries. If this plan was revised, it should have a revision block
describing the revision so that all agencies will be reviewing the same plan.
3. What is the vertical datum on Figures 2 and 3? Public Works requires NGVD
1929 datum. This shall be identified on the plan. A Public Works Flood Control
Zone permit will be required. All the elevations listed on plan Figure 3 shall be
identified on the bridge section. Six feet (6') of freeboard above the 100 year
flood elevation is required. The 100 year base flood elevation shall also be
shown on the plan.
4. Show the location of the lowest land elevation within the project area on the
plan.
5. Show lowest bridge member elevation in accordance with the Green River
Hydraulics Analysis and the Black River Hydraulics Analysis. Include information
on King County Water and Land Resources Division pump station operation.
6. For coordination and other agency review, applicant shall contact the
following parties:
Ron Stroke
City of Renton, WA
(425) 235-2500
. •
Andy Levesque
King County Surface Water Management
700 5th Avenue #2200
Seattle, WA
(206) 296-6519
Green River Flood District
Local Tribal Agencies
6. A Shoreline Permit from the City of Tukwila will be required
7. Submit a copy of the JARPA Application as listed in item 10, page 3, of the
SEPA Application
8. What does the abbreviation "WSEL" on Figure 3 stand for? Give an
explanation of "Normal WSEL = 3.8."
9. Submit cross sections shown on Figure 2.
10. Identify any Land Altering activities. Quantities of cut and fill associated with
this project shall also be specified.
11. Item B.1.e lists a fill quantity of approximately five cubic yards (5 CY).
Identify proposed location of fill placement on the plans.
12. If the Black River flows under the bridge (per item 2, page 6 of the SEPA
Application), item 3 is incorrect. Are the old wood piles being removed and new
piles being placed to support the concrete bridge?
13) Attached are FIRM map panel numbers 53033C0976F and 53033C0957F.
Please forward these maps to the applicants with the Flood Control Permit
packet.
2
•
CITY O TUKW/LA
Department of Community Development
6300 Southcenter Boulevard, Tukwila, WA 98188
Telephone: (206) 431-3670
ENVIRONMENTAL REVIEW (SEPA) APPLICATION
To submit for SEPA review, provide the items listed above to the Planning Division at 6300
Southcenter Boulevard, Room 100.
6 copies of the completed and signed environmental checklis+
You may use the City's pre-printed form or you may re -type the questions on your
computer. If you choose to re -type the form into your computer, be sure to do so
accurately. Mistakes or omissions will increase the review time.
sets of the fji(s e plans ne ed to clearly describe the proposed action.
RECEIVED
CITY OF TUKWILA rNGINEER�.ti
❑ One set of plans reduced to 8.5" x 11". DENNER
SEP 2 4 1997 RFrFIVFn
❑ Four copies of supporting studies. PERMIT CENTER 41."(; 1 1 1997
1,71 One copy of the checklist application.
❑ One set of mailing labels for all properties 500' from the subject property. (See address
label worksheet.)
$325 filing fee.
COMPLETING THE CHECKLIST
The checklist contains several pages of questions which you are asked to answer. It covers a
comprehensive set of topics. As a result, several of the questions may not apply to your project.
If a particular question does not apply, simply write N/A underneath. HOWEVER, be aware that
many questions apply despite appearing not to. Care needs to be taken in reading and answering
the questions to ensure the appropriate response is provided.
It is important that accurate and clear information be provided. You may not know all of the
answers. Answer each question to the best of your ability. If we find an answer to be insufficient,
the City may contact you to ask for more information.
Sometimes, after reviewing the checklist, the City will ask you provide additional studies or
information. Commonly requested information includes traffic analysis, site topography, soils
studies and tree surveys.
CITY OF TUKWILA 6300 Southcenter Boulevard, Tukwila, WA 98188
DEPARTMENT OF COMMUNITY DEVELOPMENT
Telephone: (206) 431.3670
ADDRESS LABEL REQUIREMENTS
The City of Tukwila requires that neighboring residents, businesses and property owners be notified of
certain types of pending applications in order to encourage citizen participation in the land use process.
Applicants are therefore required to submit the following materials:
• Mailing labels listing the owners of record for all property within 500 feet of the boundaries (not the
center) of the applicant's site (2 sets or 3 sets if SEPA review is required).
• Mailing; :abels listing the residents or businesses of any property within 500 feet of the -property if
they are different from the land owners (2 sets or 3 sets if SEPA review is required).
• One copy of an assessor's map(s) showing the boundaries of the subject property and the 500 foot
radius.
Property owner names and addresses can be obtained from the King County Department of Assessment
located on the 7th floor of the King County Administration Building, Room 700, 500 Fourth Avenue,
Seattle. To compile the information required:
• Obtain the assessor's map(s) which contain(s) your property and all neighboring properties within
500 feet (See example diagram). You may use the maps on file in the Assessor's Office or purchase
a set from the King County Department of Public Works Map Counter on the 9th floor of the
Administration Building. Purchased maps must be ordered several hours in advance of the time you
would like fo pick them up.
• After securing the assessor's maps, obtain a "Real Estate Inquiry Batch Request Sheet" from the
Department of Assessment. On this form provide the tax account number for each affectedproperty
as shown on the assessor's map(s) and submit the completed form to the Department of Assessment
with the appropriate fee. Applicants can request that the information be printed in mailing label form
or on standard paper.
To obtain occupants/resident/business names and addresses, consult the Kroll maps located in the Tukwila
Department of Community Development and then visit the site to determine resident names and unit
numbers. The information on the mailing labels may refer to "Resident" or "Tenant", with the proper
mailing address, if the specific name is unknown.
CITY OF IIKWILA
Department of Community Development
6300 Southcenter Boulevard, Tukwila, WA 98188
Telephone: (206) 431-3670
RECEIVED
CITY OF TUKWILA
SEP 241997
PERMIT CENTER
SEPA APPLICATION CHECKLIST
FOR STAFF USE;ONLY'
Planner:
File Number: 0 47 .00 j
Receipt Number:
Cross-reference files: p a 7.dah' 's
...............
