Loading...
HomeMy WebLinkAboutPermit M13-136 - J CREW - ALTERATIONJ CREW 535 SOUTHCENTER MAIL M13-136 Parcel No.: Address: City of Oukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-431-2451 Web site: http://www.TukwilaWA.gov MECHANICAL PERMIT 9202470010 535 SOUTHCENTER MALL TUKW Project Name: J CREW Permit Number: M13-136 Issue Date: 08/23/2013 Permit Expires On: 02/19/2014 Owner: Name: WESTFIELD PROPERTY TAX DEPT Address: PO BOX 130940 , CARLSBAD CA 92013 Contact Person: Name: Address: Email: GARY PALMER PO BOX 23534 , EUGENE OR 97492 NOT PROVIDED Contractor: Name: Address: Contractor License No: Phone: 541-603-4191 Phone: Expiration Date: DESCRIPTION OF WORK: REMOVE ALL EXISTING VENTS, DUCTING, PIPING, CONTROLS ETC RELATED TO TENANT IMPROVEMENT. REPLACE REMOVED AND INSTALL NEW DUCTING, RTU'S AND RELATED CONTROLS. ALSO INSTALL NEW RESTROOM EXHAUST FAN. Value of Mechanical: $42,000.00 Type of Fire Protection: UNKNOWN Electrical Service Provided by: Permit Center Authorized Signature: I hereby certify that I have read and governing this work will be complie Fees Collected: $713.81 International Mechanical Code Edition: 2012 xami with, The granting of this permit does not pres construction or the performance of work. back of this permit. Signature: Date: oti(24) ed this permit and know the same to be true and correct. All provisions of law and ordinances whether specified herein or not. e to give authority to violate or cancel the provisions of any other state or local laws regulating I am authorized to sign and obtain this mechanical permit and agree to the conditions on the Print Name: A6- 13wit, `0r'' Date: 11 2j ((3 This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. a..,.. Ines .A11n RA1a_1za Print.d. nR_91_')ni PERMIT CONDITIONS Permit No. M13-136 1: ***BUILDING DEPARTMENT CONDITIONS*** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 5: Readily accessible access to roof mounted equipment is required. 6: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 7: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 8: Manufacturers installation instructions shall be available on the job site at the time of inspection. 9: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 10: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 11: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 12: ***FIRE DEPARTMENT CONDITIONS*** 13: H.V.A.C. units rated at greater than 2,000 cfm require auto -shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #2328) 14: H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the power source of the air -moving equipment upon detection of smoke in the main return -air duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall Joe installed in accordance with the manufacturer's installation instructions. (IMC 606.1, 606.2.1) 15: Duct smoke detectors shall be capable of being reset from a single point near the alarm panel. (City Ordinance #2328) 16: Duct detectors shall send a supervisory signal only upon activation. (City Ordinance #2328) 17: Remote indicator lights are required on all above ceiling smoke detectors. (City Ordinance #2328) 18: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2327 and #2328) 19: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 20: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575-4407. doc: IMC -4/10 M13-136 Printed: 08-23-2013 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-43 1-3670 Fax: 206-431-3665 Web site: http://www.Tukwila WA.Eov RECEIPT Parcel No.: 9202470010 Permit Number: M13-136 Address: 535 SOUTHCENTER MALL TUKW Status: APPROVED Suite No: Applied Date: 07/22/2013 Applicant: J CREW Issue Date: Receipt No.: R13-02434 Payment Amount: $571.05 Initials: JEM Payment Date: 08/23/2013 10:04 AM User ID: 1165 Balance: $0.00 Payee: EVERGREEN REFRIGERATION, LLC TRANSACTION LIST: Type Method Descriptio Amount Payment Check 006079 571.05 Authorization No. ACCOUNT ITEM LIST: Description Account Code Current Pmts MECHANICAL - NONRES 000.322.102.00.00 571.05 Total: $571.05 Printed: 08-23-2013 CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd, Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Mechanical Permit No. M Project No. A 13-'0 S Date Application Accepted: Date Application Expires: (For office use only) MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** SITE LOCATION King Co Assessor's Tax No.: Site Address: 535 Southcenter Mall Suite Number: 676 Floor: Ground Tenant Name: J Crew PROPERTY OWNER Name: Westfield Address: 11601 Willshire Blvd, 11th Floor City: Los Angeles State: CA Zip: 90025 CONTACT PERSON — person receiving all project communication Name: Gary Palmer, Property Service I Address: PO Box 23534 City: Eugene State: OR Zip: 97492 Phone: (514) 603-4191 Fax: Email: psconsultants@sbcglobal.net State: New Tenant: 0 Yes ..No MECHANICAL CONTRACTOR INFORMATION Company Name: TBD Address: City: State: Zip: Phone: Fax: Contr Reg No.: Exp Date: Tukwila Business License No.: Valuation of project (contractor's bid price): $ Describe the scope of work in detail: Remove all existing vents, ducting, piping, controls etc related to TI. Replace removed and install new ducting, RTU's and related controls. Also install new restroom exhaust fan 42,000 Use: Residential: New ❑ Replacement ❑ Commercial: New ❑ Replacement m Fuel Type: Electric 0 Gas ❑ Other: H:\Applications\Forns-Applications On Line\201 I Applications Mechanical Permit Application Revised 8-9-11.docx Revised: August 2011 bh Page 1 of 2 Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu 2 Furnace >100k btu 32 Floor furnace 2 Suspended/wall/floor mounted heater Appliance vent Repair or addition to heat/refrig/cooling system Air handling unit <10,000 cfm 1 Unit Type Qty Air handling unit 2 >10,000 cfm 32 Evaporator cooler 2 Ventilation fan connected to single duct Ventilation system Hood and duct Incinerator — domestic Incinerator — comm/industrial Unit Type Qty Fire damper 2 Diffuser 32 Thermostat 2 Wood/gas stove Emergency generator Other mechanical equipment Boiler/Compressor Qty 0-3 hp/100,000 btu 2 3-15 hp/500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+ hp/1,750,000 btu PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AUTHORIZED A Signature: G e."1 }�� , .,�► y �� � �� Date: 7/41 z// Print Name: Gary Palmer, Property Service Day Telephone: (514) 6034191 Mailing Address: PO Box 23534 Eugene OR 97492 H:\Applications\Forns-Applications On Line \2011 Applications\Mechanical Permit Application Revised 8-9-11.docx Revised: August 2011 bh City State Zip Page 2 of 2 411 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206-431-3665 Web site: http://www.TukwilaWA.gov RECEIPT Parcel No.: 9202470010 Permit Number: M13-136 Address: 535 SOUTHCENTER MALL TUKW Status: PENDING Suite No: Applied Date: 07/22/2013 Applicant: J CREW Issue Date: Receipt No.: R13-02184 Initials: WER User ID: 1655 Payment Amount: $142.76 Payment Date: 07/22/2013 04:32 PM Balance: $571.05 Payee: GARY R PALMER TRANSACTION LIST: Type Method Descriptio Amount Payment Credit Crd VISA Authorization No. 00966G ACCOUNT ITEM LIST: Description 142.76 Account Code Current Pmts PLAN CHECK - NONRES 000.345.830 142.76 Total: $142.76 ..lnr• Renaint_nn Printed• 07-22-2013 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION C 6300 Southcenter Blvd., #100, Tukwila. WA 98188 Permit Inspection Request Line (206) 431-2451 M(3 -13r (206) 431-3670 ProjecJi: t V�/ TYP f In o` +- i•JA_� Address: , r1 CC Date Called: S A Special Instructions: d _/� ..14 ,� Date Wanted: 1 t Z .ate- -.ate--.ate-..14--A,/(4 ` 1 - CO — t J P.m. Requester:oon Ph5-4 1 - 44 (o33t ) Approved per applicable codes. Corrections required prior to approval. COMMENTS: ?m vT Lo-tpiae r Insped` r: n REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTIONO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-367 Permit inspection Request Line (206) 431-2451 M13-13 � Project,,.. LIT—V.! Type of Inspection: S M0i‘e-.-. eJ cc I ok Addr 3 S .L. AA( 1 Date Called: Special Instructions: Date Wanted:r / Wim._ (1_(O ( p:m. sequester: Phone No: 54( - 48--433 Cs Approved per applicable codes.: Corrections required prior to approval. COMMENTS: MAt- .OA- (-- c : c pr0�� 19 (A)14 ,# f'() \i Insp ctor: Dat? REINSPECTION FEE REQUIRE[. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 431-2451 "3-i3(a Project: C rev./Typet- i it 1 Jul eC�- Addres :\l Date Called: Special Instructions: Date Wanted:(( _ , �13 .. Requester: Phone No. f , o' - t633c ElApproved per applicable codes. 2 Corrections required prior to approval. COMMENTS: !tnt. 1/.1 kit not Jn In pector: Date: I(' S—" -- REINSPECTION -- REINSPECTION FEE 'E4 MED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 Permit Inspection Request Line (206) 431-2451 (206) 431-3670 Project: ,.. CJ.t/U Type of Inspection: RChicH-=-N Address: 5a S.C. N 1 v (k Date Called: Special Instructions: Date Wanted: tC-) /Z Z // a.m' p.m. requester: Phone No: aC-)6-6.7-.3/ 37 VI -Approved per applicable codes. Q Corrections required prior to approval. COMMENTS: 6' (17-, f'° ,l//,1 Ins secttoor: n REINSPECTION FEE REQtkIRED. Prior to nxt inspection, fee must be paid at 6300 Southcenter B d.. Suite 100. Call to schedule reinspection. INSPECTIO NO. INSPECTION RECORD Retain a copy with permit M (3 - PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 431-2451 Project:'; c f C.... v1/ TYp��°f InspU j 1 Addr s: ,�. 5i $c_ A44(/ Sj i'" Date Called:------ 6vC.-I . Special Instructions: . Date Wanted, - 2....c: -- 1 3 . ".a a.m.. p.m. requester: Phone No:. [" (P / 7 Approved per applicable codes. Corrections required prior to approval. F COMMENTS: d Inspector: Dater -7.' )f f j \ n REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. --4k3 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-367 Permit Inspection Request Line (206) 431-2451 X13 -1.31 Project-; - c rc Type / Ir�s�ctio t ! 4 t Addre..3 J milt' Date Called: Special Instructions: Date Wanted:(�j / % ` a.m. I'i—equester: Gc5✓efCe) S4'Ce_„J Phone No: lair/'(, .S i e ci i a pr I LJ Approved per applicable codes. Corrections required prior to approval. 4 COMMENTS: A -- 01‹...e, e ( Gc5✓efCe) S4'Ce_„J foo! c.)A.( lair/'(, .S i e ci i a pr I LJ d . ._sr' .k fc. f us a . Inspectl'br: Date � () n REINSPECTION FEE REQUIRED. rior to next inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION NO. INSPECTION RECORD Retain a copy with permit Me -06 PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-36.70 Permit Inspection Request Line (206) 431-2451 Projecttil Type of Inspec on: Mem JO -c, , Addres • A 4 X51 SC Al/ Date Called: Special Instructions: Date Wanted: 5 23 43 Pim reiuester: Phone No: Approved per applicable codes. COMMENTS: Corrections required prior to approval. aiLC i -D. Ai hoAt Thr ? . t ,t) ( REINSPECTION FEE REQUIRED. Prior Ito next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 431-2451 Mia- / 3 b Project:...- J e r e vV Type/of Inspection: i< 0 G a --LA/ Address: .. 35 )c MA -I1 Date Called: Special Instructions: Date Wanted:! I ` (� `�.---- P.m. Requester: Approved per applicable codes. Corrections required prior to approval. 2 - COMMENTS: COMMENTS: Insp'ect or: li Date i&-- i_3 REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION NO. INSPECTION RECORD Retain a copy with permit m' -V3C, PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd:, #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 431-2451 Proje : Mak) Typ of Inspection: Ou6H M, N Address: 53.E S C mALL Date Called: Special Instructions: Dates Wanted: - t — 11— l3 p.m. Requester: Phone No: a.CD c7- (0-79 - 3 ►3 `7 Approved per applicable codes. 0 Corrections required prior to approval. COMMENTS: A CIS .mak-; K, - AP Qi6k/PA' o lu ► 0 sia,476 D kc- % +J rv\ -- S 1 tcAAJ yr) - INN t tJ u. S b Are_ t� l Dat E SPECTION FEE 4EQUIRED. Prior next inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION NUMBER INSPECTION RECORD Retain a copy/with permit b1? -2S-7 rY► 3 36_� PERMIT NUMBERS CITY OF TUKWILA (FIRE DEPARTMENT 444 Andover Park East, Tukwila, Wa. 98188 206-575-4407 Project: C r....Q.-ch_.J Type of Inspection: , reAL /Z -- ////1 C Address: Suite #: 93.5 ?C "WV/ Contact Person: Special Instructions: Phone No.: (Approved per applicable codes. Corrections required prior to approval. COMMENTS: Sprinklers: S Date: %/ 6dl.2 Fire Alarm: d Ye Hood & Duct: /v0 Monitor: -6;,-rP/U.,._._._ 'Pre -Fire: A/c) l` 31 e' /.A- Permits: aZ 7,�-,--) .:.��s •�€ .i�r. /Ace- Occupancy Type: f "r�S/,-..-� 2€ A�1- �fd.07 - ot/-'7 � /ifce LJ his ,¢v.i 14.24-- ✓/tri ` 7 r-44277 � e, . d' -''tet • 4,- i /G 10.el..,, <<-F-% 'S`�247 G fJG� --- ` O i `, . • Needs Shift Inspection: / Sprinklers: S Date: %/ 6dl.2 Fire Alarm: d Ye Hood & Duct: /v0 Monitor: -6;,-rP/U.,._._._ 'Pre -Fire: A/c) Permits: Occupancy Type: f Inspector Date: %/ 6dl.2 Hrs.: / 0 „.