HomeMy WebLinkAboutSEPA E95-0025 - HIGHLINE SCHOOL DISTRICT - CAPITAL FACILITIES PLANHIGHLINE SCHOOL DISTRICT NO. 401 FACILITIES DEPARTMENT CAPITAL FACILITIES PLAN E95-0025 • City of Tukwila John W. Rants, Mayor Department of Community Development Steve Lancaster, Director August 25, 1995 Alan J. Schmidt Highline School District No. 401 17810 8th Ave S. Seattle, WA 98148 RE: Six Year Capital Facilities Plan Dear Mr. Schmidt: We have reviewed the above referenced Capital Facilities Plan and DNS and have the following comments to offer. The City of Tukwila is currently conducting public hearings on a new Comprehensive Plan, with the final hearing scheduled for October 16, 1995. The Planning Commission is reviewing the draft development regulations which are scheduled to be forwarded to the City Council in early September. The draft plan, regulations and EIS have been previously forwarded to the School District. We recommend that you review these documents to ensure they will conform to the proposed CFP. If you find additional coordination between the City's and the School District's planning efforts is needed, we encourage you to take the opportunity to comment at the City Council public hearings. As noted in the executive summary, the School District has no plans for implementing impact fees for Tukwila. Should there be a change in this position, we recommend you contact us as early in your planning process as possible and provide us with information supporting new impact fees so that we may work with you to develop appropriate ordinances. If you have any question, don't hesitate to call me at 431-3686. Sincerely, Steve Lancaster Director, DCD 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431-3670 • Fax (206) 431-3665 • August 21, 1995 LL- (t)(5ce Alan J. Schmidt Highline School District No. 401 17810 8th Ave S. Seattle, WA 98148 (JJ RE: Six Year Capital Facilities Plan Dear Mr. Schmidt: • I have reviewed the above referenced Capital Facilities Plan and DNS and have the following comments to offer. The City of Tukwila is currently conducting public hearings on a new Comprehensive Plan, with the final hearing scheduled for October 16, 1995. The Planning Commission is reviewing the draft development regulations which are scheduled to be forwarded to the City Council in early September. The draft plan, regulations and EIS have been previously forwarded to the School District. We recommend that you review these documents to ensure they will conform to the proposed CFP. If afto a^ur row„ pw you find additional coordination between the City's and the School District's planning efforts, a needed, we encourage you to take the opportunity to comment at the City Council public hearings. CFP des use of impact fees to pay for school.faciliies. u m -y want to .ceerdinate with the City on impact fees, as the y of Tukwila draft plan and regulations do not propose lementation of impact fees at this time. If you have any Sincerely, Jack Pace Senior Planner question, don't hesitate to call me at 431-3686. L (0"5"(741,-3-/ 0^41474 i‘2(Ctiej lcke3(CJ ( '//`. uy\A """A ,�, (75k" Ia r C G c f 1-✓�'G' — w % Gov/ ° - ( CITY OF TUKWILA Id: MISC120 Keyword: UACT User: 1684 08/21/95 Comments regarding an Activity STATE ENVIR PROTECT ACT Permit No: E95-0025 Tenant: HIGHLINE SCHOOL DISTRICT Status: PENDING Location: 17810 8TH AVE. S., SEATTLE 98148 (HIG Line User Id Text 1 1684 8/21/94: No comments due to low priority of review. Can't 2 1684 respond by 8/24 deadline, nor do I suggest spending time 3 1684 reviewing docsince there are only a few blocks of Tukwila 4 1684 land in the Highline School dist (areas south of S. 160th 5 1684 St.). vu Enter Option: A=Add, C=Change, D=Delete, I=Inspect Up/Down=Select, PgUp/PgDn(F2)=Page, F3=First 12, ESC=Exit Comment Added O.K. ecgC 02 • I! ..... . .::. JIi7,7_,i •.P.;; ,._. 74 ri'l..;,..;',1;,-,. . ! .1 1 . •,,,-.:,,,;.....,.; . .. , ..c,,,.. u! ._; 11 i ' d .--- - I . I I -.:- 11 \- , ,.7- J;I! -. . rif 11 -.1':. ; •-•; I ji P: .-:-....,-. r. L1 r-:1 .;•.- /'-'. • r- -••• • 1 ,Y1.7.1' 77-:31 r'<•E%-s. .-; 11_ 111/4,• 1-1-7..7•".--'7'h,.. -\\ 4 if:j \ • LigRGOCIE'EC E 9."‘k• ." • •,‘ 1[J. ss. • :••••••;-•--.% "• 7* -- A , • • . ••• 1.23 •••••, • >N5: " 4.> • /..' — k.--• ".* • • , \ ;I! -••- • HI • \s! .:;111.ki•ii, ,‘• :,..- •-•::::=H';,.*:--iii7.1.•-•;-/.7.,...:•:4,,\.,.• ,.:k.`;‘. /4.\ •••/„,,,..E: .,:.4.--"-z7:17:•.z,-.... _.5....z......... r:.-.75---z-'4....._,----:z•-: . '.--- — . ;l:ii ,‘... 1-•-•...:1.i.:...„..,,;,:.,—(-,,,I,.,•,.!1.'„P. -r,-..:.,; .i;..'t.„q,:i,..'3,.'-p,,4.1,' t.4.' ..'0:t4. `:‘;..-, p4f.-..'!;il,., a.4..... •i ,.,! I,-'.....,*i'..:rI.1zi4l1p....i.1.j, -,.7.ii.1.l.7l..1p9.,.A.‘.11t...•..7,1.i;..,1 ,,_;,;..-,c;..\,.-:,;-iii•,;.•,-.I,c.•. . . ,... • ; "4 ,,14e P ,_0 —-1r43 47i " p p• T0 -A,.:11.E4-.2 •. • 4O.,. „..:: ....":7::: --. 7--:•--'t:..-- - 1 \'7',..--‘2,'..17!7•13' 4,_.'Llii. -,-; , -,-..:,-.,:-....," 11 .. •64•7.R.;1. 1414.2 L:! ::. 11 ,...2::•:...: : • .. P . . , 1:, •*!-ITT-.... '.. •- - -1 '',. • 7.41.:,--.11.1.14 • •; i 4'1 i'2 6 ' .....!•!1;.;.li..:1,-1.-•••ii:._,..,1. , ,; '-' : 'I 7 I * R..7.,T 1••, I.7.3 ,-:1 •P-1.74• 1 ,P.• : • ,!. ' • : :II_ .....• -7- , 1 " ''. ' tr••• • • -47.2 ,•I f 1 p - • ri , r , ,; - ,-,„. ,. ,...4..,.. , , n•• -••.a N. • . .1.r.! ...........„_!:....... , "-77-,:i...%*7- ••••-•-• .: ".: -;•••••••=:.:--17-• i ,ti -;••Zz.r........- / ,.1 .-::;":.....":...:-.7:".• • li '.1-.7-...• .•*,.....-•"' ' 4( , -.:.:FT".."......'Nlz...„.‘ w ?..---.."-- '' • '....: -.. ..""--"' ..::••- ' .7..-.1.-...".... .. •--.Z....... •:..--:...' 7..---:-:::....... -,.....:-...... .4.--:."----%•7-...:•.-:...,---... .......:„..,z............ -....„......... -...- ..........--- -......,......... • . • mei /-,..:1-in__ •`;‘, ,. s' ': ..-.' , RIM , . . : v . -4., .11-47.1. \ - .... , • . ' ''' - " - - il'..' :,7111'1417:1; ill- k .- ' : . • :"7,...7"';' -6...:'...?3_;:il.. _ -.'!\.' .. 7-L-!i..i.111.1.7:• . • • , r . h. :It .1, .. • , t.1 1.r , ,- , „ --,,.. • • .-, ..1._ • • .• • . i 1 CM t ) ) ' 1 . " -____S .. .1! 1.,,C1.4,1• , .1 C 1. :: . 1 ..`..c".." li ,,,,.., I, t — CP .' ; -11 , '' lic is . • I- ' PI ,:. 7 .74 •-:-.' „--,i I. - :r----, :, ,,-„srsi, L. - 1 i ' j • -i .! : I,' c_.__I -:,-. euf, i 1 1 -4..--i; TURL1ftA cAcrDS irt E4 Ocala' ca -1) iSr P I,r ij 7,.;•-•• ••••••,, 4162minum • , 1.11.1 1 C t _ ^ Riverton Hei ,ts Elementary McMicken Heights Elementary Tv kevtut LAW> S c. f(G(t.r"I( SCW. (ST Wat its vu. NIATTUl•TACOMIA DITOATIOMAL A/MOIIT Bow Lake Tyee High Chinook Mi 1 FORM FOR (PROPOSED/FINAL) DECLARATION OF (SIGNIFICANCE/NON-SIGNIFICANCE) Description of proposal Capital Facilities Plan Proponent Highline School District No. 401, Facilities Department Location of Proposal Lead Agency Highline School District No. 401 This proposal has been determined to (have/not have a significant adverse impact upon the environment. An EIS (is/is not) required under RCW 43.21C 030(2)(c). This decision was made after review by the lead agency of a completed environmental checklist and other information on file with the lead agency. The information is available to the public on request. There is no comment period for this DNS. _x This DNS is issued under 197-11-340(2); the lead agency will not act on this proposal for 15 days from the date below. Comments must be submitted y s 4. 