Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit M13-143 - MAURICES - ALTERATION
MAURICES 1071 SO UTH CENTER MALL M13-143 City AI'ukwila • Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-431-2451 Web site: http://www.TukwilaWA.gov DEVELOPMENT PERMIT Parcel No.: 9202470010 Address: 1071 SOUTHCENTER MALL TUKW Suite No: • Project Name: MAURICES Permit Number: D13-260 Issue Date: 09/17/2013 Permit Expires On: 03/16/2014 Owner: Name: WESTFIELD PROPERTY TAX DEPT Address: PO BOX 130940 , CARLSBAD CA 92013 Contact Person: Name: TIM SCHENK Address: 1120 E 80 ST, SUITE 211 , BLOOMINGTON MN 55420 Contractor: Name: J E M CONSTRUCTION INC Address: 29506 8TH AVE S , ROY, WA 98580 Contractor License No: JEMCOI*033DD Lender: Name: SELF FUNDED - MAURICES Address: Phone: 952-345-6040 Phone: 253 843-2765 Expiration Date: 05/15/2015 DESCRIPTION OF WORK: NEW TENANT: REMODEL OF AN EXISTING RETAIL TENANT SPACE AND A PORTION OF AN ADJACENT TENANT SPACE TO CREATE A NEW SPACE FOR "MAURICES". NEW PARTITONS, CEILINGS, STORE FIXTURES, STOCKROOM FIXTURES, INTERIOR FINISHES, NEW ELECTRICAL INCLUDING LIGHTS OUTLETS & SWITCHES. NEW MECHANICAL RTU, DIFFUSERS & CONTROLS, EXHAUST FAN. Value of Construction: $200,000.00 Fees Collected: $3,901.14 Type of Fire Protection: SPRINKLERS International Building Code Edition: 2012 Type of Construction: II -B Occupancy per IBC: 0019 Electrical Service Provided by: PUGET SOUND ENERGY **continued on next page** doc: IBC -7/10 D13-260 Printed: 09-17-2013 • Public Works Activities: Channelization / Striping: N Curb Cut / Access / Sidewalk / CSS: N Fire Loop Hydrant: Flood Control Zone: Hauling: Land Altering: Landscape Irrigation: Moving Oversize Load: Sanitary Side Sewer: Sewer Main Extension: Storm Drainage: Street Use: N N Water Main Extension: Water Meter: N Permit Center Authorized Signature. I hereby certify that I have read an governing this work will be compli Number: 0 Size (Inches): 0 Start Time: Volumes: Cut 0 c.y. End Time: Fill 0 c.y. Start Time: End Time: Private: Profit: N Private: The granting of this permit does no construction or the performance of work. to this permit. exa d wit Date: Public: Non -Profit: N Public: ned this permit and know the same to be true and correct. All provisions of law and ordinances whether specified herein or not. e to give authority to violate or cancel the provisions of any other state or local laws regulating I am authorized to sign and obtain this development permit and agree to the conditions attached Date: qfl-71/2j Print Name: 1 Mt1 Vakefa This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ***BUILDING DEPARTMENT CONDITIONS*** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 5: New suspended ceiling grid and light fixture installations shall meet the non -building structures seismic design requirements of ASCE 7. 6: Partition walls that are tied to the ceiling and all partitions greater than 6 feet in height shall be laterally braced to the building structure. doc: IBC -7/10 D13-260 Printed: 09-17-2013 1 • CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Mechanical Permit No. 'i ( — (L Project No. Date Application Accepted: 0"'t)-" 1 7 Date Application Expires:1 (For office use only) MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** SITE LOCATION King Co Assessor's Tax No.: IZo 2'47 • 0010 Site Address: 1071 SO/rl•IC:EKIE& 1714 c.. Suite Number: 4aB Floor: 1 New Tenant: ,....Yes El ..No Tenant Name: /nAU'LIC.es PROPERTY OWNER Name: i m S C (4EN4 Name: v,ies,('r't IaUD LLL City: f3l>`1Q((111Kc,rOn/ State• in W Z1p:SS 420 Address: 633 SW f•4ck- V-11. (HALL Email:. f. i m S @ ed(vi ori on ez. cu._ City: S -EPA- State: �� Zip t'g$ CONTACT PERSON — person receiving all project communication Name: i m S C (4EN4 Address: «20E.90 Flr ss: SY i re i 1 City: f3l>`1Q((111Kc,rOn/ State• in W Z1p:SS 420 Phone:c .3yS 6040 Fax: qSt . S54 • 'f cigq Email:. f. i m S @ ed(vi ori on ez. cu._ MECHANICAL CONTRACTOR INFORMATION Company Name: Address: City: State: Zip: Phone: Fax: Contr Reg No.: Exp Date: Tukwila Business License No.: Valuation of project (contractor's bid price): $ 15.E • Describe the scope of work in detail: KI;� QI,FFV1CPbS Catv�ttp�,S�/ Ae6 is at7-Zi c G / aru . mom/:ll a erkg/ck, QArWt kXJI.% e cHAvsr fAN , 1 Air r.. C,e t c.cx"S Use: Fuel Type: Residential: New ❑ Replacement ❑ Commercial: New ❑ Replacement ® 11- exis'ry''r6' 12rV �,,,,�. tent -Nov adnACf)n • Electric ❑ Gas Other: H:\ApplicationsTorms-Applications On Line\2011 Applications\Mechanical Permit Application Revised 8-9-1 I.docx Revised: August 2011 bh Page 1 of 2 Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Furnace >100k btu Q 18 Floor furnace I Suspended/wall/floor mounted heater ' Appliance vent Repair or addition to heat/refrig/cooling system Air handling unit <10,000 cfm Unit Type Qty Air handling unit >10,000 cfm Q 18 Evaporator cooler I Ventilation fan connected to single duct ' Ventilation system Hood and duct Incinerator — domestic Incinerator — comm/industrial Unit Type Qty Fire damper Diffuser Q 18 Thermostat I Wood/gas stove Emergency generator Other mechanical equipment Boiler/Compressor Qty 0-3 hp/100,000 btu 3-15 hp/500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+ hp/1,750,000 btu PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR ATib HORIZED AGENT: Signature: Print Name: "r 1 m S GL4eNI4 Date: de,l\ 13 Day Telephone: Q52'VS 4304Q Mailing Address: 112b E. 804: SCAO'r S'ID'E 211, CR OatnUf(t,,('O4J, MIN( S3'4Zts City State H:\Applications\Forms-Applications On Line\2011 Applications \Mechanical Permit Application Revised 8-9-11. docx Revised: August 2011 bh Zip Page 2 of 2 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206-431-3665 Web site: http://www.TukwilaWA.Hov RECEIPT Parcel No.: 9202470010 Permit Number: M13-143 Address: 1071 SOUTHCENTER MALL TUKW Status: APPROVED Suite No: Applied Date: 08/12/2013 Applicant: MAURICES Issue Date: Receipt No.: R13-02648 Payment Amount: $299.70 Initials: JEM Payment Date: 09/17/2013 11:15 AM User ID: 1165 Balance: $0.00 Payee: JEM CONSTRUCTION, INC. TRANSACTION LIST: Type Method Descriptio Amount Payment Check 12037 299.70 Authorization No. ACCOUNT ITEM LIST: Description Account Code Current Pmts MECHANICAL - NONRES 000.322.102.00.00 299.70 Total: $299.70 rinr Rcroint-fR Printed: 09-17-2013 CitglObf Tukwila, • Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206-431-3665 , Web site: http://www. ci. tukwila. wa. us SET RECEIPT RECEIPT NO: R13-02342 Initials: WER Payment Date: 08/12/2013 User ID: 1655 Total Payment: 1,744.28 Payee: ELDER JONES SET ID: 081213 SET NAME: MAURICES SET TRANSACTIONS: Set Member Amount D13-260 EL13-0761 (.M13-143. TOTAL: 1,535.04 134.32 74.92 ,? 1,535.04 TRANSACTION LIST: Type Method Description Amount Payment Check 65937 ACCOUNT ITEM LIST: Description TOTAL: 1,744.28 1,744.28 Account: Code Current Pmts ELECTRICAL PLAN - NONRES PLAN CHECK - NONRES 000.345.832.00.0 134.32 000.345.830 1,609.96 TOTAL: 1,744.28 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 431-2451 /11/3-/Y_3 Project f!?lRl(�� Type of Inspection: <0/6/« 5f/P/ (, Address: t 5 " t 4 /' Date Called:A/n i Special Instructions: Date Wed. ,r 1 e/ //3 6 p.m. Requester: Phone No: Approved per applicable codes. Corrections required prior to approval. COMMENTS: 6.vio u ¢ 5/17 /7 ,►Do tAAA 4PP / %/e a444 > 6 ire ate: l ECTION FEE REQUI D. Prior to ext inspection, fee must be at 6300 Southcenter BI, d.. Suite 100. Calc to schedule reinspection. INSPECTION RECORD Retain a copy with permit 11/113—(q 4 INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd.,#100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 431-2451 Project: Typc, of Inspection: Addres` 1011 CO . ►41-t1 Date Called:. .-- Special Instructions: Date Wanted: . —! a.m. P.m. Requester:!i'l Phone No: pproved per applicable codes. Corrections required priorto approval. COMMENTS:. I SPECTION FEE REQUIR . Prior to next spection, fee must be at 6300 Southcenter Blvd.. Suite 100. Call t,u schedule reinspection. INSPECTION NO. INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431=3670 Permit Inspection Request Line (206) 431-2451 Project: leY\ A Z P Q 1 C f- S Type ospection: l d11C... t4 – -1_ Address: 1011 SC OA A 1 Date Called: Special Instructions: Date Wanted: tO- - 13 /0 p.m. Requester: Phone No: ElApproved per applicable codes. LJ Corrections required prior to approval. COMMENTS: I) -mai) .b,2(c►'t SPECTION FEE REIRED. Prior to n - xt inspection. fee mu . e at 6300 Southcenter lvd.. Suite 100., all to schedule reinspection. (Date: / r fS /, ? INSPECTION NUMBER INSPECTIOIN RECORD Retain a copy with permit 01 - 06,-0 PERMIT NUMBERS CITY OF TUKWILA FIRE DEPARTMENT 444 Andover Park East, Tukwila, Wa. 98188 206-575- Project:: j 1 '. ! 1 - ., V P+ r.. 1 .. Sprinklers: Type of Inspection: _ 0.- '.., , i '�, f i 1 fit -)4 1,L,,,. "S duI ST , (. Address: / 0 -? -_ Suite #: /4/1,.), L j___ Contact Person: Special Instructions: Occupancy Type: Phone No.: „Approved per applicable codes. Corrections required prior to approval. COMMENTS: Sprinklers: Fire Alarm: Hood & Duct: Monitor: Pre -Fire: Permits: Occupancy Type: 0)3. i , ,k -L o !K ;,a.,.. .; J )A/ ! . 11-13 —,,, n- t a K c �J r-- `A 1 e.< ; .-- Needs Shift Inspection: Sprinklers: Fire Alarm: Hood & Duct: Monitor: Pre -Fire: Permits: Occupancy Type: Inspector: Hrs.: $100.00 REINSPECTION FEE REQUIRED. You will receive an invoice from the City of Tukwila Finance Department. Call to schedule a reinspection. Billing Address Attn: Company Name: Address: City: state: Zip: Word/Inspection Record Form.Doc 6/11/:10 T.F.D. Form F.P. 113 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Mechanical Summary MECH-SUM mpliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Revised June 2013 Project Info COPY FILE COPY 'it No. Project Address Maurices Southcenter Mall Date 8/29/2013 Southcenter Mall, Space #408 For Building Dept. Use Seattle, WA 98188 Applicant Name: Shremshock Engineering, INC. Applicant Address: 6130 S. Sunbury Rd. Westerville, OH 43081 Applicant Phone: 614-545-4550 Project Description Briefly describe mechanical system type and features. Includes Plans Rooftop HVAC Unit furnished and installed by landlord. Not in Tenant's scope of work. Drawings must contain notes requiring compliance with commissioning provisions per Section C408 Compliance Option O Simple System 0 Complex System Q Systems Analysis Equipment Schedules The following information is required to be incorporated with the mechanical equipment schedules on the plans. For projects without plans, fill in the required information below. Cooling Equipment Schedule Equip. ID Equip Type Brand Name1 Model No.1 Capacity2 Btu/h OSA CFM or Econo? SEER or EER IPLV3 Econmizer Option or Exception6 Heat Recovery Y/N RTU -1 RTU NA NA Heating Equipment Schedule Equip. ID Equip Type Brand Name1 Model No.1 Capacity2 Btu/h OSA cfm or Econo? Input Btuh Output Btuh Efficiency4 Heat Recovery Y/N RTU -1 RTU NA NA REVI WED I- t Fan E ui ment Schedule q p CODE MPLII CE Equip. ID Equip Type Brand Name1 Model No.1 CFM SP1 HP/BHP APPROVE® low Controls L? catignIf Servi SEP 11 1 City of Tukwila BUILOIt'Jr DIVISION Service Water Heating Equipment Schedule Equip. ID Equip Type Brand Name1 Model No.1 Input Capacity Sub - Category EF7 Location of Service • RECEIVED CITY OF.TUKWILA 1 If available. 