Loading...
HomeMy WebLinkAboutTIC 2017-09-12 COMPLETE AGENDA PACKETCity of Tukwila Transportation and Infrastructure Committee ❖ Kate Kruller, Chair ❖ Joe Duffie ❖ De'Sean Quinn AGENDA Distribution: K. Kruller J. Duffie D. Quinn D. Robertson Mayor Ekberg D. Cline L. Humphrey B. Giberson R. Tischmak G. Labanara P. Brodin R. Turpin A. Youn Clerk File Copy 2 Extra Place pkt pdf on Z:\Trans & Infra Agendas e-mail cover to: A. Le, C. O'Flaherty, A. Youn, K. Kruller, D. Robertson, D. Almberg, B. Saxton, S. Norris, & L. Humphrey TUESDAY, SEPTEMBER 12, 2017 — 5:30 PM FOSTER CONFERENCE ROOM — 6300 BUILDING ItemRecommended Action Page 1. PRESENTATION(S) 2. BUSINESS AGENDA a) GIS Inventory of the Water System a) Forward to 9/18/17 Pg. 1 Consultant Selection and Agreement for 2017 Regular Consent Agenda b) TUC/TOD Pedestrian Improvements b) Committee Approval Pg. 17 Transportation Alternatives Program Grant Application c) Strander Boulevard Extension Phase 3 c) Forward to 9/18/17 Pg. 21 Consultant Selection, Contract, Scope of Work, and Fee Regular Consent Agenda d) Riverton Creek Flapgate Removal Project d) Forward to 9/18/17 Pg. 191 Resolution for RCO Grant Application Regular Consent Agenda e) Sprint Communications Company e) Forward to 9/18/17 Pg. 195 Franchise Ordinance Regular Consent Agenda 3. SCATBd 4. MISCELLANEOUS Staff response to recent public comments regarding: • Speed Cushion Implementation Criteria 5. ANNOUNCEMENTS Future Agendas: Next Scheduled Meeting: Tuesday, September 26, 2017 SThe City of Tukwila strives to accommodate individuals with disabilities. Please contact the Public Works Department at 206-433-0179 for assistance. TO: IW ROM: BY: CC: DATE, 9 Public Works Department - Bob Giberson, Director Transportation and Infrastructure Committ Bob Giberson, Public Works Directorl Mike Cusick, Senior Program Manager Mayor Ekberg September 8, 2017 SUBJECT: glg IllygLitgLy gf the M&ter-S , atem Project No. 81640104 Consultant Selection and Agreement for 2017 Allan Ekberg, Mayor ISSUE Approve David Evans and Associates, Inc. (DEA) for the GIS inventory of the Tukwila Water System, Z A• The contract for the GIS Inventory of the Water System will start in the Commercial Business District. It will be the first phase of surveying the Tukwila Water system, The GIS survey project will continue through the year 2022 with data being used to create an asset management database for the water system. This project will build on the existing GIS databases that currently exist for the sewer and storm drainage systems. The City invited Requests for Professional Qualifications (RPQ) from five consulting firms that were listed in the Municipal Research and Services Center's Consultant Roster. Three RPQs were received; from DEA, PACE Engineers, and Gray & Osborn Engineering. After interviewing the consultants and reviewing their RPQs, DEA was selected for the GIS Inventory of the Water System. DEA has completed other design projects for the City and their work has been satisfactory, Consultant Budget for Agreement 2017 GIS Inventory of Water $–x10-03 $67M�OQ 10*410pm I W9 Council is being asked to approve the consultant agreement with David Evans and Associates, Inc. for the GIS Inventory of the Water System in the amount of $59,916.03 and consider this item on the Consent Agenda at the September 18, 2017 Regular Meeting. Attachments: Consultant Rating Sheet Page 70, 2017-2022 C I P Consultant Agreement with Scope of Werk W)PW EngI13R0.11EGMA- WT Projectr,\2017 Water GIS (91640104)kInfo Merno GIS Water DEA 0910817 twaaex WATER. 1315 CONSULTANT SELECTION Mike Cusick David Evans is spleried for the project. No response No response 10 10 10 10 10 10 David Evans 9 10 9 55 PACE , 9 9 9 9 9 54 2 Gray & Osborne 8 9 8 9 9 9 52 3 Huitt Zollar, Inc 001 0 0' 0 0 0 Dowel, LLC 0 00 0 0 David Evans is spleried for the project. No response No response CITY OF TUKWILA CAPITAL PROJECT SUMMARY EXPENSES 2017 to 2022 PROJECT: GIS Inventory of Water System Project No. 91640104 The GIS (Geographic Information System ) will provide current as -built data for the Tukwila water system. DESCRIPTION: The data base will include fire hydrants, valve locations, approximate water line locations, date of installation, and material type. The GIS mapping will provide information on the water system that is easily addressable by City staff JUSTIFICATION: and the public. With GIS data, the City will be able to develop an asset management plan to determine 67 the water assets needed to be upgraded or replaced. STATUS: New project for 2017 - 2022 CIP. Combined Asset Management System scheduled for 2017. MAINT. IMPACT: The survey will provide staff with -up -date information on the location of water line features. COMMENT: 567 Land(R/W) FINANCIAL Through Estimated lin S000's1 2015 2016 2017 2018 2019 2020 2021 2022 RFYOND TOTAL EXPENSES Design 67 100 100 100 100 100 567 Land(R/W) 0 Const. Mgmt. 0 Construction 0 TOTAL EXPENSES 1 0 0 67 1 100 1 100 100 1 100 1 100 1 0 567 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 67 100 100 100 100 100 0 567 TOTAL SOURCES 1 0 0 67 1 100 1 100 100 1 100 1 100 1 0 567 2017 - 2022 Capital Improvement Program 70 3 CON of Tukwila Contract Number: 6200 Southcenter Boulevard, Tukwila WA 98188 1111111111111:11Z lei 10 1;3-4VUM114* I THIS AGREEMENT is entered into between the City of Tukwila, Washington, hereinafter referred to as "the City", and David Evans Associates,inc hereinafter referred to as "the Consultant", in consideration of the mutual benefits, terms, and conditions hereinafter specified. 1. Proiect Designation. The Consultant is retained by the City to perform Engineering Services in connection with the project titled GIS Inventory of Water System, Z Sc2pe of Services. The Consultant agrees to perform the services, identified on Exhibit "A" attached hereto, including the provision of all labor, materials, equipment and supplies. 31 Duration of Agreernent;Tire for Performance. This Agreement shall be in full force and effect for a period commencing upon execution and ending unless sooner terminated under the provisions hereinafter specified, Work under this Agreement shall commence upon written notice by the City to the Consultant to proceed. The Consultant shall perform all services and provide all work product required pursuant to this Agreement no later than March 31, 2018 unless an extension of such time is granted in writing by the City. 4. Payment. The Consultant shall be paid by the City for completed work and for services rendered under this Agreement as follows: A. Payment for the work provided by the Consultant shall be made as provided on Exhibit "B" attached hereto, provided that the total amount of payment to the Consultant shall not exceed $59,916.03 without express written modification of the Agreement signed by the City. B. The Consultant may submit vouchers to the City once per month during the progress of the work for partial payment for that portion of the project completed to date. Such vouchers will be checked by the City and, upon approval thereof, payment shall be made to the Consultant in the amount approved. C. Final payment of any balance due the Consultant of the total contract price earned will be made promptly upon its ascertainment and verification by the City after the completion of the work under this Agreement and its acceptance by the City. D. Payment as provided in this section shall be full compensation for work performed, services rendered, and for all materials, supplies, equipment and incidentals necessary to complete the work. E. The Consultant's records and accounts pertaining to this Agreement are to be kept available for inspection by representatives of the City and the state of Washington for a period of three (3) years after final payments. Copies shall be made available upon request, 0 S. Ownership- and Use of Documents. All documents, drawings, specifications and other materials produced by the Consultant in connection with the services rendered under this Agreement shall be the property of the City whether the project for which they are made is executed or not. The Consultant shall be permitted to retain copies, including reproducible copies, of drawings and specifications for information, reference and use in connection with the Consultant's endeavors. The Consultant shall not be responsible for any use of the said documents, drawings, specifications or other materials by the City on any project other than the project specified in this Agreement. ComDlliarce with Laws. The Consultant shall, in performing the services contemplated by this Agreement, faithfully observe and comply with all federal, state, and local laws, ordinances and regulations, applicable to the services rendered under this Agreement. T. Indemnification. The Consultant shall defend, indemnify and hold the City, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or resulting from the acts, errors or omissions of the Consultant in performance of this Agreement, except for injuries and damages caused by the sole negligence of the City. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Consultant and the City, its officers, officials, employees, and volunteers, the Consultant's liability hereunder shall be only to the extent of the Consultant's negligence. It is further specifically and expressly understood that the indemnification provided herein constitutes the Consultant's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement. & Insurance. The Consultant shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Consultant, its agents, representatives, or employees. Consultant's maintenance of insurance as required by the agreement shall not be construed to limit the liability of the Consultant to the coverage provided by such insurance, or otherwise limit the City's recourse to any remedy available at law or in equity. A. Minimum Amounts and Scope of Insurance. Consultant shall obtain insurance of the types and with the limits described below: CA revised : 1-2013 1. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of $1,000,000 per accident. Automobile Liability insurance shall cover all owned, non -owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA DO 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage, 2, Commercial General Liab!!qy insurance with limits no less than $1,000,000 each occurrence, $2,000,000 general aggregate, Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, independent contractors and personal injury and advertising injury. The City shall be named as an insured under the Consultant's Commercial General Liability insurance policy with respect to the work performed for the City, 3. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of Washington. I M, 5 4. Professional Liabilitv with limits no less than $1,000,000 per claim and $1,000,000 policy aggregate limit. Professional Liability insurance shall be appropriate to the Consultant's profession. B. Other Insurance Provision. The Consultant's Automobile Liability and Commercial General Liability insurance policies are to contain, or be endorsed to contain that they shall be primary insurance with respect to the City, Any Insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Consultant's insurance and shall not be contributed or combined with it. C. Acceptability of Insurers. Insurance is to be placed with insurers with a current A.M. Best rating of not less than A:Vll. D. Verification of Coverage. Consultant shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the insurance requirements of the Consultant before commencement of the work. Certificates of coverage and endorsements as required by this section shall be delivered to the City within fifteen (15) days of execution of this Agreement. E. Notice of Cancellation. The Consultant shall provide the City with written notice of any policy cancellation, within two business days of their receipt of such notice. R Failure to Maintain Insurance. Failure on the part of the Consultant to maintain the insurance as required shall constitute a material breach of contract, upon which the City may, after giving five business days notice to the Consultant to correct the breach, immediately terminate the contract or, at its discretion, procure or renew such insurance and pay any and all premiums in connection therewith, with any sums so expended to be repaid to the City on demand, or at the sole discretion of the City, offset against funds due the Consultant from the City, 9Independent Contractor, The Consultant and the City agree that the Consultant is an independent contractor with respect to the services provided pursuant to this Agreement. Nothing in this Agreement shall be considered to create the relationship of employer and employee between the parties hereto. Neither the Consultant nor any employee of the Consultant shall be entitled to any benefits accorded City employees by virtue of the services provided under this Agreement. The City shall not be responsible for withholding or otherwise deducting federal income tax or social security or for contributing to the state industrial insurance program, otherwise assuming the duties of an employer with respect to the Consultant, or any employee of the Consultant. 10. Covenant Against Contingent Fees. The Consultant warrants that he has not employed or retained any company or person, other than a bonafide employee working solely for the Consultant, to solicit or secure this contract, and that he has not paid or agreed to pay any company or person, other than a bonafide employee working solely for the Consultant, any fee, commission, percentage, brokerage fee, gifts, or any other consideration contingent upon or resulting from the award or making of this contract. For breach or violation of this warrant, the City shall have the right to annul this contract without liability, or in its discretion to deduct from the contract price or consideration, or otherwise recover, the full amount of such fee, commission, percentage, brokerage fee, gift, or contingent fee. 11, Discrimination Prohibited. The Consultant, with regard to the work performed by it under this Agreement, will not discriminate on the grounds of race, religion, creed, color, national origin, age, veteran status, sex, sexual orientation, gender identity, marital status, political affiliation or the presence of any disability in the selection and retention of employees or procurement of materials or supplies. CA revised 1- 1-2013 Sm 0 12. Ass ignmen . The Consultant shall not sublet or assign any of the services covered by this Agreement without the express written consent of the City, 13. Non -Waiver. Waiver by the City of any provision of this Agreement or any time limitation provided for In this Agreement shall not constitute a waiver of any other provision. 14. Termination. A. The City reserves the right to terminate this Agreement at any time by giving ten (10) days written notice to the Consultant. B. In the event of the death of a member, partner or officer of the Consultant, or any of its supervisory personnel assigned to the project, the surviving members of the Consultant hereby agree to complete the work under the terms of this Agreement, if requested to do so by the City. This section shall not be a bar to renegotiations of this Agreement between surviving members of the Consultant and the City, if the City so chooses. 115, Applicable Law; Venue;_.Attorfl2�s Fees. This Agreement shall be subject to, and the Consultant shall at all times comply with, all applicable federal, state and local laws, regulations, and rules, including the provisions of the City of Tukwila Municipal Code and ordinances of the City of Tukwila. In the event any suit, arbitration, or other proceeding is instituted to enforce any term of this Agreement, the parties specifically understand and agree that venue shall be properly laid in King County, Washington. The prevailing party in any such action shall be entitled to Its attorney's fees and costs of suit. Venue for any action arising from or related to this Agreement shall be exclusively in King County Superior Court. 15, Severability and Survival. If any term, condition or provision of this Agreement is declared void or unenforceable or limited in its application or effect, such event shall not affect any other provisions hereof and all other provisions shall remain fully enforceable. The provisions of this Agreement, which by their sense and context are reasonably intended to survive the completion, expiration or cancellation of this Agreement, shall survive termination of this Agreement. 17, Notices. Notices to the City of Tukwila shall be sent to the following address: City Clerk City of Tukwila 6200 Southcenter Boulevard Tukwila, WA 98188 David Evans and Associates, Inc. 14432 SE Eastgate Way, Suite 400 Bellevue, WA 98007 18, Entire, 89reement; Modification. This Agreement, together with attachments or addenda, represents the entire and integrated Agreement between the City and the Consultant and supersedes all prior negotiations, representations, or agreements written or oral. No amendment or modification of this Agreement shall be of any force or effect unless it is in writing and signed by the parties. CA revised 1-2013 7 DATED this day of 20 CITY OF TUKWILA Attest/Authenticated: City Clerk, Christy O'Flaherty CA revised: 1-2013 By: Printed Name; a DAM LAMA T Title- AS50c-1A'tF- Approved as to Form: Offlee of the City Attorney 0 ME= David ansae Associates, Inc. 14432 SE Eastgate Way, Suite 400 Bellevue, WA 98007 August 24, 2017 9 1.1 Project Description. ............... ....... ___ ................ ..............................,.,.,..............................., .....,.. 1 1,2 Project Deliverables Furnished by CONSULTANT 13 Responsibilities and Services Provided by CLIENT .......................... ........................................ ...........................1 1.4 Project Assumptions— ...................... __5 ............................ __ ...... ..,,,........................... .....,.,,,..,,.,.,..,..,..,1 2.1 Project Manage menk,.............................................................................. ..... ........ ............ 2.2 Monthly Invoices/Progress Reports............................................................... .....,...... ..................... 2 2.3 Project Kick-off Meeting and Progress Meetings ............... .... ....,...........,....,.....,............,,.,....,.,,...,,..,..,.,,.,....,2 2.4 Quality Assurance /Quality Control Review.,..,.,, .... ......... ......................... ...... ...2 2.5 Change Management............ ... ....... . ..... ...... ,,..,...................... . TASK .0 WA'T'ER SYSTEM GIS INVENTORY..... . ........ ....I..... ....,,.........................., ....,..,........,,,.. 3 3.1 Field Review..,,.... - ............................................a,,.,.,,,.,. ........ ...................,......,, ... ......... ; ,,.,,.,,.,3 3.2 Hata Collection ................................... ..........,,,,,,.,..,. . , .....,.,,.............. ,, .., .,........ 3 3.3 Water System As -Ruin Research—_.... . ....... ...................,... , ., ...,..,...,...,,,..., . 3.4 Geodatahase Preparation.... ,...... ... ,..,,,..... ...... ,........................ ............s............... ...... _ ....,.,.,...,...,.....,...,..,.,,,,,,.....3 City of Tukwila Scope of Services Water System GIS Inventory August 24, 2017 10 im . I -- 1 1 111111" 11111 i &ON I MUREEISIMME= The City of Tukwila (CLIENT) is requesting professional services from David Evans and Associates, Inc. (CONSULTANT) to inventory the water system and convert it into a Geographic Information System (GIS). The major features of the project include: Water System Water Lines Water Valves Water Meters Water Manholes Fire Hydrants * Water Vaults • Water Risers • Post Indicator Valves • Fire Department Connections " Air Relief Valves 1.2 Project Deliverables Furnished by CONSULTANT CONSULTANT shall deliver the following documents and products to CLIENT as part of this agreement: 0 Electronic copy of the GIS Geodatabase, CLIENT will have the opportunity to review each of the deliverables. CLIENT review documents will be returned with subsequent revision, illustrating that each review comment has been addressed as stated, or how/why it was not addressed, 1.3 Responsibilities and Services Provided by CLIENT CLIENT will: • Provide existing water system maps, GIS maps and data, and other available mapping information. • Review all submittals made to the CLIENT within 15 working days, or as agreed, and return them to CONSULTANT with consolidated written comments regarding changes or revisions needed, • CLIENT will provide staff to aid with locating water features, 1.4 Project Assumptions • Mapping accuracy requirement for object locations is "mapping grade" (+/- 3 feet), Objects will be mapped to "survey grade" accuracy (+/- 0.10 feet) throughout the project unless dense vegetation or forested areas prevent the use of survey grade GPS equipment, s Water System mapping will be limited to area within public Right of Way, • Horizontal datum will be NAD 83/91. • Vertical datum will be NAVA 88. • The project duration is assumed to be four (4) months. City of Tukwila Water System GIS Inventory Scope of Services August 24, 2017 11 11:7111", KIM WI 11��! 2,1 Project Management CONSULTANT will provide direction for staff and review of their work over the course of the project. This work element includes preparing monthly progress reports, to accompany monthly invoicing, that include the status of individual work elements, number of meetings attended, outstanding Information required, and work items planned for the following month. CONSULTANT will monitor the project budget weekly throughout the course of the project, This work element Is intended to help monitor costs and budgets, and to propose corrective actions, if needed. These actions may Include formal requests for increases, modifications, or reductions in scope. Drawings and documents received and generated over the course of the project require review, coordination, and file management. The status of requested information will also be maintained, 2.2 Monthly Invoices/Progress Reports Monthly invoices will be prepared by CONSULTANT per CLIENT requirements for work activities for the prior month. These invoices will include SUBCONSULTANT work and will be accompanied by monthly progress reports, back-up materials for expenses, and show approved budget and amount expended to date. Qg_Ilyff_a§1es: monthly Invoices and Progress Reports (6 total), 2.3 Project Kick -cuff Meeting and Progress Meetings After receiving notice to proceed, CONSULTANT will conduct a project team kick-off meeting with staff expected to be involved in the project and key CLIENT staff, The meeting will be used to discuss critical elements of the Scope of Work, the project schedule, document control, and CA/QC procedures; and to clearly define the roles and responsibilities of the project team members. This work element provides for the preparation, attendance, follow-up, and documentation of meetings during the length of the project. These meetings will be the forums for CLIENT to provide input and guidance for the direction of the project. They will also be used,to discuss project issues, approve submittals, and develop potential solutions. CONSULTANT will prepare for, attend, and document up to four (4) meetings with CLIENT staff. The CONSULTANT will attend one meeting every month with the CLIENT's project manager for the duration of the project. The meetings will be held in a location acceptable to CLIENT and CONSULTANT. Deliverables: Meeting Minutes (4 total). 2.4 Quality Assurance /Quality Control Review This work element is for the QA/QC review of CONSULTANT deliverables by a designated QA/QC staff member of the CONSULTANT team, CONSULTANT will assign a Quality Manager to the project that will be responsible for ensuring that quality reviews are performed at stages throughout the project and on all deliverables. The review will cover field and office work on an on-going basis. QA/QC documentation will be maintained and filed with project records. City of Tukwila Scope of Services Water System GIS Inventory August 24, 2017 12 . ► Change Management Project Managers from CLIENT and CONSULTANT are responsible for managing changes to the scope and schedule. CLIENT is responsible for the authorization of any changes to the scope, budget, and/or schedule, Team members must ensure that work within their areas remains within the defined project scope, schedule, and budget. When issues, actions, or circumstances occur that could cause a change in scope, personnel, cost, or schedule, team members must communicate potential changes to the Project Manager as early as possible. Project Managers will determine whether the potential change issue will lead to a change in scope, cost, or schedule. CONSULTANT shall obtain written authorization from CLIENT before implementing any change to this Scope of Services, schedule, or budget, All changes will be documented using the Project Change Form, 3.1 Field Review CONSULTANT will conduct an existing water system maps/GIS review at the outset of the project to identify key field conditions that may impact the field mapping including safety, traffic and access issues. The procedures required to complete the field survey will be determined and safety risks will be analyzed. 3.2 luta Collection CONSULTANT will field survey the location of water system point features and water system utility paint locates south of Interstate 405 within the City of Tukwila retail water service area. Field notes will be collected to support project deliverables. Pipe connections will be completed in the field where practical. CONSULTANT will use CLIENT agreed upon GIS database structure, 3.3 Water System As -wilt Research CONSULTANT will review research on existing utility information, provided by CLIENT, for inclusion in the mapping. Where possible CONSULTANT will use provided as -built records to prepare and pre -enter system information to be field verified. This will make the field effort more efficient. 3.4 Ueodatabase Update CONSULTANT will utilize its field surveyed information, and the as -built research to create the Oeodatabase CIS files. CONSULTANT will include metadata for the Geodatabase updates. Dellvgrables: Electronic copy of the updated Oeodatabase City of Tukwila Water System GIS Inventory Scope of Services- August 24, 2017 13 Fg!O � City of Tukwila Water System IS Inventory David Evans and Associates, Inc. Negotiated Classification Hrs. X Rate Cost 1 Project Manager (PMGR/PLSU) 72 $ 13244 9,535.68 2 Quality Control Manager (PI H) 6 $ 203.28 1,219.68 3 GIS Manager (GISM) 10 $ 141.68 1,416.80 4 Survey Manager (SVYM) 14 $ 1190.96 2,67144 5 GIS Technician (GIST) 166 $ 73.92 12,27032 6 Survey Technician (SVTE) 178 $ 83,16 14,802.48 7 Party Chief (PCHF) 168 $ 92,40 15,523.20 8 Administrative Assistant (ADMA) 8 $ 92,40 739.20 9 Project Administrator (PADM) B $ 106.51 852.08 -,Total -Hrs. - 630 Total Salary Cost $ 59,033.28 Direct Expenses No. Unit Each Cost Mileage - Water System GIS Inventory 1,650 miles @ $0.535 /rrljl� $ 882,75 subtotal 882.76 David Evans and Associates Total $ 69,916.03 Y:N,Aa1akNPw fbiderVW7-08-03 City of Tukwila GIS inventory BW901 651IM010 VI-XIO 8/25/2017 14 Page 2 of 2 XWaI®Wew IpIGnIS:Qi7•t18S Ghyvt YukWIo GIS InvunIM0449ol Sbgm4Iv Vt)dee 8/251207 15 16 City of Tukwila TO: Transportation and infrastructure Comm FROIVI� Bob Giberson, Public Works Director - BY: Cyndy Knighton, Senior Program Manager Xd11111ELffa=. DATE: September 8, 2017 SUBJECT: TUC/TOD Pedestrian Improvements Project No. 90710405 Transportation Alternatives Program (TAP) Grant Applications Ekberg, Mayor ISSUE Request Committee approval to submit a grant application to the Transportation Alternatives Program offered through Puget Sound Regional Council (PRSC) for the TUC/TOD Pedestrian Improvements Project, 1. �fi�f�TZi7TII7 The Transportation Alternatives Program (TAP) is a Federal Highway Administration funding program for community-based transportation improvements such as bicycle/pedestrian facilities, historic preservation of transportation assets, environmental mitigation and others, PSRC will be distributing approximately $16 million of federal fiscal year 2017-2020 TAP funds, Grant applications are due on September 20, 2017 with funding available to successful projects beginning in February 2018. A maximum of three applications per agency can be submitted with a maximum request of $2,5 million per application, Preferences are given to projects which provide clear benefits to PSRC regional designated growth centers, therefore staff is recommending that a grant application for the TUC/TOD Pedestrian Improvements project be considered for submission, Approximately 700 feet of improvements to the Green River Trail were designed as part of the TUC Pedestrian/Bicycle Bridge Project, but were removed from the construction plans due to inadequate funding. This project will replace the Green River Trail section from the new Pedestrian bridge landing to Christensen Road with a wider trail section and increased illumination. This project is fully designed, has all required permits, and only needs construction funding to be completed, FINANCIAL IMPACT A minimum match of 13,5% of the project cost is required. The current 2017 Capital Improvement Program (CIP) only has funding in beyond 2022. The proposed matching funds, if TAP funds are awarded, would have to be moved up in the CIP during the 2019 biennial budget cycle. RECOMMENDATION Committee approval to submit a grant application to PSRC's Transportation Alternatives Program for the TUC/TOD Pedestrian Improvement Project, Attachments: pg. 25, 2017 CIP PSRC Call for Projects 07131117 WIPW onqprojectoka- rN & to projoctsUod pedestrian Improvernents (90710405)kinlo own tap grant application 090817 gl.doca 17 City Grant Tota I _Tr2Le Resoonsibv ll R Amount Green River Trail Construction jeu iest RECOMMENDATION Committee approval to submit a grant application to PSRC's Transportation Alternatives Program for the TUC/TOD Pedestrian Improvement Project, Attachments: pg. 25, 2017 CIP PSRC Call for Projects 07131117 WIPW onqprojectoka- rN & to projoctsUod pedestrian Improvernents (90710405)kinlo own tap grant application 090817 gl.doca 17 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2017 to 2022 PROJECT: TUC/TOCK Pedestrian Improvements Project No. 90710405 DESCRIPTION: Construct bike/pedestrian connection in phases between the Tukwila Urban Center (TUC) Transit Center and Tukwila Station in the Southcenter area's Transit Oriented Development (TOO) district Connecting the TUC to the Tukwila Longacres Station is needed to increase pedestrian mobiilty, improve JUSTIFICATION: access, and support more urban levels of development within walking distance of Tukwila Station, The connection involves a pedestrian path extending from Baker Blvd via the planned TUC Pedestrian Bridge and a pedestrian tunnel under the UPRR track embankment, Additional phases will extend the corridor to the mail. STATUS: See Tukwila Urban Center - Pedestrian/Bicycle Bridge, West Valley Hwy Non -Motorized and Baker Blvd Non - Motorized CIP pages. Funding shown in beyond is for construction of the UPRR underpass (in 2016 $). MAINT. IMPACT: COMMENT: Mitigation listed is $20k from Sound Transit for pedestrian underpass of the UPRR tracks. FINANCIAL Through Estimated fin 1000'.0 2015 MG 2017 2011( 2019 2020 2021 2022 Rii;yrmin TOTAL EXPENSES Design 20 660 680 Land (R/W) 0 Const, Mgmt, 440 440 Construction 3,160 3,150 TOTAL EXPENSES 0 0 20 01 01 01 01 01 4,250 1 4,270 FUND SOURCES Proposed Grant 3,400 3,400 ST Mitigation 20 20 KCDNR Trail Levy 1 0 Traffic Impact Fees 0 City Oper, Revenue 0 0 0 0 0 0 0 0 850 850 TOTAL. SOURCES 0 fl 20 0 0 0 0 4,250 4,270 2017 - 2022 Capital Improvement Program 25 18 q1AV Puget Sound Reglor al caurld To: Eligible Applicants and Interested Parties From: Kelly McGourty, Program Manager July 31, 2017 Subject: 2017 Transportation Alternatives Program Competition — Call for Projects The Puget Sound Regional Council (PSRC) invites eligible public agencies in King, Kitsap, Pierce, and Snohomish counties to submit projects for the 2017 Transportation Alternatives Program Project Selection Process. The Transportation Alternatives Program (TAP) is a Federal Highway Administration funding program for community-based transportation improvements such as bicycle/pedestrian facilities, historic preservation of transportation assets, environmental mitigation and others. PSRC will be distributing approximately $16 million of federal fiscal year 2017-2020 TAP funds. Materials for the Call for Projects are available on PSRC's website at httos: vvww, src, 2LLO_rgL/_Our_ work/futiding/12roject-selection. These materials include the following: • Information on the Workshops in each county • Schedule • Project Evaluation Criteria • Guidance and Resources • Access to the Project Application • Summary of Eligibility Requirements Please note: There is a limit of three applications per eligible sponsor, and project requests are limited to $2.5 million pgr qp2lication. in addition, all projects must meet the eligibility requirements of the funding program, as well as regional policies and all other federal requirements. Applications are due to PSRC by 5p.m. September 20, 2017. Further instructions are available within the Call for Projects materials. If you have any questions on PSRC's 2017 Transportation Alternatives Program, please contact Kelly McGourty at (206) 971-3601, or Lmcqourty src�,or � 19 pugot Sound cound • July 31 — Release Call for Projects • August 8 —11— Workshops in each of the four counties • September 20 - Project applications due to PSRC • October 9 - Scoring complete by PSRC • October 16 - 20 — Project Selection Committee meetings • November 9 — Transportation Policy Board releases projects for public comment • January 11 —Transportation Policy Board project funding recommendation • January 25 — Executive Board approves projects for funding • February 2018 —Approval into State TIP, funds available to projects 20 IN I [DJA Public Works Department - Bob Giberson, Director Transportation and Infrastructure CornmVitte _# IBob Giberson, Public Works Director -1§1 2137mw= III L TTLTF�,A SUBJECT: Strander Boulevard Extension Phase 3 Project No. 98610403 Consultant Selection, Contract, Scope of Work, and Fee Allan Ekberg, Mayor ISSUE Execute a consultant contract with Berger ARAM to provide design services for the Strander Boulevard Extension Phase 3 Project. The City of Renton completed Phase 1 of the Strander Blvd/SW 271h St (Oaksdale Ave to Naches Ave) in 2008 and Phase 2 in 2014 (from Naches to the new Sounder Commuter Rail Station parking lot, between BNSF and UPRR). Phase 3 is being led by the City of Tukwila. Tukwila received Federal grant funding for the preliminary engineering and right-of-way phases and is proceeding with the design process as part of the preliminary engineering phase. A Request for Qualifications (RFQ) was advertised on June 28 and July 5, 2017 inviting interested consulting firms to submit proposals for preliminary engineering design of Strander Boulevard Phase 3, Two engineering firms submitted proposals and both met the criteria required for consideration, Both firms were interviewed and scored by a selection panel that was unanimous in selecting Berger ARAM as the successful candidate (scoring matrix attached). A contract, scope of work, and fee estimate have been negotiated and are attached for consideration. FISCAL IMPACT The negotiated contract amount for Berger ABAM's scope and fee outlined in Exhibit A is $4,147,328.00 to provide final design services. The budget for Strander Boulevard Phase 3 is currently $4,500,000,00 Council is being asked to approve the agreement with Berger ABAM for design services for the Strander Boulevard Extension Phase 3 Project in the amount of $4,147,328.00 and consider this item on the Consent Agenda at the September 18, 2017 Regular Meeting, Attachments Page 13, 2017-2022 CIP Interview Scoring Summary Consultant Contract, Scope of Work and Fee WAPIN EngWOJECTSA- RW & RS NrojecLstSfrandet Extension (9$010403)1hase IIAPrefininaxy EngineoringtWo, Verno BeI Aharn PE 090817 gI srn,doi,x 21 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2017 to 2022 PROJECT: Strander Blvd Extension Phase 3 Project No. 98610403 DESCRIPTION: Design and construct arterial improvements for a new roadway extending Strander Blvd/SW 27th St from West Valley Highway to Oaksdale Ave in the City of Renton. JUSTIFICATION: East/west capacity between 1-405 and S 180 St is needed to serve Tukwila and Renton access. Project segregated into three phases. Phase I extended Stander Blvd/SW 27th St from Oaksdale Ave to STATUS: Naches Ave SW. Phase 11 constructed a 2 lane road from Naches to the Sounder Train's Tukwila Longacres Station's parking lot. Paid Renton $1 m for Phase I & 11. Phase III will construct the undercrossing of the UPRR and complete the 4 lane roadway from West Valley Hwy in Tukwila to Naches Ave SW in Renton. MAINT. IMPACT: New street. Project partners include the City of Renton, Boeing, WSDOT, FMSIB, Sound Transit, Metro, Amtrak, and COMMENT: BNSF and UP Railroads. Funds in 2015-16 are for updated cost estimates and grant applications. STP (PSRC), FAST Lane, and TIGER grants were submitted in 2016. FINANCIAL Through in $000's 2015 Estimated 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL EXPENSES Design 58 440 2,500 2,000 4,998 Land (R/W) 104 450 1,000 1,554 Wetland Mitigation 50 500 550 Const. Mgmt. 2,800 2,000 4,800 Construction 15,000 12,200 27,200 TOTAL EXPENSES 1162 1440 3,000 1 3,000 1 18,300 114,200 101 01 01 39,102 FUND SOURCES Awarded STP Grant 2,551 2,595 5,146 Proposed TIGER Grant 7,900 5,894 13,794 Proposed State TIB Grant 2,500 2,500 5,000 Proposed FMSIB Grant 2,500 2,500 5,000 Proposed STP Grant 5,000 3,000 8,000 City Oper. Revenue 162 440 449 405 400 306 0 0 0 2,162 TOTAL SOURCES 162 440 3,000 3,000 18,300 14,200 0 0 0 33,956 2017 - 2022 Capital Improvement Program 13 22 Strander Blvd Ext Ph 3 - Interview Scoring Summary Sheet Firm ,Cumulative Score Avg Score Rank Berger ABAM 289 96.3 OFF 258 86 2 Individual Scores will not be released Notes: Top two scoring candidates were chosen from this interview. Berger ABAM was the top scoring candidate and city will begin contract negotiations with this firm. W:\PW Eng\ PROJECTS\A- RW & RS Projects \ Strander Extension (98610403)\REQ\strander scoring -tracking, -record ot neg MA�M- Cost Plus Fixed Fee Consultant Agreement Agreement Number: Scope of Work Firm/Organization Legal Name (do not use dba's): DBE Participation BergerABAM Inc, Preparation and Delivery of Electronic Engineering and Other Data Address Federal Aid Number 33301 Ninth Ave S Ste 300, Federal Way, WA 98003 STPUL- 1276(007) UBI Number Federal TIN or SSN Number 601110595 91-1422812 Execution Date Completion Date Exhibit I 12/31/2020 1099 Form Required Federal Participation [:] Yes No Yes No Project Title Strander Boulevard/Southwest 27 Street Extension Description of Work Provide preliminary engineering design and right-of-way Services to construct a grade separated crossing Linder a freight rail line and art extension of Strander Blvd. from SR IS I to SW 27th Street. For additional description of the scope of work, see Exhibit A. Yes 9% No DBE Participation Total Amount Authorized-, $4,047,328,00 Yes No MBE Participation management Reserve Fund: $ 100,000-00 F-1 Yes EE No WBE Participation E]Yes [Z] No SBE Participation Maximum Amount Payable: $4,147,328.00 Index of Exhibits Exhibit A Scope of Work Exhibit B DBE Participation Exhibit C Preparation and Delivery of Electronic Engineering and Other Data Exhibit D Prime Consultant Cost Computations Exhibit E Sub -consultant Cost Computations Lxhibit l" Title VI Assurances Exhibit G Certification Documents Exhibit 14 Liability Insurance Increase Exhibit I Alleged Consultant Design Error Procedures Exhibit J Consultant Clain Procedures Agreement Number: Local AgencyA&E Professional Services Cost Plus Fixed Fee Consultant Agreement Page I of 14 Revised 311112016 24 THIS AGREEMENT, made and entered into as shown in the "Execution Date" box on page one (1) of this AGREEMENT, between the City of Tukwila hereinafter called the "AGENCY," and the "Firm / Organization Name" referenced oil page one (1) of this AGREEMENT, hereinafter called the "CONSULTANT." WHEREAS, the AGENCY desires to accomplish the work referenced in "Description of Work" oil page one of this AGREEMENT and hereafter called the "SERVICES;" and does not have sufficient staff to meet the required commitment and therefore deems it advisable and desirable to engage the assistance of a CONSULTANT to provide the necessary SERVICES; and WHEREAS, the CONSULTANT represents that they comply with the Washington State Statutes relating to professional registration, if applicable, and has signified a willingness to furnish consulting services to the AGENCY. NOW, THEREFORE, in consideration of the terms, conditions, covenants, and performance contained herein, or attached and incorporated and made a part hereof, the parties hereto agree as follows: 1. General Description of Work The work Linder this AGREEMENT shall consist of the above-described SERVICES as herein defined, and necessary to accomplish the completed work for this project. Tile CONSULTANT" shall furnish all services, labor, and related equipment and, if applicable, sub -consultants and subcontractors necessary to conduct and complete the SERVICES as designated elsewhere in this AGREEMENT. 11. General Scope of Work The Scope of Work and projected level of effort required for these SERVICES is described in Exhibit"A" attached hereto and by this reference made a part of this AGREEMENT' The General Scope of Work was developed utilizing performance based contracting methodologies. XTUTEM. L9KMB3= All aspects of coordination of the work of this AGREEMENTwith outside agencies, groups, or individuals shall receive advance approval by the AGENCY. Necessary contacts and meetings with agencies, groups, and/or individuals shall be coordinated through the AGENCY. The CONSULTANT shall attend coordination, progress, and presentation meetings with the AGENCY and/or such State, Federal, Community, City, or County officials, groups or individuals as may be requested by the AGENCY. The AGENCY will provide the CONSULTANT sufficient notice prior to meetings requiring CONSULTANT participation. The minimum required hours or days' notice shall be agreed to between the AGENCY and the CONSULTANT and shown in Exhibit "A." The CONSULTANTshall prepare a monthly progress report, in a form approved by the AGENCY, which will outline in written and graphical form the various phases and the order of performance of the SERVICES in Sufficient detail so that the progress of the SERVICES can easily be evaluated. The CONSULTANT, any sub -consultants, and the AGENCY shall comply with all Federal, State, and local laws, rules., codes, regulations, and all AGENCY policies and directives, applicable to the work to be performed under this AGREEMENT. This AGREE; ENT be interpreted and construed in accordance with the laws of the State of Washington. Agreement Number Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Page 2 of 14 Revised 311112016 25 Participation for Disadvantaged Business Enterprises (DBE) or Small Business Enterprises (SBE), if required, per 49 CFR Part 26, shall be shown on the heading of this AGREEMENT. If DBE firms are utilized at the commencement of this AGREEMENT, the amounts authorized to each firm and their certification number will be shown on Exhibit "B" attached hereto and by this reference made part of this AGREEMENT. If the Prime CONSULTANT' is a DBE certified firm they must comply with the Commercial Useful Function (CUF) regulation outlined in the AGENCY's "DBE Program Participation Plan" and perform a minimum of 30% of the total amount of this AGREEMENT. It is recommended, but not required, that non -DBE Prime CONSULTANTS perform a minimum of 30% of the total amount of this AGREEMENT. The CONSULTANT, on a monthly basis, is required to submit DBE Participation of the amounts paid to all DBE firms invoiced for this AGREEMENT. All Reports, PS&E materials, and other data furnished to the CONSUI-TANT by the AGENCY shall be returned. All electronic files, prepared by the CONSULTANT, must rneet the requirements as outlined in Exhibit "C -- Preparation Preparation and Delivery of Electronic Engineering and other Data." All designs, drawings., specifications, documents, and other work products, including all electronic files, prepared by the CONSULTANT prior to completion or ten-nination of this AGREEMENT are instruments of service for these SERVICES, and are the property of the AGENCY. Reuse by the AGENCY or by others, acting through or on behalf of the: AGENCY of any such instruments of service, not occurring as a part of this SERVICE, shall be without liability or legal exposure to the CONSUIJANT. Any and all notices or requests required under this AGREEMENT shall be made in writing and sent to the other party by (1) certified mail, return receipt requested, or (ii) by email or facsimile, to the address set forth below: If to AGENCY: If to CONSULTANT: Name: Steve Carstens Name,- Robert L. Fernandes Agency: City of'Fukwila Agency: BergerABANI Inc. Address: 6300 Southeenter Blvd., Suite 100 Address: 33301 Ninth Avenue S,, Suite 300 City, Tukwila State: WA Zip: 981.88 City: Federal Way State: WA Zip: 98003 Email: steve,carstens@tukwilawa,gov Email: bob,fcrtiaiides@abani.com Phone: 206-431-2446 x. 1646 Phone: 206-431-2333 Facsimile: Facsimile: 206431-2250 The CONSULTANT shall not begin any work under the terms of this AGREEMENT until authorized in writing 0 - by the AGENCY. All work Linder this AGREEMENT shall be completed by the date shown in the heading of this AGREEMENT titled "Completion Date." The established completion time shall not be extended because of any delays attributable to the CONSULTANT, but may be extended by the AGENCY in the event ofa delay attributable to the AGENCY, or because of unavoidable delays caused by an act of GOD, governmental actions, or other conditions beyond the control of the CONSULTANT. A prior supplemental AGREEMENT issued by the AGENCY is required to extend the established completion time. Agreement Number: Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Page 3 of 14 Revised 311112016 26 The CONSULTANT shall be paid by the AGENCY for completed SERVICES rendered under this AGREEMENT as provided hereinafter. Such payment shall be full compensation for SERVICES performed or SERVICES rendered and for all labor, materials, supplies, equipment, and incidentals necessary to complete SERVICES, specified in Section 11, "Scope of Work". The CONSULTANT shall conform to all applicable portions of 48 CFR Part 31 (wwwecfr.gov), The estimate in support of the Cost Plus Fixed Fee amount is attached hereto as Exhibits "D" and "E" and by this reference made part of this AGREEMENT. A. Actual Costs: Payment for all consulting services for this PROJECT shall be on the basis of the CONSULTANT'S actual cost plus a fixed fee. The actual cost shall include direct salary cost, indirect cost rate, and direct non -salary costs. I Direct (RAW) Labor Costs: The Direct (RAW) Labor Cost is the direct salary paid to principals, professional, technical, and clerical personnel for the time they are productively engaged in work necessary to fulfill the terms of this AGREEMENT. The CONSULTANT shall maintain support data to verify the direct salary costs billed to the AGENCY. 2. Indirect Cost Rate (ICR) Costs: ICR Costs are those costs, other than direct costs, which are included as Such on the books of the CONSUUI'ANT in the normal everyday keeping of its books. Progress payments shall be made at the ICR rates shown in attached Exhibits "D" and "E" of this AGREEMENT. Total ICR payment shall be based on Actual Costs. The AGENCY agrees to reirnburse the CONSULTAN]" the actual ICR costs verified by audit, tip to the Maximum Total Amount Payable, authorized under this AGREEMENT, when accumulated with all other Actual Costs. A summary of the CONSULTANT'S, cost estimate and the ICR percentage is shown in Exhibits "D" and "E", attached hereto and by this reference made part of this AGREEMENT. The CONSUIXANT (prime and all sub -consultants) will submit to the AGENCY within six (6) months after the end of each frill's fiscal year, an ICR schedule in the format required by the AGENCY (cost category, dollar expenditures, etc.) for the purpose of adjusting the ICR rate for billings received and paid during the fiscal year represented by the ICR schedule. It shall also be used for the computation of progress payments during the following year and for retroactively adjusting the previous year's ICR cost to reflect the actual rate. The ICR schedule will be sent to Ernail: Cons u I tantRates(y ,),wsdot.wa.gov. Failure to supply this information by either the prime CONSULTANT or any of their sub -consultants shall cause the AGENCY to withhold payment of the billed ICR costs until such time as the required information is received and an overhead rate for billing purposes is approved. The AGENCY' s Project Manager and/or the Federal Government may perform an audit of the CONSULTANT'S books and records at any time during regular business hours to determine the actual ICR rate, ifthey so desire. 