HomeMy WebLinkAboutTIC 2017-09-26 Item 2B - Contract Supplement #3 - Tukwila Urban Center Pedestrian-Bicycle Bridge with AKANACity of Tukwila
Public Works Department - Bob Giberson, Director
INFORMATIONAL MEMORANDUM
TO: Transportation and Infrastructure Committe
FROM: Bob Giberson, Public Works Director.
BY: Peter Lau, Senior Program Manager
CC: Mayor Ekberg
DATE: September 22, 2017
SUBJECT: Tukwila Urban Center Pedestrian/Bicycle Bridge Project
Project Number 90510403, Contract No. 16-092
Supplemental Agreement No. 3 with AKANA
Allan Ekberg, Mayor
ISSUE
Authorize the Mayor to execute Supplemental Agreement No. 3 to Consultant Contract No, 16-092 with AKANA in the amount
of $214,689.00.
BACKGROUND
AKANA's Contract No. 16-092, with Supplemental Agreements 1 and 2, provide construction management (CM) services for
the Tukwila Urban Center (TUC) Pedestrian/Bicycle Bridge Project, including Lidar scanning of the fabricated steel arch
bridge, recommendation of bridge structural acceptance, and material inspection and testing services at less cost than
WSDOT's Material Laboratory.
DISCUSSION
The TUC Pedestrian/Bicycle Bridge Project has been delayed from physical completion mainly due to the steel bridge
fabrication dispute between the construction contractor and its material fabricator. The construction contract expired on August
8, 2017, while the current estimated physical completion date is now November 22, 2017. The remaining funds from the
consultant contract with AKANA is also running out due to the delay. In order to have continuous CM support from AKANA
through the end of the construction project, Supplemental Agreement No. 3 is needed for their continuous construction
engineering, inspection and material testing services. At the same time, the City has put the construction contractor on notice
of $198,490,12 fora liquidated damage (LD) assessment.
FISCAL IMPACT
The 15% construction contingency was $942,835.59 and will cover AKANA's Supplemental Agreement No. 3. There have
been $53,756.99 in Change Orders to date and AKANA's Supplement No. 2 for $36,480.00 is being drawn from contingency.
Supplemental Agreement No. 3 for $214,689.00 was carefully reviewed and is reasonable for the scope of work.
CM & CO Expenses
AKANA Supplement No. 3 $ 214,689.00
AKANA Supplement No. 2 36,480.00
Change Orders No.1 to No. 5 53,756.99
Total: $304 925 99
15% Contingency
$942,835.59
$942,835.59
RECOMMENDATION
Council is being asked to approve Supplemental Agreement No. 3 with AKANA in the amount of $214,689.00 for the TUC
Pedestrian/Bicycle Bridge Project, and consider this item on the Consent Agenda at the October 2, 2017 Regular Meeting.
Attachments: AKANA's Supplemental Agreement No. 3
W:1PW Eng1PROJECTSW- RW & RS ProjectstTUC Ped Bicycle Bridge (90510403)1ConstmctionVt,100 - Contract Documents\CM ConsultantWKANA1Sup #3t1nto Memo For AKANA Sup #3, 9-19-17 Sm.Do0o
29
WI
Washington State
Department of Transportation
Supplemental Agreement
Number 3
Organization and Address
Cooper Zietz Engineers, Inc.
3380 146 Place SE, Suite 105
Bellevue, Washington 98007
Phone:
Original Agreement Number
16-092
Project Number
90510403
Execution Date
July 25, 2016
Completion Date
March 31, 2018
Project Title
Tukwila Urban Center Pedestrian/Bicycle Bridge
New Maximum Amount Payable
$988,550.00
Description of Work
See Summary of Payments "Exhibit A" attached.
See Scope of Work "Exhibit B" attached.
See Prime Consultant Cost Computation "Exhibit D" attached.
See Sub -Consultant Cost Computation "E" attached.
