Loading...
HomeMy WebLinkAboutPermit D13-165 - FOSTER HIGH SCHOOL - TENANT IMPROVEMENTFOSTER HIGH SCHOOL 4242 S 144 ST D13-165 City oPI'ukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-431-2451 Web site: http://www.TukwilaWA.Qov Parcel No.: 1523049108 Address: 4242 S 144 ST TIIKW Suite No: Project Name: FOSTER HIGH SCHOOL DEVELOPMENT PERMIT Permit Number: D13-165 Issue Date: 05/28/2013 Permit Expires On: 11/24/2013 Owner: Name: TUKWILA SCHOOL DISTRICT Address: 4640 S 144TH ST , TUKWILA WA 98168 Contact Person: Name: KEVIN GRINAKER Address: 9500 AURORA AV N , SEATTLE WA 98103 Contractor: Name: TECTA AMERICA SEATTLE LLC Address: 9500 AURORA AV N , SEATTLE WA 98103 Contractor License No: TECTAAS905DH Lender: Name: N/A - FUNDED BY SCHOOL DISTRICT Address: Phone: 206 522-5436 Phone: 425-881-9190 Expiration Date: 07/01/2013 DESCRIPTION OF WORK: TWO ROOF AREA PORTIONS WILL HAVE THE EXISTING SINGLE PLY ROOF REMOVED, 1/4" COVERBOARD WILL BE FULLY ADHERED TO EXISTING INSULATION, AND 2 -PLY SBS MODIFIED SYSTEM INSTALLED. THE REMAINDER OF THE ROOF AREA WILL HAVE A COATING SYSTEMS INSTALLED. Value of Construction: $260,000.00 Fees Collected: $4,611.14 Type of Fire Protection: International Building Code Edition: 2009 Type of Construction: Occupancy per IBC: 0009 Electrical Service Provided by: SEATTLE CITY LIGHT **continued on next page** doc: IBC -7/10 D13-165 Printed: 05-28-2013 Public Works Activities: Channelization / Striping: N Curb Cut / Access / Sidewalk / CSS: N Fire Loop Hydrant: Flood Control Zone: Hauling: N Start Time: End Time: Land Altering: Volumes: Cut 0 c.y. Fill 0 c.y. Landscape Irrigation: Moving Oversize Load: Start Time: End Time: N Number: 0 Size (Inches): 0 Sanitary Side Sewer: Sewer Main Extension: Private: Public: Storm Drainage: Street Use: Profit: N Non -Profit: N Water Main Extension: Private: Public: Water Meter: N Permit Center Authorized Signature: Date: I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development pe t and agree to the conditions attached to this permit. Date: This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ***BUILDING DEPARTMENT CONDITIONS*** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 4: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 5: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 6: Manufacturers installation instructions shall be available on the job site at the time of inspection. doc: IBC -7/10 D13-165 Printed: 05-28-2013 7: All plumbing and gas piping work shall billpected and approved under a separate peressued by the City of Tukwila Building Department (206-431-3670). 8: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 9: Prior to final inspection for this building permit, a copy of the roof membrane manufacturer's warranty certificate shall be provided to the building inspector. 10: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 11: ***FIRE DEPARTMENT CONDITIONS*** 12: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the following concerns: 13: Application of roof coverings with the use of an open -flame devices requires a separate permit from the Tukwila Fire Department located at 444 Andover Park East, Tukwila, Washington, 98188; telephone - (206)575-4407. There shall be not less than one multi-purpose portable fire extinguisher with a minimum 2-A 20-B:C rating on the roof being covered or repaired. (IFC 105.6.24, 1417.3) 14: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2327 and #2328) 15: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 16: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575-4407. doc: IBC -7/10 D13-165 Printed: 05-28-2013 CITY OF TUKWILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Building Permit No. /3- /6 S Project No. 5A0h3 Date'Application Accepted: Date Application Expires: /1 /io//3 (For office use only) CONSTRUCTION PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION ing Co Assessor's Tax No.: 'cl--'J CIA '61 Site Address: 42/2 S. 1HNs• ST PNLy(IA A Metite Number: Floor: Tenant Name: res -rte, Fty. 54400 PROPERTY OWNER Name: K pit) /6, _ 1, „ — Address: zr—©0 f:1 ifO rA p .- D. Name: -i-tAktu ilii 554,,,,AQ is4fjtt Phone: 24(0 _5-22 ?gyp Fax: p-C� aorni 1 Email: Address:© r US, `IAA*. sr _` Engineer Name: Contr Reg No. 1--Epr $ x Date:1 _ State: AA A City: --1\a Zip:a City: CONTACT PERSON — person receiving all project communication Name: K pit) /6, _ 1, „ — Address: zr—©0 f:1 ifO rA p .