Loading...
HomeMy WebLinkAboutPermit M13-178 - UPS - REPLACE ROOF TOP UNITS This record contains information which is exempt from public disclosure pursuant to the Washington State Public Records Act, Chapter 42.56 RCW as identified on the Digital Records Exemption Log shown below. M13-178 UPS 13035 Gateway Dr DIGITAL RECORDS (DR) EXEMPTION LOG THE ABOVE MENTIONED PERMIT FILE INCLUDES THE FOLLOWING REDACTED INFORMATION Page # Code Exemption Brief Explanatory Description Statute/Rule The Privacy Act of 1974 evinces Congress' intent that social security numbers are a private concern. As such, individuals’ social security Personal Information – numbers are redacted to protect those Social Security Numbers 5 U.S.C. sec. individuals’ privacy pursuant to 5 U.S.C. sec. DR1 Generally – 5 U.S.C. sec. 552(a); RCW 552(a), and are also exempt from disclosure under section 42.56.070(1) of the Washington 552(a); RCW 42.56.070(1) State Public Records Act, which exempts under 42.56.070(1) the PRA records or information exempt or prohibited from disclosure under any other statute. Redactions contain Credit card numbers, debit card numbers, electronic check numbers, credit Personal Information – expiration dates, or bank or other financial RCW 41 DR2 Financial Information – account numbers, which are exempt from 42.56.230(5) disclosure pursuant to RCW 42.56.230(5) RCW 42.56.230(4 5) , except when disclosure is expressly required by or governed by other law. UPS 13035 GATEWAY DR EXPIRED 08/31/2014 M13-178 • City of Tukwila Department of Community Development 2 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov MECHANICAL PERMIT Parcel No: 0004800015 Permit Number: M13-178 Address: 13035 GATEWAY DR Issue Date: 11/21/2013 Permit Expires On: 5/20/2014 Project Name: UPS Owner: Name: EPROPERTY TAX INC DEPT #207 Address: PO BOX 4900 , SCOTTSDALE, WA, 85261 Contact Person: Name: TERRY COURSE Phone: (253) 939-9495 Address: 899 WEST MAIN ST, AUBURN, WA, 98001 Contractor: Name: IECS INC. Address: P.O. BOX 19252 , SEATTLE, WA, 98109 License No: IECS***044QL Lender: Name: Address: Phone: (206) 939-9495 Expiration Date: 11/20/2014 DESCRIPTION OF WORK: SUBTYPE: NRES STATUS: PENDING DESCRIPTION: TENANT IMPROVEMENT, REPLACE (5) ROOFTOP HVAC UNITS AND REPLACE DUCTWORK AS NECESSARY. Valuation of Work: $176,000.00 Type of Work: Fuel type: Fees Collected: $2,162.63 Electrical Service Provided by: SEATTLE CITY LIGHT Water District: TUKWILA Sewer Distric: TUKWILA SEWER SERVICE Current Codes adopted by the City of Tukwila: Internations Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: 2012 International Fuel Gas Code: 2012 2012 WA Cities Electrical Code: 2012 2012 WA State Energy Code: 2012 2012 Permit Center Authorized Signatur• Date: l 14v1 • r I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signature: / 0-d1'7 Print Na mei Ja-5<0/-7 Date: //— 2/—/ 3 This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ***FIRE DEPARTMENT CONDITIONS*** 2: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the following concerns: 3: H.V.A.C. units rated at greater than 2,000 cfm require auto -shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #2328) 4: H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the power source of the air -moving equipment upon detection of smoke in the main return -air duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the manufacturer's installation instructions. (IMC 606.1, 606.2.1) 5: Remote indicator lights are required on all above ceiling smoke detectors. (City Ordinance #2328) 6: Duct smoke detectors shall be capable of being reset from a single point near the alarm panel. (City Ordinance #2328) 7: Duct detectors shall send a supervisory signal only upon activation. (City Ordinance #2328) 8: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2328) (IFC 104.2) 9: An electrical permit from the City of Tukwila Building Department Permit Center (206-431-3670) is required for this project. 10: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2327 and #2328) 11: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 12: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575-4407. 13: ***MECHANICAL PERMIT CONDITIONS*** 14: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1400 FIRE FINAL 1800 MECHANICAL FINAL 0609 PIPE/DUCT INSULATION 0701 ROUGH -IN MECHANICAL 0702 SMOKE DETECTOR TEST CITY OF TUKWILA. Community Development Deporbnent Permit Center 6300 Southcenter Blvd, Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Mechanical Permit No. tit 1, 13-•••• ( 7 Project No. [� Date Application Accepted: -{ -t 7- t 3 Date Application Expires: t) —1 9 (For o i we use on MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print* • SITE LOCATION /� p King Co Assessor's Tax No.: 000V-0-'00/5 Site Address: 13o 2 5 GtecteiU J (j t. (� JR • Suite Number: Floor: 5 New Tena : Yes ..No Tenant Name: LLP❑ PROPERTY OWNER Name: 'YT Cour) Name: C BR City: , ,OLO L ivl StateWp_ Zip3g0O 1. (!� Phone s3.. gal_4 ., 3_(i.3 .... q Addres • may`( ALT -7 f s.i Sk a -l0 City• ,ell Stet lk et 6.3,.... CONTACT PERSON - person receiving all project communication Name: 'YT Cour) Address: Oei ? 14)16+mct t� J Sfi City: , ,OLO L ivl StateWp_ Zip3g0O 1. (!� Phone s3.. gal_4 ., 3_(i.3 .... q Email: -k"2rrvCoarse O.,[rnsri,Carn MECHANICAL CONTRACTOR INFORMATION Company Name: es d `Sea f/� I err ru; Address: g99 to e)a.z.„. Sof , City: CuthuiLo State: /kk, Zips/ Phone 3,.31-gffS Fax: - -139-99Z z 9 C� tr a No.: 4 Exp Date:",40, 1 1 Tukwila Business License No.: Valuation of project (contractor's bid price): $ 1.7 ) ODD. 00 Describe the scope of work in detail: -r rt- runpr nz ; fa,t4 (I5 ► E P's+ h Roof 14-01,c, tuAas amid vviactel cittawaitc ritomtvl Use: Residential: New ❑ Replacement 0 Commercial: New ❑ Replacement '51, Fuel Type: Electric Gas Other: H:\Appticat,onstForms.ApIricatians On Line 12011 ApFlicstimalecbanxsl Permit Application Revised 8-9.11.docs Revised: August 2011 bit Page 1 of 2 Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu ■ Furnace >100k btu - Floor furnace ■ Suspended/wall/floor mounted heater ■ Appliance vent Repair or addition to heat/reMg/cooling system III Air handling unit <10,000 cfm Unit Type Qty Air handling unit ■ >10,000 cfm - Evaporator cooler ■ Ventilation fan connected to single duct ■ V entilaticn system Hood and duct III Incinerator — domestic Incinerator — comm/industrial Unit Type Qty Fire damper ■ Diffuser - Thermostat ■ Wood/gas stove ■ Emer_en • enerator Other mechanical equipment b III Boiler/Compressor Qty 0-3 hp/100,000 btu 3-15 hp/500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+ hp/1,750,000 btu (1001 Oot 100, oxo PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 1053.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING O R OR AUTH i u' E A NT: Signature. /. , . ), 1110' Date: — 10 - [ 3 - Print Name: �bCL (�) n� ' Qk�T $ & i'f � , ' `eCh 1Telephone: Qts .3 -'Z L' / �t 3 Mailing Address: 0 -1, 9 W i i 1 L 54-, OA), J L/ W ?pot HAFptications4Forms•Aicheatmns on Lme\2011 Aimbatioo,Mechaniul Permit Application Revised 8-9-1 r.doca Raised: August 2011 bb Page 2 of 2 DESCRIPTIONS PermitTRAK ACCOUNT QUANTITY PAID $1,730:10 M13-178 Address: 13035 GATEWAY DR Apn: 0004800015 1,730:10,:. Permit Fee $1,730.10 Permit Fee F:000.322.100.00.00 TOTAL FEES PAID BY RECEIPT: R160 $1,730.10 Date Paid: Thursday, November 21, 2013 Paid By: IECS INC Pay Method: CHECK 55712 Printed: Thursday, November 21, 2013 9:50 AM 1 of 1 C1WSYSTEMS • J�` T 4 wqs City of Tukwila of ;► y Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 �2 Phone: 206-431-3670 Fax: 206-431-3665 Web site: http://www.TukwilaWA.Qov Parcel No.: 0004800015 Address: 13035 GATEWAY DR TUKW Suite No: Applicant: UPS RECEIPT Permit Number: M13-178 Status: PENDING Applied Date: 09/17/2013 Issue Date: Receipt No.: R13-02653 Payment Amount: $432.53 Initials: WER Payment Date: 09/17/2013 02:28 PM User ID: 1655 Balance: $1,730.10 Payee: IECS INC TRANSACTION LIST: Type Method Descriptio ' Amount Payment Check 55391 432.53 Authorization No. ACCOUNT ITEM LIST: Description Account•Code Current Pmts PLAN CHECK - NONRES 000.345.830 432.53 Total: $432.53 oa.,wa• n0_17_jn1z INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 431-2451 (fli3-178 Project: Type of Inspection:‘, :l Addr ss:. r0s5ec6 L l Dat Called: Special Instructions: = Date Wanted: 44 a.m. Req ster: 1<e it ti ph c (053_5,c 76, izApproved per applicable codes. ClCorrections required prior.ta"approval. COMMENTS: ') tc, — v'd\1441 filkik..9-7 I REI SP CTION FEE REQUIRED. Rrior to next inspection. fee must be paiti�a 6300 Southcenter Blvd.. Sui a 100. Call to schedule reinspection. Mechanical Summary 201 Washington State Ener --..._ ._. ...... any — Q DWI R an I MECH-SUM Revised June 2013 'Project Info t Pro Address 7�.e. r �tDate 6)....,/c..)_ (3 k1/4)et,ifyy Slir \A- 5 For Building Dept. Use rICtizi a....- q tt c.. K ` Applicant Name: t P p • Applicant Address: . • aJit —111 et ..I r, - Applicant • one: 4,.5, 3 9 •-T 0441_5. - 441_5. -Project Project Description Briefly describe mechanical system type and features. At/Includes Plans e o `(L 5 e F� S+ l r I l i/ /� R`/ R F t \ d�" (-1 V 17 u(�.Q fs c ir.e lack d uc:+ 1-ua as liVcesscu rut Include documentation requiring compliance with commissioning provisions per Section C408. Compliance Option (pimple System (;omplex System Dystems Analysis E ui ment Schedules q p The following information is required to be incorporated with the mechanical equipment schedules on the , plans For projects without plans, rid in the required information below. Cooling Equipment Schedule Equip. ID Equip Type Brand Name' Model No' Capacity' Btu/h OSA CFM or Econo? EE)Econmizer or IPLV' Option or Exception° Heat Recovery Y/N 1 Ritiferi k.r 41.rC. eao 5 &NI i 3.0 0 // Heating Equipment Schedule Equip ID Equip Type Brand Name' Model No.' Capacity' Btu/h OSAcfm or Econo? input Btuh Output Btuh Efficiency' Heat Recovery YfN 1 KTk ��{{ eel NAT rt".4 4 krc QST $� L 1K,n 64:3 > 1 S 1 Al Fan Equipment Schedule Equip ID Equip Type Brand Name' Model No.' CFM SP' HP/BHP Flow Controls ��2Wi+�RRV OE C LocatiIAPF _ _ ,i/4- N0� Service Water Heating Equipment Schedule Equip. ID Equip Type Brand Name' Model No.' input Capacity Sub- Category EFT City C V Location of SeRUILDI11)7/4 . 