Loading...
HomeMy WebLinkAboutPermit D13-0338 - VULCAN - TENANT IMPROVEMENTVIJLCAN 3314 S 116 ST D13-0338 Parcel No: Address: • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.Rov DEVELOPMENT PERMIT 1023049011 Permit Number: 3314 5 116 ST Project Name: VULCAN Issue Date: Permit Expires On: D13-0338 12/17/2013 6/15/2014 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: APOLLO HOLDINGS LLC 505 5TH AVE S #900 , SEATTLE, WA, 98104 STEVE FLEXER Phone: (253) 333-2100 3500 WEST VALLEY HWY, STE 101, AUBURN, WA, 98001 RAYMOND HANDLING CONCEPTS Phone: (253) 333-2109 4140 BOYCE RD , FREMONT, CA, 94538 RAYMOHC034KB Expiration Date: 10/5/2015 DESCRIPTION OF WORK: THIS IS FOR ADDITIONAL RACK STORAGE ONLY. PREVIOUS PROJECTS PERMITTED BY RHCC. THERE ISA SEPARATE TENANT IMPROVEMENT PERMIT BY WILCOX CONSTRUCTION Project Valuation: $46,820.00 Type of Fire Protection: Sprinklers: Fire Alarm: Fees Collected: $1,550.55 Type of Construction: Occupancy per IBC: Electrical Service Provided by: TUKWILA FIRE SERVICE Water District: TUKWILA Sewer District: VALLEY VIEW SEWER SERVICE Current Codes adopted by the City of Tukwila: Internations Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: 2012 2012 2012 2012 International Fuel Gas Code: WA Cities Electrical Code: WA State Energy Code: 2012 2012 2012 Public Works Activities: Channelization/Striping: Curb Cut/Access/Sidewalk: Fire Loop Hydrant: Flood Control Zone: Hauling/Oversize Load: Land Altering: Landscape Irrigation: Sanitary Side Sewer: Sewer Main Extension: Storm Drainage: Street Use: Water Main Extension: Water Meter: • • Volumes: Cut: 0 Fill: 0 Number: 0 No(10a Permit Center Authorized Signature: Date: a ---t-7-43 I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signature: Print Name: . f l'M 'P1 DLG��I Date: This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ***FIRE DEPARTMENT PERMIT CONDITIONS*** 8: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the following concerns: 2: The total number of fire extinguishers required for an ordinary hazard occupancy with Class A fire hazards is calculated at one extinguisher for each 1,500 sq. ft. of area. The extinguisher(s) should be of the "All Purpose" (2A, 20B:C) dry chemical type. Travel distance to any fire extinguisher must be 75' or less. (IFC 906.3) (NFPA 10, 3-2.1) 3: Maintain fire extinguisher coverage throughout. 4: Emergency lighting facilities shall be arranged to provide initial illumination that is at least an average of 1 foot-candle (11 lux) and a minimum at any point of 0.1 foot-candle (1 lux) measured along the path of egress at floor level. Illumination levels shall be permitted to decline to 0.6 foot-candle (6 lux) average and a minimum at any point of 0.06 foot-candle (0.6 lux) at the end of the emergency lighting time duration. A maximum -to -minimum illumination uniformity ratio of 40 to 1 shall not be exceeded. (IFC 1006.4) 5: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2327 and #2328) 6: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2328) (IFC 104.2) 7: Maintain fire alarm system audible/visual notification. Addition/relocation of walls or partitions may require relocation and/or addition of audible/visual notification devices. (City Ordinance #2328) • • 9: Clearance between ignition sources, such as light fixtures, heaters and flame -producing devices, and combustible materials shall be maintained in an approved manner. (IFC 305.1) 10: Where storage height exceeds 15 feet and ceiling sprinklers only are installed, fire protection by one of the following methods is required for steel building columns located within racks: (a) one-hour fire proofing, (b) sidewall sprinkler at the 15 foot elevation of the column, (c) ceiling sprinkler density minimums as determined by the Tukwila Fire Prevention Bureau. (NFPA 13) 11: Storage shall be maintained 2 feet or more below the ceiling in nonsprinklered areas of buildings or a minimum of 18 inches below sprinkler head deflectors in sprinklered areas of buildings. (IFC 315.2.1) 12: Flue spaces shall be provided in accordance with International Fire Code Table 2308.3. Required flue spaces shall be maintained. 13: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 14: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575-4407. 15: ***BUILDING PERMIT CONDITIONS*** 16: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 17: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 18: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 19: VALIDITY OF PERMIT: The issuance �r granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1700 BUILDING FINAL** 0611 EMERGENCY LIGHTING 1400 FIRE FINAL CITY OF TUKN'ILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Building Perm t No. 3" 330 Project No. Date Application Accepted: 10'3'1-- 3 Date Application Expires: 11, - 0- J Li (For office use only) CONSTRUCTION PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION' Site Address: Tenant Name: 33/1 5. /167--4 577 Ape !((-) -o King Co Assessor's Tax No.: /02-30/74940 ( / Suite Number: Floor: New Tenant: ❑ Yes ..No PROPERTY OWNER � � Name:67-7,..4/6. fLeee__,- Polio .1.esO L. D/ rName:50 5-"MPeAddress: $0.) 5 - .6-- %� e. State: , City: s �64 Zipa.� ry CONTACT PERSON — person receiving all project communication � � Name:67-7,..4/6. fLeee__,- Address: 3 , t/4 , ) fq `�� City: a % State 4j Zip: Q/ Qcieri Phone: 253?.333-Z(CmFax: 253333_ c;15/ Email: 5 -6)a -re_ iia- yYwoyna/h an a/0 t GENERAL CONTRACTOR INFORMATION Company Name: ..5.i.g.ticrig.A.caticirzp-x- 64 Company Name: T/7- / io4 J,,� al Address: 55,:::n.���A/f YY /� City: State:) ,�Phone7, 3L % Fax:7 4 3z 76: Phone: 253 _ 3 pJax: 7.53_553....7 Contr Reg No.: Exp Date: Address: Tukwila Business License No.: H:\Applications\Forms-Applications On Line \2011 Applications\Permit Application Revised - 8-9-11.docx Revised: August 2011 bh / ARCHITECT OF RECORD Company Name: ..5.i.g.ticrig.A.caticirzp-x- 64 Engineer Name: 1308 5.#4.g..4. ?,- 'Address: Company Name: City: 4Pf 1.1_ We: C4_. Zip)?gift ,�Phone7, 3L % Fax:7 4 3z 76: Architect Name: Address: City: State: Zip: Phone: Fax: Email: ENGINEER OF RECORD Company Name: ..5.i.g.ticrig.A.caticirzp-x- 64 Engineer Name: 1308 5.#4.g..4. ?,- 'Address: Address:, .2.r/'...Te-iae,‘„$-ex.i.s.-i-s- 3'r City: 4Pf 1.1_ We: C4_. Zip)?gift ,�Phone7, 3L % Fax:7 4 3z 76: Email: r-yA Ct 0 -VQ-./ k1 L' . yle 7,_ LENDER/BOND ISSUED (required for projects $5,000 or greater per',RCW 19.27.095) Name: 170(/ 0 -7 -106 -Die z. z_c_ Address: 5�5— A-4 - s c C /1 City: ''' tate: Zip: C'7"t tt/ 9 c7 `So Page 1 of 4 (4 G BUILDING PERMIT INFORMATI 206-431-3670 Valuation of Project (contractor's bid price): $/ �2�. Existing Building Valuation: $ Describe the scope of work (please provide detailed information): 1-#7s 15 ArdP/77---64,46 gAte-<io Oft RQ v ouS 0 ,4- S4 -Plc.. -T �.� .1. �" v� c� e.1- - 1A-? 