Loading...
HomeMy WebLinkAboutPermit D13-0365 - CLEAR SIGN COMBUSTION - TENANT IMPROVEMENTCLEAR SIGN COMBUSTION 12870 INTERURBAN AVE S D13-0365 Parcel No: Address: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov DEVELOPMENT PERMIT 2716000010 Permit Number: D13-0365 12870 INTERURBAN AVE S BLDG 1 Issue Date: 2/3/2014 Permit Expires On: 8/2/2014 Project Name: CLEAR SIGN COMBUSTION Owner: Name: Address: EPROPERTYTAX INC DEPT#207 PO BOX 4900 , SCOTTSDALE, WA, 85261 Contact Person: Name: DAVID KEHLE, ARCHITECT Address: 1913 BONAIR DR SW , SEATTLE, WA, 98116 Contractor: Name: PRECISION BUILDERS INC Address: PO BOX 98609 , DES MOINES, WA, 98198-0609 License No: PRECIBI151C2 Lender: Name: TENANT FUNDED Address: Phone: (206) 433-8997 Phone: (206) 878-2948 Expiration Date: 7/15/2014 DESCRIPTION OF WORK: OCCUPY ADJACENT TENANT SPACE. REMOVE EXISTING DOORS AND RELOCATE TO ACCESS NEW SPACE, CREATE OPENING BETWEEN SPACES, AND INSTALL TWO NEW TEST FURNACES WITH STOCKS (UL LABEL BY INDEPENDENT INSPECTOR) Project Valuation: $5,300.00 Type of Fire Protection: Sprinklers: YES Fire Alarm: Fees Collected: $347.54 Type of Construction: VB Occupancy per IBC: Electrical Service Provided by: TUKWILA FIRE SERVICE Water District: TUKWILA Sewer District: TUKWILA SEWER SERVICE Current Codes adopted by the City of Tukwila: Internations Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: 2012 2012 2012 2012 International Fuel Gas Code: WA Cities Electrical Code: WA State Energy Code: 2012 2012 2012 Public Works Activities: Channelization/Striping: Curb Cut/Access/Sidewalk: Fire Loop Hydrant: Flood Control Zone: Hauling/Oversize Load: Land Altering: Landscape Irrigation: Sanitary Side Sewer: Sewer Main Extension: Storm Drainage: Street Use: Water Main Extension: Water Meter: Volumes: Cut: 0 Fill: 0 Number: 0 No Permit Center Authorized Signature: Date: 02-1D2) I I hearby certify that I have read and xami ed this permit and know the same to be true and correct. All provisions of law and ordinances gove in; this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signature: Date: -I 7 Print Name: (4-44/r/i This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ***BUILDING PERMIT CONDITIONS*** 2: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 3: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 4: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 5: Every occupied space other than enclosed parking garages and buildings used for repair of automobiles shall be ventilated in accordance with the applicable provisions of the International Mechanical Code. 6: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 7: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 8: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. • 11: ***FIRE DEPARTMENT PERMIT CONDITIONS*** 12: Portable fire extinguishers, not housed in cabinets, shall be installed on the hangers or brackets supplied. Hangers or brackets shall be securely anchored to the mounting surface in accordance with the manufacturer's installation instructions. Portable fire extinguishers having a gross weight not exceeding 40 pounds (18 kg) shall be installed so that its top is not more than 5 feet (1524 mm) above the floor. Hand-held portable fire extinguishers having a gross weight exceeding 40 pounds (18 kg) shall be installed so that its top is not more than 3.5 feet (1067 mm) above the floor. The clearance between the floor and the bottom of the installed hand-held extinguishers shall not be Tess than 4 inches (102 mm). (IFC 906.7 and IFC 906.9) 13: Extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (IFC 906.5) 14: The total number of fire extinguishers required for a light hazard occupancy with Class A fire hazards is calculated at one extinguisher for each 3,000 sq. ft. of area. The extinguisher(s) should be of the "all purpose" (2A, 10 B:C) dry chemical type. The travel distance to any extinguisher must be 75' or less. (IFC 906.3) (NFPA 10, 3-2.1) 15: The total number of fire extinguishers required for an ordinary hazard occupancy with Class A fire hazards is calculated at one extinguisher for each 1,500 sq. ft. of area. The extinguisher(s) should be of the "All Purpose" (2A, 20B:C) dry chemical type. Travel distance to any fire extinguisher must be 75' or less. (IFC 906.3) (NFPA 10, 3-2.1) 16: Maintain fire extinguisher coverage throughout. 