1 - I If available. 2 As tested according to Table C403.2.3(1)A thru C403.2.3(8). 3 If required. ° COP, HSPF, Combustion Efficiency, or AFUE, as applicable_ 5 Flow control types: variable air volume (VAV), constant volume (CV), or variable speed (VS). ° Economizer exception number per Simple Systems C403.3.1 or Complex Systems C403.4.1. 7 Efficiency Factor per Table C404.2. RECEIVED CITY OF TUKWILA OCT 082013 PERMIT CENTER :VVEU FOR OMPLIANCI 'ROVED 0 4 2013 If Tukwila G DIVISION CORRECTION LTR#. tat 19D I11 2012 Was In on State Ener! Code Corn .fiance Forms for Commercial Grou • R1 and > 3 sto R2 and R3 Mechanical Summary MECH-SUM 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 & R3 Revised June 2013 Project Info . . ProjectAddress2210, pi.. aAt Date q....10..., 13 For Building Dept. Use ,k5 rr C408. Applicant Name: l/ Applicant Address: 4 , i Applicant Phone: A 3 _ ♦ � — -9 t 9q-96-- `C�7 (30 -et 5 e XI S};nc R0°- +1 I-N%C t ctplace^j (, _ i4 Cts Include documentation requiring compliance with commissioning provisions per Section Project Description" Briefly describe mechanical system type and features includes Plans Compliance Option Ample System Komplex System Oystems Analysis Equipment Schedules The following information is required to be incorporated with the mechanical equipment schedules on the plans. For projects without plans, fill in the required information below. Cooling Equipment Schedule Equip. ID Equip Type Brand Name' Model No.' Capacity2 Btu{h OSA CFM or Econo? S o IPLV3 Econmizer Option or Exception° Heat Recovery Y/N c 4kr�o�1a ,O 11.to A/ iR t� tt �, �. rt ti I t1 ti tt 61 5 t % %( c% It 1,1 Heating Equipment Schedule Equip. ID Equip Type Brand Name' Model No.' Capacity= Btulh OSA dm or Econo? Input Btuh Output Btuh Efficiency° Heat Recovery Y/N ,w,n/� C�/ U KX/ V .C=� /�� Van, • I I 1 •/, i .3 Lt It r t t 1/t 11 11 Al 11- L,(1 COCCrt t t t. l l ti t t t t l l 1i /v N 5 ‘t t( Fan Equipment Schedule Equip. ID Equip Type -• Brand Name' Model No.' CFM SP' HP/BHP Flow Control° Location cf Service lu/pr Service Water Heating Equipment Schedule Equip. ID Equip Type Brand Name' Model No.' Input Capacity Sub - Category EF' Location of Service ) 1 V A.. I If available. 2 As tested according to Table C403.2.3(1)Athru C403.2.3(8). 31f required. ' COP, HSPF, Combustion Efficiency, or AFUE, as applicable. 5 Flow control types: variable air volume (VAV), constant volume (CV), or variable speed (VS). ° Economizer exception number per Simple Systems C403.3.1 or Complex Systems C403.4.1. 7 Efficiency Factor per Table C404.2. @ @oc@O ® Bpo@H@@G@NOO � poi ei$ �g113 �c aised Jute sl rgy Code ce roup Fit Project Address C,ci fe Way Coo.. 13035 r,„.17- way -6,/c(,-,:ie,1,14 IDate el _ 1 e,,, 3 The following information is nece aryto the a mechanical permit application for c mmercial provision compliance k iitit the 2012 WSEC. NOTE: Define print area In Excel prior to printing MECH-CHK pages. Applicability (yes,no,na) Code Section Code Provision Information Required Location on Plans Building Department Notes GENERAL PROVISIONS Equipment Sizing & Performance ,✓ C403.2.1 Load calculations Load calculations performed per ASHRAE Std 183 or equivalent per Chapter 3 N././ - ./calculated C403.2.2 Equipment and system siting Output capacity of heating and cooling equipment and systems do not exceed loads, note exceptions taken , C403.2.5 Minimum ventilation Ventilation (natural or mechanical) provided per IMC; indicate mechanical ventilation is capable of being reduced to minimum requirement per IMC / C403.2.3 & 0403.232 & C403.2.12.1 Equipment minimum efficiency Provide equipment schedules or complete MECH-SUM tables with type, capacity, efficiency, test standard (or other efficiency source) for all mechanical equipment / C4032.13 Electric motor efficiency Provide equipment schedule with hp, rpm, efficiency for all motors; note except. V�/ C4032.10 Fan power limitation Fan system motor hp or bhp does not exceed limits per Table C403.2.10.1(1) 0403.2.10.3 & C403.2.13 Fractional hfan motorsIndicatefan D motors to 1/12 1 hp are ECM type or meet minimum efficiency req. Maximum air cooled chiller capacity Indicate air-cooled chiller capacity does not exceed air-cooled chiller limit 11 NA - / C403.2.1 Non-standar er- led chilers Full -load and NPLV values for water-cooled centrifugal chiller adjusted for non- standard operational conditions NC403.2.12.1.2 �requirements Centrifugal fan cooling towers Large capacity cooling towers with centrifugal fans) meet efficiency for a>aal fan open circuit cooling towers N%�— t'04032.3.3 04032 3 heatersForced mr furnace and unit Indicate intermittent ignition or IIO, flue/draft damper & jacket loss I heating/cPackagedooling eelectricquipment List equipment required to be heat pumps on schedule 04032.3.4 Humidification Indicate method of humidification (note requirements for systems with economizer) HVAC System Controls & Criteria / wsystems C4032.4.1 Thermostatic controls Indicate locations of thermostatic control zones on plans, induding perimeter t / 4� J 0403.2.4.1.1 Heat pump supplementary heat Indicate staged heating (compression/supplemental) & outdoor lock -out temp \s/ C4032.4.2 Setpoint overlap (deadband) Indicate 5°F deadband minimum for systems controlling both heating &cooling NZ C4032.4.3 Automatic setback and shutdown Indicate zone t -stat controls with required automatic setback & manual override C403.2.4.3.3 Automatic (optimum) start Indicate system controls that adjust equip start time to match load conditions / �/ 0402.4.52 & C403.2 4.4 Dampers Indicate location of OSA. exhaust, relief and return air dampers; include AMCA rated leakage and control type (motorized or gravity; note exceptions taken) 1 A7.1— A7.71— C4032.11 Heating outside a building Indicate radiant heat system and occupancy controls C4032.4.5 Snow melt systems/ Indicate shut-off controls based on outdoor conditions Ar04032.4.6 Combustioequipmentn heating Indicate modulating or staged control ,b/ Group R1 hotel/motel systems Indicate method for guest room automatic setback & set-up of 5'F minimum IC4032.4.7 0403.24.8 / g Group R2it 3 dwelling unit systems Indicate 5-2 programmable thermostats in primary spaces with minimum of two setback periods; note exceptions taken A/X/J C4032.5.1 Demand controlled ventilation Indicate high -occupancy spaces and systems requiring DCV /1%� //alternate C4032.5.2 Occupancy sensors Indicate spaces requiring occupancy -based system control and method; or means provided to automatically reduce OSA when partially occupied III • ^/,4 04032.5.3 Encased loading docWparlrng garage ventilation Indicate enclosed loading dock and enclosed parking garage ventilation system activation and control method 4/16._ 04032.5.4.1 Kitchen exhaust hoods Indicate kitdten hoods requiring make-up air, indicate make-up air source and conditioning method /V./I__ C403.2.5.4.2 Laboratory exhaust systems Indicate lab exhaust systems requiring heat recovery, method &efficiency, or alternative method taken (VAV, semi -conditioned makeup, or CERM calculation) 4�//1 _ // r 04032.8.1 Energy recovery- ventilation systems Indicate ventilationsystems requiring ER, method & 9efficiency; note exceptions N/ C4032.6.2 Energy recovery -condensate systems Indicate on-site steam heating systems requiring energy recovery /1,��4 04032.8.3 systems recovery - condenser Indicate remote refrig. condensers requiring ER and use of captured energy Mechanical Permit Plans Checklist - Page 2 of 3 MECH-CHK ..12 Waslirgton State Ener gr Code Canplance Forrra for Conmerdo,Group Rt, and,- 3 stay R2 & R3 Revised une 2013 Project Address L'664e(v Gig` eU r . . 1303 s 60,,i L- JC . / , Wi /G1 ��i'T'e - Date /A .(GC,_ j ,5 _I The following information is necess yto c eco mechanical permit application for commer 'al provision compliance with th� 2012 WSEC. NOTE: Define print area in Excel prior to printing MECH-CHK pages. Applicability (yes,no,na) Code Section Code Provision Information Required Location on Plans Building Department Notes .33. _1:1LLJ.LL Li ,12177 HVAC System Controls 8 Criteria. Continued h / !v C4032.12 Variable flow control - fans/pumps Indicate fan & pump motors requiring VF control & method (VSD or equiv controls) /A '_ Iv 1//t C403.2.12.1 Variabletowers flow control - cooling Indicate cooling tower fans requiring variable flow control and method Ar // C403.2.12.2 Large volume fan systems Indicate fan systems requiring airflow reduction based on heating and cooling' demand; or ex option taken / C403.2.12.2 Single zone AC systems Indicate method of cooling demand -based fan control for sys.> 110,000 btuh Ali C403.2.4.10 DDC systemcapabfities Identify all DDC system input/output control points and indicate capability for trending and demand response setnointadiustment Ducting Systems C403.27.1&DuetconsWction 04032.7.3 Indicate all ductwork constructed and sealed per IMC, C402 leakage requirements and IBC vapor retarder requirements V C403.2.73.1-3 Duct pressure classifications Identify location of low, medium and high ;pressure ductwork on plans yyri,, _ r C403.2.7.33 High pressure dud leakage test Indicate high pressure duct leakage testing requirements on plans; provide test results to jurisdiction when completed 0403.2.7.1 /2 Duct insulation Indicate R -value of insulation on ductwork Piping Systems C4032.8 Piping insu tin Indicate R -value of insulation on piping C4032.8.1 Piping insu weather n x to Indicate method of protection from damage/degradation ID•t•t•ii ii Qualifying Systems IV C403.3 Qualifying single zone systems Verify unitary or packaged equipment does not exceed capacity limits, does not have adive humidifcation or simultaneous heating/cooling . Al403.3 ' Y Qualify systemings 2 -pipe heating Verify 2 -pipe heating -only system does not exceed capacity limits Ar , C403.32 Hydronic system controls Refer to Complex Systems Section 0403.4.3 . a Simple System Economizers ✓ C403.31 Air economizer required Indicate cooling systems requiring economizer controls; note in equip ached. , C403.3.1.1I Air economizer capacity Indicate modulating OSA control capability up to 100% OSA, or exception ' / 70403.3.1.13 Air economizer high limit controls Indicate high limit shut-off control method per Table 0403.3.1.1.3(2) 0403.1.1.2 Integrated air economizer operation Indicate capability for partial air econornkzer operation for systems with capacity > 65,000 btuh NP_ 0403.3.1 Air economizer exceptions Indicate eligible exception(s) taken and provisions to comply with exception(s) 217 Complex System Economizers C403.4.1 Air economizer required Indicate cooling systems requiring economizer controls; note in equip ached. 