Loading...
HomeMy WebLinkAbout2018-01-01 - Application - Verizon Fiber Optic Cable Installation Noise Variance (Tukwila International Boulevard)City of Tukwila Notice Of Application Noise Variance for Verizon Fiber Optic Cable Installation along Tukwila International Boulevard Project Planner: Lindsay Brown, 206.433.7166, Lindsay.Brown@TukwilaWa.gov File Number: A17-0036 Applicant: Michael Mischel for Verizon Property Owner: City of Tuwkila Project Description: Noise Variance to install conduit and fiber optic cables along the west side of Tukwila International Boulevard. Verizon will conduct night work between 10pm and 7am for 12 nights, with intermittent noise from a directional boring machine. Construction is scheduled to occur between December 1, 2017 and January 1, 2018. Your written comments on the project are requested and can be deliv- ered to DCD, 6300 Southcenter Blvd, Ste 100, Tukwila WA 98188. Comments must be received by 5:OOp.m. on December 5th, 2017. You may request a copy of any decision, comment on the project, and learn your appeal rights by contacting the project planner listed above or by visiting our offices Monday through Friday, 8:OOam to 5:00 pm at DCD 6300 Southcenter Blvd, Ste 100, Tukwila, WA 98188.