Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit D13-0350 - PROVIDENCE - TENANT IMPROVEMENT
PROVIDENCE HEALTH & SERVICES 3355 S 120 PL D13-0350 • City of Tukwila Department of Community Development =v 6300 Southcenter Boulevard, Suite #100 2 `Tukwila, Washington 98188 -/ Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov Parcel No: Address: DEVELOPMENT PERMIT 1023049082 Permit Number: D13-0350 3355 S 120 PL Project Name: PROVIDENCE HEALTH & SERVICES Issue Date: 12/6/2013 Permit Expires On: 6/4/2014 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: SABEY CORPORATION 4TH FLOOR , SEATTLE, WA, 98168 GLENN PARRY 12201 TUKWILA INTERNATIONAL BL, SEATTLE, WA, 98168 SABEY CONSTRUCTION INC. 12201 TUKWILA INTERNATIONAL BL, SEATTLE, WA, 98168-5121 SABEYCI033KM SELF FUNDED - PROVIDENCE 1!/ Phone: (206) 730-4983 Phone: (206) 281-4200 Expiration Date: 1/12/2015 DESCRIPTION OF WORK: CONSTRUCT NEW DEMISING WALL AND OFFICE Project Valuation: $45,475.00 Type of Fire Protection: Sprinklers: YES Fire Alarm: YES Type of Construction: IA Occupancy per IBC: B Electrical Service Provided by: TUKWILA FIRE SERVICE Water District: 125 Sewer District: VALLEY VIEW SEWER SERVICE Fees Collected: $1,525.31 Current Codes adopted by the City of Tukwila: Internations Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: 2012 2012 2012 2012 International Fuel Gas Code: WA Cities Electrical Code: WA State Energy Code: 2012 2012 2012 Public Works Activities: Channelization/Striping: Curb Cut/Access/Sidewalk: Fire Loop Hydrant: Flood Control Zone: Hauling/Oversize Load: Land Altering: Landscape Irrigation: Sanitary Side Sewer: Sewer Main Extension: Storm Drainage: Street Use: Water Main Extension: Water Meter: • • Volumes: Cut: 0 Fill: 0 Number: 0 No Permit Center Authorized Signature: Date: o�/G �43 I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signature: Print Name: Hfi/ , 1 i) C� Date: 72 2 1. 5 This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ***BUILDING PERMIT CONDITIONS*** 2: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 3: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 4: Partition walls shall not be tied to a suspended ceiling grid. All partitions greater than 6 feet in height shall be laterially braced to the building structure. Such bracing shall be independent of any ceiling splay bracing. 5: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 6: There shall be no occupancy of a building until final inspection has been completed and approved by Tukwila building inspector. No exception. 7: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 8: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 9: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. • • 10: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 11: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 12: ***FIRE DEPARTMENT PERMIT CONDITIONS*** 13: Portable fire extinguishers, not housed in cabinets, shall be installed on the hangers or brackets supplied. Hangers or brackets shall be securely anchored to the mounting surface in accordance with the manufacturer's installation instructions. Portable fire extinguishers having a gross weight not exceeding 40 pounds (18 kg) shall be installed so that its top is not more than 5 feet (1524 mm) above the floor. Hand-held portable fire extinguishers having a gross weight exceeding 40 pounds (18 kg) shall be installed so that its top is not more than 3.5 feet (1067 mm) above the floor. The clearance between the floor and the bottom of the installed hand-held extinguishers shall not be less than 4 inches (102 mm). (IFC 906.7 and IFC 906.9) 14: Extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (IFC 906.5) 15: Fire extinguishers require monthly and yearly inspections. They must have a tag or label securely attached that indicates the month and year that the inspection was performed and shall identify the company or person performing the service. Every six years stored pressure extinguishers shall be emptied and subjected to the applicable recharge procedures. If the required monthly and yearly inspections of the fire extinguisher(s) are not accomplished or the inspection tag is not completed, a reputable fire extinguisher service company will be required to conduct these required surveys. (NFPA 10, 4-3, 4-4) 16: The total number of fire extinguishers required for a light hazard occupancy with Class A fire hazards is calculated at one extinguisher for each 3,000 sq. ft. of area. The extinguisher(s) should be of the "all purpose" (2A, 10 B:C) dry chemical type. The travel distance to any extinguisher must be 75' or less. (IFC 906.3) (NFPA 10, 3-2.1) 17: Egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (IFC 1008.1.8.3 subsection 2.2) 18: Dead bolts are not allowed on auxiliary exit doors unless the dead bolt is automatically retracted when the door handle is engaged from inside the tenant space. (IFC Chapter 10) 19: Exit hardware and marking shall meet the requirements of the International Fire Code. (IFC Chapter 10) 20: Door handles, pulls, latches, locks and other operating devices on doors required to be accessible by Chapter 11 of the International Building Code shall not require tight grasping, tight pinching or twisting of the wrist to operate. (IFC 1008.1.8.1) 21: Aisles leading to required exits shall be provided from all portions of the building and the required width of the aisles shall be unobstructed. (IFC 1013.4) 22: All new sprinkler systems and all modifications to existing sprinkler systems shall have fire department review and approval of drawings prior to installation or modification. New sprinkler systems and all modifications to sprinkler systems involving more than 50 heads shall have the written approval of Factory Mutual or any fire protection engineer licensed by the State of Washington and approved by the Fire Marshal prior to submittal to the Tukwila Fire Prevention Bureau. No sprinkler work shall commence without approved drawings. (City Ordinance No. 2327). 23: Sprinklers shall be installed under fixed obstructions over 4 feet (1.2 m) wide such as ducts, decks, open grate flooring, cutting tables, shelves and overhead doors. (NFPA 13-8.6.5.3.3) 24: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2327 and #2328) 25: Maintain sprinkler coverage per N.F.P.A. 13. Addition/relocation of walls, closets or partitions may require relocating and/or adding sprinkler heads. (IFC 901.4) 26: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2328) (IFC 104.2) 27: Maintain fire alarm system audible/visual notification. Addition/relocation of walls or partitions may require relocation and/or addition of audible/visual notification devices. (City Ordinance #2328) 28: An electrical permit from the City of Tukwila Building Department Permit Center (206-431-3670) is required for this project. 