0403.4.1.4 Economizer heating syst impact , Verify control method of HVAC systems with economizers does not increase buildi g heating energy usage during nomral operation 0403.4.1.3 Integrated econo operation " er Indic e c a lityfor partial economizer operation for air or water econo syst ms Moved Water economiz r ca c Ind. at water ono capable of 100% cooling capacity at 50'F db/45'F wb • O C403A.1.2 Water econom r maxi pressure drop m I is a recd in coils and heat exchangers do not exceed p 9 n9 pressure drop limit C403.3.1 Air economizer exceptions Indicate eligible excepaon(s) taken and provisions to comply with exception(s) .Mechanical Permit Plans Checklist 2012 Washington State Energy Code Comptenee Forma for Commerdal, - Page 3 of 3 Group R 1, and n 3 story R26 R3 1V1ECH-CHK Revised June 2013 Project Add rasa Gak t,•,, y ( % 015-- t cite t.,.Jn- - . _ rLi 1[, W I11,0 4 - Pate CJ - t e' - I 'S The following information is necessarylo check a rtkdlanical permit application for commerd l provision compliance with the,v12 WSEC. NOTE: Define print area in Excel prior to printing MECH-CHKpages. Applicability (yesno.na) Code Section Code Provision Information Required Location on Plans Building Department Notes Specific System Requirements 0403.42 & C4032.12 Variable flow control - fans Indicate fans requiring variable flow control and method C403.4 2.1 VAVfan static pressure sensors Indicate sensor locations on plans; include at least one sensor per mapr duct branch C403A21 VAV fan static pressure setpoint Indicate fan system static pressure setpoint based on zone requiring most pressure C403.4.5 VAV systems serving multi- zones Indicate supply air systems serving multiple zones that are required to be VAV, method of primary air control, and zones served; note exceptionstaken C403.4.5.4 VAV system supply air reset Indicate controls •at automatically re supply air temp in response to loads 0403.4 Large capacity cooling systems Indicate method . •. Iti-stag orva :ble control for building cooling system capacity> 300 to C403.4.7 Hot gas bypass limitation Indicate cooling e • • : nt un • - • fin s or capacity modulation method C403.4.3 Large capacity boier systems Indicate multi-st. • ° T ner Ingle boilers > 500,000 btuh C403.4.3 Boiler sequencing Indicate automatic • •ntrol • :nce • • : ion of multiple boilers 0403-4.3.5 Chiller / boiler plant pump isolation Indicate capabiity • auto .: •uce • II plant flow and shut-off flow through dhilers & . • lers use C403.42 & C403A3.6 Variable fbw control - pumps Indicate m s re • n vac : • co ethod pumps 8 C4032.12.1 & C403.4.4 Variablefbwcontrol- cooling towers Indicate cooling tow fans re van le fl control and method C403.4 3.4 Hydronic system part load controls Indicate heating & chilled water s - ems ave the •- •- bitty to automatically reset supply water temp AND redu II• Ibyo50%for systems> 300,000 bleb 0403.4.3.2 Two-pipe changeover systems Indicate deadband, heatingkooling mo.e scheduling and changeover temperature range C403.4.13.1 Water bop heat pump- deadband Indicate capablity of central equipme to provide mm. 20F water supptytemp deadband between heat rejection and heat addition modes Provide heat exchanger that separates cooing tower and heat pump loop in Climate Zone 5 c4014.3.3 Water loop heat pump - heat rejection 0403.4.33.3 Water bop heat pump - isolation Indicate 2-way isolation vat/e on each heat puny and variable flow control for systems with total pump power 10 hp C403.4.6 Condenserry water heat recove Indicate system provided to pre-heat service water and efficiency C403.5 Cooler /freezer - antisweat heaters Indicate Ws( & control method for walk-in cooler/freezer door anti-sweat heaters C403.5 / 6 Cooler /freezer -evaporator and condenser fans Indicate motor type for evaporator and condenser fans < 1 hp =I= L.:1=1'=a=G Service Water Systems C404.2 Water-heating equip min. efficiency Provide equipment schedule or complete MECHSUM table with type, capacity, efficiency, test standard (or other efficiency source) C404.3 Temperature controls Indicate temper re controls have required setpoint capability C404.4 Heat traps I i e 'ping n to equipment have heat traps on supply & discharge C404.5 Insulation under water heater In -10 i tut under tank C404.6 Service water piping insulation Ind' t vat of nsu ion on piping; note exceptions taken 0404.7 / 8 Circulation systems and heat trace shut-off Indicate shut cape bilty based on occupancy and periods of tinted demand C404.9 Group R-2 service hot water meters Indicate method of usage meteringfor dwell. units served ag by central 11W system Pools & In-Ground Permanently Installed Spas 0404.10.1 Pool heating equip min. efficiency Provide equip stfieldule efficiency, test dard or mplete ;or oth r MECH-SUM table with type, capacity, source); heat pump heaters 04 COP 0404.10.1 /2 Pool heater on / off controlsIndicate auto c /of on heater that o re a contr I ndep nt don scheduling & axessble on/off switdi f thermostat setting; or exception taken C404.10.3 Pool covers Indicate vapor re r cove a d h laton rating as required C404.10.3 Pool assembly insulation Indicate rating of sulation ides nd (bottom of pools heated to > 90•F C404.10.4 Heat recovery Indicate method, exhaust air temperature reduction and recovered energy use REVIEWED FOR CODE COMPLIANCE O APP NOV 0 4 2013 City of Tukwila BUILDING DIVISION C United Technologies SUBMITTAL Project -Untitled 10 Date Tuesday, September 10, 2013 4111 -watt A�,� E t' RECEIVED CITY OF TUKWILA OCT 082013 PERMIT CENTER CLT��_ORRECTION Mi'rl11 - �7 X9/10/2013 Prepared By: Table Of Contents Project:—Untitled10 11:37AM 3... RTU_2-5 Unit Report 4 Certified Drawing... 5 Performance Summary... 7 Spec Sheet.... 11 13 RTU -1 Unit Report.. 14 Certified Drawing 15 Performance Summary 17 Packaged Rooftop Builder 1.39 Page 2 of 19 D9/10/2013 Prepared By: RTU 2-5 Project:-Untitled10 11:37AM RTU 2-5 Tag Cover Sheet Unit Report Certified Drawing Performance Report Spec Sheet Packaged Rooftop Builder 1.39 Page 3 of 19 )9/10/2013 Prepared By: Unit Report For RTU_2-5 Project:—Untitled10 11:37AM Unit Parameters Unit Model: 48TCDD12B2A6-6U1J0 Unit Size: 12 (10 Tons) Volts -Phase -Hertz: 460-3-60 Heating Type: Gas Duct Cfg: Vertical Supply / Vertical Return Low Heat Round Tube Plate Fin Coils Lines and Filters Gas Line Size: 3/4 Condensate Drain Line Size: 3/4 Return Air Filter Type: Throwaway Return Air Filter Quantity: 4 Return Air Filter Size: __ 20 x 20 x 2 Unit Configuration RA Smoke Detector Medium Static Option Al/Cu - Al/Cu Electromechanical Controls w/W7220 Econo Controller Temp Low Leak Economizer w/Baro Relief Unpowered Convenience Outlet Non -Fused Disconnect Standard Packaging 2 -Speed indoor fan motor controlled by VFD Warranty Information 1 -Year parts(std.) 5 -Year compressor parts(std.) 10 -Year heat exchanger - Aluminized(std.) No optional warranties were selected. Dimensions (ft. in.) & Weight (1b.)*** Unit Length: Unit Width: Unit Height: *** Total Operating Weight: 7' 4.125" 4' 11.5" 4' 1.375" 1134 lb Weights and Dimensions are approximate. Weight does not include unit packaging. Approximate dimensions are provided primarily for shipping purposes. For exact dimensions and weights, refer to appropriate product data catalog. NOTE: Please see Warranty Catalog 500-089 for explanation of policies and ordering methods. Ordering Information Part Number Description Quantity 48TCDD12B2A6-6U1J0 Rooftop Unit 4 Accessories CRPWREXH023A01 Power Exhaust System 4 Packaged Rooftop Builder 1.39 Page 4 of 19 Certified Drawing for RTU_2-5 Project:-UntitledlO 09/10/2013 11:37AM Prepared By: SOILS IIANINSIOARI AERN MSI 11001(.5511[051015 3 UIRECIIOA 0f AIR FLOW UNIT 0110000 0011 IEEE J R 4110.503 RIPE 11 1 110101 3l It5e1 ?4:3'i ERIC -A01 RIPE Ila 3:0 11 I11i11l' xnoe3 1/6 'VC."' RIP! 1! Ile I1xe/ Ill 31' Il1f1 '1'41.7P 110/ 'elc•Dae REPT 1 1 1 R'Dai I3 use! II Ile I'Dn 40IC-001 RIPE '!Ile I1x5I II Il' 15 Ile 110)1 1e10.01x RIPE 1 S/e I Ix SII Al 11 31 ll' 191{1 S Ile 113]1 411c-DDe K. 11 11010571 U 16501 x3 1501 II 4110.010 5ce6 ' L1 110511 !91{ 1(I 1 1A u [011.11 RIPE • ROSS ACNE - NOVA USE. PLAT[ ION IAIUN/At FIN ICOPPERIALUNI 451 ALIEN ACCESS PA5E1 11001.10001 CO DENSER BACK 1x5005 00(1 ACCESS PAN. 4 D — C V 1 3.311 , i idle n l[C IP )CAI 15CONN0C1 IIXAiIOP f CONDENSER COIL 001(0551-----__ 141L31 1X319![0 Du11EE .. COxv151ENCf B. 4 D — C V 1 CARRY Ifs vuoul. ON CvNNECTIOIL SIZES I S/e• 1351 01A 11013 POWER SUPPLE POLE x lir 1641 01A PORES EUPPLP A6IXR001 I Ill' 1511 CRA SAUCE ACCESS PLUG NI- 1221 014 11010 COM. RISING 0015 S/''.1' NPI C0N0ENSA1[ ORAIN 3/0'•14 NPI GAS COX/1(1105 /4-.14 API GAS 004011011011 G x • )SII DIA POWER SUPPLY 54005.041 THRU THE -BAST CHART (FIELD INST) 14[51 OLES REOOIREU FOR USE 111111 ACCP 8115. RPINP5R00A101: GAS 1NRUuite EEINPRR004A01: OAS INRU e001ASEPAN X1110[0 caSDuu 511[ yr rPc uSI ACC. 810.0 SOLI 511[5 N . IR.21 Ill. I lir 1002,0011 2 10011 3/41 EPI OS, POWER GAS Ia. 12e Cl 1 IIl• 141.11 1 3/1' 141.11 10021 PROv1001 3,4 FPI INRU CURB 115311 1 1111100, 001E 5100: 0' ISO 111 1THRU-THE-8ASE CHART (HOPI ICO '1 RU'INE.BASIPAR- FACTOR, OPTION, FOUR 5 FOR ORLE S P. 1 0 ARE PRONIDIO •, FOR BROIL 110100 MOORS, A Flf10 SUPPLIED Ili' SOAPIER IS 1(04(310 G1111/S OAST PAN !USING AND GAS 3A1v/. mSCo,e•ce TOP out I Or 0 03-08-10 11-24-085 EEOC 08-12 SINGLE ZONE ELECTRICAL. COOLING WITH GAS HEAT E8TM500985 1110 F Packaged Rooftop Builder 1.39 Page 5 of 19 Project:-Untitledl0 Prepared By: Certified Drawing for RTU_2-5 09/10/2013 11:37AM --_ xF --- COIiD0ll? SID. URN 6314x , 1 . CORN[ T COA XLR 441361 A *[14X1 IBI COMA 44 4x1 111 T CORNEA X[104 x1 4221 ---_------- 2 C'4 33 46 19601 ---_-- - -- }0 112 15211 LBS M. IBS.T AG. 1' LB5. AG- 185. XL- 262 1e IC -Ape RIPE 121 111 01 t03 12 209 15 291 101 1 1422 110511 1111 409 *28 915 116 28 96 U1 62 242 110 222 12e 1 NO 110.141 012 21 18611 23 118 12811 1910.41} 1911.429 910 112 216 68 196 69 211 211 til 5 110611 12 316 1901; 21 111 16161 0121 835 219 11.2 225 '10:.: 216 11 118 111101 22 516 16051 t+ 14921 leu -00+ 0121 R@1 940 431 221 11042,5 199 63 234 234 .6.2 110.2 266 266 129 5 III 6 59 2/4 11010: )! 