Loading...
HomeMy WebLinkAboutCOW 2011-07-11 Item 4C - Bid Award - 2010-2011 Small Drainage Program CO UNuL AGENDA SYNOPSIS Initials ITEM NO. o> Meeting Date Prepared by May r r w Council review 07/11/11 BG (R, 07/18/11 BG ITEM INFORMATION CAS NUMBER: 11-070 STAFF SPONSOR: BOB GIBERSON ORIGINAL AGENDA DATE: 7/11/11 AGENDA ITEM TITLE Bid Award for 2010/2011 Small Drainage Program CATEGORY Discussion Motion Resolution Ordinance BidAward PublicHearins Other Mtg Date 07/11/11 Mt Date Mtg Date Mt Date Mig Date 07118111 Mtg Date Mtg Date SPONSOR Council Mayor HR DCD Finance Fire IT P&R Police PW SPONSOR'S The 2010/2011 Small Drainage Program includes 2010 projects that were delayed due to SUMMARY permitting issues with 2011 projects. The 2010/2011 Small Drainage Program was advertised for bid on June 8 and 15, 2011. Four bids were opened June 22, 2011 with the low bid of $788,005.50 from Green River Construction, Inc. Green River Construction has successfully worked for the City in the past and their bid is within budget. Council is being asked to award the bid for $788,005.50. REVIEWED BY COW Mtg. CA &P Cmte F &S Cmte Transportation Cmte Utilities Cmte Arts Comm. Parks Comm. Planning Comm. DATE: 6/28/11 COMMITTEE CHAIR: DE'SEAN QUINN RECOMMENDATIONS: SPONSOR/ADMIN. Public Works COMMITTEE Unanimous Approval; Forward to Committee of the Whole COST IMPACT FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $788,005.50 $1,344,000.00 $0.00 Fund Source: 412 SURFACE WATER FUND (PAGE 144 145, 2011 CIP) Comments: MTG. DATE 1 RECORD OF COUNCIL ACTION 07/11/11 07/18/11 MTG. DATE 1 ATTACHMENTS 07/11/11 Informational Memorandum dated 6/24/11 Project Location Map Bid Tabulation Minutes from the Utilities Committee meeting of 06/28/11 07/05/11 129 130 City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: Mayor Haggerton UTILITIES COMMITTEE FROM: Bob Giberson, Public Works Director DATE: June 24, 2011 SUBJECT: 2010/2011 Small Drainaae Proaram Project No. 91041201 BID AWARD ISSUE Award the bid for construction of the 2010/2011 Small Drainage Program. BACKGROUND The Small Drainage Program constructs drainage projects throughout the City that are too large for City staff to complete, but are smaller than a typical capital improvement project. The projects originate from citizen complaints and from the maintenance staff and are compiled on the Small Drainage Project List. Each year the projects are prioritized based on need, expense, permitting requirements, and length of time on the list. The highest priority projects are designed and constructed. This year's construction includes projects that were scheduled for construction in 2010 but were delayed due to permitting issues, as well as projects from the Private Storm System Adoption Rehabilitation Program (Sites 1 5). The 2010/2011 Small Drainage Program will provide drainage improvements at nine locations listed on page 2 of this memo. ANALYSIS The project was advertised for bids on June 8 and 15, 2011. Four bids were received and opened on June 22, 2011. The bids were checked and tabulated. Green River Construction, Inc. is the low bidder with a bid of $788,005.50. The engineer's base bid estimate was $854,330.00. Green River Construction successfully constructed the 2009 Small Drainage Project. BUDGET AND BID SUMMARY (All amounts include sales tax.) Bid Results Estimate Budget Bid Amount $788,005.50 $854,330.00 SDP (2011) Budget (pg. 144) $971,000.00 Private Storm Budget (pg. 145) 373,000.00 Contingency (15 118.200.83 128.149.50 0.00 Total $906.206.33 $982.479.50 $1.344.000.00 RECOMMENDATION The Council is being asked to award the construction of the 2010/2011 Small Drainage Program to Green River Construction, Inc. in the amount of $788,005.50 for consideration at the July 