2716000010 Permit Number: D13-0365
12870 INTERURBAN AVE S BLDG 1 Issue Date: 2/3/2014
Permit Expires On: 8/2/2014
Project Name: CLEAR SIGN COMBUSTION
Owner:
Name:
Address:
EPROPERTYTAX INC DEPT#207
PO BOX 4900 , SCOTTSDALE, WA,
85261
Contact Person:
Name: DAVID KEHLE, ARCHITECT
Address: 1913 BONAIR DR SW , SEATTLE, WA,
98116
Contractor:
Name:
PRECISION BUILDERS INC
Address: PO BOX 98609 , DES MOINES, WA,
98198-0609
License No: PRECIBI151C2
Lender:
Name: TENANT FUNDED
Address:
Phone: (206) 433-8997
Phone: (206) 878-2948
Expiration Date: 7/15/2014
DESCRIPTION OF WORK:
OCCUPY ADJACENT TENANT SPACE. REMOVE EXISTING DOORS AND RELOCATE TO ACCESS NEW SPACE, CREATE
OPENING BETWEEN SPACES, AND INSTALL TWO NEW TEST FURNACES WITH STOCKS (UL LABEL BY
INDEPENDENT INSPECTOR)
Project Valuation: $5,300.00
Type of Fire Protection: Sprinklers: YES
Fire Alarm:
Fees Collected: $347.54
Type of Construction: VB Occupancy per IBC:
Electrical Service Provided by: TUKWILA FIRE SERVICE Water District: TUKWILA
Sewer District: TUKWILA SEWER SERVICE
Current Codes adopted by the City of Tukwila:
Internations Building Code Edition:
International Residential Code Edition:
International Mechanical Code Edition:
Uniform Plumbing Code Edition:
2012
2012
2012
2012
International Fuel Gas Code:
WA Cities Electrical Code:
WA State Energy Code:
2012
2012
2012
Public Works Activities:
Channelization/Striping:
Curb Cut/Access/Sidewalk:
Fire Loop Hydrant:
Flood Control Zone:
Hauling/Oversize Load:
Land Altering:
Landscape Irrigation:
Sanitary Side Sewer:
Sewer Main Extension:
Storm Drainage:
Street Use:
Water Main Extension:
Water Meter:
Volumes: Cut: 0 Fill: 0
Number: 0
No
Permit Center Authorized Signature:
Date: 02-1D2) I
I hearby certify that I have read and xami ed this permit and know the same to be true and correct. All
provisions of law and ordinances gove in; this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provisions of any other
state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this
development permit and agree to the conditions attached to this permit.
Signature: Date: -I 7
Print Name: (4-44/r/i
This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or
if the work is suspended or abandoned for a period of 180 days from the last inspection.
PERMIT CONDITIONS:
1: ***BUILDING PERMIT CONDITIONS***
2: Work shall be installed in accordance with the approved construction documents, and any changes made
during construction that are not in accordance with the approved construction documents shall be
resubmitted for approval.
3: All permits, inspection record card and approved construction documents shall be kept at the site of work
and shall be open to inspection by the Building Inspector until final inspection approval is granted.
4: All construction shall be done in conformance with the Washington State Building Code and the
Washington State Energy Code.
5: Every occupied space other than enclosed parking garages and buildings used for repair of automobiles
shall be ventilated in accordance with the applicable provisions of the International Mechanical Code.
6: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the
City of Tukwila Building Department (206-431-3670).
7: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila
Permit Center.
8: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an
approval of, any violation of any of the provisions of the building code or of any other ordinances of the
City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or
other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction
documents and other data shall not prevent the Building Official from requiring the correction of errors in
the construction documents and other data.
•
11: ***FIRE DEPARTMENT PERMIT CONDITIONS***
12: Portable fire extinguishers, not housed in cabinets, shall be installed on the hangers or brackets supplied.
Hangers or brackets shall be securely anchored to the mounting surface in accordance with the
manufacturer's installation instructions. Portable fire extinguishers having a gross weight not exceeding
40 pounds (18 kg) shall be installed so that its top is not more than 5 feet (1524 mm) above the floor.
Hand-held portable fire extinguishers having a gross weight exceeding 40 pounds (18 kg) shall be installed
so that its top is not more than 3.5 feet (1067 mm) above the floor. The clearance between the floor and
the bottom of the installed hand-held extinguishers shall not be Tess than 4 inches (102 mm). (IFC 906.7
and IFC 906.9)
13: Extinguishers shall be located in conspicuous locations where they will be readily accessible and
immediately available for use. These locations shall be along normal paths of travel, unless the fire code
official determines that the hazard posed indicates the need for placement away from normal paths of
travel. (IFC 906.5)
14: The total number of fire extinguishers required for a light hazard occupancy with Class A fire hazards is
calculated at one extinguisher for each 3,000 sq. ft. of area. The extinguisher(s) should be of the "all
purpose" (2A, 10 B:C) dry chemical type. The travel distance to any extinguisher must be 75' or less. (IFC
906.3) (NFPA 10, 3-2.1)
15: The total number of fire extinguishers required for an ordinary hazard occupancy with Class A fire hazards
is calculated at one extinguisher for each 1,500 sq. ft. of area. The extinguisher(s) should be of the "All
Purpose" (2A, 20B:C) dry chemical type. Travel distance to any fire extinguisher must be 75' or less. (IFC
906.3) (NFPA 10, 3-2.1)
16: Maintain fire extinguisher coverage throughout.
