HomeMy WebLinkAboutPS 2017-11-06 Item 2E - Public Safety Plan - Due Diligence Consulting Contracts for Selected PropertiesCity of Tukwila
Allan Ekberg, Mayor
INFORMATIONAL MEMORANDUM
TO: Public Safety Committee
FROM: Rachel Bianchi, Communications and Government Relations Manager
BY: D.J. Baxter, Shiels Obletz Johnsen
CC: Mayor Ekberg
DATE: November 6, 2017
SUBJECT: Public Safety Plan, Due Diligence Consulting Services
ISSUE
Execute contracts to provide due diligence consulting services for the selected properties selected to
implement the Public Safety Plan.
BACKGROUND
The City has identified its preferred sites for each of the facilities to be built under the Public Safety Plan.
These include the Justice Center, the Public Works Shops, and Fire Stations 52 and 54. The location for Fire
Station 51 was previously determined.
The following services are needed to support the investigation and acquisition of properties for each of these
facilities:
1. Survey
2. Geotechnical Analysis
3. Environmental Analysis
To select consulting firms who could perform these services for the Public Safety Plan, the City requested
proposals from two firms from its consulting services roster for each type of service.
In each case, the City received only one response from providers in each of the named categories. In lieu of
an evaluation of multiple firms based on qualifications and price, the City timelines dictate contracting with the
responsive bidder in each category. In addition to being listed on the City's consultant rosters, the City has
confirmed that each of these firms is well known in the community, and is well qualified to conduct the work
requested. These firms have all worked on behalf of public agencies, and consultation with the City's project
management team confirms that each of these firms is known for producing high-quality, reliable, and cost-
effective work. Given the brisk timeline for property acquisition, the project management team recommends
proceeding with each of the responsive bidders.
In the case of Geotechnical Analysis, we have requested proposals from two firms, and need to provide a little
more time for one of them to respond. We would like to ask that this contract be allowed to go directly to the
COW for consideration, as soon as we have reviewed the proposals in order to maintain our tight schedule.
The table below identifies the firms contacted for each type, the name of the responding bidder, the scope of
work that bidder will conduct, and the proposed price for those services.
241
INFORMATIONAL MEMO
Page 2
Total with Geotech Estimate:
$229,337
DISCUSSION
Each of the bidders will execute the city's standard agreement for contracted services, to provide the services
described above.
Locations of Properties to be Evaluated:
Justice Center — 9 parcels along the west side of Tukwila International Boulevard, on the north and south sides
of 150th.
Public Works Facility — 3 Parcels between E. Marginal Way and Tukwila International Boulevard, south of 112th.
Fire Station 52 —1 parcel north of Tukwila City Hall and west of 65th (survey only)
Fire Station 54 —1 parcel east of 42nd Avenue, between 139th and 140th.
FISCAL IMPACT: The cost estimate for these Due Diligence Services is $169,337, not including the
Geotechnical Analysis. We expect that work to cost approximately $60,000. Services on the Justice Center and
Fire Station properties will be billed to the Public Safety Bond, while the work performed on the Public Works
site will be equally divided between the General and Enterprise Funds.
RECOMMENDATION:
Council is being asked to approve the Due Diligence services contracts for scopes of work and associated fees
as described above and consider this item on at the November 13, 2017 Committee of the Whole meeting and
subsequent November 20, 2017 Regular Meeting.
ATTACHMENTS:
Draft Contract for GeoTech Services with Scope of Work
Draft Contract for Environmental Services with Scope of Work
242W:12017 Info Memos\Due Diligence Services 11-06-17.docx
Responsive
Service T • e
Firms Contacted
Bidder
Work Sco • e
Price
Survey
BRH
Baseline
BRH
ALTA Surveys for JC, PW,
FS52 and 54 ........................
$57,400
GeoTech
Hart Crowser
Shannon & Wilson
AESI
TBD
GeoTechnical Analysis for JC,
PW
TBD
(estimated
at $60,000)
Environmental
Sound Earth
Kane
Sound Earth
Phase 1 Reports for PW, FS54,
Phase 2 Reports for PW, JC
$111,937
Environmental
Total Due Diligence
Approvals Requested (not
includin • GeoTech
$169,337
Total with Geotech Estimate:
$229,337
DISCUSSION
Each of the bidders will execute the city's standard agreement for contracted services, to provide the services
described above.
Locations of Properties to be Evaluated:
Justice Center — 9 parcels along the west side of Tukwila International Boulevard, on the north and south sides
of 150th.
Public Works Facility — 3 Parcels between E. Marginal Way and Tukwila International Boulevard, south of 112th.
Fire Station 52 —1 parcel north of Tukwila City Hall and west of 65th (survey only)
Fire Station 54 —1 parcel east of 42nd Avenue, between 139th and 140th.
FISCAL IMPACT: The cost estimate for these Due Diligence Services is $169,337, not including the
Geotechnical Analysis. We expect that work to cost approximately $60,000. Services on the Justice Center and
Fire Station properties will be billed to the Public Safety Bond, while the work performed on the Public Works
site will be equally divided between the General and Enterprise Funds.
RECOMMENDATION:
Council is being asked to approve the Due Diligence services contracts for scopes of work and associated fees
as described above and consider this item on at the November 13, 2017 Committee of the Whole meeting and
subsequent November 20, 2017 Regular Meeting.
ATTACHMENTS:
Draft Contract for GeoTech Services with Scope of Work
Draft Contract for Environmental Services with Scope of Work
242W:12017 Info Memos\Due Diligence Services 11-06-17.docx
City of Tukwila
6200 Southcenter Boulevard, Tukwila WA 98188
Agreement Number:
CONTRACT FOR SERVICES
Amendment # 1
Between the City of Tukwila and Sound Earth Strategies, Inc.
That portion of Contract No. 17-167 between the City of Tukwila and Sound Earth
Strategies, Inc. is hereby amended as follows:
1. Project Designation. The Consultant is retained by the City to perform environmental
evaluation services for three selected sites referred to as the Justice Center Site (JC7NL),
Public Works Site (PW), and Fire Station 54 Site (FS54), in connection with the project titled
Tukwila Public Safety Plan.
2. Scope of Services. The Consultant agrees to perform the services, identified on Exhibits
"A," "B," and "C" attached hereto, including the provision of all labor, materials, equipment
and supplies.
3. Duration of Agreement; Time for Performance. This Agreement shall be in full force and
effect for a period commencing upon execution and ending December 31, 2018, unless
sooner terminated under the provisions hereinafter specified. Work under this Agreement
shall commence upon written notice by the City to the Consultant to proceed. The
Consultant shall perform all services and provide all work product required pursuant to this
Agreement no later than March 31, 2018 unless an extension of such time is granted in
writing by the City.
4. Payment. The Consultant shall be paid by the City for completed work and for services
rendered under this Agreement as follows:
A. Payment for the work provided by the Consultant shall be made as provided on Exhibit
"A" attached hereto, provided that the total amount of payment to the Consultant shall
not exceed $126,937 (including estimated expenses) without express written
modification of the Agreement signed by the City.
All other provisions of the contract shall remain in full force and effect.
Dated this
day of , 20
CITY OF TUKWILA CONTRACTOR
Allan Ekberg, Mayor Printed Name:
ATTEST/AUTHENTICATED APPROVED AS TO FORM
Christy O'Flaherty, MMC, City Clerk Office of the City Attorney
CA Revised December 2016
Page 1 of 1
243
244
Exhibit A
Stra
October 17, 2017
egies
City of Tukwila
6200 Southcenter Boulevard
Tukwila, Washington 98188
SouridEarth Strategies, Inc.
2811 Fairview Avenue East, Suite 2000
Seattte, Washington 98102
SUBJECT: PROPOSAL FOR PHASE I ENVIRONMENTAL SITE ASSESSMENT
FS54 Property
13916 42nd Avenue South, Tukwila, Washington
Proposal Number: PROP -172-59
To Whom It May Concern:
Pursuant to your recent request, SoundEarth Strategies, Inc. (SoundEarth) is pleased to submit the
following proposal to conduct a Phase I Environmental Site Assessment (ESA) of the property located at
the address listed above in Tukwila, Washington (the Property). According to the available online
assessor's records, the Property consists of a single tax parcel (King County Parcel No. 152304-9263) that
covers approximately 1.7 acres. The Property is developed with a 1966 -vintage, one-story, wood -framed
single-family residence. The Property is currently occupied by Star Nursery. If this is not accurate, or if
you have additional useful information, please inform us as soon as possible.
PHASE I ENVIRONMENTAL SITE ASSESSMENT SCOPE OF SERVICES
The objective of a Phase I ESA is to identify potential environmental liabilities or risks associated with a
specific piece of real estate referred to as recognized environmental conditions', as outlined in the
American Society for Testing and Materials (ASTM) Standard Practice for Environmental Site
Assessments: Phase I Environmental Assessment Process (ASTM E1527-13). Risks commonly evaluated
during a Phase I ESA include:
■ The potential for the presence of contaminated soil and/or groundwater.
■ The potential for on -Property migration of contaminants from off -Property sources.
■ The potential for off -Property migration of on -Property contaminants by air emissions,
groundwater, and other media.
Technical Approach
In accordance with ASTM E1527-13, which was developed by ASTM to provide a standardized method of
conducting Phase I ESA5, SoundEarth's work on this project will consist of several elements:
'Recognized Environmental Conditions are defined by ASTM E1527-13 as "the presence or likely presence of any hazardous substances or
petroleum products in, on, or at a property: (1) due to any release to the environment; (2) under conditions indicative of a release to the
environment; or (3) under conditions that pose a material threat of a future release to the environment." The term includes hazardous
substances or petroleum products even under conditions of compliance with laws. The term is not intended to include de minimis conditions
that generally do not present a material risk of harm to the public health or the environment and that generally would not be the subject of an
enforcement action if brought to the attention of appropriate governmental agencies."
recti wine t o le ',Jed :itch the
vn; ...;JUi,��.'riLll.t1G� �rll � }.�ut_f�'�i3.�,h,, j IZl-tdt,_ j
�ifi�.yh., hi � :vlll "., {.
245
City of Tukwila
October 17, 2017
■ Review of selected historical sources, where reasonably ascertainable and readily available, will
be conducted in an attempt to document obvious past land use of the Property and adjoining
properties back to 1940 or when the Property was initially developed, whichever is earlier. This
will include interviews with persons having some knowledge of current and past use of the
Property; review of historical aerial photographs and topographic maps of the Property and
surrounding area; review of city directories, Sanborn Fire Insurance Maps, county assessor's
records, building department records, and information at various local agencies, as available.
Prior environmental reports, permits and registrations, geotechnical reports, Property title
search information, and environmental lien information will be reviewed if provided by the
client.
■ Review of current state and federal databases that list the registered sites with known or
potential releases of toxic substances within a 0.5- to 1 -mile radius from the Property.
■ Reconnaissance of the Property and vicinity to observe current Property conditions and
practices. The Property reconnaissance provides an opportunity to search for evidence of
possible contamination in the form of soil discoloration, odors, vegetative stress, discarded
drums, discarded industrial debris, building construction materials, underground storage tanks,
etc.
■ Preparation of a written report documenting our methods and findings, including Property
photographs, a map showing the locations of the Property and potential sources of
contamination within a 1 -mile radius, a Property plan, and copies of supporting documents.
Additional Services Not Included
The following services, although not specifically required by ASTM E1527-13, may also be performed
concurrently with ESAs and may be beneficial for the evaluation of environmental conditions and/or an
evaluation of specific business environmental risks at the Property. At your direction, these services
have not been included as part of the scope of services for this ESA. Please note that this list is not all-
inclusive. If you seek additional services, please contact us for a supplemental proposal and cost
estimate.
■ Visual Asbestos Survey
■ Asbestos Survey in Soil
■ Visual Observations for Lead -Based Paint
■ Asbestos Survey (prior to renovation/demolition)
■ Visual Observations for Mold
■ Mold Sampling (bulk or air)
■ Radon Testing
■ Lead -Based Paint Survey
■ Lead in Drinking Water Sampling
■ Wetland Review
■ Threatened/Endangered Species Review
SounelEarth Strategies, Inc.
S:\Proposals\2017 Proposal Numbers \PROP -172-59 F559, PW5, and 1C7NL Properties Phase I & II (CONFIDENTIAL\PROP-172-59_F554_F.dout
246
Page I
City of Tukwila
October 17, 2017
■ Historic Properties/Archaeological Resources Review
■ Stormwater System Inspections
■ Permit and Regulatory Compliance Audits
RELIANCE
The report will be prepared for the exclusive use and reliance of the City of Tukwila. Reliance by other
parties is prohibited without the written authorization of the client and SoundEarth.
If, in the future, the client and SoundEarth consent to reliance on the report by a third party, SoundEarth
will grant such reliance via a Reliance Letter for an additional fee of $250 per relying party. Reliance on
the report by the client and other authorized parties will be subject to the terms, conditions, and
limitations stated in the Master Consulting Services Agreement (and sections of this proposal
incorporated therein), the Reliance Letter, and the report.
COST ESTIMATE
Phase I Environmental Site Assessment $3,500
The estimated fee listed above includes the reconnaissance time, reporting, travel time, equipment, as
well as reimbursable expenses. SoundEarth has assumed one mobilization to the Property.
SoundEarth anticipates completion of the Phase I ESA report within 15 business days, assuming written
authorization to proceed and Property access are provided within 3 days. SoundEarth shall proceed with
such services in a diligent manner to completion or as otherwise directed by the client. SoundEarth will
not be responsible for delays caused by factors beyond SoundEarth's control and which could not have
been reasonably foreseen or prevented.