11, 2011 Committee of the Whole meeting and subsequent July 18, 2011 Regular Meeting. W:\PWEng\PR0JECTSW DR Projects \91041201 (Small Drainage 2010 2011) \Design \Design 2011 \Info Memo Bid Award 2010 -11 sb.doc 131 INFORMATIONAL MEMO Page 2 The 2010/11 Small Drainaae Proaram includes: Site 1) Wells Trucking (S. 128 St West of East Marginal Way S) Replace existing failing pipe on private property that drains a public roadway. Site 2) Tukwila International Blvd. (south of SR 599) Replace existing failed 18" CMP with new pipe Site 3) East Marginal Way S (S 94 PI) Install a new catch basin to solve ponding issue Site 4) 44 Ave. S (between S 122 and S 124 Install a drainage system Site 5) Evergreen Foods (T.I.B. and 13800 block) Reline and replace an existing failing pipe on private property that drains a public roadway. Site 6) S122 no Street (between Duwamish River and 44 Ave. S) Pipe relining Site 7) 40 Ave S (Southgate Creek) Pipe relining Site 8) Gilliam Creek Regional Detention Facility Control Structure Access Site9) Gilliam Creek at Andover Park E Trash rack Private Storm System Adoption Rehabilitation Program Project Attachments: Project Location Map Bid Tabulations W. PW EngIPROJECTSW DR Projects191041201 (Small Drainage 2010- 2011)IDesignlDesign 201111nto Memo Bid Award 2010 -11 sb.doc 132 �a ua wv� „ar Q\•� F 4 �a P'aa�° m 2010/2011 s N s, Site 3 Annual Neighborhood =D m Drainage Program l 5 f bi aarc 5113M SI S115M SIS dh St y "':l 6N S1 11gh 1 f fi ns! Site 6 Site 2 N N e 's' Site 4 W E S zaf s Site 1 s 1281h Oc Not to Scale tl C I 31e Pi S 'b0 Site 7 n 5 513 5136h Site 5 re 14 N t o T 1 i 11 m a id2nd t E P S 146N SI 143rtl P t 5166(1; St a �n S ib61n sl E n T y y !�e��i fl S 1d9in st n 5'S2n Si52eJ 5, c S ite 8 R S2etl Pi s S i56M st y4 ce O1 Site 9 H TukwJa PkM S o rest. 6 15an St I ro r I' ae Wa 5 a svaaae. ema m S I S o 9G$ i1 r9il MinklerF vd 3 MldiarM Or CoACU Dr Tma„a Dr do s, dean st a� RMeyfp p m pON F e Toda titl F 5 3001M1 51 Date: June 21, 2011 131 134 o0 °I m om o oo w 14 6 16 i °li IN w o H w 14 14 14 14 6 �r t 1111 wwwwww ww ww wwwH w w w ww""w�' ww w w ZI w N _o m w 2 o o 0 O m i moo i o 0 0 a mm moo mo Ooo m m�l m m ww �aw� °'i www w "www wwNw w w 9 J U ri N O o N N w p m m 0 0 m p p m m N N O O G O m b 0 0 O O O m 66 6 I� 999 l 0 O t 0 0 0 N O O m N O O N N 9 °I .n mw o oo n m m w w w w w i w www w ww wwNw ww ww w wwww yi Q' a i Nw I a'a; iw o mo o o °ggggg owm J J U v 1 0 0 w w w w w H H w w w w N N O N y a p ON M G o w H W w K g H w N w wi '�w w w N w H H w w w g H N w w o o o o o o N N o o o o o o 0 0 n 66 v O� o 0 0 O C O O p r Y° p o G O m O Y O m m I v°i N O C ONO m N o N m N w 0 n 1 o o 6,6 4 w w N N„ N w W w w w w H w w 0 H w w N H w w W w W w H N w H H m O c r p N W N w w w w w w w i w H z 0 U °0 0 o o G o m O o 0 O N Ro o s N lV m O ep H m m O O w J U 0 w W N p l9 w l9 w W N N y w N W I w W w b w w H W O H m N N N W y w l0 W N m w N J w w p p N w W w H H w w w w w w I °o o o° loo o O o °o mOOO o°' Im 000 oco o 'o ooNO o0 o m °o m C i 9 r 0 0 0 0 O N N 1 h n t O h 0 O o 0 0 0 0 N o o 4 �p w w w w www w wpNw w NH w W W w w W O E w w w w wH w 0 z o I U w w n O o m Q O C G C C O O O C 0 0 0 w O o 0 p N G O O O p 0 0 w o H w N 6 l O N w V o a° o of w w p w n rn m w N K N w w w O O OO I!r, OO o 000 aril tmGNNN �N N m Nn m� P N N IO tV P m ��O O mN <ONm w m m�Yi NP a0 C b �Yi! �N V f HV wwww w wwNww www w www ww w ww ww E o c w -Iw c I° o c m o c o m V o p z w j N N w O O o N g w m H p p H p w W N N W K K ww W w O w h N w w K w o m m w p p LL W V mNNmr- p-- w--- 10, w N o °moi° wwww' www'^wwwwwmO w z QQ Qa QQ Q-a w w w w a r w LL 0 0 LL 0 0> LL Y z z Y z z LL LL m W U N N W W til W LL W N N N LL LL LL LL W W W W W W LL F U O I p e 7 NJUrr V rrJJ.