The Local Agency of City of Tukwila
desires to supplement the agreement entered in to with Cooper Zietz Engineers Inc
and executed on September. 2017 and identified as Agreement No 3
All provisions in the basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows:
Section 1, SCOPE OF WORK, is hereby changed to read:
Scope of Services. See Exhibit B attached
I I
Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days
for completion of the work to read• March 31, 2018
III
Section V, PAYMENT, shall be amended as follows:
Payment. The Consultant shall be paid by the City for completed work and for services rendered under this Agreement as follows:
Payment for the work provided by the Consultant shall be supplemented with $214,689.00 as provided on Exhibits "E" attached
hereto.
as set forth in the attached Exhibit A, and by this reference made a part of this supplement.
If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate
spaces below and return to this office for final action.
By:
f/Con>;ultant Signature
DOT Form 140-063
Revised 09/2005
By.
Approving Authority Signature
Date
30
Exhibit "A"
Summary of Payments
DOT Form 140-063
Revised 09/2005
31
BASIC AGREEMENT
SUPPLEMENT#1
SUPPLEMENT#2
SUPPLEMENT#3
TOTAL
DIRECT SALARY COST
Akana 177,314
AECOM 44,512
Akana 60,965
AECOM 19,661
Akana 238,279
AECOM 64,172
OVERHEAD (INCLUDING
PAYROLL ADDITIVES)
Akana 242,654
AECOM 49,762
Akana 83,431
AECOM 22,838
Akana 326,085
AECOM 72,597
DIRECT NON -SALARY COSTS
Akana 18,387
AECOM 2,372
OBEC 84,807
MTC 25,510
OBEC 36,712
MTC 36,480
Akana 6,320
AECOM 1,136
Akana 24,707
AECOM 3,512
OBEC 121,519
MTC 61,990
FIXED FEE
Akana 41,997
AECOM 13,354
Akana 14,440
AECOM 5,898
Akana 56,437
AECOM 19,252
TOTAL
$ 700,669.00
$ 36,712.00
$ 36,480.00
$ 214,689.00
$ 988,550.00
DOT Form 140-063
Revised 09/2005
31
Exhibit B
Scope of Work
Project No. 90510403
Scope of Services:
The Consultant agrees to continue Construction Management services indicated in the original agreement dated
July 25, 2016. This supplement is due to the contractor having to extend their schedule to complete the TUC
Pedestrian/Bicycle Bridge, as indicated in the latest CPM schedule provided by the contractor with a physical
completion date of November 22, 2017.
Agreement Number: 16-092
WSDOT Form 140-089 EF Exhibit A Page 1 of 1
RPv,gpd 1nnni2n14
Exhibit D
Prime Consultant Cost Computations
Please see attached AKANA Cost Computation (AKANA Exhibit D)
Agreement Number: 16-092
WSDOT Form 140-089 EF Exhibit D Page 1 of 1
Rpvi.Gpf1 l onni2n14
Proposal Fee Estimate Exhibit D - AKANA
CLIENT Name:
PROJECT Description:
Proposal11Job Number. Data: 821912017
City of Tukwila
Tukwila Pedestrian bridge Protect
AKANA
January 1, 2017 Ratesi
Clue 01110011m
1
si
:
•
a '
l
7e
a ,
2
i
2
ii
es
Po
2
:
a. k
so
i
t',
2 ! 1
2 i
!
[
: ,' -
°
I le
4 1 8
kii
:
t ,F
. ,
0 1
2 i
1
Total
AKANA
et
! AKANA
OE
2 n1
AKANA
:
2
15)
Sub
0
'2
Sub !
i
2
2
Sub
cretin
from
supplr,*
nts 1 and
2
AKANA
g.
is t
A i
AKANA AKANA
ra
o 4
Li i
o o is
o o m
:
:
.9.
a
+
I' i
i
3 41
HOody Pals:
$TE
.
I
MS i us
.
EIS ,
Sas i
Hours
Ems : 137..,
10,
rem
Ems
Ems
i 0'..