Furthermore, at the request of the client, SoundEarth will observe the Properties and the current uses
from vantage points that are accessible to the general public. SoundEarth will not communicate with the
current property owners, nor reveal information regarding the identity of the client. All information
provided to and generated by SoundEarth will remain confidential.
SoundEarth is committed to preserving the environment. Therefore, the client will be provided with a
PDF version of the final report. If, however, the client would like hard copies of the report, SoundEarth is
happy to provide up to three copies at no charge. Additional copies will be charged to the client at $50 a
copy.
SoundEarth Strategies, Inc.
5:\Proposals\2017 Proposal Numbers\PROP-172-59 F554, PW5, and )C7NL Properties Phase I & II lCONFIDENTIAL)\PROP-172-59 FS54_F.docx
Page 13
247
City of Tukwila
October 17, 2017
CLOSING
We appreciate the opportunity to provide this proposal for environmental services on this project. If the
scope of services and associated costs are acceptable, the scope of work shall be performed under
terms of the existing Consulting Agreement for Site Survey Services, dated September 18, 2017. Please
call us at 206-306-1900 if you have any questions.
Respectfully,
Ryan Bixby, LG
President
RKB:dnm
SoundEarth Strategies, Inc.
S \Proposals\2017 Proposal Numbers \PROP -172-59 FS54, PWS, and 1C7NL Properties Phase I & II CONFIDENTIAL)\PROP-172-59_F$54 F.docx
248
Page 14
Stra
October 20, 2017
egies
City of Tukwila
6200 Southcenter Boulevard
Tukwila, Washington 98188
SoundEarth Strategies, Inc.
2811 Fairview Avenue East, Suite 2000
Seattle, Washington 98102
SUBJECT: PROPOSAL FOR PHASE II ENVIRONMENTAL SITE ASSESSMENT
JC7NL Property
14845 to 15035 Tukwila International Boulevard, 15006 to 15022 Military Road South,
and 3415 South 150th Street
Tukwila, Washington
Proposal Number: PROP -172-67
To Whom It May Concern:
Exhibit B
Pursuant to your recent request, SoundEarth Strategies, Inc. (SoundEarth) is pleased to submit the
following proposal to conduct a Phase II Environmental Site Assessments (ESA) for the JC7NL Property
(the Property) listed above. The Property is located at 14845 to 15035 Tukwila International Boulevard,
15006 to 15022 Military Road South, and 3415 South 150th Street in Tukwila, Washington, as shown in
Figure 1. Figure 1 depicts a plan view/layout of the Property, which consists of eight irregularly shaped
tax parcels (King County Parcel Nos. 004100-0335, 004100-0514, 004100-0515, 004100-0517, 004100-
0480, 004100-0516, 004100-0513, 004100-0494, and 004100-0330 [Parcels A through I, respectively])
that cover a total of approximately 161,914 square feet (3.73 acres) of land in Township 23N/Range
4E/Section 22.
BACKGROUND
SoundEarth completed a Phase I ESA of eight of the nine parcels in September 2017. King County Tax
Parcel No. 004100-0330 was not included in the Phase I ESA. The Phase I ESA identified ten recognized
environmental conditions (RECs) for the Property. These included:
On -Property RECs
• The historical operation of a retail gasoline service station on the Property (Parcel D).
• The historical operation of an automotive repair facility on the Property (Parcel C).
• The historical use and storage of heating oil on the Property. Multiple on -Property buildings
were historically heated by oil -burning furnaces (Buildings 4, 5, 7, 9, and 10 located on Parcels C,
E, F, and G).
Off -Property RECs
• The historical operation of a retail gasoline service station was constructed north of the
northernmost portion of the Property (Parcel A).
il�� i fVi�. lr.� d0 i 1i1._ !hl_ ,. uC: I
249
City of Tukwila
October 20, 2017
■ The historical operation of a retail gasoline service station north of Parcel D and southeast of
Parcel A.
■ The historical operation of an automotive repair and service station facility northeast of the
Property (northeast of Parcel D).
■ The historical operation of a vehicle maintenance garage, welding facility, and print shop north
of the Property (Parcel C).
■ The historical operation of a dry cleaner and a cabinet shop on the west -adjoining properties
(Building 10 and Building 5, respectively).
■ The historical operation of a retail gasoline service station on the east -adjoining property (east
of Parcel D). Two groundwater monitoring wells (MWs) were observed at this location during
the Phase I Property reconnaissance.
■ The historical operation of a dry cleaner southwest of the Property (290 feet southwest of Parcel
H). The dry cleaning solvent tetrachloroethylene (PCE) has been detected in the soil and
groundwater beneath the former dry cleaner site. PCE -contaminated groundwater has migrated
off-site to the east, northeast, and southeast. The lateral extent of the PCE plume has not been
determined.
Although not identified as a REC, the use and storage of heating oil on adjoining properties was
identified as an issue of potential environmental concern for the Property. Buildings on the north-,
south-, east-, and west -adjoining properties were historically heated by oil -burning furnaces. Heating oil
releases are generally limited in nature and extent. Acknowledging the relatively small scale of use and
limited mobility of heating oil in the subsurface, the use and storage of heating oil on adjoining
properties did not constitute a REC.
The purpose of the Phase II ESA is to evaluate potential soil and groundwater impacts associated with
the widespread RECs for the Property. The Phase II ESA will be conducted in general accordance with
American Society for Testing and Materials E1903-11, Standard Practice for Phase II ESAs (ASTM -1903-
11).
PHASE II ENVIRONMENTAL SITE ASSESSMENT SCOPE OF SERVICES
Scope of Services
The following scope of work is proposed for the Phase II ESA. Please note that per ASTM -1903-11, all of
the RECs identified in a Phase I ESA must be evaluated in order for a Phase II ESA to be considered
complete. However, SoundEarth recognizes that certain RECs (e.g., the former on -Property gasoline
station) present a greater risk of significant impacts than others (e.g., the former use and storage of
heating oil). If a more robust or limited investigation of the Property is desired by the client, we would
be happy to adiust the scope of work to accommodate your risk tolerances and budget limitations.
Task 1, Pre -Field Activities
Pre -field activities include the development of a scope of work for the Property, coordination of internal
staff and subcontractors, development of a work plan summary, and the development of a site-specific
health and safety plan, which is a required and important part of any subsurface investigation.
SoundEarth Strategies, Inc.
5:\Proposals \2017 Proposal Numbers \PROP-172-671C7NL Properly Phase I & II (CONFIDENTIAL)\PROP-172-67_JC7NL\Proposal Documents \PROP-172-67_1C7NL_F.dou
250
Page 12
City of Tukwila
October 20, 2017
Task 2, Field Activities
This task includes the field activities associated with the Phase II ESA at the Property. Field activities
include performing a private utility locate and ground penetrating radar survey, drilling and installing 11
push -probe borings and four hollow -stem auger borings, completing the hollow -stem auger borings as
groundwater MWs, collecting environmental soil samples from each of the borings, and collecting
groundwater samples from each of the four MWs.
Four locations for the installation of MWs have been identified in the vicinity or in inferred
downgradient hydrologic positions relative to the RECs identified during the Phase I ESA research. Each
MW will be drilled up to an anticipated depth of 40 feet below ground surface (bgs). Drilling depths are
estimated based on a 2015 Maul Foster Alongi subsurface investigation conducted at the Betty Brite dry
cleaner facility at 15247 Pacific Highway South, where groundwater was encountered at depths of 20 to
33 feet bgs.
Proposed drilling locations are presented in Figure 1. Soil samples will be collected at the
soil/groundwater interface at all four MW locations. Additionally, soil samples will be collected at 10
feet bgs f om boring MW02, and at 5 and 15 feet bgs from boring MWO3 to evaluate the potential risk
of shallow impacts from on -Property RECs. Each boring will be logged by a professional geologist with
soil classified using the Unified Soil Classification System. Soil from each drilling location will be
evaluated for potential impacts through visual observations and notations of odor. Additionally, soil will
be screened in the field for potential evidence of contamination using a photoionization detector to
detect the presence of volatile organic vapors.
Groundwater is anticipated to be encountered and sampled at all four MW locations. Groundwater
samples will be submitted for the following analyses:
■ Gasoline -range petroleum hydrocarbons (GRPH) by Northwest Total Petroleum Hydrocarbon
(NWTPH) Method NWTPH-Gx
■ Diesel- and oil -range petroleum hydrocarbons (DRPH and ORPH, respectively) by Method
NWTPH-Dx
• Volatile organic compounds (VOCs), including benzene, toluene, ethylbenzene, and xylenes
(BTEX) by U.S. Environmental Protection Agency (EPA) Method 8260C
Sampling of soil or groundwater from depths greater than 40 feet bgs is not planned in this scope of
work.
Soil samples collected from the MWs will be tested for the following analytes:
• NIWO1— GRPH and VOCs (soil sample from the soil/water interface)
■ MWO2 — GRPH, DRPH, ORPH, and VOCs (soil samples from 10 feet and from the soil/water
interface)
• MWO3 — GRPH, DRPH, ORPH, and VOCs (soil samples from 5 and 15 feet and from the soil/water
interface)
• MWO4 — GRPH, DRPH, ORPH, and VOCs (soil sample from the soil/water interface)
SoundEarth Strategies, Inc,
5:\Proposals\2017 Proposal Numbers \PROP -172-67 JC7NL Property Phase I & II CONFIDENTIAL)\PROP-172-67 JC7NL\Proposal Documents \PROP -172.67 1C7NL_F.docx
Page 13
251
City of Tukwila
October 20, 2017
Additionally, 11 additional locations will be investigated using a push probe. Push probe borings are not
expected to encounter groundwater and will be advanced to 15 feet bgs or refusal, whichever is deeper.
Soil from each boring location will be evaluated for potential impacts through visual observations and
notations of odor. Additionally, soil will be screened in the field for potential evidence of contamination
using a photoionization detector to detect the presence of volatile organic vapors.
Two discrete soil samples from each of the push -probe locations will be submitted for the following
analytes:
■ B01 through B03 — DRPH
■ B04 through B08 — GRPH, DRPH, ORPH, and BTEX
■ B09 and B10 — GRPH, DRPH, ORPH, VOCs, and polychlorinated biphenyls (PCBs)
■ B11 — GPRH, DRPH, ORPH, and BTEX
Additionally, one of the soil samples from borings B09 and B10 will be analyzed for the presence of PCBs
and four composite soil samples collected from the drums of soil cuttings will be submitted for analysis
of total metals, including arsenic, barium, cadmium, chromium, lead, mercury, selenium, and silver by
EPA Methods 200.8/245.1, in order to profile the soil cuttings for future disposal. Soil samples will be
placed on ice in laboratory -supplied sample containers and shipped under chain -of -custody protocol to
the analytical laboratory for analysis of appropriate chemicals of concern.
The field activities associated with the Phase II ESA at the Property are anticipated to take four days to
complete and will require one or two field personnel per day. Depending on the results of the
investigation, additional follow-up sampling may be required to further define the extent of
contamination (if encountered). A scope of work and cost estimate for any additional investigation will
be provided based on conditions encountered during the investigation proposed here.
SoundEarth assumes that all areas of the Property will be accessible for the GPR survey and drilling
activities. The results of the field activities and laboratory analytical results will be provided in the
reports described in Task 3.
Task 3, Data Evaluation and Reporting
The results of the Phase II ESA will be presented in a summary report for the City of Tukwila. The report
will include a summary of field activities, logs of the soil borings, logs of MW construction, a site plan
showing boring locations, data tables of the soil and groundwater results, and a discussion summarizing
the findings and conclusions.
Task 4, Project Management and Communication
This task includes the project management and communication activities that are essential to the
success of achieving client objectives. Project management activities include project coordination,
contracting, and client meetings and other communication.
Contingency
Project contingency allows for conditions that at the project onset are not immediately known, but if
present, experience shows will likely result in additional costs. A 10% project contingency has been
SoundEarth Strategies, Inc.
s:\Proposals\2017 Proposal Numbers \PROP-172-671C7NL Property Phase I & II (CONFIDENTIAL)\PROP-172-67_1C7NL\Proposal Documents \PROP-172-67_1C7NL F.docx
252
Page 14
City of Tukwila
October 20, 2017
added for Tasks 1-4 to address these unanticipated conditions, which may include access delays, difficult
drilling conditions, etc. If such conditions are not encountered, the contingency will not be necessary;
however, including a modest contingency is frequently helpful in avoiding the need for change orders
and project delays to address what would otherwise be minor issues.
ESTIMATED PROJECT BUDGET
The anticipated total for the scope of work is $56,751. The details of the estimated costs are provided in
the attached cost estimate (Table 1). The estimated fees include travel time, equipment, subcontractor
costs with markup, including laboratory fees, as well as reimbursable expenses. The costs associated
with the disposal of soil and water generated during the investigation are not included in this estimate,
but can be provided after the results of laboratory testing are provided. SoundEarth proposes to
conduct the Phase II ESA investigation on a time and material contractual basis. Our cost estimate will
not be exceeded without your written authorization.
ASSUMPTIONS
Time budgeted for field work assumes that boring locations at the Property will be cleared of
obstructions by the client prior to the start of any field work, SoundEarth has full access to the drilling
locations, there will be no overhead obstacles at boring locations, and that field work will be completed
during normal weekday work hours. Failure to provide access will result in delays, inability to drill at
certain locations, and an increase in timing and cost of the investigation.
