Loading...
HomeMy WebLinkAboutPermit D13-0381 - PEARL DISTRIBUTION - TENANT IMPROVEMENTPEARL DISTRIBUTION 1091 ANDOVER PK E D13-0381 Parcel No: Address: • City of Tukwila s Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov 2623049106 1091 ANDOVER PARK E Project Name: PEARL DISTRIBUTION DEVELOPMENT PERMIT Permit Number: D13-0381 Issue Date: 1/17/2014 Permit Expires On: 7/16/2014 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: CBRE INC 20415 72ND AVE S #210 C/O STOCKBRIDGE CAPITAL GP, KENT, WA, 98032 CRAIG PEARL 401 BAKER BL, TUKWILA, WA, 98188 CEDAR RECYCLING INC 411 W VALLEY HWY S , PACIFIC, WA, 98047 CEDARRI981CM N/A LESS THAN $5,000 . Phone: (206) 244-2600 Phone: (253) 804-0404 Expiration Date: 2/18/2014 DESCRIPTION OF WORK: INSTALLATION OF 43 BAYS OF PALLET RACKING TO PLAN AND CODE Project Valuation: $2,291.00 Type of Fire Protection: Sprinklers: YES Fire Alarm: Type of Construction: Occupancy per IBC: 5-2 Electrical Service Provided by: TUKWILA FIRE SERVICE Water District: TUKWILA Sewer District: TUKWILA SEWER SERVICE Fees Collected: $250.52 Current Codes adopted by the City of Tukwila: Internations Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: 2012 2012 2012 2012 International Fuel Gas Code: WA Cities Electrical Code: WA State Energy Code: 2012 2012 2012 Public Works Activities: Channelization/Striping: Curb Cut/Access/Sidewalk: Fire Loop Hydrant: Flood Control Zone: Hauling/Oversize Load: Land Altering: Landscape Irrigation: Sanitary Side Sewer: Sewer Main Extension: Storm Drainage: Street Use: Water Main Extension: Water Meter: • • Volumes: Cut: 0 Fill: 0 Number: 0 No Permit Center Authorized Signature: I hearby certify that I have read and provisions of law and ordinances gov Date: o611H ned this permit and know the same to be true and correct. All this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local la : re;ulating construction or the performance of work. I am authorized to sign and obtain this development •ermand agr - to 'e conditioattached to this permit. Signature: Print Name: 6 _/ 4 T Date: I /7/6t This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ***FIRE DEPARTMENT PERMIT CONDITIONS*** 2: Portable fire extinguishers, not housed in cabinets, shall be installed on the hangers or brackets supplied. Hangers or brackets shall be securely anchored to the mounting surface in accordance with the manufacturer's installation instructions. Portable fire extinguishers having a gross weight not exceeding 40 pounds (18 kg) shall be installed so that its top is not more than 5 feet (1524 mm) above the floor. Hand-held portable fire extinguishers having a gross weight exceeding 40 pounds (18 kg) shall be installed so that its top is not more than 3.5 feet (1067 mm) above the floor. The clearance between the floor and the bottom of the installed hand-held extinguishers shall not be less than 4 inches (102 mm). (IFC 906.7 and IFC 906.9) 3: Extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (IFC 906.5) 4: The total number of fire extinguishers required for an ordinary hazard occupancy with Class A fire hazards is calculated at one extinguisher for each 1,500 sq. ft. of area. The extinguisher(s) should be of the "All Purpose" (2A, 20B:C) dry chemical type. Travel distance to any fire extinguisher must be 75' or less. (IFC 906.3) (NFPA 10, 3-2.1) 5: Maintain fire extinguisher coverage throughout. 6: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2328) (IFC 104.2) • 7: Maintain fire alarm system audible/visual notification. Addition/relocation of walls or partitions may require relocation and/or addition of audible/visual notification devices. (City Ordinance #2328) 8: Clearance between ignition sources, such as light fixtures, heaters and flame -producing devices, and combustible materials shall be'maintained in an approved manner. (IFC 305.1) 9: Where storage height exceeds 15 feet and ceiling sprinklers only are installed, fire protection by one of the following methods is required for steel building columns located within racks: (a) one-hour fire proofing, (b) sidewall sprinkler at the 15 foot elevation of the column, (c) ceiling sprinkler density minimums as determined by the Tukwila Fire Prevention Bureau. (NFPA 13) 10: Storage shall be maintained 2 feet or more below the ceiling in nonsprinklered areas of buildings or a minimum of 18 inches below sprinkler head deflectors in sprinklered areas of buildings. (IFC 315.2.1) 11: Flue spaces shall be provided in accordance with International Fire Code Table 2308.3. Required flue spaces shall be maintained. 12: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575-4407. 13: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 14: ***BUILDING PERMIT CONDITIONS*** 15: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 16: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 17: When special inspection is required, either the owner or the registered design professional in responsible charge, shall employ a special inspection agency and notify the Building Official of the appointment prior to the first building inspection. The special inspector shall furnish inspection reports to the Building Official in a timely manner. 18: A final report documenting required special inspections and correction of any discrepancies noted in the inspections shall be submitted to the Building Official. The final inspection report shall be prepared by the approved special inspection agency and shall be submitted to the Building Official prior to and as a condition of final inspection approval. 19: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 20: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 21: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 22: Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. Access to exits shall be marked by readily visible exit signs in cases where the exit or the path of egress travel is not immediately visible to the occupants. Exit sign placement shall be such that no point in an exit access corridor is more than 100 feet (30,480 mm) or the listed viewing distance for the sign, whichever is less, from the nearest visible exit sign. (IFC 1011.1) 23: Every exit sign and directional exit sign shall have plainly legible letters not less than 6 inches (152 mm) high with the principal strokes of the letters not less than 0.75 inch (19.1 mm) wide. The word "EXIT" shall have letters having a width not less than 2 inches (51 mm) wide except the letter "I", and the minimum spacing between letters shall not be less than 0.375 inch (9.5 mm). Signs larger than the minimum established in section 1011.5:1 of the International Fire Code shall have letter widths, strokes and spacing in proportion to their height. The word "EXIT" shall be in high contrast with the background and shall be clearly discernible when the exit sign illumination means is or is not energized. If an arrow is provided as part of the exit sign, the construction shall be such that the arrow direction cannot be readily changed. (IFC 1011.5.1) • • 24: Exit signs shall be illuminated at all times. To ensure continued illumination for a duration of not less than 90 minutes in case of primary power loss, the sign illumination means shall be connected to an emergency power system provided from storage batteries, unit equipment or on-site generator. (IFC 1006.1, 1006.2, 1006.3) 25: Emergency lighting facilities shall be arranged to provide initial illumination that is at least an average of 1 foot-candle (11 lux) and a minimum at any point of 0.1 foot-candle (1 lux) measured along the path of egress at floor level. Illumination levels shall be permitted to decline to 0.6 foot-candle (6 lux) average and a minimum at any point of 0.06 foot-candle (0.6 lux) at the end of the emergency lighting time duration. A maximum -to -minimum illumination uniformity ratio of 40 to 1 shall not be exceeded. (IFC 1006.4) PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1700 BUILDING FINAL** 0611 EMERGENCY LIGHTING 1400 FIRE FINAL 4046 SI-EPDXY/EXP CONC CITY OF TUKWILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd, Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Building Permit No. \?r ')3g Project No. Date Application Accepted: (Qk9 Date Application Expires: (For office use only) CONSTRUCTION PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION Site Address: 1091 Andover Park/ E King Co Assessor's Tax No.: 2623049106 Suite Number: B Floor: Tenant Name: Pearl distribution PROPERTY OWNER Name: 61.111-1 oh ' Name: CBRE Address: t 4 I vile ) ✓o Address: 1071 Andover Park W City: V) L wl L6.. State: 1440 City: Tukwila State: WA Zip: 98188 CONTACT PERSON — person receiving all project communication Name: 61.111-1 oh ' Address: 411 W Valley Hwy S Address: t 4 I vile ) ✓o Phone: (253) 804-0404 Fax: (253) 804-2702 City: V) L wl L6.. State: 1440 Zip:�/(,S/ Phone: 9,9 le a ti y ,akbD Fax: .0 iE7 ,/ 3v .Email: GENERAL CONTRACTOR INFORMATION Company Name: Cedar Recycling -Rusty Rack Guy's Address: 411 W Valley Hwy S City: Pacific State: WA Zip: 98047 Phone: (253) 804-0404 Fax: (253) 804-2702 Contr Reg No.: CEDARR1981CM Exp Date: 02/14/2013 Tukwila Business License No.: H:Wpplications\Forms-Applications On Line\201 I Applications\Permit Application Revised - 8.9-I l.docx Revised: August 2011 bh New Tenant: m Yes ❑..No ARCHITECT OF RECORD Company Name: Structural Concepts Engineer Name: Ali Abolhassani Company Name: City: Anaheim State: CA Zip: 92807 Phone: (714) 632-7330 Fax: (714) 632-7763 Architect Name: Address: City: State: Zip: Phone: Fax: Email: ENGINEER OF RECORD Company Name: Structural Concepts Engineer Name: Ali Abolhassani Address: 1200 N Jefferson ST, Suite F City: Anaheim State: CA Zip: 92807 Phone: (714) 632-7330 Fax: (714) 632-7763 Email: mail@sceinc.net LENDER/BOND ISSUED (required for projects $5,000 or greater per RCW 19.27.095) Name: Address: City: State: Zip: Page 1 of 4 BUILDING PERMIT INFORMATION— 206-431-3670 Valuation of Project (contractor's bid price): $ 2,291 Describe the scope of work (please provide detailed information): Installation of 43 Bays Pallet Racking to plan and Code Will there be new rack storage? ® Yes Existing Building Valuation: $ ❑.. No If yes, a separate permit and plan submittal will be required. Provide All Building Areas in Square Footage Below PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? D Yes ❑ No If "yes", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: Sprinklers ❑ Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? 0 Yes jAl No If "yes', attach list of materials and storage locations on a separate 8-1/2"x 11" paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM 0 On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:\Applications\Forms-Applications On Line\2011 Applications\Permit Application Revised - 8-9-I l.docx Revised: August 2011 bh Page 2 of 4 Existing Interior Remodel Addition to Existing Structure New Type of Construction per IBC Type of Occupancy per IBC 1° Floor 2nd Floor 3rd Floor Floors thru Basement Accessory Structure* Attached Garage Detached Garage Attached Carport Detached Carport Covered Deck Uncovered Deck PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? D Yes ❑ No If "yes", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: Sprinklers ❑ Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? 0 Yes jAl No If "yes', attach list of materials and storage locations on a separate 8-1/2"x 11" paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM 0 On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:\Applications\Forms-Applications On Line\2011 Applications\Permit Application Revised - 8-9-I l.docx Revised: August 2011 bh Page 2 of 4 PERMIT APPLICATION NOTES — Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING ! NER 312 A Signature: Print Name: Mailing Address: HORIZED AGENT: 6 B,44tef\ R� I vo Day Telephone: Date: WAV 206 L W(- ZEA r /1-i City H:\Applications\Forms-Applications On Line\201 I Applications'ermit Application Revised - 8-9-I l.docx Revised: August 2011 bh State Zip Page 4 of 4 Cash Register Receipt City of Tukwila DESCRIPTIONS I ACCOUNT I QUANTITY I PAID PermitTRAK $250.52 D13-0381 Address: 1091 ANDOVER PARK E Apn: 2623049106 $250.52 DEVELOPMENT $250.52 PERMIT FEE R000.322.100.00.00 $149.10 PLAN CHECK FEE R000.345.830.00.00 $96.92 WASHINGTON STATE SURCHARGE B640.237.114 $4.50 TOTAL FEES PAID BY RECEIPT: R467 $250.52 Date Paid: Friday, December 20, 2013 Paid By: PEARL NORTHWEST INC Pay Method: CHECK 72745 Printed: Friday, December 20, 2013 11:16 AM 1 of 1 CRW SYSTEMS INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206).431-3670 Permit Inspection Request Line (206) 431-2451 D 3 1 Proj Type of:.inspection: Address: Date Called: Special Instructions:t�7 h' + ` v� Date Wanted: 2c'... ' a.m. -. 131111.: Requeste Phone No: pproved per applicable codes. Corrections required prior to approval. COMMENTS: nspecto n REINSPECTION FEE REQ IRED. Prior�o next inspection, fee must be pa'i,d at 6300 Southcenter vd.. Suite 1 0 0. Call to schedule reinspection.: Date: 4 - INSPECTION RECORD Retain, a copy with permit INSPECTION NO. ' RMIT CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 431-2451 Project ePi(L_ ;4. Type of. Inspection: q111\01(,. 