�55 / $100.00 REINSPECTION FEE REQUIRED. You will receive an invoice from the City of Tukwila Finance Department. Call to schedule a reinspection. Billing Address Attn: Company Name: Address: ' City: State: Zip: Word/Inspection Record Form.Doc 6/11/10 T.F.D. Form F.P. 113 • PLAN PF&MW/ROTING SLIP ACTIVITY NUMBER: M13-136 DATE: 07-22-13 PROJECT NAME: J CREW SITE ADDRESS: 535 SOUTHCENTER MALL X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Issued DEPAR/T�M,�ENTS• _wilding- Divislon,'31�� Public Works n o °1'11, Fire Prevention Structural Planning Division Permit Coordinator Fl a DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Incomplete DUE DATE: 07-25-13 Not Applicable Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg 0 Fire 0 Ping 0 PW 0 Staff Initials: TUES/THURS ROUTING: Please Route Structural Review Required REVIEWER'S INITIALS: No further Review Required n DATE: APPROVALS OR CORRECTIONS: Approved Notation: n Approved with Conditions DUE DATE: 08-22-13 Not Approved (attach comments) n REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg 0 Fire 0 Ping 0 PW 0 Staff Initials: Documents/routing slip.doc 2-28-02 Contractors or Tradespeople Pr Friendly Page General/Specialty Contractor A business registered as a construction contractor with LEI to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name EVERGREEN REFRIGERATION LLC UBI No. 602512953 Phone 2067631744 Status Active Address 727 S Kenyon St License No. EVERGRL954R2 Suite/Apt. License Type Construction Contractor City Seattle Effective Date 1/6/2006 State WA Expiration Date 1/6/2014 Zip 98108 Suspend Date County King Specialty 1 General Business Type Limited Liability Company Specialty 2 Unused Parent Company ther Associated Licenses License Name Type Specialty 1 Specialty 2 Effective Date Expiration Date Status EVERGHH910J0 EVERGREEN HOME HEATING & ENGY Construction Contractor General Unused 4/20/2009 4/20/2015 Active EVERGI'201D7 EVERGREEN REFRIGERATION INC Construction Contractor General Unused 3/27/1980 7/31/2006 Re Licensed Business Owner Information Name Role Effective Date Expiration Date EVERGREEN REFRIGERATION LLC Partner/Member 12/22/2005 Bond Amount PATTON, DAVID Partner/Member 01/06/2006 WA1 5097 PATTON, RODGER Partner/Member 01/06/2006 PATTON, MATTHEW Partner/Member 01/06/2006 TRAVELERS CAS a SURETY CO Bond Information Page 1 of 1 Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 2 Merchants Bonding Co (Mutual) WA1 5097 01/01/2012 Until. Cancelled $12,000.00 12/15/2011 1 TRAVELERS CAS a SURETY CO 104667361 01/01/2006 Until. Cancelled $12,000.00 01/03/2006 Assignment of Savings Information No records found for the previous 6 year period Insurance Information Insurance Company Name Policy Number Effective Date Expiration Date Cancel Date Impaired Date Amount Received Date 3 AMERICAN FIRE AND CASUALTY COM BAW54192293 07/31/2010 07/31/2014 $1,000,000.0007/30/2013 2 Continental Western Ins Co CWP2640663 07/31/2006 07/31/2010 $1,000,000.00 03/23/2009 Summons/Complaint Information No unsatisfied complaints on file within prior 6 year period Warrant Information No unsatisfied warrants on file within prior 6 year period Infractions/Citations Information No records found for the previous 6 year period https://fortress.wa.gov/lni/bbip/Print.aspx 08/23/2013 GENERAL HVAC NOTES SP SP NOTICE TO CONTRACTOR RETURN AIR PLENUM PROTECTION REQUIRED (This only applies to those spaces that share return air plenums) Before any mall Tenant space Improvements or alterations are to begin, where plenum ceilings are removed, altered or return air ceiling grills are open/exposed to construction dust contamination, a "plenum protection plan" shall be required to show procedures and methods for protecting and sealing the return air plenums of any contamination fromconstruction dust and combustibles prior to and during construction work. No inspections shall be performed until mitigation procedures are made to protect any shared ceiling plenums. • RG -2. RG -2 O 0 N N N SD -1 240 0 0 O 0 SD -1' 240. r10"0 10"0 0 0 X10"0 • X10"0 240 H SD -1, 240 (TYP ("1 D 200 SD -5 200 n 6"0 s.s 8"0 VAV-1 T -STAT RTU -1 T -STAT SD - 200 8"0 SD -5 200 l_ 8"0 14 10 100 SENSOR II s~ SD -4 100 SD -3 50 r"6"0 RG -1 SD -3 50 100 D-3 0 SD -3 50 0 0 0 0 20x12 TYP loot 26x12 loot N SP R (001 N N N SD -1 a 240 0 0 ORTU 5500 A VAV-1 T 650 • Ili i 00 XOa O Xo 42x12 N °t p p RG -3 1 SP 0 0 s P A A ir-10"0 N G N N X Co SD -1 240 0 0 SP RG -2 A 10"0 _RG -2 i SP SD -1 240 0 0 SD -1 240 ID! O 0 0 0 e-10"0 SD -1 240 N N N N N 240 x-1ONO A N 22x12 X10"0 0 0 SD -1 240 0 0 Tr --10"0 N 240 "0 O 0 0 0 ovv 001 001 cif`- 041 0' !l ,N" O~eo osoSo O�u IRG-2 RG SD -5 100 1. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR DEMOLITION AND REMOVAL OF EXISTING DUCTWORK, DIFFUSERS, GRILLES, CONTROLS, ETC., AS REQUIRED TO FACILITATE NEW INSTALLATIONS. 2. MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL TRADES, LANDLORD REQUIREMENTS, CEILING HEIGHTS AND EXISTING STRUCTURAL CONDITIONS PRIOR TO FABRICATION OF ANY DUCTWORK OR ORDERING OF ANY EQUIPMENT. 3. ALL WORK SHALL BE IN STRICT ACCORDANCE WITH ALL FEDERAL STATE AND LOCAL CODES AND ORDINANCES. 4. FURNISH ALL LABOR, MATERIALS, TOOLS, INCIDENTALS AND DETAILS NECESSARY TO PROVIDE A COMPLETE HEATING, VENTILATING, AIR CONDITIONING SYSTEM. INCLUDE ANY LABOR AND MATERIAL NOT SPECIFICALLY MENTIONED, BUT NECESSARY TO PROVIDE A COMPLETE AND OPERATING SYSTEM. ALL WORK SHALL BE INSTALLED IN A PROFESSIONAL MANNER AND SHALL MEET ALL THE REQUIREMENTS OF THE STATE BUILDING CODE, CITY BUILDING CODE, SAFETY AND HEALTH CODES, NFPA CODES AND ALL OTHER APPLICABLE CODES AND REQUIREMENTS. ALL COSTS FOR SAID REQUIREMENTS SHALL BE INCLUDED IN THIS CONTRACTORS BID PRICE. 5. THIS CONTRACTOR SHALL SECURE AND PAY FOR ALL REQUIRED PERMITS AND INSPECTIONS AND PERFORM ALL TESTS CALLED FOR OR REQUIRED AS A PART OF HIS WORK. FURNISHED APPROVED CERTIFICATE OF FINAL INSPECTION, AND TURN OVER TO OWNER AT COMPLETION OF PROJECT. 6. MECHANICAL PLANS ARE DIAGRAMMATIC, NOT SHOWING EVERY ITEM IN EXACT LOCATION OR DETAIL MEASUREMENTS AND LOCATIONS MUST BE FIELD VERIFIED AND COORDINATED WITH ARCHITECTURAL HVAC, ARE PROTECTION, STRUCTURAL ELECTRICAL AND OTHER BUILDING DRAWINGS. 7. MECHANICAL CONTRACTOR TO PROVIDE TENANT WITH AS -BUILT DRAWINGS, ALL EQUIPMENT SHOP DRAWINGS, INFORMATION ON THERMOSTATS, CONTROL WIRING DIAGRAMS AND OTHER PERTINENT INFORMATION AT COMPLETION OF PROJECT. 8. CONTRACTOR SHALL VERIFY ALL EXISTING SITE CONDITIONS PRIOR TO BID AND INCLUDE IN BID ALL COSTS TO MAKE FIELD COORDINATION AND ADJUSTMENT TO DUCTWORK FOR FIT INTO EXISTING STRUCTURE. CONTRACTOR SHALL VERIFY AND FIELD COORDINATE FINAL LOCATION OF MECHANICAL EQUIPMENT. 9. ALL DUCTWORK SHALL BE SHEET METAL FABRICATED IN ACCORDANCE WITH ASHRAE GUIDE AND SMACNA MANUAL LATEST EDITIONS. 10. DUCT LININGS (THERMAL AND ACOUSTICAL), VIBRATION ISOLATION CONNECTORS, FLEXIBLE DUCT CONNECTORS, AND DUCT TYPE TO BE APPROVED BY CODE AND LANDLORD. 11. DUCT DIMENSIONS SHOWN ARE INSIDE NET DIMENSIONS, ADD TO SHEET METAL SIZE FOR INSULATION. IN GENERAL, DUCTWORK TIGHT TO UNDERSIDE OF STRUCTURE UNLESS OTHERWISE NOTED OR REQUIRED BY FIELD CONDITIONS. COORDINATE EXACT MOUNTING HEIGHT IN FIELD WITH GENERAL CONTRACTOR. ROUND RIGID SUPPLY, RETURN, ALL RELIEF AIR AND ALL OUTSIDE AIR DUCTS SHALL BE EXTERNALLY INSULATED WITH 1 1/2" THICK, 1.5 LBS. DENSITY FOIL FACED FIBERGLASS INSULATION. ROUND DUCTWORK IN CONDITIONED SPACE DOES NOT REQUIRE I! SULATION UNLESS OTHERWISE NOTED. 12. ALL BRANCH TAKE -OFFS SHALL BE PROVIDED WITH MANUAL BALANCING DAMPERS. 13. FLEXIBLE INSULATED DUCTS SHALL BE MAXIMUM 5'-0" LONG AND SHALL MEET INSTALLATION AND MATERIAL REQUIREMENTS OF LOCAL CODES. 14. THE MECHANICAL CONTRACTOR SHALL FURNISH AND INSTALL A COMPLETE TEMPERATURE CONTROL SYSTEM TO INCLUDE: PANELS, MODULES, RELAYS, WIRING, THERMOSTATS, SENSORS, DAMPERS, ACTUATORS AND ALL MISCELLANEOUS ITEMS AS REQUIRED TO FULFILL THE DESIGN INTENT AS INDICATED ON THE PLANS AND IN THE CODED NOTES. 15. ALL TEMPERATURE CONTROLS, FIRE ALARM COMPONENTS, EQUIPMENT NAMEPLATES, LABELS, OR COLOR CODED COMPONENTS SHALL BE MASKED DURING PAINTING TO PREVENT DAMAGE FROM OVER -SPRAY OR OBSCURING INFORMATION. 16. ALL LOW VOLTAGE WIRING AND CONDUIT REQUIRED FOR MECHANICAL EQUIPMENT SHALL BE FURNISHED AND INSTALLEDBy MECHANICAL CONTRACTOR. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINANG WITH ELECTRICAL CONTRACTOR ALL WIRING AND CONDUIT REQUIRED FOR EQUIPMENT OERATION AND CONTROL 17. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT THE MECHANICAL EQUIPMENT COMPONENTS ARE INSTALLED, AT LOCATIONS AND ELEVATIONS WHICH MAKE THEM READILY ACCESSIBLE FOR ROUTINE MAINTENANCE WITHOUT REQUIRING ANY EXTRAORDINARY MEASURES. MECHANICAL PLAN 1 /4"=1'-O" MECHANICAL CODED NOTES; 0 OWNER SHALL FURNISH AND CONTRACTOR SHALL INSTALL A "LIGHT STAT" PROGRAMMABLE THERMOSTAT WITH SUB -BASE AND REMOTE TEMPERATURE SENSOR AT 5'-0" A.F.F. COORDINATE EXACT LOCATION WITH TENANTS CONSTRUCTION MANAGER. THERMOSTATS TO BE MOUNTED ON LIGHT STAT CONTROL PANEL LIGHTSTAT THERMOSTATS AND SENSORS ARE TO CONTROL HEATING AND COOLING MODES. O RTU -1 - NEW ROOFTOP UNIT INSTALLED IN SAME LOCATION ,AS EXISTING UNIT. MECHANICAL CONTRACTOR SHALL REMOVE AND DISPOSE OF EXISTING ROOFTOP UNITS AND SHALL FURNISH AND INSTALL A ROOF MOUNTED ELECTRIC COOLING/ GAS HEATING HVAC UNIT. SEE ROOF TOP UNIT SCHEDULE FOR FURTHER INFORMATION. UNIT TO SIT ON EXISTING CURB AND ROOF OPENING. UNIT SHALL BE FURNISHED WITH TWO SETS OF STANDARD FILTERS. CONTRACTOR TO REPLACE FILTERS PRIOR TO TURNING STORE OVER TO TENANT. ALL ROOF WORK INVOLVED WITH SETTING OF THE ROOF CURB AND UNIT SHALL BE DONE BY THE LANDLORD'S ROOFING CONTRACTOR AT THE G.C. EXPENSE UNLESS NOTED OTHERWISE. GENERAL CONTRACTOR SHALL PROVIDE ANY ADDITIONAL STRUCTURAL STEEL REQUIRED TO SUPPORT RTU, PER LANDLORD'S REQUIREMENTS. COORDINATE LOCATIONS OF ROOF TOP UNITS AND EXISTING ROOF EQUIPMENT WITH LANDLORD. PROVIDE CLEAR ACCESS TO ALL EQUIPMENT AND CODE -REQUIRED CLEARANCES FOR OUTSIDE AIR INTAKES. STENCIL TENANTS NAME AND SPACE NUMBER ON RTU. UNIT SHALL BE HORIZONTAL DISCHARGE . DUCTED DOWN INTO SPACE THROUGH EXISTING ROOF OPENING. FIELD VERIFY EXACT: SIZE AND LOCATION OF EXISTING ROOF CURB AND OPENING. 0 THE CONTRACTOR SHALL FURNISH AND INSTALL CONDENSATE DRAINS FROM HVAC UNIT AS SHOWN ON PLANS. MINIMUM DRAIN SIZE TO BE 1" OR AS SPECIFIED ON PLANS. CONDENSATE DRAIN TO BE TRAPPED WITH A MINIMUM 5" TRAP DEPTH. DRAINS SHALL BE EXTENDED AT A SLOPE OF 1" PER 40'. ROUTE RTU CONDENSATE DRAINS TO SPLASH BLOCK ON ROOF OR NEAREST ROOF DRAIN AS REQUIRED BY LANDLORD AND LOCAL CODE. ® PROVIDE FULL SIZE DUCT CONNECTION TO RETURN AIR WITH ELBOW FOR SOUND ATTENUATION OF RETURN AIR, AND WIRE MESH AT OPENING. O SMOKE DETECTOR IN RETURN AIR DUCT SHALL SHUT DOWN UNIT SUPPLY FAN AND SIGNAL THE LANDLORD FIRE ALARM SYSTEM UPON SENSING SMOKE. SMOKE DETECTOR TO BE FURNISHED BY ELECTRICAL CONTRACTOR AND INSTALLED BY MECHANICAL CONTRACTOR. WIRING TO FIRE ALARM SYSTEM BY ELECTRICAL CONTRACTOR. COORDINATE REQUIREMENTS WITH LANDLORD. ® MECHANICAL CONTRACTOR SHALL FURNISH AND INSTALL A BROAN EXHAUST FAN (120V., 1 PH., 60 HZ) COMPLETE WITH INTEGRAL BACKDRAFT DAMPER AND ON-OFF SWITCH. EXHAUST CAPACITY SHALL BE 75 CFM AT .5" S.P. CONTRACTOR TO FURNISH AND INSTALL EXHAUST DUCT, AND ACCESSORIES AS REQUIRED INCLUDING SPEED CONTROLLER CONCEALED A'n ArrrcctRLL, CONNECT TO EXISTING LANDLORD EXHAUST CONNECTION IN SPACE. FIELD VERIFY EXACT SIZE AND LOCATION. O7 CONTRACTOR SHALL UNDERCUT DOOR 1" FOR AIR RETURN. ® PROVIDE NEW ELECTRONIC THERMOSTAT AND SENSOR FOR VAV BOX, AND ASSOCIATED WIRING, ETC. TO BE THE SAME MANUFACTURER AS VAV BOX. O9 VAV-1 MECHANICAL CONTRACTOR SHALL FURNISH AND INSTALL A SERIES FAN POWERED, VARIABLE -AIR -VOLUME (VAV) BOX WITH ELECTRIC HEATING, ECM MOTOR, AND ELECTRONIC CONTROL WITH AUTOCHANGE-OVER. VAV BOX SHALL BE CONNECTED TO THE MAIN AIR DISTRIBUTION SYSTEM WITH DUCT SIZES AS SHOWN. VERIFY BOX INLET AND OUTLET CONNECTION SIZES AND INCLUDE DUCT TRANSITIONS AND FLEX DUCT CONNECTIONS IN BID. SEE VARIABLE AIR VOLUME BOX SCHEDULE FOR FURTHER INFORMATION. MOUNT VAV BOX AT MAXIMUM POSSIBLE HEIGHT ABOVE FINISHED FLOOR. <D4UGHTSTAT SUPPLY AIR SENSOR MOUNTED IN DUCTWORK. 11 HORIZONTAL DISCHARGE DUCTWORK TO DROP DOWN THROUGH ROOF THROUGH EXISTING CURB AND OPENING. PROVIDE WEATHERPROOF INSULATED ENCLOSURE AROUND DUCTS AND ROOF OPENING TO MATCH EXISTING INSTALLATION. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING CURB AND OPENING TO BE REUSED. FIELD VERIFY ALL CONDITIONS BEFORE BID. !SEPARATE PERMIT REQUIRED FOR: 0 Mechanical glitleotrical el6Numbing as Piping City of Tukwila EU!L. 3ING DIVISION REVISIONS No changes sha'I be made to the scope of work witho#.t prior approval of Tukwila ,lila Building Division. r avisions will require a new plan submittal and may include additional plan review fees. FILE COPY Permit No. IA (S-1$4) firm Inflow approval is subject to errors and omissions. k; 4 of construction documents does not authorize , or< of any adopted code or ordinance. Receipt o►iipproveci Field Copy and cot ons isadmowledged: BY V)"3 City OfTukwila BUILDING DIVISION FIELD VERIFY ALL CONDITIONS DESIGN DRAWINGS ARE SCHEMATIC. THIS CONTRACTOR SHALL VISIT THE SITE PRIOR TO BIDDING OR AWARD OF CONTRACT TO INSPECT EXISTING FIELD CONDITIONS. THIS CONTRACT SHALL INCLUDE ALL LABOR AND MATERIALS NECESSARY FOR FIELD MODIFICATIONS DUE TO EXISTING CONDITIONS. THE CONTRACTOR SHALL CONTACT THE ARCHITECT, ENGINEER OR OWNER PRIOR TO BIDDING FOR INTERPRETATIONS AND CLARIFICATIONS OF THE DESIGN AND INCLUDE IN HIS BID ALL COSTS TO MEET THE DESIGN INTENT. CLARIFICATIONS MADE BY THE ARCHITECT, ENGINEER OR OWNER AFTER BIDDING WILL BE FINAL AND SHALL BE IMPLEMENTED AT CONTRACTORS COST. BIDDING CONTRACTORS SHALL HAVE A WORKING KNOWLEDGE OF LOCAL CODES AND ORDINANCES AND SHALL INCLUDE IN THEIR BIDS THE COSTS FOR ALL W iRK INSTALLED IN STRICT ACCORDANCE WITH GOVERNING CODES, THE PLANS AND SPECIFICATIONS NOT WITHSTANDING. THE CONTRACTOR SHALL ALERT ARCHITECT, ENGINEER OR OWNER OF ANY APPARENT DISCREPANCIES BETWEEN GOVERNING CODES AND DESIGN INTENT. SYMBOL LEGEND SYMBOL 00 00 DESCRIPTION 42x12 N SD -1 240 0 0 SP RG -2 A 10"0 _RG -2 i SP SD -1 240 0 0 SD -1 240 ID! O 0 0 0 e-10"0 SD -1 240 N N N N N 240 x-1ONO A N 22x12 X10"0 0 0 SD -1 240 0 0 Tr --10"0 N 240 "0 O 0 0 0 ovv 001 001 cif`- 041 0' !l ,N" O~eo osoSo O�u IRG-2 RG SD -5 100 1. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR DEMOLITION AND REMOVAL OF EXISTING DUCTWORK, DIFFUSERS, GRILLES, CONTROLS, ETC., AS REQUIRED TO FACILITATE NEW INSTALLATIONS. 2. MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL TRADES, LANDLORD REQUIREMENTS, CEILING HEIGHTS AND EXISTING STRUCTURAL CONDITIONS PRIOR TO FABRICATION OF ANY DUCTWORK OR ORDERING OF ANY EQUIPMENT. 3. ALL WORK SHALL BE IN STRICT ACCORDANCE WITH ALL FEDERAL STATE AND LOCAL CODES AND ORDINANCES. 4. FURNISH ALL LABOR, MATERIALS, TOOLS, INCIDENTALS AND DETAILS NECESSARY TO PROVIDE A COMPLETE HEATING, VENTILATING, AIR CONDITIONING SYSTEM. INCLUDE ANY LABOR AND MATERIAL NOT SPECIFICALLY MENTIONED, BUT NECESSARY TO PROVIDE A COMPLETE AND OPERATING SYSTEM. ALL WORK SHALL BE INSTALLED IN A PROFESSIONAL MANNER AND SHALL MEET ALL THE REQUIREMENTS OF THE STATE BUILDING CODE, CITY BUILDING CODE, SAFETY AND HEALTH CODES, NFPA CODES AND ALL OTHER APPLICABLE CODES AND REQUIREMENTS. ALL COSTS FOR SAID REQUIREMENTS SHALL BE INCLUDED IN THIS CONTRACTORS BID PRICE. 5. THIS CONTRACTOR SHALL SECURE AND PAY FOR ALL REQUIRED PERMITS AND INSPECTIONS AND PERFORM ALL TESTS CALLED FOR OR REQUIRED AS A PART OF HIS WORK. FURNISHED APPROVED CERTIFICATE OF FINAL INSPECTION, AND TURN OVER TO OWNER AT COMPLETION OF PROJECT. 6. MECHANICAL PLANS ARE DIAGRAMMATIC, NOT SHOWING EVERY ITEM IN EXACT LOCATION OR DETAIL MEASUREMENTS AND LOCATIONS MUST BE FIELD VERIFIED AND COORDINATED WITH ARCHITECTURAL HVAC, ARE PROTECTION, STRUCTURAL ELECTRICAL AND OTHER BUILDING DRAWINGS. 7. MECHANICAL CONTRACTOR TO PROVIDE TENANT WITH AS -BUILT DRAWINGS, ALL EQUIPMENT SHOP DRAWINGS, INFORMATION ON THERMOSTATS, CONTROL WIRING DIAGRAMS AND OTHER PERTINENT INFORMATION AT COMPLETION OF PROJECT. 8. CONTRACTOR SHALL VERIFY ALL EXISTING SITE CONDITIONS PRIOR TO BID AND INCLUDE IN BID ALL COSTS TO MAKE FIELD COORDINATION AND ADJUSTMENT TO DUCTWORK FOR FIT INTO EXISTING STRUCTURE. CONTRACTOR SHALL VERIFY AND FIELD COORDINATE FINAL LOCATION OF MECHANICAL EQUIPMENT. 9. ALL DUCTWORK SHALL BE SHEET METAL FABRICATED IN ACCORDANCE WITH ASHRAE GUIDE AND SMACNA MANUAL LATEST EDITIONS. 10. DUCT LININGS (THERMAL AND ACOUSTICAL), VIBRATION ISOLATION CONNECTORS, FLEXIBLE DUCT CONNECTORS, AND DUCT TYPE TO BE APPROVED BY CODE AND LANDLORD. 11. DUCT DIMENSIONS SHOWN ARE INSIDE NET DIMENSIONS, ADD TO SHEET METAL SIZE FOR INSULATION. IN GENERAL, DUCTWORK TIGHT TO UNDERSIDE OF STRUCTURE UNLESS OTHERWISE NOTED OR REQUIRED BY FIELD CONDITIONS. COORDINATE EXACT MOUNTING HEIGHT IN FIELD WITH GENERAL CONTRACTOR. ROUND RIGID SUPPLY, RETURN, ALL RELIEF AIR AND ALL OUTSIDE AIR DUCTS SHALL BE EXTERNALLY INSULATED WITH 1 1/2" THICK, 1.5 LBS. DENSITY FOIL FACED FIBERGLASS INSULATION. ROUND DUCTWORK IN CONDITIONED SPACE DOES NOT REQUIRE I! SULATION UNLESS OTHERWISE NOTED. 12. ALL BRANCH TAKE -OFFS SHALL BE PROVIDED WITH MANUAL BALANCING DAMPERS. 13. FLEXIBLE INSULATED DUCTS SHALL BE MAXIMUM 5'-0" LONG AND SHALL MEET INSTALLATION AND MATERIAL REQUIREMENTS OF LOCAL CODES. 14. THE MECHANICAL CONTRACTOR SHALL FURNISH AND INSTALL A COMPLETE TEMPERATURE CONTROL SYSTEM TO INCLUDE: PANELS, MODULES, RELAYS, WIRING, THERMOSTATS, SENSORS, DAMPERS, ACTUATORS AND ALL MISCELLANEOUS ITEMS AS REQUIRED TO FULFILL THE DESIGN INTENT AS INDICATED ON THE PLANS AND IN THE CODED NOTES. 15. ALL TEMPERATURE CONTROLS, FIRE ALARM COMPONENTS, EQUIPMENT NAMEPLATES, LABELS, OR COLOR CODED COMPONENTS SHALL BE MASKED DURING PAINTING TO PREVENT DAMAGE FROM OVER -SPRAY OR OBSCURING INFORMATION. 16. ALL LOW VOLTAGE WIRING AND CONDUIT REQUIRED FOR MECHANICAL EQUIPMENT SHALL BE FURNISHED AND INSTALLEDBy MECHANICAL CONTRACTOR. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINANG WITH ELECTRICAL CONTRACTOR ALL WIRING AND CONDUIT REQUIRED FOR EQUIPMENT OERATION AND CONTROL 17. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT THE MECHANICAL EQUIPMENT COMPONENTS ARE INSTALLED, AT LOCATIONS AND ELEVATIONS WHICH MAKE THEM READILY ACCESSIBLE FOR ROUTINE MAINTENANCE WITHOUT REQUIRING ANY EXTRAORDINARY MEASURES. MECHANICAL PLAN 1 /4"=1'-O" MECHANICAL CODED NOTES; 0 OWNER SHALL FURNISH AND CONTRACTOR SHALL INSTALL A "LIGHT STAT" PROGRAMMABLE THERMOSTAT WITH SUB -BASE AND REMOTE TEMPERATURE SENSOR AT 5'-0" A.F.F. COORDINATE EXACT LOCATION WITH TENANTS CONSTRUCTION MANAGER. THERMOSTATS TO BE MOUNTED ON LIGHT STAT CONTROL PANEL LIGHTSTAT THERMOSTATS AND SENSORS ARE TO CONTROL HEATING AND COOLING MODES. O RTU -1 - NEW ROOFTOP UNIT INSTALLED IN SAME LOCATION ,AS EXISTING UNIT. MECHANICAL CONTRACTOR SHALL REMOVE AND DISPOSE OF EXISTING ROOFTOP UNITS AND SHALL FURNISH AND INSTALL A ROOF MOUNTED ELECTRIC COOLING/ GAS HEATING HVAC UNIT. SEE ROOF TOP UNIT SCHEDULE FOR FURTHER INFORMATION. UNIT TO SIT ON EXISTING CURB AND ROOF OPENING. UNIT SHALL BE FURNISHED WITH TWO SETS OF STANDARD FILTERS. CONTRACTOR TO REPLACE FILTERS PRIOR TO TURNING STORE OVER TO TENANT. ALL ROOF WORK INVOLVED WITH SETTING OF THE ROOF CURB AND UNIT SHALL BE DONE BY THE LANDLORD'S ROOFING CONTRACTOR AT THE G.C. EXPENSE UNLESS NOTED OTHERWISE. GENERAL CONTRACTOR SHALL PROVIDE ANY ADDITIONAL STRUCTURAL STEEL REQUIRED TO SUPPORT RTU, PER LANDLORD'S REQUIREMENTS. COORDINATE LOCATIONS OF ROOF TOP UNITS AND EXISTING ROOF EQUIPMENT WITH LANDLORD. PROVIDE CLEAR ACCESS TO ALL EQUIPMENT AND CODE -REQUIRED CLEARANCES FOR OUTSIDE AIR INTAKES. STENCIL TENANTS NAME AND SPACE NUMBER ON RTU. UNIT SHALL BE HORIZONTAL DISCHARGE . DUCTED DOWN INTO SPACE THROUGH EXISTING ROOF OPENING. FIELD VERIFY EXACT: SIZE AND LOCATION OF EXISTING ROOF CURB AND OPENING. 0 THE CONTRACTOR SHALL FURNISH AND INSTALL CONDENSATE DRAINS FROM HVAC UNIT AS SHOWN ON PLANS. MINIMUM DRAIN SIZE TO BE 1" OR AS SPECIFIED ON PLANS. CONDENSATE DRAIN TO BE TRAPPED WITH A MINIMUM 5" TRAP DEPTH. DRAINS SHALL BE EXTENDED AT A SLOPE OF 1" PER 40'. ROUTE RTU CONDENSATE DRAINS TO SPLASH BLOCK ON ROOF OR NEAREST ROOF DRAIN AS REQUIRED BY LANDLORD AND LOCAL CODE. ® PROVIDE FULL SIZE DUCT CONNECTION TO RETURN AIR WITH ELBOW FOR SOUND ATTENUATION OF RETURN AIR, AND WIRE MESH AT OPENING. O SMOKE DETECTOR IN RETURN AIR DUCT SHALL SHUT DOWN UNIT SUPPLY FAN AND SIGNAL THE LANDLORD FIRE ALARM SYSTEM UPON SENSING SMOKE. SMOKE DETECTOR TO BE FURNISHED BY ELECTRICAL CONTRACTOR AND INSTALLED BY MECHANICAL CONTRACTOR. WIRING TO FIRE ALARM SYSTEM BY ELECTRICAL CONTRACTOR. COORDINATE REQUIREMENTS WITH LANDLORD. ® MECHANICAL CONTRACTOR SHALL FURNISH AND INSTALL A BROAN EXHAUST FAN (120V., 1 PH., 60 HZ) COMPLETE WITH INTEGRAL BACKDRAFT DAMPER AND ON-OFF SWITCH. EXHAUST CAPACITY SHALL BE 75 CFM AT .5" S.P. CONTRACTOR TO FURNISH AND INSTALL EXHAUST DUCT, AND ACCESSORIES AS REQUIRED INCLUDING SPEED CONTROLLER CONCEALED A'n ArrrcctRLL, CONNECT TO EXISTING LANDLORD EXHAUST CONNECTION IN SPACE. FIELD VERIFY EXACT SIZE AND LOCATION. O7 CONTRACTOR SHALL UNDERCUT DOOR 1" FOR AIR RETURN. ® PROVIDE NEW ELECTRONIC THERMOSTAT AND SENSOR FOR VAV BOX, AND ASSOCIATED WIRING, ETC. TO BE THE SAME MANUFACTURER AS VAV BOX. O9 VAV-1 MECHANICAL CONTRACTOR SHALL FURNISH AND INSTALL A SERIES FAN POWERED, VARIABLE -AIR -VOLUME (VAV) BOX WITH ELECTRIC HEATING, ECM MOTOR, AND ELECTRONIC CONTROL WITH AUTOCHANGE-OVER. VAV BOX SHALL BE CONNECTED TO THE MAIN AIR DISTRIBUTION SYSTEM WITH DUCT SIZES AS SHOWN. VERIFY BOX INLET AND OUTLET CONNECTION SIZES AND INCLUDE DUCT TRANSITIONS AND FLEX DUCT CONNECTIONS IN BID. SEE VARIABLE AIR VOLUME BOX SCHEDULE FOR FURTHER INFORMATION. MOUNT VAV BOX AT MAXIMUM POSSIBLE HEIGHT ABOVE FINISHED FLOOR. <D4UGHTSTAT SUPPLY AIR SENSOR MOUNTED IN DUCTWORK. 11 HORIZONTAL DISCHARGE DUCTWORK TO DROP DOWN THROUGH ROOF THROUGH EXISTING CURB AND OPENING. PROVIDE WEATHERPROOF INSULATED ENCLOSURE AROUND DUCTS AND ROOF OPENING TO MATCH EXISTING INSTALLATION. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING CURB AND OPENING TO BE REUSED. FIELD VERIFY ALL CONDITIONS BEFORE BID. !SEPARATE PERMIT REQUIRED FOR: 0 Mechanical glitleotrical el6Numbing as Piping City of Tukwila EU!L. 3ING DIVISION REVISIONS No changes sha'I be made to the scope of work witho#.t prior approval of Tukwila ,lila Building Division. r avisions will require a new plan submittal and may include additional plan review fees. FILE COPY Permit No. IA (S-1$4) firm Inflow approval is subject to errors and omissions. k; 4 of construction documents does not authorize , or< of any adopted code or ordinance. Receipt o►iipproveci Field Copy and cot ons isadmowledged: BY V)"3 City OfTukwila BUILDING DIVISION FIELD VERIFY ALL CONDITIONS DESIGN DRAWINGS ARE SCHEMATIC. THIS CONTRACTOR SHALL VISIT THE SITE PRIOR TO BIDDING OR AWARD OF CONTRACT TO INSPECT EXISTING FIELD CONDITIONS. THIS CONTRACT SHALL INCLUDE ALL LABOR AND MATERIALS NECESSARY FOR FIELD MODIFICATIONS DUE TO EXISTING CONDITIONS. THE CONTRACTOR SHALL CONTACT THE ARCHITECT, ENGINEER OR OWNER PRIOR TO BIDDING FOR INTERPRETATIONS AND CLARIFICATIONS OF THE DESIGN AND INCLUDE IN HIS BID ALL COSTS TO MEET THE DESIGN INTENT. CLARIFICATIONS MADE BY THE ARCHITECT, ENGINEER OR OWNER AFTER BIDDING WILL BE FINAL AND SHALL BE IMPLEMENTED AT CONTRACTORS COST. BIDDING CONTRACTORS SHALL HAVE A WORKING KNOWLEDGE OF LOCAL CODES AND ORDINANCES AND SHALL INCLUDE IN THEIR BIDS THE COSTS FOR ALL W iRK INSTALLED IN STRICT ACCORDANCE WITH GOVERNING CODES, THE PLANS AND SPECIFICATIONS NOT WITHSTANDING. THE CONTRACTOR SHALL ALERT ARCHITECT, ENGINEER OR OWNER OF ANY APPARENT DISCREPANCIES BETWEEN GOVERNING CODES AND DESIGN INTENT. SYMBOL LEGEND SYMBOL DESCRIPTION SYMBOL DESCRIPTION SUPPLY SHADING DUCT MOUNTED SIDEWALL.'MOUNTED RETURN CEILING RETURN SUPPLY SIMILAR SUPPLY SIMILAR DEMO EXISTING DEVICE EXISTING RE -USE CONNECT AIR DIFFUSER DENOTES BLANK -OFF AIR GRILLE OR DUCT DIFFUSER SUPPLY OR AIR LINEAR DIFFUSER MOUNTED SUPPLY OR MR LINEAR DIFFUSER AIR DUCT RISE FOR RETURN AIR AIR DUCT DROPF.D. FOR RETURN AIR DUCT AND AIR TO EXISTING (� �\ L I \ / ROOF MOUNTED EQUIPMENT AS NOTED CEILING EXHAUST FAN GRILLE -DENOTES S -DENOTES SENSOR TURNING VANES DUCT TRANSITIONS BRANCH DUCT WITH SPIN -IN FITTING AND VOLUME DAMPER - FIRE DAMPER DUCT SMOKE DETECTOR MECHANICAL CONTRACTOR ELECTRICAL CONTRACTOR HIGH SIDE WALL LOW SIDE WALL Or 0 / pRETURN /T \ I = O JJ JJJ ; JTV MOM _/ i \_ i A y + T X + 0 alt M.C. E.C. HSW LSW X„. � % ' E R 0 x``113-136 CITREVOF iIUK WiLp VERIFY ALL CONDITIONS IN FIELD PRIOR TO BIDS. ,�<<<ma PERMIT CENTER M -Engineering 750 Brooksedge Blvd. Westerville, Ohio 43081 phone: 614.839.4639 fax: 614.839.P 22 WWW. MENGINEERING. US. COM All rights reserved. No part of these drawings or specifications may be copied, reproduced or used in connection with any work, other than the specific project for which they have been prepared, without prior written authorization from the Architect. ENGINEER OF RECORD: ICFEW Southcenter Mall 633 Southcenter Mall Space No. 676 Seattle, WA 98188 Level: Ground Floor Project No. 1339 Project No. 13411114 NO. DATE ISSUE 07-17-13 Issue for Permit 07-17-13 Issue for Bid 07-17-13 Issue for LL & Client Review REVIEWED FOR :ODE COMPLIANCE APPROVED AUG 02 2013 gie LCi#y of Tukwila BUILDING DIVISION Mechanical Plan M-100 HVAC LOAD CALCULATIONS Design Parameters: City Name - _.Seattle IAP Location Washington Latitude 47.5 Deg. 122.3 Deg. 449.0 ft 85.0 °F Summer Coincident VL@tilb 65.0 °F Summer Daily Range 18.3 °F Winter Design Di9ulb 23.0 °F Winter Design VVaulb ._ _ 19.2 °F Atmospheric Clearness Number __ 1.05 Average Ground Reflectance. 