3421 0921 DI J} 1426 11151 13 1636 5/ 16 5426 14411 I 1814512 9421 615 121 104.9 12 9' 189 15.1 • 405 5 .0 165 108 61 116 19.9 210 109 210 III 43 110916 31 218 INC92 ( 1 1 1 t0 ve (511 11 4611 Ie1C Ill MCNA 4222 els 950 l Ie5 el 116 ».+ 230 118 441 RI 1 17 10428 110191 15 10422 11021 tz 1428 1264242 0) 4350 - 00341 NCNY - NOVATION 281. v AI! 114 41.04IAI VMI 29/ 110P VII Al x42 1110 (AIRIIAOG Iks 14 Y1( 1w, .own 41044 oy,g i KcasowiisLow a skLt .tbonn;& CORNER A tAa 1'2 1 03 08-101 111Y,24-08 TOP CID A 6 0o r 'I E PONT CORNER A CORNER C I 48TC 08-12 SINGLE ZONE ELECTRICAL 43 14500985 COOLING WITH GAS HEAT Packaged Rooftop Builder 1.39 Page 6 of 19 Performance Summary For RTU_2-5 D9/10/2013 Prepared By: Project:—Untitled10 11:37AM Part Number:48TCDD1 2B2A6-6U1 JO ARI EER 11.10 IEER:. 12.8 Base Unit Dimensions Unit Length:.. 88.1 in Unit Width. 59.5 in Unit Height. 49.4 in Operating Weight Base Unit Weight: 940 lb RA Smoke Detector .5 lb Medium Static Option.15 Ib Temp Low Leak Economizer w/Baro Relief. . 74 Ib Unpowered Convenience Outlet .5 lb 2 Speed Fan Controller (VFD) and Non -Fused Disconnect 20 lb Accessories Power Exhaust System 75 lb Total Operating Weight 1134 lb Unit Unit Voltage -Phase -Hertz 460-3-60 Air Discharge Vertical Fan Drive Type:. Belt Actual Airflow 4000 CFM Site Altitude:... 0 ft Cooling Performance Condenser Entering Air DB' 95.0 F Evaporator Entering Air DB:... 80.0 F Evaporator Entering Air WB:.... 67.0 F Entering Air Enthalpy 31.44 BTU/lb Evaporator Leaving Air DB 57.7 F Evaporator Leaving Air WB: 57.2 F Evaporator Leaving Air Enthalpy 24.54 BTU/lb Gross Cooling Capacity 124.10 MBH Gross Sensible Capacity 96.20 MBH Compressor Power Input. 8.90 kW Coil Bypass Factor:. 0.046 Heating Performance Heating Airflow: 4000 CFM Entering Air Temp:...._ .............. 70.0 F Leaving Air Temp 104.2 F Gas Input Capacity 120.0 / 180.0 MBH Gas Heating Capacity 147.60 MBH Temperature Rise 34.2 F NOTE Second Stage Supply Fan External Static Pressure:.. 1.00 in wg Options / Accessories Static Pressure Economizer:... 0.20 in wg Power Exhaust:. (Fan Data Includes Drop) Total External Static. 1.20 in wg Fan RPM 1042 Fan Power:.... 2.93 BHP NOTE:.. Selected IFM RPM Range: 838 -1084 Power Exhaust Packaged Rooftop Builder 1.39 Page 7 of 19 Performance Summary For RTU_2-5 39/10/2013 Prepared By: Project:-Untitled10 11:37AM Return Duct Static:. Max. Air To Exhaust. 0.20 in wg 3850 CFM Electrical Data (Before July 30, 2012) Minimum Voltage: 414 Maximum Voltage: 506 Compressor #1 RLA: 7.7 Compressor #1 LRA' 52 Compressor #2 RLA:..... ... 7.7 Compressor #2 LRA' ..52 Outdoor Fan Motor Qty' .2 Outdoor Fan FLA (ea):.. ..0.8 Indoor Fan Motor Type: MED Indoor Fan Motor FLA:. ..4.9 Combustion Fan Motor FLA (ea):. _..... ..0.25 Pwr. Exhaust Fan Motor Qty' 1 Pwr. Exhaust Fan Motor FLA. 1.8 Power Supply MCA: 26 Power Supply MOCP (Fuse or HACR). 30 Min. Unit Disconnect FLA' 27 Min. Unit Disconnect LRA' 149 Electrical Convenience Outlet:. None Electrical Data (July 30, 2012 and Beyond) Indoor Fan Motor FLA. 4.9 Power Supply MCA' 26 Power Supply MOCP: ...30 Disconnect Size FLA:...._....... _..... 27 Disconnect Size LRA. . 149 July 30th and beyond units can be identified by serial number 3112XXXXXXXXX and higher Control Panel SCCR: 5kA RMS at Rated Symmetrical Voltage Acoustics Sound Power Levels, db re 10E-12 Watts Discharge Inlet Outdoor 63 Hz 98.2 95.0 89.0 125 Hz 94.5 88.1 83.1 250 Hz 81.4 73.4 80.5 500 Hz 75.2 68.4 78.5 1000 Hz 71.7 66.3 75.5 2000 Hz 69.2 62.1 71.6 4000 Hz 72.5 62.5 69.6 8000 Hz 74.4 60.5 69.3 A -Weighted 82.8 75.9 82.0 Advanced Acoustics Page 8 of 19 Performance Summary For RTU_2-5 X9/10/2013 Prepared By: Project:-Untitled10 11:37AM Advanced Accoustics Parameters 1. Unit height above ground* 30.0 ft 2. Horizontal distance from unit to receiver 50.0 ft 3. Receiver height above ground. 5.7 ft 4. Height of obstruction:.. 0.0 ft 5. Horizontal distance from obstruction to receiver 0.0 ft 6. Horizontal distance from unit to obstruction. 0.0 ft Detailed Acoustics Information Octave Band Center Freq. Hz 63 125 250 500 1k 2k 4k 8k Overall A 89.0 83.1 80.5 78.5 75.5 71.6 69.6 69.3 91.0 Lw B 62.8 67.0 71.9 75.3 75.5 72.8 70.6 68.2 81.1 LwA C 56.6 50.7 48.1 46.1 43.1 39.2 37.2 36.9 58.6 Lp D 30.4 34.6 39.5 42.9 43.1 40.4 38.2 35.8 48.7 LpA Legend A Sound Power Levels at Unit's Acoustic Center, Lw B A -Weighted Sound Power Levels at Unit's Acoustic Center, LwA C Sound Pressure Levels at Specific Distance from Unit, Lp D A -Weighted Sound Pressure Levels at Specific Distance from Unit, LpA Calculation methods used in this program are patterned after the ASHRAE Guide; other ASHRAE Publications and the AHRI Acoustical Standards. While a very significant effort has been made to insure the technical accuracy of this program, it is assumed that the user is knowledgeable in the art of system sound estimation and is aware of the tolerances involved in real world acoustical estimation. This program makes certain assumptions as to the dominant sound sources and sound paths which may not always be appropriate to the real system being estimated. Because of this, no assurances can be offered that this software will always generate an accurate sound prediction from user supplied input data. If in doubt about the estimation of expected sound levels in a space, an Acoustical Engineer or a person with sound prediction expertise should be consulted. Packaged Rooftop Builder 1.39 Page 9 of 19 Performance Summary For RTU_2-5 39/10/2013 Prepared By: Project:—Untitled10 11:37AM 20 18 16 04 02 CO CO 0; 12 18 24 30 W 42 Airflaw(CFM.-thousands) RPM=1042 BHP=2.93 MaximumRPM=1084 MaximumBHP==4.70 Note: Pleasecontactapplicat ionengineeru>gforselectionsoutsidetheshadedregion. SC-SystemCuwe RP-RatedPoint FanCurve 54 Packaged Rooftop Builder 1.39 Page 10 of 19 \ J. _ \ \ ,,—� saoefP _ 20 &-V 3OOB P 111 11111 I I _1_ 0.9D P 0. I al 1 1A08iP--150Ei 1 1 ; `1 1 1 1 1 1 1 1 Ii -.Il I \\\ \ III 54 Packaged Rooftop Builder 1.39 Page 10 of 19 Spec Sheet for RTU_2-5 39/10/2013 Prepared By: Project:-Untitled10 11:37AM Factory Installed Smoke Detector Specification Sheet For Factory Installed smoke detectors on 2-28 ton Commercial Rooftop Units Turn to the Experts APPLICABLE UNITS: 48/50PG. PM, PD 03-28 48/50TC 04-30, 48/50HC 04-28, 50TCQ 04-24, 50HCQ 04-12 48/50HE, 5011EQ 003-006 48/5OHJ, TM. TF 004-014 5OHJQ, TFQ 004-012 GENERAL DATA Type: TelAire SuperDuct, 4 -wire PhotoeledricSensing detector and controlmodule The Carrier factory installed smoke detector system comprises a four -wire controller and one or two sensors (Return Air and'or Supply Air). Its primary functionis to shut down the rooftopimitin order to prevent smoke from circulating throughout the buiiding. It is not to be used as a life saving device. Factory installed smoke detectors require no additional sampling tubes to be field installed. SYSTEM DESCRIPTION Controller - The controller includes a controller housing, a printed circuit board andan easily removable clear plastic cover for access to the multiple terminal connections andrelay cont ads forconnectionto fire alarm systems, HVAC controls, and other awdliaxv ftmctions. Aremotetest%reset' isualalarmstationcanbeconnectedtothe controller. Detectors- The detectorincludes a plastic housing; a printed circuit board, a clear plastic cover, an exhaust tube, and a sampling tube. The exhaust tube and sampling tube are attached during factory installation The sampling tube varies in length depending on the size ofthe rooftop unit. The dear plastic cover pemitsvisual inspections aithout having to disassemble the sensor. The cover fomrs an airtight charmer around the sensing electronics. For installations using two detectors, the controller does not differentiate which detector signals an alum or trouble condition. Arapid change in environmental conditions, such a s smoke, causes the sensor to signal an alarm state but dust and debris arc -unix edover time does not. When the sensor's ability to compensate for environmental changes has reacheditslimit (100%dim), the sensor signals a trouble condition. Air is introduced to the duct smoke detector's sensing chamberthrough a sampling tube that extends into the HVAC duct and is directedbackinto the ventilation systemthrough an exhaust tube. The difference in air pressure betw•eenthe two tubes pulls the sampled air through the sensing chamber. When a sufficient asmuet of smoke is detectedin the sensing chamber, the sensor signals an alann state andthe controller automatically takes the appropriate action to shut donnthe unit via the factory installed airingconnections. Additional functions such as int egrationaithaBuilding AlannSystem, additional fans andblowers, notify the fire alanncortrolpanel, etc, require fieldaiting and configuration. Smoke sensor module Controller module Fig. 1— Controller and Detector (Sensor) Modules 1/2 11/1/2008 Packaged Rooftop