17: Egress doors shall be readily openable from the egress side without the use of a key or special knowledge
or effort. (IFC 1008.1.8.3 subsection 2.2)
18: Dead bolts are not allowed on auxiliary exit doors unless the dead bolt is automatically retracted when
the door handle is engaged from inside the tenant space. (IFC Chapter 10)
19: Exit hardware and marking shall meet the requirements of the International Fire Code. (IFC Chapter 10)
20: Door handles, pulls, latches, locks and other operating devices on doors required to be accessible by
Chapter 11 of the International Building Code shall not require tight grasping, tight pinching or twisting of
the wrist to operate. (IFC 1008.1.8.1)
21: Aisles leading to required exits shall be provided from all portions of the building and the required width
of the aisles shall be unobstructed. (IFC 1013.4)
22: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City
Ordinances #2327 and #2328)
23: All new sprinkler systems and all modifications to existing sprinkler systems shall have fire department
review and approval of drawings prior to installation or modification. New sprinkler systems and all
modifications to sprinkler systems involving more than 50 heads shall have the written approval of
Factory Mutual or any fire protection engineer licensed by the State of Washington and approved by the
Fire Marshal prior to submittal to the Tukwila Fire Prevention Bureau. No sprinkler work shall commence
without approved drawings. (City Ordinance No. 2327).
24: Maintain sprinkler coverage per N.F.P.A. 13. Addition/relocation of walls, closets or partitions may
require relocating and/or adding sprinkler heads. (IFC 901.4)
25: All new fire alarm systems or modifications to existing systems shall have the written approval of The
Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been
obtained. (City Ordinance #2328) (IFC 104.2)
26: Maintain fire alarm system audible/visual notification. Addition/relocation of walls or partitions may
require relocation and/or addition of audible/visual notification devices. (City Ordinance #2328)
27: The maximum flame spread class of finish materials used on interior walls and ceilings shall not exceed
that set forth in Table No. 803.5 of the International Building Code.
9: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not
imply approval of such condition or violation.
10: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire
Prevention Bureau at (206)575-4407.
• •
29: The fire sprinkler heads in the immediate vicinity of the furnace need to high temperature rated heads.
28: The furnace needs to comply with applicable provisions of International Fire Code Chapter 30 and needs
to be certified by an approved listing agency.
PERMIT INSPECTIONS REQUIRED
Permit Inspection Line: (206) 438-9350
1700 BUILDING FINAL**
1400 FIRE FINAL
0409 FRAMING
CITY OF 1.,KWILA
Community Development Department
Fubllc Works Department
Permit Center
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
h //www,Tt kwilaWA.gov.
SITE LOCATION
Building Permit No. \)12) UNA—
Project No,
Date Application Accepted:
Date Application Expires;
(For office use only)
CONSTRUCTION PERMIT APPLICATION
Applications and plans must be complete in order to be accepted for plan review.
Applications will not he accepted through the mail or by fax.
"Please Print**
Site Address: V 12 `at//}} ebi,
Tenant Name: (3'Q-' lmMeiorpil
PROPERTY OWNER
Name:
70
lev LVE a ZAP
State: \\16.Zip:4 1 i 4
CONTACT PERSON -- person receiving all project
communication
Name: ri,„, r,„,,,,.,
_ YI
T
Address,
i��
1,1I w 1?r „ie Vt2
Sttate:4 Zip
City:��teix
11(0
Phone: p.�k�' "� Fax: Ac„ .�, ,I L _
�
Email: aKeili.e eAbejlieg aeci i. 6,144
GENERAL CONTRACTOR INFORMATION
T
Company Name: 1
5/7
Address:
City:
State:
Zip:
Phone:
Fax:
Contr Reg No.:
Exp Date:
Tukwila Business License No.:
_____
-___J
H!App!ications`Forrs-Applications On Lir,e12012 ApplicationsSPermit Application Reused • 2-7.12 dctx
Revised re1roery2112
ray
King Co Assessor's Tax No.?1nCe et,
Shite Number: ^�- Floor:
New
New Tenant: ❑ Yes �,.No
ARCHITECT OF RECORD
Company Name: iVtal tig 7. 11L _C
Architect Name: rVeil! e
Address: IA 1(1,RZ
City: t State.\ lip: 1'
Phone: i/sv • ,35 'bill Fax: „ ,140„83x 1
pAhthivitaltht
Email: /�tt
ENGINEER OF RECORD
Company Name: n' W
Engineer Name:
Address:
State zirci
am
Phone, Fax:
Email:
LENDER/BOND ISSUED (required for projects $5,000 or
greater per RCW 19.27.095)
Name:
Address:
City:
tAf fi:44126)
State:
Zip:
Page i of 4
j BUILDING PERMIT INFORNIATIOi006-43I-3670
Valuation of Project (contractor's bid price): $
Existing Building Valuation: S4( RA464
Describe the scope of work (please provide detailed information):
0661.1r1144Ma '" 6txr VOilbVF e(. rtz4,01,0 t6* ' kid t4Ew qiiLE
fJ�.lil i U2 ill. � t iNS IA. "CWD uew iett rtiat-lba*
r . 13,e iuvEfv. __I pie
Will there be new rack storage? ❑ ....Yes
..No If yes, a separate permit and plan submittal will be required.
Provide AH Building Areas in Square Footage Below
PLANNING DIVISION:
Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches)
*For an Accessory dwelling, provide the following:
Lot Area (sq ft): I19e1'61.14F'2 Floor area of principal dwelling: Floor area of accessory dwelling:
*Provide documentation that shows that the principalriowner lives in one of the dwellings as his or her primary residence.
Number of Parking Stalls Provided: Standard: 19a���-Ie Compact: Handicap:,
Will there be a change in use? Yes 0 No If "yes", explaini t�d.i. IE '% "1 v
FIRE PROTECTION/HAZARDOUS MATERIALS:
Sprinklers 0 Automatic Fire Alarm 0 None 0 Other (specify)
Will there be be storage or use of flammable, combustible or hazardous materials in the building? 0 Yes No
if 'Yes', attach list of materials and storage locations on a separate 8-1/2" x 11" paper including quantities and Material Safe Data Sheets.