29: The maximum flame spread class of finish materials used on interior walls and ceilings shall not exceed that set forth in Table No. 803.5 of the International Building Code. 30: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 31: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575-4407. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1700 BUILDING FINAL** 1400 FIRE FINAL 0409 FRAMING 0406 SUSPENDED CEILING • CITY OF TUKWILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd, Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Building Permit No. O2 C) Project No. Date Application Accepted: 11 LS (3 Date Application Expires: S (For office use only) CONSTRUCTION PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION King Co Assessor's Tax No.: 102304-9082 Site Address: 3355 S. 120th Place Tukwila WA 98168 Suite Number: Floor: Second Tenant Name: Providence Health and Services PROPERTY OWNER Name: Intergate East LLC Address: 12201 Tukwila International Blvd City: Seattle State: WA Zip: 98168 CONTACT PERSON — person receiving all project communication Name: Glenn Parry Address: 12201 Tukwila International Blvd City: Seattle State: WA Zip: 98168 Phone: (206) 730-4983 Fax: (206) 282-9951 Email: glennp@sabey.com GENERAL CONTRACTOR INFORMATION Company Name: Sabey Construction Address: 12201 Tukwila International Blvd City: Seattle State: WA Zip: 98168 Phone: (206) 281-4200 Fax: (206) 282-9951 Contr Reg No.: CCSABEYCI033K1\ Exp Date: 01/12/2015 Tukwila Business License No.: BUS -0102122 H:\Applications\Forms-Applications On Line\2011 Applications\Permit Application Revised - 8-9-1 I.docx Revised: August 2011 bh New Tenant: ❑ Yes I..No ARCHITECT OF RECORD Company Name: Sabey Architecture Architect Name: Kara Anderson Address: 12201 Tukwila International Blvd City: Seattle State: WA Zip: 98168 Phone: (206) 281-8700 Fax: (206) 282-9951 Email: karaa@sabey.com ENGINEER OF RECORD Name: N/A a6dCl/Iu :-eQ "4— ./Lt1 tUS Address: Company Name: N/A Engineer Name: Address: City: State: Zip: Phone: Fax: Email: LENDER/BOND ISSUED (required for projects $5,000 or greater per RCW 19.27.095) Name: N/A a6dCl/Iu :-eQ "4— ./Lt1 tUS Address: City: State: Zip: Page 1 of 4 BUILDING PERMIT INFORMATIOT 206-431-3670 Valuation of Project (contractor's bid price): $ 45,475 Describe the scope of work (please provide detailed information): Construct new demising wall and office Will there be new rack storage? ❑ Yes Existing Building Valuation: $ J.. No If yes, a separate permit and plan submittal will be required. Provide All Building Areas in Square Footage Below PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? 0 Yes 0 No If "yes", explain: Floor area of accessory dwelling: FIRE PROTECTION/HAZARDOUS MATERIALS: kSprinklers Automatic Fire Alarm ❑ None 0 Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? 0 Yes No If `yes', attach list of materials and storage locations on a separate 8-1/2"x 11" paper including quantities and Material Safety ata Sheets. SEPTIC SYSTEM 0 On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:\Applications\Forms-Applications On Line \2011 ApplicationsWermit Application Revised - 8-9-1 I.docx Revised: August 2011 bh Page 2 of 4 Existing Interior Remodel Addition to Existing Structure New Type of Construction per IBC Type of Occupancy per IBC 1st Floor 188,298 IA B 2"d Floor 183,369 IA B 3`d Floor 183,369 IA B Floors thru Basement Accessory Structure* Attached Garage Detached Garage Attached Carport Detached Carport Covered Deck Uncovered Deck PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? 0 Yes 0 No If "yes", explain: Floor area of accessory dwelling: FIRE PROTECTION/HAZARDOUS MATERIALS: kSprinklers Automatic Fire Alarm ❑ None 0 Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? 0 Yes No If `yes', attach list of materials and storage locations on a separate 8-1/2"x 11" paper including quantities and Material Safety ata Sheets. SEPTIC SYSTEM 0 On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:\Applications\Forms-Applications On Line \2011 ApplicationsWermit Application Revised - 8-9-1 I.docx Revised: August 2011 bh Page 2 of 4 PERMIT APPLICATION NOTES • • Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT 1 HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AUTH Signature: Print Name: Mailing Address: 12201 Tukwila International Blvd H:\ApplicationsWorms-Applications On Line \201 1 Applications\Permit Application Revised - 8-9-11.docx Revised: August 2011 bh Date: 11/15/2013 Day Telephone: (206) 730-4983 Tukwila WA 98168 City State Zip Page 4 of 4 Cash Register Receipt City of Tukwila DESCRIPTIONS PermitTRAK ACCOUNT ( QUANTITY PAID $926.20 D13-0350 Address: 3355 S 120 PL Apn: 1023049082 $926.20 DEVELOPMENT PERMIT FEE WASHINGTON STATE SURCHARGE TOTAL FEES PAID BY RECEIPT: R279 R000.322.100.00.00 B640.237.114 $926.20 $921.70 $4.50 $926.20 Date Paid: Friday, December 06, 2013 Paid By: SABEY CONSTRUCTION INC. Pay Method: CHECK 49666 Printed: Friday, December 06, 2013 2:17 PM 1 of 1 CRW SYSTEMS Cash Register Receipt City of Tukwila DESCRIPTIONS ACCOUNT QUANTITY PAID PermitTRAK 599.11. D13-0350 Address: 3355 S 120 PL Apn: 1023049082 $599.11 DEVELOPMENT $599.11 PLAN CHECK FEE TOTAL FEES PAID BY RECEIPT: R118 R000.345.830.00.00 $599.11 $599.11 Date Paid: Friday, November 15, 2013 Paid By: SABEY CONSTRUCTION INC Pay Method: CHECK 49634 Printed: Friday, November 15, 2013 4:06 PM 1 of 1 CRWSYSTEMS INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION • 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206)431-3670 Permit Inspection Request Line (206) 431-2451 bi3cso Proj c V�� c.- ( Type of I�nnPection: t iIJAL '.. Ads{es fa jS S l ls: .PL-' Date Called: c: R .l 3C.- SUSP. Special Instructions: Date Wanted: a.m; If Z P.m. Requester: './jA ,Q Phone o/• —� (5.—tt EApproved per applicable codes. Corrections required prior to approval. COMMENTS: i F Zgm�a 'C� (a PPro.�ed1 `'>us act — (Lpfv Insp'- tor: A:5.,1 NSPECTION FEE REQUIRED. Prior to next inspection, fee (must be aid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. :_INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. A CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206)'431-3670 Permit Inspection Request Line (206) 431-2451 13_c435O Prof ct: Iry " C 1- (i Typ Inspection: P\--.1-,..: nU Address: 7t 3355 1:2419 �'�- Date Called: Special Instructions: >.. '� `i' ,�-,t1--t... 1 . ,Requester:,, Date Wanted: 2- -- --- ( tV�-fuvE' a.m. p.m. jV1 711 0(a :L•35-3 co ? ( DApprovedper applicable codes. Corrections required prior to'approval. COMMENTS: r Gam. cfiJLf eA l � Dat7: Z ._q . REINSPECTION FEE REQURED. P jor to next inspection, fee rnust be paid, at 6300 Southcenter Blvd.: Suite 100. Call to schedule reinspection. , {- 1 INSPECTION NUMBER INSPECTION RECORD Retain a copy with permit VI- 009 t - o3S'a -- -- PERMIT NUMBERS CITY OF TUKWILA FIRE DEPARTMENT . 