- D. City: State: 0 A Zip lD10 �'1fel*:'j Phone: 24(0 _5-22 ?gyp Fax: p-C� aorni 1 Email: .GENERAL CONTRACTOR INFORMATION Name:j..(i, 1'� Company Namei A J� _, ,,;� ' m� IIA Address: 't S CD nTA-a City: State: Zip: Architect Name: Phone: Fax: Engineer Name: Contr Reg No. 1--Epr $ x Date:1 _ _, `1, Tukwila Business License No.: 0006920&t1 City: H:\Applications\Forms-Applications On Line1201 1 Applications\Permit Application Revised - 8-9-I I.docx Revised: August 2011 bh New Tenant: ❑ Yes X.. No ARCHITECT OF RECORD Name:j..(i, 1'� Company Name: ) /� f V /� /� I _ : V Architect Name: Engineer Name: Address: Zip: City: State: Zip: Phone: Fax: Email: Zip: Phone: ENGINEER OF RECORD Name:j..(i, 1'� �i«�a- Company Name: /� I _ : V Engineer Name: State: Zip: Address: City: State: Zip: Phone: Fax: Email: LENDER/BOND ISSUED (required for projects $5,000 or greater per RCW 19.27.095) Name:j..(i, 1'� �i«�a- Address: City: State: Zip: Page 1 of 4 1. BUILDING PERMIT INFORMATION — 206-431-3670 Valuation of Project (contractor's bid price): $ 94101000.°Q Existing Building Valuation: $ Describe the scope of work (please provide detailed information): rr T,Do rvc Cil^ekS Siwu�r oh �>'tro Will Nye `i'�. 2x,s��I.y 5;141%e Q! j fooF loved. !y. ovZrbokrdw.11 be Full Akkf4 fv GXi�fin ;rick o4 2 l 585 mod,L►e Sf�rv1 ( ?i4L). � q �y 2, gema;nkr- of AL root' citta% hAve ci cocatil y srew, 14514u—ed Will there be new rack storage? ❑ Yes No If yes, a separate permit and plan submittal will be required. Provide All Building Areas in Square Footage Below Existing Interior Remodel Addition to Existing Structure New Type of Construction per IBC Type of Occupancy per IBC Is Floor 2"a Floor. Totl4t_. (Lot) '-'Ae4 3rd Floor Floors thni Basement' Accessory Structure* '. Attached Garage Detached Garage Attached Carport Detached Carport 1 Covered Deck Uncovered; Deck PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes 0 No If "yes", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: 0 Sprinklers ❑ Automatic Fire Alarm 0 None 0 Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? 0 Yes 0 No If "yes', attach list of materials and storage locations on a separate 8-1/2" x 11" paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM 0 On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:\ Applications\ Forts -Applications On Linei2011 Applications\Permit Application Revised- 8-9-1 I.docx Revised: August 2011 bh Page 2 of 4 PERMIT APPL'ICATIUN'rN ,TES`=s• • Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND 1 AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER RAUTHOIZED AGENT: Signature: Mid �/f Print Name: i£UN Mailing Address: 95—OO 414704 9vL H:\Applicauois\Fonns-Applications On Linei201 I Applications\Permit Application Revised - 8.9-1 I.docx Revised: August 2011 bb Date: /o —r Day Telephone: 206- I 99/0 06- lr/,h`99/o3 . City State Zip Page 4 of 4 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206-431-3665 Web site: http://www.TukwilaWA.gov RECEIPT Parcel No.: 1523049108 Permit Number: D13-165 Address: 4242 S 144 ST TUKW Status: PENDING Suite No: Applied Date: 05/10/2013 Applicant: FOSTER HIGH SCHOOL Issue Date: Receipt No.: R13-01589 Payment Amount: $4,611.14 Initials: LAW Payment Date: 05/10/2013 11:05 AM User ID: 1632 Balance: $0.00 Payee: KEVIN GRINAKER TRANSACTION LIST: Type Method Descriptio Amount Payment Credit Crd VISA Authorization No. 03653G ACCOUNT ITEM LIST: Description 4,611.14 Account Code Current Pmts BUILDING - NONRES PLAN CHECK - NONRES STATE BUILDING SURCHARGE 000.322.100 000.345.830 640.237.114 Total: $4,611.14 2,791.90 1,814.74 4.50 etc Art nr,nn INSPECTION NO. INSPECTION RECORD Retain a copy with permit Di3-1k5 PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-367 Permit Inspection Request Line (206) 431-2451 Projecti hh Type Insp ction: ` Address: TIN __..-Date 1L( .. 4242.- . i4s Called: ..----, Special Instructions: • ii Date Wanted* 2-,.