Loading...
HomeMy WebLinkAboutCOW 2011-07-11 Item 4D - Agreement - Howard Hanson Dam Flood Response / Tukwila Levee Repairs and Maintenance Co uNuL A GENDA SYNOPSIS Initials IT EMNO. Meeting Date Prepared by rrc ieav CCer ciZ revieev I 07/11/11 I BG 07/18/11 I BG I I I I I De ITEM INFORMATION I CASNumm' .R: 11-071 STAFF SPONSOR: BOB GIBE IORIGINALAGLNDADATI: 7 /11/11 A(;FINDA I'rla\a TrrLE Howard Hanson Dam Flood Response /Tukwila Levee Repairs Maintenance Design Construction Management Consultant Services C. \'17_ ?CORY Discussion Motion resolution Ordinance Bid Award Public Hearin Other t14tg Date 07/11/11 Mtg Date 07/18/11 Mt Date Mtg Date Mtg Date Mt Date Mtg Date SPONSOR Council Mayor HR DCD Finance .Fire IT P&'R Police PlV SPONSOR'S This contract is for design and construction management services for the removal of the SUMMARY Supersacks and Hesco barriers required by the Howard Hanson Dam Flood Response project. Three consultant firms were short- listed from the Consultant Works Roster and KBA, Inc. was chosen as the most qualified. Council is being asked to approve the contract with KBA in the amount of $298,000.00. RI? \'ll ?WIT BY COW Mtg. CA &P Cmte F &S Cmte Transportation Cmte Utilities Cmte Arts Comm. Parks Comm. Planning Comm. DATE: 6/28/11 COMMITTEE CHAIR: DE'SEAN QUINN RECOMMENDATIONS: SPONSOR /ADMIN. Public Works COMMIT rEE Unanimous Approval; Forward to Committee of the Whole COST IMPACT FUND SOURCE ExPFINDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $298,000.00 $400,000.00 $0.00 Fund Source: 303 GENERAL IMPROVEMENTS (PAGE 81, 2011 CIP) Comments: J MTG. DATE J RECORD OF COUNCIL ACTION 07/11/11 07/18/11 MTG. DATE J ATTACHMENTS 07/11/11 I Informational Memorandum dated 6/24/11 Consultant Selection Sheet Page 81, 2011 CIP Consultant Agreement with KBA, Inc. Minutes from the Utilities Committee meeting of 06/28/11 07/18/11 i 139 140 City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: Mayor Haggerton Utilities Committee FROM: Bob Giberson, Public Works Director _fA DATE: June 24, 2011 SUBJECT: Howard Hanson Dam Flood Response /Tukwila Levee Reoairs Maintenance Project No. 10901301 Consultant Recommendation Agreement ISSUE Approve KBA, Inc. for design and construction management services for the Howard Hanson Dam Flood Response project. BACKGROUND The City of Tukwila, King County, Kent, and Auburn installed temporary flood protection measures in 2009 in response to the damage sustained and subsequent reduced flood protection from the Howard Hanson Dam. These temporary measures included Supersacks placed along the Tukwila 205 levee and Hesco barriers placed along West Valley Highway. The Army Corps of Engineers has notified the affected jurisdictions that they expect to announce this Fall that all repairs have been completed to the Howard Hanson Dam and that the dam is operating at full protection level. DISCUSSION After notification by the Corps of Engineers that the dam is fully functional, Valley Cities have agreed to determine as a group when the temporary flood measures will be removed. Given the Corps level of confidence that the current repair work will be completed this Fall and no further work is required, the cities and King County have agreed that the temporary measures can be removed following the flood season in 2012. Each jurisdiction will be responsible for the removal and restoration within their own jurisdiction. The installation of the Supersacks and Hesco barriers required traffic modifications to West Valley Highway, grading work on public and private property, and caused damage to the Tukwila 205 Levee. Therefore, along with removal of the temporary measures, restoration and repair work will also be needed, including full restoration of the Green River Trail. To design and manage this construction project, the current Consultant Roster was reviewed and three firms were short- listed. The firms were: KBA Inc., PACE Engineers, and CH2M Hill. The Summary of Qualifications was evaluated for each firm and KBA, Inc. was selected "as the firm that best met requirements. KBA, Inc. has worked with the City in deploying the temporary measures and is currently working with the City on the Southcenter Parkway Extension project. BUDGET SUMMARY Contract Budaet Design /Construction Management 298,000.00 400,000.00 Construction 1,600,000.00 Total 298.000.00 2.000.000.00 RECOMMENDATION The Council is being asked to approve a Design and Construction Management Agreement with KBA, Inc. in the amount of $298,000.00 for the Tukwila Levee Repairs and Maintenance Project and consider this item at the July 11, 2011 Committee of the Whole meeting and subsequent July 18, 2011 Regular Meeting. Attachments: Consultant Selection Sheet Pg 81 2011 -2016 CIP Sheet Consultant Agreement WAPW Eng \PROJECTS\A- DR Projects \10901301 (Tukwila Levee Repair and Maintenance) \Design \INFORMATION MEMO Design and Construction.doc 141 142 CONSULTANT SELECTION Tukwila Levee Repairs and Maintenance KBA PACE CH2MHi11 Project Management WSDOT, Corps, and iP Levee Experience l 2 2 Firm Experience General Working with Tukwila Program Knowledge 1 1.5 1.5 Construction Managements Experience with Tukwila V" 1.5 1 PS &E Experience with Tukwila 1, 1 2 e 8 8.5 TOTALS Score consultant 1 to 3, with 1 being highest and 3 being lowest. Lowest score is consultant ranked highest. 143 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2011 to 2016 PROJECT: Tukwila Levee Repairs Maintenance PROJECT NO. 10901301 DESCRIPTION: Remove temporary flood control measures and restore property along the levee. The US Army Corps of Engineers notified Valley cities that the Howard Hanson Dam sustained damage JUSTIFICATION: during the January 2009 flood event. Available flood storage was reduced resulting in potential increased release rates and possible flooding of the Green River Valley. STATUS: Temporary containment measures were installed in 2009 that included Hesco walls and Super sacks. MAINT. IMPACT: Increased flood patrol and maintenance inspection of the temporary measures. The US Army Corps of Engineers expects to restore full storage volume of the Howard Hanson Dam in COMMENT: 2011. Direction from the Corps to remove the temporary measures is expected in 2011. The trail will also need repair and overlay due to the damage from containment placement. FINANCIAL Through Estimated (in $000's) 2009 2010 2011 2012 2013 2014 2015 2016 BEYOND TOTAL EXPENSES Engineering 200 200 Land (R/W) 0 Const Mgmt 200 200 Construction 1,300 300 1,600 TOTAL EXPENSES 0 0 1,700 300 0 0 0 0 0 2,000 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 City Oper. Revenue 0 0 1,700 300 0 0 0 0 0 2,000 TOTAL SOURCES 0 0 1,700 300 0 0 0 0 0 2,000 Proect Location W i 144 2011 2016 Capital Improvement Program 81 CONSULTANT AGREEMENT FOR DESIGN CONSTRUCTION MANAGEMENT SERVICES THIS AGREEMENT is entered into between the City of Tukwila, Washington, herein -after referred to as "the City and KBA, Inc. hereinafter referred to as "the Consultant in consideration of the mutual benefits, terms, and conditions hereinafter specified. 