3. Direct Non -Salary Costs: Direct Non -Salary Costs will be reimbursed at the Actual Cost to the CONSULTANT These charges may include, but are not limited to, the following items: travel, printing, long distance telephone, supplies, computer charges and fees of sub -consultants. Air or train travel will be reimbursed only to economy class levels unless otherwise approved by tile AGENCY. Tile CONSULTANT shall comply with the rules and regulations regarding travel costs (excluding air, train, and rental car costs) in accordance with WSDOT's Accounting Manual M 13-82, Chapter 10 —Travel Rules and Procedures, and revisions thereto. Air, train, and rental car costs shall be reimbursed in accordance with 48 Code of Federal Regulations (CFR) Part 31.205-46 "Travel Costs." The billing for Direct Non -Salary Costs shall include an itemized listing of the charges directly identifiable with the PROJECT. The CONSULIANTshall nlaintaill the original supporting documents in their office. Copies of the original supporting docurnents shall be supplied to theAGENCY upon request. All above charges must be necessary for the services provided Linder this AGREEMENT. Agreement Ntu-nber: Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Page 4 of 14 Revised 311112016 27 4Fixed Fee: The Fixed Fee, which represents the CONSULTANT'S profit, is shown in attached Exhibits "D" and "E" of this AGREEMENT. This fee is based on the Scope of Work defined In this AGREEMENT and the estimated person -hours required to perform the stated Scope of Work- In the event the CONSULTANT enters into a supplemental AGREEMENT for additional work, the supplemental AGREEMENT may include provisions for the added costs and an appropriate additional fee. The Fixed Fee will be prorated and paid monthly in proportion to the percentage of work completed by the CONSULTANT and reported in the Monthly Progress Reports accompanying the billings. Any portion of the Fixed Fee earned but not previously paid in the progress payments will be covered in the final payment, subject to the provisions of Section IX entitled "Termination of Agreement," 5. Management Reserve Fund (MRF): The AGENCY may desire to establish MRF to provide the Agreement Administrator with the flexibility to authorize additional funds to the AGREEMENT for allowable unforeseen costs, or reimbursing the CONSULTANT for additional work beyond that already defined in this AGREEMENT. Such authorization(s) shall be in writing and shall not exceed the lesser of $100,000 or 10% of the 'Total Amount Authorized as shown in the heading of this AGREEMENT. The amount included for the MRF is shown in the heading of this AGREEMENT. This fund may not be replenished. Any changes requiring additional costs in excess of the MRF shall be made in accordance with Section XIII, "Extra Work." 6. MaxiML11-n Total Amount Payable: The Maximum Total Arnount Payable by the AGENCY to the CONSULTANT under this AGREEMENT shall not exceed the amount shown in the heading of this AGREEMENT. The Maximum Total Amount Payable is comprised of the Total Amount Authorized, and the MRF. The Maximum Total Amount Payable does not include payment for Extra Work as stipulated in Section X111, "Extra Work." No minii-nurn amount payable is guaranteed under this AGREEMENT B. Monthly Progress Payments: The CONSULTANT may submit billings to the AGENCY for reimbursement of Actual Costs plus the ICR and calculated fee on a monthly basis during the progress of the work. Such billings shall be in a format approved by the AGENCY and accompanied by the monthly progress reports required under Section 111, "General Requirements" of this AGREEMENT. The billings will be supported by an itemized listing for each item including Direct (RAW) Labor, Direct Non -Salary, and allowable ICR Costs to which will be added the prorated Fixed Fee. To provide a means of verifying the billed Direct (RAW) Labor costs for CONSULTANT employees, the AGENCY may conduct employee interviews. These interviews may consist of recording the narnes, titles, Direct (RAW) Labor rates, and present duties of those employees performing work on the PROJECT at the time of the interview. C. Final Payment: Final Payment of any balance due the CONSULTANT of the gross amount earned will be made promptly upon its verification by the AGENCY after the completion of the work under this AGREEMENT, contingent, if applicable, upon receipt of all PSE, plans, maps, notes, reports, electronic data and other related documents which are required to be furnished under this AGREEMENT. Acceptance of such Final Payment by the CONSULTANT shall constitute a release of all claims for payment, which the CONSULTANT may have against the AGENCY unless such claims are specifically reserved in writing and transmitted to tile AGENCY by the CONSULTANT prior to its acceptance. Said Final Payment shall not, however, be a bar to any claims that the AGENCY may have against the CONSULTANT or to any remedies the AGENCY may pursue with respect to such claims. The payment of any billing will not constitute agreement as to the appropriateness of any item and at the time of final audit; all required adjustments will be made and reflected in a final payment. In the event that such final audit reveals an overpayment to the CONSULTANT, the CONSULTANT will refund such overpayment to the AGENCY within thirty (30) calendar days of notice of the overpayment. Such refund shall not constitute a waiver by the CONSULTANT for any claims relating to the validity of a finding by the AGENCY of overpayment. Tile CONSULTANT has twenty (20) working days after receipt of the final POST AUDIT to begin the appeal process to the AGENCY for audit findings. Agreement Number: Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Page 5 of 14 Revised 311112016 28 D= Inspection of Cost Records: The CONSULTANT and their sub -consultants shall keep available for inspection by representatives of the AGENCY and the United States, for a period of six (6) years after receipt of final payment, the cost records and accounts pertaining to this AGREEMENT and all items related to or bearing upon these records with the following exception: if any litigation, clairn or audit arising out of, in connection with, or related to this AGREEMENT is initiated before the expiration of the six (6) year period, the cost, records arid accounts shall be retained until such litigation, claim, or audit involving the records is completed. An interim or post audit may be performed oil this AGREEMENT. The audit, if any, will be performed by the State Auditor, WSDOT's Internal Audit Office and/or at the request of the AGENCY's Project Manager. A. Sub -Contracting The AGENCY permits subcontracts for those items of SERVICES as shown in Exhibit "A" attached hereto and by this reference made part of this AGREEMENT, The CONSULTANT shall not subcontract for the performance of any SERVICE under this AGREEMENT without prior written permission of the AGENCY. No permission for Subcontracting shall create, between the AGENCY and sub -consultant, ,Any contract or any other relationship. Compensation for this sub -consultant SERVICES shall be based oil the cost factors shown on Exhibit "E" attached hereto and by this reference made part of this AGREEMENT. The SERVICES of the sub -consultant shall not exceed its maximum amount payable identified in each sub - consultant cost estimate unless a prior written approval has been issued by the AGENCY All reimbursable direct labor, indirect cost rate, direct non -salary costs and fixed fee costs for the sub -consultant shall be negotiated and substantiated in accordance with section V "Payment Provisions" herein and shall be memorialized in a final written acknowledgement between the parties. All subcontracts shall contain all applicable provisions of this AGREEMENT, and the CONSULTANT shall require each sub -consultant or subcontractor, of any tier, to abide by the terms and conditions of this AGREEMENT. With respect to sub -consultant payment, the CONSULTANT shall comply with all applicable sections of the STATE's Prompt Payment laws as set forth in RCW 39.04.250 and RCW 39.76,01 1 . The CONSULTANT, sub -recipient, or sub -consultant shall not discriminate on the basis of race, color, national origin, or sex in the performance of this AGREEMENT The CONSUUFANT shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of DOT -assisted contracts, Failure by the CONSULTANT to carry out these requirements is a material breach of this AGREEMENT, which may result in the termination of this AGREEMENT or such other remedy as the recipient deems appropriate. VII. Employment and Organizational Conflict of Interest The CONSULTANT warrants that they have not employed or retained any company or person, other than a bona fide employee working solely for the CONSULTANT., to solicit or secure this contract, and that it has not paid or agreed to pay any company or person, other than a bona fide employee working solely for the CONSULTANT, any fee, commission, percentage, brokerage fee, gift, or any other consideration, contingent upon or resulting from the award or making of this contract, For breach or violation of this warrant, the AGENCY shall have the right to annul this AGREEMENT without liability or, in its discretion, to deduct frorn this AGREEMENT price or consideration or otherwise recover the full arnount of such fee, commission, percentage, brokerage fee, gift, or contingent fee. Any and all employees of the CONSULTANT or other persons while engaged in the performance of any work, or services required of the CONSULTANT tinder this AGREEMENT, shall be considered employees of the CONSULTANT only and not of the AGENCNand any and all claims that may arise under any Workmen's Agreement Number: Local Agency A &E Professional Services Cost Plus Fixed Fee Consultant Agreement Page 6 of 14 Revised 311112016 29 Compensation Act on behalf of said employees or other persons while so engaged, and any and all claims made by a third party as a consequence of any act or ormssion on the part of the CONSULTANT's employees or other persons while so engaged on any of the work or services provided to be rendered herein, shall be the sole obligation engaged and responsibility of the CONSULTANT. The CONSULTANT shall riot engage, on a full- or part-time basis. or other basis, during the period of this 0 AGREEMENT, any professional or technical personnel who are, or have been, at any time during the period of this AGREEMENT, in the employ of the United States Department of Transportation or the AGENCY, except regularly retired employees, without written consent of the public employer of such person if he/she will be working on this AGREEMENT for the CONSULTANT - During the performance ofthis AGREEMENT, the CONSULTANT, for itself, its assignees, sub -consultants, subcontractors and successors in interest, agrees to comply with the following laws and regulations: Title VI of the Civil Rights Act of 1964 (42 U,S-C. Chapter 21 Subchapter V § 2000d through 20OOd-4a) Federal -aid Highway Act of 1973 (23 U.S.C. Chapter 3 § 324) • Rehabilitation Act of 1973 (29 U,S.C. Chapter 16 Subchapter V § 794) • Age Discrimination Act of 1975 (42 U.S.C. Chapter 76 § 6101 el. seq.) * Civil Rights Restoration Act of 1987 (Public Law 100-259) * American with Disabilities Act of 1990 (42 U.S.C. Chapter 126 § 12101 et. seq.) * 23 CFR Part 200 * 49 CFR Part 21 * 49 CFR Part 26 * RCW 49.60.1 80 In relation to Title VI of the Civil Rights Act of 1964, the CONSULTANT is bound by the provisions of Exhibit "F" attached hereto and by this reference made part of this AGREEMENT, and shall include the attached Exhibit '-'F" in every sub -contract, including procurement of materials and leases of equipment, unless exempt by the Regulations or directives issued pursuant thereto. The right is reserved by the AGENCY to terminate this AGREEMENT at any time with or without cause upon ten (10) days written notice to the CONSULTANT, In the event this AGREEMENT is terminated by the AGENCY, other than for default on the part of the CONSULTANT, a final payment shall be made to the CONSULTANT for actual hours charged and any appropriate fixed fee percentage at the time of termination of this AGREEMENT, plus any direct non -salary costs incurred up to the time of termination of this AGREEMENT No payment shall be made for any SERVICES completed after ten (10) days following receipt by the CON SUI_:rANTof the notice to terminate. If the accumulated payment made to the CON SUU'I'ANT prior to Notice of Termination exceeds the total amount that would be due when computed as set forth in paragraph two (2) of this section, then no final payment shall be due and the CONSULTANT shall immediately reimburse the AGENCY for any excess paid. If the services of the CONSULTANT are terminated by the AGENCY for default on the part of the CONSULTANT, the above formula for payment shall riot apply. In the event of a termination for default, the amount to be paid to the CONSULTANT shall be determined by the AGENCY with consideration given to the actual costs incurred by the CONSULTANT in performing SERVICES to the date of termination, tile amount of SERVICES originally required which was satisfactorily completed to Agreement Nuniber: Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Page 7 of 14 Revised 311112016 30 date of termination, whether that SERVICE is in a form or a type which is usable to the AGENCY at the time of termination, the cost to the AGENCY of employing another firm to complete the SERVICES required and the time which may be required to do so, and other factors which affect the value to the AGENCY of the SERVICES performed at the time of termination, Under no circumstances shall payment made under this subsection exceed the amount, which Would have been made using the formula set forth in paragraph two (2) of this section. If it is determined for any reason that the CONSULTANT was not in default Or that the CONSULTANT's failure to perform is without the CONSULTANT's or its employee's fault or negligence, the termination shall be deerned to be a termination for the convenience of the AGENCY. In such an event, the CONSULTANT Would be reimbursed for actual costs and appropriate fixed fee percentage in accordance with the termination for other than default clauses listed previously. The CONSULTANT shall, within 15 days, notify the AGENCY in writing, in the event of the death of any mernber, partner, or officer of the CONSULTANTor the death or change of any of the CONSULTANT's supervisory and/or other key personnel assigned to the project or disaffiliation of any principally involved CONSULTANT employee. The CONSULTANT shall also notify the AGENCY, in writing, in the event of the sale or transfer of 50% or more of the beneficial ownership of the CONSULTANT within 15 days Of Such sale or transfer occurring. The CONSULTANT shall continue to be obligated to complete the SERVICES under the terms of this AGREEMENT unless (lie AGENCY chooses to terminate this AGREEMENT for convenience or chooses to renegotiate any terrn(s) of this AGREEMENT. If termination for convenience occurs, final payment will be made to the CONSULTANT as set forth in the second and third paragraphs of this section. Payment for any part of the SERVICES by the AGENCY shall not constitute a waiver by the AGENCY of any remedies of any type it may have against the CONSULTANT for any breach of this AGREEMENT by the CONSUUFANT, or for failure of the CONSULTANT to perform SERVICES required of it by the AGENCY. Forbearance of any rights Linder the AGREEMENT will not constitute waiver of entitlement to exercise those rights with respect to any future act or omission by the CONSULTANT. The CONSULTANT shall make such changes and revisions in the completed work Of this AGREEMENT as necessary to correct errors appearing therein, without additional compensation thereof, Should the AGENCY find it desirable for its own purposes to have previously satisfactorily completed SERVICES or parts thereof changed or revised, the CONSULTANT shall make such revisions as directed by the AGENCY. This work shall be considered as Extra Work and will be paid for as herein provided Linder section XIII "Extra Work." X1. Disputes Any disputed issue not resolved pursuant to the terms of this AGREEMENT shall be submitted in writing within 10 days to the Director of Public Works or AGENCY Engineer, whose decision in the matter shall be final and binding on the parties of this AGREEMENT; provided however, that if all action is brought challenging the Director of Public Works or AGENCY Engineer's decision, that decision shall be subject to judicial review. Ifthe parties to this AGREEMENT mutually agree, disputes concerning alleged design errors will be conducted under the procedures found in Exhibit ``.I". In the event that either party deem it necessary to institute legal action or proceeding to enforce any right or obligation Linder this AGREEMENT, this action shall be initiated in the Superior Court of the State of Washington, situated in the County in which the AGENCY is located, The parties hereto agree that all questions shall be resolved by application of Washington law and that the parties have the right of appeal from such decisions of the Superior Court in accordance with the laws of the State of 'Washington. The CONSULTANT hereby consents to the personal jurisdiction of the Superior Court of the State of Washington, situated in the county in which the AGENCY is located. Agreement Number: Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Page 8 of 14 Revised 311112016 31 rg I M Lq if= The CONSULTANT, any stip-consultants, and the AGENCY shall comply with all Federal, State,, and local laws, rules, codes, regulations and all AGENCY policies and directives, applicable to the work to be performed under this AGREEMENT. This AGREEMENT shall be interpreted and construed in accordance with the laws of tile State of Washington. The CONSULTANT shall defend, indemnify, and hold The State of Washington (STATE) and the AGENCY and their officers and employees harmless from all claim, demands, or suits at law or equity arising in whole or in part from the negligence of, or the breach of any obligation under this AGREEMENT by, the CONSULTANT or tile CONSULTANT's agents, employees, sub consultants, subcontractors or vendors, of any tier, or any other persons for whom the CONSULTANT may be legally liable; provided that nothing herein shall require a CONSULTANT to defend or indemnify the STATE and the AGENCY and their officers and employees against and hold harmless the STATE and the AGENCY and their officers and employees from claims, demands or suits based solely upon the negligence of, or breach of any obligation Linder this AGREEMENT by the STATE and the AGENCY, their agents, officers, employees, sub -consultants, subcontractors or vendors, of any tier, or any other persons for whom the STXfE' and/or the AGENCY may be legally liable; and provided further that if the claims or suits are caused by or result from the concurrent negligence of (a) the CONSULTANTor the CONSULTANT's agents, employees, sub -consultants, subcontractors or vendors, of any tier, or any other persons for whom the CONSULTANT is legally liable, and (b) the STATE and/or AGENCY, their agents, officers, employees, sub -consultants, subcontractors and or vendors, of any tier, or any other persons for whom the STATE and or AGENCY may be legally liable, the defense and indemnity obligation shall be valid and enforceable only to the extent of the CONSULTANT's negligence or the negligence of the CONSULTANT's agents, employees, sub -consultants, subcontractors or vendors, of any tier, or any other persons for whore the CONSULTANT may be legally liable. This provision shall be included in any AGREEMENT between CONSULTANT and any sub -consultant, subcontractor and vendor, of any tier. The CONSULTANT shall also defend, indemnify, and hold the STATE and the AGENCY and their officers and employees harmless from all claims, demands, or suits at law or equity arising in whole or in part from the alleged patent or copyright infringement or other allegedly improper appropriation or use of trade secrets, patents, proprietary information, know-how, copyright rights or inventions by the CONSULTANT or the CONSULTANT's agents, employees, sub -consultants, subcontractors or vendors, of any tier, or any other persons for whom the CONSULTANT may be legally liable, in performance of the Work under this AGREEMENT or arising out of any use in connection with the AGREEMENT of methods, processes, designs, in -formation or other iterns furnished or communicated to STATE and/or the AGENCY, their agents, officers and employees pursuant to the AGREEMENT: provided that this indemnity shall not apply to any alleged patent or copyright infringement or other allegedly improper appropriation or use ot-trade secrets, patents, proprietary information, know-how, copyright rights or inventions resulting from STATE and/or AGENCY's, their agents', officers' acrd employees' failure to comply with specific written instructions regarding use provided to STATE and/or AGENCY, their agents, officers and employees by the CONSULTANT, its agents, employees, sub -consultants, subcontractors or vendors, of any tier, or any other persons for whore the CONSULTANT may be legally liable. The CONSULTANT's relation to the AGENCY shall be at all times as an independent contractor. Notwithstanding any determination by the: Executive Ethics Board or other tribunal, the AGENCY may, in its sole discretion, by written notice to the CONSULTANT terminate this AGREEMENT if it is found after due notice and examination by the AGENCY that there is a violation of the Ethics in Public Service Act, Chapter 42.52 RCW; or any similar statute involving the CONSULTANT in the procurement of, or performance under, this AGREEMENT. The CONSULTANT specifically assumes potential liability for actions brought by the CONSUt.-TANT's own employees or its agents against the STATE and /or the AGENCY and, solely for the purpose of this indemnification and defense, the CONSULTANT specifically waives any immunity under the state industrial insurance law, Title 51 RCW. This waiver has been mutually negotiated be the Parties. Agreement Nuinber= Local Agency A& Professional Services Cost Plus Fixed Fee Consultant Agreement Page 9 of 14 Revised 311112016 32 Unless otherwise specified in this AGREEMENT, the AGENCY shall be responsible for administration of construction contracts, if any, on the project. Subject to the processing of a new sole source, or an acceptable supplemental AGREEMENT, the CONSULTANT shall provide On -Call assistance to the AG13NCY during contract administration. By providing such assistance, the CONSULTANT shall assume no responsibility for: proper construction techniques, job site safety, or any construction contractor's failure to perform its work in accordance with the contract documents. Tile CONSULTANT shall obtain and keep in force daring; the terms of this AGREEMENT, or as otherwise required, the following insurance with companies or through sources approved by the State Insurance Commissioner pursuant to Title 48 RCW. Insurance Coverage A. Worker's compensation and employer's liability insurance as required by the STATEz B. Commercial general liability insurance written Linder ISO Form CG 00 01 12 04 or its equivalent with minimum limits of one million dollars ($1,000,000.00) per occurrence and two million dollars ($2,000,000,00) in the aggregate for each policy period. Ci Business auto liability insurance written under ISO Form CG 00 01 10 01 or equivalent providing coverage for any "Auto" (Symbol 1) used in an amount not less than a one million dollar ($1,000,000.00) combined single limit for each occurrence. Excepting the Worker's Compensation Insurance and any Professional Liability Insurance, the STATE and AGENCY, their officers, employees, and agents will be named on all policies of CONSULTANT and any sub - consultant and/or subcontractor as an additional insured (the "Als"), with no restrictions or limitations concerning products and completed operations coverage. This coverage shall be primary coverage and non-contributory and any coverage maintained by the Als shall be excess over, and shall not contribute with, the additional insured coverage required hereunder. The CONSULTANT's and the sub -consultant's and/or subcontractor's insurer shall waive any and all rights of subrogation against the Als. The CONSULTANT' shall furnish tile AGENCY with verification of insurance and endorsements required by this AGREEMENT. The AGENCY reserves the right to require complete, certified copies of all required insurance policies at any time. All insurance shall be obtained from an insurance company authorized to do business in the State of Washington. The CONSULTANT shall Submit a verification of insurance as outlined above within fourteen (14) days of the execution of this AGR-EEMENTto: Name: Steve Carstens Agency: City of Tukwila Address: 6300 Southeentler Blvd., Suite 100 City: Tukwila State: WA Zip: 98188 Ernail: steve.carstetis@tukwilawa.gov Phone: 205-431-2446 x. 1646 Facsimile: No cancellation of the foregoing policies shall be effective without thirty (30) days prior notice to the AGENCY. The CONSULTANT's professional liability to the AGENCY, including that which may arise in reference to section IN "Termination of Agreement" of this AGREEMENT, shall be limited to the accumulative amount of the authorized AGREEMENT amount or one million dollars 01,000,000.00). whichever is greater, unless the limit of liability is increased by the AGENCY pursuant to Exhibit 11. In no case shall the CONSULTANT's professional liability to third parties be limited in any way. Agreement Number -- Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Page 10 of 14 Revised 311112016 33 The parties enter into this AGREEMENT for the sole benefit of the parties, and to the exclusion of any third party, and no third party beneficiary is intended or created by the execution of this AGREEMENT The AGENCY will pay no progress payments under section V "Payment Provisions" until the CONSULTANT has fully complied with this section. This remedy is not exclusive; and the AGENCY may take Such other action as is available to it Under other provisions ofthis AGREEMENT, or other -wise in law. X111. Extra Work A. The AGENCY may at any tirne, by written order, make changes within the general scope of this AGREEMENT in the SERVICES to be performed, E. If any such change causes an increase or decrease in the estimated cost of, or the time required for, performance of any part of the SERVICES under this AGREEMENT, whether or not changed by the order, or otherwise affects any other terms and conditions of this AGREEMENT, the AGENCY shall make an equitable adjustment in the: (1) maximum amount payable,* (2) delivery or completion schedule, or both; and (3) other affected terms and shall modify this AGREEMENT accordingly. C. The CONSULTANT must submit any "request for equitable adjustment," hereafter referred to as "CLAIM," under this clause within thirty (30) days from the date of receipt of the written order, However, if the AGENCY decides that the facts Justify it, the AGENCY may receive and act upon a CLAIM submitted before final payment of this AGREEMENT. D. Failure to agree to any adjustment shall be a dispute under the section XI "Disputes" clause, However, nothing in this clause. shall excuse the CONSULTANT from proceeding with the AGREEMENT as changed. E. Notwithstanding the terms and conditions of paragraphs (A.) and (B.) above, the maximum amount payable for this AGREEMENT, shall not be increased or considered to be increased except by specific written supplement to this AGREEMENT, If applicable, the CONSULTANT shall place their endorsement on all plans, estirnates, or any other engineering data furnished by thern. XV. Federal Review The Federal Highway Administration shall have the right to participate in the review or examination of the SERVICES in progress. XVI. Certification of the Consultant and the Agency Attached hereto as Exhibit"G-I(a and b)" are the Certifications of the CONSULTANT and the AGENCY, Exhibit "G-2" Certification Regarding Debarment, Suspension and Other Responsibility Matters - Primary Covered Transactions, Exhibit "G-3" Certification Regarding the Restrictions of the Use of Federal Funds for Lobbying and Exhibit "G-4" Certificate of Current Cost or Pricing Data. Exhibit "&Y' is required only in AGREEMENT's over one hundred thousand dollars ($100,000.00) and Exhibit "G-4" is required only in AGREEMENT's over five hundred thousand dollars ($500,000,00.) These Exhibits must be executed by the CONSULTANT, and submitted with the master AGREEMENT, and returned to the AGENCY at the address listed in section Ill "General Requirements" prior to its performance of any SERVICES under this AGREEMENT Agreement Number: Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Page 11 of 14 Revised 311112016 34 I This document and referenced attachillents contain all covenants, stipulations, and provisions agreed upon by tile parties. No agent, or representative of either party has authority to make, and the parties shall not be bound by or be liable for, any statement, representation, promise or agreement not set forth herein. No changes, amendments, or modifications of the terms hereof shall be valid unless reduced to writing and signed by the parties as a supplement to this AGREEMENT. This AGREEMENT may be simultaneously executed in several Counterparts', each of which shall be deemed to be an original having identical legal effect. The CONSULTANT does hereby ratify and adopt all statements, representations, warranties, covenarits, and AGREEMENTs contained in the proposal, and the supporting material submitted by the CONSLANANT, and does hereby accept this AGREEMENT and agrees to all of the terrills and conditions thereof. 11 Jill :111111111 11110 77M "st 'Tile CONSULTANT acknowledges that sorne of the material and inrorniation that, may come into its possession or knowledge in connection with this AGREEMENT or its performance may consist of information that is exempt fi-orn disclosure to the public or other unauthorized persons under either chapter 42.56 RCW or other local, state or federal statutes ("State's Confidential Information"). The "State's Confidential Information" includes, but is not limited to, names, addresses, Social Security numbers, e-mail addresses, telephone numbers, financial profiles, credit card information, driver's license numbers, medical data, law enforcement records (or any other information identifiable to an individual), STATE and AGENCY Source code or object code, STATE andAGENCY security data, non-public Specifications, STXFE and AGENCY non -publicly available data, proprietary software, State security data, or inrorrilation which may ieopardize any part of tile project that relates to any of these types of information. The CONSULTANT agrees to hold the State's Confidential Information in strictest confidence and not to make use of the State's Confidential Information for any purpose other than the performance of this AGREEMENT, to release it only to authorized employees, sub -consultants or subcontractors requiring such information for the purposes of carrying Out this AGREEMENT, and not to release, divulge, publish, transfer, sell, disclose, or otherwise make it known to any other party without the AGENCY's express written consent or as provided by law, The CONSULTANT agrees to release such information or material only to employees, sub -consultants or Subcontractors who have signed a nondisclosure AGREEMENT, the terms of which have been previously approved by the AGENCY. The CONSULTANT agrees to implement physical, electronic, and managerial safeguards to prevent unauthorized access to the State's Confidential Information. Immediately upon expiration or termination of this AGREEMENT, the CONSULTANT shall, at the AGENCY's option: (i) certify to the AGENCY that the CONSULTANT has destroyed all of the State's Confidential Information; or (ii) returned all of the State's Confidential Information to the AGENCY; or (iii) take whatever other steps the AGENCY requires of the CONSULTANT to protect the State's Confidential Information. As required tinder Executive Order 00-03, the CONSULTANT shall maintain a log documenting the following: the State's Confidential Information received in the performance of this AGREEMENT; the purpose(s) for which the State's Confidential Information was receive&, who received, maintained and used the State's Confidential Information; and the final disposition of the State's Confidential Information. The CONSULTANT's records shall be subject to inspection, review, or audit upon reasonable notice from the AGENCY. The AGENCY reserves the right to monitor, audit, or investigate the use of the State's Confidential Information collected, used, or acquired by the CONSULTANT" through this AGREEMENT. The monitoring, auditing, or investigating may include, but is not limited to, salting databases. Agreenient Nuniber- Local Agency AB Professional Services Cost Plus Fixed Fee Consultant Agreement Page 12 of 14 Revised 311112016 35 Violation of this section by the CONSULTANT or its sub-consultants or Subcontractors may result in termination of this AGREEMENT and demand for return of all State's Confidential Information, monetary damages, or penalties. It is understood and acknowledged that the CONSULTANT may provide the AGENCY with information which is proprietary and/or confidential during the term of this AGREEMENT. The parties agree to maintain the confidentiality Of Such information during the term of this AGREEMENT and afterwards. All materials containing such proprietary and/or confidential information shall be clearly identified and marked as "Confidential" and shall be returned to tile disclosing party at the Conclusion of the SERVICES Linder this AGREEMENT. The CONSULTANT shall provide the AGENCY with a list of all information and materials it considers confidential and/or proprietary in nature-, (a) at the commencement of the term of this AGREEMENT; or (b) as soon as such confidential or proprietary material is developed. "Proprietary and/or confidential information" is not meant to include any information which, at the time of its disclosure: (1) is already known to the other party; (ii) is rightfully disclosed to one of the parties by a third party that is not acting as an agent or representative for the other party; (iii) is independently developed by or for the other party; (iv) is publicly known; or (v) is generally utilized by unaffiliated third parties engaged in the same business or businesses as the CONSULTANT. The parties also acknowledge that the AGENCY is subject to Washington State and federal public disclosure laws. As such, the AGENCY shall maintain the confidentiality of all such information marked proprietary and/ or confidential or otherwise exempt, unless such disclosure is required under applicable state or federal law. If a public disclosure request is made to view materials identified as "Proprietary and/or confidential information" or otherwise exempt information, the AGENCY will notify the CONSUIA'ANT of the request and of the date that Such records will be released to the requester unless the CONSULTANT obtains a court order from a court of competent jurisdiction enjoining that disclosure. If the CONSU`rANT fails to obtain the. Court order enjoining disclosure, the AGENCY will release the requested information oil the date specified, The CONSULTANT agrees to notify the sub-consultant of any AGENCY communication regarding disclosure that may include a sub-consultant's proprietary and/or confidential information. The CONSULTANT notification to the sub-consultant will include the date that such records will be released by the AGENCY to the requester and state that unless the sub-consultant obtains a court order from a court of competent jurisdiction enjoining that disclosure the AGENCY will release the, requested information. If the CONSULTANT and/or sub-consultant fail to obtain a Court order or ether judicial relief enjoining the AGENCY by the release date, the CONSULTANT shall waive and release and shall hold harmless and indemnify the AGENCY from all claims of actual or alleged darnages, liabilities, or costs associated with the AGENCY's said disclosure of sub-consultants' information, XX. Records Maintenance During the progress of the Work and SERVICES provided hereunder and for a period of not less than six (6) years from the date of final payment to the CONSULTANT, the CONSULTANT shall keep, retain and maintain all "documents" pertaining to the SERVICES provided pursuant to this AGREEMENT. Copies of all "documents" pertaining to the SERVICES provided hereunder shall be made available for review at the CONSULTANT's place of business during normal working hours. If any litigation, claim or audit is commenced, the CONSULTANT shall cooperate with AGENCY and assist in the production of all such documents. "Documents" shall be retained until all litigation, claims or audit findings have been resolved even though such litigation, claim or audit continues past the six (6) year retention period. For purposes of this AGREEMENT, "documents" means every writing or record of every type and description, including electronically stored information ("ESI"), that is in the possession, control, or custody of the CONSULTANT, including, without limitation, any and all correspondences, contracts, AGREEMENT 's, appraisals, plans, designs, data, surveys, maps, spreadsheets, memoranda, stenographic or handwritten notes, reports, records, telegrams, schedules, diaries, notebooks, logbooks, invoices, accounting records, work sheets, charts, notes, drafts, scribblings, recordings, visual displays, photographs, minutes of meetings, Agreement Number: Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Page 13 of 14 Revised 311112016 36 tabulations, computations, Summaries, inventories, and writings regarding conferences, conversations or telephone conversations, and any and all other taped, recorded, written, printed or typed matters of any kind of, description; every copy of the foregoing whether or not the original is in the possession, custody, or control of the Z5 CONSUUFANT, and every copy of any of the foregoing, whether or not such copy is a copy identical to an original, or whether or not such copy contains any commentary or notation whatsoever that does not appear on the original. For purposes of this AGRFIEMENT, "ESI" means any and all computer data or electronic recorded media of any kind, including "Native Files", that are stored in any ruedurnfrom which it can be retrieved and examined, either directly or after translation into a reasonably useable form. ESI may include information and/or documentation stored in various software programs such as: Email, Outlook, Word, Excel, Access, Publisher, PowerPoint, Adobe Acrobat, SQL databases, or any other software or electronic communication programs or databases that the CONSULTANI'may use in the performance of its operations. ESI may be located on network servers, backup tapes, smart phones, thumb drives, CDs, DVDs, floppy disks, work computers, cell phones, laptops or any other electronic device that CONSULTANT uses in the performance of its Work or SERVICES hereunder, including any personal devices used by the CONSULTANT or any sub -consultant at home. "Native files" are a subset of ESI and refer to the electronic format of the application in which such ESI is normally created, viewed, and /or modified, The CONSULTANT shall include this section XX"Records Maintenance"" in every subcontract it enters into in relation to this AGREEMENT and bind the sub -consultant to its terms, unless expressly agreed to otherwise in writing by the AGENCY prior to the execution of such subcontract. In witness whereof, the pat -ties hereto have executed this AGREEMENT as of the day and year shown in the "'Execution Date" box on page one (1) of this AGREEMENT. Signature Mm Date Arty inodfication, change, or reformation of this AGREEMENT shall require appro as toforin by the f oaf `the Attorney General, Agreement Number: Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Page 14 of 14 Revised 311112016 37 See attached Exhibit A-1. Exhibit A Scope of Work Project No. Agreement Number: WSDO T Form 140.089 EF Exhibit A Page I of I Revised 1013012014 38 1 0 : I I - * - I . I . . b. 9 i 1 The cities of Renton and Tukwila have been working in partnership to complete a connection of Strander Boulevard in the City of Tukwila with Southwest 27th Street in the City of Renton, As lead agency for the first two phases of the project, the City of Renton completed an undercrossing of the BNSF Railway in 2014, connecting Southwest 27th Street with the Tukwila Sound Transit Station, The City of Tukwila will complete Phase 3 of the project as shown in Figure 1. Figure 1 —Project Phasing City of'rukwilA Strander Blvd/SW 27th St Extension Tukwila, Washington BergerABAM, P14.0347.00 September 2017 Exhibit Awl Page I of 60 W In order to reduce the cost of the first two phases of the project, the BNSF undercrossing was completed by installing a pump station to pump both stormwater and groundwater entering the roadway excavation from the surrounding area. This was envisioned as an interim condition until construction of a full, four -lane arterial connection of Strander to Southwest 27th, The full build -out was anticipated to require the construction of watertight walls and a bottorn seal for the underpasses, PROJECT IMPLEMENTATION This scope of work defines the effort required to complete the design of Phase 3, as described above. It also defines the effort required to reevaluate and update the project's National Environmental Protection Agency (NEPA) document, acquire right-of-way (ROW), and secure approvals from both BNSF and Union Pacific Railroad (UPRR) for temporary and permanent modifications to their facilities. Construction phase services are not included in this scope of work-, but will be provided as supplemental services when required. Phase 3 of the Strander Grade Separation Project will place Strander Boulevard beneath the UPRR tracks by extending the excavation for the BN,' -,F underpass to the west and under the UPRR. The undercrossing will utilize the pumping system constructed in Phase 2 of the project to pump stormwater for the proposed Phase 3 extension to the existing pond. The existing pump station will need to be modified and the pond will need to be enlarged and modified to function in accordance with the latest water quality standards. Groundwater will be separated from the stormwater and an additional, new groundwater pumping system will be used to purnp groundwater to an outfall in the Green River. The discharge location has yet to be determined, The roadway section will be established in consultation witl,-L the City o€ Tukwila (hereinafter referred to as CITY) and is anticipated to be similar to the roadway section established by the CITY during the planning of the project, Other features of the project include modifications to access several businesses located to the west of UPRR, and utility relocations, permanent or interim, and/or protection. SCHEDULE The target dates for completing all work are shown on the attached schedule. These target dates assume that the notice to proceed (NTP) for Phase 3 is provided on 26 September 2017. SUBCONSULTANTS The following subconsultants will participate in the delivery of this scope of work as follows. • Fehr & Peers - Traffic Engineering • Hanson Professional Services - Railroad Track Design • Shannon & Wilson - Geotechnical Engineering • I Alliance - Surveying • Abeyta & Associates — Right -of -Way Services • Bright Engineering —Structural Engineering • R & W — Purnp Station Electrical Engineering and Control Systerns, City of Tukwila Strander tilvd/,SW 27th St Extension Tukwila, washingtoll BergerABAM, P140347.00 September 201", Exhibit A-1 Page 2 of 60 EX * Widener & Associates - Environmental Documentation and Permitting The following list is included to confirm the understanding between the CITY and BergerABAM (hereinafter referred to as CONSULTANT) and will be used to guide the work. Additional assumptions are provided with each specific project task. 1. Throughout this scope of work, it is understood that the CITY will provide the CONSULTANT with one set of consolidated review comments for each draft review round. The CONSULTAN"r will respond to the comments and incorporate the agreed- upon resolution into the final document(s). 1 It is anticipated that the roadway typical section will be a four -lane arterial and that the key design features will be based on the design report prepared by CONSULTANT for the City of Renton during the planning of the project and the Stornmater System Conceptual Desi ti Report prepared by BergerABAM for the City of Tukwila, dated 7 April 2017, 1 'The underpass will be watertight and it is assumed that the small amount of groundwater from the underpass can be combined with treated stormwater and discharged to the Green River through a new outfall. 4. UPRR may require a separate utility agreement for the new discharge line described above. The costs for obtaining this are not included in the scope of work. 5. It is assumed the Citv of Renton and the Washington State Department of 'rransportation (WSDOT) will allow the CITY to use the Springbrook Creek wetland mitigation bank constructed by the City of Renton and WSDOT. 6. Stormwater, treatment will comply with the King County Surface Water Design Manual (KCSWDM), recently updated to be consistent with the 2014 Washington State Department of Ecology's (WDOE) Stormwater Management Manual for Western Washington - T The CITY will need to establish a preliminary engineering agreement with the Union Pacific Railroad (UPRR) and BNSF Railway (BNSF) to reimburse UPRR and BNSF for their review time. 8, It is assumed that CONSULTANT will design the new UPRR overpass, as well as the proposed shoofly. It is assumed that UPRR will provide comments to the CONSULTANT in a timely manner to facilitate the CONSULTANT's design of project, 9It is assume the extension of the BNSF bridge foundations, to allow the existing bridge to be widened in the future, will be the same as the existing foundations. Widening of the superstructure is not in the scope of work. City of Tukwila BergerABAM, P14.0347.00 Sh,aoder Blvd/SW 2701 St Extension September 2017 Tukwila, Washington Exhibit A-] Page I of 60 41 M Utility relocation and reconstruction plans for power, gas, and communication purveyors will be prepared by the respective utility. The CONSULTANT will coordinate directly with the utility companies and the CITY, IL It is assumed that design for relocation of the King County sanitary sewer will be completed by King County and the plans incorporated into the construction contract for the Strander Boulevard/Southwest 27th Street Extension. The CONSULTANT will coordinate directly with King County and will provide assistance with routing the sewer through the project site, 12. It is assumed that enough nionurnentation still exists to determine the necessary boundaries for this projects efforts. If additional work, such as exhaustive title research and complete section breakdown work is required, a portion of that work may be needed to be completed as a supplemental service, 13. Public utility locating services provided by callbeforeyoudig.org will be utilized to do an initial location of utilities in the public ROW. A private utility locating company is included. in this proposal, to provide complete information to verify the location of publicly and privately owned buried utilities (sanitary, storm, water, power, gas, telecommunications, etc.) with painted locate marks. 14. Additional support for vacations of existing ROW or boundary line adjustments (BLA) of resulting parcels is not included in this proposal as it cannot be determined until the design is finalizod. If these services are required, those services will be provided as supplemental service. 15, "The CITY will provide rights -of -entry onto private lands prior to field survey crew visitation, environmental explorations, and geotechnical investigations. Tile CONSULTANT will provide a. list of private property access that will be required The CITY will be responsible for making all initial contact and subsequent legal arrangements, if required, for rights -of -entry to private property. The CONSULTANT will subsequently be responsible for notifying both the CITY and the property owner regarding the timing of the work 16, Coordinate mapping values will be based upon a "project datum" being a ground realization of state plane grid coordinates. 