-2S - 14p. I m. m. Requester: Phone No: Approved per applicable codes. Corrections required prior to approval. COMMENTS:. Inspector: Date 7,5 n REINSPECTION FEE REQUI D. rior to next inspection, fee must be paid at 6300 Southcenter 131 d.. Suite 100. Call to schedule reinspection. INSPECTION NO. INSPECTION RECORD Retain a copy with permit. PERM! N CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 431-245,1 ': Prhr5/Jf Type of Inspecti E, kJ n: 1 (6 , -i-� Address:Date 71, i7 -4L !4 S`I--Sp1 Called: Instructions: 0-7 l -tea 3.! Ut ���" " r u P -e2-to Date Wanted: �10 `- (.3 a.m. (1:.m. Requ ss�er: ✓t `e`% Phone No: co- 3,-..3-4 3 ElApproved per applicable codes. ions required prior to approval. S� COMMENTS: -34 t / JrclC" j f.7` r j ✓o el) P_A Ins ctor: n REINSPECTION FEE paid at 6300 Southce Dat ito 13 UI3ED. P for to next inspection, fee must be vd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila: WA 98188 tr. (206) 431-3670 Permit Inspection Request Line (206) 431-2451 Pro t: q o S. It r 611-- spa L. Type f Inspectior� ��A Pre_ - it e/ 01 Address: Tt, 42A'2_ 1.4zi �' Date Called: SpecialyInstructions:/ 54(S5 troy _ o Date Wanted:. S.-7.- /a m,, -- j3. - p.m. Requester: Phone 6--1e3-343e Approved per applicable codes. El Corrections required prior to approval:- COMMENTS: In ettor: ate n REI SISECTION FEE REQUIRE . Prior to next inspection. fee must be ait 6300 Southcenter Blvd., uite 100. Call to schedule. reinspection:_ Stephen A. Forbes From: Sent: To: Subject: Follow Up Flag: Flag Status: Categories: Kevin Grinaker Tuesday, November 05, 2013 7:48 AM Stephen A. Forbes FW: Foster High School Roof Warranty Follow up Flagged Red Category Steve, Could you please pass this on to the Inspector who you're working with. Thanks... Kevin From: Tom Regney[mailto:tregney@agarlandind.com] Sent: Tuesday, November 05, 2013 7:45 AM To: Kevin Grinaker Subject: Foster High School Roof Warranty Kevin: 1 3 RECEIVE.° CITY OF TUKWILA FEB 2 6 2014 PERMIT CENTER (0_,C As you are aware, The Garland Company, Inc. has gone to a new roof warranty system. For the past few months we have had glicthes due to the amount of warranties that are requested this time of year after the busy roofing season. As a 21 year Garland technical representative, and vested owner in the The Garland Company, I am writing this memo to confirm that all roofs at the Foster are under a ten year warranty. Furthermore, the roofs over the Performing Arts Center (PAC) are under a 30 year warranty. The actual paper warranty will be issued in the near future and I will forward copies. This exact situation happened at Tukwila Commerence Center approximately a month ago, and the city of Tukwila accepted my memo and closed the permit. Since then, the actual warranty was in fact issued as I guaranteed it would. The same process will occur in this situation. Thank you. Tom Regney Sr. Technical Representative The Garland Company cell: (206)817-7692 www.garlandco.com 1 oste,50igh Sch of Google earth feet 400 meters1 100 GGf &ct 3 �?.+.J 535 Sr s -m, Red#�-:Ncto- o c 9,2:1-- S,qe ?Ii r0o 0) FS CO ffn) ISEPARATE PFRMIf REQUIRED FOR: ) i1 i►'�� Mechanical] Electrical Plumbing Gas Piping City of Tukwllc BUILDING DIVISION REVISIONS No changes shall be made to the scope of work without prior approval of Tukwila Building Division. NOTE: Revisions will require a new plan submittal and may include additional plan review fees. CO,> Y Pomit I) 1(e Rsa who a p ova b ,off efid ezbabia Approval of =emu c ,urea ; dogs not authorize Asv 'nolo Of any ado o 0o o f ®r gamma. Rocv pt (tt� ofopo!'P00 0 oo' o ? ^,,z,m.� bg,tiagd :sed: W DREZ RECEIVED CITY OF TUKWILA MAY 1 0 2013 PERMIT CENTER i(Pc Ex srivq 12-90( st}Si`2W� oicovtA //1/ / 91, r, I... / f r I t i-.` t Q! 1, /--- . • S. (1GOAL:r \Aas)o2 $ati.;e4 f,ter g • l� rod �nSH x .1 �s0 AS (�Ai 1-1,9�'a`�SeT 1.- � 1� co, t.T e -ro fry j t;La STatt&71t(AL ;5'ij ti 17G44e/004 er/OA REVIEWED FOR CODE COMPLIANCE APPROVED MAY 17 2013 City of Tukwila BUILDING DIVISION INO 4,,C c,57 e \ v tJk' Aco 41,0h 0,4 " kO lytorvciti 2cAu\ 14"A Ir ; 1 ,r ,_ - f. <. , • -, ,- • , , < z , 4 ( '... • , ' - 1/4- • ' . ( • • •• it . ' i \ 1 IL t/ 1 \ \ 1 s - • i I. ..... .........../.., . ' f \t'• ..' j r '• • 14upa. e L1 c_onvo.e, f,t,A6 ti7tatAt-liitClk 1.)C-itAc4vI2k crA,44.11 REVIEWED FOR CODE COMPLIANCE APPROVED MAY 1 7 2013 City of Tukwila BUILDING DIVISION since 1895 Garland � (irc shouse HPR® Torch Base Sheet PRODUCT DESCRIPTION HPR Torch Base Sheet is a Styrene -Butadiene -Styrene (SBS) membrane specially formulated to accept the high heat from a torch. HPR Torch Base Sheet has a burnable polypropylene backer that melts when the proper torching temperature has been reached. The HPR Torch Base Sheet eliminates the use of a kettle and also allows the torch applied system to be instated with a one ply underlayment. PRODUCT ADVANTAGES High Tech Base Sheet - The HPR