444 Andover Park East, Tukwila, Wa. 98188 206-575-4407 ject: PrProfit^e)-pdtJc 2,. Sprinklers: Type of Inspection: \;-.A Address: 3 3s -s- Suite #: S / ?- q h- el Contact Person: Special Instructions: Occupancy Type: Phone No.: Approved per applicable codes. Corrections required prior to approval. COMMENTS: c„,,v4,. 0 ►i. Needs Shift Inspection: Sprinklers: Fire Alarm: Hood & Duct: Monitor: Pre -Fire: Permits: Occupancy Type: Inspector: lid.cv,fti--- Date: //a y/j► q Hrs.: LI r^t 0 $100.00 REINSPECTION FEE REQUIRED. You will receive an invoice from the City of Tukwila Finance Department. Call to schedule a reinspection. Billing Address Attn: Company Name: Address: City: State: Zip: Word/Inspection Record Form.Doc 6/11/10 T.F.D. Form F.P. 113 • PLANPREVIEW%ROUTING SLIP ACTIVITY NUMBER: D13-0350 DATE: 11-15-13 PROJECT NAME: PROVIDENCE HEALTH & SERVICES SITE ADDRESS: 3355 S 120 PL X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter-# Revision # After Permit Issued DEPARTMENTS: B I g Division Public Works tWU L2,2 "SIM 12. Fire Prevention Planning Division Structural Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 11-19-13 Complete Incomplete n Not Applicable Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg 0 Fire 0 Ping ❑ PW 0 Staff Initials: TUES/THURS ROUTING: Please Route Structural Review Required No further Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved n Approved with Conditions E6. Notation: REVIEWER'S INITIALS: DUE DATE: 12-17-13 Not Approved (attach comments) DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg 0 Fire 0 Ping 0 PW 0 Staff Initials: Documents/routing slip.doc 2-28-02 SABEY CONSTRUCTION INC • 0 Washington State Department of Labor & Industries • Page 1 of 3 SABEY CONSTRUCTION INC Owner or tradesperson SABEY, DAVID ARTHUR Principals SABEY, DAVID ARTHUR Doing business as SABEY CONSTRUCTION INC WA UBI No. 601 532 164 12201 TUKWILA INT'L BLVD SEATTLE, WA98168-5121 206-281-4200 KING, County Business type Corporation Governing persons DAVIDASABEY License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor License specialties GENERAL License no. SABEYCI033KM Effective — expiration 05/14/1997 — 01/12/2015 Bond HARTFORD FIRE INSURANCE CO Bond account no. 52BSBCQ3983 Received by L&I 12/20/2004 Insurance National Fire Ins of Hartford Policy no. 2094061165 Received by L&I 10/30/2013 Active. Meets current requirements. $12,000.00 Effective date 12/31/2004 $1,000,000.00 Effective date 11/01/2012 Expiration date 11/01/2014 httos://secure.lni.wa.2ov/verify/Detail.aspx?UBI=601532164&LIC=SABEYCI033KM&S... 12/06/2013 GENERAL NOTES 1. CONTRACTOR SHALL COMPLY WITH THE CURRENT. "GENERAL CONDITIONS," AND BUILDING STANDARDS AS PROVIDED BY THE BUILDING OWNER. 2: GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK OF DIFFERENT TRADES. 3. DO NOT SCALE DRAWINGS. CONTACT ARCHITECT FOR ANY MISSING DIMENSIONS. 4. CONTRACTOR INITIATED CHANGES SHALL BE SUBMITTED IN WRITING TO THE OWNER AND ARCHITECT. FOR APPROVAL PRIOR TO FABRICATION OR CONSTRUCTION. CHANGES SHOWN ON SHOP DRAWING ONLY WILL NOT SATISFY THIS REQUIREMENT. 5. ALL MODIFICATIONS, REQUIRING OWNER OR ARCHITECT APPROVAL WILL NOT BE VALID UNLESS .. AUTHORIZED IN WRITING BY OWNER AND/OR ARCHITECT. 6. WITHIN FIVE (5) BUSINESS DAYS OF START OF CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY IN WRITING BOTH THE ARCHITECT AND OWNER OF ANY ITEMS WHOSE ESTIMATED DELIVERY TO THE SITE WOULD BE LATER THAN THAT REQUIRED FOR TIMELY INSTALLATION IN THE CONSTRUCTION SEQUENCE SUBSTITUTION OF ALTERNATE ITEMS WITH SHORTER LEAD TIMES, PAYMENT OF RUSH FABRICATION OR DELIVERY CHARGES OUT OF SEQUENCE INSTALLATION, OR DELAY OF INSTALLATION OPTIONS TO BE AT THE SOLE APPROVAL OF OWNER OR ARCHITECT. 7. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL WORK AND MATERIALS IN ACCORDANCE WITH THE LATEST LOCAL BUILDING CODES AND ORDINANCES. 8. CONTRACTOR SHALL VERIFY ALL FIELD DIMENSIONS AND CONDITIONS AND SHALL REPORT ANY CONFLICTS OR QUESTIONS FOR RESOLUTION BEFORE PROCEEDING WITH THE WORK. DO NOT. SCALE THE DRAWINGS. 9. THE USE OF WORD "PROVIDE" SHALL ALWAYS MEAN, "FURNISH AND INSTALL, CONNECT, OR SECURE" AS REQUIRED. 10. ALL MATERIALS AND EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH MANUFACTURERS WRITTEN INSTRUCTIONS AND TRADE ASSOCIATES ACCEPTED STANDARDS. 11. CONTRACTOR SHALL PROVIDE A WRITTEN CONSTRUCTION SCHEDULE. THIS SCHEDULE SHALL INCLUDE DELIVERY LEAD TIMES OF CONSTRUCTION ITEMS, AND START AND COMPLETION DATES OF EACH PHASE. THE CONTRACTOR SHALL UPDATE AND PROVIDE SUCH SCHEDULE ON A BIWEEKLY BASIS. 12. WORK MUST BE SCHEDULED WITH THE BUILDING MANAGEMENT TO AVOID DISRUPTION TO THE TENANTS. 13. ACCESS TO AND FROM THE PROJECT SITE, SPECIAL CONDITIONS, NOISY WORK, TIMING OF WORK, INTERRUPTION OF MECHANICAL AND ELECTRICAL SERVICES, RELOCATION OF EXISTING EQUIPMENT, CASEWORK, FIXTURES, FITTINGS, ETC., MUST BE COORDINATED WITH THE BUILDING MANAGEMENT. 14. ADEQUATE CLEANUP, PROTECTION AND PLACEMENT OF ANY CEILING TILES AND/OR OTHER DISRUPTION TO THE ADJACENT TENANT IMPROVEMENTS MUST BE REPLACED BEFORE BUSINESS HOURS OF THAT TENANT IN ORDER THAT THE OCCUPANT WILL NOT BE INCONVENIENCED IN THE NORMAL CONTINUATION OF THEIR OFFICE HOURS. 15. EACH SUBCONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO ADJACENT WORK AND SHALL REPAIR SAID DAMAGE AT THEIR OWN EXPENSE. THIS INCLUDES ALL AREAS ON THE PREMISES SUCH AS: COMMON HALLWAYS, FREIGHT ELEVATOR VESTIBULES, ETC. 16. SCHEDULE THE USE OF THE ELEVATOR WITH BUILDING MANAGEMENT. 17. UPON COMPLETION OF ALL CONSTRUCTION, THE CONTRACTOR SHALL SUPPLY THE LANDLORD WITH ONE SET OF "RECORD" AS -BUILT DRAWINGS. 18. ALL MATERIALS TO BE NEW UON. 19. PATCH ALL DISTURBED AND/OR DAMAGED AREAS AS REQUIRED TO ACCOMPLISH NEW WORK AND AS REQUIRED FOR FINISHED APPEARANCE. 20. GENERAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL NECESSARY BACKING, BLOCKING, AND FRAMING FOR LIGHT FIXTURES, ELECTRICAL FIXTURES, CASEWORK AND ALL OTHER ITEMS REQUIRING IT. 21. CONTRACTOR TO COORDINATE ALL FIRE ALARM WORK WITH BUILDING OWNER. 22. ALL PAINT AND FINISH MATERIAL COLORS SHALL MATCH ARCHITECT'S CONTROL SAMPLES AND REQUIRE ARCHITECT'S REVIEW PRIOR TO INSTALLATION. SUBMIT TO ARCHITECT. THREE (3) COPIES FOR REVIEW. 