SEPTIC SYSTEM
0 On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health
Department.
N lApplicationsWorms-Applications On Line\2012 Applications\Permit Application Revised - 2-7-12 docs
Re+iced February 2012
bh
Page 2 of 4
Existing
1-
Interior Remodel
Addition to
Existing
Structure
New
Type of
Construction per
IBC
Y \ r M b
Type of
Occupancy per
IBC
�%� 'd'J1'�.�._.�J�
r i
s` Floor
2a Floor
3rd Floor
Floors thru
Basement
Accessory Structure*
Attached Garage
Detached Garage
Attached Carport
Detached Carport
Covered Deck
Uncovered Deck
PLANNING DIVISION:
Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches)
*For an Accessory dwelling, provide the following:
Lot Area (sq ft): I19e1'61.14F'2 Floor area of principal dwelling: Floor area of accessory dwelling:
*Provide documentation that shows that the principalriowner lives in one of the dwellings as his or her primary residence.
Number of Parking Stalls Provided: Standard: 19a���-Ie Compact: Handicap:,
Will there be a change in use? Yes 0 No If "yes", explaini t�d.i. IE '% "1 v
FIRE PROTECTION/HAZARDOUS MATERIALS:
Sprinklers 0 Automatic Fire Alarm 0 None 0 Other (specify)
Will there be be storage or use of flammable, combustible or hazardous materials in the building? 0 Yes No
if 'Yes', attach list of materials and storage locations on a separate 8-1/2" x 11" paper including quantities and Material Safe Data Sheets.
SEPTIC SYSTEM
0 On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health
Department.
N lApplicationsWorms-Applications On Line\2012 Applications\Permit Application Revised - 2-7-12 docs
Re+iced February 2012
bh
Page 2 of 4
PERMIT APPLICATION NOTES
•
Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the Permit Center to comply with current fee schedules.
Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be
requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition).
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING OW ORIZED AGENT:
Signature: Date: ZI OZ 13
Print Name: O o ba LE
Mailing Address: NY)
H:\Applicatians\Forms-Applications On Line\2012 Applications\Perrnit Application Revised - 2.7.12 docx
Revised: February 2012
bh
Day Telephone: • 4-3 3 -C(—
City
Wh. gel&
State Zip
Page 4 of 4
Cash Register Receipt
City of Tukwila
DESCRIPTIONS ACCOUNT
PermitTRAK
QUANTITY PAID
$607.40
013-0361 Address: 12671 GATEWAY DR 1 Apn: 2716000040 $330.00
DEVELOPMENT $330.00
PERMIT FEE
R000.322.100.00.00
$325.50
WASHINGTON STATE SURCHARGE
B640.237.114
$4.50
D13-0365 Address: 12870 INTERURBAN AVE S BLDG 1 Apn: 2716000010 $212.40
DEVELOPMENT $212.40
PERMIT FEE
R000.322.100.00.00
$207.90
WASHINGTON STATE SURCHARGE
B640.237.114
$4.50
D13-065 Address: 12870 INTERURBAN AVE S Apn: 2716000010 $65.00
DEVELOPMENT $65.00
ADDITIONAL PLAN REVIEW R000.345.830.00.00 $65.00
TOTAL FEES PAID BY RECEIPT: R1041 $607.40
Date Paid: Monday, February 03, 2014
Paid By: PRECISION BUILDERS, INC.
Pay Method: CHECK 7691
Printed: Monday, February 03, 2014 8:34 AM 1 of 1
?SYSTEMS
Cash Register Receipt
City of Tukwila
DESCRIPTIONS
PermitTRAK
QUANTITY
PAID
$135.14
D 13-0365
Address: 12870 INTERURBAN AVE S BLDG 1 Apn: 2716000010
135:14
DEVELOPMENT
$135.14
PLAN CHECK FEE
TOTAL FEES PAID BY RECEIPT: R249
R000.345.830.00.00
$135.14
$135.14
Date Paid: Wednesday, December 04, 2013
Paid By: DAVID E KEHLE
Pay Method: CREDIT CARD 025597
Printed: Wednesday, December 04, 2013 12:21 1 of 1
PM
CRWSYSTEMS
INSPECTION NO.
INSPECTION RECORD
Retain a copy with permit
.71 3L
PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670
Permit Inspection Request Line (206) 431-2451
Pr ect:
(% keA t �
.k)
Type of Inspection:
1 (A r1'\ I al b--+- .
n?.14 I
Address:
-S1 O
\',,
--0+3 f Zdt"\)
Date Called:
ko S
r -
Special Instructions:
Date Wanted:
i0 -.2-IL/
ei.m._
p.m'
Requester: ,
Phone N/ii�:4
sitApproved per applicable codes. Corrections required prior to approval.
COMMENTS:
12C10(\ INt9 -
r
CAM I
Date:
REINS ECTION FEE REQUIRE. Prior to rfext inspection, fee must be
paid a 6300 Southcenter Blvd. Suite 100. all to schedule reinspection.
INSPECTION NUMBER
INSPECTION RECORD
Retain a copy with permit
N .3 - c>3& .t,.
/q -S-((3
k1 /3- 023,
PERMIT NUMBERS.
CITY OF TUKWILA FIRE DEPARTMENT
444 Andover Park East, Tukwila, Wa. 98188 -206-575-4407
Project:
Type of Inspection:
Address:
Suite #: I zgj-7 0 ,E , A ,5,
Contact Person:
-
Special Instructions:
Phone No.: - .
.z.5J-32..Co -6O .
-
Approved per -applicable codes.
