Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit D13-070 - LA VISTA APARTMENTS - REROOF
LA VISTA APARTMENTS 5555 S 152 ST EXPIRED 10-08-13 D13-070 City oilkukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-431-2451 Web site: http://www.TukwilaWA.gov Parcel No.: 1157200221 Address: 5555 S 152 ST TUKW Suite No: Project Name: LA VISTA APARTMENTS DEVELOPMENT PERMIT Permit Number: D13-070 Issue Date: 03/22/2013 Permit Expires On: 09/18/2013 Owner: Name: LA VISTA ESTATES APTS Address: 10520 GRAVELLY LAKE DR SW , LAKEWOOD WA 98499 Contact Person: Name: ED EHNAT Address: 1015 145 STS , TACOMA WA 98444 Contractor: Name: PREFERRED ROOF SERVICES INC Address: 1015 145 STS , TACOMA WA 98444 Contractor License No: PREFERS936QT Lender: Name: Address: Phone: 253-318-8918 Phone: 253-318-8918 Expiration Date: 11/30/2013 DESCRIPTION OF WORK: TACOMA ABATEMENT WILL REMOVE EXISTING ROOF. PRS WILL NAIL DOWN OVER WOOD SUBSTRATE FR10 SHEET, MECHANICALLY ATTACH EPS TAPERED ROOF INSULATION. MECHANICALLY ATTACH TPO ROOF MEMBRANE, HEAT WELD SEAMS WITH HOT AIR WELDER. Value of Construction: $26,800.00 Fees Collected: $1,018.34 Type of Fire Protection: International Building Code Edition: 2009 Type of Construction: V -B Occupancy per IBC: 0021 Electrical Sex -vice Provided by: PUGET SOUND ENERGY **continued on next page** doc: IBC -7/10 013-070 Printed: 03-22-2013 Public Works Activities: Channelization / Striping: N Curb Cut / Access / Sidewalk / CSS: N Fire Loop Hydrant: Flood Control Zone: Hauling: N Start Time: End Time: Land Altering: Volumes: Cut 0 c.y. Fill 0 c.y. Landscape Irrigation: Moving Oversize Load: Start Time: End Time: N Number: 0 Size (Inches): 0 Sanitary Side Sewer: Sewer Main Extension: Private: Public: Storm Drainage: Street Use: Profit: N Non -Profit: N Water Main Extension: Private: Public: Water Meter: Permit Center Authorized Signature: N Date: I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performanc- of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. �- n i Signature: Print Name: Date: 03----P-13 This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ***BUILDING DEPARTMENT CONDITIONS*** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 4: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 5: Manufacturers installation instructions shall be available on the job site at the time of inspection. 6: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. doc: IBC -7/10 D13-070 Printed: 03-22-2013 7: Prior to final inspection for this building pet, a copy of the roof membrane manufacturrarranty certificate shall be provided to the building inspector. 8: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. doc: IBC -7/10 D13-070 Printed: 03-22-2013 CITY OF TUKi? `,A Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Building Pert No. 70 Project No. Date Application Accepted: -;--t 3 Date Application Expires: l- k -5 (For office use only) CONSTRUCTION PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION Site Address: SJ 5S S /3 n Ql 5 J King Co Assessor's Tax No.: Suite Number: New Tenant: Tenant Name: PROPERTY OWNER Name: Ed FA /1 Address:/0 `S- /yc Si, S, 7 S Name: Phone: L;zs -31 _ /(7 t . Fax: Email: Pi -e-& / � fd-ia ✓'G�r, Ser^Jrc>✓S'4)fil1lieGS f. oe Address: ContrReg No.:Pre�,rS y.36Q+Exp Date: City: State: Zip: CONTACT PERSON — person receiving all project communication Name: Ed FA /1 Address:/0 `S- /yc Si, S, 7 S City: State: ,,c Zip: �G,`yt/ Ce01.41G 1 O 7 Phone: L;zs -31 _ /(7 t . Fax: Email: Pi -e-& / � fd-ia ✓'G�r, Ser^Jrc>✓S'4)fil1lieGS f. oe GENERAL CONTRACTOR INFORMATION Company Name: T �re e rre J c>f S C r v 'Cee o Address: 10 is `rs-f4N 5 1-s- 7Statetde) Company Name: City:- cop, ei G Zip: FS, ryy Phone:a .3-31s,-�' Fly,Fax: ContrReg No.:Pre�,rS y.36Q+Exp Date: /1 Tukwila Business License No.: H:\Applications\Forms-Applications On Line\2012 Applications\Permit Application Revised - 2-7-12.docx Revised: February 2012 bh Floor: ❑ Yes 111.. No ARCHITECT OF RECORD Name: Address: Company Name: Architect Name: Address: City: State: Zip: Phone: Fax: Email: ENGINEER OF RECORD Name: Address: Company Name: Engineer Name: Address: City: State: Zip: Phone: Fax: Email: LENDER/BOND ISSUED (required for projects $5,000 or greater per RCW 19.27.095) Name: Address: City: State: Zip: -s°t.°\ Page 1 of 4 BUILDINGPERMIT INFORMATI 206;'431=3670 Valuation of Project (contractor's bid price): $ a�� d -00 Describe the scope of woli` (please provide detailed information): %atonia f9eme07 te/:// rep,ove e i-hh rovf. . P .� w //�44,/do�1� over cvaei stibs4rQ e Fe /61 s�iee 7 Ikrer 411 ;c5o ac% CPS -/A ered roof 1 nst, 11--i'oL, pier ha n ; cc l1171cc 1, • /./PI Orth e , ) eQ, e o1 eqi s, k /qr cdeicio r Existing Building Valuation: $ Will there be new rack storage? ❑ ....Yes ❑ ..No If yes, a separate permit and plan submittal will be required. • Provide All: Building Areas in Squire Footage- Below PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? 0 Yes 0 No If"yes", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: ❑ Sprinklers ❑ Automatic Fire Alarm 0 None 0 Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? 0 Yes ❑ No If "yes', attach list of materials and storage locations on a separate 8-1/2" x 11 " paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:\ApplicationsTornts-Applications On Line\2012 Applications\Permit Application Revised - 2-7-12.docx Revised: February 2012 bh Page 2 of 4 Existing Interior Remodel . •Addrt,on to' , Existing Structure New ,Type -of Construction per. IBC Type of: Occupancy per IBC •1 Floor 2nd Floor 3rd Floor Floors thrii Basement Accessory Structure* Attached Garage Detached Garage Attached Carport Detached Carport Covered Deck ' Uncovered Deck PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? 0 Yes 0 No If"yes", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: ❑ Sprinklers ❑ Automatic Fire Alarm 0 None 0 Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? 0 Yes ❑ No If "yes', attach list of materials and storage locations on a separate 8-1/2" x 11 " paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:\ApplicationsTornts-Applications On Line\2012 Applications\Permit Application Revised - 2-7-12.docx Revised: February 2012 bh Page 2 of 4 Scope of Work (please provide detailed information): Call before you Dig: 811 Please refer to Public Works Bulletin #1 for fees and estimate sheet. Water District ❑ .. Tukwila ❑ .. Water Availability Prov.. d Sewer District ❑ .. Tukwila ❑ .. Sewer Use Certificate ❑ .ewer Availability Provided 0 ...Water District #125 ❑... Highline .Valley View 0...Renton Septic System: 0 On-site Septic System — For on-site se is system, provide 2 copies of a current septic design . proved by King County Health Department. 