1995. Responsible Official Alan J. Schmidt Position/Title Asst. Director, Maintenance Phone 433-2252 Address 17810 - 8th Avenue South Seattle, WA. 98148 Date F- �f - 9s- Signature gle?,&. iyy,,c 0 You may appeal this determination to (Name): Alan J. Schmidt at (Location): HSD #401, 17810 8th Ave. So., Seattle, WA 98148 no later than (date): August 24, 1995 by (method): Written comments You should be prepared,to make specific factual objections. Contact Alan J. Schmidt to read or ask about the procedures for SEPA appeals. 0 There is no agency appeal. �33�dlll muiva- �(cleC�tS HIGHLINE SCHOOL DISTRICT NO. 401' KING .COUNTY=WASHINGTON HIGHLINE SCHOOL DISTRICT NO. 401 Six -Year Capital Facilities Plan 1995-1996 2000-2001 June 1995 For Information on the Plan, please call the Facilities Department at 433-2501 HIGHLINE SCHOOL DISTRICT NO. 401 15675 Ambaum Blvd. S.W. Burien, Washington 98166 12061433-0111 SIX-YEAR CAPITAL FACILITIES PLAN 1995-1996 2000-2001 June 1995 BOARD OF DIRECTORS Ben Kodama Carol Mohler Eduardo I. Pina Tom Slattery Wilton S. ViaII I11 ADMINISTRATION Joseph R. McGeehan Superintendent Geraldine L. Fain Assistant Superintendent Business & Plant Linda Byrnes Administrative Assistant to the Superintendent HIGHLINE SCHOOL DISTRICT NO. 401 SIX-YEAR CAPITAL FACILITIES PLAN TABLE OF CONTENTS Section Page Number Executive Summary 2 11 Six -Year Enrollment Projection 4 III Current District "Standard of Service" 9 IV Inventory and Capacity of Existing Schools 12 V Six -Year Planning and Construction Plan 17 VI Relocatable Classrooms 26 VII Projected Classroom Capacity 27 VIII Finance Plan and Impact Fee Schedules 29 Hiphline School District Six -Year Capital Facilities Plan June, 1995 Pape 1 !\• / / .\ • \ )' / q ,/ 1- •r: V 1c •�),1: ' L. .. r y / / /, •\ .1 ) f' / • f Executive Summary This Six -Year Capital Facilities Plan has been prepared by the Highline School District, in compliance with the requirements of Washington's Growth Management Act and King County Ordinance No. 10162. This annual plan update was prepared using data available during the 1994-1995 school year. The 1995 Plan is consistent with prior long-term capital facilities plans adopted by the Highline School District. This Plan is not intended to be the sole planning document for all of the District's needs. The District may prepare interim and periodic Long Range Capital Facilities Plans. Any plans will be consistent with this Plan. The 1995 Plan is an update of a Plan which originated in 1984. The fulfillment of the original plan began in 1986 with a $57 million capital bonds measure. The focus of the original plan was to modernize existing schools, provide additional space and provide needed core facilities to support the educational programs. During the past 9 years, the Plan has been adapted to place greater emphasis on constructing additional facilities to house the growing enrollment that has resulted from the 1985 King County Growth Management Plan. The District Plan has also been modified to reduce the total number of schools that the District will operate in the future. Schools will be larger with increased enrollments and staffing. This will enhance the delivery of programs and services, and increase operating efficiency. In order for impact fees to continue to be collected in the unincorporated portions of the District, the Metropolitan King County Council must also adopt this plan update. In order for impact fees to be collected in the incorporated portions of the District, the City of Burien, the City of Des Moines, the City of Normandy Park, and the City of SeaTac must also adopt this Plan and their own school impact fee ordinances. To date, none of these cities have adopted a school impact fee ordinance. A financing plan is included which outlines the District's intent for implementing this Plan. This Capital Facilities Plan delineates the District's "standard of service" in order to determine the District's current and future capacity. The Growth Management Act and King County Ordinance No. 10162 authorizes the District to make adjustments to the standard of service based on specific needs of the District. Hiphhne School District Six -Year Capital Facilities Plan June, 1995 Pape 2 Executive Summary (continued) The capacity of the schools in the District is calculated based on this standard of service and the existing inventory, which includes relocatable classrooms. The District's 1994-95 program capacity of permanent facilities is 20,726. District relocatable capacity of 500 brings the District's current capacity to 21,226. Full Time Equivalent enrollment in October, 1994 was 16,888. The actual number of individual students per the October 1994 head count was 17,937. During the Summer of 1994 the District's Long Range Capital Facilities Plan was studied by the Building Study Committee, "A Blue Ribbon Panel." The Final Report was issued on August 19, 1994. Findings and recommendations of this committee were used in revising the Long Range Plan. The Capital Facilities Long Range Plan was originally adopted by the Highline School District Board of Directors on June 17, 1992. An updated plan was reviewed and approved by the Board on June 8, 1994. The update was based upon the assumption of the passage of a 1995 Capital Projects Bond Issue. The issue was on the May 16, 1995 ballot and failed to gain a 60% approval. The revised 1995 Capital Facilities Plan is predicated upon the passage of a 1996 Bond Issue. Relocatable facilities (portables) will be used to accommodate District growth until new buildings could come "on-line" in 1998. The District's Board of Directors approved this 1995 update of the Plan in its regular meeting of June 28, 1995. As required by the Growth Management Act, this Plan will be updated periodically, with changes in the fee schedule adjusted accordingly. The Plan has undergone SEPA review and a DNS has been issued. The notification appeal and comment period concluded June 5, 1992. (See Appendix D for Checklist.) Highline School District Six -Year Capital Facilities Plan June, 1996 Pape 3 f 11 , ---.SIX-YEAR ENROLLMENT PROJECTION' 1 f / u. J \� J 7 ,7 (, • ')/ r ) / `1, J \ II Six - Year Enrollment Projection Growth projections were calculated by analyzing an eight-year history of the District. The King County live births and the District's relational percentage average were used to