HomeMy WebLinkAboutSEPA E95-0024 - BOEING - BUILDING #2-86 DEMOLITIONBOEING
BUILDING #2-86
DEMOLITION
7755 E. MARGINAL WAY S.
E95-0024
TO: Jack Pace
FROM: John Jimerson
RE: SEPA - Boeing Bldg.
DATE: August 10, 1995
Memorandum
Project File No. E95-0024
2-86
Project Description:
The site is located at 7755 East Marginal Way South, located on
Boeing Plant No. 2. The proposal is to demolish Building 2-86,
which is a 30,000 square foot wood and metal building, leaving the
foundation in tact. The site is zoned Heavy Industrial (M-2).
Agencies With Jurisdiction:
None
Comments to SEPA Checklist:
Page 4, No. 1(g): The site will be covered with impervious
surfaces. However, there will be no changes in the percent of
impervious surface area, as the foundation will remain in place.
Summary of Primary Impacts/Proposed Mitigation:
No significant adverse impacts associated with this project have
been identified. The temporary noise, dust and traffic generated
during the demolition will not be detrimental to the vicinity given
its heavy industrial character.
Recommended Threshold Determination:
DNS
CITY OF TUKWILA
DETERMINATION OF NONSIGNIFICANCE (DNS)
DESCRIPTION OF PROPOSAL:
DEMOLITION OF A 30,000 S.F. BUILDING (2-86)
PROPONENT: LORI PITZER
LOCATION OF PROPOSAL, INCLUDING STREET ADDRESS, IF ANY:
ADDRESS: 7755 EAST MARGINAL WY S
PARCEL NO: 000160-0020
SEC/TWN/RNG: 33/24/04
LEAD AGENCY:
CITY OF TUKWILA FILE NO: E95-0024
The City has determined that the proposal does not have a probable
significant adverse impact on the environment. An environmental
impact statement (EIS) is not required under RCW 43.21c.030(2)(c).
This decision was made after review of a completed environmental
checklist and other information on file with the lead agency. This
information is available to the public on request.
***************************************************************************
Thin determination is final and signed this IO th
day of
1995.
Steve Lancaster, Responsible Official
City of Tukwila, (206) 431-3680
6300 Southcenter Boulevard
Tukwila, WA 98188
You may appeal this determination to the City Clerk at City Hall, 6200
Southcenter Boulevard, Tukwila, WA 98188 no later than 10 days from the
above signature date by written appeal stating the basis of the appeal for
specific factual objections. You may be required to bear some of the
expenses for an appeal.
Copies of the procedures for SEPA appeals are available with the City
Clerk and Department of Community Development.
d `y City of Tukwila
-14ora
1908
6200 Southcenter Boulevard
Tukwila, WA 98188-2599
.LORI PITZER
BOEING COMPANY
• P 0 BOX 3707 MS 2R-71
SEATTLE WA 98124
CITY OF TUKWILA
6200 SOUTHCENTER BLVD.
TUKWILA, WA 98188-2599
(206) 433-1800
SEPA ENVIRON. REVIEW
DEPT OF ECOLOGY
P 0 BOX 47703
OLYMPIA WA 98504-7703
CHECKLIST: ENVIIIIIMENTAL REVIEW/SHORELINE PERMIT MAILINGS
FEDERAL AGENCIES
( )U.S. ARMY CORPS OF ENGINEERS
( )FEDERAL HIGHWAY ADMINISTRATION
( )DEPT. OF INTERIOR -FISH & WILDLIFE SERVICE
WASHINGTON
( )U.S. ENVIRONMENTAL PROTECTION AGENCY
( )U.S. DEPARTMENT OF H.U.D. (REGION X)
STATE AGENCIES
( )OFFICE OF ARCHAEOLOGY
( )TRANSPORTATION DEPARTMENT
( )DEPT. OF NATURAL RESOURCES
( )OFFICE OF THE GOVERNOR
( )DEPT. OF COMMUNITY DEVELOPMENT
( )DEPT. OF FISHERIES
( )K.C. PLANNING & COMMUNITY DEV.