17: Egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (IFC 1008.1.8.3 subsection 2.2) 18: Dead bolts are not allowed on auxiliary exit doors unless the dead bolt is automatically retracted when the door handle is engaged from inside the tenant space. (IFC Chapter 10) 19: Exit hardware and marking shall meet the requirements of the International Fire Code. (IFC Chapter 10) 20: Door handles, pulls, latches, locks and other operating devices on doors required to be accessible by Chapter 11 of the International Building Code shall not require tight grasping, tight pinching or twisting of the wrist to operate. (IFC 1008.1.8.1) 21: Aisles leading to required exits shall be provided from all portions of the building and the required width of the aisles shall be unobstructed. (IFC 1013.4) 22: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2327 and #2328) 23: All new sprinkler systems and all modifications to existing sprinkler systems shall have fire department review and approval of drawings prior to installation or modification. New sprinkler systems and all modifications to sprinkler systems involving more than 50 heads shall have the written approval of Factory Mutual or any fire protection engineer licensed by the State of Washington and approved by the Fire Marshal prior to submittal to the Tukwila Fire Prevention Bureau. No sprinkler work shall commence without approved drawings. (City Ordinance No. 2327). 24: Maintain sprinkler coverage per N.F.P.A. 13. Addition/relocation of walls, closets or partitions may require relocating and/or adding sprinkler heads. (IFC 901.4) 25: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2328) (IFC 104.2) 26: Maintain fire alarm system audible/visual notification. Addition/relocation of walls or partitions may require relocation and/or addition of audible/visual notification devices. (City Ordinance #2328) 27: The maximum flame spread class of finish materials used on interior walls and ceilings shall not exceed that set forth in Table No. 803.5 of the International Building Code. 9: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 10: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575-4407. • • 29: The fire sprinkler heads in the immediate vicinity of the furnace need to high temperature rated heads. 28: The furnace needs to comply with applicable provisions of International Fire Code Chapter 30 and needs to be certified by an approved listing agency. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1700 BUILDING FINAL** 1400 FIRE FINAL 0409 FRAMING CITY OF 1.,KWILA Community Development Department Fubllc Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 h //www,Tt kwilaWA.gov. SITE LOCATION Building Permit No. \)12) UNA— Project No, Date Application Accepted: Date Application Expires; (For office use only) CONSTRUCTION PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not he accepted through the mail or by fax. "Please Print** Site Address: V 12 `at//}} ebi, Tenant Name: (3'Q-' lmMeiorpil PROPERTY OWNER Name: 70 lev LVE a ZAP State: \\16.Zip:4 1 i 4 CONTACT PERSON -- person receiving all project communication Name: ri,„, r,„,,,,., _ YI T Address, i�� 1,1I w 1?r „ie Vt2 Sttate:4 Zip City:��teix 11(0 Phone: p.�k�' "� Fax: Ac„ .�, ,I L _ � Email: aKeili.e eAbejlieg aeci i. 6,144 GENERAL CONTRACTOR INFORMATION T Company Name: 1 5/7 Address: City: State: Zip: Phone: Fax: Contr Reg No.: Exp Date: Tukwila Business License No.: _____ -___J H!App!ications`Forrs-Applications On Lir,e12012 ApplicationsSPermit Application Reused • 2-7.12 dctx Revised re1roery2112 ray King Co Assessor's Tax No.?1nCe et, Shite Number: ^�- Floor: New New Tenant: ❑ Yes �,.No ARCHITECT OF RECORD Company Name: iVtal tig 7. 11L _C Architect Name: rVeil! e Address: IA 1(1,RZ City: t State.