2 As tested according to Table C403.2.3(1)A thru C403.2.3(3). 3 If required. 4 COP, HSPF, Combustiognale E, as applicable. 6 Flow control types: variable air volume (VAV), constant volume (CV), or variable speed (VS). 6 Economize excepfron number per CORRECTION k a. l LI 3 LTR# PERMIT CENTER Mechanical Permit Plans Checklist - Pa • e 1 of 3 MECH-CHK 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Revised June 2013 Project Address Maurices Southcenter Mall Date 8/29/2013 The following information is necessary to check a mechanical permit application for commercial provision compliance with the 2012 WSEC. NOTE: Define print area in Excel prior to printing MECH-CHK pages. Applicability (yes,no,na) Code Section Code Provision Information Required Location on Plans Building Department Notes GENERAL PROVISIONS Equipment Sizing & Performance Y es C403.2.1 Load calculations Loada calculations performed per ASHRAE Std 183 or equivalent per yes 0403.2.2 Equipment and system sizing Output capacity of heating and cooling equipment and systems do not exceed calculated loads, note exceptions taken yes C403 2 5 Minimum ventilation Ventilation (natural or mechanical) provided per IMC; indicate mechanical ventilation is capable of being reduced to minimum requirement per IMC yes C403.2.3 & C403.2.3.2 &efficiency C403.2.12.1 Equipment minimum Provide equipment schedules or complete MECH-SUM tables with type, capacity, efficiency, test standard (or other efficiency source) for all mechanical equipment na C403.2.13 Electric motor efficiency Provide equipment schedule with hp, rpm, efficiency for all motors; note except. na C403.2.10 Fan power limitation Fan system motor hp or bhp does not exceed limits per Table C403.2.10.1(1) yes C403.2.10.3 & C403 2 13 Fractional hp fan motors Indicate fan motors 1/12 to 1 hp are ECM type or meet minimum efficiency req na 0403.2.3 capacity Maximum air cooled chiller Indicate air-cooled chiller capacity does not exceed air-cooled chiller limit na 0403.2.1 Non-standard water-cooled chillers Full -load and NPLV values for water-cooled centrifugal chiller adjusted for non-standard operational conditions na 0403.2.12.1.2 Centrifugal fan cooling towers Large capacity cooling towers with centrifugal fan(s) meet efficiency requirements for axial fan open circuit cooling towers na C403.2.3 furnace and unit heaters Indicate intermittent ignition or IID, flue/draft damper & jacket loss na C403 2 3 3 Packaged electric heating/cooling equipment List equipment required to be heat pumps on schedule naeconomizer) C403.2.3.4 Humidification Indicate method of humidification (note requirements for systems with HVAC System Controls & Criteria yesperimeter C403.2.4.1 Thermostatic controls Indicate locations of thermostatic control zones on plans, including systems naheat C403.2 4 1 1 Heat pump supplementary Indicate staged heating (compression/supplemental) & outdoor lock -out temp yescooling C403.2.4.2 Setpoint overlap (deadband) Indicate 5°F deadband minimum for systems controlling both heating & YeSshutdown C403.2.4.3 Automatic setback and Indicate zone t -stat controls with required automatic setback & manual override es Yconditions C403.2.4.3.3 Automatic (optimum) start Indicate system controls that adjust equip start time to match load yes C402.4.5.2 & C403.2.4.4 Dampers Indicate location of OSA, exhaust, relief and return air dampers; include AMCA rated leakage and control type (motorized or gravity; note exceptions na C403.2.11 Heating outside a building Indicate radiant heat system and occupancy controls na C403.2.4.5 Snow melt systems Indicate shut-off controls based on outdoor conditions na C403.2.4.6 Combustion heating equipment Indicate modulating or staged control na C403.2.4.7 Group R1 hotel/motel systems Indicate method for guest room automatic setback & set-up of 5°F minimum na C403.2.4.8 / g Group R2/R3 dwelling unit systems Indicate 5-2 programmable thermostats in pnmary spaces with minimum of two setback periods; note exceptions taken na C403.2.5.1 Demand controlled ventilation Indicate high occupancy spaces and systems requiring DCV na C403.2.5.2 Occupancy sensors Indicate spaces requiring occupancy -based system control and method; or alternate means provided to automatically reduce OSA when partially na C403.2.5.3 Enclosed loading dock/parking garage ventilation Indicate enclosed loading dock and enclosed parking garage ventilation system activation and control method na C403.2 5 4 1 Kitchen exhaust hoods Indicate kitchen hoods requiring make-up air; indicate make-up air source and conditioning method na C403.2.5.4.2 Laboratory exhaust systems Indicate lab exhaust systems requiring heat recovery, method & efficiency; or alternative method taken (VAV, semi -conditioned makeup, or CERM calculation) na 0403.2.6.1 Energy recovery - ventilation systems Indicate ventilation systems requiring ER, method & efficiency; note exceptions na C403.2.6.2 Energy recovery - condensate systems Indicate on-site steam heating systems requiring energy recovery na C403 2 6 3 Energy recovery - condenser systems Indicate remote refrig condensers requiring ER and use of captured energy 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Mechanical Permit Plans Checklist - Page 2 of 3 MECH-CHK 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Revised June 2013 Project Address Maurices Southcenter Mall Date 8/29/2013 The following information is necessary to check a mechanical permit application for commercial provision compliance with the 2012 WSEC. NOTE: Define print area in Excel prior to printing MECH-CHK pages. Applicability (yes,no,na) Code Section Code Provision Information Required Location on Plans Building Department Notes GENERAL PROVISIONS, CONTINUED HVAC System Controls & Criteria, Continued na C403.2.12 Variable flow control - fans/pumps Indicate fan & pump motors requiring VF control & method (VSD or equiv controls) na C403.2.12.1 Variable flow control cooling towers Indicate cooling tower fans requiring variable flow control and method na C403.2.12.2 Large volume fan systems Indicate fan systems requiring airflow reduction based on heating and cooling demand; or exception taken na C403.2.12.2 Single zone AC systems Indicate method of cooling demand -based fan control for sys. > 110,000 btuh na C403.2.4.10 DDC system capabilities Identify all DDC system input/output control points and indicate capability for trendino and demand response setooint adiustment Ducting Systems yes • C403.2.7.1 &Duct C403.2.7.3 construction Indicate all ductwork constructed and sealed per IMC, C402 leakage requirements and IBC vapor retarder requirements yes C403.2.7.3.1-:: Duct pressure classifications Identify location of low, medium and high pressure ductwork on plans natest C403.2 7 3 3 High pressure duct leakage Indicate high pressure duct leakage testing requirements on plans; provide test results to junsdiction when completed yes C403.2.7.1 / 2 Duct insulation Indicate R -value of insulation on ductwork Piping Systems yes C403.2.8 Piping insulation Indicate R -value of insulation on piping yes C403.2.8.1 Piping weather insulation exposed to Indicate method of protection from damage/degredation SIMPLE SYSTEMS Qualifying Systems yes C403.3 Qualifying single zone systems Verify unitary or packaged equipment does not exceed capacity limits, does not have active humidifcation or simultaneous heating/cooling na C403.3 Qualifying 2 -pipe heating systems • Venfy 2 -pipe heating -only system does not exceed capacity limits na C403.3.2 Hydronic system controls Refer to Complex Systems Section C403.4.3 Simple System Economizers yes C403.3.1 Air economizer required Indicate cooling systems requiring economizer controls; note in equip sched. yes C403.3.1.1.1 Air economizer capacity Indicate modulating OSA control capability up to 100% OSA, or exception yes C403.3.1.1.3 Air economizer high limit controls Indicate high limit shut-off control method per Table C403.3.1.1.3(2) yes C403.1.1.2 Integrated air economizer operation Indicate capability for partial air economizer operation for systems with capacity > 65,000 btuh yes C403.3.1 Air economizer exceptions Indicate eligible exception(s) taken and provisions to comply with exception(s) COMPLEX SYSTEMS Complex System Economizers na C403.4.1 Air economizer required Indicate cooling systems requiring economizer controls; note in equip sched. na C403.4.1.4 Economizer heating system impact Venfy control method of HVAC systems with economizers does not increase building heating energy usage during normal operation na C403.4.1.3 Integrated economizer operation Indicate capability for partial economizer operation for air or water econo systems Moved na Water economizer capacity Indicate water econo capable of 100% cooling capacity at 50°F db/45°F wb OSA C403.4.1.2 na Water economizer maximum pressure drop Indicate precooling coils and heat exchangers do not exceed pressure drop limit na C403.3.1 Air economizer exceptions Indicate eligible exception(s) taken and provisions to comply with exceotion(s) 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Mechanical Permit Plans Checklist - Page 3 of 3 MECH-CHK 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Revised June 2013 Project Address Maurices Southcenter Mall Date 8/29/2013 The following information is necessary to check a mechanical permit application for commercia provision compliance with the 2012 WSEC. NOTE: Define print area in Excel prior to printing MECH-CHK pages. Applicability (yes,no,na) Code Section Code ProvisionInformation Required Location on Plans Building Department Notes COMPLEX SYSTEMS, CONTINUED Specific System Requirements na C403.4.2 & 0403.2.1.12 Variable flow control - fans Indicate fans requiring variable flow control and method nasensors C403 4 2 1 VAV fan static pressure Indicate sensor locations on plans; include at least one sensor per major duct branch na 0403.4.2.2 VAV fan static pressure setpoint Indicate fan system static pressure setpoint based on zone requiring most pressure na C403.4.5 VAV systems serving multi- zones Indicate supply air systems serving multiple zones that are required to be VAV, method of primary air control, and zones