determine the number of kindergartners entering the system. The percentage increase ranged from a high of 7.03 in 1986 to a low of 6.04 in 1993. Based on an eight-year average, 6.07 of King County live births are equivalent to the number of students projected to enter Kindergarten in the District for the next six-year period. Projections for Grades 1-12 are calculated using historical cohort survival ratios from the past five years. These are weight averaged by year to produce future year projections. Based on the District's forecast, student enrollment is projected to increase by approximately 1,429 through the 2000-2001 school year which will be an 8% increase over the District's current student population. The expectation is that growth will occur Districtwide, with future emphasis on the Northwest Quadrant (White Center) and the "Highway 99" Corridor. Although increased residential density is now permitted in these areas, economic factors will probably drive these growth areas. Future mass transit plans could accelerate this growth. The District continues to track new and proposed developments. The Highline School District has reviewed King County, Des Moines, Normandy Park, and SeaTac Comprehensive Plans. We are awaiting a final plan from the City of Burien. In the recent past, development has continued at a greater pace in the Des Moines area, and adjacent south District lands. The District is currently absorbing this growth while planning for increased growth in other areas due to increased residential zoning densities. Land availability will continue to drive South District growth. Over time, however, as the developable land becomes increasingly scarce and expensive, the growth is expected to slow. Projections consider the following assumptions: 1. New housing development, both single and multi -family units, will continue at the current rate. 2. There will be no major policy changes which will alter the holding capacity of the students currently enrolled or projected for enrollment in the Highline School District. Highline School District Six -Yea Capital Facilities Plan June 1996 Pape 4 3. There will be no unexpected, major land use changes in the Highline School District. 4. The economic conditions in the District and the area will generally follow the same trend that prevailed in 1994. 5. The residential in/out-migration patterns of students will remain constant. 6. No dramatic changes in present ratios of private to public school enrollments will occur. 7. Existing and foreseeable educational programs will approximate those currently operating within the Highline School District. 8. Current child care programs will exist and the effect of child care placement in the community, as well as District child care programs will remain the same. Current projections may be modified to reflect significant changes in such conditions as: 1. Unexpected increase or decrease in new housing starts for single and/or multiple family units. 2. Modification of District policy related to • open enrollment • student transfer • out -of -district students • child care programs 3. Major land use rezoning, such as • development of SeaTac Business Park • extension of SR 509 • further adjustment of residential density by municipalities 4. Unexpected changes in the District's construction/remodeling schedules impacting the availability of space for students at specific sites. Highlune School District Six -Year Capital Facilities Pin June 1996 Pqe 6 5. The availability and placement of new child care facilities. 6. The current rate of in/out-migration of students. 7. Port of Seattle land acquisition. 8. The opening or closing of private schools. Highline School District Six -Year Capital Facilities Plan June 1996 Page 6 Highline School District - 1995 Capital Facilities Plan Enrollment History - Table #1 Number of Live Births Shown are from Five Years Prior to the Enrollment Year. Highline School District Ss -Year Capital Facilities Plan June 1995 Page 7 1986 1987 1988 1989 1990 1991 1992 1993 1994 King Co. Live Births 18,388 18,811 18,533 18,974 19,788 19,953 20,423 21,275 22,386 HSD Kind/Births % 7.03% 6.89% 7.31% 7.07% 6.31% 6.68% 6.20% 6.04% 6.06% Kindergarten 1,293 1,296 1,355 1,342 1,248 1,332 1,266 1,285 1,356 Grade 1 1,272 1,291 1,315 1,379 1,411 1,281 1,408 1,328 1,376 Grade 2 1,130 1,257 1,329 1,338 1,329 1,342 1,303 1,402 1,358 Grade 3 1,211 1,155 1,298 1,349 1,320 1,353 1,403 1,327 1,464 Grade 4 1,132 1,201 1,198 1,290 1,313 1,367 1,364 1,416 1,355 Grade 5 1,051 1,155 1,164 1,198 1,300 1,373 1,374 1,394 1,414 Grade 6 1,089 1,084 1,185 1,175 1,195 1,317 1,366 1,375 1,413 Sub Total K-6 8,178 8,439 8,844 9,071 9,116 9,365 9,484 9,527 9,736 Grade 7 1,070 1,120 1,110 1,199 1,233 1,254 1,348 1,381 1,410 Grade 8 1,135 1,103 1,122 1,089 1,173 1,201 1,217 1,303 1,336 Sub Total 7-8 2,205 2,223 2,232 2,288 2,406 2,455 2,565 2,684 2,746 Grade 9 1,183 1,165 1,191 1,170 1,199 1,350 1,341 1,443 1,599 Grade 10 1,308 .1,191 1,152 1,137 1,222 1,220 1,355 1,303 1,379 Grade 11 1,409 1,377 1,267 1,209 1,149 1,218 1,257 1,240 1,219 Grade 12 1,494 1,523 1,523 1,270 1,205 1,195 1,246 1,313 1,258 Sub Total 9-12 1 5,394 5,256 5,133 4,786 4,775 4,983 5,199 5,299 5,455 Total Enrollment 15,777 15,918 16,209 16,145 16,297 16,803 17,248 17,510 17,937 Increase/Decrease N/a 141 291 (64) 152 506 445 262 427 Number of Live Births Shown are from Five Years Prior to the Enrollment Year. Highline School District Ss -Year Capital Facilities Plan June 1995 Page 7 Highline School District - 1995 Capital Facilities Plan Six -Year Enrollment Projection - Table #2 Number of Live Births Shown are from Five Years Prior to the Enrollment Year. Projections are Based on Information from the Wa State Center for Health Statistics. King Co. Live Births are Projected for 1999 & 2000. HSD Kind/Births % Projections(1995-2000) are a Weighted Average. Highline School District Sz-Year Capital Facilities Plan June 1995 Page 8 1994 1995 1996 1997 1998 1999 2,000 King Co. Live Births 22,386 22,951 22,799 23,049 22,330 22,123 21,916 Increase/Decrease 1,111 565 (152) 250 (719) (207) (207) HSD Kind/Births % 6.06% 6.07% 6.07% 6.07% 6.07% 6.07% 6.07% Kindergarten 1,356 1,393 1,384 1,399 1,355 1,343 1,330 Grade 1 1,376 1,351 1,464 1,454 1,470 1,425 1,411 Grade 2 1,358 1,314 1,336 1,448 1,438 1,454 1,409 Grade 3 1,464 1,434 1,344 1,367 1,481 1,471 1,487 Grade 4 1,355 1,339 1,447 1,356 1,379 1,494 1,484 Grade 5 1,414 1,438 1,360 1,470 1,377 1,401 1,518 Grade 6 1,413 1,400 1,444 1,366 1,476 1,384 1,407 Sub Total K-6 9,736 9,669 9,780 9,860 9,978 9,971 10,047 Grade 7 1,410 1,417 1,443 1,488 1,408 1,521 1,426 Grade 8 1,336 1,341 1,376 1,401 1,445 1,367 1,477 Sub Total 7-8 2,746 2,758 2,818 2,889 2,853 2,888 2,903 Grade 9 1,599 1,510 1,554 1,595 1,623 1,675 1,585 Grade 10 1,379 1,479 1,504 1,548 1,588 1,617 1,668 Grade 11 1,219 1,271 1,402 1,467 1,510 1,549 1,577 Grade 12 1,258 1,269 1,301 1,435 1,502 1,546 1,586 Sub Total 9-12 1 5,455 5,529 5,762 6,045 6,224 6,388 6,417 Total Enrollment 17,937 17,956 18,360 18,795 19,055 19,247 19,366 Increase/Decrease 427 19 404 435 260 192 119 Number of Live Births Shown are from Five Years Prior to the Enrollment Year. Projections are Based on Information from the Wa State Center for Health Statistics. King Co. Live Births are Projected for 1999 & 2000. HSD Kind/Births % Projections(1995-2000) are a Weighted Average. Highline School District Sz-Year Capital Facilities Plan June 1995 Page 8 } • (/ : J• -1' y ( \ ) ,CURRENT. DISTRICT ,'STANDARD;OFiERVICE'. f• —7 A \'6 ( � / 1t• • )j -'' -, . ' i ( . 