Applicant notified of incomplete application:
Applicant notified :of'complete application:
Notice ofapplication issued:
A. NAME OF PROJECT/DEVELOPMENT:
Replacement of Union Pacific Railroad Bridge 173.41
B. LOCATION OF PROJECT/DEVELOPMENT: (address and accessors parcel number(s))
Located over the Black River just upstream of the Green River in
Tukwila, Washington.
Quarter: Section: Township: Range:
(This information may be found on your tax statement)
•
C. PROJECT DESCRIPTION:
Replacement of an existing 173.3' timber railroad bridge with a 160'
reinforced concrete bridge.
D. APPLICANT:
NAME:
Terry Bowen of Boyle Engineering Corporation; Agent for Union Pacific Railroa
ADDRESS: 165 S. Union Blvd. Suite 200 Lakewood, Colorado 80228
PHONE: (303) 987-3443
SIGNATURE: PA. B -04-c,
DATE: )9 55d- it47
• 1
ENVIRONMENTAL CHECKLIST
Purpose of Checklist
The State Environmental Policy Act (SEPA), chapter 43.21C RCW, requires all governmental agencies
to consider the environmental impacts of a proposal before making decisions. An environmental impact
statement (EIS) must be prepared for all proposals with probable significant adverse impacts on the quality
of the environment. The purpose of this checklist is to provide information to help you and the agency
identify impacts from your proposal (and to reduce or avoid impacts from the proposal, if it can be done)
and to help the agency decide whether an EIS is required.
Instruction for Applicants:
This environmental checklist .asks you to describe some basic information about your proposaL.. The City
uses this checklist to determine whether the environmental impacts of your proposal are significant,
requiring preparation of an EIS. Answer the questions briefly, with the most precise information known,
or give the best description you can.
You must answer each question accurately and carefully, to the best of your knowledge. Inmost cases,
you should be able to answer the questions from your own observations or project plans without the need
to hire experts. If you really do not know the answer, or if a question does not apply to your proposal,
write "do not know" or "does not apply". Complete answers to the questions now may avoid unnecessary
delays later.
Some questions ask about governmental regulations, such as zoning, shoreline, and landmark designations
Answer these questions if you can. If you have problems, the City staff can assist you.
The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of
time or on different parcels of land. Attached any additional information that will help describe your
proposal or its environmental effects. The City may ask you to explain your answers or provide additional
information reasonably related to determining if there may be significant adverse impact.
Use of checklist for nonproject proposals:
Nonproject proposals refer to actions which are different or broader than a single site specific development
project, such as plans, policies and programs.
Complete this checklist for nonproject proposals, even though questions may be answered "does not apply".
In addition, complete the supplemental sheet for nonproject actions (part D).
For nonproject actions, the references in the checklist to the words "project", "applicant", and "property
or site" should read as "proposal", "proposer", and "affected geographic area", respectively.
•
ENVIRONMENTAL CHECKLIST
411
ControNo.
Epic File No.
Fee $ 325 Receipt No.
A. BACKGROUND
1. Name of proposed project, if applicable: Replacement of Bridge 173.41
2. Name of applicant: BOYLE ENGINEERING CORPORATION , Agent for Union Pacific Railroad
3. Address and phone number of applicant and contact person: Terry Bowen, 165
S. Union Blvd., Suite 200, Lakewood, Colorado 80228 (303) 987-3443
4. Date checklist prepared: 8/28/97
5. Agency requesting Checklist: City of Tukwila
6. Proposed timing or schedule (including phasing, if applicable):
When all permits are approved.
7. Do you have any plans for future additions, expansion, or further activity
related to or connected with this proposal? If yes, explain. N/A
8. List any environmental information you know about that has been prepared, or will
be prepared, directly related to this proposal. None known
9. Do you know whether applications are pending for governmental approvals of other
proposals directly affecting the property covered by your proposal? If yes,
explain. None known
-2-
• •
10. List any government approvals or permits that will be needed for your proposal.
Dept. of Fisheries - HPA
JARPA
Department of Ecology - Modification
11. Give brief, complete description of your proposal, including the proposed uses
and the size of the project and site. There are several questions later in this
checklist that ask you to describe certain aspects of your proposal. You do not
need to repeat those answers on this page. Section E requires a complete
description of the objectives and alternatives of your proposal and should not be
summarized here.
Replace existing 173.3' timb;:. bridge with a 160' reinforced concrete bridge
12. Location of the proposal. Give sufficient information for a person to understand
the precise location of your proposed project, including a street address, if
any, and section, township, and range, if known. If a proposal would occur over
a range of area, provide the range or boundaries of the site(s). Provide a legal
description, site plan, vicinity map, and topographic map, if reasonably
available. While you should submit any plans required by the agency, you are not
required to duplicate maps or detailed plans submitted with any permit applica-
tions related to this checklist.
Union P$ a GLeeu
River in Tukwila Washington
13. Does the proposal lie within an area designated on the City's Comprehensive Land
Use Policy Plan Map as environmentally sensitive?
Unknown
-3-
410
TO BE COMPLETED BY APPLICANT Evaluation for
Agency Use Only
B. ENVIRONMENTAL ELEMENTS
1. Earth
a. General description of the site (circle one): Flat,
rolling, hilly, steep slopes, mountainous, other
embankment
b. What is the steepest slope on the site (approximate
percent Slope)?Track embankment - 50M (2A0V)
c. What general types of soils are found on the site
(for example, clay, sand, gravel, peat, muck)? If
you know the classification of agricultral Juils,
specify them and note any prime farmland.
sandy clay
d. Are there surface indications or history of unstable
soils in the immediate vicinity? If so, describe.
None
e. Describe the purpose, type, and approximate quanti-
ties of any filling or grading proposed. Indicate
source of fill. Minimal fill required at each
abutment. (Approx. 5 cuyd) Use local borrow
f. Could erosion occur as a result of clearing,
construction, or use? If so, generally describe.
The existing channel slope will not be modified.
Grass areas disturbed by construction equipment
will be revegetated.
g•
About what percent of the site will be covered with
impervious surfaces after project construction (for
example, asphalt or buildings)?