23. CONTRACTOR SHALL FURNISH SHOP DRAWINGS FOR REVIEW ON CABINETWORK, MILLWORK AND ANY OTHER SPECIAL ITEMS REQUIRING CUSTOM SHOP FABRICATION. SUBMIT TO ARCHITECT AT LEAST THREE (3) COPIES FOR REVIEW. 24. REPETITIVE FEATURES NOT FULLY SHOWN OR NOTED ON THE DRAWINGS SHALL BE COMPLETELY PROVIDED AS IF DRAWN IN FULL. 25. THROUGHOUT THE DRAWINGS ARE ABBREVIATIONS WHICH ARE IN COMMON USE. THE LIST OF ABBREVIATIONS PROVIDED IS NOT INTENDED TO BE A COMPLETE LIST. THE ARCHITECT WILL DEFINE THE INTENT OF ANY IN QUESTION. SYMBOLS ELEVATION REFERENCE SYMBOL U DETAIL ID :SHEET NO. SECTION REFERENCE SYMBOL DETAIL REFERENCE SYMBOL REVISIONS No changes shall be made to the scope of work without prior approval of Tukwila Building Division. NOTE: FRsvlslons will require a new plan submittal and may include additional plan review fees. 1 INDICATES FINISHED 1 SURFACES TO ALIGN DRAWING TITLE BAR DETAIL IDENTIFICATION DRAWING TITLE GRAPHICAL SCALE 0 1 2. 3 • COLUMN AND/OR GRID LINE SYMBOL DIMENSION LINE: L ANGLE,1 ©. AT CENTERLINE FLOOR ELEVATION SYMBOLS +1'-0" NOMINAL FLOOR f ELEVATION HEIGHT (ABOVE/BELOW) BUILDING SPACE / ROOM ID OFFICE SPACE NAME -�- SPACE NUMBER 1127 DOOR SYMBOL DOCUMENT SHEET SYMBOL --e- KEYED SHEET NOTES -+*- GLAZING SYMBOL -�*- REVISION NUMBER ARCH / INTERIOR ABBREVIATIONS ADJ =ADJUSTABLE AFF . - ABOVE FINISH FLOOR ALT ALTERNATE = ALUM - ALUMINUM APC ACOUSTICAL PANEL CEILING. APPROX APPROXIMATE ARCH ARCHITECTURAL ACT AV,. BLDG BOT CAB CL CLG CLR - ACOUSTICAL CEILING TILE - AUDIO VISUAL BUILDING BOTTOM CABINET `• CENTER LINE CEILING CLEAR COL -COLUMN CONC CONCRETE CONF CONFERENCE DEMO DEPT DF DIA DIFF DIM DTL DW DWG EA EL - DEMOLITION OR DEMOLISH. DEPARTMENT - DRINKING FOUNTAIN -DIAMETER - DIFFUSER -. DIMENSION DETAIL - DISHWASHER - DRAWING. -EACH - ELEVATOR ELEC - ELECTRICAL." ELEV EQ EQUIP EXT FA FD FE FEC. FFE FIN FLUOR FLR FO FOIC FURR GA GC GL GWB HC HDW HM HR INCL INFO INSUL LAV LF MATL MAX ELEVATION EQUAL - EQUIPMENT. - EXTERIOR - FIRE ALARM - FLOOR DRAIN • - FIRE EXTINGUISHER FIRE EXTINGUISHER CABINET FINISH FLOOR ELEVATION FINISH -FLUORESCENT -FLOOR - FACE OF - FURNISHED BY OWNER, INSTALLED BY CONTRACTOR FURNISHED BY TENANT, INSTALLEID BY CONTRACTOR - FURRING - GAUGE GENERAL CONTRACTOR - GLASS - GYPSUM WALLBOARD. - HANDICAPPED -HARDWARE - HOLLOW METAL (STEEL FRAME) -HOUR - INCLUDING OR INCLUDED - INFORMATION - INSULATION -LAVATORY - LINEAR FOOT - MATERIAL - MAXIMUM • MDF MECH MEZZ MFR MIN MISC MTD MTL N/A NIC NTS OC OFF OPNG OVHD P: PART PERF PERIM MEDIUM DENSITY FIBERBOARD' - MECHANICAL MEZZANINE -MANUFACTURER - MINIMUM - MISCELLANEOUS MOUNTED = METAL NOT APPLICABLE NOT IN CONTRACT - NOT TO SCALE - ON CENTER - OFFICE OPENING -OVERHEAD - PAINT - PARTITION - PERFORATED - PERIMETER PERP ' -PERPENDICULAR PLAM PLASTIC LAMINATE PLYWD - PLYWOOD QTY - QUANTITY (R) - RELOCATED RA RETURN AIR RCP ' - REFLECTED CEILING PLAN REC -RECESSED REF -REFERENCE REFR -REFRIGERATOR REL RELOCATE REV - REVISION OR REVISED RM -ROOM RO ROUGH OPENING RTD -RATED SCHED SCHEDULE . SF`:. SHT SIM SPEC - SQUARE FEET/FOOT -SHEET - SIMILAR - SPECIFICATION SPKLR - SPRINKLER SPKR -SPEAKER. SQ STD STL STOR STRL STRUC SYMM TBD TEL -SQUARE STANDARD - STEEL -STORAGE STRUCTURAL -STRUCTURAL - SYMMETRICAL - TO BE DETERMINED TELEPHONE OR TELECOM TEMP -TEMPERED THK THICKNESS TO TOS TYP UON UPS VCT VIF W/ WC WD W/O -TOP OF - TOP OF SLAB - TYPICAL - UNLESS OTHERWISE NOTED - UNINTERRUPTED POWER SUPPLY - VINYL COMPOSITE TILE - VERIFY IN FIELD - WITH - WATER CLOSET - WOOD - WITHOUT STREET MAP SEPARATE PERMIT REUIRED FOR: Elect Plum Gas Piping City of Tukwila I'\ G DIVISION 1 DEFINITIONS AND DIMENSIONS A. DEFINITIONS: 1. "TYPICAL" OR "TYP" INDICATES IDENTICAL COMPLETE SYSTEM FOR THE CONDITION NOTED. 2. "SIMILAR" OR "SIM." INDICATES COMPLETE SYSTEM AND COMPONENTS COMPARABLE TO THE CHARACTERISTICS FOR THE CONDITION NOTED. 3. "AS REQUIRED" INDICATES CONTRACTOR SHALL PROVIDE COMPONENTS REQUIRED TO COMPLETE THE NOTED SYSTEM AS INDICATED IN THE PROJECT DOCUMENTS. 4. "ALIGN" INDICATES ACCURATELY PROVIDE FINISH FACES OF MATERIALS IN STRAIGHT, TRUE, AND. PLUMB RELATION ADJACENT MATERIALS. 5. "CLEAR" INDICATES CRITICAL DIMENSION AND SHALL SET PRECEDENT FOR LAYOUT OF PARTITIONS. B. DIMENSIONS: 1. DIMENSIONS ARE INDICATED TO THE FACE OF FINISHED SURFACE AT ALL NEW AND EXISTING CONSTRUCTION, CENTER OF COLUMNS, OR GRID LINES UNLESS OTHERWISE NOTED. 2. ALIGNMENT OF PARTITIONS AND FINISHES AS SCHEDULED SHALL BE STRAIGHT, TRUE & PLUMB. DIMENSIONAL LAYOUT SHALL BE IN THE FOLLOWING PRIORITY ORDER. A. STRUCTURAL DRAWINGS B. LARGE SCALE DETAILS C. SMALL SCALE DETAILS D. ENLARGED PLANS AND SECTIONS E. FLOOR PLANS 3. MINIMUM DIMENSIONS FOR ACCESSIE3ILITY CLEARANCES AND BUILDING CODE REQUIREMENTS SHALL BE MAINTAINED. 4. FLOOR ELEVATIONS ARE INDICATED AT THE FACE OF THE STRUCTURAL SLAB, UNLESS OTHERWISE NOTED. 5. VERTICAL DIMENSIONS ARE INDICATED FROM THE FLOOR ELEVATION TO FACE OF FINISHED MATERIAL, UNLESS NOTED ABOVE FINISH FLOOR - "AFF". 6. CEILING HEIGHTS ARE INDICATED FROM THE FLOOR ELEVATION TO THE FACE OF SUSPENDED ACOUSTIC CEILING GRID OR FACE OF FINISH MATERIAL FOR OTHER CEILING TYPES, UNLESS OTHERWISE NOTED. I.' ' I ' 7. DOCUMENTS ARE DRAWN DIAGRAMATICALLY, AND SCALED DIMENSIONS ARE APPROXIMATE. DIMENSIONS SHALL INDICATE REQUIRED SIZE; CLEARANCES, AND RELATIONSHIPS ARE INDICATED BY DIMENSIONS AS NOTED. BUILDING SUMMARY 1. PROJECT ADDRESS: SABEY DATA CENTER INTERGATE.EAST, BLDG. 5, SECOND FLOOR 3355 S. 120TH PLACE TUKWILA, WA 98168 2: APPLICABLE CODES & ORDINANCES: A BUILDING CODES INTERNATIONAL BUILDING CODE - 2012 B REGULATIONS & ORDINANCES NFPA C ACCESSIBILITY INTERNATIONAL BUILDING CODE - 2012 ICC/ANSI 117.1 ACCESSIBLE & USABLE BUILDINGS AND FACILITIES - 2004 3. GENERAL BUILDING DESCRIPTION: TYPE OF CONSTRUCTION: ICC CONSTRUCTION TYPE IA FIRE RESISTIVE SYSTEM: SPRINKLERED OCCUPANCY TYPE: B (SERVER FARM) 4. FIRE RESISTIVE CONSTRUCTION REQUIREMENTS: SHAFT ENCLOSURES: 2 HOURS EXIT STAIR ENCLOSURES: 2 HOURS CORRIDORS: 1 HOUR 5. EXITS: APPROXIMATE AREA OF CONSTRUCTION -1,400 SF TOTAL APPROXIMATE SUITE AREA - 2,463 SF WEST ROOM: 1,258 SF EAST ROOM: 1,205 SF OCCUPANT LOAD FACTOR -100 NUMBER OF TOTAL PROPOSED OCCUPANTS - NO CHANGE WEST ROOM: 13 EAST ROOM: 13 NUMBER OF. EXITS -1 REQUIRED AT EACH ROOM WEST ROOM: 1 EAST ROOM: 1 MINIMUM EGRESS WIDTH REQUIRED - 3'-8", 3'-0" AT DOORS COMMON PATH OF TRAVEL - 100' AREA OF WORK HAS LESS THAN 30 OCCUPANTS PER IBC 1014.3 REVIEWED FOR .. CODE COMPLIANCE APPROVED NOV 2 7 2013 ^ity ofa��iI BUILDING 1VISION 6. PROJECT DESCRIPTION: NEW PARTITIONS, DOORS, AND FINISHES PROJECT TEAM TENANT: PROVIDENCE INTERGATE.EAST 3355 S. 120TH PLACE SEATTLE, WA 98168 Tel Fax: ATTN: ARCHITECT/DESIGNER: SABEY ARCHITECTURE 12201 TUKWILA INTERNATIONAL BLVD. SEATTLE, WA 98168 Tel: 