0.20 Soil Conductivity - _ 0.800 BTU/(hift °F) Local Time Zone (GMT -My hours) 8.0 hours Consider Daylight Savings Time- No Simulation Weather Data _ __ Seattle IAP (TM2) Current Data is __..2001 ASHRAE Handbook Design Cooling Months. January to December Longitude Elevation Summer Design DQulb Air System Information Air System Name Total Load Equipment Class _.. PKG ROOF Air System Type. SZCAV Sizing Calculation Information Zone and Space Sizing Method: Zone CFM Sum of space airflow rates Space CFM Individual peak space loads Central Cooling Coil Sizing Data Total coil load 13.6 Tons Total coil load 163.7 MBH Sensible coil load 159.0 MBH Coil CFM at Jun 13QQ 5465 CFM Max block CFM 5465 CFM Sum of peak zone CEM ...5465 CFM Sensible heat ratio 0.971 ft2/Ton 346.4 BTU/(hift2) 34.6 Water flow @ 10.0 °F rise N/A Central Heating Coil Sizing Data Max coil load 1325 MBH Coil CFM at Des Htg 5465 CFM Max coil CFM. 5465 CFM Water flow @ 20.0 °F drop __. N/A Supply Fan Sizing Data Actual max CFM 5465 CFM Standard CFM 5377 CFM Actual max CFM/ft2 1 16 CFM/ft2 ZONE LOADS Window & Skylight Solar Loads Wall Transmission Roof Transmission Window Transmission Skylight Transmission Door Loads Floor Transmission Partitions Ceiling Overhead Lighting Task Lighting Electric Equipment People Infiltration Miscellaneous Safety Factor » Total Zone Loads Zone Conditioning Plenum Wall Load Plenum Roof Load Plenum Lighting Load Return Fan Load Ventilation Load Supply Fan Load Space Fan Coil Fans Duct Heat Gain / Loss » Total System Loads Central Cooling Coil Central Heating Coil » Total Conditioning Key: Number of zones 1 Floor Area 4727.0 ft2 Location Seattle IAP, Washington Calculation Months . Jan to Dec Sizing Data Calculated Load occurs at Jun 1300 OA DB/WB. 82.0/64.4°F Entering DB / WB. 86.6 / 67.1 °F Leaving DB / WB 59.2 / 57.4 °F Coil ADP 56.1- °F Bypass Factor 0.100 Resultin0H 56 % Design supply temp - 56.0 °F Zone Tstat Check 1 of 1 OK Max zone temperature deviation Q.0 °F Load occurs at Des Htg BTU/(hift2) _ 28.0 Ent. DB / Lvg DR 57.9 / 80.8 °F Fan motor BHP - 1 59 BHP Fan motor kW 1.19 kW Fan static 1.00 in wg DESIGN COOLING DESIGN HEATING COOLING DATA AT Jun 1300 HEATING DATA AT DES HTG COOLING OA DB / WB 82.0 °F / 64.4 °F HEATING OA DB / WB 23.0 °F / 19.2 °F Sensible Latent Sensible Latent Details (BTU/hr) O ft2 0 Oft2 0 4727 ft2 33153 Oft2 0 O ft2 0 O ft2 0 4727 ft2 0 O ft2 0 Oft2 0 2321 W 4195 8608 W 22225 4550 W 15525 53 9329 - 0 - 0 10% /10% 8443 92869 83373 0% 0 70% 77358 30% 2376 5465 CFM 0 1274 CFM -8110 5465 CFM 4052 0 0% 0 159048 - 159048 0 159048 (BTU/hr) Details O ft2 0ft2 4727 ft2 O ft2 O ft2 0 ft2 4727 ft2 Off O ft2 0 0 0 0 10695 0 0 1070 10% 11765 11765 - 0 0 0 5465 CFM -7067 1274 CFM 61699 5465 CFM -4052 - 0 0% 0 4698 - 132508 4700 - 0 132508 4700 132508 Positive values are htg loads Negative values are clg loads (BTU/hr) (BTU/hr) 0 71987 0 0 0 0 0 0 0 0 0 0 0 0 7199 79186 74860 0 0 0 0 Positive values are clg loads Negative values are htg loads 0 0 0 0 0 0 0 0 0 VENTILATION REQUIREMENTS 1. Summary Ventilation Sizing Method Sum of Space OA Airflows Design Ventilation Airflow Rate 1274 CFM 2. Space Ventilation Analysis Table Floor Maximum Required Required Required Required Uncorrected Area Maximum Supply Air Outdoor Air Outdoor Air Outdoor Air Outdoor Air Outdoor Air Zone Name / Space Name Mult. (ft2) Occupants(CFM) (CFM/person) (CFM/ft2) (CFM) (% of supply) (CFM) Zone 1 JCrew Non Sales 1 959.0 4.8 1298.8 0.00 0.15 0.0 0.0 143.9 JCrew Sales 1 3768.0 50.2 4166.5 0.00 0.30 0.0 0.0 1130.4 Totals (incl. Space Multipliers) 5465.3 1274.3 METAL GAUGE FOR DUCTWORK TO BE AS FOLLOWS: ROUND DUCT 3 TO 19 INCHES TO BE 26 GAUGE RECTANGULAR DUCT UP TO 12 INCHES WIDE TO BE 26 GAUGE RECTANGULAR DUCT 13 TO 30 INCHES WIDE TO BE 24 GAUGE. RECTANGULAR DUCT ABOVE 30 INCHES WIDE TO BE 22 GAUGE. STEEL STRAP HANGER DUCTWORK SELF -TAPPING, SHEET METAL SCREW HANGER SPACING DUCT FACE AREA FROM 0 TO 4 SQ. FT. HANGERS 98" O.C. MAX DUCT FACE AREA FROM 4 TO 10 SQ. FT. HANGERS 72" O.C. MAX DUCT FACE AREA FROM 10 AND GREATER HANGERS 48" O.C. MAX WHERE DUCTS ARE LESS THAN 2 SQ. FT. IN FACE AREA, HANGERS SHALL BE NOT LESS THAN 1"x1/16" STRAP STEEL WHERE DUCT ARE GREATER THAN 2 SQ. FT. IN FACE AREA. HANGERS SHALL BE NOT LESS THAN 1"x1/8" STRAP STEEL WHERE DUCT ARE 8 SQ. FT. IN FACE AREA. HANGERS SHALL BE BRACED BY 1'x1"x1/8" STEEL ANGLES ALL AROUND, SPACED NO MORE THAN FOUR FEET ON CENTERS. WHERE DUCTS ARE OVER 48" WIDE. THE HANGERS SHALL BE BROUGHT DOWN UNDER THE DUCT SIDES 4" AND FASTENED TO THE BOTTOM. SECURE HANGERS TO STRUCTURAL MEMBERS OR TO UNITSTRUT BETWEEN MEMBERS. DO NOT ATTACHE TO DECK. DUCT SUPPORT SCHEMATIC NTS ALL DUCT LINER TRANSVERSE EDGES TO BE COATED W/ ADHESIVE IN ACCORDANCE W/ SMACNA STANDARDS (TYP.) MAIN DUCT PROVIDE INTERNAL LINER OR EXTERNAL WRAP INSULATION AS SPECIFIED FLANGED AND GASKETED JOINT OR DUCT CONNECTION AND RE - ENFORCEMENT IN ACCORDANCE W/ SMACNA 2" W.G. CLASS, SEAL NON-GASKETED TRANS- VERSE JOINTS IN ACCORDANCE W/ SMACNA CLASS "C" (TYP.) TAPE. DOWN EXTERNAL INSULATION FASTEN W/ MIN. (3) SHT. MTh. SCREWS, SEAL W/ DUCT TAPE AND MASTIC TYP. ROUND DUCT TAKE NTS ROOFTOP UNIT SCHEDULE F zUNIT aa NUMBER TRANE MODEL # cn m z 00 z F- EER SUPPLY FAN VOLTAGE HEAT PUMP OUTPUT ELEC HTG. COIL TOTAL CLG SENSIBLE CLG ;I O.A. CFM NOTES HP m m z c) SP RPM 1 RTU -1 WSH180E3 15 10.6 5 5500 1.0 3450 208V/30 93 13.5 KW 186 163 ; 1300 Q(2) CD® 208 3 000 • A • A 00000 SD -3 TITU OMNIS 12"X12" 6"O • • • 1 A NOTE: 1. UNITS SHALL BE HI -EFFICIENCY, EER AS SHOWN IN SCHEDULE. 2. PROVIDE THE FOLLOWING FACTORY INSTALLED ACCESSORIES - ECONOMIZER WITH REFERENCE ENTHALPY CONTROL - THROUGH THE BASE ELECTRIC/GAS CONNECTIONS. - UNIT MAIN POWER DISCONNECT SWITCH. - FIELD POWERED CONVENIENCE OUTLET. - HINGED ACCESS DOORS. - HEAT PUMP UNIT WITH SECOND STAGE HEAT ELECTRIC COIL 13.5 KW 3. PROVIDE THE FOLLOWING FIELD INSTALLED ACCESSORIES. - KNOCKDOWN ROOFCURB. - POWER EXHAUST - PROGRAMMABLE NIGHT SETBACK THERMOSTAT. - HORIZONTAL DISCHARGE 4. START-UP AND ONE YEAR LABOR WARRANTY SHALL BE PROVIDED BY INSTALLING CONTRACTOR. AIR FLOW CONICAL OR BELLMOUTH SPIN - IN FITTING, SEAL AIRTIGHT W/ MASTIC MANUAL BALANCING DAMPER ROUND RIGID DUCT 1" WRAPPED INSULATION TO S.A. MAIN INSULATED ROUND DUCT VOLUME DAMPER FLEXIBLE CONNECTIO (MAX. 5 FT.) - ALL HANGER WIRES TO STRUCTURAL SUPPORT MUST BE VERTICAL (TYP) PROVIDE SUPPORT FROM STRUCTURAL SUPPORTS ABOVE. DO NOT REST AIR, DEVICE ON CEILING.� PROVIDE 16 GA. X 1 1/2 IN. STEEL CHANNELS (WITHti 9/16 IN. MINIMUM ANGLES) AS NECESSARY, AND METAL I1 I I I SCREWS FORM INSIDE PER MANUFACTURER'S PRINTED' INSTRUCTIONS OFF SCHEMATIC SUPPLY AIR DIFFUSER STRAP CLAMP (TYPICAL) INSTALL DAMPER AND EQUALIZING GRID PER AIR DEVICE SCHEDULE AND MANUFACTURER'S PRINTED INSTRUCTIONS. INSTALL ALL SHEET METAL SCREWS FROM INSIDE OF NECK. DRYWALL CEILING SURFACE MOUNT WITH NO EXPOSED FASTENERS ROUND DIFFUSER MOUNTING SCHEMATIC NTS 8" OR 10"0 FLEX (5' MAX. LENGTH ,11 or' YOUNG REGULATOR BOWDE CABLE CONTROLS 5020CC DAMPER WITH 270/275 DRIVE CONTROL KIT. OR EQUAL YOUNG REGULATOR DAMPER WITH CABLE TO FACE OF REGISTER PLENUM PROVIDED BY MECH. CONTR. TRANSITION AS REQUIRED LINEAR DIFFUSER SCREW DRIVER ADJUSTMENT AT FACE OF DIFFUSER FIELD COORDINATE INSTALLATION WITH GENERAL CONTRACTOR. LINEAR DIFFUSER SCHEMATIC B NTS NOTES 1. DIFFUSER SHALL APPEAR CONTINUOUS. 2. ALL CORNERS SHALL BE MITERED. VANES PRE -ASSEMBLED ON RUNNER PLATES. USE GALVANIZED VANES FOR GALVANIZED OR ALUMINUM DUCTS. PLATE SAME GAUGE AS DUCT. DUCT SIZE OVER 36"X36" SQ. ELBOW WITH TYPE "A" DOUBLE THICKNESS VANES R=2" DUCT SIZE 36"X36" OR UNDER SQ. ELBOW WITH SINGLE THICKNESS VANES TURNING VANE SCHEMATIC NTS VARIABLE AIR VOLUME BOX SCHEDULE TAG MANUFACTURER & MODEL PRIMARY AIR INLET SIZE ("0) BOX PRIMARY CFM FAN (SERIES) ELECTRIC HEATING COIL NOTES LIMITATIONS DESIGN OPERATION CFM E.S.P.VOLTS (IN WC) HP PHASE KW STEPS VOLTS PHASE MAX. MIN. DESIGN COOLING DESIGN HEATING VAV-1 TRANE VSEF 10 700 300 650 650 650 0.5 0.25 120 1 5 2 208 3 000 NOTES; 1. MINIMUM STATIC PRESSURE DROP ACROSS THE VAV BOX FOR PROPER OPERATION SHALL BE BETWEEN 0.1' AND 0.15", AS TESTED PER ARI 880. 2. PROVIDE FACTORY MOUNTED ELECTRIC HEATER AIR FLOW SWITCH, POWER FUSE AND DISCONNECT SWITCH. 3. PROVIDE ELECTRONIC CONTROLS, REVERSE ACTING TYPE WITH MAGNETIC CONTACT FOR ELECTRIC HEATING COIL THERMOSTAT CONTROLS BY SAME MANUFACTURER AS UNIT. AIR DEVICE SCHEDULE NOTES 1. SYMBOL KEY - 4. VOLUME DAMPER - FIRST LETTER: S -SUPPLY R -RETURN E-EXH T -TRANSFER FACTORY FURNISHED. OPPOSED BLADE OR BUTTERFLY SECOND LETTER: D -DIFFUSER R -REGISTER G -GRILLE WHERE AVAILABLE. ADJUSTABLE FROM FACE. 2.PROVIDE OPTIONAL DIRECTIONAL BLOW FEATURE FOR 5. BORDER STYLE - OTHER THAN 4 -WAY. "A" SURFACE MOUNTED 3. FINISH -"B" LAY -IN, PROVIDE WITH PLASTER FRAME "A" WHITE FOR DRYWALL CEILING MOUNTING. "B" WHITE - G.C. TO FIELD PAINT "C" LAY -IN FRAME FOR T -BAR CEILING. TO MATCH CEILING OR WALL WITH ENAMEL FINISH. 6. PROVIDE BOOT FOR DUCT MOUNTING. SYMBOL (1)(2) MANUFACTURER/ CATALOG NUMBER NOMINAL SIZE MOUNTING MATERIAL FINISH (3) DPR. (4) BORDER (5) REMARKS MOD. NECK CLG. OTHER STEEL ALUM. SD -1 AIR 22"0 10"0 • • A • A 00 SD -2 TUS FL -1O -HT 48" LENGTH 8"0 • • A • A 00000 SD -3 TITU OMNIS 12"X12" 6"O • • • CONDENSING UNITS - A • A 00 SD -4 -MS OMNI 12"X12" 8"0 • • • • A • A 00 SD -5 TMSS 24'X24" 8"0 • 411 STRUCTURAL SUPPORTS FOR RTU• AS REQUIRED. A • C 00 • SEE CODED NOTES 1 • • SEE CODED NOTES DIFFUSERS AND GRILLES RG -1 ' TITUS 350 RL 12"x12" 10"x10" • • DIFFUSERS/GRILLES FIRE DAMPERS A • A 0 RG -2 3T50 RL 24"X12" 2,2'x10" • • A • B 00 RG -3 mus 350 RL 24"X24" 22"x22" • • • LOW PRESSURE DUCTWORK A • C 0 1 EQUALS SHALL BE BY PRICE OR KRUEGER. G.C. TO CONFIRM AVAILABILITY WITHIN CONSTRUCTION SCHEDULE. PROVIDE AIR DEVICES WITH SHORTEST LEAD TIME. 2 ALL SURFACE MOUNTED AIR DEVICES SHALL BE INSTALLED WITH NO EXPOSED FASTENERS. 3 PROVIDE FRAME & BORDER TYPE ?66 PLENUM AND ALL HARDWARE. PROVIDE WITH END BORDERS. 4 INSTALL RECTANGULAR DUCT ROTO TWIST BY METROPOLITAN AIR RT -150 DAMPER WITH CABLE CONTROLS MOUNTED INSIDE PLENUM OF SLOT- DIFFUSER WITH PLENUM BRACKET. EQUALS BY YOUNG'S. 5 USE POSITION 1 SETTING 6 PROVIDE LENGTH OF AIR DEVICE AS SHOWN ON ARCHITECTURAL SHEETS. PROVIDE CONTINUOUS INSULATED PLENUM WITH MULTIPLE 8" INLETS AS SHOWN FOR SUPPLY AIR. MECHANICAL/PLUMBING RESPONSIBILITY SCHEDULE ITEM FURNISHED BY -�- INSTALLED BY REUSE EXISTING N/A REMARKS TENANT ANDLORD CONTR. ANDLORD CONTR. AIR HANDLING UNITS (WSHP) • STRUCTURAL & VIBRATION SUPPORTS FOR AHU AS REQUIRED (WSHP) • AHU MIXING BOX AND MIXING BOX MOTOR OPERATED DAMPERS • AHU MIXING BOX MOTOR OPERATED DAMPER ACTUATOR • CONDENSING UNITS - • ROOF TOP UNITS • • ROOF CURB AND/OR CURB ADAPTER FOR RTU AS REQUIRED • • • SEE CODED NOTES STRUCTURAL SUPPORTS FOR RTU• AS REQUIRED. • • SEE CODED NOTES V.A.V. BOXES • • SEE CODED NOTES DIFFUSERS AND GRILLES • • SEE CODED NOTES DIFFUSERS/GRILLES FIRE DAMPERS • WALL FIRE DAMPERS AND/OR COMBINATION SMOKE/FIRE DAMPERS • HYDRONIC PIPING • LOW PRESSURE DUCTWORK • • SEE CODED NOTES HIGH/MEDIUM PRESSURE DUCTWORK • TEMPERATURE CONTROL SYSTEM • • SEE CODED NOTES RELIEF AIR/MAKE UP AIR MOTOR OPERATED DAMPERS • RELIEF AIR/MAKE UP AIR MOTOR OPERATED DAMPER ACTUATORS • SMOKE DETECTOR(S) IN RETURN AND/OR SUPPLY AIR DUCT • • ZONE DAMPERS • DUCT HEATER(S) • UNIT/BASEBOARD HEATER(S) • RETURN AIR FAN • OUTSIDE AIR MOTORIZED DAMPER & DUCTWORK • RELIEF AIR FAN OR HOOD • TOILET EXHAUST FAN(S) • • SEE CODED NOTES TOILET EXHAUST DUCTWORK WALL OR ROOF CAP • • • SEE CODED NOTES AIR BALANCE REPORT • AABC OR NEBB CERTIFIED AS -BUILT DRAWINGS 5 PLUMBING FIXTURES • • SEE CODED NOTES SAN, CW, HW, PIPING AND WATER METER • • SEE CODED NOTES SPRINKLER PIPING AND HEADS • • SPRINKLER DRAWINGS AND CALCULATIONS AND HUNG • • GENERAL NOTE REFERENCE. ALL ITEMS LISTED HERE ARE SPECIFIED AND DETAILED ENCOUNTERS ITEMS THAT ARE CONTRADICTORY THEN IT IS HIS MANAGER SO THAT THESE ITEMS CAN BE CLARIFIED THIS SCHEDULE IS INTENDED AS A "QUICK" ON THESE DRAWINGS. IF THE CONTRACTOR RESPONSIBILITY TO INFORM TENANT'S CONSTRUCTION FOR THE CONTRACTOR. t'U3 j34 REVIEWED FOR CODE COMPLIANCE APPROVED AUG 02 2013 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA JUL 2 2013 PERMIT CENTER M -Engineering 750 Brooksedge Blvd. Westerville, Ohio 43081 phone: 614.839.4639 fax: 614.839.2222 WWW.MENG/NEERING.USCOM All rights reserved. No part of these drawings or specifications may be copied, reproduced or used in connection with any work, other than the specific project for which they have been prepared, without prior written authorization from the Architect. ENGINEER OF RECORD: ICREW Southcenter Mall 633 Southcenter Mall Space No. 676 Seattle, WA 98188 Level: Ground Floor Project No. 1339 Project No. 13411114 NO. DATE ISSUE 07-17-13 Issue for Permit 07-17-13 Issue for Bid 07-17-13 Issue for LL & Client Review Mechanical Schedules Details M-200 DIVISION 15 - MECHANICAL SECTION 15000 MECHANICAL GENERAL PROVISIONS A. GENERAL CONDITIONS I . SHOP DRAWINGS A. 1. DRAWINGS AND GENERAL PROVISIONS OF CONTRACT, INCLUDING GENERAL AND 1. SUPPLEMENTARY CONDITIONS AND ALL OTHER SPECIFICATION SECTIONS ARE A PART OF THIS CONTRACT AND APPLY TO THIS AND THE OTHER SECTIONS OF DIVISION 15. 