17. Preparing and recording a Record of Survey (ROS) is not included in this proposal. If additional work is required, this work will be provided as supplemental service. To facilitate management of the project in. an efficient manner, Phase 3 work will be broken into the tasks listed below. City of Tukwila Berge rABAM, P14,034700 Straoder Blvd/SW 27th St Extension September 2017 Tukxvila. Washington rxhibit A-1 Page 4 of 60 42 Task I ,O Project Management 'Task 10 Directed Services Task 10 Independent Cons tructabili ty Review Task 4.0 Survey and Base Mapping Task 5.0 Utilities Task 6.0 Traffic Engineering, Illumination, and Signal Design Task 7,0 Right -of -Way Task 8.0 Environmental Documentation and Permitting Task 9.0 Railroad Engineering and Design Task 10.0 Structural Engineering Task 11.0 Geotechnical Engineering Task 12,0 Drainage Design Task 13.0 I -lump Station Design Task 14.0 Roadway Design The level of effort associated with providing these services is shown in Exhibits D and E. The estimated level of effort is based upon the assumptions and task descriptions provided below. Efforts to complete these tasks can vary fron'i the effort assumed for the preparation of the level of effort shown in Exhibits D and E. Sorne budget items may cost more and others may cost less. The CONSULTANT shall monitor total costs expended under this agreement and shall notify the CITY if funds need to be reallocated bet -ween tasks. City of Tukwila BergerABAM, P14.0347.00 Strander Blvd/SW 27th St Extension September 2017 Tukwila, Washington fixhilAt A-] Vage 5 of 60 43 TASK 1.0 PROJECT MANAGEMENT Subtask 1.1 Project Coordination BergerABAM (hereinafter referred to as CONSULTANT) shall provide project management and corru-nunications between the CONSULTANT team and the City of Tukwila (hereinafter referred to as CITY). The CONSULTANT shall perform. project administration and management tasks as follows. # Prepare and submit monthly invoices, including a tabulation of hours expended, broken down by each major task. • Prepare monthly progress reports summarizing the status of the budget, identifying trends, and taking corrective actions if necessary. • Prepare and update project schedule periodically as circurris Lances require or as requested by the CITY. The project schedule shall be developed using Microsoft Project. • Prepare subconsultant agreements and perform ongoing subconsultant coordination. • Maintain all contract -required documentation, • It is anticipated that the Phase 3 effort will last approximately two years (24 months), Subtask 1.2 Quality Assurance The CONSULTANT shall provide quality assurance/quality control (QA/ C) for all design work in accordance with the CONSULTANT's QA/(,aC standards, Subtask 1.3 Meetings Project Team Meetings The CONSULTANT shall facilitate biweekly internal project team coordination meetings during Phase 3. A total of 52 team meetings are anticipated over a period of two years. Meetings shall be approximately 1 hour in duration and shall be attended by an average of five CONSULTANT team member,,,, including three of the CONSULTANT's project management and/or project engineering staff and two other CONSULTANT discipline specialists. Progress Meetings with CITY Staff The CONSULTANT shall facilitate monthly progress/project meetings with CITY staff. A total of 24 CITY meetings are anticipated over a period of two years. Meetings shall be approximately 4 hours in duration, including preparation and travel time and shall be attended by an average of four CONSULTANT team members, including two of the CONSULTANT's project rnanagernent and/or project engineering staff and two other CONSULTANT discipline specialists, Defiverable(s) # Monthly progress report and invoice (one copy) City ofTukwila Strander Blvd/SW 27th St Extension Tt*wila, Washington BergerABAM, 1'14,0,347.00 Septernbes 2017 Exhibit A-1 Page 6 of 60 EV • Updated project schedules if required (one copy) • Updated contract forms and certifications • Meeting notes for all t-neetings • QA/QC documentation for all design work will be made available to the CITY upon request City of'l'ukwila Strander B)vd/SW 27th St Lxtefisiou Tukwila, Washington BergerABAM, P14.03,17.00 Sop tember 2017 Exhibit A-] Page 7 of 60 45 This task is intended to cover project activities that are likely to be required, but for which the scope and level of effort cannot accurately be defined, These activities are currently not included in the scope of services but will be provided as a supplemental service if required. Subtask 2.1 Public Involvement If requested by the CITY, the CONSULTANT shall conduct two public open houses during the design of the project. The purpose of these open houses would be to provide the general public information about the status of the project. This information is expected to include the purpose and need for the project, provide responses to frequently asked questions, and provide information about the funding status and schedule for the project. It is anticipated that the CITY will receive input on the project at these meeting and that the input will generally be supportive of the project. Up to two CONSULTANT technical staff will, attend to answer questions about the project. It is anticipated that one open house will be held early in the design and the second would be held when it becomes clear that the project is in a position to move into cons t ructi oil. Written responses to comments received are not anticipated, but can be provided as a supplementary service. Additional stakeholder involvement in the planning of the project is included in other project tasks where necessary. Deliverable(s) • Up to five exhibits • One hundred notices for mailing • Written summary of comments, received Subtask 2.2 Value Engineering If requested by the CITY, the CONSULTANT shall participate in a value engineering (VE) review of the project. The CITY may elect to contract directly with a VE workshop facilitator or may request the CONSULTANT provide this service. Other services to be provided by the CONSULTANT include the preparation of the presentation to the VE workshop participants, a written response to VE team recomnieridations, and modifications to the project's design required to implement VE team suggestions that are acceptable to the CITY. It is assumed that the VE workshop would be conducted at the 30 percent design level so that any recorn-mericlations to be incorporated in the project can be implemented early in the design, when the effort to incorporate them is minimal and can be accomplished as part the submittal review process, Dellverable(s) • An initial presentation, of the project to the VE team • Review and response to the VE team recornmenclations • VE recommendations accepted by the CITY will be incorporated in future design submittals Subtask 2.3 Ad, Bid, and Award Services The CONSULTANT shall provide additional bid period engineering services for the Strander Boulevard/Southwest 27th Street Extension - Phase 3 project. The CONSULTANT' shall answer City of Tukwila BergerABAM, P14,0347.00 Strander Blvd/F)W 27th St Extension September 2017 Takwila, Washington W:tibi(A-] Page 8 of 60 EN questions from bidders that are forwarded through the CITY. The answers shall be returned to the CITY for distribution by the CITY to respective parties. Subconsultant Coordination The CONSULTANT will coordinate with internal resources, including the project geotechnical and environmental engineers, as required, to assist in answering bidder questions. This may involve coordinating resources to draft revised special provisions and/or plan sheets. Plan Modifications, Addendurns, and Clarifications 'The CONSULTANT will furnish tecl-Ltical input to the CITY in response to bidder requests for clarification of bid docurnents. If warranted, the CONSULTANT will provide technical assistance necessary for preparing addenclums that may include revised plan sheets and/or revised special provisions. Assume up to 25 unique requests averaging 2 hours of response time for each request- Assume up to three addenda and up to 16 hours of preparation for each addendum. Deliverable(s) * Ernail responses to CITY for bidder questions a Orte electronic copy of new special provisions or revised special provisions for each addendum in Microsoft Word format # One electronic copy of revised bid quantities for each addendum * One half sized (11.x17) print of revised plan sheets for each addendum City oaf Tukwila Strander Blvd/SW 27tli St Extension Tukwila, Washington BergerABAM, P14.0347.00 Sept(qub(7 2017 Exhibit A-1 Page 9 of 60 47 Ott -Sakai (hereinafter referred to as SUBCONSULTANT), under a separate subconsultant agreement with CONSULTANT, shall facilitate an independent constructability review of the project. This effort shall be completed at the 30 percent design level so that any recommendations to be incorporated in the project can be implemented early in the design, when the effort to incorporate them is minimal and can be accomplished as part the submittal review process. It is assumed that this review will require a minimum of three constructability workshops/meetings. SUBCONSULTANT will also provide an independent construction cost estimate at the 30and 60 percent design levels. The proposed constructability review is anticipated to focus primarily on the development of alternative methods of constructing the bottom seal. The alternative methods are not well- defined, but are anticipated to include use of tremie methods, in combination with some dewatering, The goal is to minimize the amount of dewatering. The CONSULTANT will develop preliminary design concepts and submit/present to SUBCONSULTANT for review and comment. A memorandum will be written to summarize the alternative bottom seat work access needs, including temporary walls to facilitate construction. SUBCONSULTANT will use plan sheets provided by CONSULTANT and superimpose the equipment locations, crane size, and pick radius needed for the work. The work will also inctude formulating a conceptual level cost estimate and a review of the construction schedule provided by the CONSULTANT. Del ver able(s) * An initial presentation of the project to SUBCONSULTANT SUBCONSULTANT will prepare a draft and final memoral-idurn of the work described above Up to two other meetings, with meeting minutes, to discuss and resolve issues identified by the review # An independent review of the construction cost at the 30 and 60 percent design submittals City of Tukwb Strander Blvd/SW 27th St Extension Tukwila, Washington. BergerABAMI, 1114,0347A September 2017 exhibit A-1 Page 10 of 60 ER il;,Irirrii, One Alliance (hereinafter referred to as SUBCONSULTANT), under a subconsultarit agreement with the CONSULTANT, will provide existing site condition data in addition to the preparation of existing condition documents for this project's design. This will include existing conditions topographical survey and ROW, and parcel boundary document research, field work and base mapping preparation, including any traffic control and or safety compliance requirements - Surveying services shall be performed under the direction of a professional land surveying licensed to practice in the state of Washington. The SUBCONSUL'TANT shall provide geodetic survey control to support the project. Surveying services shall be performed tinder the direction of a professional land surveyor licensed to practice in the state of Washington. The survey control network will be based on CITY and other jurisdictions' published control, as well as survey control established in previous phases of this project. Horizontal and vertical datums will conform to the daturas established by Phase I of the Stander Boulevard Extension Project. Horizontal Datum - NAD83/91 Washington State Planes, North Zone, US Survey Feet Vertical Datum - North American Vertical Datum of 1988 (NAVD 88), US Survey Feet Survey control will be -set out of the expected project extents to ensure a good basis for this project's future construction. Caclastral monumentation local to the site, as available, will be tied into this survey, to aid in resolution of the ROW in the project area. Subtask 4.2 Topographic Survey The mapping provided, as shown in Figure 2, will be in support of the design of improvements to design the roadway extension of Southwest 27tb Avenue to Strander Boulevard, and the associated sidewalks, utilities, and underpass beneath the existing railroad tracks. 'The topographic mapping will cover approximately 39 acres and will include the following. 9 Locate overhead utilities, including "sag" locations/elevations of all overhead lines crossing the proposed Strander extension. All utility poles, including transmission poles north and south of the proposed Strander extension., will also be located. Topo for United Pacific Railroad (UPRR) embankment and tracks, with elevations of top of both rails, for 1,000 feet north of, and 1,000 feet south of, the crossing of Strander. Track survey shall be at 50 -foot intervals in curves and 100 -foot intervals in tangent track. City of Tukwila BergerABAM, P14.0347.00 Strander Blvd/SW 27th St Extension September 2017 Tukwila, Washington E—xhibit A-) Page 11 of 60 49 Figure 2. City of Tukwila BergerABAM, P14.0347,00 Strander Blvd/SW 27th St Extension September 2017 Tukwila, Washington Exhibit A-1 Pagc 12 of 60 ME • Topo BNSF Railway(BNSF) undercrossing, (abutments, low chord, top of track, and roadway features below), as well as embankment and top of both rails for 100 feet north and 1.00 feet south of undercrossing. • Buildings and structure envelopes and fence envelopes for areas secured by fencing. • Striping and channelization for existing roadways, West Valley Highway and businesses with limits shown in Figure 2. • Concrete, asphalt, gravel, curbs, paths, • Drainage courses, swales, • Inlet and outlet of found culverts, including those shown in Figure 2. • Visible utilities and painted underground utility locations marked by a utility location company. • Up to 40 potholes (20 by APS and 20 by Olympic Pipeline), • Ground elevations and all breaklines sufficient to create ]-foot contours, • Trees 6 inches Dl3H and larger. • Pipe invert elevations and descriptions of storm/sanitary sewer structures. • Locate Ordinary High Water Mark along the Green River from Strander Boulevard to 200 feet south of the southern outfall. • SUBCONSULTANT will apply for a UPRIZ "PERMIT TO BE ON RAILROAD PROPERTY FOR NONINTRUSIVE CIVIL ENGINEERING SURVEY." CITY will assist, if necessary, in obtaining this permit. • SUBCONSULTANT will obtain UPRX and BNSF badges, as well as obtain adequate railroad insurance prior to entering railroad property. Subtask 4.3 Utility Locate Services The SUBCON SULTANT will provide underground utility location information on existing site condition documents, A private utility locating company will be utilized to initiate utility marking with 81, 1, Utility Locate Services and to mark-, utilities not covered by the 811 service. All utility marks will be located as part of the topographic survey. Subtask 4.4 Right -of -Way and Parcel Resolution SUBCONSULTANT will resolve existing ROW and adjacent parcel boundaries and existing easements on the adjacent parcels within the project area. It is estimated that 22 title reports will City of Tukwila BergerABAM, P14 0347.00 Strander Blvd/SW 2701 St Extension SLpteniber 2017 Tukwila, Washivigton Exhibit A-3 Page 13 of 60 51 be needed to determine the CITY's ROW boundaries, as well as determine potential ROW acquisition areas, easements, and permits. ROW and boundary resolution that was performed for previous phases of the project will be utilized and expanded upon to generate a ROW base rnap for the project. Subtask 4.5 Easements and Exhibits SUBCONSULTANT will prepare and deliver legal descriptions and exhibits for up to 22 parcels (ownerships) for ROW takes and easements. Up to 40 easements (temporary or permanent) and exhibits will be prepared with up to three revisions per parcel. Subtask 4.6 Wetlands and Pond SUBCONSULTANT will map the detention pond and adjoining wetlands as Shown as areal in Figure 2. Mapping will include two days of a three-person crew (or three days of a two -person crew), for locating wetland flags as set by others. Assumption(s) • SUBCONSULTANT shall obtain title reports with underlying documents for up to 22 parcels. • SUBCONSULTANT shall obtain right -of -entry (ROE) for U]"RR and BNSF properties, • SUBCONSULTANT will coordinate access and entry onto railroad properties. • SU13CONSULTANT cannot warranty that adequate access to any properties will be granted and will notify the CITY if problems with access are experienced. • ROE to 22 adjacent properties will be required and obtained by the CITY. SUBCONSULTANT will coordinate and schedule work with the client and CITY to ensure proper notification of property owners. * 'Traffic control, if required, to be provided by SUBCONSULTANT. * Tree tags and driplines are not a part of the scope of services. • Wetland and OFIWM flags to be set by others. Sketched maps of the wetland and OHWM flag locations will be provided to SUBCONSULTANT prior to the wetland mapping. The estimate for wetland flag locating is for three 8 -hour days for normal two -person crew- • Estimate for potholes is an estimate only and may change based on actual costs, including potholing OPL pipelines, SUBCONSULTANT has no control over this work or the price for this work and does not warranty either the price or the quality of the work itself. • Estimate for underground utility locates is subject to change, SUBCONSULTANT has no control over this work or the price for this work and does not warranty either the price of the quality of the work itself. City of Tukwila BergerABAM, P14.0347,00 stranger Blvd/SW 27th St kxtension Septcmbt,,�r 2017 Tukwila, Washington rExiiibit A-1 Pap 14 of 60 52 Price for title reports is an esfirnate only. SUBCONSUTLANT has no control over this price. It may be higher. Deliverable(s) Topographic survey and ROW base rnap (electronic copy), I -foot contour intervals • AutoCAD surfaces (DTM Files) (electronic copy) Copy of field survey books (electronic copy) ASCII file of control points Construction control plans City of Tukwila aergerABAM, 1`14,0347,00 Strander Blvd/21M 27th St Extension Sopturnber 2017 Tukwila, Washington Exhibit A-1 Page 15 of 60 53 TASK 5.0 UTILITIES The CONSULTANT shall coordinate with the utility companies during the conceptual design process in order to determine the necessary impacts to their systems, staging alternatives, upgrades to utilities, and to assess any utility relocation costs. Subtask 5.1 Existing Utility Data The CONSULTANT shall contact all utilities within the corridor to obtain and review available as-bullts and construction record drawings for the existing utilities, A private utility locate service will determine the location of all the underground utilities. This work is included in Task 4 - Surveying and Base Mapping, As -built information and other information obtained from the utility companies will be incorporated into the project base map. The CONSULTANT shall provide the CITY with an AIWA color -coded Existing Utility Map Exhibit. Utilities known to exist in the project area, and anticipated to be affected by construction of the project include the following. # Olympic Pipe petroleum gas lines (12 -inch and 14 -inch) 9 PSE overhead power (transmission and distribution) * PSE substation • Fiber optic (AT&T, Level 3, and Sprint located in UPRR ROW) • King County sanitary sewer • Sixty -inch Seattle Public Utilities (SPU) waterline to the north, perpendicular to UPRR. Affected by shoofly • 'Utilities in vicinity of West Valley, including PSE gas comrriu�nications, and water, sewer, and power services, all of which may or may not be affected • City of Renton lighting system installed August 2017 (located along north side of sidewalk from BNSF to intersection of Naches Avenue) The CONSU LTANT shall identify options for maintaining sewer service during the project and for relocating or replacing the permanent utilities, The following research work will need to be completed for this task, Collect and review available paper and electronic as-builts and construction record drawings for the existing utilities and associated equipment, including valves, structures, and other features. • Collect and review available sanitary system masterplan, hydraulic model, and any reports from King County, with an emphasis on the design criteria used for the existing sanitary force main line. City of Tukwila bergerABAM, P]4,03VAI Strander Blvd/SW 27th St ExtenMon September 2017 Tukwila, Washington Exhibit A-1 Page 113 of 60 54 Deliverable(s) * Draft existing utility map exhibit (color 34x22 roll plot) Subtask 5.2 Preliminary Coordination with Utilities The CONSULTANT will facilitate the coordination efforts with both the public and private utilities within the corridor. The CONSULTANT will coordinate directly with the utility companies. The CONSULTANT shall attend a utility kick-off coordination meeting with each of the utility companies, which will be held at the CITY- The CONSULTANT will endeavor to reduce the number of meetings by meeting with more than one at a time. ''lie purpose of the kick-off meeting is to inform them of the project, discuss impacts to the utilities based on the preliminary concepwal construction staging, discuss utility upgrades, determine existing utility easements, and to get initial feedback on the utilities' concerns and their anticipated level of effort for the project-, Based on utility company feedback from the utility coordination meeting, the CONSULANT shall develop utility construction staging and relocation concepts. The concepts will be incorporated into the draft utility relocation/protection conceptual design for CITY and utility review. All comments will be consolidated into a single set of comments by the CONSULTANT, As part of the effort described above, the CONSULTANT will facilitate one additional coordination meeting with each of the utility companies, which will be held at the CITY. The purpose of this coordination meeting is to present the proposed utility relocation plan and to get final feedback on the utilities' concerns and their anticipated level of effort for the project. Because it may not be possible to have all the utilities present at one time, an allowance has been made for at least one separate rilecting with each utility. It is assumed the respective utility owners will provide timely concurrence on relocation plans for all utilities and will provide design of the relocation. to the CITY and CONSULTANT in subsequent phases of the project, The CONSULTANT shall assist the CITY in preparing any necessary agreements by providing a memorandurn, documenting proposed relocation plans and including meeting minutes and other correspondence generated by the utility coordination effort. Assumptions(s) • Final utility relocation/protection conceptual design will be used by the CITY in their Utility Memorandum of Understanding. Deliverable(s) * Draft utility relocation/protection conceptual design (1IxI7 electronic copies) — Construction phase relocation/protection — Final condition relocation/protection City of Tukwfla Strander Blvd/SW 27th St Extension Tukwila, Washington BergerARAM, 1114-0347,00 5eptemb", 2017 Exhibit A-1 Page 17 of 60 55 # Consolidated comments (Excel electronic format) Final utility reparation/protection conceptual design (11xl7electronic copies) — Construction phase relocation/protection — Final condition relocation/protection Subtask 5.3 Coordination with Utilities for Final Design The CONSULTANT shall. attend. two meetings with utility representatives and the CITY, one before and one after the preliminary design (30 percent PS&E) submittal, Decisions from these meetings will be documented in the meeting minutes and incorporated into the plans, The CONSULTANT will provide exhibits and the minutes for these meetings. Meetings for the water main and sanitary sewer force main will be held separately and are included under Subtask 53, Assumptions(s) • Two utility coordination meetings, • One round of comments from CITY and utilities on the preliminary design submittal, • CONSULTANT will compile comments from utilities into the utility coordination log. Deliverable(s) Consolidated set of utility comments for the preliminary design submittal in MS Excel format * Meeting minutes in MS Word electronic format • Hard copy of plans (11x17) for cacti individual utility at each irteeting and a full-size set for use in discussions at each meeting • Hard copy roll plot (22x34) depicting all utility relocations will be provided to each utility at a 30 percent design level Subtask 5.4 SPU Waterline Monitoring Plan The CONSULTANT shall propose a plan to the CITY to monitor SKUs waterline for settlement or other movement. Deliverable(s) * One PDF of a draft waterline monitoring plan # One round of comments from King County and CITY on the preliminary design submittal CONSULTANT will compile comments from CITY and King County into the utility coordination log • If applicable, the CONSULTANT will coordinate and obtain written concurrences from the County on any requested deviation from the County's standards prior to the beginning of construction of the Interceptor Adjustment Work City of'rukwila &rgerABAM, P1,0347.00 Strander 13]vd/SW 27th St Extension September 2[7't7 Tukwila, Washingtoii Lxhibit A-1 Va p ,e 18cif 60 .19 Dellverable(s) Consolidated set of sanitary sewer comments for the preliminary design submittal in MS Excel format 9 Meeting minutes in MS Word electronic format Subtask 5.5 King County Sanitary Sewer Relocation A new sanitary sewer pump station will be required to divert flow from a portion of a King County owned sanitary sewer trunk line that will be impacted by this project, The CONSULTANT shall present options to relocate the King County sanitary sewer interceptor (between existing County Manhole No. R-18-16 located at the northwest corner of the Tukwila property and intersection of Southwcst 2701 Street/Naclies Avenue). The CONSULT AN"I'shall coordinate with King County on the route and document decisions agreed to in meeting minutes. It is assumed King County will design the relocation and provide final plans, specifications, and estimates to the CONSULTANT to include in the construction contract for the Strander Boulevard/Southwest '7th Street Extension project. Key components of the relocation. design will include duplex submersible solids handling pumps, wet well, valves, valve vault, discharge piping, controls, CMU block building to house the controls, and standby generator. The wet well and valve vault will be precast concrete. It is assumed that King County will evaluate the need for odor and corrosion mitigation and incorporate required mitigation into the design if deemed necessary. Deliverable(s) * Meeting mmittes documenting design coordination with King County City of'rukwfla BergerABAM, 1'14,0347,00 Strander Blvd/5W 27th St Extension Septembox 2017 Tukwila, Washington Exhibit A-1 Page 19 of 60 57 ff-mm-mi'miiiiiiiii i lF 11 l5l1'i1ll1!;11l!11 1� 1� i !';l :;1�lli . I k 1. 0 Subtask 6.1 Develop Assumptions and Methods for Traffic Analysis SUBCONSULTANT (hereinafter referred to as SUBCONSULTANT), under separate subconsultarit agreement with CONSULTANT, will collect, review, evaluate, and synthesize prior traffic analyses prepared for the Strander Boulevard extension and other projects in the study area (Northwest Arena DEIS, Southcenter Subarea Plan EIS, Transportation Element Update, etc). Ii -i addition, SUBCONSULTANT will coordinate with part -net agencies/jurisdictions to understand expectations for the project. The primary purpose of this task will be to gather additional background information required to complete the traffic analysis and design of the extension project. Specific tasks include the following. * Coordinate with WSDOT, Renton, and Tukwila to obtain and review relevant traffic studies. Review the analyzed scenarios, including traffic forecasts and horizon years associated with phasing the project. Coordinate with the CITY to determine the roadway cross section and active transportation access needs to analyze in Phase 3 and the appropriate horizon years to analyze. Deliverable(s) • Surnmary of prior reports/studies • preliminary construction cost estimates for anticipated signal modifications Subtask 6.2 Traffic Study/Operation Analysis for Environmental Documentation and 30 Percent Design SUBCON' ULTANT will prepare a traffic study to verify the intersection/roadway georrietrics that satisfies environi-nen(A documentation requirements, This process will consist of the following. PM peak period traffic counts and traffic signal timing plans will be collected within the study area that will be defined as part of Phase 3. For the purpose of budgeting, it is assured that the following intersections will be analyzed. • Strander Boulevard and West Valley Highway • South 180th Street and West Valley Highway • Southwest Grady Way and West Valley 1-fighway • Strander Boulevard and Andover Park West • Long ,acres Way and West Valley Highway • South 156th Street and West Valley Highway • Fort Dent Way and Interurban Avenue South • Strander Boulevard. and Naches Avenue SW 0 Strander Boulevard./Southwest 27th Street and Oakesdale Avenue SW city of Tukwila Strander Blvd/%W 27th St Extension Tokwila, Washington BergerABANI, P14.0347.00 September 2017 EMiNt A-1 Page 20 of 60 .IQ Relatively recent traffic counts during the PM peak hour may have been collected as part of the Northwest Arena EIS project, To the extent that relevant traffic counts are available, those counts will be used. Twenty -four-hour tube counts with vehicle classification and average speed for up to 20 locations will also be collected for the noise and air quality analysis. The rationale behind the relatively large study area is to understand how traffic patterns will shift with the completion of the Strander Boulevard extension, understand if any traffic signal timing modifications are warranted at nearby intersections, and to fully capture the potential environmental impact,,; of the new traffic pattern. TrafficOperations Analysis PM peak hour intersection level of service will be evaluated for the above intersections according to the Highway Capacity Manual 2010 standards, Traffic operations will be evaluated using Synchro/SimTraffic software. Scenarios evaluated include existing conditions, the design concept-, and future no -action scenarios. A field visit during the peak hours will be conducted to verify model results. Operations will be evaluated for existing conditions, year of opening, and a horizon year determined through coordination with CITY' staff, The build and no -build scenarios will be evaluated for the opening and horizon year. One option for the horizon year analysis is to increase traffic volurries until the interim design begins to experience level of service degradation. Based on growth rates from the City of Tukwila Travel Demand Forecasting model, a "year of failure" can be identified to determine at which point the full widening project would be warranted. Traffic signal warrants will be prepared for the Strander Boulevard/Tukwila Station Access Road loop ramp intersection for submittal with the traffic signal permit. SUBCONSULTANT will complete the traffic signal permit and submit to WSDOT for review. They will address WSDOT comments and process the permit for approval. SUBCONSULTANT will prepare a traffic signal warrant analysis in accordance, with the procedures stated in the WSDOT Design Manual, July 201.7, and the current MUTCD. The future no -action scenario is included for environmental documentation purposes. As an. optional task, additional scenarios can also be evaluated to determine potential design modifications to accommodate events at the Northwest Arena. 'the new traffic operations analysis and findings will be incorporated into an update of the Technical Transportation Discipline (TDR) report completed in 2004. The TDR update will utilize the Traffic Study Report and will only include the build. alternative and no -build alternative at opening and horizon year. Minimal budget and effort are included. The scope and budget include reforecasted future traffic volumes and growth rates using data from the City of Tukwila BergerABAM, P14.0.347.00 Strander BIWISW 27th St Extension September 2017 Tukwih, Washington 8xhibit A -I Page 21 of 60 �-g Traffic Study Report. SUBCONSULTANT will also refine impacts to rail, transit, trail, and freight. Additional data will be documented for the build and no -build scenarios to Support the noise and air quality analysis. This includes documenting assumed roadway characteristics, vehicle speeds, vehicle classification, traffic volumes, and traffic signal characteristics. Recognizing that this project will seek competitive grant funding, SUBCONSULTANT will also propose a greenhouse gas (GHG) emissions/vehicle-miles of travel analysis. This type of analysis can demonstrate how reduced congestion and less circuitous vehicle circulation can reduce vehicle emissions and improve area connectivity. Deliverable(s) * 'Merno describing the traffic analysis methods and assumptions # Traffic Study Report 9 intersection/signal/cliatinelization design recommendations * Coordination to incorporate traffic analysis into environmental noise and air quality analysis o Focused updated 'Transportation Technical Discipline Report * WSDOT traffic signal permit * WSDOT/NIUTCD signal warrant analysis Subtask 6.3 Preliminary Illumination and Signal Design (30 percent PS&E) SUBCONSULTANT will prepare -30 percent design plans and construction cost estimates for illumination within the project area, a traffic signal modification at the Strander Boulevard/West Valley Highway intersection, and traffic signal installation at the Strander Boulevardrrukwila Station Access Road loop ramp intersection. It is assumed that others will provide the as -built design plans and geometric base drawings. As part of the design process, a site visit will be conducted to verify existing conditions, including observable utility locations, sight lines, traffic detection infrastructure, and existing signal and illumination equipment. The 30 percent plans will identify required changes to signal phasing, existing traffic signal equipment, and proposed signal and lighting equipment locations. The plans will also help to identify potential impacts to ROW and to determine if other design measures are needed to accommodate the project. SUBCONSULTANT will develop construction cost estimates based on the 30 percent design plans, SUBCONSULTANT will address one round of comments from the CITY and submit revised 30 percent plans and estimates. City of Tukwila Berger ARAM, P14.0347,00 )trander Blvd/SW 27th St Extension September 2017 Tukwila, Washington Exhibit A-) Pagc 22 of 60 ME Dellverable(s) 4 Thirty percent plans and construction cost estimates for signal modification at Strander Boulevard/West Valley Highway, signal installation at Strand( -.-,,r Boulevard/Tukwila Station Access Road loop ramp intersection, traffic signal installation at Strander Boulevard/Naches Avenue, and illumination within the study area (on Strander Boulevard between West Valley Highway and Naches Avenue, the new pedestrian bridge, the new vehicular bridge over Strander Boulevard, and the UPRR bridge) Subtask 6.4 Final Illumination and Signal Design (60, 90, and 100 percent PS E) SUBCONSULTANT will prepare final plans, specifications, and construction cost estimates for illumination within the project area, a traffic signal modification at the Strander Boulevard/West Valley Highway intersection, and traffic signal installation at the Strander Boulevard/Tukwila Station Access Road loop ramp intersection. 'rho design will also include traffic signal interconnect ort Strander Boulevard from West Valley Highway to Naches Avenue, It is assumed that the soil bearing pressure for traffic signal foundation designs will be provided to SUBCONSULTANT by others. It is anticipated that submittals will be required at 60, 90, and 100 percent completion levels. The construction cost estimates will be updated for each submittal. SUBCONSULTANT will address one round of comments from the CITY for each submittal. SUBCONSULTANT will prepare a Public Interest Finding (PIF) Form if proprietary traffic signal or illumination equipment is required. They will submit the PIF to WSDOT for approval, Deliverable(s) Sixty, 90, and 100 percent plans, specifications, and construction cost estimates for a signal modification at Strander Boulevard/West Valley Highway, signal installation at Strander Botilevard/Tukwila Station Access Road loop ramp intersection, and traffic signal at Strander Boulevard/Naches Avenue, and illumination within the study area (on Strander Boulevard between West Valley Highway and Naches Avenue, the new pedestrian bridge, the new vehicular bridge over Strander Boulevard, and the UPRR bridge) * Public Interest Finding (PIF) Form for WSDOT approval. of proprietary signal and illumination equipment Anticipated drawing list: Traffic signal plans for the three intersections described above - 5 sheets/each for a total of 15 sheets - Traffic Signal Plan - Traffic Signal. Wiring Schedule and Breaker Schedule - Traffic Signal Wiring Diagram Traffic Signal Standard Detail Chart Traffic Signal Input File Layout Illumination Plan - I sheet City oi-Nikwila BergerABAM, P14.0347.00 Strarider Blvd/SW 27th St Extension September 2017 TuAwfla, Washington Exhibit A-1 Page 23 of 60 61 TASK 7.0 RIGHT-OF-WAY PLANNING AND PROJECT FUNDING ESTIMATE Subtask 7.1 Local Business Access Design This task involves engineering, design, and coordination required to reconfigUre, access to the Taco Bell and Jack -In -the -Box restaurant,,; located at the intersection of Strander Boulevard and West Valley highway. This work may involve potential revisions to the parking configuration at a conceptual design level.The level of effort for this task assumes up to three meetings each with these businesses; one to confirm operations, a second to present potential solutions, and a third follow-up meeting, if required, to be determined in consultation with the CITY.This work is to be completed in coordination with the roadway design effort described in Task 14. Assumptions(s) * One round of CITY review comments Deliverable(s) • Preliminary conceptual design of revised access to Taco Bell and Jack- in- the- Box, required modifications to parking, and other changes as may be agreed to with each business • Conceptual design to be included in the 30 percent plans Subtask 7.2 Right -of -Way Plan ROW required for the project has not yet been determined. For the purpose of budgeting this task, the CONSULTAN,r has assumed a minimal level of effort for coordinating with potential affected property owners. It is assumed that any significant effort required to address property owner concerns, as required to facilitate the acquisition process, would be provided as supplemental service during the ROW acquisition phase of the project. It is assumed that ROW plans will not be required to support the preparation of the Project Funding Estimate (PFE). It is assumed that up five ROW drawings/exhibits will need to be prepared, in WSDOT required format, to illustrate the project's ROW needs and impacts. Deliverable(s) * Coordination meeting minutes * ROW drawings/exhibits as required to support the preparation of the PFE Subtask 7.3 Project Funding Estimate The CONSULTANT will identify real property rights (perrnanentand temporary) required for the project and evaluate the potential acquisition impacts as they may relate to preliminary ROW acquisition costs and timeline to complete the ROW acquisition process. Based on the work described above, the CONSULTANT shall prepare a Project Funding Estimate (PFE) to be used to obligate ROW funds. 9ER00-1am Abeyta (hereinafter referred to as SIJ BCONSULTANT), under a subconsultant agreement with CONSULTANT, shall perform the following services. City of Tukwila BergerABAM, P14,0347_00 Strand Blvd/SW 27th St Extension September 2017 Tukwila, Washington Exhibit A-1 Page 24 of 60 62 This scope of work entails Pre-acquisition services for the construction of the Strander Grade Separation Intersection Project. These services will be furnished inaccordance with city, state and federal guidelines and regulations, including the policies and procedures of the Uniform Relocation Act. The overall ROW acquisition objectives are * Prepare a PFE report # Provide support to CONSULTANT and the CITY in preliminary evaluation of property acquisition impacts A specific list of performance objectives is outlined in the following paragraphs, Specific Objectives The key objectives for this project include the following. Inspect and prepare a preliminary survey report for each parcel (22 parcels) 1 Provide a PFE/AOS report with WSDOT approval — a total of 22 parcels 1 Provide support to CONSULTANT to evaluate schedule, financial, and risk estimates for obtaining real property acquisitions, including appraisal and valuations for possible property acquisitions to support cost estimates — a maximum of 20 hours Assumption(s) • ROW needs will be provided by CONSULTANT • CONSULTANT will provide direction that defines, the level of effort for requested support • CONSULTANT will coordinate property research with SUBCONSULTANT Deliverable(s) • PFE (draft and final) • Electronic versions of all documents as compiled PRFs and two hard copies Deliverable(s) e Preliminary cost estimates for anticipated ROW acquisitions and easements. Input to the project schedule regarding the timeline for completing and certifying the project ROW * PFE for completing the ROW acquisition Subtask 7.4 Right -of -Way Acquisition These services are not included in the scope of work. ON of'rukwila Strander Blvd/SW 271h St Vxlelltiiori Tukwila, Washington BergerABAM, 1114,034700 September 2017 Exhibit A-1 Page 25 of 60 63 TASK 8.0 ENVIRONMENTAL DOCUMENTATION AND PERMITTING (Widener & Associates) Currently, the project has yap proved NEPA and SERA documentation. However, this documentation needs updating, and the project's NEPA and SEPA determinations need to be updated, prior to the next federal action. Widener & Associates (hereinafter referred to as SUBCONSULTANT), under a separate subconsultant agreement with CONSULTANT, will provide design assistance and early agency coordination during Phase 3 of the project. Early input into the foririation of project alternatives will be provided to ensure each alternative includes provisions to minimize impacts to the surrounding environment. This coordination within the various design elements of the project will identify and incorporate rninimization measures early in the alternative development phase of the project and will ensure that an appropriate range of stormwater and groundwater management alternatives are developed prior to agency coordination. Task 8 requires the following tasks to document the reevaluation of the project's currently approved NETIA and SEPA documents, Depending on the outcome of updated traffic modeling, amendments/supplements to existing environmental documentation will be required for noise, air, Section 106, wetlands and wetland bank use, hazardous materials, and CITY permits. New docurnents are required for the biological assessment (BA), the Joint Aquatic Resource Permit Application (JARPA), and environmental justice. Subtask 8A Design Assistance and Early Agency Coordination The CONSULTANT, with assistance from SUBCONSULTANT, will assist the CM in presenting the alternatives to both the state and federal permitting agencies to identify the regulatory issues associated with each alternative. Potential minimization measures for each alternative will also be identified during the coordination with agency representatives- All permitting issues and the recommended perri-vitting process for the preferred alternative will be documented in the project design report. It is assurned that this effort will be accomplished with graphics and design drawings required to complete the design report and to conduct the open houses, and that no other special presentation materials are required. Deliverable(s) SUBCONSULTANTwill prepare meeting minutes and memoranda documenting the coordination activities with state and federal agencies, as required Subtask 8.2 Prepare the Area of Potential Effect (APE) The CONSULTANT will coordinate with SUBCONSULTANT and provide support for updating the APE if required. Deliverable(s) o Draft APE for the project City of Tukwila BergerABA M, P1 4.0347 00 Strander 131vd/SW 27th 51, f-,xtansion September 2017 Tukwila, Washington Exhibit A- I Page 26 of 60 M] Subtask 8.3 Section :106 Report (Cultural and Historic Resources) This work would include the preparation of the Section 106 report amendment in accordance with the State Historic Preservation Office standards and guidelines for any new areas that maybe impacted. The work will include the following. Pertinent literature on the archaeology, ethnography, and history of the project area will be reviewed to determine the existence of archaeological sites and to refine the probability of archaeological resources and traditional cultural places in the project areas. 2, The SUBCONSULTANT will maintain contact with the local tribes for any information on historic Indian USO of the project area. 3a A systematic field reconnaissance will be conducted to identify previously recorded and/or unrecorded. archaeological sites for the proposed project where ground - disturbing activities are expected to take place. Field reconnaissance will consist of the traverse of pedestrian transects at varying intervals, depending on, terrain throughout the proposed project area. Shovel probes (digging a hole with a shovel) will be excavated, as deep as feasible, and in areas expected to have a high probability for cultural resources. Shovel probes will be augmented through auger probes to explore the deepest possible deposits. Shovel probes will be screened in highly probable areas and in soil matrixes too dense to identify small chipping debris. 4All new sites will be mapped, photographed., and recorded on Washington State Archeological Inventory forms and submitted to the state Office of Archeological and Historic Preservation (OAHP) for Smithsonian numbers. Every effort will be made to include Tribal cultural resources personnel in assisting the field effort. Rights -of -entry will be provided by the CITY. Deliverable(s) a Three copies of a draft Section 106 Report will be prepared to describe cultural resources identified in the project area to meet state and federal standards for reporting as outlined in the guidelines provided by the OAHP. The report will include summary background information appropriate to a cultural resources assessment of the project area, including environment, previous cultural resources studies, othnography/ethno, history, and history. A discussion of agency and Tribal consultation, methodology, the results of the investigation, and a map of located archaeological sites will be provided. Recommend a tions will also be extended to any cultural resources that may be significant. Monitoring of construction excavation recommendations may also be included. The historic structures inventory form and/or archaeological site inventory form will be attached to the report as an appendix Three copies of a revised draft Section 106 report incorporating ', CITY comments & Three, copies of a final Section 106 report incorporating WSDOTcomments City of Tukwila Bergei-ABANI, P14-034700 Strander Blvd/SW 27th St Wension September 2017 Tukwila, Washington Exhibit A-1 Page 27 of 60 65 Subtask 8.4 Noise Study The SUBCONSULTANT will prepare a traffic noise report to evaluate traffic noise levels at sensitive receptors near the project that would be poteritially affected by traffic noise and to identify potential mitigation measures. The traffic noise report will be developed in accordance with WSDOT's Environmental Procedures Mantial- Sound Level Measurements After review of the proposed project alternatives, the SUBCONSULTANT shall visit the project area to identify potentially sensitive noise receivers and to take measurements of existing sound levels. The SUBCONSULTANT will measure existing noise levels during the peak hours to be used in calibrating the noise model. Measurements will be undertaken in accordance with WSDOT and Federal Highway Administration (FHWA) guidelines, and will be made with Type 1, sound level meter. During these measurements, souroes, of existing noise and topographical features will be noted and traffic speeds and vehicle numbers and mix will be noted. Construction Noise Impact Evaluation The noise analysis will evaluate potential short-term impacts of noise from construction activities. Construction noise on nearby sensitive receptors will be evaluated based on estimates published by the U.S. Environmental Protection Agency (EPA) of maximum noise levels of typical construction equipment in conjunction with simple distance attenuation, Computer modeling of construction noise levels will not be performed. Traffic Noise Impact Evaluation The SUBCONSULTANT will evaluate traffic noise impacts using the FHWA Traffic Noise Model (TNM) to estimate future traffic noise levels for the worst-case build alternative. The worst-case, scenario will be selected from among the build alternatives, and will be chosen based on expected future traffic Volumes and the location of the alignment relative to sensitive receivers. The noise modeling will predict PM peak -hour L,eq noise levels frorn traffic at a maximurn of 15 receptor locations that could be affected by the proposed project and will consider existing conditions and design year conditions. Modeling to calculate noise contour lines is not included, Mitigation Analysis The SUBCONSULTANT will identify mitigation measures to reduce noise levels during construction. If predicted long-term traffic noise levels from operation of the project would cause noise impacts, mitigation measures will be developed in cooperation with the lead agency and design engineers. Mitigation analysis, if required, will include evaluation of the effectiveness and general size and location of natural and man-made noise barriers using the TNM model. Deliverable(s) Three copies of a draft traffic noise analysis report for review by ary witti accompanying draft special provisions if required City of Tilkwila fiergerABAM, P14.Cl347,00 Strander Blvd/,;W 27th St Extension 5pptembar 2017 Tukwila, Was iington Exhibit A-1 Pap 28 of 60 66 Three copies of a draft traffic noise analysis report, incorporating the CITY's comments, for submittal to FHWA/VVSDOT Three copies of a revised draft traffic noise analysis report, incorporating comments by FHWA/WSDOT, for submittal for approval Subtask 8.5 Hazardous Material Memorandum The SUBCONSUTANT will prepare a hazardous materials memo to evaluate the presence, or likely presence, of potential hazardous substances within the physical kraits of the project that would have an effect on the overcrossing project. Sites with potential for environmental issues/impacts include those that indicate current or past uses as service stations, battery shops, dry cleaners, chemical storage, or manufacturing facilities; sites with fuel or chemical storage tanks or drums present; or those with strong pungent or noxious odors, The scope of services for this study will include A review of the results of a federal, state, and local environmental database search provided by an outside environmental data service for listings of known or suspected environmental problems at the sites or nearby properties within the search distances specified by WSDOT. 2. A review of historical aerial photographs, fire insurance maps, city directories, chain -of - title reports, and tax assessor records, as available and appropriate, to identify past development history on the parcels relative to the possible use, generation, storage, release, or disposal of hazardous substances. An attempt to identify uses of the sites from the present to the time that records show no apparent development of the site, or to 1940, whichever is earlier. Conduct of a visual reconnaissance of the parcels and adjacent properties to identify visible evidence of potential sources of contamination. 4. A letter report that will summarize the results of this study- The letter report will briefly discuss the project activities and include a table ranking the parcels (low, moderate, high) by their potential for contamination from either on-site or off-site sources, A draft letter report will be provided for review and comment, Upon receiving comments, the letter will be modified as appropriate and made final. Deliverable(s) • Three copies of the draft hazmat memo will be provided • Three copies of the hazmat memo will be provided incorporating CITY comments • Three copies of the final hazinat memo will be provided incorporating WSDOT/FHWA comments if required. It is assurned that WSDOT/FHWA corrunents will not alter the basic conclusion of the documentation or require further alternative studies City of Tukwlta Strander Blvd/SW 2711t St Extension Tukwila, Washington bergerABAM, P14,0347 DO September 2017 Exhibit A-1 Pap 2) of 60 67 Subtask 8.6 Biological Assessment (BA) A BA (NO EFFECT LETTER) will be prepared for the preferred alternative in accordance with WSDOT guidelines. The following subtasks will be undertaken in preparation of the project BA (NO EFFECT' LETTER). Collect available documentation concerning the project activities and pertinent biological information. Biological information will include priority habitat and species data from thea Washington' State Department of Fish and Wildlife, along with rare plant and high-quality ecosystem data from Washington State Departrnent of Natural Resources (WDNR). This information will be reviewed and a consultation strategy will Be developed, Check with United States Fish and Wildlife Service (USFWS) and National Oceanographic and Atmospheric Administration (NOAA) Fisheries to verify lists of endangered, threatened, proposed, and candidate species. 3. Conduct a field reconnaissance to investigate on-site habitat conditions. 4. Make telephone contact with the appropriate resource agency staff for input on species occurrence, habitat use, and potential project impacts. Prepare a draft BA (NO EFFECT LETTER) addressing listed species, proposed species, candidate species, species of concern, and critical habitat. The BA (NO EFFECT LETTER) will include a project description, a list of species, a description of the species and their habitat, an analysis of project effects, and mitigation recommendation,-,. Provide the draft B.A (NO EFFECT LETTER) to the CITY for review and approval. 7. Revise the BA (NO EFFECT LETTER), as appropriate, and submit the final BA (NO EFFECT LETTER) to wsr)ar for their approval- Deliverable(s) * One electronic copy of a draft BA (NO EFFECT LETTER) for review by CITY One electronic copy of a draft BA (NO EFFECT LETTER), incorporating the CITY's comments, for submittal to WSDOT 9 'Three copies of a final BA (NO EFFECT LETTER) that incorporates WSDarcornments Subtask 8.7 Air Quality Analysis The purpose of the air quality report is to identify any significant impacts and necessary mitigation measures, and to determine conformity with pertinent air quality rules, The air quality modeling assessment will meet the requirements of federal and state conformity regulations and the procedures in EPA's Guidelines for Modeling Carbon Monoxide from Roadway Intersections (1992), and will provide a project -level conformity determination for the project. City of Tukwila BergerABAM, (14,0347.00 Strander Blvd/SW 27th St Extension Septernbcr 2017 Tukwila, Washington Exhibit A-1 Pago 30 of 60 68 I After review of the proposed project alternatives and the results of the traffic analysis, the SUBCONSULTANTwill select intersections for project -level air quality modeling. 