Torch Base Sheet has a high percentage of SBS rubber which when fused together with the torch applied membrane gives the system superior puncture and abrasion resistance. It also has high tensile and elongation characteristics. Eliminates the Use of the 2 Ply Underlayment - Because the HPR Torch Base Sheet is 110 mils (2,794 microns) thick (as thick as 2 plies of Type IV glass in hot asphalt), one ply will be sufficient as the underlayment for torch applied membrane. Superior Strength - The HPR Torch Base membrane is re- inforced with a dual fiberglass scrim. The superior strength provided by this reinforcement resists the movement created by today's modern buildings. In addition, HPR Torch Base Sheet provides tensile strength in excess of 200 pounds per inch in the machine direction. This translates to long term resistance to splits and tears in the completed HPR Torch Applied roof system. Advanced Rubber Technology -The modifier utilized in HPR Torch Base Sheet is SBS. When the SBS rubber is properly dispersed throughout the high penetration asphalt, the rubber provides increased thermal shock resistance, UV protection, heat resistance, elongation, and low temperature flexibility. To ensure proper dispersion, a special high shear mixer is used in manufacturing. USES HPR Torch Base Sheet is used as the underlayment ply for any of Garland's torch -applied membranes. It is fully compat- ible with both APP or SBS modified membranes. However, DO NOT USE the HPR Torch Base Sheet with hot asphalt or cold adhesives. APPLICATION The HPR Torch Base Sheet must be used for heat fusing or mechanical fastening applications only. Heat the HPR Torch Base Sheet until the burnable backer is melted. As this occurs, the SBS coating becomes tacky and is ready to roll in place. REVIEWED FOR CODE COMPLIANCE APPROVED MAY 172013 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA MAY 10 2013 PERMIT CENTER DIly-Apc HPR Torch Base Sheet Technical Data HPR Torch Base Sheet *Tensile Strength *Tear Strength *Elongation MD 210 Ibf./in. (36.75 kN/m) XD 210 Ibf./in. (36.75 kN/m) MD 250 Ibf. (1112 N) XD 250 Ibf. (11 12 N) MD 4.0°i° XD 4.0% * Test Method ASTM D 5147 is tested at 2 in/min @ 73.4 ± 3.6°F (50 mm/min @ 23 ± 2°C) Roll Dimensions HPR Torch Base Sheet Width Length Weight Nominal Thickness Net Coverage Packaging 3 ft. 3 in. (1 m) 34 ft. 8 in. (10.57 m) 76 lbs. (34.5 kg) 110 mil (2,794 microns) 100 ft2 (9.29 m2) 25 rolls/pallet For specific application recommendations, please contact your local Garland Representative or Garland Technical Service Department. since 1 8 9 5 For more information, visit us at: www.gariandco.com The Garland Company, Inc. 3800 East 91st Street Cleveland, OH 44105 FAX: 216-641-0633 Phone: 216-641-7500 Toll Free: 800-321-9336 Garland Canada, Inc. 1290 Martin Grove Rd. Toronto. Ontario Canada, M9W 4X3 FAX 416-747-1980 Phone: 416-747-7995 Toll Free: 800-387-5991 (Only in Canada) Eco -Facts HPR Torch Base Sheet Recycled Content Pre -Consumer Post -Consumer N/A 7% The Garland Company UK, Ltd. Unit 5 Glevum Works, Upton Street Gloucester, United Kingdom GL1 4LA FAX: 01452 330 657 011 44 1452 330 657 (Outside UK) Phone: 01452 330 646 011 44 1452 330 646 (Outside UK) Toll Free: 0800 328 5560 (Only in UK) (W, APPROVED c`E")us 'Test verified by independent laboratories. Actual root performance ,pec.ficatior Is wa j ury depending on teat spfAXl and tun/haature. l )Al a,ulre,ts samp/, s,andta,(y collected. x 10% variation may be erpenenced. The above data supersedes all previouslypublshedinforma- tion. Consult your local Garland Representative or the home orrice tot more information. Garland Greenhouse is a trademark of The Garland Company. Inc. HPR is a trademark of The Garland Company. Inc., Garland Canada Inc. and The Garland Company UK. Ltd. ,5 2009 Garland Industnes. Inc. HPR TB 0709 Garland StressPly' IV Membranes °use since 1 8 9 5 StressPly IV • StressPly IV Mineral • StressPly IV UV Mineral PRODUCT DESCRIPTION StressPly IV membranes are a high strength, fiberglass rein- forced, rubber modified roofing membrane designed to be used in torching applications. The 195 mil membrane offers not only high strength, but also a high percentage of quality blended Styrene -Butadiene -Styrene (SBS) rubber compound. StressPly IV membranes incorporate a burn -off backer to indicate when proper heat is obtained during application. PRODUCT ADVANTAGES Unmatched