( )BOUNDARY REVIEW BOARD
( )FIRE DISTRICT #11
( )FIRE DISTRICT #2
( )SOUTH CENTRAL' SCHOOL DISTRICT
( )TUKWILA LIBRARIES
( )RENTON LIBRARY
( )KENT LIBRARY
( )CITY OF SEATTLE LIBRARY
( )US WEST
( )SEATTLE CITY LIGHT
( )WASHINGTON NATURAL GAS
( )WATER DISTRICT.#75
( )SEATTLE WATER DEPARTMENT
( )GROUP W CABLE
( )OLYMPIA PIPELINE
( )KENT PLANNING DEPARTMENT
( )TUKWILA CITY DEPARTMENTS:
( )PUBLIC WORKS ( ) FIRE
( )POLICE ( )FINANCE
( )PLANNING ( )BUILDING
( )PARKS AND ORECREATION
( )TUKWILA MAYOR
( )DEPARTMENT OF SOCIAL & HEALTH SERVICES
( )DEPT. OF ECOLOGY, SHORELANDS DIVISION
( )DEPT. OF ECOLOGY, SEPA DIVISION*
( )DEPARTMENT OF WILDLIFE
( )OFFICE OF ATTORNEY GENERAL
*SEND CHECKLIST WITH DETERMINATIONS AND
*SEND SITE MAPS WITH DECISION
KING COUNTY AGENCIES
( )KING COUNTY DEPT. OF PARKS
( )HEALTH DEPARTMENT
( )PORT OF SEATTLE
( )BUILDING & LAND DEV. DIV.-
SEPA INFORMATION CENTER
SCHOOLS/LIBRARIES
( )HIGHLINE SCHOOL DISTRICT
( )KING COUNTY PUBLIC LIBRARY
(,.--)SEATTLE MUNICIPAL REFERENCE LIBRARY ••
( )SEATTLE SCHOOL DISTRICTS
( )RENTON SCHOOL DISTRICT
UTILITIES
( )PUGET SOUND POWER & LIGHT
( )VAL-VUE SEWER DISTRICT
( )WATER DISTRICT #20
( )WATER DISTRICT #125
( )CITY OF RENTON PUBLIC -WORKS
( )RAINIER VISTA
( )SKYWAY
CITY AGENCIES
( )RENTON PLANNING DEPARTMENT
( )CITY OF SEA -TAC
( )CITY OF SEATTLE
( )CITY OF BURIEN
( )TUKWILA PLANNING COMMISSION MEMBERS
( )TUKWILA CITY COUNCIL MEMBERS
OTHER LOCAL AGENCIES
( )PUGET SOUND REGIONAL COUNCIL
( )P.S. AIR POLLUTION CONTROL AGENCY
( )SW K.COUNTY CHAMBER OF COMMERCE
( )MUCKLESHOOT INDIAN TRIBE
( )DUWAMISH INDIAN TRIBE
MEDIA
( )DAILY JOURNAL OF COMMERCE
( )VALLEY DAILY NEWS
( )METRO ENVIRONMENTAL PLANNING DIV.
OFFICE/INDUSTRIAL 5,000 GSF OR MORE
RESIDENTIAL 50 UNITS OR MORE
RETAIL 30,000 GSF OR MORE
( ) HIGHLINE TIMES
( ) SEATTLE • TIMES
• •
PUBLIC NOTICE MAILINGS FOR PERMITS
SEPA MAILINGS
Mail to: (comment period starts on date of mailing)
Dept. of Ecology Environmental Review Section
Applicant
Other agencies as necessary (checked off on attached list)
Include these documents:
SEPA Determination (3 -part form from Sierra)
Findings (staff report, usu. with MDNS)
SEPA Checklist (filled out by applicant)
Drawings/Plans of project (site plan, elevations, etc. from PMT's)
Affidavit of Dlstribution (notice was mailed & sent to newspaper).
SHORELINE MAILINGS
Notice of Application:
Notice of application for a substantial development Permit must be
mailed to owners and to property owners within 300 feet of subject
property, prepare an affidavit of publication, and publish two
consecutive weeks with deadline for comments due 30 days after last
newspaper publication date.
Shoreline Permit:
Mail to: (within 8 days of decision; 30 -day appeal period begins
date received by DOE)
Department of Ecology Shorelands Section
State Attorney General
Applicant _
Indian Tribes
Other agencies as necessary (checked off on attached list).
Include these documents:
Shoreline Substantial Development Permit (3 -part form from Sierra)
Findings (staff report, if applicable)
Shoreline Application Form (filled out by applicant)
Drawings/Plans of project (site plan, elevations, etc. from PMT's)
Site plan, with mean high water mark & improvements
Cross-sections of site w/structures & shoreline
Grading plan
_ Vicinity map
SEPA Determination (3 -part form from Sierra)
Findings (staff report, usu. with MDNS)
SEPA Checklist (filled out by applicant)
Any background studies related to impacts on shoreline
Notice of Application
AffidavitofDistribution (notice was mailed & sent to newspaper)
Affidavit of Publication (notice was published in newspaper).