'rhe SUBCONSULTANT will visit the project area to assess the presence of potentially sensitive receivers and to measure the physical parameters of the selected intersections. 2. Traffic Impact Evaluation: The SUBCONSULTANT will conduct an air quality impact analysis using approved regulatory models and modeling techniques, This analysis will include use of the latest MOBILE series emission factor prediction model and Version 2 of the CAL3QHC dispersion model. In this process, the SUBCONSULTANT will coordinate as necessary with the appropriate regulatory agencies. Tile modeling will calculate carbon monoxide (CO) concentrations near each intersection for the following scertarios: (1) existing conditions; (2) opening and design year no action; and (3) opening and design of the build alternative. Mitigation Analysis: In the event the impact analysis modeling indicates the project would cause significant air quality impacts, it will be necessary to quantitatively consider mitigation measures for each of the intersections where impacts are expected. For purposes of estimating a budget, the STJBCONSULTANT will assume modeling mitigation measures are necessary at all four affected intersections for the worst-case of the build alternatives,, and will allow one day for the iterative process of WASIT or CAL3QHC and available traffic modeling. 4. Air Quality Technical Study: The SUBCONSULTANT will prepare a draft technical air quality report to document the methods and the results of the impact and mitigation analyses, and to provide a conformity statement for the project. The CITY will review the draft report and prepare consolidated comments, The SUBCONSULTANT will incorporate the CITY's comments into a final technical report Deliverable(s) * Three copies of the draft will be provided Three copies of the final air conformity analysis report will be provided to WSDOT/FHWA incorporating CITY comments * 'Three copies of the final air conformity will be incorporating WSDOT/FHWA comments Subtask 8.8 NEPA Environmental Classification Summary Update Service-, will be provided to prepare the ECS form by reviewing technical reports related to the project, applying project -specific data to the form and coordinating approval for the project by both WSD(fr. Deliverable(s) * Three copies of the draft ECS will be provided City of Tukwih Strander Blvd/SW 27th St Extension Tukwila, Washington EtergerABAK VNM47,00 September 2017 Exbibit A-1 Page 31 of 60 W Three copies of the final ECS documentation will be provided incorporating CITY comments Three copies of the final ECS documentation will be provided incorporating WSDOT/ FHW.A comments if required, It is assumed that WSDOT/FHWA comments will not alter the basic conclusion of the documentation or require further alternative studies Subtask 8.9 Wetland and Critical Areas Study The purpose of this report is to identify jurisdictional wetland within the project corridor and critical areas, as well as provide mitigation if necessary. The SUBCONSULTANT will develop, implement, and complete field surveys to identify and delineate wetlands in the project area using the appropriate methods, described in the U.S, Army Corps of Engineers (USACE) Wetlands Delineation Manual (Environmental Laboratory, 1987), Wetlands Research, Technical Report Y-87-1, January 1987. The SUBCONSULTANT will delineate wetlands within 200 feet of the project area. The SUBCONSULTANT will prepare a comprehensive report that includes detailed wetland maps, documentation of survey methods, results, potential impacts from project actions, and recommendations for wetland protection and mitigation. The report also will contain appropriate forms for wetland identification, delineation, and function assessment required by USACE. The information in this report is intended for use in compliance with Section 404 of the Clean Water Act. The final report and associated documents will be in a format acceptable to USACE. Delineated wetland boundaries will be identified on the ground with flagging, The delineated wetland boundaries will, be mapped with accuracy acceptable to USACE. Deliverable(s) An electronic copy of a draft wetland delineation for review by the CITY with accompanying critical areas provisions if required An electronic copy of a draft wetland delineation, incorporating the CITY's comments, for submittal to USACE and DOE An electronic copy of a final wetland delineation, incorporating comments by USACE and DOE Subtask 8.10 Wetland Mitigation Use Plan A wetland mitigation plan will be prepared for the development of the cay owned properties, The plan will be completed to meet the requirements of USACE and DOE, The following subtasks will be undertaken in preparation for the project mitigation use plan. a 1. Condition assessment of the proposed mitigation site. cit},,wrukwiti Berger.ABAK P14.0347.00 Strander Blvd/SW 27th St Extension SeptembOT 2017 Tukwila, Wasliington Exhibit A- I Page 32 of 60 70 Analysis of the proposed impacts and the proposed mitigation site to show how the mitigation site comply with USACE and DOE regulations. 3. Complete a draft of the wetland mitigation use plan which will include a narrative describing the proposed mitigation site, a vicinity map, a plan view and/or detail maps of the proposed mitigation and other informational maps as required by the permitting agencies. 4, Revise the plan based on agency comments Deliverable(s) # Three copies of a draft mitigation use plan for review by the CITY with accompanying draft special provisions if required 'Three copies of a draft mitigation use plan, incorporating the CITY's comments, for submittal to USACE and DOE Three copies of a revised draft mitigation plan, incorporating comments by USACE and DOE Subtask 8.11 SEPA The SUBCONSULTANT shall complete appropriate SEPA documentation, including all needed studies, modeling, and analysis in accordance with State Environmental Policy Act (RCW 43.21C) and SEPA Rules (WAC 197-11). The SUBCONSULTANT will coordinate with the CITY to address comments oil the SEPA Checklist and provide support for the SEPA process. Deliverable(s) * SEl-A Checklist Subtask 8.12 State and Federal Permits SUBCONSULTANT will assemble and organize all necessary environmental permit applications to a standard acceptable by the permitting agencies. Anticipated permits include the following, • Section 404 Permit • Section 401 Permit • Shorelines Permit Permit applications shall include all requested information, such as application forms, all necessary pert -nit drawings, an attachment describing project location, project purpose and need, alternatives considered, and a summary of project impacts. The SUBCONSULTANT shall also provide a draft transmittal letter for submittal of they application by the CITY. Draft applications, including supporting information, shall be submitted to the CITY for review and comment. Revised permit applications shall be provided to the CITY for signature and submittal to permitting agencies. The SUBCONSULTANT shall perform the necessary coordination to obtain the permits. City of Tukwila BergerABAM, P14,0347.00 Strander Blvd/SW 27th St Extension September 2017 Tukwila, Washington Exhibit A-] Page 33 of 60 71 Deliverable(s) • Three copies of the draft JARPA for review by the CITY • Three copies of the revised draft JARPA incorporating CITY comments • Three copies of the final JARPA will be prepared incorporating agency cornment,- Subtask 8.13 CITY Permits SUBCONSULTANT will assemble and organize all necessary environmental permit applications to a standard acceptable by the permitting agencies. Anticipated permits include the following. • Critical Area Permit • Fill and Grade permit Permit applications shall include all requested information, such as application forms, all necessary permit drawings, an attaclirnent describing project location, project purpose and need, alternatives considered, and a summary of project impacts, The SUBCONSULTANT shall also provide a draft transmittal letter for submittal of the application by the CITY. 'Draft applications, including supporting information, shall be submitted to the CITY for review and comment. Revised permit applications shall be provided to the CITY for signature and submittal to permitting agencies, The SUBCONSULTANT shall perform the necessary coordination to obtain the permits. Deliverable(s) • Two draft copies of the permit applications • Two final copies of the permit applications City ofrukwila BergerABAM, P14.0347.00 Strander BlvdISW 27th $t Lxtension September 2017 Tukwila, Wasbington Exhibit A -1 Page 34 of 60 72 TASK 9.0 RAILROAD ENGINEERING AND DESIGN (Hanson Professional Services) Hanson Professional Services (hereinafter referred to as SUBCONSULTANT), under a separate subconsultant agreement with CONSULTANT, will provide the following tasks, Subtask 9.1 Project Coordination Deliverable(s) None. St, BCONSULTANT will manage/administer Task 9.0 and coordinate with others as appropriate for the various project phases. Subtask 9.2 10 Percent Railroad Shoofly Plan 1, Conduct a site review concurrent with the topographic survey and prepare a one-page Field technical rnemorandurn of rail weight, tie type, rail weight transitions, insulated joints, culvert locations, and general observations. The purpose of this item is to collect required track, and tie information and to provide the track designers with first-hand knowledge of the project site, 'Topographic Survey to be provided by others. Prepare 10 percent shoofly track plans suitable for developing an opinion of probable cost of construction ((SPCC), per the requirements stated in the checklist contained in the UPRR'Public Projects — Plan Submittal Guidelines', Rev. 8/04/2017 (available upon request), 10 percent plans will be based on the previous Strander Boulevard project base mapping 1 An OPCC will be developed using current industry track costs and civil costs from WSDOT unit bid prices. See Limitations and Assumptions. Deliverable(s) Brief field technical. memorandum of rail weight, tie type, transitions, photos, and observations # 10 percent shoofly design plans (1lxl7) PDF format # OPCC of construction for 10 percent track plans Subtask 9.3 25 Percent Railroad Shoofly and Phasing Plan 1, Further the 10 percent shoofly horizontal and vertical design to 2_5 percent per the requirements stated in the checklist contained in the LYPRR'Public Projects — Plan Submittal Guidelines', Rev. 8/04/2017 (available upon request). The approximate tasks and plan list to be developed from the UPFR requirements are as follows: — Plans will include responses to the UPPR 10 percent design comments. — Plans will be updated with now base mapping (by others). See Limitations and Assumptions. City of Tukwila bergeiAHAM, P14,0347,00 Strander Blvd5W 27th St Extensic.in Septernber 2017 Tukwila, Washington Exhibit M Page 35 of 60 73 Prepare a phasing plan schematic - (no scale 11x17 — tip to two sheets) and prepare a brief phasing narrative technical memorandum, See Limitations and Assumptions. Shoofly plan and profile( rofile sheets (three sheets) to cover at least 200 feet beyond the end of the shoofly (1"=100' i6 Size 11x17), Shoofly typical section sheets (four sheets) to include continuous stationing, and potential embankment pre -loading (no scale 1107). Curve data sheet with shoofly coordinates (one sheet) (no scale 11x17). Prepare civil/track detail sheet (two sheets) (no scale I1x17). Earthwork model (Civil 3D 2017) by phases in Civil 3D based on UPRR standards and geotechrucal report recommendations. Shoofly cross section sheets (minimal annotation) by phase (12 sheets) (1"=20' 1/2 Size 11x17). — Review geotechnical report for subgrade and slope recommendations. — Provide utility review for UPRR guideline conformance. Utility casing and extension design, is not included in the scope of services. See Limitations and Assumptions, — Design shoofly track to accommodate positive railway drainage. Hydraulic and hydrologic (H&H) analysis and report are not included in this scope of services. See Limitations and Assumptions. — Prepare quantity summary table directly on the plan sheets to delineate those quantity items by contractor and UP' Z. — Prepare an engineering design, technical memorandum to record design methodologies, decisions, and assumptions. — Start preparations of track. specifications — UPRIZ standard construction specifications will be considered the primary specifications for the track construction; however, other technical specifications will be developed as necessary, 2. Update the OP CC for track and embankment to 25 percent level. 3. Prepare PDFs for submittal. 4. Schedule and attend a site visit with a UPRR project representative. Deliverable(s) * Updated phasing plait —schematic format with phasing narrative City of Tukwila BergerABAM, VI 4,0347 00 Strander Blvd/SW 27th St Extension September 2017 Tukwila, Washington Exhibit A-1 Page 36 of 60 74 Twenty-five percent shoofly design plan set Opinion of probable cost of construction for 25 percent track plans Draft 25 percent engineering design technical memorandum 0 Subtask 9.4 30 Percent Railroad Shoofly Plans Update the 25 percent shoofly design plans to 30 percent per the requirements stated in the checklist contained in the UPRR'Public Projects — Plan Submittal Guidelines', Rev. 8/04/2017 (available upon request). This phase will consist primarily of updating the shoofly design plan set from commentary provided by UPRR on the 25 percent submittal and the subsequent UPRR site visit, Deliverable(s) • Updated phasing plan — schematic format with phasing narrative • Thirty percent shoofly design plan set • OPCC for 30 percent track plans • Thirty percent draft engineering design technical memorandum Subtask 9.5 60 Percent Railroad Shoofly Plans — Only Required at UPRR's Request Updating the 30 percent shoofly design plans to 60 percent could be required by UPRR. As this is typically only required due to unusually complicated site conditions, this task is not currently included in this scope. Deliverable(s) * None Update the 30 percent shoofly design plans to 90 percent per the requirements stated in the checklist contained in the UPI .'Public Projects — Plan Submittal Guidelines', Rev- 8/04/2017 (available upon request). This phase will consist primarily of updating the shoofly design plan set from the 30 percent submittal. The 90 percent consists generally of updates driven by railway signal needs, and general site grading as follows. Addition of cut and fill lines to the track plans to account for railway walkways, signal pads, etc, See Limitations and Assumptions. * 5chedule and attend a site visit with a UPRR project representative Deliverable(s) * Updated phasing plan — schematic format with phasing narrative * Ninety percent shoofly design plan set 9 (SPCC for 90 percent track plans * Specifications * Ninety percent draft engineering design technical memorandum City of Tukwila Berger'ABAM, P14-0347,00 Strander Blvd/SW 27th St Extensm September 2017 TuRwila, Washington Exhibit A-1 Page 37 of 60 75 Subtask 9.7 100 Percent Railroad Shoofly Plans — Including Bid Support through Contractor Award Update the 90 percent shoofly design plans to 100 percent per the requirements stated in the checklist contained in the UPRR'Public Project's — Plan Submittal Guidelines', Rev. 8/04/2017 (available upon request). This phase will consist primarily Of Updating the shoofly design plan set from commentary provided by UPRR on the 90 percent submittal and the UPRR site visit. Review and add text as necessary to the final construction project handbook (construction project handbook by Others). Verify bid item list pertaining to the shoofly track to be provided by the contractor. Respond to contractor and CITY RFls. See Limitations and Assumptions. Attend prebid meeting (one meeting), See Limitations and Assumptions, beliverable(s) • Updated phasing plan — schematic forma with phasing narrative • One hundred percent shoofly design plan set • OPCC for 100 percent track plans • Finalized specifications and bid item list • Final engineering design technical memorandum • Responses to Contractor and CITY R.Fls (up to six) Limitations and Assumptions • CADD work in this scope of services will be in AutoCADICivil,3D 2017 with line -styles, s!pnbuls, etc. conforrning to UPRR CADD Standards, Conversion to other CAOD platforms isnot in this ,scope of services, Should CARD conversion be required, it would be considered as an additional service, • Base mapping updates (by others) to be in AutoCADICivil 3D 2017 at a compatible dattrin with previous Strander Boulevard design efforts. 4P General shoofly plan developinent is per LIPRR 'Public Projects — Plan ,fit b;nittal Guidelines', Rev. 810412017 • UPRRs disposition towards this grade separation project will be more clearlil known after the suInnittal of the prelintinary engineering agreernent. It is assumed that should significant changes be required they would be considered as an additional service(s), • Separate H&H analysis and report for° the shoqfly is not included in this scope of services, • UPRR utiliti .1 casing extension design, and review of nona,UPRR utility design is not included in this scope of services, • Bidding support is included in 100 percent phase through contractor award, Construction tnanageinent (CM) is not included in this scope of set -vices, • OPCC costs will use current railwav industry and WSDOT cost data- Final construction cost for UPRR supplied labor and materials to be provided by UPRR with C&M Agreenjent. • The design process will eniploy the Hanson Professional Services Inc. QC Review process, • Should a 60 percent submittal be required by UPRR, a suppleirtental scope and fee will be submitted at that hive. City of Tukwila BergerABAM, 4'14.0347.00 5trander 81vd/SW 27th St Vmtension SLptember 2017 Tukwila, Washington Exhibit A-1 Page 3A of 60 76 Railway signal additions ky UPRR, includingsignal berins are not anticipated, Significant signal grading improvements beyond track walkwt;qls including a separate grading plan are not included 07 this proposal and will be considered as an additional service, Railway parallel railroad maintenance and access roads deemed necessary by LIPRR are not anticipated, because there art, none in the existing condition. Parallel railroad maintenance and access track access road design is not included in this proposal and will be considered as an additional service. Subinitting as list of construction. inaterials to the CITYfor separate analysis and assistance with that analysis effort is not included in this scope of services and will be considered as an additional service, It is assioned the specifications provided in this scope of services are fair the shoofly track construction, ruction, shoqfly bid items, and language linking the railway specifications to the front end'. The front end" sections of bid documents are by others. city of 'rukwfla BergerABAM, 1114.047,00 Strander Blvd/SW 27th St Extension September 2017 Tukwila, Washington Exhibit A-1 Page 39 of 60 77 This task includes the structural engineering required to develop conceptual layouts, coordinate design efforts, and complete construction documents for structural elements identified herein for the Strander undercrossing of the BNSF and UPR R railroad tracks. The following design codes will be used to conduct the design and analyses. 1. WSDOT Bridge Design Manual LRFD, version M 23-50.17, June 2.017 2. AASHTO LRFD Bridge Design Specifications, 7th Edition, and interims 3, AASHTO Guide Specifications for LRFD Seismic Bridge Design 2nd Edition (2011) 4. 'W DOT Standard Specifications for Road, Bridge, and Municipal Construction (2016) 5, INF-UPRR Guidelines for Railroad Grade Separation Projects (1/24/2007) 6. AREMA Manual for Railway Engineering (2017) Assumption(s) Shoofly for UPRR Railroad tracks will be constructed to the east. A temporary shoring wall will be designed and included in the contract to accommodate the construction of the UPPR bridge. A temporary shoring wall will not be required to extend the BNSF bridge foundation. The UPRR bridge undercrossing will be constructed adjacent to the temporary shoring wall and completed in one stage, including an extension of the bridge foundation to the west for a future track. Vehicular and pedestrian access to the existing Sound Transit: Station, from Southwest 27th Street, will be closed during construction of the walls, seal, and bridges east of the UPRR tracks. Vehicular bridge for access to Sound Transit Station will be normal to undercrossing alignment, a single -span structure (no interior pier required), and the approach grading will accommodate alignment and profile effects. Sound Transit parking may be extended towards this structure and this access will be coordinated through the CITY, as required. Seal will be constructed with open excavation, coffer cell, and tremie placement of concrete. A structural seal and fascia wall elements will be incorporated to seal and strengthen the undercrossing. Temporary struts may be required during construction, but permanent struts are not assumed to be incorporated into the design. # Sheet pile wall with whalers and ground anchors will be used as the structural wall system, in place of secant pile wall designs. Dead -man (buried anchor) walls will be utilize to limit extension of permanent ground anchors (PCAs) along project, where possible. City of Tukwila BergerABAM, P14.0347.00 Strander Blvd/SW 27th St Extension September 2017 'rukwila, Washington Exhibit A -I Pare 40 of 60 78 Bridge Service and Strength Analysis Service and strength load combination analyses of the proposed new bridge structures will be conducted to demonstrate that the proposed structure meets the performance requirements per AASHTO or AREMA, as applicable, Bridge Extreme Analysis Extreme load combination analysis of the proposed new bridge structure will be conducted to demonstrate that the proposed structure meets the performance requirements per AASHTO or AREMA, as applicable. Bridge Capacity Analysis and Design Component capacity calculations will be completed and designs will be prepared for the bridge components based on the controlling design forces as determined from the -service-, strength, and extreme analyses. Wall Service, Strength, and Extreme Analysis Analysis of the walls will be based on service, strength, and extreme load combinations to demonstrate that the proposed structures meet the performance requirements per AASHTO or AREMA, as applicable. Subtask 10.1 BNSF Railroad Bridge and Walls The CONSULTANT shall review the as -built drawings for the existing BNSF underpass structure, review geotechnical data, coordinate with geotechnical engineer, develop design parameters, design elements, meet with the CITY and BNSF, and prepare the following submittals to meet the requirements of Table 3-2 of the BNSF-UPRR Guidelines for Railroad Grade Separation Projects (1/24/2007). Prepare bridge substrucwre extension concept design plans and pictures for the BNSF bridge over Strander and will be used in establishing a preliminary engineering agreement with BNSF. The bridge will. be similar to existing BNSF substructure, which is a pile -supported footing extending full width of underpass with abutments and an interior pier wall. 2Develop the applicant response to the BNSF comments to the conceptual design and prepare a type selection report (30 percent submittal), including design plans and construction phasing. 3, Integrate the bridge concept with adjacent permanent or temporary retaining wall designs, if necessary. Coordinate with the geotechnical engineer to design ground improvement procedures between the structure foundation and the seal. 4. Coordinate with tile civil design for roadway section, drainage, and utilities within the underpass. 5, Develop the applicant response to the BNSF comments to the 30 percent submittal and prepare a 60 percent design submittal, 'including design plans and calculations; city of rukwfla BergerABAM, P14.0.347.00 Straoder Blvd/SW 27th St Extension September 2017 Tukudla, Washington Exhibit A-] Page 41 of 60 79 geotechnical report (see Task 11); project specifications and special provisions (see Subtasks 10,9, 14.5 and 1.4.6),- drainage report and plan (see Task 12); and construction phasing. Develop the applicant response to the BNSF comments to the 60 percent submittal and prepare a final design submittal (CITY's 90 percent submittal), including design plans and calculations,- geotechnical report (see Task 11); project specifications and special provisions (see Subtasks 10.9, 14.5 and 14,6),- drainage report and plan (,see Task 12); and construction phasing. The CONSULTANT shall update and coordinate design efforts for contract documents based on WSDOT and CITY review of final design. See Subtasks 1.0.9,14.5 and 14.6 for specials and estimate. Deliverable(s) • BNSF concept submittal (11x17 PDF format) • BNSF 30 percent submittal (llxl-/ PDF format) • BNSF 60 percent submittal (11x17 PDF format) • BNSF final submittal (11x17 PDF format and I1x17 hard copy) • CITY and WSDOTreview Package (11x17 PDF format) • Contract documents (IIx17 PDF format and 7.1x17 hard copy) Subtask 10.2 Union Pacific Railway Bridge and Walls 'I"he CONSULTANT shall review the site conditions for the existing UPRIZ underpass structure, review geotechnical data, coordinate with geotechnical engineer, develop design parameters, design elements, meet with the CITY and UPRR,and prepare the following submittals to meet the requirements of Table 3-2 of the BNSF-UPRR Guidelines for Railroad Grade Separation Projects (1/24/2007). Prepare bridge superstructure and substructure concept design plans and pictures for UP RR bridge over Strander and will be used in establishing a preliminary engineering agreement with UPRR. Bridge to be similar to adjacent BNSF structure, which is steel plate girder with pile -supported footing extending full width of underpass with abutments and an interior pier wall. Develop the applicant response to the UPRR comments to the conceptual design and prepare a type selection report (30 percent submittal), including design plans, construction phasing, and shoofly (see Task 9). 3. Prepare staging options at bridge. Integrate bridge concept with adjacent permanent or temporary retaining wall designs. Coordinate with the geotechnical engineer to design ground improvement procedures between the structure foundation and the seat. Coordinate track and ballast design with rail engineer. See Subtask 10.3 for temporary shoring wall design. City of Tukwila BergerABAM, P14.0347.00 stra"der 131vd/SW 27th St Extcnsion Septurnbu 2017 "I'Awila, Wa-,-,hington Exhibit A-1 Page 42 of 60 80 4. Prepare concepts for utility conduits on. bridge and design components to integrate the utilities. Coordinate with the civil design for roadway section, drainage, and utilities within. the underpass. Develop the applicant response to the UPRR comments to the 30 percent submittal and prepare a 60 percent design submittal, including design plans and calculations; geotechnical report (seeTask 11); project specifications and special provisions (see Subtasks 111.9, 14.5 and 14.6),- drainage report and plan (see Task 121),- shoofly design (see Task 9); and construction phasing, & Develop the applicant response to the UPRR corrin -tents to the 60 percent submittal and prepare a final design submittal (CITY's 90 percent submittal), including design plans and calculations; geotechnical report (see Task 11); project specifications and special i i provisions (see Subtasks 111.9, 14,5 and14.6); drainage report and plan (see Task 12); shoofly design (see Task 9); and construction phasing. The CONSULTANT shall update and coordinate design efforts for contract documents based on WS001'and CITY review of final design. See Subtasks 10.9,14.5 and 14.6 for specials and estirnate. Deliverable(s) • UPRR concept submi t tat (11x17 PDF format) • UPRR 30 percent submittal (11x17 PDF format) • UPRR 60 percent, submittal (I Ix17 PDF format) • UPRR final submittal (11x17 PDF format and 1Ix17 hard copy) • CITY and WSDOT review package (I I x17 PDF format) • Contract documents (11 xI 7 PDF format and 11x"17 hard copy) Subtask 10.3 Union Pacific Railway Temporary Shoring Wall The CONSULTANT shall prepare a concept and design of the temporary shoring wall required to Stage construction between the shoofly and the UPRR bridge. This wall shall be included in the contract documents, reviewed, and approved by UPM as part of the requirements of 'Table 3-2 of the BNSF-UPRR Guidelines for Railroad Grade Separation Projects (1/24/2007). The submittals will be incorporated into those listed in Task 102 Subtask 10.4 Sound Transit Vehicular Bridge The CONSULTANT shall prepare a concept and design of a vehicular bridge that connects the loop ramp intersection from the undercrossing to the Sound Transit Station as a single span precast -prestressed concrete girder bridge. The foundations will be constructed with a pile - supported footing and abutment walls, similar to the existing BNSF bridge. Retaining walls and shoring will be coordinated with the undercrossing structure and civil design. Ground improvements will be evaluated and cl",ilpied, as required, at the interface of the foundation and the seat. City of Tuk- will bergerAUAM, P14,0347A Strander Ulvd/SW 271b St Extension Sep lcrnber 2017 TU141AIII-a, Washinknon Exhibit A-1 Page 43 of 60 81 Special provisions, quantities, and estimates will be included in Subtask 10.9. Deliverable(s) * Thirty percent CITY submittal (I7.x]7 PDF format) * Sixty percent CITY submittal (11x17 PI format) * 90 percent CITY submittal (11x17 PDF format) * WSDOrf/CITY contract submittal (11x17 PDF format and IIxl7 hard copy) Subtask 10.5 Retaining Walls The CONSULTANT shall prepare a concept and design of the permeant retaining walls for the undercrossing, maintenance access for local utilities, business access, and integration of pedestrian and vehicle traffic throughout the project. The retaining walls for the undercrossing will be constructed with a sheet pile wall system utilizing permanent ground anchors (PGA) and buried anchor (dead -man) walls. Cantilever soldier pile walls and cast -in-place walls will be integrated where applicable. Geosynthetic retaining walls and moment slabs will be required to grade up to the required profile for the pedestrian bridge, and possibly the vehicular bridge, spanning the undercrossing. See Figure 3 for preliminary retaining wall layout. Figure 3 — Preliminary Retaining Wall Layout Retaining wall and shoring staging will be coordinated with the adjacent structures and civil design. The structural seal is integrated with the undercrossing walls, but is separated out as Subtask 10.6. Special provisions, quantities, and estimates will be included in Subtask 10.9, Deliverable(s) * Thirty percent CITY submittal (11x17 PDF format) * Sixty percent CITY submittal (11x17 PI format) * 90 percent CITY submittal (1.1.x17 PIF format) * WSDor/ci,ry contract submittal (11 x17 PDF format and 11x17 hard copy) City of Tukwila BergerABAM, 1'14,0347.00 Strander 13lvdJSW 27th St Extension Sep Lernber 2017 Tukwila, Washington Exhibit A-1 Page 44 of 60 82 Subtask 10.6 Seal and Fascia Walls The CONSULTANT shall prepare a concept and design of the undercrogsing structural Seal and fascia walls. The staging of the seat shall be coordinated with the construction of the shoofly and temporary shoring walls, and integrate the BN F, vehicular, and UPRR bridge foundations. The seal depth will vary along the length of the project to counter buoyancy effects of the permanent and temporary excavations. The sea.], in conjunction with the reinforced concrete portion of the seal and fascia walls, the pile -supported structure foundations, ground improvement, and roadway section grading, will create a water resistant barrier and act integrally with the structural walls to create a boat for the undercrossing. Storm drainage and infiltration will be addressed in Tasks'12 and 13. The seal will be constructed in stages and poured in segments to accommodate site conditions, such as high-water table, differing subsurface materials, staging of the corridor, utilities, and contractor means and methods. These impacts and staging of the seal will be evaluated as part of the seal design. An edge beam and approach slab will be utilized at each transition of the seal to standard subsurface ground conditions. Special provisions, quantities, and estimates will be included in Subtask 10.9. Deliverable(s) • Thirty percent CITY submittal (11x17 PDF format) • Sixty percent C11'Ysubmittal (11x17 PDF format) • Ninety percent CITY, submittal (11x17 PDF format) • WSDOT/CITY contract submittal (11x17 PDF format and 11x17 hard copy{) Subtask 10.7 Pedestrian Bridge The CONSULTANT shall prepare a concept and design of a pedestrian bridge that connects the Interurban Trail over the undetcrossing using a prefabricated bridge. The foundations will be constructed with spread footings and curtain walls that surcharge the structural walls of the undercrossing and will be incorporated into Subtask 10.5. Retaining walls will be constructed to raise the trail profile and meet ADA standards (see Subtask 10.5). The CONSULTANT will coordinate the superstructure performance criteria with up to three prefabricated bridge suppliers, The superstructure will be acquired by the contractor based on performance criteria. The foundation and bearings will be design and incorporated into the contract documents, based on the superstructure performance criteria. Special provisions, quantities, and estimates will be included in Subtask 10.9. Deliverable(s) • Thirty percent CITY submittal (11x17 PDF format) • Sixty percent CITY submittal (I1x17 PDF format) City of TukwflD BergerABAM, P14.0347.00 Strander Blvd/ -';W 27th St lExtension Svpteinber 2017 Tukwila, Washington Exhibit Al fate 45 of 60 83 • Ninety percent CITY submittal (11x'17 PDF format) • WSDOT/CITY contract submittal. (11 x17 PDF format and I I x 17 hard copy) Subtask 10.8 Miscellaneous Structures The CONSULTANTshall prepare a design of the following miscellaneous structural elements. • Limits of the structure excavation Luminaire bracket's and details, incorporated into the und-ercrossing structure • Signal bridge at intersection for loop rarnp to Sound Transit Station • Signal bridge foundations, integrated behind or into structural walls of undercro.s'sing The CONSULTANTwill coordinate the design of these elements with the other structural and civil aspects of the project. Special provisions, quantities, and estimates will be included in Subtask 10.9. Deliverable(s) • Sixty percent CITY submittal (11x17 PI format) • Ninety percent CITY submittal (11x17 PDF format) • WSDOT/CITY contract submittal (11x17 TTP format and Ilx'17 hard copy) Subtask 10.9 Structural Special Provision and Estimate 'The CONSULTANT'shall prepare a conceptual estimate for the 30 percent submittal, a special provision outline, updated estimate for the 60 percent submittal, and a project estimate and special provisions for the 90 percent and final submittals. Defiverable(s) • Thirty percent CITY submittal — structural estimate (PDF format) • Sixty percent CITY submittal — structural estimate (PDF format) • Sixty Pei -cent CITY submittal — structural special provisions outline (PDF format) • Ninety percent CITYsubmittal — structural estimate (PD F format) • Ninety percent CITY submittal — structural special provisions (NIS Word and PDF format) • WSDOT/CITY contract submittal — structural estimate (PDF format) • WSDOT/CITY contract submittal — structural special provisions (MS Word and PDF format) The CONSULTANT shall utilize standard WSIDOT forn-i liners for aesthetic treatments for the walls of the underpass. The CONSULTANT will participate in up to three 2- hour meetings with the CITY to discuss concepts. The preferred alternative will be incorporated into the project and no additional plan sheets will be included in the contract documents for architectural treatments, City of Tukwila BergerABANI, 1'IC034700 Strauder Blvd/SW 27th St FxtemMon. September 2017, Tukwila, Washitigton Exhibit A-1 Page 46 of 60 84 TASK 10.0 STRUCTURAL ENGINEERING (Bright Engineering) Bright Engineering Inc. (hereinafter referred to as SUBCONSULTANT), under a separate subconsultant agreement with CONSULTANT, will perform the following tasks. Subtask 10.3 Union Pacific Railroad Temporary Shoring Wall The SUBCONSULTANT shall prepare a concept and design of the temporary Shoring wall required to stage construction between the shoofly and the UPRR bridge. This wall will be integral with undercrossing structural walls and will utilize PCAs underneath shoofly, PGA, Whaler, and other details to construct, maintain, and remove the temporary shoring wall will be included in this effort. This wall shall be included in the contract documents, reviewed and approved by UPRR as part of the requirements of Table 3-2 of the BNSF-UPRR Guidelines for Railroad Grade Separation Projects (1/24/2007), to be performed by CONSULTANT. Special provisions, quantities, and estimates will be generated by CONSULTANT Subtask 10.4 Sound Transit Vehicular Bridge The CONSULTANT shall prepare a concept and design of a vehicular bridge that connects the loop ramp intersection from the undercrossing to the Sound Transit Station as a single -span precast -prestressed concrete girder bridge. The superstructure will be a precast -prestressed concrete girder with integral concrete deck and diaphragms, per WSDOT standard practice. The bearings, expansion joints, barriers, and all other connections to the bridge superstructure are included in the superstructure design. Typical 2 - 2-inch-diarneter conduit with junction boxes will be included in the traffic barrier, but other conduits, utilities, luminaries, or miscellaneous items connected to the bridge will be designed by CONSULTANT, The foundations will be constructed with pile -supported footing and abutment walls, similar to the existing BNSF bridge. Retaining walls and shoring will be coordinated with the undercrossing structure and civil design. Ground improvements will be evaluated and designed, as required, at the interface of the foundation and the seal. Walls, abutments, foundations, and other interactions with undercrossing structure will be designed by CONSULTANT. Special provisions, quantities, and estimates will be generated by CONSULTANT. Deliverable(s) • Thirty percent, CITY submittal (11x17 PDF format) • Sixty percent Cll'Ysubmittal ('Ilx'17PDF format) • Ninety percent CITY submittal (I1x]7 PDF format) • WSDOT/CITY contract submittal (11x17 PDF format and 11x17 hard copy) City of Tukwih BergerABAM, 1"14.0347.00 StranOer 131vd/SW 27th St Extension Suptember 2017 Tulovila, Washington Exhibit A -I Ila ge 47 of 60 85 Subtask 10.8 Miscellaneous Structures The SUBCONSULTANT shall prepare a design of the following miscellaneous Structural elements. Signal bridge at intersection for loop rarrip to Sound Transit Station. Structure will be rectangular sections, per WSDOT BDM Chapter 10, with bolted connections and baseplate with anchor bolts. Signal bridge foundations, integrated behind or into Structural walls of undercrossing, Foundation will be drilled shafts placed an appropriate distance behind the structural walls (to be determined), Geotechnical engfi-teers will provide allowable lateral bending capacities of soil. Design shall follow requirernents, of BDM Chapter 10. 'the SUBCONSULTANT will coordinate the design of these elements with the, other structural and civil aspects of the project. Special provisions, quantities, and estimates will be generated by CONSULTANT. Dellverable(s) • Sixty percent CITY submittal (11x17 PDF format) • Ninety percent CITY submittal (1IxI7 PDF format) • WSDOT/CITYcontract submittal +11x17 PDF format and 11x 17 copy) city of rotowiia BergeYABAM, P14 034TOO Strander BIVd/5W 27th St Extenwri September 2017 Tukwila, Washington Exhibit A-1 Page 48 of 60 86 TASK 11.0 GEOTECHNICAL ENGINEERING SUPPORT (Shannon & Wilson) Shannon & Wilson (hereinafter referred to asSUBCONSULTANT), Linder a separate subconsultant agreement with CONSULTANT, will evaluate the subsurface conditions at the project site based on available existing subsurface data and one in Situ test, described below. Based on the subsurface conditions, the SUBCONSULTANT will provide geotechnical engineering recommendations for final design of the project. Recommendations would include foundations, walls, temporary shoring, settlement, stability, and seismic considerations. SUBCONSULTANT would assist in developing plans and specifications for the project bid package. Subtask 111 In Situ Testing Stormwater Pond Infiltration The existing stormwater pond will be expanded as part of the project. The facility design depends partly on the infiltration rate of the subgrade. To improve the estimate of the infiltration rate, SUBCONSULTANT will perform a pilot infiltration test (PIT) near the existing stormwater pond. The PIT will require an excavator and water source,- SUBCONSULTANT will retain an excavator subcontractor, and use an on-site water source to perform the PIT Assumption(s) The test will be located on public property, UPRR property, or PSE property. The CITY will contact property owners and arrange for ROE for the test(s). SUBCONSULTANT will notify the CONSULTANT, CITY, and property owner regarding the timing of the testing work. • Water for the PIT will be available at the test location near the existing stormwater pond. A water truck or outside water source will not be required. • The PIT excavation will be loosely backfilled with the excavated material. No site restoration will be performed. • If street -use permits, traffic control, or railroad flaggers will be required to perform the test, the SUBCONSULTANT will plan, coordinate, and procure the required items. • To locate utilities on public property, SUBCONSULTANT will call the One -Call Utility Locate number; any private utility location would be done by the CONSULTANT. • The CONSULTANT or CITY will survey (provide plan coordinates and elevation of the ground surface) the test location. Subtask 11.2 Geotechnical Engineering SUBCONSULTANT will provide design recommendations in accordance with applicable standards, including CITY, WSDOT, UPRR, ad BNS F Railway. Engineering services will include City ofrukwifil HergerABANJ, P14.0347,00 Strander Mvd/5W 27th St P.W�nsion svpwmber 2017 Tukwila, Washington Exhibit A-1 Page 49 of 60 87 Seismic Design Considerations. SUBCONSULTANT would provide seismic design parameters for the project based on the seismic design level specified by the CITY. STJBCONSULTANT would perform liquefaction hazard analyses for the existing subsurface explorations in the footprint of the project, and include the results of those analyses in other engineering evaluation$ (e.g., earth pressures, stability). Develop Bridge Foundation Recommendations SUBCONSULTANT would provide LRFD axial and lateral resistances for deep foundations, or bearing and lateral resistance for shallow foundations, if applicable. If we recommend deep foundations, we would provide parameters for developing lateral resistance curves, but'AIOLIld not perform lateral resistance analyses (e,g., LPILE). Develop Retaining Wall Recommendations SUBCONSULTANT would provide LIZFD bearing resistances, static earth pressures, and seismic earth pressures, as applicable, for temporary and permanent retaining walls. Wall types may include soldier piles with tieback/deadman anchors, cantilever, and structural earth walls. Evaluate settlement, global stability, and seismic displacement of walls, as applicable, Develop Underpass Design Recommendations Evaluate uplift forces and mitigation alternatives for the Underpass structure. Mitigation alternatives could be fiedown anchors, gravity structure, etc. Develop Shoofly Embankment Recommendations Evaluate settlement and stability of the shoofly embankment. Develop recommendations to achieve required design standards for settlement and stability (e.g., base reinforcement, preloading), Update Existing Groundwater Model SUBCONSULTANT would continue reading existing dataloggers at the site (six piezometers and two stormwater pond stage loggers). SUBCONSU ,TENT would update the groundwater model calibration using the recorded groundwater and pond stage level. Develop Recommendations for Utility Protection SUBCONSULTANT would evaluate potential impacts to existing utilities from construction activities (e.g., vibrations, settlement), and develop mitigation alternatives. Evaluate New Outfall Foundations Evaluate foundation type,, and settlement of the new outfall. SUBCONSULTANT would estimate the soil conditions it the outfall location based on geologic maps and engineering judgment, Evaluate Stormwater Infiltration Rates Evaluate design infiltration rates based on PIT' results. CRY of Tvkwita BergerABAK P14,0347,00 Strander Blvdy' SW 27th St Extension September 2037 Tukwila, Washington Exhibit A-1 Page 50 of 60 88 Evaluate Construction Considerations Evaluate construction considerations related to site preparation, earthwork, excavations, ground improvement, and temporary shoring. Assumption(s) 9 SUBCONSULTANT's hours estimate shows the assumed number of analyses/scenarios for each scope item, Approximately 75 percent of the analyses would be completed for the draft geotechnical report, The remaining analyses would be completed as part of the final report, Deliverable(s) • Draft (60 percent) geotechnical report • Final geotechnical report Subtaskil.3 Plans and Specifications SUBCONSULTANT will review and cornment on construction plans and specifications related to geotechnical components of the project. City of Tukwila BergerABAK f'14,0347,00 Stratider Blvd/SW 2701 St Extension Seplernber 2017 Tukwila, Washington Exhibit A-1 Page 51 of 60 89 i The CONSULTANT shall prepare a drainage report and preliminary conveyance design for the project in sufficient detail to support the completion and approval of the environmental documentation for the project. 'The drainage report will be prepared per the criteria of the adopted 2016 King County Surface Water Design Manual (SWDM) and relevant policies of the City of Tukwila as appropriate. The drainage report shall include the following, I. Project overview 2. Detailed project description 1 'Tributary area exhibits 4, Runoff calculations 5, Gutteranalysis including sag analysis & Detention calculations T Water quality computations 8. Storinwater conveyance calculations 9, Wetland hydro period analysis 10t Maintenance and operation of facilities The drainage report and preliminary conveyance design will be based on the concept illustrated below, with the outfall location and discharge route to be determined after topographic survey information has been obtained, An outfall and discharge route memorandum will be provided to the CITY. The CONSULTANT shall meet with the CITY and the environmental subconsultant to determine the wetland hydra period baseline. Assumptions(s) a Groundwater seeping into the underpass will not need to be treated. o Storm water runoff from the roadway will be collected separately frorn the groundwater, treated and subsequently comingled with the groundwater and discharged to the Green River. o The discharge route and outfall location will be selected based. on the ability to gravity flow (or not) the treated storm water and untreated ground water. These decisions will be made in consultation with CITY staff and documented in a brief memorandum. The stormwater design process will include Lip to three meetings with the CITY and other involved parties to review and discuss options being considered. One additional meeting with the CITY will be required to review and discuss comments on the draft drainage report. 