2. THE CONTRACTOR FOR THIS WORK IS REQUIRED TO READ THE ENTIRE SPECIFICATIONS AND REVIEW DRAWINGS FOR ALL OTHER TRADES. 3. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING HIS SUBCONTRACTORS WITH A FULL SET OF BID SET DOCUMENTS (INCLUDING SPECIFICATIONS) AND THE COORDINATION OF HIS WORK AND INSPECTIONS AND THE WORK AND INSPECTIONS OF HIS SUBCONTRACTORS WITH ALL OTHER TRADES ON SITE CONFORMING TO THE GENERAL CONTRACTOR'S TIME SCHEDULE. 4. THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO SUBMITTING HIS BID TO DETERMIINE CONDITIONS AFFECTING THE WORK. BIDS SHALL SERVE AS EVIDENCE OF KNCAM.EDGE OF EXISTING CONDITIONS AND ANY MODIFICATIONS WHICH ARE REQUIRED TO MEET THE INTENT OF THE DRAWINGS AND SPECIFICATIONS. FAILURE TO VISIT THE SITE DOES NOT RELIEVE THE CONTRACTOR ODF RESPONSIBILITY IN_ PERFORMANCE OF WORK. 5. WHEN USED, THE TERM 'PROVIDED BY CONTRACTOXR' SHALL BE INTERPRETED AS MEANING 'FURNISHED AND INSTALLED' WITH THE EXCEPTION WHERE ITEMS ARE 'PROVIDED' BY TENANT' WHICH MEANS 'FURNISHED ONLY' (INSTALLED BY CONTRACTOR), EXCEPT AS SPECIFICALLY NOTED OTHERWISE. B. GENERAL REQU I REMENNTS 1. THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, TOOLS. TRANSPORTATION, INCIDENTALS AND DETAILS NECESSARY TO PROVIDE A COMPLETE AND FULLY FUNCTIONAL MECHANICAL SYSTEM AS SHIOWN ON THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS, AND AS REQUIRED BY JOB CONDITIONS. ALL WORK NOT SPECIFICALLY NOTED AS BEING BY THE LANDLORD SHALL BE PROVIDED BY THE MECHANICAL CONTRACTOR. CLOSELY COORDINATE THE ENTIRE INSTALLATION WITH THE LANDLORD, AS REQUIRED. FIELD VERIFY THP EXACT TYPE, SIZE AND LOCATION, ETC. OM: EXISTING PIPE AND DUCTS IN THE TENANT SPACE PRIOR TO BID. 2. THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO SUPPLEMENT EACH OTHER AND ANY MATERIAL OR LABOR CALLED FOR IN ONE SWILL BE PROVIDED EVEN THOUGH NOT SPECIFICALLY MENTIONED IN BOTH. ANY MATERIAL OR LABOR WHICH IS NEITHER SHOWN ON THE DRAWINGS NOR CALLED FOR IN THE SPECIFICATIONS, BUT WHICH IS OBVIOUSLY NECESSARY TO COMPLETE THE WORK, AND WHICH IS USUALLY INCLUDED IN WORK OF SIMILAR CHARACTER, SHALL BE PROVIDED AS PART OF CONTRACT. 3. WHERE TIE DRAWINGS OR SPECIFICATIONS CALL FOR ITEMS WHICH EXCEED CODES OR THE LANDLRD'S TENANT CRITERIA, THE CONTRACTOR IS STILL RESPONSIBLE FOR PROVIDING THE SYSTEM AS DESIGNED AND DESCRIBED ON�N THESE DRAWINGS, UNLESS SPECIFICALLY NOTED OTHERWISE. 4. ALL MECHANICAL WORK SHALL BE INSTALLED SO AS TO BE READILY ACCESSIBLE FOR OPERATING. SERVICING, MAINTAINING, AND REPAIRING. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING SUFFICIENT ACCESS TO ALL EQUIPMENT FOUR SERVICE. 2. SUBMIT SIX COPIES OF MATERIAL LISTS AND SHOP DRAWINGS FOR ALL EQUIPMENT AND DUCT FABRICATION DRAWINGS TO THE TENANT'S CONSTRUCTION MANAGER FOR APPROVAL PRIOR TO ORDERING EQUIPMENT. SUBMISSIONS MUST BE EARLY ENOUGH TO ALLOW THE TENANT'S CONSTRUCTION MANAGER EIGHT WORKING DAYS FOR REVIEW WITHOUT CAUSING DELAYS OR CONFLICTS TO THE JOB'S PROGRESS. SUBMITTALS SHALL BE IN ACCORDANCE WITH THE GENERAL CONDITIONS USING THE MANUFACTURER'S LISTED ON THE DRAWINGS. SHOP DRAWINGS SHALL INCLUDE ALL DATA THAT PERTAINS TO THE REQUIREMENTS SET FORTH ON THE DRAWINGS AND IN THE SPECIFICATIONS:. THE SUBMITTAL SHALL INCLUDE BUT NOT LIMITED TO CUTS OR CATALOGS INCLUDING DESCRIPTIVE LITERATUE AND CHARACTERISTICS OF EQUIPMENT SHALL SHOW MAJOR DIMENSIONS, ROUGHING -IN DATA, CAPACITY, CURVES,; PRESSURE DROP, CODE COMPLIANCE, MOTOR AND DRIVE DATA AND ELECTRICALjDATA. OBSERVE SPECIAL INSTRUCTIONS WHEN REQUIRED. SUBMITTALS SHALL BEAR THE STAMP OF THE GENERAL AND.SUB-CONTRACTOR SHOWING THAT HE HAS REVIEWED AND CONFIRMED THAT THEY ARE IN CONFORMANCE WITH THE CONTRACT DRAWINGS AND SPECIFICATIONS OR INDICATE WHERE EXCEPTIONS TAKEfPLACE. LACK OF SUCH CONTRACTOR'S REVIEW AND APPROVAL WILL BE CAUSE FOR REJECTION WITHOUT REVIEW BY TENANT'S CONSTRUCTION MANAGER. ALL SHOP DRAWINGS MUST APPEAR IN THE OPERATION AIB. MAINTENANCE MANUALS LEFT ON SITE AT JOB COMPLETION.` TENANTS CONSTRUCTION MANAGERS REVIEW OF SHOP DRAWINGS OR SCHEDULES SHALL'NOT RELIEVE THE CONTRACTOR FROM RESPONLSIBI'LITY FOR ERRORS, OMISSIONS OR OTHER DEFICIENCIES OR DEVIATIONS IN THE SHOP DRAWING FROM THE CONTRACT DRAWINGS AND SPECIFICATIONS. . RECXRRD DRAWINGS K. 5. THE CONTRACTOR SHALL DO ALL CUTTING, CORE DRILLING, CHASING OR CHANNELING AND PATCHING REQUIRED FOUR ANY WORK.UNDER THIS DIVISION. L. CUTTING SHALL HAVE PRIOR APPROVAL BY THE TENANT'S CONSTRUCTION MANAGER AND THE LANDLORD. PATCHING SHALL MATCH, FINISH OF SURROUNDING AREA. C. CODES 1. ALL WORK SHALL BE PERFORMED IN A NEAT PROFESSIONAL MANNER USING GOOD ENGINEERING PRACTICES. ALL WORK SHALL CONFORM TO THE LANDLORD'S CRITERIA, THE STATE'S, COUNTY'S, CITY'S AND LOCAL CODES AND ORDINANCES, SAFETY AND HEALTH CODES, NEPA CODES, ENERGY CODES AND ALL OTHER APPLICABLE CODES AND REQUIREMENTS. THE CONTRACTOR SHALL INQUIRE M. INTO AND COMPLY WITH ALL APPLICABLE CODES, (ORDINANCES, AND REGULATIONS. AFTER CONTRACT IS ISSUED, NO ADDITIONAL COST DUE TO CODE ISSUES SHALL BE REIMBURSED BY THE TENANT TO THE CONTRACTOXR. D. LICENSES, PERMITS, INSPECTIONS NII FEES 1. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL LICENSES, PERMITS, INSPECTIONS, AND FEES REQUIRED OR RELATED TO HIS WORK. 2. FURNISH TO THE TENANT'S CONSTRUCTION MANAGER ALL CERTIFICATES OF INSPECTION AND FINAL INSPECTION APPROVAL AT SUBSTANTIAL COMPLETION DATE CF PROJECT. E. DRAWINGS 1. DRAWINGS (PLANS, SPECIFICATIONS, AND DETAILS) ARE DIAGRAMMATIC AND . INDICATE THE GENERAL LOCATION AND INTENT OF THE MECHANICAL SYSTEMS. BECAUSE OF THE SMALL SCALE OF THE DRAWINGS, ITIS NOT POSSIBLE TO INDICATE ALL DUCT AND PIPING OFFSETS, FITTINGS AND ACCESSONRIES THAT MAY BE REQUIRED. 2. THE LAYOUT SHOWN ON THE DRAWINGS IS BASED OHI A PARTICULAR MAKE OF EQUIPMENT. IF ANOTHER MAKE OF EQUIPMENT IS USED WHICH REQUIRES MOD I F I CAT I OFN OMR CHANGE OF ANY DESCRIPTION FROM THE DRAW I NGS OMR SPECIFICATIONS, THE CONTRACTOR SHALL BE RESPONSIBLE AS PART OF THIS WORK, FOR MAKING ALL SUCH MODIFICATIONS AND CHANGES, INCLUDING THOSE INVOLVING OTHER TRADES WITH THE COST THEREOF INCLUDED IN HIS BID. IN SUCH CASE, CONTRACTOR SHALL SUBMIT DRAWINGS AND SPECIFICATIONS PRIOR TO STARTING WORK SHOWING ALL SUCH MODIFICATIONS AND CHANGES. HIS PROPOSAL SHALL BE SUBJECT TO THE APPROVAL OF THE TENANT'S CONSTRUCT I O7NN MANAGER. F. EXISTING SHELL SPACE CONDITAGS 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THE DEMOLITION OF EXISTING MECHANCIAL WORK SHOWN ON THE MECHANCIAL DRAWINGS AND THE MECHANCIAL DEMOLITION SHOWN ON THE ARCHITECTURAL DRAWINGS. 2. THE CONTRACTOR SHALL INCLUDE, AND WILL BE HELD RESPONSIBLE FOR, THE REMOVAL OF ALL EXISTING FIRE PROTECTION, PLUMBING FIXTURES, PIPING, HVAC UNITS, REFRIGERANT RECAPTURE, EXHAUST FANS, ETC. AND ASSOCIATED ROOF CURBS NOT TO BE REUSED ON THIS PROJECT, UNLESS SPECIFICALLY NOTED OTHERWISE. CONTRACTOR MUST VERIFY WITH THE LANDLORD ALL PRESUMED ABANDONED EQUIPMENT, PIPES, DUCTWORK, AND EQUIPMENT PRIOR TO REMOVAL. ROOF' CURBS SHALL BE REMOVED AND THE ROOF PATO2ED UNLESS NOTED FOUR REUSE OMR RECONFIGURATION ON PLANS. ROOM" PATCHING SHALL BE PERFORMED AT THE CONTRACTOR'S EXPENSE BY A ROOFING CONTRACTOR APPROVED BY THE LANDLOXRD. ALL EXTRANEOUS ITEMS IN THE SPACE OR ON THE ROOF (ABOVE THIS SPACE) NOT APPLICABLE TO THE NEW WORK OMR PART OF THE LANDLORD'S OR MOTHER TENANT'S ACTIVE SYSTEM MUST BE REMOVED AND ROOF/WALL/FLOO R PATCHED/REPAIRED TO MATCH EXISTING STRUCTURE. EXISTING ABANDONED PIPES, DUCTS, OR EQUIPMENT IN THE FLOOR, EMBEDDED IN CONCRETE, OR OTHERWISE INACCESSIBLE ARE TO BE CUT OFF AND SEALED BELOW OR WITHIN FLOOR OMR WALL LEVEL WEEN THEY ARE NOT TO BE REUSED IN THIS PROJECT. I F REQUIRED BY LANDLOXRD OMR CODES, ABA DONED PIPING ANO/OR DUCTWORK MUST BE REMOVED TO POINT OF ORIGIN. CONFIRM THE EXTENT OF DEMOLITION PRIOMR TO BID AND INCLUDE IN BID PROPOSAL. 3. ACTIVE LANDLORD OR OTHER TENANT SERVICES ENOUNTERED IN WORK SHALL BE PROTECTED ANO SUPPORTED. IF EXISTING SERVICES NOT ANTICIPATED REQUIRE RELOCA IO, CONTACT � TENANT'S iRUCTION ' - IH DIATELY. ALL COSTS FOR REPAIR OF DAMAGES TO ACTIVE LANDLORD OMR OTHER TENANT SERVICES DURING CONSTRUCTION SHALL BE PAID FOUR BY THE CONTRACTOR CAUSING THE DAMAGE. 4. TIE-INS ANO MODIFICATIONS TO EXISTING LANDLORD SERVICES MUST BE DONE WITH MINIMUM INTERRUPTION OF LANDLOXRD OPERATION AND DURING HOURS SPECIFIED BY THE LANDLORD. THE CONTRACTOR IS RESPONSIBLE FOR CONFIRMING EXACT WORKING HOURS OF THIS WORK WITH THE LA DLORD PRIOMR TO SUBBMITTING HIS BID. THE CONTRACTOR SHALL INCLUDE IN HIS BID, ALL PREMIUM TIME REQUIRED TO PERFORM MODIFICATIONS DURING OTHER THAN NORMAL WORKING HOURS. ALL SUCH WORK MUST BE COORDINATED WITH THE LANDLORD. G. DISCREPANCIES IN DOCUUMENTS 1. DRAWINGS (PLANS, SPECIFICATIONS. AND DETAILS) ARE DIAGRAMMATIC AND INDICATE THE GENERAL LOCATION AND INTENT OF THE MECHANICAL SYSTEMS. WHERE DRAWINGS, EXISTING SITE CONDITIONS, SPECIFICATIONS OR OTHER. TRADES CONFLICT OR ARE UNCLEAR, ADVISE THE GENERAL CONTRACTOR IN. WRITING, PRIOR TO SUBMITTAL OF BID. THE GENERAL CONTRACTOR IS RESPONSIBLE TO ADVISE THE TENANT'S CONSTRUCTION MANAGER, IN WRITING, OF VARIATIONS TO CONTRACT DOCUMENTS PRIOR TO SUBMISSION OF BID. OTHERWISE, TENANT'S CONSTRUCTION MANAGER'S INTERPRETATION OF CONTRACT DOC1 ENTS OR CONDITIONS SHALL BE FINAL WITH NO ADDITIONAL COMPENSATION PERMITTED. H. TRADE NAMES AND MIAMFACTURERS 1. WHERE TRADE NAES AND MANUFACTURERS ARE USED OV THE DRAWINGS OR I N THE SPECIFICATIONS. THE EXACT EQUIPMENT SHALL BE USED AS A MINIMUM STANDARD FOR THE BASE BID. MANUFACTURERS CONSIDERED AS AN EQUAL OR BETTER IN ALL ASPECTS TO. THAT SPECIFIED WILL BE SUBJECT TO APPROVAL IN WRITING BY THE TENANT'S CONSTRUCTION MANAGER PRIOR TO ACCEPTANCE. THE USE OF ANY UNAUTHORIZED EQUIPMENT SHALL BE SUBJECT TO REMOVAL AND REPLACEMENT AT THE CONTRACTOR'S EXPENSE. N. 1. THE CONTRACTOR SH4ALL_MAINTAIN ONE COPY OF DRAWINGS AND SPECIFICATIONS ON THE JOB SITE TO RECORD DEVIATIONS FROM CONTRACT DRAWINGS, SUCH AS: LOCATION OF CONCEALED PIPING VALVES AND DIOTS. REVISIONS, ADDENDUMS, AND CHANGE ORDERS. SIGNIFICANT DEVIATIONS MADE NECESSARY BY FIELD CONDITIONS, , APPROVED EQU I RMENT SUBSTITUTIONS, AND CONTACTOR S-COORD-I NATI ON WITH OTHER TRADES. �. D. EXACT ROUTING OF ALL SANITARY AND DOAESTICIWATER PIPING UDER FLOOR. A. B. C. B. C. DIVISION 15 - MECHANICAL SECTION 15200 PLUMBING SCOPE OF WORK A. 1. THIS CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, TOOLS. TRANSPORTATION AND FACILITIES NECESSARY FOR, REASONABLY IMPLIED AND INCIDENTAL TO, THE FURNISHING, INSTALLATION, COMPLETION AND TESTING OF ALL THE WORK FOR THE PLUMBING SYSTEMS AS SHOWN ON THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS, AND AS REQUIRED BY JOB CONDITIONS, TO INCLUDE,, BUT NOT BE LIMITED TO THE FOLLOWING: (REFER TO RESPONSIBILITY SCHEDULE FOR EXACT RESPONSIBILITIES) A. B. C. D. E. COMPLETE SANITARY PIPING SYSTEMS OF WASTE, DRAINS, AND VENTS. COMPLETE COLD AND HOT WATER PIPING SYSTEMS, APPURTENANCES AND INSULATION. PLUMBING FIXTURES AND EQUIPMENT AS SCHEDULED . COMPLETE NATURAL GAS PIPING SYSTEMS (AS APPLICABLE, REFER TO PLANS). TESTS AND ADJUSTMENTS. 2. BEFORE STARTING WORK, THIS CONTRACTOR SHALL EXAMINE THE ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL PLANS AND SPECIFICATIONS TO SEQUENCE, COORDINATE, AND INTEGRATE THE VARIOUS ELEMENTS OF THE PLUMBING SYSTEM, MATERIALS, AND EQUIPMENT WITH OTHER CONTRACTORS TO AVOID INTERFERENCES AND CONFRONTATIONS. 3. RELOCATION OF EXISTING WATER, GAS, WASTE, VENT, OR DRAINAGE LINES TO FACILITATE STORE DESIGN CRITERIA MUST BE INCLUDED IN BID PROPOSAL. PLUIrBING EQUIPMENT GENERAL PIPING REQUIREMENTS 1. GENERALLY, SANITARY AND POTABLE WATER TAPS WILL BE PROVIDED BY THE LANDLORD. FIELD VERIFY EXACT C{NNNECT I ON POINTS PR I OMR TO SUEN I TT I NG BID AND NOTIFY THE TENANT'S CONSTRUCTION MANAGER IF CONDITIONS ARE NOT AS SHOWN ON THE PLANS OR AS STATED IN THE SPECIFICATIONS. CONTRACTOR MIUST VERIFY THE OPERABILITY OF ENTIRE SYSTEM PRIOR TO TIE IN AS FOLLOWS: A. SNAKE SANITARY FOR A DISTANCE OF 100 FEET AND REPORT ANY BLOCKAGE. B. TEST WATER PRESSURE TO INSURE MINIMUMI OF 50 PSI. 2. AT COMPLETION OF THE PROJECT AND BEFORE F I NAL AI tPROAL, THE CONTRACTOR SHALL MAKE ANY FINAL CORRECTIONS TO DRAWINGS ANS CERTIFY THE ACCURACY OM: EACH PRINT BY SIGNATURE THEREON. THE DRAWINGS'ARE TO BE TURNED OVER TO THE TENANT. GUARANTEE 1. THE CONTRACTOR SHALL GUARANTEE ALL MATERIALS AI�WORK UNDER HIS CONTRACT AND SHALL MAKE GOOD, REPAIR OR REPLACE.AT HIS OWN EXPENSE, ANY DEFECTIVE WORK, MATERIAL, OR EQUIPMENT WHICH MAY BE DISCOVERED WITHIN A PERIOD OF 12 MONTHS FROM THE DATE OF.AC:IEPTANCE (IN WRITING) OF THE INSTALLATION BY THE TENANT'S CONSTRUCTION MANAGER. PROVIDE EXTENDED WARRANTIES AS SPECIFIED WITH INDIVIDUAL EQUIPMENT. IN CASE OF REPLACEMENT OR REPAIR OR EQUIPMENT DUE TO FAILURE WITHIN GUARANTEE PERIOD. GUARANTEE ON THAT PORTION�OF WORK SHALL BE EXTENDED FOR A PERIOD OF ONE (1) YEAR FROM DATE OF SUCH.REPLACEIETN OR REPAIR. OPERATIONS MANUALS 1. ONE COPY OF EACH OPERATION AND MAINTENANCE MANUAL FOR ALL EQUIPMENT FURNISHED ON JOB SHALL BE COLLECTED AND INSERTED IN A 3' THREE RING BINDER AND TURNED OVER TO THE TENANT. EACH NOTEBOOK SHALL INCLUDE BUT NOT BE LIMITED TO INSTALLATION, MAINTENANCE AND OPERATING INSTRUCTIONS, PAMPHLETS OR BROCHURES APPROVED SHOP DRAWINGS AND WARRANTIES OBTAINED FROM EACH MANUFACTUER OF PRINCIPAL ITEMS OF EQUIPMENT. SLEEVES 1. THE CONTRACTOR SHALL PROVIDE SLEEVES TO PROTECT EQUIPMENT OMR FACILITIES IN THE INSTALLATION. EACH SLEEVE SHALL EXTEND THROUGH IT'S RESPECTIVE FLOOR, WALL OR PARTITION AND SHALL BE'CUT FLUSH WITH EACH SURFACE EXCEPT SLEEVES TWAT PENETRATE THE FLOOR, WHICH SHALL EXTEND 2' ABOVE THE FLOOR. 