\ lip: 1' Phone: i/sv • ,35 'bill Fax: „ ,140„83x 1 pAhthivitaltht Email: /�tt ENGINEER OF RECORD Company Name: n' W Engineer Name: Address: State zirci am Phone, Fax: Email: LENDER/BOND ISSUED (required for projects $5,000 or greater per RCW 19.27.095) Name: Address: City: tAf fi:44126) State: Zip: Page i of 4 j BUILDING PERMIT INFORNIATIOi006-43I-3670 Valuation of Project (contractor's bid price): $ Existing Building Valuation: S4( RA464 Describe the scope of work (please provide detailed information): 0661.1r1144Ma '" 6txr VOilbVF e(. rtz4,01,0 t6* ' kid t4Ew qiiLE fJ�.lil i U2 ill. � t iNS IA. "CWD uew iett rtiat-lba* r . 13,e iuvEfv. __I pie Will there be new rack storage? ❑ ....Yes ..No If yes, a separate permit and plan submittal will be required. Provide AH Building Areas in Square Footage Below PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): I19e1'61.14F'2 Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principalriowner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: 19a���-Ie Compact: Handicap:, Will there be a change in use? Yes 0 No If "yes", explaini t�d.i. IE '% "1 v FIRE PROTECTION/HAZARDOUS MATERIALS: Sprinklers 0 Automatic Fire Alarm 0 None 0 Other (specify) Will there be be storage or use of flammable, combustible or hazardous materials in the building? 0 Yes No if 'Yes', attach list of materials and storage locations on a separate 8-1/2" x 11" paper including quantities and Material Safe Data Sheets. SEPTIC SYSTEM 0 On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. N lApplicationsWorms-Applications On Line\2012 Applications\Permit Application Revised - 2-7-12 docs Re+iced February 2012 bh Page 2 of 4 Existing 1- Interior Remodel Addition to Existing Structure New Type of Construction per IBC Y \ r M b Type of Occupancy per IBC �%� 'd'J1'�.�._.�J� r i s` Floor 2a Floor 3rd Floor Floors thru Basement Accessory Structure* Attached Garage Detached Garage Attached Carport Detached Carport Covered Deck Uncovered Deck PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): I19e1'61.14F'2 Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principalriowner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: 19a���-Ie Compact: Handicap:, Will there be a change in use? Yes 0 No If "yes", explaini t�d.i. IE '% "1 v FIRE PROTECTION/HAZARDOUS MATERIALS: Sprinklers 0 Automatic Fire Alarm 0 None 0 Other (specify) Will there be be storage or use of flammable, combustible or hazardous materials in the building? 0 Yes No if 'Yes', attach list of materials and storage locations on a separate 8-1/2" x 11" paper including quantities and Material Safe Data Sheets. SEPTIC SYSTEM 0 On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. N lApplicationsWorms-Applications On Line\2012 Applications\Permit Application Revised - 2-7-12 docs Re+iced February 2012 bh Page 2 of 4 PERMIT APPLICATION NOTES • Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OW ORIZED AGENT: Signature: Date: ZI OZ 13 Print Name: O o ba LE Mailing Address: NY) H:\Applicatians\Forms-Applications On Line\2012 Applications\Perrnit Application Revised - 2.7.12 docx Revised: February 2012 bh Day Telephone: • 4-3 3 -C(— City Wh. gel& State Zip Page 4 of 4 Cash Register Receipt City of Tukwila DESCRIPTIONS ACCOUNT PermitTRAK QUANTITY PAID $607.40 013-0361 Address: 12671 GATEWAY DR 1 Apn: 2716000040 $330.00 DEVELOPMENT $330.00 PERMIT FEE R000.322.100.00.00 $325.50 WASHINGTON STATE SURCHARGE B640.237.114 $4.50 D13-0365 Address: 12870 INTERURBAN AVE S BLDG 1 Apn: 2716000010 $212.40 DEVELOPMENT $212.40 PERMIT FEE R000.322.100.00.00 $207.90 WASHINGTON STATE SURCHARGE B640.237.114 $4.50 D13-065 Address: 12870 INTERURBAN AVE S Apn: 2716000010 $65.00 DEVELOPMENT $65.00 ADDITIONAL PLAN REVIEW R000.345.830.00.00 $65.00 TOTAL FEES PAID BY RECEIPT: R1041 $607.40 Date Paid: Monday, February 03, 2014 Paid By: PRECISION BUILDERS, INC. Pay Method: CHECK 7691 Printed: Monday, February 03, 2014 8:34 AM 1 of 1 ?SYSTEMS Cash Register Receipt City of Tukwila DESCRIPTIONS PermitTRAK QUANTITY PAID $135.14 D 13-0365 Address: 12870 INTERURBAN AVE S BLDG 1 Apn: 2716000010 135:14 DEVELOPMENT $135.14 PLAN CHECK FEE TOTAL FEES PAID BY RECEIPT: R249 R000.345.830.00.00 $135.14 $135.14 Date Paid: Wednesday, December 04, 2013 Paid By: DAVID E KEHLE Pay Method: CREDIT CARD 025597 Printed: Wednesday, December 