Builder 1.39 Page 11 of 19 Spec Sheet for RTU_2-5 39/10/2013 Prepared By: Project: -Untitled 10 11:37AM GUIDE SPECIFICATIONS System Specifications: • System Type: Separate controller and detector modules Four Wire Controller and Detector Photoelectric Sensing Environmental compensationnith differential sensing forreliable, stable, and drift -free sensitivity • Operating environment: Temperature -20' to 158'F(-29'to 70' C) Humidity 10% to 93% RH, non -condensing • Magnet-activatedtestreset sensor switches • Tool -less connectionteminal access • Recessed momentary snitch for testing and resettingthe detector Table 1- Controller Terminal Connections Terminal Number Name 1 AUX( 2 Reset 3 SUPV Contact COM 4 Alarm Contact COM s Alarm Contact NO 6 AUX 1 Contact COM 7 AUX 2 Contact NO 8 AUX 2 Contact NC 9 24VAC DC In (t) 10 24V AC(DC In (-} 11 Not used 12 Muttl-Shutdown 13 SUPV Contact NO 14 SUPV Contact NC IS REM AfsnnLED Out 16 AUX 1 Contact NC 17 AUX I Contact NO 18 AUX 2 Contact COM 19 18 VDC Output (+) 20 18VDC Output (-) 163.1 Not Used 183-2 Not Used N AC Neutral L AC Lina Controller specifications: Controller shall include: • One set ofnonnally open alanninitiation contacts for connectionto aninitiating device circuit on a fire alarm control panel • Two Fonn-C auxiliary alam relays forinterface with rooftop unit or other equipment • One Form -C supervision (trouble) relay to control the operation o f the Trouble LED on a remote test%reset station • Capable of direct connsctionto two individual dstectormoties • Can bewired toupto 14 other duct smoke detectors formultiple fan shutdonnapplications Turn to the Experts Wire Size: High voltage terminals: All others: Operating voltages: Operating current: 20-29VDC: 24VAC: 120VAC: 220/240 VAC: LED indicators: Relays Alarm initiation relay: Quantity: Style: Ratings: Auxiliary relays: Quantity: Style: Ratings: 10 A at 250 VAC Supervision (trouble) relay: Quantity: Style: Ratings: Detector specifications: Sensor. Smoke detection method Air velocity (min -max): Pressure differential (min -max): Sensitivity: Wire size: Resettlme: Power up time: Alarm test responsetime: LED indicators: 12-22 AGW 14-22 AGW 20-29 VAC, 50/60 Hz 120 VAC, 50/60 Hz 220/240 VAC, 50/60 Hz 175 mA 500 mA at 50/60 Hz 100 mA, 50 Hz 75 mA at 60 Hz 53 mA at 50 Hz 40 mA at 60 Hz Red (Alarm) Yellow (Trouble) Green (power) 1 Normally open 2.0A at 30 VDC (resistive) 2 Form C 10A at 30 VDC, 1 Form C 2.0A at 30 VDC (resistive) 8.70x5.45x1.90 in. Photoelectric 100 - 4,000 ft/min 0.005-1.00 in 0.67 to 2.48 %obacuration!n 14to22AGW 2second maximum 8 seconds max 5,to 7 seconds Red (alarm) Yellow (Trouble) Yellow (Dirty) Green (Power) 2/2 11/1/2008 Packaged Rooftop Builder 1.39 Page 12 of 19 RTU -1 X9/10/2013 Prepared By: Project:-Untitled10 11:37AM RTU -1 Tag Cover Sheet Unit Report Certified Drawing Performance Report Packaged Rooftop Builder 1.39 Page 13 of 19 Unit Report For RTU -1 39/10/2013 Prepared By: Project:-Untitled10 11:37AM Unit Parameters Dimensions (ft. in.) & Weight (lb.) *** Unit Model. 48TCEA05A2A6-0B1C0 Unit Length. 6' 2.375" Unit Size. 05 (4 Tons) Unit Width: 3' 8" Volts -Phase -Hertz: 460-3-60 Unit Height 2' 9.375" Heating Type:. Gas *•• Total Operating Weight .......626 lb Duct Cfg:.................. Vertical Supply I Vertical Return Medium Heat "' Weights and Dimensions are approximate. Weight does Round Tube Plate Fin Coils not include unit packaging. Approximate dimensions are provided primarily for shipping purposes. For exact dimensions and weights, refer to appropriate product data catalog. Lines and Filters Gas Line Size. 1/2 Condensate Drain Line Size. 3/4 Return Air Filter Type:.. Throwaway Return Air Filter Quantity. 2 Return Air Filter Size: 16 x 25 x 2 Unit Configuration Medium Static Option Al/Cu - Al/Cu Base Electromechanical Controls Temperature Economizer w/ Barometric Relief Unpowered Convenience Outlet Non -Fused Disconnect Standard Packaging Warranty Information 1 -Year parts(std.) 5 -Year compressor parts(std.) 10 -Year heat exchanger - Aluminized(std.) No optional warranties were selected. NOTE: Please see Warranty Catalog 500-089 for explanation of policies and ordering methods. Ordering Information Part Number 48TCEA05A2A6-0BIC0 Description Rooftop Unit Quantity 1 Packaged Rooftop Builder 1.39 Page 14 of 19 Certified Drawing for RTU -1 Project:—Untitledl0 Prepared By: 09/10/2013 11:37AM NOTES: I INNIISI AREA IIEI NILLI Y(i[A3. IMF NSIONf R. S CENTER OF GRAVITY 3. y DIIECTIOR OF AIR FLOW UNIT A RITC -ADA 33 ,/e 15411 le 3/e l A1E1 461C -ADA 33 515 5471 14 //I (ST11 RITE -ADI 33 111 11411 14 ill 5311 Al 314 116511 5 TIN 11111 FILIEI ACCESS PAA[L 1501.14[951 1 -CONDEMNER CARP. ACCESS c011 - ACCE115001 RI SS P01(1 - PANEL ' 0 4E111 T' -r 1 r UOr BACK 32114 01 IT CA ARI s TTHAm. AmuuDA i nirii� i'uAlmVA':I"nl"e E A A[[ iiafA w6' urn. S a Imo- 31 111 �1 1111 (2P11,11,"°3 I� II 14111 14 111111 4.511 11111 LECIIICAL DISCONNECT IWAlIAS OPT IWAL FACTORY INSTALLED CONVENIENCE CUTLET n -1/t 14141 3.114 551i1 J/4 nert LEFT 1.1 115111 II.1/e 14.1/4 II.1/4 14111 5631 I3121 I I 1 SEE THAI HART INE RISE C 25.5/1 —� IIs 1 RETURN AIR OFT 0 E ALT. -- CONDENSATE ORAS GAMIN IN S15EPAN 11-3/4 14511 SurPIT AIN 19/4 1511 . REMU15 AIR I It21(1111 J JI AIR 25 (62634 ROOD LN[ [511 TOP OP 34711 —449 12-116 63m 541/2 14101 OPtIWAI FCTOR/ FACTORY INSTALLED DISCONNECT CONTROL BOX ACCSS PANEL `-` ` _-_ I — II INDOOR 6101E1 ACCESS II�-NANOIE ISE 1E0.1 NOL( COesSII SIZE NANDLL I/ SIZES 1113.1 Rale 1/l 10 till( 11641 A yl FRONT (Aare 12111 CONNECTION SIZES 1 3/I' 1351 DIA FIELD PODIA SUPPLY HOLE 2. 1501 014 POWER SUPPLY AIIOCAOUI 1314' 1511 IIA SAW( ACCESS PLUG TIN 1121 DIA FIELD CONING. DINING HOLE 114•-14 In CONDENSATE DRAIN Ill -14 1121 NIS CONNECTION 2 111 ' 1641 IIA PORTS SGA/LY NNOCR-041 Tes INE -BASE CIM THESE NOUS SEOUIIIA AGI ISE CABINPI2901AN1. 153A51 TIIEAREI ISE 1E0.1 NOL( COesSII SIZE ISO SIZES 1113.1 1/l ACc. Tie. 5[.31 1 Ill' 346 1/6' 122.31 1 4 311. 1141.1.3, ,WEA 1 le 126.41 244 11011 1/2' FPI GAS 1 1/11. 110.11 FOA 'SIU-TNI-BASEPAN' FACTORY OPTION. FI111161 FOI ONLY I.Y. 1 2 ARE PROVIDED ' SELECT EITHER 3/4. O1 1/2' FOR PONES. DEPENDING ON WIRE SIZE .. 5011 PROVIDES 3/4' FP1 TURN cues FLANGE A FITTING. 12131 21 3,4 11411 51 1/4 11.31 SUPPLYAIR 416 AINYIN RIGHT 521 ILTER OUTSIDE All v I AANI IAIONETRIC FLEF OW lag 11-24-08 09-29-08 48TC 04-07 SINGLE ZONE ELECTRICAL COOLING WITH GAS HEAT 48TM500993 5.0 Packaged Rooftop Builder 1.39 Page 15 of 19 Certified Drawing for RTU -1 Project:-Untitledl0 09/10/2013 Prepared By: 11:37AM UNIT 310. UNIT 1113111 COINER 0116111 III COINER REIGN) III COINER 131641 ICI COINER 0111x1 III Cl.. X11611 LIS. 16. L/3. I0. III. IG. LII. I6. III. I6. 1 1 2 1110511 113 211 III 50 Ill 51 131 51 111 53 31 11111 23 15011 15 3/0 11131 1110-412 551 214 Ill 56 151 13 113 II 121 51 31 11111 23 11011 11 11321 11111101 531 251 131 51 111 61 151 10 131 12 11 11111 23 15111 11 1/1 11311 111[461 652 311 131 IN Ill 11 116 NI 151 11 3111111 2313841 201//15111 Cl UNITES .... 1m 1a r[cxNG10Gt[a m16-, n CA101[0 Intl IrdwArtiriTiliftvra` CORNER A CORNER B TOP CORNER C FRONT 11-24-08 1W[tt[1[1 09-29-08 48TC 04-01 SINGLE ZONE ELECTRICAL 'COOLING WITH GAS NEAT 48TN500993 5.0 Packaged Rooftop Builder 1.39 Page 16 of 19 X9/10/2013 Prepared By: Performance Summary For RTU -1 Project:-Untitledl0 11:37AM Part Number:48TCEA05A2A6-0BIC0 ARI SEER:.. 13.00 Base Unit Dimensions Unit Length:.. 74.4 in Unit Width:... 44.0 in Unit Height 33.4 in Operating Weight Base Unit Weight 537 lb Medium Heat 9 lb Medium Static Option 10 lb Temperature Economizer w/ Barometric Relief:... 50 lb Unpowered Convenience Outlet 5 lb Non -Fused Disconnect: 15 lb Total Operating Weight 626 Ib Unit Unit Voltage -Phase -Hertz. 460-3-60 Air Discharge. Vertical Fan Drive Type. ... Belt Actual Airflow 1600 CFM Site Altitude: . 0 ft Cooling Performance Condenser Entering Air DB:... 95.0 F Evaporator Entering Air DB:..... 80.0 F Evaporator Entering Air WB. 67.0 F Entering Air Enthalpy 31.44 BTU/Ib Evaporator Leaving Air DB' 60.2 F Evaporator Leaving Air WB 57.7 F Evaporator Leaving Air Enthalpy 24.83 BTU/lb Gross Cooling Capacity 47.60 MBH Gross Sensible Capacity:.. 34.22 MBH Compressor Power Input 3.31 kW Coil Bypass Factor:. 0.246 Heating Performance Heating Airflow:... 1600 CFM Entering Air Temp. 70.0 F Leaving Air Temp. 123.8 F Gas Input Capacity 115.0 MBH Gas Heating Capacity 93.00 MBH Temperature Rise:... 53.8 F Supply Fan External Static Pressure 1.00 in wg Options / Accessories Static Pressure Economizer 0.07 in wg Total External Static. 1.07 in wg Fan RPM:.. 1164 Fan Power 1.13 BHP NOTE:.. ...Selected IFM RPM Range: 770 -1175 Electrical Data (Before July 30, 2012) Minimum Voltage 414 Maximum Voltage 506 Compressor RLA 6.2 Compressor LRA' 41 Packaged Rooftop Builder 1.39 Page 17 of 19 X9/10/2013 Prepared By: Performance Summary For RTU -1 Project:-Untitledl0 11:37AM Outdoor Fan Motor Qty. 1 Outdoor Fan FLA (ea)' 0.8 Indoor Fan Motor Type. ...MED Indoor Fan Motor FLA' 2.1 Combustion Fan Motor FLA (ea)' 0.24 Power Supply MCA:.. 10.7 Power Supply MOCP (Fuse or HACR):. 15 Min. Unit Disconnect FLA:.... 10 Min. Unit Disconnect LRA' ..49 Electrical Convenience Outlet None Electrical Data (July 30, 2012 and Beyond) Indoor Fan Motor FLA. 2.6 Power Supply MCA' 12 Power Supply MOCP:........__ 15 Disconnect Size FLA' 11 Disconnect Size LRA. 52 July 30th and beyond units can be identified by serial number 3112)00000000C and higher Control Panel SCCR: 5kA RMS at Rated Symmetrical Voltage Acoustics Sound Power Levels, db re 10E-12 Watts 63 Hz 125 Hz 250 Hz 500 Hz 1000 Hz 2000 Hz 4000 Hz 8000 Hz A -Weighted Advanced Acoustics Discharge Inlet Outdoor 88.1 88.0 90.9 82.7 79.8 84.6 74.7 66.4 79.5 70.4 64.0 77.9 66.9 63.2 76.5 61.5 57.2 71.1 63.2 52.8 66.9 58.6 45.6 62.5 74.0 69.4 81.0 Advanced Accoustics Parameters 1. Unit height above ground. 30.0 ft 2. Horizontal distance from unit to receiver 50.0 ft 3. Receiver height above ground. 5.7 ft 4. Height of obstruction. 