Reflectivity - The StressPly IV UV Mineral mem- brane incorporates the unique Starburst"" mineral which provides Tong -term protection and added energy savings. The superior reflectivity of this mineral protects the StressPly IV UV Mineral membrane from ultra -violet damage and at the same time decreases under roof temperatures. As a result, the workload on the building's air conditioning system is re- duced and proper interior temperatures can be maintained at a lower cost. The Starburst minerals are more than twice as reflective as standard roofing minerals. Rubber Technology - StressPly IV membranes are formulated with a high quality SBS rubber polymer offering unmatched lowtemperatureflexibility, weathering and elastomeric proper- ties. Adequate mixing of the polymer ensures proper phase inversion which optimizes the rubber's performance. Security in Multi -Ply Applications - StressPly IV membranes are the top component of a multi -ply system. They combine the inherent advantages and proven performance of multi -ply protection with the strength, flexibility and elongation of elasto- meric systems. This unique combination minimizes dependence on perfect workmanship, contact adhesive seaming, etc. USES StressPly IV membranes can be used in conjunction with other HPR products, as well as with conventional glass base sheets or fiberglass felt underiayment. In addition, StressPly IV membranes can be used as the top ply in a two ply flash- ing system. They can also be used to repair splits, cracks or other deteriorated areas of existing built-up roofs. APPLICATION StressPly IV membranes are the torchable top layer of a modi- fied roof system. Two plies of ASTM D 2178, Type IV or VI fiberglass felt are solidly bonded to the approved substrate. The StressPly IV membrane is then solidly adhered to these base layers by torching. StressPly IV membranes can also be applied in a two ply torch - applied modified system. Garland's HPR Torch Base Sheet is applied to the approved substrate and the StressPly IV mem- brane is solidly ad-hered to the torch base sheet by torch. For specific application recommendations, please contact your local Garland Representative or Garland Technical Service Department. REVIEWED FOR CODE COMPLIANCE APPROVED MAY 172013 City of Tukwila BUILDING DIVISION StressPly IV Membranes Technical Data StressPly IV StressPly IV Mineral StressPly IV UV Mineral Tensile Strength *MD 210 Ibf/in. (36.75 kN/m) *MD 210 Ibf/in. (36.75 kN/m) *MD 210 Ibf/in. (36.75 kN/m) *XD 210 Ibf/in. (36.75 kN/m) *XD 210 Ibf/in. (36.75 kN/m) *XD 210 Ibf/in. (36.75 kN/m) **MD 250 Ibf/in. (44 kN/m) **MD 250 Ibf/in. (44 kN/m) **MD 250 Ibf/in. (44 kN/m) **XD 250 Ibf/in. (44 kN/m) **XD 250 Ibf/in. (44 kN/m) **XD 250 Ibf/in. (44 kN/m) *Tear Strength MD 250 Ibf. (1112 N) MD 250 Ibf. (1112 N) MD 250 Ibf. (1112 N) XD 250Ibf. (1112 N) XD 250 Ibf. (1 112 N) XD 250 Ibf. (1112 N) *Elongation MD 6.0% MD 6.0% MD 6.0% XD 6.0% XD 6.0% XD 6.0% *Low Temperature Flex -30°F (-34'C) -20°F (-29°C) -20°F (-29°C) Finished membrane meets and/or exceeds ASTM D 6163, TYPE III Test Method ASTM D 5147 is tested at *2 in/min @ 73.4 ± 3.6°F **0.08 in/min @ 0 ± 3.6°F (50 mm/min @ 23 ± 3°C) (2.0 mm/min @ -18 ± -3°C) Roll Dimensions StressPly IV StressPly IV Mineral StressPly IV UV Mineral Width Length Weight Nominal Thickness Net Coverage Packaging 3 ft. 3 in. (1 m) 26 ft. 2 in. (7.98 m) 110 lbs. (49.9 kg) 180 mils (4,572 microns) 75 ft2 (6.97 m2) 20 rolls/pallet 3 ft. 3 in. (1 m) 26 ft. 2 in. (7.98 m) 125 lbs. (56.7 kg) 195 mils (4,953 microns) 75 ft2 (6.97 m2) 20 rolls/pallet 3 ft. 3 in. (1 m) 26 ft. 2 in. (7.98 m) 125 lbs. (56.7 kg) 195 mils (4,953 microns) 75 ft2 (6.97 m2) 20 rolls/pallet Eco -Facts StressPly IV StressPly IV Min. StressPly IV UV Min. Recycled Content Post Consumer Post Industrial N/A 15.07% N/A N/A N/A N/A s n00 1895 For more information, visit us at: www.garlandco.com The Garland Company, Inc. 3800 East 91st Street Cleveland, OH 44105 FAX: 216-641-0633 Phone: 216-641-7500 Toll Free: 800-321-9336 Garland Canada, Inc. 1290 Martin Grove Rd. Toronto, Ontario Canada, M9W 4X3 FAX 416-747-1980 Phone: 416-747-7995 Toll Free: 800-387-5991 (Only in Canada) The Garland Company UK, Ltd. Unit 5 Glevum Works, Upton Street Gloucester, United Kingdom GL1 4LA FAX: 01452 330 657 011 44 1452 330 657 (Outside uKl Phone: 01452 330 646 011 44 1452 330 646 (Outside UK) Toll Free: 0800 328 5560 (Only in UK) MIMI®� nmva°aroawvww APPRIAIRI The Starburst product used in conjunction with Stress - Ply membranes is protected by 11.5. 