PROJECT SCHEDULE
SoundEarth anticipates that the pre -field, soil, and groundwater sampling activities will require
approximately 2 weeks to complete from the date we are authorized to proceed, assuming access to the
Property can be provided quickly and that drillers are available. Soil and groundwater analytical results
will be provided by the laboratory approximately 2 weeks from the date the samples are submitted, and
a draft report summarizing our findings and conclusions at the Property will be prepared approximately
3 weeks from the date the laboratory results are received.
SoundEarth is available to begin this scope of work as soon as authorized by the client. SoundEarth shall
proceed with such services in a diligent manner to completion or as otherwise directed by the client.
SoundEarth will not be responsible for delays caused by factors beyond the consultant's control and
which could not have been reasonably foreseen or prevented.
RELIANCE
The Phase II Environmental Site Assessment report will be prepared for the exclusive use and reliance of
the City of Tukwila. Reliance by other parties is prohibited without the written authorization of the client
and SoundEarth.
If, in the future, the client and SoundEarth consent to reliance on the report by a third party, SoundEarth
will grant such reliance via a Reliance Letter for an additional fee of $250 per relying party. Reliance on
the report by the client and other authorized parties will be subject to the terms, conditions, and
limitations stated in the Consulting Agreement for Site Survey Services (and sections of this proposal
incorporated therein), the Reliance Letter, and the report.
SoundEarth Strategies, Inc.
5:\Proposals \2017 Proposal Numbers \PROP-172-671C7NL Property Phase I & II (CONFIDENTIAL(\PROP-172.67 1C7N1\Proposal Documents \PROP -172-67 1C7N1_F.doa
Page I 5
253
City of Tukwila
October 20, 2017
CLOSING
We appreciate the opportunity to provide this proposal for environmental services on this project. If the
scope of services and associated costs are acceptable, the scope of work shall be performed under
terms of the existing Consulting Agreement for Site Survey Services, dated September 18, 2017. Please
call us at 206-306-1900 if you have any questions.
Respectfully,
Ryan ixby, LG
President
Attachments: Figure 1, Proposed Exploration Plan
Table 1, Phase II ESA Cost Estimate
ASW/RKB:hsb
SoundEarth Strategies, Inc.
5:\Proposa1s\2017 Proposal Numbers\PROP-172-671C7NL Property Phase I & II (CONFIDENTIAL)\PROP-172-67_1C7NL\Proposal Documents \PROP -172-67 JC7NL_F,docx
254
Page 16
'- CIYURCH BY THESIDE OF TN E 0O W
B45SSOUTH149THBTREET
EL MATADOR APARTMENTS
1497.8 MILITARY ROAD SOUTH
PARCEL 004111C007070 -.
AFRICANPARADISE I
RESTAURANT - I
1.5 TURVALA
I1Li-�' '',.INTERNATIONAL
BOULEVARD -
'.. I I STIP¢ I PAREEL 0041050930 I .
BUILDING
o%'IMARD SCALE IN FEET
TRAVE1000E
W STUMMLA
INTUONAL
B0010WIEVARD
PARCEL01110TO.
1.0 MILITARY ROAD SO
PARCEL' OD110D)150
-. CHINA PAVILION
N495TLCA
IMERt4E0ATIM1Al
BOULEVARD
PARCEL: 01111000350
CO UT
PARCEL
FORMER POST OFFICE
SOUTH 150TH STREET
•
PEGASUS PARALEGAL
15001 MILITARY ROAD BOURN
PAROEIR EA410W>TG
-FADrgfAI
t. )MET s
T1,100051)
BU Mt
IIPARCEiDJ
FORMER'
PARCEL:9W1000519
LEGEND
iATTOTHERHSG/WELL
i.Y 00 PROPOSED
MONiTORIND. LL
911FUSHPROBE
BORING
15045M UTARY ROAD SOUTH
PARCEL 0001000045
ARCELSWAG.
', I'PARCEL E !PARCELF
FORMER BUILDING CARO..
PROPERTY BOUNDARY
PARCEL BouNDARY
VST TANK ROUND STORAGE
MRECTOWHTEY ROW
PARRIROLOT
PARCEL 5041000530
BUILDING'S
YCFVAR ENV PETCIL WILDING yl
15005MMTARY ROAD 0'OUTH
PARCEL 0041000005 •
EEL 0041050400
BUILDING0
PARCEL
5001Mp519
RE90ENCE
51,01vN OF 1'1�
15 MILITARY TAVFRt4
1 AO OSOUT I'PARCEL t1
PARCEL1500030
i PARCEr.WIM
J1340 SOUTH
RISC
SOUNDEARTHRIC COM
JCR, PROPERTY
I'. gt=EOur LA
INTERNATioNAL BOULEVARD R
EL'
TUAVALA. WASHINGTON
sOUDDEARTH PROPOSAL AR, 61
IGURE 1
FPROPOSED EAPLORATION PLAN
255
V"",
!.3,,ratc]gio.
Table 1
Phase II ESA Cost Estimate
JC7NL Property
14845 to 15035 Tukwila International Boulevard, 15006 to 15022 Military Road south, and 3415 South 150th Street
Tukwila, Washington
PROP -172-67
Task
No.
, , '
, , • ,
, ' ,
Description
, • . SoundEarth labor Categories, Rates, and Hours
' ' ',
SoundEarth
,
Communication
Fees ,
SoundEarth °DCA,
Subcontractors and
Field Equipment
SoundEarth
Laboratory
' Expenses
Task Total
Managing
,
Pnncipal
Associate I
Engineer/ ,
Geologist/
Scientist
Associate II
Engineer/ '
Geologist/
Scientist
Staff I ''
Engineer/
Geologist/
Scientist
CAD/ GIS
Specialist I
TecIttlical
Writer/
'' Editor
Senior Project
Coordinator
Project
Coordinator
5225
$160 '
' $150
$120
$110 ' '
$115
$95 ,
• $85 ' ''
tabor
1
Pm -Field Activities
2
8
8
4
2
1
$3,365
$101
$3,466
2
Field Activities
2
8
60
58,855
$266
$23185
$e,005
• $38,305
3
Data Evaluation and Reporting
2
8
24
4
4
2
1
$5,705
$171
$5,876
4
Project Management
4
16
3
1
$3,830
$115
$3,945 ,
TOTAL $21,750 $653 $21,185
Contingency 10%
$8,005
514.
$56,751
Assumptions to Cost Estimate
• SoundEarth wilt have access to the properties during normal working hours.
• SoundEarth will be granted access to neighboring properties. Client will provide executed access agreements.
• Task 2 assumes 7 days of hollow stem auger drilling for monrtoring well installatIon, up Co 40feet bgs each and 1 day groundwater samplIng.
• Task 2 push probe work assumes 2 days of field work at 11locations to max 70' feet bgs or refusal.
• Cost estimate does not include disposal
of investigation derived waste.
loll
256
October 30, 2017
City of Tukwila
6200 Southcenter Boulevard
Tukwila, Washington 98188
SUBJECT:
SoundEarth Strategies, Inc.
2811 Fairview Avenue East, Suite 2000
Seattle. Washington 48102
PROPOSAL FOR PHASE I/II ENVIRONMENTAL SITE ASSESSMENT
PW5 Property
11210 and 11234 Tukwila International Boulevard and 11231 East Marginal Way South
Tukwila, Washington
Proposal Number: PROP -172-66
To Whom It May Concern:
Exhibit C
Pursuant to your recent request, SoundEarth Strategies, Inc. (SoundEarth) is pleased to submit the
following proposal to conduct Phase I and Phase II Environmental Site Assessments (ESA) of the property
located at the addresses listed above in Tukwila, Washington (the Property). According to the available
online assessor's records, the Property consists of five tax parcels (King County Parcel Nos. 092304-9411,
092304-9152, 102304-9059, 092304-9387, and 102304-9056) that cover a total of approximately 13.6
acres. The Property is developed with a 1959 -vintage, one-story, wood -framed warehouse; a 1974 -
vintage, one-story, prefabricated steel -framed service repair garage; a 1975 -vintage, one-story,
prefabricated steel -framed transit warehouse; a 1975 -vintage, one-story, prefabricated steel -framed
storage garage; and a 2002 -vintage, steel -framed manufacturing building. An espresso stand is also
located on the western portion of the Property. The Property is currently occupied by a shipping
company, George Heiser Body Co., Jet Fuel Espresso, and offices. If this is not accurate, or if you have
additional useful information, please inform us as soon as possible.
TASK 1, PHASE I ENVIRONMENTAL SITE ASSESSMENT SCOPE OF SERVICES
The objective of a Phase I ESA is to identify potential environmental liabilities or risks associated with a
specific piece of real estate referred to as recognized environmental conditions, as outlined in the
American Society for Testing and Materials (ASTM) Standard Practice for Environmental Site
Assessments: Phase I Environmental Assessment Process (ASTM E1527-13). Risks commonly evaluated
during a Phase I ESA include:
• The potential for the presence of contaminated soil and/or groundwater.
• The potential for on -Property migration of contaminants from off -Property sources.
'Recognized Environmental Conditions are defined by ASTM E1527-13 as "the presence or likely presence of any hazardous substances or
petroleum products in, on, or at a property: (1) due to any release to the environment; (2) under conditions indicative of a release to the
environment; or (3) under conditions that pose a material threat of a future release to the environment." The term includes hazardous
substances or petroleum products even under conditions of compliance with laws. The term is not intended to include de minimis conditions
that generally do not present a material risk of harm to the public health or the environment and that generally would not be the subject of an
enforcement action if brought to the attention of appropriate governmental agencies."
y .1 jhi,
257
City of Tukwila
October 30, 2017
■ The potential for off -Property migration of on -Property contaminants by air emissions,
groundwater, and other media.
Technical Approach
In accordance with ASTM E1527-13, which was developed by ASTM to provide a standardized method of
conducting Phase I ESAs, SoundEarth's work on this project will consist of several elements:
■ Review of selected historical sources, where reasonably ascertainable and readily available, will
be conducted in an attempt to document obvious past land use of the Property and adjoining
properties back to 1940 or when the Property was initially developed, whichever is earlier. This
will include interviews with persons having some knowledge of current and past use of the
Property; review of historical aerial photographs and topographic maps of the Property and
surrounding area; review of city directories, Sanborn Fire Insurance Maps, county assessor's
records, building department records, and information at various local agencies, as available.
Prior environmental reports, permits and registrations, geotechnical reports, Property title
search information, and environmental lien information will be reviewed if provided by the
client.
■ Review of current state and federal databases that list the registered sites with known or
potential releases of toxic substances within a 0.5- to 1 -mile radius from the Property.
■ Reconnaissance of the Property and vicinity to observe current Property conditions and
practices. The Property reconnaissance provides an opportunity to search for evidence of
possible contamination in the form of soil discoloration, odors, vegetative stress, discarded
drums, discarded industrial debris, building construction materials, underground storage tanks,
etc.
■ Preparation of a written report documenting our methods and findings, including Property
photographs, a map showing the locations of the Property and potential sources of
contamination within a 1 -mile radius, a Property plan, and copies of supporting documents.
Additional Services Not Included
The following services, although not specifically required by ASTM E1527-13, may also be performed
concurrently with ESAs and may be beneficial for the evaluation of environmental conditions and/or an
evaluation of specific business environmental risks at the Property. At your direction, these services
have not been included as part of the scope of services for this ESA. Please note that this list is not all-
inclusive. If you seek additional services, please contact us for a supplemental proposal and cost
estimate.
■ Visual Asbestos Survey
■ Asbestos Survey in Soil
■ Visual Observations for Lead -Based Paint
■ Asbestos Survey (prior to renovation/demolition)
■ Visual Observations for Mold
■ Mold Sampling (bulk or air)
■ Radon Testing
SoundEarth Strategies, Inc.
5:\Proposals\2017 Proposal Numbers \PROP -172-66 PW5 Properly Phase I & II (CONFIDENTIAL(\PROP-172.66_PW5_F,docx
258
Page 12
City of Tukwila
October 30, 2017
■ Lead -Based Paint Survey
■ Lead in Drinking Water Sampling
■ Wetland Review
■ Threatened/Endangered Species Review
■ Historic Properties/Archaeological Resources Review
■ Stormwater System Inspections
■ Permit and Regulatory Compliance Audits
Scheduling and Reporting
SoundEarth anticipates completion of the Phase I ESA report within 15 business days, assuming written
authorization to proceed is provided within 3 days. SoundEarth shall proceed with such services in a
diligent manner to completion or as otherwise directed by the client. SoundEarth will not be responsible
for delays caused by factors beyond SoundEarth's control and which could not have been reasonably
foreseen or prevented. SoundEarth has assumed one mobilization to the Property.
Furthermore, at the request of the client, SoundEarth will observe the Property and the current uses
from vantage points that are accessible to the general public. SoundEarth will not communicate with the
current property owners, nor reveal information regarding the identity of the client. All information
provided to and generated by SoundEarth will remain confidential.
PHASE II ENVIRONMENTAL SITE ASSESSMENT SCOPE OF SERVICES
At the request of the City of Tukwila, costs for a subsurface investigation to evaluate the current soil and
groundwater quality at the Property are included in this proposal.
Task 2, Pre -Field Activities
Pre -field activities include the development of a scope of work for the Property, coordination of internal
staff and subcontractors, development of a work plan summary, and the development of a site-specific
health and safety plan.
Task 3, Phase II ESA Field Activities
Field activities will include conducting public and private utility locates, advancing up to 15 direct -push
soil borings, collecting environmental soil samples from each of the borings, and collecting
environmental groundwater samples from each of the borings, if applicable.
Prior to drilling activities, a private utility locate will be performed in order to clear the proposed boring
locations of any underground features or utilities on the Property that are not identified by the public
one -call locate.