47— 0- W i LCOX- 7tis Will there be new rack storage? S ❑.. No If yes, a separate permit and plan submittal will be required. Provide All Building Areas in Square Footage Below PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes ❑ No If"yes", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: ❑ Sprinklers ❑ Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes ❑ No If `yes', attach list of materials and storage locations on a separate 8-1/2"x 11" paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM 0 On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:\Applications\Forms-Applications On Line \2011 Applications\Permit Application Revised - 8-9-11.docx Revised: August 2011 bh Page 2 of 4 Existing Interior Remodel Addition to Existing Structure New Type of Construction per IBC Type of Occupancy per IBC 1st Floor 2nd Floor 3rd Floor Floors thru Basement Accessory Structure* Attached Garage Detached Garage Attached Carport Detached Carport Covered Deck Uncovered Deck PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes ❑ No If"yes", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: ❑ Sprinklers ❑ Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes ❑ No If `yes', attach list of materials and storage locations on a separate 8-1/2"x 11" paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM 0 On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:\Applications\Forms-Applications On Line \2011 Applications\Permit Application Revised - 8-9-11.docx Revised: August 2011 bh Page 2 of 4 PERMIT APPLICATION NOTES —0 Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OWED AGENT: Signature: Print Name: ��a7 �"' W DayTelephone,: 5039%— ( Mailing Address: 3.5'0 O W` S r V 4"l ( 7/ t'�' AG (.�/C2(Gg./ �,e/ City State) Date: (6-3/ 3/ -C 3 H:Wpplications\Forms-Applications On Lme'2012 Apphcations\Permit Application Revised - 2-7-12.docx Revised: February 2012 bh Page 4 of 4 PUBLIC WORKS PERMIT 1NOMATION — 206-433-0179 • Scope of Work (please provide detailed information): Call before you Dig: 811 Please refer to Public Works Bulletin #1 for fees and estimate sheet. Water District ❑ .. Tukwila ❑ ...Water District #125 ❑ .. Water Availability Provided Sewer District ❑ .. Tukwila ❑ .. Sewer Use Certificate Septic System: 0 On-site Septic System — For on-site sep system, provide 2 copies of a current septi /esign approved by King County Health Department. ❑... Highline ❑... alley View ❑...Renton ❑ ...S "•wer Availability Provided 0... Rent ... Seattle Submitted with Application mark boxes wh a ❑ .. Civil Plans (Maximum Paper Size — 22" .• �4") ❑ .. Technical Information Report (Storm Draina ❑ .. Bond 0... Insurance ❑. Proposed Activities (mark boxes that apply): ❑ .. Right-of-way Use - Nonprofit for less than 72 hours ❑ .. Right-of-way Use - No Disturbance ❑ .. Construction/Excavation/Fill - Right-of-way 0 Non Right-of-way 0 0... Geota' nical Report ement(s) 0...M tenance Agreement(s) ❑ .. Total Cut ❑ .. Total Fill cubic yards cubic yards ❑ .. Sanitary Side Sewer ❑ .. Cap or Remove Utilities ❑ .. Frontage Improvements ❑ .. Traffic Control ❑ .. Backflow Prevention - Fire Protect' Irrigation Domesti ❑ Abandon Septic T ... Curb Cut ...Pavement Cut 0...Looped Fire Line ater ❑ .. Permanent Water Meter Siz-,"' ) ❑ .. Temporary Water Meter S'. - (1) ❑ .. Water Only Meter Size. ❑ .. Sewer Main Extension Public ❑ .. Water Main Extensi., Public ❑ .. Traffic Impact. Analysis ❑ .. Hold Harmless — (SAO) ❑ .. Hold Harmless — (ROW) ...Right-of-way Use - Profit for less than 72 hours 0...Right-of-way Use — Potential Disturbance ❑... Work in Flood Zone ...Storm Drainage 0...Grease Interceptor ❑ ... Channel ization ❑ ... Trench Excavation ❑... Utility Undergrounding WO # (2) '_ " WO # (3) WO # (2) " WO # (3) WO # k .. Deduct Water Meter Size ❑ Private 0 ❑ Private 0 " WO# " WO# FINANCE INFO ON Fire Line Size at Pr.:erty Line Number of Public Fire Hydrant(s) 0 .. Water 0 .. Sewer 0 .. Sewage Treatment Monthl Serv' •. Billin to: Name: Day Telephone: Mailing Address: State Zip Water Meter Refund/Billing: Name: Mailing Address: City Day Telephone: City State Zip H:\ApplicationsWorms-Applications On Line\2012 Apphcations\Permn Application Revised - 2-7-I2.docx Revised: February 2012 Page 3 of 4 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206-431-3665 Web site: http://www.TukwilaWA.gov Parcel No.: 1023049011 Address: 3314 S 116 ST TUKW Suite No: Applicant: VULCAN RECEIPT Permit Number: D13-338 Status: PENDING Applied Date: 10/31/2013 Issue Date: Receipt No.: R13-03026 Initials: WER User ID: 1655 Payment Amount: $1,550.55 Payment Date: 10/31/2013 02:46 PM Balance: $0.00 Payee: STEPHEN FLEXER TRANSACTION LIST: Type Method Descriptio Amount Payment Credit Crd VISA Authorization No. 031721 ACCOUNT ITEM LIST: Description 1,550.55 Account Code Current Pmts BUILDING - NONRES PLAN CHECK - NONRES STATE BUILDING SURCHARGE 000.322.100 000.345.830 640.237.114 Total: $1,550.55 937.00 609.05 4.50 Rcroinf_flA Printed: 10-31-2013 INSPECTION RECORD: Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 431-2451 i -0339 Projecv ` - Type o spection: Address:Date t31 S IIL°S_y Called: Special Instructions: • Date Wanted: / 1_ -- i — , t P.m. Requester: Phone No: ,-453-3 zIPC7 IS Approved per applicable codes. • Correctionsrequiredprior to approval. COMMENTS: > r ,1�`e Ii -9 Ir kpecto : -(A/IAA� J, e0, -LA Date: ,. Iy. n R1�SPECTION FEE REQUr'ciED. Prior to next inspection. fee must be p id at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection.. INSPECTION NO. I INSPECTION RECORD Retain a copy with permit RMIT NO. CITY OF TUKWILA BUILDING DIVISION (206) 431-3670 6300 Southcenter Blvd., #100, Tukwila. WA 98188 Permit Inspection Request Line (206) 431-2451 Project:Type \i t,1 i W,4 �, of Inspection: C—, tQA G I tAeic,,,1e_ki t-,6144, - vJ1 n.. Address: 314 S 1IL' 5I Date Called: Special Instructions:Date ‘Z. A @ kc-, Q.),)-1 01-1 (,-/"- Wanted: \ — 9 _ 0,/ aim: b:nr." Requester: R ASI n1 I -i ;r _ Phone No: 253 333-Z105 .:. ElApproved per applicable codes.Corrections required prior to approval. COMMENTS: I tAeic,,,1e_ki t-,6144, - vJ1 n.. \--trP 1-I►JA L 3) J A1.,_ 1,.9 -1 --ii°✓ 7=,2 AAE ;, ,. t�lAb, JnY- -TO vont,{1tt eEvs Q,utoteci /e-) 1 Da`eiq_ t9 n I�EIIISPECTION FEE RE UIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION NUMBER INSPECTION RECORD Retain a copy with permit PERMIT NUMBERS CITY OF TUKWILA FIRE DEPARTMENT 444 Andover Park East, Tukwila, Wa. 98188 206-575-4407 Project: // // % f �i(iL S Fire Alarm:Hood Type of ection: i 'AC/ Address. Suite #: S/ S7— Contact Person: _._ Special Instructions: Phone No.: FrApproved per applicable codes. Corrections required prior to approval. COMMENTS: Sprinklers: Fire Alarm:Hood % /L: Cysf /7_, -- /91'5-5 Monitor: Pre -Fire: . Permit: Occupancy Type: . c, /t,474%fre Pie, e, .9,A-ez;, �j — ! �/'Ah 6j 1 -/lam((. -.a,,,,,,,, 1_5 .Z. ,„-- 4,,a ,J,,,,i ietic,/, f C� ,76/.47 Needs Shift Inspection: Sprinklers: Fire Alarm:Hood & Duct: Monitor: Pre -Fire: . Permit: Occupancy Type: . InspeCtor: i?Jfj E Date:G///sly Hrs.: / v T $100.00 REINSPECTION FEE REQUIRED. You will receive an invoice from the City of Tukwila Finance Departrpent. Call to schedule a reinspection. Billing Address Attn: Company Name: Address: City: Stater Zip: Word/Inspection Record Form.Doc 6/11/10 T.F.D. Form F.P. 113 u N,,/EL ites_s --p_Ac_c< I 4 w T T; L IN/i VN IEWED FOR COMPLIANCE PPROVED OV 27 2013 ity of Tukwila 8U1 CLING DIVISION II J 1 1 1 1 I I N A 1 I 1 J\ I< TO OUR CUSTOMERS: The Information on this drawing Is prepared with the Intent of communicating a concept and design that Is the Intellectual property of Raymond Handling Concepts Corporation. It Is not Intended for other organizations not tlfed as a means of quoting. designing / and or engineering atiematIves. INCOMPLETE OFS1Q4 BT: RAMON For amidortoo oam 000.175.250D DF900 FOR: APOLLO BRAVING NO. 1 Scab:/3r-IT /RAW Trf EL. 9393 SHEET Date: 11/05/13 CIECXED 9393apollov D13-.338 REV. RECEIVED CITY OF TUKWILA NOV 1 4 2013 PERMIT CENTER T REVIEWED FOR CODE COMPLIANCE APPROVED NOV 21 2013 City orfukwila OWING DIVISION GENERAL NOTES: OCCUPANCY TYPE: GROUP 5-1 STORAGE (NO CHANGE TO EXISTING OCCUPANCY) OCCUPANT LOAD: DESIGN LOAD: EXITS REQUIRED: EXITS PROVIDED: 500 SF/PERSON 4. 