Contr�No. ,�
Epic File No.
Fee'$ 325 Receipt No.
ENVIRONMENTAL CHECKLIST
A. BACKGROUND
1. Name of proposed project, if applicable: - $(p
2. Name of applicant: ' Q, Fj,5.L„15
w h�
3. Address and phone number of applicant and contact person: 11_p_acerkc1c.
�.o<► Pr r_zEA, P.V. 6wc 3701 ; VV1S ?(Z l Seattle_ cikC y
4. Date checklist prepared:
5. Agency requesting Checklist: City of Tukwila
6. Proposed timing or schedule (including phasing, if applicable):
Ectrlkl 14u50$+ - 1995
7. Do you have any plans for future additions, expansion, or further activity
related to or connected with this proposal? If yes, explain. (4O
8. List any environmental information you know about that has been prepared, or will
be prepared, directly related to this proposal.
j� aft �i'v�c g. roh�rye 1N YstkPath +G �' w►en
a i .
iSh O.orror arlooelopy►nevt Prop
crkt 1) 91.5
9. Do you know whether applications are pending for governmental approvals of other
proposals directly affecting the property covered by your proposal? If yes,
explain. N
-2-
•
10. List any government approvals or permits that will be needed for your proposal.
-
de.r 1t1 p2�cmi
11. Give brief, complete description of your proposal, including the proposed uses
and the size of the project and site. There are several questions later in this
checklist that ask you to describe certain aspects of your proposal. You do not
need to repeat those answers on this page. Section E requires a complete
• description of the objectives and alternatives of your proposal and should not be
summarized here.
11.1_ pro�ec.- f5 c��,rno1\ 1ioh ac ave �x��s�ir 5 uc vre..
�-D ' S
bac ���•v`J ; s ► . • ... •� . S. �
• •. • • • _ •• . _� L .� h+r ( 1
- +Mo• LIZ. c.k 4171 re.o.jrl 4. . cO, 4pa�a ria t �� rc .
qv.8_ au¢. l� �¢, iv. Sct t�ohc+ � tr . Il p 10_ Ill i h
uv\ iov w%% Q 104+ ivy lace (.0%. . r,v be -la )4- rude MO.
v
12. Location of the proposal. Give sufficient information for a person to understand
the precise location of your proposed project, including a street address, if
any, and section, township, and range, if known. If a proposal would occur over
a range of area, provide the range or boundaries of the site(s). Provide a legal
description, site plan, vicinity map, and topographic map, if reasonably
available. While you should submit any plans required by the agency, you are not
required to duplicate maps or detailed plans submitted with any permit applica-
tions related to this checklist.
lig_ bvi\chir\s ic1evkiFred. asvt a-e� 130‘.10.14,5Cc vc�
13. Does the proposal lie within an area designated on the City's Comprehensive Land
Use Policy Plan Map as environmentally sensitive?
-3-
TO BE COMPLETED BY APPLICS
B. ENVIRONMENTAL ELEMENTS
1. Earth
.Evaluation for.
Agency Use Only
a. General description of the site (circle one): Flat,
rolling, hilly, steep slopes, mountainous, other
Flo ay.J__ pa yea
b. What is the steepest slope on the site (approximate
percent slope)? 714 46 176
c. What general types of soils are found on the site
(for example, clay, sand, gravel, peat, muck)? If
you know the classification of agricultural soils,
specify them and note any prime farmland.
d. Are there surface indications or history of unstable
soils in the immediate vicinity? If so, describe.
1`�ld
e. Describe the purpose, type, and approximate quanti-
ties of any filling or grading proposed. Indicate
source of fill. mcmpL. tievym14ioh ohV
f. Could erosion occur as a result of clearing,
construction, or use? If 5o, generally describe.
8errbl►•kioh ao uv+ck.Aroh or\1)(
g•
About what percent of the site will be covered with
impervious surfaces after project construction (for
example, asphalt or buildings)?
0 Evaluation for
Agency Use Only
h. Proposed measures to reduce or control erosion, or
other impacts to the earth, if any:
Ncw t
2. Air
a. What types of emissions to the air would result from
the proposal (i.e., dust, automobile odors,
industrial wood smoke) during construction and when
the project is completed? If any, generally
describe and give approximate quantities if known.
uglf 4..WN SSt'Ors urW hC c e111O. 1.101Cy occur.