9 171 -ie CONSULTANT shall provide PS&E for the projects storm water system, including submittal reviews with the C11Y at the 30, 60, 90, and 100 percent completion levels. city (.)f,rukwili BergerABAM, P14.0347.00 Strander tilv4/SW 27111 St rxtension Septcmbe.r 2017 Tukwila, Washington Exhibit A-1 Page 52 of 60 90 Storm titer PS&E submittals, and the effort associated with them, are not included in this task, but will be incorporated in to the roadway design submittals as described in Task :14. Deliverable(s) a Meeting minutes Draft and final outfall and discharge route memoranclum(one electronic and two hard copy') Draft and final drainage report (one electronic and two hard copy) City tit Tukwila BergerABIAM, 1`14.0347.00 Strander Mvd/SW 27th 51 Extensioty Septurnber 2017 'ruk"61a, Washington Exhibit A•1 Ila ge 53 of 60 91 TASK 13.0 PUMP STATION The pump stations and outfall configurations will be established based on the final discharge route. The existing pump system will be modified as described and shown in Figure 4. Existing pump station modifications will include the addition of a third pump and associated valves and controls, upsized power feed, and modifications to the existing pump layout and control system as necessary to accommodate the addition of the third pump. The: need for a second standby generator will be assessed and incorporated in to the modification if deemed necessary. If the discharge to the Green River cannot be routed via gravity flow, a new combined storm/groundwater purnp station will be required to pump treated storm water and groundwater to the outfall. It is assumed this pump station will largely mirror the existing in configuration and layout. Key components will include duplex submersible pumps, wet well, valves, valve vault, discharge piping, controls, CMU block building to house the controls, and standby generator. The wet well and valve vault will be precast concrete. The associated work for this additional pump station systern, is included in Subtask 13.8 Outfall Pump Station Design. A groundwater pump system will be required to pump collected groundwater to the discharge pipe or to the new combined stortri/groundwater pump station. The new groundwater pumps will be duplex submersible and installed in an existing manhole that will be converted to a wet well.Thecontrols will either be housed in an outdoor enclosure or inside the existing pump station building if there is room. All of the new pump stations will have telemetry equipment and will be connected to the municipal Supervisory Control and Data Acquisitions (SCADA) system, If ownership of the existing pump station is transferred to the CITY, that the existing lift station telernetry and control panels will be replaced with the CITY's standard panels. The current concept for the basic pump station improvements are shown in Figure 4 below. It is understood this may be refined during the initial design phase and, as noted in Subtask 13.8 below, there may be a need to provide an outfall pump station if the preferred discharge route cannot be gravity fed. Subtask 13.1 Determine Criteria The CONSULTANT shall meet with the CITY to confirm design criteria, determine pump sizes, and identify equipment brands that are acceptable to the CITY and, if possible, comply with "Buy American" provisions for this potentially federally funded project, Meeting minutes will be provided. City of Ttil,wila fiergerASAM, PNR347,00 51rander Blvd/.SW 27th St Extension Seplember 2012 TAvvila, Washington Exhibit A-1 Page 51 of 60 92 To Duffel! Stormwater from Combined Pond N Storm 0 Existing Inlet Manhole Add 3rd Purnp - UpsizefReplace Motors and Impellers Existing Wetweil Existing Valve Vault Load Bank Existing Control Bldg Existing Meter Vault "- Add 3rd MCC Section F Existing Generator Figure 4. III—Add 500 kW Generator - To Energy Dissipator/ Combined Pond City of Tukwila Strander Blvd/SW 27th St Extension (.0 Tukwila, Washington Exhibit A-1 BergerABAM, P14.0347.00 September 2017 Page 55 of 60 Subtask 13.2 Draft Stormwater Pump Station Memorandum Preliminary drawings, supporting calculations, equipment data, specifications, and cost estimates of construction for the stormwater pump station will be provided in a draft stormwater pump station memorandum for CITY review. The CITY will provide one set of consolidated review comments. The CONSULTANT and the CITY shall rneet to review the corvirrients, and responses. Comments will be incorporated into a final stormwater pump station memorandum as part of Subtask 133. Meeting minutes will be provided. Deliverable(s) 0 Draft stormwater pump station memorandum Subtask 13.3 Final Stormwater Pump Station Memorandum Comments from the CITY on the draft stormwater pump station report will be incorporated into the final stormwater pump station memorandum, Deliverable(s) • Final stormwater pump station memorandum Subtask 13.4 Public Interest Findings Proprietary components of the pump station(s) will need an approved Public Information Finding (PIF) from WSDOT. It is assumed that there will be three components that will each need a separate RIF. Deliverable(s) 0 Three PIFs for WS OT approval Subtask 13.5 Stormwater Pump Station Plans The CONSULTANT shall prepare the stormivater pump station plans in accordance with tile drawing list included with the level of effort estimate. Deliverable(s) # Thirty percent permitting submittal Sixty Percent Submittal. This submittal shall incorporate comments from the CITY on the 30 percent submittal and shall represent a complete draft of the construction contract Ninety Percent Submittal. This submittal shall incorporate comments from the CITY on the 60 percent submittal and shall represent a complete draft of the construction contract • Final Submittal, This submittal shall incorporate CITY comments on the 90 percent submittal and is intended for final review by SDOT to obligate construction funds for the project City of Tukwfla BergarABANI, PIC0347.00 Strander Blvd/SW 27th St Extension September 2017 Tukwila, Washington Exhibit A-1 Page 56 of 60 94 Subtask 13.6 Stormwater Pump Station Specifications WSDOT Standard Specifications for Road, Bridge, and Municipal Construction (2018) will be the standard specifications for the work, The CONSULTANT' will prepare the general special provisions and project -specific special provisions required for construction of the pump station. Deliverable(s) * Special provision submittals at 60 (outline), 90, and 100 percent level of completion Subtask 13.7 Stormwater Pump Station Construction Cost Estimate A construction cost estimate shall be prepared for the 60,100, and final subinIttals. This estimate will be used as the basis of review for the lowest responsive responsible bidder Deliverable(s) • Costestimate submittals at 30,60,90, and 100 percent level of completion • Three hard copies of the construction cost estimate • One electronic copy (PDF) of the construction cost estimate • One electronic copy (NIS Excel) of the construction cost estimate Subtask 13.8 Outfall Pump Station Design A new combined storm/groundwater pump station will be required if the stormwater/groundwater cannot be discharged to the Green River via gravity flow. It is assumed this pump station will largely mirror the existing in configuration and layout. Key components will include duplex submersible pump--,, wet well, valves, valve vault, discharge piping, controls, CMU block building to house the controls, and standby generator, The wet well and valve vault will be pre -cast concrete, This subtask includes the design of the additional combined storm/ground water pump station, Dellverable(s) • Purnp station plan submittals at 3C1, 60, 90, and 100 percent level of completion • Special provision submittals at 60 (outline), 9t1, sand 100 percent level of completion • Cost estirriate submittals at30,60, 90, and 100 percent level of completion Subtask 13.9 Stormwater Pump Station Electrical Engineering R (hereinafter referred to as SUBCONSULTANT), under a separate subconsultant agreement with CONSULTANT, will provide electrical engineering and control systems design required for upgrades to the existing stormwater pump station, construction of a new 100 HP stormwater pump station, and if required construction of a new groundwater pump station. For each pump station, the SUBCONSULTANT shall perform the following tasks. Meet with CONSULTANT and CITY to review the pump station design requirements. 1 Prepare electrical calculations for utility service, generator sizing, and electrical distribution based on pump station design criteria. 3. Coordinate electrical service requirements for provision of power to the upgraded pump station site. Meet with the local power company if required. City of "I'Awila BergerABAM, P14.0,347.00 Strander Blvd/SW 27th St Extension SLptember 2017 'rukwila, Washington Exhibit A-1 Page 57 of 60 95 4- Attend one workshop with the project team to review the preliminary design documents and establish criteria for final design. 5, Prepare final electrical and control system drawings for construction, Drawing submittals shall be provided for 60, 90, and final completion stages. Anticipated drawings include - Legend and abbreviations - Site plan - Modified one -line diagram - Electrical building power, lighting and control - Vault power, lighting and control - Electrical distribution details - Circuit schedules and panel schedules - Pump starter schematic diagrams - Control system power schematic - Control system 1/0 diagrams - RTU interconnection diagrams - Control panel details 6. Prepare electrical and control system technical specifications based on standard specifications from the owner. 7. Prepare an engineering opinion of construction costs for the electrical and control systems. 8, Attend up to four design team review meetings. City of Tukwila BergurABAM, P14.0347,00 Strander Blvd/SW 27th St Extension September 2017 Tukwila, Washington Exhibit A -I Page 58 of 60 96 TASK 14.0 ROADWAY DESIGN This task involves engineering and design work for the roadway, trail, and project construction phasing. Subtask 14.1 Roadway Geometry The CONSULTANT shall prepare a preliminary layout of the roadway. The roadway shall meet sight distance requirements based on the roadway design speed, vehicle turning requirements based on the, project design vehicle(s), the requirements of the current Americans with Disabilities Act (ADA), and other guidelines. The CONSULTANT shall prepare environmental documents to support the roadway design as needed. Assumptions(s) 9 One round of CITY review con-u-nents. Deliverable(s) 9 Preliminary design(s) of the roadway to be included in the 30 percent plans, including cross section and horizontal and vertical geometry. * Environmental exhibits to support roadway design, Subtask 14.2 Trail Layout The existing interurban trail parallels the UPIZ on the west side of the UPRR requires a pedestrian bridge over the grade separation, which affects the profile and length of the underpass. In order to bring Southwest 27th up to grade in the shortest distance, the trail will likely need to be rerouted to the west or the east. The CONSULTANT shall investigate tip to three alternative routes and prepare preliminary layout of the preferred trail route. The trail shall n-teet the requirements of the current ADA guidelines. Assumptions(s) • One round of CITY review comment-, • The trail will require a prefabricated bridge over the grade separation, Defiverable(s) * Preliminary design(s) of the trail to be included in the 30 percent plans Subtask 14.3 Project Construction Staging The CONSULTANT will develop construction staging and phasing concepts for the project. The concepts will include all major construction activities and the sequencing of these activities, Deliverable(s) • Construction staging plans will be included in the roadway PSE submittals described below Subtask 14.4 Roadway Plans The CONSULTANT shall prepare roadway plans in accordance with the drawing list included with the level of effort estimate, �--ity f T.kwil. Berpi-ABAM, P14.0347M Strandev Blvd/SW 27th St Extension September 2017 Nkwila, Washing Ilton Exhibit A-1 Page, 59 of 60 97 Deliverable(s) * Plan submittals at30,60,90, and 100 percent level of completion Subtask 14.5 Specifications The underpass construction is not common and special provisions will be required to supplement the WSDOT Standard Specifications for Road, Bridge, and Municipal Construction and the associated amendments and general special provisions. The CONSULTANT will prepare outline specifications identifying all anticipated payment items. Draft special provisions will be prepared where required. It is anticipated that there will be a special provision required for each of the following, among others. • Secant pile walls • Bottom sea] construction • Railroad construction • Pump stations • Utility work Deliverable(s) * Special provision submittals at 60 (outline), 90, and 100 percent level of completion Subtask:14.G Construction Cost Estimate An engineer's construction cost estimate shall be prepared based upon the list of anticipated pay items and quantities obtained from the design effort. Deliverable(s) * Cost estimate submittals at 30, 60, 90, and 100 percent level of completion Three hard copies of the construction cost estimate One electronic copy (PDF) of the construction cost estimate One electronic copy (NIS Excel) of the construction cost estimate City of Tukwila tae, gerABAM, PIC0347,00 Strander Blvd/SW lith St Extension September 2017 Tukwila, Washington Exhibit A-1 Pa -e 60 of 60 0 98 CITY OF TUKWILA - STRANDERIUPRR GRADE SEPARATION PHASE 3 - UPRR UNDERCROSSING ID 4, 07 2015 2019 2020 1:0 Jul Apt Sap Oal Nov Dec .1i Feb 59 Apr May JIM Jul Aua Sep Oct Yeo Dec fan Feb Mu AK May Ain JO Aug Sep Oct N0v Dec Jal 'Feb ty,..a, Akpa, May .14m Al Amg Sep act Now D.. 9r26 • NTP to COMULTANT 2 9126 a MOBILIZE SUBCONSULTANTS 3 ftlif SURVEY 9. MAPPING 10/3 Perform Surrey 11/25 Prepare Saxe Map 30 12 111,11111, FINALIZE STORM WATER CORFIGURATION 13 11125 Confirm Dutfali Location and Route 14 12112 Finalise Draft Memorandum 15 12,26 City Review of Draft Memorandum 15 1116 Resons. to City C.M.MAS 1/16 • Comment Resolution Meeting 1/17 II Fineibe Memorandum 19 1/24 • Final Memorandum 18 "11410 39% UPRR Railroad Design 22 236 Prepare UPRR Concept Design 23 3/20 • Submit UPRR Concept Design 24 3121 Conceptual Design Review by UPFIR 25 639 II= 3014 Design Review 25 27 25 30 31 33! 30% PLANS, SPECIPtCATIONS & ESTIMATES 33 12)26 Prepare 30% PSSE IPerrortting Subm.rttaly 34 3/20 Ea QA/QC it10ng Submittal 35 4/2 * Permitting Subinittai to City 4111•19 GEDTECHNICAL ENGINEERING 932 Final Geolechnical Design Recommendations 9113 NI Flnei Geotecbincal Report 1271 IM=li 90% Design Review 36 37 33 35 40 42 43 44 45 46 47 40 49 50 51 52 5-3 413 City Review of Permitting Submittal 4/24 • Permilling Subrnitlat Continent RR-Wu-F/4m Meeting 4125 Finalize Perintetirto Submitial 5/8 • Submit Permitting Submittal FINAL 1)/RR Railroad 'Design 7/19 100% Design Review 916 Flnalbe Construction Agreement 584 -AL PLANS, SPEC IFtCATIONS & ESTIMATES SN Prepare Intermediate ISM) Submittal 911 QA/QC 6054 Sub:mat:al att4 • 60%Subrnittal to City 6115 Cily Review of 60% Submittal 915 • 6054Siebroiftat Comment Reba/lotion Meeting Sr% Prepare 60%Sobrnittai 11/1 QAPLIG 9" Sub matal tun 51/11%Submittal to City 11/26 IM• City Review at 94:1%Submiltal 92/20 • 90% Submittal Corninnet Resolution Meeting 317 Prepare Cott Final Subinliftl 512 In CIA/QC Draft Final Submittal Tue 615117 1 of 2 Task Mtone • Sizao.ry• Criticat T CITY OF TUKWILA - STRANDERIUPRR GRADE SEPARATION PHASE 3 - UPRR UNDERCROSSING ID 47 nta 2019 2020 0 Jul ALI Sep OP. Mee Dec Jan Feb Mo A4' May Jun Jul Aura Sep Oct Nay Dec Jan Feb F.to Apr May Jr Jet _ Aug Seo Oct Nov Dec Jan Feb Mar Ap' May Jim Jul 522 * Draft final Sitbroittell to Citir 54 55 55 57 53 59 6-5 51 62 02 114 65 65 55 00 63 70 71 73 74 75 76 77 75 19 55 91 5;23 1=1 City Review of Draft Final Submittal 6113 • Draft Foal Submittal Comment Resolution Meeting 414 1=1 Prepare Final Subrnitta/ 715 OAICIC Final Sub -mazer 7115 • Final Su bmitlat to City NEPA REEVALUISIION • 12126 Confirm Scoping & Water Treatment and Detention 43 pair. Updated Discipline Reports 11129 NM Review by City 7115 Incorporate City Comments 7124 • Submit Draft Updated Discipline Reports to WSOOT 7125 WSOOT Review 6122 an truenzerate WSOOT Comments, 9f5 • Submit Draft Updated Discipline Reports to Agencies gill ie.° Tr- Agency Review 1341 en Palette Updated Ofsrapline Reports 15117 4. Submit Final Updated Reports to City 10/19 go MOOT Rseriew of NEPA REevalualten 10f31 • INS DOT Approval of NEPA REevaltrallon PERMITS 1111 Prepare Penns APPPC-non-5 12/12 • Subinft Permit Applications to City 52113 Review by City TN 0 mg incorporate City Continents 1123 • Submit Permit Applications to Agencies e‘a 1124 Process Agency Review 05 017 • Permits- issued 84 4118 Incorporate Permit Conditions trno PS&E es 55 87 519 Complete IRMO Plans Itudirdes reviews) 88 7/4 Comptes! RAY Fun41ng Estimate 89 1111 in Obligate FLW Funding 50 11114 • FLAN Funds Authrerized 91 11115 52 33 9,1 55 55 57 55 55 100 101 102 11)3 104 105 Oct Nevi De RIGHT CIF WAY PLANS S ACQUISITION (Future Work Not in Scope) Complete RW Acquisition 1351 igs Complete ROW Certification 11113 * RAN Certified by WSDOT fr• ADVERTISE, BID & AWARD 11114 Authorize Construction Fending 12d12 Ceraracl Assail -113+y by City 12125, • Final Cominents lo Consultant 1227 irs Prepare Ad Ready Plans If Spealfications 119 41 Subrrei Ad Ready Plans & Specifications 1123 • Advertise 1124 - Sid Period 315 • Open Olds 3f6 Evaluate Bids 3/19 • Award Contract Toe 915117 2 of 2 Task l&sieslline • Sim -Tool/ Critcal Task See attached Exhibit B. DBE Particn p i atio l Agreement Number: WSDOT Form 140-089 EF EKhibit B Page I of I Revised 1013012014 101 STRANDER BOULEVARD/SW 27TH STREET EXTENSION 9/5/2017 EXHIBIT B - DBE PARTICIPATION PLAN Firm Services to be Provided DBE Cert. No. Contract Amount DBE Participation Planned Actual Planned Actual Berger ABAM One Alliance Geomatics Fehr & Peers Abeyta & Associates Widener & Associates Hansen Professional Services Bright Engineering Shannon & Wilson Ott -Sakai & Associates, LLC R&VV Project Management, Civil & Structural Engineering Surveying Traffic Engineering Right of Way Planning & Project Funding Estimate Environmental Documentation & Permitting Railroad Engineering Structural Engineering Geotechnical Engineering Constructability Review & Construction Cost Estimating Pump Station Electrical & Control Systems 04M0022928 D5F0019645 D3M0015622 D4M0023226 $ 2,881,529 $ 250,337 $ 164,952 $ 33,220 $ 188,491 $ 179,333 $ 94,991 $ 141,320 $ 42,505 $ 70,650 - 6.19% 0.00% - 0.82% 0.00% - 2.35% aim% - 1.05% 0.00% Notes: Planned amounts reflect the scope of work and level of effort at project NTP. 0 Totals = $ 4,047,328 $ 0 10.40% 0.00% Page 1 of 1 Exhibit C Preparation and Delivery of Electronic Engineering and Other Data In this Exhibit the agency, as applicable, is to provide a description of the format and standards the consultant is to use in preparing electronic files for transmission to the agency, The format and standards to be provided may include, but are not limited to, the following: 1. Surveying, Roadway Design, & Plans Preparation Section A. Survey Data See attached Exhibit A-1, B. Roadway Design Files Civil 3D, Version to be determined by consultant based on current practice at the time the work is completed. C. Computer Aided Drafting Files AutoCAD. Version to be determined by consultant based on current practice at the time the work is completed. Agreement Number: WSOOT Form 140-089 EF Exhibit C Pagel of Revised 1013012014 103 D. Specify the Agency's Right to Review Product with the Consultant See attached Exhibit An I E. Specify the Electronic De4verables to Be Provided to the Agency See attached Exhibit As 1, F. Specify What Agency Furnished Services and Information Is to Be Provided See attached Exhibit A- I . Agreement Number WSDOTForm 140-089 EF Exhibit C Page 2 of 4 Revised 1013012014 104 ll. Any Other Electronic Files to Be Provided Sce attached Exhibit A-V IIT, Methods to Electronically Exchange Data Methods will be determined in consultation with agency during the Course of the work, WSDOT Form 140.089 EF Exhibit C Page 3 of 4 Revised 1013012014 105 A. Agency Sollware SUite None, B, Mectronle Messaging, System None, c. Flic -n-ansfers Formal. See attached Exhibit A-1, WSOOT Form 140.089 EF Exhibit C Page 4 of 4 Revised 1013012014 106 Exhibit D 0 0 Exhibit D- I - COIISUI.tant Fee Determination Exhibit D3 - Consultant WSDOT ICK. Letter Agreement Number: WSDOT Form 140.089 EF Exhibit D Page 1 of 1 Revised 1013012014 107 L$J a WAR) = I ;J 21fill I W-,W!.*l DIRECT SALARY COSTS JDSC) Phase 3 Cost Summary 915/2017 Personnel Hours Rate Cost 1 Principal/Project Manager 414 X $ 93,03 = $ 38,514 2 Project Engineer 3,599 X $ 6154 $ 228,680 3 Structural Engineer 3,413 X $ 47.98 $ 163,756 4 Civil Engineer 4,371 x $ 40.67 = $ 177,769 5 Construction Specialist 372 X $ 62.04 a $ 23,079 6 Designer/CAD Operator 6,010 X $ 46.26 $ 278,023 7 Graphics 136 X $ 40,00 = $ 5,440 8 Department Coord./Admin 408 X $ 35,26 =$ 14,386 Total Hours 18,723 Subtotal Direct Salary Costs (DSC) = $ 929,647 Salary Escalation (SE) = 5% of DSC = $ 46,482 Subtotal (DSC + SE) $ 976J29 Overhead (OH) 163,45% of (DSC + SE) = $ 1,595,483 Fixed Fee (FF) 31,55% of (D8C + SE) $ 307,968.73 TOTAL SALARY COSTS (DSC + SE + OH + FF) = $ 2,879,681 DIRECT NONSALARY COSTS L QN Cl Mileage Design Team Boo miles @ $ 0,560 $ 448 Expendables (photographs, equip rental, etc.) I Estimate $ 1,500 $ 1,500 TOTAL REIMBURSABLE EXPENSES (DNSC) = $ 41 I TOTALBergerASAM = $ 2,881,52E] SUBCONSULTANTS One Alliance Geomatics - Survey $ 250,337 Fehr and Peers - Traffic $ 164,952 Abeyta & Associates - ROW Planning Services/Project Funding Estimate (PFE) $ 33,220 Widener & Associates - Environmental $ 188,491 Hanson - Railroad $ 179,333 Bright - Structural $ 94,991 Shannon & Wilson - Geotechnical $ 141,320 Ott Sakai - Constructability $ 42,505 R & W - Pump Station Electrical & Control Systems $ 70,650 TOTAL Subconsutlants; = $ 1.165.799 IManagement Reserve = $ 100,0001 I TOTAL Authorized Amount $ 4:147*,329 I 108 Mom Classification INarne I Rate I % Participatiori Principal/Project Manager Bob Fernandes $93,03 100% Project Engineers Ross French $6100 Naomi elove $56,64 Stuart Bennion $63.54 100% Matt Huxley $58.05 Structural Engineers Greg Banks $63-64 Santiago Aguilar $47,98 100% Civil Engineers Blake Nelson $35.58 Brook Emry $40.67 100% Construction Specialists Bob Lee $62.04 100% Ed Cline $58,89 Designer/CAD Operator John Reyes $41.61 30% Jef Blake $55.19 30% Lee Childress $43.05 40% Graphics Aaron Savage $40,00 100% Kim Crow $37,91 Department Coord./Admin Nora Bretana $34,88 Kelly Robinson $3516 100% Rate 40.671 0XII01 WIM 109 EXHBIIT D-1 - CONSULTANTFEE DETERMINATION CITY OF TUKWILA - STRANDER BOULEVARD EXTENSION ABAM Phase 3 Hours 9/5/2017 Page 3 of 31 0 Task Number a:c iti '6 C C a_ c III 'PT Q. Zi' c ci 7 3 0 C ...2 c&P .= , ii, CI. rn to (..) 0 Go 0 0 c ai '43 (7 0. 0_ 0 0 o 0 0 (3 Totals DSC 5 93,03 f 5 63.54 I 5 47.98 I $ 40.67 j $ 62.04 j 5 46.26 I 5 40.00 I $ 35.26 TASK 1 - PROJECT MANAGEMENT 1 238 708 220 172 104 - - 156 1.598 Project Coordination (24 months) 1,1 48 95 48 - - - - 96 288 Quality Assurance- 1.2 18 440 - - 104 - - 12 574 Preparation of QA Plan and Monitoring 8 60 - - - 12 80 Checking Subconsuitant Work Products 2 100 - 102 30 Percent Submittal OA 2 60 - - 32 - - - 94 60 Percent Submittal QA 2 80 - - 20 - - i 102 90 Percent Submittal QA 2 80 - - 32 - - 114 Final Submittal QA 2 60 - 20 - - 82 Meetings 1.3 172 172 172 172 - -48 736 Project Team Meetings (52) 52 52 52 52 - - . - 208 Meetings with City Staff (24) 120 120 120 120 - - 48 528 i TASK 2 - DIRECTED SERVICES 2 - - - - - - - - - Public Involvement 2.1 - - - - - - - - - Exhibrts - Mailings- _ Summary of Comments - Value Engineering (VE) 2.2 - - - - - - - - Initial Presentation of Project to VE Team - Review and Response to VE Recommendations - Ad, Bid, and Award Services 2.3 - - - - - - - - - Answers to Bid -der Questions Addenda Special Provisions Addenda Bid Quantities - Addenda Plans: - TASK 3- INDEPENDENT CONSTRUCTABiLITY REVIEW 3 See Ott Sakai Fee Estimate tor Details - ii Page 3 of 31 0 EXHBIIT D-1 - CONSULTANTFEE DETERMINATION CITY OF TUKWILA - STRANDER BOULEVARD EXTENS ON ABAM Phase 3 Hours 9/5/2017 Task Number 0 a. E a ci < c ci c io 0 ur e ....' CO M .0 t 75 ... .... Ins , 00. gm * 00. MI 0.0 El 0 o O&) DO 0 C3 I) Totals DSC 5 93.03 1 $ 63.54 I $ 47.98 I $ 40.67 1 5 62.04 46.26 1 5 40.00 I $ 35.26 TASK 4 - SURVEY AND BASE MAPPING Record Research, GPS RTK Control and, Terrestrial Control! Survey Work Topographic Survey Utility Locate Services Additional Topographic Survey of Adjacent Wetland(s) Title and ROW Review 4 4.1 4.2 4.3 4.4 4.5 See One Alliance Fee Estimate for Details See One Alliance Fee Estimate for Details See One Alliance Fee Estimate for Details See One Alliance Fee Estimate for Details See One Affiance Fee Estimate for Details TASK 5 - UTILITIES Transmission, Substation), BP Pipelines (Olympic Pipelme), AT&T, Level 3, Sprint, King County Sanitary Sewer, Seattle Public Utilities Waler, Communications (2) Existing Utility Data Contact Utilities for As-builts (12 contacts @ 1 hr each) Collect and Review As -Bulbs and Construction Record Drawings Collect & Review Sanitary Sewer Masterplan. Hydraulic Model Compile As-builts into Base map Prepare Existing Utility Map Exhibit Preliminary Coordination with Utilities Utility Coordination Kick Off Meeting (1 hr) Prepare Materials for Utility Kickoff Meeting Provide Meeting IVIinutes for Utility Kickoff Meeting Project Utility Coordination (2 hrs per month) Additional Utility Coordination Meetings (1-1 hr mtg per utility) Develop Utility Relocation/Protection Conceptual Design Review Utility Relocation Conceptual Design with City Consolidate Comments from Utilities and City Finalize Utility Relocation/Protection Conceptual Design Utility Relocation Memorandum 12 166 253 8 116 8 8 571 5.1 2 24 36 16 78 4 8 - 12 2 4 - - 6 12 - 12 4 16 8 - 28 2 2 8 8 - 20 5.2 Co-ordination with Utilities for Final Design 5.3 Respond to Utility Comments Meeting Minutes Plan Generation 10 88 76 4 20 8 6 , 212 4 4 4 12 2 4 -1 7 2 - 1 3 36 . 36 12 12 - 24 8 24 8 40 4 4 4 12 4 4 8 8 8 4 20 2 8 16 4 8 8 4 50 20 40 24 84 8 16 - 24 4 8 - - 12 8 16 24 46 Page 4 of 31 EXHBIIT D-1 - CONSULTANTFEE DETERMINATION CITY OF TUKWILA - STRANDER BOULEVARD EXTENSION ABAM Phase 3 Hours 9/5/2017 Page 5 of 31 Task Number 1:-" o_ Tv t . CL GI 5 rti c c ." 0 c I 1. I ii 0 : 17 a. 0 c o < 71 r_.) W c ‘r.1 c 2 ,5 , CD 0 T.; `u1 -F., 2 P, = C Gi 0 0 0 CL CD Ct. tr.) w0 to. 00 0 = M 6 -E t c o -0 E < CL 0 01 o 0 c...) Totals DSC $ 93.03 1 $ 63.54 1 $ 47.98_1 5 40.67 I 5 62.04 1 5 46.26 1 5 40.00 I $ 35.26 SPU Waterline Monitoring Plan 5,4 - 16 - - - - - - 16 Draft Waterline Monitoring Plan - 16 - - - - - - 16 Coordination with Utilities For Final Design 5,5 - 18 - 101 4 56 - 2 181 King County Coordination Meeting - 4 - 4 - - - - 8 Provide Meeting Minutes for Meeting - - - 1 - - - 2 3 Develop Design Criteria - 4 16 - 20 Provide Draft Conceptual Sanitary System Layout - 4 . 40 - 40 - - 84 Incorporate County Comments into Conceptual Design - 2 - 16 - 16 - - 34 Construction Cost Estimate - 4 24 4 - - - 32 TASK 6 - TRAFFIC ANALYSIS, ILLUMINATION & SIGNAL DESIGN 6 - - - - - _ _ _ Traffic Capacity Analysis 6,1 See Fehr and Peers Fee Estimate for Details - Preliminary Construction Cost Estimate 6.2 See Fehr and Peers Fee Estimate for Details - Preliminary Illumination (30 Percent) Design 6.3 See Fehr and Peers Fee Estimate for Details - Traffic Study for Environmental Documentation 64 See Fehr and Peers Fee Estimate for Details - TASK 7 - RIGHT OF WAY PLANNING AND COORDINATION 7 30 208 55 324 18 192 - - 827 I I Affected Property Owners (10): Taco Bell, Jack In The Bax, Puget Sound lEnergy ROW, Sound Transit, Kaiser Permanente, King County Metro Transit RapidRide, Boeing, BN'SF, UPRR Local Business Access Design 7.1 30 58 _ ss - 72 - - 256 Meet with Taco Bell 4 8 - 8 - 4 - - 24 Develop Revised Access Options 2 8 24 - 16 - - 50 Review Options for Revised Access with City 3 3 _ - - - - - 15 Revise Access Options - 4 - 16 - 8 .. - 25 Present Options to Taco Bell 3 3 - - - - - 8 Follow Up Meeting 3 3 - - - 8 - - 14 I Meet with Jack in the Box 4 8 - 8 - 4 - - 24 Devetop Revised Access Options 2 8 24 - 16 - - 50 Review Options for Revised Access with City 3 3 - - - - - 6 Revise Access Options - 4 - 16 - 8 - .. 26 Present Options to Jack in the Box 3 3 _ _ _ - - - 6 Follow Up Meeting 3 3 - - - 14 Page 5 of 31 EXHBIIT D-1 - CONSULTANTFEE DETERMINATION ABAM Phase 3 Hours CITY OF TUKWILA - STRANDER BOULEVARD EXTENSION 9/5/2017 DSC Puget Sound Energy ROW Coordination Meet with PSE ROW department (1 hr mtg) Provide Minutes far PSE Mtg Develop Access Options Revise Access Options Present Final Driveway Configuration to PSE ROW General Coordination (1 hri month) Sound Transit Coordination Meet with Sound Transit (6-1 5 hr mtg) Provide Minutes for Sound Transit Mg Prepare Eichibits for Sound Transit Meetings and Correspondence General Coordination (3 hri month) Kaiser Coordination Meet with Kaiser (2-1 hr mtg) Provide Minutes for Kaiser Mg General Coordination (1 hrl month) Intersection Pian for Approval (IPA) (Assume 3 review cycles) Prepare IPA piens Submit IPA to WSDOT Review, respond and address WSDOT Comments King County Metro (KCM) RapidRide Coordination Meet with KCM (1 hr mtg) Provide Minutes for KCM Mtg Develop Draft Detour Route Submit Draft Detour Route to KCM for Approval Submit Final Detour Route to KCM for Approval General Coordination (0.5 hr/ month) Boeing ROW Coordination Meet with Boeing ROW department (1 hr mtg) Provide Minutes or Boeing Mtg Develop Draft Construction Route for approval Task Numbe 7.2 7.2 7.2 7.2 7.2 7.2 $ 930 $ 63.54 a, 3 1 2 2 c vi a -fi t Tn 13 7, m 0 c 2 u c Lit 2 75) = 40 0 _.?_00 LIJ 0 47.9 0. 0 -0 E it -a 0. 0 0 0 .67 46.26 1 40.00 35.26 8 8 35 55 32 21 21 - 6 2 - a 32 32 8 6 6 6 2 14 78 8 60 3 3 18 10 3 1 6 8 20 20 2 4 4 2 2 4 4 11 14 6 3 3 1 2 24 3 1 18 2 130 42 8 80 14 12 2 112 88 3 21 26 3 1 ‘. 10 2 10 Page 6 of 31 6 1 18 EXHBIIT D-1 CONSULTANTFEE DETERMINATION CITY OF TUKWILA - STRANDER BOULEVARD EXTENSION ABAM Phase 3 Hours 9/5/2017 Task Number w u 0 0 0 1--- E 7,3 00 c ..... .., _ 4.1, .75 cra 42 o a. 00. 0O 00 0. Totals DSC 5 93.03 5 63.54 j 5 47.98 J $ 40.67 I $ 62.04 1 $ 46.26 1 $ 40.00 1 $ 35.26 Revise Access Options Present Final Construction Route to Boeing ROW at Mtg General Coordination (1 hr/ month) BNSF ROW Coordination, 7.2 Meet iiirith BNSF (1 hr mtg) Provide Minutes for BNSF Revise Access Options Present Final Impacts to BNSF ROW at Mtg General Coordination (1 hr! month) UPRR ROW Coordination 7.2 Meet %%din UPRR (1 hr m19) Provide Minutes for UPRR Mtg Revise Access Options Present Final Impacts to UPRR ROW at Mtg General Coordination (1 hr/ month) Right -of -Way Plans & Coordination (assume 12 properties) Coordination (4 hr month for 9 months) Exhibits (Assume 24) Legal Descriptions (Assume 24) Plans 7.2 2 3 9 3 1 2 3 9 3 1 2 3 10 6 6 70 36 6 3 6 3 68 68 8 6 21 6 8 6 21 6 1 8 6 184 72 { 112 TASK 8 - ENVIRONMENTAL COMPLIANCE/PERMITTING REQs Design Assistance and Early Agency Coordination Prepare Area of Potential Effect Section 106 Report Noise Study Hazardous Materials Memorandum Biological Assessment (BA) Air Quality Anatysis NEPA Environmental Classification Summary Update Wetland and Critical Areas Study Wetland Mitigation Use Plan 8 8.1 8.2 8.3 8.4 8.5 8.6 8.7 8.8 8.9 8.10 See Widener and Associates Fee Estimate for Details See Widener and Associates Fee Estimate for Details See Widener and Associates Fee Estimate for Details See Widener and Associates Fee Estimate for Details See Widener and Associates Fee Estimate for Details See Widener and Associates Fee Estimate for Details See Widener and Associates Fee Estimate for Details See Widener and Associates Fee Estimate for Details See Widener and Associates Fee Estimate for Details See Widener and Associates Fee Estimate for Details Page 7 of 31 EXHBIIT D-1 - CONSULTANTFEE DETERMINATION CITY OF TUKWILA - STRANDER BOULEVARD EXTENSION ABAM Phase 3 Hours 9/5/2017 Page 8 of 31 Task Number t 1-1, ..._,0 ' c .c c < ' Eli ...., .... c..) t E c .2 Ts t as 75 , E < ,C- al —• = Q C u — a u c cku 5 ra. -27 o "En - r. c cu ct. ri' ro 0 Totals DSC $ 93.03 I $ 63.54 I $ 47.98 I $ 40.67 I S 62.04 I $ 46.26 I $ 40.00 I $ 35.26 SEPA 8.11 See Widener arid Associates Fee Estimate for Details - State & Federal! Permits 8.12 See Widener and Associates Fee Estimate for Details - City Permits 8.13 See Widener and Associates Fee Estimate for Details - TASK 9 - RAILROAD 9 1 20 16 44 - 54 - - 135 Project Coordination 9.1 See Hanson Fee Estimate for Details - Railroad Shoofly and 'Phasing Concept 9.2 See Hanson Fee Estimate for Details - 30 Percent Railroad Shoofly and Phasing Plan 9.3 See Hanson Fee Estimate for Details - 60, 90 & 100 Percent Railroad Shoofly and Phasing Plan 9.4 See Hanson Fee Estimate for Details - Shoofly Plans - Hanson See Hanson Fee Estimate for Details - Shoofly Coordination (BergerABAM) 9.5 1 20 16 44 - 54 - - 135 Shoofly Design Coordination - 6 8 16 - - - 30 Shoofly Plans - BergerABAM - 10 - 20 - 54 - . 84 Shoofly Coordination Estimate 1 4 8 8 - - - 21 TASK 10 - STRUCTURAL ENGINEERING 10 75 1,195 2,720 14 168 2,196 48 160 6.576 I BNSF Bridge and Walls 10.1 22 120 260 - 20 206 - 30 658 Coordination and Meetings with CITY and BNSF (3 Meetings) 12 12 12 - - - 6 42 Retaining Wait and integration - 12 24 - 4 _ . 40 Foundation Design and Ground improvement - 20 60 - 8 - - - 88 Staging and Misc Details - 12 40 - 8 - - - 60 BNSF Bridge Plans 42 84 - 190 - - 316 BNSF Conceptual Submittal 2 4 6 - - - - 4 16 BNSF 30% Submittal 2 4 8 - 8 - 6 28 BNSF 60% Submittal 2 6 12 - - 8 6 34 BNSF Final Submittal 2 4 8 - _ 4 18 WSDOT/CITY Contract Submittal 2 4 6 - - - 4 16 UPRR Bridge and Walls 10.2 22 206 544 - 54 454 - 32 1,312 Goct-dinetion and Meetings with CITY and UPRR (3 Meetings) 12 12 12 - - - - 6 42 Retaining Wall and Integration - 10 40 - 5 - - - 56 Foundation Design and Ground Improvement 24 BO - 12 - - - 116 Staging and Misc Details - 12 60 - 24 - - - 96 Superstructure Design and Track Coordination - 40 120 - 12 - - - 172 Page 8 of 31 EXHBIIT D-1 - CON'SULTANTFEE DETERMINATION CITY OF TUKWILA - STRANDER OULEVARD EXTENSION ABAM Phase 3 Hours 9/5/2017 Page 9 of 31 Task Number ap 'IT ...... ra r5 cc E.- 2 a, c ..... to 2 o. 0 c < o o c a a 15 C 111 ii; Q ,o] 2 2 7: bc = c Q 0 CL, a id. a5 w o01 0 0 u o. CI .c 0 -0 E < ic - a o 0 o Totals DSC 5 93_03 1 $ 63.54 .: $ 47.98 1 $ 40.67 I $ 62.04 I $ 46.26 ' $ 40.00 35.26 UPRR Bridge Plans - 86 172 - - 438 - _ 696 UPRR Conceptual Submittall 2 4 8 - - 4 - 4 22 UPRR 30% Submittal 2 4 12 - - 4 - 6 28 UPRR 60% Submittal 2 6 20 - - 8 8 44 UPRR Final Submittal 2 4 12 - - - - 4 22 tevsoonciTY Contract Submittal 2 4 8 - - - - 4 18 UPRR Temporary Shoring Wall 10.3 - 24 32 - - - - 8 64 Temporary Shoring Wall Design See Bright Fee Estimate for Details - Coordination of Staging with Civil, Structural, and Shoofly See Bright Fee Estimate for Details - UPRR Temporary Shoring Wall Plans See Bright Fee Estimate for Details - Bright Engineering Design Coordination - 12 16 - - - - 28 Coordination with UPPR Submittals in Task 102 - 12 16 - - - 8 36 Sound Transit Vehicular Bridge 10.4 8 136 304 - 26 242 16 26 758 Foundation Design and Ground Improvement - 28 88 - 6 _ - 122 Superstructure Design See Bright Fee Est mate for Details - Retaining and Shoring Wall Design Coordination - 16 40 - 12 - - - 68 Coordination of Staging with Civil and Structural - 16 24 - 8 - - - 48 Vehicular Bridge Plans (Substructure) - 46 92 - _ 234 - - 372 Vehicular Bridge Plans (Superstructure) See Bright Fee Estimate for Details - Bright Engineering Design Coordination - 12 24 - - - - 36 30% City Submittal 2 4 8 - - 4 8 6 32 60% City Submittal 2 4 8 - - 4 8 8 34 90% City Submittal 2 6 12 - - - 4 24 WSDOTICITY Contract Submittal 2 4 8 - . 8 22 Retaining VValls 10.5 8 340 760 - 28 716 16 26 1,894 Underctossing Wall Concept and Layout 16 40 - 16 12 - - 84 Coordination with Utilities, Drainage, and Staging - 12 24 - 12 8 - 1 56 Retaining Wats #1 thru #4 Design - 24 80 - - - 104 Retaining Walls #5, #8 & #17 Design - 24 72 - - - - - 96 Retaining Walls #6 and #7 Design - 24 60 - - 8-4 Retaining Walls #9 thru #12 Design - 32 80 - - - - 112 Retaining Walls #13 thru #16 and Moment Slab Design 32 80 - - - .. - 112 Railing and Fence Design - 8 24 - - - - - 32 Page 9 of 31 EXHBIIT D-1 - CONSULTANTFEE DETERMINATION CITY OF TUKWILA - STRANDER BOULEVARD EXTENSION ABAM Phase 3 Hours 915/2017 Page 10 of 31 Task Nurnber t; 0 Tv 7 o. .07 0 o 0 c < c — LLI toi` i it_ T "B citl Z CI c 0 Til C I:2 ra f a w cr) o 0 t.,9 E RI .... m o o o Totais DSC $ 93.03 5 5 . 1 47.98 .67 5 62.041 46.26 40.00 .26 Retaining Wall Plans - 132 264 - .. 668 - - 1,084 30% City Submittal 2 8 8 4 8 6 35 60% City Submittal 2 8 8 _ - 4 8 38 90% City Submittal 2 12 12 - - - 4 30 WSDOTICITY Contract Submittal 2 8 a - - - -5 26 Seal and Fascia Walls 10.6 8 200 452 - 24 354 - 16 1,054 Sea i Concept and Layout - 16 36 12 8 - - 72 Coordination with Utilities, Drainage. Structures and Staging - 12 24 - 12 8 - 4 60 Un -Reinforced Seal Design - 20 40 - - - - - 60 Ground tinprovement Design - 8 24 - 32 Reinforced Seal Design - 16 40 - - - - - 5 Edge Beam and Approach Slab Design - 20 48 - - - - 68 Fascia Wall Design 24 80 - - - - 104 Structural Seal Plans - 66 132 - - 338 .. - 536 30% City Submittal 2 4 4 - - - 12 60% City Submittal 2 4 6 - - - 4 1 90% City Submittal 2 6 12 - - - 4 24 WSDOTit !TY Contract Submittal 2 4 6 - - - 14 TraiI Bridge 10.7 4 56 134 8 8 124 _ 342 Conceptual. Design and Coordination with Venders i. 4 16 - - - - 20 Foundation Design - 16 40 - 4 - - 60 Coordination of Staging with Civil and Structural 4 16 8 4 - - - 32 Pedestrian Bridge Plans - 24 48 - - 124 - - 196 30% City Submittal 1 2 4 - - - - 60% City Submittal 1 2 4 - - - 2 90% City Submittal 1 2 4 - - - - 2 9, 1 WSDOT/CITY Contract Submittal 1 2 2 - - iscellaneous Structures 10.8 3 58 128 - 8 100 -6 303 Limits of Structural Excavation Development - 12 20 - 4 - - - 36 Luminaire Brackets Design Signal Bridge Design - 12 40 - 4 See Bright Fee Estimate for Details - - - , Signal Bridge Foundation Design See Bright Fee Estimate for Details Page 10 of 31 EXHBIIT D-1 CONSULTANTFEE DETERMINATION CITY OF TIJKWILA - STRANDER BOULEVARD EXTENS ON ABAM Phase 3 Hours 9/5/2017 U 0 I.- Page 11 of 31 Q -0-' 0) a.c 71 Task 01 7 % C at 8 o o o t .c til e — on ti. oi 2 -97. a a 00. 31 0' c 3— WO., 2 lc CL MI E ''‘ r -6 a. 0 6., Number a_ (7/ w 0 uo 0 0 0 0 u Totals DSC $ 93,03 I $ 63,54 t $ 47.98 f $ 40.67 1 $ 62.04 I $ 46.26 1 $ 40.00 $ $ 35.26 Miscellaneous Structures Plans See Bright Fee Estimate for Details - Miscellaneous Structures Plans - 20 40 - - 100 - - 160 = Bright Engineering Design Coordination - 8 16 - - - - - 24 60% City Submittal 1 2 4 - - - - 2 9 90% City Submittal 1 2 4 - - - 2 9 WSDOT/CITY Contract Submittal 1 2 4 - - - 2 ' 9 Structural Special Provisions and Estimate 10.9 _ 45 106 - - - - 8 160 30% City Submittal - Estimate - 8 24 - - - 2 34 60% City Submittal - Special Provision Outline and Estimate - 20 48 - - - 2 70 90% City Submittal - Special Provision and Estimate - 12 24 - - - - 2 38 WSDOT/CITY Contract Submittal - 6 10 - - 2 18 Project Aesthetics 10.10 - 9 - 6 - - 16 - 31 Project Aesthetics Meetings (3 - 2 hr Meetings) - 9 - 6 - - 16 - 31 TASK 11 - GEOTECHNICAL ENGINEERING SUPPORT ' 11 12 8 18 - - - - - 38 Subsurface Explorations and Testing 11.1 See Shannon and Wilson Fee Estimate for Details - Update Existing Groundwater Flow Model Structure 11.2 See Shannon and Wilson Fee Estimate for Details - Update Groundwater Flow Model Calibration 11.3 See Shannon and Wilson Fee Estimate for Details - Groundwater Flow Model Simulations to Incorporate Phase 3A 11.4 See Shannon and Wilson Fee Estimate for Details Geotechnical Engineering 1 11.5 See Shannon and Wilson Fee Estimate for Details Geotechnical Review (BergerABAM) 11.9 12 8 18 - - - - - 38 Review of Draft Geotechnical Report 9 6 12 - - - - - 27 Review of Final Geotechnical Report 3 2 6 - - - - - 11 TASK 12 - DRAINAGE DESIGN 12 14 32 - 168 - 28 - 12 254 Determine Preferred Discharge Route - 4 - 24 8 - - 36 Determine Wettand Hycfroperiod Baseline with WieleneriCity - 4 - 4 - - - - 8 Finalize Conceptual Drainage Design ' - 4 - 12 - - - - 16 Draft Drainage Memo 8 8 - 100 - 20 - 8 44 Address Comments on Draft Drainage Memo 2 8 - 20 - - - - 30 Final Drainage Memo I 4 4 - 8 - - 4 20 Page 11 of 31 EXHBIIT D-1 CONSULTANTFEE DETERMINATION CITY OF TUKWILA - STRANDER BOULEVARD EXTENSION ABAM Phase 3 Hours 915/2017 Page 12 of 31 Task Number 00 -ET a. To tp• .) ,a c c a. ILJ ,cg tt..w TO , I. eD ... c w 8 cu a -a : u a o t 0 c 0 0 0. in 0 < t..) 171 0 0 0. 0 0 c fa 0 00 rD u Totals DSC $ 93.03 1 $ 63.54 I. 5 47.98 5 40.67 1 $ 62.04 $ 46.26 I $ 40.00 1 5 35.26 TASK 13 - PUMP STATION DESIGN 13 12 312 264 904 20 864 - 48 2,424 Meeling with City to Determine Criteria 13.1 - 4 - 4 - - - 2 10 Draft Stormwater Pump Station Memorandum 13.2 - 44 - 84 - 16 - 4 148 Final Pump Station Memorandum 13.3 - 16 - 16 - - - 2 34 Public Interest Findings 13.4 - 36 - - - - - - 36 Stormwater Pump Station Drawings 13.5 12 116 40 464 - 440 - - 1,072 Specifications 13.6 - 16 40 80 . - 40 176 Construction Cost Estimate 13.7 - 4 - 40 20 - - - 64 Outfall Pump Station Design (Optional) 13.8 - 76 184 216 .408 - - 884 !TASK 14 - ROADWAY DESIGN 14 20 950 120 2,492 54 2,560 80 24 6,300 Roadway Geometry 14,1 .. 52 - 208 - 228 80 8 576 Determine Design Criteria & Roadway Limits - 4 - 16 - 4 - - 24 Develop Cross-sections - 4 - 8 - 16 28 ReWew Sigh! Distance - 4 - 16- - - - 20 ! Autotum Analysis 4 - 16 - 16 - - 36 ADA Analysis - 4 - 16 . 16 - - 36 Develop Roadway Conceptual Design - 8 16 - 16 - - 40 Review Roadway Conceptual Design with City - 4 - - - - _ - 4 Finalize Roadway Conceptual Design 4 - 8 8 - 20 Generating Environmental Documents - 8 - 32 - 32 -8 80 Base map Review and Roadway Modeling - 8 - 80 - 120 80 - 288 Trail Layout 14.2 4 24 16 40 - 20 - - 104 Meet with City and King County Parks 4 4 4 - - - - 12 Develop Trail Conceptual Criteria & Design - 8 16 4 - - 28 Develop 3 Alternative Trail Routes/Configuralions - 4 4 16 - 12 - - 36 Review Trail Alts with City/County to Determine Preferred Design - 4 4 - - - - 8 Finalize Trail Conceptual Design - 4 4 8 - 4 - - 20 Project Construction Staging 14.3 - 12 16 22 22 8 - - 80 Develop Constniction Staging/ Phasing Concepts - 6 12 16 16 4 - - 56 Review Construction Staging/ Phasing Concepts With City - 2 2 - - - - 4 Finalize Construction Staging/ Phasing Concepts - 2 2 6 6 4 . - 20 Page 12 of 31 EXHBIIT D-1 CONSULTANTFEE DETERMINATION CITY OF TUKWILA - STRANDER BOULEVARD EXTENS ON ABAM Phase 3 Hours 915/2017 Page 13 of 31 Task Number o tA c3 c c -.7 m a_ io o ci., c Q -2-.. a_ t _C 2 Pi tr) tfl c 7=- a "Zi 7, ea c 0 0 0. (.) ti) c 0 CA 0 ri3 ca. at a. 0 0 0 73 E 4 a. o 0. 0 C) Totals DSC $ 93.03 1 $ 63.54 1 $ 47..98 j $ 40.67 i 5 62.04 1 $ 46.26 I $ 40.00 1 $ 35.26 Roadway Plans (See General -Civil Drawing List) Specifications Construction Cost Estimate 14.4 14.5 14.6 - 8 8 742 60 60 72 8 8 2,142 40 40 - 16 16 2,264 -- - - 40 - 8 8 5,220 140 180 TASK 15 - SANITARY SEWER REPLACEMENT 15 -- . - - - - - _ Total 414 3,599 3,413 4,371 372 6,010 136 408 18,723 Page 13 of 31 EXHIBIT DI: CONSULTANT FEE DETERMINATION CITY OF TUKWILA - STRANDER BOULEVARD EXTENSION Right -of -Way Drawing List 915/2017 DRAWING UST Number o_ p. cn 3 ra a. E cr: c t a) n. To .. 4- 67 . — GO = 4 «. = La u ,c c.7) wu a eR , ,ro 7ii -3 0 . Lo a t) Z.: 4 c .,c „.. 5 0 0 0 0 u :c ci. fa 0< 6 a U -- u c Totals DSC $ 93.03 1 $ 63.54 1 $ 47.98 I] $ 40.67 i $ 62.04 1 $ 46.26 $ 40.00 I $ 35.26 ] , RIGHT-OF-WAY PLANS _ 10 - 34 - 68 - - 112 man- OF WAY AND EASEMENT KEY MAP 1 2 2 4 8 [ RIGHT OF WAY AND EASEMENT PLANS - SHEET 1 2 2 8 16 26 -..RIGHT OF WAY AND EASEMENT PLANS - SHEET 2 3 2 8 16 26 FRI-Gl-fl- OF WAY AND EASEMENT PLANS - SHEET 3 4 2 8 15 26 'RIGHT OF WAY AND EASEMENT PLANS - SHEET 4 5 2 8 16 26 RK;HT OF WAY MD EASEMENT PLANS - SHE t 5 6 RIGHT OF WAY AND EASEMENT PLANS - SHEET 6 7 IRIC-HT OF WAY AND EASEMENT PLANS - SHEET 7 8 RIGHT OF WAY AND EASEMENT FLANS - SHEET 8 9, 'MGHT OF WAY AND EASEMENT PLANS - SHEET 9 10 RIGHT OF WAY AND EASEMENT PLANS - SHEET 19 11 RIGI-fT OF WAY AND EASEMENT PLANS - SHEET 11 12 IC -4-1T OF WAY AND EASEMENT PLANS. SHEET 12 13 SUBTOTAL - ALL RIGH`T-OF-WAY DRAWINGS 10 34 68 112 Page 14 of 31 EXHIBIT 0-1: CONSULTANT FEE DETERMINATION CITY OF TUKWILA - STRANDER BOULEVARD EXTENSION Shoofly Drawing List 9/5/2017 Page 15 of 31 .... C.) a_ c Lit r , O o C w r, LI .c _c c o a a .... c r, T. C 0 o . a a. f ell E '0 DRAWING UST Number cri ku to 0 . o. < Totals, DSC $ .01 6 .54 _1 47.9 4 .67 1 5204 4&26 1 $ 40.00 1 5.2 SHOOFLY PLANS - HA ON - - _ . SHOOFLY EMBANKMENT PLACEMENT - EAST SHOOFLY EMBANKMENT PLACEMENT - WEST 2 SHOOFLY EMBANKMENT PLACEKENT - WEST END DETAILS 3 SHOOFLY EMBANKMENT PLACEMENT - EAST END DETAILS 4 SHOOFLY EMBANKMENT PLACEMENT - SPU SECTION 5 , UPRR SHOOFLY - TYPICAL SECTiONS 6 1.7PRR SHOOFLY - TEMPORARY - TRACK PLAN AND PROFILE 7 See Hanson Fee Estimate for Details UPRR SHOOFLY - FINAL - TRACK PLAN AND PROFILE 8 UPRR SHOOFLY - CROSS SECTIONS - SHEET 1 9 UPRR SHOOFLY - CROSS SECTLONS - SHEET 2 10 UPRR SHOOFLY - CROSS SECTIONS - SHEET 3 11 UPRR SHOOFLY - CROSS SECTIONS - SHEET 4 12 UPRR SHOOFLY - CROSS SECTIONS - SHEET 5 13 UPRR SHOOFLY - DROSS SECTIONS - SHEET 6 14 UPRR SHOOFLY - CROSS SECTIONS - SHEET 7 15 i UPRR SHOOFLY - CROSS SECTIONS - SHEET 8 18 I SHOOFLY PLANS - BER E BA a 2 - !SHOOFLY SURCI-AGRE 17 - 2 - 4 . 12 - - 16 1SHOOFLY END GRADING 16 - 2 4 - 12 16 1SHOOFLY EMBANKMENT CATCH DETAILS (1 OF 2) 19 2 4 - 10 - 16 SHOOFLY EM8AWMENT CATCH DETAILS (2 OF 2) 20 - 2 4 - 10 16 SHOOFLY MISCELLANEOUS 1 21 2 4 -16 ,SUBTOT& • ALL SHOOFLY DRAWINGS 10 20 54 84 Page 15 of 31 EXHIBIT D1: CONSULTANT FEE DETERMINATION CITY OF TUKWILA - STRANDER BOULEVARD EXTENSION Structures Drawing List 915/2017 DRAWING LIST Nurnber w 6 a c Q. g 5) Fi n. 75' .15.. 2; 0 c 2 E1 rii Et 0 c u.1 '-f• 6 c = _ u fr/ < 5) a Ts o a a 0 0 11 ,5 6 0 2 -a a_< Totals DSC . 1 $ 6154 1 $ 47.98 1 $ 40.67 1 $ 62.04 5 46.26 1 $ 40.00 1 5 35.26 1 BNSF BRIDGE PLANS 10.1 - 42 84 - - 190 _ - 3 6 BNSF BRIDGE - BRIDGE GENERAL NOTES AND SHEET LIST 1 _ 2 4 12 - - 18 BNSF BRIDGE - GENERAL PLAN 2 2 4 . - 12 . - 18 BNSF BRIDGE - ELEVATION AND TYPICAL. SECTION 3 - 2 4 10 - - 16 BNSF BRIDGE - RETAINING WALL DEMOLTION 4 2 4 - 10 16 BNSF BRIDGE - GROUND IMPROVEMENT - SHEET 1 5 - 2 4 - 10 - 16 BNSF BRIDGE GROUND IMPROVEMENT - SHEET 2 6 2 4 - 10 - 16 BNSF BRIDGE - GROUND IMPROVEMENT - SHEET.3 7 2 4 - 10 - 16 BNSF BRIDGE - PILE LAYOUT PLAN & FOOTING REINFORCEMENT 8 2 4 - 10 - 16 eNSF BRIDGE PILE & FOOTING DETAILS 9 - 2 4 - 10 - 16 BNSF BRIDGE - TYPICAL SECTION & BEARING ELEVATIONS 10 2 4 8 - - 14 BNSF BRIDGE - ABUTMENT 41 ELEVATION 11 - 2 4 8 14 BNSF BRIDGE ABUTMENT #1 PLAN 12 - 2 4 - 8 - 14 BNSF BRIDGE - ABUTMENT #3 ELEVATION 13 2 4 - - 8 - 14 BNSF BRIDGE - ABUTMENT F* PLAN 14 2 4 - 8 - - 14 BNSF BRIDGE - PIER 62 ELEVATION 15 2 - 5 - 14 BNSF BRIDGE - PIER #2 PLAN 16 - 2 4 8 - - 14 BNSF BRIDGE_ - STAGELINE WALLS AT ABUTMENTS 17 2 4 - 8 - I 14 BNSF BRIDGE - ABU -WEN I & PIER SECTIONS 18 2 4 8 - .. 14 BNSF BRIDGE - MISCELLANEOUS FOUNDATION DETAILS 19 - 2 4 8 - 14 BNSF BRIDGE - FOUNDATION REINFORCEMENT TABLES 20 2 4 - - 6 14 BNSF BRIDGE - FOUNDATION ESTIMATED QUANTITIES 21 2 4 8 - - 14 UPRR BRIDGE PLANS 10 2 - 64 172 - - 438 - - 696 UPRR BRIDGE - BRIDGE GENERAL NOTES AND SHEET LIST 22 2 4 - 12 - 18 UPRR BRIDGE - GENERAL PLAN 23 2 4 12 - - 18 UPRR BRIDGE - ELEVATION AND TYPICAL SECTION 24 2 4 - 12 _ _ 18 UPRR BRIDGE - SHEET PILE NOTES 25 2 4 - 12 - - 18 UPRR BRIDGE - BRIDGE RETIANING WALL PLAN 26 2 4 10 - - 16 UPRR BRIDGE - BRIDGE RETLANING WALL ELEVATION 27 2 4 10 16 UPRR BRIDGE - GROUND ANCHOR DETAILS 28 2 4 - 10 - 16 UPRR BRIDGE - WALER & ANCHOR VVALL DETAILS 29 - 2 4 10 16 UPRR BRIDGE SHORING, TIEBACK, AND ANCHOR WALL LIMITS 30 2 4 - 10 - - 16 UPRR BRIDGE - GROUND IMPROVEMENT - SHEET 1 31 - 2 4 - 10 - 16 UPRR BRIDGE - GROUND IMPROVEMENT - SHEET 2 32 2 4 - 10 - 16 UPRR BRIDGE - GROUND IMPROVEMENT - SHEET 3 1 33 2 4 10 - 15 Page 16 o 1 EXHIBIT D1: CONSULTANT FEE DETERMINATION CITY OF TUKWILA - STRANDER BOULEVARD EXTENSION Structures Drawing List 9/5/2017 DRAWING UST Number 1 -wTz6c64'/ o. 2 a. W ILAu U 60 0 0 a -0 a. < Totals DSC 5 93.03 I $ 63,54 I 5 47.96 i $ 40.67 1 $ 62.04 ] $ 46.26 I 5 40.00 I 5 35.26 UPRR BRIDGE - PILE- LAYOUT PLAN & FOOTING REINFORCEMENT 34 2 4 - 10 , - 16 UPRR BRIDGE - PILE & FOOTING DETAILS 35 2 4 10 - - 16 UPRR BRIDGE - BEARING ELEVATIONS 36 2 4 - 10 - - 16 UPRR BRIDGE - TYPICAL SECTION 37 2 4 10 16 UPRR BRIDGE- ABUTMENT #1 ELEVATION 38 2 4 - 10 16 UPRR BRIDGE - ABUTMENT #1 PLAN 39 2 4 - 10 - 16 UPRR BRIDGE - ABUTMENT #3 ELEVATION 40 2 4 10 _ 16 UPRR BRIDGE - ABUTMENT #3 PLAN 41 - 2 4 - 10 _ - 16 UPRR BRIDGE - PIER #2 ELEVATION 42 2 4 10 - 16 UPRR BRIDGE - PIER #2 PLAN 43 - 2 4 1G - - 16 UPRR BRIDGE - STAGELINE WALLS AT ABUTMENTS 44 - 2 4 ID - 16 UPRR BRIDGE - ABUTMENT & PIER SECTIONS 45 2 4 10 - 16 UPRR BRIDGE - MISCELLANEOUS FOUNDATION DETAILS 46 - 2 4 . ID - 16 UPRR BRIDGE - FOUNDATION REINFORCEMENT TABLES 47 2 4 - ' 10 - - 16 UPRR BRIDGE - FOUNDATION ESTIMATED QUANTITIES 48 . 2 4 _ 10 - 16 UPRR BRIDGE - FRAMING PLAN - SPAN 1 (MAIN 1 & 2) 49 2 4 10 - - 16 UPRR BRIDGE - FRAMING PLAN - SPAN 2 (MAIN 1 & 2) 50 - 2 4 - 10 - 16 UPRR BRIDGE- FRAMING DETAILS 51 2 4 10 16 UPRR BRIDGE - BALLAST PAN PLAN 52 - 2 4 - It) - 16 UPRR BRIDGE - BALLAST PAN DETAILS 53 2 4 ID 16 UPRR BRIDGE - BEARING DEIAILS 54 - 2 4 - - 10 _ 16 UPRR BRIDGE - MISCELLANEOUS STEEL DETAILS (10F 2) 55 2 4 10 16 UPRR BRIDGE - MISCELLANEOUS STEEL DETAILS (2 OF 2) 56 2 4 - 10 - 16 UPRR BRIDGE - HANDRAIL PANEL DETAILS (1 OF 2) 57 2 4 10 16 UPRR BRIDGE - HANDRAIL PANEL DETAILS (2 OF 2) 58 - 2 4 - - 10 - 16 UPRR BRIDGE - BRIDGE DECK WATERPROOFING (1 OF 2) 59 2 4 - 10 16 UPRR BRIDGE - BRIDGE DECK WATERPROOFING (2 OF 2) 60 - 2 4 _ 10 16 UPRR BRIDGE - BRIDGE UTILITY PLAN 61 2 4 10 - 16 UPRR BRIDGE - BRIDGE UTILITY DETAILS 62 - 2 4 - 10 - 16 UPRR BRIDGE - MISCELLANEOUS DETAILS (1 OF 2) 63 - 2 4 - - 10 - - 16 UPRR BRIDGE - MISCELLANEOUS DETAILS (2 OF 2) 1 64 2 4 - 10 - 16 UPRR TEMPORARY SHORING WALL PLANS 103 - - _ - - _ - _. 1 UPRR BRIDGE - SHEET P-ILE NOTES 65 UPRR BRIDGE - TEMPORARY SHORING PLAN - STAGE 1 66 UPRR BRIDGE - TEMPORARY SHORING ELEVATION - STAGE 1 67 See Elnelht Fee Es6rnele for Detaes UPRR BRIDGE. GROUND ANCHOR DETAILS 68 Page 17 of 31 EXHIBIT D1: CONSULTANT FEE DETERMINATION CITY OF TUKWILA - STRANDER BOULEVARD EXTENSION Structures Drawing List 9/5/2017 DRAWING LIST Number 7 a_ _ ,,, c %—. a. a c LU -• . a. ra ,.. z 0 ,e z a co w < c -6) 'tz c c w -. 12 o ,,. 2 , •""> i..5 0 an 0 0 ._ .c 0. r.9 — ..: o o C . .) 0. i ci. < Totals DSC S 93.03 [s 63.54 1 $ 47.98J 5 40. 7 1 $ 62.04 ! $ 46 26 1 5 40.00 1 5 35.26 UPRR BRIDGE - WALER & ANCHOR WALL DETAILS 69 UPRR BRIDGE - SHORING, TIEBACK, AND ANCHOR WALL LIMITS 70 VEHICULAR BRIDGE PLANS 10.4 - 46 92 -234 - - 372 VEHICULAR BRIDGE - BRIDGE GENERAL NOTES AND SHEET LIST 71 - 2 4 12 18 VEHICULAR BRIDGE - GENERAL PLAN & ELEVATION 72 2 4 - 12 - - 18 VEHICULAR BRIDGE - SHEET PILE NOTES 73 2 4 . 10 - - 16 VEHICULAR BRIDGE - BRIDGE RETIANING WALL PLAN 74 - 2 4 - 10 - - 16 VEHICULAR BRIDGE - BRIDGE RETIANING WALL ELEVATION 75 2 4 - - 10 - - 16 VEHICULAR BRIDGE - GROUND ANCHOR DETAILS 76 - 2 4 10 - 16 VEHICULAR BRIDGE - WALER & ANCI-IOR WALL DETAILS 77 2 4 - 10 - 16 VEHICULAR BRIDGE - SHORING, TIEBACK, AND ANCHOR WALL LIMITS 78 - 2 4 - - 10 - 16 VEHICULAR BRIDGE - GROUND IMPROVEMENT - SHEET 1 79 - 2 4 10 - - 16 VEHICULAR BRIDGE - GROUND IMPROVEMENT - SHEET 2 80 2 4 - - 10 - - 16 VEHICULAR BRIDGE - GROUND IMPROVEMENT - SHEET 3 81 - 2 4 _ 10 - - 16 VEHICULAR BRIDGE - PILE LAYOUT PLAN & FOOTING REINFORCEMENT 82 2 4 - 10 - 16 VEHICULAR BRIDGE - PILE & FOOTING DETAILS 83 2 4 - 10 - 16 VEHICULAR BRIDGE - BEARING ELEVATIONS 84 2 4 - 10 - - 16 VEHICULAR BRIDGE - ABUTMENT '41 ELEVATION 85 - 2 4 , 10 - 16 VEHICULAR BRIDGE - ABUTMENT #1 PLAN 86 2 4 - to - 16 VEHICULAR BRIDGE - ABUTMENT rt3 ELEVATION 87 - 2 4 - 10 - 16 VEHICULAR BRIDGE - ABUTMENT tI3 PLAN 88 2 4 10 16 VEHICULAR BRIDGE - STAGELINE WALLS AT ABUTMENTS 89 2 4 - - 10 - - 16 VEHICULAR BRIDGE - ABUTMENT & PIER SECTIONS 90 - 2 4 10 - 16 VEHICULAR BRIDGE - MISCELLANEOUS FOUNDATION DETAILS 91 - 2 4 - 10 - i6 VEHICULAR BRIDGE - FOUNDATION REINFORCEMENT TABLES 92 2 4 - 10 - 16 VEHICULAR BRIDGE - FOUNDATION ESTIMATED 'QUANTITIES 93 - 2 4 - 10 - - 16 VEHICULAR BRIDGE- FRAMING PLAN 94 VEHICULAR BRIDGE - TYPICAL SECTION 95 VEHICULAR BRIDGE - GIRDER DETAILS (1 OF 3) 96 VEHICULAR BRIDGE- GIRDER DETAILS (2 OF 3) 97 VEHICULAR BRIDGE - GIRDER DETAILS (3 OF 3) 98 VEHICULAR BRIDGE END DIAPHRAGM 99 VEHICULAR BRIDGE - INTERIVIEDIATE DIAPHRAGM 100 VEHICULAR BRIDGE - DECK REiNFORCEMENT 101 VEHICULAR BRIDGE - DECK REINFORCEMENT SECTION 102 VEHICULAR BRIDGE- TRAFFIC BARRIER DETAILS (1 OF 3) 103 Se BrIgthi Fee Estimate for Details Page 18 of 31 EXHIBIT 01: CONSULTANT FEE DETERMINATION CITY OF TUKWILA - STRANDER BOULEVARD EXTENSION Structures Drawing List 9/5/2017 DRAWING UST I Number tl -2- —6 'z cl. Cr) 2 2 ci Cli c . _ oa Lij tdi ci a 1 z 0 u c 2 a Cri w 'Eo 0 _ c IL _ o = .- o co < (..) cl c cm cTi .cii 0 0 .2 .c a 6 o 0 .1 c :i.' L 71 Totals DSC $ 93.03 1 $ 63.54 I $ 47.98 I $ 40.67 1 $ 62.04 I $ 46.26 1 $ 40.00 I $ 35.26 VEHICULAR BRIDGE - TRAFFIC BAR2R1ER DETAILS (2 OF 3) 104 105 106 107 1013 109 VEHICULAR BRIDGE- TRAFFIC BA RR I E R DETAILS (3 OF 3) VEHICULAR BRIDGE - EXPANSION JOINT DETAILS VEHICULAR BRIDGE - APPROACH SLAB DETAILS (1 OF 2) VEHICULAR BRIDGE- APPROACH SLAB DETAILS (2 OF 2) VEHICULAR BRIDGE - SUPERSTRUCTURE REINFORCEMENT TABLES RETAINING WALL PLANS 10.5 - 132 264- - 688 - - 1,084 STRUCTURAL RETAINING WALL - GENERAL NOTES AND LIST OF SHEETS EXISTING RETAINING WALL REMOVAL SHEET PILE NOTES RETAINING WALL 81 - PLAN (1 OF 2) !RETAINING WALL 81 - PLAN (2 OF 2) RETAINING WALL 81 - ELEVATION (1 OF 2) RETAINING WALL 81 - ELEVATION (2 OF 2) RETAINING WALL 41 - SECTIONS RETAINING WALLS 82 & F/3- PLAN (1 OF 2) RETAINING WALLS 42 483- PLAN (2 OF 2) RETAINING WALLS 82 & 83 - ELEVATION (1 OF 2) RETAINING WALLS 82 & 83 - ELEVATION (2 OF 2) 110 111 112 113 114 115_ 116 117 118 119 120 121 122 123 124 125- 126 127- 128 129 130 131 132 133 134 135 136- 137- 138 . - - - - - - - - - 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 4 4 4 4 412 4 4 4- 4- 412 410 4 410 410 4 4 4- 4 410 4 4 4- 4 412 4- 4- 4 4 4- - - - - - - - - - - - _ - - - - - - - - - - - - - 12- 12 10 12- 10 10 10 12 10 10 10 10 10 10 10 10 10 12 10 10 10 10 - - - - - - _ - - - - - - - - 18 18 16 18 18 16 16 16 18 18 16 16 16 16 16 16 16 16 16 16 16 16 16 18 la 16 16 16 16 RETAINING WALLS 82 & 83 - SECTIONS RETAINING WALL 44 -PLAN RETAINING WALL 4.1 - ELEVATION RETAINING WALL #4 - SECTIONS RETAINING WALL 85- PLAN RETAINING WALL 85 ELEVATION RETAINING WALL 85 - SECTIONS & DETAILS (1 OF 2) RETAINING WALL 85 - SECTIONS & DETAILS (2 OF 2) RETAINING WALL 46 PLAN RETAINING WALL 46 - ELEVATION RETAINING WALL 46 - SECTIONS RETAINING WALL 87 - PLAN RETAINING WALL 87- ELEVATION RETAINING WALL 87 - SECTIONS RETAINING WALL 48 - PLAN RETAINING WALL 88 - ELEVATION RETAINING WALL 88 - SECTIONS & DETAILS (1 OF 2) Page 19 of 31 EXHIBIT D1: CONSULTANT FEE DETERMINATION CITY OF TUKWILA - STRANDER BOULEVARD EXTENSION Structures Drawing List 9/5/2017 DRAWING UST Number rs co c -5 a. c . . us CI. cp t 5 oo os c c —--. o ...Ct. a. E a.. 0 os r. 72 1 U , us ar -3 cl; wCs o — - To' '5 r 0 Ls u 0 -:-. m ._ ,. 