6,933,007 and pending in Canada 2,473,267 Tests verified by independent laboratories. Actual roof performance specifications will vary depending on test speed and temperature, Data reflects samples randomly collected. ± 10% variation way be experienced. The above data supersedes all previously published information. Consult your local Garland Representative or the home office for more information. StressPly and Starburst are trademarks of The Garland Company, Inc. O 2006 Garland Industries, Inc. SP IV 1006 since 1895 White -Knight® Plus Base Coat/ White-Staflion® Plus Base Coat PRODUCT DESCRIPTION White -Knight Plus Base Coat/White-Station Plus Base Coat is a gray, multi-purpose, single -component aliphatic ure- thane, liquid waterproofing membrane, designed as the initial layer of a White -Knight Plus/White-Stallion Plus system, to maintain, restore and upgrade the performance of existing, aged single -ply. metal, smooth BUR and modified bitumen roof systems. PRODUCT ADVANTAGES Waterproofing Protection - White -Knight Plus Base Coat/ White -Stallion Plus Base Coat will provide 32 wet mils (26 dry mils) of additional waterproofing protection to an existing roof system as just a base coat. This process will effectively extend the life of the roof system and allow reasonable time to budget for replacement or recoat. UV Resistant - This high performance aliphatic urethane coating protects the existing roof from the harmful effects of UV - greatly reducing thermal shock. The coating itself is UV resistant due to its aliphatic chemistry. User Friendly - The ease of application makes White -Knight Plus Base Coat/White-Stallion Plus Base Coat extremely fast and simple to install. This superior coating can be used to reinforce and seal laps, make spot repairs or restore entire roofing systems. USES White -Knight Plus Base CoatNVhite-Stallion Plus Base Coat can be used to coat an entire aged single -ply, metal, smooth BUR and modified bitumen roof system. It can also be used as a repair material for maintenance applications. It is designed to be the base coat in the White -Knight Plus/White-Stallion Plus system. APPLICATION White -Knight Plus/ White -Stallion Plus can be applied by brush, roller, or spray. Restoration Overview - Ensure that all wet insulation is removed. An infrared scan is highly recommended. Remove all dirt, dust and debris from the roof surface. Make any necessary repairs and also verify that all repairs are securely bonded. Prior to coating any surface, be sure the coating will adhere by performing an adhesion test (ASTM D 903). Proper coverage rate is critical to the sucess of all coating projects. Use a wet mil gauge to ensure proper coverage rates. Single -Ply Restoration System - Power wash the entire surface including flashings with TSP or Simple Green and then throughly rinse. The first coat of White -Knight Plus Base Coat/White-Stallion Plus Base Coat should be applied at ap- proximately 2 gal./100 sq. ft. (0.811/m2), 32 wet mils, stripped in over all seams, flashings and repaired areas. Allow roof system to dry for 24-48 hours but no more than 72 hours. In the field of the roof, apply an additional 2 gal./ 100 sq. ft. (0.81 I/m2) for the finish coat (32 wet mils). The first layer may still be tacky at 24 hours, this is normal. Modified/BUR Restoration System - Power wash the entire surface including flashings with TSP or Simple Green. Allow roof system to dry for 24-48 hours, then prime the entire roof surface with All -Knight -/All -Stallion- Primer at a rate of 1/2 gal./100 sq. ft. (.21 Vm2). For the field of the roof and flashings, apply 2 gal. sq.ft. (0.81 I/m2) of White -Knight Plus Base Coat/White-Stallion Plus Base Coat (32 wet mils). Allow roof system to dry for 24-48 hours but no more than 72 hours. In the field of the roof apply an additional 2 gal. sq.ft (0.81 I/m2) for the finish coat. The first layer may still be tacky at 24 hours, this is normal. Metal Restoration System - Power wash the entire sur- face including flashings with TSP or Simple Green®. When coating a metal surface, all rust must be removed and then treated. All surfaces must be sound, dry, clean, and free of oil, dirt, grease, wax, mildew, loose or flaking paint and rust by scraping, sanding, wire brushing or