served; note exceptions taken na 0403.4.5.4 VAV system supply air reset Indicate controls that automatically reset supply air temp in response to loads na 0403.4 Large capacity cooling systems Indicate method of multi -stage or vanable control for building cooling system capacity > 300 tons na 0403.4.7 Hot gas bypass limitation Indicate cooling equipment unloading or capacity modulation method na 0403.4.3 systems Large capacity boiler Indicate multi -stage or modulating burner for single boilers > 500,000 btuh na 0403.4.3 Boiler sequencing Indicate automatic controls that sequence operation of multiple boilers na 0403.4.3.5 Chiller / boiler plant pump isolation Indicate capability to automatically reduce overall plant flow and shut-off flow through chillers & boilers when not in use na 0403.4.2 & C403.4.3.6 Variable flow control - pumps Indicate pumps requinng vanable flow control & method na 040403 4 1 & 0403.4.4 Varcooling flow control - cooling towers Indicate cooling tower fans requinng vanable flow control and method na C403.4.3.4 Hydronic system part load controls o automatically reset supply water temp AND reduce flow by i' 50% for _ na 0403.4.3.2 Two -pipe changeover systems Indicate deadband, heating/cooling mode scheduling and changeover temperature range nadeadband C403.4 3 3 1 Water loop heat pump - Indicate capability of central equipment to provide min. 20°F water supply temp deadband between heatJection and heat addition modes na 0403.4.3.3 Water loop heat pump - heat rejection Provide heat exchanger that separates cooling tower and heat pump loop in Climate Zone 5 na 0403.4.3.3.3 Water loop heat pump - isolation Indicate 2 -way isolation valve on each heat pump and variable flow control for systems with total pump power > 10 hp na C403.4.6 Condenser water heat recovery Indicate system provided to pre -heat service water and efficiency na C403.5 Cooler / freezer - anti -sweat heaters Indicate w/sf & control method for walk-in cooler/freezer door anti -sweat heaters na C403.5 / 6 Cooler / freezer - evaporator and condenser Indicate motor type for evaporator and condenser fans < 1 hp SERVICE WATER HEATING Service Water Systems yesefficiency 0404.2 Water -heating equip min. Provide equipment schedule or complete MECH-SUM table with type, capacity, efficiency, test standard (or other efficiency source) yes 0404.3 Temperature controls Indicate temperature controls have required setpoint capability yesdischarge C404.4 Heat traps Indicate piping connected to equipment have heat traps on supply & yes0404.5 heaterion under water Indicate R-10 insulation under tank yes 0404.6 insulation Service water piping Indicate R -value of insulation on piping; note exceptions taken na C404.7 / 8 Circulation systems and heat trace shut-off Indicate shut-off capability based on occupancy and periods of limited demand na 0404.9 Group R-2 service hot water meters Indicate method of usage metering for dwell. units served by central HW system Pools & In -Ground Permanently Installed Spas na C404.10.1 Pool heating equip min. efficiency Provide equipment schedule or complete MECH-SUM table with type, capacity, efficiency, test standard (or other eff. source); heat pump heaters z4 COP naswitch 0404.10 1 / 2 Pool heater on /off controls Indicate automatic on/off control based on scheduling & accessible on/off on heater that operates independent of thermostat setting; or Indicate vapor retardant cover and insulation rating as required na C404.10.3 Pool covers na 0404.10.3 Pool assembly insulation Indicate rating of insulation on sides and bottom of pools heated to > 90°F na C404.10.4 Heat recovery Indicate method, exhaust air temperature reduction and recovered energy use • • August 29, 2013 Department of Community Development 6300 Southcenter Blvd., Suite #100 Tukwila, WA 98188 Attn: Jennifer Marshall, Permit Technician RE: MAURICES Southcenter Mall Store #2170 1071 Southcenter Mall SP# 408 Tukwila, WA 98188 ARCH PROJECT No.: 130453 Permit Application No.: D13-260 Ms. Marshall, Itemized below are responses to the Building Department Comments dated August 19, 2013: Responses to Review Memo: Comment 1: Please provide the weight of RTU -1 and the weight of the unit it is replacing. If the new unit is heavier than the old one we will need structural engineering that would include structural design changes to the building and associated calculations. If the new unit weighs less than the old unit please confirm that it will be sitting on the same footprint as the old unit and the gravity load will be less. Eng. Response: The new unit is furnished and installed by the Landlord and is not a part of the tenant's scope of work as noted in coded note 12 sheet M-1 and ROOFTOP HVAC UNIT SCHEDULE, note 3 sheet M-2. Comment 2: SHREMSHOCK Architects & Engineers 6130 S. Sunbury Rd. Westerville, OH 43081 t 614 545 4550 888 373 4130 f 614 545 4555 www.shrcroshock.com RECEIVED Please provide a completed 2012 Washington State Mechanical Code CITY OF TUKWILA Summary form. CORRECTION LTR# M13 113 SEP, 0 3 2013 PERMIT CENTER I Eng. Response: The Washington State Mechanical Code Summary is attached. Thank you, Jeromy Perry Shremshock Architects and Engineers, Inc. • August 23, 2013 • City of Tukwila • Jim Haggerton, Mayor Department of Community Development Jack Pace, Director Tim Schenk 1120E 80 St, Ste 211 Bloominton, MN 55420 RE: Correction Letter #1 Mechanical Permit Application Number M13-143 Maurices —1071 Southcenter Mall Dear Mr. Porowski, This letter is to inform you of corrections that must be addressed before your development permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the Building Department. At this time the Fire Department has no comments. Building Department: Dave Larson at 206 431-3678 if you have questions regarding the attached comments. Please address the attached comments in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that two (2) sets of revised plan pages, specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a `Revision. Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections/revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, I can be reached at (206) 431.-3670. 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 • Tukwila Building Division Dave Larson, Senior Plan Examiner Building Division Review Memo Date: August 19, 2013 Project Name: Maurices Permit # M13-143 Plan Review: Dave Larson, Senior Plans Examiner The Building Division conducted a plan review on the subject permit application. Please address the following comments in an itemized format with revised plans, specifications and/or other applicable documentation. (GENERAL NOTE) PLAN SUBMITTALS: (Min. size 11x17 to maximum size of 24x36. Please submit all plans on the same size paper. Revised plans need to be the same size as originally submitted). (If applicable) Structural Drawings and structural calculation sheets shall be stamped and signed. 1. Please provide the weight of RTU -1 and the weight of the unit it is replacing. If the new unit is heavier than the old unit we will need structural engineering that would include structural design changes to the building and associated calculations. If the new unit weighs less than the old unit, please confirm that it will be sitting in the same footprint as the old unit and that the gravity load will be less. 2. Please provide a completed 2012 Washington State Mechanical Code Summary form. Should there be questions concerning the above information please contact the Building Division at 206-431-3670. PERMIT COORD COPY • PLAN REVIEW/ROUTING SLIP ACTIVITY NUMBER: M13-143 DATE: 09-03-13 PROJECT NAME: MAURICES SITE ADDRESS: 1071 SOUTHCENTER MALL Original Plan Submittal Response to Incomplete Letter # X Response to Correction Letter # 1 Revision # After Permit Issued DEPARTMENTS: ux ouilding ivis on Public Works n Fire Prevention Structural Planning Division ❑ Permit Coordinator n U DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 09-05-13 Complete Incomplete n Not Applicable ❑ Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg 0 Fire 0 Ping 0 PW 0 Staff Initials: TUES/THURSROUTING: Please Route Structural Review Required No further Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 10-03-13 Approved n Approved with Conditions 'W Not Approved (attach comments) n Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg 0 Fire 0 Ping 0 PW 0 Staff Initials: Documents/routing slip.doc 2-28-02 41tERMIT COORD COPY o PLAN REVIEW/ROUTING SLIP ACTIVITY NUMBER: M13-143 DATE: 08-12-13 PROJECT NAME: MAURICES SITE ADDRESS: 1071 SOUTHCENTER MALL X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Issued D PA TMEN S: e fir12 din Divisi n Public Works ❑ Avg M/01) /et Fire Prevention Structural Planning Division Permit Coordinator CI U DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Incomplete ❑ DUE DATE: 08-13-13 Not Applicable 111 Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW 0 Staff Initials: TUES/THURS ROUTING: Please Route Structural Review Required ❑ No further Review Required ❑ REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved ❑ Approved with Conditions Notation: DUE DATE: 09-10-13 Not Approved (attach comments) REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Documents/routing slip.doc 2-28-02 f) Bldg Fire ❑ Ping ❑ PW 0 Staff Initials: /1\ City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Web site: http://www.TukwilaWA.gov Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: Q\31i3 Plan Check/Permit Number: M13- 143 ❑ Response to Incomplete Letter # • Response to Correction Letter # 1 ❑ Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner Project Name: Maurices Project Address: 1071 Southcenter Mall Contact Person: 13 rn SGtAersi e-- Phone Number: cm -2..145.6040 60440 Summary of Revision: 7 s€ sEe mack-44.--0 (LEsFbrae LE r ea- ► -iota (Lci4 . Ctrs ),...OK1N1.a 32013' PERMIT CENTER Sheet Number(s): Narte . 