92 PEOPLE 9 PEOPLE 3 EXIT WIDTH (1005.1): 9 PEOPLE X .15-1.35' PROVIDED 3 is 36' PROVIDED EXT ACCESS: (1014.2) MEANS OF EGRESS ARE NOT PROHIBITED THROUGH AMONG OR INTER/ENING ROOMS OR SPACES IN GROUP S WHEN ADJOINING OR INTERVENING ROOMS OR SPACES ARE THE SAME OR LESSER HAZARD OCCUPANCY GROUP. MAX. TRAVEL DISTANCE: 5-1 250 SPRINKLERED SCOPE OF WORK BUILDING AREA: 41.267 SF NNLIMITED BUILDING AREA FOR TWO STORY PARKING: PLUMBING: EXISTING 41,267 SF WAREHOUSE CONSTRUCTED UNDER THE UBC 1991, AREA OF TENANT IMPROVEMENTS IS 41,267 SF, NO CHANGE OF USE 61 STALLS EXISTING ON SITE (51 STALLS WERE REQUIRED AT TIME OF CONSTRUCTION. USE AND OCCUPANCY HAS NOT CHANGED.) 1/2003 SF.. 21 SPACES REQUIRED (TUKWILA ZONING CODE SEPT. 2000) NO CHANGE EXISTING TO REMAIN. WATER CLOSETS 41267/50004 MALE/ 4 FEMALE MALE: 1 1-50 FEMALE. 1:1-50 1 PER 40 OCCUPANTS OF EACH SEX EXISTING: MALE: 3 W.C. 2 URINALS, 2 LAYS, 1 SHOWER FEMALE: 3 W.C. 2 LAYS. 1 SHOWER 36' OPEN fl CITY PER 0 0 OCODE SUMMARY PLAN SCALE: 1/16' = 1 -0' DATE PLOTTED: XX/XX/2013 DWG FILE NO. VW-COVERSHEET.tlwg T1SCARENO ASSOCIATES 4RCRiT-cCTLRE-01BCR DESIGN Tlscareno Associates PS 500 Union Street, Suite 926 Seattle, WA 98101 T: 206.325.3356 F: 206.701.9769 MEMBERS OF THE AMERICAN INSANE OF ARCHRECTS PROJECT TUKWILA WAREHOUSE TENANT IMPROVEMENT PROJECT N0. 13008 DATE 10/16/13 DRAWN BY PRINCIPAL IN CHARGE REVISIONS NO. DATE JC 4 11/13/13 CEIVED F TUKWILA V 1 4 2013 IT CENTER 4556 REGISTERED ARCHITECT JAMES EDWIN CADE STATE OF WASHINGTON CONSTRUCTION DOCUMENTS SHEET TITLE CODE SUMMARY SHEET ND. G101 1 OF XX COPYRIGHT 2013 TISCARENO ASSOCIATES PS LXBHT0IG BY COWER M UE REPAIR CEILING GRID AND REPLACE CEILING 11LES AS RECIUTI EX TING SUSFEMED IXNT FIXTURES (FV) IY/.11o`.;lrt1 .s NEW 100 ►` I SUSPENDED �dl 9- 0 0 0 0 r^TIY`i 0 0 NEW 109 -------------------- • y: TIL :,':Tl14y GENERAL NOTES: 1. G.C. SHALL BE RESPONSIBLE FOR SEPARATE ELECTRICAL PERMIT AND LIGHTING LOAD CALCULATIONS -f j --REVIEWED FOR jiCODE COMPLIANCE APPROVED NOV 2 7 2013 ( VAULT 1 DHEI=E__{___IEDI=111130E___1____i____ m=1= mom -SIELWNG LAYOUT FOR REFERENCE ONLY, COORD. WITH RACK DWG'S NO OWNER'S FURNITURE PLMI— N u N E 'FROM DOSING COORDINATE TONT FIXTURE LAYOUT WITH SFELWE STORAGE 515FER BELOW F- NEW L1YB GERM • 0 EXPasm TO NIRRA.I MOUNT AT B-0' AF NOTES TO DRAWING: 1. PROVIDE NEW UGHTING TO MATCH EXISTING OVER DEMOLISHED LEVEL 2 AREA. MOUNT TO MATCH EXISTING. PROVIDE MOTION SENSORS. 2. NEW TYPE N FIXTURE TO MATCH EXISTING SHALL BE COOPER H81 SERIES, 6 T8 LAMPS 3. ALIGN LIGHTS WITH SHELVING, COORDINATE WITH OWNER'S R E FURNITURE PLAN LEGEND: E N CITY 0 NOV 1 4 2013 PERMIT CST TESTED ARCHITECT TiSCARENO ASSOCIATES Tiscareno Associates PS 500 Union Street, Suite 926 Seattle, WA 98101 7: 206.325.3356 F: 206.701.9769 MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS PROJECT TUKWILA WAREHOUSE TENANT IMPROVEMENT PROJECT N0. 13008 DATE DRAWN BY 10/16/13 CW PRINCIPAL IN CHARGE JC REVISIONS N0. DATE EIVED TUKWILA 6 UMP FLUORESCENT FIXTURE AND ENERGY SAVING BALLASTS FOR EMERGENCY OR NCHT U00 R 6 UMP FLUORESCENT FIXTURE OPEN GWB ACT *1 WALL MOUNTED 05x1 1=r EMERGENCY UGHT IX4 SURFACE MOUNTED FIXTURE I�1 204 LAY—IN FIXTURE OSCALE: 1B' 1'-0' LEVEL 1 REFLECTED CEILING PLAN - WEST = DATE PLOTTED: REVDATE DWG RLE NO. FNAME JAMES EDWIN CADE STATE 08 WASHINGTON CONSTRUCTION DOCUMENTS SHEET TITLE LEVEL 1 REFLECTED CEILING PLAN - WEST SHEET NO. A-702 X OF X COPYRIGHT 2013 TISCARENO ASSOCIATES PS z 0 Z N 1 • U QIw 4 GENERAL NOTES: 1. G.C. SHALL BE RESPONSIBLE FOR SEPARATE ELECTRICAL PERMIT AND LIGHTING LOAD CALCULATIONS REVIEWED FOR CODE COMPLIANCE APPROVED NOV 2 7 2013 a L ANIL ANL NEMA 1rE11.1. - : II Alai Adak ANL Aillk Aft. Nt E NEW SJ10TNBD OCT CE1D46r AND UGHT FIXTURES E-7 XI E ;i E -RACK LAYOUT FOR REFERENCE ONLY. aORD,M911-RAOH-DIVS-AND OMER'S FURNITURE PIAN - ;i E 1 WNtExou5E 1 E E E c E :JE r-><10 E E E —4 OST. S.5111.00) ICT CEILING AND LIGHT FTXRRNFS r 1 1 ;iE r><1E ___J E 1. n 0 0 INN tI • v■ t — I ;AniaM asp .gyrter m._ m NEW COD IMO SUSPENDED ICT AS REQUIRED, MATCH EXISTING NOTES TO DRAWING: 1. PROVIDE NEW LIGHTING TO MATCH EXISTING OVER DEMOLISHED LEVEL 2 AREA. MOUNT TO MATCH EXISTING. PROVIDE MOTION SENSORS. 2. NEW TYPE N FIXTURE TO MATCH EXISTING SHALL BE COOPER H81 SERIES, 6 T8 LAMPS 3. ALIGN LIGHTS WITH SHELVING, COORDINATE WITH OWNERS FURNITURE PLAN T1SCARENO ASSOCIATES Ancultec,,n,,nacN DES., Tiscareno Associates PS 500 Union Street. Sutte 926 Seattle. WA 98101 T: 206.325.3356 F: 206.701.9769 MEMBERS OF THE AMERICAN BISTROS OF ARCHITECTS PROJECT TUKWILA WAREHOUSE TENANT IMPROVEMENT PROJECT N0. 13008 DATE 10/16/13 DRAWN BY PRINCIPAL IN CHARGE CT JC REVISIONS N0. DATE ECEIVED CIT OF TUKWILA LEGEND: PE E ><:3 DUSTING 6 LAP FLUORESCENT RXTURE N ® AND ENERGY SAYING 84LSTS FOR EMERGENCY OR NIGHT LIGHT N 1--1 6 UAW FLUORESCENT ma I1 OPEN GYM AET WNL MOUNTED LIGHT 1=1. , EMERGENCY UGHT . 104 SURFACE MOUNTED FIORE 204 LAY -IN MOIRE LEVEL 1 REFLECTED CEILING PLAN - WEST SCALE: 118" DATE PLOTTED: REVDATE DWG FILE NO. FNAME 1, OV 1 4 2013 x556 RARCHEGISTITECTERED JAMES EDWIN CAGE STATE OF WASHINGTON CONSTRUCTION DOCUMENTS SHEET TITLE LEVEL 1 REFLECTED CEILING PLAN - EAST SHEET N0. A-701 X OF X COPYRIGHT 2013 TISCARENO ASSOCIATES PS St� ctural L.oncepts ngineering FDIC ennv 1200 N. Jefferson St, Suite F Anaheim, CA 92807 Tel: 714.632.7330 Fax: 714.632.776 e-mail: mail@sceinc.net Project Name : APOLLO TUKWILA WAREHOUSE Project Number : N-102113-1 Date : 10/29/13 Street Address : 3314 5 116TH ST City/State : TUKWILA, WA 98188 Scope of Work : SELECTIVE RACK bt33o REVIEWED FOR CODE COMPLIANCE APPROVED NOV 2 7 2013 BUILDINGCity ° Tukwila DIVISION OCT 29 2041 RECEIVED CITY OF TUKWILA OCT 3 1 2013 PERMIT CENTER Str tural I oncepts Engineering 1200 N. Jefferson Ste. Ste F Anaheim. CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: BOB Project: APOLLO TUKWILA WHSE TABLE OF CONTENTS Project#: N-102113-1 Title Page 1 Table of Contents 2 Design Data and Definition of Components 3 Critical Configuration 4 Seismic Loads 5 to 6 Column 7 Beam and Connector 8 to 9 Bracing 10 Anchors 11 Base Plate 12 Slab on Grade 13 Other Configurations 14 TYPE 1 SELECT-APOLLO.xls Page of / 10/29/2013 Stturas rJoncepts Engineering 1200 N. Jefferson Ste. Ste F Anaheim. CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: BOB Project: APOLLO TUKWILA WHSE Project #: N-102113-1 Design Data 1) The analyses conforms to the requirements of the 2012 IBC and the 2008 RMI/ANSI MH 16.1 Rack Design Manual Steel Storage Racks (RMI) and the ASCE 7-05, section 15.5.3 2) Transverse braced frame steel conforms to ASTM A570, Gr.55, with minimum strength, Fy=55 ksi Longitudinal frame beam and connector steel conforms to ASTM A570, Gr.55, with minimum yield, Fy=55 ksi All other steel conforms to ASTM A36, Gr. 36 with minimum yield, Fy= 36 ksi 3) Anchor bolts shall be provided by installer per ICC reference on plans and calculations herein. 