blasting. Apply Rust -Go® Primer over a small area at 1/2 gal./100 sq. ft. (.211/m2) and let set for twenty (20) minutes. Monitor to ensure adhesion and note if sag occurs. If any sag occurs, adjust coverage as necessary. Once adhesion is confirmed, then apply Rust -Go Primers over the entire surface at 1/2 gal./100 sq. ft. (.21 Vm2). The first coat of White -Knight Plus Base Coat/White-Stallion Plus Base Coat should be applied at approximately 2 gal./100 sq. ft. (0.81 I/m2), 32 wet mils, stripped in over all seams and fasteners. Allow roof system to dry for 24-48 hours but no more than 72 hours. Next, install the finish coat at 2 gal./100 sq. ft. (0.81 I/m2) over the entire roof (32 wet mils). The first layer may still be tacky at 24 hours, this is normal. REVIE CODE COMPLIANCE APPROVED NCE MAY 17 2013 BUILDING Tukwila VISION White -Knight® Plus Base Coat/ White -Stallion® Plus Base Coat Technical Data White -Knight Plus Base Coat/White-Stallion Plus Base Coat Tensile Strength 1700 psi (ASTM D 412) Tear Resistance 700 Ibf./in. (ASTM D 624) Elongation >600% (ASTM D 412) Density CO 77°F (25°C) 9.3 lbs./gal. (1.1 g/cm3) (ASTM D 2939) Flash Point 110° F (44° C) (ASTM D 93) Non -Volatile Typical 83% (ASTM D 75) Viscosity @ 77°F (25°C); 5,500 cP 10 rpm Brookfield RVT, #4 Spindle Shelf Life 1 yr. (unopened container) Wet Film Thickness 32 mils (812.8 micros) @ 2 gal./100 sq. ft. (0.81 I/m2) Color Gray Packaging 5 gallon (19 I) pail 55 gallon (208.1 I) drum For specific application recommendations and coverage rates, please contact your local Garland Representative or Garland Technical Service Department. since 1895 For more information, visit us at: www.garlandco.com The Garland Company, Inc. 3800 East 91st Street Cleveland, OH 44105 FAX: 216-641-0633 Phone: 216-641-7500 Toll Free: 800-321-9336 Garland Canada Inc. 1290 Martin Grove Rd. Toronto, Ontario Canada, M9W 4X3 FAX 416-747-1980 Phone: 416-747-7995 Toll Free: 800-387-5991 (Only in Canada) Eco -Facts White -Knight Plus Base Coat/ White -Stallion Plus Base Coat VOC 165 g/I PRECAUTIONS • Do not apply when temperatures are below 40°F (4.4°C) or rain is in the forecast. Spray Application is not recommended below 50°F (10°C) • In areas where the roof is subject to foot traffic, it is recommended to apply a granule walkway surface • Excess water on the roof surface can cause the roof to become slippery • If spraying, consult the White -Knight Plus/White-Stallion Plus spray application guide • Prior to coating any surface, be sure the coating will adhere by performing an adhesion test (ASTM D 903) • Not intended to restore glaze coats of asphalt • A reinforcement fabric should be used when coating over heavily alligatored areas or any type of surface irregularities The Garland Company UK, Ltd. Unit 5 Glevum Works, Upton Street Gloucester, United Kingdom GL1 4LA FAX: 01452 330 657 011 44 1452 330 657 (outside UK) Phone: 01452 330 646 011 44 1452 330 646 (Outside UK) Toll Free: 0800 328 5560 (Only in UK) IE":!S verpiev l Il!-Ilrler>.rnl, y,r Wtvvalrves. Aelualtool p,aloirnarne specifications wia vary depending on test speed and rernperature. Data rcPccrs randoms; m+rcted. A r 104.. ve at, a may beexperienced. %heaboveda;a supersedesallprevious,published i ianaillon. 0ons:.E .00, :a..a Garland Representdrne or Garland Corpnralo DKr.. Iry mn, vl`Mmatinn. 'Jhite-0niytn. All-,i,:.il,i. a,J Rust -Co are tr.lemarl s al 11,e Garland G,nP.-u+'y ann NI.St'm,cn eri l.a°ena,l.s sv rr,arlanci Canada Inc Cr' 20 If, Ga,iand 6�dusmes. Inc. WKAVS PLUS BASECOAT 04/10 10-01-2013 KEVIN GRINAKER 9500 AURORA AV N SEATTLE WA 98103 City of Tukwila Jim Haggerlon, Mayor Department of Community Development Jack Pace, Director RE: Permit No. D13-165 FOSTER HIGH SCHOOL 4242 S 144 ST TUKW Dear Permit Holder: In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 11/25/2013. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206-431-2451 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven (7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 11/25/2013, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, Bill Rambo Permit Technician File: Permit File No. D13-165 6300 Sordhcenter Boulevard, Suite. #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Far 206-431-3665 •ERMIT COORD COSY«! PLAN REVIEW/ROUTING SLIP ACTIVITY NUMBER: D13-165 DATE: 05/10/13 PROJECT NAME: FOSTER HIGH SCHOOL SITE ADDRESS: 4242 S 144 ST X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # after Permit Issued DEPARTMENTS: AS ci Building Division Public Works 5:PP- Avt 0CAC. 1 3 Fire Prevention Structural Planning Division ❑ Permit Coordinator ❑ DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Incomplete ❑ DUE DATE: 05/14/13 Not Applicable ❑ Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg 0 Fire 0 Ping ❑ PW 0 Staff Initials: TUESITHURS ROUTING: Please Route Structural Review Required ❑ No further Review Required ❑ REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved ❑ Approved with Conditions Not Approved (attach comments) ❑ Notation: REVIEWER'S INITIALS: DUE DATE: 06/11/13 DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg 0 Fire 0 Ping ❑ PW ❑ Staff Initials: PLAN REVIEW CHECKLIST - (Nonstructural) Permit App. jaJ /`t By: IBC Edition % & State Amend. Date: Project title: /-/ S' +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Classify the building or portion thereof in accordance with Chapter 3 Determine the type of construction of the building in accordance with Chapter 6. Determine if the location of building on the site and clearances to property lines and other buildings on the site plan are in accordance with code provisions. Review for conformity with General building height and area limitations in accordance with Chapter 5. Review for conformity with special detailed requirements based on use and Occupancy. Review for conformity with Type of Construction requirements of Chapter 6. Review for conformity with Fire and Smoke protection features of Chapter 7. Review for conformity with requirements of interior finishes of Chapter 8. Review for conformity with requirements for fire protection systems of Chapter 9. Review for conformity with requirements for means of egress requirements of Chapter 10 Review for conformity with requirements of accessibility in accordance with Chapter 11, and ICC A117.1 Review for conformity with Washington State Energy Code. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ ✓ In circle = topic has been reviewed for the application. X In circle = topic is not relevant to proposed scope of work. Contractors or Tradespeople Prrer Friendly Page General/Specialty Contractor A business registered as a construction contractor with LEtI to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name TECTA AMERICA SEATTLE LLC UBI No. 602730183 Phone 4258819190 Status Active Address 9500 Aurora Ave N License No. TECTAAS905DH Suite/Apt. License Type Construction Contractor City Seattle Effective Date 3/8/2010 State WA Expiration Date 7/1/2013 Zip 98103 Suspend Date County King Specialty 1 General Business Type Limited Liability Company Specialty 2 Unused Parent Company Other Associated Licenses License Name Type Specialty 1 Specialty 2 Effective Date Expiration Date Status WESTERS973BN WESTERN ROOFING SERVICE Construction Contractor Roofing Unused 1/15/2003 7/29/2013 Active WRSSE•"936L8 WRS SEATTLE Construction Contractor General Unused 7/1/2007 7/1/2011 Inactive Business Owner Information Name Role Effective Date Expiration Date GRINAKER, STEVEN LYLE Manager 03/08/2010 Bond Amount FORBES, STEPHEN A Manager 03/08/2010 17S003756 GRINAKER, ERIN JANEANE Partner/Member 03/08/2010 KRACHT, TODD N Partner/Member 06/28/2011 Safeco Ins Co of America SONTACRONE, MARK F Partner/Member 06/28/2011 Bond Information Page 1 of 2 Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 2 American States Insurance Co 17S003756 04/20/2012 Until Cancelled $12,000.00 05/07/2012 1 Safeco Ins Co of America 64621930029 03/01/2010 04/20/2012 $12,000.00 03/08/2010 Assignment of Savings Information No records found for the previous 6 year period Insurance Information Insurance Company Name Policy Number Effective Date Expiration Date Cancel Date Impaired Date Amount Received Date 5 Corch lnsurance 41pkg8898404 03/31/2013 03/31/2014 $2,000,000.00 03/29/2013 4 Corch lnsurance 41PKG8871803 03/31/2012 03/31/2013 $2,000,000.00 04/02/2012 3 Arch Insurance 41PKG2378302 03/31/2011 03/31/2012 $2,000,000.00 04/05/2011 2 Arch Ins Co 41PKG2279501 02/28/2010 03/31/2011 $2,000,000.0002/28/2011 1 ARCH INS CO 41PKG2279501 02/28/2010 02/28/2011 $2,000,000.0003/08/2010 Summons/Complaint Information No unsatisfied complaints on file within prior 6 year period Warrant Information No unsatisfied warrants on file within prior 6 year period https://fortress.wa.gov/lni/bbip/Print.aspx 05/28/2013