206.281.8700 Fax: 206.282.9951 ATTN: BRANDON HARRIS Email: brandonh@sabey.com BUILDING MANAGER: SABEY CORPORATION 12201 TUKWILA INTERNATIONAL BLVD. FOURTH FLOOR SEATTLE, WA 98168 Tel: 206.281.8700 ATTN: BRANDON HARRIS GENERAL CONTRACTOR: SABEY CONSTRUCTION 12201 TUKWILA INTERNATIONAL BLVD. SEATTLE,WA 98168 Tel: 206.281.8700 Fax: 206.281.0920 ATTN: GLENN PARRY WA License: SABEYC1033KM MECHANICAL ENGINEER: TBD - Bidder Design Build by. G.C. ELECTRICAL ENGINEER: TBD Bidder Design Build by G.C. FIRE/LIFE SAFETY ENGINEER: TBD - Bidder Design Build by G.C. MECHANICAL, ELECTRICAL, LIFE SAFETY PERMITS UNDER SEPARATE SUBMITTALS. LEGAL DESCRIPTION /PARCEL` NUMBER PARCEL NUMBER: 102304-9082 LEGAL DESCRIPTION: PARCEL D (BUILDING 21-05) LOT 5, BOUNDARY LINE ADJUSTMENT NO. L02-057, RECORDED UNDER RECORDING NO. 20030327900002, AS AMENDED BY RECORDING NO. 20030725001852, RECORDS OF KING COUNTY, WASHINGTON. DRAWING INDEX .. G0.0 COVER SHEET / PROJECT INFORMATION G0.1 PROJECT NOTES G0.2 ' SITE PLAN A1.0 FLOOR PLANS AND DETAILS FIRST FLOOR KEY / EXITING PLAN - 1" = 40'-0" EACH OFFICE AREA HAS LESS THAN 30 OCCUPANTS EXIT STAIR AREA OF WORK-' • CD 30' M 10.0' b' 0'D• 10'6• 11' 0' x' r I 0r 4 16' Q I mom ion WEST �OOM----- OMMbN PATH OF EGFESS = 62' - mom Itom - - EAST RO8M OMMONIPATH OF EGRESS = 75' 1r-9' I EXIT STAIR q-0 I �i y � �r'' Paan rete* aproval;is sub)e i to errors and will ►e. t ;y. �,:algfr "! ruction documents does not authorize ,.. _,1,;^ violent r.u_a. _- . , opi,d cede or ordinance. Sed: i °7".mV"rG4evr' a a r i c-6) �� 'City of Tukw 3 611-16i+UIVISSTON 4imm mom ME MN MIN I NNE 1111•10 NMI 1010111 I=M In= MIN NINO • 1 -13 V! IMO ecce eeee eee, eeee eeee eee eee a. Ard • 10 I 10 vim rommmmm 3446000 SAB EY SABEY ARCHITECTURE seattle, washington 206.281.8700 sabey.com TENANT IMPROVEMENT: PROVIDENCE NOC infiVegatceast 3355 South 120th. Place Tukwila, WA RECEIVED CITY OF TUKWILA NOV 1 5 2013 PERMIT CENTER 11/14/13 BUILDING PERMIT MARK I DATE I DESCRIPTION ISSUE: PROGRESS DATE: DRAWN BY: CHECKED BY: APPROVED BY: 11.14.13 BH SS KA PROJECT NO: FILE: 13-1112_IGE-5__ProvNOC All drawings and written material appearing herein constitute the original and unpublished work of the Sabey Corporation and the same may not be duplicated, used or disclosed without the written consent of the Sabey Corporation. COVER SHEET PROJECT INFORMATION GO.0 PROJECT NOTES DIVISION I - GENERAL CONDITIONS 01010 SUMMARY OF WORK TENANT IMPROVEMENT 1. GENERAL DESCRIPTION OF THE PROJECT: NON-STRUCTURAL INTERIOR OF A COMMERCIAL OFFICE SUITE. 2. WHERE NO BUILDING STANDARDS EXIST FOR MATERIALS CALLED OUT AS "BUILDING STANDARD" ON THE PLANS, THE CONTRACTOR SHALL SO ADVISE SABEY ARCHITECTURE WITHIN TEN (10) DAYS OF THE CONTRACTOR'S RECEIPT OF THE PLANS SO THAT SABEY ARCHITECTURE MAY MAKE ALTERNATE SELECTIONS. 3. CONTRACTOR SHALL VERIFY ALL REQUIREMENTS OF EXACT SIZE AND QUANTITY OF EQUIPMENT FURNISHED BY THE TENANT, INCLUDING REQUIREMENTS FOR MECHANICAL AND ELECTRICAL SERVICES, AND IS RESPONSIBLE FOR ALL ROUGH -IN CONNECTIONS. EACH SUBCONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO ADJACENT WORK AND SHALL REPAIR SAID DAMAGE AT THEIR OWN EXPENSE. 4. FIRE/EMERGENCY SYSTEMS INCLUDE, BUT ARE NOT LIMITED TO, SPRINKLER MODIFICATIONS, FIRE EXTINGUISHER PLACEMENT, AUDIBLE ALARMS, SMOKE AND HEAT DETECTORS, STROBES,. AND EXIT SIGN PLACEMENT. 5. CONTRACTOR SHALL FURNISH SHOP DRAWINGS FOR APPROVAL ON CABINETWORK, MILLWORK AND ANY OTHER SPECIAL ITEMS REQUIRING CUSTOM SHOP FABRICATION WORK. SUBMIT TO ARCHITECT THREE (3) COPIES FOR APPROVAL. 6. MECHANICAL AND ELECTRICAL TO BE DESIGN BUILD UNDER SEPARATE PERMIT. 7. WORK NOT INCLUDED: CONTRACTOR SHALL PROVIDE THE FOLLOWING ITEMS DESCRIBED IN THE SPECIFICATIONS AND SHOWN ON THE PLANS EXCEPT FOR THE ITEMS INDICATED "N.1C." (NOT IN CONTRACT), SUCH AS TELEPHONE AND DATA CABLES, OFFICE FURNITURE, EQUIPMENT AND MOBILE KITCHEN APPLIANCES. 8. CONTRACTOR TO PROVIDE ALL FIRE/EMERGENCY SYSTEMS AS REQUIRED BY ALL APPLICABLE CODES. FIRE/EMERGENCY SYSTEMS INCLUDE BUT NOT LIMITED TO SPRINKLER MODIFICATIONS, FIRE EXTINGUISHERS, AUDIBLE ALARMS, STROBES, SPRINKLERS, SMOKE AND HEAT DETECTORS, AND EXIT SIGNS. 9. EVERY EXIT DOOR SHALL BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF A KEY OR ANY SPECIAL KNOWLEDGE OR EFFORT, AND SHALL BE EQUIPPED WITH PANIC HARDWARE WHERE REQUIRED AND INDICATED. 10. ANY MATERIAL USED IN CONSTRUCTION SHOULD MEET CURRENT FLAME CODE REGULATIONS. 11. ALL ELECTRICAL, PLUMBING AND MECHANICAL MATERIAL INSTALLATIONS SHALL COMPLY WITH THE BUILDING SHELL STANDARD SPECIFICATIONS. DIVISION II - SITE WORK 02050 DEMOLITION 1. FURNISH ALL LABOR MATERIALS AND EQUIPMENT AS REQUIRED TO COMPLETE THE DEMOLITION AND REMOVAL OF ALL ITEMS LOCATED IN THE CONSTRUCTION AREAS. UPON COMPLETION OF ALL DEMOLITION WORK, ALL AREAS SHALL BE LEFT BROOM CLEAN. 2. DEMOLITION OF TELEPHONES, ELECTRICAL, VOICE/DATA AND PANELS ARE TO BE REMOVED BACK TO ORIGINATING SOURCE. DEMOLITION OF CORES AND RELATED CABELING TO BE REMOVED FROM TENANT SPACES BELOW. I' 3. DURING THE REMOVAL OF ANY ENVIRONMENTALLY HAZARDOUS MATERIALS, PROTECTION GUIDELINES SHOULD BE STRICTLY FOLLOWED BY CODE OR LOCAL GOVERNING AUTHORITY. 4. ALL EXISTING CONSTRUCTION ITEMS THAT INTERFERE WITH THE CONSTRUCTION PER THE PRICING PLAN SHALL BE REMOVED, RELOCATED, OR KEPT FLUSH IN CEILING, WALL, OR FLOOR AS REQUIRED. 5. ALL DAMAGED AREAS SHALL BE PATCHED AS REQUIRED AND FINISHED TO MATCH EXISTING ADJACENT AREAS OR AS SPECIFIED TO PROVIDE A "LIKE -NEW FINISH". 6. CONTRACTOR SHALL PROVIDE PLASTIC SHEETING OR OTHER APPROPRIATE BARRIER TO CONTROL DUST AND DEBRIS SUCH THAT IT DOES NOT AFFECT AREAS OUTSIDE THE AREA OF WORK. DIVISION VI - ARCHITECTURAL CARPENTRY AND CASEWORK 06100 - ROUGH CARPENTRY 1. ROUGH CARPENTRY TO INCLUDE ANY WOOD STUDS, FURRING, BLOCKING, ROUGH FRAMING; WOOD CURBS, BUCKS, NAILERS, BACKING, FIXTURE FRAMING, EQUIPMENT SUPPORTS, ETC. AS DETAILED. 06200 - FINISH; CARPENTRY 1. FINISH CARPENTRY TO INCLUDE INSTALLATION OF ALL FIXTURES AND ASSOCIATED TRIMS, HARDWARE AND NOSINGS. 1, ' 2. PROVIDE INTERIOR DOOR AND SIDELIGHT FRAMES AS SCHEDULED. DIVISION VIII - DOORS AND WINDOWS 08100 - METAL DOORS AND FRAMES t PROVIDE AND INSTALL INTERIOR SUITE DOORS AS INDICATED ON DRAWINGS. 08710 - FINISH HARDWARE 1. FINISH AND SPECIALTY HARDWARE INCLUDES ALL ACCESSORIES, TOOLS, AND FASTENERS REQUIRED FOR HARDWARE INSTALLATION AND MAINTENANCE. ITEMS NOT SPECIFICALLY MENTIONED, BUT NECESSARY TO COMPLETE THE WORK, SHALL BE FUR TCHING IN QUALITY AND FINISH OF SPECIFIED IN SIMILAR LOCATIONS. 