Drilling activities include advancing approximately 15 direct -push soil borings in suspect areas or in the
inferred downgradient hydrologic position of suspect areas, as identified during the Phase I ESA
research. Each boring will be advanced to a maximum depth of 15 feet below ground surface (bgs). Soil
samples will be collected at 4- to 5 -foot depth intervals. Each boring will be logged by a professional
geologist with soil classified using the Unified Soil Classification System. Soil from each boring will be
evaluated for potential impacts through visual observations and notations of odor. Additionally, soil will
SoundEarth Strategies, Inc.
5:\Proposals \2017 Proposal Numbers \PROP -172-66 PW5 Property Phase I & II (CONFIDENTIAL)\PROP-172-66 PW5_F.doa
Page 13
259
City of Tukwila
October 30, 2017
be screened in the field for potential evidence of contamination using a photoionization detector to
detect the presence of volatile organic vapors.
Approximately two samples from each soil boring will be submitted for one or more of the following
analyses:
• Gasoline -range petroleum hydrocarbons (GRPH) by Northwest Total Petroleum Hydrocarbon
(NWTPH) Method NWTPH-Gx
■ Diesel -range petroleum hydrocarbons (DRPH) and oil -range petroleum hydrocarbons (ORPH) by
Method NWTPH-Dx
■ Full volatile suite (VOCs) by U.S. Environmental Protection Agency (EPA) Method 8260C
• Washington State Model Toxics Control Act (MTCA) 5 metals (arsenic, cadmium, chromium,
lead, and mercury) by EPA Method 200.8
Additional analyses may be added based on the findings of the Phase I ESA research.
Soil samples will be placed on ice in laboratory -supplied sample containers and shipped under chain -of -
custody protocol to the analytical laboratory for analysis of appropriate chemicals of concern.
If groundwater is encountered in the soil borings, reconnaissance groundwater samples will be collected
from each of the 15 borings. Reconnaissance groundwater samples will be submitted for one or more of
the following analyses:
• GRPH by Method NWTPH-Gx
• DRPH and ORPH by Method NWTPH-Dx
• VOCs by EPA Method 8260C
• MTCA 5 metals by EPA Method 200.8
Sampling of soil and groundwater from depths greater than 15 feet bgs is not envisioned in this scope of
work.
The field activities associated with the Phase II ESA at the Property, including the private utility locate,
drilling, and soil and groundwater sampling, are anticipated to take 2 days to complete. Depending on
the results of the investigation, additional follow-up sampling may be required to further define the
extent of contamination (if encountered).
SoundEarth assumes that all areas of the properties will be accessible during the assessments. The
results of the field activities and laboratory analytical results will be provided in the reports described in
Task 4.
Costs for profiling and disposal of investigation -derived waste are not included in this proposal and cost
estimate.
Task 4, Data Evaluation, Tabulation, and Reporting
Following completion of the soil and groundwater sampling activities and receipt of the laboratory
analytical results, a summary letter will be prepared and will include the following:
SoundEarth Strategies, Inc.
\ Proposals \2017 Proposal Numbers\PROP-172-66 PW5 Property Phase I & II( CONFIDENTIAL)\PROP-172-66 PW5_F.docz
260
Page 14
City of Tukwila
October 30, 2017
■ A description of subsurface conditions encountered during the subsurface investigation,
including detailed soil boring logs and a site and exploration plan.
■ Tabulated analytical results with comparisons to applicable state cleanup levels, and discussion
of results and potential environmental liabilities or concerns associated with the Property.
Task 5, Project Management
This task includes the project management activities that are essential to the success of achieving client
objectives. Project management activities include project coordination, contracting, and client meetings
and other communication.
Schedule
SoundEarth is available to begin this scope of work as soon as authorized by the client. The standard
Phase I ESA report preparation is about 2 to 3 weeks, but may be expedited since the Ecology files have
already been requested. The Phase II ESA will include 2 days in the field, 2 weeks for laboratory analysis,
and 2 weeks for reporting. SoundEarth shall proceed with such services in a diligent manner to
completion or as otherwise directed by the client. SoundEarth will proceed with Task 2 activities
following identification of any additional recognized environmental conditions during the Phase I ESA
(Task 1). SoundEarth will not be responsible for delays caused by factors beyond the consultant's control
and which could not have been reasonably foreseen or prevented.
RELIANCE
The Phase I ESA report and Phase II report will be prepared for the exclusive use and reliance of the City
of Tukwila. Reliance by other parties is prohibited without the written authorization of the client and
SoundEarth.
If, in the future, the client and SoundEarth consent to reliance on the report by a third party, SoundEarth
will grant such reliance via a Reliance Letter for an additional fee of $250 per relying party. Reliance on
the report by the client and other authorized parties will be subject to the terms, conditions, and
limitations stated in the Consulting Services Agreement (and sections of this proposal incorporated
therein), the Reliance Letter, and the report.
ESTIMATED COSTS
The estimated total cost to conduct the Phase I ESA and the Phase II ESA described above is $51,686.
The costs associated with the disposal of investigation -derived waste are not included in this estimate.
The details of the estimated costs are provided in the attached table. SoundEarth proposes to conduct
the subsurface investigation on a time and material contractual basis. Our cost estimate will not be
exceeded without your written authorization.
SoundEarth is committed to preserving the environment. Therefore, the client will be provided with a
PDF version of the final report. If, however, the client would like hard copies of the report, SoundEarth is
happy to provide up to three copies at no charge. Additional copies will be charged to the client at $50 a
copy.
SoundEarth Strategies, Inc.
S;\ Proposals \ 2017 Proposal Numbers \PROP -172-66 PW5 Property Phase I & II (CONFIDENTIAL)\PROP-172-66 PW5 j.docx
Page 15
261
City of Tukwila
October 30, 2017
CLOSING
We appreciate the opportunity to provide this proposal for environmental services on this project. If the
scope of services and associated costs are acceptable, the scope of work shall be performed under
terms of the existing Consulting Agreement for Site Survey Services, dated September 18, 2017. Please
call us at 206-306-1900 if you have any questions.
Respectfully,
Ryan Bixby, LG
President
Attachments: Table 1: Phase I and II Environmental Site Assessment Cost
Estimate
RKB:dnm/slf
SoundEarth Strategies, Inc.
65Proposais\2017 Proposal Numbers \PROP -172-66 PW5 Property Phase I & II CONFIDENTIAL)\PROP-172-66_PW5_F.doa
262
Page 16
Table 1
Phase I end II Environmental Site Assessment Cost Estimate
PWS Property
11210 and 11234 Tukwila International Boulevard and 11231 East Marginal Way South
Tukwila, Washington
PROP -172.66
TOTAL
$23,170
$695
$7,659
$20,162
$51,686
Assumptions to Cost Estimate
• SoundEarth will have access to the properties during no mai working hour
• Task 2 assumes 2 days of drilling to advance 15 soil borings to 15 fees below ground surface.
• Task assumes standard turnaround for laboratory analyses.
• Aletter report will be provided as the deliverable for Task 4.
e Cost estimate does nal include disposal of Inveshgaiion-derived waste.
loft
263
SoundEarth Labor. Cate
odes, Rates, and Hours
: SoundEarth
Labor
Communication
Fees
SoundEarth ODCs,
Subcontractors, end
Field Equipment
soundEanh
Laboratory
Expenses
.Task Total
Task
No. Desalptlon
Managing
Principal
Senior
'Engineer/
Gwbgist/
Scientist
Project I
Engineer/
Geologist/
Scientist
Staff1.
Engineer/
Geologist/
Scientist
CAD/GIS
, Specialist I
Senior
Technical
Writer/ Editor
Senior Project
Coordinator.:
Cledul
::$221
$185
'.t $135
$120
$110 r-
$115 -'.
$95
$70
1 Phase l ESA
3
3
32
44
$6,370
5191
5439
$7,000
2 Pro -Field Activities
2
6
8
4
2
$2,890
$87
...:1$2,977. ..
3 Phase 11 ESA Field Activities
24
24
$3,870
$116
57,220
$20,162
: $31,368
4 Data Evaluation, Tabulation, end Reporting
4
12
24
8
4
2
1
57,000
$210
'. $7,210
5 Project Management
4
124
2
$3,040
591
::: $3 131
TOTAL
$23,170
$695
$7,659
$20,162
$51,686
Assumptions to Cost Estimate
• SoundEarth will have access to the properties during no mai working hour
• Task 2 assumes 2 days of drilling to advance 15 soil borings to 15 fees below ground surface.
• Task assumes standard turnaround for laboratory analyses.
• Aletter report will be provided as the deliverable for Task 4.
e Cost estimate does nal include disposal of Inveshgaiion-derived waste.
loft
263
264
City of Tukwila
6200 Southcenter Boulevard, Tukwila WA 98188
Contract Number:
CONSULTANT AGREEMENT FOR
SITE SURVEY SERVICES
THIS AGREEMENT is entered into between the City of Tukwila, Washington, hereinafter
referred to as "the City", and Bush Roed & Hitchings, Inc. hereinafter referred to as "the
Consultant", in consideration of the mutual benefits, terms, and conditions hereinafter specified.
1. Project Designation. The Consultant is retained by the City to perform survey services for
four selected site referred to as the Justice Center Site (JC7NL), Public Works Site (PW),
Fire Station 52 Site (FS52), and Fire Station 54 Site (FS54), in connection with the project
titled Tukwila Public Safety Plan.
2. Scope of Services. The Consultant agrees to perform the services, identified on Exhibit "A"
attached hereto, including the provision of all labor, materials, equipment and supplies.
3. Duration of Agreement; Time for Performance. This Agreement shall be in full force and
effect for a period commencing upon execution and ending December 31, 2018, unless
sooner terminated under the provisions hereinafter specified. Work under this Agreement
shall commence upon written notice by the City to the Consultant to proceed. The
Consultant shall perform all services and provide all work product required pursuant to this
Agreement no later than January 31, 2018 unless an extension of such time is granted in
writing by the City.
4. Payment. The Consultant shall be paid by the City for completed work and for services
rendered under this Agreement as follows:
A. Payment for the work provided by the Consultant shall be made as provided on Exhibits
"A," "B," "C," and "D" attached hereto, provided that the total amount of payment to the
Consultant shall not exceed $57,400 (including estimated expenses) without express
written modification of the Agreement signed by the City.
B. The Consultant may submit vouchers to the City once per month during the progress of
the work for partial payment for that portion of the project completed to date. Such
vouchers will be checked by the City and, upon approval thereof, payment shall be
made to the Consultant in the amount approved.
C. Final payment of any balance due the Consultant of the total contract price earned will
be made promptly upon its ascertainment and verification by the City after the
completion of the work under this Agreement and its acceptance by the City.
D. Payment as provided in this section shall be full compensation for work performed,
services rendered, and for all materials, supplies, equipment and incidentals necessary
to complete the work.
E. The Consultant's records and accounts pertaining to this Agreement are to be kept
available for inspection by representatives of the City and the state of Washington for a
period of three (3) years after final payments. Copies shall be made available upon
request.
265
5. Ownership and Use of Documents. All documents, drawings, specifications and other
materials produced by the Consultant in connection with the services rendered under this
Agreement shall be the property of the City whether the project for which they are made is
executed or not. The Consultant shall be permitted to retain copies, including reproducible
copies, of drawings and specifications for information, reference and use in connection with
the Consultant's endeavors. The Consultant shall not be responsible for any use of the said
documents, drawings, specifications or other materials by the City on any project other than
the project specified in this Agreement.
6. Compliance with Laws. The Consultant shall, in performing the services contemplated by
this Agreement, faithfully observe and comply with all federal, state, and local laws,
ordinances and regulations, applicable to the services rendered under this Agreement.
7 Indemnification. The Consultant shall defend, indemnify and hold the City, its officers,
officials, employees and volunteers harmless from any and all claims, injuries, damages,
losses or suits including attorney fees, arising out of or resulting from the acts, errors or
omissions of the Consultant in performance of this Agreement, except for injuries and
damages caused by the sole negligence of the City.
Should a court of competent jurisdiction determine that this Agreement is subject to RCW
4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or
damages to property caused by or resulting from the concurrent negligence of the
Consultant and the City, its officers, officials, employees, and volunteers, the Consultant's
liability hereunder shall be only to the extent of the Consultant's negligence. It is further
specifically and expressly understood that the indemnification provided herein constitutes the
Consultant's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the
purposes of this indemnification. This waiver has been mutually negotiated by the parties.
The provisions of this section shall survive the expiration or termination of this Agreement.
8. Insurance. The Consultant shall procure and maintain for the duration of the Agreement,
insurance against claims for injuries to persons or damage to property which may arise from
or in connection with the performance of the work hereunder by the Consultant, its agents,
representatives, or employees. Consultant's maintenance of insurance as required by the
agreement shall not be construed to limit the liability of the Consultant to the coverage
provided by such insurance, or otherwise limit the City's recourse to any remedy available at
law or in equity.
A. Minimum Amounts and Scope of Insurance. Consultant shall obtain insurance of the
types and with the limits described below:
1. Automobile Liability insurance with a minimum combined single limit for bodily
injury and property damage of $1,000,000 per accident. Automobile Liability
insurance shall cover all owned, non -owned, hired and leased vehicles.
Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a
substitute form providing equivalent liability coverage. If necessary, the policy
shall be endorsed to provide contractual liability coverage.
2. Commercial General Liability insurance with limits no less than $1,000,000 each
occurrence, $2,000,000 general aggregate. Commercial General Liability
insurance shall be written on ISO occurrence form CG 00 01 and shall cover
liability arising from premises, operations, independent contractors and personal
injury and advertising injury. The City shall be named as an insured under the
Consultant's Commercial General Liability insurance policy with respect to the
work performed for the City.