0... Renton ❑...S•. tle Submitted with Application (mark boxes wh h a ❑ .. Civil Plans (Maximum Paper Size — 22" ❑ .. Technical Information Report (Storm Draina ❑ .. Bond 0... Insurance ❑. 0... Geotechnical e port 0 .. Traffic Impact Analysis ement(s) ❑... Maintenanc> • greement(s) ❑ .. Hold Harmless — (SAO) 0 .. Hold Harmless — (ROW) Proposed Activities (mark boxes that apply): ❑ .. Right-of-way Use - Nonprofit for less than 72 hours ❑ .. Right-of-way Use - No Disturbance ❑ .. Construction/Excavation/Fill - Right-of-way 0 Non Right-of-way ❑ ❑ .. Total Cut ❑ .. Total Fill cubic yards cubic yards O ... Ri: -of-way Use - Profit for less than 72 hours ❑... ' :ht -of -way Use — Potential Disturbance ❑ ... Work in Flood Zone orm Drainage ❑ .. Sanitary Side Sewer 0... Abando . eptic Tank 0...Grease Interceptor ❑ .. Cap or Remove Utilities 0... Curb t ❑... Channelization ❑ .. Frontage Improvements 0... Pav ent Cut 0...Trench Excavation ❑ .. Traffic Control ❑... L• ped Fire Line El...Utility Undergrounding 0 .. Backflow Prevention - Fire Protection Irrigation Domestic Water ❑ .. Permanent Water Meter Size (1) WO # (2) " WO # (3) " WO # ❑ .. Temporary Water Meter Size (1) " WO # (2) " WO # (3) " WO # ❑ .. Water Only Meter Size WO # ❑ .. Deduct Wat- eter Size " ❑ .. Sewer Main Extension ublic 0 Private ❑ ❑ .. Water Main Extension . Public ❑ Private ❑ FINANCE INFORMATION Fire Line Size at Property ►ne Number of Public Fire Hydrant(s) 0 .. Water ❑ .. Sewer 0 .. Sewage Treatment Monthl Service B. n to: Name: Mailing Ad. ss: Day Telephone: City Water ter Refund/Billing: State Zip Name: Day Telephone: Mailing Address: City State Zip H:Wpplicatians\Fonns-Applications On Line\2012 Applications\Permit Application Revised - 2-7-12.docx Revised: February 2012 bh Page 3 of 4 PERMIT APPLICATION_ NOTES • Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY,FOR THIS PERMIT. BUILDING OW R 6RAUTHO' D E►y Signature: .k".. l ♦ ,�` �/� Print Name: reILMr lY J't Mailing Address: M/ -S $5- 44 $ / S H:Vtpplications\Forms-Applications On Line'2012 Applications\Permit Application Revised - 2-7-12.docx Revised: February 2012 bh Date: 03"0 Day Telephone: 25 ? — 3/c1Q O )/S /PCoPIa City tia State Zip Page 4 of 4 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206-431-3665 Web site: http://www.TukwilaWA.gov Parcel No.: 1157200221 Address: 5555 S 152 ST TUKW Suite No: Applicant: LA VISTA APARTMENTS RECEIPT Permit Number: D13-070 Status: APPROVED Applied Date: 03/01/2013 Issue Date: Receipt No.: R13-01111 Payment Amount: $618.95 Initials: WER Payment Date: 03/22/2013 10:33 AM User ID: 1655 Balance: $0.00 Payee: EDWARD EHNAT TRANSACTION LIST: Type Method Descriptio Amount Payment Credit Crd VISA Authorization No. 552766 ACCOUNT ITEM LIST: Description 618.95 Account Code Current Pmts BUILDING - NONRES STATE BUILDING SURCHARGE 000.322.100 614.45 640.237.114 4.50 Total: $618.95 Drin+orl• (12_99_9!114 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206-431-3665 Web site: http://www.TukwilaWA.gov Parcel No.: 1157200221 Address: 5555 S 152 ST TUKW Suite No: Applicant: LA VISTA APTS RECEIPT Permit Number: D13-070 Status: PENDING Applied Date: 03/01/2013 Issue Date: Receipt No.: R13-00939 Payment Amount: $399.39 Initials: WER Payment Date: 03/01/2013 09:09 AM User ID: 1655 Balance: $618.95 Payee: ED EHNAT TRANSACTION LIST: Type Method Descriptio Amount Payment Credit Crd VISA Authorization No. 360979 ACCOUNT ITEM LIST: Description 399.39 Account Code Current Pmts PLAN CHECK - NONRES 000.345.830 399.39 Total: $399.39 a..... o......�..� nc Printers• n4_!YI_9n13 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila: WA 98188 v (206) 431-3670 Permit Inspection Request Line (206) 431-2451 ,b13 070 Project:�-- (�� �/21-1---4. rel �j t t • Typ -of Ins ection: p -, ;r ct .lam , tu,n� 44 Adgeg Date Called: 55 I SZ ST Special Instructions: Date.-- 1 -13 !� p.m. Requester: Phone No: Approved per applicable codes. Corrections required prior to approval. COMMENTS: eilior1F4N ,&y (671/4-40/07, • Inspector Date: 7i Q_ �/ REINSPECTION FEE REQU RED. Prior to n7 'inspection,' fee must be Tie at 6300 Southcenter Bl d.. Suite 100./halt to schedule reinspection. Google http://maps.googie.com/maps?f... REVISIONS No damps shall be made to the scope of work without prior approval of Tukwila Building Division. !OTE: Revisions will require a new plan subanal Page 1 of 1 To see all the details that are visible on the screen, use the "Print" Zink next to the map. Approval of ©©2 violatIoi of any ©VW WM MIMS DM RATE PERMIT REQUIRED FOR: Mechanics° Electrical Plumbing Gas PipIn. City of Tukwila BUILDING DIVISION 13- 070 RECEIVED CITY OF TUKWILA MAR 0 1 2013 PERMIT CENTER 3/1/201 2/28/2013 Preferred Roof Services Inc. Mr. Phil Ehnat, St. attle Attached is the notification to Labor and Industries for the roof removalion for t 5 5555 S.asbestos5in then ofing As , WA 98188 Bldg. C. LaViasta Apts. This is the only required notificationof you may not know Puget Sound Clean Air Agency does not req��favvnith tarotificationr base. This make thisfor the roof non -friable asbestos removal, and as you know this is a built up material non -friable for the purpose of removal, disposal and notifications. I have also included a copy of the waste profile to Republic for you records. If you have any questions please feel free to contact me, r�/ Mike miller';- Operations Manager AHERA building Inspector Certification # BI/R-NES-11-26-12-03 Expiration date 11/26/2013 REVIEWED FOR CODE COMPLIANCE APPROVED MAR 13 2013 City of Tukwila BUILDING DIVISION tV?,b 070 5111 S Burlington Way, Tacoma, WA 98409 Phone: 253.830-5945; Fax: 253-383.1592 RECEIVED CITY OF TUKWILA MAR 0 1 2013 PERMIT CENTER Page 2 of 2 Address: 5555 S. 152nd. St. Building Name: LaVista Appts. Room: Bldg. C units 114,113,112,100,99.98,85.84 City: Seattle Zip + 4: 98188 County: King Facility Type: Appt. Age: 1977 Size: 20000 Type of activity: Repair Quantity of Asbestos to Be Removed Outdoors Quantity: 5000 square feet Roofing Quantity: linear feet Control Measures Wet methods HEPA vacuum Manual methods Respiratory Protection 1/2 mask APR Comments: Date/Time Submitted 2/28/2013 12:11:22 PM htt://vw w.lni.wa.gov/safety/topics/atoz/asbestos/FormDataDisplay.asp?FormID=68879%... 