2. PROVIDE ALL HARDWARE AS SPECIFIED PER THE HARDWARE SCHEDULE. II I,II, Jr! (Il 3. ALL LOCK SETS SHALL CONFORM TO THE BUILDING'S GRAND MASTER KEYING SYSTEMS. TWO (2)KEYSFOREACH)CK AND TWO(2)MASTER KEYS FOR THE SUITE: ALL KEYS TO PROVIDE LC H BE TAGGED WITH ROOM NUMBERS, 4. SUBMIT HARDWARE SCHEDULE WITH CATALOGUE CUT SHEETS FOR ARCHITECT REVIEW. 5. ALL DOORS SHALL HAVE A MINIMUM OF 1-1/2 PAIR OF BUTT HINGES, ONE LATCHSET OR LOCK SET, AND ONE DOOR STOP TO MEET A.D.A. REQUIREMENTS. 6. ALL HARDWARE SHALL BE COMMEIRCIAL GRADE. 7. PROVIDE CLOSERS PER HARDWARE SCHEDULE. 08810 - GLASS 1. ALL GLASS AT SIDELIGHTS AND DOORS SHALL BE 1/4" TEMPERED SAFETY GLAZING, UON. 2. THIS PROJECT CONTAINS GLAZING THAT WILL BE SUBJECT TO FEDERAL GLAZING STANDARDS. GLAZING SUBCONTRACTOR SHALL BIE RESPONSIBLE FOR ADHERENCE TO THE REQUIREMENTS. IF GLAZING SUBCONTRACTOR FINDS ANYTHING IN THE DOCUMENTS NOT INCOMPLIANCE WITH THE STANDARD, THEY SHALL BRING DISCREPANCIES TO THE ATTENTION OF THE ARCHITECT BEFORE PROCEEDING WITH THE WORK. DIVISION IX - FINISHES 09250 GYPSUM DRYWALL AND METAL: STUDS 1. INCLUDE NECESSARY MATERIALS, LABOR AND ACCESSORIES FOR THE INSTALLATION OF ALL PARTITIONS AS SHOWN IN THE PLANS. 2. "WALL SURFACES" MEAN ALL VERTICAL SURFACES INCLUDING COLUMNS WHERE EXPOSED, CONVECTOR OR RADIATOR ENCLOSURES, FASCIAS, RETURNS, PLYWOOD BACKBOARDS, ETC. 3. ALL PARTITION HEADS SHALL MATCH BUILDING STANDARD, UON. 4. WALLS SHOWN ALIGNED WITH BASE BUILDING STRUCTURE SHALL BE FLUSH AND SMOOTH WITH BASE BUILDING STRUCTURE, UON. 5. SEISMIC BRACING: PROVIDE SEISMIC BRACING AS REQUIRED PER THE LATEST BUILDING CODES (NEW CONSTRUCTION ONLY) TO THE PARTITION HEADS AND CEILING GRID. 6. FRAMING STUDS: GALVANIZED STEEL -STUDS PER CONSTRUCTION PLANS. PROVIDE WITH SHEET METAL BACKING WITHIN ALL WALLS RECEIVING CASEWORK (CABINETS, BOOKSHELVES, ETC.). VERIFY STUD SIZE MATCHES DOOR FRAMES IN STOCK IF APPLICABLE. 7. CONTRACTOR SHALL PROVIDE AND LOCATE ACCESS PANELS AS REQUIRED AFTER INSTALLATION OF MECHANICAL DUCTS, PLUMBING, AND ELECTRICAL WORK. FIRE RATE AS REQUIRED. 8. ALL DRYWALL TO BE 5/8" TYPE "X" UNLESS OTHERWISE NOTED. PROVIDE."M/R" TYPE DRYWALL WHERE REQUIRED BY CODE AND AT ALL TOILET ROOMS, AND BEHIND CERAMIC TILES, UON. 9. INSTALL CORNER BEADS AT ALL EXTERNAL CORNERS. INSTALL METAL EDGE TRIM AT AT WHENEVER EDGE OF GYPSUM BOARD WOULD OTHERWISE BE EXPOSED OR SEMI -EXPOSED.. 10. PRIOR TO RECEIVING FINISH, ALL SURFACES SHALL BE PROPERLY PREPARED AS REQUIRED TO RECEIVE FINAL FINISHING AS SPECIFIED. 11. EXTEND ALL SOFFIT FRAMING TO STRUCTURE ABOVE. PROVIDE DIAGONAL BRACING AS AS NECESSARY. 12. PROVIDE FRAMING FOR SUSPENDED CEILING WITH SEISMIC BRACING IN ACCORDANCE WITH REQUIREMENTS OF APPLICABLE CODES AND AS SHOWN ON DRAWINGS. 13. USE ACOUSTICAL SEALANT AROUND ALL PIPES, DUCTS,CONDUIT, OUTLETS, SWITCHES ETC. ON BOTH SIDES OF CROSSING/PENETRATING WALLS WITH ACOUSTICAL INSULATION. PENETRATIONS OF FIRE -RATED WALLS SHALL BE PROTECTED BY APPLICABLE FIRE -RATED ASSEMBLIES. 09530 - ACOUSTICAL TREATMENT 1. PROVIDE ACOUSTICAL INSULATION BETWEEN FRAMING STUDS AND EXTENDING TWO FEET ON EACH SIDE OF PARTITION HEAD ABOVE CEILINGS FOR ALL WALLS NOTED PER PLANS. 2. NEW DEMISING WALL CONSTRUCTION TO HAVE SOUND BATT INSULATION BETWEEN FRAMING STUDS AND TWO FEET OF INSULATION ON EITHER SIDE OF THE PARTITION HEAD ABOVE CEILING GRID. 2. DOOR SCHEDULE SPECIFIES FINISH (BOTH SIDES OF DOOR) AND FRAME UNLESS OTHERWISE NOTED. •I' I'. 3. DOORS SHALL BE PRE -MACHINED FOR HARDWARE PER HARDWARE SCHEDULE. 4. PROVIDE SHOP DRAWING SUBMITTALS FOR ARCHITECT REVIEW. :11 09680 - CARPET 1. PROVIDE COMMERCIAL GRADE CARPET AS INDICATED IN DRAWINGS. 2. CARPET TO BE INSTALLED AS INDICATED IN DRAWINGS: 3. PREPARE SUB FLOOR WITH LIGHT WEIGHT CONCRETE UNDERLAY WHERE REQUIRED TO PROVIDE APPROVED SUBSTRATE. MAX. ALLOWABLE TOLERANCE = 1/4" OVER 10'. 4. PROVIDE SEAMING DIAGRAMS FOR ARCHITECT'S REVIEW. 09900 - PAINTING AND STAIN 1. UNLESS OTHERWISE NOTED, PRIME ALL GWB WALL SURFACES AND PAINT WITH MINIMUM OF TWO (2) FINISH COATS OF BENJAMIN MOORE EGGSHELL FINISH LATEX PAINT OR APPROVED EQUAL. PROVIDE FOR NUMBER OF PAINT COLORS AS INDICATED IN DRAWINGS. 2. FINISH DOORS, DOOR FRAMES, AND SIDELIGHT FRAMES AS INDICATED IN DRAWINGS. A) PAINTED WOODWORK TO BE FINISHED WITH ONE (1) COAT PRIMER AND TWO (2) FINISH COATS. B) SEALED WOODWORK TO BE STAINED PER FINISH SCHEDULE AND SEALED WITH A COMMERCIAL GRADE CLEAR SATIN VARNISH. 3. PAINT FOR THE LIGHT SURFACES TO CONFORM TO THE REQUIREMENTS OF THE "ARCHITECTURAL SPECIFICATIONS MANUAL" (AWS) FOR PAINT SYSTEMS. LATEX PAINT: AWS SYSTEM 3-B "CUSTOM" (2 COAT) GRADE LIGHT COLOR PAINT FINISH ON GYPSUM BOARD SURFACES. 4. PAINT FOR THE DARK SURFACES TO CONFORM TO THE REQUIREMENTS FOR THE "ARCHITECTURAL SPECIFICATIONS MANUAL" (AWS) FOR PAINT SYSTEMS. LATEX PAINT: AWS SYSTEM 3-B "CUSTOM" (2 COAT) GRADE DEEP TONE PAINT FINISH ON GYPSUM BOARD SURFACES. 5. UPON COMPLETION OF WORK, REMOVE EXCESS PAINT, STAIN, VARNISH, ADHESIVE, CAULK, ETC. FROM ALL OTHER SURFACES THAT WERE NOT SPECIFIED TO RECEIVE SAME: 6. TOUCH-UP AND PATCH SURFACES AS REQUIRED AFTER THE COMPLETION OF WORK BY OTHER TRADES. 7. WHERE COLUMNS OCCUR IN AREAS SCHEDULED TO BE FINISHED, THEY SHALL RECEIVE THE SAME FINISH AS THE ROOM UON. DIVISION XV - MECHANICAL 15500 - FIRE PROTECTION 1. FIRE PROTECTION SYSTEM PER BUILDING STANDARD AND LOCAL REGULATIONS AND ORDINANCES. 2. PROVIDE ALL EMERGENCY LIGHTING, EXIT SIGNS, FIRE ALARM SPEAKERS, STROBES AND BELLS AS REQUIRED BY CODE. DESIGN AND INSTALL THE SAME IN COMPLIANCE WITH THE AMERICANS WITH DISABILITIES ACT. 3. PROVIDE SPRINKLERS, FIRE RATED DOORS AND FRAMES, FIRE EXTINGUISHERS, ETC. AS REQUIRED BY APPLICABLE LOCAL CODES AND LAWS. 4. FIRE EXTINGUISHERS SHALL BE BY UNDERWRITER'S LABORATORY 2A-10BC 5 -LB, MULTIPURPOSE EXTINGUISHER WITH SQUEEZE -TYPE HANDLE AND FLEXIBLE DISCHARGE HOSE WITH VISIBLE PRESSURE GAUGE. 5. FIRE EXTINGUISHERS SHALL BE INSTALLED IN PER BUILDING STANDARD REQUIREMENTS, UON. 6. DESIGN BUILD FIRE PROTECTION DRAWINGS INDICATE: A. LAYOUT, LOCATION, AND SIZE OF SPRINKLER LINES AND HEADS. B. PRESSURE REQUIREMENTS. C. SPRINKLER HEAD SPECIFICATIONS. D. LOCATION OF FIRE PROTECTION RISERS AND WALL HYDRANTS 7. CONTRACTOR PROVIDE INSTALLATION DESIGN DOCUMENTS TO ARCHITECT AND BUILDING OWNER FOR REVIEW AND APPROVAL PRIOR TO INSTALLATION. 15800 - HEATING VENTILATING AND AIR CONDITIONING 1. PROVIDE BUILDING STANDARD HVAC SYSTEM WITH ALL MATERIALS, LABOR AND ACCESSORIES FOR COMPLETE OPERATION OF SYSTEM. CONTRACTOR TO BALANCE HVAC SYSTEM AS REQUIRED. 2. DESIGN OF MECHANICAL TO BE PREPARED UNDER A SEPARATE PERMIT. 3. DESIGN BUILD MECHANICAL ENGINEERING DRAWINGS INDICATE: A. DUCTS, AIR MOVEMENT REQUIREMENTS, & SIZES OF GRILLES & REGISTERS. 4. CONTRACTOR PROVIDE INSTALLATION DESIGN DOCUMENTS TO ARCHITECT AND BUILDING OWNER FOR REVIEW AND APPROVAL PRIOR TO INSTALLATION. 