Minimal (less than 10%) replace one bridge with
another.
-4-
Evaluation for
Agency Use Only
h. Proposed measures to reduce or control erosion, or
other impacts to the earth, if any:
Grassed areas disturbed by construction equipment
will be revegetated.
2. Air
a. What types of emissions to the air would result from
the proposal (i.e., dust, automobile odors,
industrial wood smoke) during construction and when
the project is completed? If any, generally
describe and give approximate quantities if known.
Construction equipment only for the duration of the
project. (Crane, dozer, backhoe).
b. Are there any off-site sources of emissions or odor
that may affect your proposal? If so, generally
describe.
None
c. Proposed measures to reduce or control emissions or
other impacts to air, if any:
3. Water
a. Surface:
1) Is there any surface water body on or in the
immediate vicinity of the site (including year-
round and seasonal streams, saltwater, lakes,
ponds, wetlands)? If yes, describe type and
provide names. If appropriate, state what
stream or river it flows into.
The Black River flows under the midge_ Tt flown
into the Green River.
-5-
1
2) Will the project require any work over, in, or
adjacent to (within 200 feet) the described
waters? If yes, please describe and attach
available plans.
Yes - The Black River will flow under the bridge.
3) Estimate the amount of fill and dredge material
that would be placed in or removed from surface
water or wetlands and indicate the area of the
site that would be affected. Indicate the
source of fill material.
There will be no fill or dredged.maxe.riaplaced
in or removed from the Black River.
4) Will the proposal require surface water
withdrawals or diversions? Give general
description, purpose, and approximate quan-
tities, if known.
No
5) Does the proposal lie within a 100 -year
floodplain? If so, note location on the site
plan.
Yes
6) Does the proposal involve any discharges of
waste materials to surface waters? If so,
describe the type of waste and anticipated
volume of discharge.
None
-6-
Evaluation for
Agency Use Only
• •
b. Ground:
1) Will ground water be withdrawn, or will water be
discharged to ground water? Give general
description, purpose, and approximate quan-
tities, if known.
No
2) Describe waste materials that will be discharged
into the ground from septic tanks or other sour-
ces, if any (for example: Domestic sewage;
industrial, containing the following
chemicals...; agricultural; etc.) Describe the
general size of the system, the number of such
systems, the number of houses to be served (if
applicable), or the number of animals or humans
the system(s) are expected to serve.
Jd/A
c. Water Runoff (including storm water):
1) Describe the source of runoff (including storm
water) and method of collection and disposal, if
any (include quantities, if known). Where will
this water flow? Will this water flow into
other waters? If so, describe.
Existing runoff patterns will be maintained.
Runoff from the bridge will flow to the ground
and then to the Black River.
-7-
Evaluation for
Agency Use Only
Evaluation for
Agency Use Only
2) Could waste materials enter ground or surface
waters? If so, generally describe.
No
d. Proposed measures to reduce or control surface,
ground, and runoff water impacts, if any:
None needed.
4. Plants
a. Check or circle types of vegetation found on the
site:
_ deciduous tree: alder, maple, aspen, other
evergreen tree: fir, cedar, pine, other
X shrubs
g grass
_ pasture
crop or grain
_ wet soil plants: cattail, buttercup, bullrush,
skunk cabbage, other
_ water plants: water lily, eelgrass, milfoil, other
other types of vegetation
b. What kind and amount of vegetation will be removed
or altered?
Vegetation disturbed by construction equipment
will be replaced.
c. List threatened or endangered species known to be on
or near the site.
No known endangered species.
-8-
•
d. Proposed landscaping, use of native plants, or other
measures to preserve or enhance vegetation on the
site, if any:
None
5. Animals
a. Circle any birds and animals which have been
observed on or near the site or are known to be on
or near the site:
biros: hawk, heron, eagle, songbirds, other:
None observed
mammals: deer, bear, elk, beaver, other:
None Observed
fish: bass, salmon, trout, herring, shellfish,
other: None observed
b. List any threatened or endangered species known to
be on or near the site.
No known endangered species.
c. Is the site part of a migration route? If so,
explain.
Not known
d. Proposed measures to preserve or enhance wildlife,
if any:
Leave site in its existin
condition.
-9-
Evaluation for
Agency Use Only
•
Evaluation for
Agency Use Only
6. Energy and Natural Resources
a. What kinds of energy (electric, natural gas, oil,
wood stove, solor) will be used to meet the
completed project's energy needs? Describe whether
it will be used for heating, manufacturing, etc.
No specific energy needs
b. Would your project affect the potential use of solar
energy by adjacent properties? If so, generally
describe.
No
c. What kinds of energy conservation features are
included in the plans of this proposal? List other
proposed measures to reduce or control energy
impacts, if any:
None
7. Environmental Health
a. Are there any environmental health hazards,
including exposure to toxic chemicals, risk of fire
and explosion, spill, or hazardous waste, that could
occur as a result of this proposal? If so,
describe.
No change trom existing
1) Describe special emergency services that might
be required.
None
2) Proposed measures to reduce or control environ-
mental health hazards, if any:
None
-10-
• •
b. Noise
Evaluation for
Agency Use Only
1) What types of noise exist in the area which may
affect your project (for example: traffic,
equipment, operation, other)?
Noise will not affect project.
2) What types and levels of noise would be created
by or associated with the project on a short-
term or a long-term basis (for example: traf-
fic, construction, operation, other)? Indicate
what hours noise would come from the site.
Short term: Equipment to dismantle the bridge
and to construct new bridge.
Long -Term: No change from exiating
3) Proposed measures to reduce or control noise
impacts, if any:
None
8. Land and Shoreline Use
a. What is the current use of the site and adjacent
properties?
Rail transportation. Adjacent properties are
industrial and manufacturing.
b. Has the site been used for agriculture? If so,
describe.
Not known.
c. Describe any structures on the site.
Rail tracks. Existing_ 173.3 foot timber bridge
-11-
• •
d. Will any structures be demolished? If so, what?
Yes - existing bridge
e. What is the current zoning classification of the
site? Not known
f. What is the current comprehensive plan designation
of the site? Not known
g.