3. Workers' Compensation coverage as required by the Industrial Insurance laws of
the State of Washington.
CA revised : 1-2013
266
Page 2
4. Professional Liability with limits no less than $1,000,000 per claim and
$1,000,000 policy aggregate limit. Professional Liability insurance shall be
appropriate to the Consultant's profession.
B. Other Insurance Provision. The Consultant's Automobile Liability and Commercial
General Liability insurance policies are to contain, or be endorsed to contain that they
shall be primary insurance with respect to the City. Any Insurance, self-insurance, or
insurance pool coverage maintained by the City shall be excess of the Consultant's
insurance and shall not be contributed or combined with it.
C. Acceptability of Insurers. Insurance is to be placed with insurers with a current A.M.
Best rating of not less than A: VII.
D. Verification of Coverage. Consultant shall furnish the City with original certificates and
a copy of the amendatory endorsements, including but not necessarily limited to the
additional insured endorsement, evidencing the insurance requirements of the
Consultant before commencement of the work. Certificates of coverage and
endorsements as required by this section shall be delivered to the City within fifteen (15)
days of execution of this Agreement.
E. Notice of Cancellation. The Consultant shall provide the City with written notice of any
policy cancellation, within two business days of their receipt of such notice.
F. Failure to Maintain Insurance. Failure on the part of the Consultant to maintain the
insurance as required shall constitute a material breach of contract, upon which the City
may, after giving five business days notice to the Consultant to correct the breach,
immediately terminate the contract or, at its discretion, procure or renew such insurance
and pay any and all premiums in connection therewith, with any sums so expended to be
repaid to the City on demand, or at the sole discretion of the City, offset against funds
due the Consultant from the City.
9. Independent Contractor. The Consultant and the City agree that the Consultant is an
independent contractor with respect to the services provided pursuant to this Agreement.
Nothing in this Agreement shall be considered to create the relationship of employer and
employee between the parties hereto. Neither the Consultant nor any employee of the
Consultant shall be entitled to any benefits accorded City employees by virtue of the services
provided under this Agreement. The City shall not be responsible for withholding or
otherwise deducting federal income tax or social security or for contributing to the state
industrial insurance program, otherwise assuming the duties of an employer with respect to
the Consultant, or any employee of the Consultant.
10. Covenant Against Contingent Fees. The Consultant warrants that he has not employed or
retained any company or person, other than a bonafide employee working solely for the
Consultant, to solicit or secure this contract, and that he has not paid or agreed to pay any
company or person, other than a bonafide employee working solely for the Consultant, any
fee, commission, percentage, brokerage fee, gifts, or any other consideration contingent
upon or resulting from the award or making of this contract. For breach or violation of this
warrant, the City shall have the right to annul this contract without liability, or in its discretion
to deduct from the contract price or consideration, or otherwise recover, the full amount of
such fee, commission, percentage, brokerage fee, gift, or contingent fee.
11. Discrimination Prohibited. The Consultant, with regard to the work performed by it under
this Agreement, will not discriminate on the grounds of race, religion, creed, color, national
origin, age, veteran status, sex, sexual orientation, gender identity, marital status, political
affiliation or the presence of any disability in the selection and retention of employees or
procurement of materials or supplies.
CA revised : 1-2013
Page 3
267
12. Assignment. The Consultant shall not sublet or assign any of the services covered by this
Agreement without the express written consent of the City.
13. Non -Waiver. Waiver by the City of any provision of this Agreement or any time limitation
provided for in this Agreement shall not constitute a waiver of any other provision.
14. Termination.
A. The City reserves the right to terminate this Agreement at any time by giving ten (10)
days written notice to the Consultant.
B. In the event of the death of a member, partner or officer of the Consultant, or any of its
supervisory personnel assigned to the project, the surviving members of the Consultant
hereby agree to complete the work under the terms of this Agreement, if requested to
do so by the City. This section shall not be a bar to renegotiations of this Agreement
between surviving members of the Consultant and the City, if the City so chooses.
15. Applicable Law; Venue; Attorney's Fees. This Agreement shall be subject to, and the
Consultant shall at all times comply with, all applicable federal, state and local laws,
regulations, and rules, including the provisions of the City of Tukwila Municipal Code and
ordinances of the City of Tukwila. In the event any suit, arbitration, or other proceeding is
instituted to enforce any term of this Agreement, the parties specifically understand and
agree that venue shall be properly laid in King County, Washington. The prevailing party in
any such action shall be entitled to its attorney's fees and costs of suit. Venue for any action
arising from or related to this Agreement shall be exclusively in King County Superior Court.
16. Severability and Survival. If any term, condition or provision of this Agreement is declared
void or unenforceable or limited in its application or effect, such event shall not affect any
other provisions hereof and all other provisions shall remain fully enforceable. The
provisions of this Agreement, which by their sense and context are reasonably intended to
survive the completion, expiration or cancellation of this Agreement, shallsurvive termination
of this Agreement.
17. Notices. Notices to the City of Tukwila shall be sent to the following address:
City Clerk
City of Tukwila
6200 Southcenter Boulevard
Tukwila, WA 98188
Notices to Consultant shall be sent to the following address:
Thomas Carner, P.L.A.
Bush Roed & Hitchings, Inc.
2009 Minor Avenue East,
Seattle, WA 98102-3513
18. Entire Agreement; Modification. This Agreement, together with attachments or addenda,
represents the entire and integrated Agreement between the City and the Consultant and
supersedes all prior negotiations, representations, or agreements written or oral. No
amendment or modification of this Agreement shall be of any force or effect unless it is in
writing and signed by the parties.
CA revised : 1-2013
268
Page 4
DATED this day of , 20
CITY OF TUKWILA CONSULTANT
By:
Allan Ekberg, Mayor
Printed Name:
Title:
CA revised : 1-2013
Page 5
269
270
Exhibit A
BRH
VIA EMAIL
October 24, 2017
Carrie Holmes
Axis Planning & Development, LLC
1529 Western Avenue
Seattle, WA 98101
Bush Roed & Hitchings, Inc.
Proposed Land Survey Services - ALTA Survey - Site FS52
Parcel no.: 3597000320
Vicinity of 65th Avenue S & Southcenter Blvd.
Tukwila, WA 98188
Dear Ms. Holmes,
We look forward to providing you with land title survey services at the site referenced above.
(See Exhibit "A").
Please note that our proposed scope of work is based upon decades of BRH experience with ALTA
surveys.
Title Report
Our survey will be conducted based on a Title Report furnished by your office.
Specifications
Our survey will be performed per ALTA/NSPS Land Title Survey Standards, 2016, Table A Items 2,
3, 4, 7a, 7b1, 7c, 8, 9, 11, 13, 14, 16, 17, 18, 19 and 20 (See Exhibit "B").
Please forward any lender/client survey specifications, if applicable.
Please forward the names of the entities to whom the survey is to be certified.
Zoning Report
Please note that if Table A, item 6a or 6b is required, we will need to be provided with a zoning
report. Adding these items may also affect our fee.
BRH - Land Surveyors & Civil Engineers
2009 Minor Avenue East, Seattle, WA 98102-3513
Phone: (206) 323-4144 / (800) 935-0508, Fax: (206) 323-7135, Internet: www.brhinc.com
271
AXIS PLANNING & DEVELOPMENT, LLC
Carrie Holmes
October 24, 2017
Page 2
Fees
BRH, Inc.
Our fee to provide this service is $5,800.
Expense items, such as parking fees, tolls, printing charges and delivery fees will be billed at our
cost plus 15% in addition to the above fee for our services. The terms of this proposal are valid for
60 days.
Deliverables
The final ALTA drawing will be prepared for you in AutoCAD.
Stamped and signed documents will be delivered.
Please provide a distribution list for the final delivery of the survey.
Delivery Schedule
We will complete and deliver the final drawing within 25 business days of a signed authorization to
proceed.
Professional Responsibility for Reliability and Accuracy
All ALTA surveys are not equal — accurate and reliable data prevents delays that cost you money
We Offer Reliability:
The survey we will provide to you will be based on actual, on -the -ground, field measurements and
observations. We will NOT:
1) rely on mapping obtained by a 3rd party
2) copy or trace existing mapping by others
3) utilize internet-based mapping
We Meet Professional Standards:
What you will get from BRH will comply with National ALTA/NSPS standards and Washington State
law.
BRH certifies that all mapping information presented in your survey will be solely the work of BRH
personnel, based on information acquired on-site by BRH personnel and record information
researched by BRH personnel.
Insurance
The activities of Bush, Roed & Hitchings, Inc. are insured for both commercial general liability and
professional liability. Commercial general liability limit is $1,000,000 per occurrence and $2,000,000
in the aggregate. Professional liability limit of coverage is $2,000,000.
We always encourage our clients to request a Certificate of Insurance — something we will provide to
you upon request.
272
AXIS PLANNING & DEVELOPMENT, LLC
Carrie Holmes
October 24, 2017
Page 3
BRH, Inc.
Thank You
We appreciate the opportunity to submit this proposal to you, and we look forward to working with
you on this project.
Sincerely,
BUSH, ROED & HITCHINGS, INC. ACCEPTED BY:
Thomas E. Carner, P.L.S.
Survey Project Manager
TEC/caj
Enclosure
AXIS PLANNING & DEVELOPMENT, LLC
Printed Name:
Signature:
Title:
Date:
Summary
We have prepared many thousands of ALTA surveys.
And we have found the best way to commence services is to clarify responsibilities.
We will ask you to provide:
a. Your signed and dated acceptance (above) — within 60 days of the date of this proposal.
b. A Title Report — receiving this, and the information noted below, as soon as possible,
will be the key to the timely completion of your ALTA survey.
c. Any applicable lender/client survey specifications.
d. Name of entities to whom the survey will be certified.
e. A Distribution List for the documents.
BRH will provide:
a. A Certificate of Insurance, upon your request.
b. An accurate and reliable ALTA survey, based upon on -the -ground observations, and
applicable
AL T A/NSPS Standards and Washington State law.
273
Exhibit "A"
King County iMap
499,7(500005
The reformation included on this map has been compled by king County staff frau a variety of sources andis subeot to change
vtthout notice. IGng County makes no representations or warranties, express orimplied, as to accuracy. completeness. tenelness,
or rights to the use of such information. This document s not intended for use as a survey poducf. king County shall not be lade
for any generd, special, redreck incidental. or cone W entla damage; inducing, but not limited to, lost revenues or lost profits
recalling from the use or mouse tithe iriormatbn contained on the map. Any sale of this map or information on this map is
prohbited except by written permssion of king County.
Date: 10/24/2017 Notes.
kg King County
GIS CENTER
274
EXHIBIT B
TABLE A
OPTIONAL SURVEY RESPONSIBILITIES AND SPECIFICATIONS
NOTE: The twenty (20) items of Table A may be negotiated between the surveyor and client. Any
additional items negotiated between the surveyor and client shall be identified as 21(a), 21(b), etc. and
explained pursuant to Section 6.D.ii.(g). Notwithstanding Table A Items 5 and 11, if an engineering design
survey is desired as part of an ALTA/NSPS Land Title Survey, such services should be negotiated under
Table A, Item 21.
If checked, the following optional items are to be included in the ALTA/NSPS LAND TITLE
SURVEY, except as otherwise qualified (see note above):
1.
Monuments placed (or a reference monument or witness to the corner) at all major
corners of the boundary of the property, unless already marked or referenced by existing
monuments or witnesses in close proximity to the corner.
2. _X Address(es) of the surveyed property if disclosed in documents provided to or obtained
by the surveyor, or observed while conducting the fieldwork.
3. _X Flood zone classification (with proper annotation based on federal Flood Insurance Rate
Maps or the state or local equivalent) depicted by scaled map location and graphic
plotting only.
4. _X Gross land area (and other areas if specified by the client).
5. Vertical relief with the source of information (e.g., ground survey, aerial map), contour
interval, datum, and originating benchmark identified.
6.
(a) If set forth in a zoning report or letter provided to the surveyor by the client, list the
current zoning classification, setback requirements, the height and floor space area
restrictions, and parking requirements. Identify the date and source of the report or letter.
(b) If the zoning setback requirements are set forth in a zoning report or letter provided to
the surveyor by the client, and if those requirements do not require an interpretation by
the surveyor, graphically depict the building setback requirements. Identify the date and
source of the report or letter.
7. _X (a) Exterior dimensions of all buildings at ground level.
(b) Square footage of:
X (1) exterior footprint of all buildings at ground level.
(2) other areas as specified by the client.
_X (c) Measured height of all buildings above grade at a location specified by the client. If no
location is specified, the point of measurement shall be identified.
8. X Substantial features observed in the process of conducting the fieldwork (in addition to
Page 1 of 3
Copyright 2016. All rights reserved.
American Land Title Association and
National Society of Professional Surveyors
NSPS
AMEN ICAN
LAND TIT LL
ASSOCIAI ION
275
EXHIBIT B
the improvements and features required pursuant to Section 5 above) (e.g., parking lots,
billboards, signs, swimming pools, landscaped areas, substantial areas of refuse).
9. _X_ Number and type (e.g., disabled, motorcycle, regular and other marked specialized
types) of clearly identifiable parking spaces on surface parking areas, lots and in parking
structures. Striping of clearly identifiable parking spaces on surface parking areas and
lots.
10.
(a) As designated by the client, a determination of the relationship and location of certain
division or party walls with respect to adjoining properties (client to obtain necessary
permissions).