8‘ fir. 111 Zol't- I„rA CAVE inecoiANI eNeeljii cQrn1R.tndcr m,„"s "Cloud" or highlight all areas of revision including date of revjsion Received at the City of Tukwila Permit Center by: Entered in Permits Plus on l —� C:\Users\jennifer-m\Desktop\Revision Submittal Form.doc Reviswl. May ?MI Contractors or Tradespeople P1ter Friendly Page • General/Specialty Contractor A business registered as a construction contractor with Llil to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name J E M CONSTRUCTION INC UBI No. 601770782 Phone 2538432765 Status Active Address 29506 8Th Ave S License No. JEMCOI*033DD Suite/Apt. License Type Construction Contractor City Roy Effective Date 3/4/1997 State WA Expiration Date 5/15/2015 Zip 98580 Suspend Date County Pierce Specialty 1 General Business Type Corporation Specialty 2 Unused Parent Company Business Owner Information Name Role Effective Date Expiration Date MILLER, JAMES E President 01/01/1980 Amount Bond Information Bond Company Name CBIC Bond 3 Page 1 of 2 Bond Account Number Effective Date SA7695 03/0112002 Expiration Date Until Cancelled Cancel Date Impaired Date Bond Amount Received Date $12,000.00 03/19/2002 Assignment of Savings Information No records found for the previous 6 year period Insurance Information Insurance Company Name Policy Number Effective Date Expiration Date Cancel Date Impaired Date Amount Received Date 14 American States Insurance Co 01C12205495 04/16/2013 04/16/2014 $1,000,000.0004/11/2013 13 American States Insurance Co 01C12205491 04/16/2011 04/16/2013 $1,000,000.0004/13/2012 12 AMERICAN STATES INS CO 01C1220549 04/16/2009 04/16/2011 $1,000,000.0004/21/2010 11 AMERICAN STATES INS CO 01C1220549 04/16/2009 04/16/2010 $1,000,000.00 04/17/2009 10 0010 CAS INS BL053040470 12/02/2008 12/02/2009 $1,000,000.00 11/20/2008 9 OHIO CAS INS BL00353040470 12/02/2003 12/02/2008 $1,000,000.00 11/27/2007 Summons/Complaint Information Cause County Complaint Judgment Status Payment Paid By 10-2-11928-6 BROOKDALE LUMBER INC InterPlead: No PIERCE Date: 08/16/2010 Amount: $10,795.92 Bond(s): SA7695 Date: Amount: $0.00 Dismissed Date: Amount: Warrant Information No unsatisfied warrants on file within prior 6 year period Infractions/Citations Information No records found for the previous 6 year period https://fortress.wa.gov/lni/bbip/Print.aspx 09/17/2013 • 11 Irlllllllllilllllllll K • RESTROOM CEILING PIAN REVISIONS No chimes shall to the scope of rrsrk withOut prior approval of ukriii.a Building ing Division.r- s't= will require a new plan submittal may i :crude additional plan review fees. FILE COPY Perna No- t41'!I 143 Plan review approval is subject to errors and omissions. kr, . a) of construction documents does not authorize of any adopted code or ordinance. Receipt tai LpproveclField Copy conditionsis aG wiled: Date. Rh -03 City Of 'WOW BUILDING DIVISION '�.11-�LE. PERMIT i f , `i ;PEDFOR: PIED 0 Mechanical Gitiectrical '1umbing Las Piping of Tukwila DIVISION PROGRAMMABLE THERMOSTATS "HONEYWELL" #T1351F2010 THERMOSTAT. MAURICES SHALL FURNISH- MECHANICAL CONTRACTOR INSTALL AND PROGRAM T -STATS FOR EACH UNIT AS SHOWN ON PLAN A5 FOLLOWS: • H.VA.C. UNIT(5) SHALL "START UP" (OCCUPIED MODE), MONDAY THRU SUNDAY (1 -DAYS) BY MALL/STORE OPENING TIME AND "SETBACK" (UNOCCUPIED MODE) AT MALL/STORE CLOSING TIME. CONTRACTOR SHALL VERIFY STORE OPERATING HOURS WITH STORE MANAGER OR MALL MANAGEMENT. • IF MULTIPLE UNITS EXIST, START EACH ONE UP AT INTERVALS OF 15 MINUTES. APART AND HAVE ALL UNITS OPERATING BY ONE HOUR AFTER OPENING. • OCCUPIED SPACE TEMPERATURE SETTINGS - SET POINT FOR COOLING SHALL BE 14 DEG.F.. SET POINT FOR HEATING SHALL BE 68 DEG. F. • UNOCCUPIED SPACE TEMPERATURE SETTINGS SET POINT FOR COOLING SHALL BE ci5 DEG. F.. SET POINT FOR HEATING SHALL BE 55 DEG. F. • THERMOSTAT CONFIGURATION SWITCHES OR PROGRAM SETTINGS, SHALL BE SET FOR: FAHRENHEIT TEMPERATURE FORMAT, I2 -HOUR TIME DISPLAY AND INTERMITTENT FAN CONTROL. CONFIGURATION SWITCHES AND/OR PROGRAM SETTINGS SHALL BESET FOR STAGING CONTROL APPROPRIATE FOR THE ASSOCIATED H.V.A.. UNIT. AFTER T -STATS ARE PROGRAMMED - ENGAGE "KEYPAD LOCKOUT" TO PREVENT TAMPERING A5 DESCRIBED IN THE INSTALLATION/OPERATING MANUAL. • THE PROGRAMMABLE THERMOSTAT(S) SHALL CONTROL ALL HEATING/COOLING AND "SET BACK" FUNCTIONS OF THE H.VA.C. EQUIPMENT. NOTES: I. MECHANICAL CONTRACTOR SHALL VISIT SITE AND VERIFY EXISTING CONDITIONS. MECHANICAL CONTRACTOR 15 RESPONSIBLE FOR REMOVING ALL MECHANICAL EQUIPMENT THAT 15 NOT BEING REUSED. NOTHING SHALL BE ABANDONED IN PLACE. CONTRACTORS TO TURN OFF HVAC, OR COVER ALL RETURN AIR GRILLES WITH PLASTIC OR FILTERING MATERIAL DURING PERIODS OF DEMOLITION AND SANDING OF GYPSUM BOARD TO PREVENT EXCESS DUST FROM ENTERING HVAC. SYSTEM. II FIRE SPRINKLER SYSTEM: THE LANDLORD APPROVED FIRE SPRINKLER CONTRACTOR SHALL SUBMIT A COMPLETE SPRINKLER/FIRE PROTECTION PLAN FOR THE TENANT SPACE INCLUDING LOCATION AND TYPE OF ALL SPRINKLER HEADS, CHANGES TO EXISTING SPRINKLER MAINS OR BRANCH PIPING, AND LOCATION AND TYPE OF REQUIRED ALARM DEVICES. ALL WORK SHALL CONFORM TO N.F.PA. AND LOCAL FIRE OFFICIAL REQUIREMENTS. ALL WORK SHALL BE SCHEDULED WITH LANDLORD'S FIELD REPRESENTATIVE. ALL SYSTEMS SHALL BE CHARGED AND OPERATIONAL WHEN THE CONTRACTOR 15 NOT ON THE PREMISES. SEE LANDLORD'S "FIRE PROTECTION DESIGN CRITERIA" FOR FURTHER DIRECTION AND REQUIREMENTS. (TVP.) MECHANICAL PLAN 0 1' 3' 5' 10' 2' 4' i,5 vhc�P� LA014(/1-- 44 / 3 7D MECHANICAL GENERAL NOTES: I. ALL WORK SHALL BE IN ACCORDANCE WI/LOCAL, COUNTY AND FEDERAL CODES $ REGULATIONS. 2. CONTRACTOR SHALL VISIT SITE AND BE FULLY AWARE OF, ALL EXISTING CONDITIONS PRIOR TO PROPOSAL. 3. FIELD VERIFY ALL SYSTEMS AND REPORT DISCREPANCIES TO MAURICES PROJECT MANAGER FOR RESOLUTION. 4. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED UTILITY SERVICE UPGRADES, INSPECTIONS AND PERMITS. 5. CONTRACTOR SHALL COORDINATE ALL CUTTING, PATCHING AND NEW ROOF PENETRATIONS WITH LANDLORD AND/dR LANDLORD'S ROOFING CONTRACTOR. 6. CONTRACTOR SHALL COORDINATE ALL WORK WITH ARCHITECTURAL, ELECTRICAL AND STRUCTURAL DRAWINGS. 1. CONTRACTOR SHALL PROVIDE ALL MATERIALS, EQUIPMENT AND LABOR, EXCEPT AS NOTED, AS NECESSARY FOR A COMPLETE WORKABLE SYSTEM. CONTRACTOR SHALL GUARANTEE THAT WORK DONE UNDER THIS SPECIFICATION WILL BE FREE FROM FAULTY MATERIALS OR WORKMANSHIP AND HEREBY AGREES TO REPAIR OR REPLACE ANY SYSTEM IN SAID WORK FOR A PERIOD OF ONE YEAR. BALANCING CONTRACTOR SHALL TEST AND BALANCE ALL EQUIPMENT TO PERFORM AND DELIVER SPECIFIED QUANTITIES - PROVIDE BALANCE REPORT TO CODE' OFFICIALS, LANDLORD AND MAURICES, INC.. 10. CONTRACTOR SHALL SUBMIT 2 -SETS OF SHOP DRAWINGS AND MANUFACTURERS CATALOGS OR BROCHURES ON NEW PRODUCTS FOR APPROVAL BY THE ARCHITECT. II. FLEX DUCT SHALL NOT EXCEED 1 -LIN. FEET. NO FIBERGLASS DUCTWORK ALLOWED -- ALL RIGID DUCTWORK SHALL BE SHEET METAL. 12. ALL ELECTRIC -EQUIPMENT SHALL BE LISTED BY UNDERWRITERS LABS. 13. REFER TO LANDLORD'S "TENANT CRITERIA", AND BASE BUILDING PLANS FOR FURTHER INFORMATION AND DIRECTION. COORDINATE THE EXTENSION, MODIFICATION, FINAL CONNECTIONS AND TESTING OF ALL SYSTEMS WITH THE LANDLORD'S FIELD REPRESENTATIVE. (TVP.) MECHNICAL CODED NOTES OMAURICES SHALL FURNISH AND MECHANICAL CONTRACTOR SHALL INSTALL A NEW HONEYWELL 1 DAY PROGRAMMABLE THERMOSTAT AT 5 FT. ABOVE FINISHED FLOOR. COORDINATE EXACT LOCATION WITH GENERAL CONTRACTOR. THERMOSTAT MUST BE FULLY COMPATIBLE WITH HVAC UNIT USED FOR PROJECT, COORDINATE TYPE WITH UNIT MANUFACTURER. O GENERAL CONTRACTOR SHALL REUSE EXISTING ROOF TOP UNIT (EX. RTU -2). PROVIDE 3 SETS OF 2" FILTERS, CHANGE FILTER AFTER FINAL STORE CLEANING AND AGAIN PRIOR TO AIR BALANCE. CHEMICALLY CLEAN COILS, REBALANCE FAN AND REPLACE BELTS, REPLACE/REPAIR ANY DEFiCTIVE PARTS. GREASE AND/OR REPLACE (IF REQUIRED) FAN BEARINGS. CHECK CONTROLS FOR PROPER OPERATION AND MOTOR FOR PROPER FAN PERFORMANCE. CLEAN, AND/OR REPLACE CONDENSATE LINE AS REQUIRED. FIELD VERIFY EXACT LOCATION AND REQUIREMENTS. TERMINATE EXISTING DUCTWORK AT THIS POINT AND GAP END OF DUCT AIRTIGHT. REUSE EXISTING DUCT MOUNTED RETURN AIR SMOKE DETECTOR. CLEAN, INSPECT AND REPAIR AS REQUIRED FOR PROPER OPERATION. EF -I: MECHANICAL CONTRACTOR TO PROVIDE NEW EXHAUST FAN TO REPLACE EXISTING, COMPLETE WITH INTEGRAL BAGKD,RAFT DAMPER. EXHAUST CAPACITY SHALL BE 15 CFM AT 0.5" S.F. INSTALL AND SECURE PER MANUFACTURER'S INSTRUCTIONS. CONNECT TO EXISTING EXHAUST DUCT SERVING TOILET ROOM. 0 ZD -I: ZONE DAMPER, TRANSFORMER, AND THERMOSTAT FURNISHED AND INSTALLED BY MECHANICAL CONTRACTOR. YOUNO'S REGULATOR: MODEL #4010 -PO ROUND 2 -POSITION DAMPER, THERMOSTAT T312, TRANSFORMER #3035 24V/I20 40VA. REFER TO SHEET E -I FOR J -BOX LOCATION ACCESSIBLE IN PLENUM NEAR ZONE DAMPER AND INSTALL 24V/120V4OVA TRANSFORMED. MECHANICAL CONTRACTOR TO FURNISH AND INSTALL THREE CONDUCTOR PLENUM RATED SHIELDED, 24V CONTROL WIRE BETWEEN. TRANSFORMER, THERMOSTAT AND DAMPER MOTOR A5 DIAGRAMED ON M-2 ZONE DAMPER DETAIL (WHERE REQUIRED BY CODE, THE MECHANICAL CONTRACTOR 15 TO INSTALL TEMPERATURE CONTROL WIRING IN CONDUIT. ELECTRICAL CONTRACTOR 15 TO FURNISH AND INSTALL CONDUIT WITH PULL WIRE.) ELECTRICAL CONTRACTOR TO PROVIDE 120V POWER TO TRANSFORMER AS INDICATED ON SHEET E-2. INSTALL THERMOSTAT AT 45" ABOVE FINISHED FLOOR. OEXISTING SA 4 RA DUCTS SHALL BE REUSED AS NOTED. CLEAN, INSPECT AND REPAIR DUCTS AS REQUIRED. SEAL UNUSED OPENINGS AIRTIGHT. REPAIR DAMAGED INSULATION IN KIND. REPAIR/REPLACE HANGERS 0 TOILET ROOM FIXTURES TO REMAIN AND BE REUSED. CLEAN, INSPECT, REFURBISH, AND REPAIR TO LIKE NEW CONDITION. OGENERAL CONTRACTOR SHALL REUSE A5 MUCH AS POSSIBLE FROM THE EXISTING SPRINKLER SYSTEM AND ALARM SYSTEM. COORDINATE WITH LANDLORD. THE SPRINKLER HEADS IN THE STORE FRONT AND SALES AREA ARE TO BE RECEJLD ANDIWHITE. MODIFY SYSTEM A5 REQUIRED TO MEET CODE. PROVIDE INSPECTIONS TEST CONNECTION PER LANDLORD REQUIREMENTS. COORDINATE WITH LANDLORD AND AUTHORITY HAVING JURISDICTION. 10 SPRINKLER HEADS SHOWN FOR REFERENCE ONLY. FIRE PROTECTION PROFESSIONAL TO DETERMINE ACTUAL AMOUNT AND LOCATION OF HEADS. SPRINKLER HEADS SHALL BE LINED UP WITH LIGHTS. COORDINATE WITH LANDLORD AND TENANT. II MOUNT TRANSFER GRILLE A5 HIGH A5 POSSIBLE. 12 REPLACE EXISTING ROOFTOP UNIT WITH NEW UNIT IN SAME LOCATION. FIELD VERIFY EXACT LOCATION AND ORIENTATION OF EXISTING UNIT PRIOR TO BID/CONSTRUCTION. LANDLORD TO INSTALL AN ELECTRIC COOLING/GAS HEATING ROOFTOP UNIT. FIELD VERIFY EXACT LOCATION AND SIZE. PROVIDE RTU WITH 3 5E15 OF FILTERS. CHANGE FILTER AFTER FINAL STORE CLEANING AND AGAIN FRIOR TO AIR BALANCE: SEE ROOFTOP HVAC UNIT SCHEDULE FOR FURTHER INFORMATION. 13 PROVIDE SUPPLY DEMAND CONTROL VENTILATION WITH NEW TRANE "RTU -I". PROVIDE AND INSTALL CO2 SENSOR A5 SHOWN ON PLANS. MOUNT NEXT TO THERMOSTAT. 14 MAKE NEW CONNECTIONS BELOW ROOF TO EXISTING SUPPLY AND RETURN DUCTWORK. RECONFIGURE EXISTING DUCTWORK A5 NECESSARY TO MAKE NEW CONNECTION. FIELD VERIFY SIZE AND LOCATION OF EXISTING DUCTWORK PRIOR TO BID/CONSTRUCTION. 