If applicable, what is the current shoreline master
program designation of the site? Not known
h. Has any part of the site been classified as an
"environmentally sensitive" area? If so, specify.
Not known
i. Approximately how many people would reside or work
in the completed project?Ap continuous worker
at the site
j•
Approximately how many people would the completed
project displace? None
k. Proposed measures to avoid or reduce displacement
impacts, if any: N/A
1. Proposed measures to ensure the proposal is com-
patible with existing and projected land uses and
plans, if any: N/A
-12-
Evaluation for
Agency Use Only
•
Evaluation for
Agency Use Only
9. Housing
a. Approximately how many units would be provided, if
any? Indicate whether high, middle, or low-income
housing? N/A
b. Approximately how many units, if any, would be eli-
minated? Indicate whether high, middle, or low-
income housing.
c. Proposed measures to reduce or control housing
impacts, if any: N/A
10. Aesthetics
a. What is the tallest height of any proposed
structure(s), not including antennas; what is the
principal exterior building material(s) proposed?
The track itself
b. What views in the immediate vicinity would be
altered or obstructed?
No change from existing
c. Proposed measures to reduce or control aesthetic
impacts, if any:
None
-13-
•
Evaluation for
Agency Use Only
11. Light and Glare
a. What type of light or glare will the proposal
produce? What time of day would it mainly occur?
None
b. Could light or glare from the finished project be a
safety hazard or interfere with views?
No
c. What existing off-site sources of light or glare may
affect your proposal?
None
d. Proposed measures to reduce or control light and
glare impacts, if any:
None
12. Recreation
a. What designed and informal recreational oppor-
tunities are in the immediate vicinity?
None
b. Would the proposed project displace any existing
recreational uses? If so, describe.
No
c. Proposed measures to reduce or control impacts on
recreation, including recreation opportunities to be
provided by the project or applicant, if any:
N/A
-14-
• •
13. Historic and Cultural Preservation
Evaluation for
Agency Use Only
a. Are there any places or objects listed on, or pro-
posed for, national, state, or local preservation
registers known to be on or next tothe site? If
so, generally describe.
Not known
b. Generally describe any landmarks or evidence of
historic, archaeological, scientific, or cultural
importance known to be on or next to the site.
None
c. Proposed measures to reduce or control impacts, if
any:
N/A
14. Transportation
a. Identify public streets and highways serving the
site, and describe proposed accss to the existing
street system. Show on site plans, if any.
N/A
b. Is the site currently served by public transit? If
not, what is the approximate distance to the nearest
transit stop?
N/A
c. How many parking spaces would the completed project
have? How many would the project eliminate?
None
None
-15-
•
Evaluation for
Agency Use Only
d. Will the proposal require any new roads or streets,
or improvements to existing roads or streets, not
including driveways? If so, generally describe
(indicate whether public or private).
No
e. Will the project use (or occur in the immediate
vicinity of) water, rail, or air transportation? If
so, generally describe.
Rail Transportation
f. How many vehicular trips per day would be generated
by the completed project? If known, indicate when
peak volumes would occur.
Train schedule varies
g. Proposed measures to reduce or control transpor-
tation impacts, if any:
No change from existing
15. Public Services
a. Would the project result in an increased need for
public services (for example: fire protection,
police protection, health care, schools, other)? If
so, generally describe.
No
b. Proposed measures to reduce or control direct
impacts on public services, if any.
N/A
-16-
•
16. Utilities
a. Circle utilities currently available at the site:
electricity, natural gas, water, refuse service,
telephone, sanitary sewer, septic system, other.
__N/A
b. Describe the utilities that are proposed for the
project, the utility providing the service, and the
general construction activities on the site or in
the immediate vicinity which might be needed.
No change from existing
C. Signature
The above answers are true and complete to the best of
my knowledge. I understand that the lead agency is
relying on them to make its decision.
Signature: t 4. )t1.,re,„0,1'3
Date Submitted:
PLEASE CONTINUE TO THE NEXT PAGE.
-17-
Evaluation for
Agency Use Only
•
TO BE COMPLETED BY APPLICANT Evaluation for
Agency Use Only
D. SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS
(do not use this sheet for project actions)
Because these questions are very general, it may be helpful
to read them in conjunction with the list of the elements of
the environment.
When answering these questions, be aware of the extent the
proposal, or the types of activities likely to result from
the proposal, would affect the item at a greater intensity
or at a faster rate than if the proposal were not imple-
mented. Respond briefly and in general terms.
1. How would the proposal be likely to increase discharge
to water; emissions to air; production, storage, or
release of toxic or hazardous substances; or production
of noise?
No increase over present use
Proposed measures to avoid or reduce such increases are:
None
2. How would the proposal be likely to affect plants, ani-
mals, fish, or marine life?
Reduce number of piers in the channel
Proposed measures to protect or conserve plants, ani-
mals, fish, or marine life are:
None
-18-
o •
Evaluation for
Agency Use Only
3. How would the proposal be likely to deplete energy or
natural resources?
None
Proposed measures to protect or conserve energy and
natural resourses are:
None
4. How would the proposal be likely to use or affect
environmentally sensitive areas or areas designated (or
eligible or under study) for governmental protection;
such as parks, wilderness, wild and scenic rivers,
threatened or endangered species habitat, historic or
cultural sites, wetlands, floodplains, or prime
farmlands?
N/A
Proposed measures to protect such resources or to avoid
or reduce impacts are:
None
5. How would the'proposal be likely to affect land and
shoreline use, inclduing whether it would allow or
encourage land or shoreline uses incompatible with
existing plans?
No impact
-19-
•
Proposed measures to avoid or reduce shoreline and land
use impacts area:
None
How does the proposal conform to the Tukwila Shoreline
Master Plan? Not known
6. How would the proposal be likely to increase demands on
transportation or public services and utilities?
No change from existing
Proposed measures to reduce or respond to such demand(s)
are: None
7. Identify, if possible, whether the proposal may conflict
with local, state, or federal laws or requirements for
the protection of the environment.