2. ALL SLEEVES AND OPENINGS THROUGH FIRE RATED WALLS AND/OXR FLOORS SHALL BE FIRE SEALED WITH CALCIUM SILICATE, SILICONE 'RTV' FOAM, '3M' FIRE RATED SEALANTS OMR EQUAL, SO AS TO RETAIN THE FIRE RATING OF THE FLOOR OR WALL. CONFORM TO U.L. ASSEMBLY RATING OF FLOOR OMR WALL. 3. SLEEVES IN BEARING AND MASONRY WALLS, FLOORS, AND.PARTITIONIS SHALL BE STANDARD WEIGHT STEEL PIPE FINISHED WITH SMOOTH EDGES. FOUR OTHER THAN MASONRY PARTITIONS, THROUGH SUSPENDED CEILINGS, OCR FOR CONCEALED VERTICAL PIPING, SLEEVES SHALL BE NO. 22 U.S.G. GALVANIZED STEEL MINIMUM. 4. DUCT SLEEVES TO BE MINIMUM 14 GAUGE STEEL. i HANGERS I HANGERS SHALL INCLUDE ALL MISCELLANEOUS STEEL'SUCH AS ANGLE IRON, BANDS, C -CLAMPS WITH RETAINING CLIPS, CHANNELS. HANGER RODS, ETC., NECESSARY FOR THE INSTALLATION OF WORK. 2. HANGERS SHALL BE FASTENED TO BUILDING STEEL, CONCRETE, OR MASONRY, BUT NOT TO PIPING OR DUCTWORK. HANGING FROM:METAL DECK IS NOT PERMITTED. HANGERS MUST BE ATTACHED TO UPPER CHORD OF BAR JOIST. WHERE INTERFERENCES O CUR, IN ORDER TO SUPPORT DUCTWORK OMR PIPING, THE CONTRACTOR MUST INSTALL TRAPEZE TYPE HANGERS OR SUPPORTS WHICH SHALL BE LOCATED WHERE THEY DO NOT INTERFERE WITH ACCESS TO FIRE DAMPERS. VALVES, ACCESS DOORS AND OTHER EQUIPMENT SERVICE;' REQUIREMENTS AND/OR OTHER TRADES. HANGER TYPES MID INSTALLATION METHODS ARE SUJBJECT TO LANDLORD CRITERIA. 3. HANGERS FOR ALL INSULATED PIPING SHALL BE SIZED AND INSTALLED FOR THE GRATER DIAMETER OF INSULATION. INSTALL 6' LONG SPLIT CIRCLE GALVANIZED SADDLE BETWEEN THE HANGER AND THE PIPE INSULATION. 4. HANGERS AND PIPING OF DISSIMILAR METALS SHALL BE DI -ELECTRICALLY SEPARATED FROM ONE ANOTHER. 0. ACCESS DOORS P. FURNISH STEEL ACCESS DOORS AND FRAMES. MIN. 16' X 20' OR AS SHOWN ON DRAWINGS, TO GENERAL CONTRACTOR FOR ALL LOCATIONS WHERE NECESSARY TO PROVIDE ACCESS TO CONCEALED VALVES, AND OTHER EQUIPMENT REQUIRING SERVICE OR INSPECTION. LOCATION, TYPE, SIZE AND NUMBER AS DETERMINED BY CONTRACTOR AND APPROVED BY TENANT CONSTRICTION MANAGER TO SUIT EQUIPMENT REQUIREMENTS. GENERAL CONTRACTOR WILL INSTALL ACCESS DOORS AND FRAMES. 2. ACCESS DOORS LOCATED I N FIRE -RATED WALLS, FLOORS, CEILING -FLOOR OMR CEILING, -ROOF ASSEMBLIES SHALL BE FIRE RATED, UNDERWRITER'S LABORATORIES, INC., LISTED AND LABELED. 3. ACCESS DOORS SHALL BE FLUSH TYPE, MANUFACTURED FROM NO. 14 GAUGE STEEL, COMPLETE WITH FLUSH FLANGE TYPE FRAMES MANUFACTURED FROM NO. 16 GAUGE STEEL, PROVIDED WITH ANCHORS. ACCESS DOORS SHALL BE SUITABLE FOR INSTALLATION IN WALL OMR CEILING MATERIALS SHOWN IN ROOM FINISH SCHEDULES. ELLO:IKICAL WTORS 1. FURNISH, INSTALL AND ALIGN ALL MOTORS REQUIRED FGAR THIS EQUIPMENT. UNLESS THEY ARE FACTORY INSTALLED ON THE UNIT, ALL STARTERS AID ASSOCIATED WIRING AND SAFETY SWITCHES FOR SUCH MOTORS SHALL BE FURNISHED AND INSTALLED BY THE ELECTRICAL CONTRACTOR. STARTERS SHALL MEET ALL REQUIREMENTS AS DEFINED IN THE ELECTRICAL DIVISION OF THE SPECIFICATIONS. 2. DESIGN. CONSTRUCTIOMN AND PERFORMANCE CHARACTERISTICS OF MOTORS SHALL CONFORMI TO ALL APPL I CABLE PROV I S IONS OF LATEST NEMA, ANSI , I SEE STANDARDS FOR ELECTRICAL EQUIPMENT. ALL MOTORS,SHALL BE SUITABLE FOR OPERAT I ONN ON VOLTAGE VAR I AT I OV OF PLUS OMR MINUS ` 10X, 40 DEGREES C AMBIENT TEMPERATURE; HAVE A SERVICE FACTOR O" NOT LESS THAN 1.15. Q. LOW 1. VOLTAGE (24 VOLT) WIRING THE CONTRACTOR IS TO INSTALL ALL LOW VOLTAGE WIRING REQUIRED FOR HIS EQUIPMENT. THIS WORK INCLUDES ALL TRANSFORMERS AND DEVICES TO MAKE THIS A COMPLETE FUNCTIONAL SYSTEM. 2. ALL WORK IS TO CONFORM TO THE LATEST ADDITION N.E.0 AND TO DIVISION 16 ELECTRICAL SPECIFICATIONS. 3. ANY CONDUIT REQUIRED BY CODE OR THE LA DLORD WILL BE INSTALLED BY THE ELECTRICAL SUBCONTRACTOR. 2. INSTALL ALL NECESSARY PIPE HANGERS, SADDLES, AND CARRIERS TO PROPERLY SUPPORT ALL PIPING AND FIXTURES. HANGERS SHALL SUIT TYPE OF PIPING PROVIDED AND BE SPACED AT A MAXIMUM SPAN OF 5 FEET. PROVIDE SWAY AND SEISMIC BRACING WHERE REQUIRED BY CODES. DIVISION 15 - MECHNICAL SECTION 15300 FIRE PROTECTION SCOPE OF WORK A. 1 DIVISION 15 - MECHANICAL SECTION 15500 HEATING, VENTILATION, AND AIR CONDITIONING SCOPE OF WORK THE F.P. CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT, 1. SERVICES, TOOLS, TRANSPORTATION AND FACILITIES NECESSARY' FOR. REASONABLY IMPLIED AND INCIDENTAL TO, THE FURNISHING, INSTALLATION. COMPLETION AND TESTING OF ALL THE WORK FOR THE SPRINKLER SYSTEMS AS SHOWN ON THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS, AND AS REQUIRED BY JOB CONDITIONS, TO INCLUDE, BUT NOT BE LIMIITED TO THE FOLLOWING: (REFER TO RESPONSIBILITY SCHEDULE FOR EXACT RESPONSIBILITIES) A. INSTALLATION OF NEW WET SPRINKLER SYSTEM AS REQUIRED TO PROVIDE COVERAGE IN ACCORDANCE WITH NFPA-13, LOCAL CODES, LANDLORD'S CRITERIA, AND INSURANCE CARRIERS FOR THE MALL AND TENANT. B. TAPS, RISERS, LATERALS, BRANCHES, VALVES, ALARMS, SPRINKLER HEADS AND ALL COMPONENTS REQUIRED FOR A COMPLETE SYSTEM. C. DESIGN DRAWINGS, CALCULATIONS, SUBMITTALS AND APPROVALS. D. PERMITS, FEES, AND',CHARGES. E. TESTS AND TEST CERTIFICATES. F. COST FOR SHUT DOWN FEES. 2. THE CONTRACTOR THAT DOES THE ACTUAL SPRINKLER WORK IS REQUIRED TO BE A LANDLORD APPROVED SPRINKLER CONTRACTOR. 3. BEFORE STARTING WORK, THE CONTRACTOR SHALL EXAMINE THE ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL PLANS AND SPECIFICATIONS TO SEQUENCE, COORDINATE, AND INTEGRATE THE VARICUUS ELEMENTS OF THE FIRE PROTECTIOV SYSTEM, MATERIALS, AND EQUIPMENT WITH OTHER CONTRACTORS TO AVOID INTERFERENCES AND CONFRONTATIONS. 4. RELOCATION OF EXISTING MAINS, LATERALS, BRANCHES AND RISERS TO FACILITATE STORE DESIGN CRITERIA MUST BE INCLUDED. IN BID, PROPOSAL. . SHOP DRAWINGS THE FIRE PROTECTION CONTRACTOR SHALL PREPARE DETAILED SHOP DRAWINGS AND CALCULATIONS FOR HIS WORK. SUIBMIT SIX (6) COPIES TO GENERAL _. CONTRACTOR FOR APPROVAL. NO WORK SHALL BEGIN UNTIL"TENANT'S CONSTRUCTION MANAGER APPROVES HEAD AND PIPING LOCAT I ONS 3. ESCUTCHEONS SHALL BE CHROME PLATED, SIZE AS REQUIRED AND PLACED AT ALL PIPE PENETRATIONS AT WALLS, FLO RRS. AND CEILINGS IN FINISHED AREAS. FLASHING SHALL BE SEALED WATERTIGHT AND PERFO ED IN ACCORDANCE TO THE LANDLORD'S CRITERIA. USE A LANDLORD APPROVED ROFING CONTRACTOR WHERE APPLICABLE. 4. D. PIPING SANITARY PIPING - NO PVC ALLOWED (STORM PIPING AS REQUIRED) A. WASTE, DRAIN AD VENT PIPING SHALL BE SERVICE WEIGHT, CAST IRON SOIL PIPE. VENT PIPING ABOVE FLOOR 2' OR SMALLER MAY BE GALVANIZED STEEL. B. JOINTS: BELOW FLOOR SLAB - BELL AND SPIGOT WITH CAULKED JOINTS PER CODE. C. PITCH WASTE LINES 2' AND SMALLER NOT LESS THAN 1/4' PER FOOT. PITCH LARGER MAINS NOT LESS THAN 1/8' PER FOOT. D. INSTALL A CLEANOUT AT BASE OF EACH SOIL STACK, AT EACH CHANGE IN DIRECTION, AT INTERVALS NOT OVER 50 FEET, AND ELSEWHERE AS SHOWN ON DRAWINGS OR REQUIRED BY LOCAL CODE. CLEANOUTS SWILL NOT BE INSTALLED IN PUBLIC AREAS WITHOXUT SPECIFIC PERMISSION BY TENANT'S CONSTRUCTION MANAGER; BUT WHERE NECESSARY, THE WALL COVERS ARE TO BE STAINLESS STEEL AND THE FLOOR COVERS ARE TO BE BRASS (FLUSH WITH FINISHED FLOOR). PROVIDE COVERS WITH INSET AREA FOR CARPETED FLOOR LOCATIONS. ALL CLEAN-OUT LOCATIONS SHALL BE APPROVED BY THE TENANT'S CONSTRUCTION MANAGER. E. INSULATE ALL HORIZONAL RUNS OF PIPING LOCATED IN CEILING SPACES WHEN APPLICABLE. INSULATION TO BE AS SPECIFIED FOR WATER PIPING. F. INSULATE THE TRAP, SANITARY AND SUPPLY PIPES UNDER LAVATORY WITH 1/2' ARMSTRONG 'ARMAFLEX' PIPING INSULATION OR TRUEBRO MODEL 102W 'HANDI LAV GUARD' INSULATION KIT. 2. CONDENSATE PIPING SHALL BE TYPE 'L' DRAWN COPPER TUBE WITH 955 TIN - ANTIMONY SOLDERED JOINTS AND WROUGHT COPPER FITTINGS WITH DIELECTRIC SEPARAT I ON BETWEEN DISSIMILAR METALS. 3. POTABLE WATER PIPING: A. BELOW GRADE: TYPE 'K', ANNEALED TEMPERED COPPER TUBE FOR PIPE SIZES 2 INCHES AND SMALLER. BRAZE ALL JOINTS. B. ABOVE GRADE: TYPE 'L' DRAWN COPPER TUBE WITH WROUGHT COPPER FITTINGS AND 95 5 TIN -ANTIMONY SOLDER.. C. INSTALL AIR CHAMBER SHOCK ABSORBERS IN PIPING SYSTEM TO PREVENT NOISE AND DAMAGE DUE TO WATER HAMMER. D. ALL BRANCH PIPING SYSTEM SHALL HAVE ACCESSIBLE SERVICE VALVE. PROVIDE SHUT OFF VALVES IN THE SUPPLY PIPING TO EVERY FIXTURE. PROVIDE ACCESS DOORS WHERE NECESSARY. E. PROVIDE WATER METER AND REMOTE READER PER LANDLORD'S CRITERIA OR LOCAL UTILITIES�REQUIREMENTS IF APPLICABLE. REFER TO PLANS TO DETERMINED IF WATER METER IS REQUIRED. F. SECURE PIPE AT ANGLE STOPS. G. PROVIDE FLEXIBLE INSERTS AT ALL PIPE PENETRATIONS THROUGH FRAMING TO KEEP PIPES FROM HITTING FRAME WHEN IN OPERATION. 4. GAS PIPING 2. THE FIRE PROTECTION CONTRACTOR IS RESPONSIBLE FOR SUBMITTING COORDINATED DRAWINGS, CALCULATIONS, HEAD TYPES AND COLORS TO ALL AUTHORITIES HAVING JURISDICTION FOR APPROVAL. NO KR K SHALE BEGIN UJNTIL ALL APPROVALS HAVE BEEN RECEIVED. 3. A COPY OF THE LETTER OF APPROVAL FROM THE LANDLORD'S INSURANCE RATING BUREAU SHALL BE FORWARDED TO THE LANDLORD'S AGENT AND TO THE TENANT'S CONrSTRUCTION MANAGER. C. EQUIPMENT SPRINKLER HEADS: A. ALL SPRINKLER HEADS SHALL BE NEW (EXISTING HEADS SHALL BE REPLACED AS NECESSARY), U.L., F.M. LISTED AND A PROVED AUTOMATIC SPRAY TYPE AS MANUFACTURED BY CENTRAL SPRINKLER CO.. GLOBE, GRINNELL, RELIABLE, STAR, OMR VIKING. B. ALL SPRINKLER HEADS SHALL BE RATED FOR 165'F UNLESS INDICATED OTHERWISE ON DRAWINGS OR REQUIRED BY LOCAL CODES. C. ALL SALES FLOORS HEADS ARE TO HAVE BE FACTORY APPLIED�COLOR FINISH TO MATCH ARCHITECTURAL CEILING FINISH. VERIFY HEAD TYPES AND COLORS WITH TENANT'S CONSTRUCTION MANAGER AND SUBMIT WITH SPRINKLER DRAWINGS FOR PERMIT. D. SPRINKLER HEAD TYPES SHALL BE AS FOLLOWS: 1. FINISHED CEILING (SALES AREA) - FULLY' RECESSED/CONCEALED TYPE 2. FINISHED CEILING NON -SALES AREA) - SEMI -RECESSED TYPE 3. NO -CEILING - CHROME UPRIGHT TYPE. NOTE:SEMI-RECESSED HEADS SHALL PROTRUDE NO MORE THAN 1' BELOW LEVEL OF CEILING OF SOFFIT. ALL HORIZONTAL SPRINKLER RUNS AT SIDEWALL SOFFITS SHALL BE CONCEALED WITHIN SOFFIT FRAMING. D. GENERAL PIPING A. PROVIDE A COMPLETE GAS PIPING SYSTEM IF APPLICABLE. REFER TO PLANS TO DETERMINE IF A GAS SYSTEM IS REQUIRED. B. LOW PRESSURE (14' W.C. AND BELOW) GAS LINES SHALL BE BLACK STEEL, SCHEDULE 40. ASTM A-120, WITH MALLEABLE THREADED FITTINGS FOR 2' AND SMALLER, AND WITH WELDED JOINTS FOR X1/2' AND LARGER. MEDIUM PRESSURE (ABOVE 14' W.C.) SHALL WOVE WELDED JOINTS. C. PROVIDE A GAS COCK, DIRT LEG. AND UNION CONVECTION TO EACH PIECE OF EQUIPMENT. PROVIDE GAS METER A D/OR REGLATOR AS REQUIRED . REGLATOR TO BE VENTED TO THE EXTERIOR. D. PITCH PIPING AT A UNIFORM GRADE OF 1/4' IN 15 FEET UPWARD IN E. DIRECTION OF FLOW. SUPPORT PIPING EVERY 5 FEET. SUPPORT AS REQUIRED BY LANDLORD CRITERIA, AS DETAILED ON DRAWINGS, OR BY STANDARD INDUSTRY PRACTICE, WHICHEVER IS MORE STRINGENT. E. GAS PIPING EXPOSED ON ROOF MUST BE PAINTED WITH RUST -INHIBITING PAINT. F. INSTALLATION, TESTING AND PURGING OF GAS PIPING SHALL BE DONE PER THE REQUIREMENTS OF THE LOCAL GAS COMPANY, LOCAL CODES, AND APPLICABLE NFPA 54 CODES. G. CONTACT AND COORDINATE GAS SERVICE AND METER REQUIREMENTS WITH THE LOCAL GAS COMPANY AND THE WILL'S MANAGER PRIOR TO BID. 5. INSULATION F. A. INSULATE ALL WATER AND INTERIOR CONDENSATE PIPING WITH 1' THICK (K=0.23 0 75 F) SNAP-ON FIBERGLASS PIPE INSULATION WITH AN ALL SERV ICE JACKET TO MEET LOCAL COXES AND U. FLAE SPREAD RATING OF 25 AND SMOKE DEVELOPED RATINGS OF 50. APPROVED MAANIFACTURER: MANVILLE MICRO -LOO. 6. TEST A STERILIZATION A. LEAKAGE TESTS SHALL BE PER LOCAL CODES, MINIMUM AS FOLLOWS: 1. TEST POTABLE WATER PIPING AND CONDENSATE PIPING AT 125 PSIG FOR SIX HOURS. 2. TEST DRAIN, WASTE, VENT PIPINNG BY A 10' WATER COLUMN FOR TWO HOURS. ALL JOINTS SHALL BE GAS AD WATER TIGHT. 3. TEST GAS PIPING WITH PER TEPA 54 CODES. 4. STERILIZE POTABLE HOT A COLD WATER LINES UPON COMPLETION OF SYSTEM. STERILIZE WATER SYSTEM IN ACCORDANCE WITH LOCAL CODES. 