1 I • . . 1 • f 1 \ J ,. / 7' , / / . �� J , \ J tl• i r �\' ) /.t ` / /• / 1 ! Il —( _ _ S 1 \ -•-( t i••4 I_ ) 1 :• . •') '1 . `./ 1 { ; •\1 f /. • '1. - J / , -. . (I 1 !. /'4t ,.• •f.,./• •1•• \ \,.,- 1 ;1 \ •t•{ /1,1 • • N. • • r• \— \ . C f III Current Highline School District "Standard of Service" In order to determine the capacity of the District's facilities, the King County Ordinance No. 10162 refers to a "standard of service" that each school district must establish in order to ascertain its overall capacity. The standard of service identifies the program year, the class size, the number of classrooms, students and programs of special need, and other factors determined by the District which would, in the District's judgment, best serve its student population. This Plan includes the standard of service as established by Highline School District. The standard of service defined herein may change due to state wide budget cuts to special education funding. Future changes to the standard of service will be reflected in future Capital Facilities plans. The Highline School District's standard of service is predicated on housing all instructional programs and non -instructional services in appropriate permanent facilities. Portable classroom units are used to house programs and services only as an interim measure until suitable permanent facilities can be provided. District Programs The District's facilities house the basic "regular" education program, plus a broad range of "special programs." Special programs is a generic term which includes programs for students with disabilities, remedial programs, and enhancement programs. Approximately 15 percent of the District's students are enrolled in special programs. The District's standard of service requires facilities for support activities provided by school based and itinerant personnel who provide counseling, tutoring, therapy and other vital services. These activities are typically "pull-out" activities, i.e. they occur in spaces other than the student's regular classrooms. Finally, the District's standard of service further requires adequate "core facilities" to house library, administration, physical education, and food service spaces. These spaces are sized to accommodate the needs of the anticipated or planned enrollment for a particular facility. Highline School District Six -Year Capital Facilities Plan June 1996 Pape 9 Identified students are provided educational opportunities in programs as follows: Bilingual/ESL Program Challenge Program Communication Disorder Specialist Computer Assisted Instruction (CAI) Deaf and Hard of Hearing Developmentally Disabled (DD) = Mentally Retarded/Mild, Moderate and Severe Developmentally Handicapped (DH) Early Childhood Assistance Program (ECEAP) Gifted Education Graduation Equivalent Program (GED) Health Impaired (HI) Highline Preschool Home Schooling Program Honors Program Indian Education Program International Baccalaureate (IB) Multiple Handicapped (MH) Occupational/Physical Therapy Olympic Childcare Orthopedically Handicapped (OH) Realistic Transition Program Reentry Program Teen Parent Program Serious Behaviorally Disabled (SBD) Specific Learning Disabled (SLD or LD) Vision Impaired Vocational/Occupational/Career Ed Program Grade Span Class Sia s The required number of classrooms is primarily a function of the ratio of students per teacher (class size). Grade level student/teacher ratios are established by the District's collective bargaining agreement with its teachers and by the State's funding apportionment formula. Highline School District Six -Year Capital Facilities Plan June 1995 Pape 10 The District's current bargaining agreement specifies the following basic ratios. Grade level Kindergarten 1-3 4-6 7-8 9-12 OSC Regular Prngram Special Program 23.5:1 (47:1 @ 1/2FTE) 24:1 26.5:1 28:1 28.5:1 N/A 6:1-12:1 „ „ „ „ „ „ „ „ 28.5:1 For planning purposes the District bases classroom space requirements on an average ratio of 25:1 for regular programs and 12:1 for special programs. Room Utilizatinn As a result of yearly variations in student enrollment, the need for specialized rooms for certain programs, and the need for teachers to have a work space during their planning periods, it is not possible to achieve 100% utilization of regular teaching stations. Based on the analysis of actual utilization, the District has concluded that the current utilization rate is 80%. As new buildings are added to the District's inventory to replace older buildings, the utilization factor will increase. New elementary buildings designed for a capacity of 650 students have an increased utilization factor of 85%. The District's recently constructed elementary schools therefore, house approximately 550 students. The intent of the District's Master Plan is to permanently close small inefficient elementary schools as new larger schools are built. The utilization factor will increase over time as new construction continues. The increased efficiency of the new elementary buildings will increase the overall District efficiency by 1-2% over the six year period. Highine School District Six -Near Capital Facilities Plan June 1996 Rige 11 ,I• • L `• I -•rte; i 't - \ - - • (• • • 1 IV Inventory and Capacity of Existing Schools The District currently has permanent program capacity to house 20,726 students based on the District's Standard of Service. Relocatable capacity of 500 students brings the total capacity to 21,226. Full Time Equivalent student enrollment for 1994-1995 is 17,937. Included in this section are: a map of existing facilities, the current classroom capacity analysis, and an October 1994 enrollment summary. The existing facilities map shows current schools and other District properties. District classroom capacity is shown for permanent and relocatable rooms. Regular and special programs enrollments are identified by location in the enrollment summary. School addresses are as follows: FLFMENTARY SCHOOLS Beverly Park @ Glendale 1201 S. 104th St. Bow Lake 18237 42nd Ave. So. Cedarhurst 611 So. 132nd St. Des Moines 22001 9th Ave. So. Gregory Heights 16216 19th Ave. S.W. Hazel Valley 402 