Not known
-20-
Evaluation for
Agency Use Only
0 •
Evaluation for
Agency Use Only
8. Does the proposal conflict with policies of the Tukwila
Comprehensive Land Use Policy Plan? If so, what poli-
cies of the Plan? Not known
Proposed measures to avoid or reduce the conflict(s)
are:
-21-
TO BE COMPLETED BY APPLICANT • Evaluation for
Agency Use Only
E. SUPPLEMENTAL SHEET FOR ALL PROJECT AND NON PROJECT
PROPOSALS
The .objectives and the alternative means of reaching the
objectives for a proposal will be helpful in reviewing the
aforegoing items of the Environmental Checklist. This
information provides a general overall perspective of the
proposed action in the context of the environmental infor-
mation provided and the submitted plans, documents, suppor-
tive information, studies, etc.
1. What are the objective(s) of the proposal?
To replace an old timber bridge with a new concrete bridge
2. What are the alternative means of accomplishing these
objectives? Use machines and equipment within the
right-of-way
3. Please.compare the alternative means and indicate the
preferred course of action:
-22-
•
Evaluation for
Agency Use Only
4. Does the proposal conflict with policies of the Tukwila
Comprehensive Land Use Policy Plan? If so, what poli-
cies of the Plan? Not known
Proposed measures to avoid or reduce the conflict(s)
are• Project will be completed quickly to continue
rail traffic.
-23-
07/28/97 15:37 BOYLE ENGINEERING -> 2064313665
•
BOYLE ENGINEERING CORPORATION
165 South Union Boulevard, Suite 200
Lakewood, Colorado 80228
NO.891 D01
TEL 303/987-3443
FAX 303/987.3908
T4,
RArSco•-\
COMPANY/LOCATION:
C 41 o 4'Tkkw: tq
FAX NUMBER:
(?.�b) 413r- 3665
FAX TRANSMITTAL
FROM:RO
V Gkrrto
Waif
DATE;
7 fir, 8
TIME:
'1:
30
TOTAL NUMBER OF PAGES:
(including this sheet) /47
JOB NUMBER:
'
tog TS`
PLEASE DELIVER THESE PAGES TO THE INDIVIDUAL NAMED ABOVE.
IF YOU HAVE DIFFICULTY RECEIVING THIS TRANSMISSION OR IF ANY PAGES ARE MISSING OR ILLEGIBLE,
PLEASE CALL 303/987-3443 AND ASK TO SPEAK TO
TRANSMITTED ARE THE FOLLOWING:
TRANSMITTED AS CHECK BELOW:
[ ] For Your Approval
[ J As Requested
For Your Use
For Your Review and Comment
[ ] Per Attached
[ I
REMARKS:
444, 401
,. 173.(-(I.
RECEIVED
CITY OF TUKWILA
JUL 281997
PERMIT CENTER
07/28/97 15:38 BOYLE ENGINEERING 4 2064313665
• •
THE UNITED STATES 'DEPARTMENT
OF THE ARMY CORPS OF ENGINEERS
Seattle District, Regulatory Branch
P.O. Box C-3755
Seattle, Washington 98124-2255
Attention: NPS -OP -RF
DEPARTMENT OF FISH AND WILDLIFE
22516 S.E. 64th P1. Suite 230, Bld. E.
Issaquah, Washington 98027
.Attention: Phil Schneider
DEPARTMENT OF COMMUNITY DEVELOPMENT
City of Tukwila
6300 S. Center Blvd. Suite 100
Tukwila, Washington 98188
Attention: Kelcie Peterson
NO. 891 D02
June 6, 1997
RECEIVED
CITY OF. TUKWILA
JUL 281997
PERMIT CENTER
Bridee 173.41, Seattle Subdivision, Service Unit 15 - Columbia River
As part of their ongoing maintenance program, the Union Pacific Railroad Company proposes to
replace Bridge 173.41, Seattle Subdivision. The bridge is located on the Black River just
upstream of the confluence with the Green River, approximately 1.0 miles northeast of the City
of Tukwila in King County, Washington. The site is located in the SE 1/4 of the SE 1/4 of
Section 14, Township 23 North, Range 4 East on the Renton, Washington 7.5 min. quadrangle
map. The attached copies of Figures 1, 2, and 3 show the site location, the plan view, and an
elevation view of the structure.
The following information is included for your use:
1. The existing structure at Milepost 173.41 is an 11 -span,173.3-foot timber pile trestle
ballast deck bridge. The proposed replacement structure is a 6 -span, 160 -foot concrete
box girder bridge. Approximately 80 feet downstream, the BNSF Burlington Northern Railroad
has a 214 feet steel girder bridge.
2. Bridge 173.41 is located in an urbanized area consisting of residential, commercial and
industrial areas. The contributing drainage area at this bridge is estimated to be 15,550
07/28/97 15:38 BOYLE ENGINEERING i 2064313665
•
Page 2
NO.891 1;103
June 6, 1997
acres. However, peak flows are regulated by a pump plant located upstream on the Black
River, approximately 1000 feet north of Bridge 173.41.
3. The proposed activity is a replacement of an existing structure and will have minimal.
impacts on the local environment. The Railroad understands that the proposed
construction activity may not require an individual permit from the Corps of Engineers as
this project may be authorized by Nationwide Permit No. 3, Maintenance, as defined in
Appendix A of 33 CFR 330. A set of color copy photos is provided to help with the
USCOE review.
4. A Storm Drainage Permit from the City of Tukwila may be required for the replacement
activity, which must also be compatible with the requirements of the Green River
Management Agreement. Hydrologic and hydraulic information about the drainage
structure at Milepost 173.41 is contained in the "Final Report, Hydrology and Hydraulics"
revised June 1997. This information is submitted to address the requirements of the
Storm Drainage Permit. The City of Tukwila will also be reviewing the proposed bridge
construction for a Grade and Fill Permit.
5. The Washington State Department of Fish and Wildlife is responsible for reviewing all
construction plans for hydraulic projects in western Washington. A completed Hydraulic
Project Application and appropriate supporting material are attached. Preliminary data
and a set of color copy photos have previously been sent.