0.0 ft 5. Horizontal distance from obstruction to receiver 0.0 ft 6. Horizontal distance from unit to obstruction. 0.0 ft Packaged Rooftop Builder 1.39 Page 18 of 19 )9/10/2013 Prepared By: Performance Summary For RTU -1 Project:-Untitled10 11:37AM Detailed Acoustics Information Octave Band Center Freq. Hz 63 125 250 500 1k 2k 4k 8k Overall A 90.9 84.6 79.5 77.9 76.5 71.1 66.9 62.5 92.4 Lw B 64.7 68.5 70.9 74.7 76.5 72.3 67.9 61.4 80.8 LwA C 58.5 52.2 47.1 45.5 44.1 38.7 34.5 30.1 60.0 Lp D 32.3 36.1 38.5 42.3 44.1 39.9 35.5 29.0 48.4 LpA Legend A Sound Power Levels at Unit's Acoustic Center, Lw B A -Weighted Sound Power Levels at Unit's Acoustic Center, LwA C Sound Pressure Levels at Specific Distance from Unit, Lp D A -Weighted Sound Pressure Levels at Specific Distance from Unit, LpA Calculation methods used in this program are patterned after the ASHRAE Guide; other ASHRAE Publications and the AHRI Acoustical Standards. While a very significant effort has been made to insure the technical accuracy of this program, it is assumed that the user is knowledgeable in the art of system sound estimation and is aware of the tolerances involved in real world acoustical estimation. This program makes certain assumptions as to the dominant sound sources and sound paths which may not always be appropriate to the real system being estimated. Because of this, no assurances can be offered that this software will always generate an accurate sound prediction from user supplied input data. If in doubt about the estimation of expected sound levels in a space, an Acoustical Engineer or a person with sound prediction expertise should be consulted. 18 Fan Curve 03 Q9 12 15 18 Airflow(CFM-thousands) RPM=1164BHP=1.13 MaximumRPM=1175 MaximumBHP=2.40 Note: Pleasecontactapplicationengineeringforselectionsoutsidetheshadedregion. SC-SystemCurve RP-RatedPoint Packaged Rooftop Builder 1.39 Page 19 of 19 -07-2013 14:15 - 888-261-0361 Pg -1 M rrY.1, vONDIND 401 V41111 10/7/2013 twouNT. FtityThousand Dollars and 00r100 x>,xe'"xxrtxax+e*vr,e""nvw."na TO: Small Business Owner United Sees of Au-nerica OOLLARS CLIENT CODE: CBF -0112 Dou.ARs cE Ts **3501000 .00 SPECIMEN - NON-NEGO T IABLE - NOTA CHECK SHORT TERM BUSINESS LOAN - FAST AND SIMPLE Time is money. We offer a fast and simple alternative to traditional bank financing. Our cutting edge technology allows us to approve loans quickly and get you the capital to push your business forward. Loan Size $3,000.00 - $250,000.00 Terms 6-18 months Security No collateral needed Timing Approval in 24 hours; Funding in 2 business days Qualifications Min. 500 credit score; At least 1 year time in business Details True Business Loan; *NOT* a Merchant Cash Advance CALL NOW TO SPEAK WITH A FINANCE SPECIALIST; 1-800-873-8022 Our mission is to provide capital for small businesses when traditional lenders are not. Our clients use our capital to fund anything from inventory to renovations, temporary cash flow to marketing...Take advantage of our working capital for anything to push your business forward! Recently Funded Transactions (As of Monday, October 07, 2013): $40,000.00 - Auto Repair Shop - Houston, TX - For additional marketing $25,000.00 - Bakery/Deli - Portland, OR - For store improvements and remodeling $67,200.00 - Optometrist - Orlando, FL - For additional employees S35,000.00 - Restaurant - Oceanside, CA - To prepare for busy season $10,000.00 - Restaurant/Cafe - Indianapolis, IN - For additional marketing $55,000.00 - HVAC Contractor - Morganton, NC - For material to take on new jobs $75,000.00 - Retail Store Boutique - Irvine, CA - For additional inventory Visit us online at www.communitvbf.com No longer interested? Please visit thefaxremovalservice.com, or call 888-261-0361 to be removed PILE COpy STRUCTURAL CALCULATRMS FOR UPS — RTUS GATEWAY CORPORATE PARK — BUILDING 9 TUKWILA, WASHINGTON PREPARED FOR: SEATTLE MECHANICAL JULY 16, 2013 REVISED: OCTOBER 3, 2013 REVIEWED FOR CODE COMPLIANCE APPROVED NOV 0 4 2013 City of Tukwila BUILDING DIVISION CASCADE CREST CONSULTING ENGINEERS. INC. 21902 96Th AVENUE SE SNOHOMISH, WASHINGTON 98296 (206) 909-7808 PREPARED BY: KEITH MOORE, S.E. 401,:x36''.9t'\j'NZ14541(4. 40.10//3 t, F o,,, -- zit a' Y �� :,1 '. % rn 0' 1899�p,%�(t- 444/0NAI EN ® .. EXPIRES CORRECTION LTO# RECEIVED CITY OF TUKWILA OCT 0 8 2013 PERMIT CENTER GENERAL STRUCTURAL NOTES: 1. ALL MATERIALS, WORKMANSHIP, DESIGN, AND CONSTRUCTION SHALL CONFORM TO THESE NOTES AND THE INTERNATIONAL BUILDING CODE (IBC), 2012 EDITION. 2. DESIGN LOADING CRITERIA: ROOF LIVE LOAD 25 PSF MECHANICAL UNIT RTU -1 — 1,036 POUNDS RTU -2 —1,370 POUNDS RTU -3 —1,377 POUNDS RTU -4 —1,278 POUNDS RTU -5 —1,134 POUNDS EARTHQUAKE Sr's = 0.95 SITE CLASS D to E WIND 85 MPH, EXPOSURE B 3. STRUCTURAL CALCULATIONS AND SKETCHES SHALL BE USED IN CONJUNCTION WITH MECHANICAL DRAWINGS FOR BIDDING AND CONSTRUCTION. CONTRACTOR SHALL VERIFY DIMENSIONS AND CONDITIONS FOR COMPATIBILITY AND SHALL NOTIFY ENGINEER OF ALL DISCREPANCIES PRIOR TO CONSTRUCTION. 4. CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS, MEMBER SIZES AND CONDITIONS PRIOR TO COMMENCING ANY WORK. ALL DIMENSIONS OF EXISTING CONSTRUCTION SHOWN ARE INTENDED AS GUIDELINES ONLY AND MUST BE VERIFIED. THE EXISTING CONDITIONS SHOWN ON THE SKETCHES ARE BASED EITHER ON SITE OBSERVATION, ORIGINAL DRAWINGS OR WERE ASSUMED BASED ON EXPECTED CONDITIONS. IF THE EXISTING CONDITIONS DO NOT CLOSELY MATCH THE CONDITIONS SHOWN ON THE SKETCHES, OR IF THE EXISTING MATERIALS ARE OF QUESTIONABLE OR SUBSTANDARD QUALITY, NOTIFY THE ENGINEER PRIOR TO COMMENCING ANY WORK. 5. CONTRACTOR SHALL PROVIDE TEMPORARY BRACING FOR THE STRUCTURE AND STRUCTURAL COMPONENTS UNTIL ALL FINAL CONNECTIONS HAVE BEEN COMPLETED IN ACCORDANCE WITH THE DRAWINGS. 6. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SAFETY PRECAUTIONS AND THE METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES REQUIRED FOR THE COMPLETION OF THE WORK. 7. FRAMING LUMBER SHALL BE KILN DRIED OR MC -19, AND GRADED AND MARKED IN CONFORMANCE WITH W.C.L.B. STANDARD GRADING RULES FOR WEST COAST LUMBER NO. 17. FURNISH TO THE FOLLOWING MINIMUM STANDARDS: JOISTS: (2x MEMBERS) JOISTS: (4x MEMBERS) HEM: -FIR NO.2 HEM -FIR NO. 1 Fb = 850 PSI, Fv = 150 PSI Fb = 975 PSI, Fv = 150 PSI 8. TIMBER CONNECTORS CALLED OUT BY LETTERS AND NUMBERS SHALL BE "STRONG - TIE" BY SIMPSON COMPANY, AS SPECIFIED IN THEIR CATALOG NO. C-2013. INSTALL NUMBER AND SIZE OF FASTENERS AS SPECIFIED BY MANUFACTURER. CONNECTORS SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS. • 9. SHEET METAL SCREWS SHALL CONFORM TO THE AMERICAN IRON AND STEEL INSTITUTE (AISI) "SPECIFICATIONS FOR THE DESIGN OF COLD -FORMED STEEL STRUCTURAL MEMBERS". 10. WOOD SCREWS SHALL CONFORM TO ANSI/ASME STANDARD B 18.6.1. 11. CONNECT RTU -1 TO THE METAL CURB ADAPTER AND THE METAL CURB ADAPTER TO THE EXISTING METAL CURB WITH A MINIMUM OF (3) #10 SHEET METAL SCREWS ON EACH SIDE OF THE UNIT. PLACE ONE SCREW AT 6" TO 8" FROM EACH CORNER OF THE UNIT WITH THE THIRD SCREW AT APPROXIMATELY THE MIDDLE OF THE UNIT ON EACH SIDE. 12. CONNECT RTU -2 AND RTU -4 TO THE METAL CURB ADAPTER AND THE METAL CURB ADAPTER TO THE EXISTING METAL CURB WITH A MINIMUM OF (4) #10 SHEET METAL SCREWS ON EACH SIDE OF THE UNIT. PLACE ONE SCREW AT 6" TO 8" FROM EACH CORNER OF THE UNIT OR EXISTING CURB WITH THE OTHER SCREWS EQUALLY SPACED BETWEEN. 13. CONNECT RTU -3 TO THE METAL CURB WITH A MINIMUM OF (3) #10 SHEET METAL SCREWS ON EACH SIDE OF THE UNIT. PLACE ONE SCREW AT 6" TO 8" FROM EACH CORNER OF THE EXISTING CURB WITH THE OTHER SCREW AT APPROXIMATELY THE MIDDLE OF THE UNIT. CONNECT THE METAL CURB TO THE WOOD ROOF STRUCTURE WITH (4) #10 x 2" LONG WOOD SCREWS ON EACH SIDE OF THE UNIT. PLACE ONE SCREW AT 6" TO 8" FROM EACH CORNER AND THE OTHER SCREWS EQUALLY SPACED BETWEEN. 14. CONNECT RTU -5 TO THE EXISTING METAL CURB WITH A MINIMUM OF (4) #10 SHEET METAL SCREWS ON EACH SIDE OF THE UNIT. PLACE ONE SCREW AT 6" TO 8" FROM EACH CORNER OF THE EXISTING CURB WITH THE OTHER SCREWS EQUALLY SPACED BETWEEN. Ezz-hc FOO -FPR -11 -rt oF re_e? -A.43.; 5 4h6Cpw? LOSLI'L SIS.1512_ 2)c 10 Of1._ L 046614 .td Lpda. IcD sv- g -he Ice, s.i- fe--- PLACES. Et4, [)1-1 Fr -66441 1-1-c-1 :pLik14 -f-)cc, co uFiG, #0644G5RZAS 10,_Ep -re, SuPpb PL/. 4hcio LOSi-f,(0 44444 ciciz: 4"4- PROJECT: 127-1):. ENGR: ' riVIA DATE: c,/13 SCALE: Yito SHEET PROTECT DESCRIPTION: The project consists of the replacement of four existing rooftop mechanical units with new units and installation of a new rooftop mechanical unit. LOADS: LIVE 25 PSF DEAD Roofing and re -roof 5.0 Plywood sheathing 1.5 2x4 @ 24" o.c. 0.7 4x14 @ 8' o.c. 1.5 Insulation 1.0 MEP 2.0 Ceiling & Lights 2.0' Total Dead 13.7 DEAD + LIVE WIND 85 mph, Exposure B, 11 PSF SEISMIC Latitude 47.628 Longitude -122.346 Site Class D to E SDS (D) = 47.487 SDs (E) = -122.282 SDs = 0.95 38.7 PSF 114, Design Maps Summary Report http://geohazards.usgs.gov/designmaps/us/summary.php?template-mi... ZU GS Design Maps Summary Report User -Specified Input Report Title UPS RTUs Tue July 16, 2013 00:50:28 UTC Building Code Reference Document 2012 International Building Code (which utilizes USGS hazard data available in 2008) Site Coordinates 47.487°N, 122.282°W Site Soil Classification Site Class D - "Stiff Soil" Risk Category I/II/III •I'-L7r rood, • Newcastle a Cougar , Reg11411da ti Pisa ; (�1% �. `: East Re Highlan USGS-Provided Output Ss= 1.500g S = 0.562 g Sins = 1.500 g SMI = 0.844 g SDS = 1.000 g SDI = 0.562 g For information on how the SS and S1 values above have been calculated from probabilistic (risk -targeted) and deterministic ground motions in the direction of maximum horizontal response, please return to the application and select the "2009 NEHRP" building code reference document. 1.65 1.50 1.35 1.20 1.05 S0 0.90 v H 0.75 0.60 0.45 0.30 0.15 0.00 0.00 0.20 MCER Response Spectrum 0.40 0.60 0.80 1.00 1.20 1.40 Period, T (sec) 1.10 1.00 0.90 0.80 0.70 0! 