1. Project Designation. The Consultant is retained by the City to perform design and construction management services in connection with the project titled Tukwila Levee Repair and Maintenance Proiect. 2. Scope of Services. The Consultant agrees to perform the services, identified on Exhibit "A" attached hereto, including the provision of all labor, materials, equipment and supplies. 3. Time for Performance. Work under this contract shall commence upon the giving of written notice by the City to the Consultant to proceed. The Consultant shall perform all services and provide all work product required pursuant to this Agreement within 550 calendar days from the date written notice is given to proceed, unless an extension of such time is granted in writing by the City. 4. Payment. The Consultant shall be paid by the City for completed work and for services rendered under this Agreement as follows: A. Payment for the work provided by the Consultant shall be made as provided on Exhibit "B" attached hereto, provided that the total amount of payment to the Consultant shall not exceed $298,000.00 without express written modification of the Agreement signed by the City. B. The Consultant may submit vouchers to the City once per month during the progress of the work for partial payment for that portion of the project completed to date. Such vouchers will be checked by the City and, upon approval thereof, payment shall be made to the Consultant in the amount approved. C. Final payment of any balance due the Consultant of the total contract price earned will be made promptly upon its ascertainment and verification by the City after the completion of the work under this Agreement and its acceptance by the City. D. Payment is provided in this section shall be full compensation for work performed, services rendered, and for all materials, supplies, equipment and incidentals necessary to complete the work. E. The Consultant's records and accounts pertaining to this Agreement are to be kept available for inspection by representatives of the City and state for a period of three (3) years after final payments. Copies shall be made available upon request. 1 145 5. Ownership and Use of Documents. All documents, drawings, specifications and other materials produced by the Consultant in connection with the services rendered under this Agreement "Documents shall be the property of the City whether the project for which they are made is executed or not. The Consultant shall be permitted to retain copies, including reproducible copies, of drawings and specifications for information, reference and use in connection with the Consultant's endeavors. The Consultant shall not be responsible for any modifications to the Documents made by the City, nor for any use of the said Documents by the City on any project other than the project specified in this Agreement. 6. Compliance with Laws. The Consultant shall, in performing the services contemplated by this Agreement, faithfully observe and comply with all federal, state, and local laws, ordinances and regulations, applicable to the services to be rendered under this Agreement. 7. Indemnification. The Consultant shall indemnify, defend and hold harmless the City, its officers, agents and employees, from and against any and all claims, losses or liability, including attorney's fees, arising from injury or death to persons or damage to property occasioned by any negligent act, omission or failure of the Consultant, its officers, agents and employees, in performing the work required by this Agreement. With respect to the performance of this Agreement and as to claims against the City, its officers, agents and employees, the Consultant expressly waives its immunity under Title 51 of the Revised Code of Washington, the Industrial Insurance Act, for injuries to its employees, and agrees that the obligation to indemnify, defend and hold harmless provided for in this paragraph extends to any claim brought by or on behalf of any employee of the Consultant. This waiver is mutually negotiated by the parties. This paragraph shall not apply to any damage resulting from the sole negligence of the City, its agents and employees. To the extent any of the damages referenced by this paragraph were caused by or resulted from the concurrent negligence of the City, its agents or employees, this obligation to indemnify, defend and hold harmless is valid and enforceable only to the extent of the negligence of the Consultant, its officers, agents and employees. 8. Insurance. The Consultant shall secure and maintain in force throughout the duration of this contract comprehensive general liability insurance, with a minimum coverage of $500,000 per occurrence and $1,000,000 aggregate for personal injury; and $500,000 per occurrence/ aggregate for property damage, and professional liability insurance in the amount of $1,000,000 per occurrence and annual aggregate. Said general liability policy shall name the City of Tukwila as an additional named insured. In case of cancellation and nonrenewal of any of the required insurance coverage, the Consultant shall, within two business days of their receipt of such notice of cancellation, forward same to the City. Certificates of coverage as required by this section shall be delivered to the City within fifteen (15) days of execution of this Agreement. 9. Independent Contractor. The Consultant and the City agree that the Consultant is an inde- pendent contractor with respect to the services provided pursuant to this Agreement. Nothing 2 146 in this Agreement shall be considered to create the relationship of employer and employee between the parties hereto. Neither the Consultant nor any employee of the Consultant shall be entitled to any benefits accorded City employees by virtue of the services provided under this Agreement. The City shall not be responsible for withholding or otherwise deducting federal income tax or social security or for contributing to the state industrial insurance program, otherwise assuming the duties of an employer with respect to the Consultant, or any employee of the Consultant. 