Boyle Engineering Corporation is acting as the Union Pacific Railroad's representative in
securing these permits. Please provide this office with the appropriate permits and instructions to
allow the railroad to proceed with the proposed construction. Please issue all permits to the
Union Pacific Railroad Company, Attn: Roger Boraas, and send them to Boyle Engineering.
Corporation, 165 South Union Blvd., Suite 200, Lakewood, Colorado 80228.
If you have any questions concerning this matter or require additional information, please contact
Mr. Terry Bowen, Project Manager at (303) 987-3443. Please refer future contacts to Bridge
173.41 - Seattle Subdivision, Service Unit 15 - Columbia River. Thank you for your
cooperation.
Boyle Engineering Corporation
Terry A. Bowen, P.E.
Project Manager
Copies to:
Roger Boraas/UPRR
DN•U20-104-44 da i
*La: ,ter-il,e#,N4likkAte,
fgrop--_,---71-0001----0440R41:1
----"Api-- ' -- ----""ws----.A..i.-
itiqp,4•„, ,, 4,11..„—Akor*,,'
to"
EB
RAILROAD _
•
L it
L
B
11
11 lig
' • lc
,
:12
• . Apt.
a I
• :761
•77:i
! •
477
Source: USGS 7.5 Minute Quadrangle
RENTON, WASHINGTON
Mapping,
o-
_oN QUADRANGLE LOCATION
BOYLE
CORIPOFIFIrion
SITE LOCATION OF
FIGURE 1
UPRR BRIDGE 173.41
TO
GEORGETOWN
BRIDGE 173.41
EXISTING 173.3 -FOOT
TIMBER PILE TRESTLE
BALLAST DECK BRIDGE
UPRR R.O.W. LINE
-
SPRINT FIBER OPTIC CABLEFO
MCI CABLE-4.-
49
ABLE-"
49 +00
FO
BLDG.
CONC. PIPELINE BASE
AT&T FIBER OPTIC CABLE
APPROX. L
180', 6 -SPAN B
TO
KENT
BLDG.
TION OF PROPOSED
GIRDER BRIDGE
�- BENCHMARK
FOUND IRON ROD
HDA 1873010198
10957180869158
EL.=31.55
POWER BOX
- UPRR R.O.W. LINE
B.M.: US COAST & GEODETIC MARKER
NO. J384, 1959 AT TOP OF CURB,
NW END OF ROAD BRIDGE JUST
UPSTREAM OF UPRR BRIDGE NO.
173.41. EL.=32.17
SCALE: 1" =100'
GREEN RIVER
BURLINGTON NORTHERN RAILROAD
214 FT. STEEL GIRDER BNRR BRIDGE
ON CONCRETE PIERS
O SURVEYED CROSS SECTIONS
----0 INTERPOLATED CROSS SECTIONS
•
204'L 2
LOCATION PLAN
BRIDGE 173.41, SEATTLE SUBDIVISION
FIGURE 2
1
35
30
25
20
15=
10=
05
PROPOSED 5 -SPAN
160' BOX GIRDER BRIDGE
EXISTING AND PROPOSED
TOP OF RAIL -�
EXISTING BRIDGE
EXISTING (SW)
B.O.R.=32.81-
T
H
NORN11-\i..
00 -
NORTHWEST TO
GEORGETOWN
DATUM: SW B.O.R. EL=32.81 NGVD
SCALE: HORIZ. 1" =20'
VERT. 1" =10'
io
0)
ifr
EXISTING GROUND LINE
(VIEW LOOKING NORTHEAST)
EXISTING STRUCTURE:
WSEL = 19.23
LOW CHORD EL (SW) = 29.38
INVERT EL = 0.08
TOP OF RAIL EL (SW)= 33.41
tfiz
32' SPAN
(nP)
1
H
H
H
lu
SOUTHEAST TO
KENT •
PROPOSED STRUCTURE:
WSEL = 19.23
LOW CHORD EL (SW) = 28.85
INVERT EL = 0.08
TOP OF RAIL EL (SW) = 33.41
2O4'L fi
PROPOSED REPLACEMENT SECTION
UPRR BRIDGE 173.41 SEATTLE SUBDIVISION
FIGURE 3
J
landmarks. The valley is a giant trough dug by
the ice. As a part of the ancient Puget Sound,
the trough was filled with seawater. Tukwila
Hill and Bruinmer's Hill are two of many an-
cient rocky hills re -excavated from the glacial
drift. Appearing as hills in recent time, origi-
nally they were part of a large island separated
from the mainland by a long arm of the sea
which reached far up into the Lake Washington
basin. At the end of the last Ice Age Mount
Rainier was about 2,000 feet higher. The land
was bare and gray, but soon grasses and brush
took hold, and as the climate warmed trees were
reestablished. Soon the Cedar River built a delta
in the eastern channel separating the Lake
Washington basin from the rest of the salt
water. Streams poured fresh water from the
mountains into the basin, flushing out the
remaining salt water, and Lake Washington was
created. The lake grew deeper as the delta rose,
and its outflow combined with the Cedar River
to produce the Black River.
About 3,000 years ago the summit of
Mount Rainier collapsed during a major erup-
tion. A tremendous avalanche of mud and
shattered rock swept down the northern slope of
the mountain and was funneled by the canyons
of the White River and its west fork out onto
the lowland, where it spread out over at least
125 square miles of land, creating the White
River Valley. The cataclysmic mudslide filled
the eastern portion of the ancient Puget Sound
channel as far north as the present city of Kent.
The avalanche deposit, known as the
Osceola Mudflow, diverted the White River
toward its outlet at Auburn. As the river cut a
new channel through the mudflow and underly-
ing glacial material, it built a delta fan atop the
rubble already in the channel. Over time the
sediments brought down by the river pushed out
the sea and created a flat valley floor, giving it
its present character.
That closes the third chapter. The volcanic
highland of the microcontinent and its folded
margin, the Ice Age sediments exposed in the
unstable valley walls, and the river floodplain
shape the world we live in.
THE FIRST PEOPLE
n early historic times, the main village of
the Duwamish stood in what is now
Renton, but other villages lined the river
banks from Elliott Bay all the way to Maple
Valley. To the Duwamish people, the water-
course made up of the Duwamish, Black and
Cedar rivers was one river that they called the t-
hw-duw, which meant something like "going
inside," which is where it took people who
paddled their canoes upstream from the bay.