5. HVAC CONTRACTOR TO CLEAN, REPAIR OR REPLACE SOILED OR DAMAGED HVAC GRILLS. REVIEWED FOR CODE COMPLIANCE APPROVED NOV 2'7 2013 City of Yu% W1la1 BUILDING DIVISION DIVISION XVI - ELECTRICAL 16000 ELECTRICAL AND TELECOMMUNICATIONS 1. REUSE EXISTING ELECTRICAL AND DATA AS APPROPRIATE TO MEET THE TENANT'S REQUIREMENTS. 2. PROVIDE ALL WORK, EQUIPMENT AND LABOR FOR A COMPLETE AND OPERABLE ELECTRICAL SYSTEM.. PROVIDE ELECTRICAL OUTLETS PER POWER AND DATA PLAN.: 3. PROVIDE MUD RING FOR DATA AND COMMUNICATION AS SHOWN ON THE POWER AND DATA PLAN. EACH MUD RING TO HAVE A MINIMUM NUMBER OF WIRE PULLS AS INDICATED ON DRAWINGS. COORDINATE DATA CABLE CONFIGURATION WITH THE TENANT. 4. ALL OUTLETS AND MUDRINGS TO BE LOCATED AT 15" AFF TO THE CENTER LINE, UON. 5. WHERE MULTIPLE DEVISES OCCUR IN A SINGLE LOCATIONS, ALL DEVICES SHALL BE GANGED UON. 6. GFI CIRCUITS TO BE LOCATED 24" FROM FAUCET CENTERLINE, PER CODE. 7. ALL WIRING DEVICES: SHALL BE BUILDING STANDARD EXCEPT: "ISOLATED GROUND" OUTLETS SHALL BE ORANGE, "HOSPITAL GRADE ISOLATED GROUND" OUTLETS SHALL BE ORANGE WITH A GREEN DOT, "EMERGENCY" OUTLETS SHALL BE RED, AND "DEDICATED" OUTLETS FOR "CLEAN CIRCUIT" FIXTURES SHALL BE GRAY (UNLESS BUILDING STANDARD DICTATES OTHERWISE). ALL COVERPLATES SHALL BE BUILDING STANDARD FINISH, UON. 8. PROVIDE SEPARATE CIRCUITS FOR TENANT'S EQUIPMENT (INCLUDING THE TELEPHONE SWITCH, COPIERS, COMPUTERS, ETC.) WHEN NOTED ON THE CONSTRUCTION DOCUMENTS. 9. COORDINATE SCHEDULE WITH FURNITURE VENDOR FOR THE USE OF ELECTRICIANS DURING THE INSTALLATION OF TENANT'S NEW FURNITURE. 10. ALL ELECTRICAL WIRING, TELEPHONE AND COMPUTER CABLING, AND CONDUIT SHALL BE CONCEALED IN FLOORS, WALLS, OR CEILINGS. CABLING FOR VOICE AND DATA TO BE PROVIDED BY TENANT'S VENDORS AND SHALL BE COORDINATED BY THE BUILDING MANAGER: 11. THE CONTRACTOR IS TO COORDINATE WITH THE OWNER SUPPLIED FURNITURE SYSTEMS TO INCLUDE BUT NOT LIMITED TO: ELECTRICAL AND DATA WIRING LOCATIONS, J -BOX LOCATIONS, CONNECTIONS AND WALL MOUNTED REQUIREMENTS. 12. THE CONTRACTOR IS TO VERIFY EXISTING ABANDONED CORE DRILL LOCATIONS AND FILL AS REQUIRED WITH MATERIAL TO MEET CURRENT FLAME SPREAD REGULATIONS. LOCATIONS TO BE PREPARED TO RECEIVE NEW FLOOR FINISH AS REQUIRED. 13. ARCHITECTURAL DRAWINGS INDICATE LOCATION ONLY OF DEVICES SHOWN. SWITCHING AND CIRCUITING SHALL BE INDICATED ON SEPARATE ELECTRICAL ENGINEERING AS -BUILT DRAWINGS AND SHALL MEET OWNER'S GUIDELINES. 14. ALL TELEPHONE, ELECTRICAL, COMMUNICATION AND SECURITY WORK SHALL BE COMPLETED --IN ACCORDANCE- WITH ALL APPLICABLE CODES. 15. DRAWINGS INDICATE ALL DIMENSIONS TO CENTERLINE OF TELEPHONE, ELECTRICAL AND COMMUNICATION COVERPLATE. OUTLETS SHOWN GROUPED TOGETHER ON PLAN SHALL BE SET TO A MINIMUM DIMENSION BETWEEN EACH DEVICE. 16. BACK-TO-BACK OUTLETS ARE NOT PERMITTED. OFFSET OUTLETS THE MINIMUM DIMENSION REQUIRED. 17. LOCATION OF ALL WALL MOUNTED'POWER AND DATA DEVICES SHALL BE FIELD REVIEWED BY THE TENANT BEFORE INSTALLATION. 18. ELECTRICAL ENGINEER TO PROVIDE DESIGN/BUILD PACKAGE TO ARCHITECT FOR REVIEW PRIOR TO INSTALLATION. 19. THE LAYOUT DIAGRAMS COORDINATE LOCATION OF'POWER & DATA DEVICES. REFER TO DESIGN/BUILD DOCUMENTS FOR SCOPE, TECHNICAL LAYOUT AND SPECIFICATIONS FOR EACH. DISCIPLINE. 20. ARCHITECTS DOCUMENTS INDICATE LOCATION AND RELATIONSHIP OF DEVICES. COORDINATE EXACT LOCATION WITH FURNITURE VENDOR. 21. COORDINATE POWER/DATA & LIGHT FIXTURE MOUNTING LOCATIONS WITH INTERIOR ELEVATIONS, FINISHES & CASEWORK. 22. PROVIDE EXTENSION RINGS AND MOUNTING ACCESSORIES WHERE REQUIRED FOR POWER/DATA DEVICES AND LIGHT FIXTURES. COORDINATE WITH INTERIOR FINISHES AND CASEWORK. 23. CONTRACTOR PROVIDE INSTALLATION DESIGN DOCUMENTS TO ARCHITECT AND BUILDING OWNER FOR REVIEW AND APPROVAL PRIOR TO INSTALLATION. 16500 - LIGHTING 1. LOCATION OF SWITCHES SHALL BE SHOWN ON THE REFLECTED CEILING PLAN. ALL SWITCHES SHALL BE MOUNTED AT A MAXIMUM HEIGHT OF 48" A.F.F. TO MEET THE LATEST HANDICAPPED CODES AND REGULATIONS. 2. WHERE MULTIPLE SWITCHES OCCUR IN A SINGLE LOCATION, ALL SWITCHES SHALL BE GANGED UON. 3, DOWN LIGHTS SHOWN IN THE CENTER OF CEILING TILE WITHOUT DIMENSIONS ARE TO BE LOCATED IN THE CENTER OF CEILING TILE, UON. 4. REUSE ALL EXISTING B/S FLUORESCENT FIXTURES AS NEEDED PER DESIGN LAYOUT AND TO MEET LOCAL ENERGY CODE COMPLIANCE. 5. DESIGN OF ELECTRICAL TO BE PREPARED UNDER A SEPARATE PERMIT AS A DESIGN BUILD PROJECT. PERMIT DRAWINGS TO BE REVIEWED AND APPROVED IN WRITING BY LANDLORD PRIOR TO COMMENCEMENT OF WORK. 6. ALL OFFICE AREAS LESS THAN 300 SQ. FT. ENCLOSED BY WALLS OR CEILING -HEIGHT PARTITIONS, AND ALL MEETING AND CONFERENCE ROOMS, SHALL BE EQUIPPED WITH OCCUPANCY SENSORS, PER CODE.. 7. DESIGN BUILD ELECTRICAL ENGINEERING DRAWINGS INDICATE: A. CIRCUITING AND WIRING OF LIGHT FIXTURES, AND SWITCHES. B. LIFE SAFETY EQUIPMENT. C. LOCATION OF REQUIRED EMERGENCY LIGHT FIXTURES. D. LIGHT FIXTURE SPECIFICATIONS 8. CONTRACTOR PROVIDE INSTALLATION DESIGN DOCUMENTS TO ARCHITECT AND BUILDING OWNER FOR REVIEW AND APPROVAL PRIOR TO INSTALLATION. bI3- o,3sd RECEIVED CITY OF TUKWILA NOV 1 5 2013 PERMIT CENTER. SABEY SABEY ARCHITECTURE seattle, washington 206.281.8700 sabey.com TENANT IMPROVEMENT: PROVIDENCE NOC ihteY ate.���� A TECHNOLOQY CAMPUS 3355 South 120th. Place Tukwila, WA 11/14/13 BUILDING PERMIT MARK DATE ) DESCRIPTION ISSUE: PROGRESS DATE: 11.14.13 DRAWN BY: BH CHECKED BY: SS APPROVED BY: KA PROJECT NO: FILE: 13-1112 IGE-5 ProvNOC All drawings and written material appearing herein constitute the original and unpublished work of the Sabey Corporation and the same may not be duplicated, used or disclosed without the written consent of the Sabey Corporation. PROJECT NOTES G0.1 �►�.. V:n��� c "s� ; iia BUILDING 2 ZONING: MMC/H MANUFACTURING / INDUSTRIAL CENTER HEAVY AND LIGHT AREA: 48. 20388 ACRES BUILDING AREA: BUILDING 1 BUILDING 2 BUILDING 3 BUILDING 4 BUILDING 5 BUILDING 6 TOTAL AREA: SEISMIC ZONE: 3 98,564 S.F. 107,489 S.F. 201,360 S.F. 115,010 S.F. 217,355 S.F. 5,352 S.F. 745,130 S.F. PARKING REQUIRED: OFFICE: 33,226 S.F. X 2.5 /1,000 88 STALLS MANUFACTURING: 551,142 S.F. X 1 /1000 561 STALLS WAREHOUSE: 154,179 S.F. X 1 /2000 77 STALLS X441 BUILDING 1 TOTAL REQUIRED:. 