4) All welds shall conform to AWS procedures, utilizing E70xx electrodes or similar. All such welds shall be performed in shop, with no field welding allowed other than those supervised by a licensed deputy inspector. 5) The slab on grade is 5.5" thick with minimum 2500 psi compressive strength. Soil bearing capacity is 1000 psf. Definition of Components Frame Height Beam Product Beam Spacing Beam Length Front View: Down Aisle (Longitudinal) Frame Column Beam to Column Connector Base Plate and Anchors Panel Height Frame Depth Section A: Cross Aisle (Transverse) Frame Horizontal Brace Diagonal Brace TYPE 1 SELECT-APOLLO.xls Page 3 of /(/ 10/29/2013 Str tural concepts Engineering 1200 N. Jefferson Ste. Ste F Anaheim. CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: BOB Project: APOLLO TUKWILA WHSE Project #: N-102113-1 Configuration & Summary: TYPE 1 SELECTIVE RACK 144" 44" 4 Seismic Criteria Ss=1.502, Fa=1 # Bm Lvls Frame Depth Frame Height # Diagonals **RACK COLUMN REACTIONS ASO LOADS AXIAL Dl= 150 /b AXIAL LL= 5,100 /b SEISMIC AXIAL Ps= t/- 3,465 /b BASE MOMENT= 0 in -lb Beam Length 3 44 in 192.0 in 5 144 in Frame Type Single Row 1 2 3 3,400 Ib 3,400 Ib 60.0 in 60.0 in 42.0 in 42.0 in 42.0 in 12.0 in 399 Ib 598 Ib 223 Ib 3,500 Ib 335 Ib 1,750 Ib 5,025 "# 3,451 "# 4 pin OK 8,375 "# 6,592 "# 4 pin OK Total: 1,1961b 6701b Notes TYPE 1 SELECT-APOLLO.xIs Page Y of ! y 10/29/2013 Component Description STRESS Column Fy=55 ksi Hannibal IF3014-3x3x14ga P=5250 Ib, M=18760 in -Ib 0.97 -OK Column & Backer None None None N/A Beam Fy=55 ksi HMH 60130/6" Face x 0.09" thk Lu=144 in Capacity: 8155 Ib/pr 0.42-0K Beam Connector Fy=55 ksi Lvl 1: 4 pin OK 1 Mconn=11742 in -Ib Mcap=22664 in -Ib 0.52-0K Brace -Horizontal Fy=55 ksi Hannibal 1-1/2x1-1/2x16ga 0.24-0K Brace -Diagonal Fy=55 ksi Hannibal 1-1/2x1-1/2x16ga 0.29 -OK Base Plate Fy=36 ksi 8x5x3/8 Fixity= 0 in -Ib 0.72 -OK Anchor 2 per Base 0.5" x 3.25" Embed HILTI KWIKBOLT TZ ESR 1917 Inspection Reqd (Net Seismic Uplift=2214 Ib) 0.875 - OK Slab & Soil 5.5" thk x 2500 psi slab on grade. 1000 psf Soil Bearing Pressure 0.66-0K Level Load Per Level Beam Spcg Brace Story Force Transv Story Force Longit. Column Axial Column Moment Conn. Moment Beam Connector - _-- - _- - _ ., fl :.. 100 II, 11) Ih 5.250 Ib 18.760 "# 11,742 "# 4 pin OK 1 2 3 3,400 Ib 3,400 Ib 60.0 in 60.0 in 42.0 in 42.0 in 42.0 in 12.0 in 399 Ib 598 Ib 223 Ib 3,500 Ib 335 Ib 1,750 Ib 5,025 "# 3,451 "# 4 pin OK 8,375 "# 6,592 "# 4 pin OK Total: 1,1961b 6701b Notes TYPE 1 SELECT-APOLLO.xIs Page Y of ! y 10/29/2013 Str tura) Joncepts Engineering 1200 N. Jefferson Ste. Ste F Anaheim. CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: BOB Project: APOLLO TUKWILA WHSE Project #: N-102113-1 Seismic Forces Configuration: TYPE 1 SELECTIVE RACK Lateral analysis is performed with regard to the 2012 IBC Sec. 2208.1, 2008 RMI/ANSI MH 16.1 Sec 2.6 & ASCE 7-05 sec 15.5.3 Transverse (Cross Aisle) Seismic Load V= Cs*Ip*Ws=Cs*Ip*(0.67*LL*PLrf+DL) Csl= [Sds/R] * 0.67 Cs2= Cs3= Cs -max= 0.67'K w -per RMrommwmySaL19 Sec 21 Limit Slater Reduction nr Aso Lowing 0.1677 0.14*Sds*0.67 0.0939 [0.5*S1/R] * 0.67 0.0434 0.1677 Base Shear Coeff=Cs= 0.1677 ASD FonnatLoads Cs -max * Ip= 0.1677 Vmin= 0.015 Eff Base Shear=Cs= 0.1677 WS= (0.67*PL,L * PL)+DL = 7,134 Ib Level PRODUC LOAD/LVL,PL PL*0.67*PLrf 1 3,400 Ib 2,278 Ib 2 3,400 Ib 2,278 Ib 3 3,400 Ib 2,278 Ib vt Transverse Elevation Vtransv=Vt= 0.1677 * (300 Ib + 6834 Ib) EL= 1,196 Ib ASD Level Transverse seismic shear per upright DL 100 Ib 100 Ib 100 Ib hi 60 in 120 in 180 in wi*hi 142,680 285,360 428,040 Ss= 1.502 S1= 0.518 Fa= 1.000 Fv= 1.500 Sds=2/3*Ss*Fa= Sd1=2/3*S1*Fv= Ca=0.4*2/3*Ss*Fa= (Transverse, Braced Frame Dir.) R= Ip= PL F1= Pallet Height=hp= DL per Beam Lvl= Fi 199.3 Ib 398.7 Ib 598.0 Ib 1.001 0.518 0.4005 4.0 1.0 1.0 60.0 in 100 Ib Fi*(hi+hp/2) 17,937-# 59,805-# 125,580-# sum: 10,200 Ib 6,834 Ib Longitudinal (Downaisle) Seismic Load Similarly for longitudinal seismic loads, using R=6.0 Cs1=Sd1/(T*R)= 0.0578 Cs2= 0.0939 Cs3= 0.0289 Cs -max= 0.0939 Level 1 2 3 300 Ib W=7134 Ib 856,080 1,196 Ib 1=203,322 Ws= (0.67 * PLRF2 = 7,134 Ib Cs=Cs-max*Ip= 0.0939 * PL) + DL PLS= 1.0 (Longitudinal, Unbraced Dir.) R= 6.0 T= 1.00 sec Vlong= 0.0939 * (300 Ib + 6834 Ib) EL= 670 lb ASD Level Longit seismic shear per upright PRODUC LOAD/LVL,PL 3,400 Ib 3,400 Ib 3,400 Ib PL*0.67*PLrf 2,278 Ib 2,278 Ib 2,278 Ib DL 100 Ib 100 Ib 100 Ib hi 60 in 120 in 180 in wi*hi 142,680 285,360 428,040 1-1 Fi 111.7 Ib 223.3 Ib 335.0 Ib Front View sum: TYPE I SELECT-APOLLO.xIs 6,834 Ib 300 Ib W=7134 Ib 856,080 670 Ib Page tj of / 10/29/2013 Str tural oncepts Engineering 1200 N. Jefferson Ste. Ste F Anaheim. CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: BOB Project: APOLLO TUKWILA WHSE Project #: N-102113-1 Downaisle Seismic Loads Configuration: TYPE 1 SELECTIVE RACK Determine the story moments by applying portal analysis. The base plate is assumed to provide no fixity. Seismic Story Forces Vlong= 670 Ib Vcol=Vlong/2= 335 Ib F1= 112 Ib F2= 223 Ib F3= 335 Ib Seismic Story Moments Typical frame made Tributary area of two columns of rack frame \_ •"4 t f 96 —11 Front View Conceptual System Side View Typical Frame made oftwo columns 11 1' Top View Mbase-max= 0 in -Ib <=== Default capacity Mbase-v= (Vcol*hleff)/2 = 9,380 in -Ib <=== Moment going to base Mbase-eff= Minimum of Mbase-max and Mbase-v = 0 in -Ib PINNED BASE ASSUMED M 1-1= [Vcol * hleff]-Mbase-eff = (335 Ib * 56 in) -0 in -Ib = 18,760 in -Ib Mseis= (Mupper+Mlower)/2 hl-eff= hi - beam clip height/2 = 56 in Vcol M 2-2= [Vcol-(F1)/2) * h2 = [335 Ib - 111.7 lb]*60 in/2 = 8,375 in -Ib Mseis(1-1)= (18760 in -Ib + 8375 in-lb)/2 Mseis(2-2)= = 13,567 in -Ib (8375 in -Ib + 5025 in-lb)/2 6,700 in -Ib Beam to Column Elevation Sum mary of Forces Mconn** 11,742 in -Ib 6,592 in -Ib 3,451 in -Ib Beam Connector 4 pin OK 4 pin OK 4 pin OK LEVEL 1 2 3 hi 60 in 60 in 60 in Axial Load 5,250 Ib 3,500 Ib 1,750 Ib Column Moment 18,760 in -Ib 8,375 in -Ib 5,025 in -Ib Mseismic 13,567 in -Ib 6,700 in -Ib 2,513 in -Ib Mend -fixity 2,089 in -Ib 2,089 in -Ib 2,089 in -Ib Mconn= (Mseismic + Mend-fixity)*0.75 Mconn-allow(4 Pin)= 22,664 in -Ib TYPE 1 SELECT-APOLLO.xIs Page 4. of E y 10/29/2013 Str tural Ioncepts Engineering 1200 N. Jefferson Ste. Ste F Anaheim. CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: BOB Project: APOLLO TUKWILA WHSE Project #: N-102113-1 Column (Longitudinal) Configuration: TYPE 1 SELECTIVE RACK Conforms to the requirements of Chapter C5 of the AISI Cold Formed Steel Design Manual for combined bending and axial loads. Section Properties Section: Hannibal IF3014-3x3x14ga Aeff = 0.643 in^2 Ix = 1.130 in^4 Sx = 0.753 in^3 rx = 1.326 in 4f= 1.67 E= 29,500 ksi Loads Considers loads at level 1 Iy = 0.749 in^4 Sy = 0.493 in^3 ry = 1.080 in Fy= 55 ksi Cmx= 0.85 Kx = 1.7 Lx = 57.0 in Ky = 1.0 Ly = 42.0 in Cb= 1.0 3.000 in x _ _.-._.