2/28/2013 P • ,, REPUBLIC SERVICES EXPRESS WASTE PROFILE 4178 Roosevelt Regional MSW LF WA Requested Disposal Facility: tofr7. , Generator Information Generator Name: Tacoma Abatement Company, LLC Generator Site Address: 5555 S. 152nd. St. County: King State Approval/Waste Code: event): 5555 S. 152nd. St. County: Tacoma Abatement Co State IDIReg No: Generator Mailing Address (if diff Waste Profile # Sales Rep #. Generator Contact Name: Mike Miller Ext: Phone Number. (253) 830-5945 Ila. Transporter Information Transporter Name: Republic Transporter Address: State: Washington (if applicable) State: Washington Email: mmiller@tacomaabatement.com Zip: 98188 Zip: 98188 Fax Number. (253) 383-1592 Contact Name: Phone Number. County: Fax Number. lib, Billing Information Bill To: Tacoma Abatement Company, LLC State Transportation Number. Contact Name: Mike Miller City: Tacoma Email: mmiller@tacomaabatement.com zip: 98409 Phone: (253) 830-5945 111, Waste Stream Information Name of Waste: (Petroleum products -applies only to contaminated media and debris). ❑ Diesel Fuel ❑ Horne Heating Fuel #1-6 ❑ Kerosene ❑ Aviation Fuel ❑ Hydraulic Fluid ❑ Unleaded Gasoline (UST Corrective action) Process Generating Waste: Roofing BAGGED Method of Shipment m BULK ❑ DRUM ❑ Estimated Annual Volume: Frequency: ® ONE TIME ['ANNUAL ❑ Weathered Wood ❑ RCRA Empty Containers ❑ Treated Medical Waste ❑ Animal Carcass ❑ Plant Trash ❑ Meth Contaminated Debris ❑ Friable Asbestos ® Non Friable Asbestos ❑ Cured Asphalt ❑ Tires O Food Products (inducing Animal Food) 0 OTHER: IV. Certification 1 hereby certify that to the best of my knowledge and �1� �t binformation i i contained �e�e� ��g nor other employeeson of of the e waste ny allibeing r sp for disposal. I further n bylaw. Our company hereby agrees to fully company will deliver for disposal or attempt to deliver for disposal any waste which is classified as toxic waste, hazardous waste or infectious waste, or any other waste material this facility is prohibited from accepting that the indemnify this disposal facility against any damages this resulting sheetfrom asthis i provided by Rebeing cincuue atelor untrue. I further certify company has not altered the form or content profile Mike R Miller e (type or Print) REV 1 Tacoma Abatement Company. LLC Company Name 2-28-2013 Date ©Republic Services. Aug 2011 Page 1 of 2 Dept. of Labor & Industries, Division of Occupational Safety & Health Asbestos Project Notification Form Form ID: 68879##1532TACOM063226 Notice Date: 1/4/2013 Start Date: 2/22/2013 Completion Date: 3/8/2013 Status: Amended Off Hold Site Work Hours: 8am - 3:30pm Site Work Days: Monday Tuesday Wednesday Thursday Friday Contractor: TACOMA ABATEMENT CO LLC Job Site C.A.S.: Ivan Guzman Your e-mail address: mmiller2tacomaabatement.com Contractor Phone Number: 253-830-5945 Property Owner Name: Owner's Agent: Rex Nikula Company: Reeder Property Management Address: 10520 Gravelly Lk. Dr. SW City: Lakewood State: WA Zip+4: 98499 Phone: 253-584-6732 ex Job Site htt://www•ini.wa.gov/safety/topics/atoz/asbestos/FormDat:aDisplay.asp?FormID=68879%... 2/28/2013 P MANUS 2003 m REVIEWED FOR Molders •Associottion CODE COMPLIANCE APPROVED MAR 1 3 2013 City of Tukwila BUILDING DIVISION BUILDING INSULATION 07210 EPS Molders Association 1298 Cronson Blvd. Crofton, MD 21114 Phone: (800) 607-3772 Fax: (410) 451-8343 www.eosmolders.orq This MANU-SPECTM utilizes the Construction Specifications Institute (CSI) Manual of Practice, including MasterFormat', SectionFormaff and PageFormalTM. A MANU-SPEC is a manufacturer -specific proprietary product spedfication using the proprietary method of specifying applicable to project specifications and master guide specifications. Optional text is indicated by brackets 0; delete optional text in final copy of spedfication. Specifier Notes typically precede specification text; delete notes in final copy of specification. Trade/brand names with appropriate symbols typically are used in Specifier Notes; symbols are not used in spedfication text. Metric conversion, where used, is soft metric conversion. This MANU-SPEC specifies Expanded Polystyrene Insulation (EPS) for use in a variety of construction applications. This product is manufactured by a variety of manufacturers and is represented by the EPS Molders Association. For applications other than conventional building insulation, this document should be edited to suit project requirements. Revise MANU-SPEC section number and title below to suit project requirements, specification practices and section content. Refer to CSI MasterFormat for other section numbers and titles. SECTION 07210 BUILDING INSULATION (EXPANDED POLYSTYRENE INSULATION) PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Expanded Polystyrene (EPS) Insulation used as building insulation. Specifier Note: Article below may be omitted when specifying manufacturer's proprietary products and recommended installation. Retain References Article when specifying products and installation by an industry reference standard. If retained, list standard(s) referenced in this section. Indicate issuing authority name, acronym, standard designation and title. Establish policy for indicating edition date of standard referenced. Conditions of the Contract or Division 1 References Section may establish the edition date of standards. This article does not require compliance with standard. It is a listing of all references used in this section. 1.02 REFERENCES A. General: Standards listed by reference, including revisions by issuing authority, form a part of this spedfication section to the extent indicated. Standards listed are identified by issuing authority, authority abbreviation, designation number, title or other designation established by issuing authority. Standards subsequently referenced herein are referred to by issuing authority abbreviation and standard designation. RECEIVED B. American Society for Testing and Materials (ASTM): CITY 0 F T U K W I L A 1. ASTM C578 Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation. 