The people living beside it were known as the
duw-AHBSH, "inside people," a name since
anglicized to Duwamish. Other groups living
along adjacent rivers were closely related.
The Duwamish made their home in a very
favorable natural environment. Near their
confluence, the Black and White rivers flowed
between natural levees built up from heavier
riverborne sediments deposited during floods.
Between these levees and the valley walls, the
floodplain was swampy and covered with a dense
growth of hardhack and willow thickets and
bordered by gallery forests of alder, maple,
cottonwood, and occasional groves of cedar, fir
and yew. During floods, the marshy floodplain
vegetation held water like a sponge, releasing it
slowly through a maze of intersecting drainage
channels. The highlands were mantled with
towering coniferous forests broken here and there
by swamps and luxurious, parklike meadows.
It is estimated that about 300 people lived
in the Tukwila area in the eighteenth century;
probably no more than 2,000 lived along the
length of the three river system, and not many
more than double that throughout the entire
Duwamish River watershed.
0
VILLAGES IN THE VALLEYS
D
n Tukwila, longhouses clustered at
two locations: at sko-AHL-ko, meaning
"confluence," where the Black and White
rivers met, and further up the White River near
the southern margin of a swamp west of the river
XIII
called bis -H00 -kid, "where there are swans."
Longhouses consisted of a frame of uprights and
rafters sheathed by split, adze -hewn cedar planks.
If it were not burned accidentally or destroyed
in some other way, a longhouse might last a
generation, but by then rot and the buildup of
vermin that normally accompanied prolonged
human habitation generally drove the residents
to build a new one a short distance away.
Although the longhouse site might shift,
evidence indicates that people settled in general
areas for long periods of time. In 1981 archae-
ologists excavated the floor of a longhouse on
the Black River that had been occupied in the
fourth century A.D. Artifacts recovered indicate
the area near the confluence was rich enough to
make its residents relatively wealthy and influ-
ential over 1,000 years ago.
It is believed that a village was located at
the confluence on the point of land between the
rivers. An 1862 land survey map shows a lake,
named White Lake by the settlers, at this point,
separated from the rivers by the levees. This was
an intermittent feature produced by flood
waters, and the village's two longhouses, each
said to have measured 60 by 120 feet, probably
stood on the levees or on high ground back from
the lake somewhere within the present confines
of Fort Dent Park. On the north side of the
Black River, on a flat called t-ah-WEH-deech,
"river duck," there were houses of undetermined
size. West of the confluence, beneath the bluff
presently rising above Interurban Ave., there
were four medium-sized longhouses measuring
50 by 100 feet. The name of this house site is
the anglicized version of the place name skah-
LEELS, "bad looking," which referred to the
muddy rocks in the river here. It is probable that
not all of these house sites were inhabited at the
same time, and the four longhouses at Skal-alius
may represent the maximum number of
longhouses that stood at the confluence site.
South on the White River, two more
longhouses measuring 60 by 120 feet stood
beside the river at the head of the swamp that
extended from S. 180th St. to Southcenter.
Another longhouse may have stood on the river's
xiv
west bank at what is now Bicentennial Park.
Each longhouse commonly sheltered several
related families. Together they made a house
group, a self-sufficient economic unit whose
members shared food and other goods and who
spent the winter months under a single roof.
One or more house groups were united by
kinship, residence and exogamy (marriage to
partners from other house groups). This consti-
tuted a winter village group. Exogamy broad-
ened a group's economic base since the right to
gather food at certain places was passed down
through family lines and distributed through
marital ties. A member of one winter village
group who married into another retained the
identification with his or her birth village, and
when he or she died, the body was often trans-
ported back to the home winter village burial
ground. The fact that an Indian burial ground is
remembered to have been located on the hill-
side west of the confluence suggests that the
house groups there made up a winter village
group, but the lack of a burial site for the house
groups at bis -H00 -kid suggests that they were
affiliated with the major stuk-AHBSH winter
village.
THE YEAR BEGINS WITH SPRING
or the people living at these locations,
the year began in late February, when a
chorus of frogs heralded the onset of a
new season of life. Storytellers elaborated upon
the lascivious adventures of Mink, who came
ashore from his raft of snags and impregnated
virtually anything that moved. As the fertile
earth grew green, families prepared to leave the
,longhouses to harvest the product of his virility.
In late winter a man who had the Father of
Smelt for a supernatural ally would sing the fish
upstream, where the people caught them in tube
weirs woven from cedar. Steelhead trout also
appeared in the rivers and were caught with
spears and nets. Hunters left for the swamps to
capture elk that came to browse on the brilliant
blooming skunk cabbage, and parties of women
LIFE ON THE DUWAMISH IN THE 1850s
on �errit3 y
lkin� C°��eOCo rt1 18D, \g53,
�tioct ot s utl0nt P' °{ Match, 853
F it ve StRes (1 is 5th dal i I. atch, O. °{
Fir
t,th K of the
a that ° UMay�ata `° the �n Couoty act as
e�»to thehous»fU S. tda-cewith
be it tete C
the
CO
S
o.
the tOtaete et at the t �amea peXo r * eac Wata e o ,
K• et he {ots-to- t .• GeotGe SR;tth,
Saetea that a {�tOts pace, hn
sct
S
atAa Count ,tl the house
`ncO onets and
nvenea a ae\y ot6 0{ Oteg,o Cotnet`issactea:
eatt\e, a" ,A. C k Det' y as ttan
hefts\ative P' a pt• P ess w ��o�ed *o
M Co\h ` {o\\ov'ingbustn
be su M p\e,
P
at t to,wt xenN
ve as bta� \e * Y\enty Be\\, l°t SttOb
amue\M,p�li\so". WR` et,ioh
Nod ass 'DaviahDct Da41co. •t
P
S
a
sioner and juror posts, others appointed to
political office from the Duwamish were
Bennett L. Johns, Constable, and John Holgate,
Assessor.
In the years following the foundation of
King County, those pioneering the Duwamish
Valley filled a number of county offices.