S.W. 132nd St. Hilltop 12250 24th Ave. So. Madrona 3030 So. 204th St. Marvista 19800 Marine View Dr. S.W. McMicken Heights 3708 So. 168th St. Midway 22447 24th Ave. So. Mount View 10811 12th Ave. S.W. North Hill 19835 8th Ave. So. Olympic (1) 615 So. 200th St. Parkside 2104 So. 247th St. Riverton Heights (2) 3011 So. 148th St. Salmon Creek 614 S.W. 120th St. Seahurst 14603 14th Ave. S.W. Shorewood (3) 2725 S.W. 116th St. Southern Heights 11249 14th Ave. So. Sunnydale 15631 8th Ave. So. Valley View 17622 46th Ave. So. White Center Heights 712 S.W. 102nd St. (1) Former junior high school (2) Location of elementary grade level severely disabled programs. enrollment at 6:1. (3) Kindergarten based in Evergreen High School. Hiphline School District Six -Yen Capital Facilities Plan June 1996 Special Pce 12 MIDDLE SCHnnI HIGH SCHOOLS Cascade Evergreen 11212 10th Ave. S.W. 830 S.W. 116th St. Chinook Highline 18650 42nd Ave. So. 225 So. 152nd St. Pacific Mt. Rainier 22705 24th PI. So. 22450 19th Ave. So. Sylvester Tyee 16222 Sylvester Road S.W. 4424 So. 188th St. ALTERNATIVE SCHnn1 S Satellite High School 440 So. 186th St. SeaTac Occupational Skills Center 18010 8th Ave. So. Highline School District Six -Year Capital Facilities Plan June 1995 Pps13 = HIGHLINE SCHOOL DISTRICT NO. 401 iii . s r ��••1i 1 11111 tt it 1iA1111C.i� 111! 11I ^PIIIK 1I . !Imo MOE n'� 1 11. F • '�lll iffih1 l�1 11 �1i 11 ,11LL■■.■■ 111110111116Effil IMO White Center Heights Elementary Er1;itru iMin !!R4lIt 1 Beverly Park @ Glendale Elementary Southern Heights Elementary Salmon Creek Elementary Hilltop Elementary Hazel Valley Elemen Cedarhurst Elementary Seahurst Elementary Highline High Sunnydale Elementary Gregory Heights Elementary Sylvester Middle 1!9llii_w !!IR!Rl� I�l� 1i1 -,SrattailkEEMENIONME AllN4a� X11 11 feat'!ilrir��_�,,,•�„�s�Gll!R!!!!1 • Riverton Heights Elementary McMicken Heights Elementary 1' ' Valley View Elementary SeaTac OSC Satellite Alternative High Marvista Elementary North Hill Elemen Olympic Elemen 0 0 Des Moines Elementary OTHER PROPERTIES 1/2 1_ a 1 2 Highline School District Six -Year Capital Facilities Plan Bow Lake Elementary Tyee High Chinook Middle Madrona Elementary Mt. Rainier High Midway Intermediate Pacific Middle Parkside Primary June 1995 MAP #1 Page 14 Highline School District - 1995 Capital Facilities Plan 1994/95 Existing Capacity - Table #3 School Regular Rooms Cap Special Rooms Cap Permanent Rooms Cap Portables Rooms Cap Total Rooms Cap Elem Subtotal 419 10,475 36 348 455 10,823 16 400 471 11,223 MS Subtotal 126 3,150 11 132 137 3,282 4 100 141 3,382 HS Subtotal 261 6,525 8 96 269 6,621 0 0 269 6,621 District Total 1 806 20,150 55 576 861 20,726 20 500 881 21,226 School Regular Rooms Cap Special Rooms Cap Permanent Rooms Cap Portables Rooms Cap Total Rooms Cap Bev Park @ Glen 23 575 2 24 25 599 0 0 25 599 Bow Lake 16 400 6 36 22 436 2 50 24 486 Cedarhurst 17 425 2 24 19 449 0 0 19 449 Des Moines 18 450 2 24 20 474 0 0 20 474 Gregory Hts 21 525 1 12 22 537 0 0 22 537 Hazel Valley 15 375 2 24 17 399 2 50 19 449 Hilltop 16 400 0 0 16 400 0 0 16 400 Madrona 14 350 1 12 15 362 4 100 19 462 Marvista 20 500 1 12 21 512 1 25 22 537 McMicken Hts 15 375 2 24 17 399 1 25 18 424 Midway 24 600 0 0 24 600 0 0 24 600 Mt View 19 475 0 0 19 475 0 0 19 475 North Hill 16 400 2 24 18 424 1 25 19 449 Olympic 27 675 1 12 28 687 0 0 28 687 Parkside 25 625 0 0 25 625 0 0 25 625 Riverton Hts 13 325 8 48 21 373 0 0 21 373 Salmon Creek 12 300 2 24 14 324 0 0 14 324 Seahurst 27 675 0 0 27 675 0 0 27 675 Shorewood 20 500 0 0 20 500 1 25 21 525 Southern Hts 15 375 2 24 17 399 0 0 17 399 Sunnydale 21 525 0 0 21 525 0 0 21 525 Valley View 11 275 0 0 11 275 3 75 14 350 White Center Hts 14 350 2 24 16 374 1 25 17 399 Elem Subtotal I 419 10,475 36 348 455 10,823 16 400 471 11,223 Cascade 35 875 6 72 41 947 3 75 44 1,022 Chinook 25 625 3 36 28 661 0 0 28 661 Pacific 29 725 1 12 30 737 1 25 31 762 Sylvester 37 925 1 12 38 937 0 0 38 937 MS Subtotal I 126 3,150 11 132 137 3,282 4 100 141 3,382 Evergreen 59 1,475 0 0 59 1,475 0 0 59 1,475 Highline 68 1,700 1 12 69 1,712 0 0 69 1,712 Mt Rainier 59 1,475 0 0 59 1,475 0 0 59 1,475 Tyee 45 1,125 6 72 51 1,197 0 0 51 1,197 Alternate H.S. 16 400 1 12 17 412 0 0 17 412 Occupatn'l Skills 14 350 0 0 14 3.50 0 0 14 350 HS Subtotal I 261 6,525 8 96 269 6,621 0 0 269 6,621 District Total 1 806 20,150 55 576 861 20,726 20 500 881 21,226 Highline Shod Diaries Sx-Year Capital Facilities Plan Jure 1995 Page 15 Highline School District — 1995 Capital Facilities Plan October 1994 — Enrollment Summary — Table #4 School Regular Kind 1-6 7-8 9-12 Reg Subttl Spec Prog Current Total FTE Total Beverly Park @ Glen 69 415 0 0 484 75 559 506 Bow Lake 52 285 0 0 337 42 379 353 Cedarhurst 46 297 0 0 343 41 384 361 Des Moines 44 253 0 0 297 11 308 286 Gregory Hts 52 309 0 0 361 42 403 376 Hazel Valley 51 325 0 0 376 47 423 3975 Hilltop 70 310 0 0 380 12 392 359 Madrona 67 395 0 0 462 0 462 428.5 Marvista 58 433 0 0 491 0 491 462 McMicken Hts 66 327 0 0 393 0 393 360 Midway 0 373 0 0 373 35 408 408 Mt View 63 381 0 0 444 0 444 4125 North Hill 100 246 0 0 346 62 408 344 Olympic 0 241 0 0 241 116 357 348 Parkside 131 381 0 0 512 53 565 490 Riverton Hts 27 183 0 0 210 15 225 2115 Salmon Creek 46 260 0 0 306 0 306 283 Seahurst 88 437 0 0 525 71 596 552 Shorewood 52 354 0 0 406 69 475 449 Southern Hts 54 308 0 0 362 18 380 353 Sunnydale 53 347 0 0 400 115 515 4885 Valley View 23 185 0 0 208 74 282 2705 White Center Hts 39 309 0 0 348 74 422 3875 Elementary Subtotal 1 1,251 7,354 0 0 8,605 972 9,577 8,887 Cascade 0 0 579 0 579 166 745 744 Chinook 0 0 543 0 543 107 650 649 Pacific 0 0 506 0 506 66 572 570 Sylvester 0 0 622 0 622 87 709 708 Middle School Subttl I 0 0 2250 0 2250 426 2676 2671 Evergreen 0 0 0 895 895 213 1108 1093 Highline 0 0 0 1120 1120 172 1292 1290 Mt Rainier 0 0 0 1073 1073 101 1174 1145 Tyee 0 0 0 752 752 174 926 917 High School Subtotal 1 0 0 0 3840 3840 660 4500 4445 Basic Skills Program 0 0 0 276 276 0 276 276 Maywood Programs 0 158 70 185 413 0 413 233 Satellite School 0 0 0 198 198 3 201 171 OSC—HSD(OSC Only) 0 0 0 0 0 64 64 64 OSC—Out of District 0 0 0 0 0 235 235 141 Subtotal 1 0 158 70 659 887 302 1189 885 District Total 1 1251 7512 2320 4499 15582 2360 17942 16887.5 Note: FTE Total Reflects Part Time Kindergarten & Special Program Students. Higbline School District Sx—Year Capital FadlitieaPlan June 1995 Page 16 ,SIX`YEAR PLANNING AND CONSTRUCTION PLAN' ..• / / I•. .