Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
CDN 2017-11-13 Item 2C - Public Safety Plan - Fire Station 51 Design
TO: City of Tukwila Allan Ekberg, Mayor INFORMATIONAL MEMORANDUM Community Development and Neighborhoods Committee Public Safety Committee FROM: Rachel Bianchi CC: Mayor Ekberg DATE: November 7, 2017 SUBJECT: Fire Station 51 Design Update ISSUE City staff and consultants seek to share information about the design of Tukwila's new Fire Station 51. BACKGROUND As a part of implementing the Public Safety Plan, the City's fire stations architects, Weinstein A+U are finishing up schematic design of Fire Station 51. The intent is to share the initial drawings with the public at the City's Open House scheduled for December 2 from 10:00 a.m. to Noon at the Water District 125Nalley View Sewer building. Staff would like to ensure that Council has the opportunity to review the drawings in advance of the Open House. RECOMMENDATION Information and discussion only. ATTACHMENTS Fire Station 51 schematic designs. 11 12 XT COVERED STOR FILL SCBA BOTTLES CORRIDOR— UPr SHOP STOR EMS CORRIDOR PRIN MECH i REAR APRON L— H APP BAY V r DECON WASH q 11 'I ��• COMM U V�ASH AIRLOC r GEAR STOR RECEIV LAUN/JAN BATH ADA BATH- >i< ATH >i 101 BATH BUNK BUNK BUNK BUNK K_ BUN 1 K_BUNN / / / / / / COURTYARD f OVERHANG ABOVE BQ TUKWILA FIRE STATION 51 I Floor Plan FUTURE, DETOX PHYS TRAIN AIRLOCK ��-_ CORRIDOR "LASH r— 0 FIREFIGHTER PARKING TRASH V SECURITY GATE N \, R n BATTERY/STOR GREAT ROOM° 0 GAS METER TATION OFFICE ELEC P OFFICE II 2 VISITOR PARKING INE ' F ROOF ABOVE OVERHANG ABOVE Scale: 118" = 1'-0" 0 4' 8' 16' FRONT APRON ENTRY PLAZA • • est • s WE 1 NSTE 1 NA+U ARCHITECTS -I- URBAN DESIGNERS TUKWILA FIRE STATION 51 EXISTING DETENTION POND 1 ■ • Emma • . 1 Illustrative Site Plan •••••. Mal ■Mina EXTERIOR COVERED STORAGE . - ■ INNS III WIN. SCBA STO R EMS MECH • �11�•�. APP BAY _ . loam •WES• 0 0 _ ILS H10SI 3S _ • _ DECON GEAR WASH GEAR STORAGE STATION OFFICE +32.5' COMM BATH BUNKS es ■ awe . man • ammo -- ENTRY CAP OFFICE +34.5' ./ +34' -i ./ • • COVERED PARKING /STORAGE - ••••i 0 GREAT ROOM PHYS TRAIN ELEC i +33.5' rnen gosse —' +31' • +33.5' e I ' ' +32' ' - east eon- 341' ER PON Sov1Ncti '• ss' FRONT APRON O REAR APRON © VISITOR PARKING TRASH / RECYCLING GENERATOR/FUELING FIREFIGHTER PARKING COURTYARD PUBLIC ENTRY PLAZA SLOPED PLANTING AND BIORETENTION CELL FEATURE SEAT WALL VEHICULAR CONCRETE PAVING PERMEABLE CONCRETE PAVING ® PEDESTRIAN CONCRETE PAVING SECURITY FENCE ® SECURE GATE 0 8 16 32 �, WEINSTEINA+U SWIFTCOMPANYLLc ARCHITECTS + URBAN DESIGNERS