2. ASTM E84 Standard Test Method for Surface Burning Characteristics of Building Materials. MAR 0 1 2013 C. Factory Mutual Research Corporation (FMRC): PERMIT CENTER 1. Factory Mutual Research Corporation Approval Guide (current edition). Contact manufacturer for approval standard and number. 1.03 DEFINITIONS A. Special definitions that apply to this section include: 1. EPS Board: Expanded polystyrene board insulation product specifically manufactured and recommended by its SPEGDATA" and MANU-SPEC" are registered trademarks of Reed Elsevier Inc. the three port MANU-SPEC format conforms to the editorial style of the Constriction CMD Specifications Institute and is used with their permission. manufacturers responsible for technical accuracy. °2003 CMD Rist Source AI Rights Reserved. 13070 MANU% m t'? 2003 BUILDING INSULATION 07210 EPS Molders Association manufacturer for building insulation applications, based on its R -value and other physical properties when tested in accordance with ASTM C578. Specifier Note: Article below should be restricted to statements describing design or performance requirements and functional (not dimensional) tolerances of a complete system. Limit descriptions to composite and operational properties required to link components of a system together and to interface with other systems. 1.04 SYSTEM DESCRIPTION A. Design Requirements: Provide products and systems that have been manufactured, fabricated and installed to meet the following criteria: 1. (Specify system design criteria.). B. Performance Requirements: Provide products and systems that have been manufactured, fabricated and installed to meet the following criteria: 1. (Specify system performance criteria.). Specifier Note: Article below includes submittal of relevant data to be furnished by Contractor before, during or after construction. Coordinate this article with Architect's and Contractor's duties and responsibilities in Conditions of the Contract and Division 1 Submittal Procedures Section. 1.05 SUBMITTALS A. General: Submit listed submittals in accordance with Conditions of the Contract and Division 1 Submittal Procedures Section. B. Product Data: Submit manufacturer's product data and installation instructions. C. Shop Drawings: Provide drawings indicating (Specify requirements for shop drawings.). D. Quality Assurance/Control Submittals: Submit the following: 1. Certificates: Submit manufacturer's certificate that products meet or exceed specified requirements. E. Closeout Submittals: Submit the following: 1. Warranty documents specified herein. Specifier Note: Article below should include statements of prerequisites, standards, limitations and criteria that establish an overall level of quality for products and workmanship for this section. Coordinate article below with Division 1 Quality Assurance Section. 1.06 QUALf1Y ASSURANCE A. Installer Qualifications: Utilize an installer having demonstrated experience on projects of similar size and complexity. Specifier Note: Paragraph below should list obligations for compliance with specific code requirements particular to this section. General statements to comply with a particular code are typically addressed in Conditions of the Contract and Division 1 Regulatory Requirements Section. Repetitive statements should be avoided. B. Regulatory Requirements and Approvals: (Specify applicable requirements of regulatory agencies.). 1. (Code agency name). a. (Report or approval number). C. Certifications: 1. Provide third party certification for testing, inspection and review of product production practices for compliance with ASTM C578. Specifier Note: Delete subparagraph below if not applicable to project. 2. Underwriters Laboratories, Inc. (UL): SPEC -DATA' and MANU-SPEC' are registered trademarks of Reed Elsevier Inc. Ire three part MANU-SPEC format oonforrrs 10 the editorial style of the Construction CMD Specifications InstiMe and is used with their permission. fie monufacturer h responsible for technical accuracy. °2003 CMD Rrst Source Al Rights Reserved. \\\ MANUS 2003 BUILDING INSULATION 07210 EPS Molders Association a. UL Building Materials Directory. b. UL Roofing Materials & Systems Directory. 3. Factory Mutual Research Corporation (FMRC) Approval: Comply with FMRC Approval Guide. Contact manufacturer for approval standard and number. Specifier Note: Retain paragraph below if mock-up is required. D. Mock -Ups: (Specify requirements for mock-up.). 1. Subject to acceptance by owner, mock-up may be retained as part of finish work. 2. If mock-up is not retained, remove and properly dispose of mock-up. Spedfier Note: Retain paragraph below if preinstallation meeting is required. E. Preinstallation Meetings: (Specify requirements for meeting.). Spedfier Note: Article below should include specific protection and environmental conditions required during storage. Coordinate article below with Division 1 Product Requirements Section. 1.07 DELNERY, STORAGE & HANDLING A. General: Comply with Division 1 Product Requirement Section. B. Comply with manufacturer's ordering instructions and lead time requirements to avoid construction delays. C. Delivery: Deliver materials in manufacturer's original, unopened, undamaged containers with identification labels intact. D. Storage and Protection: Store materials protected from exposure to harmful environmental conditions and at temperature and humidity conditions recommended by the manufacturer. 1. Prolonged exposure to sunlight will cause slight discoloration and surface dusting of EPS insulation. 2. EPS insulation exposed to moisture should be replaced or thoroughly dried prior to application of finish or covering materials. Spedfier Note: Coordinate article below with Conditions of the Contract and with Division 1 Closeout Submittals (Warranty) Section. Use this article to require special or extended warranty or bond covering the work of this section. 1.08 WARRANTY A. Project Warranty: Refer to Conditions of the Contract for project warranty provisions. B. Manufacturer's Warranty: Submit, for Owner's acceptance, manufacturer's standard warranty document executed by authorized company official, for insulation R -value when tested according to ASTM C578. Manufacturer's warranty is in addition to, and not a limitation of, other rights Owner may have under contract documents. Spedfier Note: Coordinate subparagraph below with manufacturer's warranty requirements. 