15 UH -I: HORIZONTAL PROJECTION UNIT HEATER FURNISHED AND INSTALLED BY THE MECHANICAL CONTRACTOR WHERE SHOWN ON PLANS. UNIT HEATER TO BE U.L. LISTED AND HAVE A HEATING CAPACITY OF 3.0 KW AT 205V., I PH., WITH SELF CONTAINED THERMOSTAT SET AT 68 DEGREES F. SUSPEND UNIT HEATER FROM THE STRUCTURE 6" BELOW LOWEST STRUCTURAL MEMBER. COORDINATE EXACT LOCATION WITH CONSTRUCTION MANAGER AND PROVIDE ACCESS FOR SERVICE. (EX)RTU- REVIEWED FOR CODE COMPLIANCE APPROVED SEP 11 2013 sW — vI/C. City of Tukwila BUILDING DIVISION NOTE: I. MECHANICAL CONTRACTOR SHALL REUSE EXISTING DUCTWORK WHICH 15 IN GOOD CONDITION TO THE GREATEST EXTENT POSSIBLE. GAP UNUSED OPENINGS. INSPECT AND REPAIR LEAKS, INSULATION AND HANGERS A5 REQUIRED. SYMBOLS & ABBREVIATIONS LEGEND C) THERMOSTAT SENSOR DUCT SMOKE DETECTOR C -�-- UNDERCUT DOOR 2 C-1 DUCT OFFSET Ili- -41 SUPPLY DUCT - UP SUPPLY DUCT - DN RA OR EXH. DUCT UP RA OR EXH. DUCT DN ELBOW TURNING VANES FIRE DAMPER (FD) 2 MANUAL BALANCE DAMPER TRANSITION 2 / 2 •,, 0 SUPPLY DIFFUSER RETURN GRILLE EXHAUST GRILLE SPIN -IN FITTING SPIN -IN FITTING IN/ MAN. BAL. DPR. CONNECT TO EXISTING UPRIGHT SPRINKLER HEAD RECESSED SPRINKLER HEAD CONCEALED SPRINKLER HEAD 0 PENDANT SPRINKLER HEAD X"N ROUND DUCT AB. A/C AD. ABOVE AIR CONDITIONING ACCESS DOOR. AFF. ABOVE FINISHED FLOOR AHU. AIR HANDLING UNIT ARCH. ARCHITECT BDD. BAGKDRAFT DPR. BEL. BLDG. CFM. CLG. CONT. GONTR. COORD. GUN. DIFF. DISC. DN. DPR. EA. EC. EX. EXH. F. DPR. FLEX. FLR. GC. HP.. MAX. MCA. MECH. MFR. MIN. MOCP. MTD. NTS. OA. RA. RTU. SA. 5E. TYP. IN/ BELOW BUILDING CUBIC FEET PER MINUTE CEILING CONTINUATION CONTRACTOR COORDINATE CABINET UNIT HEATER DIFFUSER DISCONNECT DOWN DAMPER EACH ELECTRICAL CONTRACTOR EXISTING EXHAUST FIRE DAMPER FLEXIBLE FLOOR GENERAL CONTRACTOR HORSEPOWER MAXIMUM MAX CIRCIUT AMPACITY MECHANICAL MANUFACTURER MINIMUM MAX OVERCURRENT PROTECTION MOUNTED NOT TO SCALE OUTSIDE AIR RETURN AIR ROOFTOP UNIT SUPPLY AIR SMOKE EXHAUST AIR TYPICAL RECEIVED WITHCITY OF TUKWILA AUG 1 2 2013 PERMIT CENTER 13- 143 1 I W O Cerj Lo O W W CL Z (/)Z ‘4. 2 co WD co it` -J 0 t Co 0 C) 2 0 w J Zj (j w Z I- R w C9 Ce Z }- W W .m Woz co CO W o WcnZE• O 0 U 0 co coLO CD LO tri LO LO L 0 Lo ; _E CO 42 o w F o N z J (0)Ce co Q W 00 z � Wci) (0'U Q zI� r I �w W O E F (/) D Q O oW Cs (/) JOB NO. 2170 DATE: 08-06-13 STORE TEAM: MC/MD-SS/CJ APPROVED BY XX REVISIONS: AECHANICAL PLAN SHEET M-1 OF 22 SHEETS I I I .;n � (TVP.) �I I I I I I V K v 1 I I I I I I I I 1 I I I i 1 IIOI 1 I 1 1 I I I I I I I I I I I I I I I I• 11. ■ I •® ©. © I - 16 RG -2 I I 1 I SD -4 RTU-I I - I O F I � IO fQ�C� I F H _ 16 Q 0I I� I �� 1 1 4 I -405. I O ��� ®� ■ ■ u�© O ZD -I � .��' 540r?I � SD-I1.17:7-1 � ><I 1 1— ®�s� 6 x O r; I ♦ • M loll 405 'rail QI _ ( ?..- M M M-Ai la M 1 � 1 �� I � (TVP.) � I I I 1 5P '8 I 1 I I I sP 18 i I i I sP 's s 11 i CI �$ -, 0 v - III II�-li I;IIIIII1IIIl III 1I I -1 RG -1 I _ ���♦ ����11� �����' 071 •�� illk o ®RTU=1 Ter X18 (� I 12" 3T50G-M 14 ►� :70:111 1210 ` `Q'�y 1 �S®'y 5. I111 Sag 1 • . Mill�'. �Ilr (EX)1604x (pr4 ►� ,w--- � RG -I I �� I RG -I 1111.k -'-7- <� I 1� RG- I \ — —-- OI(TYP.)121 12"�In'ul I a• �'I��■ low ��� I I I I -1_1 �� 1O' .`��`�NT-LT -.mom ���1�! IO� 14 SD -2 ti ���al,� 1 itt .4m1 ©'250 �iu�oMI'r►Ir t., ° ® I O 1 1 1 I 12' w I �--- I I T �- I '`NO YAH i ' EX. RTU -2 .pvr�� 0 (EX)I6"� (E)Q20' o —I. -- c'� • 'L ' I ®� ZSOO CFM I ��•�: I I I `�' I I (EX)I6"w I' (EX)12"w I _J - PI2-- / I I 12". 11 \ ,1 % / , ►4 I I ►1 I I2 w I\ i I •• r ----11 5D -I I ` /,►1121w I�.v,� ,� w $ I 1 al Mar° 405 _ I B�����.,, . _� �►II ' Q 18• I A-4' A-4' B .,� \�A-4 B (TYR) _p A-4 �i�ro 0 0 RG -2 RG -I 0 1 O8 B O 15D // B 1 Q 5D -I t _ I _ 1s -I \� SD -I pvy ry W © I O 1SH O I 1 1 1 405 1s ��►; 415 B I 1 1405 1 15P I I 10 I � I r I I I I I I I I O X r---, r- I I 1 I I I 1 `Al Ih6. I a BI O I I I I I w h\\� i�\\- 1 �� _ O I I I I I I UH -I 1 ;` \` ' L I �/ 1[• 300 1 1 ; I 1i; `�i 1i \�I Z �I- F _ I I I I I I \ I I I �J I I I I I I M I_ •I W J P1 I 5D-2 I af. I L RG -I I I RG -I RG -I I J\ I I , I - to (TVP.) 1 1 III IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIILIIII I K 250 . A I I )- _ 1 1 0 .\ Mr II o .-- 1.-4 tostsI I I I I 1 �� I t► c Awn! ..X11 I %PI - .. 11 I. S %IP I I I I6 x12 1 I I I 16"x12"� \ 1111k1 0 H\ 1 5P 1 I I I I 5P 18 I I sP 's I 1 I 5P 118 O I 1 F d- � I P "r�II W , SD -I 5D -I � � 5D -I \ I(�ITTI I -I 111111I111111IIIIIIIIIIIIIII - 9 _I� ■ - I IAN I 4.30 435 la 435 1%,„.M - T� ■ M 1 M I 1...\_ 1 M Mr I M \ 0 'I �� 1 BI Q I I I I I I I I I I I I 1 I5 I �� • • , / A -12'A-30 A124 1 1 f .-s' iIiiu.. IFI I IFI 0 IFI -FI I - IFI O IP� ( O IFI I0 300 L I I 1 I I I J W lill. _- I I I I I 1 I 1 0 0 0 ' 0 ' '. ' , ' 4, I _ I 1 1 1 1 1'I I I I I 11 1 1 1 I 1 1 1 1 1 1 I 1 1 1 1 1 I I I I I I I I I I 1 1 1 1 1 - I 121'10 I I I 12"w I I 1,; I 121 w 12� 1 0 I I I I - I 1.\ I I� I I 1 I I 1 1 1 — (Ex)24 x16 (EX, —► I6"w I I — 7-- I -� I 1— -1- I � I— I 1 I I I T PROGRAMMABLE THERMOSTATS "HONEYWELL" #T1351F2010 THERMOSTAT. MAURICES SHALL FURNISH- MECHANICAL CONTRACTOR INSTALL AND PROGRAM T -STATS FOR EACH UNIT AS SHOWN ON PLAN A5 FOLLOWS: • H.VA.C. UNIT(5) SHALL "START UP" (OCCUPIED MODE), MONDAY THRU SUNDAY (1 -DAYS) BY MALL/STORE OPENING TIME AND "SETBACK" (UNOCCUPIED MODE) AT MALL/STORE CLOSING TIME. CONTRACTOR SHALL VERIFY STORE OPERATING HOURS WITH STORE MANAGER OR MALL MANAGEMENT. • IF MULTIPLE UNITS EXIST, START EACH ONE UP AT INTERVALS OF 15 MINUTES. APART AND HAVE ALL UNITS OPERATING BY ONE HOUR AFTER OPENING. • OCCUPIED SPACE TEMPERATURE SETTINGS - SET POINT FOR COOLING SHALL BE 14 DEG.F.. SET POINT FOR HEATING SHALL BE 68 DEG. F. • UNOCCUPIED SPACE TEMPERATURE SETTINGS SET POINT FOR COOLING SHALL BE ci5 DEG. F.. SET POINT FOR HEATING SHALL BE 55 DEG. F. • THERMOSTAT CONFIGURATION SWITCHES OR PROGRAM SETTINGS, SHALL BE SET FOR: FAHRENHEIT TEMPERATURE FORMAT, I2 -HOUR TIME DISPLAY AND INTERMITTENT FAN CONTROL. CONFIGURATION SWITCHES AND/OR PROGRAM SETTINGS SHALL BESET FOR STAGING CONTROL APPROPRIATE FOR THE ASSOCIATED H.V.A.. UNIT. AFTER T -STATS ARE PROGRAMMED - ENGAGE "KEYPAD LOCKOUT" TO PREVENT TAMPERING A5 DESCRIBED IN THE INSTALLATION/OPERATING MANUAL. • THE PROGRAMMABLE THERMOSTAT(S) SHALL CONTROL ALL HEATING/COOLING AND "SET BACK" FUNCTIONS OF THE H.VA.C. EQUIPMENT. NOTES: I. MECHANICAL CONTRACTOR SHALL VISIT SITE AND VERIFY EXISTING CONDITIONS. MECHANICAL CONTRACTOR 15 RESPONSIBLE FOR REMOVING ALL MECHANICAL EQUIPMENT THAT 15 NOT BEING REUSED. NOTHING SHALL BE ABANDONED IN PLACE. CONTRACTORS TO TURN OFF HVAC, OR COVER ALL RETURN AIR GRILLES WITH PLASTIC OR FILTERING MATERIAL DURING PERIODS OF DEMOLITION AND SANDING OF GYPSUM BOARD TO PREVENT EXCESS DUST FROM ENTERING HVAC. SYSTEM. II FIRE SPRINKLER SYSTEM: THE LANDLORD APPROVED FIRE SPRINKLER CONTRACTOR SHALL SUBMIT A COMPLETE SPRINKLER/FIRE PROTECTION PLAN FOR THE TENANT SPACE INCLUDING LOCATION AND TYPE OF ALL SPRINKLER HEADS, CHANGES TO EXISTING SPRINKLER MAINS OR BRANCH PIPING, AND LOCATION AND TYPE OF REQUIRED ALARM DEVICES. ALL WORK SHALL CONFORM TO N.F.PA. AND LOCAL FIRE OFFICIAL REQUIREMENTS. ALL WORK SHALL BE SCHEDULED WITH LANDLORD'S FIELD REPRESENTATIVE. ALL SYSTEMS SHALL BE CHARGED AND OPERATIONAL WHEN THE CONTRACTOR 15 NOT ON THE PREMISES. SEE LANDLORD'S "FIRE PROTECTION DESIGN CRITERIA" FOR FURTHER DIRECTION AND REQUIREMENTS. (TVP.) MECHANICAL PLAN 0 1' 3' 5' 10' 2' 4' i,5 vhc�P� LA014(/1-- 44 / 3 7D MECHANICAL GENERAL NOTES: I. ALL WORK SHALL BE IN ACCORDANCE WI/LOCAL, COUNTY AND FEDERAL CODES $ REGULATIONS. 2. CONTRACTOR SHALL VISIT SITE AND BE FULLY AWARE OF, ALL EXISTING CONDITIONS PRIOR TO PROPOSAL. 3. FIELD VERIFY ALL SYSTEMS AND REPORT DISCREPANCIES TO MAURICES PROJECT MANAGER FOR RESOLUTION. 4. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED UTILITY SERVICE UPGRADES, INSPECTIONS AND PERMITS. 5. CONTRACTOR SHALL COORDINATE ALL CUTTING, PATCHING AND NEW ROOF PENETRATIONS WITH LANDLORD AND/dR LANDLORD'S ROOFING CONTRACTOR. 6. CONTRACTOR SHALL COORDINATE ALL WORK WITH ARCHITECTURAL, ELECTRICAL AND STRUCTURAL DRAWINGS. 1. CONTRACTOR SHALL PROVIDE ALL MATERIALS, EQUIPMENT AND LABOR, EXCEPT AS NOTED, AS NECESSARY FOR A COMPLETE WORKABLE SYSTEM. CONTRACTOR SHALL GUARANTEE THAT WORK DONE UNDER THIS SPECIFICATION WILL BE FREE FROM FAULTY MATERIALS OR WORKMANSHIP AND HEREBY AGREES TO REPAIR OR REPLACE ANY SYSTEM IN SAID WORK FOR A PERIOD OF ONE YEAR. BALANCING CONTRACTOR SHALL TEST AND BALANCE ALL EQUIPMENT TO PERFORM AND DELIVER SPECIFIED QUANTITIES - PROVIDE BALANCE REPORT TO CODE' OFFICIALS, LANDLORD AND MAURICES, INC.. 10. CONTRACTOR SHALL SUBMIT 2 -SETS OF SHOP DRAWINGS AND MANUFACTURERS CATALOGS OR BROCHURES ON NEW PRODUCTS FOR APPROVAL BY THE ARCHITECT. II. FLEX DUCT SHALL NOT EXCEED 1 -LIN. FEET. NO FIBERGLASS DUCTWORK ALLOWED -- ALL RIGID DUCTWORK SHALL BE SHEET METAL. 12. ALL ELECTRIC -EQUIPMENT SHALL BE LISTED BY UNDERWRITERS LABS. 13. REFER TO LANDLORD'S "TENANT CRITERIA", AND BASE BUILDING PLANS FOR FURTHER INFORMATION AND DIRECTION. COORDINATE THE EXTENSION, MODIFICATION, FINAL CONNECTIONS AND TESTING OF ALL SYSTEMS WITH THE LANDLORD'S FIELD REPRESENTATIVE. (TVP.) MECHNICAL CODED NOTES OMAURICES SHALL FURNISH AND MECHANICAL CONTRACTOR SHALL INSTALL A NEW HONEYWELL 1 DAY PROGRAMMABLE THERMOSTAT AT 5 FT. ABOVE FINISHED FLOOR. COORDINATE EXACT LOCATION WITH GENERAL CONTRACTOR. THERMOSTAT MUST BE FULLY COMPATIBLE WITH HVAC UNIT USED FOR PROJECT, COORDINATE TYPE WITH UNIT MANUFACTURER. O GENERAL CONTRACTOR SHALL REUSE EXISTING ROOF TOP UNIT (EX. RTU -2). PROVIDE 3 SETS OF 2" FILTERS, CHANGE FILTER AFTER FINAL STORE CLEANING AND AGAIN PRIOR TO AIR BALANCE. CHEMICALLY CLEAN COILS, REBALANCE FAN AND REPLACE BELTS, REPLACE/REPAIR ANY DEFiCTIVE PARTS. GREASE AND/OR REPLACE (IF REQUIRED) FAN BEARINGS. CHECK CONTROLS FOR PROPER OPERATION AND MOTOR FOR PROPER FAN PERFORMANCE. CLEAN, AND/OR REPLACE CONDENSATE LINE AS REQUIRED. FIELD VERIFY EXACT LOCATION AND REQUIREMENTS. TERMINATE EXISTING DUCTWORK AT THIS POINT AND GAP END OF DUCT AIRTIGHT. REUSE EXISTING DUCT MOUNTED RETURN AIR SMOKE DETECTOR. CLEAN, INSPECT AND REPAIR AS REQUIRED FOR PROPER OPERATION. EF -I: MECHANICAL CONTRACTOR TO PROVIDE NEW EXHAUST FAN TO REPLACE EXISTING, COMPLETE WITH INTEGRAL BAGKD,RAFT DAMPER. EXHAUST CAPACITY SHALL BE 15 CFM AT 0.5" S.F. INSTALL AND SECURE PER MANUFACTURER'S INSTRUCTIONS. CONNECT TO EXISTING EXHAUST DUCT SERVING TOILET ROOM. 0 ZD -I: ZONE DAMPER, TRANSFORMER, AND THERMOSTAT FURNISHED AND INSTALLED BY MECHANICAL CONTRACTOR. YOUNO'S REGULATOR: MODEL #4010 -PO ROUND 2 -POSITION DAMPER, THERMOSTAT T312, TRANSFORMER #3035 24V/I20 40VA. REFER TO SHEET E -I FOR J -BOX LOCATION ACCESSIBLE IN PLENUM NEAR ZONE DAMPER AND INSTALL 24V/120V4OVA TRANSFORMED. MECHANICAL CONTRACTOR TO FURNISH AND INSTALL THREE CONDUCTOR PLENUM RATED SHIELDED, 24V CONTROL WIRE BETWEEN. TRANSFORMER, THERMOSTAT AND DAMPER MOTOR A5 DIAGRAMED ON M-2 ZONE DAMPER DETAIL (WHERE REQUIRED BY CODE, THE MECHANICAL CONTRACTOR 15 TO INSTALL TEMPERATURE CONTROL WIRING IN CONDUIT. ELECTRICAL CONTRACTOR 15 TO FURNISH AND INSTALL CONDUIT WITH PULL WIRE.) ELECTRICAL CONTRACTOR TO PROVIDE 120V POWER TO TRANSFORMER AS INDICATED ON SHEET E-2. INSTALL THERMOSTAT AT 45" ABOVE FINISHED FLOOR. OEXISTING SA 4 RA DUCTS SHALL BE REUSED AS NOTED. CLEAN, INSPECT AND REPAIR DUCTS AS REQUIRED. SEAL UNUSED OPENINGS AIRTIGHT. REPAIR DAMAGED INSULATION IN KIND. REPAIR/REPLACE HANGERS 0 TOILET ROOM FIXTURES TO REMAIN AND BE REUSED. CLEAN, INSPECT, REFURBISH, AND REPAIR TO LIKE NEW CONDITION. OGENERAL CONTRACTOR SHALL REUSE A5 MUCH AS POSSIBLE FROM THE EXISTING SPRINKLER SYSTEM AND ALARM SYSTEM. COORDINATE WITH LANDLORD. THE SPRINKLER HEADS IN THE STORE FRONT AND SALES AREA ARE TO BE RECEJLD ANDIWHITE. MODIFY SYSTEM A5 REQUIRED TO MEET CODE. PROVIDE INSPECTIONS TEST CONNECTION PER LANDLORD REQUIREMENTS. COORDINATE WITH LANDLORD AND AUTHORITY HAVING JURISDICTION. 