1 A FIRE PROTECTION SYSTEM STUB IN SHALL BE FURNISHED a THE LANDLORD. SPRINKLER SPACING SHALL NOT EXCEED 130 SQ. FT..IN 'SALES' AREAS AND 100 SQ. FT. IN 'STOCK' AREAS. COMPLY WITH LANDLORD'S DESIGN CRITERIA. PIPE SIZING SHALL BE BASED OMI NFPA ORDINARY HAZARD. 2. ALL SPRINKLER LINES SHALL BE INSTALLED CONCEALED, AVOIDING INTERFERENCE WITH LIGHTS, DUCTS, PIPES, STORAGE DECMK. ETC. FIRE PROTECTION CONTRACTOR SHALL PREPARE COORDINATED SHOP DRAWINGS INDICATING THE LOCATIONS OF ALL SPRINKLER HEADS,,SPRINKLER LINES, LIGHTS, DIFFUSERS, GRILLES AND REGISTERS PRIOR TO .INZTALLATIOV. HORIZONTAL SPRINKLER RUNS AT MERCHANDISE SOFFITS SHALL BE PLACED INSIDE SOFFIT STRUCTURE. VERTICAL DROPS FROM CEILING TO MERCHANDISE SOFFIT SHALL BE LOCATED FLUSH AGAINST DEMISING WALLS. 3. WHERE POSSIBLE, REWORK THE EXISTING SPRINKLER SYSTEM TO MEET THE NEW REQUIREMENTS OF THIS DESIGN. RELOCATE ALL MAINS AND BRANCHES INTERFERING WITH CEILING HEIGHTS, EQUIPMENT, AND MAJOR COMPONENTS INCLUSIVE OF ADJACENT TENANTS AND MALL COI/MON AREAS. REMOVE ALL UNUSED PIPING. 4. LOCATIONS OF ALL HEADS SHOULD BE APPROVED BY THE LOCAL FIRE PROTECTION OFFICIAL AD THE TENANT'S CONSTRUCTIOINN MANAGER BEFORE INSTALLATION. HEADS MUST BE LOCATED IN THE CENTER OF CEILING TILES A D IN A SYMMETRICAL PATTERN WITH OTHER CEILING FIXTURES. ADDITIONAL MONIES WILL NOT BE ALLOCATED FOR ADDITIONAL HEADS REQUIRED BY FIELD FIRE INSPECTOR AFTER BIDS ARE ACCEPTED. HEADS IN MERCHANDISE BAYS SHALL BE CENTERED SIDE TO SIDE AND FRONT TO BACK. 5 PROVIDE AND INSTALL A VALVED TEST CONVECTION FOR THE SPRINKLER SYSTEM AS REQUIRED OR REQUESTED BY THE MALL. LOCAL INSPECTOR, OR INSURANCE CARRIER. COORDINATE LOCATION WITH TENANT'S CONSTRUCTION MANAGER AND LOCAL FIRE PROTECTION OFFICIAL PRIOR TO ROUGH -IN. 6. SPRINKLER HEADS LOCATED IN STOCK, CORRIDOR ON TOILET ROOM CEILINGS OR WALLS BELOW 8'-0' ABOVE THE FINISHED FLOOR ARE TO BE PROTECTED WITH APPROVED GUARDS. PIPING: 1. 2. 3. 4. SCHEDULE 40, BLACK STEEL PIPE, ASTM A-53 FOR FERROUS PIPING, WELDED AND SEALESS, ANSI B-36-10-70 FOR WROUGHT STEEL PIPE. CAST IRON OR MALLEABLE IRON SCREWED FITTINGS FOR PIPES 2 INCHES AND SMALLER. SCREWED OR CAST IRON FLANGED JOINTS FOR PIPES LARGER THAN 2 INCHES. GALVANIZED OR BLACK MALLEABLE IRON WITH BRASS SEAT SCREWED UNIONS FOR PIPES 2 INCHES AND SMALLER. VICTAULIC TYPE COUPLINGS ARE ACCEPTABLE, WHERE APPROVED BY (ODE AND THE LANDLORD. TESTS 1. WHEN COMPLETED. THE ENTIRE FIRE PROTECTION PIPING SYSTEM SHALL BE HYDROSTATICALLY TESTED AS REQUIRED BY THE RULES AND REGULATIONS OF THE AUTHORITIES HAVING JURISDICTION. SYSTEM SHALL SHO AD SIGNS OF LEAKAGE OR OTHER DEFECTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGE TO THE WORK OF THE OTHER CONTRACTORS OR TO TIE BUILDING. OR TO ITS CONTENTS, PEOPLE, ETC., CAUSED BY LEAKS IN ANY O" THE EQUIPMENT INSTALLED BY HIM. ALL REPAIRS OR REPLACEMENT OF DAMAGES SHALL BE AT THIS CONTRACTOR'S EXPENSE. 2. PROPERLY COMPLETED AND SIGNED 'SPRINKLER CONTRACTOR'S MATERIAL AND TEST CERTIFICATES' SHALL BE FURNISHED TO THE LANDLORD, AUTHORITIES HAVING JURISDICTION, AND TENANT'S CONSTRUCTION MANAGER. B. C. THE HVAC CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, TOOLS, TRANSPORTATION AND FACILITIES NECESSARY FOR, REASONABLY IMPLIED AND INCIDENTAL TO, THE FURNISHING, INSTALLATION, COMPLETION AND TESTING OF ALL THE WORK FOR THE MECHANICAL SYSTEMS AS SHOWN ON THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS, AND AS REQUIRED BY JOB CONDITIONS, TO INCLUDE, BUT NOT BE LIMITED TO THE FOLLOWING:(REFER TO RESPONSIBILITY SCHEDULE FOR EXACT RESPONSIBILITIES) B. C. D. E. F. G. H. I. J. K. ROOFTOP UNITS, EQUIPMENT, AND APPURTENANCES. DUCTWORK, FITTINGS, DAMPERS, AND INSULATION. HYDRONIC PIPING AND INSULATION (AS APPLICABLE, REFER TO PLANS). REFRIGERANT PIPING (AS APPLICABLE, REFER TO PLANS). DIFFUSERS, GRILLES, AND REGISTERS. CURBS AND STEEL FRAMING FOR SUPPORT (AS APPLICABLE, REFER TO PLANS). TESTING, ADJUSTING, AND BALANCING. OPERATIONS MANUALS. TEMPERATURE CONTROLS AND RELATED DIAGRAMS. SEQUENCES Cf OPERAT I ODN . CONNECTION TO ANY LANDLORD ENERGY MANAGEMENT SYSTEM. 3. BEFORE STARTING WIORK, THIS CONTRACTOR SHALL EXAMINE THE ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL PLANS AD SPECIFICATIONS TO SEQUENCE, COORDINATE, AND INTEGRATE THE VARIOUS ELEMENTS OF THE HVAC SYSTEM, MATERIALS, AND EQUIPMENT WITH OTHER CONTRACTORS TO AVOID INTERFERENCES AND CONFRONTATIONS. HVAC EQUIPMENT PRIMARY HEATING, VENTILATION AND AIR CONDITIONING UNITS. A. PRIMARY HEATING, VENTILATION, AND AIR CONDITIONING UNITS ARE TO BE BY CARRIER AS SCHEDULED. ALL COMPRESSORS ARE TO INCLUDE A 5 -YEAR EXTENDED WARRANTY. B. EQUALS EQUIPMENT AS MANUFACTURED BY TRANE OMR YORK ARE ACCEPTABLE. C. ALL EQUIPMENT SHALL BE COMPLETE IN EVERY RESPECT WITH ALL DEVICES, APPURTENANCES, AND ACCESSORIES PROVIDED TO MEET THE DESIGN INTENT AND OPERATION OF THE SYSTEMS SHOWN ON THE DRAWINGS AND SPECIFIED HEREIN. D. EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS. ALL AIR CONDITIONING EQUIPMENT MUST HAVE A CONDENSATE DRAIN AND BE TRAPPED IN ACCORDANCE WITH MANUFACTURERS DATA. SEE DRAWINGS FOR ADDITIONAL DETAILS. E. SECONDARY DRAIN PANS ARE REQUIRED TO BE INSTALLED BENEATH ALL INDOOR AIR CONDITIONING EQUIPMENT WITH THE EXCEPTION OF VAV BOXES. SECONDARY PMIS ARE TO PROTECT ENTIRE UNIT. PROVIDE CONDENSATE PUMPS, AS REQUIRED. CONDENSATE SHALL BE DIRECTED TO MOP SINK OR AS SPECIFIED ON PLANS. 2. VARIABLE AIR VOLUME BOXES (VAV) A. WHERE SHOWN ON DRAWINGS, PROVIDE VAV BOXES COMPLETE WITH CONTROLS, HEATING COILS (FANS AS REQUIRED). ALL DUCT CONNECTIONS FLEXIBLE DUCT/PIPE CONNECTIONS SWILL BE PROVIDED BY THE CONTRACTOR. 3. TOILET EXHAUST FANS A. WHERE SHOWN ON DRAWINGS, PROVIDE A TOILET EXHAUST FAN UNIT COMPLETE WITH GRAVITY BACK DRAFT DAMPERS. ALL DUCTWORK, ROOF' OPENINGS AND CAPS NECESSARY TO PROVIDE A COMPLETE EXHAUST SYSTEM SHALL BE PROVIDED BY THE CONTRACTOR. REFER TO PLANS FOR APPLICABILITY. 4. BASEBOARD, CABINET, AND UNIT HEATERS . A. WHERE SHOWN ON DRAWINGS, PROVIDE ELECTRIC HEATERS COMPLETE WITH ELECTRIC HEATING COIL, CONTROLS, AND INTEGRAL THERMOSTAT. 5. INLINE PUMPS A. WHERE SHOWN ON DRAWINGS PROVIDE AN INLINE CLOSE COUPLED PUMP(S), BRONZE FITTED, PUMPS SHALL BE FURNISHED WITH BRONZE CASE WEARING RINGS, BRONZE SHAFT SLEEVE AND MECHANICAL SHAFT SEAL RATED FOR. PUMPS TO BE SO CONSTRUCTED THAT THEY MAY BE MOUNTED IN A HORIZONTAL OR VERTICAL PIPE LINE. MOTOR TO BE 1750 RPM UNLESS NOTED OTHERWISE. 6. VIBRATION ISOLATION DEVICES A. VIBRATION ISOLATION DEVICES SHALL BE PROVIDED IN ALL SUPPORTS BETWEEN VIBRATING EQUIPMENT (FANS, ROOFTOP UNITS, AIR HANDLERS, FAN POWERED VAV BOXES, ETC.) AND STRUCTURE. B. VIBRATING EQUIPMENT HUNG FROM STRUCTURE SHALL BE ISOLATED WITH RUBBER AND SPRING DEVICES. VIBRATING EQUIPMENT SUPPORTED FROM FLOOR OR DECK SHALL BE ISOLATED WITH HOUSED SPRING MOU T DEVICES. C. EXAMINE DEAD LOAD AND OPERATING LOAD CONDITIONS WHEN SELECTING DEVICES. ADJUST FOUR PROPER ALIGNMENT AND LOADING. AVOID 'GROUNDING' THE ISOLATOR. D. CHECK HANGER ROD SIZE FOR ALLOWABLE LOADS AT THE ISOLATING DEVICE AND AT THE UPPER AND LOWER ATTACHMENTS TO STRUCTURES, DUCTS, EQUIPMENT, ETC. E. CONSULT MANUFACTURER FOR APPLICATION DATA. 7. CURBS AND STEEL FRAMING FOR SUPPORT A. THIS CONTRACTOR WILL PROVIDE ALL NECESSARY CURBS MD STEEL FRAMING REQUIRED TO INSTALL ALL HVAC EQUIPMENT AS DESCRIBED OR IMPLIED ON THE DRAWINGS. CURBS SHALL BE A MINIMUM OF 14' HIGH, OF THE SAME MANUFACTURER OF TIHE EQUIPMENT SUPPORTED. INSULATE UNDER THE COMPRESSOR SECTION TO PREVENT CONDENSATION. ALL CURBS MUST BE INSTALLED SO THAT TOP OF CURBS ARE 'DEAD' LEVEL. ALL PENETRATIONS OF EXISTING STRUCTURE SHALL BE DONE IN ACCORDANCE TO THE LANDLORD'S GUIDELINES AT THIS CONTRACTOR'S EXPEL. METAL DUCTWORK - ND FIBERGLASS DUCT ALLOWED 1. NO DUCTWORK SHALL BE FABRICATED PRIOR TO APPROVAL BY THE TENANT'S CONSTRUCTION MANAGER. SIGNIFICANT DEVIATIONS FROM DESIGN MiUST BE APPROVED BY TENANT'S CONSTRUCTION MANAGER PRIOR TO FABRICATION OR INSTALLATION. ALL DUCT MAINS ARE TO BE RECTANGULAR UNLESS NOTES OTHERWISE. ALL DUCT BRANCHES TO DIFFUSERS ARE TO BE ROUND RIGID DUCT. 2. EXCEPT AS OTHERWISE INDICATED, FABRICATE AND INSTALL RECTANGULAR DUCTS WITH GALVANIZED SHEET STEEL. IN ACCORDANCE WITH SMACNA 'HVAC DUCT CONSTRUCTIOINN STANDARDS' OF THE LATEST EDITION. CONFORM TO THE REQUIREMENTS IN THE REFERENCED STANDARD FOR METAL THICKNESS, REINFORCING TYPES AND INTERVALS, TIE ROM) APPLICATIONS, AND JOINT TYPES AMD INTERVALS. 3. EXCEPT WHERE OTHERWISE INDICATED, CONSTRUCT DUCT SYSTEMS TO THE FOLLOWING PRESSURE CLASSIFICATIONS: (VERIFY WHETHER RETURN OR EXHAUST DUCT IS POSITIVE OMR NEGATIVE PRESSURE). A. SUPPLY DUCTS: 2 INCHES WATER GAUGE, POSITIVE PRESSURE B. RETURN AND EXHAAUST DUCTS: 2 INCHES WATER GAUGE, NEGATIVE PRESSURE. PRESSURE TEST DUCTS FOUR LEAKAGE. REMAKE LEAKING JOINTS AND APPLY SEALANTS AS REQUIRED TO FABRICATE A SYSTEM THAT DOES NOT EXCEED 5M LEAKAGEEOMR LESS AS STATED BY PRESSURE CLASS RATINGS IN SMACNA STANDARDS. 4. ASA MINIMUM. CROSSBREAK ALL FLAT SURFACES OR REINFORCE WITH A BEAD APPROXIMATELY 3/8' WIDE X 3/16' DEEP ON 12' CENTERS TO PREVENT VIBRATIONS. 5. INSTALL DOUBLE THICKNESS TURNING VANES IN ALL RIGHT ANGLE ELBOWS. 6. INSTALL RIGID ROUD AND RECTANGULAR METAL DUCT WITH SUPPORT SYSTEMS INDICATED IN SMACNA STADARDS. SUPPORT HORIZONTAL DUCTS WITHIN 2 FEET OF EACH ELBOW AND WITHIN 4 FEET OF EACH BRANCH INTERSECTION USING DOUBLE STRAP HANGERS ON EACH SIDE OF FITTING. SUPPORT VERTICAL DUCTS AT A MAXIMA INTERVAL OF 16 FEET AND AT EACH FLOOR. NO WOO) SHALL BE USED TO SUPPORT OMR BRACE DUCTS. PROVIDE SWAY AND SEISMIC BRACING AS REQUIRED BY STATE AND LOCAL CODES OR BY LANDLORD. 7. WHERE DUCTS PASS THROUGH ROOM'S MD FLOORS, PROVIDE AS M I N I MUMU 1- 1/2'X1-1/2' X1/8' STEEL ANGLE FRAMES AT EACH SIDE OF OPENING. THE ANNULAR SPACE BETWEEN DUCT AND ANGLE FRAMES SHALL BE CAULKED WITH SILICONE SEALANT OR FIREPROOFED AS REQUIRED BY ASSEMBLY FIRE RATING. 8. ALL TRAVERSE JOINTS AND SEAMS IN SUPPLY AIR DUCT SHALL BE SEALED AIR TIGHT WITH DAP CMC DUCT SEALER. JOINTS ALSO SHALL BE RIVETED OR CONNECTED WITH SHEET METAL SCREWS. 9. SOFT ELASTOMER BUTYL GASKET WITH ADHESIVE BACKING SHALL BE USED TO SEAL FLANGED JOINTS. 10. DUCT TRANSITIONS SHALL NOT EXCEED 30 DEGREES SLOPE EXCEPT AS SPECIFICALLY NOTED OTHERWISE. 11. PROVIDE ACCESS TO ALL MOTORIZED DAMPERS, FIRE DAPERS, CONTROLS, AND OTHER ITEMS IN DUCTWORK THAT REQUIRE SERVICE OR INSPECTION. IF THE ACCESS PANEL LOCATION IS EXPOSED TO THE SALES AREA, IT MUST BE APPROVED BY THE TENANT'S CONSTRUCTION MANAGER PRIOR TO INSTALLATION. LAY -IN SUPPLY AND RETURN AIR DIFFUSERS, GRILLES AND REGISTERS WITH PLASTER FRAMES MAY BE USED AS ACCESS LOCATIONS. D. 12. FLEXIBLE CONNECTIOrS A. FLEXIBLE COLLARS SHALL BE PROVIDED IN ALL CONNECTIONS BETWEEN VIBRATING EQUIPMENT (FANS, ROOFTOP UNITS, AIR HANDLERS, FAN POWERED VAV BOXES. ETC.) AND DUCTS OR CASINGS. ALSO, PROVIDE FLEXIBLE CONNECTIONS WHERE DUCTS CROSS BUILDING EXPANSION JOINTS. B. FLEXIBLE CONNECTIONS SHALL CONSTRUCTED OF NEOPRENE -COATED FLAMEPROOF FABRIC. PROVIDE ADEQUATE JOINT FLEXIBILITY; TO ALLOW FOR MOVEMENT AND PREVENT THE TRANSMISSION OF VIBRATION. C. FLEXIBLE CONNECTION IS TO BE RATED FOR THE OPERATING PRESSUARE OF THE SYSTEM. 13. FIRE DAMPERS A. PROVIDE PRIMARY FIRE DAMPERS WHERE INDICATED OR RE IVIED BY QU.. CODES. DAMPERS SHALL BE DESIGNED FOR HORIZONTAL OR VERTICAL. FLOW OF AIR AS REQUIRED. FIRE DAMPERS SHALL BE UL LABELED..', B. FIRE DAMPERS SHALL HAVE THE BLADES OUT OF THE AIRSTREAM AND A 165'F FUSIBLE LINK, TYPE A, AS MINIMUM. 'j C. PROVIDE ALL NECESSARY FRAMING AND SLEEVES FOR DAMPER'MOUNTING PER UL AND CODE REQUIREMENTS. D. PROVIDE DUCT ACCESS DOORS IN AN ACCESSABLE LOCATION FOR ALL FIRE DAMPERS. DOOR IS TO BE 20 GA GALVANIZED DOOR WITH QUICK -OPENING LATCH AND PIANO HINGE. t 14. FLEXIBLE AIR DUCT A. FLEXIBLE AIR DUCT SHALL BE 1' INSULATED CLASS 1 AND RATTED FGR THE OPERATING PRESSURE OF THE SYSTEM. DUCT CONSTRUCTION TERIAL (PLASTIC, CLOTH, ALUMINUM) MUST ADHERE TO LOCAL CODES 'AND LANDLORDS REQUIREMENTS AND BE INCLUDED AS SUCH IN TIE BID. B. FLEXIBLE AIR DUCT MAZY ONLY BE USED IN VERTICAL APPLICATIONS WITH PRIOR APPROVAL FROM TENANT'S CONSTRUCTION MANAGER. C. FLEXIBLE DUCT SHALL NOT EXTEND OVER 5'-0' IN LENGTH ATANY ONE LOCATION. 15. SUPPLY AIR TAKE -OFF FITTINGS A. PROVIDE CONICAL OR 'BELL -MOUTH' TAKE -OFFS FROM MAIN D`TWORK�TO , ll,�� ROUND BRANCHES. INSTALL PER MANUFACTURERS I NSTRUCTI:ONS. B. PROVIDE 45' RECTANGULAR TAKE -OFFS FROM MAIN DUCTWORK TJ RECTANGULAR BRANCHES. 16. DAMPERS A. PROVIDE MANUAL LOCKING QUADRANT VOLUME CONTROL DAMPERS WITH HADLE OPERATORS IN EACH BRANCH DUCT AND AS SHOWN ONN PLANS TO FACILITATE AIR BALANCING. B. WHERE ACCESS TO BALANCING DAMPER IS RESTRICTED, YOUNG'S REGULATORS SHALL BE USED. C. ALL RECTANGULAR DAMPERS IN OUTSIDE AIR.. RELIEF AIR, CR RETURN AIR DUCTS ARE TO BE OF OPPOSED BLADE TYPE. ALL OUTSIDE AIR DUCT DAMPERS MUST ALSO BE OF THE LOW LEAKAGE TYPE. D. ALL MOTORIZED DAMPERS NOT FURNISHED WITH EQUIPMENT ARE TO BE HONEYWELL DAMPERS. 