1. Warranty Period: (Insert years.) beginning with date of substantial completion. PART 2 PRODUCTS Specifier Note: Retain artide below for proprietary method specification. Add product attributes, performance characteristics, material standards and descriptions as applicable. Use of such phrases as "or equal" or "or approved equal" or similar phrases may cause ambiguity in specifications. Such phrases require verification (procedural, legal and regulatory) and assignment of responsibility for determining "or equal" products. 2.01 EPS INSULATION BOARD SPEC -DATA" and MANU-SPEC' ore registered trademarks of Reed E6evier Inc. The three part MANU-SPEC format conforms to the editorial style of the Constriction Spedficatiors Institute and Ls used with their permission. The manufacturers responsible for technical accuracy. 02063 CMD Rrst Source All Rights Reserved. CMD 4 • MANUS cl 2003 BUILDING INSULATION 07210 EPS Molders Association Specifier Note: Paragraph below is an addition to CS1 SectionFormat and a supplement to MANU-SPEC. Retain, edit or delete paragraph below to suit project requirements and specifier practice. A. Manufacturer: EPS Molders Association. 1. Contact: 1298 Cronson Blvd., Crofton, MD 21114; Telephone: (800) 607-3772; Fax: (410) 451-8343; website: www.epsmolders.orq. B. Proprietary Products/Systems: EPS insulation boards, including the following: 1. Rat Stock Board: a. Material Description: Rigid, dosed cell, expanded polystyrene (EPS) board stock. b. Material Standard: Comply with ASTM C578. c. Thickness: (Specify thickness.). d. Nominal Density: (1.0 pcf (Type 1)) (1.25 pcf (Type VIII)) (15 pcf (Type II)) (2.0 pcf (Type IX)). e. Ramespread Index (ASTM E84): Contact manufacturer for test results. f. Smoke Development Index (ASTM E84): Contact manufacturer for test results. g. Fadng: (Unfaced) (Foil faced (aluminum kraft paper laminate)) (Poly faced (polyethylene skin kraft paper laminate)). Specifier Note: Edit Artide below to suit project requirements. If substitutions are permitted, edit text below. Add text to refer to Division 1 Project Requirements (Product Substitutions Procedures) Section. 2.02 PRODUCT SUBS11TUTIONS A. Substitutions: No substitutions permitted. Specifier Note: Specify subordinate or secondary items that aid and assist primary products specified above or are necessary for preparation or installation of those items. Retain, edit or delete to suit project and specifier practice. 2.03 ACCESSORIES A. Provide installation accessories as follows: 1. Adhesive: a. Material, Type and Manufacturer: (Compatible with EPS insulation board and acceptable to EPS insulation board manufacturer) (Specify material, type and manufacturer.). 2. Wall Ties: a. Material, Type and Manufacturer: (Compatible with EPS insulation board and acceptable to EPS insulation board manufacturer) (Specify material, type and manufacturer.). 3. Mechanical Fasteners: a. Material Type and Manufacturer: (Compatible with EPS insulation board and acceptable to EPS insulation board manufacturer) (Specify material, type and manufacturer.). 4. Furring Channels: a. Material, Type and Manufacturer: (Compatible with EPS insulation board and acceptable to EPS insulation board manufacturer) (Specify material, type and manufacturer.). PART 3 EXECUTION Specifier Note: Article below is an addition to the CSI SectionFormat and a supplement to MANU-SPEC. Revise artide below to suit project requirements and specifier's practice. 3.01 MANUFACTURER'S INSTRUCTIONS SPEGDATA" and MANU-SPEC' are registered trademarks of Reed Elsevier Inc. The three part MANU-SPEC format conforms to the editorial style of the Construction CM Spedficatiorss Institute and is used with their permission. lhe manufacturer is responsbaccuracy.e for technical accuracy. 02003 CMD hrst Source Al Rights Reserved. 1/4 MAN U�'.i.,l 2003 BUILDING INSULATION 07210 EPS Molders Association A. Comply with the instructions and recommendations of the EPS insulation board manufacturer. Spedfier Note: Specify actions to physically determine that conditions are acceptable to receive primary products of the section. 3.02 EXAMINATION A. Site Verification of Conditions: 1. Verify that site conditions are acceptable for installation of EPS insulation board. 2. Do not proceed with installation of EPS insulation board until unacceptable conditions are corrected. Spedfier Note: Coordinate article below with manufacturer's recommended installation requirements. 3.03 INSTALLATION A. General: 1. Install EPS board insulation in a (Single) (Double) layer to achieve required R-value(s) as indicated in drawings. Cut and fit tightly around projections and penetrations. 2. Secure insulation to substrate with (Mechanical fasteners) (Or) (Spot adhesive applied to back of board) using quantity and pattern recommended by manufacturer. B. Insulation Board Joints: Stagger EPS insulation board joints in one direction for each course. Butt edges and ends tightly to adjacent EPS boards. Spedfier Note: Retain, edit or delete articles below to suit project and specifier practice. C. Sheathing and Underlayment Installation: On exterior side of stud framing, install EPS insulation board (Vertically) (Horizontally). Fasten vertically 12" (300 mm) maximum on centers using fasteners recommended by manufacturer. On interior side of stud framing, install minimum 1/2" (12.7 mm) thick gypsum wallboard over EPS board. D. Concrete and Masonry Walls: Install EPS insulation board over furring channels attached to concrete and unit masonry substrates. Fasten vertically 12" (300 mm) maximum on centers using fasteners recommended by manufacturer. E. Cavity Walls: Install EPS insulation board on exterior surface of interior wythe of cavity wall, fitting board between wall ties and other projections and penetrations. F. Perimeter Foundation: Install EPS insulation board on exterior surface of perimeter foundation walls. Secure board with spot adhesive applied to back of board using quantity and pattern recommended by manufacturer. G. Slab -On -Grade: Install EPS insulation board under slab -on -grade and over properly prepared subgrade of compacted fill and vapor retarder. Race EPS board with sides and ends butted. Spedfier Note: Specify the final actions required to clean installed equipment or other completed work to properly function or perform. Coordinate article below with Division 1 Execution Requirements (Cleaning) Section. 