Corrections required prior to approval.
COMMENTS:
CD L
Needs Shift Inspection:
,v cz
Sprinklers: ' ¢ s
•
Fire Alarm:
o N kS
Hood & Duct:
Monitor:
Pre -Fire: Q
Permits:•
1
Occupancy Type:
F---,
Inspector:
,v cz
Date: 0 ((Z t 14
Hrs.:
I
-l1
$100.00 REINSPECTION FEE REQUIRED. You will receive an invoice from
the City of Tukwila Finance Department. Call to schedule a reinspection.
Billing Address
Attn:
Company Name:
Address:
City:
State:
Zip:
Word/Inspection Record Form.Doc
6/11/10
T.F.D. Form F.P. 113
2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 R3
Envelope Summary
ENV -SUM
2012 Washington State Energy Code Compliance Forms for Commercial. Groun RI and 9 n nry R2 & R3
Revised June 2013
Project Info
Project Address (I 4 is
Date 12
114510 IM t -laeWAt fes'E 4
For Building Department Use
CO FIC
FILLrecr
Applicant Name:94 ` betotig it.phiir
Applicant Address: Ii«0416m132'W ' Ip. A UC(C
C�
Applicant Phone: /too ,44.0.-/.5 _P t1-
Project Description
• New Building ❑ Addition 04 Alteration ■ Change of Occupancy/Conditioning
Compliance Path
❑ Total Building Performance
■ Prescriptive ❑ Component Performance
Occupancy Group
• Commercial 0 Group R (R-1 & > 3 story R-2 and R-3)
Climate Zone
* Climate Zone /Gly 0 Climate Zone (e4( See WSEC 301.1 for county list)
Vertical Fenestration and
Skylight Area Calculation
!f complying via the Prescriptive path,
provide values for vertical fenestration,
skylights, gross walls and roof. If
complying via the Component
Performance path, these values are auto-
filled by the ENV -UA form end cannot be
edited here.
Total vertical Gross Exterior
Fenestration Above Grade % Vertical
(rough opening) divided by Wall Area times 100 equals Fenestration
J X 100 =
Gross Exterior
Total Skylight divided by Roof Area times 100 equals % Skylight
Witt_ X 100 =
Maximum Prescriptive
Fenestration Area
VerticalRLCEIVtu
Fenestration 14A. CITY OF TUKWILA
Skylights
c DEC 0 4 2013
50% Floor Area in DLZ
0 More than 50% of the floor area in daylight zone per C402!3.ERMiT CENTER
Semi -Heated Path
❑ Project has semi -heated areas as defined per 0402.1.4
and has a max. heating system
for requirements.
other conditioned spaces- provide
or Component Performance compliance
spaces shall comply with
■ Applying wall exception to semi -heated areas
1. To be deemed semi -heated the area is heated but not cooled,
output capacity between 3.4 - 8 Btuh/ft2. Refer to C402.1.4
2. Semi -heated .spaces shall be documented separately from
separate compliance forms for each conditioned area type.
3.Semi-heated spaces may comply under the Prescriptive
path.
4.Envelope elements separating semi -heated from other conditioned
thermal envelope requirements for an exterior wall.
Refrigerated Spaces
freezer
of Occupancy/Conditioning
-,, ..•:-....'._..: •.., •..: +.: '.n
tfENtrm.
for
Refer
■ Walk-in cooler • Walk-in
0 Refrigerated Warehouse Cooler • Change
Refrigerated spaces shall comply under the Prescriptive - ..
these areas may be combined with non -refrigerated am:. in
Mixed Occupancy and/or
Space Conditioning
Project includes more than one occupancy type and/or le = I
compliance forms may be required. Select all that apply t scope
Commercial 0 Group R1 or >3 story - ° R3
IP
.'�•j'$.�?. • A e �u�
o'•,, "" • 1
RIIefriger'aated Space
03
DLj' Low9Enerrgy
for
t l nitdr nixii inm
• Fully Conditioned 0 Semi -Heated
•
0 Group R2/R3 < 3 story
*Low energy areas are exempt from all thermal envelope rovisiderglibeinTilkttlittns
these areas are not required. Refer to C101.5.2 for exem.; kitti
U4007.1 p7►11U i44 -1,woeve
2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3
Interior Lighting Summary
LGT-SUM
2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3
Revised June 2013
Project Info
Project Address Oar/ tj
,
,
Date `•Z` ili
For Building Department Use
'�� t"/
•
Applicant Name:
\I
"
t` OEt.}W�i �.`
eI
R9Obi el iY /p
lafll:
Applicant Address
Applicant Phone:nD
(1r
3 -f:/14 4"
Project Description
-lik Alteration
■ New Building ■ Addition
■ Plans Induded
Lighting Compliance
Path
0 Lighting Power Density Calculations 0 Total Building Performance
(if Total Building Performance then only LGT-CHK is required.)
Interior Lighting
Compliance Option
o Building Area Method ® Space -by -space Method
Interior Lighting Systemn,
Description (�
Briefly describe lighting
system type and features.
Additions and Change of Space Use (C101.4.3 & C101.4.4)
1 Addition
area or Change of Space Use area complies with all applicable provisions as stand alone project
area or Change of Space Use area is combined with existing building lighting systems to demonstrate
with all applicable provisions
Building Area Method (LTG -!NT -BLD) or Space -By -Space Method (LTG -INT -SPACE) Compliance FOIm. Document maximum
and proposed (including existing if applicable) lighting wattage of Addition or Change of Use scope. Provide applicable lighting
per C405.2 and commissioning of lighting controls per 0405.13.