0 0 0 CE 0 0 o 0 0 0 0 E - 13 e.5 a. < Total DSC $ 9193 t S 63.54 $ 47.98 I $ 40.67 I $ 62.04 1 5 46/6 1 $ 40.00 ] $ 35.26 RETAINING WALL a - SECTIONS & DETAILS (2 OF 2) 139 2 4 - - 10 - 16 RETAINING WALL #9 - PLAN 140 - 2 4 10 . 18 RETAINING WALL #9 - ELEVATION 141 - 2 4 - - 10 - 16 RETAINING WALL #9 - SECTIONS 142 2 4 - 10 15 RETAINING WALL #10 - PLAN 143 2 4 - 10 - 16 RETAINING VVALL #10 - ELEVATION 144 - 2 4 - 10 - 15 RETAINING WALL #10 - SECTIONS 145 Z 1 - 10 16 RETAINING WALL #11 - PLAN 146 - 2 4 - 10 - 16 RETAINING WALL #11 - ELEVATION (1 OF 21 147 2 4 - - 12 15 RETAINING WALL #11 - ELEVATION (2 OF 2) 148 2 4 10 16 RETAINING WALL #11 -SECTIONS 149 2 4 - - 10 16 RETAINING WALL #12 - ELEVATION (I OF 2) 150 , 2 4 - _ 12 18 RETAINING WALL #12 - ELEVATION (2 OF 2) 151 .. 2 4 - - 10 - 16 RETAINING WALL #12 - SECTIONS 152 2 4 - - 10 16 RETAINING WALL - GROUND ANCHOR DETIALS (1 OF 2) 153 • 2 4 10 16 RETAINING WALL - GROUND ANCHOR DET1ALS (2 OF 2) 154 2 4 - - 10 15 RETA)NING WALL - ANCHOR WALL DETIALS (1 06 4) 155 2 4 - 10 16 RETAINING VVALL - ANCHOR WALL DETIALS (2 OF 4) 156 - 2 4 - 10 - 16 RETAINING WALL - ANCHOR WALL DETIALS (3 OF 4) 157 _ 2 4 _ 10 15 RETAINING WALL - ANCHOR WALL DETIALS (4 06 41 158 - 2 4 10 16 RETAINING WALLS - SOLDIER PILE WALL DETAILS (1 OF 2) 159 - 2 4 - 12 • 18 'RETAINING WALLS - SOLDIER PILE WALL DETA1LS (2 OF 2) 160 - 2 4 - 12 15 RETAINING WALLS #13 TO #15 - PLAN 161 2 4 - - 10 . 16 RETAINING WALLS #13 &#15 - ELEVATION 162 - 2 4 , 10 - 15 'RETAINING WALLS #14 &#16 - ELEVATION 163 2 4 - 10 15 RETAINING WALLS - GEOSYNTETIC WALL DETAILS (1 OF 2) 154 .. 2 4 . 10 16 RETAINING WALLS - GEOSYNTETIC WALL OETAILS (2 OF 2) 165 2 4 - 10 16 MOMENT SLAB DETAILS (1 OF 2) 166 - 2 4 10 16 MOMENT SLAB DETAILS (2 OF 2) 167 24 - 10 15 RETAINING WALL #17 - PLAN 165 - 2 4 - - 10 16 'RETAINING WALL #12 - ELEVATION 169 2 4 - 12 15 RETAINING WALL *17 - SECTIONS & DETAILS (1 OF 21 170 - 2 4 - 12 18 RETAINING WALL #17 - SECTIONS & DETAILS (2062) 171 - 2 4 - , 10 16 PEDESTRAIN RAILING (1 OF 2) 172 - 2 4 . 10 16 PEDESTRAIN RAILING (2 OF 2) 173 2 4 - - 10 16 SAFETY FENCE DETAILS (1 06 2) 174 1' 4 - - 10 16 1 SAFETY FENCE DETAILS (2 OF 2) 175 - 2 4 - ' 12 - 16 Page 20 of 31 EXHIBIT D1: CONSULTANT FEE DETERMINATION CITY OF TUKWILA - STRANDER BOULEVARD EXTENSION Structures Drawing List 91512017 LIST Number 7.5 0 • „- - a. Ii ha-, co. co ci. 2 c tu 6 a. Ti ,.. U1 11.1 8 c _ it/ 0 c - 13 c ji '6EDRAWING 0 La 0 0 :E 0 — 0 c a_ < Totals ; DSC 5 93 63 54 i 5 47.98 1 $ 40.67 1 5 62.04 i $ 46 26 i 5 40.00 [ 5 35.26 STRUCTURAL SEAL PLANS 10.6 - 132 - , 338 _ - 636 SEAL - FOUNDATION PLAN (1 OF 5) 176 - 2 4 - - 12 18 SEAL - FOUNDATION PLAN (2 OF 6) 177 . 2 4 12 18 SEAL - FOUNDATION PLAN (3 OF 6) 178 2 4 15 - 16 SEAL FOUNDATION PLAN (4 OF 6) 179 2 4 - 10 16 SEAL - FOUNDATION PLAN (5 OF 6) 180 - 2 4 - 10 - 16 SEAL - FOUNDATION PLAN (6 OF 6) 181 - 2 4 - IC) - 16 SEAL - SECTIONS (1 OF 4) 182 2 4 - 12 18 SEAL - SECTIONS (2 OF 4) 183 2 4 _ 12 1$ SEAL - SECTIONS (3 OF 4) 184 2 4 - 10 - 15 SEAL SECTIONS (4 OF 4) 185 - 2 4 - 10 le SEAL - STAGING (1 OF 2) 186 2 4 - 10 16 SEAL - STAGING (2 OF 2) 187 2 4 10 15 SEAL - STRUCTURE/FOUNDATON INTERFACE (1 OF 2) 188 2 4 10 16 SEAL - STRUCTUREFOLINDATION INTERFACE (2 OF 2) 189 - 2 4 10 - 15 SEAL - GROUND ;MPROVEMENT (1 OF 2) 190 2 4 - 10 16 SEAL - GROUND IMPROVEMENT (2 OF 2) 191 - 2 4 - 10 16 SEAL- REINFORCED SEAL DETAILS (1 OF 3) 192 2 4 10 15 SEAL - REINFORCED SEAL DETAILS (I OF 3) 193 2 4 - 10 _ 16 SEAL- REINFORCED SEAL DETAILS (1 OF 3) 194 2 4 10 16 SEAL - EDGE BEAM (1 OF 5) 195 2 4 10 - 16 SEAL - EDGE BEAM (2 OF 5) 196 2 4 - - 10 - 16 SEAL - EDGE BEAM (3 OF 5) 197 2 4 . 10 - 16 SEAL - EDGE BEAM (4 OF 5) 198 2 4 - 10 16 SEAL - EDGE BEAM (5 OF 5) 199 - 2 4 10 16 SEAL- APPROACH SLAB (oVEST) 200 2 4 10 - 16 SEAL - APPROACH SLAB (EAST) 201 2 4 _ - 10 - 16 SEAL - APPROACH SLAB (LOOP) 202 - 2 4 - 10 16 SEAL - APPROACH SLAB (NORTH) 203 2 4 10 16 SEAL - APPROACH SLAB (SOUTH) 204 2 4 - - 10 - 16 SEAL - APPROACH SLAB DETAILS 205 2 4 10 - 16 SEAL - FASCIA WALL SECTIONS AND DETAILS (1 OF 3) 206 - 2 4 10 16 ,SEAL - FASCIA WALL SECTIONS AND DETAILS (2 OF 3) 207 2 4 - 10 16 SEAL - FASCIA WALL SECTIONS AND DETAILS (3 OF 3) 208 - 2 4 - 10 16 ! I PEDESTRIAN BRIDGE PLANS 10 7 1 - 24 45- 124 - 196 Page 21 of 31 EXHIBIT DI: CONSULTANT FEE DETERMINATION CITY OF TUKWILA - STRANDER BOULEVARD EXTENSION Structures Drawing List 91512017 DRAWING LIST 1 Number ):0 c 5.7 co a To t IL .7 3 Ez o c c "Ei c- E Q. To 0 0 u__F 2 cm I.77, W , c a 0 0 _c 0 c 2 Lu '-ra is 1-4 -3 2E, = c ea 7,7 0 0 r.0 0 0 t.) k a fo L,... — ..: 0 0 0 c — 2 -0 a. q Totals DSC $ 93.03 i $ 63,54 1 $ 47.98] $ 41167 1 S 6104 1 $ 46.26 1 5 40.00 1 5 35.26 TRAIL BRIDGE - BRIDGE GENERAL NOTES AND SHEET LIST 209 . 2 4 - - 12 16 TRAIL BRIDGE - GENERAL PLAN 8 ELEVATION 210 - 2 4 - 12 18 TRAIL BRIDGE - SUPERSTRUCTURE TYPICAL SECTION & NOTES 211 2 4 10 - 16 TRAIL BRIDGE - FOUNDATION PLAN 212 - 2 4 - IC) 16 TRAIL BRIDGE - ABUTMENT ELEVATION 213 - 2 4 - - 10 - 16 TRAIL BRIDGE - ABUTMENT PLAN 214 - 2 4 10 - 16 TRAIL BRIDGE - ABUTMENT CURTAIN WALLS 215 2 4 - 10 - 16 TRAIL BRIDGE - MISCELLANEOUS FOUNDATION DETAILS (i OF 2) 216 . 2 4 . . 10 - 16 TRAIL BRIDGE - MISCELLANEOUS FOUNDATION DETAILS (2 OF 2) 217 - 2 4 - 10 - 16 TRAIL BRIDGE - FOUNDATION REINFORCEMENT TABLES 2/8 2 4 - - 10 - , 16 TRAIL BRIDGE - FOUNDATION ESTIMATED QUANTITIES 219 - 2 4 - - 10 - - 1 16 TRAIL BRIDGE - BEARiNGS 220 - 2 4 10 16 NIISCILLANEOLIS STRUCTURAL DRAWINGS 10.8 - 20 40 - . 100 - - 160 LIMITS OF STRUCTURAL EXCAVATION CLASS A - BNSF FOUNDATION SLAB 221 - 2 4 - 10 - 16 LIMITS OF STRUCTURAL EXCAVATION CLASS A - uPRR FOUNDATION SLAB 222 - 2 4 , 10 - 15 LIMITS OF STRUCTURAL EXCAVATION CLASS A - VEHICULAR FOUNDATION SLA' 223 - 2 4 - 10 15 UM ITS OF STRUCTURAL EXCAVATION CLASS A - PED FOUNDATION FOOTINGS 224 2 4 - 10 - 15 LIMITS OF STRUCTURAL EXCAVATION CLASS A - ANCHOR WALLS 225 2 4 - 10 15 LNITS OF STRUCTURAL EXCAVATION CLASS A - SEAL (1 OF 3) 226 2 4 _ - 10 - - 15 LIMITS OF STRUCTURAL EXCAVATION CLASS A - SEAL (2 OF 3) 227 - 2 4 - 10 - - 15 LIMITS OF STRUCTURAL EXCAVATION CLASS A- SEAL (3 OF 3) 228 2 4 10 - 16 LUMINAIRE BRACKET DETAILS (1 OF 2) 229 - 2 4 - 10 16 LUMINAIRE BRACKET DETAILS (2 OF 2) 230 - 2 4 - 10 . - 16 SIGNAL BRIDGE PLAN AND ELEVATION 231 SIGNAL BRIDGE DETAILS (1 OF 3) 232 SIGNAL BRIDGE DETAILS (2 OF 3) 233 See BrIgths Fee Estimate to Dews SIGNAL BRIDGE DETAILS (3 OF 3) 234 SIGNAL BRIDGE FOUNDATION (1 OF 2) 235 SIGNAL BRIDGE FOUNDATION (2 OF 2) 236 SUBTOTAL - ALL STRUCTURAL DRAWINGS, 416 832 2112 1 3,360 Page 22 of 31 EXHIBIT D-1: CONSULTANT FEE DETERMINATION CITY OF TUKWILA - STRANDER BOULEVARD EXTENSION Pump Station Drawing List 9/5/2017 TASK 0ESCRFPT1ON Task Number 0 _ c E 41I c L tl 15i .c c a o+ '— o a. LI m 00 10 0 1.1 c Totals DSC $ 93.03 ¶ $ 63.54 1 5 47.98 $ 40.67 1 $ 62,04 $ 46.26 5 40.90 35.26 DRAINING LIST Totals, PUMP STATION PLANS OUTFALL PUMP STATION PLANS PUMP STATIONS - ovERALL PLAN EXISTING PUMP STATION - DESIGN DATA EXISING PUMP STATION - ENLARGED PLAN IEXIS4NG PUMP STATION - DEMOLITON DETAILS - SHEET 1 1EXLS1NG PUMP STATION - OEMOLJTON DETAILS - SHEET 2 EXISING PUMP STATION - DEMOLITON DETAILS - SHEET 3 EXISTING PUMP STATION - WET WELL & VAULT - PLAN EXISTING PUMP STATION - WET WELL AND VAULT SECTIONS - SHEET 1 EXISTING PUMP STATION - WET WELL AND VAULT SECTIONS - SHEET 2 EXISTING PUMP STATION - WET WELL ANO VAULT SECTIONS - SHEET 3 EXISTING PUMP STATION WET WELL AND VAULT DETAILS - SHEET1 EXISTING PUMP sTA-rtaN - WET WELL AND VAULT IDETFAILS - SHEET 2 EXISTING PUMP STATION - STRUCTURAL NOTES !EXISTING PUMP STATION - STRUCTURAL DETAILS - SHEET 1 ,EXISTING PUMP STATION - STRUCTURAL DETAJLS - SHEET 2 IGROUND WATER PUMP STATION - DESIGN DATA GROUND WATER PUMP STATION - SITE PLAN GROUND WATER PU52 STATION - PIPING PLAt4 AND PROFILES GROUND WATER PUMP STATION - DEMOLITION DETAILS - SHEET 1 GROUND WATER PUMP STATION - DEMOLITION DET.AILS - SHEET 2 GROUND WATER PUMP STATION - WET WELL AND VAULT - PLAN GROUND WATER PUMP STATION - WETWELL AND VAULT SECTIONS - SHEET 1 GROUND WATER PUMP STATION - WETWELL AND VAULT SECTIONS - SHEET 2 GROUND WATER PUMP STATION - CML DETAILS - SHEET GROUND WATER PUMP STATION - COAL DETAILS - SHEET 2 OUND WATER PUMP STATION - CML IJETAILS - SHEET 3 OUTFALL PUMP STATION - DESIGN DATA OUTFALL PIJMP STATION - SITE PLAN UTFALL PUMP STATION - PIPING PLAN AND PROFILES OUTFALL PUMP STATION WET WELL AND VAULT PLAN OUTFALL PUMP STATION - WETWELL AND VAIJLT SECTIONS - SHEET 1 OUTFALL PUMP STATION - WETWELL AND VAULT SECTIONS - SHEET 2 OUTFALL PUMP STATION - WETWELL AND VAULT SECTIONS - SHEET 3 OUTFALL PUMP STATION - CML DETAILS - SHEET 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 15 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 12 1/6 40 464 440 76 184 216 408 112 4 16 16 4 40 6 4 6 18 4 6 16 4 a 16 4 a 16 4 40 16 4 24 16 4 24 16 4 24 15 4 16 16 4 10 16 8 6 15 8 16 24 a 16 24 4 40 16 4 8 24 4 411 15 4 8 15 4 8 16 4 40 24 4 24 16 4 24 15 4 24 16 4 8 16 4 8 16 a 40 15 4 15 16 4 16 24 4 40 24 4 24 24 4 24 16 4 24 16 4 8 16 1,072 884 48 52 28 28 28 28 60 44 44 44 36 36 32 48 dB 60 36 60 28 28 65 44 44 44 28 28 54 36 44 58 52 44 44 28 Page 23 of 31 EXHIBIT D-1: CONSULTANT FEE DETERMINATION CITY OF TUKVVILA - STRANDER BOULEVARD EXTENSION Pump Station Drawing List 915/2017 TASK DESCRIPTIDN Task Number ): C f IP ---cc LLI 15: t; RD at a at t't a v r., t; a c — — -ED .... cl.:g .... c tn. u.s r9 0 ra, C Isl = > _ C 0 ;-- — C.) y 0 < 0 .i. Ca c Cs, ..... 0 o 8 0 0 .. u c o. < Totats DSC 5 93.03 I $ 63.54 I $ 47.98 [ $ 40.671 5 62.04 5 46.26 I $ 40.00 1 5 35.26 OUTFALL PUMP STATION - COAL DETAILS - SHEET 2 OUTFALL PUMP STATION - COAL DETA/LS - SHEET 3 OUTFALL PUMP STATION - CIVIL DETAILS - SHEET 4 OUTFALL PUMP STATION - STRUCTURAL NOTES OUTFALL PUMP STATION STRUCTURAL PLANS OUTFALL PUMP STATION - STRUCTURAL ELEVATIONS OUTFALL PUMP STATION - STRUCTURAL SECTIONS OUTFALL PuMP STATION - STRUCTURAL DETAILS - SHEET 1 OUTFALL PUMP STATION - STRUCTURAL DETAILS - SHEET 2 OUTFALL PUMP STATIC/14 - STRUCTURAL DETAILS - SHEET 3 35 36 37 38 39 40 41 42 43 44 4 4 4 4 16 4 40 4 40 4 40 4 16 4 16 4 15 13 a 9 16 16 16 16 40 40 40 24 24 24 28 28 26 36 84 64 84 44 44 44 SUBTOTAL DRAWINGS 12 192 224 680 848. Page 24 of 31 EXHIBIT D -i: CONSULTANT FEE DETERMINATION CITY OF TUKWILA - STRANDER BOULEVARD EXTENSION Genera -Civil Drawing List 9/5/2017 TASK DESCRIPTION Task Number ef z ca. L- c 6: 2 ..a.: c -a c w 5 ,= a a -E.-.' c a_ tn. ui � a) c w - (7.) c o c o Ta o o a Ell a. u u) o 0 0 -S. E 2 in a. < Totals DSC 5 93.03 1 5 63.54147.98 1 5 40.671 62.04 I $ 46.26 1 5 40.00 j 5 35.26 DRAWING LIST Number TotaI5 GENERAL-CEVIL PLANS - 742 72 2,142 - 2,264 . 5220 ,COVER SHEET 1 2 2 a 12 IVIOINITY MAP 2 2 2 5 12 SUMMARY OF QUANTITIES - SHEET 1 3 2 2 4 4 12 ' SUMMARY OF QUANTITIES - SHEET 2 4 2 2 4 4 12 INDEX SHEET - SHEET 1 5 2 4 4 10 INDEX SHEET - SHEET 2 6 2 4 4 10 ,KEY PLAN LAYOUT 7 2 4 a 14 SURVEY CONTROL - SHEET 1 8 4 9 8 20 EGEND AND AB8REV1ATIONS - SHEET 1 9 2 4 a 14 !LEGEND AND ABBREVIATIONS - SHEET 1 10 2 4 8 14 GENERAL NOTES AND UTILITY NOTES . SHEET 1 11 4 4 4 12 ENERAL NOTES AND UTILITY NOTES - SHEET 2 12 4 4 4 12 GENERAL NOTES AND UTILITY NOTES - SHEET 3 13 4 4 4 12 GENERAL NOTES MD UTILITY NOTES - SHEET 4 14 4 4 4 12 ALIGNMENT KEY MAP - SHEET 1 15 4 4 8 16 ALIGNMENT LAYOUT - SI-TEET 1 16 4 4 8 16 AUGNMENT LAYOUT - S1-EET 2 17 4 4 a 16 ALIGNMENT LAYOUT - SHEET 3 18 4 4 9 16 ALIGNMENT LAYOUT - SHEET 4 19 4 4 5 16 ALIGNMENT LAYOUT - SHEET 5 20 4 4 8 16 ALIGNMENT LAYOUT - SHEET 5 21 4 4 6 16 ALIGNMENT LAYOUT - SHEET 7 22 4 4 9 16 ALIGNMENT LAYOUT - SHEET 8 23 4 4 a la ALIGNMENT LAYOUT - SHEET 9 24 4 4 5 16 AUGNMENT LAYOUT - SHEET 10 25 4 4 8 16 RIGHT OF WAY AND EASEMENT KEY MAO 26 2 4 5 14 RIGHT OF WAY AND EASEMENT PLANS - SHEET 1 27 2 2 4 a iRIGHT OF WAY AND EASEMENT PLANS - S/-IEET 2 26 2 2 4 6 RIGHT OF WAY AND EASEMENT PLANS - SHEET 3 29 2 2 4 5 RIGHT OF WAY AND EASEMENT PLANS - SHEET 4 30 2 2 4 8 Rioi-t-r OF WAY AND EASEMENT PLANS - SHEET 5 31 2 2 4 6 FOGH I OF WAY AND EASEMENT PLANS - SHEET 6 32 RIGHT OF WAY AND EASEMENT PLANS - SHEET 7 33 RGI -IT OF WAY AND EASE WNT PLANS - SHEET 6 34 RIGHT OF WAY AND EASEMENT PLANS - SHEET 9 35 Page 25 of 31 EXHIBIT D-1: CONSULTANT FEE DETERMINATION CITY OF TUKWILA - STRANDER BOULEVARD EXTENSION General -Civil Drawing List 915/2017 TASK DESCRIPTION Task Number 41 sit a 0 5' c41 < , at41 0CI a. c c Tu to; La uu ... 0 0 a. a) Ii. Lta 1,J, c a c `i: a. 2 a. 44 u ca 00 Totals DSC RIGHT OF WAY AND EASEMENT PLANS - SHEET 10 RIGI-fi OF WAY AND EASEMENT PLANS - SHEET 11 RIC -HT CIF WAY AND EASEMENT PLAN'S - SHEET 12 C NSTRUCTION STAGING PROJECT - SHEET 1 CONSTRIJCTION STAGING PROJECT - SHEET 2 CONSTRUCTION STAGING PROJECT - SHEET 3 CONSTRUCTION STAGING PROJECT - SHEET 4 CONSTRUCTION STAGING PROJECT - SHEET 5 CONSTRUCTION STAC-1NG UTILITIES - SHEET 1 'CONSTRUCTION STAGING UTILITIES - SHEET 2 CONSTRUCTION STAGING UTILITIES - SHEET 3 CONSTRUCTION STAGING UTILITIES SHEET 4 CONSTRUCTION STAGING UTILITIES - SHEET 5 TRAFFIC CONTROL AND PHASING PLAN SHEET 1 TRAFFIC CONTROL AND PHASING PLAN - SHEET 2 TRAFFIC coraROL AND PHASING PLAN - SHEET 3 TRAFFIC CONTROL .4140 PHASING PLAN - SHEET 4 TRAIL DETOUR - SHEET 1 TRAIL DETOUR - SHEET 2 TRAIL DETOUR - SHEET TRAIL DETOUR - SHEET 4 SITE PREP AND DEMOLITION - SHEET SITE PREP 4440 DEMOLITION - SHEET 2 ISI -TE PREP ,AND DEMOLITION - St -18E11 3 ISITE PREP AND DE VDLTTION - SHEET 4 SITE PREP AND DEMOLITION - SHEET 5 SITE PREP AND DEMOLITION - SHEET 6 1SFTE PREP AND DEMOLITION - SHEET 7 SITE PREP .AND DEWILITION - SHEET 8 SITE PREP AND DEMOUTION - SHEET SITE PREP AND DEMOLITION - SHEET TO EROSION AND SEDIMENT CONTROL NOTES EROSION AND SEDIMENT CONTROL PLAN - SHEET 1 EROSION, AND SEDIMENT CONTROL PLAN - SHEET 2 EROSION AND SEDI44ENT CONTROL PLAN - SHEET 3 EROSION AND SEDIMENT CONTROL PLAN - SH-EET 4 EROSION AND SEDIMENT CONTROL PLAN - SKEET 5 35 37 38 39 40 -1 1 42 43 44 45 46 47 48 49 50 51 52 53 54 55 55 57 58 59 60 61 62 63 64 65 66 57 68 69 70 71 /2 $ 93,03 5 6154 1 $ 47.98 $ 40.67] 5 62.04 I $ 46.26 1 5 40.00 1 $ 3526 4 4 12 12 4 4 12 12 4 4 12 12 4 4 12 12 4 4 12 12 4 4 12 12 4 4 12 12 4 4 12 12 4 4 12 12 4 4 12 12 4 4 12 12 4 1 12 12 4 4 12 12 4 1 12 12 8 12 12 4 12 12 8 12 12 3 12 12 4 12 12 4 12 12 4 12 12 4 12 12 4 12 12 4 12 12 4 12 12 4 12 12 4 12 12 4 12 12 4 12 12 4 12 12 4 12 12 4 12 12 4 12 12 4 12 12 32 32 32 32 32 32 32 32 32 32 32 32 32 32 32 32 32 32 28 28 28 28 28 22 28 28 28 28 28 28 28 28 28 28 Page 26 of 31 EXHIBIT D-1: CONSULTANT FEE DETERMINATION CITY OF TUKWILA - STRANDER BOULEVARD EXTENSION General -Civil Drawing List 9/512017 TASK DESCRIPTION DSC Task Number o_ 2 c 1:31 c 13.1 414, u w 0 ra '5' z "ff, .., c , 13. 65 w 0 0 5 93.03 $ 63.54 I $ 47.98 $ 40.67 [5 62.04 $ 46.26 5 40.00 I 35.26_ Totals EROSION AND SEDIMENT CONTROL PLAN - SHEET 6 EROSION AND SEDIMENT CONTROL PLAN - SHEET 7 EROSIa4 AND SEDIMENT CONTROL FLAN - SHEET 8 EROSION AND SEDIMENT CONTROL PLAN - SHEET 9 EROSION AND SEDIMENT CONTROL PLAN- SHEET 19 FINAL GRADING PLAN - SHEET 1 FINIAL GRADING PLAN - SHEET 2 FINAL GRADING PLAN - SHEET 3 FINAL GRADING PLAN. SHEET 4 FINAL GRADING PLAN - SHEEr 5 ROADWAY SECTIONS - SHEET 1 ROADWAY SECTIONS - SHEET 2 ROADWAY SECTIONS - SHEET 3 ROADWAY SECTIONS - SKEET ROADWAY SECTIONS - SHEET 5 ROADWAY SECTIONS - SHEET 6 ROADWAY SECTIONS - SHEET 7 ROADWAY SECTIONS - SHEET 8 ROADWAY PLAN a PROF ILE - SHEET 1 ROADWAY PLAN a PROFILE - SKEET 2 ROADWAY PLAN a PROFILE - SHEET 3 ROADWAY PLAN a PROF IIE - SHEET 4 ROADWAY PLAN & PROFILE - SHEET 5 ROADWAY PLAN PROFILE - SHEET 6 ROADWAY PLAN & PROFILE - SHEET 7 ROADWAY DETAILS - SNIZET 1 ROADWAY DETAILS - SHEET 2 ROADWAY DETAILS - SHEET 3 ROADWAY !DETAILS - SHEET TRAIL SITE PLAN TRAIL PLAN - SHEET 1 TRAIL PLAN - SHEET 2 TRAIL PLAN, - SHEET 3 TRAIL DEIAILS- SNIEEI 1 SOUND TRANSIT PEDESTRIAN! PATH SITE PLAN SOUND TRANSIT PED PATH - SHEET 1 SOUND TRANSIT PED PATH - SHEET 2 73 74 75 76 77 78 79 80 81 82 83 84 85 86 81 88 89 90 91 92 93 94 95 96 97 98 90 100 101 102 103 104 105 106 107 108 109 4 12 52 4 12 12 4 12 12 4 12 I? 4 12 t2 4 12 8 4 12 8 4 12 8 4 12 5 4 12 8 4 16 16 4 16 15 4 15 16 4 113 15 4 16 18 4 16 16 4 16 16 4 16 16 4 15 15 4 15 16 4 16 16 4 16 16 4 15 16 4 16 15 4 15 16 4 16 16 4 15 16 4 16 13 4 16 16 4 16 15 4 16 13 4 15 16 4 16 18 4 16 16 4 18 16 4 16 15 4 16 16 28 28 28 28 28 24 24 24 24 24 35 36 36 35 35 36 36 36 36 38 35 36 16 36 36 36 36 38 36 35 36 36 36 36 36 36 36 Page 27 of 31 EXHIBIT 0-1: CONSULTANT FEE DETERMINATION General -Civil Drawing List CITY OF TUKWILA - STRANDER BOULEVARD EXTENSION 915/2017 TASK DESCRIPTION Task Number 0. 5)62 Ern c < o u 8 • 0 c = o 0 o. O 0. 05) 0 0 6 Total's SOUND TRANSIT PED PATH - SHEET 3 SOUND TRANSIT PED PATH DETAILS - SHEEN 1 'PAVING PLAN - SHEET 1 PAVING PLAN - SHEET 2 PAVING PLAN - SHEET 3 PAVING PLAN - SHEET 4 PAVING PLAN - SHEET 5 PAVING PLAN - SHEET 6 PAVING PLAN - SHEET 7 INTERSECTION PLAN - W VALLEY HIGHWAY -INTERSECTION PLAN - BUSINESS EN1RANCE 1 INTERSECTION PLAN - BUSINESS ENTRANCE 2 INTERSECTION PLAN - TLAVOLA STATIOT4 ACCESS RD INTERSECTION PLAN - NACHES AVE SW INTERSECTION PLAN - PSE ACCESS 'INTERSECTION DETAILS - SHEET 1 INTERSECTION DETAILS - SHEET 2 ,TACO BELL SITE PLAN - SHEET 1 TACO BELL GRADING PLAN - SHEET ; 1 TACO BELL DETAILS - SHEET 1 TACO BELL DETAILS - SHEET 2 JACK 15 BOX SITE PLAN - SHEET 1 JACK IN BOX GRADING PLAN - SHEET 1 JACK 15 BOX DETAILS - SHEET 1 JACK IN BOX DETAILS - SHEET 2 BUSINESS PARKING LOT PLAN - SHEET 1 BUSINESS PARKING LOT PLAN - SHEET 2 !BUSINESS PARKING LOT DETAILS - SHEET 1 !SIGNING & CI3ANNELIZATION PLAN - SHEET 1 StGNING & CEIANNELIZAT1ON PLAN - SHEET 2 SIGNING & CHANNELIZATICV PLAN - SHEET 3 'SIGNING & CHANNELIZATION PLAN - SHEET A SIGNING & CHANNELIZATION PLAN - SHEET 5 SIGNING & CHANNELLZATIGN PLAN - SHEET 6 SIGNING & CHANNELIZAT1ON PLAN - SHEET 7 ICHANNEDZATION AND SIGNING DETAILS - SHEET 1 ICHANNEUZATION AND SIGNING DETAILS - SHEET 2 DSC' 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 731 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 $ 53-031 $ 63.54 I 5 47.98 1 $ 40.67 1 $ 6104 1 S 46.26 I $ 40.00 $ 35.26 4 16 16 4 16 16 4 8 12 4 8 72 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 16 16 4 15 16 4 16 16 A 15 16 4 16 15 4 16 16 4 16 16 4 16 16 8 12 12 a 12 12 8 12 12 8 12 12 a 12 12 8 12 12 8 12 12 6 12 12 8 12 16 8 12 16 8 12 16 4 15 16 4 15 15 4 16 15 4 16 16 4 16 16 4 15 16 4 16 16 4 15 16 4 16 16 36 35 24 24 25 24 24 24 24 36 36 36 36 36 36 36 36 32 32 12 32 32 32 32 32 36 36 36 36 36 36 35 36 36 36 36 16 Page 28 of 31 EXHIBIT 0-1: CONSULTANT FEE DETERMINATION CITY OF TUKWILA - STRANDER BOULEVARD EXTENSION General -Civil Drawing List 9/5/2017 TASK DESCRIPTION Task Number .... Et -,- iu ..... crt 13 rs cc -r. c a. Zc z cit 'LI c 2. '5 u ULF I& o o C ta _ = 0 e (.3 to 0 - ,_. o o Cr c (.., .= 77) c c c 0 0 °- t.. 0 -o a_ < Totals DSC 5 9303 J $ 63.54 { $ 47.98 I $ 40.67 I 5 62.04 I 5 46.26 I $ 40.00 I $ 35.26 OVERALL COMPOSITE UTILITY PLAN 147 4 8 16 28 UTILITY PLAN AND PROFILE- SHEET 1 148 4 16 16 36 UTILITY PLAN AND PROFILE SHEET 2 149 4 16 16 36 liTILITY PLAN AND PROFIR F- SHEET 3 150 4 16 16 36 UTILITY PLAN P240 PROFILE- SFIEET 4 151 4 16 16 36 UTILITY PLAN AND PROFILE- SHEET 5 152 4 16 16 36 UTILITY PLAN AND PROFILE- SHEET 6 153 4 15 16 36 UTILITY P1A.14 AND PROFILE- SHEET 7 154 4 16 16 36 uriu-ri DETAILS - SHEET 1 155 4 16 16 36 UTILITY DETAILS - SHEET 2 156 4 16 16 36 UTILITY DETAILS - SHEET 3 157 4 *5 15 36 BRIDGE STAGE I UTILITY PLAN 158 4 12 12 28 BRIDGE STAGE I UTILITY DETAILS 159 4 12 12 23 BRIDGE STAGE 1E UTILITY PLAN 160 4 12 12 23 BRiDGE STAGE A LJT:LITY DETAILS 161 4 12 t2 28 SPU WATER MAIN PROTECTION - SHEET 1 162 4 4 8 12 28 SPU WATER MAJN PROTECTION - SHEET 2 163 4 4 8 12 26 SPU WATER MAIN PROTEC.TION - SI-IEET 3 164 4 4 8 12 28 DRAINAGE PLAN - SHEET 1 165 4 16 16 36 DRAINAGE PLAN - SHEET 2 165 4 15 1,6 36 DRAINAGE PLAN - SI-rEET 3 167 4 16 15 36 DRAINAGE PLAN - SHEET 4 168 4 16 16 36 DRAINAGE PLAN - SHEET 5 169 4 16 16 38 DRAINAGE PLAN - SHEET 6 170 4 15 15 36 DRAINAGE PLAN - SHEET 7 171 4 15 16 36 DRAINAGE PROFILE - SHEET 1 372 4 16 16 36 DRAINAGE PROFILE - SPEET 2 13 4 16 15 14 DR.AJNAGE PROFILE - SKEET 3 174 4 16 16 36 DRAINAGE PROFILE - SHEET 4 1 75 4 16 16 36 DISCRARGE ROUTE PLAN 6 PROFILE - SHEET 1 176 4 16 16 36 DISCHARGE ROUTE PLAN 6 PROFILE - SHEET 2 177 4 16 15 36 POND PLAN - SHEET 1 1 78 4 16 16 36 POND SECTIONS - SHEET 1 179 4 16 15 36 DRAINAGE DETAILS - SI-FEE_T 1 130 4 16 16 36 RAINAGE DETAILS - SHEET 2 181 4 16 16 35 IDRAINAGE DETAJLS - SHEET 3 182 4 16 15 36 1DRAINAGE DETAILS - SHEET 4 183 4 16 16 36 Page 29 of 31 EXHIBIT D-1: CONSULTANT FEE DETERMINATION CITY OF TUKWILA STRANDER BOULEVARD EXTENSION General -Civil Drawing List 91512017 TASK DESCRIPTION ' Task , Number 7. 4.2 a. * w c = LU ar E a. I! " 2 't; = —2 Ca*" m Ill 'al cr "En Lu = > — c 7-.}17; = , 0 G 0 Cr) 0 < ---,_ ,. CI 0 0 ,,, c a 6- -: o 0 t _C S.' E a. < Totals DSC 5 93.03 $ 63.54 1 $ 47.98 1 $ 4067J 62.04 1 5 4616 1 $ 40.00 i 5 35.26 , OUTFALL PLAN & PROFILE - SHEET 1 F^ DETAILS - SHEET 1 184 185 4 4 742 72 16 16 2142 16 16 2264 36 36 5,220 SUBTOTAL DRAWINGS Page 30 of 31 EXHIBIT D -T: CONSULTANT FEE DETERMINATION CITY OF TUKWILA - STP -ANDER BOULEVARD EXTENSION KC Pump Station DrawIngo 9)512017 TASK DESCRIPTION Task Number o , 41 cL c, u m50 cc E c c 76 4- , to .3 w 0 = a 5 c c En c ilo -, c _ 5 5 rs U ci 41C U -- ..i, c r2. 4,3 La — Es o 1) 7.1 c Totals DSC $ 93.03 1 $ 63.54 J $ 47.98 1 $ 40,67 1 $ 62.04 1 $ 4626 i $ 40.00 1. $ 3526 DRAMN UST Nwnher ToWs PUMP STATION PLANS - . . -0 - - - KONG COUNT, PUMP STATION - DESIGN DATA 1i 0 KING COUNT* PUMP STATION - SITE PLAN 2 9 KONG COUNT' PUMP STATION SEWER irNE cLAN AND PPOFFLES - SMEET : 3 0 'KING COUNTY Puma STATION SEWER UNE PLAN AND PROFILES - 3) -)EST 2 4 41 KONG COUNTY PUMP STATION - SEWER LINE PLAN AND FROFILES - SHEET 3 5 ' 0 KONG COUNTY PUMP STATION - WETWELL AND VAULT PLAN 6 0 .KING COUNTY PUMP STA -PION - WERNELL AND VAULT SECTIONS - SHEET 1 7 0 KING COUNTY PIMP STATION - VVETWITELL AND VAULT SECTIONS - SHEET 2 8 0 KONG COUNTY ELME STATION - wEnArat_ AND VAULT SECTIONS - SHEET 3 cl 0 1KJNG CattNTY PUMP STATION - CP./IL DETAILS . SHEET 7 10 0 KONG courm, RUMP STATION CIVIL DETAILS SHEET 2 11 .3 KING COUNTY P.AAR STATION- CML DETAILS SHEET 3 12 0 KING COUNTY P',./AP STATION CM! DETAILS SI- EET 4 13 0 KING COUNTY PLMF STATION CIVIL DETAILS SKEET 5 14 0 KING COUNTY PUMP STATION C.VIL DETAILS SPEET 6 15 1 0 KING COUNTY PUMP STATION COWL DETAILS SHEEP. 7 15 1 0 KING COUNTY PUMP STATION - CV111 DETAILS - SFEET 5. 17 1 0 KING cour,rTv PUMP STATION -, STRUCTURAL NOTES 18 I 0 KING COUNTY FLMF STATION .. STRUCTURAL FLANS 19 I 0 KING COUNTY PUMP STATION- STRUCTURAL ELEVATIONS 20 i 0 KING counire RCMP STATION - ST RL)CTURAL SECTIONS 21 0 KING COUNTY PLITAP STATION- STRUCTURAL DET/VLS - Si-EET T 22 0 KING' COUNTY POMP STATION - STRIA:TVRAL DETAILS - SI-EET 2 23 1 KING COUNTY RL MR STATION.- STR I:CT.-URAL D'.1 -AILS - SHEET 3 24 1 KING COUNTY RUMP STATION - STRUCTURAL DETAILS - 5, -TET 4 25 0 KING GUNTY Pt -1P STATION - STRUCTURAL DETAILS- 5FIEE7 5 25 0 KING COUNTY PUMP STATION- STRUCTURAL DETAILS - SHEETS 25 SUBTOTAL DNANGS 0 0 0 0 0 0 Page 31;031 [002 lite AM& ftshington State Department of Transportation November 29, 2010 Bero,erABAM, Inc. 33301 Ninth AVC111LIe South, Suite 300 Federal Way, WA 98003-2600 Subject: Acceptance F 2016 ICC — Audit Office Review Dear Ms. N/leaun Isaacks: Transpoilation Btiflding 3 10 Maple Park Avenu� S. E. P.O. Box 473100 Olympia, WA 08504-7300 360-105-7000 wvrl�.'7 S('10t. "'J a'qo V Transmitted herewith is the WSDOT Audit Office's inerno of "Acceptance" of your firm's FYE 2016 Indirect Cost Rate (IC R) of 174.19%. This rate will be applicable for WSDOT Agreements and Local Agency Contracts in Washington only. This rate may be subject to additional review if considered necessary by WSDOT. Your ICR must be updated oil an annual basis. Costs billed to agreernents/contracts will still be subject to audit of actual costs, based on the terms and conditions of the respective agreernent/contract. This was not a cognizant review. Any other entity contracting with Your firill is responsible for determining the acceptability of the ICR, If you have any questions, feel free to contact out, office at (360) 705-7019 or via email Regards-, fRI I S )N�� Manager, Consultant Services Office EK-I:kms Acv,crilaiwe ICR Audii 011`1vtRovink, 139 Berget-ARAM, lue. ludirect Cost Rate Schedule For the Year Euded May 31, 2016 Vringe Benefilse'Salary Overhead Incentive Compensation Vacation Holiday Sick Leave OtIour Paid Leave FICA Federal UnemploNmicnt State Unemployment indusn ial Insurance USL&I4 Work Comp Group Instirrince Retirement Fxpense Benefit Recovery Franke Benefit Adjustment Total Fringe Beriefils/Sal, Ovlid. 409,330 1,408,263 625,994 447,026 19,931 1,461,004 13,685 I 19,045 6 143,:318 1,967,3641 438,126 (824) (6,882) tt 7,053,102 (7,706) 0 409,330 Gencrat Firm Accepted 625,994 classification Ledger Adjust. Ret. Amount % Direct Labor Base 11 ,394,308 13,695 KI 11,394,308 119.055 I ndircei Salaries 6 000% 03,318 1,26% Pioposiil Admin Salaries 662,699 437,302 662,699 5.82% Ptoposal/Negotinfion Salaries 33,225,714 (56,945) A, Ni 3,168,769 27 81'19 Administrative Salaries 2,597,641 (18,792) A 2„558,849 22 46 % Payroll Variance ( 15, 160) 13,523 (13,523) -0,16% Office Support Salaric's 0 Employee Welfare ti 000% Accounting Salaries 48(1,6) 4 1 062% 486,041 4,27% llow,ekeepingiStby Salaries 0 43,018 0 0,00% Professional Activitin Salaries 64,686 64,686 0,57% rducallon &Tunrling Salarics 257,642 (2,376) 257,642 -), I(,% Researeb and Development 16,314 106,894 16,314 0.140% Computer Salary 395,020 RcYcarcb &, Develop Expen3c 395,020 3.47% Total Indirect Salaries 7,687,50 (95,737) 7,591,860 66.630/,. Vringe Benefilse'Salary Overhead Incentive Compensation Vacation Holiday Sick Leave OtIour Paid Leave FICA Federal UnemploNmicnt State Unemployment indusn ial Insurance USL&I4 Work Comp Group Instirrince Retirement Fxpense Benefit Recovery Franke Benefit Adjustment Total Fringe Beriefils/Sal, Ovlid. 409,330 1,408,263 625,994 447,026 19,931 1,461,004 13,685 I 19,045 6 143,:318 1,967,3641 438,126 (824) (6,882) tt 7,053,102 (7,706) 0 409,330 3.59% I,A08,263 12,36% 625,994 5 49%, 4417,026 392% 19,931 0,17% 1,401,004 12M% 13,695 0.1`2% 119.055 1 04% 6 000% 03,318 1,26% 1,967,364 1727% 437,302 3,84% 0 0.00% .6,882 -0.06% 7,045,390 61.83% Ad ini nist rA live Expenses Travel & Stibsistence 202,238 (21,733) n. r, r, q 1801 505 1 58%) Recruning Fee,, & rxponics 69,417 69,417 061% Contract Personnel 49,938 (29,863) 21,075 0,18% Advertising 2,300 (2,300) Ij,C 0 00% Entertainincrit Expense 000% Cliarnable Contobutions 13,523 (13,523) B,D 0 0, 00%) Employee Welfare 102,28Q (31,715) firs 70,565 062% Employee meals 97,219 (54,191) N 43,018 0.39% Library 21,108 (196) 20,912 0 181/0 Profmmrial Activities 14,209 (2,376) ai 11,933 010% Fducation & 'I'mining Fees 106,894 (49) 3 106,935 O 94% RcYcarcb &, Develop Expen3c 0 0 0.00% General Admin w2,991 (7,2105) rA 95,788 094% Ass. eiation Ducs 87,274 (22,179) n 65,095 0 57% General Liability Insurance 88,001 (738) a. a 97,267 M7% Legal Fees 174,693 (32,173) n 142,520 1.25% Accounting Fees 233,223 (97,9(08) K !3>,31 1,19% Proposal Administration (444,,806) (99,500) 11, M. N -344.306 478% Proposal & Negotiation 0 0001/4 Office rind Work Space 1,692,464 0 1692,464 14.85% Operating Experise 75,975 R 75,975 0,67% Page 140 Berget-ARAM, laic. Indirect Cost Rate Schedule For the Year Ended May 31, 2016 174.19% Refere,rices Ittmovcd by BerlcrADAIVI A Unallowable proposal Negotiation Salaries ($56,945 36) and Administrative salaries ($38,792,04) B Unallowable administrative expenses Firin hacks unallowable expenses on tile gericral ledger, C Advertising unallolvable per 49 CFR 31.205-1(1)- 1) 1 205-1(J)1) Comributions un -allowable per 48 CV 31,20$-8. F Removed by Berger/ABAIM in compliance with various FARS regulations, V (ravel and submstence that are over the daily FAIL alio,.vable rat" per 48 CFR 31.205- 6 G Interest and other financial costs not allowable pet -48 CFR 31 205-20 I -t Fringe Benoit adjwlmerlt-, directly associated cost to unallowable advertising„ public relations and direct selling labor Unallowable per 48 CFR 31.204-6 a) I Detcrinining �illaxvabil lily - costs pioperry supported mth adc4ume docrannelation arcallowable CI:R 31 201-21(j) J CFR31.201,3(b) (I)Delcinniiing, reasonableness - Cosi, teaurally 1101 reconl7wIns oldirlary and rleccssaiy foi the conduct ol'basineAs are unallowable K Tasrs -Taxts horn which exemptions are available to the callilacior directly are unalluwablc when Lite burden incident to Oburulning the exemption outweigill the correitionding benefits accruing to the Government. ClItI 1 -105-4 1 (B) (3) L Txxe%, - Federal incorm and excess profits tastes are unallowable M Design build to,;$ a4nisimatas N Unaltowlible adjustments made fican condudirig Q, quant Audit- 11839,22 Froin travel, 878,12 Corm tnuak and,1234.2 I removed from proposal Page 141 General rtrjyi Accepted Classification t crlper 1d u4t. lRel" Alinfluill % Fumiture & Small Equ)ptilent 8,558 8,558 0,08% turn & Small Office Depr 273,297 273,297 140% Office Lquipment 0 a D 00% Office Supplies 62,126 0 62,126 0,35% Field Fquipaient 14 195 14,195 0,12% Field Uquip Dellircciatiori 67„010 67,010 059% AUIO Fuel & Maintenance 47;551 47,551 0.42% Auto Insurance & Licerm, It 26,132 0,23% Auto &'riuck Depreciation 45,805 45,905 0.40% Vield kquip Recovery (11 100% Telephone 217„979 217,879 1,91% fl"qflgc & Frel Bull 19-151 19,351 01701: Reproduction 161680 162,690 1.4 No Petsollal Profictly'l-a" 24,307 24,307 0.21% Fidelity Insurance 31,324 31,324 (1,27% Business & prof l"Icolse 42,04 t 41-041 0 37% Interest Fxpense 3,072 (3,072) 0 000% 1 -i -tor & 01111sqIons Insurance 600,041 U 600,041 'S 27% MO Taxcs 536,753 536.753 411% City, State line] Federal -Tutus 5-39,386 (523,246) 1'. 16, 1,40 0,14% Computer l3xperlse 590,688 590,688 i 18% Computer Depreciation 249,730 249,730 i 19% Wsc income N4 0 000% Gain or 1-riss Sale of Asset (15,3115) - 15,395 -0.1:}% Total Admilli'trative Expenses 6,121,564 (940,965) 0 5,190,599 45.47% Total I ndircct Cush, a old Ovurlivild 20,862,263 (1,044,408) 0 173.92% 19.817,855 lodirect Cost Rate 1.83 1.74 Facil itici Cost of Capital 3 1,()53 11.27% S20,862,263 ($1,044,408) 19,848,908 174.19% Refere,rices Ittmovcd by BerlcrADAIVI A Unallowable proposal Negotiation Salaries ($56,945 36) and Administrative salaries ($38,792,04) B Unallowable administrative expenses Firin hacks unallowable expenses on tile gericral ledger, C Advertising unallolvable per 49 CFR 31.205-1(1)- 1) 1 205-1(J)1) Comributions un -allowable per 48 CV 31,20$-8. F Removed by Berger/ABAIM in compliance with various FARS regulations, V (ravel and submstence that are over the daily FAIL alio,.vable rat" per 48 CFR 31.205- 6 G Interest and other financial costs not allowable pet -48 CFR 31 205-20 I -t Fringe Benoit adjwlmerlt-, directly associated cost to unallowable advertising„ public relations and direct selling labor Unallowable per 48 CFR 31.204-6 a) I Detcrinining �illaxvabil lily - costs pioperry supported mth adc4ume docrannelation arcallowable CI:R 31 201-21(j) J CFR31.201,3(b) (I)Delcinniiing, reasonableness - Cosi, teaurally 1101 reconl7wIns oldirlary and rleccssaiy foi the conduct ol'basineAs are unallowable K Tasrs -Taxts horn which exemptions are available to the callilacior directly are unalluwablc when Lite burden incident to Oburulning the exemption outweigill the correitionding benefits accruing to the Government. ClItI 1 -105-4 1 (B) (3) L Txxe%, - Federal incorm and excess profits tastes are unallowable M Design build to,;$ a4nisimatas N Unaltowlible adjustments made fican condudirig Q, quant Audit- 11839,22 Froin travel, 878,12 Corm tnuak and,1234.2 I removed from proposal Page 141 Exhibit E Subwconsultant Cost Computations The CONSULTANT shall not sub -contract fbl� the performance of any work under this AGREEME NT without prior written permission of the AGENCY. Defer to section VI "SUb-Contracting" of this AGREEM ENT. Exhibit E-1 - Subconsutlant Fee Determination Exhibit E-3 - Subconsultant WSDOT IC R Letters or Safe Harbor Letter/Rates Agreement Number-. WSDOT Form 140-089 EF Exhibit E Page I of 1 Revised 1013012014 142 EXHIBIT E-1, SUBCONSULTANT FEE DETERMINATION CITY OF TUKWILA- STRANDER BLVD/SW 27TH ST EXTENSION Ott -Sakai & Associates LLC Strander trade Separation 129 E. Lake Sarnmamish Shin NE Samrnarnish, WA 98074 Fee Estimate - Censtructability Review 425-890-3533 5/16/2415 Senior Construe Principal tion Contract ptt Costs Rate Specialist Manager $215.26 $209.11/ $159.91./ Item Scope /hour hour hour Invoicin and re orcin 4 $639.64 Contructabilit wyL Reports 1 Site Visit 2 Staff) 4 8 $2,533,92 2 Review Prellminary Desion 8 $1.672.88 3 Site Access Flan 24 $5,018.64 4 Temporary Walls 8 $1 ,672,88 5 Bottom Seall Alternatesu to 3 methods 2 24 $5,44916 8 tvlernorandum 16 $3,345.76 9 Meeis 4 (a_4 htrsd 16 $3,345,76 Schedule 14 Pre re Schedule PrelUminar µ 38r C whprl 2 16 $3,776.28 Contractor S e stirnate 11 Pre are estimate 30% and 60% Update) 2, �56 $12,140.68 meetin _.................... _ - 2 509.32, rave x enaes $200.00 Sub - Totals 10 188 4 —T $42,344.92 All Inclusive Hourly Rate TOfiAL ESTItv1ATEd $42,504,92 p) Ott 9/4/2411 Page 1 of 1 143 Ott—Sakai & Associates, LLC 1-'9E.IJ..Sanuiian-nshS)iorelane,ZE,-qai-i-inim-ii,s VAM',w -S90-35 � 3, -sakaixom bill 0tv 42' bill1dotr Ktv�n Salai! kvfn E August 25, 2017 BergerABAM 33301 Ninth Ave. South, Suite 300 Federal Way, WA 98003-2600 Subjject: Hourly Rates Attn: Kelly Robinson / Bob Fernandes Ott -Sakai is young and a small firm that that does not have an established overhead rate not- do we have audited overhead rates. Below are our lowest fully burdened (all-inclusive) hourly billing rates for Ott - Sakai and Associates, LLC services. These rates are fully burdened and are the lowest rates billed to our clients for this type of work. Classification Max. Hourly Rate Principal, Bill Ott, Kevin Sakai $215,26 Senior. Constr. Specialist $209411 Kevin Parrish Charlie McCoy Forrest Dill David Place Eric Reichelt Construction Specialist Bing Ma $19&80 Contracts Administrator Janice Christain $159,91 The above hourly rates are fully burdened and are all-inclusive except for travel mileage, parking, or any other direct expenses. Ott -Sakai shall comply with the rules and regulations regarding travel costs (excluding air, train, and rental costs) in accordance with the Tukwila Travel Rules and Procedures, All sub -consultant cost and direct reimbursable expenses will be at cost with no mark-ups. Respectfully, Page I of 2 144 William P. Ott 145 EXHIBIT E-1 - SUBCONSULTANT FEE DETERMINATION CITY OF TUKWILA STRANDER BOULEVARD/SW 27TH STREET EXTENSION I ALLIANCE URVisYINI� & MAPPING MBE/COBE LEVEL OF EFFORT I R" rid +`; 5 2 2 fits r� s t 5-i s yR s ui ItiL � 5 x 1S 9;6,r t Wnlpi 5 i is dC Tow4f,44 i f1 6Vi l i �r I F !is 4tsi if Kc +...a 3 TOTA1 HOURS j Im f iilGl+aC _ICIh(VdPiF} _. iJ 1r.:........ to( 2dfaAA-Inw, HER 11•L17G 6t F w NAME Strancicr i;xeraeti:nn dare COENT 6eraerAUAM ei.l OWNI.R iiCY u9 Tukwile d,i t., I R" rid +`; 5 2 2 fits r� s t 5-i s yR s ui ItiL � 5 x 1S 9;6,r t Wnlpi 5 i is dC Tow4f,44 i f1 6Vi l i �r I F !is 4tsi if Kc +...a 3 TOTA1 HOURS j Im f iilGl+aC _ICIh(VdPiF} _. iJ 1r.:........ to( 2dfaAA-Inw, Tnrm DIRCCi PI) RBC 1118 SALARYCoM t,Au iEjTCYA41,41tG53 XXA [PORTS %_' at,fl1511.t1l7 Mom CCONTROL Lati• d,,,i Pu sc ftii ,h sv I !=;1e+; - ' VIChl`[5 , ui POTl OUS LSTiMATETd a S 100 Tsui do PN u�sd 53ix tli5 to to Lcx..rr , t«a l:aS T'il P -69f Rt 7`U KlflttfNfCnAj!!(iltiP u.m.n�y:C71'/t{7k\1 A °n++�. ICunllon jn!,;, 1 Alliance Geomatics, LLC Main 425.598.2200 ( Fax 425.502.8067 1261-120 Ave NE, Bellevue, WA 98005 146 ALLIANCE • d Tnrm DIRCCi PI) RBC 1118 SALARYCoM t,Au iEjTCYA41,41tG53 XXA [PORTS %_' at,fl1511.t1l7 Mom CCONTROL Lati• d,,,i Pu sc ftii ,h sv I !=;1e+; - ' VIChl`[5 , ui POTl OUS LSTiMATETd a S 100 Tsui do PN u�sd 53ix tli5 to to Lcx..rr , t«a l:aS T'il P -69f Rt 7`U KlflttfNfCnAj!!(iltiP u.m.n�y:C71'/t{7k\1 A °n++�. ICunllon jn!,;, 1 Alliance Geomatics, LLC Main 425.598.2200 ( Fax 425.502.8067 1261-120 Ave NE, Bellevue, WA 98005 146 [WA"111.0112 AM, v7o" Washington State fflDepartment of Transportatill July 12,2 17 Jason Nakamura, President I Alliance Geomatics, LL -C 1261 A 120"' Ave NE Bellevue WA 98005-2 121 Re: I Alliance Gcornatics, LLC Safe Harbor Indirect Cost Rate Extension Dear Mr, Nakamura: Transportation BUIldill!) - 310 Maple Park Avoriva SA -L P.0, Box .17300 Olyfl-ipin, WA 08504-7300 360-705-7000 TTY. 1-800-833-6380 wwwwsdol.wa,gov Washirigton State has received approval from our local Federal Highway Administration (FHWA) Division to continue administering the "safe harbor" indirect cost rate program oil engineering and design related service contracts, as well as for Local Public Agency projects. We completed our risk assessment for I Alliance Geomatics, LLC, in May, 2014. Our assessillent was conducted based on the documentation provided by the firinTile reviewed data included, but was not limited to, a description of the company, basis of accounting, accounting system and the basis of indirect costs. used on our review, we found tile firm eligible to use the Safe Harbor rate. I Alliance opted to use the Safe Harbor rate, rather than provide a FAR -compliant rate. Based on further review and discussion with the firm, we are issuing an extension of the Safe Harbor Indirect Cost Rate of 110% of direct, labor with a field rate, where applicable, of 80% of direct labor for I Alliance Geornatics, LLC. I Alliance G-coniatics, LLC has agreed to improve Internal Controls and timekeeping processes in order to be able to develop an Indirect Cost Rate Schedule in the future in accordance with tile Federal Acquisition Regulations (FAR), Subpart 31, Tile SDOT internal Audit Office has provided guidance and information related to FARs and the AASUTO Audit Guide. You may use tile Safe Harbor Rate of 1111%, or 80% for field office situations, for agreements entered into prior to June 30, 2019. For agreements entered into after this date, please contact the WSDOT Consultant Services Office (CSO) or our office for guidance. The Safe Harbor Rate will ggj be subject to audit. Please coordinate with CSO or your Local Programs contact if you have questions about when to apply the Safe Harbor rate to your agreement. If you have any questions, please contact me, Jeri Sivertson, or Steve McKerney at (360)705-7003. Sincere e 2 Schatzie Harvey Agreement Compliance Audit Manager cc: Steve McKerney, Director of Internal Audit Jeri Sivertson, Assistant Director of Internal Audit Larry Schofield, MS 47323 File 147 EXHIBIT C-1 -SUBCONSULTANT FEE DETERMINATION CITY OF TUKWILA -STRANDER BLVD/$W 27TH STREET EXTENSION Task 6.1 Whase 31 Task 6.2 & 6,3 (Phase 31 D -I.) G,.V.sW Krittin tali. J.,- Sell.,dt Curnon Kwan Sarah K -n -n kadwl Sn�dl yuk.,; ktt,-Owt "'njor As�ociatt pdr,"Pal Svnlor A33odiup Semen Senior Engloter1ru ,(I Eriflilwln/planner tonk pilrdow Scrnior Amdate Tochldith E�Afn--Plaunot Cnqi.",jP)a-e, 4d lnlq,Ai.e AdministmIn, ,task response t-om-nt, 8 C,codimb- rneeiinp 4 mi to comments 4 16 - Document aeve 7 341 34 1p 72 su'"'naffto d.4nrnmrt studies / mwh 2 is 12 public InW"tit Finding suiannitial Outllno4ert,olaltl wwpoffivolt0for Plime 311 8 4 8 50 44 4 p,einlinh(V analy"rest illurniwi- f tfallfi, 4 AdinniniW0.in 20 72 dpal Tut.] Heats 16 60 130 114 128 a 32 ask DiNdph- Repent S 65.87 $ 48,56 5 37L55 9 101 5 168.42 4 Total Hours 9 4 30% Fee 24 V 2 4 DSR 95.6'7 6581 5 -0,52 48,56 37,50 5 31.73 $ 34.38 S 35,16 (lid 176 041% $ 16$,42 5 1 7 5,96 5 95.49 66.02 $ 55.96 s 6 S 6L79 Adminior.fi- 19,76 51457 r`, ]3.75 a `1 a2 5 16.31 10.53 L"', 110111, 38 201 .59 148,6; 1, "97,11 250 105,22 107.42 Suhtozai $2,535: Lt! $866.35. 5445.84 $2,794 36_1_ 5 31.73 5 _$210'435429.68 35.10 Ojq 176,04% 168,42 5 115.96 85.49 S 66.01 5 59.86 S Intal Budget 57,31,76 Task 6.2 & 6,3 (Phase 31 T.& r a Daniel G13YUSNI 9,100 Calfa lbmes SOIIA,d} CA,.tn i Sarah Keenan i Sewell y.k.0 .111,7111-117 "'njor As�ociatt pdr,"Pal Svnlor A33odiup Semen Eqintilflhp seriw Eriflilwln/planner tonk rnffi,5onaor 0q,jptanno, todliaglw, Emgin-r/plawnr Mem..inline t'.1th, .-l"i, / --pt,-, response t-om-nt, 8 1`101 visit -- - - mi to comments 4 16 fralu" optratlw AnalvaN 74 341 34 $8 72 VIAT/GliG airalVtl§ 2 is 12 public InW"tit Finding suiannitial Itai Study A.p.,t 8 4 8 50 44 4 CAurdnallon for erwiroornental 'J."arw000nt 4 AdinniniW0.in 20 72 Convort I'Tauk StUdY Report Tut.] Heats 16 60 130 114 128 a 32 ask DiNdph- Repent S 65.87 $ 48,56 5 37L55 9 101 5 168.42 S a1.S.96 Tralik 11pal Permit 2. 4 30% Fee M 44 1125 30% Illuniination / n,.i signal med,floWn 11111ing Rate 5 292.74 $ 201-59 149.61 5 11437 5 9711 10122 5 107.42 Sal,MAI 54,5$4.12 512,045.31 5191319.69 513,09321 512,429,63 5841.73 $9,437.44 Total Budget $65,89164 deugn and -lacnrne to can, enh 6 10 24 34 36 Adminior.fi- 12 50 L"', 110111, 38 24 46 262 250 12 50 0511 9567 5 65V 4956 37.50 5 31.73 5 34.3B 5 35.10 Ojq 176,04% 168,42 5 115.96 85.49 S 66.01 5 59.86 S 60 S2 S 61.79 3014 too 5 18 70 s 19.76 ASI 5 11 2e 5 h.9 S to,;) 5 10,53 Billing Rate S-71,219 IjfiA 5 114,77 91.11 s 105,22 5 10742 5utgotal $6,83620 $10,068,43 __$24,21662 S1,262,50 $5,371,011 PM inte-di- traffic C-ts & 24-1,, speedfvolume tube -ni, 5g 096.06 Total Budget 1,770,94, T.& r a Note: Optional Task (initial Traffic Signal Timing Plans) Budget to be Provided if included. Grand Total $164,952,34 F&P Fee 9/3/2017 148 Daniel Gl.VdAl Ww" 6'.410 14m.& 5all4rds Como, Kwan Salah Konan, 851havl Sewell Y,,k.4,i Renomton(T pit"Cipil "'njor As�ociatt serior f"anwin1plat'not AdMIMISi Ado,nhWolive rjsk ro'bolcor, rnffi,5onaor 0q,jptanno, 60% IIlunslnatlon/tr.Ifki7g­nol d-gnau response t-om-nt, 8 mi to comments 4 16 i4 74 341 and -i t. --nh public InW"tit Finding suiannitial 4 i tuppo'T ld, bidding 4 4 AdinniniW0.in 8 32 Tut.] Heats 16 60 130 114 128 a 32 ask 5 95,67 S 65.87 $ 48,56 5 37L55 31 73 5 34,39 5 3` .10 176,04% 5 168.42 S a1.S.96 05,49 5 66.0. 55.86 5' 60.52 5 61,79 30% Fee 28,711 1 CA, 1125 5 9,51 10-31 10.53 11111ing Rate 5 292.74 $ 201-59 149.61 5 11437 5 9711 10122 5 107.42 Sal,MAI 54,5$4.12 512,045.31 5191319.69 513,09321 512,429,63 5841.73 $9,437.44 Total Budget $65,89164 Note: Optional Task (initial Traffic Signal Timing Plans) Budget to be Provided if included. Grand Total $164,952,34 F&P Fee 9/3/2017 148 AM& Washington State Department of Transportation June 21, 2017 Fehr & Pee" 100 Pringle Avenue, Suite 600 Walnut Creek, CA 94596 Subject: Acceptance FYE 2016 ICR — Audit Office Review Dear Ms. Marion Donnolly: Transportation Building 310 Maple Park Avenue S, E. P.O, BOX 47300 Olympia, WA UBS04-7300 360-705- M00 rTY: 1-800-833-6388 wvvvi.vvsdOt.%Ya.gov Transmitted herewith is the WSDOT Audit Office's memo of "Acceptance" of your firm's FYE 2016 Indirect Cost Rate (ICR) of 176.04%. This rate will be applicable for WSDOT Agreements and Local Agency Contracts in Washington only- This rate may be subject to additional review if considered necessary by WSDOT, Your ICR must be updated on an annual basis. Costs billed to agreements/contracts will still be subject to audit of actual costs, based on the tenns and conditions of the respective agreement/contract. This was not a cognizant review. Any other entity contracting with your firm is responsible for determining the acceptability of the ICR. If you have any cluestions, feel free to contact our office at (360) 705-7019 or via email consultantrates@wsdot.wg.gov, Regards; ERIK K. JONSON Manager, Consultant Services Office EKJ:kms Acceplanco ICR Audit 01"fice Review 149 Preparri for BergerABAM tem 1: Project Administration 1 Prop Mgt Adrnin EXHlBiT E-1 Strander Grade Separation Phase 3 PM/Sr. Acq A erot Acq A ent SR Aca A ent Title REO Escrow Total Coord & Meetings with Tukwila & BergerABAM Hours: 0 251 135 0 0 0 0 25 Certification Assistance - 0.00 6,835.50 0 0 0 0 11,830.50 0 Contract Admin - 7 7 PFEIAOS Clearing Title - 55 105 160 Pre -Design Acq Cost Assessment & Evaluations Condemn Support - 20 ' 20 Project Funding Estimate 40 30 70 Coord wfSubconsultants- 0 0 i 0 0 0 0 0 Hours: Direct Labor $: 0 0 147 135 0 0 0 0 282 0.00 6,635.50 4,995.00 11,830.50 Item 2: Right -of -Way Acquisition Title Report Review, ROW Plan and Legal Descriptions Review Hours: 0 0 147 135 0 0 0 0 0 Pre-OffenFile Setup 0.00 6,835.50 0 0 0 0 11,830.50 Negotiations 0 0 Clearing Title - 0 0 Condemn Support - 0 Data/file & Diary Maintenance & Delivery 0 Hours: Direct Labor $: 0 0 0 0 0 0 0 0 0.00 0.00 0.00 - Direct Labor Totals: Hours: 0 0 147 135 0 0 0 0 282 Dollars: 0.00 6,835.50 4,995.00 0 0 0 11,830.50 Work Break Down: 1 PFE Report Includes 7 Acq, 5 Penn Easements, & 10 TCEls). Ol Abeyta Associates Eir31i2017 Direct Salary Cost Direct Labor Rate: Audited Overhead Rate: Profit: Composite Multiplier 11,830.50 Total Labor Fee: $ Expenses: Review Appraisals Appraisal 6 Mileage/Travel $ Reprographic, Copy, & Printing$ Couriex Overnight Postage 1 1.5 0.3 2.8 33,125.40 95.00 Subtotal: $ 95.00 TOTAL $ 33,220.40 Pagel Adft shington State r7w WaDepartment of Transportation August 25, 2017 Abeyta & Associates 1011 SW Klickitat Way, Suite 206 Seattle, WA 98134 Subject: Acceptance FYE 2016 ICP - Negotiated 1Z, Dear Ms. Rosa Villa: Transportation BUilding 310 Maplo Park Avenue S. E. RO, Box 47300 Olymp4 WA 98504-7300 3630-M5.7000 I , 1-G00-833-6388 wwmwsdot'wa.gov We have negotiated and accepted your firms FYE 2016 Indirect Cost Rate (ICP} of 150.00%. This rate will be applicable for Local Agency Contracts in Washington only. This rate may be subject to additional review if considered necessary by WS T. Your ICS, must be updated on an annual basis, Costs billed to agreements/contracts will still be subject to audit of actual costs, based on the terms and conditions of the respective agreement/contract. This was not a cognizant review. Any other entity contracting with the firin is, responsible for determining the acceptability of the ICP. If you have any questions, feel free to contact our office at (360) 705-7019 or via email consultantrates@wsdot.wa.&ov. Regards; ERtK K. JONSON Manager, Consultant Services Office EKJ:kms Acceptance 1CR Negotiated 151 EXHIBIT E-1 - SUBCONSULTANT FEE DETERMINATION CITY OF TUKWILA - STRANDER BLVD/SW 27TH ST EXTENSION Exhibit B Project Name strander Client Abam Location Tukwila Widener Fee 9/3/2017 Date 12/6/2015 Tasks Project Manager flours Senior Biologist flours Project Biologist Archaeologist Hours flours 1.1 Design Assistance and Early Agency Coordinatio 1.2 Section 106 Consultation 40 4 16 APE 1.3 106 Section Report Coordination Draft 8 12 2 8 4 -4 36 Final 2 4 2 12 1.4 Noise Report Draft Final 12 8 20 8 60 20 WSDOT Review 4 3 16 1.4 Air Report Draft Final 12 8 20 8 60 20 WSDO"I'Review 1.5 Hazardous Materials Memo Draft 4 2 2 3 2 2 16 16 2 -Final WSDOI'Review 4 2 4 1.6 Environmental Justice Survg,, draft 12 6 40 final 1.7 Biological Assessment No Effect Letter 6 8 12 Draft Final 12 8 16 2 40 12 1.8 NEPA ECS Draft 4 9 32 Final 2 2 WSDOT Review 1.9 Wetland and Critical Areas Study 8 4 4 Field Work[ Draft 8 121 241 601 1201 I of 2 152 EXHIBIT E-1 - SUBCONSULTANT FEE DETERMINATION CITY OF TUKWILA - STRANDER BLVD/SW 27TH ST EXTENSION Widener Fee 9/312017 Final 32 8 48 1.10 Wetland Mitigation Use Plan Draft 40 12 80 Final 20 8 401 1.10 Wetland Mitigation Use Plan Draft 40 12 80 Final 20 8 40 1. 11 SEPA Draft 2 2 24 Final 2 2 8 Coordination and RcS JCJnSeComments 81 21 16 1.12 Permit Coordination Section 404 36 12 80 Section 401 36 12 40 Coordination and RcsLonse Comments 40 8 24 Critical Areas permits 6 12 HPA Total hours 476 255 1056 48 Surninag Hours Direct Overhead PIvrlt Cost Project Manager 476 $64,00 $70,40 $19.20 $73,113.60 Senior Biologist 255 $50.00 $55.00 $15.00 $30,600.00 Project Biologist 1056 $31.00 $34.10 $9.30 $78,566.40 Project Ai-ellaeolo_gjst_ 48 $50.00 $55.00 $15.00 $5,760.00 Total Labor $188,040,00 Expenses Trips to project(5 'Tri s} 146 miles $0.56 per mile $408-80 _site Tri e to Local Programs 1 Trip) 30 miles $0,56 per mile $16,80 Field Su lies Flagging &_Stakes $25,00 Total Expenses $450,60 TOTAL ESTIMATED COST - - ------- L..$188,4 �,6O 2 oft 153 EXHIBIT E-3 WasChivlgton State Department of Mlanspunt aUon Lynn Pvtorson Secretary of Transportation February 27, 2014 Jeanette Widener, President DGK Inc, 10108 32nd Avenue W, Suite D Everett, WA 98204-1302 Trarmportation Oudding 310 Maple Parlt Avenue S.E, R(I Box -17300 Olympla, WA 985041-7300 3GO-705-7000 M; wWvV-kvad01x1,.1,90'1 Re: DGK (dba Widener & Associates) Safe Harbor Indirect Cost Rate Dear Ms. Widener: Washington State is one often states who have received approval fi-om Federal Highway Headquarters to participate in the Test and Evaluation Program (TE -045) for use of a "safe harbor" indirect cost rate on engineering and design related service contracts, as well as for Local Public Agency projects. We have completed our risk assessment for DGK. Our assessment was conducted based on the documentation provided by the fin -n. The reviewed data included, but was not limited to, a description of the company, basis of accounting, accounting system and the basis of indirect costs. used on our review, your firm is eligible to use the Safe Harbor rate for the City of Bellingham West Horton Road Project. We are issuing the Safe Harbor Indirect Cost Rate of 110% of direct labor for DGK. The Safe Harbor rate is effective on February 27, 2014. DGK has agreed to improve Internal Controls and timekeeping processes in order to be able to develop an Indirect Cost Rate Schedule in future accordance to Federal cost principles (48 CFR FAR). The WSDOT Internal Audit Office has provided guidance and information related to FARs and the AASHTO Audit Guide. The Safe Harbor Rate will not be subject to audit. Please coordinate with WSDOT Consultant Services (CSO) or your WSDOT Local Programs Manager if you have questions about when to apply the Safe Harbor rate to your agreement. 