726 STALLS PARCEL NUMBER: 102304-9082' LEGAL DESCRIPTION: PARCEL D (BUILDING 21-05) LOT 5, BOUNDARY LINE ADJUSTMENT NO. L02-057, RECORDED UNDER RECORDING NO. 20030327900002, AS AMENDED BY RECORDING NO. 20030725001352, RECORDS OF KING COUNTY, WASHINGTON. BUILDING 3 BUILDING 4 0 o 0 0 0 W V 0 0 o 0 < 00 0 0 0 0 00 S 124TH ST BUILDING 5 SABEY SABEY ARCHITECTURE seattle, washington 206.281.8700 sabey.com TENANT IMPROVEMENT: PROVIDENCE NOC ihi?qgqtcc 3355 South 120th. Place Tukwila, WA MARK ISSUE: 11/14/13 BUILDING PERMIT DATE I DESCRIPTION PROGRESS DATE: 11.14.13 DRAWN BY: BH CHECKED BY: SS APPROVED BY: KA PROJECT NO: FILE: 13-1112 IGE-5 ProvNOC All drawings and written material appearing herein constitute the original and unpublished work of the Sabey Corporation and the same may not be duplicated, used or disclosed without the written consent of the Sabey Corporation. INTERGATE.EAST SITE PLAN oes 50' 100' SCALE: 1" = 100'-0" RECEIVED CITY OF TUKWILA NOV 1 5 2013 PERMIT CENTER SITE PLAN G0.2 EXISTING F/E RM. EXISTING SERVER RM. EXISTING OPEN OFFICE t� A EXPANDED NOC 91-011 42'-11" 51'-11" CONSTRUCTION PLAN SCALE: 1/8" = 1'-0" 1 AI 0' r ' 1 R -e 2 REFLECTED CEILING PLAN SCALE: 1/8" = 1'-0" O1 16' (U)( 0 6'-2" li rrl n n cab 110 oi° 9'-0" EXISTING POWER PLAN SCALE: 1/8" = 1'-0" 0 2' 1 0I 16' SYMBOLS LEGEND: EXISTING CONSTRUCTION TO REMAIN EXISTING CONSTRUCTION TO BE REMOVED NEW CONSTRUCTION (PER DTL: 4 /A1.0) EXISTING POWER AND DATA TO REMAIN *NEW WORK TO BE VERIFIED BY CONTRACTOR CEILING LEGEND: LletL EXISTING FIXTURE 2'x4' TO BE RELOCATED RELOCATED FIXTURE 2'x4' NEW EGG -CRATE CEILING TILE KEY. NOTES: 4 0 4 4 0 0. NEW 20 kW UPS NEW 90 AMP BREAKER TO FEED UPS - INSTALL POWER METER ON FEED DEMO EXISTING WALL, RELOCATE DOOR AND FRAME - MAKE GOOD WALLS, FLOOR, CEILING OWNER TO RELOCATE VESDA PANEL NEW OFFICE, - NEW WALLS TO U/S OF CEILING - NEW DOOR AND RELITE - NEW POWER(DATA AND LIGHTING AS NEEDED VERIFY MECHANICAL AND SPRINKLER MODIFICATIONS AS NEEDED - NEW STROBES AS REQUIRED BY CODE INSTALL (14) - (16) 55" MONITORS - WALL MOUNTED (2) ROWS - NEW POWER/DATA AS NEEDED PROVIDE BLOCKING AS REQUIRED FOR MOUNTING CEILING TO REMAIN - CHANGE ONE ROW OF TILE TO EGG -CRATE ABOVE MONITORS NEW/ RELOCATED FURNITURE - PROVIDE RUBBER BASE AND PAINT ALL NEW WALLS, DOORS, AND FRAMES - MATCH EXISTING VERIFY POWER AND DATA MODIFICATIONS AS NEEDED BOTTOM OF STRUCTURE rrOVIDE ENCAPSULATED ACOUSTICAL BATT EXTENDING 24" -EACH SIDE OF PARTITION. BRACE PER CODE AT STRUCTURE - & TOP OF WALL SUSPENDED CEILING AS EXISTING 3/8" CONT. FOAM SOUND ISOLATION TAPE TAPEABLE MET. TOP TRACK ATTACHED TO BRACING W/2 SELF -TAPPING SM. SCREWS @ 48"oc, AND 3/4" PIPE SLEEVES 1/4" :i TYPICAL WALL DETAIL SCALE: 3" = 1'-0" NON -RATED FLOOR TO CEILING PARTITION INSULATION 3 5/8" X 20 GA METAL STUDS @ 24" OC, TO 14'-0" MAX. HEIGHT. 1 LAYER 5/8" TYPE "X" GYP. BD. EA. SIDE OF METAL STUDS POWDER DRIVEN FASTENER @ 24" OC MET. RUNNER TRACK SEALANT CONCRETE SLAB 11 11 8" GENERAL DEMOLITION NOTES: 1. REFER TO CONSTRUCTION PLAN AND CEILING PLAN FOR EXTENT OF DEMOLITION. 2. SAVE AND STORE ALL LIGHT FIXTURES, EXIT SIGNS, DOORS AND HARDWARE FOR REUSE, UON: 3. REMOVE ALL TELEPHONE, ELECTRICAL, AND DATA OUTLETS, FIXTURES, PANELS, ETC. FROM ALL DEMOLISHED PARTITIONS. REMOVE ALL CORRESPONDING CABLES, CONDUIT, WIRING, ETC. ALL THE WAY BACK TO ORIGINATING SOURCE, UON. GENERAL CONSTRUCTION NOTES: 1. REFER TO PROJECT NOTES FOR CONSTRUCTION REQUIREMENTS. 2. GENERAL CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF WORK. 3. ALL INTERIOR PARTITION, PENETRATIONS, AND OTHER OPENINGS IN THE BUILDING SHELL SHALL BE SEALED, GASKETED, OR WEATHER STRIPPED AS REQUIRED TO MEET PARTITION RATINGS. 4. WHERE PARTITION LAYOUT INTERSECTS EXISTING SHELL/CORE GYPSUM BOARD, REMOVE EXISTING CORNER BEADS AND OTHER ACCESSORIES, ALIGN FACE OF PARTITIONS, TAPE & SAND SMOOTH FOR NEW FINISH. 5. PROVIDE PARTITION ANCHOR BRACKETS FOR ALL CASEWORK, FIXTURES, EQUIPMENT, & DEVICES MOUNTED ON OR ATTACHED TO PARTITIONS. 6. ALL WOOD USED IN INTERIOR FRAMING IS TO BE FIRE-RETARDENT TREATED WOOD. 7. DOORS AND CASED OPENINGS WITHOUT DIMENSIONS OR DETAILS ARE TO BE LOCATED 4" FROM ADJACENT WALL OR MATCH EXISTING SUITE STANDARD. 8., REPAIR EXISTING WALLS AS REQUIRED. 9. VERIFY ALL SECURITY AND LOW VOLTAGE VOICE DATA WITH BUILDING MANAGEMENT. 10. ALL OUTLETS SHOWN ARE APPROXIMATE. DUE TO HIDDEN CONDITIONS ADDITIONAL P/P/D MAY EXIST BUT NOT BE REFLECTED ON THE PLANS. GENERAL RCP NOTES: 1. REFER TO PROJECT NOTES FOR CONSTRUCTION REQUIREMENTS. . 2. ARCHITECTURAL REFLECTED CEILING PLANS INDICATE TYPE AND LOCATION OF LIGHT FIXTURES REFER TO DESIGN BUILD ELECTRICAL DRAWINGS AND DESIGN BUILD LIFE SAFETY FOR COMPLETE REFLECTED CEILING PLAN DESIGN. 3. LIGHT SWITCHES ARE SHOWN FOR LOCATION AND DESIGN INTENT ONLY. REFER TO ELECTRICAL DESIGN BUILD FOR SPECIFIC LOCATION AND SWITCHING DIAGRAMS. 4. UNLESS NOTED OTHERWISE, MULTIPLE SWITCH'S IN A SINGLE LOCATION SHALL BE GANGED IN A SINGLE BOX AND COVERED WITH A SINGLE COVERPLATE. 5. CLEAN, REPAIR OR REPLACE AS REQUIRED ALL EXISTING SUSPENDED CEILING GRID AND TILES EXISTING TO REMAIN. 6. HVAC CONTRACTOR TO CLEAN ALL EXISTING SUPPLY/RETURN GRILLS PRIOR TO COMPLETION OF PROJECT. -7. ELECTRICAL SUB -CONTRACTOR IS RESPONSIBLE FOR CONFIRMING THE COUNTS OF EXISTING"- FIXTURES. XISTING FIXTURES. GENERAL DOOR & HARDWARE NOTES: 1. SEE HARDWARE SPECIFICATIONS FOR HARDWARE, TYPES AND INSTALLATION. 2. DOOR WIDTH & HEIGHT ARE NOMINAL DIMENSIONS FROM JAMB TO JAMB AND FINISH FLOOR TO BOTTOM OF FRAME @ HEAD. REFER TO SPECIFICATIONS FOR CLEARANCES. 3. DOUBLE DOOR NOMINAL WIDTH INDICATES 2 DOOR LEAVES OF EQUAL WIDTH, U.O.N. 4. DOOR CONSTRUCTION SHALL PROVIDE. ATTACHMENT OF ALL HARDWARE WITHOUT THROUGH - BOLTS. 5. DOOR / HARDWARE SHALL COMPLY WITH ALL APPLICABLE IBC & ACCESSIBILITY REQUIREMENTS. DOOR SCHEDULE: DOOR NUMBER DOOR 2 0 J 0 z NOMINAL HEIGHT 0 a. —t z 0 W 0 L E w o 2 to ILL 0 z REVIEWED FOR ODE COMPLIANCE APPROVED NOV 2 7 2013 City of Tukwila BUILDING DIVISION 205 3'-0" 8'-0" A HM NR TO BE STAINED HARDWARE GROUP HARDWARE NOTES GROUP 1 SINGLE, OFFICE LOCKSET NON -RATED 1 OFFICE FUNCTION LOCKSET (1) PAIR HINGES 1 WALL -MOUNTED DOOR STOP DOOR TYPE A cD WIDTHt PAINTED HOLLOW METAL FRAME STAINED FLUSH S.C. WOOD 'DOOR MATCH ALL EXISTING CONDITIONS to) 13-03s.6 SIDELIGHT / GLAZING SCHEDULE: SIDELIGHT NUMBER SIDELIGHT SILL HEIGHT HEADER HEIGHT SIDELIGHT TYPE 0 FIRE RATING (MIN) (1) w 0 z 0'-4" 8'-0" 3'-0" A 1/4" TEMPERED HM NR TO BE STAINED SIDELIGHT TYPE A w WIDTH PAINTED HOLLOW METAL FRAME GLAZING AS SCHEDULED MATCH ALL EXISTING CONDITIONS RECEIVED CITY OF TUKWILA NOV 1 5 2013 PERMIT CENTER SABEY: SABEY ARCHITECTURE seattle, washington 206.281.8700 sabey.com TENANT IMPROVEMENT: PROVIDENCE NOC I ii tergqgj 3355 South 120th. Place Tukwila, WA 11/14/13 BUILDING PERMIT MARK DATE DESCRIPTION ISSUE: PROGRESS DATE: DRAWN BY: CHECKED BY: APPROVED BY: 11.14.13 BH SS KA PROJECT NO: FILE: 13-1112 IGE-5 ProvNOC All drawings and written material appearing herein constitute the original and unpublished work of the Sabey Corporation and the same may not be duplicated, used or disclosed without the written consent of the Sabey Corporation. FLOOR PLANS AND DETAILS A1 .0