04, 2013 12:21 1 of 1 PM CRWSYSTEMS INSPECTION NO. INSPECTION RECORD Retain a copy with permit .71 3L PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 431-2451 Pr ect: (% keA t � .k) Type of Inspection: 1 (A r1'\ I al b--+- . n?.14 I Address: -S1 O \',, --0+3 f Zdt"\) Date Called: ko S r - Special Instructions: Date Wanted: i0 -.2-IL/ ei.m._ p.m' Requester: , Phone N/ii�:4 sitApproved per applicable codes. Corrections required prior to approval. COMMENTS: 12C10(\ INt9 - r CAM I Date: REINS ECTION FEE REQUIRE. Prior to rfext inspection, fee must be paid a 6300 Southcenter Blvd. Suite 100. all to schedule reinspection. INSPECTION NUMBER INSPECTION RECORD Retain a copy with permit N .3 - c>3& .t,. /q -S-((3 k1 /3- 023, PERMIT NUMBERS. CITY OF TUKWILA FIRE DEPARTMENT 444 Andover Park East, Tukwila, Wa. 98188 -206-575-4407 Project: Type of Inspection: Address: Suite #: I zgj-7 0 ,E , A ,5, Contact Person: - Special Instructions: Phone No.: - . .z.5J-32..Co -6O . - Approved per -applicable codes. Corrections required prior to approval. COMMENTS: CD L Needs Shift Inspection: ,v cz Sprinklers: ' ¢ s • Fire Alarm: o N kS Hood & Duct: Monitor: Pre -Fire: Q Permits:• 1 Occupancy Type: F---, Inspector: ,v cz Date: 0 ((Z t 14 Hrs.: I -l1 $100.00 REINSPECTION FEE REQUIRED. You will receive an invoice from the City of Tukwila Finance Department. Call to schedule a reinspection. Billing Address Attn: Company Name: Address: City: State: Zip: Word/Inspection Record Form.Doc 6/11/10 T.F.D. Form F.P. 113 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 R3 Envelope Summary ENV -SUM 2012 Washington State Energy Code Compliance Forms for Commercial. Groun RI and 9 n nry R2 & R3 Revised June 2013 Project Info Project Address (I 4 is Date 12 114510 IM t -laeWAt fes'E 4 For Building Department Use CO FIC FILLrecr Applicant Name:94 ` betotig it.phiir Applicant Address: Ii«0416m132'W ' Ip. A UC(C C� Applicant Phone: /too ,44.0.-/.5 _P t1- Project Description • New Building ❑ Addition 04 Alteration ■ Change of Occupancy/Conditioning Compliance Path ❑ Total Building Performance ■ Prescriptive ❑ Component Performance Occupancy Group • Commercial 0 Group R (R-1 & > 3 story R-2 and R-3) Climate Zone * Climate Zone /Gly 0 Climate Zone (e4( See WSEC 301.1 for county list) Vertical Fenestration and Skylight Area Calculation !f complying via the Prescriptive path, provide values for vertical fenestration, skylights, gross walls and roof. If complying via the Component Performance path, these values are auto- filled by the ENV -UA form end cannot be edited here. Total vertical Gross Exterior Fenestration Above Grade % Vertical (rough opening) divided by Wall Area times 100 equals Fenestration J X 100 = Gross Exterior Total Skylight divided by Roof Area times 100 equals % Skylight Witt_ X 100 = Maximum Prescriptive Fenestration Area VerticalRLCEIVtu Fenestration 14A. CITY OF TUKWILA Skylights c DEC 0 4 2013 50% Floor Area in DLZ 0 More than 50% of the floor area in daylight zone per C402!3.ERMiT CENTER Semi -Heated Path ❑ Project has semi -heated areas as defined per 0402.1.4 and has a max. heating system for requirements. other conditioned spaces- provide or Component Performance compliance spaces shall comply with ■ Applying wall exception to semi -heated areas 1. To be deemed semi -heated the area is heated but not cooled, output capacity between 3.4 - 8 Btuh/ft2. Refer to C402.1.4 2. Semi -heated .spaces shall be documented separately from separate compliance forms for each conditioned area type. 3.Semi-heated spaces may comply under the Prescriptive path. 4.Envelope elements separating semi -heated from other conditioned thermal envelope requirements for an exterior wall. Refrigerated Spaces freezer of Occupancy/Conditioning -,, ..•:-....'._..: •.., •..: +.: '.n tfENtrm. for Refer ■ Walk-in cooler • Walk-in 0 Refrigerated Warehouse Cooler • Change Refrigerated spaces shall comply under the Prescriptive - .. these areas may be combined with non -refrigerated am:. in Mixed Occupancy and/or Space Conditioning Project includes more than one occupancy type and/or le = I compliance forms may be required. Select all that apply t scope Commercial 0 Group R1 or >3 story - ° R3 IP .'