II Addition
compliance
Provide
allowed
controls
Alterations,
Renovations and Repairs (0101.4.3.1)
of luminaires in space replaced
Building Area Method (LTG -INT -BLD) or Space -By -Space Method (LTG-iNT-SPACE) Compliance Fo►m. Document maximum
and proposed (including existing) lighting wattage of project scope
■ 60% or more
Provide
allowed
60% of luminaires in space replaced
Space -by -space Method (LTG -!NT -SPACE) Compliance Form. Document existing total wattage in space and proposed
existing) lighting wattage of project scope
• Less than
Provide
(including
ballast replacement within existing luminaires only — existing total interior building wattage not increased
• Lamp and/or
installed to serve added fixtures and/or fixtures relocated to new circuit
applicable manual lighting controls (C405.2.1), occupancy sensors (0405.2.2.2), daylight zone controls (C405.2.2.3), specific
controls (0405.2.3), and commissioning of lighting controls per C405.13
• New wiring
Provide
application
lighting panel
all applicable lighting controls as noted for New Wiring, automatic time switch controls (0405.2.2.1), and commissioning of
controls per C405.13.
• New or moved
Provide
lighting
reconfigured - luminaires unchanged or moved only
all applicable lighting controls as noted for New Wiring and commissioning of lighting controls per 0405.13.
a Space is
Provide
Ifk No changes are being made to the interior lighting and space use not changed.
DCI
enoineews
Portland
Spokane
San Diego
intoe
FILE COPY
Pernntt No.
t. h,d,IQnt to errors and orniI Sing.
Eugene
ClearSiSan Francisco
gn Combustion Corporation
Anchorage
12870 Interurban Avenue South
Seattle, Washington
Stack Support
Structural Calculations
November 22, 2013
DCI Job #13011-0469
REVIEWED FOR
CODE COMPLIANCE
APPROVED
DEC 19 2013
City of Tukwila
BUILDING DIVISION
Prepared By:
DCI ENGINEERS
818 STEWART STREET, SUITE 1000
SEATTLE, WASHINGTON 98101
818 Stewart Std, Swte 1000
RECEIVED
CITY OF TUKWILA
DEC 0 4 2013
PERMIT CENTER
ipl;--CS(oC"'
Seattle, Washington, 98101 Phone (208) 332-1900
Service Innovation Value
DCI
E f G I f E E R S
Project No.
I',ot ( --AL1 b1
Sheet No.
Project Gl-itql-SIG NI
Date
11'2t 13
Subject E )(14
ST
By Cars
S&o96 of IA10Mc-
1 c-TJM-1. ) 4 r\I F 17'5
krTher-44 pit eii-rs Sr1G
FDO TWD klebq
Sys Ns! oe 5Icrs rl (44
s- r r—�u lock -repo
2 870 t tre&-v t ktv Ave 3Dirpo
5-`'E , WA -
146 -0
A-14 5 IS 1 -1 -011.50A -Le
30/ 14-1, t-titp & or- $�� t .
-r:Freit4�►���gr 90
TD - SIC<ST, ,s/ CLot-$ oti1
+e Sys& '
wl L - LATER -4w1
.S -4(b Ari rts tt t. r
(2-o0F -rtn S corMU,tiaa
,U6(171011-- -loVr; f.461 r (30T
Q,65t9r WW1- f'lovvr-(e1.CT
S -V0uovi i st 7-1
fog. 5-rer.K- . Wei k(yit
p (4, 1/01-K :
TD-ik_ 576t4 itk
L172-+
Wit P 1 Q»)4 = s Ps e (sp-)
S1S c c
uot46 ! I 2-2_,1-15�
FylAti OS GS
5ps=oi13
O' `k Sn (Hs)
c&efFio L
o (41 Of (570.e-4741)
,0131 vie (AID)
O
S
co
fico
r.•
•O
0 a)
'Q
CI O
O
C O
0 I
co
lG
G3
WOMB
stack base detail
0
0
0
0
0
0
0
0
o
,
84::'? c0 .. !>
—
eT""'I I I i 1 u0 17
;— N N I N E-1-_->
( V
0
:,,' .•: ,ti:r:.rS.rS,�.�.4r.r'r�.�:.�n:.v.vri.ry�r:W1 i y!:►'+►':►:�:►.►.� :� :�.�5.�:.� �. �::v:�.•1:r.ry:r Li L'► �a �•�r•1►•5.:�
;�✓~~ ••• ,'T,T,TTTT TT•r•r•T+rl�l�l� •. .�J•, . , , • ,,RR !• T,TTTT �.y•. • Tl�i�•.�1"4�.,�.�Y' 1^{��I �T��4
i
«0-t01.
.0 - tOZ
C
)N
aa) • ar
co 0 as
U Vj 4 Vj
\U U
E N Z—
o'— E E
c o O °
ir`i c 2
Y Y Y Y
2. Z
to to
N
O
Z
Weight Calculations, Stack
Rev 1
Shell Weight. Lbs
Base: (1) * 1" x [(30" x 30") - (24" x 24")] x 0.28 #/in3 = 91
Sides: (4) * [360" x 24" x 141 x 0.28 #/in3 = 2419 2510
Hat: (8) * [1/8" x 36" x 24"] x 0.28 #/in 242
Insulation
Sides: (2) * [28' x 2' x 11 x 29 #/ft3 = 1,624
Sides: (2) * [28' x 1' x 3 1x 29 #/ft3 = 812 2436
Miscellaneous
Anchors at 2% of shell sides 50
Paint at 1% of shell sides 25
Weld at 2% of shell sides 50 125
Stack. Estimated Total Weight 5313 lbs
D) ST11-1 PJUT
2'Il I+ io-qa-102+24-+so _ 41304
J . q13 0* 0f = 1(014 PAF
3
o
DCI
Ef1GIflEERS
Project No.