10 SPRINKLER HEADS SHOWN FOR REFERENCE ONLY. FIRE PROTECTION PROFESSIONAL TO DETERMINE ACTUAL AMOUNT AND LOCATION OF HEADS. SPRINKLER HEADS SHALL BE LINED UP WITH LIGHTS. COORDINATE WITH LANDLORD AND TENANT. II MOUNT TRANSFER GRILLE A5 HIGH A5 POSSIBLE. 12 REPLACE EXISTING ROOFTOP UNIT WITH NEW UNIT IN SAME LOCATION. FIELD VERIFY EXACT LOCATION AND ORIENTATION OF EXISTING UNIT PRIOR TO BID/CONSTRUCTION. LANDLORD TO INSTALL AN ELECTRIC COOLING/GAS HEATING ROOFTOP UNIT. FIELD VERIFY EXACT LOCATION AND SIZE. PROVIDE RTU WITH 3 5E15 OF FILTERS. CHANGE FILTER AFTER FINAL STORE CLEANING AND AGAIN FRIOR TO AIR BALANCE: SEE ROOFTOP HVAC UNIT SCHEDULE FOR FURTHER INFORMATION. 13 PROVIDE SUPPLY DEMAND CONTROL VENTILATION WITH NEW TRANE "RTU -I". PROVIDE AND INSTALL CO2 SENSOR A5 SHOWN ON PLANS. MOUNT NEXT TO THERMOSTAT. 14 MAKE NEW CONNECTIONS BELOW ROOF TO EXISTING SUPPLY AND RETURN DUCTWORK. RECONFIGURE EXISTING DUCTWORK A5 NECESSARY TO MAKE NEW CONNECTION. FIELD VERIFY SIZE AND LOCATION OF EXISTING DUCTWORK PRIOR TO BID/CONSTRUCTION. 15 UH -I: HORIZONTAL PROJECTION UNIT HEATER FURNISHED AND INSTALLED BY THE MECHANICAL CONTRACTOR WHERE SHOWN ON PLANS. UNIT HEATER TO BE U.L. LISTED AND HAVE A HEATING CAPACITY OF 3.0 KW AT 205V., I PH., WITH SELF CONTAINED THERMOSTAT SET AT 68 DEGREES F. SUSPEND UNIT HEATER FROM THE STRUCTURE 6" BELOW LOWEST STRUCTURAL MEMBER. COORDINATE EXACT LOCATION WITH CONSTRUCTION MANAGER AND PROVIDE ACCESS FOR SERVICE. (EX)RTU- REVIEWED FOR CODE COMPLIANCE APPROVED SEP 11 2013 sW — vI/C. City of Tukwila BUILDING DIVISION NOTE: I. MECHANICAL CONTRACTOR SHALL REUSE EXISTING DUCTWORK WHICH 15 IN GOOD CONDITION TO THE GREATEST EXTENT POSSIBLE. GAP UNUSED OPENINGS. INSPECT AND REPAIR LEAKS, INSULATION AND HANGERS A5 REQUIRED. SYMBOLS & ABBREVIATIONS LEGEND C) THERMOSTAT SENSOR DUCT SMOKE DETECTOR C -�-- UNDERCUT DOOR 2 C-1 DUCT OFFSET Ili- -41 SUPPLY DUCT - UP SUPPLY DUCT - DN RA OR EXH. DUCT UP RA OR EXH. DUCT DN ELBOW TURNING VANES FIRE DAMPER (FD) 2 MANUAL BALANCE DAMPER TRANSITION 2 / 2 •,, 0 SUPPLY DIFFUSER RETURN GRILLE EXHAUST GRILLE SPIN -IN FITTING SPIN -IN FITTING IN/ MAN. BAL. DPR. CONNECT TO EXISTING UPRIGHT SPRINKLER HEAD RECESSED SPRINKLER HEAD CONCEALED SPRINKLER HEAD 0 PENDANT SPRINKLER HEAD X"N ROUND DUCT AB. A/C AD. ABOVE AIR CONDITIONING ACCESS DOOR. AFF. ABOVE FINISHED FLOOR AHU. AIR HANDLING UNIT ARCH. ARCHITECT BDD. BAGKDRAFT DPR. BEL. BLDG. CFM. CLG. CONT. GONTR. COORD. GUN. DIFF. DISC. DN. DPR. EA. EC. EX. EXH. F. DPR. FLEX. FLR. GC. HP.. MAX. MCA. MECH. MFR. MIN. MOCP. MTD. NTS. OA. RA. RTU. SA. 5E. TYP. IN/ BELOW BUILDING CUBIC FEET PER MINUTE CEILING CONTINUATION CONTRACTOR COORDINATE CABINET UNIT HEATER DIFFUSER DISCONNECT DOWN DAMPER EACH ELECTRICAL CONTRACTOR EXISTING EXHAUST FIRE DAMPER FLEXIBLE FLOOR GENERAL CONTRACTOR HORSEPOWER MAXIMUM MAX CIRCIUT AMPACITY MECHANICAL MANUFACTURER MINIMUM MAX OVERCURRENT PROTECTION MOUNTED NOT TO SCALE OUTSIDE AIR RETURN AIR ROOFTOP UNIT SUPPLY AIR SMOKE EXHAUST AIR TYPICAL RECEIVED WITHCITY OF TUKWILA AUG 1 2 2013 PERMIT CENTER 13- 143 1 I W O Cerj Lo O W W CL Z (/)Z ‘4. 2 co WD co it` -J 0 t Co 0 C) 2 0 w J Zj (j w Z I- R w C9 Ce Z }- W W .m Woz co CO W o WcnZE• O 0 U 0 co coLO CD LO tri LO LO L 0 Lo ; _E CO 42 o w F o N z J (0)Ce co Q W 00 z � Wci) (0'U Q zI� r I �w W O E F (/) D Q O oW Cs (/) JOB NO. 2170 DATE: 08-06-13 STORE TEAM: MC/MD-SS/CJ APPROVED BY XX REVISIONS: AECHANICAL PLAN SHEET M-1 OF 22 SHEETS DIVISION FIFTEEWMEGHANICAL 15001 DESIGN INFORMATION NOTE: CARE SHOULD BE TAKEN TO AVOID MODIFICATION TO IN-PLACE SPRINKLER HEADS WHEREVER POSSIBLE. GENERAL NOTES: I. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS. 2. PATCH ALL OPENINGS IN WALLS, ROOFS, AND FLOORS TO MATCH EXISTING WHERE MECHANICAL EQUIPMENT, DUCTS, OR PIPES HAVE BEEN REMOVED. 3. PATCH OPENINGS IN DUCTS THAT ARE TO REMAIN ACTIVE AND HAVE HAD A SECTION OR BRANCH DUCT REMOVED. ALSO, REPAIR DUCT LINING 50 IT 15 CONTINUOUS. 4. THE INSTALLATION OF NEW DUCTS, PIPES, AND EQUIPMENT MAY REQUIRE THE REMOVAL OF EXISTING WALLS AND CEILINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING AND REPAIRING THESE WALLS AND/OR CEILINGS 50 THEY MATCH THE EXISTING WHERE NOT REPLACED UNDER ARCHITECTURAL DIVISION. 5. CONTRACTOR TO COORDINATE THE LOCATION OF ALL DUCTWORK AND DIFFUSERS WITH LIGHTING PLAN PRIOR TO BEGINNING WORK. 6. MAXIMUM FLEXIBLE DUCT LENGTH NOT TO EXCEED 1'-0" OR AS REQUIRED BY LOCAL CODE, WHICHEVER 15 THE LEAST LENGTH. 1. MECHANICAL CONTRACTOR SHALL HAVE READ AND BE FAMILIAR WITH THE GENERAL AND ELECTRICAL SPECIFICATIONS AND PLANS. S. MECHANICAL CONTRACTOR SHALL PROVIDE "AS -BUILT" DRAWINGS OF ALL MECHANICAL SYSTEMS UPON COMPLETION OF WORK TO MAURICES INCORPORATED. NOTIFY MAURICE5 IN WRITING OF ANY DEVIATIONS FROM THE PLANS. MAJOR DEVIATIONS MUST BE APPROVED BY THE MECHANICAL ENGINEER IN WRITING BEFORE IMPLEMENTATION. SCOPE OF WORK: FURNISH ALL LABOR, EQUIPMENT, SUPPLIES * MATERIALS. PERFORM ALL OPERATIONS NECESSARY FOR THE INSTALLATION OF COMPLETE AND OPERABLE MECHANICAL SYSTEM. PROVE SATISFACTORY OPERATION OF ALL EQUIPMENT AND CONTROLS TO MAURICES. CHECK AND RECONDITION EXISTING MECHANICAL AND PLUMBING SYSTEMS FOR OPTIMUM PERFORMANCE DURING FUTURE USE. INFORM MAURICES AND LANDLORD, IN WRITING, OF ANY MAJOR MAINTENANCE AND/OR REPLACEMENT PROCEDURES ARE NECESSARY PRIOR TO UNDER TAKING SAME. EXCAVATION AND BACKFILL: DO ALL EXCAVATING AND BACKFILLING REQUIRED BY THE WORK IN THIS DIVISION. FOUNDATIONS AND SUPPORTS: FURNISH AND INSTALL ALL BASES AND SUPPORTS FOR MECHANICAL EQUIPMENT, UNLESS SPECIFIED OTHERWISE. IDENTIFICATIONS: I. MAIN DOMESTIC COLD WATER; MAIN DOMESTIC HOT WATER AND ALL GAS VALVES SHALL BE IDENTIFIED BY BRASS OR PLASTIC DISK. 2. ALL FIRE DAMPERS AND THEIR ACCESS DOORS SHALL BE IDENTIFIED BY PRINTED STENCIL SECURED TO THE ACCESS DOOR OR A LOCATION APPROVED BY MAURICES. BALANCING: AT THE COMPLETION OF THE INSTALLATION, THE MECHANICAL SYSTEM SHALL BE BALANCED BY THE CONTRACTOR. PROVIDE MAURICES WITH TABULATIONS. OPERATING AND MAINTENANCE INSTRUCTIONS: OPERATING AND MAINTENANCE INSTRUCTION SHALL BE DELIVERED TO THE MAURICES CONSTRUCTION REPRESENTATIVE ON COMPLETION OF THE WORK. MECHANICAL CONTRACTOR SHALL INSTRUCT THE STORE MANAGER ON OPERATION OF ALL EQUIPMENT UNDER HIS CONTRACT. ALL LIGHTING AND ELECTRICAL REQUIREMENTS SHALL TAKE PRECEDENCE OVER MECHANICAL REQUIREMENTS IN THAT NO MECHANICAL SYSTEM GRILLES, DIFFUSERS, OR DEVICES OF ANY NATURE SHALL PENETRATE THROUGH DECORATIVE FIXTURES, LIGHTING ELEMENTS, OR MIRRORS. COORDINATE LOCATIONS PRIOR TO INSTALLATION. GENERAL CONTRACTOR SHALL PROVIDE TENANT NAME AND SPACE NUMBER ON HVAC UNIT(S) AND ANY HVAC RELATED APPENDAGES. REPLACE ALL FILTERS FOR EXISTING HVAC UNIT(5) BEING RETAINED AT END OF CONSTRUCTION. IMPORTANT: SCC ARCHITECTURAL SPECIFICATIONS AND DRAWINGS FOR ADDITIONAL INFORMATION. SEE TASK RESPONSIBILITY LIST ON SHCCT Al OF THE ARCHITECTURAL DRAWINGS FOR BREAKDOWN OF TASK RESPONSIBILITIES. 15440 PLUMBING FIXTURES THE FOLLOWING FIXTURES OR EQUALS SHALL BE PROVIDED (OR RETAINED) IN THE RESTROOM(5) 4 SHALL BE CONNECTED TO COLD WATER LINE * SANITARY SEWER ROUGH -INS. PROVIDE ALL NECESSARY VENTS AND EXHAUSTS AND COORDINATE ALL ROOF CUTS WITH LANDLORD. PROVIDE SHUT-OFF VALVES AT EACH FIXTURE WATER SUPPLY LINE. INVESTIGATE ALL PLUMBING ELEMENTS EXISTING WITHIN THE LEASED AREA(S). NOTIFY MAURICES AND LANDLORD OF ANY EXISTING OR POTENTIAL FUTURE PROBLEM CONDITIONS. CLEAN, REPAIR, OR REPLACE ALL PLUMBING ELEMENTS (E.G., WC, LAV, ETC.) A5 REQUIRED. ALL FIXTURES MUST COMPLY WITH THE CANADIANS WITH DISABILITIES ACT. WHERE CODE PERMITS, CONTRACTOR SHALL RETROFIT EXISTING WATER CLOSETS WITH SEATS BY OLSONITE, OR EQUAL, A5 REQUIRED TO MODIFY EXISTING WATER CLOSETS TO MEET ADA REQUIREMENTS. WHERE FIXTURE REPLACEMENT IS NECESSARY, THE FOLLOWING FIXTURES SHALL BE USED: TAKE OFF SCREWED AND SEALED WITH DUCT SEALANT TO DUCT. CONICAL COLLAR BY MECH. CONTR. EXTERNAL INSULATION WHERE REQUIRED. INNER NYLON 66 DUCTSTRAP CLAMP. SHEET METAL SCREW AT INNER LINER. VOLUME DAMPER ADJUSTMENT. CEILING DIFFUSER (WITH FIRE DAMPER IF REQUIRED) NOTES: FLEXIBLE DUCT 15 TO BE USED FOR VERTICAL DROPS -ONLY. KNOUTS AND ELBOWS ARE TO BE SHEETMETAL DUCT. THE MECHANICAL CONTRACTOR MUST PROVIDE ADAPTERS FOR DIFFUSERS WITH SQUARE AND RECTANGULAR NECKS A5 REQUIRED. INNER LINER TO BE SECURED TO COLLAR BY NYLON STRAP AND THREE SHEET METAL SCREWS TO PREVENT LINER FROM SLIPPING OFF COLLAR. MAXIMUM FLEX DUCT 15 1 FEET. CUT SMALL SLIT IN LINER AT DAMPER ADJUSTMENT IN/STRING OR WIRE MARKER TO SHOW LOCATION. DIFFUSER CONNECTION DETAIL SCALE: NTS SQUARE EL5O1AI AIR FLOW ACCESS DOOR 3" MAX. DOUBLE THICKNESS VANES BRANCH DUCT 45 • L0 3" 3" MIN. RETURN TAP L 0.25x? 3" MIN. BRANCH DUCT AIR FLOW L = 0.25 x 3" MIN. SUPPLY TAP AIR FLOW 45 DEG R R/WMUT BE101 GREATER THAN I. OR EQUAL TO 1.5 45 DEG NO TURNING VANES REQUIRED. I MANUAL AIR DAMPER WITH LOCKING QUADRANT SUPPLY GRILLE WITH INTEGRAL VOLUME DAMPER SUPPLY TAP WITH SUPPLY GRILLE DUCT CONNECTION DETAIL SCALE: NTS ALTERNATE TO RECTANGULAR ELBOW WATER CLOSETS: (IF REPLACEMENT 15 REQUIRED) WHITE, VITREOUS CHINA, SIPHON JET, ELONGATED RIM WATER CLOSET WITH TANK AND TRIM, BACKFLOW PREVENTER, BOLT CAPS, AND ANGLE FLEXIBLE SUPPLY WITH STOP VALVE: KOHLER - "HIGHLINE" #K -3427 -EB; AMERICAN STANDARD - "ELONGATED CADET" #2104.405; CRANE - "RADCLIFFE" #3-144; ELJER - "EMBLEM" #041-1605; UNIVERSAL RUNDLE - "NEW CASTLE" #40241. HANDICAP HEIGHT A5 REQUIRED. SEATS WHITE, SOLID PLASTIC, OPEN FRONT SEAT, LESS COVER: OLSONITE #I6 -GC; 5ENEKE #523; KOHLER #K -4610-C; BEMIS #1455-C; ELJER #124-0355; OLSONITE "HANDI-AID" #L -240/L-24 OR SIMILAR. LAVATORY (IE REPLACEMENT 15 REQUIRED) WHITE, VITREOUS CHINA, WALL HUNG, 20" X IS" LAVATORY WITH BACK. G.P. ALL BRASS I-1/4" TRAP, SUPPLY AND WASTE FITTING. CONGEALED WALL CARRIER. MOUNT AS PER AMERICANS WITH DISIBILITIES ACT REQUIREMENTS FOR HANDICAP ACCESS WIT I- RIM HEIGHT AT 34" ABOVE FINISHED FLOOR. INSULATE TRAP AND HW SUPPLY. KOHLER "GREENWICH" #K-2032; AMERICAN STANDARD - "LUCERNE" *0355.012; CRANE - "NORWICH" #I-144-5; ELJER - DELWYN #051-1848. PROVIDE PERFORATED STRAINER, ANGLE SUPPLIES $ STOPS AND TRAP WITH CLEANOUT A5 SUPPLIED BY MANUFACTURER. CARRIERS SM#ALL BE: JOSAM 17100; WADE W 520; SMITH #700; ZURN ZR 1231. 15463 ELECTRIC WATER HEATER (IF REPLACEMENT 15 REQUIRED) ELECTRIC WATER HEATER SHALL BE LOCATED ON DECK ABOVE TOILET ROOM. "STATE" #Pb -6 -10M5 -K OR EQUAL, 6 -GALLON STORAGE CAPACITY. 