Si 1'0 uacele,wcJ QS q or rate_
[inh rcl d ust . O ehro'J Pc t iw
h
le W SS ions
U � w�11 occ�r.
b. .Are there any off-site sources of emissions or odor
that may affect your proposal? If so, generally
describe. No
c. Proposed measures to reduce or control emissions or
other impacts to air, if any:
Nl0 he -
3. Water
a. Surface:
1) Is there any surface water body on or in the
immediate vicinity of the site (including year-
round and seasonal streams, saltwater, lakes,.
ponds, wetlands)? If yes, describe type and
provide names. If appropriate, state what
stream or river it flows into.
Nome. t1n‘'h ZCSO' a4 4u.
v.) u 1' e. WCt
-5-
0 Evaluation for
Agency Use Only
2) Will the project require any work over, in, or
adjacent to (within 200 feet) the described
waters? If yes, please describe and attach
available plans.
NCO
3) Estimate the amount of fill and dredge material
that would be placed in or removed from surface
water or wetlands and indicate the area of_the
site that would. be affected. Indicate the
source of fill material.
Nohsz___
4) Will the proposal require surface water
withdrawals or diversions? Give general
description, purpose, and approximate quan-
tities, if known.
5) Does the proposal lie within a 100 -year
floodplain? If so, note location on the site
plan. NOk
6) Does the proposal involve any discharges of .
waste materials to surface waters? If so,
describe thetype of waste and anticipated
volume of discharge.
No
-6-
b. Ground:
Evaluation for
Agency Use Only
1) Will ground water be withdrawn, or will water be
discharged to ground water? Give general
description, purpose, and approximate quan-
tities, if known.
No
2) Describe. waste materials that will be discharged
into the ground from septic tanks or other sour-
ces, if any (for example: Domestic sewage;
industrial, containing the following
chemicals...; agricultural; etc.) Describe the
general size of the system, the number of such
systems, the number of houses to be served (if
applicable), or the number of animals or humans
the system(s) are expected to serve.
N/A
c. Water Runoff (including storm water):
1) Describe the source of runoff (including storm
water) and method of collection and disposal, if
any (include quantities, if known). Where will
this water flow? Will this water flow into
other waters? If so, de cribe.
Mc_vi\e_ c_YQCt t rortn proyc, I.
-7-
0 Evaluation for
Agency Use Only
2) Could waste materials enter ground or surface
waters? If so, generally describe.
Nd.
d. Proposed measures to reduce or control surface,
ground, and runoff water impacts, if any:
4. Plants
a. Check or circle types of vegetation found on the
site:
deciduous tree: alder, maple, aspen, other
evergreen tree: fir, cedar, pine, other GU'C`f.2.Y\pct�2-��,
shrubs r_
grass c5(.5r cdG2.,
pasture
crop or grain
wet soil plants: cattail, buttercup, bullrush,
skunk cabbage, other
water plants: water lily, eelgrass, milfoil, other
— other types of vegetation
b. What kind and amount of vegetation will be removed
or altered?
No v�Q_
c. List threatened or endangered species known to be on
or near the site.
None.
-8-
•
. Evaluation for
Agency Use Only
d. Proposed landscaping, use of native plants, or other
measures to preserve or enhance vegetation on the
site, if any:
N/A
5. Animals
a. Circle any birds and animals which have been
observed on or near the site or are known to be on
or near the site:
birds: hawk, heron, eagle, songbirds, other:
mammals: deer, bear, elk, beaver, other:
fish: bass, salmon, trout, herring, shellfish,
other:
b. List any threatened or endangered species known to
be on or near the site.
c. Is the site part of a migration route? `If so,
explain.
NO
d. Proposed measures to preserve or enhance wildlife,
if any:
-9-
•
• Evaluation for
Agency Use Only
6. Energy and Natural Resources
a. What kinds of energy (electric, natural gas, oil,
wood stove, solor) will be used to meet the
completed project's energy needs? Describe whether
it will be used for heating, manufacturing, etc.
N�vve_ recd v►' real
b. Would your project affect the potential use of solar
energy by adjacent properties? If so, generally
describe.
No
c. What kinds of energy conservation features are
included in the plans of this proposal? List other
proposed measures to reduce or control energy
impacts, if any:
7. Environmental Health
a. Are there any environmental health hazards,
including exposure to toxic chemicals, risk of fire
and explosion, spill, or hazardous waste, that could
occur as a result of this proposal? If so,
describe.