\ - . \--, 1 • ) • � V District's Six - Year Planning and Construction Plan The Highline School District has recently completed three projects following its long range planning process. These projects are as follows: Sylvester Middle School: Addition of eight permanent classrooms. Cascade Middle School: Addition of eight permanent classrooms. Pacific Middle School: Rehabilitation of common areas and special program areas. On May 16, 1995 a $118.5 million bond issue was presented to the Highline voters to fund major capital improvements. The ballot issue was defeated at the polls. The long range plan, as well as the District's six year plan, has now been moved forward by approximately two years. This plan projects a capital projects bond issue in the Fall of 1996. If a bond issue were to pass at that time, construction on new projects would begin in the Spring of 1997, with completion of five to six new elementary schools by Fall of 1998. The six year plan proposes to house increased student enrollment between 1995 and 1998 in relocatable (portable) classrooms. The District would add portables at sites where appropriate in order to temporarily house the student population increase. At the writing of this report it is difficult to predict exact locations for the required portables. The Highline School District's Long Range Plan calls for elementary schools to have a capacity of approximately 650 students. This equates to 550 students, at an 85% utilization efficiency. Upon completion of the six year plan, the District's four middle schools would be sized for an expected utilization of 750 students per school. Three high schools (Mt. Rainier, Highline and Evergreen) would be sized for an expected utilization of 1500, while Tyee would be sized for 1000 students. The intent of the District's Long Range Plan is to increase the size of elementary schools to the approximate 650 student size. This will gradually increase the District's utilization factor. Included in this plan is a schedule of projects for the six year construction period, outlined by type, location, and estimated completion date. Hiphline School District Six -Year Capital Facilities Plan June 1996 Pipe 17 Urhan Growth/Long Range Plan During the Summer of 1994 a "blue ribbon panel" of experts was convened to review the Highline School District's Long Range Capital Facilities Plan. Participants in this review included planning professionals from the local municipalities, as well as King County. Those jurisdictions which had comprehensive plans, presented those to the committee along with growth summaries. The District has provided an overall urban growth plan (see Map 2). This growth plan takes into account input from all the jurisdictions involved in the blue ribbon panel. Areas of increased density were outlined by the planners, indicating that growth would occur in the northwest quadrant of the District (White Center), and along the "Highway 99" corridor. The southern portion of the District is growing at a high to moderate rate. Other areas are zoned for low to moderate growth. Review of the District's Long Range Plan (see Maps 3, 4, 5 and 6) shows an increase in District capacity, relative to the higher growth areas. Four replacement elementary schools are proposed for the northwest quadrant of the District. Three replacement elementary schools are outlined for construction along the "Highway 99" corridor. The growth to be accommodated is based upon current enrollment projections, and demographics. The areas intended for more intense urban growth as outlined in the comprehensive plans do not appear at the writing of this report to be generating additional enrollment beyond our current projections. Until such time as the local economies will be able to generate an increased level of residential development, the District does not foresee a need for additional construction. The District is, however, maintaining an inventory of properties for the purpose of accommodating additional growth, if economic conditions produce higher residential densities in designated urban areas. Highline School District Six -Year Capital Facilities Plan June 1998 Pape 18 Regional Projected Growth * Based on Municipal Comprehensive Plans Highline School District Six - Year Capital Facilities Plan June 1995 Map #2 Page 19 Elementaries Completed by 1998 White Center Mt View Salmon Creek Shorewood Hazel Valley Seahurst Sunnydale Gregory Hgts North Hill Bev Park @ Glen Southern Hgts Hilltop Cedarhurst Riverton Hgts McMicken Heights Marvista Olympic Des Moines Valley View 0 Replacement Schools Closed Schools HlghWe School District Six - Year Capital Facilities Plan June1995 Midway Parkside Map #3 Page 20 Elementaries Completed by 2000 White Center Mt View Salmon Creek Shorewood Hazel Valley Seahurst Sunnydale Gregory Hgts North Hill Marvista Bev Park @ Glen Southern Hgts Hilltop Cedarhurst Riverton Hgts McMicken Heights Valley View aReplacement Schools Closed Schools HighlIne School District Six - Year Capital Facilities Plan June1995 Midway Parkside Map #4 Page 21 Middle School Six -Year Plan Remodel Project Highline School District Six - Year Capital Facilities Plan June 1995 Map #5 Page 22 High School Six -Year Plan Remodel Project Highline School District Six - Year Capital Facilities Plan June 1995 Map #6 Page 23 5 m m ACTIVITY ORIG DESCRIPTION DUR 1997 1998 1999 2000 2001 2002 2003 2004 Madrona 24 .....:: ;, r : Madrona '" Mt View 1 I •�' ,'��;. i"' Hazel Valle I Y Mt View 24 Hazel Valley 24 White Center 24 i i White Center I I Gregory Heights McMicken Heights -1 Gregory Heights 24 McMicken Heights 24 1 + North Hill 241 North Hill Marvista I Marvista 24 I Shorewood 24 Shorewood Mt Rainier HS 30I Bow Tyee Lake HN Mt Rainier HS Six—Year Plan Bow Lake 24 Tyee HS 24 Pacific MS 24 IPacifi9 MS Highline HS 30 `' `'`'` " "' Highline 1 I I HS HS Evergreen HS 30 1 I 1 f ''' F�vergreen Midway 241 ` i...'' Midway1 Parkside HS Parkside 24 1 1• 1 1 1 Satellite HS 24 Satellite Cedarhurst 24 Cedarhurst 4 1 I I l Waskowitz I Sunnydale 24 Sunnydale I I I Camp Waskowitz 24 Camp + 4 1 I Zenith 24 Zenith MI I + I MS View 1 Chinook MS 24 Chinook 1 1 1 1 I 1 Hilltop 241 Southern Sxlvest 1 1 1 I Hgts eT+ I 1 11 I Hint/ 1 1 1 1 Valley 1 I I 1 Valley View 24 Long Range Plan Southern Hgts 24 Sylvester MS 24 Cascade MS •24 Cascade MS SIX—YEAR & LONG RANGE SCHEDULE Highline School District — 1995 Capital Facilities Plan Permanent Capacity Schedule — Table #5 School Student Capacity 1994 1995 1996 1997 1998 1999 2000 Madrona 362 362 362 362 650 650 650': Mt View 475 475 475 475 ............................. 650 650 650 Hazel Valley 399 399 399 399 662 662 662 White Center Hts 374 374 374 374 650 650 650'. Gregory Hts 537 537 537 537 650 650 650'. McMicken Hts 399 399 399 399 662 662 662 North Hill 424 424 424 424 424 662 662:'. Marvista 512 512 512 512 512 650 650 Shorewood 500 500 500 500 500 ' 650 650'. Mt Rainier HS 1475 1475 1475 1475 1475 1475 1700 Bow Lake 436 436 436 436 436 436 650 Tyee HS 1197 1197 1197 1197 1197 1197 ............ .......... . 