(b) As designated by the client, a determination of whether certain walls are plumb (client
to obtain necessary permissions).
11. _X Location of utilities existing on or serving the surveyed property as determined by:
• observed evidence collected pursuant to Section 5.E.iv.
• evidence from plans requested by the surveyor and obtained from utility companies,
or provided by client (with reference as to the sources of information), and
• markings requested by the surveyor pursuant to an 811 utility locate or similar
request
Representative examples of such utilities include, but are not limited to:
• Manholes, catch basins, valve vaults and other surface indications of
subterranean uses;
• Wires and cables (including their function, if readily identifiable) crossing the
surveyed property, and all poles on or within ten feet of the surveyed property.
Without expressing a legal opinion as to the ownership or nature of the potential
encroachment, the dimensions of all encroaching utility pole crossmembers or
overhangs; and
• Utility company installations on the surveyed property.
Note to the client, insurer, and lender - With regard to Table A, item 11, source
information from plans and markings will be combined with observed evidence of utilities
pursuant to Section 5.E.iv. to develop a view of the underground utilities. However,
lacking excavation, the exact location of underground features cannot be accurately,
completely, and reliably depicted. In addition, in some jurisdictions, 811 or other similar
utility locate requests from surveyors may be ignored or result in an incomplete response,
in which case the surveyor shall note on the plat or map how this affected the surveyor's
assessment of the location of the utilities. Where additional or more detailed information
is required, the client is advised that excavation and/or a private utility locate request may
be necessary.
12. As specified by the client, Governmental Agency survey -related requirements (e.g., HUD
surveys, surveys for leases on Bureau of Land Management managed lands).
13. _X_ Names of adjoining owners according to current tax records. If more than one owner,
identify the first owner's name listed in the tax records followed by "et al."
Page 2 of 3
Copyright 2016. All rights reserved.
American Land Title Association and
National Society of Professional Surveyors
276
NSPS
EMMMUSI
AMERICAN
LAND II ILI`
ASSOCIATION
EXHIBIT B
14. _X As specified by the client, distance to the nearest intersecting street.
15. Rectified orthophotography, photogrammetric mapping, remote sensing, airborne/mobile
laser scanning and other similar products, tools or technologies as the basis for the
showing the location of certain features (excluding boundaries) where ground
measurements are not otherwise necessary to locate those features to an appropriate
and acceptable accuracy relative to a nearby boundary. The surveyor shall (a) discuss
the ramifications of such methodologies (e.g., the potential precision and completeness
of the data gathered thereby) with the insurer, lender, and client prior to the performance
of the survey, and (b) place a note on the face of the survey explaining the source, date,
precision, and other relevant qualifications of any such data.
16. _X Evidence of recent earth moving work, building construction, or building additions
observed in the process of conducting the fieldwork.
17. _X Proposed changes in street right of way lines, if such information is made available to the
surveyor by the controlling jurisdiction. Evidence of recent street or sidewalk construction
or repairs observed in the process of conducting the fieldwork.
18. _X_ If there has been a field delineation of wetlands conducted by a qualified specialist hired
by the client, the surveyor shall locate any delineation markers observed in the process of
conducting the fieldwork and show them on the face of the plat or map. If no markers
were observed, the surveyor shall so state.
19. _X Include any plottable offsite (i.e., appurtenant) easements or servitudes disclosed in
documents provided to or obtained by the surveyor as a part of the survey pursuant to
Sections 5 and 6 (and applicable selected Table A items) (client to obtain necessary
permissions).
20. _X_ Professional Liability Insurance policy obtained by the surveyor in the minimum amount
of $ to be in effect throughout the contract term. Certificate of Insurance to
be furnished upon request, but this item shall not be addressed on the face of the plat or
map.
21.
Adopted by the Board of Governors, American Land Title Association, on October 8, 2015.
American Land Title Association, 1800 M St., N.W., Suite 300S, Washington, D.C. 20036-5828.
www. alta. orq
Adopted by the Board of Directors, National Society of Professional Surveyors, on October 9, 2015.
National Society of Professional Surveyors, Inc., 5119 Pegasus Court, Suite Q, Frederick, MD 21704.
http://www.nsps.us.com/
Page 3 of 3
Copyright 2016. All rights reserved.
American Land Title Association and
National Society of Professional Surveyors
NSPS
ingEREME
AMERICAN
LANL) MEI
A)SOCIA"I ION
277
278
BRH
VIA EMAIL
October 24, 2017
Carrie Holmes
Axis Planning & Development, LLC
1529 Western Avenue
Seattle, WA 98101
Bush Roed & Hitchings, Inc.
Proposed Land Survey Services - ALTA Survey - Site FS54
Parcel no.: 1523049263
13916 42nd Avenue S
Tukwila, WA 98168
Dear Ms. Holmes,
We look forward to providing you with land title survey services at the site referenced above.
(See Exhibit "A").
Please note that our proposed scope of work is based upon decades of BRH experience with ALTA
surveys.
Title Report
Our survey will be conducted based on a Title Report furnished by your office.
Specifications
Our survey will be performed per ALTA/NSPS Land Title Survey Standards, 2016, Table A Items 2,
3, 4, 7a, 7b1, 7c, 8, 9, 11, 13, 14, 16, 17, 18, 19 and 20 (See Exhibit "B").
Please forward any lender/client survey specifications, if applicable.
Please forward the names of the entities to whom the survey is to be certified.
Zoning Report
Please note that if Table A, item 6a or 6b is required, we will need to be provided with a zoning
report. Adding these items may also affect our fee.
BRH - Land Surveyors & Civil Engineers
2009 Minor Avenue East, Seattle, WA 98102-3513
Phone: (206) 323-4144 / (800) 935-0508, Fax: (206) 323-7135, Internet: www.brhinc.com
Exhibit B
279
AXIS PLANNING & DEVELOPMENT, LLC
Carrie Holmes
October 24, 2017
Page 2
Fees
BRH, Inc.
Our fee to provide this service is $7,900.
Expense items, such as parking fees, tolls, printing charges and delivery fees will be billed at our
cost plus 15% in addition to the above fee for our services. The terms of this proposal are valid for
60 days.
Deliverables
The final ALTA drawing will be prepared for you in AutoCAD.
Stamped and signed documents will be delivered.
Please provide a distribution list for the final delivery of the survey.
Delivery Schedule
We will complete and deliver the final drawing within 25 business days of a signed authorization to
proceed.
Professional Responsibility for Reliability and Accuracy
All ALTA surveys are not equal — accurate and reliable data prevents delays that cost you money
We Offer Reliability:
The survey we will provide to you will be based on actual, on -the -ground, field measurements and
observations. We will NOT:
1) rely on mapping obtained by a 3rd party
2) copy or trace existing mapping by others
3) utilize internet-based mapping
We Meet Professional Standards:
What you will get from BRH will comply with National ALTA/NSPS standards and Washington State
law.
BRH certifies that all mapping information presented in your survey will be solely the work of BRH
personnel, based on information acquired on-site by BRH personnel and record information
researched by BRH personnel.
Insurance
The activities of Bush, Roed & Hitchings, Inc. are insured for both commercial general liability and
professional liability. Commercial general liability limit is $1,000,000 per occurrence and $2,000,000
in the aggregate. Professional liability limit of coverage is $2,000,000.
We always encourage our clients to request a Certificate of Insurance — something we will provide to
you upon request.
280
AXIS PLANNING & DEVELOPMENT, LLC
Carrie Holmes
October 24, 2017
Page 3
BRH, Inc.
Thank You
We appreciate the opportunity to submit this proposal to you, and we look forward to working with
you on this project.
Sincerely,
BUSH, ROED & HITCHINGS, INC. ACCEPTED BY:
Thomas E. Garner, P.L.S.
Survey Project Manager
TEC/caj
Enclosure
AXIS PLANNING & DEVELOPMENT, LLC
Printed Name:
Signature:
Title:
Date:
Summary
We have prepared many thousands of ALTA surveys.
And we have found the best way to commence services is to clarify responsibilities.
We will ask you to provide:
a. Your signed and dated acceptance (above) — within 60 days of the date of this proposal.
b. A Title Report — receiving this, and the information noted below, as soon as possible,
will be the key to the timely completion of your ALTA survey.
c. Any applicable lender/client survey specifications.
d. Name of entities to whom the survey will be certified.
e. A Distribution List for the documents.
BRH will provide:
a. A Certificate of Insurance, upon your request.
b. An accurate and reliable ALTA survey, based upon on -the -ground observations, and
applicable
ALTA/NSPS Standards and Washington State law.
281
Exhibit "A"
King County iMap
aVogizzgoi-
73 G060043
15,23 0;1:9 029,.
The information incbded on this map has been canpied by Ion g County staff frau a variety of sources and is subject to change
without notice. IGng County makes no representations or vans rdi., express or im pied, as to accuracy, competeness, timelness,
or rights to the use of such information. This document is not intended for use as a survey product. king County shall not be lade
for any general, special, incited, incidental, orconsequentla damages includng, but not limitedto, lost revenues or bsl profits
resdtirg from the use or msuse of the information contained on the map. Any sale of this map orinformabon on this map is
prohibited except by written permission of thing County.
Date: 10/24/2017 Notes:
N
King County
GIS CENTER
282
EXHIBIT B
TABLE A
OPTIONAL SURVEY RESPONSIBILITIES AND SPECIFICATIONS
NOTE: The twenty (20) items of Table A may be negotiated between the surveyor and client. Any
additional items negotiated between the surveyor and client shall be identified as 21(a), 21(b), etc. and
explained pursuant to Section 6.D.ii.(g). Notwithstanding Table A Items 5 and 11, if an engineering design
survey is desired as part of an ALTA/NSPS Land Title Survey, such services should be negotiated under
Table A, Item 21.
If checked, the following optional items are to be included in the ALTA/NSPS LAND TITLE
SURVEY, except as otherwise qualified (see note above):
1.
Monuments placed (or a reference monument or witness to the corner) at all major
corners of the boundary of the property, unless already marked or referenced by existing
monuments or witnesses in close proximity to the corner.
2. _X Address(es) of the surveyed property if disclosed in documents provided to or obtained
by the surveyor, or observed while conducting the fieldwork.
3. _X Flood zone classification (with proper annotation based on federal Flood Insurance Rate
Maps or the state or local equivalent) depicted by scaled map location and graphic
plotting only.
4. _X Gross land area (and other areas if specified by the client).
5.
6.
Vertical relief with the source of information (e.g., ground survey, aerial map), contour
interval, datum, and originating benchmark identified.
(a) If set forth in a zoning report or letter provided to the surveyor by the client, list the
current zoning classification, setback requirements, the height and floor space area
restrictions, and parking requirements. Identify the date and source of the report or letter.
(b) If the zoning setback requirements are set forth in a zoning report or letter provided to
the surveyor by the client, and if those requirements do not require an interpretation by
the surveyor, graphically depict the building setback requirements. Identify the date and
source of the report or letter.
7. X (a) Exterior dimensions of all buildings at ground level.
(b) Square footage of:
_X (1) exterior footprint of all buildings at ground level.
(2) other areas as specified by the client.
X (c) Measured height of all buildings above grade at a location specified by the client. If no
location is specified, the point of measurement shall be identified.
8. X Substantial features observed in the process of conducting the fieldwork (in addition to
Page 1 of 3
Copyright 2016. All rights reserved.
American Land Title Association and
National Society of Professional Surveyors
NSPS
INEEMEMII
AMERICAN
I.ANI) "I I ELL
ASSOCIM ION
283
EXHIBIT B
the improvements and features required pursuant to Section 5 above) (e.g., parking lots,
billboards, signs, swimming pools, landscaped areas, substantial areas of refuse).
9. _X_ Number and type (e.g., disabled, motorcycle, regular and other marked specialized
types) of clearly identifiable parking spaces on surface parking areas, lots and in parking
structures. Striping of clearly identifiable parking spaces on surface parking areas and
lots.
10.
(a) As designated by the client, a determination of the relationship and location of certain
division or party walls with respect to adjoining properties (client to obtain necessary
permissions).
(b) As designated by the client, a determination of whether certain walls are plumb (client
to obtain necessary permissions).
11. _X_ Location of utilities existing on or serving the surveyed property as determined by:
• observed evidence collected pursuant to Section 5.E.iv.
• evidence from plans requested by the surveyor and obtained from utility companies,
or provided by client (with reference as to the sources of information), and
• markings requested by the surveyor pursuant to an 811 utility locate or similar
request
Representative examples of such utilities include, but are not limited to:
• Manholes, catch basins, valve vaults and other surface indications of
subterranean uses;
• Wires and cables (including their function, if readily identifiable) crossing the
surveyed property, and all poles on or within ten feet of the surveyed property.
Without expressing a legal opinion as to the ownership or nature of the potential
encroachment, the dimensions of all encroaching utility pole crossmembers or
overhangs; and
• Utility company installations on the surveyed property.
Note to the client, insurer, and lender - With regard to Table A, item 11, source
information from plans and markings will be combined with observed evidence of utilities
pursuant to Section 5.E.iv. to develop a view of the underground utilities. However,
lacking excavation, the exact location of underground features cannot be accurately,
completely, and reliably depicted. In addition, in some jurisdictions, 811 or other similar
utility locate requests from surveyors may be ignored or result in an incomplete response,
in which case the surveyor shall note on the plat or map how this affected the surveyor's
assessment of the location of the utilities. Where additional or more detailed information
is required, the client is advised that excavation and/or a private utility locate request may
be necessary.
12. As specified by the client, Governmental Agency survey -related requirements (e.g., HUD
surveys, surveys for leases on Bureau of Land Management managed lands).