00 I,,tGE\;‘l�.( Address .oci 1 _A R PKz` Date Called: Special Instructions: Date Wanted:. ( --Z r i - r. u ,..6 .. '�p.m., Requester: Phone No: : Approved per applicable codes. .Corrections requiredprior to approval. COMMENTS: Date: O n R t SPECTION FEE RE UIRED. Prior to next inspection. fee must be p i at 6300 Southcenter lvd.. Suite 100. Call to schedule reinspection. INSPECTION NUMBER INSPECTION RECORD Retain a copy with permit p) 3 -03?! PERMIT_NUMBERS CITY OF TUKWILA FIREDEPARTMENT 444 Andover Park East, Tukwila, Wa. 98188 206-575-4407 Project / � Type of Inspection: Address: /Oa 7 Suite #: Contact Person: A Pe Special Instructions: Phone No.: Approved per applicable codes. Corrections required prior to approval. COMMENTS: /.7.a�-ami Needs Shift Inspection:.e-r Sprinklers: /..s..::a Fire Alarm: �„e, Hood & Duct: Monitor: Pre -Fire: j1% Permits: Occupancy Type: Inspector: ,,, 3 Date: //Z -S/7' Hrs.: /, 0 $100.00 REINSPECTION FEE REQUIRED. You will receive an invoice from the City of Tukwila Finance Department. Call to schedule a reinspection. Billing Address Attn: Company Name: Address: City: State: Zip: Word/Inspection Record Form.Doc 6/11/10 T.F.D. Form F.P. 113 Client: Pearl Distribution 1091 Andover Park E. Tukwila, WA 98168 Contact: Craig Pearl Field Report Report #: 059255 Project Number: 14-136 Permit #: D13 0381 Project Name: Pearl Distribution Address: 1091 Andover Park E. Inspection Performed: Proprietary Anchors Date: 1/27/2014 Time: Temperature: Anchor bolts for pallet racks, a total of five rows. Verified installation of Simpson Strongbolt 2 anchors, 1/2" x 4 3/4" with 3 1/4" embedment, torqued to 60 ft. lbs. Note: Plans call for two anchors per base plate, only one base plate has been installed. Engineer's approval required which is attached. Distribution: • Distribute Client Distribute Contractor ❑ Distribute Engineer ❑ Distribute Owner 1;01 Distribute Municipality ❑ Distribute Other • Distribute Architect ❑ Distribute Other Inspector: Trow, Michael Reviewed by: Mike Blackwell All reports are considered confidential and are the property of the client and A.A.R. Testing Laboratory. Inc. Reproduction except in full without the written consent of A.A.R. Testing is strictly forbidden Fireproofing Aggregates Shot.crete Concrete Masonry Asphalt Roofing Piling Steel Soils Wood January'28, 2014 File No. 14-136 Building Official City of Tukwila Building Department 6300 Southcenter Blvd. Tukwila, WA 98188 Project: Pearl Distribution Address: 1087 Andover Park E. Permit: D13-0381 A.A.R. TESTING LABORATORY, INC. CONSTRUCTION INSPECTION AND fe ATERIRL TESTING NATIONALLY ACCEPTED LABORATORY This is to advise you that special inspections are completed on the above referenced project. The following inspection was required and a copy of our inspection report is attached. 1. Proprietary anchor installation To the best of our knowledge all work inspected conformed to Tukwila Building Department approved plans, specifications, IBC and related codes and/or verbal or written instructions from the. Engineer of Record. Sincerely, A.A.R. TESTING LABORATORY, INC. Kimberle Anderson President CC: Pearl. Distribution -Craig Pearl Rusty Rack Guys -Steve. Brewer Tel: (425) 881-5812 Fax (425) 881-5441 O 7126 180th Ave. NE o P.O. Box.2523 Redmond, WA 98073 FILE COPY Sift ..__.4„ ctural oncepts ngineerin REVIEWED FOR CODE COMPLIANCE APPROVED DEC 31 2013 City of Tukwila BUILDING DIVISION ro 1200 N. Jefferson St, Suite F Anaheim, CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 e-mail: mail@sceinc.net EARL DISTRIBUTION Project Number : N-121213-10 Date : 12/16/13 Street Address : 1091 ANDOVER PK 5TE B City/State : TUKWILA, WA 98188 Scope of Work : SELECTIVE RACK RECEIVED CITY OF TUKWILA DEC 2 0 2013 PERMIT CENTER '. J.:!):17:1,:-1;n71:4,13T-'':5:eTiS::%,:1/4;-':11 f pt3-381 Strturai once is p ngineering 1200 N. Jefferson Ste. Ste F Anaheim. CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: RPL Project: PEARL DISTRIBUTION Project #: N-121213-10 TABLE OF CONTENTS Title Page 1 Table of Contents 2 Design Data and Definition of Components 3 Critical Configuration 4 Seismic Loads 5 to 6 Column 7 Beam and Connector 8 to 9 Bracing 10 Anchors 11 Base Plate 12 Slab on Grade 13 Other Configurations 14 to 15 PEARL DISTRIBUTION TYPE A Page 2. of 1 5 12/16/2013 StrturaI oncepts Engineering 1200 N. Jefferson Ste. Ste F Anaheim. CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: RPL Project: PEARL DISTRIBUTION Project #: N-121213-10 Design Data 1) The analyses conforms to the requirements of the 2009 IBC and the 2008 RMI/ANSI MH 16.1 Rack Design Manual Steel Storage Racks (RMI) and the ASCE 7-05, section 15.5.3 2) Transverse braced frame steel conforms to ASTM A570, Gr.55, with minimum strength, Fy=55 ksi Longitudinal frame beam and connector steel conforms to ASTM A570, Gr.55, with minimum yield, Fy=55 ksi All other steel conforms to ASTM A36, Gr. 36 with minimum yield, Fy= 36 ksi 3) Anchor bolts shall be provided by installer per ICC reference on plans and calculations herein. 4) All welds shall conform to AWS procedures, utilizing E70xx electrodes or similar. All such welds shall be performed in shop, with no field welding allowed other than those supervised by a licensed deputy inspector. 5) The slab on grade is 6" thick with minimum 3200 psi compressive strength. Soil bearing capacity is 2000 psf. Definition of Components Frame Height _7 Beam r Product Beam Spacing Beam Length Front View: Down Aisle (Longitudinal) Frame Column Beam to Column Connector Base Plate and Anchors Panel Height Frame Depth Section A: Cross Aisle (Transverse) Frame Horizontal Brace Diagonal Brace PEARL DISTRIBUTION TYPE A Page 3 of / 5 12/16/2013 Structural Concepts Engineering 1200 N. Jefferson Ste. Ste F Anaheim. CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: RPL Project: PEARL DISTRIBUTION Project #: N-121213-10 Configuration & Summary: TYPE A SELECTIVE RACK 120" T 48" —I 96" 120" 24" 36" 36" e- +— +— 44" **RACK COLUMN REACTIONS ASD LOADS AXIAL DL= 100 /b AXIAL LL= 1,200 /b SEISMIC AXIAL Ps= +/- 477 lb BASE MOMENT= 0 in -lb Bas Seismic Criteria # Bm Lvls Frame Depth Frame Height # Diagonals Beam Length Frame Type Ss=1.403, Fa=1 2 44 in 120.0 in 3 96 in Single Row Component Description STRESS Column Fy=55 ksi LMT LM20/3x3x14ga P=1300 Ib, M=3578 in -lb 0.17-0K Column & Backer None None None N/A Beam Fy=55 ksi LMT LBC40/4"deepx2.75"x0.075" Lu=96 in Capacity: 7788 lb/pr 0.15-0K Beam Connector Fy=55 ksi Lvl 1: 3 pin OK Mconn=2765 in -lb Mcap=12691 in -lb 0.22-0K Brace -Horizontal Fy=55 ksi LMT 1-1/2x1-1/4x14ga 0.08-0K Brace -Diagonal Fy=55 ksi LMT 1-1/2x1-1/4x14ga 0.08 -OK Base Plate Fy=36 ksi 8x5x3/8 Fixity= 0 in -lb 0.2-0K Anchor 2 per Base 0.5" x 3.25" Embed SIMPSON STR BOLT II ESR 3037 Inspection Reqd (Net Seismic Uplift=145 Ib) 0.1 - OK Slab & Soil 6" thk x 3200 psi slab on grade. 