-y 0.075 in 14_0.75 in 3.000 in COLUMN DL= 150 Ib COLUMN PL= 5,100 Ib Mcol= 18,760 in -Ib 0.11Sds= 0.110143 0.14Sds= 0.140182 Axial Analysis Critical load case RMI Sec 2.1, item 4: (1 +0.11Sds)DL + (1 +0.145DS)PL *0.75+EL *0.75 <= 1.0, ASD Method Axial Load=P= (1.110143*150 Ib)+(1.140182*5100 Ib*0.75) = 4,528 Ib Moment=Mx= Mcol*0.75 = 18760 in -Ib * 0.75 = 14,070 in -Ib KxLx/rx = 1.7*57"/1.326" = 73.1 Fe= n^2E/(KL/r)max^2 = 54.5ksi Pn= Aeff*Fn = 26,446 Ib P/Pa= 0.33 > 0.15 Bending Analysis KyLy/ry = 1*42"/1.08" Fe > Fy/2 = 38.9 Fn= Fy(1-Fy/4Fe) = 55 ksi*[1-55 ksi/(4*54.5 ksi)] Fy/2= 27.5 ksi = 41.1 ksi Pa= Pn/4c Qc= 1.92 = 26446 lb/1.92 = 13,774 Ib Check: P/Pa + (Cmx*Mx)/(Max*px) <_ 1.0 P/Pao + Mx/Max <_ 1.0 Pno= Ae*Fy = 0.643 in^2 *55000 psi = 35,365 Ib Max= My/Qf = 41415 in-lb/1.67 = 24,799 in -Ib px= {1/[1-(Qc*P/Pcr)]}^-1 = {1/[1-(1.92*4528 lb/35039 lb)]}^ -1 = 0.75 Combined Stresses Pao= Pno/Qc = 353651b/1.92 = 18,419 Ib Myield=My= Sx*Fy = 0.753 in^3 * 55000 psi = 41,415 in -Ib Pcr= n^2EI/(KL)max^2 = nA2*29500 ksi/(1.7*57 in)^2 = 35,039 Ib (4528 lb/13774 Ib) + (0.85*14070 in-lb)/(24799 in-Ib*0.75) = (4528 Ib/18419 Ib) + (14070 in-lb/24799 in -Ib) = 0.97 < 1.0, OK (EQ C5-1) 0.81 < 1.0, OK (EQ C5-2) TYPE 1 SELECT-APOLLO.xls Page 7 10/29/2013 StrAtural on is ngineering 1200 N. Jefferson Ste, Ste F Anaheim, CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: BOB BEAM Project: APOLLO TUKWILA WHSE Project #: N-102113-1 Configuration: TYPE 1 SELECTIVE RACK DETERMINE ALLOWABLE MOMENT CAPACITY A) Check compression flange for local buckling (B2.1) w= c - 2*t -2*r = 1.75 in - 2*0.09 in - 2*0.09 in = 1.390 in w/t= 15.44 1=lambda= [1.052/(k)^0.5] * (w/t) * (Fy/E)^0.5 = [1.052/(4)^0.5] * 15.44 * (55/29500)^0.5 = 0.351 < 0.673, Flange is fully effective B) check web for local buckling per section b2.3 fl(comp)= Fy*(y3/y2)= 50.15 ksi f2(tension)= Fy*(y1/y2)= 101.91 ksi Y= f2/f1 Eq. B2.3-5 = -2.032 k= 4 + 2*(1-Y)^3 + 2*(1-Y) Eq. B2.3-4 = 65.81 flat depth=w= yl+y3 = 5.640 in w/t= 62.66666667 OK 1=lambda= [1.052/(k)^0.5] * (w/t) * (f1/E)^0.5 = [1.052/(65.81)^0.5] * 5.64 * (50.15/29500)^0.5 = 0.335 be=w= 5.640 in bl= be(3-Y) = 1.121 b1+b2= 3.941 in < 0.673 b2= be/2 = 2.82 in > 1.86 in, Web is fully effective Determine effect of cold working on steel yield point (Fva) per section A7.2 Fya= C*Fyc + (1-C)*Fy (EQ A7.2-1) Lcomer=Lc= (p/2) * (r + t/2) 0.212 in C= 2*Lc/(Lf+2*Lc) Lflange-top=Lf= 1.390 in = 0.234 in m= 0.192*(Fu/Fy) - 0.068 (EQ A7.2-4) = 0.1590 Be= 3.69*(Fu/Fy) - 0.819*(Fu/Fy)^2 - 1.79 = 1.427 since fu/Fv= 1.18 < 1.2 and r/t= 1 < 7 OK then Fyc= Bc * Fy/(R/t)^m (EQ A7.2-2) = 78.485 ksi Thus, Fya-top= 60.49 ksi (tension stress at top) Fya-bottom= Fya*Ycg/(depth -Ycg) = 117.42 ksi (tension stress at bottom) Check allowable tension stress for bottom flange Lflange-bot=Lfb= Lbottom - 2*r*-2*t = 2.390 in Cbottom=Cb= 2*Lc/(Lfb+2*Lc) = 0.151 Fy-bottom=Fyb= Cb*Fyc + (1-Cb)*Fyf = 58.54 ksi Fya= (Fya-top)*(Fyb/Fya-bottom) = 30.16 ksi if F= 0.95 Then F*Mn=F*Fya*Sx=I 59.16 in -k Eq. B2.1-4 Eq. B2.1-1 Eq B2.3-2 (EQ A7.2-3) 6.000 in 2.75 in 1.75 in is Beam= HMH 60130/6" Face x 0.09" thk depth Ix= Sx= Ycg= t= Bend Radius=r= Fy=Fyv= Fu=Fuv= E= top flange=b= bottom flange= Web depth= fl(comp) 6.429 in^4 2.065 in^3 3.960 in 0.090 in 0.090 in 55.00 ksi 65.00 ksi 29500 ksi 1.750 in 2.750 in 6.000 in Fy @(tension) yl= Ycg-t-r= 3.780 in y2= depth-Ycg= 2.040 in y3= y2 -t -r= 1.860 in Str tural on is ngineering 1200 N. Jefferson Ste, Ste F Anaheim, CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: BOB Project: APOLLO TUKWILA WHSE Project #: N-102113-1 BEAM Configuration: TYPE 1 SELECTIVE RACK RMI Section 5.2, PT II Section Beam= HMH 60130/6" Face x 0.09" thk Ix=Ib= 6.429 in^4 Sx= 2.065 in^3 t= 0.090 in E= 29500 ksi Fy=Fyv= 55 ksi F= 150.0 Fu=Fuv= 65 ksi L= 144 in Fya= 60.5 ksi Bending Mcenter=F*Mn= W*L*W*Rm/8 W=LRFD Load Factor= 1.2*DL + 1.4*PL+1.4*(0.125)*PL RMI2.2, item 5 FOR DL=2% of PL, W= 1.599 Rm= 1 - [(2*F*L)/(6*E*Ib + 3*F*L)] 1 - (2*150*144 in)/[(6*29500 ksi*6.429 inA3)+(3*150*144 in)] = 0.964 if F= 0.95 Then F*Mn=F*Fya*Sx= 118.66 in -k Thus, allowable load per beam pair=W= F*Mn*8*(# of beams)/(L*Rm*W) = 118.66 in -k * 8 * 2/(144in * 0.964 * 1.599) = 8,554 Ib/pair Mend= W*L*(1-Rm)/8 = (8554 Ib/2) * 144 in * (1-0.964)/8 = 2,771 in -Ib Deflection 6.000 in 2.75 in 1.75 in ,l Dmax= Dss*Rd Rd= 1 - (4*F*L)/(5*F*L + 10*E*Ib) = 1 - (4*150*144 in)/[(5*150*144 in)+(10*29500 ksi*6.429 inA4)] = 0.957 in if Dmax= L/180 and Dss= 5*W*LA3/(384*E*Ib) L/180= 5*W*L^3*Rd/(384*E*Ib*# of beams) solving for W yields, W= 384*E*I*2/(180*5*L^2*Rd) = 384*6.429 in^4*2/[180*5*(144 in)^2*0.957 = 8,155 Ib/pair Allowable load= 8,155 Ib/pair • Str ural ngineering 1200 N. Jefferson Ste. Ste F Anaheim. CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: B0B Project: APOLLO TUKWILA WI -15E Project #: N- 102 113- I 4 Pin Beam to Column Connection TYPE 1 SELECTIVE RACK I he beam end moments shown herein show the result ot the maximum nduced fixed end monents torm seismic + static Toads and the code mandated minimum value ot 1.5u/o(DL+PL) Mconn max= (Mseismic + Mend-fixity)*0.75 = 11,742 in -Ib Load at level 1 Shear Capacity of Pin Connector Type= 4 Pin Pin Diam= 0.44 in Fy= 55,000 psi Ashear= (0.438 in)^2 * Pi/4 = 0.1507 in^2 Pshear= 0.4 * Fy * Ashear = 0.4 * 55000 psi * 0.1507inA2 = 3,315 Ib Bearing Capacity of Pin tcol= 0.075 in Fu= 65,000 psi Omega= 2.22 a= 2.22 Pbearing= alpha * Fu * diem * tcol/Omega = 2.22 * 65000 psi * 0.438 in * 0.075 in/2.22 = 2,135 Ib < 3315 lb Moment Capacity of Bracket Edge Distance=E= 1.00 in Pin Spacing= 2.0 in Fy= 55,000 psi C= P1+P2+P3+P4 tclip= 0.18 in = P1+P1*(4.5"/6.5")+P1*(2.5"/6.5")+P1*(0.5"/6.5") = 2.154 * P1 Mcap= Sclip * Fbending =0.127in^3*0.66*Fy = 4,610 in -Ib Pclip= Mcap/(2.154 * d) = 4610.1 in-lb/(2.154 * 0.5 in) = 4,281 Ib C*d= Mcap = 2.154 Thus, P1= 2,135 lb Mconn-allow= [P1*6.5"+P1*(4.5"/6.5")*4.5" +P1*(2.5"/6.5")2.5" +P1*(0.5"/6.5")*0.51 = 2135 LB*[6.5"+(4.5"/6.5")*4.5"+(2.576.5")*2.5"+(0.5'/6.5")*0.51 = 22,664 in -Ib > Mconn max, OK Sclip= 0.127 in^3 d= E/2 = 0.50 in TYPE 1 SELECT-APOLLO.xls Page [ of 1 Y 10/29/2013 Str tural oncepts Engineering 1200 N. Jefferson Ste. Ste F Anaheim. CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: BOB Transverse Brace Project: APOLLO TUKWILA WHSE Project #: N-102113-1 Configuration: TYPE 1 SELECTIVE RACK Section Properties Diagonal Member= Hannibal 1-1/2x1-1/2x16ga Area= 0.273 in^2 r min= 0.496 in Fy= 55,000 psi K= 1.0 Qc= 1.92 Frame Dimensions Diagonal Member 01.500 0.25 Horizontal Member= Hannibal 1-1/2x1-1/2x16ga Area= 0.273 in^2 r min= 0.496 in 7 Fy= 55,000 psi 1 .500 K= 1.0 14-1.500 0.25 1 .500 1 w Bottom Panel Height=H= 42.0 in Frame Depth=D= 44.0 in Column Width=B= 3.0 in Clear Depth=D-B*2= 38.0 in X Brace= NO Critical load case RMI Sec 2.1, item 4: (1 +0.11Sds)DL + (1 +0.145DS)PL *0.75+EL *0.75 <= 1.0, ASD Method, DL=PL=0 for upright brace members Vb=Vtransv= 1,196 Ib Ldiag= [(D-B*2)A2 + (H-6")^2]^1/2 = 52.3 in Pmax= V*(Ldiag/D) * 0.75 = 1,0661b Pn= AREA*Fn = 0.273 in^2 * 26208 psi = 7,155 Ib Pallow= Pn/Q = 7155 Ib /1.92 = 3,726 Ib Pn/ Pallow= Horizontal brace 0.29 <= 1.0 OK (kl/r)= (k * Ldiag)/r min = (1 x 52.3 in /0.496 in ) = 105.4 in Fe= pi^2*E/(kl/r)^2 = 26,208 psi SINCE Fe<Fy/2, Fn= Fe = 