Ems W.,
Fees
Task 1011,p reconstruction serrites
Preconstrucaon services
:
!
—
I
.r
k
i
0
•
so1 so
4,
SOI
SO
i
SO:
•
so
50'
5.01 SO
SO
So
50!
SO
SO
50
so
$0
Task
a
1
•
01
a
S01 se,
sal
501
SO
I
SO
50
So
SO
SO
TaSk 100 . Subtotal
0k
0:
0:
Oi
0
01
0
01 0,
0 0
01
0
0
SO 50,
SO
so
Uri
so
;
so
SDI Se
50
Ss
Task 200 -Construction Services Field office
!
r
:
.
SO
SO
AOthi!lOstion _
0
-i
—
1
ala
510
C
:
519 390 526 522
SO
54.50L
SO
50
O
0
5S0O
i1
O
SO
SO
01.820 50
532.432
$52352
0
O
SO
SO
501
as-
5o
SO
ED
SO
SO
0
50! 50
501
SO
so;
50
SO:
SO
as
SO
Task ZOO- Subtotal
0
o0.
Oi
0
01
a
Oi 0:
Oi 0,
5101
a
510
519.360i 526.622,
$4 5901
SO
$01
SO,
SO
51.8201 50
so
550932
50
Task 300 - Construction Services Field
field Inspection services
!
,
:
-i--i-
747[
i
. -
20,
4
767
r
S34 45.5i 047.165'
,
S-8 163!
50.
!
SW
SO:
50
54.860
552.712
C
so: SO
$01
SO
,
SO
SO
SO.
50
50.9.9251
594 203
Task.
o
soi so
sw
as,
ask
so
.
SO,
SC
'
SO
so
.
0
S01 SO
SO
SO,
50j
50.
50.
• SC
.
,
SO
SO
Task 200 -Subtotal
0
0.
0
5'
0
7471
0,
01 0
01 20'
0
0
767
524.465! 547,155
53.1631-
SO
501
S0'
so'
, SO
S4 5001 50
SO
559,525
SO
Task 400 -materials
m
o
L
_
Oi
,
.
0.
0
0
!aterials
so 1 SO'
501 50
50
501
SO
50.
SO
SO
SO:
50,
i
!
SOi.
50
50
!
!--
SC
so
594295
SO
Task
Task
-
1
i
a
so: 50.
as:
so:
50i
50
.
50
55
.
50
50
Task 400- Subtotal
o
of
o.
ol
o-
ok
o
sl 0.
of so'
ok
o
o
sok so:
SO
SO,
50:
SO-
:
SO.
so
so1 SO
50
so
SO
Task $00 -Project Completion
_Li
!
i
.
i
•
so
closeout40
Task
24
7
89
144
0
57 120i, 59.744
so: SO
51.666i
SO
5.0
SO-
50.1_
SO:
50
SO
5,2_
SO.
' 50
all 430
518550
Task
0
SO1 so.
s01
so
so:
SO
SO
so
SO
SO
Task
!
. .
a
sok so
sok
so:
sok
so
so
SO
so
SO
Task SOO • Subtotal
40
0
0
rii
0.
241
Or
01 0
01 a
so:
0
144
57.120 S9 744
Ei.6661
SO.
301
SO
5050:
so
50
so
so
Task SOO -§strire_y
i
!
•
i
.
SO
SO
SO
50
.
i
SC
SC
SC
all 430
SO
SO
SO
513,550
QA suivey
Task
!
i
0
0
as: sq,1
as SO,
WI SO'
SO SO
-1
SOi_
so
SO
SO
10
SO
SO
SO
1
SO!
SO!
SO
• !
. .
'
,
SO
SO
so
as
50
SD
Task
0
o
Task
1
Task 000 - Subtotal
o
01
0
01
O.
di
0'
ol 0
oI 0:
CE
0
o
SO[ SO
SO
so r
SO
SD
.
•
,
50
SO
50
501
50
SO
Task 700 - Painting inspection services ?LACE
!
,
!
SO
SO
50
Nese pointing inspection of steel.