�•j'$.�?. • A e �u� o'•,, "" • 1 RIIefriger'aated Space 03 DLj' Low9Enerrgy for t l nitdr nixii inm • Fully Conditioned 0 Semi -Heated • 0 Group R2/R3 < 3 story *Low energy areas are exempt from all thermal envelope rovisiderglibeinTilkttlittns these areas are not required. Refer to C101.5.2 for exem.; kitti U4007.1 p7►11U i44 -1,woeve 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Interior Lighting Summary LGT-SUM 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Revised June 2013 Project Info Project Address Oar/ tj , , Date `•Z` ili For Building Department Use '�� t"/ • Applicant Name: \I " t` OEt.}W�i �.` eI R9Obi el iY /p lafll: Applicant Address Applicant Phone:nD (1r 3 -f:/14 4" Project Description -lik Alteration ■ New Building ■ Addition ■ Plans Induded Lighting Compliance Path 0 Lighting Power Density Calculations 0 Total Building Performance (if Total Building Performance then only LGT-CHK is required.) Interior Lighting Compliance Option o Building Area Method ® Space -by -space Method Interior Lighting Systemn, Description (� Briefly describe lighting system type and features. Additions and Change of Space Use (C101.4.3 & C101.4.4) 1 Addition area or Change of Space Use area complies with all applicable provisions as stand alone project area or Change of Space Use area is combined with existing building lighting systems to demonstrate with all applicable provisions Building Area Method (LTG -!NT -BLD) or Space -By -Space Method (LTG -INT -SPACE) Compliance FOIm. Document maximum and proposed (including existing if applicable) lighting wattage of Addition or Change of Use scope. Provide applicable lighting per C405.2 and commissioning of lighting controls per 0405.13. II Addition compliance Provide allowed controls Alterations, Renovations and Repairs (0101.4.3.1) of luminaires in space replaced Building Area Method (LTG -INT -BLD) or Space -By -Space Method (LTG-iNT-SPACE) Compliance Fo►m. Document maximum and proposed (including existing) lighting wattage of project scope ■ 60% or more Provide allowed 60% of luminaires in space replaced Space -by -space Method (LTG -!NT -SPACE) Compliance Form. Document existing total wattage in space and proposed existing) lighting wattage of project scope • Less than Provide (including ballast replacement within existing luminaires only — existing total interior building wattage not increased • Lamp and/or installed to serve added fixtures and/or fixtures relocated to new circuit applicable manual lighting controls (C405.2.1), occupancy sensors (0405.2.2.2), daylight zone controls (C405.2.2.3), specific controls (0405.2.3), and commissioning of lighting controls per C405.13 • New wiring Provide application lighting panel all applicable lighting controls as noted for New Wiring, automatic time switch controls (0405.2.2.1), and commissioning of controls per C405.13. • New or moved Provide lighting reconfigured - luminaires unchanged or moved only all applicable lighting controls as noted for New Wiring and commissioning of lighting controls per 0405.13. a Space is Provide Ifk No changes are being made to the interior lighting and space use not changed. DCI enoineews Portland Spokane San Diego intoe FILE COPY Pernntt No. t. h,d,IQnt to errors and orniI Sing. Eugene ClearSiSan Francisco gn Combustion Corporation Anchorage 12870 Interurban Avenue South Seattle, Washington Stack Support Structural Calculations November 22, 2013 DCI Job #13011-0469 REVIEWED FOR CODE COMPLIANCE APPROVED DEC 19 2013 City of Tukwila BUILDING DIVISION Prepared By: DCI ENGINEERS 818 STEWART STREET, SUITE 1000 SEATTLE, WASHINGTON 98101 818 Stewart Std, Swte 1000 RECEIVED CITY OF TUKWILA DEC 0 4 2013 PERMIT CENTER ipl;--CS(oC"' Seattle, Washington, 98101 Phone (208) 332-1900 Service Innovation Value DCI E f G I f E E R S Project No. I',ot ( --AL1 b1 Sheet No. Project Gl-itql-SIG NI Date 11'2t 13 Subject E )(14 ST By Cars S&o96 of IA10Mc- 1 c-TJM-1. ) 4 r\I F 17'5 krTher-44 pit eii-rs Sr1G FDO TWD klebq Sys Ns! oe 5Icrs rl (44 s- r r—�u lock -repo 2 870 t tre&-v t ktv Ave 3Dirpo 5-`'E , WA - 146 -0 A-14 5 IS 1 -1 -011.50A -Le 30/ 14-1, t-titp & or- $�� t . -r:Freit4�►���gr 90 TD - SIC<ST, ,s/ CLot-$ oti1 +e Sys& ' wl L - LATER -4w1 .S -4(b Ari rts tt t. r (2-o0F -rtn S corMU,tiaa ,U6(171011-- -loVr; f.461 r (30T Q,65t9r WW1- f'lovvr-(e1.CT S -V0uovi i st 7-1 fog. 5-rer.K- . Wei k(yit p (4, 1/01-K : TD-ik_ 576t4 itk L172-+ Wit P 1 Q»)4 = s Ps e (sp-) S1S c c uot46 ! I 2-2_,1-15� FylAti OS GS 5ps=oi13 O' `k Sn (Hs) c&efFio L o (41 Of (570.e-4741) ,0131 vie (AID) O S co fico r.