26,208 psi Tvoical Panel Confiauration Check End Weld Lweld= 2.5 in Fu= 65 ksi tmin= 0.060 in Weld Capacity= 0.75 * tmin * L * Fu/2.5 = 2,925 Ib OK Pmax=V= 897 Ib (kl/r)= (k * Lhoriz)/r min = (1 x 44 in) /0.496 in = 88.7 in SINCE Fe>Fy/2, Fn=Fy*(1-fy/4fe) = 34,564 psi Pn/Pallow= 0.24 <= 1.0 OK Fe= pi^2*E/(kl/r)^2 = 37,006 psi Pn= AREA*Fn = 0.273inA2*34564 psi = 9,436 Ib Fy/2= 27,500 psi Pallow= Pn/Qc = 9436 Ib /1.92 = 4,915 Ib TYPE 1 SELECT-APOLLO.xIs Page < U of 7 10/29/2013 Str tura) concepts Engineering 1200 N. Jefferson Ste. Ste F Anaheim. CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: BOB Project: APOLLO TUKWILA WHSE Single Row Frame Overturning Loads Project #: N-102113-1 Configuration: TYPE 1 SELECTIVE RACK Load case per RMI Sec 2.1, item 3: (0.6-0.11Sds)DL + (0.6-0.14Sds)PLapp*0.75 - EL*0.75 Vtrans=V= 1,196 Ib DEAD LOAD PER UPRIGHT=DL= 300 Ib PL PER UPRIGHT=PL= 10,200 Ib PLapp=PL*0.67= 6,834 Ib 1st=(0.489857*DL+0.459818*PLapp*0.75)= 2,503 Ib PL @ TOP= 3,400 Ib DL/LvI= 100 Ib E(Fi*hi)= 203,322 in -Ib Total Dead Load per Bay=DL= 300 Ib Load Case 1: Fully Loaded rack Vtrans= 1,196 Ib Movt= E(Fi*hi)*0.75 = 152,492 in -Ib (0.6-0.11Sds)= 0.4899 (0.6-0.14Sds)= 0.4598 Frame Depth=D= 44.0 in Htop-Iv1=H= 180.0 in # Levels= 3 # Anchors/Base= 2 h= 210.0 in hp= 60.0 in hp • T D -.I SIDE ELEVATION Load Case 2: Top Level Loaded Only citical Level= 3 Mst= Wst * D/2 = 2503 Ib * 44 in/2 = 55,066 in -Ib T= (Movt-Mst)/D = (152492 in -Ib - 55066 in-lb)/44 in = 2,214 Ib Net Uplift per column V1=Vtop= Cs * Ip * Ws = 0.1677 * (3400 Ib) = 570 Ib V2=VDL= Cs*Ip*DL = 50 Ib Mst= (0.489857*DL+0.459818*PL*0.75) * D/2 = (100 lb*3 * 0.489857 + 3400 lb*0.459818*0.75)*44 in/2 = 29,029 in -Ib Anchor Pinned Base h= 210.0 in Movt= [V1*h + V2 * H/2]*0.75 = [570 lb*210 in +50 lb*180 in/2]*0.75 = 93,150 in -Ib T= (Movt-Mst)/D = (93150 in -Ib - 29029 in-lb)/44 in = 1,457 Ib Net Uplift per column Check (2) 0.5" x 3.25" Embed HILTI KWIKBOLT TZ anchor(s) per base plate. Special inspection is required per ESR 1917. Pullout Capacity=Tcap= 1,250 Ib Shear Capacity=Vcap= 1,840 Ib Tcap*Phi= 1,250 Ib Vcap*Phi= 1,840 Ib (1107 lb/1250 Ib)^1 + (299 Ib/1840 Ib)^1 = (729 lb/1250 Ib)^1 + (143 Ib/1840 Ib)^1 = Fully Loaded: Top Level Loaded: L.A. City Jurisdiction? NO Phi= 1 1.05 <= 1.2 OK 0.66 <= 1.2 OK -TYPE I SELECT-APOLLO.xIs Page /( of / y IO/29/2013 Str tural Ioncepts Engineering 1200 N. Jefferson Ste. Ste F Anaheim. CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 Base Plate By: BOB Project: APOLLO TUKWILA WHSE Configuration: TYPE 1 SELECTNE RACK Project #: N-102113-1 Section Baseplate= 8x5x3/8 Eff Width=W = 7.00 in a = 2.50 in Eff Depth=D = 5.00 in Anchor c.c. =2*a=d = 5.00 in Column Width=b = 3.00 in N=# Anchor/Base= 2 Column Depth=dc = 3.00 in Fy = 36,000 psi L = 2.00 in Plate Thickness=t = 0.375 in Down Aisle Loads Critical load case RMI Sec 2.1, item 4: (1+0.11Sds)DL + (1+0.14SDS)PL*0.75+EL*0.75 <= 1.0, ASD Method Axial=P= (1.110143*150 Ib)+(1.140182*5100 Ib*0.75) = 4,5281b Downaisle Elevation COLUMN DL= 150 Ib COLUMN PL= 5,100 Ib Base Moment= 0 in -Ib 0.11Sds= 0.110143 0.14Sds= 0.140182 Mb= Base Moment*0.75 = 0 in -Ib * 0.75 = 0 in -Ib Axial Load P = 4,528 Ib Mbase=Mb = 0 in -Ib Axial stress=fa = P/A = P/(D*W) = 129 psi Moment Stress=fb = M/S = 6*Mb/[(D*BA2] = 0.0 psi Moment Stress=fbl = fb-fb2 = 0.0 psi M3 = (1/2)*fb2*L*(2/3)*L = (1/3)*fb2*L^2 = 0 in -Ib 5 -plate = (1)(t^2)/6 = 0.023 in^3/in fb/Fb = Mtotal/[(S-plate)(Fb)] 0.41 OK Tanchor = (Mb-(PLapp*0.75*0.46)(a))/[(d)*N/2] = -1,252 Ib No Tension Critical bad case RMt sec 2.1, Item 4: (1+0.115cfs)DL + (1+0.145D5)PL'0.75+EZ'0.75 c= 1.0, ASO Method M1= wL^2/2= fa*L^2/2 = 259 in -Ib Moment Stress=fb2 = 2 * fb * L/W = 0.0 psi M2= fb1*L^2)/2 = 0 in -Ib Mtotal = M1+M2+M3 = 259 in-Ib/in Fb = 0.75*Fy = 27,000 psi F'p= 0.7*F'c = 1,750 psi OK Tallow= 1,250 Ib Cross Aisle Loads OK Check uplift Toad on Baseplate Pstatic= 4,528 lb Movt*0.75= 152,492 in -Ib Frame Depth= 44.0 in P=Pstatic+Pseismic= 7,993 Ib b =Column Depth= 3.00 in L =Base Plate Depth -Col Depth= 2.00 in fa = P/A = P/(D*W) = 228 psi Sbase/in = (1)(t^2)/6 = 0.023 in^3/in fb/Fb = M/[(S-plate)(Fb)] = 0.72 OK TYPE I SELECT-APOLLO.xls Pseismic= Movt/Frame Depth = 3,466 Ib M= wL^2/2= fa*LA2/2 = 457 in-Ib/in Fbase = 0.75*Fy = 27,000 psi Effec. Effec. E Pf Check uplift forces on baseplate with 2 or more anchors per RMI 7.2.2. hen the base plate configuration consists of two anchor bolts looted on either side f the column and a net uplift force exists, the minimum base plate thickness hall be determined based on a design bending moment in the plate equal o the uplift force on one anchor times 1/2 the distance from he centerline of the anchor to the nearest edge of the rack column" Page /2- of / y Ta Elevation Uplift per Column= 2,214 Ib Qty Anchor per BP= 2 Net Tension per anchor=Ta= 1,107 Ib c= 2.00 in Mu=Moment on Baseplate due to uplift= Ta*c/2 = 1,107 in -Ib Splate= 0.117 in^3 OK [fb/Fb]*0.75= 0.262 10/29/2013 Str tura) oncepts ijEngineering 1200 N. Jefferson Ste. Ste F Anaheim. CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: BOB Project: APOLLO TUKWILA WHSE Project #: N-102113-1 Slab on Grade Configuration: TYPE 1 SELECTIVE RACK slab 1HHiiiiiiihIIii1IIIIIiiiiiiiiiiiiiiliiiiiiiiiiiiiiiiiiiiiiiiiiihIii X �I 14--c-°' �I •-- -- y L SLAB ELEVATION Base Plate Effec. Baseplate width=B= 7.00 in Effec. Baseplate Depth=D= 5.00 in Column Loads width=a= 3.00 in depth=b= 3.00 in DEADLOAD=DL= PRODUCT LOAD=PL= P -seismic= EL= Puncture 150 Ib per column unfactored ASD load 5,100 Ib per column unfactored ASO load (Movt/Frame depth) 3,465 Ib per column unfactored ASD load Baseplate Plan View Concrete Pc= 2,500 psi tslab=t= 5.5 in teff= 5.5 in phi=0= 0.6 Soil fsoil= 1,000 psf Movt= 152,491 in -Ib Frame depth= 44.0 in Sds= 1.001 0.2*Sds= 0.200 midway dist face of column to edge of plate=c= 5.00 in midway dist face of column to edge of plate=e= 4.00 in Load Case 1) (1.2+0.2Sds*DL) + (0.85+0.2Sds*PL) + 1.5*EL RMI SEC 2.2 EQTN 5 = 1.40026*150 Ib + 1.05026*5100 Ib + 1.5*3465 Ib = 10,764 Ib Load Case 2) (0.9-0.2Sds)DL + (0.9-0.2Sds)*PLapp + 1.5EL RMI SEC 2.2 EQTN 6 = (0.69974*150 Ib) + (0.69974*3417 Ib) + (1.5*3465 Ib) = 7,693 Ib Load Case 3) 1.2*DL + 1.4*PL RMI SEC 2.2 EQTN 2 = 1.2*150 Ib + 1.4*5100 Ib = 7,320 Ib Effective Column Load=Pu= 10,764 Ib per column Apunct= [(c+t)+(e+t)]*2*t = 220.0 in^2 Slab Bending Fpunct= 2.66*phi*sgrt(fc) = 79.8 psi fv/Fv= Pu/(Apunct*Fpunct) = 0.613 < 1 OK Pse=DL+PL+E= 10,764 Ib Asoil= (Pse*144)/(fsoil) = 1,550 in^2 x= (L -y)/2 = 11.9 in Fb= 5*(phi)*(fc)^0.5 = 150. psi L= (Asoil)^0.5 = 39.37 in M= w*x^2/2 = (fsoil*x^2)/(144*2) = 495.8 in -Ib y= (c*e)^0.5 + 2*t = 15.5 in S -slab= 1*teff^2/6 = 5.04 in^3 fb/Fb= M/(S-slab*Fb) = 0.656 < 1, OK TYPE I SELECT-APOLLO.xI5 Page /3 of f `7" 10/29/2013 Strturai V oncepts Engineering 1200 N. Jefferson Ste. Ste F Anaheim. CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 Project: APOLLO TUKWILA WHSE Project #: N-102113-1 By: BOB Configuration & Summary: TYPE 2 SELECTIVE RACK Y 60" 192" 60" 192" 60" 96" 12" 42" 42" f 42" 42" , X44„4 Seismic Criteria Ss=1.502, Fa=1 # Bm Lvls 3 Frame Depth Frame Height # Diagonals **RACK COLUMN REACTIONS ASD LOADS AXIAL DL= 150 /b AXL4L LL= 4,500 /b SEISMICAXIAL Ps=+/- 3,077/b BASE MOMENT= 0 in -lb Beam Length 44 in 192.0 in 5 96 in Frame Type Single Row Component Column Description Column & Backer Beam Fy=55 ksi Beam Connector Brace -Horizontal Brace -Diagonal Base Plate Anchor None HanniballF3014-3x3x14ga P=4650 Ib, M=16632 in -Ib STRESS 0.85-0K None None Fy=55 ksi HMH 41160/4.125" Face x 0.075" thk Lu=96 in Capacity: 5028 Ib/pr Fy=55 ksi Lvl 1: 4 pin OK Fy=55 ksi Mconn=11316 in -Ib Hannibal 1-1/2x1-1/2x16ga Mcap=22664 in -Ib N/A 0.6-0K 0.5-0K 0.22-0K Fy=55 ksi Slab & Soil Level I Load Per Level 1 3,000 Ib 2 3,000 Ib 3 3,000 Ib Hannibal 1-1/2x1-1/2x16ga Fy=36 ksi 2 per Base 8x5x3/8 Fixity= 0 in -Ib 0.25-0K 0.5" x 3.25" Embed HILTI KWIKBOLT 17 ESR 1917 Inspection Reqd (Net Seismic Uplift=1964 Ib) 0.64 -OK 0.775 - OK 5.5" thk x 2500 psi slab on grade. 