10. Covenant Against Contingent Fees. The Consultant warrants that it has not employed or retained any company or person, other than a bonafide employee working solely for the Consultant, to solicit or secure this contract, and that it has not paid or agreed to pay any company or person, other than a bonafide employee working solely for the Consultant, any fee, commission, percentage, brokerage fee, gifts, or any other consideration contingent upon or resulting from the award or making of this contract. For breach or violation of this warrant, the City shall have the right to annul this contract without liability, or in its discretion to deduct from the contract price or consideration, or otherwise recover, the full amount of such fee, commission, percentage, brokerage fee, gift, or contingent fee. 11. Discrimination Prohibited. The Consultant, with regard to the work performed by it under this Agreement, will not discriminate on the grounds of race, color, national origin, religion, creed, age, sex or the presence of any physical or sensory handicap in the selection and retention of employees or procurement of materials or supplies. 12. Assignment. The Consultant shall not sublet or assign any of the services covered by this Agreement without the express written consent of the City. 13. Non Waiver. Waiver by the City of any provision of this Agreement or any time limitation provided for in this Agreement shall not constitute a waiver of any other provision. 14. Termination. A. The City reserves the right to terminate this Agreement at any time by giving ten (10) days written notice to the Consultant. B. In the event of the death of a member, partner or officer of the Consultant, or any of its supervisory personnel assigned to the project, the surviving members of the Consultant hereby agree to complete the work under the terms of this Agreement, if requested to do so by the City. This section shall not be a bar to renegotiations of this Agreement between surviving members of the Consultant and the City, if the City so chooses. 15. Attorneys Fees and Costs. In the event either party shall bring suit against the other to enforce any provision of this Agreement, the prevailing party in such suit shall be entitled to recover its costs, including reasonable attorney's fees, incurred in such suit from the losing party. 3 147 16. Notices. Notices to the City of Tukwila shall be sent to the following address: City Clerk City of Tukwila 6200 Southcenter Boulevard Tukwila, WA 98188 Notices to Consultant shall be sent to the following address: Kristen A. Bettv, PE KBA, Inc. 11000 Main Street Bellevue, WA, 98004 17. Integrated Agreement. This Agreement, together with attachments or addenda, represents the entire and integrated Agreement between the City and the Consultant and supersedes all prior negotiations, representations, or agreements written or oral. This Agreement may be amended only by written instrument signed by both the City and the Consultant. DATED this day of 2011. CITY OF TUKWILA CONSULTANT By: Mayor Printed Kristen A. Bettv, PE Title: President Attest /Authenticated: Approved as to Form: City Clerk Office of the City Attorney 4 148 KBA, Inc. June 8, 2011 EXHIBIT A SCOPE OF SERVICES for Tukwila Levee Repair and Maintenance Project Contract No. KBA, Inc. (Consultant) and their Subconsultant, KPG, Inc. (Subconsultant) will provide services to the City of Tukwila (City) for the Project known as Tukwila Levee Repair and Maintenance Project. As detailed in the following Scope of Services: The Consultant will provide services during the design, bidding, construction, and project closeout stages of the Project. This will include assessment of existing conditions, determination of needs for any site restoration, preparation of necessary traffic control and channelization plans, coordination with WSDOT, railroad, and other stakeholders. The Subconsultant will provide design and permitting coordination and preparation services, prepare the bid package, and provide survey and other support. Project Description: This project is the removal of the protective measures installed in 2009 on top of the Green River levee and around Tukwila's Central Business District, together with some levee repair and site restoration. Major items of work include: Removal of Super Sacks and Hesco Barriers, located near City Maintenance Facility (approximately 300 LF of Hesco Barrier) and surround the Central Business District (CBD) Removal of Concrete Barrier on West Valley Highway Rechannelization along West Valley Highway and removal of signs placed during the initial 2009 installation Re- paving of the paved portions of the existing trail General restoration as required to restore approximate existing conditions Levee repair and cleanup, at the direction of the Corps of Engineers I. DETAILED TASK DESCRIPTION CONSULTANT (KBA) A. Project Management 1. Day -to -day project management: liaison and coordinate with City on a regular basis to discuss Project issues and status. Decide on best modes and frequency of communication with the City and Subconsultants, and use them. 2. Manage Team, comprised of Consultant's staff and Subconsultants. Organize and layout work for Team. 3. Review monthly expenditures and Team scope activities. Prepare and submit to City, invoices and progress report describing services performed. Prepare and submit reporting required by funding source(s), if any. Deliverables Monthly invoices and progress reports B. Design Phase Services 1. Participate in a field review with the Subconsultant and the City to determine the current condition of the site and levee system, and assist in defining the scope and magnitude of the levee restoration, including the type of temporary structures to be removed, underlying levee surfacing, and general restoration needs. 8:\ ProjedslDaniroclslD 4ent,Tukwila1BP1 1046-TukvnWL.ve CA anuplDra11s8NegoBali.nR —rdsVn houseDraflslExhAScope- KBA (FINAL)- 20110608 .doa 1 of 11 149 KBA, Inc. June 8, 2011 2. Advise the Subconsultant on challenging constructability issues, to aid in their development of Bid Documents. 3. Assist the City and the Subconsultant in the application and coordination with any necessary permitting agencies and governing bodies. This is intended to include review of correspondence to the US Army Corps of Engineers, King County Flood Control District, WSDOT, and Union Pacific Railroad. 4. Prepare property use agreements for approval by the City. Meet with affected property owners to work toward gaining access to allow the removal of the protective measures. 