13. X Names of adjoining owners according to current tax records. If more than one owner,
identify the first owner's name listed in the tax records followed by "et al."
Page 2 of 3
Copyright 2016. All rights reserved.
American Land Title Association and
National Society of Professional Surveyors
284
NSPS
AMERICAN
LAND 1IILI:
:
ASSOCIATION
EXHIBIT B
14. _X As specified by the client, distance to the nearest intersecting street.
15.
Rectified orthophotography, photogrammetric mapping, remote sensing, airborne/mobile
laser scanning and other similar products, tools or technologies as the basis for the
showing the location of certain features (excluding boundaries) where ground
measurements are not otherwise necessary to locate those features to an appropriate
and acceptable accuracy relative to a nearby boundary. The surveyor shall (a) discuss
the ramifications of such methodologies (e.g., the potential precision and completeness
of the data gathered thereby) with the insurer, lender, and client prior to the performance
of the survey, and (b) place a note on the face of the survey explaining the source, date,
precision, and other relevant qualifications of any such data.
16. _X_ Evidence of recent earth moving work, building construction, or building additions
observed in the process of conducting the fieldwork.
17. _X Proposed changes in street right of way lines, if such information is made available to the
surveyor by the controlling jurisdiction. Evidence of recent street or sidewalk construction
or repairs observed in the process of conducting the fieldwork.
18. X_ If there has been a field delineation of wetlands conducted by a qualified specialist hired
by the client, the surveyor shall locate any delineation markers observed in the process of
conducting the fieldwork and show them on the face of the plat or map. If no markers
were observed, the surveyor shall so state.
19. X Include any plottable offsite (i.e., appurtenant) easements or servitudes disclosed in
documents provided to or obtained by the surveyor as a part of the survey pursuant to
Sections 5 and 6 (and applicable selected Table A items) (client to obtain necessary
permissions).
20. _X_ Professional Liability Insurance policy obtained by the surveyor in the minimum amount
of $ to be in effect throughout the contract term. Certificate of Insurance to
be furnished upon request, but this item shall not be addressed on the face of the plat or
map.
21.
Adopted by the Board of Governors, American Land Title Association, on October 8, 2015.
American Land Title Association, 1800 M St., N.W., Suite 300S, Washington, D.C. 20036-5828.
www. alta.orq
Adopted by the Board of Directors, National Society of Professional Surveyors, on October 9, 2015.
National Society of Professional Surveyors, Inc., 5119 Pegasus Court, Suite Q, Frederick, MD 21704.
http://wvvw.nsps.us.com/
Page 3 of 3
Copyright 2016. All rights reserved.
American Land Title Association and
National Society of Professional Surveyors
NSPS
SINUMBEN
AMERICAN
LAND II I LL
ASSOCIA'I ION
285
286
BRH
VIA EMAIL
October 24, 2017
Carrie Holmes
Axis Planning & Development, LLC
1529 Western Avenue
Seattle, WA 98101
Bush Roed & Hitchings, Inc.
Proposed Land Survey Services - ALTA Survey - Site JC7NL
Parcel no's: 0041000515, 0041000514, 0041000480, 0041000494, 0041000513,
0041000516, 0041000517, 0041000335 & 0041000330
Vicinity of International Blvd & S 150th Street
Tukwila, WA 98188
Dear Ms. Holmes,
We look forward to providing you with land title survey services at the site referenced above.
(See Exhibit "A").
Please note that our proposed scope of work is based upon decades of BRH experience with ALTA
surveys.
Title Report
Our survey will be conducted based on a Title Report furnished by your office.
Specifications
Our survey will be performed per ALTA/NSPS Land Title Survey Standards, 2016, Table A Items 2,
3, 4, 7a, 7b1, 7c, 8, 9, 11, 13, 14, 16, 17, 18, 19 and 20 (See Exhibit "B").
Please forward any lender/client survey specifications, if applicable.
Please forward the names of the entities to whom the survey is to be certified.
Zoning Report
Please note that if Table A, item 6a or 6b is required, we will need to be provided with a zoning
report. Adding these items may also affect our fee.
BRH - Land Surveyors & Civil Engineers
2009 Minor Avenue East, Seattle, WA 98102-3513
Phone: (206) 323-4144 / (800) 935-0508, Fax: (206) 323-7135, Internet: www.brhinc.com
Exhibit C
287
AXIS PLANNING & DEVELOPMENT, LLC
Carrie Holmes
October 24, 2017
Page 2
Fees
BRH, Inc.
Our fee to provide this service is $15,700.
Expense items, such as parking fees, tolls, printing charges and delivery fees will be billed at our
cost plus 15% in addition to the above fee for our services. The terms of this proposal are valid for
60 days.
Deliverables
The final ALTA drawing will be prepared for you in AutoCAD.
Stamped and signed documents will be delivered.
Please provide a distribution list for the final delivery of the survey.
Delivery Schedule
We will complete and deliver the final drawing within 25 business days of a signed authorization to
proceed.
Professional Responsibility for Reliability and Accuracy
All ALTA surveys are not equal — accurate and reliable data prevents delays that cost you money
We Offer Reliability:
The survey we will provide to you will be based on actual, on -the -ground, field measurements and
observations. We will NOT:
1) rely on mapping obtained by a 3rd party
2) copy or trace existing mapping by others
3) utilize internet-based mapping
We Meet Professional Standards:
What you will get from BRH will comply with National ALTA/NSPS standards and Washington State
law.
BRH certifies that all mapping information presented in your survey will be solely the work of BRH
personnel, based on information acquired on-site by BRH personnel and record information
researched by BRH personnel.
Insurance
The activities of Bush, Roed & Hitchings, Inc. are insured for both commercial general liability and
professional liability. Commercial general liability limit is $1,000,000 per occurrence and $2,000,000
in the aggregate. Professional liability limit of coverage is $2,000,000.
We always encourage our clients to request a Certificate of Insurance — something we will provide to
you upon request.
288
AXIS PLANNING & DEVELOPMENT, LLC
Carrie Holmes
October 24, 2017
Page 3
BRH, Inc.
Thank You
We appreciate the opportunity to submit this proposal to you, and we look forward to working with
you on this project.
Sincerely,
BUSH, ROED & HITCHINGS, INC. ACCEPTED BY:
.fid°r'`4
Thomas E. Carner, P.L.S.
Survey Project Manager
TEC/caj
Enclosure
AXIS PLANNING & DEVELOPMENT, LLC
Printed Name:
Signature:
Title:
Date:
Summary
We have prepared many thousands of ALTA surveys.
And we have found the best way to commence services is to clarify responsibilities.
We will ask you to provide:
a. Your signed and dated acceptance (above) — within 60 days of the date of this proposal.
b. A Title Report — receiving this, and the information noted below, as soon as possible,
will be the key to the timely completion of your ALTA survey.
c. Any applicable lender/client survey specifications.
d. Name of entities to whom the survey will be certified.
e. A Distribution List for the documents.
BRH will provide:
a. A Certificate of Insurance, upon your request.
b. An accurate and reliable ALTA survey, based upon on -the -ground observations, and
applicable
ALTA/NSPS Standards and Washington State law.
289
Exhibit "A"
King County iMap
443 9 2.340
0041000 335ti
66471'00051
043000`009
X0"043000003 x0043000014.,0
84260000005 at , ;ti R �d 3e• f o of
0 43 00 00 93
004:3000090
The information included on this map has been compf ed by King County staff from a variety of sources and is subject to change
vithout notice. IGng County makes no representations or varranties, express orimpied, as lo accuracy, completeness.timefness,
or rights to the use of such information. This document's riot intended for use as a survey product. tog County shall not be fable
for any general, special, indrec/ incidental, or conse4entid damages inducing, but not limitedto, lost revenues or lost profits
resdtirg from the use or misuse dthe information contained on this map. Any sale of this map orinformeton on this map is
prohbited except by written permission of Keg County.
Date: 10/24/2017 Notes:
King County
GIS CENTER
290
EXHIBIT B
TABLE A
OPTIONAL SURVEY RESPONSIBILITIES AND SPECIFICATIONS
NOTE: The twenty (20) items of Table A may be negotiated between the surveyor and client. Any
additional items negotiated between the surveyor and client shall be identified as 21(a), 21(b), etc. and
explained pursuant to Section 6.D.ii. (g). Notwithstanding Table A Items 5 and 11, if an engineering design
survey is .desired as part of an ALTA/NSPS Land Title Survey, such services should be negotiated under
Table A, Item 21.
If checked, the following optional items are to be included in the ALTA/NSPS LAND TITLE
SURVEY, except as otherwise qualified (see note above):
1.
Monuments placed (or a reference monument or witness to the corner) at all major
corners of the boundary of the property, unless already marked or referenced by existing
monuments or witnesses in close proximity to the corner.
2. _X Address(es) of the surveyed property if disclosed in documents provided to or obtained
by the surveyor, or observed while conducting the fieldwork.
3. _X_ Flood zone classification (with proper annotation based on federal Flood Insurance Rate
Maps or the state or local equivalent) depicted by scaled map location and graphic
plotting only.
4. _X Gross land area (and other areas if specified by the client).
5. Vertical relief with the source of information (e.g., ground survey, aerial map), contour
interval, datum, and originating benchmark identified.
6.
(a) If set forth in a zoning report or letter provided to the surveyor by the client, list the
current zoning classification, setback requirements, the height and floor space area
restrictions, and parking requirements. Identify the date and source of the report or letter.
(b) If the zoning setback requirements are set forth in a zoning report or letter provided to
the surveyor by the client, and if those requirements do not require an interpretation by
the surveyor, graphically depict the building setback requirements. Identify the date and
source of the report or letter.
7. _X (a) Exterior dimensions of all buildings at ground level.
(b) Square footage of:
_X (1) exterior footprint of all buildings at ground level.
(2) other areas as specified by the client.
_X (c) Measured height of all buildings above grade ata location specified by the client. If no
location is specified, the point of measurement shall be identified.
8. X Substantial features observed in the process of conducting the fieldwork (in addition to
Page 1 of 3
Copyright 2016. All rights reserved.
American Land Title Association and
National Society of Professional Surveyors
NSPS
EMENCEIN
AMIi RI CAN
LAND III 1.1
AS SOCIA')ION
291
EXHIBIT B
the improvements and features required pursuant to Section 5 above) (e.g., parking lots,
billboards, signs, swimming pools, landscaped areas, substantial areas of refuse).
9. _X_ Number and type (e.g., disabled, motorcycle, regular and other marked specialized
types) of clearly identifiable parking spaces on surface parking areas, lots and in parking
structures. Striping of clearly identifiable parking spaces on surface parking areas and
lots.
10.
(a) As designated by the client, a determination of the relationship and location of certain
division or party walls with respect to adjoining properties (client to obtain necessary
permissions).
(b) As designated by the client, a determination of whether certain walls are plumb (client
to obtain necessary permissions).
11. _X Location of utilities existing on or serving the surveyed property as determined by:
• observed evidence collected pursuant to Section 5.E.iv.
• evidence from plans requested by the surveyor and obtained from utility companies,
or provided by client (with reference as to the sources of information), and
• markings requested by the surveyor pursuant to an 811 utility locate or similar
request
Representative examples of such utilities include, but are not limited to:
• Manholes, catch basins, valve vaults and other surface indications of
subterranean uses;
• Wires and cables (including their function, if readily identifiable) crossing the
surveyed property, and all poles on or within ten feet of the surveyed property.
Without expressing a legal opinion as to the ownership or nature of the potential
encroachment, the dimensions of all encroaching utility pole crossmembers or
overhangs; and
• Utility company installations on the surveyed property.
Note to the client, insurer, and lender - With regard to Table A, item 11, source
information from plans and markings will be combined with observed evidence of utilities
pursuant to Section 5.E.iv. to develop a view of the underground utilities. However,
lacking excavation, the exact location of underground features cannot be accurately,
completely, and reliably depicted. In addition, in some jurisdictions, 811 or other similar
utility locate requests from surveyors may be ignored or result in an incomplete response,
in which case the surveyor shall note on the plat or map how this affected the surveyor's
assessment of the location of the utilities. Where additional or more detailed information
is required, the client is advised that excavation and/or a private utility locate request may
be necessary.
12. As specified by the client, Governmental Agency survey -related requirements (e.g., HUD
surveys, surveys for leases on Bureau of Land Management managed lands).
13. X Names of adjoining owners according to current tax records. If more than one owner,
identify the first owner's name listed in the tax records followed by "et al."
Page 2 of 3
Copyright 2016. All rights reserved.
American Land Title Association and
National Society of Professional Surveyors
292
NSPS
IMESSEll
AMERICAN
LAND TI I'LL
ASSOCIA"II ON
EXHIBIT B
14. _X As specified by the client, distance to the nearest intersecting street.
15. Rectified orthophotography, photogrammetric mapping, remote sensing, airborne/mobile
laser scanning and other similar products, tools or technologies as the basis for the
showing the location of certain features (excluding boundaries) where ground
measurements are not otherwise necessary to locate those features to an appropriate
and acceptable accuracy relative to a nearby boundary. The surveyor shall (a) discuss
the ramifications of such methodologies (e.g., the potential precision and completeness
of the data gathered thereby) with the insurer, lender, and client prior to the performance
of the survey, and (b) place a note on the face of the survey explaining the source, date,
precision, and other relevant qualifications of any such data.
16. _X Evidence of recent earth moving work, building construction, or building additions
observed in the process of conducting the fieldwork.
17. _X Proposed changes in street right of way lines, if such information is made available to the
surveyor by the controlling jurisdiction. Evidence of recent street or sidewalk construction
or repairs observed in the process of conducting the fieldwork.