• •O 0 a) 'Q CI O O C O 0 I co lG G3 WOMB stack base detail 0 0 0 0 0 0 0 0 o , 84::'? c0 .. !> — eT""'I I I i 1 u0 17 ;— N N I N E-1-_-> ( V 0 :,,' .•: ,ti:r:.rS.rS,�.�.4r.r'r�.�:.�n:.v.vri.ry�r:W1 i y!:►'+►':►:�:►.►.� :� :�.�5.�:.� �. �::v:�.•1:r.ry:r Li L'► �a �•�r•1►•5.:� ;�✓~~ ••• ,'T,T,TTTT TT•r•r•T+rl�l�l� •. .�J•, . , , • ,,RR !• T,TTTT �.y•. • Tl�i�•.�1"4�.,�.�Y' 1^{��I �T��4 i «0-t01. .0 - tOZ C )N aa) • ar co 0 as U Vj 4 Vj \U U E N Z— o'— E E c o O ° ir`i c 2 Y Y Y Y 2. Z to to N O Z Weight Calculations, Stack Rev 1 Shell Weight. Lbs Base: (1) * 1" x [(30" x 30") - (24" x 24")] x 0.28 #/in3 = 91 Sides: (4) * [360" x 24" x 141 x 0.28 #/in3 = 2419 2510 Hat: (8) * [1/8" x 36" x 24"] x 0.28 #/in 242 Insulation Sides: (2) * [28' x 2' x 11 x 29 #/ft3 = 1,624 Sides: (2) * [28' x 1' x 3 1x 29 #/ft3 = 812 2436 Miscellaneous Anchors at 2% of shell sides 50 Paint at 1% of shell sides 25 Weld at 2% of shell sides 50 125 Stack. Estimated Total Weight 5313 lbs D) ST11-1 PJUT 2'Il I+ io-qa-102+24-+so _ 41304 J . q13 0* 0f = 1(014 PAF 3 o DCI Ef1GIflEERS Project No. 13011-0461 Sheet No. ti Project G 5160 Date Subject 4,w4. imO J'4 By Ci ti 0 f = 0b3qx20 cpor. F-sitt394 'vo-aor- =13�3 DCI Ef1GIflEERS Project No. 13011- o't6q Sheet No. 5 Project C tz Date 424� 3 Subject ST K Dcs,c J By cAs CCK 51-Ftr,le seviioNl nP k)� ?L W o1= 51 *- AI" OfeNlri F .1 f tkefig Jry1-r L= 1(003%V l,7in3 dim -0J = Fbs = O,s)c34e-Si0m 12- 2-31) 2 yso -Fr of PIA 37 Moment Of Inertia -pud hoist beam Project 13011-0469 Moment of Inertia / Section Modulus X -X axis Item b h Y Area AY lo d Ad^2 1 24.00 2 0.50 3 3.50 N.A. _ INPUT d= 0.25 26.00 0.25 9.60 26 9.60 1= 1602.7 ftM S= 167.00 fM3 r= 8.98 ft 0.13 6.00 13.00 13.00 24.00 0.88 Sums = 19.88 =lo+Ad^2 =1/c1 =(I/Ay0.5 0.75 169.00 21.00 190.75 Page 1 0.0313 732.3333 0.0046 732.3691 -9.47 3.40 14.40 538 151 182 870 O Loads: LC 1, DL + Seismic Results for LC 1, DL + Seismic T SK -1 Nov 21, 2013 at 220 PM Staciu3d Company . Designer . Job Number : Nov 21, 2013 2:21 PM Checked By. Joint Reactions (Bv Combination) J ZE u 1 1 N1 -.379 2.424 0 0 0 0 2 1 N2 -1.383 0 0 0 0 0 3 1 Totals: -1.762 2.424 0 4 1 COG (ft): X: 0 Y: 15 Z: 0 Member Section Forces lBv Combination) LC Member Label Sec 1 1 M1 1 Axial(kj 2.424 y Shearfk) .379 z Shear(kj Torquelk ft) y -y Mo... z z Mo 0 0 0 0 2 2 2.02 .099 0 0 0 -1.195 3 3 1.616 -.181 0 0 0 -.99 4 4 1.212 -.461 0 0 0 .615 5 6 7 8 9 10 1 M2 5 1 2 3 4 5 .808 .808 .606 .404 .202 0 -.741 .642 .502 .362 .222 .082 IA !top 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ..9 .38 0 RISA -3D Version 11.0.2 [J:12013 Projects\13011-0469 ClearSign Exhaust Stack\Stack.r3dj Page 1 DCI Ef1GIflEERS Project No. 1011-09-61 Sheet No. 9 Project Ga1- S G' Date //3 Subject Cf- $fs - 12 = S,3k Alter or -2l-6"4 Z,S+2x0,33 = 3,16 iC. gt4Ate } w/ sit 4 v- es- (iM nO Tb 3 w ►raf- C,4otisT Cf -se A -s Pli00+iO4 Sr-) (Solt_ - 5300ib z = 540 (sF �� Svl t. 011- gGlAup.) SI -ht p'SS U -t EO 10 ge A M 1 rel N 0 let o;r 5000r , Sm -y OIL 33o*I VW Silte.L U56. (g) 3/ tet/ ' c: - HI} Eco = Z2►�— I'I mlE 421 Yo j 330 DCI EfGIflEERS Project No. ►011-04661 Sheet No. O Project c '0i1, 5i Cl 4 Subject n _ . erre Date 11/21/(3 By 4..�s SUR1t000001 I N Sew List,' 4 --Alt 2-830 11 --ft Sg 213��2 fie 040436000 1.61113 Mq S = 2-1'1 2'11/2 DCI EfGIPlEERS Project No. 13011-o'f69 Sheet No. I' Project X51 4 Date IuI// l3 Subject A% L� eo i A 0 to of By cAs I x _ 1261 4 - at -K()'+ scew be -9 _ � - -� _ 2/4" 2C, Cd .2 2x 75-04714 )t 5F 8d 1,0,04 I2= la I USE ()%3° !A -el _caw -Ns DCI e n s o P E E R S Project No. _1011-0469 Sheet No. !2 Project 1.6fr i-51414 Date 1/21/13 subject opM ,I6 By cas x(57 /ZOO f i ►aC etithl 1 3! o"J4 2-b4 11 VOL 2x04 14E4466 1 _ ;oo_rtify 1st U1, --Et PL r141,44, 7v6 41 De 27cY Jo i3T 2, " 1004 W=11xitcyls= YOpr/1z 81-61 I2 = 42-o4 11 = 5 -Do 11 -41 - as -e - I *asp Pgt. g41A4,0 — 7240 1-41- 1 DCI EfGIf1EERS Project No. I �o I► -04641 Sheet No. SSK-oI Project G 14 Subject ?rTZ-T-L. (tea Date 11/2-1(13 By Cyd N F eeocTRATINIS f0- SS 14-02 S.314 -o3 Lot/11014S .