13011-0461
Sheet No. ti
Project G 5160
Date
Subject 4,w4. imO J'4
By Ci
ti
0
f = 0b3qx20
cpor. F-sitt394
'vo-aor- =13�3
DCI
Ef1GIflEERS
Project No.
13011- o't6q
Sheet No. 5
Project C tz
Date 424� 3
Subject ST K Dcs,c J
By cAs
CCK 51-Ftr,le seviioNl
nP k)�
?L W o1= 51 *- AI"
OfeNlri
F .1 f tkefig Jry1-r
L= 1(003%V
l,7in3
dim -0J = Fbs = O,s)c34e-Si0m
12-
2-31)
2
yso
-Fr of PIA 37
Moment Of Inertia -pud hoist beam
Project 13011-0469
Moment of Inertia / Section Modulus
X -X axis
Item b h Y Area AY lo d Ad^2
1 24.00
2 0.50
3 3.50
N.A. _
INPUT d=
0.25
26.00
0.25
9.60
26
9.60
1= 1602.7 ftM
S= 167.00 fM3
r= 8.98 ft
0.13 6.00
13.00 13.00
24.00 0.88
Sums = 19.88
=lo+Ad^2
=1/c1
=(I/Ay0.5
0.75
169.00
21.00
190.75
Page 1
0.0313
732.3333
0.0046
732.3691
-9.47
3.40
14.40
538
151
182
870
O
Loads: LC 1, DL + Seismic
Results for LC 1, DL + Seismic
T
SK -1
Nov 21, 2013 at 220 PM
Staciu3d
Company .
Designer .
Job Number :
Nov 21, 2013
2:21 PM
Checked By.
Joint Reactions (Bv Combination)
J
ZE
u
1
1
N1
-.379
2.424
0
0
0
0
2
1
N2
-1.383
0
0
0
0
0
3
1
Totals:
-1.762
2.424
0
4
1
COG (ft):
X: 0
Y: 15
Z: 0
Member Section Forces lBv Combination)
LC Member Label Sec
1
1
M1
1
Axial(kj
2.424
y Shearfk)
.379
z Shear(kj Torquelk ft) y -y Mo... z z Mo
0
0
0
0
2
2
2.02
.099
0
0
0
-1.195
3
3
1.616
-.181
0
0
0
-.99
4
4
1.212
-.461
0
0
0
.615
5
6
7
8
9
10
1
M2
5
1
2
3
4
5
.808
.808
.606
.404
.202
0
-.741
.642
.502
.362
.222
.082
IA !top
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
..9
.38
0
RISA -3D Version 11.0.2 [J:12013 Projects\13011-0469 ClearSign Exhaust Stack\Stack.r3dj Page 1
DCI
Ef1GIflEERS
Project No.
1011-09-61
Sheet No. 9
Project Ga1- S G'
Date
//3
Subject
Cf- $fs -
12 = S,3k
Alter or -2l-6"4
Z,S+2x0,33 = 3,16
iC.
gt4Ate } w/ sit 4
v- es- (iM nO Tb 3 w ►raf-
C,4otisT Cf -se A -s Pli00+iO4
Sr-)
(Solt_ - 5300ib z = 540 (sF
��
Svl t.
011- gGlAup.) SI -ht
p'SS U -t EO 10 ge A M 1 rel N 0 let
o;r 5000r , Sm -y OIL
33o*I VW Silte.L
U56. (g) 3/ tet/ ' c: -
HI}
Eco = Z2►�— I'I mlE
421
Yo j
330
DCI
EfGIflEERS
Project No.
►011-04661
Sheet No. O
Project c '0i1, 5i Cl 4
Subject n _ . erre
Date
11/21/(3
By
4..�s
SUR1t000001 I N
Sew
List,' 4 --Alt
2-830 11 --ft
Sg 213��2
fie 040436000
1.61113
Mq S = 2-1'1 2'11/2
DCI
EfGIPlEERS
Project No.
13011-o'f69
Sheet No. I'
Project X51 4
Date
IuI//
l3
Subject A% L� eo i A 0 to of
By cAs
I x _ 1261
4 -
at -K()'+ scew
be -9 _ � - -� _ 2/4"
2C, Cd
.2 2x 75-04714 )t
5F 8d
1,0,04
I2= la I
USE ()%3° !A -el _caw -Ns
DCI
e n s o P E E R S
Project No.
_1011-0469
Sheet No. !2
Project 1.6fr i-51414
Date 1/21/13
subject opM ,I6
By cas
x(57 /ZOO f i ►aC etithl
1
3! o"J4 2-b4
11
VOL 2x04 14E4466
1 _
;oo_rtify
1st
U1, --Et
PL
r141,44, 7v6
41 De 27cY Jo i3T
2, " 1004
W=11xitcyls=
YOpr/1z
81-61
I2 = 42-o4
11 = 5 -Do 11 -41 -
as -e -
I *asp Pgt.
g41A4,0 — 7240 1-41-
1
DCI
EfGIf1EERS
Project No.
I �o I►
-04641
Sheet No.
SSK-oI
Project G 14
Subject
?rTZ-T-L. (tea
Date
11/2-1(13
By
Cyd N F
eeocTRATINIS
f0- SS 14-02
S.314 -o3
Lot/11014S .�
5Y c UG►J x
t 1,
(') '-h�a4� @ 8.0 oG
i
ceN
DCI
EflGifEERS
Project No.
Sheet No.
SsK-o2
Project G (,6A --SIG 14
Date II iv / 13
Subject
o f @ IJP Der4
By c, op
2-K4 14F4-2-
WO
F*2i oS of ON
OLi-xI(o
to 04;v0A-riz
(c. o INteosoNs)
w/ 1,61-i44._ .