3.04 CLEANING A. Remove and legally dispose of trash and debris resulting from the work. Specifier Note: Specify provisions for protecting work after installation but prior to acceptance by the owner. Coordinate article below with Division 1 Execution Requirements Section. 3.05 PROTECTION A. Protect installed work from damage due to subsequent construction activity on the site. END OF SECTION SPEC -DATA" and MANU-SPEC" are regStered trademarks of Reed Elsevier Inc. The three part MANU•SFEC format conforms to the editorial style of the Construction CMD L Specifications Institute and is used witn eir permission. fie manufacturer ls responsible for technical accuracy. 02003 CMD Rrst Source Al Rights Reserved. FIRE RETARDANT SLIPSHEETS ATLAS® +FIRE RETARDANT SLIPSHEETS FR -10 and FR -50 fire resistant slipsheets enhance the overall fire performance of many conventional commercial roof systems, including metal roofs. FR -10 and FR -50 are coated -glass fiber mats specifically designed for installation over wood decks or certain combustible insulation. FR -50 incorporates a heavier glass mat than FR -10 to provide enhanced fire performance. • Superior protection against flame spread and penetration. • A lightweight and easy -to -install roof system component. • Part of a "Class A" assembly over noncombustible decks and expanded polystyrene • Part of a "Class A" assembly over combustible and noncombustible decks and extruded polystyrene +FIRE—RETARDANT SLIPSHEETS RECOMMENDED USES FR -10 and FR -50 are specifically formulated for use over wood decks or polystyrene insulation. The proprietary flame-retardant coating and glass -fiber mat provide protection against flame spread and flame penetration through the roof system. The slipsheet can also act as a barrier between chemically incompatible insulation and roof membranes. In addition, the sheet may be used in multiple layers to achieve certain Class A fire resistance ratings. > INSTALLATION Atlas Fire Retardant Slipsheets are lightweight, easy to handle and, therefore, quicker to install than thermal barriers or coverboards. The slipsheet should be rolled out, overlapping the side and end of the preceding sheet a minimum of two (2) inches. Consult the membrane manufacturer for specific application recommendations (e.g., slipsheet roll direction perpendicular to membrane roll). Mechanical attachment of the slipsheet is not needed in most applications. The patented coating generally provides enough weight to anchor the sheet until the membrane is installed. Mechanical or adhesive attachment may be necessary under windy conditions. Install only as much slipsheet as can be covered by the end of the day. >STORAGE Factory -applied packaging is intended solely for protection during transit. When stored outdoors or on the job site, the slipsheet rolls should be stacked on pallets at least four inches above ground level and completely covered with a weatherproof covering such as a tarpaulin. ' VFLAS A ri, .,.,fit •,. WARRANTY AND LIMITATION. OF LIABILITY Other than the aforementioned representations and descriptions, Atlas Roofing Corporation (hereafter, °Seller") makes no other representations or warranties as -, to the product sold herein. The Seller disclaims all other warranties, express or implied, including the warranty of merchantability and the warranty of fitness for a particular purpose. The Seller shall not be liable for any incidental or consequential dama9es including the cost of installation; removal, repair or replacement of this product, insulation _ and/or roof membrane, etciTtie Buyer's remedies shall be- - limited exclusively to, at Seller's option; the repaymentof the purchase price or resupply of product manufactured by Atlas in a quantity equal to that of the nonconforming product, Atlas distributors; agents, salespersons, or other independent representatives have no authority to waive or alter the above limitation of liability and remedies. U REVIEWED FOR CODE COMPLIANCE APPROVED MAR 1 3 2013 City of Tukwila BUILDING DIVISION This product is covered by one or more US and foreignpatents. n-:r}s .. slipsheetfor RofingSystems asto n External Fire Exposure only. USS ULDirectoryzp_du tsCertifiedfor Canada and UL Roofing Materials Systems Directory. .Miami -Dade County,. Florida ,NOV "-'1 ; No. 05-0602.03, 10/20/10 i1 EIVED 1j CITY OF TU\KWILA MAR 0 /1 2013 (1 PERMIT'_CENTER _ AtlasRoofing.com ATL -080450-00 FRIO FR50 DataSheet VI 1 :had 1 13 5/21/09 2:54:28 PM FIRE RETARDANT SLIPSHEETS +APPLICATIONS TYPICAL COMBUSTIBLE DECK/METAL ROOF APPLICATION METAL ROOFING TYPICAL COMBUSTIBLE DECK APPLICATION MEMF3RANE FASTENER SINGLE -PLY MEMBRANE IR SLIPSHEETS TYPICAL NON-COMBUSTIBLE DECK APPLICATION BRANE FASTENER SINGLE -PLY MEMBRANE ER SLIPSHEETS THERMAL BARRIER (c.,;ypsom EK)A D) EXPANDED OR EXTRUDED POLYSTYRENE. INSULATION +TECHNICAL DATA r SLIP SHEET FR -10 FR -50 STANDARD SIM PERROLL COVERAGE W/2" LAP 10 Squares (1000 sq. ft.) 9.64 Squares (964 sq. ft.) 48.25" x 250' (1225.55 mm 076.2 m) 96 lbs. 4.2 Squares (420 sq. ft.) 4.02 Squares (402 sq. ft.) 4x. x 105' (1219.2 mm x32 m) 80 lbs. TENS EROPJ '---- SALESOFFICESTeronto,oNT CamisNall-14P7A6 (80°68 754957 DIboll, TX 6 (Boo) 766-141363 -1 Fax: (309) :06°10:7neons-12.4_,;76colltn .„.F,axt"ph, (9a03).66)04812°9',914 -A1-547613°1 Fax: (717) 5 Fax: (877) Fax:(303) 252-4417 Fax: (480) 655-9209 (800) 288-1476 lisrangt.. (800) 477-1476 (8OO) 455-1476 Fax: (706) 8824047 PR PERTY TEST METHOD F0-10 FR -50 EII Machine Direction Cross Machine Direction TAPPI T 1009 om-06 37 lbs/in. 64 lbs/in. TAPPI T 1009 om-06 27 lbs/in. 46 lbs/in. CORPORATE SALES & MARKETING 2000 RiverEdge Parkway, Suite 800 Atlanta, GA 30322 .ZONE --No/ www.grectzoneam 6:14:0PYright ;PO% Ada:$ f40,6,19 Cion 1-0t0450 5/09 , ATL -080450-00 FR10 FR50 DataSheet V11.indd 2 5/21/09 2:54:30 PM et c• VERSICO ROOF N G S Y S M S CODE R E Cp ED FOR APPROVE p NCE MAR 1 3 2013 TPO ROOFING SYSTEMS b13- 070 VERSICO RECEIVED CITY OF TUKWILA MAR 0 1 2013 PERMIT CENTER A SINGLE SOURCE FOR SINGLE -PLY ROOFING ROOFING SYSTEMS Verslco, PO Box 1289, Carlisle, PA 17013 Tel: 800.992.7663 Fax: 717.960.4036 Web: www.verslco.com ��I VERSIWELD VERSIWELD ROOFING SYSTEMS The VersiWeld® Roofing Systems