2000 psf Soil Bearing Pressure 0.09-0K Level Load Per Level Beam Spcg Brace Story Force Transv Story Force Longit. Column Axial Column Moment Conn. Moment Beam Connector 1 1,200 lb 48.0 in 36.0 in 94 lb 53 lb 1,300 lb 3,578 "# 2,765 "# 3 pin OK 2 1,200 lb 48.0 in 36.0 in 24.0 in 189 lb 106 lb 650 lb 1,272 "# 1,424 "# 3 pin OK Total: 283 lb 159 lb Notes PEARL DISTRIBUTION TYPE A Page 4 of 1.5 12/16/2013 Strtu ra i once is - ngineering 1200 N. Jefferson Ste. Ste F Anaheim. CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: RPL Project: PEARL DISTRIBUTION Project #: N-121213-10 Seismic Forces Configuration: TYPE A SELECTIVE RACK Lateral analysis is performed with regard to the 2009 IBC Sec. 2208.1, 2008 RMI/ANSI MH 16.1 Sec 2.6 & ASCE 7-05 sec 15.5.3 Transverse (Cross Aisle) Seismic Load V= Cs1= Cs2= Cs* Ip* W s= Cs* Ip* (0.67 * LL* PLrf+D L) [Sds/R] * 0.67 0.67 factor per RTll commentary Sec 2.1 Sec 21 Lint Sates Reductianf ASO Loading 0.1567 0.14*Sds*0.67 0.0877 Cs3= [0.5*S1/R] * 0.67 = 0.0402 Cs -max= 0.1567 Base Shear Coeff=Cs= 0.1567 ASD Format Loads Level 1 2 Cs -max * Ip= 0.1567 Vmin= 0.015 Eff Base Shear=Cs= 0.1567 WS= (0.67*PLRFI * PL)+DL = 1,808 lb PRODUC LOAD/LVL,PL PL*0.67*PLrf 1,200 lb 804 lb 1,200 lb 804 lb Vt Transverse Elevation Vtransv=Vt= 0.1567 * (200 lb + 1608 Ib) EL= 283 lb ASD Level Transverse seismic shear per upright DL 100 lb 100 lb hi 48 in 96 in wi*hi 43,392 86,784 Ss= 1.403 51= 0.480 Fa= 1.000 Fv= 1.520 Sds=2/3*Ss*Fa= 0.935 Sd1=2/3*S1*Fv= 0.486 Ca=0.4*2/3*Ss*Fa= 0.3741 (Transverse, Braced Frame Dir.) R= 4.0 Ip= 1.0 PLRF1= %1.0 .. Pallet Height=hp= 38.0 in DL per Beam Lvl= 100 lb Fi Fi*(hi+hp/2) 94.3 lb 6,318-# 188.7 lb 21,701-# sum: 2,400 lb 1,608 lb Longitudinal (Downaisle) Seismic Load 200 lb W=1808 lb 130,176 283 lb F=28,019 (Similarly for longitudinal seismic loads, using R=6.0 Cs1=Sd1/(T*R)= 0.0543 Cs2= 0.0877 Cs3= 0.0268 Cs -max= 0.0877 Level 1 2 Ws= Cs=Cs-max*Ip= (0.67 * PLRF 1,808 lb 0.0877 PL) + DL PLRF2= 1.0 (Longitudinal, Unbraced Dir.) R= 6.0 T= 1.00 sec Vlong= EL= 0.0877 * (200 lb + 1608 Ib) 159 lb ASO Level LongiL seismic shear per upright PRODUC LOAD/LVL,PL pL*0.67*PLrf 1,200 lb 804 lb 1,200 lb 804 lb DL 100 lb 100 lb hi 48 in 96 in wi*hi 43,392 86,784 is.."`.y Fi 53.0 lb 106.0 lb Front View sum: 1,608 lb 200 lb 159 lb W=1808 lb 130,176 PEARL DISTRIBUTION TYPE A Page 5 of ! 6 12/16/2013 Str tural Joncepts Engineering 1200 N. Jeerson Ste. Ste F Anaheim. CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: RPL Project: PEARL DISTRIBUTION Project #: N-121213-10 Downaisle Seismic Loads Configuration: TYPE A SELECTIVE RACK Determine the story moments by applying portal analysis. The base plate is assumed to provide no fixity. Seismic Story Forces Vlong= 159 lb Vcol=Vlong/2= 80 lb F1= 53 lb F2= 106 lb F3= 0 lb Seismic Story Moments lyiesso, Typical frame made Tributary area of two columns of rack frame \- r \\may 4 14— 96 Front View Conceptual System Side View •\\.\\1:(..\ Typical Frame made of two columns – – Too View Mbase-max= 0 in -lb <=== Default capacity Mbase-v= (Vcol*hleff)/2 = 1,789 in -lb <=== Moment going to base Mbase-eff= Minimum of Mbase-max and Mbase-v = 0 in -lb PINNED BASE ASSUMED M 1-1= [Vcol * hleff]-Mbase-eff M 2-2= [Vcol-(F1)/2] * h2 = (80 lb * 45 in) -0 in -lb = [80 lb - 53 Ib]*48 in/2 = 3,578 in -lb = 1,272 in -lb hl-eff= hl - beam clip height/2 = 45 in Vcol Mseis= (Mupper+Mlower)/2 Mseis(1-1)= (3578 in -lb + 1272 in-Ib)/2 Mseis(2-2)= (1272 in -lb + 0 in-lb)/2 = 2,425 in -lb = 636 in -lb Beam to Column Elevation Summary of Forces LEVEL 1 2 hi 48 in 48 in Axial Load 1,300 lb 650 lb Column Moment 3,578 in -lb 1,272 in -lb Mseismic 2,425 in -lb 636 in -lb Mend -fixity 1,262 in -lb 1,262 in -lb Mconn** 2,765 in -lb 1,424 in -lb Beam Connector 3 pin OK 3 pin OK Mconn= (Mseismic + Mend-fixity)*0.75 Mconn-allow(3 Pin)= 12,691 in -lb PEARL DISTRIBUTION TYPE A Page (p of F 6 12/16/2013 Strturai Lonceats P Engineering R' 1 1200 N. Jefferson Ste, Ste= F•Anaheim:ICAA 92807 Tel: 714: 632: 7330, Fax: 714.632:7763=1r, By: "RFL Project: PEARL DISTRIBUTION Project #: N-121213-10 Column (Longitudinal) Configuration: TYPE A SELECTIVE RACK Conforms to the requirements of Chapter C5 of the AISI Cold Formed Steel Design Manual for combined bending and axial loads. Section Properties Section: LMT LM20/3x3x14ga Aeff = 0.643 in^2 Ix = 1.130 in^4 Sx = 0.753 in^3 rx = 1.326 in 52f= 1.67 E= 29,500 ksi Loads Considers loads at level 1 Iy = 0.749 in^4 Sy = 0.493 in^3 ry= 1.080 in Fy= 55 ksi Cmx= 0.85 Kx = 1.7 Lx = 46.0 in Ky = 1.0 Ly = 36.0 in Cb= 1.0 3.000 in -r-� 10.075 in 14_0.75 in 3.000 in Critical load case RMI Sec 2.1, item 4: (1 +0.11Sds)DL + (1 +0.14SDS)PL *0.75+EL *0.75 <= 1.0, ASD Method COLUMN DL= 100 lb COLUMN PL= 1,200 lb Axial Load=P= (1.102883*1001b)+(1.130942*12001b*0.75) Moment=Mx= Mcol*0.75 Mcol= 3,577 in -lb = 1,128 lb = 3577 in -lb * 0.75 0.11Sds= 0.102883 = 2,683 in -lb 0.14Sds= 0.130942 Axial Analysis KxLx/rx = 1.7*46"/1.326" KyLy/ry = 1*36"/1.08" = 59.0 = 33.3 Fe= n^2E/(KL/r)max^2 = 83.7ksi Pn= Aeff*Fn = 29,556 lb P/Pa= 0.07 < 0.15 Bending Analysis Fy/2= 27.5 ksi 52c= 1.92 Fe > Fy/2 Fn= Fy(1-Fy/4Fe) = 55 ksi*[1-55 ksi/(4*83.7 ksi)] = 46.0 ksi Pa= Pn/Qc = 29556 lb/1.92 = 15,394 lb Check: P/Pa + Mx/Max 1.0 Pno= Ae*Fy = 0.643 in^2 *55000 psi = 35,365 lb Max= My/Qf = 41415 in-lb/1.67 = 24,799 in -lb px= {1/[1-(52c*P/Pcr)]}^-1 = {1/[1-(1.92*1128 lb/53801 lb)]}^ -1 = 0.96 Combined Stresses Pao= Pno/Qc = 353651b/1.92 = 18,419 lb Myield=My= Sx*Fy = 0.753 in^3 * 55000 psi = 41,415 in -lb Pcr= n^2EI/(KL)max^2 = n^2*29500 ksi/(1.7*46 in)^2 = 53,801 lb (1128 lb/15394 lb) + (2683 in-lb/24799 in -Ib) = 0.17 < 1.0, OK (EQ C5-3) PEARL DISTRIBUTION TYPE A Page 7 of 12/16/2013 StrAtural onis tor ngineering 1200 N. Jefferson Ste, Ste F Anaheim, CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: RPL Project: PEARL DISTRIBUTION Project #: N-121213-10 BEAM Configuration: TYPE A SELECTIVE RACK DETERMINE ALLOWABLE MOMENT CAPACITY A) Check compression flange for local buckling (62.1) w= c - 2*t -2*r = 1.875 in - 2*0.075 in - 2*0.075 