Appointed in 1853, in 1854 Luther Collins
was elected King County Commissioner.
Jacob Maple, John Buckley, Henry Van
Asselt, Louis V. Wyckoff, Timothy Grow,
Joseph and Stephen Foster,. Charles
e\, Brownell and William Gilliam served on
the county grand and petit juries. The
aay same year Collins was appointed the
first King County Road District Super-
visor, and Stephen Foster served as
Deputy Sheriff for Sheriff Carson
Boren.
From 1855 through 1857
men from the Duwamish Valley
were frequently elected to the presti-
gious county commissioner post, the top office
in the county: Cyrus Lewis, 1855-1856, Francis
McNatt, 1857, and Henry Adams, 1860. In the
1850s county commissioners were paid at a rate
of $6/day while serving at session. Fifteen cents
a mile travel expenses were paid to elected
county officials to attend sessions at the
county seat.
Nod
as petto\,nMoss,Wm ,
ot, the {itst M°n
a my Van Psse\t• aa, o meet
opt to
�taeted that the coot
Si6't`ea'
I,. T/i bins*
P.Denvy
Coco.oUssiottets
* Duwamish Valley Settlers
the counties north of the Columbia River and
the Oregon Territory capital in Salem was too
great to allow for good communication between
the capital and the far-flung county seats. Thus,
after the creation of the new counties agitation
began for a separate territorial government to be
created for the region north of the Columbia
River. A convention was held at Monticello,
near the mouth of the Cowlitz River on the
Columbia, to petition Congress for the creation
of a new territory to be called "Columbia." The
seven delegates from King County were Luther
M. Collins, Charles C. Terry, George N.
McConahan, William Bell, John Low, Arthur
Denny and Dr. David Maynard. The memorial
was adopted on March 2, 1853, with the name
changed from "Columbia," to "Washington."
Of the 17 men making up the initial King
County government, almost one-third were
from the Duwamish. In addition to commis -
MOX LA PUSH PRECINCT
he year King County was established
the entire county was a single precinct
and all official activity took place in
Seattle, the county seat. In 1854 additional
precincts were established at Stuck, Auburn and
Mox la Push (Fort Dent Park area). The pre-
cinct name was the Chinook jargon name for
the confluence of the Black and White rivers,
Mox la Push ("two mouths"). The name arose
from a natural phenomenon of the area. In the
nineteenth century the Black River floodplain
was sufficiently flat that during spring flood the
pressure of the White River's waters reversed the
19
121
TUKWILA-COMMUNITY AT THE CROSSROADS
current of the Black River, forcing it to empty
into Lake Washington. Hence, the river had
two mouths.
Initially, the Mox la Push precinct did not
have well-defined boundaries but included all
the voters living on the Duwamish, Black and
White rivers and environs. In May 7, 1860, the
boundaries of Mox la Push were simply defined
as the area lying between Luther Collins'
northline and the northline of G. P. Bissel's
land in the White River Valley, south of what
became Orillia. In the records, the precinct
name Mox la Push is variously spelled
Moxlapush, Moxt La Busch, Mox lapuch, Mox
le Push, and Mox lapush.
For the first ten years the Mox la Push
precinct polling place moved from cabin to
cabin. Being situated at the confluence of the
rivers, Joseph Foster's cabin was a convenient
location and served as the official polling place
for a number of years. Cyrus C. Lewis, Abraham
Bryant and John Thomas, from the White
River, served as the first election judges. Cyrus
Lewis was appointed Justice of the Peace, a
position he held for many years, and Abe Bryant
was constable for the entire precinct district.
The next year election judges were Henry
Adams, Sam Grow, C. C. Lewis, and Abe
Bryant. Voting again took place at Joseph
Foster's, while neighbor Charles Brownell served
as election clerk. In 1859 Mox la Push precinct
was reconfirmed by the county commissioners
and the polling place moved across the river
from Foster's to L. V. Wyckoff s cabin.
In May of 1860 voting took place at Ben
Johns' house near the Lewis ferry landing. On
May 8, 1865, the Mox la Push polling place was
moved to the ferry landing which had recently
been taken over by Joseph Steele. The
Duwamish River Road crossed the river at the
ferry landing, making it the crossroads of the
valley and as such the most accessible location.
Settlers typically traveled by water to the polling
place.
The main issues placed before the voters at
this time were selection of officials and taxes.
For example, in the election held on June 6,
20
1857, the following taxes were approved: 2 mill
school tax, 3 mill county tax, 1 mill territorial
tax. Road tax was 25 cents for each $100 of
income, and $9 road tax on each person defined
as "liable" to pay road tax. A taxpayer could
perform road construction labor in lieu of paying
cash.
TRAVEL IN THE EARLY 1850S
ntil the construction of the local
railroad line in the 1870s, travel in the
Duwamish and White river valleys was
by water, Indian trail or the rugged roads built
by the settlers. The rivers were the highway for
traveling, shipping produce, and receiving mail
and supplies. Almost all of the early exploration
and travel was done via canoes paddled by hired
Indian guides. The river valley settlers quickly
adopted a special Indian type of canoe for their
river travel, and everyone had at least one canoe
which was very satisfactory for light loads or a
few passengers.
The rich river -bottom soil produced bumper
crops that provided enough surplus to sell in the
village of Seattle. To haul heavy loads a simple
barge was improvised by firmly lashing poles laid
across the hulls of two large canoes placed side
by side. The cargo of potatoes, hay, butter, fruit
or animal skins was secured to this platform.
Hogs or other small livestock were not put on
the platform but tied in the bottom of the
canoe, and the slow careful trip down the river
began. If a sudden storm blew in, the boatman
had a hazardous time of it. Depending upon the
starting point, the journey could take a few
hours or more than a day. The trip had to be
timed with the outgoing tide, since the mouth of
the Duwamish was a muddy delta at low tide. In
the late 1850s, enterprising Indians started. a
canoe ferry service for the settlers, charging $1 a
two -canoe barge load.
Traveling around Puget Sound from Olym-
pia to Victoria was possible on one of several
small steamboats in operation from the early
1850s. The best known was the Eliza Anderson.