1197 Pacific MS 737 737 737 737 737 737 862 Highline HS 1712 1712 1712 1712 1712 1712 1712 Evergreen HS 1475 1475 1475 1475 1475 1475 1475 Midway 600 600 600 600 600 600 600 Parkside 625 625 625 625 625 625 625 Alternate HS 412 412 412 412 412 412 412 Cedarhurst 449 449 449 449 449 449 449 Sunnydale 525 525 525 525 525 525 525 Zenith 0 0 0 0 0 0 0 Chinook MS 661 661 661 661 661 661 961 Hilltop 400 400 400 400 400 400 400 Valley View 275 275 275 275 275 275 275 Southern Hts 399 399 399 399 399 399 399 Sylvester MS 937 937 937 937 937 937 937 Cascade MS 947 947 947 947 947 947 947 Beverly Park @ Glen 599 599 599 599 599 599 599 Seahurst 675 675 675 675 675 675 675 Occupatioal Skills 350 350 350 350 350 350 350 Salmon Creek 324 324 324 324 0 0 0 Riverton Hts 373 373 373 373 0 0 0 Olympic 687 687 687 687 687 0 0 Des Moines 474 474 474 474 474 474 474 Total 1 20,726 20,726 20,726 20,726 21,407 21,246 22,110 Highline School District Sz—Year Capital Fieilaiea Plan — Denotes Increased Capacity & School Year Project is Complete. June 1995 Page 25 VI RELOCATABLE CLASSROOMS Currently the District utilizes 77 total portables. Of this total 20 are utilized for classrooms in excess of permanent capacity, 57 are used for other educational programs or services. The plan proposes to increase the number of portable classroom locations in the 1995-96 school year, and 1996-97 school year. Additional classroom portables will come from those which are presently used for other purposes. The District does not plan on purchasing additional portables within the next five years. The Highline School District does not consider portables or relocatable classrooms as acceptable permanent facilities. A major concern of the Highline School District is the lack of adequate portable soundproofing for use under the flight path of SeaTac International Airport. Other concerns include heating, ventilation, fire safety, security, restrooms, and lack of water. The District's Long Range Master Plan does not propose to eliminate relocatable facilities entirely. Portables permit the District additional flexibility in dealing with uneven or unbalanced enrollment. The District plans to utilize portables for interim housing during construction of facilities. Portables are an integral part of the District's planning process and help to alleviate a number of short-term over -crowding concerns. Highline School District Six -Year Capital Facilities Plan June, 1995 FIpe28 VII PROJECTED CLASSROOM CAPACITY Based on enrollment projections, District Standards of Service, current inventory and capacity, and future planned classroom space, the District will have sufficient capacity to house students over the next six years. Some schools may experience overcrowding as the District awaits funding of additional construction projects. Portable classrooms will be utilized to relieve the overcrowding. Overcrowding may also occur due to variations in area enrollments. This will also be accommodated by the use of portables. Table 6 outlines the District's present and projected capacities. Highline School District Six -Year Capital Facilities Plan June, 1996 Paps27 Highline School District - 1995 Capital Facilities Plan Capacity Calculations - Table #6 Factor 1994 1995 19% 1997 1998 1999 2000 Permanent Capacity Added Capacity(Perm) 20,726 20,726 Madrona 288 Mt View 175 Hazel Valley 263 White Center Hts 276 Gregory Hts 113 McMicken Hts 263 North Hill 238 Marvista 138 Shorewood 150 Mt Rainier 225 Bow Lake 214 Tyee 0 Pacific 125 Chinook 300 Closed Schools Salmon Creek (324) Riverton Hts (373) Olympic (687) Permanent Capacity 20,726 20,726 20,726 20,726 21,407 21,246 22,110 Permanent Capacity(Chk) 20,726 20,726 20,726 20,726 21,407 21,246 22,110 Permanent Classrooms 860 860 860 860 880 873 893 Relocatable Capacity 500 525 925 1,450 900 900 400 Relocatable Classrooms 20 21 37 58 36 36 16 Total Capacity 21,226 21,251 21,651 22,176 22,307 22,146 22,510 Total Classrooms 880 881 897 918 916 909 909 Utilization Efficiency 80% 80% 80% 80% 81% 82% 82% Adjusted Capacity 16,981 17,001 17,321 17,741 18,069 18,160 18,458 Total Enrollment Total FTE Enrolment 17,937 16,888 17,956 16,906 18,360 17,286 18,795 17,695 19,055 17,941 19,247 18,121 19,366 18,233 Surplus Capacity 93 95 35 45 128 38 225 * Notes: 1. Utilization Factor: 80% - 1994 FTE Enrollment/Total Capacity. 2. Utilization Factor Increase is due to New Building Efficiency. 3. FTE = Approximate Full Time Equvalent (ie 112 day Kindergarten = 0.5). Highline School District Sx-Year Capital Facilities Plan June 1995 Page 28 1 / •_ ;;, 1 • (• 1 , 11. 1 • . .s. \' " - 1 VIII ' FINANCE PLANAND IMPACTvFEE 'SCHEDULES / I 1 ' , — !- 7- l -7 \, { — 1 , /I y./ .� .$.'( / •/ I,. C • I 'f 1. • 1 1 /� I \ e� -.\ II\J1 J\,`, 1 — ..)\ I 1I •\_� }' l /, i 1 / 1 . `l r ` 1 \ i-.. / 1 4. 1 s(\ 4 , \. ( • \ ` \ }t\ ,`"\ • \. l-. •/J .: , / ' / .• 1,1 , — — /, . J -r/ i \ \. /, / 1/ • • \ I • / \ 1 /— \ / ` 1. '� •l VIII Finance Plan The finance plan demonstrates how the Highline School District plans to finance improvements for the years 1995 through 2000. The financing components include secured and unsecured funding. The plan is based on the passage of future bond issues, available funds from previous bond issues, securing of State funding, and collection of impact fees. The plan shows the District accumulating further impact fees without a corresponding expenditure until 1998. If the bond issue fails, the District will accumulate impact fees for up to four years (1995-97) before expenditure. The accumulated fees will be used in the fifth year for construction of new permanent classroom space. These additions will be added to schools which have recently been remodeled or replaced. A free standing classroom building may be considered at sites where existing buildings are to be demolished, only if specific growth demands warrant. Impact fee calculations are provided in this section for single family and multi- family developments. Following the King County Ordinance methodology these fees are calculated as follows: Single Family Multi -Family Highline School District Six -Year Capital Facilities Plan $2577.03 per unit $1535.09 per unit June 1995 Pep 29 Highline School District — 1995 Capital Facilities Plan Six—Year Finance Plan — Table #7 Funding Sources 1995 1996 1997 1998 1999 2000 Bond Funds 15,000 120,000 90,000 46,246,512 23,243,628 37,931,628 State Match 18,228,000 9,100,000 14,812,000 Impact Fees 625,488 156,372 156,372 Other Funds 15,000 120,000 90,000 10 700000 Total 1 $15,000 $120,000 S90,000 S65,100,000 $32,500,000 S52,900,000 Note: Bond Funds, State Matching Funds, & Impact Fees are Unsecured. Impact Fees are Projected Based on Amounts Accrued in 1993 & 1994. Project Expenditures 1995 1996 1997 1998 1999 2000 Portables 15,000 120,000 90,000 Madrona 11,300,000 Mt View 10,400,000 Hazel Valley 10 700000 Gregory Hts 10,400,000 White Center 10,400,000 McMicken Hts 11,900,000 North Hill 11,100,000 Marvista 8,900,000 Shorewood 12,500,000 Mt Rainier 25,800,000 Bow Lake 11,600,000 Tyee 9,200,000 Pacific 