1) Describe special emergency services that might
be required.
2) Proposed measures to reduce or control environ-
mental health hazards, if any:
-10=
b. Noise
. Evaluation for
Agency Use Only
1) What types of noise exist in the area which may
affect your project (for example: traffic,
equipment, operation, other)?
More_.
2) What types and levels of noise would be created
by or associated with the project on a short-
term or a long-term basis (for example: traf-
fic, construction, operation, other)? Indicate
what hours noise would come from the site.______
Ac.AfoArt5 47i e—fkt/ Cissoacdee w tin .
rnA kst�o n
tC s e< \Q. tis 6n. Vu_kc . e of (38
' ' • .
dewto s'4e,_ cs •4a11y 106 Liv,
pro p«ly,
3) Proposed measures to reduce or control noise
impacts, if any:
�ov\�
e.8. b�) 66/6.5
.5
8. Land and Shoreline Use
a. What is the current use of the site and adjacent
properties?
lY1C,V-s�c� CSX./ Man° kGGAurt r USQS
b. Has the site been used for agriculture? If so,
describe.
Np
c. Describe any structures on the site.
e-Olfev‘i'1y -86 bui ►n
fS lex. cjiei 0^ 'Ito t , ck.H
00 1.15_4
-11-
•
• Evaluation for
Agency Use Only
d. Will any structures be demolished? If so, what?
yew
- . z _8ca_ 10 ►1 ��
e. What is the current zoning classification of the
site? Na_ - lleGu j \v►Autkro..Q,.
f. What is the current comprehensive pla designation
of the site? lita0%) 1h AOS}r��
9.
If applicable, what is the current shoreline master
program designation of the site? N/A
h. Has any part of the site been classified as an
"environmentally sensitive" area? If so, specify.
i. Approximately how many people would reside or work
in the completed project?
Nrwt-
Approximately how many people would the completed
project displace?
j•
k. Proposed measures to avoid or reduce displacement
impacts, if any:
No rvt...
1. Proposed measures to ensure the proposal is com-
patible with existing and projected land uses and
plans, if any:
ikon, - Viso h c \ res
Pro po'ca E 1 S (% i IS)
-12-
•
9. Housing
•Evaluation for
Agency Use Only
a. Approximately how many units would be provided, if
any? Indicate whether high, middle, or low-income
housing?
Mc.) N
b. Approximately how many units, if any, would be eli-
minated? Indicate whether high, middle, or low-
income housing.
NovNo
c. Proposed measures to reduce or control housing
impacts, if any:
10. Aesthetics
a. What is the tallest height of any proposed
structure(s), not including antennas; what is the
principal exterior building material(s)proposed?
\00 �� 1 hS A.0 �'JR �� 1N`Qt 514. .
b. What views in the immediate vicinity would be
altered or obstructed?
NOY‘2..
c. Proposed measures to reduce or control aesthetic
impacts, if any:
1ku HQ�
-13-
•
11. Light and Glare
•Evaluation for
Agency Use Only
a. What type of light or glare will the proposal
produce? What time of day would it mainly occur?
b. Could •light or glare from the finished project be a
safety hazard or interfere with views?
Na
c. What existing off-site sources of light or glare may
affect your proposal?
KO
d. Proposed measures to reduce or control light and
glare impacts, if any:
12. Recreation
a. What designed and informal recreational oppor-
tunities are in the immediate vicinity?
Mahe
b. Would the proposed project displace any existing
recreational uses? If so, describe.
N1Uh2.
c. Proposed measures to reduce or. control impacts .on
recreation, including recreation opportunities to be
provided by the project or applicant, if any:
V14
-14-
411 • Evaluation for
Agency Use Only
13. Historic and Cultural Preservation
a. Are there any places or objects listed on, or pro-
posed for, national, state, or local preservation
registers known to be on or next to the site? If
so, generally describe.
kkahz_
b. Generally describe any landmarks or evidence of
historic, archaeological, scientific, or cultural
importance known to be on or next to the site.
c. Proposed measures to reduce or control impacts, if
any:
14. Transportation
a. Identify public streets and highways serving the
site, and describe proposed accss to the existing
street system. Show on site plans, if any.
Eqtsk YY1G ► hcs,1 W t b +L2_ c v r r e v�,}
Qe L mss . Aif 4s5 4o if.c. (44 o li jitw
15f Vq- PS v f v\Vtrwc1, 6oetrs
qr c.tss Iracl AS
b. Is the site currently served by public transit? If
not, what is the approximate distance to the nearest
transit stop?
c. How many parking spaces would the completed project
have? How many would the project eliminate?