in = 1.575 in w/t= 21 l=lambda= [1.052/(k)^0.5] * (w/t) * (Fy/E)^0.5 = [1.052/(4)^0.5] * 21 * (55/29500)A0.5 = 0.477 < 0.673, Flange is fully effective B) check web for local buckling per section b2.3 fl(comp)= Fy*(y3/y2)= 48.93 ksi f2(tension)= Fy*(y1/y2)= 100.70 ksi Y= f2/f1 Eq. B2.3-5 = -2.058 k= 4 + 2*(1-Y)^3 + 2*(1-Y) Eq. B2.3-4 = 67.31 flat depth=w= y1+y3 = 3.700 in w/t= 49.33333333 OK l=lambda= [1.052/(k)^0.5] * (w/t) * (f1/E)^0.5 = [1.052/(67.31)^0.5] * 3.7 * (48.93/29500)^0.5 = 0.258 < 0.673 be=w= 3.700 in b2= be/2 bl= be(3-Y) = 1.85 in = 0.732 bl+b2= 2.582 in > 1.21 in, Web is fully effective Determine effect of cold working on steel yield point (Fva) per section A7.2 Fya= Lcorner=Lc= Lflange-top=Lf= m= Bc= since fu/Fv= and r/t= then Fyc= Thus, Fya-top= Fya-bottom= C*Fyc + (1-C)*Fy (p/2) * (r + t/2) 0.177 in 1.575 in 0.192*(Fu/Fy) - 0.068 0.1590 (EQ A7.2-1) C= 2*Lc/(Lf+2*Lc) = 0.184 in (EQ A7.2-4) 3.69*(Fu/Fy) - 0.819*(Fu/Fy)^2 - 1.79 1.427 1.18 < 1.2 1 < 7 0K Bc * Fy/(R/t)^m 78.485 ksi 59.31 ksi (tension stress at top) Fya*Ycg/(depth -Ycg) 115.13 ksi (tension stress at bottom) (EQ A7.2-2) Check allowable tension stress for bottom flange Lflange-bot=Lfb= Lbottom - 2*r*-2*t = 2.450 in Cbottom=Cb= 2*Lc/(Lfb+2*Lc) = 0.126 Fy-bottom=Fyb= Cb*Fyc + (1-Cb)*Fyf = 57.97 ksi Fya= (Fya-top)*(Fyb/Fya-bottom) = 29.86 ksi if F= 0.95 Then F*Mn=F*Fya*Sx= 36.23 in -k Eq. 62.1-4 Eq. 62.1-1 Eq 62.3-2 (EQ A7.2-3) 4.000 i 2.75 in 1.88 in Beam= LMT LBC40/4"deepx2.75"x0.075" Ix= Sx= Ycg= t= Bend Radius=r= Fy=Fyv= Fu=Fuv= E= top flange=b= bottom flange= Web depth= 2.660 in^4 1.277 in^3 2.640 in 0.075 in 0.075 in 55.00 ksi 65.00 ksi 29500 ksi 1.875 in 2.750 in 4.000 in Fy yl= Ycg-t-r= 2.490 in y2= depth-Ycg= 1.360 in y3= y2 -t -r= 1.210 in 1200 N. Jefferson Ste, Ste F Anaheim, CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: RPL Project: PEARL DISTRIBUTION Project #: N-121213-10 BEAM Configuration: TYPE A SELECTIVE RACK RMI Section 5.2, PT II Section Beam= LMT LBC40/4"deepx2.75"x0.075" Ix=Ib= 2.660 inA4 Sx= 1.277 in^3 t= 0.075 in Fy=Fyv= 55 ksi Fu=Fuv= 65 ksi Fya= 59.3 ksi Bending E= 29500 ksi F= 150.0 L= 96 in Mcenter=F*Mn= W*L*W*Rm/8 W=LRFD Load Factor= 1.2*DL + 1.4*PL+1.4*(0.125)*PL FOR DL=20/0 of PL, RMI 2.2, item 5 W= 1.599 Rm= 1 - [(2*F*L)/(6*E*Ib + 3*F*L)] 1 - (2*150*96 in)/[(6*29500 ksi*2.66 in^3)+(3*150*96 in)] = 0.944 if F= 0.95 Then F*Mn=F*Fya*Sx= 71.95 in -k Thus, allowable load per beam pair=W= Mend= F*Mn*8*(# of beams)/(L*Rm*W) 71.95 in -k * 8 * 2/(96in * 0.944 * 1.599) 7,945 lb/pair W*L*(1-Rm)/8 (7945 lb/2) * 96 in * (1-0 944)/8 = 2,670 in -lb Deflection 4.000 i 2.75 in 1.88 in ,l Dmax= Dss*Rd Rd= 1 - (4*F*L)/(5*F*L + 10*E*Ib) = 1 - (4*150*96 in)/[(5*150*96 in)+(10*29500 ksi*2.66 in^4)] = 0.933 in if Dmax= L/180 and Dss= 5*W*L^3/(384*E*Ib) L/180= 5*W*L^3*Rd/(384*E*Ib*# of beams) solving for W yields, W= 384*E*I*2/(180*5*L^2*Rd) 384*2.66 inA4*2/[180*5*(96 in)^2*0.933) 7,788 lb/pair Allowable load= 7,788 lb/pair • M� II..e., MAI _ YIAincoo 'IYIA 1200 N. Jefferson Ste, Ste F Anaheim, CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: RPL Project: PEARL DISTRIBUTION Project #: N- 12 12 13- I 0 3 Pin Beam to Column Connection TYPE A SELECTIVE RACK he beam end moments shown herein show the result ot the maximum induced tixed end monents torm seismic + static loads and the code mandated minimum value ot 1.5%(DL+PL) Mconn max= (Mseismic + Mend-tixity)*0.75 = 2,765 in -lb Load at level 1 Shear Capacity of Pin O P1 2 rt P3 1/2 4 • r ; 1c" Connector Type= 3 Pin Pin Diam= 0.44 in Fy= 55,000 psi Ashear= (0.438 in)^2 * Pi/4 = 0.1507 in^2 Pshear= 0.4 * Fy * Ashear = 0.4 * 55000 psi * 0.1507in^2 = 3,315 lb Bearing Capacity of Pin tcol= 0.075 in Fu= 65,000 psi Omega= 2.22 a= 2.22 Pbearing= alpha * Fu * diam * tcol/Omega = 2.22 * 65000 psi * 0.438 in * 0.075 in/2.22 = 2,135 lb < 3315 lb Moment Capacity of Bracket Edge Distance=E= 1.00 in Pin Spacing= 2.0 in Fy= 55,000 psi C= P1+P2+P3 tclip= 0.18 in = P1+P1*(2.5"/4.5")+P1*(0.5"/4.5") = 1.667 * P1 Mcap= Sclip * Fbending =0.127in^3*0.66*Fy = 4,610 in -lb Pclip= Mcap/(1.667 * d) = 4610.1 in-lb/(1.667 * 0.5 in) = 5,531 lb C*d= Mcap = 1.667 Thus, P1= 2,135 lb Mconn-allow=[P1*4.5"+P1*(2.5"/4.5")*2.5"+P1*(0.5"/4.5")*0.51 = 2135 LB*[4.5"+(2.5"/4.5")*2.5"+ (0.5"/4.5")*0.5"] = 12,691 in -lb > Mconn max, OK Sclip= 0.127 in^3 d= E/2 = 0.50 in PEARL DISTRIBUTION TYPE A Page 9 of / 5 12/16/2013 Str tura) once is n ineerin 9 9 —'--- 1200 N. Jefferson Ste. Ste F Anaheim. CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: RPL Project: PEARL DISTRIBUTION Project #: N-121213-10 Transverse Brace Configuration: TYPE A SELECTIVE RACK Section Properties Diagonal Member= LMT 1-1/2x1-1/4x14ga Area= 0.278 in^2 r min= 0.405 in Fy= 55,000 psi K= 1.0 4c= 1.92 Frame Dimensions Horizontal Member= LMT 1-1/2x1-1/4x14ga I .500 Area= 0.278 in^2 r min= 0.405 in 7 Fy= 55,000 psi 1.250 K= 1.0 1.1-- 0.25 I 14-1.500� 0.25 1 I .250 Bottom Panel Height=H= 36.0 in Frame Depth=D= 44.0 in Column Width=6= 3.0 in Diagonal Member Clear Depth=D-B*2= 38.0 in X Brace= NO Critical load case RMI Sec 2.1, item 4: (1+0.11Sds)DL + (1+0.14SDS)PL*0.75+EL*0.75 <= 1.0, ASD Method, DL=PL=0 for upright brace members Vb=Vtransv= 283 lb Ldiag= [(D-B*2)^2 + (H-6")^2]^1/2 = 48.4 in Pmax= V*(Ldiag/D) * 0.75 = 233 lb Pn= AREA*Fn = 0.278 in^2 * 20388 psi = 5,668 lb Pallow= Pn/4 = 5668 lb /1.92 = 2,952 lb Pn/Pallow= Horizontal brace 0.08 <= 1.0 OK (kl/r)= (k * Ldiag)/r min = (1 x 48.4 in /0.405 in ) = 119.5 in Fe= pi^2*E/(kl/r)^2 = 20,388 psi SINCE Fe<Fy/2, Fn= Fe = 20,388 psi Tvoical Panel Ccnfquration Check End Weld Lweld= 2.5 in Fu= 65 ksi tmin= 0.075 in Weld Capacity= 0.75 * tmin * L * Fu/2.5 = 3,656 lb OK Pmax=V= 212 lb (kl/r)= (k * Lhoriz)/r min = (1 x 44 in) /0.405 in = 108.6 in Since Fe<Fy/2, Fn=Fe = 24,687 psi Pn/Pallow= 0.08 <= 1.0 OK Fe= pi^2*E/(kl/r)^2 Fy/2= 27,500 psi = 24,687 psi Pn= AREA*Fn = 0.278in^2*24687 psi = 6,863 lb Pallow= Pn/Qc = 6863 lb /1.92 = 3,574 lb PEARL DISTRIBUTION TYPE A Page /0 of i 6 12/16/2013 Strturai once is p"- ngineering 1200 N. Jefferson Ste. Ste F Anaheim. CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: RPL Project: PEARL DISTRIBUTION Project #: N-121213-10 Single Row Frame Overturning Configuration: TYPE A SELECTIVE RACK Loads Load case per RMI Sec 2.1, item 3: (0.6-0.11Sds)DL + (0.6-0.14Sds)PLapp*0.75 - EL*0.75 Vtrans=V= 283 lb DEAD LOAD PER UPRIGHT=DL= 200 lb PL PER UPRIGHT=PL= 2,400 lb PLapp=PL*0.67= 1,608 lb ist=(0.497117*DL+0.469058*PLapp*0.75)= 665 lb PL @ TOP= 1,200 lb DL/Lvl= 100 lb E(Fi*hi)= 28,019 