154 Page 2 DGK February 27, 2014 If you or any representatives of DG K have any questions, please contact Martha Roach, Jeri Sivertson, or Steve McKemey at (360)70547003. Sincerely, P6t�4'— Martha S, Roach Agreement Compliance Audit Manager cc: Steve McKerney, Director of Internal Audit Jeri Sivertson, Assistant Director of Internal Audit Larry Schofield, MS 47323 File 155 CE Firin Name: D t s project Number/Name; r iR iIn 1, the imelvi-signed, ceri�ft ihal I1701T I-ellit"Ited the proposal to establish 0106, 8'a Hewbol, rate. The fli'm is efecthig to itse the SAF EHA RB(. R hVDPZrC7' COST RATE qf11 tJr%. knowledge [Md belicf,- (1) Thefil'M hCrX IT01' ha(I U FAR conildirmt iMth-eCl cost tw/u previousli, accepted by an), other sime agmcjr, h) Thefliwi will pi-ovide reports cis requimd b - v the SAFE HARBOR k4TE, urogram on 11701- progmss toward coiliplicoice iviih the cost principles Ql'the r "llei-al Acqioishion Rupdations (FAR) of title 48, Code of'Fedural Regulations Wrl). part 31. A// kiyolvi) Inelle)-iol wan suctions or events that have occurred a - cling thefinn'x onwership, twgallifalioll 41114iorior & cul -rent i1ad0ect cost ivies have been disclosed. Thefii-in agrees lofollow the 'Path 10 Compliance ", Sleps noted below: Tim Pathway mitv inclvdt,,� A li'llekeephig a)qlwn it-hich inclucks the hilei-wd Owrdi; 4kxcribud in chopler 6 An ucvolmlillgslowem 11-hich sepurolds in(firout coxis 01161 41h.ect covfv An ucvolwlh1,g aItvwu which separales cillowable cmd miallowatill,, cost • A eusisplitmijob eostsyslvm which is ge)yer(il letjger 41pil-vil • rrohringfur acculmling pu)-somiet und kc�v mensugeniont (III Patl J/ of IN PedurerlAcquixision Regulolionv, Contract Cost Priticiplus and Pruveehwe.v • A strong writien imernal contralpolivy, it -ills (I polig, undprneecture.v waimol t 5i gnat Ure: 'Name of Certi6ling Official (Print): 0- a n t N e_ L (4) Ids." , �[— Date ot'Certification (mm/dd/yyyy): _* _Z2J_LL_ 4 Note- I'll is form is to be completed by an individual executive or f mane, ial officer- of tile consu Itaill lit a level no lower than a Vice President or Ciflef Financial Officer, or equivalent, wlio has the authority to represent the financial intbrination utilized to establish the indirect cost rate proposal submitted in conjunction with the agreement. 156 DIRECT SALARY COSTS (DSQ Personnel Hours M HANSON Costs 913/2017 00 1 Principal 10 X $ 90,00 = $ 900 2 Engineer VII (PM) 181 X $ 50,00 = $ 9,050 3 Engineer VII (PE) 744 X $ 50,00 = $ 37,200 4 Engineer V1 0 X $ 50.00 5 Engineer V 173 X $ KOO = $ 8,650 6 Engineer IV 0 X $ 40.00 = $ - 7 Engineer 111 30 X $ 40.00 = $ 1,200 8 Technician VII 0 X $ 35,00 $ - Total Hours 1,138 Subtotal Direct Salary Costs (DSC) $ 67,000 Salary Escalation (SE) 2% of DSC = $ 1,140 Subtotal (DSC + SE) = $ 58,140 Overhead (OH) 174.37% of (DSC + SE) $ 101,379 Fixed Fee (FF) 33.00% of PSC + SE) $ 19,186.20 TOTAL SALARY COSTS (DSC + SE + OH + FF) = $ 178,705 DIRECT NONSALARY COSI§JDNSCI Mileage 800 miles @ $ 0,535 $ 428 Miscellaneous Expendables (photographs, equip rental, etc) $ 200 TOTAL REIMBURSABLE EXPENSES (DNSC) = $ 628 I AUTHORIZED AMOUNT - $ 179,333 1 157 EXHIBIT E-1 - SUBCONSULTANT FEE DETERMINATION CITY OF TUKWILA - STRANDER BLVD/SW 27TH ST EXTENSION Hanson Hours 9/3/2017 Task Descriptions 71 5— C,- C -""" w ct, '. w _ Ui 5riginelqr VI 11 "6 5 so a 10 5 & a FA a a -6, c tli Project Set -Up I . et ,5 or f--- ..,... 475 Labor Rate 90009 50.00 S 50.00 S 50.00 9 Project l.%nagernent (l ttiVit for 56 weeks) ... 50.00 S 40.00 9 40.00 5 35.00 Invoicing Per Client Fornat (14 hring cycles anticipated anticipated) 14 — 14 Subtask 9.1 — Project Administration 100 0 11 10 250 Project Set -Up I 4 4 9 Project l.%nagernent (l ttiVit for 56 weeks) ... 0 56 Invoicing Per Client Fornat (14 hring cycles anticipated anticipated) 14 — 14 0 14 Prepare Progress Reports (14 lotal) 7 14 21 Meetings with Design Team. City, arid/or UPRR Kick -Off Meeting rn Tukwila 6 6 12 Progress Meetinos in Federal Way 0 10% Plans: :3 meetings 0 9 31 3 21 25% Plans: 3 meetings S 9 3 j 3 21 30% Plans, 1 meeting 2 4 6 90% Plans: 1 meeting 2 4 2 2 10 100% Plans: 1 meeting 2 4 2 2 10 Progress Meetinas via Conference Ca0 4 10% Plans. 6 cabs 3 59 25% Plans: 6 cabs i 6 , , 9 30% Plans: 2 cabs 2 6 8 90% Plans. 2 caE H 2 4 , 6 100% Plans: 2 callsa 2 ' Site Meetings with UPRR 0 25% Plans- 1 meeting 4 0 ' 10 90% Plans- 1 meeting 4 9 , I 10 Pre -Bid Meeting (1 meeting) 4 5, 10 Subtask 91 - 10% Railroad Shoofly Plan 2 8 102 0 2) 0, 4 0 137 Site review arid Field Report (concurrent with survey) 2 B 1 Survey Data Reduclion for Engkeering B, 7 Establish Existing Track Alignment from SurveySurve a1 9 Shoofly Track Alignment i a 2 I 11 10% Earthwork Model (Civil 3D 2017) 16 2 18 10% SI-aofly Plan -1,11x17 - 3 sheets) 32 4 ga 10% Opinion of Protrabte Cost of Eonstroction 1 6 2 9 QC Review 2 2 6 4 14 Final Revisions 8 Prepare PDFs for submittal 2 1 12 4 4 22 Subtask 9.3 - 25% Shoofly and Phasing Plans 2 » 13 239 0 61 9 4 0 ,1 316 Review and Prepare responses to LfPPR Design Comments 1. 4 1 6 Phasing Plan Schematic - (11x17 - 2 sheets) 12 2 II 14 Phasing Narrative 1 4 , 6 25% Shoofly Plan & Profile b - s -(9 sheets) 32 6 38 25% Shoofly Typic,e1Seaen Sheets - 14 shftts1 24 I 2 1 26 Curve Data Sheet (1 Sheet) 3 14 Prepare Cbal if Track Detail Sheet (2 stieets1 7 Earthwork Model (Civil 30 2017) by Phase 40 9 48 25% S5cot1 Cross Section Sheets by Phase- (12 sheets) 40 a 46 Review GeotechrStal Report 6 4 , 10 Utlity Review !cc conformance with UPR.R reg. H 2 1 a1 17 Verify Shoofly Track Draaxage . 16 4 20 Prepare Quantity Sunman/ Table 3 2 5 Update Opinion of Probable Cost of Construction 2 6 , 2 , 10 Page 2 of 4 EXHIBIT E-1 - SUBCONSULTANT FEE DETERMINATION CITY OF TUKWILA STRANDER BLVD/SW 27TH ST EXTENSION. Hanson Hours 9/3/2017 Task Descriptions � � o c � _ 3 � Engineer V � 3 � or _> -. _ 8. , t... a ta Labor Rate ' 5 90.00 5 50.00 S 50.0 S sra3.00 S 0 _Cill a 40.00 5 40.00 , 5 35.00 Resign Report i S 4 13 Prepare lrritial TrackSpteefications 2 19 2 14 QC Review 2 2 2 4 10 Final Revisions, & Prepare Pr7Fs for suhrrllta€ 2 10 t= 4 22 'Su,btask 9.4 - 30% Plans.. (Update 25% per Site iMeetinn) 2 14 77 '.. 0 32 0 40 129 Review and Prepare responses 10 UPPR Site Review 1 3 4 Update Pfbasingl Plan Schematic - (11x17 - 2 sheets? 5 5 Update Phasing 1+tarrative. 1 3 4 Update Shoofly Plan & PxoRle Sheets - (3 sheets) 5 2 7 Update 51tooSy T )pleat Sea on S els - f 4 steels) 5 I Update Curve Qata. Sheet (1 Sheet) 2 2 Update Prepare Cruit r Tuck Detail Street (2 sheets} 4 4 Update Eart del (Caul 30 2011) by Phase Update Shoofly Cross, Seuior3 Sheets by Phase- (12 sheets} I3 g Review Geotechnical Report ' '.,o 2 : fS Adif. Utility Review for conformance with UPRR. req. 3 a i 10 Update Shoofly Track Drainage , '. 6 1 7 Update Quantity Summary Table.. 2 2 Update Opinion of Probable Coat. d3 Con struction 2 : 4 2. :8 Update Design Report. 1 '.. 4 4 4 Update Initial Trackk 5pecifications 1 2 4 F t3 QC Review 2 2 3 5 12 Finan Revisions & Prepare PEIFs for submotai 2 fi 5 4 17 Subtesk 9.5 - 60% Plans (Update 30% if required. by UPRR) 0 0 L 0 Q. 0 0 i. 0 0 0 Enpirteerbrg Contingency (noire) 0 Subtask 9.6 - 90% Plans 2 6. 189 d 29 0 4 0 150 Update Shoofly'Plan S Profile Sheets - Finalize Cut Ss Fill Lines, signal ft( needed) 14 3. 17 Update Stioaflv o ypicaI Seon S els -14 meets) 10 r : 4 14 Update Prepare C. F Track Detail Sheet (2 sheets} 7 7 Update Earthwork Model 3r. Potential Signal'. Pads and Special Sections. 28 4 32'. Update Sthootly Craps Section Sheets incl. Special Secitore Of needed)- (12 steels} cr i, 1 10 Update Quantity Summary Table 3 j: '... 3 Update Opinion of Probable Cost of Construction 1 5 1 2 5 Update Design Report 1 5 2 8 QC Review 2 i 10 5 18. Finalize Track Specifications 1 11 4 16 Contingency to Incorporate Comments from 50%. U Revriev Final Revisions B Prepare PQFs for svubm9Eal 1 7 4 4 15 Subfask 9.7 - 10-0:,' Plans (Update 90%: rutin all UPRR comments) 2 11 1113 0 '.. 19 y 0 a, 0. 15-4 Update Shoofly Plan S Prohle Sheets - Finaaze Cot & Fill Lines, i 14 t 16. Update Shoofly Typical Section Streets. - (4 sheets; : 11 1 12 Update Prepare Civ 1 Trac Detail. Sheet (2) 5 1 8 Update Earthworir. Model 1rtc1 Potential Sinrrl Pads and Special Sections 15 1 '... 15.. Update Shoofly Crass Section Sheets knit- Special Secaurrs. (if needed)- (10 streelsl 12 - 14 Update Quantity Summary Table a.. '... 4 Update Opinion of Probable Cosa of Construction 1 3 3 7 Update Design Report 1 3. 3 7 Page of 4 EXHIBIT E-1 - SUBCONSULTANT FEE DETERMINATION CITY OF TUKWILA - STRANDER BLVD/SW 27TH ST EXTENSION Hanson Hours 9/3/2017 Task Descopnons _ ea 131 5 al- > k, > 0 c LL1 = _ `31 0 c Fr% La 5 a m Tr i _ Lanni- Rale 8g000 s50 0 $ 50.00 s 50 GOs 0 s 40 00 s 40 00 , s 35 DO QC Renew 2 t I 7 3 i13 Update Fins/ Track Specolisatons enclucemg agreernera mak 'front end' documents 2 le 18 I Bea Support through Award 4T 24 28 Feria/ Revisions & Prepare PDFs Ise subr/Alal 53 4 /3 Hours 10 181 I 744 173 0 3D 0 1138 Page 4 of 4 ■ Aft Washington State Department of Transportation July 6, 2017 Hanson Professional Services Inc. 1525 S. Sixth Street Springfield, IL 62703 Transportation Building 310 Maple Park Avenue S. E. RO� BOX 47300 Olympia, WA 98504-7300 3BO-705.7000 UN6, 1-800-833-6388 WWw'WSd0T'Wa'q0v .Subject: Acceptance FYE 2016 ICR — Risk Assessment Review Dear Ms, Jo Ellen Reim: Based on Washington State Department of Transportation's (WSDOT) Risk C, Assessment review of your Indirect Cost Rate (ICR), we have accepted your proposed FY E 2016 ICR of 174.37%. This rate is applicable to Washington Local Agency Contracts only, This rate may be subject to additional review if considered necessary by WSDOT. Your ICR must be updated on an annual basis. Costs billed to agreements/contracts will still be subject to audit of actual costs, based on the terms and conditions of the respective agreernent/contract. This was not a cognizant review. Any other entity contracting with your firm is responsible for determining the acceptability of the ICR. If you have any questions, feet free to contact our office at (360) 705-7019 or via email consultantrates 04 wsdot.wazov. Regards; ERIK K. Jt SON Manaar0er, Consultant Services Office RI Jikms Accel)(asice ICR Audit Office Review 161 I Zf-11 0 1 9J q IN DIRECT SALARY COSTS JQaC) Personnel Hours w sm 1 Principal/Project Manager 20 X $ 71.25 = $ 1,425 2 Project Engineer 108 X $ 67.00 = $ 7,236 3 Structural Engineer 254 X $ 60i00 z $ 15,240 4 Civil Engineer 0 X $ = $ - 5 Construction Specialist 0 X $ - = $ - 6 Designer/ CAD Oper 216 X $ 3130 = $ 6,761 7 Graphics 0 X $ - = $ 8 Project Coor, /Admire 12 X $ 22.50 $ 270 Total Hours 610 Subtotal Direct Salary Costs (DSC) $ 30,932 Salary Escalation (SE) 5% of DSC $ 1,547 Subtotal (DSC + SE) $ 32,478 Overhead (OH) 161.8G% of (DSC + SE) $ 52,570 Fixed Fee (FF) 30.00% of PSC + SE) = $ 9,74152 TOTAL SALARY COSTS (DSC + SE + OH + FF) =$ 94,791 DIRECT NONSALARY COSTS (DNSC) Mileage Design Team 300 miles@ $ 0,560 $ 168 Expendables (photographs, equip rental, etc) 1 Estimate $ 32 $ 32 TOTAL REIMBURSABLE EXPENSES IDNSC) = $ 200 TOTAL Bright Fee = $ 94,991 162 EXHIBIT E-1 - SUBCONSULTANT FEE DETERMINATION CITY OF TUKWILA - STRANDER BLVD/SW 27TH ST EXTENSION Bright Phase 3B Hours 91312017 TASK DESCRIPTION Task Number 0 97 a. 75 6 c c 1: m o. E a .c cc UJ1, t _c '6 2 cr. au ._ z, w —'5 c 0 rd. . -z,-, VI '-o. . u c, 0 _ r..) cin 0 < Q 1_- , cr i 71 0 0 .._ 0 CL 0 — g 0 ., u a 2i'E M -o (5 ct a Totals DSC $ 71.25 ] $ 67.00 I $ 60.00 I 5 - 1 $ - I 5 31.30 5 - _ 22.50 TASK 10 - STRUCTURAL ENGINEERING (supplemented) 10 20 108 254 - 216 - 12 610 UPRR Temporary Shoring Wall 10.3 8 30 64 - 56 - 4 162 Temporary Shoring Wall Design 10 24 - - - - - 34 Coordination of Staining with Civil. Structural, and Shoofly - 4 8 - - - - 12 UPRR Temporary Shoring Wall Plans - 12 24 - - 56 - - 92 PM & Submittal Coordination 8 4 8 - - 4 24 Sound Transit Vehicular Bridge 10.4 8 56 132 - - 150 - 4 350 Superstructure Design - 20 60 - - - - - 80 Vehicular Bridge Plans - 32 64 - - 150 - - 246 PM & Submittal Coordination 8 4 8 - - 4 24 Miscellaneous Structures 10.8 4 22 58 - - 10 - 4 98 Signal Bridge Design - 8 24 - - - - 32 Signal Bridge Foundation Design - 8 24 - - - - - 32 Pedestrian Bridge Plans - 2 6 - - 10 - _ 18 PM & Submittal Coordination 4 4 4 - - 4 16 Total 20 108 254 - - 216 - 12 610 Page 2 of 3 EXHIBIT E-1 SUBCONSULTANT FEE DETERMINATION CITY OF TUKWILA - STRANDER BLVD/SW 27TH ST EXTENSION Bright Strucutres Drawing List 9/3/2017 DRAWING LIST Number et -(3 a. .c. up c= 11.1 111 A, 76 tr. tt C 0 0 7., L ..c g3 c T:l _E 11.1 '-' a c m _ ' C '1 a t LI 0 7,_ co ea 0 . c ry, „. 7. it o 0 ..., 4; ti _ 0 0 1) 2 -o a. < Totals DSC 6 71.25 I 5 67.00 [ 5 60.00 I $ - [ s - I s 31.30 I 6 - 1 5 22.50 UPRR TEMPORARY SHORING WALL PLANS 10.3 - 12 24- - 66 - - 92 UPRR BRIDGE - SHEET PILE NOTES 1 2 4 • 10 16 UPRR BRIDGE - TEMPORARY SHORING PLAN - STAGE 1 2 - 2 4 10 16 UPRR BRIDGE - TEMPORARY SHORING ELEVATION - STAGE 1 3 - 2 4 - a - 14 UPRR BRIDGE GROUND ANCHOR DETAILS 4 - 2 4 - - 10 16 UPRR BRIDGE WALER 5. ANCHOR WALL DETAILS 5 2 4 10 . 16 UPRR BRIDGE - SHORING, TIEBACK. AND ANCHOR WALL LIMITS 6 2 4 - a 14 VEHICULAR BRIDGE PLANS 10.4 _ 32 64 - - 160 - 246 VEHICULAR BRIDGE - FRAMING PLAN 1 - 2 4 - 1(1 16 VEHICULAR BRIDGE - TYPICAL SECTION 2 2 6 - - la 16 VEHICULAR BRIDGE - GIRDER DETAILS (1 OF 3) 3 - 2 4 - 10 - - 16 VEHICULAR BRIDGE - GIRDER DETAILS (2 OF 3) 4 - 2 4 - 10 - - 16 VEHICULAR BRIDGE - GIRDER DETAILS (3 OF 3) 5 - 2 4 - 10 - 16 VEHICULAR BRIDGE END DIAPHRAGM 6 2 4 - TO - - 16 VEHICULAR BRIDGE - INTERMEDIATE DIAPHRAGM 7 - 2 4 - - 10 16 VEHICULAR BRIDGE - DECK REINFORCEMENT 8 2 4 - 10 - 16 VEHICULAR BRIDGE - DECK REINFORCEMENT SECTION 1 9 2 4 - 10 16 VEHICULAR BRIDGE - TRAFFIC. BARRIER DETAILS (I OF 3) 10 - 2 1 - - a 14 V.EHICULAR BRIDGE - TRAFFIC BARRIER DETAJLS (2 OF 3) 11 - 2 4 - a - 14 VEHICULAR BRIDGE - TRAFFIC BARRIER DETAILS (3 OF 3) 12 2 4 a 14 VEHICULAR BRIDGE - EXPANSION JOINT DETAILS 13 - 2 4 - 19 16 VEHICULAR BRIDGE - APPROACH SLAB DETAILS (1 OF 2) 14 2 4 - a - 14 VEHICULAR BRIDGE - APPROACH SLAB DETAILS (2 OF 2) 15 2 4 B - - 14 VEHICULAR BRIDGE - SUPERSTRUCTURE REINFORCEMENT TABLES 16 2 4 - - 10 - - 16 MISCILLANEOUS STRUCUTRAL DRAWINGS 10.8 - 1 24 - - 54 - - 90 SIGNAL BRIDGE PLAN AND ELEVATION 1 - 2 4 - - 10 - 16 'SIGNAL BRIDGE DETAILS (I OF 3) 2 2 4 - - 10 - 16 SIGNAL BRIDGE DETAILS (2 OF 3 - 2 4 - a - 14 SIGNAL BRIDGE DETAILS (3 OF 3) 4 - 2 4 - . a - 1 14 SIGNAL BRIDGE FOUNDATION (1 OF 2) 5 2 4 - - 19 - - 16 SIGNAL BRIDGE FOUNDATION (2 Of 2) 6 - 2 4 - - e 14 SUBTOTAL - ALL STRUCTURAL DRAWINGS 56 112 260 428 Page 3 of 3 ELOJ a g In'Awl I WAMM g all g 101 .1 za lkyj 0 TAT 0 Hours Rate S&W Phase 3 Costs 913/2017 Cost I Vice President 49 X $ 82,68 = $ 4,010 2 Associate 156 X $ 65,92 = $ 10,284 3 Senior Engineer 1 272 X $ 40,27 = $ 10,953 4 Engineer IV 124 X $ 36,91 = $ 4,577 5 Engineer 11 345 X $ 30.77 = $ 10,616 6 Senior Drafter 22 X $ 35,96 = $ 791 Total Hours 968 Subtotal Direct Salary Costs (DSC) = $ 41,230 Salary Escalation (SE) = 4.0% of DSC = $ 1,649 Subtotal (DSC + SE) = $ 42,880 Overhead (OH) 190.27% of (DSC + SE) = $ 81,687 Fixed Fee (IFF) 30.00% of (DSC + SE) = $ 12,863.86 TOTAL SALARY COSTS (DSC + SE + OH + FF) = $ 137,330 DIRECT NONSALARY COSTS (DINISC) Excavator subcontractor PIT equipment Pumping test subcontractor Pumping test ODCs Mileage Reproduction lump sum $ 2,500 lump sum $ 500 lump sum lump sum 875 miles @ 0,56 $ 490 lump sum $ 500 TOTAL REIMBURSABLE EXPENSES (DINISC) $ __1199 A F77�)TAIL AUTHORIZED AMOUNT $ 141,320 165 w 166 V > TASK > c CL w ui uj :D U) ASK 11 SUPPORT . ......... ...... . .... 48.5 156 272 0 li1 0 347, . . ..... . ...... ...... . ... . ............ 0 22 rrI ana elncntQuo 24 60 . 0 84 Meetings (ass ("IJ tars enuh for 2 people) Coordinate Ocrinlis, lialfic control, and/or railmad daggers for in situ 0 2 4 16 0 0 22 Coordinate and perform pilot infiltration test 0 2 12 0 12 0 26 install and develop lest well 0 0 0 0 0 0 0 Coordinate and c)bsLry jq�Lf�jp 0 0 0 0 iatc results 9�uit� 11 rpp rr img, _w a0 0 0 0 0 0 0 — — - — Seismic design criteria --------- I 1 3 0 1) 0 5 Liquefaction evaluation 1 2 0 12 0 0 1 -1--l- 3 . ........ 0 22 —6r -atio—nAli-u-IR-esisiancc (".3 Cases) 6 0 12 Bridge roundatton Lateral Resistance (3 Cases) . .......... 1 -, . 3 6 0 12 ...... .... 0 22 �I'Iql�iti Ld! L —io aS; —rO U P.. Interaction (3 Cas , es .. . ........... 0.5 ......... . . - 3 . .......... . ....... . 6 .............. . —,", . 0 . ............. -- .............. . .. 12 . . 0 �2 Wall Ranh Pressure (6 Cmcs) 1 6 12 0 24 0 43 Ctetnrnln Wall (global Stability d-S—ettle-me—mt -(6-C-ascs)- -9 - - 1-3-6- 1 4 0 8 - -------- — ---i'Td i —"I I I m �, I 10 n a I i a ij�,v a —0 --" --,- 2 0 32 -, 0 52 Shoolly Funbanknicrit Global Swbilily and Settlement (4 Cases) 1 8 20 0 64 Continae readin, existing clatiloggers on site (I readings) 0 0 3 0 9 12 rtsunrisv, ter model 1 0 12 0 8 0 21 Evaluate construction dewaicTing (6 rases) 0 0 0 0 0 0 0 Construction Dtwatering-Induced Settlement and Impacts G 00 a 0 0 0 1 1 4 0 . i6 0 22 --, __.w._...._ . . .... . . .. .. . ............................ ............ . .... ........ .......— New Outfall Recommendations — - - - - ------- ----" - 0 " ----------------- . ............. 1 — — - - 4 - ------------- . . .... 0 . .............. . -- 8 . ..... 0 — 13 _Val UUIC StGTV1IN%'.IICr irifiltr3linn T31CS 0 2 4 0 0 0 6 Construction Considerations 1 0 211 8 -0 0_ 33 4 16 40 60 16 8 144 Revise 60%Report i3ased un CITYind UPRR Commern.s ............. 2 2 8 4 0 2 is .. . . .. . ............ Prepare final report -- . . . 2 . ......... 8 241 0 16 2 52 Reviewand e 4 4 24 24 0 0 56 Develq_spec i Reat ions (dowaternI,and instrumentation) 0 0 0. 0 0 0 0 Total 110"r.1 d0 iSG 212 124 345 22 968 i 166 EXHIBIT E-3 AM& Washington State Department of Transportation June 14, X017 Shannon & Wilson, Inc, 400 N, 34" Street, Suite 100 Seattle, WA 98103 Subject: Acceptance FY E 2016 lCR — CPA Report Dear Ms. Noelani Bevilla Transporlition GLI11(11114] 310 Maple Park Avenue S.E. M BOX 47100 01yinplal WA 98504-7300 360-705-7000 `TTr 1-800-633-6388 WV,Jv/.WGd0t,Wa.q0V We have accepted your firms FYE 2016 Indirect Cost Rate (ICS.) of 190.27% based on the "Independent CPA Report," prepared by CPA Consulting, Inc- This rate will be applicable for WSDOT Agreements and Local Agency Contracts in Washington only. This rate may be subject to additional review if considered necessary by WSDOT. Your ICR must be updated on an annual basis. Costs billed to agreements/contracts will still be subject to audit of actual costs, based on the terms and conditions of the respective agreement/contract, This was not a cognizant review. Any other entity contracting with the firm is responsible for determining the acceptability of the ICT. If you have any questions, feel free to contact our office at (360) 705-7019 or via email conso I tantrates @bwsdot,wa-,,ov- Regards; Jonson, Erik C05i8n ERIK K. JONSON Manager, Consultant Service,,; Office ElUkrns AcceptattcL ICC CPA Report 167 Firm Name: shannon &Wilson, Inc. Indirect Cost Rate Proposal: 190.267% Date of Proposal Preparation (mm/ddlyyyy): 5/190017 Fiscal Period Covered (i-ni-n/dd/yyyy to mm/dd/yyyy): 1r1/2om - i2im/2oi6 1, the undersigned, certify that / have reviewed the proposal to establish final indirect cost rates for the fiscal period as specified above and to the best of my knowledge and belief, 1) All costs included in this proposal to establish final indirect cost rates are allowable in accordance with the cost principles of 1176 Federal Acquisition Regulations, (PAR) of title 48, Code of Federal Regulations (CFR), part 31. 2-) This proposal does not include any costs which are expressly unallowable under the cost principles of the FAR of 48 CFR 31. All known material transactions or events that have occurred affecting the firm's ownership, organization and indirect cost rates have been disclosed, Signature: Name of Certifying Official* (Print): Hollie L, Ellis Title: SIR Vice President Date of Certification (mm/dd/yyyy): 5124/17 "The "Certifying Official" must be an individual executive or financial officer of the firm at a level no lower than a Vice President or Chief Financial Officer, or equivalent, who has the authority to represent the financial information utilized to establish the indirect cost rate for use under Agency contracts. Ref. FHWA Directive 4478.1A available on line at. bttL� oovileasreosld,irectiveslordei-s/44701 ajitril �Jlwwwjhwa,dot O/H Certification; Nov 2010 168 DIRECT LABOR FRINGE BENEFITS Additional compensation Qualified retirement plans Vacation, sick and holiday Payroll fringes GENERAL OVERHEAD Administrative salaries Proposal and business development labor Equipment Rent and facility Travel and auto Proposal and business development Interest Supplies Outside professional services Computer Telephone and postage Conferences and professional Depreciation lnsurance Taxes and licenses Bad debts Revenue from in-house charges SHANNON & WILSON, EtiC. STATEMENT OF DIRECT LABOR, FRINGE BENEFITS AND GENERAL OVERHEAD For the Year Ended December 31, 2016 General Ledger Balance Portion Unallowable $ 13,074,066 S 2,088,?23 1,264,491 2,484,371 5,196,436 11,033,520 3,3,8,445 3,680,256 265,180 2,127,443 423,066 511,096 10,723 531,011 182,393 768,301 328,508 463,484 484,907 1,085,847 2,482,842 215,341 (651,849) 16,236,992 Total Fringe Benefits and General Overhead S 27,270,5/2 Facilities capital cost of money 400,000 (143,000) 257,000 (3,154) (203,726) (5,082) (3,393) (357,475) (10,723) FAR Reference (15) 31205-6 2,3 31.205-1,13 (1,4) 31205-6(f),(p) (5) 31.205-1 (13) (6) 31.203(b) 31205-46 (7,8,9) 31.205-1,8,14 (1.0) 31_205-20 (27_707) (6,14) 31.205-46,22 (1,862.141) (11) 31.205-41 (215,341) (12) 31.205-3 (2,688,743) (2,431,743) Proposed Percent of Audited Total Direct Labor 13,074,066 2,488,223 1,264,491 2,484,371 5,053,436 11,290,520 3,325,290 3,476,530 265,180 2,122,361 419,673 153,620 531,011 182,393 768,301 328,508 435,777 484,907 1,085,847 620,701 (651,849) 13,548.248 $ 24,838,768 S 34,896, 86.4% 103.6% 190.0% 0267% See accompanying notes. 3 SHANNON & WILSON, INC. STATEMENT OF DIRECT LAUOR, FRINGE IIENEFFrS AND GENERAL OVERIIEAD For the Year Ended December 31, 2016 FAR References: (1) Unallowable spot bonuses (2) Taxes related to unallowable promotion labor (3) Unallowable meals and employee gifts (4) Not used (5) Advertising and public relations labor (6) Excess per diern and travel expense (7) Unallowable contribution costs (8) Unallowable entertainment costs (9) Unallowable advertising and public relations costs (10) Interest expenses (11) Federal income taxes (12) Bad debts (13) Rent charged as direct costs to projects (14) Unallowable lobbying cost (1 5) Accrued prior year bonuses paid in current year See acconipanying notes, 4 170 SHANNON & WILSON, INC. NOTES TO STATEMENT OF DIRECT LABOR, FRINGE BENEFITS AND GENERAL OVERHEAD For the Year Ended December 1, 2016 NOTE A. DESCRIPTION OF BUSINESS AND BASIS OF ACCOUNTING Description of business — Shannon & Wilson, Inc, (the Company) provide-, geotechnical engineering and environmental consulting services, primarily thaOUghOUt the United States of America. Basis of accounting Tire Company maintains its accounting records on the accrual basis for financial reporting while using the cash method of accounting for federal incorne tax put -poses. The Company's policy is to prepare its overhead schedules, which support the Statement of Direct Labor, Fringe Benefits, and General Overhead (the Slaternent), on the basis of accounting practices prescribed by Pao 31 of the, Federal Acquisition Regulations (FAR). Accordingly, the above-mentioned Statement is not intended to present the results of operations of the Company in conformity with accounting principles generally accepted in the United States of America. NOTED: DESCRIPTION OF ACCOUNTINGsYsTEm Description of accoutiting—The Company maimains a job -order cost accounting systern for the recording and accumulation of costs incurred under its contracts. Each project is assigned a job number so that costs may be segregated and accumulated in the Company's job -order cost accounting systcm The audited overhead rate is a unitary rate for all disciplines. Direct project costs and allocated indirect costs are included in the project cost record. The allocation basis for indirect costs is direct labor, Direct labor of salaried employees is calculated using a standard hourly rate based on an annual liour base of 2,0M Direct costs incurred in providing services billed to clients at unit rates or on the basis of a published fee schedule are charged by 'Functional accounts and accumulated as a single project or grouping to allow segregation of such costs from other direct costs. The Company's method of estimating costs for pricing purposes during the proposal process is consistent with the accumulation and reporting of costs under its job -order cost accounting system. Direct labor costs — T he Company distributes labor costs directly to projects for all employee classifications at standard cost, Certain officers and associates are not, paid for the time worked in excess of 40 hours per week (uncompensated overtime). The uncompensated overtime in excess of 40 hours is credited to administrative salaries in the amount of $1,249.05 1. Overtime premium costs have been excluded from direct labor and are included in general overhead as part of administrative salaries and totaled $36,508. Overhead rate — The calculated overhead rate is a unitary rate for all offices (ten) and includes all disciplines, 171 NOTE B: DESCRJJI"IrtON OF ACCOUNTING SYSTEM (continued) Depreciation — Depreciation has been provided on the straight-line method Over the estimated USCU lives of buildings, equipment and leasehold improvements. The depreciation included in 6encral Overhead does not exceed the arnount used in The financial statements and is allowable under FAR 31205-11 (e). Sick leave — Sick, leave costs are neither accrued annually nor paid to an employee upon termination. Applicable sick leave costs are expensed if paid and then included in the overhead rate. Compensation —The Company paid no compensation in excess of the FAR 31.205-6(p) limit of $487,000 per person. Senior executive compensation was analyzed using the 2016 National Cornpensation Uawix in accordance with the AASI1T'0 Audit Guide and all compensation was allowable. NOTE C: FACILITIES CAPITAL COST OF MONEY (FCCM`) The Facilities Capital Cost of Money rate has been calculated in accordance with FAR Section 31,205- 10; using average net book Values of equipment and facilities multiplied by the average Treasury rates for the applicable period, as showw Beginning net capital assets, January 1, 2016 $ 1,717,307 Ending not capital assets, December 31, 2016 1,473,166 Average Net Capital Assets 1,595,237 Average Treasury Rate 1188% Facilities Cost of Money $ 34,896 Direct Labor Base 13,074,066 FCCM Rate 0.267% NOTE D: BENEFIT PLANS ,rhe Company has two qualified retirement plans which cover ernployces who W meet eligibility requirennents. The Company made cash contributions of $1,264,491 to the plans during the year ended December 31, 2016. NOTE E: AUDITOR CONTACT The person to contact relative to this engagement is: Kristine L. Tryon CPA Consulting, Inc,, P.S. Phone (425) 401-5061 172 EXHIBIT El - SUBCONSULTANT FEE DETERMINATION R&W PS remodel PROJECT r40. : DATE ,..-.". -' `,., , r.::::. C01N1:,- PSTITT‘TECT. R&W PROJECT PLAN BUDGET - -, ,, -4 -- T FEE CALCULATIONS AND SUMMARY Stec:do:eh N,14 ,Tch eel 3,42:, I! 1 MA URS S I AFT- Cass:hints:in HOURS RATE t t COST I PEOIEDT TASES P JPM Sr Engr It Sr Env I En r Sr Tec P Sr Tech I Tech/Des CAD ech Cler/Admini TOTALS I 50 P 1 0 PM 11 16 Sr Env It 2 0 Sr Engr i 20 8:5 End= 25 0 Sr Tech II 3 0 Sr Tech I 30 0 TechiCie.s 4 4 CAD/Tad, S 311.5 Cler/Adnctrr 7 4 TOTAL FEE: 139.5 MSC. ExPENSLS, 1 1 0 i lit R 050111 1 ODOR, I OMER 050011 QA/QT, I'D 44533 SUBTOTAL EXPENSES: TOTAL COSTS: CONIINttIN1 I- (TOTAL BUDGET: PRINT DATE: :PREPARED ve , 0 $16000 $14500 $135 00 5125.00 $110_00 511.0.00 $08,00 58730 567.00 54500 SI 00 S0,44 SU,I0 III). 5111, 1 1.45.L44 312,:.. 9/3/2007 $ . 5 2,32=0_011 : 5 $ 10,6251.00 : $ 5 5 - 5 350.00 i $ 2,043.50 5 164.00 S 15,522.50 , T , -, , 2,173.15 S 12,695.55 5 85131 $ 15,590.00 =Upgrade existing pomp station 5� ,,.. 50 earn note 6.00 57E0 Jr6'ty Sere cc PreImnarpLode DndCPcCalms 4.00 5500 'Generate= Si2ing 1:001 2.00 , 5365 PS istribut:en Celcs 100 2 CD i 53.95 50 UUyCoerd,aDen 2-40 4. $600 Site edit 3 00 $1,000 gn orkannp 402 , 5500 $0 &thins SO gend 1.00 0.50 , $159 Site plan 1.8=3 3.80 1100 51056 One Ire diagram 1. 7.00 &OD 63 51thng power, Eighting, signet 2.80 4.00 6.00 51,162 Vau4 penar, i nting, signal I.00' 1 00 2 00 5904 CC DeIa1r 000 4.80 51,013AIR- chgdPles 500 3. 200 5529011UP Parnpshcmalrcr LOG: 4.00 : 4.00 5913 : SO SO Sencificatlorn 2.00 600 4.00 51,224 , C,C)St t tate 100 4.00 5535 $0 Meetin = . 24.00 53,003 PM 4.00 5550 0 So SO I SO TOTALS: - 15,80 - 3S20 - 4.013 3050 4.00 STAFF C 551FICATtONS: P: PRINCIPAL IRTECH IL SENIOR TECHNICIAN El Phii PROIECT MANAGER SR TECH I ' SEN OR TECHN=OAN I SPIENGR U SEN OR ENGINEER tl TECH/OES. TECHNICIAN/DESIGNER SR ENGR T . SENIOR ENGINEER I DRAFT CAD: DRAFTING (CAD) ENGR, ENGINEER CLER/ACAMM CLERICAL/ADMINISTRATIVE 1 of EXHIBIT E-1 - SUBCONSULTANT FEE DETERMINATION CITY OF TUKWILA - STRANDFRBI VDISW 27TH ST EXTENSION PROIEE F - DATE : PROIECT: R&W PS remodel (C) 91312617 R&W PROJECT PLAN BUDGET FEE CALCULATIONS AND SUMMARY Starld„-Ir& Rate 5,,:hecUe MANI-OURS PROJECT TASKS PM I Sr Er Sr Engr I 1 Ergs JSrTRch El Sr Tech ethJISur CAD/Tech Cler/Admin TOTALS -STAFF ClassilicatIon HOURS RATE COSTS 50 Upgrade existing pump station $0 Drawings $0, Contro system power 2.00 4.00 2. 5945 Control :JO 2.00 5.03 EGO 51,545 Mstrurnentation 1.00 1.00 2,00 $810 RTU interconnection 1.0,3 8.00 4.00 51.485 Oeta its 1..00 4.00 400 5985 2.00 4,00 5.1,204 Cost estimate 4.00 $500 511 Team meeting? CC 51,5 50 50 60 $0 SO $0 50 $0 Sc 50 SO SO 50 P 1 0 5183.00 $ PM 11 G $145.00 5 Sr ETV II 2 9 $13500 5 1.215-00 Sr Erg I 2A 48 5125.00 5 6,000.00 Ener 25 0 5110.00 $ Sr Tech. II 3 0 5110.03 $ Sr Tech I 34 0 598 00 5 Tech/Des 4 18 $87.50 5 1,575_00 CAD/Tech 5 0 557 GO 5 Oar/Admin 7 4 549.00 $ 184_00 TOTAL FEE: 79 $ 8,974.00 WHSC. EXPENSES: nILPN 411 I SUES 01HER: SO.UO 011E5 SO 00 n OTHER: I $0. 551 OTHER: EU US 011115. OMER' 1110 111S.987.66 $.1, €10 SUBTOTAL EXPENSES: TOTAL COSTS: SO TOTALS: 1200. 48001 18.03 4001 tO,NTINGE NOP STAFF CLASSIFICATIONS' P: PRINCIPAL PM: PROJECT MANAGER SR.ENGR It: SENIOR ENGINEER SR ENGR : SENIOR ENGINEER ENGR: IENIKEER SR TECH IJ. SEMOR TECHNICIAN II SR TECH I : SENIOR TECHNICIAN I TECH/DES: TECHNICIAN/DESIGNER DRAFT CAD: CRAFTING (CAD? (LER/ADMEN, CLERICAL/ADMINISTRATIVE TOTAL BUDGET: PRINT DATE: 9/3/2017 PREPARED Sr' II 1,255.36 $ 10,230.35 S al • 2 $ 10,740.00 EXHIBIT E- - SUBCONSU TANT FEE DETERMINATION PROTECT NO5774,757S"Cd1 R&W PROJECT PLAN BUDGET DATE SG:NIG-II 7 PROJECT, INTGT, 757 R&W New PS 913/201 FEE CALCULATIONS AND SUMMARY StApdA 7Ix7777 Schedt77777 MANJIOURS PRO, Ea TASKS New Pump Station earn [meeting 111t5h•tv Service Prebrdnary Load Demand Cats Genecatol Sizing PS Distribution Calm Utifity Coordmaton Site visit P PM Sr Eng., 1.00 3.00 Engr I 600 2.00 2.02 2.00 4.00 . Design. worhadhop 2.00 Drawings Legend 1.00 STE Plan One hoe diagram ,ding power, tighting, signal Vaud power, lthhng, signal ICC Details neck -Les Pomp schematics Spec ficatops Cost ethrnate Meetings TOTALS. STAFF CLASSIFICATIONS: 1.00 500 1.30 4.00 2.03 6.00 1.00 2.08 1210 2 00 4.00 [ 200 4.00 2.00 6.00 1.00 4.00 24.00 4.80 16.00 83,00 P; PRINCIPAL PM PROJECT MANAGER 53 ENGR 3: SENIOR ENGINEER ti SR ENGR I : SENIOR ENGNEER ENGR: ENGINEER Engr [ Sr Tech II r Tech Tech/Des ICAOffech Cler/Admml TOTAL S. $0 $0 $0 5753- 5250 5395 5395 $0 400 $sao 5250 0.50 800 4.00, 8.00 700 4 00 2700 00 5159 $3,431 5923 50.576 $525 $768 $529 $913 4.00 $0 $3,224 5645 So $3,800 $580 $0 $0 400 32.50 4,00 SR TECH El SENIOR TEChNICIAN El SR TECH I SENOR TECI4NICiAN I TECH/DES: TECHNICIAN/DESIGNER DRAFT CAD: DRAFTING (CAD) CLER/ADMIN: CLERICAtIADMINISTRATIVE STAFF Classification HrdIRS RATE CO 1 0 5190.80 PM 16 5145.00 5 2,320.00 Sh Engr Ii 2 0 5135.00 $ Sr Engr 4 2A 83 5125.00 $ 10,375.00 Ener 28 0 $110.00 $ 'Sr Tech n 3 0 511000 $ Sr Tech I 94 0 598.00 $ Tech/Des 4 4 587.50 $ 350_00 CAD/Tech 5 52 5 $67 GO $ 2,177_50 Clerhadmin 7 4 $46.00 $ 13400 TOTAL FEE: 139.5 $ 15,4063. 5% 31151. EXPENSES: 5.1735,7 5 2117 DII ER 7 SOPO DI HUY_ 50,00 OTHER I$0.7:10 OTHr1t I SO OTT 7, OTHI77 OTHER: 0010, 1i2I1 5 E 35.0 SUBTOTAL EXPENSES' TOTAL COSTS:. CONTINGENCY TOTAL BUDGET: PRINT DATE: 9/312017 PREPARED DY: 0 $ 2,156-91 5 17,563.41 7.70 , S 5)5.11 $ 18,440,00 3 of 8 EXHIBIT E-1 - SUBCONSULTANT FEE DETERI491NATION R&W Ne P C) A PROJE11 NO. INSTE R&W PROJECT PLAN BUDGET PROJECT. MANHOURS PROTECT TASKS IMMEENNEEEMMEMEIETICESII New Pump 5tati�on. Control ech/De ZEZEIMEEM MMI Control I/O RTU irtercn'rrectlon 2.Oil 1 IIM=UMMEN -- 5 1.29'5 EN=11 MINIE3 4. __�MIDE ' ��® 4.00 -- IM 1=Elli=E31 VIMEMIMMI 12.D0 ®--.... ,11111=.11..= MMIIMMIll JIMEM 'l MMIIIM=1 'IMI 111111M=1 .111111 MIIIIIIIIIIIIMIEIIIIMEMIIIIIIIIIIIIIMMNIMIIIMIIMIMIMIIIIIIIIII aIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIMIIIIIIIIMII.H.IIIIIIIMMIIIIMIIIIIIIIIIIIIIIIIIII.M11 1.111111111.1.11111111111.111111.1111 111111=11.11111.1.1111.1111111111.111MI ®®®MIIIIIIIII®EIMM111111111111111111MIN5 111•11111®IIIIIIIII® ®® .111111M11111.e la- 4.02 TOTALS: $1,500 $0 "TAFF- C PRINCIPAL PM' PROJECT MANAGER SR_EN OR I7: 5811I06 EtiGl'N'EEA zI 5R. ENGGR I : 5011.06 ENGINEER EN0R: ENGINEER SR TECH SI_ SENIORCHNICIAN VI SR TECH I : SENIOR TECS4NICIAO TECH/DES: 'TECHNICIAN/DES'GNER' DRAFT CAD:. DRAFTING ICADI CLER/ADMIN: CLERICAL/ADrMENISTRATPVE FEE CALCULATIONS AND SUMMARY SI:a¢rci:. r Ott-Y¢h.�d;r..l.e. STAFF Classuficatuon HOURS RATE COSTS PM 11 O 5180.00 5 O $145.00 $ Sr Engr 8 Z 5 5131.00 $ 5,080.00 S r Engr @ 2A 38 5525 00 $ 4,710.00 Engr 21 0 5$1.0.00 5 Sr Tech ll 3 0 S r Tech] 3A 0 ed./Den 4 18 CADf T era 5 0 567.02 5.. Crier/Adrn:.n 7 4 546.00 $. 184.8X,7 68. S 7,669.00 1,575.017 TOTAL FEE. F mISC EXPENSES. ATTR DOTER. O k Eft; OTHER: OTHER: OTHER: OTHER., IS A O.E SO, CO J.CILl 50.00 5. SEE 00 31.1,11 ,. 5.1139331 $1.35_00 SUBTOTAL EXPENSES: 5 0062.46. TOTAL COSTS: $ 8,551.46 LONE ,NfyEN1,S' 40x0:; S S.l;rS.r TOTAL BUDGET: PRINT LATE_ PREPARED BY - 9/3/2717 $ 9,080.00'. 4o€6 EXHIBIT - SUBCONSULTANT FEE DETERMINATION R&W GW PS PROJECT NO. 11111 , ... ' . J.' USCi PROJECT- R&W PROJECT PLAN BUDGET 91 - _ ..T...- _ 3 5, .. ,_ 3 FEE CALCULATPONS AND SUMMARY ',,,t,11-L$rtH Rate. Schedule .r. .ArEHOURS r STAFF Classificatwart HOURS RATE COSTS ! PROIECT TASKSF PM Sr Engr 4 Sr Env Engr SrTnrh 9 Sr Tech Inch/Den CADTIecS Oar/Ad m TOTALS ! 50 1 C 516030$ . ?M 11 10 5145.00 $ 1,450.00 Sr Eng u 2 0 5135.00 $ Sr Engr i 2A SO 5125.00 $ 5,250.20 Engr 29 0 5110.00 $ Sr Tech 3 3 0 5110.00 5 Sr Tech I 35 0 $93.00 5 Tech/Des 4 0 587.50 S - CAD/Tech 5 18.5 $57.00 5 1,239.50 C1erfAdmin 7 0 546.00 5 TOTAL FEE: 785 $ 8,939.50 5% \S( EXCISES SJt Alp' I 3013 nHER50.0.0 LUHIrH 1 5010 J OCHER, I 1313 3013 CO HER. OTHER' C1 15. 5 9563Cibi 513 E .00 SUBTOTAL EXPENSES. S 1,25153 TOTAL COSTS: 5 10491 03 CONTINGENC1 ',UR— S 549. TOTAL BUDGET, $ 10,700.00 PRINT DATE- 9/3/2017 PREPARED FY 0 Eon $ earn rneetrrr.g 6„00 5754 UtaRy SenRce Pm mrnnry Load 0earrdCaks 200 5254 enemator Si2ing 1„00 1 00 5270 PS Disifibuton - _ „OS) 100 5270, SO ' $0 Ste rnrt 2.00 250 Orrnrgn worSrshrnp 200 $250 0 Legend 100 030 5159 Co 1,055 0'n One 3iagrvrr 100 200 4.00 5563 1 $0 $0 che ules 100 200 2.00 5520 !.. Purrpschematen 100 200 4320 - 913 --,, $0 ,periTcaHenn 100 2.01 5195HEk. ost estimate 100 '00 5395 1 $0 3 eeungs moo $2,500 :PM 200 5290 ., 1 $0 ''. T0515: - 2000 50.00 1 - . -- 1950 - 0.1 -AFC CLASS1F CATIONS: P: P6I54.1PAL SR TECH 9: SENIOR TECHNICIAN R PM. PROJECT MANAGER 59 TECH : SENIOR TECHNICIAN SR_ENGR 9: SENIOR ENGINEER 1, TECHIC ES: TECHNKLAN(DESIGNER SR ENOR t . SENOR ENGINEER T DRAFT CAD: DRAFTING ICAO} @MGR ENGINEER CLER/ADM[N: CLER1CAMADACNISTRATNE of EXHIBIT E-1 - SUBCONSULTANT FEE DETERMINATION CITY OF TUKWILA - STRANDFER BLVDISW 27TH ST FXTENSJON PROJECT No.: PROIECT- R&W PROJECT PLAN BUDGET R&W GW PS (C) q/3/201 FEE CALCULATIONS AND SUMMARY Slann., al Rat, SL .edvl e MANI-IOU RS PROIECT TASKS GW Pump Station Control Drawings Control system power Control- Imstrumentatkon RTU interconnection Detaiks Specs Cost estimate, Team meetings TOTALS, STAFF CLASSIFICAMONS, PM I Sr Env Sr ENr I 2.00 1.00 1 6.00 1.00 1.00 4131) P, PRINCIPAL PM PROJECT MANAGER $R.ENGR 0: SENIOR ENGINEER SR 81309 SENIOR ENGINEER I ENG.R. ENGINEER 4.00 2.00 2.00 12 00 5400 Engr Sr Tech III Sr Tech I Tt.ch./Des CAD/Tech er/Admr0 I TOTAL 1.00 4..00 1.02 4.00 400 1400 SR TECH II: SENIOR TECHNICIAr0 II SR TECH I: SENIOR TECHNICIAN I TECH/DES: TECHNICIAN/DESIGNER DRAFT CAD: DRAFTING (CAD) CIER/ADIVIN: CLERICAVADMINiSTRATIVE 4.00 50 STAFF Classification HOURS RATE 50 F' 1 0 5130,00 $ 50 PM 11 0 5145.00 $ SO CO $338 Sr Engr IP 2 4 5135.00 $ 5-40.00 $985 Sr Engr 1 ZA 34 5125.00 5 4:6000 $338 ENT 23 0 5110.00 $ 51,235 $985 Sr Tech IE 3 0 511000 50 Sr Tech I 3A 0 598330 $ $569 Tech/Des 4 14 $87.50 $ 1,22500 $250 $0 'CAD/Tech 5 0 557.00 $ $1500 Cler/Adnfin 7 4 543.00 5 1e4.00 $0 SO 50 1TOTAL FEE: 56 S 0,194.00 SO ' 5% $O AMiSt. EXPENsi.S. SO irdR. i 5'0.0C SO ID TI tEit- 1 Scuo SO ‘oliweR 1 III 33 $o IOTHEH. 1 5000 $0 101flE 0. 1 50.3.7..1 ., SO OTItE I! $0 10111E9: so ICIA/Q,... 4.132667 514,03 $0 SO I SUBTOTAL EXPENSES 5 837.56 $o 1 $O TOTAL COSTS, S 7055.86 50 100 11401\[:( =5 303 3=1 'TOTAL BUDGET: 7,420.00 PR/NT DA9/5/2017 TE: PREPARED 35 : 6 of 9 W710TUa Title T1 Assurancej During the performance of this AGREEMENT, the CONSULXANT, for itself, its assignees, and successors in interest agrees as follows: I . Compliance with Regulations: The CONSULTANT shall comply with the Regulations relative to non- discrimination in federally assisted prograrns of the AGENCY, Title 49, Code of Federal Regulations, Part 21, as they may be amended from time to time (hereinafter referred to as the "REGULATIONS„}, which are herein incorporated by reference and rnade a part of this AGiREETVIEN'r. 2. Non-discrimination: The CONSULTANT, with regard to the work performed during this AGREEMENT, shall not discriminate on the grounds of race, color, sex, or national origin in the selection and retention of sub -consultants, including procurement of materials and leases of equipment. The CONSULTANT shall not participate either directly or indirectly in the discrimination prohibited by Section 21.5 of the REGULATIONS, including employment practices when this AGREEMENT covers a program set forth in Appendix B of the REGULATIONS. Solicitations for Sub -consultants, Including Procurement of Materials and Equipment: In all solicitations either by competitive bidding or negotiations made by the CONSULTAN'r for work to be performed under a sub -contract, including procurement of materials or leases of equipment, each potential sub - consultant or supplier shall be notified by the CONSULTANT of the CONSULTANT's obligations under this AGREEMENT and the REGULATIONS relative to non-discrimination on the grounds of race, color, sex, or national origin, 4, Information and Reports: The CONSULTANT shall provide all information and reports required by the REGULATIONS or directives issued pursuant thereto, and shall permit access to its books, records, accounts, other sources of information, and its facilities as may be determined by the AGENCY, the STATE, or the Federal Highway Administration (FH WA) to be pertinent to ascertain compliance with such REGULKI]ONS, orders and instructions. Where any information required of a CONSULTANT is in the exclusive possession of another who fails or refuses to furnish this information, the CONSULTANT shall so certify to the A(JENCY, the S'rNf'E, or the FHWA as appropriate, and shall set forth what efforts it has made to obtain tile information. 5. Sanctions for Non-compliance: In the event of the CONSULTANT's non-cornpliance with the non- discrimination provisions of this AGREEMENT, the AGENCY shall impose Such AGREEMENT sanctions as it, the STATE, or the FHWA may determine to be appropriate, including, but not limited to: Withholding of payments to the CONSULTANT under this AGREEMENT until the CONSULTANT' complies, and/or, . Cancellation, termination, or suspension of this AGREEMENT, in whole or in part. Incorporation of Provisions: The CONSULTANT shall include the provisions of paragraphs (1) through (5) in every subcontract, including procurement of materials and leases of equipment, unless exempt by the REGULATIONS, or directives issued pursuant thereto. Tile CONSULTANT shall take such action with respect to any sub -consultant or procurement as the STATE, the AGENCY, or FH WA may direct as a means of enforcing such provisions including sanctions for non-compliance. Provided, however, that in the event a CONSULTANT becomes involved in, or is threatened with, litigation with asub-consultant or supplier as a result of such direction, the CONSULTANT may request the AGENCY enter into such litigation to protect the interests of the STATE and/or the AGENCY and, in addition, the CONSULTANT may request the United States enter into such litigation to protect the interests of the United States. Agrecilieiii. NUmber: WSDOT Form 140-089 EF Exhibit F Page I of I Revised 1013012014 179 Exhibit G Certification Documents Exhibit G- I (a) Certification of Consultant Exhibit G- 1(1-x) Certification o1ity of Tukwila Exhibit G-2 Certification Regarding Debarment, Suspension and Other Responsibility Matters - Primary Covered Transactions Exhibit C®3 Certification Regarding the Restrictions of the Use of Federal Funds for Lobbying Exhibit G-4 Certificate of Current Cost or Pricing Data Agreement Number, WSDO T Form 140-089 EF Exhibit G Page 1 of I Revised 1013012014 180 Exhibit G -1(a) Certification of Consultant I hereby certify that I am the and duly authorized representative of the firm of BergerABAM Inc. whose address is 33301 Ninth Avenue S,, Suite 300, Federal Way, WA 98003 and that neither the above firm nor I have: a) Employed or retained for a commission, percentage, brokerage, contingent fee, or other consideration, any firm or person (other than a bona fide employee working solely for me or the above CONSULTANT) to solicit or secure this AGREEMENT; b) Agreed, as an express or implied condition for obtaining this contract, to employ or retain the services of any firm or person in connection with carrying out this AGREEMENT; or c) Paid, or agreed to pay, to any firm, organization or person (other than a bona fide employee working solely f`or me or the above CONSULTANT) any fee, contribution, donation, or consideration of any kind for, or in connection with, procuring or carrying out this AGREEMENT; except as hereby expressly stated (if any); I acknowledge that this certificate is to be furnished to the City of Tukwila and the Federal Highway Administration, U.S. Department of Transportation in connection with this AGREEMENT involving participation of Federal -aid highway funds, and Is subject to applicable State and Federal laws, both criminal and civil. BergerABAM Inc. m1rufflMEM, Sigriature (Authorized Official of Consultant} Date Agreement Nuniber: WSDOT Form 1404089 EF Exhibit G Page I of I Revised 1013012014 181 Exhibit G -1(b) Certification of the City of Tukwila I hereby certify that I ani the: a ME of the , and or its representative has not been required, directly or indirectly as an express or implied condition in connection with obtaining or carrying out this AGREEMENT to: a) Employ or retain, or agree to employ to retain, any firm or person; or b) Pay, or agree to pay, to any firm, person, or organization, any fee, contribution, donation, or consideration ofariy kind; except as hereby expressly stated (if any)-. I acknowledge that this certificate is to be furnished to the and the Federal Highway Administration, U.S. Department of Transportation, in connection with this AGREEMENT involving participation of Federal -aid highway funds, and is SLIlZjeCt to applicable State and Federal laws, both criminal and civil. Signature Date Agreement Number- WSDO T Form 140.089 EF Exhibit G Page 1 of 1 Revised 1013012014 182 Exhibit G-2 Certification Regarding Debarment, Suspension and Oth Responsibility Matters - Primary Covered Transactions i 1. The prospective primary participant certifies to the best of its knowledge and belief, that it and its principals: A. Are not presently debarred, suspended, proposed for:• debarment, declared ineligible, or voluntarily excluded from covered transactions by any Federal department or agency, B. Have not within a three (3) year period preceding this proposal been convicted of or had a civil judgment rendered against thern for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State, or local) transaction or contract under a public transaction; violation of Federal or State anti-trust statues or cormnission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving .stolen property; C. Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State, or local) with commission of any of the offenses enumerated in paragraph (1)(b) of this certification, and D. Have not within a three (3) year period preceding this application / proposal had one or more public transactions (Federal, State and local) terminated for cause or default. 11. Where the prospective primary participant is unable to certify to any of the statements in this certification, such prospective participant shall attach an explanation to this proposal. BergerABAM Inc, Consultant (Firm Name) Signature (Authorized Official of Consultant) Date Agreement Number INSDOT Form 140.089 EF Exhibit G Page I of I Revised 1013012014 183 Exhibit G-3 Certification Regarding the Restrictions of the Use of Federal Funds for Lobbying The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that: No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or any employee of a Member of Congress in connection with the awarding of any federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative AGREEMENT, and the extension, continuation, renewal, amendment, or modification of Federal contract, grant, loan or cooperative AGREEMENT. 2. If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Mernber of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan or cooperative AGREEMENT, the undersigned shall complete and submit Standard Form - LLL, "Disclosure Form to Report Lobbying," in accordance with its instructions. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1.352, Title 31, US. Code, Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000.00, and not more than $100,000,00, [or each such failure. The prospective participant also agrees by submitting his or her bid or proposal that he or she shall require that the language of this certification be included in all lower tier sub contracts, which exceed $100,000, and that all such sub -recipients shall certify and disclose accordingly. BergerABAM Inc. Consultant (Firm Name) Signature (Authorized Official of Consultant) Date Agreement Number. WSDOT Form 140-089 EF Exhibit G Page I of I Revised 1013012014 184 This is to certify that, to the best of my knowledge and belief, the cost or pricing data (as defined in section 2.101 of the Federal Acquisition Regulation (FAR) and required under FAR subsection 15,403-4) submitted, either actually or by specific identification in writing, to the Contracting Officer or to the Contracting Officer's representative in support of Strander Blvd./SW 27th Street Extension are accurate, complete., and current as of 9/5/17 This certification includes the cost or pricing data supporting any advance AGREEMENT's and forward pricing rate AGREEMENT's between the offer or and the Government that are part of the proposal. Firm: BergerABAM Inc. Vice President Signature Title Date of Execution***: 4demity the proposal, quotation, request for pricing adjustment, or other submission involved, giving the appropriate identifying number (e.g. prqject title.) **Insert the day, month, and year, when price negotiations were concluded and price AGREEMf,.