� 5Y c UG►J x t 1, (') '-h�a4� @ 8.0 oG i ceN DCI EflGifEERS Project No. Sheet No. SsK-o2 Project G (,6A --SIG 14 Date II iv / 13 Subject o f @ IJP Der4 By c, op 2-K4 14F4-2- WO F*2i oS of ON OLi-xI(o to 04;v0A-riz (c. o INteosoNs) w/ 1,61-i44._ . (E) 1-1,11 e( 1 � „ _ ./1 2 OLi-xI(o to 04;v0A-riz (c. o INteosoNs) DCI EfG11lEEPS Project No. ID11-04661 Sheet No. SS IK -0 3 Project ar7,011,611.1 Date 11/2-1/13 Subject n ooF f 0 eij 41., u oo By U4-5 1, FloctLg To g6 Asim Pr3 4 2, eUVt r6 -44001c SPcuAL 1rtsPEcTio Fait WV -PS 3, sTP U -T1) (lel. SQL W1w i aG / 191.10-T1 OtJ DCI E n G I n E E R S Project No. 1301-o't 1 Sheet No. Project Cl.g11-‘t 114 Date 1I/13 Subject P-ODF E -T OF 1 @ ST�e..., IM►L1c, f yoF Phi `U1 T I O 4 PV -12 GM' SSK-Os z' -' S k (, 4 G000ecno o f (40F ST K 'lUGiL S Is R- ) I a-1 0 a.- pest 3i (1a4s Purl sSt&-03 DCI EflGIPIEERS Project No. 13011-041 Sheet No. 5i4.-05 Project 1, ' -- 14 0 Date II/a-2/1 3 Subject Co OA „OA n ST By acts ()sem of 4s. DCI Project No. I3011-014bl Sheet No. SSK-0& Project C ✓ s 14 a Subject Gtx p1 NFO Mei- 0 S'lIt-IL opet31 n14S Date II/21113 By �p (2)oPeolt346 irJ c on) AOJAt-SipES 0)G 141-e" nov6 SLA -8 4 (1) @ 11-41 A$ov6 S+ -(3 ti Of tit ltd STS 24( 17 le 2-)(2..y 1/41, ELEVATI SSI -n7 Stack Detail, Rev 1 One of Two Identical Stacks Shown 8' — 0" --> O 0 0 N 1.4 2'_0„ prttoxrc hat plate layout roof line 4" welded hat plate (top view) ss -os stack base detail <10" E--- 2' _ 6" > Notes: Stack column from 1/4" C.S. plate Stack hat from 1/8" C.S. plate Stack inlets from 2"x2"xW C.S. angle Stack base from C.S. plate DCI EflGIfEER5 FELE COPY Project No. 1;1)11 -0q6q Sheet No. 5SK-0I Project 6,A 14 t\I Date„/y'/j3 Subject ?eri:2_,TIpti, R40 1,..4cto By c^j CL1 Iii heri2A71-1 01\1,51 fE'!i 53 14-01_ 45sK.-03 tA0(xr fo H 7 6\( CLEF Sl',J REVIEWED MLIANCE R CODE APPROVED DEC 19 2013 City of Tukwila BUILDING DIVISION j RECEIVED CITY OF TUKWILA DEC 0 4 2C13 PERMIT CENTER pl303tQs DCI Ef1GIf1EERS Project No. 14O11-04"69 Sheet No. SsK--o2 Project G1,64°14-- S 141-i Subject g-OOF 1-1 @ r\ or' Date `` /21 13 By Com"! s 2- pB� -F2 c►O S off- oriJ4 wf yt15 - (coT (E.) 2)/i -f- atsomruT W52+ 1 (G - DI 1 s oP5) DCI EfGIf1EERS Project No. 13011-01+69 Sheet No. E?SK-03 Project c,, 1/_ 1 Date (I / Z+ I Subject ?0 f j?>•A 1 e J w j ALS a (l -ACS'S By C I\143 I,Lc-s TO fA el:SitYt A3 pot UJ -..p .s 3, sTrwg-T) A -i. STErL vJ>;0)oAt EAr cA-TtotJ sqA-u.. $e- poKIE ( WA -Bo cvLispiEr WELPE-IGS DCI EflGlfEERS Project No. 1301-061661 Sheet No. 5s iz -014 Project aLsAlt-s� Date Subject O F 1 014 1@ By Ffulhinkic, 6 yoF COVTY1117 1014 Pv-2 S14. -d 2 Fy „ 77/ -1. �11 x xl (Z) Vb°40 ? 3+' r,5 -1- 11/41 OTV o Go011EcTl0of (40F 0 -To 06- p• DCI ERGIPIEERS Project No. 13o11 -o461 Sheet No. s1 -C;)5 - Project 141.1 Date I l i2Z /' 3 Subject $f\5a 14,0 f By acts 546 //2 ,' --- - -ftlP ;ta i6 C8) I M 1°50 t 3/Ii: 4' 2.1/ 21: Trie-O FIS HIO) (F) S LM o+' DC1 enGineeRs Project No. 13oli-o461 Sheet No. ',SIL -O& Project n --C--114...; 14 Subject itoc‘L..e (LEI NFoiLteftk)i -ril-r44- OP34 Date 11(22-/I3 By ce ji:td kipre- 0-)OPE1`)1136S 10 91 -it -IL 00 AO.J (1)e 1-1-1-e' \)5 4 14OVst-A-5 I Ete0A-T1 OKI . A 0 0 0 0 N Sh-o7 Stack Detail, Rev 1 One of Two Identical Stacks Shown �-- 8' — p" --3 hat plate layout welded hat plate (top view) RA -JC r p» ?G SSK.-05 — 0" stack base detail 11.w -c5 p&& 5514.