5. Constructability Reviews. Participate in constructability reviews of Subconsultant's documents and design at the following milestones: a. 30% Stage Review. Review the 30% Plans and Preliminary Engineer's Estimate. i. Review at this stage will be for areas of cost saving opportunities, constructability, operability, and general clarity. ii. One review cycle. Meet with City and /or Designer (Subconsultant) staff to present and discuss comments. Submit letter report or meeting notes detailing limits of the review, in the time and budget available, and highlighting key areas of concern. b. 90% Stage Review. i. Review the 90% Plans, Contract Provisions, and Engineer's Estimate for such things as: (a) Areas of cost saving opportunities (b) Constructability and operability (c) General clarity (d) Consistency among standard specifications, amendments, and special provisions /bid items (e) Completeness and adequacy of bidding and contracting documents /forms (f) Special Provisions for non standard items (g) Pay items for construction elements ii. One review cycle. Meet with City and /or Designer (Subconsultant) staff to present and discuss comments. Prepare and submit Constructability Review Comments spreadsheet, along with red -line markup of the documents. Deliverables Property use agreements 30% stage letter report 90% stage Constructability Review Comments spreadsheet, and red -line markups C. Bid Phase Services 1. Assist Subconsultant with answering questions during the bidding period. Bidder Review. Based on the bid tabulation prepared by the Subconsultant, review the bid results on the project for irregularities. Review low bidder for responsibility and responsiveness. Deliverables Bid and Bidder evaluations and checklists D. Preconstruction Services 1. Prepare a Construction Management Plan (CM Plan) for the project. The CM Plan will be developed based on the Consultant's boilerplate document and modified to adapt to and include City practices and funding agency requirements, including forms to be used on the project. Submit to City for review and comment and finalize based on those comments. The CM Plan will cover at least the following: Si IPro je GSlConlractslCEen1\Tuk \BP1 f-0 46-TukwilaLeveeCleanu plDrafMNegoliationRewrdslln.h.sS O ftslExhA -Swpe- KBA FINAL)- 20110608.d.c 2 of 11 150 KBA, Inc. June 8, 2011 a. Communication and coordination between the CM Team, Designer (Subconsultant), City and other stakeholders b. Project procedures and forms c. Document control system 2. Organize and lead preconstruction conference. a. Prepare and distribute notices b. Prepare agenda c. Conduct the meeting d. Prepare and distribute meeting notes to attendees and affected agencies 3. Provide one set of preconstruction photographs and video. Deliverables Construction Management Plan, draft and final Preconstruction Conference Notice, Agenda, and Notes Preconstruction photos, digital files on CD /DVD or video file on DVD E. Construction Services Contract Administration 1. Liaison with the City, Construction Contractor, Designer (Subconsultant), appropriate agencies, property owners, and utilities. 2. Provide the City with brief monthly construction progress reports, highlighting progress and advising of issues which are likely to impact cost, schedule, or quality /scope. 3. Schedule Review. a. Review Construction Contractor's schedules for compliance with Contract Documents. b. Monitor the Construction Contractor's conformance to schedule and require revised schedules when needed. Advise City of schedule changes. 4. Progress Meetings. Lead regular (usually weekly) progress meetings with the Construction Contractor, including City pre- briefing, and preparing weekly meeting agenda and meeting notes, and distributing copies to attendees. Track outstanding issues on a weekly basis. 5. Update CM Plan as needed to reflect changes in policy and /or procedure that occur during the Project, and orient CM Team to the changes. 6. Manage Submittal Process. Track and review, or cause to be reviewed by other appropriate party, work plans, shop drawings, samples, test reports, and other data submitted by the Construction Contractor, for general conformance to the Contract Documents. 7. Manage RFI (Request for Information) process. Track and review /evaluate, or cause to be reviewed evaluated by other appropriate party, RFIs. Manage responses to RFIs. 8. Change Management. Evaluate entitlement, and prepare scope, impact, and independent estimate for change orders. Facilitate resolution of change orders. 9. Monthly Pay Requests. Prepare monthly requests for payment and /or review payment requests submitted by the Construction Contractor. Review with City and Construction Contractor, and recommend approval, as appropriate. 10. Evaluate Construction Contractor's Schedule of Values for lump sum items. Review the Contract Price allocations and verify that such allocations are made in accordance with the requirements of the Contract Documents. 11. Assist the City in the investigation of malfunctions or failures during construction. 12. Public Information. Provide information for City to prepare media communications and public notices on Project status. Provide information for City's inclusion into a Project website and /or newsletters, if requested. S lProje MC.1., slC4WTuk.bTPI 1 -046 -Tuk VI.L.ve Clea nu pl Dra llsB Nego 6ali. nRe., dslln- hou seD.f tsIE KhA- Smpe.KBA {FINAL).20110608 d.M 3 of 11 151 KBA, Inc. June 8, 2011 13. Record Drawings. Review not less than monthly, the Construction Contractor's redline set of contract plans. Maintain a CM Team set of conformed drawings tracking plan changes, location of discovered anomalies, and other items, as encountered by the CM team. Use these markups to check the progress of the Contractor prepared Record Drawings. 14. Document Control. Establish and maintain document filing and tracking systems, following City guidelines and meeting funding agency requirements. Collect, organize, and prepare documentation on the Project. 15. Project Closeout. Prepare Certificates of Substantial (including punch list), Physical, and Final Completion. Prepare final pay estimate. 16. Final Records. Compile and convey final project records, transferring to the City for archiving at final acceptance of the Project. Records will consist of hard copy originals. Deliverables Monthly Construction Progress Reports Schedule review comments Meeting agendas and notes Submittal log RFllog Change Order(s) Progress pay requests Certificates of Completion and punch list(s) Final records hard copy F. Construction Services Field 1. Observe the technical conduct of the construction, including providing day -to -day contact with the Construction Contractor, City, utilities, and other stakeholders, and monitor for adherence to the Contract Documents. The Consultant's personnel will act in accordance with Sections 1 -05.1 and 1 -05.2 of the Standard Specifications. 