-15-
• Evaluation for
Agency Use Only
d. Will the proposal require any new roads or streets,
or improvements to existing roads or streets, not
including driveways? If so, generally describe
(indicate whether public or private).
No
. Will the project use (or occur in the immediate
vicinity of) water, rail, or air transportation? If
so, generally describe.
.ev Noli k.roh e k 1
f. How many vehicular trips per day would be generated
by the completed project? If known, indicate when
peak volumes would occur.
NOv.t.
g. Proposed measures to reduce or control transpor-
tation impacts, if any:
�i01n2_
15. Public Services
a. Would the project result in an increased need for
public services (for example: fire protection,
police protection, health care, schools, other)? If
so, generally describe.
No
b. Proposed measures to reduce or control direct
impacts on public services, if any.
Nov\
-16-
•Evaluation for
Agency Use Only
16. Utilities
a. Circle utilities currently available at the site:
electricity, natural gas, water, refuse service,
telephone, sanitary sewer, septic system, other.
X 11 u4 \ 4r.ts W trL a �lablt - �1.� ► E�.
wets Sere Vc4.1 r J $Q,W.tA._ .
b. Describe the utilities that are proposed for the
project, the utility providing the service, and the
general construction activities on the site or in
the immediate vicinity which might be needed.
C. Signature
The above answers are true and complete to the best of
my knowledge. I understand that the lead agency is
relying on them to make its decisiAn.
Signature:
Date Submitted: 8/2"
PLEASE CONTINUE TO THE NEXT PAGE.
-17-
• TO BE COMPLETED BY APPLIC• Evaluation for
Agency Use Only
E. SUPPLEMENTAL SHEET FOR ALL PROJECT AND NON PROJECT
PROPOSALS
The objectives and the alternative means of reaching the
objectives for a proposal will be helpful in reviewing the
aforegoing items of the Environmental Checklist. This
information provides a general overall perspective of the
proposed action in the context of the environmental infor-
mation provided and the submitted plans, documents, suppor-
tive information, studies, etc.
1. What are the objective(s) of the proposal?
obAtCA CO2. t 4o Cl err of t151., ah
eicrs4.i h� D} -r cAvre.. 1 ver c k v r
4 .x. cuv.cOL.At'or W V,1.4_ k 4► h
2. What are the alternative means of accomplishing these
objectives?
Nowe-
3. Please compare the alternative means and indicate the
preferred course of action:
PY2gerrte Course. 64 ac+iThh N
w.n1%`SL, 4.41 54rucWre_ r2moo2
t4� 2.brt GV c. WiG.IGS a re &
-22-
..1
• •
4. Does the proposal conflict with policies of the Tukwila
-Comprehensive Land Use Policy Plan? If so, what poli-
cies of the Plan?
No
Proposed measures to avoid or reduce the conflict(s)
are:
NI/A
-23-
Evaluation for
Agency Use Only
DEM CMGMGMad
PLANT 2
SEATTLE / TUKWILA, WA
\�I
0 50
I 1 I I IIFT
SCALE
sCP-
PLA
RE @MAP
Building 2-86 Demolition
_ •. lJ
DUWAMISH
WATERWAY
,A
PARKING
2
NORTH
DUWAMISH
, CAMPUS
2-14
GATE
2-05 8-60
ix
GATE -
151, 8-42
•J> 1226
230
`' 2 2 a
P
2' i t6�
2-31 "
1
2-25
2-41
2-40
•
GATE 8-34
2-24
BOEING COMPAN'
HEADQUARTERS
CAFETERIA ,
THEATRE
LOBBY
l GATE B-32
2-44
2-51
2-47
GATE B-18
tt L_
A 2-63 p aa) p 2-57
N
2-48
•
•
•
10 s.
0 -45
MEDICAL �� •�%
FACILITY iJs s•
GATE B-14
r�CU02-68
6l ill ID
2-
til
'15-19
• 15-09
15-21
15-25
15-22
•
•
To be Demolished
\ JORGENSEN
FORGE CO.
THOMPSON
SITE , \
126 p� 1t
2-102 8 2.104
2-103 /2-110
2-109 ,
BOEING
FIELD
LEGEND:
IR PEDESTRIAN
TUNNEL
2-24 Building
7755 E Marginal Way S
Seattle. WA 98108