(E) 1-1,11
e(
1
�
„
_
./1
2
OLi-xI(o
to 04;v0A-riz
(c. o INteosoNs)
DCI
EfG11lEEPS
Project No.
ID11-04661
Sheet No.
SS IK -0 3
Project ar7,011,611.1
Date
11/2-1/13
Subject n ooF f 0 eij 41., u oo
By U4-5
1, FloctLg To g6 Asim Pr3 4
2, eUVt r6 -44001c SPcuAL 1rtsPEcTio
Fait WV -PS
3, sTP U -T1) (lel. SQL W1w i aG / 191.10-T1 OtJ
DCI
E n G I n E E R S
Project No.
1301-o't 1
Sheet No.
Project Cl.g11-‘t 114
Date
1I/13
Subject P-ODF E -T OF 1 @ ST�e...,
IM►L1c, f yoF
Phi `U1 T I O 4 PV -12
GM' SSK-Os
z' -'
S
k
(, 4 G000ecno o f (40F ST K
'lUGiL S Is R- ) I a-1 0 a.-
pest
3i
(1a4s Purl
sSt&-03
DCI
EflGIPIEERS
Project No.
13011-041
Sheet No.
5i4.-05
Project 1, ' -- 14 0
Date
II/a-2/1 3
Subject
Co OA
„OA n ST
By acts
()sem of
4s.
DCI
Project No.
I3011-014bl
Sheet No.
SSK-0&
Project C ✓ s 14
a
Subject Gtx p1 NFO Mei- 0 S'lIt-IL opet31 n14S
Date
II/21113
By
�p (2)oPeolt346 irJ c on) AOJAt-SipES
0)G 141-e" nov6 SLA -8 4 (1) @ 11-41 A$ov6 S+ -(3
ti
Of tit ltd
STS
24(
17 le 2-)(2..y 1/41,
ELEVATI
SSI -n7
Stack Detail, Rev 1
One of Two Identical Stacks Shown
8' — 0" -->
O
0
0
N
1.4
2'_0„
prttoxrc
hat plate layout
roof line
4"
welded hat plate
(top view)
ss -os
stack base detail
<10"
E--- 2' _ 6" >
Notes: Stack column from 1/4" C.S. plate
Stack hat from 1/8" C.S. plate
Stack inlets from 2"x2"xW C.S. angle
Stack base from C.S. plate
DCI
EflGIfEER5
FELE COPY
Project No.
1;1)11 -0q6q
Sheet No.
5SK-0I
Project 6,A 14 t\I
Date„/y'/j3
Subject ?eri:2_,TIpti, R40 1,..4cto
By c^j
CL1 Iii
heri2A71-1 01\1,51
fE'!i 53 14-01_
45sK.-03
tA0(xr fo H 7
6\( CLEF Sl',J
REVIEWED MLIANCE
R
CODE
APPROVED
DEC 19 2013
City of Tukwila
BUILDING DIVISION
j
RECEIVED
CITY OF TUKWILA
DEC 0 4 2C13
PERMIT CENTER
pl303tQs
DCI
Ef1GIf1EERS
Project No.
14O11-04"69
Sheet No.
SsK--o2
Project G1,64°14-- S 141-i
Subject g-OOF
1-1 @ r\ or'
Date `` /21 13
By Com"! s
2-
pB� -F2
c►O S off- oriJ4
wf yt15 -
(coT (E.) 2)/i -f-
atsomruT
W52+
1
(G - DI 1 s oP5)
DCI
EfGIf1EERS
Project No.
13011-01+69
Sheet No.
E?SK-03
Project c,, 1/_ 1
Date (I / Z+ I
Subject
?0 f j?>•A 1 e J w j ALS a (l -ACS'S
By C
I\143
I,Lc-s TO fA el:SitYt A3
pot UJ -..p .s
3, sTrwg-T) A -i. STErL vJ>;0)oAt EAr cA-TtotJ
sqA-u.. $e- poKIE ( WA -Bo cvLispiEr
WELPE-IGS
DCI
EflGlfEERS
Project No.
1301-061661
Sheet No.
5s iz -014
Project aLsAlt-s�
Date
Subject O F 1 014
1@
By
Ffulhinkic, 6 yoF
COVTY1117 1014 Pv-2
S14. -d 2
Fy „ 77/ -1.
�11 x xl
(Z) Vb°40 ? 3+'
r,5
-1-
11/41 OTV
o Go011EcTl0of (40F 0 -To 06-
p•
DCI
ERGIPIEERS
Project No.
13o11 -o461
Sheet No.
s1 -C;)5 -
Project 141.1
Date I l i2Z /' 3
Subject $f\5a 14,0 f
By acts
546 //2
,' --- -
-ftlP
;ta
i6
C8) I M 1°50 t 3/Ii: 4' 2.1/ 21:
Trie-O FIS HIO)
(F) S LM o+'
DC1
enGineeRs
Project No.
13oli-o461
Sheet No.
',SIL -O&
Project
n --C--114...; 14
Subject itoc‘L..e (LEI NFoiLteftk)i -ril-r44- OP34
Date
11(22-/I3
By ce ji:td
kipre- 0-)OPE1`)1136S 10 91 -it -IL 00 AO.J
(1)e 1-1-1-e' \)5 4 14OVst-A-5
I
Ete0A-T1 OKI
. A
0
0
0
0
N
Sh-o7
Stack Detail, Rev 1
One of Two Identical Stacks Shown
�-- 8' — p" --3
hat plate layout
welded hat plate
(top view)
RA -JC r
p» ?G SSK.-05
— 0" stack base detail
11.w -c5
p&& 5514.-ve E 10"
E--- 2' — g" -->
Notes: Stack column from %" C.S. plate
Stack hat from 1/8" C.S. plate
Stack inlets from 2"x2"x1A" C.S. angle
Stack base from dp C.S. plate
/�
August 4, 2014
•
City of Tukwila
Jim Haggerton, Mayor
Department of Community Development .Jack Pace, Director
James Harmon
12870 Interurban Ave S
Tukwila, WA 98168
RE: Request for Extension
Permit Numbers D13-0365 & M13-0236
ClearSign Combustion —12870 Interurban Ave S
Dear Mr. Harmon,
This letter is in response to your written request for an extension to Permits D13-0359 and M13-0236.