� Q U 6 I Z Q G V n m m mN �m�. m J r I d o o V U o V 'c GUCj U �7 t 2 c C n mho°_' o o_ w a= c x o E v w O E m Um V o uUa w p° DO c m y ai d ai c m Y m wWC0_ 2` c 3 cif >OQQ 'A E da "a o.a K V n o w iL o r R E u o c e c u u i$ d v m m r r W o p o a° �n� >i d m c E °c u._ L w n n w Y c F, o o m c< Z c'm v n a a o a n n a m o a N e o o.J U U U c�7cc¢ w zp cv= .Q cc�ec a =e'L?'q y�mmm °L c_ n a w m w f °c 1 O_ -6 c aa q_ �o ~Q AmEn��".° og o �_dp °m'��w w ¢¢$oo88vummm'� mpd J. H °O o"'owwww 'o0` "Ny �uNrmAm >Z `2w� rte- En E° oaaa.a °o EE Q cc €�Ec rEEon W z E �rKa�U a CiUxxU� p NLL' p ter_- xwaaao. a`�� �UF- HiN NN C_V UUU V -W d r I f 6l H G Q o w o °i oSo o V mH O m p 0 �Qo 000 6 �z g N u m Nm N O Nm m r r o- a r m o o?oN�ewm.m ��v� o mN N� r m L f 135 136 City of Tukwila Utilities Committee UTILITIES COMMITTEE Meeting Minutes June 28, 2011 S: 00 p.m. Conference Room #1 PRESENT Allan Ekberg, Acting Chair (sitting is for De'Sean Quinn); Dennis Robertson and Kathy Hougardy Staff: Bob Giberson, Frank Iriarte, Robin Tischmak, Ryan Larson, Greg Villanueva and Kimberly Matej CALL TO ORDER: Acting Committee Chair Ekberg called the meeting to order at 5:03 p.m. I. PRESENTATIONS No Presentations II. BUSINESS AGENDA A. 2010/2011 Small Drainage Program Bid Award, Staff is seeking Council approval to award a bid in the amount of $788,005.50 to Green River Construction for the 2010/2011 Small Drainage Program. This annual program constructs drainage projects throughout the City that are too large for completion by City staff but smaller than the average capital improvement project. This year the Small Drainage Program will construct nine drainage improvements at nine locations (specific locations outlined in memo included in Committee agenda packet). Each year, projects considered for this program are reprioritized based on such things as need, expense, time on the list, etc. Highest priority projects are designed and constructed within annual budget limitations. The City has worked successfully with Green River Construction on past projects including the 2009 Program. Although this is an annual program, projects from 2010 will be constructed due to previous permitting delays. Funding for this project is drawn from two budget line items, the Small Drainage Program and the Private Storm System Adoption Rehabilitation. On a side note, the Committee had a discussion regarding Council approval on project bid amounts, contingency and change orders above signing thresholds. Kimberly Matej will follow up with the City Attorney on the Committee's inquiries. UNANIMOUS APPROVAL. FORWARD TO JULY 11 COW FOR DISCUSSION. B. Howard Hanson Dam Flood Response: Levee Repairs Maintenance Consultant Recommendation and Agreement Staff is seeking Council approval to enter into a consultant agreement with KBA, Inc. in the amount of $298,000 for design and construction management services related to removing temporary flood measures and restoring and repairing affected areas by use of said measures. It is anticipated that this fall the Corps of Engineers will announce that the Howard Hanson Dam is fully functional and all temporary measures implemented to protect potential flood areas can be removed after the 2012 flood season. In order to be ready to remove the protection measures (i.e.: Supersacks and Hesco barriers) and repair the affected land, staff recommends beginning the design process now. KBA, Inc. was chosen from three firms on the Consultant Roster. They have provided satisfactory work for the City in the past including placement of above measures and current work on the Southcenter Parkway Extension Project. Funding for this project is provided in the CIP under Tukwila Levee Repairs and Maintenance. UNANIMOUS APPROVAL. FORWARD TO JULY 11 COW FOR DISCUSSION. 137 138