2. Observe material, workmanship, and construction areas for compliance with the Contract Documents and applicable codes, and notify Construction Contractor of noncompliance. Advise the City of any non conforming work observed during site visits. 3. Prepare daily construction reports, recording the Construction Contractors' operations as actually observed by the Consultant; includes quantities of work placed that day, Contractor's equipment and crews, and other pertinent information. 4. Interpret Contract Documents, in coordination with Designer (Subconsultant). 5. Decide questions which may arise as to the quality and acceptability of material furnished, work performed, and rate of progress of work performed by the Construction Contractor. 6. Establish communications with adjacent property owners. Respond to questions from property owners and the general public. 7. Coordinate with permit holders on the Project to monitor compliance with approved permits, if applicable. 8. Prepare field records and documents to help assure the Project is administered in accordance with City requirements. 9. Attend and actively participate in regular on -site meetings. 10. Take periodic digital photographs during the course of construction. Photographs to be labeled and organized as detailed in the CM Plan. S 1ProjeGSlCwtmclslCFentlTukwdaISP 11 -046- TukwilaLe.e Clea nu plDr oftsd Nego t ialranRecordsllmhouseDraASIExhA. Scope- KBA.(FINAL)- 20110608.docx 4 of 11 152 KBA, Inc. June 8, 2011 11. Punch List. Upon substantial completion of work and coordinate with the City and affected agencies to prepare a 'punch list' of items to be completed or corrected. Coordinate final inspection with those agencies. 12. Testing. Conduct or cause to be conducted, materials and laboratory tests. Coordinate the work of the Field Representative(s) and testing laboratories in the observation and testing of materials used in the construction; document and evaluate results of testing; and inform City and Construction Contractor of deficiencies. Deliverables Daily Construction Reports with project photos submitted on a weekly basis Punch List, Certificate of Substantial Completion Test reports II. DETAILED TASK DESCRIPTION SUBCONSULTANT (KPG) A. Base Mapping 1. Prepare base maps for the length of the project, approximately 8,800 linear feet, in addition to approximately 300 LF of Hesco Barrier installed near the City maintenance facility. Base maps will be based on available City aerial data with the supplemental information listed in items 2 -4 below incorporated. 2. Raw GPS survey data points obtained prior to the installation of temporary measures in 2009 will be processed and overlaid on aerial mapping to provide an approximate baseline for reference and payment purposes along the levees. 3. Perform field reviews with the Consultant and City to identify the type of temporary structures to be removed, underlying levee surfacing, and general restoration needs for incorporation into the base map. 4. Prepare survey of existing channelization and pavement edge of West Valley Highway within the limits of the area requiring WSDOT channelization plan approval. Deliverables Base maps will be included as part of the final bid documents Field notes and photographs will be made available to the City KBA as requested B. Community Outreach 1. Assist the City with public outreach to affected stakeholders, as directed by the City. This work may include preparation of sign layout, communication with stakeholders, and other tasks as assigned. 2. License to Construct (LTC) authorizations from adjacent property owners will be obtained by Consultant. In support of Consultant's efforts to obtain License to Construct (LTC) authorizations from adjacent property owners, attend one -on -one meetings as requested with affected property owners along the corridor to discuss the project, private property restoration, access issues or other concerns. (Estimate 6 meetings.) Deliverables Open house meeting graphics. Notes from any one -on -one meetings C. Permitting and Agency Coordination Provide coordination for permits and /or approvals from the following agencies: SlProjeds\ Contacts\ Client\ TukvMa1BP11 -046 -TukwilaLeve Cleanup\ Drafts& NegotlationRecordslln- houseDraBs\ExhA. Scope KBA {FINAL) 20110608docx 5 of 11 153 KBA, Inc. June 8, 2011 1. Citv of Tukwila. Prepare a SEPA checklist documenting the scope of temporary measure removal within the project limits. 2. Washinaton State Department of Transoortation WSDOT). Coordinate with WSDOT for channelization plan approval along West Valley Highway and identify future ownership of WSDOT provided barrier. This work is anticipated to include: Prepare preliminary channelization plan and attend one coordination meeting with WSDOT to review the preliminary plan and identify specific traffic control concerns that need to be included. Update Channelization Plans to incorporate WSDOT comments and concerns and provide specification language to address traffic control needs. Coordination to identify future ownership WSDOT point of delivery or disposal by Contractor) of WSDOT- provided zipper barrier that was installed with the temporary levee measures in 2009. 3. US Armv Corps of Enaineers USACE) Kinq, Countv Flood District. The 2009 temporary levee protection measures were installed in coordination with the USACE and King County Flood District. The City continues to coordinate with the both agencies on their removal. It is anticipated that no formal permit or environmental documentation will be required by either agency, but that the following coordination will be required prior to construction: Review and comment on notification letters prepared by the City to both agencies. Attend up to three (3) coordination meetings during project design with the USACE and /or King County Flood District to identify elements for inclusion in project plans and specifications. Coordination to identify future ownership (point of delivery or disposal by Contractor) of USACE provided super sacks that were installed with the temporary levee measures in 2009. 4. Washinaton Department of Fish and Wildlife (WDFW). Provide coordination with WDFW to obtain a Hydraulic Project Approval (HPA) as follows: Attend one meeting with WDFW to review the project scope and identify any necessary mitigation needs that will need to be incorporated into the project design. Prepare a Joint Aquatic Resources Permit Application (JARPA) and submit to WDFW for approval. Provide necessary coordination to obtain the HPA. 5. Washinaton Department of Ecoloqv (WDOE). Prepare a Notice of Intent (NOI) to WDOE in accordance with National Pollution Discharge Elimination System (NPDES) Construction Stormwater General Permit. Prepare Project Specifications requiring the Contractor to transfer and implement the permit requirements. 