The Building Official has reviewed your letter and considered your request to extend the above referenced
permits. It has been determined that the City of Tukwila Building Division will be granting an extension
to these permits through February 25, 2015.
If you should have any questions, please contact our office at (206) 431-3670.
Sincerely,
`1,0
Bill Rambo
Permit Technician
File: Permit Nos. D13-0365 & M13-0236
W:\Permit Center\Extension Letters\Permits\2013\D13-0365 Permit Extension.docx
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665
•
July 30, 2014
Hand Delivered
Building Official
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite 100
Tukwila, Washington 98188
RE: Permits No. D13-0365 and M13-0236
Dear Sir or Madam:
4klearSign
RECEIVED
1UL 30 2014
COMMUNI I Y
DEVELOPMENT
This is to request an extension of the above referenced permits for which we received the attached
notices. The work relates to the installation of two testing furnaces used for research purposes
that have extended construction and calibration periods. Please extend these permits for an
additional 180 days to accommodate our installation needs.
If you have questions, please contact me by phone on my mobile at 206/669-0441 or by e mail at
jimna clearsign.com
Sincerely,
ClearSign Combustion Corporation
fi)
N. Harmon
Financial Officer
Attachments: As stated
cc: Bill Rambo, Permit Technician
Clearsign Combustion Corporation
12870 Interurban Avenue South
Seattle, WA 98168
Phone: 206.673.4848 I Fax: 206.299.35531 www•clearsigncombustion.com
7/1/2014
•
City of Tukwila
•
Department of Community Development
DAVID KEHLE, ARCHITECT
1913 BONAIR DR SW
SEATTLE, WA 98116
RE: Permit No. D13-0365
CLEAR SIGN COMBUSTION
12870 INTERURBAN AVE S
Dear Permit Holder:
Jim Haggerton, Mayor
Jack Pace, Director
In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building
Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National
Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and
become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of
such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun
for a period of 180 days. Your permit will expire on 8/2/2014.
Based on the above, you are hereby advised to:
1) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each
inspection creates a new 180 day period, provided the inspection shows progress.
-or-
2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire.
Address your extension request to the Building Official and state your reason(s) for the need to extend your permit.
The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your
extension request is granted, you will be notified by mail.
In the event you do not call for an inspection and/or receive an extension prior to 8/2/2014, your permit will become null and void
and any further work on the project will require a new permit and associated fees.
Thank you for your cooperation in this matter.
Sincerely
-?D4-4
Bill Rambo
Permit Technician
File No: D13-0365
6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665
410ERMIT COORD COPY
PLAN REVIEW/ROUTING SLIP
ACTIVITY NUMBER: D13-0365 DATE: 12/04/13
PROJECT NAME: CLEAR SIGN COMBUSTION
SITE ADDRESS: 12870 INTERURBAN AVE S
X Original Plan Submittal Response to Incomplete Letter #
Response to Correction Letter #
Revision # after Permit Issued
DEPARTMENTS:
AVOC V-31 5
Building Division MI
n t.. 12 2S t i 5
P blic Works
Awc 04 12-.0sti3
Fire Prevention
Structural
Planning Division
❑ Permit Coordinator ❑
DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 12/05/13
Complete
Incomplete
Not Applicable
Comments:
Permit Center'Use Only �' %;� t - ,
INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED:
Departments determined incomplete: Bldg 0 Fire 0 Ping 0 PW 0 Staff Initials:
TUES/THURS ROUTING:
Please Route
Structural Review Required ❑
No further Review Required ❑
REVIEWER'S INITIALS: DATE:
APPROVALS OR CORRECTIONS: DUE DATE: 01/02/14
Approved ❑ Approved with Conditions _ Not Approved (attach comments) ❑
Notation:
REVIEWER'S INITIALS:
DATE:
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections:
Bldg 0 Fire 0 Ping D PW 0 Staff Initials:
PRECISION BUILDERS INC Its
0 Washington State Department of
Labor & Industries
Page 1 of 2
PRECISION BUILDERS INC
Owner or tradesperson
SANBURN, SCOT DEAN
Principals
SANBURN, SCOT DEAN
ELIZABETH SANBORN
Doing business as
PRECISION BUILDERS INC
WA UBI No.
600 553 713
PO BOX 98609
DES MOINES, WA98198-0609
206-878-2948
KING, County
Business type
Corporation
Governing persons
LIZSANBORN
License
Verify the contractor's active registration / license / certification (depending on trade) and any past violations.
Construction Contractor
License specialties
GENERAL
License no.
PRECIBI151 C2
Effective — expiration
02/22/1985 — 01/19/2016
Bond
DEVELOPERS INS CO
Bond account no.
415171C
Received by L&I
01/14/2002
Insurance
West American Ins Co
Policy no.
BKW55554018
Received by L&I
07/03/2013
Savings
No savings accounts during the previous 6 year period.
Active.
Meets current requirements.
$12,000.00
Effective date
01/19/2002
$1,000,000.00
Effective date
07/15/2013
Expiration date
07/15/2014
httns://secure.lni.wa.aov/verifv/Detail.aspx?UBI=600553713&LIC=PRECIBI151C2&SAW= 02/03/2014