-ve E 10" E--- 2' — g" --> Notes: Stack column from %" C.S. plate Stack hat from 1/8" C.S. plate Stack inlets from 2"x2"x1A" C.S. angle Stack base from dp C.S. plate /� August 4, 2014 • City of Tukwila Jim Haggerton, Mayor Department of Community Development .Jack Pace, Director James Harmon 12870 Interurban Ave S Tukwila, WA 98168 RE: Request for Extension Permit Numbers D13-0365 & M13-0236 ClearSign Combustion —12870 Interurban Ave S Dear Mr. Harmon, This letter is in response to your written request for an extension to Permits D13-0359 and M13-0236. The Building Official has reviewed your letter and considered your request to extend the above referenced permits. It has been determined that the City of Tukwila Building Division will be granting an extension to these permits through February 25, 2015. If you should have any questions, please contact our office at (206) 431-3670. Sincerely, `1,0 Bill Rambo Permit Technician File: Permit Nos. D13-0365 & M13-0236 W:\Permit Center\Extension Letters\Permits\2013\D13-0365 Permit Extension.docx 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 • July 30, 2014 Hand Delivered Building Official City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite 100 Tukwila, Washington 98188 RE: Permits No. D13-0365 and M13-0236 Dear Sir or Madam: 4klearSign RECEIVED 1UL 30 2014 COMMUNI I Y DEVELOPMENT This is to request an extension of the above referenced permits for which we received the attached notices. The work relates to the installation of two testing furnaces used for research purposes that have extended construction and calibration periods. Please extend these permits for an additional 180 days to accommodate our installation needs. If you have questions, please contact me by phone on my mobile at 206/669-0441 or by e mail at jimna clearsign.com Sincerely, ClearSign Combustion Corporation fi) N. Harmon Financial Officer Attachments: As stated cc: Bill Rambo, Permit Technician Clearsign Combustion Corporation 12870 Interurban Avenue South Seattle, WA 98168 Phone: 206.673.4848 I Fax: 206.299.35531 www•clearsigncombustion.com 7/1/2014 • City of Tukwila • Department of Community Development DAVID KEHLE, ARCHITECT 1913 BONAIR DR SW SEATTLE, WA 98116 RE: Permit No. D13-0365 CLEAR SIGN COMBUSTION 12870 INTERURBAN AVE S Dear Permit Holder: Jim Haggerton, Mayor Jack Pace, Director In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 8/2/2014. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 8/2/2014, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely -?D4-4 Bill Rambo Permit Technician File No: D13-0365 6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 410ERMIT COORD COPY PLAN REVIEW/ROUTING SLIP ACTIVITY NUMBER: D13-0365 DATE: 12/04/13 PROJECT NAME: CLEAR SIGN COMBUSTION SITE ADDRESS: 12870 INTERURBAN AVE S X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # after Permit Issued DEPARTMENTS: AVOC V-31 5 Building Division MI n t.. 12 2S t i 5 P blic Works Awc 04 12-.0sti3 Fire Prevention Structural Planning Division ❑ Permit Coordinator ❑ DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 12/05/13 Complete Incomplete Not Applicable Comments: Permit Center'Use Only �' %;� t - , INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg 0 Fire 0 Ping 0 PW 0 Staff Initials: TUES/THURS ROUTING: Please Route Structural Review Required ❑ No further Review Required ❑ REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 01/02/14 Approved ❑ Approved with Conditions _ Not Approved (attach comments) ❑ Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg 0 Fire 0 Ping D PW 0 Staff Initials: PRECISION BUILDERS INC Its 0 Washington State Department of Labor & Industries Page 1 of 2 PRECISION BUILDERS INC Owner or tradesperson SANBURN, SCOT DEAN Principals SANBURN, SCOT DEAN ELIZABETH SANBORN Doing business as PRECISION BUILDERS INC WA UBI No. 600 553 713 PO BOX 98609 DES MOINES, WA98198-0609 206-878-2948 KING, County Business type Corporation Governing persons LIZSANBORN License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor License specialties GENERAL License no. PRECIBI151 C2 Effective — expiration 02/22/1985 — 01/19/2016 Bond DEVELOPERS INS CO Bond account no. 415171C Received by L&I 01/14/2002 Insurance West American Ins Co Policy no. BKW55554018 Received by L&I 07/03/2013 Savings No savings accounts during the previous 6 year period. Active. Meets current requirements. $12,000.00 Effective date 01/19/2002 $1,000,000.00 Effective date 07/15/2013 Expiration date 07/15/2014 httns://secure.lni.wa.aov/verifv/Detail.aspx?UBI=600553713&LIC=PRECIBI151C2&SAW= 02/03/2014