6. Union Pacific Railroad (UPRR). Prepare a permit application for work in vicinity of UPRR facilities and incorporate permit requirements into the Project Specifications. Deliverables File copies of all permit applications File copies of any meeting notes or correspondence with agencies D. Prepare Plans, Specifications, and Estimates 1. Review available 2009 construction record drawings and permit approvals and perform a detailed site walk with members of the original Consultant construction team and City staff. S: WrojedslContactslClienllTukwBa18Pt I N&TukwilaLe eeCleanu010rafMNegotiationRecordsktn- IwuseDraftslExhA -Snipe KBA- (FINAL).20110608.docx 6 of 11 154 KBA, Inc. June 8, 2011 The purpose of the site walk is to identify existing conditions and site restoration needs, including but not limited to the following: Asphalt pavement damage and repair limits Concrete pavement damage and repair limits Areas of root intrusion for removal and barrier installation Access limitations and staging Potential waste sites Private property concerns Areas requiring additional survey or investigations 2. Prepare Draft 30% Plans on aerial base maps that incorporate the results of the site walk and preliminary feedback from the resource agencies identified in Task II.C. The 30% Plans will include plan view depictions of all anticipated project elements for removal and restoration. Plans will be distributed to the City and Consultant for review and comment. 3. Incorporate City Consultant comments on the 30% Plans. The updated 30% Plans will be used as the basis of final design, permit and agency coordination, and for use by the City Consultant in obtaining LTC authorizations. 4. Prepare 90% Plans (estimate 35 sheets) for review and approval by the Consultant and the City. Plans shall be based on the 'centerline' established in Task ILA as a means of reference, but not as a surveyed centerline. City standard details and WSDOT standard plans will be supplemented with project specific details as required. Plan information will include: Cover Sheet Overall site plans showing: (200+ scale) Access and Staging criteria Limits of construction Permit/ coordination items Aerial Plan Sheets showing: (40 scale) Limits of Super Sack Removal Limits of Hesco Unit Removal Limits of Traffic Barrier Removal Temporary Erosion and Sediment Control Measures Paving limits of existing trail Restoration notes Channelization plans and details Erosion Control notes and details Restoration typical sections and details 5. Prepare 30% (outline of pay items only) and 90% specifications for review and approval by Consultant and the City. Specifications shall be based on 2010 WSDOT APWA standard specifications, as amended, using contract boilerplate and general special provisions provided by the City. 6. Calculate quantities and prepare a construction cost estimate in support of the 30% and 90% plans and specifications. 7. Incorporate City and Consultant comments on the 90% Plans, Specifications, and Estimate and finalize for bid advertisement on bxwa.com. Deliverables e 5 copies 11x17 Draft 30% Plans (to City, Consultant) 5 copies 30% Estimate and pay item outline (to City, Consultant) 10 copies 11x17 Final 30% Plans (to City, Consultant, Task 4 agencies) 10 copies 11x17 90% Plans (to City, Consultant, Task 4 agencies) S:1 ProjeclslConaactslCGenATukwda' BPII0 46- TukMiaLeveeCl eanupf Draf LsANegolialionRewrdsUn- houseDrahslExhA Swpe- K8A {FINAL)- 20110608.docx 7 of 11 155 KBA, Inc. June 8, 2011 10 copies 90% Specifications (to City, Consultant, Task 4 agencies) 20 copies 11x17 Final Plans for Bid and Construction 20 copies 11x17 Final Specifications for Bid an Construction Engineer's Estimate at 30 90 and Bid Document Upload of Bid Documents to BXWA.com Digital file copy of final Bid Documents in .pdf format E. Bid and Construction Services 1. Assist Consultant and the City during the bid period by responding to bidder inquiries, attendance at a pre -bid meeting (if required), preparation of addenda, and preparation of the certified bid tabulation. 2. Provide pre- construction support to Consultant and the City, including general coordination and attendance at the preconstruction meeting. 3. Provide on -call engineering and /or survey support to Consultant and the City during construction. These services may include: Response to RFIs Submittal Reviews Field reviews for verification of restoration needs following removals Plan preparation for field changes Attendance at weekly construction meetings as requested Survey verification or other services as requested Deliverables Preparation and upload of addenda Certified Bid Tabulation Construction documentation as required 111. ASSUMPTIONS A. Budget 1. Weekly construction progress meetings will not last more than one hour each. 2. Staffing levels are anticipated in accordance with the attached budget estimate. A certain amount of overtime has been figured into the budget to use, if needed, during peak construction activities. Supplemental assistance may be needed depending upon Construction Contractor's activities (number of crews and shifts). 3. The majority of the work is anticipated to be performed during daytime hours. Some of the operation along West Valley Highway may be performed at night. A 15 percent premium for labor will be applied to all hours that Consultant employees work between 7 pm and 7 am. 4. The level of effort in accomplishing the scope items is limited to the pre- approved budget. Consultant will not exceed the approved budget without prior approval by the City. Consultant services are budgeted based on a 60- working day construction contract, plus time allotted for project setup and closeout, all completed in 2011. Should further services be required, or should the construction contract run longer than this time period, the City and Consultant will negotiate a supplement to this Agreement. 5. The Consultant can utilize existing field office space for the Southcenter Parkway Extension, assuming that the physical work occurs during the summer of 2011 at no additional cost to the City. Should the work be delayed beyond the schedule of the Southcenter Parkway Extension Project, The City may provide field office space, or the Consultant can provide a construction office. Should the Consultant provide a separate field office (other than the Southcenter Parkway Extension field office), it will be considered Additional Services. S: IPro jects \COnVadslCkentlTukwRa1BP11146 TukwilaLeveeCleanup\ Drafts& NegobationRecmdskinhouseDraftslExhA .Scope -HBA- (FINAL)- 20110608.docx 8 of 11 156 KBA, Inc. June 8, 2011 6. The budget allocations shown on Exhibit B are itemized to aid in project tracking purposes only. The budget may be transferred between tasks or people, or between labor and expenses, provided the total contracted amount is not exceeded without prior written authorization. 