1000 psf Soil Bearing Pressure Story Force Story Force Column Column Conn. Beam Spcg Brace I Transv I Longit. I Axial I Moment I Moment 60.0 in 42.0 in 177 Ib 99 Ib 4,650 Ib 16,632 "# 11,316 "# 60.0 in 42.0 in 354 Ib 198 Ib 3,100 Ib 7,425 "# 6,749 "# 60.0 in 42.0 in 531 Ib 297.lb 1,550 Ib 4,455 "# 3,965 "# 42.0 in 12.0 in 0.54-0K Beam Connector 4 pin OK 4 pin OK 4 pin OK Total: 1,062 Ib 594 Ib Notes TYPE 2 SELECT-APOLLO.xIs Page /y of /y 10/29/2013 November 5, 2013 • City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director Steve Flexer Raymond Handling Concepts 3500 West Valley Hy, Suite 101 Auburn, WA 98001 RE: Incomplete Letter #1 Development Permit Application Number D13-338 Vulcan — 3314 S 116 St Dear Mr. Flexer, This letter is to inform you that your permit application received at the City of Tukwila Permit Center on October 31, 2013 is determined to be incomplete. Before your application can continue the plan review process the attached/following items from the following department(s) need(s) to be addressed: Building Department: Allen Johannessen at 206 433-7163 if you have any questions regarding the attached comments. Please address the comments above in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that four (4) sets of revised plans, specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal a `Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, please contact me at the Permit Center at (206) 431-3670. Sincerely, Bill Rambo Permit Technician File No. D13-338 W:V'ermit CenteNncomplete Letters\2013\D13-338 Incomplete Letter #I.docx 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 Tukwila Building Division Allen Johannessen, Plan Examiner Determination of Completeness Memo Date: November 5, 2013 Project Name: Vulcan Permit #: D13-338 Plan Review: Allen Johannessen, Plans Examiner The Building Division has deemed the subject permit application incomplete. To assist the applicant in expediting the Department plan review process, please forward the following comments. (GENERAL NOTE) PLAN SUBMITTALS: (Min. size 11 x 17 to maximum size of 24x36; all sheets shall be the same size). (If applicable) Structural Drawings and structural calculations sheets shall be original signed wet stamped, not copied.) 1. Due to the large scale of new racks to be installed in addition to the existing racks shown, the emergency egress paths shall be identified on the plan to show all emergency egress paths leading to the required emergency exits are not compromised in any way. An egress plan may have been provided with another permit; however it shall be required with this permit as well. Provide an egress plan that specifically identifies the egress paths leading to the exits. It shall be those pathways that shall be inspected with light meters for the average 1 foot-candle illumination required at the floor level. Emergency illuminations shall not be blocked by rack storage or other related elements. Sufficient illumination shall be provided in the rack aisle ways. Include dimensions for the paths of egress travel. (IBC 1006.2 & 1006.3 #1) 2. It appears some racks are placed blocking doorways to restrooms and offices. Also some exterior doorways (west exits) appear to be blocked by new rack installation. In addition the west rack aisle would in affect create a dead end corridor exceeding 50 feet. Please provide clarification for the blocking of doors or methods of access provided to those rooms, exits with passageways or exits provided for dead end rack corridor. Rack column shall also be placed to prevent blockage to rooms and exits allowing minimum required clear access. 3. Provide the square footage of the warehouse/storage. Should there be questions concerning the above requirements, contact the Building Division at 206-431-3670. No further comments at this time. PERMIT COOPD COPY • PLAN REVIEW/ROUTING SLIP ACTIVITY NUMBER: D13-0338 DATE: 11-14-13 PROJECT NAME: VULCAN SITE ADDRESS: 3314 S 116 ST Original Plan Submittal X Response to Incomplete Letter # 1 Response to Correction Letter # Revision # After Permit Issued DEPARTMENTS: kw(' t1.211i$ Building Division Public Works Fire Prevention Structural Planning Division n ❑ Permit Coordinator 111 DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 11-19-13 Complete Incomplete n Not Applicable Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg 0 Fire 0 Ping 0 PW 0 Staff Initials: TUES/THURS ROUTING: Please Route Structural Review Required REVIEWER'S INITIALS: No further Review Required DATE: n APPROVALS OR CORRECTIONS: DUE DATE: 12-17-13 Approved ❑ Approved with Conditionsk." Not Approved (attach comments) n Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg 0 Fire 0 Ping 0 PW 0 Staff Initials: Documents/routing slip.doc 2-28-02 • • PLAN REVIEW%ROUTING SLIP ACTIVITY NUMBER: D13-338 PROJECT NAME: VULCAN SITE ADDRESS: 3314 S 116 ST X Original Plan Submittal Response to Correction Letter # _ DATE: 10-31-13 Response to Incomplete Letter # Revision # After Permit Issued DEPAR MENTS: ding *iv' ioneig-r5 A-wG tie Fire Prevention Public Works n Structural Planning Division Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 11-05-13 Complete Incomplete Not Applicable Comments: Permit Center Use Only 1 �^ INCOMPLETE LETTER MAILED: ` ' ' I /� LETTER OF COMPLETENES'IMAILED: Departments determined incomplete: Bldg N. Fire Ping ❑ PW 0 Staff Initials: W�L� TUES/THURS ROUTING: Please Route n Structural Review Required n No further Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 12-03-13 Approved ❑ Approved with Conditions ❑ Not Approved (attach comments) n Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg 0 Fire 0 Ping 0 PW ❑ Staff Initials: Documents/routing slip.doc 2-28-02 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206-431-3665 Web site: http://www.ci.tulwila.wa.us REVISION SUBMITTAL Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: if— 1 Plan Check/Permit Number: D13-338 ® Response to Incomplete Letter # 1 ❑ Response to Correction Letter # ❑ Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner RECEIVED CITY OF TUKWI{ A NOV .14 2013 °CRAW rt R Project Name: Vulcan Project Address: 3314 S 116 St Contact Person:��✓� f1 _ic &.Phone Number: 5o3-139-105.8 Summary of Revision: AS JO✓t S to 3j ,4 .)OYL,t t/ 154.1 "lax- tt 1. T. r Pe er tg2Ess s Gt{171-77, v (Sl,.te.TS Cto) 4'70174704 2A S rrlt vv -moi txr'Ts pet Slvt.e-r0'/0/ poems Ajoyedo Agi 2B -63/t T DOSS NOT -40 M4- it/Le../3& f t2 ( f0 / coPe.