18. _X_ If there has been a field delineation of wetlands conducted by a qualified specialist hired
by the client, the surveyor shall locate any delineation markers observed in the process of
conducting the fieldwork and show them on the face of the plat or map. If no markers
were observed, the surveyor shall so state.
19. _X_ Include any plottable offsite (i.e., appurtenant) easements or servitudes disclosed in
documents provided to or obtained by the surveyor as a part of the survey pursuant to
Sections 5 and 6 (and applicable selected Table A items) (client to obtain necessary
permissions).
20. X Professional Liability Insurance policy obtained by the surveyor in the minimum amount
of $ to be in effect throughout the contract term. Certificate of Insurance to
be furnished upon request, but this item shall not be addressed on the face of the plat or
map.
21.
Adopted by the Board of Governors, American Land Title Association, on October 8, 2015.
American Land Title Association, 1800 M St., N.W., Suite 300S, Washington, D.C. 20036-5828.
www.alta.org
Adopted by the Board of Directors, National Society of Professional Surveyors, on October 9, 2015.
National Society of Professional Surveyors, Inc., 5119 Pegasus Court, Suite Q, Frederick, MD 21704.
http://www.nsps.us.corn/
Page 3 of 3
Copyright 2016. All rights reserved.
American Land Title Association and
National Society of Professional Surveyors
NSPS
AMERICAN
LAND IIII.1:
ASSOCIATION
293
294
R
VIA EMAIL
October 24, 2017
Carrie Holmes
Axis Planning & Development, LLC
1529 Western Avenue
Seattle, WA 98101
Bush Roed & Hitchings, Inc.
Proposed Land Survey Services - ALTA Survey - Site PW5
Parcel no's: 0923049411, 0923049152, 1023049059, 0923049387 & 1023049056
Vicinity of International Blvd & E Marginal Way
Tukwila, WA 98168
Dear Ms. Holmes,
We look forward to providing you with land title survey services at the site referenced above.
(See Exhibit "A").
Please note that our proposed scope of work is based upon decades of BRH experience with ALTA
surveys.
Title Report
Our survey will be conducted based on a Title Report furnished by your office.
Specifications
Our survey will be performed per ALTA/NSPS Land Title Survey Standards, 2016, Table A Items 2,
3, 4, 7a, 7b1, 7c, 8, 9, 11, 13, 14, 16, 17, 18, 19 and 20 (See Exhibit "B").
Please forward any lender/client survey specifications, if applicable.
Please forward the names of the entities to whom the survey is to be certified.
Zoning Report
Please note that if Table A, item 6a or 6b is required, we will need to be provided with a zoning
report. Adding these items may also affect our fee.
BRH - Land Surveyors & Civil Engineers
2009 Minor Avenue East, Seattle, WA 98102-3513
Phone: (206) 323-4144 / (800) 935-0508, Fax: (206) 323-7135, Internet: www.brhinc.com
Exhibit D
295
AXIS PLANNING & DEVELOPMENT, LLC
Carrie Holmes
October 24, 2017
Page 2
Fees
BRH, Inc.
Our fee to provide this service is $28,000.
Expense items, such as parking fees, tolls, printing charges and delivery fees will be billed at our
cost plus 15% in addition to the above fee for our services. The terms of this proposal are valid for
60 days.
Deliverables
The final ALTA drawing will be prepared for you in AutoCAD.
Stamped and signed documents will be delivered.
Please provide a distribution list for the final delivery of the survey.
Delivery Schedule
We will complete and deliver the final drawing within 30 business days of a signed authorization to
proceed.
Professional Responsibility for Reliability and Accuracy
All ALTA surveys are not equal — accurate and reliable data prevents delays that cost you money
We Offer Reliability:
The survey we will provide to you will be based on actual, on -the -ground, field measurements and
observations. We will NOT:
1) rely on mapping obtained by a 3rd party
2) copy or trace existing mapping by others
3) utilize internet-based mapping
We Meet Professional Standards:
What you will get from BRH will comply with National ALTA/NSPS standards and Washington State
law.
BRH certifies that all mapping information presented in your survey will be solely the work of BRH
personnel, based on information acquired on-site by BRH personnel and record information
researched by BRH personnel.
Insurance
The activities of Bush, Roed & Hitchings, Inc. are insured for both commercial general liability and
professional liability. Commercial general liability limit is $1,000,000 per occurrence and $2,000,000
in the aggregate. Professional liability limit of coverage is $2,000,000.
We always encourage our clients to request a Certificate of Insurance — something we will provide to
you upon request.
296
AXIS PLANNING & DEVELOPMENT, LLC
Carrie Holmes
October 24, 2017
Page 3
BRH, Inc.
Thank You
We appreciate the opportunity to submit this proposal to you, and we look forward to working with
you on this project.
Sincerely,
BUSH, ROED & HITCHINGS, INC. ACCEPTED BY:
Thomas E. Garner, P.L.S.
Survey Project Manager
TEC/caj
Enclosure
AXIS PLANNING & DEVELOPMENT, LLC
Printed Name:
Signature:
Title:
Date:
Summary
We have prepared many thousands of ALTA surveys.
And we have found the best way to commence services is to clarify responsibilities.
We will ask you to provide:
a. Your signed and dated acceptance (above) — within 60 days of the date of this proposal.
b. A Title Report — receiving this, and the information noted below, as soon as possible,
will be the key to the timely completion of your ALTA survey.
c. Any applicable lender/client survey specifications.
d. Name of entities to whom the survey will be certified.
e. A Distribution List for the documents.
BRH will provide:
a. A Certificate of Insurance, upon your request.
b. An accurate and reliable ALTA survey, based upon on -the -ground observations, and
applicable
ALTA/NSPS Standards and Washington State law.
297
Exhibit "A"
King County iMap
1023'09-901
''+IK is r �ii'rtr('r'iY;
The n fam ation included on this map has been can pied by leng County staff from a variety of sources and is subject to change
without notice. ling County makes no representations or warranties, express orimpied, as to accuracy, completeness, tumeiness,
or rights to the use of such information. This document's rot intended for use as a survey product. Idng County shall not be age
fa any genera, special, odrect, incidental, orconsegaentie damages inducing, but not limited to, lost revenues or bst profits
resdting from the use or misuse of the informatbn contained on flis map. Any sale of this map orinformabon on this map is
prohbited except b/ written perrrissian of leng County.
Date: 10/24/2017 Notes:
�,:,
annrnyi�#' r � 1f17R{l49(17fi
1.41 King County
GIS CENTER
298
EXHIBIT B
TABLE A
OPTIONAL SURVEY RESPONSIBILITIES AND SPECIFICATIONS
NOTE: T.'ie twenty (20) items of Table A may be negotiated between the surveyor and client. Any
additional items negotiated between the surveyor and client shall be identified as 21(a), 21(b), etc. and
explained pursuant to Section 6.D.ii.(g). Notwithstanding Table A Items 5 and 11, if an engineering design
survey is desired as part of an ALTA/NSPS Land Title Survey, such services should be negotiated under
Table A, Item 21.
If checked, the following optional items are to be included in the ALTA/NSPS LAND TITLE
SURVEY, except as otherwise qualified (see note above):
1.
Monuments placed (or a reference monument or witness to the corner) at all major
corners of the boundary of the property, unless already marked or referenced by existing
monuments or witnesses in close proximity to the corner.
2. _X_ Address(es) of the surveyed property if disclosed in documents provided to or obtained
by the surveyor, or observed while conducting the fieldwork.
3. _X Flood zone classification (with proper annotation based on federal Flood Insurance Rate
Maps or the state or local equivalent) depicted by scaled map location and graphic
plotting only.
4. X Gross land area (and other areas if specified by the client).
5.
6.
Vertical relief with the source of information (e.g., ground survey, aerial map), contour
interval, datum, and originating benchmark identified.
(a) If set forth in a zoning report or letter provided to the surveyor by the client, list the
current zoning classification, setback requirements, the height and floor space area
restrictions, and parking requirements. Identify the date and source of the report or letter.
(b) If the zoning setback requirements are set forth in a zoning report or letter provided to
the surveyor by the client, and if those requirements do not require an interpretation by
the surveyor, graphically depict the building setback requirements. Identify the date and
source of the report or letter.
7. X (a) Exterior dimensions of all buildings at ground level.
(b) Square footage of:
_X (1) exterior footprint of all buildings at ground level.
(2) other areas as specified by the client.
_X (c) Measured height of all buildings above grade at a location specified by the client. If no
location is specified, the point of measurement shall be identified.
8. X Substantial features observed in the process of conducting the fieldwork (in addition to
Page 1 of 3
Copyright 2016. All rights reserved.
American Land Title Association and
National Society of Professional Surveyors
NSPS
MIZZEMEni
AMERICAN
_. _...._.... ...._
i.A N I) r r n.1
ASSOCIATION
299
EXHIBIT B
the improvements and features required pursuant to Section 5 above) (e.g., parking lots,
billboards, signs, swimming pools, landscaped areas, substantial areas of refuse).
9. X Number and type (e.g., disabled, motorcycle, regular and other marked specialized
types) of clearly identifiable parking spaces on surface parking areas, lots and in parking
structures. Striping of clearly identifiable parking spaces on surface parking areas and
lots.
10.
(a) As designated by the client, a determination of the relationship and location of certain
division or party walls with respect to adjoining properties (client to obtain necessary
permissions).
(b) As designated by the client, a determination of whether certain walls are plumb (client
to obtain necessary permissions).
11. _X Location of utilities existing on or serving the surveyed property as determined by:
• observed evidence collected pursuant to Section 5.E.iv.
• evidence from plans requested by the surveyor and obtained from utility companies,
or provided by client (with reference as to the sources of information), and
• markings requested by the surveyor pursuant to an 811 utility locate or similar
request
Representative examples of such utilities include, but are not limited to:
• Manholes, catch basins, valve vaults and other surface indications of
subterranean uses;
Wires and cables (including their function, if readily identifiable) crossing the
surveyed property, and all poles on or within ten feet of the surveyed property.
Without expressing a legal opinion as to the ownership or nature of the potential
encroachment, the dimensions of all encroaching utility pole crossmembers or
overhangs; and
Utility company installations on the surveyed property.
Note to the client, insurer, and lender - With regard to Table A, item 11, source
information from plans and markings will be combined with observed evidence of utilities
pursuant to Section 5.E.iv. to develop a view of the underground utilities. However,
lacking excavation, the exact location of underground features cannot be accurately,
completely, and reliably depicted. In addition, in some jurisdictions, 811 or other similar
utility locate requests from surveyors may be ignored or result in an incomplete response,
in which case the surveyor shall note on the plat or map how this affected the surveyor's
assessment of the location of the utilities. Where additional or more detailed information
is required, the client is advised that excavation and/or a private utility locate request may
be necessary.
12. As specified by the client, Governmental Agency survey -related requirements (e.g., HUD
surveys, surveys for leases on Bureau of Land Management managed lands).
13. _X Names of adjoining owners according to current tax records. If more than one owner,
identify the first owner's name listed in the tax records followed by "et al."
Page 2 of 3
Copyright 2016. All rights reserved.
American Land Title Association and
National Society of Professional Surveyors
300
NSPS
AMERICAN
LAND IIILII
A5 SOC IAIN)N
EXHIBIT B
14. X As specified by the client, distance to the nearest intersecting street.
15.
Rectified orthophotography, photogrammetric mapping, remote sensing, airborne/mobile
laser scanning and other similar products, tools or technologies as the basis for the
showing the location of certain features (excluding boundaries) where ground
measurements are not otherwise necessary to locate those features to an appropriate
and acceptable accuracy relative to a nearby boundary. The surveyor shall (a) discuss
the ramifications of such methodologies (e.g., the potential precision and completeness
of the data gathered thereby) with the insurer, lender, and client prior to the performance
of the survey, and (b) place a note on the face of the survey explaining the source, date,
precision, and other relevant qualifications of any such data.
16. X Evidence of recent earth moving work, building construction, or building additions
observed in the process of conducting the fieldwork.
17. _X Proposed changes in street right of way lines, if such information is made available to the
surveyor by the controlling jurisdiction. Evidence of recent street or sidewalk construction
or repairs observed in the process of conducting the fieldwork.
18. X If there has been a field delineation of wetlands conducted by a qualified specialist hired
by the client, the surveyor shall locate any delineation markers observed in the process of
conducting the fieldwork and show them on the face of the plat or map. If no markers
were observed, the surveyor shall so state.
19. _X_ Include any plottable offsite (i.e., appurtenant) easements or servitudes disclosed in
documents provided to or obtained by the surveyor as a part of the survey pursuant to
Sections 5 and 6 (and applicable selected Table A items) (client to obtain necessary
permissions).
20. _X Professional Liability Insurance policy obtained by the surveyor in the minimum amount
of $ to be in effect throughout the contract term. Certificate of Insurance to
be furnished upon request, but this item shall not be addressed on the face of the plat or
map.
21.
Adopted by the Board of Governors, American Land Title Association, on October 8, 2015.
American Land Title Association, 1800 M St., N.W., Suite 300S, Washington, D.C. 20036-5828.
www. alta. orq
Adopted by the Board of Directors, National Society of Professional Surveyors, on October 9, 2015.
National Society of Professional Surveyors, Inc., 5119 Pegasus Court, Suite Q, Frederick, MD 21704.
http://www.nsps.us.com/
Page 3 of 3
Copyright 2016. All rights reserved.
American Land Title Association and
National Society of Professional Surveyors
NSPS
AMERICAN
LAND TI T LE
ASSOCIA"IION
301
302