7. The budget assumes that Consultant's standard forms, logs, and processes will be used. The file structure and Inspector's Daily Reports will copy the current format being used on the Southcenter Parkway Extension Project. Any customization to meet specialized City requirements will be Additional Services. B. Items and Services City will provide: 1. Meeting arrangements and facilities for pre -bid and preconstruction meetings. 2. Aerial photography. 3. Any available plans and permits from the original 2009 installation. 4. SEPA processing, postings,. and determination. 5. Subconsultant will serve as authorized agent to the City on permit applications; however, all permits will be signed by the City of Tukwila. 6. Review and written comments on all design submittals. C. Scope 1. Neither specialized engineering studies (structural, geotechnical, traffic), nor reconstruction of the permanent levees or work requiring specialty geotechnical or structural review and analysis are anticipated or included in this scope of services. 2. Environmental documentation or permits beyond what is described are not anticipated or included in this scope of services. 3. No pre -bid meeting is anticipated as part of this project. 4. Constructability Review of design documents will be for constructability, for general conformance with the design concept, and for contradictions and inconsistencies between the various parts of the design documents. This review will not include review of the accuracy or completeness of details, such as quantities, dimensions, weights, gauges, or fabrication processes; and will not include quantity takeoffs. 5. Consultant will provide observation services for the days /hours that their Inspector(s) personnel is /are on -site. The Inspector(s) will not be able to observe or report construction activities or collect documentation during the time they are not on -site. 6. The Consultant's monitoring of the Construction Contractor's activities is to ascertain whether or not they are performing the work in accordance with the Contract Documents; in case of noncompliance, Consultant will reject non conforming work, and pursue the other remedies in the interests of the City, as detailed in the Contract Documents. The Consultant cannot guarantee the Construction Contractor's performance, and it is understood that Consultant shall assume no responsibility for: proper construction means, methods, techniques; project site safety, safety precautions or programs; or for the failure of any other entity to perform its work in accordance with laws, contracts, regulations, or City's expectations. 7. Definitions and Roles. The use of the term "inspect" in relation to Consultant's services is synonymous with "construction observation, and reference to the "Inspector' role is synonymous with "Field Representative" and means: performing on -site observations of the progress and quality of the Work and determining, in general, if the Work is being performed in conformance with the Contract Documents; and notifying the City if Work does not conform to the Contract Documents or requires special inspection or testing. SlRrojectslDonlraclslClienllTukwla1BP11 -046- Tukwii.Le. a CleanuptD.11,&Negotiat.o RemrdsVnhouseDra11s1ExhA -Smpe -KBA {FINAL) 20110608 d= 9 of 11 157 KBA, Inc. June 8, 2011 8. Because of the prior use of the Project site, there is a possibility of the presence of toxic or hazardous materials. Consultant shall have no responsibility for the discovery, presence, handling, removal or disposal of toxic or hazardous materials, or for exposure of persons to toxic or hazardous materials, in any form at the Project site, including but not limited to asbestos, asbestos products, polychlorinated biphenyl (PCB) or other toxic substances. If the Consultant suspects the presence of hazardous materials, they will notify the City immediately for resolution. 9. Review of Shop Drawings and other Construction Contractor submittals is not intended as an approval of the submittals if they deviate from the Contract Documents or contain errors, omissions and inconsistencies, nor is it intended to relieve the Construction Contractor of their full responsibility for Contract performance, nor is the review intended to ensure or guarantee lack of inconsistencies, errors, and /or omissions between the submittals and the Contract requirements. This review will not include review of the accuracy or completeness of details, such as quantities, dimensions, weights, or gauges, fabrication processes, construction means or methods, or coordination of the work with other trades, all of which are the sole responsibility of the Construction Contractor. Review of a specific item will not indicate that the Consultant has reviewed the entire assembly of which the item is a component. 10. Any opinions of probable construction cost provided by the Consultant will be on the basis of experience and professional judgment. However, since Consultant has no control over competitive bidding or market conditions, the Consultant cannot and does not warrant that bids or ultimate construction costs will not vary from these opinions of probable construction costs. 11. Development of construction schedules and /or sequencing, and /or reviewing and commenting on Contractors' schedules, is for the purpose of estimating number of days to complete a project, and for identifying potential schedule and coordination challenges and determining compliance with the construction contract. It is not a guarantee that a Construction Contractor will complete the project in that sequence or timeline, as means and methods are the responsibility of the Construction Contractor. 