120 VAC, I -PH., 1,650 WATTS,.8 GALLONS PER HR. RECOVERY AT 410 DEG. TEMP. RISE. PROVIDE BALL VALVES, DIELECTRIC UNIONS AND CANADIAN APPROVED T 4 P RELIEF VALVE AND ALL OTHER ACCESSORI 5 AS SHOWN ON "ELECTRIC WATER HEATER DETAIL" AND A5 REQUIRED FOR COMPLETE INSTALLATION. 15240 DUCT INSULATION I. DUCT INSULATION, FOR NEW DUCTWORK, SHALL BE I-1/2" FOIL FACED DUCT WRAP, MINIMUM R-5 AND/OR GREATER AS SPECIFIED ON 'BASE BUILDING" MECHANICAL PLANS AND SPECIFICATIONS OR AS PER EXISTING BUILDING STANDARD. 15320 FIRE PROTEQTION SPRINKLER SYSTEMS FIRE SPRINKLER SYSTEM SHALL BE INSTALLED THROUGHOUT TENANT SPACE AND SHALL CONFORM TO ALL LANDLORD AND UNDERWRITER REQUIREMENTS. REFER TO GENERAL REQUIREMENTS: SPRINKLER SYSTEM SHALL HAVE CONFIGURATION A5 REQUIRED NOT TO INTERFERE WITH STORE FIXTURES, ELECTRICAL OR MECHANICAL WORK. FIRE SPRINKLER HEAD FINISH SHALL MATCH FINISH OF EXISTING FIRE HEADS IF EXISTING (FIELD VERIFY) OR A5 PER BUILDING STANDARD IF NEW SYSTEM. (SEE TASK RESPONSIBILITY LIST). FIRE SPRINK.ERSYSTEM SHALL BE MAINTAINED THROUGHOUT MAURICES SPACE. SPRINKLER SYSTEM SHALL BE MODIFIED, A5 REQ., NOT TO INTERFERE WITH STORE FIXTURES, ELECTRICAL OR MECHANICAL WORK. SPRINKLER CONTRACTOR SHALL PROVIDE SPRINKLER DRAINING FOR LANDLORD'S APPROVAL PRIOR TO PROCEEDING WITH WORK. 15840 DUCTWORK PROVIDE ONE (OR MORE) SUPPLY AIR DUCT AND DIFFUSER(5) AT EACH FITTING ROOM BANK. PROVIDE AN ADJ. DAMPER IN ANY DUCTS THAT ARE EXISTING TO SERVICE AREA. MODIFY, FURNISH OR RELOCATE DUCTWORK, AS REQUIRED OR A5 SHOWN ON PLAN, TO SUPPLY AN AIR DISTRIBUTION SYSTEM FOR THE ENTIRE NEW STORE CONFIGURATION. DUCTWORK SHALL BE IN ACCORDANCE WITH SMACNA DUCT MANUAL, AIA FILE NO. 30-D-4. DUCTWORK MATERIALS: I. ALL DUCTWORK SHALL BE GALVANIZED STEEL EXCEPT AS OTHERWISE CALLED FOR 2. DUCTWORK INCLUDED IN ANY LIFE SAFETY OR SMOKE CONTROL SYSTEM SHALL BE GALVANIZED STEEL. 3. LOW VELOCITY FLEXIBLE DUCTS TO BE GENFLEX, WIREMOLD, THERMAFLEX, PORTODUCT OR CLECON WITH I" THICK INSULATION. ROUND DUCT CONNECTORS TO BE THERMAFLAIR III, GLENFLEX 5M -ID, CLEVAPAK DSC, OR EQUAL. THE FLEXIBLE DUCT MUST BE APPROVED BY THE LOCAL CODE AUTHORITY FOR THE SPECIFIC APPLICATION. DUCT INSULATION: DUCT INSULATION, FOR NEW DUCTWORK, SHALL BE I -I/2" FOIL FACED DUCT WRAP, MINIMUM R-5 AND/OR GREATER A5 SPECIFIED ON 'BASE BUILDING" MECHANICAL PLANS AND SPECIFICATIONS OR A5 PER EXISTING BUILDING STANDARD. ALL EXISTING DUCTWORK BEING REUSED SHALL BE THOROUGHLY CLEANED ON THE INSIDE PRIOR TO REUSE WHETHER RELOCATED OR IN ORIGINAL POSITION. 15415 DAMPERS FIRE DAMPERS SHALL BE FABRICATED 4 INSTALLED IN ACCORDANCE WNL REQ., W/AGCE55 DOOR IN DUCT, FOLDING BLADE DAMPERS IN/FUSIBLE LINK, RUSKIN IBD OR EQUAL A5 APPROVED BY LOCAL CODE AUTHORITY. 15432 REGISTERS, GRILLES, AND DIFFUSERS - AS SPECIFIED ON SHEET M -I AND/OR A5 FOLLOWS: CEILING DIFFUSER: FOUR-WAY, OFF-WHITE BAKED ENAMEL FINISH 4 ROUND NECK. TITUS #TMS; CARNES #SJ; KRUGER *1400. LIMA #150 FOR NON -SALES AREA ONLY. R.A. GRILLE: PERFORATED FACE, OR A5 PER PLAN, OFF-WHITE BAKED ENAMEL FINISH. TITUS #PXP OR *PAR; TUTTLE BAILEY #CTPV; CARNES 43544; KRUGER #11416-A. 15450 MECHANICAL CONTROLS AND INSTRUMENTATION UNLESS OTHERWISE INDICATED, ANY REPLACEMENT MOTORS AND CONTROLS SHALL BE FURNISHED, SET IN PLACE, AND WIRED IN ACCORDANCE WITH THE FOLLOWING SCHEDULE. (M015 MECHANICAL DIVISION; ED 15 ELECTRICAL DIVISION.) IF FURNISHED A5 PART OF FACTORY -WIRED EQUIPMENT, POWER WIRING ONLY BY ED. IF LINE THERMOSTATS, P.E. SWITCHES, TIME SWITCHES, ETC., CARRY THE FULL LOAD CURRENT TO ANY DEVICE, THEY SHALL BE FURNISHED BY THE MECHANICAL DIVISION AND SHALL BE SET IN PLACE AND CONNECTED UNDER THE ELECTRICAL DIVISION. WHERE SUCH ITEMS ARE AN INTEGRAL PART OF THE MECHANICAL EQUIPMENT, OR DIRECTLY ATTACHED TO DUCTS, PIPING, ETC., THEY SHALL BE SET IN PLACE UNDER THE MECHANICAL DIVISION AND CONNECTED BY THE ELECTRICAL DIVISION. IF THEY DO NOT CARRY THE FULL -LOAD CURRENT TO ANY MOTOR, THEY SHALL BE FURNISHED, SET IN PLACE, AND WIRED UNDER THE MECHANICAL DIVISION. CONTROL DEVICES CARRYING FULL -LOAD. CURRENT FURNISHED BY MECHANICAL AND WIRED BY ELECTRICAL SHALL BE LOCATED AT THE DEVICE BEING CONTROLLED UNLESS SHOWN OTHEWNISE ON THE DRAWINGS OR MUTUAL AGREEMENT IS MADE BETWEEN THE CONTRACTORS WITH CHANGE IN THE CONTRACT PRICE. WIRING FROM ALARM CONTACTS TO ALARM SYSTEM BY ED; ALL CONTROL FUNCTION WIRING BY MD. MD SHALL COORDINATE LOCATIONS WITH ED. CONNECTIONS TO ALL CONTROLS DIRECTLY ATTACHED TO DUCTS, PIPING, AND MECHANICAL EQUIPMENT SHALL BE MADE WITH FLEXIBLE CONNECTORS. WIRING: ALL LINE VOLTAGE. WIRING AND INSTALLATION IN CONNECTION WITH THE AUTOMATIC CONTROL SYSTEM SHALL BE BY THE ELECTRICAL CONTRACTOR AND SUPERVISED BY THE MECHANICAL CONTRACTOR. THE MECHANICAL CONTRACTOR SHALL PROVIDE TO THE ELECTRICAL CONTRACTOR TWO (2) COPIES OF THE COMPLETE SUBMITTAL INCLUDING TERMINAL WIRING DIAGRAMS. UPON COMPLETION OF THE INSTALLATION, MECHANICAL CONTRACTOR SHALL LINK ALL VALVES AND DAMPERS AND SHALL CHECK OUT AND CALIBRATE CONTROLS FURNISHED UNDER THIS SECTION. WHEN HVAC UNIT(5) ARE EQUIPPED WITH ECONOMIZER OPTION, THE FOLLOWING SHALL APPLY: BELOW 55 DEG. F. OUTSIDE TEMPERATURE, AN OUTSIDE AIR CHANGEOVER THERMOSTAT WILL LOCK OUT THE COMPRESSOR AND MODULATE THE RETURN AIR AND OUTSIDE AIR DAMPERS TO SATISFY THE ROOM THERMOSTAT WHEN THE SELECTOR SWITCH 15 ON "COOL". WHEN THE OUTDOOR AIR TEMPERATURE 15 ABOVE 55 DEG. F., THE AIR CHANGEOVER THERMOSTAT SETTING THE DAMPERS SHALL MOVE TO A MINIMUM POSITION (10% OUTSIDE AIR). WHEN HEAT 15 ENERGIZED, THE OUTDOOR AIR DAMPER ALSO MOVES TO THE MINIMUM POSITION. THE OUTDOOR AIR DAMPER SHALL CLOSE WHENEVER THE INDOOR FAN 15 NOT OPERATING OR THE SELECTOR SWITCH 15 IN THE "OFF" POSITION. NOTE: ALL REFRIGERANT PIPING, RECHARGING, REPAIRS, ETC., FOR EXISTING AND NEW H.V.A.C. EQUIPMENT SHALL BE DONE IN ACCORDANCE WITH GOVERNMENT MANDATED REFRIGERANT HANDLING REGULATIONS. 15142 ROOFTOP PACKAGED HVAC. UNITS (EXISTING) A. CONTROLS: I. THE COOLING SYSTEM SHALL BE PROTECTED WITH HIGH PRESSURE THERMOSTATS, LOW PRESSURE THERMOSTATS, LOSS -OF -CHARGE PROTECTION, INDOOR COIL FREEZE THERMOSTATS, AND CURRENT AND TEMPERATURE SENSITIVE OVERLOAD DEVICES. 2. ALL DEVICES SHALL BE WIRED TO PREVENT COMPRESSOR RESTART UNTIL RESET OF CIRCUIT BREAKER. 3. THIS CONTRACTOR SHALL INSTALL I-1EATING/COOLING "T" THERMOSTAT(5) PER PLAN TO PROVIDE CONTROL OF STAGED COOLING AND STAGED HEATING WITH AUTOMATIC CHANGEOVER AND "FAN ON" CONTROL. MOUNT DEVICES AT 60" AFF TO BOTTOM PER ADA. PROVIDE INITIAL PROGRAMMING OF SYSTEM. COORDINATE PROGRAMMING REQUIREMENTS WITH TENANT NATIONAL ACCOUNT REPRESENTATIVE AND PROGRAMMING SECTION BELOW. 4. WHEN THERMOSTAT/SENSOR GALLS FOR COOLING, FIRST STAGE OF COMPRESSOR SHALL ENERGIZE UNTIL SPACE TEMPERATURE IS SATISFIED. AFTER TEN MINUTES, SECOND STAGE OF COMPRESSOR SHALL ENERGIZE UNTIL SPACE TEMPERATURE 15 SATISFIED. 5. WHEN THERMOSTAT/SENSOR CALLS FOR HEATING, FIRST STAGE OF HEAT SHALL ENERGIZE UNTIL SPACE TEMPERATURE 15 SATISFIED. AFTER TEN MINUTES, SECOND STAGE OF HEAT SHALL ENERGIZE UNTIL SPACE TEMPERATURE 15 SATISFIED. 6. FAN SHALL ENERGIZE AND RUN CONTINUOUSLY DURING OCCUPIED HOURS. 1. HVAC CONTROL SYSTEMS SHALL BE TESTED TO ENSURE 'THAT CONTROL ELEMENTS ARE CALIBRATED, ADJUSTED, AND IN PROPER WORKING CONDITION. B. PROGRAMMING OF CONTROLS/SEQUENCE OF OPERATION: I. CONTRACTOR SHALL PROVIDE PROGRAMMING OF HVAC CONTROL SYSTEM PER MANUFACTURER'S INSTRUCTIONS AND A5 REQUIRED TO MEET THE BELOW OPERATION. 2. SPACE TEMPERATURE SETPOINT - UNOCCUPIED SETPOINTS SHALL BE 15 DEG F COOLING AND 60 DEG F HEATING. WARM-UP/OCCUPIED SETPOINTS SHALL BE 12 DEG F COOLING AND 68 DEG F HEATING. SETPOINTS SHALL BE LOCKED OUT TO PREVENT ADJUSTMENT MORE THAN 3 DEG F UP OR DOWN FROM DEFAULT. 3. ALL SETPOINTS ARE ADJUSTABLE - PRIOR TO PROGRAMMING OF CONTROLS SYSTEM, VERIFY SETPOINTS WITH TENANT CONSTRUCTION REPRESENTATIVE. 4. UNIT OPERATION - DURING OCCUPIED HOURS, FAN SHALL RUN CONTINUOUSLY ("FAN ON") AND UNIT SHALL STAGE COOLING OR HEATING. DURING UNOCCUPIED HOURS, FAN SHALL RUN ONLY WHEN HEATING OR COOLING ARE CALLED FOR ("FAN AUTO"). 5. OCCUPIED/UNOCCUPIED/WARM-UP - UNOCCUPIED MODE SHALL BE SET FOR ONE HOUR AFTER MALL CLOSING TO ONE HOUR PRIOR TO MALL OPENING. UNOCCUPIED MODE SHALL HAVE MANUAL OVERRIDE. 6. REFER TO CONTROLS SECTION ABOVE FOR ADDITIONAL REQUIREMENTS. SMOKE DETECTORS (NFPA REQUIREMENTS): NO SMOKE DETECTOR DEVICES REQUIRED ON SYSTEMS 14414 CFM AND LESS. EACH SUPPLY SYSTEM SHALL BE EQUIPPED WITH A MANUAL EMERGENCY STOP CONTROL LOCATED AT A CONVENIENT AND ACCESSIBLE POINT FOR SHUTTING OFF THE FAN IN CASE OF FIRE. FOR THE PURPOSE OF THIS SPECIFICATION, THE DISC. SWITCH WILL SERVE THIS PURPOSE. IN SYSTEMS OVER 2,000 CFM CAPACITY, SMOKE DETECTORS APPROVED FOR DUCT INSTALLATION SHALL BE INSTALLED AT A SUITABLE LOCATION IN THE MAIN SUPPLY DUCT ON THE DOWN STREAM SIDE OF THE FILTERS, AND THE RETURN AIR STREAM (PRIOR TO EXHAUSTING FROM THE BUILDING OR BEING DILUTED BY OUTSIDE AIR) TO AUTOMATICALLY STOP THE FAN. EXCEPTION: BOTH DETECTORS MAY BE OMITTED, PROVIDED THAT THE SYSTEM 15 LESS THAN 15,000 CFM CAPACITY, THE ENTIRE SYSTEM 15 WITHIN THE SPACE SERVED, AND SUCH SPACE 15 PROTECTED BY AN AREA SMOKE DETECTOR SYSTEM. CONTRACTOR NOTE: SOME JURISDICTIONS REQUIRE PHOTOELECTRIC TYPE DETECTORS. CONTRACTOR SHALL VERIFY WITH LOCAL BUILDING OFFICIALS PRIOR TO START OF CONSTRUCTION AND PROVIDE IF REQUIRED. SMOKE DETECTORS SHALL BE IONIZATION TYPE DUCT DETECTORS FOR DETECTION OF COMBUSION GASES $ FIRE $ SMOKE IN AIR CONDITIONING AND VENTILATION SYSTEM DUCTS $ SHALL BE IN COMPLIANCE WITH THE NATIONAL FIRE PROTECTION ASSOCIATION, RECOMMENDED PRACTICES PAMPHLET 0410A. THE ASSEMBLY SHALL CONSIST OF A CASTING TO ACCOMMODATE SAMPLING TUBES THAT EXTEND ACROSS THE DUCT OF THE VENTILATION SYSTEM. WHILE THE FANS ARE OPERATING, A CONTINUOUS CR055 SECTIONAL SAMPLING OF AIR FROM THE DUCT WILL FLOW THROUGH THE IONIZATION DETECTOR, AFTER WHICH TIME, SAMPLED AIR SHALL BE RETURNED TO THE DUCT. DETECTORS SHALL BE CAPABLE OF DETECTING THE PRODUCTS OF COMBUSTION OF 0.01 GRAMS PER CU. FT. OF AIR AT THE DETECTOR AND SHALL OPERATE ON THE IONIZATION PRINCIPLE. THE DETECTOR SHALL NOT CONTAIN HOT FILAMENT TUBES OR MOVING PARTS J SHALL NOT REQUIRE REPLACEMENT OR READJUSTMENT Al- I t -h . AN ALARM HAS BEEN GIVEN. THE DETECTOR SENSITIVITY SHALL BE INDIVIDUALLY ADJUSTABLE, FIXED, AND SET BY A FACTORY TRAINED TECHNICIAN AT INSTALLATION. IT SHALL BE POSSIBLE TO ACCURATELY MEASURE THE DETECTORS SENSITIVITY WITH AN APPROPRIATE INSTRUMENT. THE UNIT SHALL PROVIDE THE FOLLOWING FUNCTIONS: I. FURNISH NECESSARY POWER FOR OPERATION OF THE DETECTOR. 2. SUPERVISE THE DETECTOR CIRCUIT AND ALL RELAY COILS. 3. PROVIDE POWER TO THE NEON ALARM INDICATOR. 4. PROVIDE ONE SET OF N.O. 4 ONE SET OF SPDT ALARM OPERATED RELAY CONTACTS. 