6,300,000 Highline Evergreen Midway Total 1 S15,000 $120,000 S90,000 $65,100,000 $32,500,000 $52,900,000 Highline School District Se—Year Capital Pacilitia Plan June 1995 Page 30 Highline School District — 1995 Capital Facilities Plan Impact Fee Calculation — Factors — Table #8 Description Value Unit Al — Elementary School Site Cost $0.00 $ A2 — Middle School Site Cost $0.00 $ A3 — High School Site Cost $0.00 $ B1 — Elementary School Construction Cost $12,903.11 $/Student B2 — Middle School Construction Cost $16,018.99 $/Student B3 — High School Construction Cost $17,475.26 $/Student C1 — Elementary School Relocatable Cost $45,000.00 $ C2 — Middle School Relocatable Cost $45,000.00 $ C3 — High School Relocatable Cost $45,000.00 $ D1 — Elementary School SPI Square Foot Allowance 80 SF D2 — Middle School SPI Square Foot Allowance 110 SF D3 — High School SPI Square Foot Allowance 120 SF Elementary School Student/Teacher Ratio 24.8:1 S:T Middle School Student/Teacher Ratio 28:1 S:T High School Student/Teacher Ratio 28.5:1 S:T Boeckh Index $86.96 $/SF State Matching Percentage 46.50% % Capital Property Tax Rate $0.70 $/1000 Bond Interest Rate 4.98% % Average Assessed Value — Single Family $129,200.00 $ Average Assessed Value — Multi—Family $36,719.00 $ Permanent Square Footage Factor 0.98 Perm/Ttl SF Temporary Square Footage Factor 0.02 Temp/Ttl SF Student Generation Factor — Single Family (K-6) 0.305 Students/Unit Student Generation Factor — Single Family (7-8) 0.090 Students/Unit Student Generation Factor — Single Family (9-12) 0.159 Students/Unit Student Generation Factor — Multi—Family (K-6) 0.148 Students/Unit Student Generation Factor — Multi—Family (7-8) 0.085 Students/Unit Student Generation Factor — Multi—Family (9-12) 0.074 Students/Unit Notes: 1. All planned projects will occur on existing sites. While it may be necessary to increase site size for some projects there is no basis for site costs at this time. 2. The student generation factors are based on surveys of existing developments in the Highline School District. Highline School District Sx—Year Capital Facilities Plan June 1995 Page 31 Highline School District - 1995 Capital Facilities Plan Impact Fee Calculation - Single Family Residence - T#9 • Site Acquistion Cost per Single Family Residence(A) - N/A at this Time • Permanent Facility Construction Cost per Single Family Residence Formula: Construction Cost per Student x Student Factor x (Permanente Total Sauar Category Const Cost Student Footage Subtotal Per Student Factor Ratio B 1 (Elementary) $12,903.11 24.8 0.305 0.98 $3,856.74 B 2 (Middle School) $16,018.99 28.0 0.090 0.98 $1,412.87 B 3 (High School) $17,475.26 28.5 0.159 0.98 $2,723.00 B (Subtotal) 1 $7,992.61 • Temporary Facility Construction Cost per Single Family Residence Formula: (Facility Cost/Facility Capacity) x Student Factor x (Temporary/Total Square Foot Category Facility Facility Student Footage Subtotal Cost Capacity Factor Ratio C 1 (Elementary) $45,000.00 24.8 0.305 0.02 $11.07 C 2 (Middle School) $45,000.00 28.0 0.090 0.02 $2.89 C 3 (High School) $45,000.00 28.5 0.159 0.02 $5.02 C (Subtotal) 1 $18.98 • State Match Credit per Single Family Residence Formula: Boeckh Index x SPI Footage x District Match % x Student Fact Category Current SPI District Student Subtotal Boeckh Footage Match % Factor D 1 (Elementary) $86.96 80 0.4650 0.305 $986.65 D 2 (Middle School) $86.96 110 0.4650 0.090 $400.32 D 3 (High School) $86.96 120 0.4650 0.159 $771.53 D (Subtotal) 1 $2,158.50 • Tax Credit per Single Family Residence Formula: Assessed Value x Tax Rate x Compound Interest Category Value Average Residential Assessed Value B = Permanent Facility Cost per Residence $129,200.00 Current Debt Service Tax Rate $18.98 0.00070 Annual Interest Rate/Discount Period ($2,158.50; 4.98 % /10 Years TC Tax Credit (((1+0.0498) ^ 10-1)/(0.0498•(1+0.0498) ^ 10))•129,200'0.0007 $699.03 • Developer Provided Facility Credit(FC) • Fee Reca $0.00 Category Cost A = Site Acquistion Cost per Residence $0.00 B = Permanent Facility Cost per Residence $7,992.61 C = Temporary Facility Cost per Residence $18.98 Subtotal of Costs $8,011.59 D = State Match Credit per Residence ($2,158.50; TC = Tax Credit per Residence ($699.03; FC = Developer Provided Facility Credit $0.00 Subtotal of Credits ($2,857.53; Total Unfunded Need(Costs - Credits) $5,154.06 Developer Fee Obligation per Residense(Need x 0.5) $2,577.03 Highline School District Sur -Year Capital Facilities Plan June 1995 Page 32 Highline School District - 1995 Capital Facilities Plan Impact Fee Calculation - Multi -Family Residence - T#10 • Site Acquistion Cost per Multi -Family Residence(A) - N/A at this Time • Permanent Facility Construction Cost per Multi -Family Residence Formula: Construction Cost per Student x Student Factor x (Permanent/Total Square Footage Ratio Category Const Cost Student Footage Subtotal Per Student Factor Ratio B 1 (Elementary) $12,903.11 24.8 0.148 0.98 $1,869.82 B 2 (Middle School) $16,018.99 28.0 0.085 0.98 $1,337.73 B 3 (High School) $17,475.26 28.5 0.074 0.98 $1,267.31 B (Subtotal) 1 $4,474.85 • Temporary Facility Construction Cost per Multi -Family Residence Formula: (Facility Cost/Facility Capacity) x Student Factor x (Temporary/Total Square Footage Ratio Category Facility Facility Student Footage Subtotal Cost Capacity Factor Ratio C 1 (Elementary) $45,000.00 24.8 0.148 0.02 $5.37 C 2 (Middle School) $45,000.00 28.0 0.085 0.02 $2.74 C 3 (High School) $45,000.00 28.5 0.074 0.02 $2.34 C (Subtotal) 1 510.44 • State Match Credit per Multi -Family Residence Formula: Boeckh Index x SPI Footage x District Match % x Student Factor Category Current SPI District Student Subtotal Boeckh Footage Match % Factor D 1 (Elementary) $86.96 80 0.4650 0.148 $478.35 D 2 (Middle School) $86.96 110 0.4650 0.085 $379.03 D 3 (High School) $86.96 120 0.4650 0.074 $359.08 D (Subtotal) 1 $1,216.45 • Tax Credit per Multi -Family Residence Formula: Assessed Value x Tax Rate x Comuound Interest Category Value Average Residential Assessed Value B = Permanent Facility Cost per Residence $36,719.00 Current Debt Service Tax Rate $10.44 0.00070 Annual Interest Rate/Discount Period ($1,216.45; 5 % /10 Years TC Tax Credit (((1+0.0498) ^ 10-1)/(0.0498•(1+0.0498) ^ 10))•36,719.0.0007 5198.67 • Developer Provided Facility Credit(FC) • Fee Reca 50.00 Category Cost A = Site Acquistion Cost per Residence $0.00 B = Permanent Facility Cost per Residence $4,474.85 C = Temporary Facility Cost per Residence $10.44 Subtotal of Costs $4,485.29 D = State Match Credit per Residence ($1,216.45; TC =Tax Credit per Residence ($198.67` FC = Developer Provided Facility Credit $0.00 Subtotal of Credits (51,415.12: Total Unfunded Need(Costs - Credits) $3,070.18 Developer Fee Obligation per Residense(Need x 0.5) 51,535.09 Hig,Iine Sehool District Sx-Year Capital Facilities Plan June 1995 Page 33