0.60 0.50 Uli 0.40 0.30 0.20 0.10 0.00 Design Response Spectrum 1.60 1.90 2.00 0.00 0.20 0.40 0.50 0.80 1.00 1.20 1.40 1.60 1.90 Period. T (sec) 2.00 Although this Information Is a product of the U.S. Geological Survey, we provide no warranty, expressed or implied, as to the accuracy of the data contained therein. This tool Is not a substitute for technical subject -matter knowledge. 1 of 1 7/15/2013 5:50 PM Design Maps Summary Report httpJ/geohazards.usgs.gov/designmaps/us/summary.php?template9ni... usGs Design Maps Summary Report User -Specified Input Report Title UPS RTUs Tue July 16, 2013 00:51:02 UTC Building Code Reference Document 2012 International Building Code (which utilizes USGS hazard data available In 2008) Site Coordinates 47.487°N, 122.282°W Site Soil Classification Site Class E - "Soft Clay Soil" Risk Category I/II/III _Cowley .. oVashon IS mapgvest USGS-Provided Output Ss = 1.500 g SMS = 1.350 g S1 = 0.562 g SM1 = 1.350 g SDS = 0.900 g Sol = 0.900 9 For Information on how the SS and Si values above have been calculated from probabilistic (risk -targeted) and deterministic ground motions in the direction of maximum horizontal response, please return to the application and select the "2009 NEHRP' building code reference document. MCEa Response Spectrum 0.99 1.40 0.90 1.26 0.81 1.12 0.72 0.98 0.63 S 0.84 • 0.54 a 0.70 0.45 0.56 0.36 0.42 0.27 0.28 0.18 0.14 0.09 0.00 0.00 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.90 2.00 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 Period. T (sec) a Design Response Spectrum Period, T (sec) 2.00 Although this Information is a product of the U.S. Geological Survey, we provide no warranty, expressed or Implied, as to the accuracy of the data contained therein. This tool Is not a substitute for technical subject -matter knowledge. 1 of 1 7/15/2013 5:51 PM !WI Awl ever. We 6it1rer*Mot �w.yR Now Ills wwPl MUM, WON Irw111dI1rwen ererwronl NUDOe1 !led* ed sob 10 1 / 0 5 ,, ti10 r. 4elcooiM&14 uw000Ier aiarAoe WPM +sao w 2 1= 4.1P01E* 2110. 200 ewb 10 1 i:/..10 MY 'rAOW% 1112O01/12Ae1e MAW= PAOOM 1W1-112:00 Ail 3 1eK:A06/01 401110014101 107? 10 1 -1 40100O17A*11e AR-000LW PACKAW 4 KAM 114 144 10 11 o Wow CuY 141114 41110O011A2A0 A21C1X2i0 PACSCAOR IF 011244 1ICO$00G 4 I/ Ivy, ie?c0oe Ae14001.20 PAWN* Google earth miles km 100 Lam 47. 4-7 Ltit4C. — , 213 51Tc. Catcl b E 200 CURBS, WEIGHTS & DIMENSIONS (cont.) NOTES: 1. DINE111013 ANE I1 1B�RES� DINENSIOR IN I 1 Alf IN NIIIIIETEI}5. 2. CENTER OF 1111111 1. NO, 01010710/ OF AIR FLOW LEFT f Ir Mil 11 -143/1 gm"E r 11GRT UNIT OMRCil0N SI2EE A 1 311' DIA 1351 FIELD PORN SIMPLY NOL1 D 2 112. 1641 DIA PORI SUPPLY 1.400007 C 1 1/1' 11A 1111 SAUR /CUSS RIS D 7/6. 016 1221 FIELD CURIOS WIRING 0OLE E 3/4•-11 OPT CONDENSATE DN1140 40 316 112531 1R'-11 MPT SAS COMECTEOI F 314'-11 127 SAS 5006(10101 1 E • 116 1511 POWER SUPPLY DOCK -OUT LEFT f Ir Mil 11 -143/1 gm"E r 11GRT UNIT OUTDOOR COIL TYPE J A N 4570-A66 RTPF 41 1/4 110411 33 (6561 15 1/6 14031 411E400 RTPF 40 316 112531 31 111 (3451 27 1/6 17011 48TC-112 IT►F 41 3/6 11153) 37 114 11461 15 7/6 (4031 4015-006 DTPF 41 114 110461 33 1150114031 15 1/6 4571-000 RTPF 41 318 112531 37 114 (0411 151/8 14071 4075.012 OPT 41 3/6 11153) 17 144 11161 13 716 14031 4875-406 MCXk 0104614 33 11561 150 4.21 4/TC-012 IICIR 41 3/61 11253) 1/1 12151 11 (271.41 ITN - 0031D 166E PLA E FIB !COPPER/610111 NCN1 • 60167106 CALGH/A10N) 14 13311 r — 23.1/1 —. 11411 FNONT FILTER ACCINS PAR/ 1T00L-LEIS) 110001 COIL ACCES PAUL 01041113111 COIL P THRU-THE-BASE CHART (FIELD INST) 212fEll ' 1�[C1 1 ALN 111L[�d : E, s SNI 1LOlE1 . E . a 80 1- 3- : : 081 0 -4.1-111 11 RE0'D NOTE 13141 31 14441 33111 ... FNONT FILTER ACCINS PAR/ 1T00L-LEIS) 110001 COIL ACCES PAUL 01041113111 COIL P THRU-THE-BASE CHART (FIELD INST) THESE ROLES REQUIRED FOR OSE WITH ACC1 1175: CMTIPW0002A01: OAS TRU 5480 CR0TIPRHD01A01: BAS TR0U 0A3EPAH THREADED WIRE RE0'D NOTE 0000217 512E 119E S12E3 1850.1 O 1/2' ACC. 7/6' 122.21 1 112' 24V 710' 122.21 1 1 1/4' 1002.004) POWER 1 314. 111.4) 2 • 10011 3/4' FPT 6A3 1 3/1. 114.11 1002) PROVIDES 3/4 FPT 7 R CURS • FLANGE 1 4(11108. ROLE 5121: 2' 150.61 Pig 3 - IJIb1Wedoss 48TC 08-12 22 BACK THRU-THE-BASE CHART (FIOP) FOR '1110-Tl(-0&UPAR' FACTORY 011100 FITTIMS FOG 0811 E. 1, a IIAEE PMVIkEO. N r SWPLR1LEDD 1/2 T11EAD��E�APTERL0* ImmorIc``IW 0E2RE0 EASE PAN FITT113 ADD OAS VALVE: IlTCD.5.01.040 010006 ��b CURBS, WEIGHTS & ]DIMENSIONS (cont.) UNIT COILTYPE1111061 STD. UNIT CORNER NIGHT (0) CORNER 9118 T IRI CORNER 0116141 (CI CONNER REI6NT 10) C.E. LBS. 16. LRS. 18. LRS. II. LBS. 1O. L68. 16. I f I (81C -A08 RIFF 160 354 176 81 130 12 219 93 231 107 11 112 (10541 33 1/6 16101 20 1/2 15211 46TC-401 RTPF 120 410 212 16 183 03 243 110 262 126 10 718 (10361 N 18641 23 1/8 ($671 48TC-012 RTPF 130 422 111 16 196 OD 241 112 072 123.3 42 (10671 33 1/6 (641) 24 1/4 (0161 IBTC-9$6 RTPF 835 379 164 74.3 170 17.2 255 115.0 246 111.7 41 7/8 (11401 35 5/1 (1051 11 3/8 14021 48IC-109 RTPF 130 422 226 103.3 187 85 232 105.3 283 128.5 39 3/4 110101 32 7/e (1331 18 5/8 (4131 46TC-012 6101 940 421 231 104.1 181 83.8 234 106.2 266 129.8 39 3/4 (10101 33 (6381 16 1/2 11101 (81C-006 NCNS 805 365.5 160 12.9 153 61.5 240 101 260 Ile 43 110121 31 3/0 19241 21 311 (511.71 48TC-012 NCH1 695 106.3 105 04 178 71.9 210 110 274 124.4 42 7/8 110011 35 112 11021 22 7/8 [5011 RTPF • ROUND 118E. PLATE FIN (COPPER/ALUM' NCIII • 11011110N (ALUN/ALON) .. swwI RI 0110 ran nmr non 141 won u Nnor ruins. 0111011 411 L i 111. rrnl 10 01 frOSRT WA WAN. Fig. i - 4181'C 08-12 011267 Fig. 7 - Henke Menace LOC common CCND1710N A 48 -In (1219 mm) 38-1n (914 mm) 18: -In (457 mm) 18 -In (457 mm) 12 -In (305 mm) Unit disconnect is mounted on panel If dimension -8 Is 12 -In (305 mm) No disconnect. convenience outlet option Recommended service clearance (use deckle screwdriver) Minimum dearer= (use manual ratchet egowdHwr) B 36 -In (914 mm) 12 -In (306 nen) Special Unit hes economic er 11 dImerlelon-AID 9(1 --in (914 mm) Check for sources of flue products within 10 -ft of unit fresh aft Intake hood C 88 -in (914 nen) 18 -In (457 mm) Me condensate drain Is used Minimum clearance D 48 -In (1219 mm) 42 -In (1087 mm) 88 -In (914 mm) Specie] No clue discharge acoeeeory Installed. eurfacele oombustlble mderlaf Surface behind ember Is grounded (e.g., metal, masonry wall, another unit) Surface bsNnd servicer le electrically non-oonduotive (e.g., wood, fiberglass) Chad( for adjacent unite or building fresh * Infakae within 10 -ft of this unit's flue outlet Jna a881grlea OCslruUNIcn 9�Org9a nppllo ltwn ng for guicanoe on any obstruction or verlbal clearances. 23 iii 6:7:11 Alb: Monne- Tam EXISTING CURB LAYOUT ANNOYS) MUM CURB SHORN a COI IITANDAIID CONROURATION 'MOOED COI RUMOR TRU MONTTOCHANGE LAYOUT glizioLasebolgem., Aim WITHOUT NO1f CAT101L•CURSIBNEEOUDBIA iCOPERBIT OONIIOURATNNI COI MUST BE NOTIFIED 4 SNUAt pk 1'1 IniiiNtliFe PRIOR TO MOM AN OMR 4011.50 lam wr.1w+►141011 ...14086-4006 OUOIE rk R 141771 '64E03 — 111.171111.7=-1, 11=111111 EXISTING CURB LAYOUT MOW J Lt' L -2 1K 70 W CURB MILAN IS COI STANDARD CONFIGURATION Col POMMES INE RJOHT TO CHANGE LAYOUT WITHOUT NOTWICATNN1. W CURB IS NEEDED IN A DIFFERENT CO.rIGURAINNN COI MUST BE NOTEIED PRIOR TO PLACING AN ORDER. m i mIsms=1 0 ..__L../'"'7-1111_ E!� CURBS, WEIGHTS & DIMENSIONS (cont.) 3d i I.1411.,u_ I C '14 i i IC IC 00 WSW PI& / - M..f cu.b Degas 4era 11-14 24 - 4 N4 {rt-tv� @ _tG,E OP UNA rT` 4,4 gam,„ 2- EK- 4-)t- RA-MI -�t- P►c, F ► N1G PLA4 -Ern) -k-+LrouLI L)3. a.& r�l�.ce rn� Vt&..k W-±-1 nu -e-., R- I u -'I Uri + Vcici tor -6 �� 3 ct.19 t37) - by 3401,3 PROJECT: UP - s CASCADE Cam COMEBULTEIS ENOEsoRa. E,a ENGR: DATE: 7, SCALE: v t(2713 SHEET I P= nst6A -- ti 5 ,� -71( 74i I E -F V- r7 etc • gTo t P dL W1._ . 'Zfe`? I 12L. ` :w,. :74C) '70 (5)i 60'0 O ,d) to S14.%4ids2 C.P = WS X4 -F 10:5 L �- 074- Si -/l3 � t^t -t,1:1 z. '•( Ce ty-t e)4. car- n v -r- .e. I o j. C-14. UVta ' l } 4 co— SK -/7,($ '`s. CASCADIECiesrcanoanab.amsas.MQ PROJECT: U Ps IETJ ENGR: i ILV► DATE: 7A (0/13 SCALE: SHEET .133HS :3 IV3$ :31Va :ZIoN3 _a-- + S .i a 8 S 1. .1-a%,10QaMi:,,27kt'1 it- 17.:?' :1a3road - o o 71, of Z £'.S01 -it -') • c)4.2 1 N r (I-2s)A - "frkvi '4 -.. S oZ 1 Load Express: Load Calculation Software Version 2.2 Title Page Load Express: Load Calculation Software By: Seattle Mechanical General Job Pile cc) Pprpm. ..R R. y Job Description: Building Owner: Program User: Comments: Program was Run: Dataset Name: UPS Seattle Mechanical 3/21 /2013at 2:19:38 PM C:\CDS\LOADEXP\DATA\UPS.LE Alternative 1 AIt1 Geographical Data Location: Seattle, Washington Weather File: Seattle, Washington Latitude: 47 deg Elevation: 386 ft Design Data Summer Dsn Dry Bult Summer Dsn Wet Bul Winter Design Dry Bu Density -Sp Heat Prod Design Simulation per REVIEWED FOR CODE COMPLIANCE APPROVED NOV 0 4 2013 City of Tukwila BUILDING DIVISION 80.0 deg F 64.0 deg F 26.0 deg F 1.0988 Btu-min/(hr-ft3-F) Apr To Nov M13- 17 8 Building Peak Data Month/Hour: Jul / 14 Cooling Capacity: 287.1 Mbh Cooling Sensible: 225.1 Mbh Sensible Heat Ratio (SH 0.862 Heating Capacity -174.4 Mbh RECEIVED CITY OF TUKWILA SEP 1 1 2013 PERMIT CENTER Load Express: Load Calculation Software Version 2.2 Zone/Air Handler Descriptions Zone/Air Handler Descriptions Alternative - 1 AIt1 Air Handler Type Description 1 BYPASS AHU1 2 CONSTANT AHU2 3 BYPASS AHU3 Zone Type Description 1 Commercial Retail Zone1 2 Commercial Retail Zone2 3 Commercial Retail Zone3 Load Express: Load Calculation Software Alternative 1 Alt1 1-2 Story Office Version 2.2 Zone Input Data General Job Data Weather Location: Seattle, Washington Weather Region: Northwest Clg Simulation Start Month: Apr Clg Simulation End Month: Nov Zone Data Alternative Number: 1 Zone Number: 1 Floor Width: 49 ft Floor Length: 57 ft Ceiling Height: 9 ft Fir -to -Fir Height: 12 ft No. of Dup Zones: 1 Ceiling U -Factor: 0.04 Btu/(hr-F-ft2) Floor Calculation Type: None W H Type Building Opening Time: 8 am Building Closing Time: 6 pm Building Direction: 0 Clg Sensible SF: 10.00 Cooling Dry Bulb: Relative Humidity: Heating Dry Bulb: People