5. PROVIDE ONE SET OF SPDT, TROUBLE -OPERATED RELAY CONTACTS. THE UNIT SHALL OPERATE FROM A TWO WIRE, 120 VAC, 60 CYCLE POWER SOURCE AND SHALL BE OPERABLE OVER A RANGE OF 102-132 VAC. THE TROUBLE CIRCUIT SHALL ACTIVATE IF THE UNIT BECOMES INOPERATIVE DUE TO LOIN INPUT VOLTAGE. THE STANDBY POWER CONSUMPTION, EXCLUDING ANY EXTERNAL DEVICES, SHALL NOT EXCEED WATT. THE UNIT SHALL BE MOUNTED DIRECTLY TO THE OUTSIDE OF DUCT WITH BOLTS. A TEMPLATE SHALL BE PROVIDED FOR MAKING NECESSARY CUTOUTS AND HOLES. COMPLETE INSTRUCTIONS SHALL BE PROVIDED WITH THE UNIT. MINIMUM O. A. REQUIREMENTS (per ASHRAE 62.1) REQUIRED: SALES AREA NON -SALES AREA 4113 5.1. x 03 cfm/s.f. 4180 s.f. x 0.15 cfm/s.f. 1400 CFM OUTSIDE AIR TO BE PROVIDED THROUGH RTU -142. 1234 am • 147 am 1351 am ‹> EXISTING ROOFTOP UNITS TO REMAIN AND BE REUSED. <> BALANCE SUPPLY, RETURN AND OUTSIDE AIR TO QUANTITIES SHOWN. VERIFY CONTROLS ARE IN GOOD WORKING ORDER 24V WIRING BY MECH. CONTR FOR USE ON 16"$, DAMPER ONLY. DAMPER MOTOR T312 T -STAT 40VA., 24/120V TRANSFORMER 120V WIRING BY ELECT. CONTR. ZONE DAMPER DETAIL SCALE: NTS UNIT TO BE FURNISHED AND NSTA1 I FD BY LANDLORD. LANDLORD TO PROVIDE UNIT WITH FACTORY MOUNTED DISCONNECT, ECONOMIZER, BAROMETRIC RELIEF, AND FACTORY INSTALLED GFI DUPLEX RECEPTACLE. O4 10.0 TONS WITH GA5 HEAT. TITUS INDUSTRIES AIR DISTRIBUTION DEVICES ROOFTOP HVAC UNIT SCHEDULE UNIT NO. MFR., MODEL NO. CFM OA. GFM `xt' S.P. DPR. COOLING DATA SUPPLY FAN MOTOR CEILING HEATING DATA FILTERS MCA MOGP IG (LB5.) REMARKS TOTAL COOLING MBH • SENSIBLE COOLING MBH ARI EER WATTS BHP R.P.M. VOLTS PHASE CAPACITY INPUT MBH CAPACITYWP._HT OUTPUT MBH RTU -I TRANS Y5C120 3150 800 0.1" 120 A 416 -- - W-3 -- 208 3 200 160 2" 441.6 60.0 -- Q® (EX)RTiJ-2 GARRI ER 481%1008 2500 600 0.6" 410 • 65 - A -- -- 208 3 125 100 2" 44.41 50.0 -- .0 0 ‹> EXISTING ROOFTOP UNITS TO REMAIN AND BE REUSED. <> BALANCE SUPPLY, RETURN AND OUTSIDE AIR TO QUANTITIES SHOWN. VERIFY CONTROLS ARE IN GOOD WORKING ORDER 24V WIRING BY MECH. CONTR FOR USE ON 16"$, DAMPER ONLY. DAMPER MOTOR T312 T -STAT 40VA., 24/120V TRANSFORMER 120V WIRING BY ELECT. CONTR. ZONE DAMPER DETAIL SCALE: NTS UNIT TO BE FURNISHED AND NSTA1 I FD BY LANDLORD. LANDLORD TO PROVIDE UNIT WITH FACTORY MOUNTED DISCONNECT, ECONOMIZER, BAROMETRIC RELIEF, AND FACTORY INSTALLED GFI DUPLEX RECEPTACLE. O4 10.0 TONS WITH GA5 HEAT. TITUS INDUSTRIES AIR DISTRIBUTION DEVICES SYMBOL CATALOG NUMBERMOD. SIZE MOUNTING MATERIAL FINISH DPR. BORDER STYLE NECK . CEILING OTHER STEEL ALUM. SD -I TITUS 24"x24" 12"45 • Details • nt (BTU/hr) A B C 0 ft2 5D-2 TITUS TMS 24"x24" 10"45 • • Wall Transmission A B C 0 ft2 W-3 TITUSDUCT 300 RL 14"x10" 12 x8 Roof Tr nsmission MOUNTED 0 - A A A W-4 TITUSINALL 300 RL 14"x10" 12"x8" - MOUNTED • - A A A 0 ft2 RG -1 T31' 24"x24" 22"x22" • 0 Door Loads , A 0 G O ft2 RG -2 TITUS 24"x12" 22"x10" Floor Transmission MOUNTED 0 - A 0 A NOTES: I. SYMBOL KEY - FIRST LETTER: 5 -SUPPLY R -RETURN E. -EXHAUST. SECOND LETTER: 0 -DIFFUSER R -REGISTER G -GRILLE. 2. CATALOG NUMBERS REFER TO TITUS AIR DEVICES. 3. PROVIDE DIRECTIONAL BLOW FOR AIRFLOW OTHER THAN 4 -WAY. 4. FINISH - 'A" - SEE ARCHITECTURAL SHEETS FOR FINISH COLOR, IF NO COLOR SPECIFIED PROVIDE STANDARD WHITE. ▪ B - WHITE - G.G. TO FIELD PAINT. TO MATCH CEILING OR WALL WITH ENAMEL FINISH. ▪ - FLAT BLACK. DAMPERS SHALL BE OPERABLE FROM FACE. "A" OPPOSED BLADE RECT. MANUAL BALANCING DAMPER. "B" ROUND MANUAL BALANCE DAMPER. "C" - FIRE DAMPER WITH VOLUME CONTROL. "D" - YOUNG'S REGULATOR, DAMPER MODEL # 5020 -CG. 6. BORDER STYLE - "A" SURFACE MOUNTED "B" - LAY -IN, PROVIDE WITH PLASTER FRAME FOR DRYWALL CEILING MOUNTING, SEE DETAIL ON SHEET M2. "C" - LAY -IN FRAME FOR T -BAR CEILING. 7. PROVIDE BOOT FOR DUCT MOUNTING. ML3f3 MANDATORY MECHANICAL ENERGY cs-Th GODS REQUIREMENTS SEE M SERIES SHEET FOR EQUIPMENT EFFICIENCIES, SYSTEM CONTROLS, OUTDOOR -AIR VENTILATION RATES. HEATING AND COOLING LOADS: DESIGN HEATING AND COOLING LOADS, FOR TENANT SPACE, CALCULATED A5 REQUIRED. SYSTEM CONTROLS: EACH HEATING OR COOLING SYSTEM SERVING A SINGLE ZONE - A SPACE OR GROUP OF SPACES WITHIN A BUILDING WITH ANY COMBINATION OF HEATING, COOLING, OR LIGHTING REQUIREMENTS SUFFICIENTLY SIMILAR 50 THAT DESIRED CONDITIONS CAN BE MAINTAINED THROUGHOUT BY A SINGLE CONTROLLING DEVICE MUST HAVE ITS OWN TEMPERATURE CONTROL DEVICE. • THERMOSTATS CONTROLLING BOTH HEATING AND COOLING MUST EITHER BE A SOLID-STATE AN AUTOMATIC CONTROL DEVICE RESPONSIVE TO TEMPERATURE OR CAPABLE OF A 5 DEG. F DEADBAND, OR RANGE OF TEMPERATURE INHERE NO HEATING OR COOLING 15 AVAILABLE. EXCEPTION: • DEADBAND CAPABILITY 15 NOT REQUIRED IF THE THERMOSTAT REQUIRES MANUAL CHANGEOVER BETWEEN HEATING AND COOLING AND DOES NOT HAVE AUTOMATIC CHANGEOVER CAPABILITY. THE SYSTEM OR ZONE CONTROL MUST BE A PROGRAMMABLE THERMOSTAT OR OTHER AUTOMATIC CONTROL MEETING THE FOLLOWING CRITERIA: • CAPABLE OF AUTOMATICALLY SETTING BACK OR SHUTTING DOWN SYSTEMS DURING UNOCCUPIED HOURS FOR SEVEN DIFFERENT DAY SCHEDULES. • • HAVE AN ACCESSIBLE 2 -HOUR OCCUPANT OVERRIDE • HAVE A BATTERY BACK-UP CAPABLE OF MAINTAINING PROGRAMMED SETTINGS FOR AT LEAST 10 HOURS IF POWER 15 LOST. OUTDOOR -AIR VENTILATION - SEE CALCULATIONS ON THIS SHEET • THE SYSTEM MUST SUPPLY OUTSIDE VENTILATION AIR AS REQUIRED BY CHAPTER 4 OF THE INTERNATIONAL MECHANICAL CODE. IF THE VENTILATION SYSTEM 15 DESIGNED TO SUPPLY OUTDOOR AIR QUANTITIES EXCEEDING MINIMUM REQUIRED LEVELS, THE SYSTEM MUST BE CAPABLE OF REDUCING OUTDOOR -AIR FLOW TO THE MINIMUM REQUIRED LEVELS. • OUTDOOR -AIR SUPPLY SYSTEMS WITH DESIGN AIR FLOW RATES GREATER THAN 3000 CUBIC FEET PER MINUTE OF OUTDOOR AIR AND ALL EXHAUST SYSTEMS MUST HAVE DAMPERS THAT AUTOMATICALLY CLOSE WHILE THE EQUIPMENT 15 NOT OPERATING. DUCT CONSTRUCTION AND INSULATION • DUCTWORK MUST BE CONSTRUCTED AND ERECTED IN ACCORDANCE WITH THE INTERNATIONAL MECHANICAL CODE. • SUPPLY AND RETURN AIR DUCTS FOR CONDITIONED AIR LOCATED IN UNCONDITIONED SPACES (SPACES NEITHER HEATED NOR COOLED) MUST BE INSULATED WITH A MINIMUM. OF 5-5. UNCONDITIONED SPACES INCLUDE ATTICS, CRAWL SPACES, UNHEATED BASEMENTS AND UNHEATED GARAGES. • SUPPLY AND RETURN AIR DUCTS AND PLENUMS MUST BE INSULATED TO A MINIMUM OF R-8 WHEN LOCATED OUTSIDE. THE BUILDING ENVELOPE THE ELEMENTS OF A BUILDING THAT ENCLOSE CONDITIONED SPACES THROUGH WHICH THERMAL ENERGY MAY BE TRANSFERRED TO OR FROM THE EXTERIOR OR TO OR FROM UNCONDITIONED SPACES. • WHEN DUCTS ARE LOCATED IN EXTERIOR COMPONENTS (E.G., FLOORS OR ROOFS), MINIMUM R-5 INSULATION 15 REQUIRED ONLY BETWEEN THE DUCT AND THE BUILDING EXTERIOR • ALL JOINTS, LONGITUDINAL AND TRANSVERSE SEAMS AND CONNECTIONS IN DUCTTNORK MUST BE SECURELY SEALED USING WELDS, MECHANICAL FASTENERS WITH SEALS OR GASKETS OR MASTICS, MESH AND MASTIC SEALING SYSTEMS OR TAPES. TAPES AND MASTICS MUST BE LISTED AND LABELED IN ACCORDANCE WITH UL ISIA A TEST PROCEDURE FOR TAPES AND MASTICS USED TO SEAL DUCTWORK OR UL 188 - A TEST PROCEDURE FOR TAPES AND MASTICS USED TO SEAL DUCTWORK. EXCEPTION: • CONTINUOUSLY WELDED AND LOCKING -TYPE LONGITUDINAL JOINTS AND SEAMS ON DUCTS OPERATING AT STATIC PRESSURES LESS THAN 2 IN. W.G. PRESSURE CLASSIFICATION. • DUCTS MUST BE CONNECTED TO FANS AND OTHER AIR DISTRIBUTION EQUIPMENT INCLUDING MULTI -ZONE TERMINAL UNITS USING MECHANICAL FASTENERS WITH SEALS, MASTICS OR GASKETS. • EACH SUPPLY AIR OUTLET OR DIFFUSER AND EACH ZONE TERMINAL DEVICE (SUCH AS VAV OR MIXING BOXES) MUST HAVE ITS OWN BALANCING DEVICE. - ACCEPTABLE BALANCING DEVICES INCLUDE ADJUSTABLE DAMPERS LOCATED WITHIN THE DUCTWORK, TERMINAL DEVICES OR SUPPLY AIR DIFFUSER. • ALL DUCTS AND PLENUMS OPERATING AT STATIC PRESSURES GREATER THAN 2 IN. W.G. MUST BE SEALED. MATERIALS AND EQUIPMENT INFORMATION • OPERATION AND MAINTENANCE DOCUMENTATION MUST BE PROVIDED TO THE OWNER THAT INCLUDES AT LEAST THE FOLLOWING INFORMATION: • EQUIPMENT INPUT AND OUTPUT CAPACITY AND REQUIRED MAINTENANCE ACTIONS. EQUIPMENT OPERATION AND MAINTENANCE MANUALS. HVAC SYSTEM CONTROL MAINTENANCE AND CALIBRATION INFORMATION, INCLUDING WIRING DIAGRAMS, SCHEMATICS, AND CONTROL SEQUENCE DESCRIPTIONS. DESIRED OR FIELD DETERMINED SET POINTS MUST BE PERMANENTLY RECORDED ON CONTROL DRAWINGS, AT CONTROL DEVICES, OR, FOR DIGITAL CONTROL SYSTEMS, IN PROGRAMMING COMMENTS. A COMPLETE NARRATIVE OF HOW EACH SYSTEM IS INTENDED TO OPERATE. DESIGN WEATHER PARAMETERS City Name Seattle IAP Location Washington Latitude 47.5 Deg. Longitude 122.3 Deg. Elevation 449.0 ft Summer Design Dry -Bulb 85.0 °F Summer, Coincident Wet -Bulb 65.0 °F Summer Daily Range 18.3 °F Winter Design Dry -Bulb 23.0 °F Winter Design Wet -Bulb 19.2 °F Atmospheric Clearness Number 1.05 Average Ground Reflectance 0.20 Soil Conductivity 0.800 BTU/(hr-ft-°F) Local Time Zone (GMT +I_ N ho erg) R0 hours ConsiderDaylight Savings Time No Simulation Weather Data noneN/A Current Data is 2001 ASHRAE Handbook Design Cooling Months January to December HVAC LOAD CALCULATIONS REVIEWED FO CODE COMPLIAI APPROVED SEP 11 2013 DESIGN COOLING DESIGN HEATIN4 COOLING DATA AT Jun 1500 COOLING OA DB / WB 84.0 °F / 65.0 °F HEATING DATA AT DES HTG HEATING OA DB / WB 23.0 °FItDING City of Tukwi l DTVI ZONE LOADS Details Sensible (BTU/hr) Latent (BTU/hr) Details Sensible (BTU/hr) nt (BTU/hr) Window & Skylight Solar Loads 0 ft2 0 - 0 ft2- - Wall Transmission 0 ft2 0 0 ft2 0 - Roof Tr nsmission 5093 ft2 9328 - 5093 ft2 27631 - Transmission O ft2 0 - 0 ft2 0 - Skylight Transmission 0 ft2 0 - 0 ft2 0 - Door Loads , O ft2 0 - O ft2 0 - Floor Transmission 0 ft2 0 - 0 ft2 0 - Partitions 0 ft2 0 - 0 ft2 0 - Ceiling O ft2 0 - O ft2 0 . - Overhead Lighting 5413 W 11437 - 0 0 - Task Lighting 3072 W 9004 - 0 0 - Electric Equipment 6040 W 19312 - 0 0 - People 142 28804 29429 0 0 0 Infiltration - 0 0 - 0 0 Miscellaneous - 0 0 - 0 0 Safety Factor 10% I 10% 7789 2943 10% 2763 0 » Total Zone Loads 86674 32371 - 30394 0 Zone Conditioning - 101082 32371 - 33929 -0 Plenum Wall Load 30% 0 - 0 0 - Plenum Roof Load 70% 21764 - 0 0 - Plenum Lig h ing Load 30% 5541 - 0 0 - Return Fan Load ' 6532 CFM 0 - 6532 CFM 0 - Ventilation Load 1381 CFM 10586 -5823 1381 CFM 66300 0 Supply Fan Load 6532 CFM 12722 - 6532 CFM -12722 - Space Fan Coil Fans - 0 - - 0 - Duct Heat Gain / Loss 5% 4284 - 5% 1520 - » Total System Loads - 156979 26548- 89027 0 Central Cooling Coil 155979 26551- U 0 - Central Heating Coil - 0 - - 89027 RECEIVE » Total Conditioning - 155979 26551- 89027 CITY OF TU k Key: Positive values are Gig loads Negative values are htg loads Positive values are htg loads Negative values are clg loads AUG 1 2 2 U co W N W D Lo O 0 w e W W Z r- Z cc c0 WPI` J DC LO0 U Z (9 12 W Z 5 NN W W v W Z Fr) 0W Z= WtA 00 O M 0 W -J W ce Cli C'7 U, U, U, Co LL. U, U') r 17,I - E 0 N L J` N 0 C) _e) Co 02 L O C co J LII•2‹ 1-111‘-c° Ct co QZ Oo wo (If � w 0J E rn D O �W U)N(I) JOB NO. 2170 DATE: 08-06-13 STORE TEAM: MC/MD-SS/CJ APPROVED BY : XX REVISIONS: MECH SPEC'S D WILA 013 SHEET M-2 CENTER OF 22 SHEETS