12. Consultant is not responsible for any costs, claims, or judgments arising from or in any way connected with errors, omissions, conflicts or ambiguities in the Contract Documents prepared by others. The Consultant does not have responsibility for the professional quality or technical adequacy or accuracy of the design plans or specifications, nor for their timely completion by others. IV. OPTIONAL SERVICES All services not detailed above, are considered Optional Services, which, along with any other Additional Services requested by the City, will be performed only when a mutually negotiated Supplement to this Agreement is executed, specifying scope of services and budget. Potential Optional Services include: A. Permit acquisition B. Environmental documentation C. Additional surveying D. Geotechnical review E. Structural review F. Public Involvement support 1. Additional public outreach 2. Coordinate media releases and traffic advisory updates 3. Develop and maintain Project website, updating project progress monthly S: IProjectslCanlractslCfentlTukwila1BP11-0 46- Tukwil aleveeCl eamiplDraW Negot ialionRecordslln- houseDrafislExhA -Scope KBA {FINAL).2011 10 of 11 158 KBA, Inc. June 8, 2011 4. Provide periodic notification newsletters to affected property owners on upcoming work, and include contact numbers G. Provide administrative and support services during construction which are not included in the above scope of services, which may include: 1. Investigations, meetings, and negotiations with the Construction Contractor involving claims and legal complaints, or a significant amount of defective or rejected work. A "significant amount" would be an item that might represent more than 2.5 percent of the total contract bid amount. 2. Additional work resulting from delinquency or insolvency of the Construction Contractor; or as a result of damage to the construction Project caused by fire, flood, earthquake or other acts of God, all exclusive of additional work resulting from litigation. 3. Additional work resulting from strikes, walkouts, or other acts of trade or labor unions or work required to resolve disputes or goals involving minorities. Additional work resulting from significant delays or acceleration of the work by the Construction Contractor. 4. Assistance to legal, financial, or other consultants engaged by the City beyond the services previously described. 5. Additional services resulting from changes in scope or design of the Project due to circumstances beyond the Consultant's control. Changes include, but are not limited to: changes in size, complexity, the schedule, character of construction, or method of financing. H. Prepare additional copies of approved drawings, specifications, and other contract documents, either for bidding purposes, or as requested by the City. I. Drafting of Procedures, or Operations and Maintenance Manual(s). S1 ProjeUSlContractstC5en11Tukwila1 BP11-046- TukwilaLev eeCleanupl DraflsB NegolialionR— rdslln- h..DraflslExhA- Scope- KBAiFINAL).20110KS.d— 11 of 11 159 160 EXHIBIT B CONSULTANT FEE DETERMINATION SUMMARY SHEET (Cost Plus Multiplier) Project: Tukwila Levee Repair and Maintenance Project KBA RATES (Loaded) 2011 Classification Hours DSC Rates Est. Cost Totals Principal 138 x $192.00 26,496 Contract Specialist 60 x $102.00 6,120 Resident Engineer 180 x $115.00 20,700 Office Engineer Document Controls 124 x $80.00 9,920 Inspector 480 x $90.00 43,200 Project Support 8 x $99.00 792 Permit Specialist 48 x $135.00 6,480 TOTAL KBA LABOR 1,038 113,708 KBA REIMBURSABLES Vehicles 2,100 Mileage 150 Misc: Supplies, Postage, Courier 392 2,642 SUBCONSULTANT COSTS KPG Project Manager 123 $187.92 23,114 Project Engineer 312 $155.30 48,454 Engineer 308 $112.93 34,782 Technician 396 $91.76 36,337 Survey Crew 24 $139.94 3,359 Admin 115 $67.78 7,795 KPG Subtotal Labor 1,278 153,840 KPG Reimbursables 4,160 KPG TOTAL 158,000 Materials Testing (TBD) 15,000 Subconsultant Mark -up (5 8,650 TOTAL SUBCONSULTANT 181,650 MANAGEMENT RESERVE (0 GRAND TOTAL 298,000 The budget presented uses 2011 rates and assumes design /bid /construction will occur in 2011. Rates will adjust anually on January 1st should work continue beyond 2011, which may affect the stated budget. PREPARED BY: Mike Roberts 6/8/11 S:\ Projects \Contracts \Client \Tukwila \BP11 046- TukwilaLeveeCleanup\ DraftsB NegotiationRecords\ In- houseDrafts \Ex- B- 20110608.xlsx Page 1 of 1 161 City of Tukwila Utilities Committee UTILITIES COMMITTEE Meeting Minutes June 28, 2011 5: 00 p.m. Conference Room #1 PRESENT Allan Ekberg, Acting Chair (sitting is for De'Sean Quinn); Dennis Robertson and Kathy Hougardy Staff: Bob Giberson, Frank Iriarte, Robin Tischmak, Ryan Larson, Greg Villanueva and Kimberly Matej CALL TO ORDER: Acting Committee Chair Ekberg called the meeting to order at 5:03 p.m. I. PRESENTATIONS No Presentations II. BUSINESS AGENDA A. 2010/2011 Small Drainage Program Bid Award Staff is seeking Council approval to award a bid in the amount of $788,005.50 to Green River Construction for the 2010/2011 Small Drainage Program. This annual program constructs drainage projects throughout the City that are too large for completion by City staff but smaller than the average capital improvement project. This year the Small Drainage Program will construct nine drainage improvements at nine locations (specific locations outlined in memo included in Committee agenda packet). Each year, projects considered for this program are reprioritized based on such things as need, expense, time on the list, etc. Highest priority projects are designed and constructed within annual budget limitations. The City has worked successfully with Green River Construction on past projects including the 2009 Program. Although this is an annual program, projects from 2010 will be constructed due to previous permitting delays. Funding for this project is drawn from two budget line items, the Small Drainage Program and the Private Storm System Adoption Rehabilitation. On a side note, the Committee had a discussion regarding Council approval on project bid amounts, contingency and change orders above signing thresholds. Kimberly Matej will follow up with the City Attorney on the Committee's inquiries. UNANIMOUS APPROVAL. FORWARD TO JULY 11 COW FOR DISCUSSION. B. Howard Hanson Dam Flood Resoonse: Levee Repairs Maintenance Consultant Recommendation and Ap-reement Staff is seeking Council approval to enter into a consultant agreement with KBA, Inc. in the amount of $298,000 for design and construction management services related to removing temporary flood measures and restoring and repairing affected areas by use of said measures. It is anticipated that this fall the Corps of Engineers will announce that the Howard Hanson Dam is fully functional and all temporary measures implemented to protect potential flood areas can be removed after the 2012 flood season. In order to be ready to remove the protection measures (i.e.: Supersacks and Hesco barriers) and repair the affected land, staff recommends beginning the design process now. KBA, Inc. was chosen from three firms on the Consultant Roster. They have provided satisfactory work for the City in the past including placement of above measures and current work on the Southcenter Parkway Extension Project. Funding for this project is provided in the CIP under Tukwila Levee Repairs and Maintenance. UNANIMOUS APPROVAL. FORWARD TO JULY 11 COW FOR DISCUSSION. 162