incorporate 45 -mil, 60 -mil or 80 -mil (TPO) Thermoplastic Polyolefin membrane. Versico's VersiWeld membrane is comprised of three layers - a TPO polymer base; a strong, polyester -reinforced fabric center (scrim) and a tough thermoplastic polyolefin compounded top ply. Because top ply is the most vital membrane component for long-term weathering characteristics, Versico manufacturers its membranes with an industry leading "thicker" and "smoother" top ply over scrim. The smooth surface resists dirt pick-up and biological growth compared to other thermoplastic membranes. MEMBRANE BENEFITS ENVIRONMENT VersiWeld membranes are ideally suited when environmental issues are of concern because the membrane is produced without the use of any chlorinated ingredients or plasticizers. VersiWeld membranes are 100% recyclable. MEMBRANE FLEXIBILITY Membrane formulation contains no plasticizers or chlorine so it will not dry out or become brittle with age. This sheeting easily accommodates the building's normal expansion and contraction. CHEMICAL RESISTANCE VersiWeld membrane is highly chemical and contaminant resistant. Most liquids and chemicals normally exhausted onto the roof have no effect on the membrane. OCTAEUARO XT FIRE RESISTANCE WEATHERING PACKAGE Versico's VersiWeld membranes are enhanced with Versico's OctaGuard XT"" Weathering Package resulting in the most dependable, long-term performance characteristics in the industry. VersiWeld TPO membranes carry the ENERGY STAR®' qualification having exceeded the stringent program guidelines based upon solar reflectance and heat emittance. Additionally, VersiWeld is listed as a CRRC (Cool Roof Rating Council) certified product meeting the Title 24 mandates for the state of California. Versico's ENERGY STAR -qualified VersiWeld membranes with their high reflectivity ratings help reduce the amount of energy required to maintain cool building environments. Less energy consumed results in less pollutants generated back into the atmosphere (lessening the Urban Heat Island Effect) and directly contributes to a cleaner, cooler environment. VersiWeld roofing meets UL 790 requirements for external fire Class A ratings and UL P assemblies for internal, hourly fire ratings. Consult the UL Building Material Directory for specific assemblies. WIND RESISTANCE VersiWeld roofing has surpassed Factory Mutual's 1-90 wind resistance classification, one of the most stringent standards in the industry, as listed in the FM Approval Guide. INSTALLATION Heat -welded systems are easy to install since minimal labor and few components are required. VersiWeld membrane welds at fast speeds — 10- to 15 -feet per minute at moderate temperature settings. VERSICO TOTAL SYSTEM WARRANTIES 5 -year to 30 -year No Dollar Limit Total System Warranty coverage is available. li t a M C L LE o P d V 1,?© 0[ (g), ACCESSORIES ertified Fabricated Accessory The most critical and time consuming portion of VersiWeld roofing installation is made easier and faster with VersiWeld Certified Fabricated Accessories. VersiWeld accessories provide exceptional durability and weatherability with the added benefit of being heat weldable. VersiWeld TPO accessories greatly reduce job time, in turn, reducing labor time. All VersiWeld TPO accessories carry the Certified Fabricated Accessory (CFA) seal of approval meaning they adhere to the most stringent quality tolerances required to be included in a Versico warranted roof system. TPO PS RUSS TPO Non -Reinforced Flashing TPO Molded Sealant Pockets TPO T -Joint Covers PS Coverstrip TPO Split Pipe Seals * Please see VersiWeld accessories literature for a more complete listing of accessories. TPO ROOFING SYSTEMS VersiWeld Fully Adhered Roofing System begins with insulation mechanically attached to the roof deck The membrane and substrate are then coated with VersiWeld bonding adhesive The membrane is rolled into place and seams are then hot-oir welded VersiWeld Mechanically Attached Roofing System starts with insulation fastened to the substrate. VersiWeld membrane is then fastened through the insulation with fasteners and plates. (Consult the Versico Fastener Sell Sheet) Adjoining membrane sheets are overlapped and joined together by hot-air welding VERS CO ROOFING SYSTEMS VERSIWELID VERSIWELD 45- & 60 -MIL THICK REINFORCED TPO Basic Properties and Characteristics (Standard and HS) Physical Property ASTM D6878 Requirement 45 -mil 60 -mil 80 -mil Tolerance on nominal thickness, % ASTM D751 test method +15, -10 ± 10 ± 10 ± 10 Thickness over scrim, in. (mm) ASTM D6878 optical method, average of 3 areas 0.012 min (0.305) 0.018 typ (0.457) 0.024 typ (0.610) 0.034 typ (0.864) Breaking srength, Ibf (kN) ASTM D751 grab method Elongation break of reinforcement, % ASTM D751 grab method 220 (976 N) min 15 min 225 (1.0) min 320 (1.4) typ 15 min 25 typ 250 (1.1) min 360 (1.6) typ 15 min 25 typ 350 (1.6) min 425 (1.9) typ 15 min 25 typ Tearing strength, Ibf (N) ASTM D751 proc. B 8 in. x 8 in. Brittleness point, °F (°C) ASTM D2137 Linear dimensional change, % ASTM D1204, 6 hours at 158°F 55 (245) min -40 (-40) max ± 1 max 55 (245) min 130 (578) typ -40 (-40) max -50 (-46) typ ± 1 max -0.2typ 55 (245) min 130 (578) typ -40 (-40) max -50 (-46) typ ± 1 max -0.2 typ 55 (245) min 130 (578) typ -40 (-40) max -50 (-46) typ ± 1 max -0.2 typ Ozone Resistance, no cracks 7X ASTM D1149, 100 pphm, 168 hrs PASS PASS PASS PASS Water absorption resistance, mass % ASTM D471 top surface only 166 hours at 158°F water ± 3.0 max ± 3.0 max 2.O typ ± 3.0 max 2.0typ ± 3.0 max 2.0 typ Factory seam strength, Ibf/in (kN/m) ASTM D751 grab method 66 (290) min 66 (290) min 66 (290) min 66 (290) min Field seam strength, Ibf/in (kN/m) ASTM D1876 tested in peel Water vapor permeance, Perms ASTM E96 proc. B Puncture resistance, Ibf (kN) FTM 101C, method 2031 (see supplemental section) No requirement No requirement 25 (4.4) min 50 (8.8) typ 0.10 max 0.05 typ 25 (4.4) min 60 (10.5) typ 0.10 max 0.05 typ 40 (7.0) min 70 (12.3) typ 0.10 max 0.05 typ No requirement 250 (1.1) min 325 (1.4) typ 300 (1.3) min 350 (1.6) typ 400 (1.8) min 450 (2.0) typ Properties after heat aging ASTM D573, 670 hours @ 240°F Breaking strength, % retained Elongation reinf., % retained Tearing Strength, % retained Weight change, % Typical Weights 90 min 90 min 60 min ± 1.0 max 90 min 90 min 90 min 90 min 