Task
.
!
i
i
o
0
so! $0
SO SO
i
Sal
501
SO.
SO
SO
SO
SOs
SO
SO
so
so
'Tusk
!
,
'
. .
•
.
0
501 SO
501
50
SO
50
50,
SO
SO
50
SO
Task
1
.
:
•
o
s01 SO
SO
SO
501
SO
I
50
SO
I
SO
SO
Task 700 -Subtotal
a
01
o
01
0'
0.
0:
01 0
0; 0,
sI
C
0
501 SO
SO
50
SO
SO
• . ,
SO
SO
so!
so so
Task SOO -Additional Services
I
!
.
i
.
.
.
. •
so
sol
501
closeout,
Task
.
.
-:L
,
a
o
soi SO
501 SO
sol SO
soi SO.
Sal
.S0
sol
so:
so
SO
50
SOI
101
SO
SO
SO.
SO
SO
SO
SO
SO,
SO
50
L.
, SO
SO
. so
I
SO
SO
so
so
SO
50
Task
0
Task
.!
:
.
.
!
0
Task 800 • Subtotal
0.
0:
0,
O
0
ol
O.
01 0
01 0
01
0
0
SSi SO
so!
SO
SOI
SO1
SOI
50
ssl
SO
SO
AR Plisses Total
40
ca
Or
0,
0
7711
0
01 0,
O OCC
SSO
0
1421
S60,06E1 SI3.451
St4.44O
50
SO
SO
SO:
50 SO
saskol SO S104.150
50:
$165,106
cAumrairm0A,OstalsaMermoMmmatMCachsTamithelsoklOOMMAE.MlImimimedisidsM-141Touptimmi.
Pam 1
Exhibit E
Sub -consultant Cost Computations
Please see attached AECOM Cost Computation(AECOM Exhibit E)
Project No. 90510403
Agreement Number: 16-092
WSDOT Form 140-089 EF Exhibit E Page 1 of 1
RPui.CP.ri 9nl21W2nid
Proposal Fee Estimate Exhibit E -AECOM
AKANA
CUENT Name:
PROJECT Description:
Proposal/Job Number 90510403
City of Tukwila
Tukwila Pedestrian bridge project
Date: 911912017
January 1, 2017 Rates
Classification:
Ty Bardwell
Powell
C
A
L
rO
C
_
L
O
U
I
Total
AECOM
q
Ti C
O
I- i
AECOM
cc
U
Of
tl+l,
2-
0—
AECOM
ce
U
p
FYx
S
0 .-
AECOM
o
LL
V p
K A
LL co
AECOM
o
z
T! �� e
Z C O.-
a t0 U 0
a
n
><
m
o
9-
+
w
w
m C
J 4
p W
12
Hourly Rate:
$6.20 1
$2.05
31.96
I9.63
Hours
Fees
1.147 1.394
301h
Fees
Fees
Field Overhead Administrative Rates
Field Services
2041
I
204
517.585
520,170
55.275
91,138
526.581
544,166
l
8
I
I
6.
5656
57531
5197
5950
51,806
I
6
0
0
8
5256
5293
577
5370
5626
Task
al
_
a1
0
50
50
50
50
50
Task 100 • Subtotal
2041
8
8
0
0
DI
0
0
0
0
0
0
0
220
516.496.88
521.215,92
50.00
55,549.06
51,136.00
527,900.99
546,397.67
Office Administrative Services
1
Office Services
61
8
5690
50
5961
5207
51.168
51.858
16
16
5474
50
5661
5142
5803
51,277
0
50
50
50
50
50
50
-
50
50
50
50
50
50
0
50
50
50
50
50
50
Task 200. Subtotal
sI
o
0
16
0
SII
0
0
0
0
0
0
0
24
51,164
50
5349
S0
51.971
53.135
All Phases Total
21II
a
a
16
0
oI
0
0
0
0
0
0
0
244
519,661
521.216
51,622
55,098
92,272
529,672
549,533