in -lb Total Dead Load per Bay=DL= 200 lb Load Case 1: Fully Loaded rack (0.6-0.11Sds)= 0.4971 (0.6-0.14Sds)= 0.4691 Frame Depth=D= 44.0 in Htop-Iv1=H= 96.0 in # Levels= 2 # Anchors/Base= 2 h= 115.0 in hp= 38.0 in I`D1.I SIDE ELEVATION Vtrans= 283 lb Movt= E(Fi*hi)*0.75 = 21,014 in -lb Load Case 2: Top Level Loaded Only Mst= Wst * D/2 = 665 lb * 44 in/2 = 14,630 in -lb T= (Movt-Mst)/D = (21014 in -lb - 14630 in-lb)/44 in = 145 lb Net Uplift per column ttical Level= 2 V1=Vtop= Cs * Ip * Ws = 0.1567 * (1200 Ib) = 188 lb V2=VDL= Cs*Ip*DL = 311b Mst= (0.497117*DL+0.469058*PL*0.75) * D/2 = (100 lb*2 * 0.497117 + 1200 lb*0.469058*0.75)*44 in/2 = 11,475 in -lb Anchor Pinned Base h= 115.0 in Movt= [V1*h + V2 * H/2]*0.75 = [188 lb*115 in +31 lb*96 in/2]*0.75 = 17,331 in -lb T= (Movt-Mst)/D = (17331 in -lb - 11475 in-lb)/44 in = 133 lb Net Uplift per column Check (2) 0.5" x 3.25" Embed SIMPSON STR BOLT II anchor(s) per base plate. Special inspection is required per ESR 3037. Fully Loaded: Top Level Loaded: Pullout Capacity=Tcap= 1,075 lb Shear Capacity=Vcap= 1,370 lb Tcap*Phi= 1,075 lb Vcap*Phi= 1,370 lb L.A. City Jurisdiction? NO Phi= 1 (73 lb/1075 Ib)^1 + (71 Ib/1370 Ib)^1 = (67 lb/1075 Ib)^1 + (47 Ib/1370 Ib)^1 = 0.12 <= 1.2 OK 0.10 <= 1.2 OK PEARL DISTRIBUTION TYPE A Page 11 of 15 12/16/2013 Strjturai once is ngineering 1200 N. Jefferson Ste. Ste F Anaheim. CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: RPL Project: PEARL DISTRIBUTION Project #: N-121213-10 Base Plate Configuration: TYPE A SELECTIVE RACK Section Baseplate= 8x5x3/8 Eff Width=W = 8.00 in Eff Depth=D = 5.00 in Column Width=b = 3.00 in Column Depth=dc = 3.00 in L = 2.50 in Plate Thickness=t = 0.375 in a = 3.00 in Anchor c.c. =2*a=d = 6.00 in N=# Anchor/Base= 2 Fy = 36,000 psi W Downaisle Elevation Down Aisle Loads Critical load case RMI Sec 1.1, item 4: (1+0.11Sds)DL + (1+0.145D5)PL*0.75+EL*0.75 <= 1.0, ASD Method COLUMN DL= 100 lb COLUMN PL= 1,200 lb Base Moment= 0 in -lb 0.11Sds= 0.102883 0.14Sds= 0.130942 Axial stress=fa = Moment Stress=fb = Moment Stress=fbl = M3 = S -plate = fb/Fb = Tanchor = Cross Aisle Loads Axial=P= (1.102883*100 Ib)+(1.130942*1200 ib*0.75) = 1,128 lb Mb= Base Moment*0.75 = 0 in -lb * 0.75 = 0 in -lb Axial Load P = 1,128 lb Mbase=Mb = 0 in -lb P/A = P/(D*W) 28 psi M/S = 6*Mb/[(D*B^2] 0.0 psi fb-fb2 0.0 psi (1/2)*fb2*L*(2/3)*L = (1/3)*fb2*LA2 0 in -lb (1)(t^2)/6 0.023 in^3/in Mtotal/[(S-plate)(Fb)] 0.14 OK (Mb-(PLapp*0.75*0.46)(a))/[(d)*N/2] -333 lb No Tension Critical load case RMI Sec 2!, Item 9: (1+0.11Sds)OL + (1 +0.14SOS)PL'0.75+EL'0. 75 c= 1.0, ASO Method M1= Moment Stress=fb2 = M2= Mtotal = Fb = Fop= Tallow= wL^2/2= fa*L^2/2 88 in -lb 2*fb*L/W 0.0 psi fbl*LA2)/2 0 in -lb M1+M2+M3 88 in-lb/in 0.75*Fy 27,000 psi 0.7*F'c 2,240 psi OK 1,075 lb OK Check uplift load on Baseplate Effec. Effec. E Pstatic= 1,128 lb Movt*0.75= 21,014 in -lb Frame Depth= 44.0 in P=Pstatic+Pseismic= 1,606 lb b =Column Depth= 3.00 in L =Base Plate Depth -Col Depth= 2.50 in fa = P/A = P/(D*W) = 40 psi Sbase/in = (1)(t^2)/6 = 0.023 in^3/in fb/Fb = M/[(S-plate)(Fb)] = 0.20 OK PEARL DISTRIBUTION TYPE A Pseismic= Movt/Frame Depth = 478 lb M= wL^2/2= fa*L^2/2 = 125 in-lb/in Fbase = 0.75*Fy = 27,000 psi Page 12 of Check uplift forces on baseplate with 2 or more anchors per RMI 7.2.2. en the base plate configuration consists of two anchor bolts located on either side f the column and a net uplift force exists, the minimum base plate thickness hall be determined based on a design bending moment in the plate equal to the uplift force on one anchor times 1/2 the distance from he centerline of the anchor to the nearest edge of the rack column" Ta T Elevation Uplift per Column= 145 lb Qty Anchor per BP= 2 Net Tension per anchor=Ta= 73 lb c= 2.50 in Mu=Moment on Baseplate due to uplift= Ta*c/2 = 91 in -lb Splate= 0.117 in^3 [fb/Fb]*0.75= 0.021 OK 12/16/2013 Str tura) once is T p / ngineering 1200 N. Jefferson Ste. Ste F Anaheim. CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: RPL Project: PEARL DISTRIBUTION Project #: N-121213-10 Slab on Grade Configuration: TYPE A SELECTIVE RACK 1111111111111111111111111111111111111111111 SLAB ELEVATION Base Plate Effec. Baseplate width=B= 8.00 in Effec. Baseplate Depth=D= 5.00 in Column Loads width=a= 3.00 in depth=b= 3.00 in slab ral b e I � • ' • Down Aisle Baseplate Plan View ' Cross Aisle Concrete f c= 3,200 psi tslab=t= 6.0 in teff= 6.0 in phi=0= 0.6 Soil fsoil= 2,000 psf Movt= 21,620 in -lb Frame depth= 44.0 in Sds= 0.935 0.2*Sds= 0.187 midway dist face of column to edge of plate=c= 5.50 in midway dist face of column to edge of plate=e= 4,00 in DEAD LOAD=DL= PRODUCT LOAD=PL= P -seismic= EL= Puncture 100 lb per column unfactored ASD load 1,200 lb per column unfactored ASD load (Movt/Frame depth) 491 lb per column unfactored ASD load Load Case 1) (1.2+0.2Sds*DL) + (0.85+0.2Sds*PL) + 1.5*EL RMI SEC 2.2 EQTN 5 = 1.38706*100 lb + 1.03706*1200 lb + 1.5*491 lb = 2,120 lb Load Case 2) (0.9-0.2Sds)DL + (0.9-0.2Sds)*PLapp + 1.5EL RMI SEC 2.2 EQTN 6 = (0.71294*100 Ib) + (0.71294*804 Ib) + (1.5*491 Ib) = 1,381 lb Load Case 3) 1.2*DL + 1.4*PL RMI SEC 2.2 EQTN 2 = 1.2*100 lb + 1.4*1200 lb = 1,800 lb Effective Column Load=Pu= 2,120 lb per column Apunct= [(c+t)+(e+t)]*2*t = 258.0 in^2 Slab Bending Fpunct= 2.66*phi*sqrt(fc) = 90.3 psi fv/Fv= Pu/(Apunct*Fpunct) = 0.091 < 1 0K Pse=DL+PL+E= 2,120 lb Asoil= (Pse*144)/(fsoil) = 153 in^2 x= (L -y)/2 = -2.2 in Fb= 5*(phi)*(fc)^0.5 = 169.71 psi L= (Asoil)^0.5 = 12.37 in M= w*x^2/2 = (fsoil*x^2)/(144*2) = 32.4 in -lb y= (c*e)^0.5 + 2*t = 16.7 in S -slab= 1*teff^2/6 = 6.0 in^3 fb/Fb= M/(S-slab*Fb) = 0.032 < 1, OK PEARL DISTRIBUTION TYPE A Page t 3 of 5 12/16/2013 Structural Concepts Engineering 1200 N. Jefferson Ste, Ste F Anaheim, CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: RPL Project: PEARL DISTRIBUTION Project #: N-121213-10 Configuration & Summary: TYPE B SELECTIVE RACK 120" 96" 96" 120" 24" 36" 36" 44" 4 - **RACK COLUMN REACTIONS ASO LOADS AXIAL DL= 50 /b AXIAL LL= 600 /b SEISMIC AXIAL Ps= +/- 278 lb BASE MOMENT= 0 in -lb Bas Seismic Criteria # Bm Lvls Frame Depth Frame Height # Diagonals Beam Length Frame Type Ss=1.403, Fa=1 1 44 in 120.0 in 3 96 in Single Row Component Description STRESS Column Fy=55 ksi LMT LM20/3x3x14ga P=650 lb, M=3674 in -lb 0.14 -OK Column & Backer None None None N/A Beam Fy=55 ksi LMT LBC40/4"deepx2.75"x0.075" Lu=96 in Capacity: 7788 lb/pr 0.15 -OK Beam Connector Fy=55 ksi Lvl 1: 3 pin OK Mconn=2324 in -lb Mcap=12691 in -lb 0.18 -OK Brace -Horizontal Fy=55 ksi LMT 1-1/2x1-1/4x14ga 0.04 -OK Brace -Diagonal Fy=55 ksi LMT 1-1/2x1-1/4x14ga 0.04 -OK Base Plate Fy=36 ksi 8x5x3/8 Fixity= 0 in -lb 0.1 -OK Anchor 2 per Base 0.5" x 3.25" Embed SIMPSON STRONG BOLT TYPE II ESR 3037 Inspection Reqd (Net Seismic Uplift=145 Ib) 0.083 - OK Slab & Soil 6" thk x 3200 psi slab on grade. 