17. DIFFUSERS, GRILLES, AD REGISTERS A. PROVIDE DIFFUSERS GRILLES AND REGISTERS AS SCHEDULED. 'DEVICES TO BE COMPLETE WITH DAMPERS FRAMES AND ALL ACCESSORIES. FINISH AS INDICATED. B. INSTALL ALL AIR DEVICES AS LOCATED ON THE ARCHITECTURAL REFLECTED CEILING PLAN. C. APPROVED MANUFACTURERS: TITUS IS SPECIFIED, EQUALS BY ETALAIRE OR KRUEGER IS ACCEPTABLE. 18. MEDIUM PRESSURE DUCT A. WHERE DUCCTWORK IS SPECIFICALLY NOTED AS MEDIUM PRESSURE, IT SHALL BE CONSTRUCTED IN ACCORDANCE WITH SMACNA STANDARDS FOR A PRESSURE RATING OF 3 INCHES WATER COLUMN MINIMA OR LARGER AS REQUIRED BY LANDLORD. B. ALL GAUGES AND REINFORCEMENT MUST MEET WITH THE LATEST EDITION OF SMACNA STADARDS FOR MEDIUM PRESSURE DUCT AND WITH THE LANDLORD'S CRITERIA. C. ALL OTHER ITEMS FROM METAL DUCTWORK SPECIFICATION SECTION APPLY TO THIS SECTION 19. DUCTWORK INSULATION A. INSTALL INSULATION PRODUCTS IN ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS, AD IN ACCORDANCE WITH RECOGNIZED INDUSTRY PRACTICES. INLSULAT I ON MUST COMPLY WITH NEPA 90A. B. DUCT SIZES SHOWN ON DRAWINGS ARE INSIDE CLEAR DIMENSIONS. INSULATE SUPPLY AND RETURN AIR RECTANGULAR DUCTWORK. DUCTWORK SHALL BE INTERNALLY LINE WITH 1' THICK ACCOUSTICAL LINER. IF REQUIRED, DUCTWORK SHALL BE EXTERNALLY WRAPPED WITH,1 1/2' THICK, FOIL FACED FIBERGLASS INSULATION IN PLACE OF ACCOUSTICAL LINER. C. ALL ROUND AND OUTSIDE AIR DUCTWORK ABOVE THE CEILING SHALL BE EXTERNALLY INSULATED WITH A MINIMA OF 1' THICK, 1-1/2LB. DENSITY (R�.6) DUCT WRAP WITH VAPOR BARRIER. VAPOR BARRIER IS TO BE MAINTAINED THROUGHOUT DUCT SYSTEM. ALL JOINTS MUST BE TAPED SO THAT NO INSULATION FIBER IS VISIBLE. EXTEND DUCTWORK INSULATION WITHOUT INTERRUPTION THROUGH WALLS, FLOORS, AND SIMILAR PENETRATIONS. D. DUCTWORK LOCATED IN THE CONDITIONED SPACE SHALL NOT BE INSULATED UNLESS OTHERWISE NOTED OV PLANS. INSULATE ALL DUCT DROPS OR THE FIRST 20 FEET OF DUCT AT THE HVAC UNITS IN ALL CASES. E. ALL INSULATION SHALL HAVE A FLAME SPREAD RATING OF NOT MORE THOU 25 AND A SMOKE DEVELOPED RATING OF NO HIGHER THAN 50 WHEN TESTED IN ACCORDANCE WITH ASTM C 411, OR AS REQUIRED BY LOCAL CODES. 20. SYSTEM CLEANOUT A. DUCTWORK AND AIR HANDLING EQUIPMENT IS TO BE CLEANED OUT AND BLOMM OUT BEFORE PAINTING IS STARTED BY THE GENERAL CONTRACTOR. B. FILTERS MUST BE IN UNITS AT ANY TIME FANS ARE OPERATED. HYDRONIC PIPING NSA 1. PROVIDE A COMPLETE HYDRONIC PIPING SYSTEM IF APPLICABLE. REFER TO PLANS TO DETERMINE IF A HYDRONIC SYSTEM IS REQUIRED. 2. PIPING A. HYDRONIC PIPING FOR CHILLED WATER AND/OR HEATING WATER AND/OR CONDENSER WATER SHALL BE ASTM A-120, SCHEDULE 40, ERN,,BLACK STEEL PIPE WITH PLAIN ENDS. INSTALL STEEL PIPE WITH WELDED JOINTS WHERE PIPE IS 2-1/2 INCH AND LARGER. INSTALL STEEL PIPE WITH THREADED JOINTS AND FITTINGS OR INSTALL TYPE 'K' ANNEALED TEMPERED COPPER TUBE WITH SILFOS JOINTS FOR 2 INCH AND SMALLER PIPE. PROVIDE DIELECTRIC UNIONS BETWEEN DISSIMILAR METALS. ALL PIPING SHALL BE I N STRICT CONFORMIANCE WITH ASTM, ASA, AND LANDLORD'S REQUIREMENTS, WHICHEVER IS MOST STRINGENT. 'UNIONS OR FLANGES MUST BE USED AT EQUIPMENT CONNECTIONS WHERE SERVICE OR REMOVAL MAY BE REQUIRED. B. ALL PIPING AND EQUIPMENT SHALL BE PRESSURE TESTED WITHOUT LEAKAGE AT A MINIMA PBEtagE OF 125 PSI. C. ALL HYDRONIC PIPING AND EQUIPMENT CONNECTED TO THE HVAC PIPING SYSTEM SHALL BE CLEANED AND FLUSHED. REMOVE, CLEAN, AN) REPLACE STRAINER SCREENS. FILL TENANT'S SYSTEM WITH DOMESTIC�WATER AND VENT ALL PIPING AND EQUIPMENT PRIOR TO CONNECTION TO THE LANDLORD'S SYSTEM. CONTRACTOR SHALL NOT FILL TENANT'S','SYSTEM WITH WATER FROM THE LANDLORD'S SYSTEM UNLESS SPECIFICALLY INSTRUCTED TO DO SO FROM THE LANDLORD'S FIELD REPRESENTATIVE. D. PRIOR TO CONVECTION TO THE LANDLORD'S SYSTEM, CONTRACTOR SHALL OBTAIN WRITTEN CONFIRMATION FROM THE LANDLORD'S FIELD i REPRESENTATIVE, THAT ALL TESTING, FLUSHING, AND PROPER FILLING OF THE TENANT'S SYSTEM HAS BEEN COMPLETED IN ACCORDANCE .TO THE LANDLORD'S REQUIREMENTS AND THAT THE TENANT'S SYSTEM IS READY TO BE CONNECTED TO THE LANDLORD'S SYSTEM. 3. VALVES A. GATE VALVES, 2 -INCH AND SMALLER: CLASS 150, BODY MD UNION BONNET OF ASTM B 62 CAST BRONZE WITH THREADED OR SOLDEfR ENDS, INTEGRAL SEAT, RENEWABLE SOLID BRONX WEDGE DISC, RISING STEM, SCREWED BONNET AND RE -PACKABLE UNDER PRESSURE. BALL VALVES ARE ACCEPTED AS AN EQUAL SUBSTITUTION. B. GATE VALVES, 2-1/2 INCH AND LARGER: CLASS 125 CAST IROI,BODY, RENEWABLE BRONZE SEATS AND SOLID WEDGE DISC, RISING STEM, FLANGED ENDS, AND RE -PACKABLE UNDER PRESSURE. C. SWING CHECK VALVES, 2 -INCH AND SMALLER: CLASS 150, CAST BRONZE BODY AND CAP CONFORMING TO ASTM B 62 WITH HORIZONTAL SWING, Y - PATTERN, RENEWABLE BRONZE DISC, AND HAVING THREADED OR SOLDERED ENDS. D. SWING CHECK VALVE, 2-1/2 INCH AND LARGER: CLASS 125 CAST IRON EDDY AND BOLTED CAP, HORIZONTAL SWING, RENEWABLE BRONZE DISC, FLANGED ENDS AND CAPABLE OF BEING REFITTED WHILE THE VALVE REMAINS IN THE LINE. E . COMBINATION BALANCING AND SHUT-OFF VALVES: BELL Al: GOSSETT CIRCUIT SETTER WITH LOCKING SETPOINT. A CIRCUIT SETTER BALANCE WHEEL MUST BE INCLUDED WITH 0 Alt M MANUAL. F. FLOW METER: BELL AND GOSSETT THERMOFLO INDICATOR MODEL TFI.. E. F. G. 4. PIPING SPECIALTIES A. PRESSURE/TEMPERATURE TEST PLUGS ( PETE'S PLUG) - 1/4 INCH NPT FITTINGS TO RECEIVE EITHER A TEMPERATURE OR PRESSURE PROBE, 1/8 INCH O.D. FITTING AND CAPS SHALL BE BRASS WITH VALVE CORE OF NORDEL, RATED AT 400 PSIG, O'F TO 200'F. B. STRAINERS - 'Y' PATTERN STRAINERS, 125 PSIG, CAST IRON BODY WITH PERFORATED STAINLESS STEEL SCREEN, THREADED FOR 2 INCHES AND SMALLER, FLANGED FOR 2-1/2 INCHES AND LARGER. SCREEN OPENING SIZE AT 0.033 INCH FOR HEATING AND 1/8 INCH FOR CHILLED OR CONDENSER WATER. PROVIDE WITH BLOWDOWN VALVE WITH HOSE END FITTING. C. THERMOMETERS - DIE CAST ALUMINUM, 9' INDUSTRIAL MERCURY THERMOMETER, FULLY ADJUSTABLE WITH CLEAR ACRYLIC WINDOW AND BRASS SEPARABLE SOCKET. D. MANUAL AIR VENTS - 1/8' COIN-OPERATED VENT. PROVIDE AN AIR CHAMBER CONSISTING OM: A 3/4' NIPPLE AND BUSHINGS. 5. GENERAL I NSTALLAT I OMNI A. INSTALL WATER MAINS WITHOUT PITCH. USE ECCENTRIC REDUCING COUPLINGS AT CHANGES IN SIZE WITH THE TOP OF PIPES AT SAME ELEVATION. MAKE CHANGES IN DIRECTION WITH FITTINGS. B. BRANCHES TO UNITS BELOW MAINS TO BE TAKEN FROM BOTTOM OF MAINS AT A 45 DEG EE ANGLE, PITCH DOWNWARD TOWARD UNITS. BRANCHES TO UNITS ABOVE MAINS TO BE TAKEN FROM TOP OF MAINS AT A 45 DEGREE ANGLE PITCHED UPWARD TOWNARDS UNITS. PITCH NOT LESS THAN 1' TO 10 FEET. C. HANGERS SHALL BE SIZED AND INSTALLED FOR THE OUTSIDE DIAMETER OF THE INSULATED PIPE. INSTALL 6' LONG SPLIT CIRCLE GALVANIZED SADDLE BETWEEN THE HANGER AND PIPE INSULATION. D. HANGERS AND PIPING (F DISSIMILAR METALS SHALL BE DIELECTRICALLY SEPARATED FROM OBE ANOTHER. E. SEE PLANS FOR APPLICABLE DETAILS. F. ALL PRESSURE PIPING SYSTEMS INSTALLED SHALL CONFORM TO THE REQUIREMENTS OF THE STATE PIPING AND WELDING CODES. G. INSTALL VALVES AT LOW POINTS FOR DRAINING EACH SYSTEM AND INSTALL MANUAL VENTS AT ALL HIGH POINTS OF EQUIPMENT AND PIPING IN` THE SYSTEM TO PROPERLY REMOVE ENTRAPPED AIR. 6. I NSULAT I OMNI A. ALL HYDROM�NIC PIPING FOR CHILLED WATER AND/OR HEATING WATER, VALVES, FITTINGS, AD ACCESSORIES SHALL BE INSULATED. FOR PIPE SIZES UP TO 2 INCHES, INSULATE WITH 1 INCH THICK (K-0.23 0 75'F FIBERGLASS INSULATION WITH ALL SERVICE JACKET AND VAPOR BARRIER. FOR PIPE SIZES 2-1/2 INCHES AND LARGER, INSULATE WITH 1-1/2 INCH THICK (K4.23 0 75'F) FIBERGLASS INSULATION WITH ALL SERVICE JACKET A) VAPOR BARRIER. B. INSULATION AT ALL HANGERS FOUR PIPING 2-1/2 INCHES AND LARGER SHALL BE HARD AND NON-COMESSIBLE. C. ALL INSULATION SHALL HAVE A FLAME SPREAD RATING OF NOT MORE THAN 25 AND A SMOKE DEVELOPED RATING OF NO HIGHER THAT 50 TO CONFORM WITH THE REQUIREMENTS OF THE NFPA. REFRIGERANT PIPING NSA 1. PROVIDE A COMPLETE REFRIGERANT PIPING SYSTEM BETWEEN INDOOR FAN UNITS AND OUTDOOR CONDENSING, UNITS, IF APPLICABLE. PROVIDE OIL, REFRIGERANT CHARGE AND TEST SYSTEM. REFER TO PLANS TO DETERMINE IF A REFRIGERANT PIPING SYSTEM IS REQUIRED. 2. MATERIALS A. REFRIGERANT PIPING SWILL BE TYPE 'L' DRAWN COPPER TUBING (ASTM 888), WROUGHT COPPER OR CAST BRONZE FITTINGS (ANSI B16.22), WITH SILFOS 5 SOLDERED JOINTS. B. SERVICE VALVES, CHARGING PORTS, FILTER -DRIER, SIGHT CLASS, AND A THERMOSTATIC EXPANSION VALVE (TXV) SHALL BE INSTALLED FOR EACH SYSTEM AS A MINIMUM. 3. INSTALLATION A. SIZE LINES WITH ADEQUATE LIFT TRAPS AND DOUBLE SUCTION RISERS AS NECESSARY TO MEET THE NEEDS OF EQUIPMENT SPECIFIED, FIELD CONDITIONS, AND EQUIPMENT MANUFACTURER'S RECOMMENDATIONS. B. PRESSURE TEST FOUR LEAKS WITH AN INERT GAS AT 250 PSIG. REDO LEAKING JOINTS AND RETEST UNTIL SYSTEM IS TIGHT. EVACUATE GAS AND CHARGE SYSTEM. RE -TEST SYSTEM AND CHECK FOR LEAKS WITH HALIDE LEAK DETECTOR. ALL LEAKING JOINTS MUST BE COMPLETELY RE- DONE UNTIL NO LEAKS EXIST. C. UPON COMPLETION OF TESTING, BUT BEFORE INSULATION IS APPLIED, PIPING MUST BE INSPECTED BY A REPRESENTATIVE OF THE LOCAL GOVERNING AUTHORITY AS NECESSARY. D. REFRIGERANT LINES SHALL BE INSULATED WITH 1 INCH THICK RUBATEX OR ARMSTRONG REFRIGERANT PIPE INSULATION IN ACCORDANCE WITH INDUSTRY STANDARDS. SYSTEM TESTING, ADJUSTING, AND BALANCING 1 • TESTING, ADJUSTING AND BALANCING OF ALL WORK SHALL BE MME BY AN INDEPENDENT CONTRACTOR WHO IS CURRENTLY LICENSED ASSOCIATED AIR BALANCING COUNCIL (AABC) OR NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB) BALANCING CONTRACTOMR. NO OTHER BALANCE REPORTS WILL BE REVIEWED OR ACCEPTED. ALL BALANCING WORK MUST BE COMPLETE AND DONE IN ACCORDANCE WITH THE MOST RECENT STA DARDS OF THEIR SOCIETY. PAYMENT OF ALL COSTS FOR TESTING SHALL BE MME BY THE HVAC CONTRACTOR. 2. THE HVAC CONTRACTOR SHALL INSTALL NEW FILTERS IN ALL UNITS PRIOR TO THE AIR BALANCE. THE COMPLETE AIR BALANCE SHALL TAKE PLACE WITH OUTSIDE AIR DAMPERS IN MINIMUM POSITION. 3. BALANCE AIR A D WATER QUANTITIES TO WITHIN + 5% OF THAT INDICATED ON THE DRAWINGS. ANY REQUIRED CHANES IN SHEAVES, BELTS, PULLEYS, OR THE ADDITION OF DAMPERS REQUIRED TO ACHIEVE SPECIFIED FLOW RATES SHALL BE PERFORMED BY THE HVAC CONTRACTOR WITH NO ADDITIONAL COST TO THE TENANT. 4. THE BALANCE REPORT SHALL INCLUDE AS A MINIMUM THE FOLLOWING INFORMATION: A. AABC OR NEBB CERTIFICATION NUMBER AND SIGNATURE OF BALANCING CONTRACTOR. B. INSTRUMENTATION LIST WITH LAST CALIBRATION DATES. C. MAKE AND MODEL MIMBERS OF ALL (HVAC EQUIPMENT TESTED. D. AIR CFM AND STATIC PRESSURE READINGS (DISCHARGE AND SUCTION) AS MEASURED BY PITOT TUBE DUCT TRAVERSE AT THE UNIT. E. MOTOR NAMEPLATE DATA WITH ACTUAL FIELD VOLTAGE AND AMPERAGE READINGS FOR EACH LEG. F. MOTOR AND FAN RPMS, SHEAVE SIZES AND BELT SIZES. G. OUTSIDE, RETURN. MIXED AND SUPPLY AIR TEMPERATURES AT FULL COOLING. H. WATER BALJANCE DATA INCLUDING GPM WITH INLET AND OUTLET TEMPERATURE AND PRESSUE READINGS (WHERE APPLICABLE). I. MAKE AND MODEL NUMBERS OF ALL AIR DISTRIBUTION EQUIPMENT. J. FINAL BALANCED AIR VOLUMES AT ALL OUTLETS (INCLUDING RETURNS WHERE DUCTED) . K. INDEXED PLAN WITH DIFFUSER AD RETURN LOCATIONS. L. REPORT SHALL INCLUDE VAV BOX AIRFLOW SENSOR DIFFERENTIAL PRESSURE READING AT MAX. AND MIN. COOLING. 5. ALL CONTROL SEQUENCES SHALL BE TESTED (INTERLOCKED EQUIPMENT, SMOKE DETECTORS, SMOKE EVACUATION, ECONOMIZER, ETC.) AND OPERATING STATUS RECORDED IN THE REPORT. 6. THREE COPIES OF THE BALANCE REPORT SHALL BE SUBMITTED THROUGH THE GENERAL CONTRACTOR TO THE TENANT'S CONSTRUCTION MANAGER FOR APPROVAL. 7. THE BALANCING CONTRACTOR SHALL PERFORM ALL APPLICABLE TESTING AND BALANCING FUNCTIONS REQUIRED FOR THE SYSTEM DESIGNED IN THESE DRAWINGS. THE BALANCING CONTRACTOR SHALL RECHECK ANY ITEMS THAT THE TENANT DEEMS NECESSARY AT NO ADDITIONAL COST TO THE TENANT. 8. FINAL BALANCE REPORT SHALL BE INCLUDED IN THE OPERATION AU: MAINTENANCE MANUALS. FINAL HVAC INSPECTIONS 1. ASIDE FROM NORMAL INTERIM INSPECTIONS OF WORK IN PLACE, THE TENANT SHALL HAVE THE RIGHT TO AN INDEPENDENT HVAC CONTRACTOR INSPECT THE FINISHED HVAC INSTALLATION UPON COMPLETION FOR COMPLIANCE WITH THE PLANS, SPECIFICATIONS, AND CODES. THE INSTALLING CONTRACTOR WILL BE RESPONSIBLE TO BRING ALL ITEMS REPORTED BY THE INDEPENDENT HVAC CONTRACTOR UP TO PLANS AND SPECIFICATION REQUIREMENTS AT NO COST TO TENANT. REVIEWED FOR 'CODE COMPLIANCE APPROVED } AUG 0 2 2013 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA JUL222013 PERMIT CENTER M -Engineering 750 Brooksedge Blvd. Westerville, Ohio 43081 phone: 614.839.4639 fax: 614.839.2222 WWW. MENGINEERING. US COM All rights reserved. No part of these drawings or specifications may be copied, reproduced or used in connection with any work, other than the specific project for which they have been prepared, without prior written authorization from the Architect. ENGINEER OF RECORD: J.CREW Southcenter Mall 633 Southcenter Mall Space No. 676 Seattle, WA 98188 Level: Ground Floor Project No. 1339 Project No. 13411114 NO. DATE ISSUE 07-17-13 Issue for Permit 07-17-13 Issue for Bid 07-17-13 Issue for LL & Client Review Mechanical Specifications M-300