60 min 60 min ±1.Omax ±1.Omax 0.23 Ib/ft2 (1.1 kg/m2) 0.29 (1.4) 90 min 90 min 60 min ± 1.0 max 0.40 (2.0) " Typical properties and characteristics are based on samples tested and are not guaranteed for oil samples of this product. This data and Information is Intended as a guide and does not reflect the specification range for any particular property of this product. ��*sOa U� APPROVED Radiative Properties for ENERGY STAR® Cool Roof Rating Council (CRRC) & LEED® Physical Property Test Method White TPO Tan TPO Gray TPO ENERGY STAR initial solar reflectance Solar Spectrum Reflectometer 0.87 0.68 n/a ENERGY STAR solar reflectance after 3 years Solar Spectrum Reflectometer (after cleaning) 0.83 0.64 n/a CCRC initial solar reflectance CCRC solar reflectance after 3 years CCRC initial thermal emittance CCRC thermal emittance after 3 years ASTM C 1549 ASTM C 1549 (uncleaned) ASTM C 1371 ASTM C 1371 (uncleaned) 0.79 0.70 0.90 0.86 0.71 0.64 0.86 0.87 0.46 0.43 0.90 0.88 LEED thermal emittance SRI (Solar Reflectance Index) ASTM E 408 ASTM E 1980 0.95 110 0.95 88 0.95 55 ra 2011 Versico REPRINT REQUEST CODE: 601733-"VersiWeld 4 page brochure' '' Versico, VersiWeld, OclaGuard XT and the Versico logo are irodemortis of Versico. 11E0 is a registered Updated: 10/11. Printed In U S.A. 10/11 trademark of the U.S. Green Building Council. ENERGY STAR is a registered trademark owned by the U S. Government. 'ENERGY STAR qualification is only valid in the U.S. 09-03-2013 ED EHNAT 1015 145 ST S TACOMA WA 98444 City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director RE: Permit No. D13-070 LA VISTA APARTMENTS 5555 S 152 ST TUKW Dear Permit Holder: In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 10/08/2013. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206-431-2451 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven (7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 10/08/2013, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, Bill Rambo Permit Technician File: Permit File No. D13-070 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax-. 206-431-3665 PLAN REVIEW CHECKLIST - (Nonstructural) Permit App. DO -070 By: IBC Edition / & State Amend. Date: ,— 6-17 Project title: I -A ()So, 7 G- /4 +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ • 0 1 Classify the building or portion thereof in accordance with Chapter 3 Determine the type of construction of the building in accordance with Chapter 6. Determine if the location of building on the site and clearances to property lines and other buildings on the site plan are in accordance with code provisions. Review for conformity with General building height and area limitations in accordance with Chapter 5. Review for conformity with special detailed requirements based on use and Occupancy. Review for conformity with Type of Construction requirements of Chapter 6. Review for conformity with Fire and Smoke protection features of Chapter 7. Review for conformity with requirements of interior finishes of Chapter 8. Review for conformity with requirements for fire protection systems of Chapter 9. Review for conformity with requirements for means of egress requirements of Chapter 10 Review for conformity with requirements of accessibility in accordance with Chapter 11, and ICC A117.1 Review for conformity with Washington State Energy Code. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ ✓ In circle = topic has been reviewed for the application. X In circle = topic is not relevant to proposed scope of work. PLAN REVIEW/ROUTING SLIP ACTIVITY NUMBER: D13-070 DATE: 03-01-13 PROJECT NAME: LA VISTA APARTMENTS SITE ADDRESS: 5555 S 152 ST X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Issued DEPARTMENTS: ( p�ie BGl�in9 DidtWC n U`3Fire Prevention v ` 7 Public Works Structural Planning Division Permit Coordinator on DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete iy] Incomplete DUE DATE: 03-05-13 Not Applicable Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg 0 Fire 0 Ping 0 PW 0 Staff Initials: TUES/THURS ROUTING: Please Route IT Structural Review Required n No further Review Required ❑ REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved n Approved with Conditions DUE DATE: 04-02-13 Not Approved (attach comments) n Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg 0 Fire 0 Ping 0 PW 0 Staff Initials: Documents/routing slip.doc 2-28-02 Contractors or Tradespeople Piller Friendly Page • General/Specialty Contractor A business registered as a construction contractor with LEI to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name Phone Address Suite/Apt. City State Zip County Business Type Parent Company PREFERRED ROOF SERVICES INC 2533188918 1015 145Th St S Tacoma WA 98444 Pierce Corporation UBI No. Status License No. License Type Effective Date Expiration Date Suspend Date Specialty 1 Specialty 2 602780822 Active PREFERS936QT Construction Contractor 11/30/2007 11/30/2013 General Unused Business Owner Information Name Role Effective Date Expiration Date EHNAT, PHIL President 11/30/2007 Bond Amount EHNAT, PEGGY Secretary 11/30/2007 32s209557 EHNAT, ED Vice President 11/30/2007 Bond Information Page 1 of 1 Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 2 American States Insurance Co 32s209557 04/20/2012 Until Cancelled $12,000.0005/11/2012 11/26/2012 1 American States Insurance Co 6536773 11/29/2007 04/20/2012 $12,000.00 11/30/2007 Assignment of Savings Information No records found for the previous 6 year period Insurance Information Insurance Company Name Policy Number Effective Date Expiration Date Cancel Date Impaired Date Amount Received Date 5 Starr Surplus Lines Insurance SLPGGL00383 02 11/29/2012 11/29/2013 $1,000,000.00 11/26/2012 4 Starr Surplus Lines Insurance FMTX00624 11/29/2010 11/29/2012 $1,000,000.0011/29/2011 3 FIRST MERCURY INS CO FMTX006624 11/29/2009 11/29/2010 $1,000,000.00 11/25/2009 2 CENTURY SURETY CO CCP577366 11/29/2008 11/29/2009 $1,000,000.00 11/25/2008 1 ATLANTIC CAS INS CO L1250007020 11/29/2007 11/29/2008 $1,000,000.00 11/30/2007 Summons/Complaint Information No unsatisfied complaints on file within prior 6 year period Warrant Information No unsatisfied warrants on file within prior 6 year period Infractions/Citations Information No records found for the previous 6 year period https://fortress.wa.gov/lni/bbip/Print.aspx 03/22/2013