2000 psf Soil Bearing Pressure 0.07-0K Level Load Per Level Beam Spcg Brace Story Force Transv Story Force Longit. Column Axial Column Moment Conn. Moment Beam Connector 1 1,200 lb 96.0 in 36.0 in 142 lb 79 lb 650 lb 3,674 "# 2,324 "# 3 pin OK 36.0 in 24.0 in Total: 142 lb 79 lb Notes PROVIDE ADL BOLT & NUT FOR SINGLE BEAM APPLICATION. PEARL DISTRIBUTION TYPE B Page l 4 of 5 12/13/2013 Str tural Voncepts Engineering 1200 N. Jefferson Ste. Ste F Anaheim. CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: RPL Project: PEARL DISTRIBUTION Project #: N-121213-10 Configuration & Summary: TYPE C SELECTIVE RACK 192" 72" 72" 96" 42" 54" 192" 36" 36" 44" **RACK COLUMN REACTIONS ASD LOADS AXIAL DL= 100 /b AXIAL LL= 1,200 /b SEISMIC AXIAL Ps= #/- 670 lb BASE MOMENT= 0 in -lb Bas Seismic Criteria # Bm Lvls Frame Depth Frame Height # Diagonals Beam Length Frame Type Ss=1.403, Fa=1 2 44 in 192.0 in 4 96 in Single Row Component Description STRESS Column Fy=55 ksi LMT LM20/3x3x14ga P=1300 Ib, M=5486 in -lb 0.23 -OK Column & Backer None None None N/A Beam Fy=55 ksi LMT LBC40/4"deepx2.75"x0.075" Lu=96 in Capacity: 7788 lb/pr 0.15 -OK Beam Connector Fy=55 ksi Lvl 1: 3 pin OK Mconn=3719 in -lb Mcap=12691 in -lb 0.29 -OK Brace -Horizontal Fy=55 ksi LMT 1-1/2x1-1/4x14ga 0.08 -OK Brace -Diagonal Fy=55 ksi LMT 1-1/2x1-1/4x14ga 0.08-0K Base Plate Fy=36 ksi 8x5x3/8 Fixity= 0 in -lb 0.22 -OK Anchor 2 per Base 0.5" x 3.25" Embed SIMPSON STRONG BOLT TYPE II ESR 3037 Inspection Reqd (Net Seismic Uplift=338 Ib) 0.175 - OK Slab & Soil 6" thk x 3200 psi slab on grade. 2000 psf Soil Bearing Pressure 0.1 -OK Level Load Per Level Beam Spcg Brace Story Force Transv Story Force Longit. Column Axial Column Moment Conn. Moment Beam Connector 1 1,200 lb 72.0 in 36.0 in 94 lb 53 lb 1,300 lb 5,486 "# 3,719 "# 3 pin OK 2 1,200 lb 72.0 in 36.0 in 54.0 in 42.0 in 189 lb 106 lb 650 lb 1,908 "# 1,662 "# 3 pin OK Notes Total: 283 lb 159 lb PEARL DISTRIBUTION TYPE C Page l r3 of l 6 12/ 1 3/20 13 °PERMIT COORD COPY PLAN RENEW/ROUTING SLIP PERMIT NUMBER: D13-0381 DATE: 12/20/13 PROJECT NAME: PEARL DISTRIBUTION SITE ADDRESS: 1091 ANDOVER PK E X Original Plan Submittal Response to Correction Letter # Revision # before Permit Issued Revision # after Permit Issued DEPARTMENTS: AtA)C (i--43 Building Division Public Works AWL S Fire Prevention Structural Planning Division Permit Coordinator PRELIMINARY REVIEW: Not Applicable (no approval/review required) DATE: 12/24/13 Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved ❑ Approved with Conditions Corrections Required ❑ Denied (corrections entered in Reviews) (ie: Zoning Issues) DUE DATE: 01/21/14 Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 CEDAR RECYCLING INC S 0 Washington State Department of Labor & Industries Page 1 of 3 CEDAR RECYCLING INC Owner or tradesperson ECK, JERALD D Principals ECK, JERALD D Doing business as CEDAR RECYCLING INC WA UBI No. 602 084 893 411 W VALLEY HWY S PACIFIC, WA98047 253-804-0404 KING, County Business type Corporation Governing persons JERALDDECK License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor Active. Meets current requirements. License specialties GENERAL License no. CEDARRI981CM Effective — expiration 02/14/2002 — 02/18/2014 Bond RLI INSURANCE COMPANY Bond account no. SRS1002727 Received by L&I 02/14/2002 Insurance Hudson Specialty Ins Co Policy no. HCX356989 Received by L&I 12/31/2013 Savings No savings accounts during the previous 6 year period. $12,000.00 Effective date 02/13/2002 $1,000,000.00 Effective date 12/31/2013 Expiration date 12/31/2014 SNS https://secure.lni.wa.gov/verify/Detail.aspx?UBI=602084893&LIC=CEDARRI981CM&SAW= 01/17/2014 C 21'-2" 5'-1l" 21'-2" 66'-3" 21'-2" HEATER 5'-11" 21'-211 2012 IBC MEANS OF EGRESS ILLUMINATION 1006.3.1 Illumination level under emergency power. Emergency lighting facilities shall be arranged to provide initial illumination that is at least an average of 1 foot-candle and a minimum at any point of 0.1 foot-candle measured along the path of egress at floor level. Illumination levels shall be permitted to decline to 0.6 foot-candle at the end of the emergency lighting time duration. A maximum -to - minimum illumination uniformity ration of 40 to 1 shall not be exceeded. 21'-2" C 44" X 96" C 44" X 96" C 44" X 96" C 44" X 96" C 44" X 96" C 44" X 96" C 44" X 96" C 44" X 96" 82'-9" 00 A 44" X 96" A 44" X196" A 44" X 96" A 44" X 96" B ( 44" X 96" A - A - _ - - 44" X 96" A A 44" X 96" A 44" X 96" A 44" X 96" A 44" X 96" B 44" X 96" A 44" X 96" A 44" X 96" A 44" X 96" A 44" X 96" A 44" X 96" A 44" X 96" A 44" X196" A 44" X 96" A 44" X 96" B ( 44" X 96" A 44" X 96" A 44" X 961" A 44" X 96" A 44" X 96" A 144" X 96" z71 - A 44" X 96" A 44" X196" A 44" X 96" A 44" X 96" B 44" X 96" A 44" X 96" A 44" X 961" A 44" X 96" A 44" X 96" A 144" X 96" Proude- L; ,d9 d3 SEPARATE PERMIT REQUIRED FOR: echanical Ilectrical PI mbing Was Piping C!ty of Tukwila °NG DIVISION N REVISIONS No changes shall be made to the scope of work without prior approval of Tukwila Building Division. NOTE: Revisions will require a new plan submittal and may include additional plan review fees. Prboi& &in et IOi'5 &G,[fit' `/% / /r 1L-tig -4001" Q,/ie" veeee 6)4 (1-- , /4 /1 /0 es ik7/6 Lam, re, /00 I 0 -Pia_ Ail ilea joa /4 ,,, A fri, o ktia.4.- n9a , C1 e c.4.,8 5 20'-4" /21'-2" '�,. 1 n . ' ',Tr%'//</ /IVI LEGEND EL - EMERGENCY LIGHTING DESCRIPTION 2012 IBC MEANS OF EGRESS ILLUMINATION 1006.1 lllumnation required. The means of egress, including the exit discharge, shall be illuminated at all times the building space served by the means of egress is occupied. 1006.2 Illumination level. The means f egress illumination level shall not be less than 1 foot-candle at the walking surface. 1006.3 Ilium nation emergency power. The power upply for means of egress illumination shall normally be rovided by the premises' electrical supply. In the event f power supply failure, an emergency electrical system shall utomatically illuminate the following areas: 1. Aisle and unenclosed stairways of rooms that require two or more means of egress. 2. Corri cors, exit enclosures and exit passageways... 3. Exte for egress components.:. 4. Interior exit discharge elements... 