-,N'I' was reached. *"Insert, the day, month, and year, of signing which should be as close as practicable to the date when the price negotiations were concluded and the contract price was agreed to Agreement Nurnbev WSDOT Forrn 140-089 EF Exhibit G Page 1 of I Revised 1013012014 185 Exhibit H Liability Insurance Increase To Be Used Only If Insurance Requirements Are Increased "The professional liability limit of the CONSULTANT to the AGENCY identified in Section X11, Legal Relations and Insurance of this Agreement is amended to $ The CONSULTANT shall provide Professional Liability Insurance with minimum per occurrence limits in the arnount of $ Such "Insurance cove -rage shall be evidenced by one of the following methods: • Certificate of Insurance. • Self-insurance through an irrevocable Letter of Credit from a qualified financial institution. Self-insurance through documentation of a separate fund established exclusively for the payment of professional liability claims, including claim amounts already reserved against the fund, safeguards established for payment from the fund, a copy of the latest annual financial statements, and disclosure of the investment portfolio for those funds. Should the minimum Professional Liability insurance limit required by the AGENCY as specified above exceed $1 million per occurrence or the value of the contract, whichever is greater, then justification shall be submitted to the Federal Highway Administration (FHWA) for approval to increase the minimum insurance limit. If FH WA approval is obtained, the AGENCY may, at its own cost, reimburse the CONSULTANT for the additional professional liability insurance required. Notes: Cost of added insurance requirements: $ 9 Include all costs, fee increase,. prerniums. • This cost shall not be billed against an F14WA funded project. • For final contracts, include this exhibit. N/A Agreement Number WSDOT Form 140-089 EF Exhibit H Page I of I Revised 1013012014 186 Exhibit I Alleged Consultant Design Error Procedures The purpose of this exhibit is to establish a procedure to determine if a consultant's alleged design error is of a nature that exceeds the accepted standard of care. In addition, it will establish a uniform method for the resolution and/or cost recovery procedures in those instances where the agency believes it has suffered some material damage due to tile alleged error by the consultant, Step I Potential Consultant Design Error(s) is Identified by Agency's Project Manager At the first indication of potential consultant design error(s), the first step in the process is for the Agency's project manager to notify the Director of Public Works or Agency Engineer regarding the potential design error(s). For federally funded projects, the Region Local Programs Engineer should be infornied and involved in these procedures, (riots: The Director of Public Works or Agency Engineer may appoint an agency staff person other than the project manager, who has not been as directly involved in the project, to be responsible for the remaining steps in these procedures.) Stop 2 Project Manager Documents the Alleged Consultant Design Error(s) After discussion of the alleged design error(s) and the magnitude of the alleged error(s), and with the Director of Public Works or Agency Engineer's concurrence, the project manager obtains more detailed documentation than is normally required on the project. Examples include: all decisions and descriptions of work; photographs, records of labor, materials and equipment. Step 3 Contact the Consultant Regarding the Alleged Design Error(s) If it is determined that there is a need to proceed further, the next step in the process is for the project manager to contact the consultant regarding (lie alleged design error(s) and the magnitude of the alleged error(s). The project manager and other appropriate agency staff should represent the agency and the consultant should be represented by their prqJject manager and any personnel (including sub -consultants) deemed appropriate for the alleged design error(s) issue. Step 4 Attempt to Resolve Alleged Design Error with Consultant After the mecting0(s) with the consultant have been completed regarding the consultant's alleged design error(s), there are three possible scenarios; • It is determined via Mutual agreement that there is not a consultant design error(s). If this is the case, then the process will not proceed beyond this point, • It is determined via mutual agreement that a consultant design error(s) occurred. Ifthis is the case, then the Director of Public Works or Agency Engineer, or their representatives, negotiate a settlement with the consultant. The settlement would be paid to the agency or the amount would be reduced from the consultant's agreement with the agency for the services on the project in which the design error took place. The agency is to provide UY, through the Region Local Programs Engineer, a summary of the settlement for review and to make adjustments, if any, as to how the settlement affects federal reimbursements. No further action is required. • There is not a Mutual agreement regarding the alleged consultant design error(s). The consultant may request that the alleged design error(s) issue be forwarded to the Director of Public Works or Agency Engineer for review. If the Director Of Public Works or Agency Engineer, after review with their legal counsel, is not able to reach mutual agreement with the consultant, proceed to Step 5. Agreement Nunibr: WSDOT Form 140-089 EF Exhibit I Page 1 of 2 Revised 1013012014 187 Step 5 Forward Documents to Local Programs I"or federally funded prcjects all available information, including costs, should be forwarded through the Region Local Programs Engineer to LP for their review and consultation with the FIJWA. LP will meet with representatives of the agency and the consultant to review the alleged design error(s), and attempt to find a resolution to the issue. If necessary, LP will request assistance from the Attorney General's Office for legal interpretation. LP will also identify how the alleged error($) affects eligibility of project costs for federal reirnbursement- lf'i-nLitual agreement is reached, the agency and consultant adjust the scope of work and costs to reflect the agreed upon resolution, LP, in consultation with FIJWA, will 'identify the amount of federal participation in the agreed upon resolution of the issue. • If Mutual agreement is not reached, the agency and consultant may seek settlement by arbitration or by litigation. Agreement Number: WSDOT Form 140-089 EF Exhibit I Page 2 of 2 Revised 1013012014 188 Exhibit J Consultant Claim Procedures . . ....... . .... The purpose of this exhibit is to describe a procedure regarding claim(s) on a consultant agreement. The following procedures should only be utilized on consultant claims greater than $1,000. If the consultant's claim(s) are a total of $1,000 or less, it would not be cost effective to proceed through the outlined steps. It is suggested that the Director of Public Works or Agency Engineer negotiate a fair and reasonable price for the consultant's claim(s) that total $1,000 or less. This exhibit will outline the procedures to be followed by the consultant and the agency to consider a potential claire by the consultant, Step I Consultant Files a Claim with the Agency Project Manager If the consultant determines that they were requested to perform additional services that were outside of the agreement's scope of work, they may be entitled to a claim. The first step that must be completed is the request for consideration of the claim to the Agency's project manager. The consultant's claim must outline the following: • Summation of hours by classification for each firm that is included in the claim; • Any correspondence that directed the consultant to perform the additional work, • "Timeframe of the additional work that was Outside of the project scope, • Surnmary of direct labor dollars, overhead costs, profit and reimbursable costs associated with the additional work; and • Explanation as to why the consultant believes the additional work was outside of the agreement scope of work. Step 2 Review by Agency Personnel Regarding the Consultant's Claim for Additional Compensation After the consultant has completed step 1, the next step in the process is to forward the request to the Agency's project manager. The project manager will review the consultant's claim and will met with the Director of Public Works or Agency Engineer to determine if the Agency agrees with the claim. If the FHWA is participating in the project's funding, forward a copy of the consultant's claim and the Agency§s recommendation for federal participation in the claim to the WSDOT Local Programs through the Region Local Programs Engineer, I r the claim is not eligible for federal participation, payment will need to be firorn agency funds. If the Agency project manager, Director of Public Works or Agency Engineer, WSDOT Local Programs (if applicable), and FHWA (if applicable) agree with the consultant's claim, send a request memo, including backup documentation to the consultant to either supplement the agreement, or create a new agreement � for the claim. After the request has been approved, the Agency shall write the supplement and/or new agreement and pay the consultant the amount of the claim. Inform the consultant that the final payment for the agreement is subject to audit. No further action in needed regarding the claim procedures. If the Agency does not agree with the consultants claim, proceed to step 3 of the procedures. Agreement Number: WSDOT Form 140-089 EF Exhibit J Pagel of Revised 1013012014 189 Step 3 Preparation of Support Documentation Regarding Consultant's Claim(s) If the Agency does not agree with the consultant's claim, the project manager shall prepare a summary for the Director of Public Works or Agency Engineer that included the following: • Copy of information supplied by the consultant regarding the claim; • Agency's summation of hours by classification for each firrn that should be included in the claim; • Any correspondence that directed the consultant to perform the additional work; • Agency's summary of direct labor dollars, overhead costs, profit and reimbursable costs associated with the additional work; • Explanation regarding those areas in which the Agency does/does not agree with the consultant's clairn(s); • Explanation to describe what has been instituted to preclude future consultant claim(s); and • Recommendations to resolve the claim. Step 4 Director of Public Works or Agency Engineer Roiews Consultant Claim and Agency Documentation The Director of Public Works or Agency Engineer shall review and administratively approve or disapprove the clairn, or portions thereof, which may include getting Agency Council or Commission approval (as appropriate to agency dispute resolution procedures). If the project involves federal participation, obtain concurrence from WSDOT Local Programs and FI-IWA regarding final setilcment of the claire. Ifthe claim is riot eligible for federal participation, payment will need to be from agency funds, Step 5 Informing Consultant of Decision Regarding the Claim The Director of Public Works or Agency Engineer shall notify (in writing) the consultant of their final decision regarding the consultant's claim(s). Include the final dollar amount of the accepted claim(s) and rationale utilized for the decision. Step 6 Preparation of Supplement or New Agreement for the Consultant's Claim(s) The agency shall write the supplement and/or new agreement and pay the consultant the amount of the claim. Inform the consultant that the final payment for the agreement is subject to audit, agreement Number: WSDOT Form 140.089 EF Exhibit J Page 2 of 2 Revised 1013012014 190 Cl!y of Tukwila Allan Ekberg, Mayor TO: .tt Transportation and Infrastructure Cornmitteg. FROM1, Bob, Giberson, Public Works Director -iy�v BY: Mike Perfetti, Habitat Project Manager CC: Mayor Ekberg SUBiECT Riverton Creek Flapgate Removal Projec Project No. 99830103 Resolution for RCO Grant Application ISSUE Approve a Resolution to the State of Washington Recreation and Conservation Office (RCCA) for a second grant application for the Riverton Creek Flapgate Removal Project, The City is currently working on the design phase of the project, which will expand salmon habitat, including habitat for ESA-iisted Chinook salmon. This project is a priority project listed in the WRIA 9 Salmon Habitat Plan. As a recognized local entity, WRIA 9 has recommended to the RCO's Salmon Recovery Funding Board (SRFB) that the Riverton Creek Flapgate Removal Project receive construction grant funds. DISCUSSION The Riverton Greek Flapgate Removal Project is currently estimated to cost approximately $996,430, including design and construction. To date, the SRFB has granted $551,070 (PSAR grant #16-1892) for this project, but these funds are on hold until the State Legislature approves the 2017-2019 biennial budget, at which point the grant contract will be routed through City Council for approval. This second grant application, for $295,895 (SRFB grant #171048), requires the applicant submit an Application Authorization Form in the form of a City Resolution, FISCAL IMPACT The two grants total $846,965 and both require a 15% City match, or $149,465. There is currently only $868,000 budgeted for the Riverton Creek Flap Gate Removal project with $551,070 In grant funding and $318,000 in Surface Water funds. The entire project budget will have to be increased to the estimated $996,430, but with the second SRFB grant, the surface water funding will be sufficient at $318,000. RECOMMENDATION Council is being asked to approve the Resolution authorizing the submission of the second SRFB grant funding request and consider this item on the Consent Agenda at the September 18, 2017 Regular Meeting. Attachments: Draft Resolution page108, 2017-2022 CIP WAPW EqTROJECTSW DR PromorAffivortort Flap Gale Removal 260B 2011 GoOtInfo Memo 2017 RCU SRF8 Gwt Rew1wim 091217 91,dor.X 191 2016 PSAR grant $551,070,00 2017 SRFB grant 29 89500 IRS11 RECOMMENDATION Council is being asked to approve the Resolution authorizing the submission of the second SRFB grant funding request and consider this item on the Consent Agenda at the September 18, 2017 Regular Meeting. Attachments: Draft Resolution page108, 2017-2022 CIP WAPW EqTROJECTSW DR PromorAffivortort Flap Gale Removal 260B 2011 GoOtInfo Memo 2017 RCU SRF8 Gwt Rew1wim 091217 91,dor.X 191 WHEREAS, under the provisions of the Salmon Recovery Act, state grant assistance is requested to aid in financing the cost of restoration; and WHEREAS, the City Council of the City of Tukwila considers it in the best public interest to complete the Riverton Creek Flap Gate Removal Project (#17-1048) described in the application; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. The Habitat Project Manager, Mike Perfetti, is authorized to make formal application to the Salmon Recovery Funding Board for grant assistance. Section 2. The City of Tukwila has reviewed the sample project agreement on the Washington State Recreation and Conservation Office's Web site (at www.rco.wa.gov documents/manuals&forms/SaMpjtPro'Lgreement.pd A f) and authorizes the Mayor to enter _ into such a project agreement, if funding is awarded. The City Council understands and acknowledges that the project agreement will contain the indemnification (applicable to any sponsor) and waiver of sovereign immunity (applicable to Tribes) and other terms and conditions that are contained in the sample project agreement, and that the sample project agreement may be revised periodically by the Recreation and Conservation Office, The City Council recognizes that such changes might occur prior to the authorized representative signing the actual project agreement, and accepts the responsibility and the presumption that the authorized representative shall have conferred with them as to any such changes before he/she executes the project agreement on behalf of the City of Tukwila and so executes with their authorization. WMard Roces s lng\Res olutions \Grant funding applicationAverlon Creek 8-30-17 MRbJs Page I of 2 192 Section 3. Any grant assistance received will be used for only direct eligible and allowable costs that are reasonable and necessary to implement the project(s) referenced above. Section 4. The City of Tukwila expects their matching share of project funding will be derived from City of Tukwila funds and possibly other sources and meets the requirements of WAC 420-12-040. In addition, the City Council understands the City is responsible for supporting all non-cash commitments to this project should they not materialize. Section 5. The City Council acknowledges that if the Salmon Recovery Fund Board approves grant assistance for the project, the Recreation and Conservation Office will pay the City on only a reimbursement basis, except for a specially approved advance payment. It is understood that "reimbursement basis" means the City will only request payment from the Recreation and Conservation Office after it incurs eligible and allowable costs and has paid them, The Recreation and Conservation Office may also determine an amount of retainage and hold that amount until the project is complete. The Recreation and Conservation Office may approve advance payments in limited circumstances, pursuant to WAC 420-12-060 and the policy outlined in Manual 8, Reim bursem ents. Section 6. The City acknowledges that any property restored will be maintained for a period of 10 years after the project is complete unless otherwise provided and agreed to by the City of Tukwila and the Salmon Recovery Funding Board in the project agreement or an amendment thereto. Section 7. This application authorization becomes part of a formal application to the Salmon Recovery Funding Board for grant assistance. Section 8. Appropriate opportunity for public comment on this application was provided. Section 9. The City Council of the City of Tukwila certifies that this application authorization was properly and lawfully adopted following the requirements of the City of Tukwila and applicable laws and policies and that the person signing as authorized representative is duly authorized to do so. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this day of , 2017, ATTEST/AUTHENTICATED: Christy O'Flaherty, MMC, City Clerk Dennis Robertson, Council President Filed with the City Clerk: Passed by the City Council: Resolution Number: KNWord Processing\Resolutions%Grant funding application -Riverton Creek 8-30-17 MRbis Page 2 of 2 193 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2017 to 2022 PROJECT- Riverton Creek Flap Gate Removal Project No, 9983012 DESCRIPTION: Remove two culverts and flap gates at Duwamish River; install pipe arch, create open channel confluence, install trail bridge over now channel, restore/revegetate 200 feet of creek channel and 450 ft. of pond shoreline. JUSTIFICATION: Increase available salmonid rearing habitat and increase flood refuge in lower Duwamish River. Improve fish access to Riverton Greek and enhance salmon rearing and resting area. STATUS: Design at 70% completion in 2011 with a Salmon Recovery Funding Board grant of $42,500 and $30,000 from People for Puget Sound. Construction is grant dependent. MAINT. IMPACT: Expected to increase maintenance. COMMENT: Proposed grants include State & Federal habitat grants. Project used as mitigation for East Marginal Way Pipe Replacement Project and MPA Control#1 33763-1 requires work to be completed by June 11, 2019. FINANCIAL Through Estimated (in son(fti 2015 217116 2017 2019 2019 2020 2021 2022 FIFYOND TOTAL EXPENSES . ....... . .... ......... .... . ... Design 114 10 108 232 Land (R]W) 0 Const. Mgmt. 100 100 Construction 650 650 TOTAL EXPENSES 114 10 108 750 0 0 0 01 01 982 FUND SOURCES Awarded Grant 72 72 Proposed Grant 550 550 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 42 10 108 200 0 0 0 0 0 360 TOTAL SOURCES 1 1141 10 1 108,1 750 1 0 01 01 0 01 982 2017 - 2022 Capital improvement Program 108 194 Tullkwila Altan Ekberg, May] Public Works Department - Bob Giber -son, Director TO: Transportation and Infrastructure Committee FROM.- Bob Giberson, Public Works Director DATE: September 8, 2017 SUBJECT: S rint,Communications Company Franchise Ordinance ISSUE Approval of Sprint Communications Company Franchise Ordinance. 111 P Ift t" To I Headquartered in Herndon, VA, the Sprint Communications Company (Sprint) is a wholly owned subsidiary of US Telecom. Sprint provides long distance telecommunication services and transmission of voice, data, and video. ANALYSIS The attached Franchise Ordinance would allow Sprint to operate and maintain its telecommunications facilities within City of Tukwila rights-of-way. FINANCIAL IMPACT Under the terms of the Franchise, Sprint Communications Company will pay a $5,000 administrative fee within 30 days of franchise approval. 19MOMINIMA IM9 Council is being asked to approve the Ordinance that will grant a Franchise Agreement to Sprint Communications Company and consider this item on the Consent Agenda at the September 18, 2017 Regular Meeting. Attachment-, Draft Franchise Ordinance mlpw oil morno tip On i 9.0.11Aocx 195 *M A A 61MUMMUM"110111— 0 11 ig Film I= 2 2:0111 VTO 91-111 WHEREAS, Sprint Communications Company LP., hereinafter referred to as "Sprint," is a telecommunications company that, among other things, provides high capacity interexchange transport to telecommunications common carriers, including data transmission, linkage to long distance carriers and other telecommunications services to customers in the Puget Sound region', and WHEREAS, Sprint's desired route through the City of Tukwila, hereinafter referred to as "City," requires the use of certain portions of City rights-of-way for the installation, operation and maintenance of a telecommunications system; and WHEREAS, the City Council has determined that the use of portions of the City's rights-of-way for installation of a telecommunications system is appropriate from the standpoint of the benefits to be derived by local business and the region as a result of such services; and WHEREAS, the City Council also recognizes that the use of public rights-of-way must be restricted to allow for the construction of amenities necessary to serve the future needs of the citizens of Tukwila and that the coordination, planning and management of the City's rights-of-way is necessary to ensure that the burden of costs for the operations of none municipal interests are not borne by the citizenry; and WHEREAS, the Revised Code of Washington (RCW) authorizes the City to grant and regulate non-exclusive franchises for the use of public streets, right-of-ways and other public property for installation, operation and maintenance of a fiber optic system and transmission of communications; W: Word Processinq\Ordinances%Sprint Franchise Agreement 8-11-17 BGtjs Page 1 of 12 196 NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY ORDAINS AS FOLLOWS: Section 1. Non-exclusive Franchise Granted. A. The City hereby grants to Sprint, subject to the conditions prescribed in this ordinance ("Franchise Agreement"), the franchise rights and authority to construct, replace, repair, monitor, maintain, use and operate the equipment and facilities necessary for a telecommunications facility within all City -owned rights-of-way, hereinafter referred to as the "Franchise Area." S. The foregoing franchise rights and authority ("Franchise") shall not be deemed to be exclusive to Sprint and shall in no way prohibit or limit the City's ability to grant other franchises, permits, or rights along, over or under the areas to which this Franchise has been granted to Sprint; provided, that such other franchises do not unreasonably interfere with Sprint's exercise of franchise rights granted herein as determined by the City. This Franchise shall in no way interfere with existing utilities or in any way limit, prohibit or prevent the City from using the Franchise Area or affect the City's jurisdiction over such area in any way - C. This Franchise Agreement merely authorizes Sprint to occupy and use the Franchise Area, Nothing contained herein shall be construed to grant or convey any right, title, or interest in the Franchise Area to Sprint. Section 2. Authority. The Director of Public Works or his or her designee is hereby granted the authority to administer and enforce the terms and provisions of this Franchise Agreement and may develop such lawful and reasonable rules, policies and procedures as he or she deems necessary to carry out the provisions contained herein, Section 3, Franchise Term. The franchise rights granted herein shall remain in full force and effect for a period of 10 years from the effective date of this ordinance. However, this Franchise Agreement shall not take effect and Sprint shall have no rights under this Franchise Agreement unless a written acceptance with the City is received pursuant to Section 4 of this Agreement. If Sprint requests a Franchise renewal prior to the expiration date, the City may, at the City's sole discretion, extend the term of this Franchise Agreement for up to one year beyond the expiration date to allow processing of renewal. If the City elects to extend the term of this Franchise, written notice of the extension shall be provided to Sprint prior to the Franchise expiration date. Section 4. Acceptance of Terms and Conditions. The full acceptance of this Franchise Agreement and all the terms and conditions shall be filed with the City Clerk within 30 days of the effective date of this ordinance in the form attached hereto as Exhibit A. Failure on the part of Sprint to file said consent within 30 days of the effective date of this ordinance shall void and nullify any and all rights granted under this Franchise Agreement. W: Word Processing\0rdinances\S,,)hnt Franchise Agreement 8-11-17 BG:bjs Page 2 of 12 197 Section 6. Construction Provisions and Standards. The following provisions shall be considered mandatory and failure to abide by any conditions described herein shall be deemed as non-compliance with the terms of this Franchise Agreement and may resultin some or all of the penalties specified in Section 6. 1. Permit Required. No construction, maintenance or repairs (except for emergency repairs) shall be undertaken in the Franchise Area without first obtaining appropriate permits from the City of Tukwila, Department of Public Works. In case of an emergency, Sprint shall, within 24 hours of the emergency, obtain a permit from the City of Tukwila's Public Works Department, 2. Coordination. All capital construction projects performed by Sprint within the Franchise Area shall be inspected by a City inspector. All work and inspection shall be coordinated with the Engineering Division of the Public Works Department to ensure consistency with City infrastructure, future Capital Improvement Projects, all developer improvements, and pertinent codes and ordinances. 3, Construction Standards, Any construction, installation, maintenance and restoration activities performed by or for Sprint within the Franchise Area shall be constructed and located so as to produce the least amount of interference with the free passage of pedestrian and vehicular traffic. All construction, installation, maintenance and restoration activities shall be conducted such that they conform to the City's development guidelines and standards and comply with Title 11 of the Tukwila Municipal Code. 4. Underground Installation Required. All telecommunications cables and junction boxes or other vaulted system components shall be installed underground unless otherwise exempted frorn this requirement, in writing, by the Public Works Director. 5, Relocation. a. The City shall have the right to require Sprint to alter, adjust, relocate, or protect in place its facilities within the public right-of-way when reasonably necessary for construction, alteration, repair, or improvement of any portion of the public rights-of- way for purposes of public welfare, health, or safety ("Public Improvements"), Such Public Improvements include, by way of example but not limitation, public rights-of-way construction; public rights-of-way repair (including resurfacing or widening); change of public rights-of-way grade: construction, installation or repair of sewers, drains, water pipes, power lines, signal lines, communication lines, or any other type of government- owned communications, utility or public transportation systems, public work, public facility, or improvement of any government-owned utility; public rights-of-way vacation, and the construction of any public improvement or structure by any governmental agency acting in a governmental capacity. In the event the City requires Sprint to relocate its facilities, the City shall provide Sprint with written notice requesting such relocation, along with plans for the public improvement that are sufficiently complete to allow for the initial evaluation, coordination and the development of a relocation plan. The City and Sprint shall meet at a time and location determined by the City to discuss the project requirements including critical timelines, schedules, construction standards, VT Word ProcessingQrdinances%Sprint Fran rhise Agreement 8-11-17 BG -bis Page 3 of 12 198 utility conflicts, as -built requirements, and other pertinent relocation plan details. The City shall notify Sprint as soon as practicable of the need for relocation and shall specify the date by which relocation shall be completed. Except in case of emergency such notice shall be no less than 90 days. b. To ensure timely execution of relocation requirements, Sprint shall, upon written request from the City, provide at Sprint's expense, base maps, current as, built information, detailed relocation plan (including detailed schedule of relocation activities, identification of critical path, identification of facilities, and relocation procedures), and other design, technical or operational requirements reasonably required for such relocation within the time frame specified by the City. c. Sprint may, after receipt of written notice requesting a relocation of its facilities, submit to the City written alternatives to such relocation within the time specified by the City. Except in case of emergency, as determined by the City in its sole discretion, such time specified by the City shall be no less than 30 days. Such alternatives shall include the use and operation of temporary facilities in adjacent rights- of-way, The City shall evaluate such alternatives and advise Sprint in writing if one or more of the alternatives are suitable to accommodate the work, which would otherwise necessitate relocation of the facilities. If requested by the City, Sprint shall submit additional information as reasonably required to assist the City in making such evaluation. The City shall give each alternative proposed by Sprint full and fair consideration. In the event the City, in its sole discretion, decides not to accept the alternatives suggested by Sprint, Sprint shall relocate its facilities as otherwise specified in Section 5, subparagraph 5. d. Upon final approval of the relocation plan by the City, Sprint shall, at its own expense, unless otherwise prohibited by statute, and at the time frame specified by the City, temporarily or permanently remove, relocate, place underground, change or alter the position of any facilities or structures within the right-of-way whenever the City has determined that such removal, relocation, undergrounding, change or alteration is reasonably necessary for the construction, repair, maintenance, installation, public safety, or operation of any public improvement in or upon the rights-of-way. In the event relocation is required by reason of construction by a third party, non-governmental entity, for the sole benefit of the third party, non-governmental entity, then Sprint's relocation costs shall be borne by the third party. e. If during the construction, repair, or maintenance of the City's public improvement project an unexpected conflict occurs from Sprint's facilities, Sprint shall, upon notification from the City, respond within 24 hours to resolve the conflict. t Sprint acknowledges and understands that any delay by Sprint in performing the work to alter, adjust, relocate, or protect in place its facilities within the public rights-of-way may delay, hinder, or interfere with the work performed by the City and its contractors and subcontractors in furtherance of construction, alteration, repair, or improvement of the public rights-of-way, and result in damage to the City, including but not limited to, delay claims. Sprint shall cooperate with the City and its contractors and subcontractors to coordinate such relocation work to accommodate the public W: Word Proce5singtOrdjnances`rSprint Franchise Agreement 8-11-17 BGtjs Page 4 of 12 199 improvement project and project schedules to avoid delay, hindrance of, or interference with such project. g, Should Sprint fail to alter, adjust, protect in place or relocate any facilities ordered by the City to be altered, adjusted, protected in place, or relocated, within the time prescribed by the City, given the nature and extent of the work, or if it is not done to the City's reasonable satisfaction, the City may, to the extent the City may lawfully do so, cause such work to be done and bill the reasonable cost of the work to Sprint, including all reasonable costs and expenses incurred by the City due to Sprint's delay. In such event, the City shall not be liable for any damage to any portion of Sprint's system. In addition to any other indemnity set forth in this Franchise Agreement, Sprint will indemnify, hold harmless, and pay the costs of defending the City from and against any and all claims, suits, actions, damages, or liabilities for delays on public improvement construction projects caused by or arising out of the failure of Sprint to adjust, modify, protect in place, or relocate its facilities in a timely manner; provided that, Sprint shall not be responsible for damages due to delays caused by the City, 6. Removal or Abandonment. Upon the removal from service of any service antennas or other associated structures, facilities and amenities, Sprint shall comply with all applicable standards and requirements prescribed by the City of Tukwila's Public Works Department for the removal or abandonment of said structures and facilities, No facility constructed or owned by Sprint shall be abandoned without the express written consent of the City. 7. Bond. Before undertaking any of the work, installation, improvements, construction, repair, relocation, or maintenance authorized by this Franchise Agreement, Sprint shall, upon the written request of the City, furnish a bond executed by Sprint and a corporate surety authorized to operate a surety business in the State of Washington, in such sum as may be set and approved by the City as sufficient to ensure performance of Sprint's obligations under this Franchise Agreement, provided, however, that such sum shall not exceed 150% of the cost of the work to be done or the telecommunications system to be installed by Sprint in the City rights-of-way. At Sprint's sole option, Sprint may provide alternate security in the form of an assignment of funds or a letter of credit, in the same amount as the bond. All forms of security shall be in the form reasonably acceptable to the City. The bond shall be conditioned so that Sprint shall observe all the covenants, terms and conditions and shall faithfully perform all of the obligations of this Franchise Agreement, and to repair or replace any defective Sprint work or materials discovered in the City's roads, streets or property. 8, "One -Call" Location and Liability. Sprint shall subscribe to and maintain membership in the regional "One -Call" utility location service and shall promptly locate all of its lines upon request. The City shall not be liable for any damages to Sprint's system components or for interruptions in service to Sprint customers which are a direct result of work performed for any City project for which Sprint has failed to properly locate its lines and facilities within the prescribed time limits and guidelines established by One -Call. The City shall also not be liable for any damages to the Sprint system components or for interruptions in service to Sprint customers resulting from work performed under a permit issued by the City. W: Word ProcessingNOrdinancesXSprint Franchise Agreement a_11-17 BG:bjs Page 5 of 12 200 9, As -Built Plans Required. Sprint shall maintain accurate engineering plans and details of all installations within the City limits and shall provide such information in both paper form and electronic form using the most current AutoCAD version prior to close-out of any permits issued by the City and any work undertaken by Sprint pursuant to this Franchise Agreement. The City shall determine the acceptability of any as -built submittals provided under this section. 10. Recovery of Costs. Sprint shall be subject to all permit fees associated with activities undertaken through the authority granted in this Franchise Agreement or under ordinances of the City. Where the City incurs reasonable costs and expenses for review or inspection of activities undertaken through the authority granted in this Franchise Agreement or any ordinances relating to the subject for which permit fees have not been established, Sprint shall pay such reasonable costs and expenses directly to the City within 30 days following receipt of an invoice, together with reasonable supporting documentation evidencing such costs and expenses. 11. Vacation. If, at any time, the City shall vacate any City road, right-of-way or other City property which is subject to rights granted by this Franchise Agreement and said vacation shall be for the purpose of acquiring the fee or other property interest in said road, right-of-way or other City property for the use of the City, in either its proprietary or governmental capacity, then the City may, at its option and by giving 60 - days written notice to Sprint, terminate this Franchise Agreement with reference to such City road, right-of-way or other City property so vacated, and the City shall not be liable for any damages or loss to Sprint by reason of such termination other than those provided for in RCW 35,99. A. Franchise Violations. The failure by Sprint to fully comply with any of the provisions of this Franchise Agreement may result in a written notice from the City that describes the violations of the Franchise Agreement and requests remedial action within 60 days of receipt of such notice, If Sprint has not attained full compliance at the end of the 60 -day period following receipt of the violation notification, the City may declare an immediate termination of all franchise rights and privileges, provided that full compliance was reasonably possible within that 60 -day period, B. Emergency Actions. 1. If any of Sprint's actions under this Franchise Agreement, or any failure by Sprint to act to correct a situation caused by Sprint, is deemed by the City to create a threat to life or property, financial harm, or cause a delay of the construction, repair or maintenance of the public improvement, the City may order Sprint to immediately correct said threat, financial harm, or delay or, at the City's discretion, the City may undertake measures to correct said threat, financial harm or delay itself; provided that, when possible, the City shall notify Sprint and give Sprint an opportunity to correct within a specified time said threat, financial harm or delay before undertaking such corrective measures. Sprint shall be liable for all reasonable costs, expenses and damages attributed to the correction of such an emergency situation as undertaken by the City to the extent that such situation was caused by Sprint and shall further be liable VV: Word Processing\O rd i na ncestS print Franchise Agreement 8-11-17 BG:bj-. Page 6 of 12 201 for all reasonable costs, expenses and damages resulting to the City from such situation and any reimbursement of such costs to the City shall be made within 30 days of written notice of the completion of such action or determination of damages by the City. The failure by Sprint to take appropriate action to correct a situation caused by Sprint and identified by the City as a threat to public or private safety or property, financial harm, or delay of the construction, repair or maintenance of the public improvement shall be considered a violation of the terms of this Franchise Agreement, 2, If, during construction or maintenance of Sprint's facilities, any damage occurs to an underground facility and the damage results in the release of natural gas or other hazardous substance or potentially endangers life, health or property, Sprint or its contractor shall immediately call 911 or other local emergency response number. C. Other Remedies. Nothing contained in this Franchise Agreement shall limit the City's available remedies in the event of Sprint's failure to comply with the provisions of this Franchise Agreement, to include but not limited to, the City's right to a lawsuit for specific performance and/or damages. D. Removal of System. In the event this Franchise Agreement is terminated as a result of violations of the terms of this Franchise Agreement, Sprint shall, at its sole expense, promptly remove all system components and facilities, provided that the City, at its sole option, may allow Sprint to abandon its facilities in place. Section 7. Insurance, A. Sprint shall maintain liability insurance written on a per -occurrence basis during the full term of this Franchise Agreement for personal injuries and property damages. The policy shall contain coverage in the amounts and conditions stipulated in Title 11 of the Tukwila Municipal Code, Should Title 11 of the TMC be amended to increase the required amounts and conditions, Sprint shall acquire additional insurance, B. Such insurance shall specifically name as additional insured, the City, its officers and employees; shall apply as primary insurance; shall stipulate that no insurance affected by the City will be called on to contribute to a loss covered thereunder; and shall further provide that the policy shall not be materially modified or canceled during the life of the permit or Franchise Agreement without Grantee giving 30 days written notice to the City. Notice shall be by certified mail, return receipt requested to the City. Section 8. Other Permits and Approvals. Nothing in this Agreement shall relieve Sprint from any obligation to obtain approvals or necessary permits from applicable federal, state and City authorities for all activities in the Franchise Area. Section 9. Transfer of Ownership. A. The rights, privileges, benefits, title or interest provided by this Franchise shall not be sold, transferred, assigned or otherwise encumbered, without the prior written consent of the City, with such consent not being unreasonably withheld or delayed. No such consent shall be required, however, for a transfer in trust, by other hypothecation, or by assignment or any rights, title or interest in Sprint's telecommunications system in W, Word Processing\Ordinances\Sprint Franchise Agreement 4-11-17 Mbjs Page 7 of 12 202 order to secure indebtedness. Approval shall not be required for mortgaging purposes provided that the collateral pledged for any mortgage shall not include the assets of this franchise. Approval shall not be required for any transfer from Sprint to another person or entity controlling, controlled by, or under common control with Sprint. Sprint may license fibers to other users without the consent of the City provided that Sprint remains solely responsible for the terms and conditions outlined in this Franchise Agreement. B. In any transfer of this Franchise that requires the approval of the City, Sprint shall show that the recipient of such transfer has the technical ability, financial capability, and any other legal or general qualifications as reasonably determined by the City to be necessary to ensure that the obligations and terms required under this Franchise Agreement can be met to the full satisfaction of the City. The qualifications of any transferee shall be determined by a hearing before the City Council and the approval to such transfer shall be granted by resolution of the City Council. Any reasonable administrative costs associated with a transfer of this Franchise that requires the approval of the City shall be reimbursed to the City within 30 days of such transfer. Section 10. Administrative Fees. A. Pursuant to the Revised Code of Washington (RCW), the City is precluded from imposing franchise fees for "telephone businesses" as defined in RCW 82,16.010, or "service provider" as defined in RCW 35.99,010, except that fees may be collected for administrative expenses related to such franchise. Sprint does hereby warrant that its operations, as authorized under this Franchise Agreement, are those of a telephone business as defined in RCW 82.16,010 or a service provider as defined in 35,99,010. B, Sprint shall be subject to a one-time $5,000 administrative fee for reimbursement of costs associated with the preparation, processing and approval of this Franchise Agreement, These costs shall include, but not be limited to, wages, benefits, overhead expenses, equipment and supplies associated with such tasks as plan review, site visits, meetings, negotiations and other functions critical to proper management and oversight of the City's right-of-way. Administrative fees exclude normal permit fees as stipulated in Title 11 of the Tukwila Municipal Code. Payment of the one-time administrative fee is due 30 days after notice of franchise approval. C. The City reserves the right to exercise authority it has or may acquire in the future to charge a franchise fee as authorized by law. D. In the event Sprint submits a request for work beyond the scope of this Franchise Agreement, or submits a complex project that requires significant comprehensive plan review or inspection, Sprint shall reimburse the City for franchise amendments and expenses associated with the project. Sprint shall pay such costs within 60 days of receipt of a bill from the City, together with reasonable supporting documentation evidencing such costs. E. Failure by Sprint to make full payment of bills within the time specified shall be considered sufficient grounds for the termination of all rights and privileges existing under this ordinance, utilizing the procedures specified in Section 6 of this ordinance. W: Word Processing\Ordinancen\Sprint Franchise Agreement 8-11-17 BG -Ibis Page 8 of 12 203 Section 11. Notices. Any notice to be served upon the City or Sprint shall be delivered to the following addresses respectively: City of Tukwila Office of the City Clerk Email: Tukwila CityClerk@tukwilawa,agv Phone: 206-433-1855 Sprint Communications Company L.P. ATTN: Manager, Real Estate 6391 Sprint Parkway M& KSOPHT0101-Z2040 Overland Park, KS 66251 With copies to: Sprint Communications Company L.P. Attn� Real Estate Attorney 6391 Sprint Parkway MS* KSOPHT0101-Z2020 Overland Park, KS 66251 Steven Schauer Sprint Senior OSP Engineer 2210 S 35th St Tacoma, WA 98409 Section 12, Indemnification, A. Sprint shall use reasonable and appropriate precautions to avoid damage to persons or property in the construction, installation, repair, operation and maintenance of its structures and facilities within the Franchise Area. Sprint shall indemnify and hold the City harmless from all claims, actions or damages, including reasonable attorney's and expert witness fees, which may accrue to or be suffered by any person or persons, corporation or property to the extent caused in part or in whole by any negligent act or omission of Sprint, its officers, agents, servants or employees, carried on in the furtherance of the rights, benefits, and privileges granted to Sprint by this Franchise. In the event any claim or demand is presented to or filed with the City that gives rise to Sprint's obligation pursuant to this section, the City shall within a reasonable time notify Sprint thereof and Sprint shall have a right, at its election, to settle or compromise such claim or demand. In the event any claim or action is commenced in which the City is named a party, and which suit or action is based on a claim or demand that gives rise to Sprint's obligation pursuant to this section, the City shall promptly notify Sprint thereof, and Sprint shall, at its sole cost and expense, defend such suit or action by attorneys of its own election. In defense of such suit or action, Sprint may, at its election and at its VT Word Processinq\0rdinances\,Spr1nt Franchise Agreement 8.11-17 BG:bjs Page 9 of 12 204 sole cost and expense, settle or compromise such suit or action. This section shall not be construed to require Sprint to: 1. protect and save the City harmless from any claims, actions or damages; 2. settle or compromise any claim, demand, suit or action; 3. appear in or defend any suit or action; or, 4, pay any judgment or reimburse the City's costs and expenses (including reasonable attorney's fees), to the extent such claim arises out of the negligence or intentional acts of the City, its employees, agents or independent contractors. B. To the extent of any concurrent negligence between Sprint and the City, Sprint's obligations under this paragraph shall only extend to its share of negligence or fault. The City shall have the right at all times to participate through its own attorney in any suit or action that arises out of any right, privilege, and authority granted by or exercised pursuant to this Franchise Agreement when the City determines that such participation is required to protect the interests of the City or the public, Such participation by the City shall be at the City's sole cost and expense. C. With respect to the performance of this Franchise and as to claims against the City, its officers, agents and employees, Sprint expressly waives its immunity under Title 51 of the Revised Code of Washington, the Industrial Insurance Act, for injuries to its officers, agents and employees and agrees that the obligation to indemnify, defend and hold harmless provided for in this paragraph extends to any claim brought by or on behalf of Sprint's officers, agents or employees. This waiver is mutually negotiated by the parties. Section 13. Severability. If any section, sentence, clause or phrase of this ordinance is held to be invalid or unconstitutional by a court of competent jurisdiction, either party may deem the entire ordinance to be affected and thereby nullified. However, in the event that a determination is made that a section, sentence, clause or phrase in this ordinance is invalid or unconstitutional, the parties may agree to treat the portion declared invalid or unconstitutional as severable and maintain in force the remaining provisions of this ordinance; provided that, if the City elects, without agreement by Sprint, to enforce the remaining provisions of the ordinance, Sprint shall have the option to terminate the Franchise Agreement. Section 14. Reservation of Rights. The parties agree that this Agreement is intended to satisfy the requirements of all applicable laws, administrative guidelines, rules, orders and ordinances. Accordingly, any provision of this agreement or any local ordinance that may conflict with or violate the law shall be invalid and unenforceable, whether occurring before or after the execution of this agreement, it being the intention of the parties to preserve their respective rights and remedies under the law, and that the execution of this Agreement does not constitute a waiver of any rights or obligations by either party under the law. W: Word Pror.ess1rg\Ordinances%Spr1nt Franuhise Agreement 8-11-17 BG:ojs Page 10 of 12 205 Section 15. Police Powers. Nothing contained herein shall be deemed to affect the City's authority to exercise its police powers, Sprint shall not by this Franchise Agreement obtain any vested rights to use any portion of the City right-of-way except for the locations approved by the City and then only subject to the terms and conditions of this Franchise Agreement. This Franchise Agreement and the permits issued thereunder shall be governed by applicable City ordinances in effect at the time of application for such permits, Section 16. Future Rules, Regulations and Specifications. Sprint acknowledges that the City may develop rules, regulations and specifications, including a general ordinance or other regulations governing telecommunications operations in the City. Such regulations, upon written notice to Sprint, shall thereafter govern Sprint's activities hereunder; provided, however, that in no event shall regulations: 1, materially interfere with or adversely affect Sprint's rights pursuant to and in accordance with this Franchise Agreement; or 2. be applied in a discriminatory manner as it pertains to Sprint and other similar user of such facilities. Section 17. Repealer. Ordinance Nos. 2102 and 1439 are hereby repealed. Section 18. Corrections by City Clerk or Code Reviser. Upon approval of the City Attorney, the City Clerk and the code reviser are authorized to make necessary corrections to this ordinance, including the correction of clerical errors; references to other local, state or federal laws, codes, rules, or regulations, or ordinance numbering and section/subsection numbering. Section 19. Force Majeure. Sprint will not be held in violation under, or in noncompliance with, the provisions of this Franchise, nor suffer any enforcement relating thereto, where such noncompliance or alleged violation occurred or was caused by circumstances reasonably beyond the ability of Sprint to control. This includes war or riots, civil disturbances, floods or other natural catastrophes, labor stoppages or slowdowns not attributable to Sprint's employees, or power outages exceeding back-up power supplies, and work delays caused by waiting for utility providers to service or monitor their utility poles to which Sprint's Cable System is attached as well as verifiable unavailability of materials and/or qualified labor to perform the work necessary. Sprint shall have a reasonable time, under the circumstances, to perform the affected obligation under this Franchise or to procure a substitute for such obligation that is satisfactory to the City. If Sprint believes that a reason beyond its control has prevented or delayed its compliance with the provisions of this Franchise, Sprint shall provide documentation as reasonably required by the City to substantiate Sprint's claim. If Sprint has not yet cured the deficiency, Sprint shall also provide the City with its proposed plan for remediation, including the timing for such cure. W Word Processing\Ordinances\Sprint Franchise Agreement 8-11-17 BG:bjs Page 11 of 12 206 Section 20. Effective Date. This ordinance or a summary thereof shall be published in the official newspaper of the City, and shall take effect and be in full force five days after passage and publication as provided by law, PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this day of , 2017, ATTEST/AUTHENTICATED: Christy O'Flaherty, MMC, City Clerk Allan Ekberg, Mayor APPROVED AS TO FORM BY: Filed with the City Clerk: Passed by the City Council: Published: Effective Date: Rachel B, Turpin, City Attorney Ordinance Number: Attachment: Exhibit A — Franchise Agreement Acceptance Form VV: Word Processing0rdinances\Sprint Franchise Agreement 8-11-17 BG,bjs Page 12 of 12 207