✓tame% z e- /4/45-7- hsc - R vl St ern; 1- Q T�.�.I��i3 s -r Ht��✓-4rr J. �dd� = Co Doe_ 3 - SQA fierd-C6 is 1/, 267 Pee 4)W. Sheet Number(s): "Cloud" or highlight all areas of revision including date of revision Received at the City of Tukwila Permit Center by: pEntered in Permits Plus on \applications\forms-applications on Iine\revision submittal Created: 8-13-2004 Revised: RAYMOND HANDLING CONCEPTS CORP 0 Washington State Department of Labor & Industries 1 Page 1 of 2 RAYMOND HANDLING CONCEPTS CORP Owner or tradesperson RAYMOND, STEPHEN Principals RAYMOND, STEPHEN Doing business as RAYMOND HANDLING CONCEPTS CORP WA UBI No. 601 785 727 41400 BOYCE ROAD FREMONT, CA94538 253-333-2100 Business type Corporation Governing persons ALEXGABORRO License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor License specialties GENERAL License no. RAYMOHC034KB Effective — expiration 05/02/1997 — 10/05/2015 Bond FEDERATED MUTUAL INS CO Bond account no. 1090263 Active. Meets current requirements. $12,000.00 Received by L&I Effective date 09/28/2001 07/22/2001 Insurance Federated Mutual Ins Co $1,000,000.00 Policy no. 9045549 Received by L&I Effective date 09/03/2013 10/01/1996 Expiration date 10/01/2014 Savings No savings accounts during the previous 6 year period. https://secure.lni.wa.gov/verify/Detail.aspx?UBI=601785727&amp;LIC=RAYMOHC034KB&amp;... 12/17/2013 TiSCARENO ASSOCIATES Tiscareno Associates P'S 500 Union Street, Suite 926 Seattle, WA 98101 T: 206.325.3356 F: 206.701.9769 MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS EXIST. GATE TO REMAIN EXIST. TREES AND LANDSCAPING PROJECT EXI ING FIR HYDRANT, F.D. ACC SS (EXISTING PARKING) NEW, 19' HIGH CHAIN LINK FENCE NEW PAIR OF 12'-0"+/- GATES, LOCK IN tStA TUKWILA WAREHOUSE TENANT IMPROVEMENT PROJECT NO. 1 3008 NEW 10%, HIGH CHAIN LINK FENOE REVIEWED FOR CODE COMPLIANCE APPROVED NOV 2 7 2013 Ci f kwiia BUILDING IVISION EXISTING WAREHOUSE BUILDING EXISTING HYDRANT DRAWN BY EXISTING LOADING BAYS EXIST. RAMP PROPERTY LINE 10/16/13 HC/CW PRINCIPAL IN CHARGE JC REVISIONS NO. DATE 1 7/15/13 - LOCKING GATES 2 07/17/13 - GATE LOC'S 4 10/16/13 - OWNER CHANGES EXISTING LOADING BAY EXISTING LOADING BAYS EXISTING FIRE HYDRANT R'7CEIVED CITY OF TUKWil (EXISTING PARKING) 1 ��.�Pa ; PERMIT CENTER SEPARATE PERMIT REQUIRED FOR: $1 Mechanical Electrical gPlumbing Gas Piping The P,E, certificatirfl herein $•)yr SCE stogy It `( e v OdICC REGISTERED ARCHITECT PROPERTY LINE CZ.,; of Tukwila Iii ill..r °‘1G3 DIVISION Engineer of Record Structural C 4c..: p9 ..I Qiricer1frr�` . • 1200 N, ;soars te. • (71.4) 6 ..«.7330 CONSTRUCTION DOCUMENTS SHEET TITLE TING SITE PLAN REVISIONS No changes shall be made to the scope of work without prior approval of Tukwila Building Division. NOTE: I ', ;visions will require a new plan submittal J may i:a'ude additional plan review fees, ! FLE GOOFY 441 Permit No. \-A/12 -071 Plan review approval is subject to errors and omissions. 4pproval of construction documents does not authorize the v;oiation of any adopted code or ordinance. Receipt of approved Held •,s1 and cot ions is acknowledged: SHEET NO. EXPIRES 10125! 2 9 2013 COPYRIGHT 2013 TISCARENO ASSOCIATES PS DATE PLOTTED: REVDATE City OflUkwila BUILDING DIVISION b.to33 REVIEWED FOR CODE COMPLIANCE APPROVED NOV 2 7 2013 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA UC 3 1 2013 PERMIT CENTER L Cr The RE, certifici.tion provided herein by SCE, Inc. pertains to the star be rack coax portents only. All other componen s are otii.sidc the )ft'his ccrti;, T* .digins r Strut ral 12 seffeT I+� •; „ J sia (7.1 Rec r >'e 32.7330 OCT 2 O 2011 TO OUR CUSTOMERS: The information on this drawing is prepared with the intent of communicating a concept and design that is the intellectual property of Raymond Handling Concepts Corporation. It is not intended for other organizations not titled as a means of quoting, designing / and or engineering alternatives. DESIGN BY: DESIGN FOR: APOLLO I— -cemeeeis .imeleet For assistance call: 800.675.2500 Scale: Date: 06/24/ 13 DRAWN BY S.L. CHECKED riablERT 9393 9393apollov xt�drtes..19,1,„ SHEET REV. DRAWING NO, 1 X13-0 3 3 8 3" COLUMN 5" NOTES: USE @ ALL COLUMN/BASE LOCATIONS TYP. 8" 2 1 3 3/8" 12 MIN. 1 1/2" 3/8"0 X 7/8" SLOT 4 PLCS 3/4" 3 DESCRIPTION BASE PLATE: 8" x 5" DESCRIPTION COLUMN: HMH IF 3014 DESCRIPTION BRACING: HORIZ. & DIAG. DESCRIPTION ROW SPACER MATERIAL 3/8" THICK PLATE STEEL YIELD ASTM A36, Fy=36,000 PSI MATERIAL STEEL YIELD 14 GAGE STEEL ASTM A570, Fy= 55,000 PSI MATERIAL STEEL YIELD 16 GAGE STEEL ASTM A570, Fy=55,000 PSI NOTES: USE @ ALL HMH BRACE LOCATIONS TYP. MATERIAL 14 GAGE STEEL YIELD ASTM A36, Fy = 36,000 PSI NOTES: ATTACH WITH (4) 3/8"0 GR. 5 BOLTS, (2) @ EACH END 11/16'Y 5/160 SAFETY PIN /160 GR. 55 RIVET 33/16" 4 DESCRIPTION MATERIAL STEEL YIELD 4 -PIN CONNECTOR 7 GAGE ASTM A570, Fy=55,000 PSI NOTES: USE @ ALL BEAM TO COLUMN CONNECTION LOCATIONS. 192" 60" 60" TYPE 1 SELECTIVE RACK 144" DESCRIPTION FRONT VIEW STORAGE RACK ELEVATIONS 192" 6 60" TYPE 2 SELECTIVE RACK FRONT VIEW SIDE VIEW 1 3/4" / / / 1 5/8" DESCRIPTION 4-1/8" BEAM (HMH# 41160) MATERIAL 16 GAGE NOTES: `STEEL YIELD ASTM A570, Fy=55,000 PSI USE @ ALL 96" BEAM LOCATIONS TYP 4 1/8" 6 0 BASE PLATE F.F. 1/2" 3 1/4" MIN. EMBED. 7 DESCRIPTION 6" BEAM (HMH# 60130) MATERIAL 13 GAGE NOTES: STEEL YIELD ASTM A570, Fy=55,000 PSI USE @ ALL 144" BEAM LOCATIONS TYP. DESCRIPTION HILTI KWIK BOLT TZ ANCHOR SIZE 1/2"0 x 3-1/4" MIN. EMBED. ESR# 1917 NOTES: SEE NOTE #4 ABOVE FOR ANCHOR SPECS. GENERAL PROJECT NOTES 1. DESIGNED PER REQUIREMENTS OF THE 2012 IBC, 2008 RMI RACK DESIGN MANUAL 2. SEISMIC CRITERIA Ss = 1.502, S1 = 0.518, Fa = 1.00, Fy = 1.50 Ip = 1.0 (NO PUBLIC ACCESS), Sds = 1.001, Sd1 = 0.518, OCCUPANCY CATAG. II. SITE CLASS D, SEISMIC DESIGN CATAG. D 3. STORAGE CAPACITY: TYPE 1 -144"BAY= 3400# PER LEVEL TYP TYPE 2-96"BAY = 3000# PER LEVEL TYP 4. ANCHORS HILTI KWIK BOLT TZ ESR #1917 / POWER SD2 ESR #2502, 1/2"0 X 3-1/4" MIN. EMBED. AS USED IN CALCULATIONS OR ICC & ENGINEER APPROVED EQUAL. (2) ANCHOR PER BASEPLATE TYP. 5. PERIODIC SPECIAL INSPECTION IS REQUIRED DURING ANCHOR INSTALLATION. 6. EXISTING S.O.G. CONCRETE THICKNESS & COMPRESSIVE STRENGTH, 5.5" x 2500 PSI 7. SOIL BEARING PRESSURE 1000 PSF 8. ALL RACK INSTALLATIONS AND RACKS MANUFACTURED IN CONFORMITY WITH THIS STANDARD SHALL DISPLAY IN ONE OR MORE CONSPICUOUS LOCATIONS A PERMANENT PLAQUE EACH NOT LESS THAN 50 SQUARE INCHES IN AREA AND SHOWING THE MAXIMUM PERMISSIBLE UNIT LOAD IN CLEAR, LE 9. ALL BOLTS GR. 5 OR BETTER, INSTALL TO SNUG TIGHT FIT OR BETTER 10. ALL WELDING PERFORMED IN THE SHOP OF AN APPROVED FABRICATOR CERTIFIED WELDERS USING E70XX ELECTRODE OR BETTER. FIELD WE ANY, SHALL BE PROVIDED UNDER THE SUPERVISION OF A LICENSED 11. THE CLEAR SPACE BELOW SPRINKLERS SHALL BE A MIN. OF 18" BE TOP OF THE STORAGE AND THE CEILING SPRINKLER DEFLECTOR. REVIEWED FOR CODE COMPLIANCE APPROVED NOV 27 2013 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA OCT 3 1 2013 PERMIT CENTER Engine ,r .)t Re:ord Structural Cr.NIcept2 Engineering. 200 ,ertei ' ; tc. F (714) 632.7330 a Q1) v v APOLLO TUKWItA WHSE. 3314S 116TH ST. 1 f51iHf91:i1 d13-0338 OCT 2 9 2013 JOB NO. N-102113-1 SHEE1 NP. SCE.1 OF 1