5. Exte for landings...for exit discharge doorways... OFFICE FILE COPY ovezei Permit No. it$4. V-9 U I Plan review approval is k i;rova? of cons ' wt the. :o'atio approv BY of 7 ny to errors and omissions. nts does not authct9 e or ordinance. Receipt ed: is Saint .1 • I City Of liakwila BUILDING DIVISION REVIEWED FOR CODE COMPLIANCE APPROVED DEC 31 2013 City of TUI ivila BUILDING DIVISION The RE, • ., , provided herein by SCE, Inc i '......a ns to thf: storage rack aon Ali other components are ot1. - scope of this DEC 10 2013 PERMIT CENTER 3-O3 1-0 EXPIRES o N 0 N kf N T • N 4:),14 rn C cc3 0 't3 w e '(;)' E-.4 .ctq4.4 0 DRAWINGS PRE. 0 00 00 00 0) QI— a >— <c Q � U F -- .1# DEC 1 6 2010 DRAWN BY: JAL SCALE: SCA DATE: 12/11/13 DRAWING NO: CHECKED BY: SHEET NO. 1 OF 2 SHEETS BRACING CONNECTION DETAIL -.-f f -t-1/2" FLOOR ANCHOR DETAIL SEE NOTES FOR SPECS 1 1/2" .075 THK 5/8" DIA. 2 HOLES 3/8" THK. 1 1/4" SECT. A -A SECT. B -B 3" 14GA THK. 3/4"----1 I-�-- 6" - I 8" BASE PLATE DETAIL (2)-1/2"0 ANCHOR BOLTS PER BASE PLATE 3-1/4" EMB., (SEE NOTE NO.. 4) SINGLE 2" TYP. AS NOTED r-1/4" REF. ❑ ❑ ❑ LM2 0 14GA THK. 7/8" 3" 14GA ASTM A570 GR50 AS NOTED %4"0 SAFETY LOCK (1000# CAPACITY) 16"0 RIVET ASTM A576 -90B HOT -WROUGHT UNS G10100 GRACE C-1010 8' R1/8" TYP. LBC40 RACK TYPE "A" 4" BEAM FACE 8' RACK DETAILS SCALE: %a" = 1" RACK TYPE "B" TUNNEL SINGLE 4" BEAM FACE RACK ELEVATIONS SCALE: %z" = 1'-0" STRUCTURAL NOTES: 1. DESIGN OF STEEL STORAGE RACKS AS SHOWN BY THESE DRAWINGS AND CALCULATIONS ARE IN COMPLIANCE WITH THE REQUIREMENTS OF THE INTERNATIONAL BUILDING CODE 2012 EDITION, SECTION 2209. 2. S'T'EEL FOR ALL SHAPES FY=55 KSI. ASTM A1011 GR.55 (EXCEPT AS NOTED). 3. NO FIELD WELDING IN THIS PROJECT ALL WELDED CONSTRUCTION IN THE SHOP OF THE APPROVED FABRICATOR #777 (E70XX ELECTRODES). 4. ALL ANCHORS TO BE SIMPSON STRONG -BOLT 2 ICC -ES ESR -3037, SPECIAL INSPECTION IS REQUIRED. 5. CONCRETE SLAB 6" THICK 3,200 PSI. SOIL BEARING CAPACITY 2,000 PSF. 6. STORAGE RACK CAPACITY 1,200 #/ LEVEL. 7. RACK INSTALLATIONS SHALL DISPLAY IN ONE OR MORE CONSPICUOUS LOCATIONS A PERMANENT SIGN OF 50 SQUARE INCHES IN AREA, SHOWING THE CAPACITY OF THE RACK (1,200 #1 LEVEL). 8. STORAGE RACKS SHALL BE INSTALLED WITH A MAXIMUM TOLERANCE FROM THE VERTICAL OF %2" IN 10'-0" OF HEIGHT. 9. THE CLEAR SPACE BELOW SPRINKLERS SHALL BE A MINIMUM OF 18 INCHES BETWEEN THE TOP 0 THE STORAGE AND THE CEILING SPRINKLER DEFLECTOR. FIRE PROTECTION NOTES. 1. SPRINKLER DENSITY IS .395GPM OVER 5,600SQ FT. 2. SPRINKLER HEAD TEMPERATURE IS SET AT 265°F. 3. POLYESTER FABRIC IN CARDBOARD BOXES, NON -ENCAPSULATED. 4. TOP OF STORED PRODUCT NOT TO EXCEED 12'-0" ON LOW RACKING AND 20'-0" AGAINST WALL. 5. APPROXIMATE CEILING HEIGHT 24'-7", 22'-4" CLEAR TO RAFTERS. EXITING NOTES: 1. EXTERIOR DOORS ARE 3' SWING TYPE WITH LOCKING KNOB WHICH :REQUIRES NO SPECIAL KNOWLEDGE OR EFFORT TO OPEN. N r RACK TYPE "C" b13o38l The R.E. certificatiion provided herein by SCE, Inc,r"i ns to t storage rac.k A other coreponeeE`. are REVIEWED FOR ;BODE COMPLIANCE APPROVED DEC 31 2013 City of Tukwila 4" BEAM FACE BUILDING DIVISION RECEIVED CITY OF TUKWILA DEC Z 0 2013 PERMIT CENTER rza DESCRIPTION a Q 0 yo Z () LU > W ¢ l7 Yy W W a_ o_ w HLQ� F1m A Pl CI4U X N w w J J 2m MC CA CL ,C3 La Go J Vice wl-r WLjy tzJ=O V,=i..y V) Z a IL3<C 88 $C' LNxw 1.4z' -LUQ .E.;m s Q w H FF--d'oece F-C3 01ce-J wwl- F->-d•y F.wd 22Z�-^C3 tt LUn..4 I=—I— F- C3 OQCrr-- N O N co cg DRAWINGS PREPARED FOR 00 CO 00 C) DRAWN BY: JAL SCALE: AS S TE: 12/11/13 DRAWING NO: DEC 1 6 2013 CHECKED BY: SHEET NO. 2 OF 2 SHEETS ./ 3,I COLUMN NOTES: USE @ ALL COLUMN/BASE LOCATIONS TYP. DESCRIPTION BASE PLATE: 8" x 5" DESCRIPTION COLUMN: LM20 MATERIAL 3/8" THICK PLATE MATERIAL 14 GAGE STEEL STEEL YIELD ASTM A36, Fy=36,000 PSI /8"CIGR. 5 BOLT TO REINFORCE SGL BEAM STEEL YIELD ASTM A570, Fy=55,000 PSI BRACING: HORIZ. & DIAG. 14 GAGE STEEL STEEL YIELD ASTM A570, Fy=55,000 PSI DESCRIPTION MATERIAL NOTES: USE @ ALL BRACE LOCATIONS TYP. HOR. BRACE DIAG. BRACE NOT A DEPICTION OF THIS PROJECT ROW SPACER 1 C L C COLUMN BEAM I I CONNECTOR BASE PLATE DESCRIPTION GENERAL RACK VIEW NOTES 7/16"0 GR.5 RIVET / / / / / 1 7/8" f--7/38"--/ / ////////1 1 1 /2" / / / 3 1/4" MIN. EMBED. 0 1 /2"-/ L. DESCRIPTION 3 -PIN CONNECTOR NOTES: MATERIAL 7 GAGE USE @ ALL BEAM TO COLUMN STEEL YIELD ASTM A570, Fy=55,000 PSI CONNECTION LOCATIONS TYP. DESCRIPTION MATERIAL STEEL YIELD 4" BEAM (LBC40) 14 GAGE ASTM A570, Fy=55,000 PSI NOTES: USE @ ALL BEAM LOCATIONS TYP. DESCRIPTION SIMPSON STRONG BOLT II ANCHOR SIZE 1/2" DIA. X 3-1/4" MIN. EMBEDT. ESR# 3037 NOTES: SEE NOTE #4 ABOVE FOR SPECS. 120" 4 II 48" TYPE A SELECTIVE RACK \ 120" 9L+11 TYPE B SELECTIVE RACK 611 2 II 36" 3 II 44" 192" \ 72" 72" FRONT VIEW FRONT VIEW SIDE VIEW N TYPE C SELECTIVE RACK 611 4 II 54" 36" 3 II FRONT VIEW SIDE VIEW DESCRIPTION STORAGE RACK ELEVATIONS GENERAL PROJECT NOTES 1. DESIGNED PER REQUIREMENTS OF THE 2009 IBC, 2008 RMI RACK DESIGN MANUAL 2. SEISMIC CRITERIA Ss = 1.403, S1 = 0.48, Fa=1.00, Fv = 1.52 Ip = 1.0 (NO PUBLIC ACCESS), Sd1 = 0.935, Sd2 = 0.486, OCC. CATAG. II, SITE CLASS C, SEISMIC DESIGN CLASS D 3. STORAGE CAPACITY: TYPE A = 1200# PER LEVEL TYP. TYPE B = 1200# PER LEVEL TYP. TYPE C = 1200# PER LEVEL TYP. 4. ANCHORS SIMPSON STRONG BOLT II ESR# 3037 AS USED IN CALCULATIONS OR ICC & ENGINEER APPROVED EQUAL 1/2"0 x 3 1/4" MIN. EMBED. (2) ANCHOR PER BASEPLATE 5. PERIODIC SPECIAL INSPECTION IS REQUIRED DURING ANCHOR INSTALLATION. 6. CONCRETE THICKNESS & COMPRESSIVE STRENGTH, 6" x 3200 PSI. 7. SOIL BEARING PRESSURE 2000 PSF @ GRADE OR BETTER 8. ALL RACK INSTALLATIONS AND RACKS MANUFACTURED IN CONFORMITY WITH THIS STANDARD SHALL DISPLAY IN ONE OR MORE CONSPICUOUS LOCATIONS A PERMANENT PLAQUE EACH NOT LESS THAN 50 SQUARE INCHES IN AREA AND SHOWING THE MAXIMUM PERMISSIBLE UNIT LOAD IN CLEAR, LEGIBLE PRINT. 9. ALL BOLTS GR. 5 OR BETTER. INSTALL TO SNUG TIGHT FIT WITH ALL PLYS IN FLAT CONTACT 10. ALL WELDING PERFORMED IN THE SHOP OF AN APPROVED FABRICATOR BY AWS CERTIFIED WELDERS USING E70XX ELECTRODE OR BETTER. FIELD WELDS, IF ANY, SHALL BE PROVIDED UNDER THE SUPERVISION OF A LICENSED DEPUTY INSPECTOR. 11. THE CLEAR SPACE BELOW SPRINKLERS SHALL BE A MIN. OF 18" BETWEEN TOP OF THE STORAGE AND THE CEILING SPRINKLER DEFLECTOR. p13-038) REVIEWED FOR ;CODE COMPLIANCE f APPROVED DEC 31 2013 City of Tukwila BUILDING DIVISION St RECEIVED CITY OF TUKWILA DEC 2.0 2013 PERMIT CENTER 0 N cc 1200 N. JEFFERSON ST. STE.#F ANAHEIM, CA 92807 PH.714.632.7330 FAX 714.632.7763 TUKWILA, WA 98188 4t '•!b/ DEC 1 6 2013 U a JOB NO. N-121213-10 SHEET NO. SCE 1 OF 1