Density: People Activity: People Sensible Load: People Latent Load: Misc. Equip. Type: Misc. Equip. Sensible Load Misc. Equip. Latent Load: Misc. Equip. Sensible to RF Lighting Intensity: Lighting Type: ecessed fluorescent, not vented 72 deg F 50 % 70 deg F 100 ft2/pers General Office Space 210 Btuh/pers 255 Btuh/pers Microcomputers 350.00 Watt/pers 0.00 Watt/ft2 0 Btuh 1.00 W att/ft2 Clg Latent SF: 10 Htg Sensible SF: 10 People Diversity: 100 % Bldg Simulation Type: Cooling and Heating Ballast Factor: 1.00 % Percent Light to RA: 50 % Vent Type: General Office Space Vent Cool Design: 20.00 cfm/pers Vent Heat Design: 20.00 cfm/pers Supply Cool Design: 0 cfm Supply Heat Design: 0 cfm Infiltration Type: Pressurized, Average Construction Infilt. Cooling Desigi 0.30 ach/hr Infilt. Heating Desigi 0.30 ach/hr Room Exhaust: 0.00 cfm U -Factor Color Percent (%) Direction Susp Ceil Tilt Cool Adj Heat Adj Dimension % Glass Shading Coeff Spc Temp Spc Temp degF deg F Shading WALL 1 49 x 9 GLASS 1 40 x 5 WALL 2 70 x 9 GLASS 1 60 x 5 ROOF 1 49 x 57 PART 1 57 x 9 PART 2 49 x 9 12" H.W. Concrete, 5" Ins Double Coated 1/4 in. 12" H.W. Concrete, 5" Ins Double Coated 1/4 in. Steel Deck, 3.33" Ins Frame, 0.75" gypsum board Frame, 0.75" gypsum board 0.05 0.50 0.05 0.50 0.08 0.39 0.39 Light Light Light 0 Plenum 0 Plenum 0 RA North North North 0 0 0 0 Yes 0 0 0 0 0 0 0 Area 0 0 0 0 Area 0 0 72 70 72 70 0.00 0.55 Internal 0.00 0.55 Internal 0.00 0.00 0.00 Load Express: Load Calculation Software Zone Data Alternative Number: 1 Zone Number: 2 Floor Width: 28 ft Floor Length: 49 ft Ceiling Height: 9 ft Fir -to -Fir Height: 12 ft No. of Dup Zones: 1 Ceiling U -Factor: 0.04 Btu/(hr-F-ft2) Floor Calculation Type: None W H Type Cooling Dry Bulb: Relative Humidity: Heating Dry Bulb: People Density: People Activity: People Sensible Load: People Latent Load: Misc. Equip. Type: Misc. Equip. Sensible Load Misc. Equip. Latent Load: Misc. Equip. Sensible to RA Lighting Intensity: Lighting Type: ecessed fluorescent, not vented 72 deg F 50 % 70 deg F 100 ft2/pers General Office Space 210 Btuh/pers 255 Btuh/pers Microcomputers 350.00 Watt/pers 0.00 Watt/ft2 0 Btuh 1.00 Watt/ft2 Version 2.2 Zone Input Data -. Ballast Factor: 1.00 % Percent Light to RA: 50 % Vent Type: General Office Space Vent Cool Design: 20.00 cfm/pers Vent Heat Design: 20.00 cfm/pers Supply Cool Design: 0 cfm Supply Heat Design: 0 cfm Infiltration Type: Pressurized, Average Construction Infilt. Cooling Desigl 0.30 ach/hr Infilt. Heating Design 0.30 ach/hr Room Exhaust: 0.00 cfm U -Factor Color Percent (%) Direction Susp Ceil Tilt Cool Adj Heat Adj Dimension % Glass Shading Coeff Shading Spc Temp Spc Temp deg F deg F WALL 1 28 x 9 GLASS 1 23 x 5 ROOF 1 28 x 49 PART 1 49 x 9 PART 2 28 x 9 12" H.W. Concrete, 5" Ins Double Coated 1/4 in. Steel Deck, 3.33" Ins Frame, 0.75" gypsum board Frame, 0.75" gypsum board 0.05 Light North 0.50 0 Plenum 0.08 Light 0 RA North 0.39 0.39 0 0 Yes 0 0 0 0 0 0 0 Area 0 0 72 70 72 70 0.00 0.55 Internal 0.00 0.00 U.UU Load Express: Load Calculation Software Zone Data Alternative Number: 1 Zone Number: 3 Floor Width: 44 ft Floor Length: 98 ft Ceiling Height: 9 ft Fir -to -Fir Height: 12 ft No. of Dup Zones: 1 Ceiling U -Factor: 0.04 Btu/(hr-F-ft2) Floor Calculation Type: None W H Type Cooling Dry Bulb: Relative Humidity: Heating Dry Bulb: People Density: People Activity: People Sensible Load: People Latent Load: Misc. Equip. Type: Misc. Equip. Sensible Load Misc. Equip. Latent Load: Misc. Equip. Sensible to RF Lighting Intensity: Lighting Type: ecessed 72 deg F 50 % 70 deg F 100 ft2/pers General Office Space 210 Btuh/pers 255 Btuh/pers Microcomputers 350.00 Watt/pers 0.00 Watt/ft2 0 Btuh 1.00 Watt/ft2 fluorescent, not vented Version 2.2 Zone Input Data -. Ballast Factor: 1.00 % Percent Light to RA: 50 % Vent Type: General Office Space Vent Cool Design: 20.00 cfm/pers Vent Heat Design: 20.00 cfm/pers Supply Cool Design: 0 cfm Supply Heat Design: 0 cfm Infiltration Type: Pressurized, Average Construction Infilt. Cooling Desigi 0.30 ach/hr Infilt. Heating Desigi 0.30 ach/hr Room Exhaust: 200.00 cfm U -Factor Color Percent (%) Direction Susp Ceil Tilt Cool Adj Heat Adj Dimension % Glass Shading Coeff Spc Temp Spc Temp degF deg F Shading WALL 1 GLASS 1 PART 1 PART L 44 x 40 x 44 x 98 x 9 5 9 9 12" H.W. Concrete, 5" Ins Double Coated 1/4 in. Frame, 0.75" gypsum board Frame, 0.75" gypsum hoard 0.05 Light 0.50 0.39 0.39 0 Plenum East 0 0 0 0 0 0 Area 0 72 70 0 72 70 0.00 0.55 0.00 0.00 Internal Return Air R2 Duct Insulation 1.0 degFTD No Duct Insulation 2.0 degFTD BYPASS 0 cfm 0 cfm 2 Supply Duct Location: Supply Duct Insulation: Supply Duct Temp Rise: Return Duct Insulation: Return Duct Temp Rise: Terminal Type: Total Cool Airflow: Total Heat Airflow: Zone(s) Connected: Load Express: Load Calculation Software Air Handler Input Alternative 1 Air Handler 1 Fan Configuration: Draw Fan & Motor Efficiency: 56.00 % Cooling Supply Air Temp: 55.00 deg F Heating Supply Air Temp: 0.00 deg F Minimum Relative Humidity: 0 % Supply Fan Static Pressure: 2.50 in H2O Return Fan Static Pressure: 2.00 in H2O BYPASS AHU1 Version 2.2 Air Handler Input Supply Duct Location: Supply Duct Insulation: Supply Duct Temp Rise: Return Duct Insulation: Return Duct Temp Rise: Terminal Type: Total Cool Airflow: Total Heat Airflow: Zone(s) Connected: Air Handler 2 Fan Configuration: Fan & Motor Efficiency: Cooling Supply Air Temp: Heating Supply Air Temp: Minimum Relative Humidity: Supply Fan Static Pressure: Return Fan Static Pressure: BYPASS AHU2 Draw 56.00 % 55.00 deg F 0.00 deg F 0 % 2.50 in H2O 2.00 in H2O Return Air R2 Duct Insulation 1.0 degFTD No Duct Insulation 2.0 degFTD BYPASS 0 cfm 0 cfm 1 Supply Duct Location: Supply Duct Insulation: Supply Duct Temp Rise: Return Duct Insulation: Return Duct Temp Rise: Terminal Type: Total Cool Airflow: Total Heat Airflow: Zone(s) Connected: Air Handler 3 Fan Configuration: Fan & Motor Efficiency: Cooling Supply Air Temp: Heating Supply Air Temp: Minimum Relative Humidity: Supply Fan Static Pressure: Return Fan Static Pressure: BYPASS AHU3 Draw 56.00 % 55.00 deg F 0.00 deg F 40 % 2.50 in H2O 1.00 in H2O Unvented Space R4 Duct Insulation 0.5 degFTD R4 Duct Insulation 0.3 degFTD Bypass 0 cfm 0 cfm 3 Load Express: Load Calculation Software versio2.2 Peak Load Information Alternative 1 Design Heating: Airflow (cfm) Space Total Heating Coil Total Outside % O.A. Sensible Sensible Entering Leaving Humidification Air Handler St/Type Btuh Btuh DB DB Btuh BLDG BLOCK -59,311.90 -174,428.00 -22,681.8 BLDG PEAK -59,311.90 -174,428.00 -22,681.8 1 BY PASS 3,628.01 558.60 15.40 -31,588.50 -61,296.40 62.55 77.92 2 BY PASS 1,616.39 274.40 16.98 -11,851.10 -26,444.50 61.78 76.67 3 BY PASS 4,675.24 862.40 18.45 -15,872.40 -86,687.30 61.07 73.09 -22,681.8 Design Cooling: Air Handler #!Type BLDG BLOCK BLDG PEAK 1 BY PASS 2 BY PASS 3 BY PASS Airflow (cfm) Cooling Cooling Coil Total Outside % O.A Total Sensible S.H.R. Entering Leaving ft2/ton cfm/ton cfmlft2 Total 3,628.01 1,616.39 675.24 558.60 15.40 274.40 16.98 862.40 18.45 Btuh Btuh 287,051.00 247,573.00 287,096.00 248,237.00 110,337.00 96,567.20 49,912.40 43,849.40 126,847.00 107.820.00 0.86 0.86 0.88 0.88 0.85 DB WB DB WB 76.93 61.22 52.37 50.36 77.20 61.32 52.37 50.36 75.30 61.21 52.87 51.15 354.38 354.32 303.76 329.86 407.93 394.6 388.6 442.3 tons 23.9 23.9 9.2 4.2 10.6 Building Peak Load Components Cooling (Btuh) Heating (Btuh) Mo/Hr: Solar Cond Internal OA+Inf Misc Total Cond OA+Inf Misc Total Bldg 7/14 16,553.5 13,577.1 161,395.0 31,160.7 38,269.1 260,956.0 -35,476.8 -100,413.0 -22,681.2 -158,571.0 Air Hand 1 7/14 9,283.8 8,882.9 53,037.5 10,959.7 18,142.3 100,306.0 -22,640.1 -33,083.9 -55,724.0 Zone 1 7/14 9,283.8 8,882.9 53,037.5 10,959.7 82,163.9 -22,640.1 -33,083.9 -55,724.0 Air Hand 2 7/15 2,050.8 4,220.5 26,252.3 4,968.1 7,883.2 45,374.9 -7,788.7 -16,251.7 -0.0 -24,040.4 Zone 2 7/15 2,050.8 4,220.5 26,252.3 4,968.1 37,491.7 -7,788.7 -16,251.7 -0.0 -24,040.4 Air Hand 3 7/14 5,134.5 792.7 82,252.9 14,891.6 12,243.6 115,315.0 -5,048.0 -51,076.9 -22,681.7 -78,806.6 Zone 3 7/14 5,134.5 792.7 82,252.9 14,891.6 103,072.0 -5,048.0 -51,076.9 -22,681.7 -78,806.6 Load Express: Load Calculation Software Psychrometric State Points - Alternative 1 Alt1 Air Hand 1 Dry Bulb Wet Bulb Temp Diff. AHU1 ( deg F ) ( deg F ) ( deg F ) Space 72.0 59.0 Air Hand Return Air Heat Pickup 3.1 Return Fan 1.3 Return Air 76.4 60.6 Outdoor Air 79.4 64.3 Return/Outdoor Air Mix 76.9 61.2 Blow Through Fan 0.0 Entering Coil 76.9 61.2 Leaving Coil 52.4 50.4 Draw Through Fan 1.6 Supply Duct Heat Gain 1.0 Supply Air 55.0 51.5 Percent Outside Air Space Sensible Heat Ratio (SHR) Coil Airflow 16.94 0.901 3,298 cfm Air Hand 2 Dry Bulb Wet Bulb Temp Diff. AHU2 ( deg F ) ( deg F ) ( deg F ) Space 72.0 59.1 Air Hand Return Air Heat Pickup 3.3 Return Fan 1.3 Return Air 76.6 60.7 Outdoor Air 80.0 64.0 Return/Outdoor Air Mix 77.2 61.3 Blow Through Fan 0.0 Entering Coil 77.2 61.3 Leaving Coil 52.4 50.4 Draw Through Fan 1.6 Supply Duct Heat Gain 1.0 Supply Air 55.0 51.5 Percent Outside Air Space Sensible Heat Ratio (SHR) Coil Airflow 18.67 % 0.894 1,469 cfm Version 2.2 Psychrometrics Load Express: Load Calculation Software Psychrometric State Points - Alternative 1 Alt1 Air Hand 3 Dry Bulb Wet Bulb Temp Diff. AHU3 ( deg F: ) ( deg F ) ( deg F ) Space 72.0 59.6 Air Hand Return Air Heat Pickup 1.6 Return Fan 0.7 Return Air 74.3 60.5 Outdoor Air 79.4 64.3 Return/Outdoor Air Mix 75.3 61.2 Blow Through Fan 0.0 Entering Coil 75.3 61.2 Leaving Coil 52.9 51.2 Draw Through Fan 1.6 Supply Duct Heat Gain 0.5 Supply Air 55.0 52.1 Percent Outside Air Space Sensible Heat Ratio (SHR) Coil Airflow 20.29 % 0.877 4,250 cfm Version 2.2 Psychrometrics Load Express: Load Calculation Software Version 2.2 Sensible Load Profile Sensible Load Profile (Mbh)- Alternative 1 Alt1 Hour 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Air Hand 1 11 9 8 7 6 11 15 53 61 68 75 81 85 88 89 88 86 83 43 30 23 18 15 13 Air Hand 2 5 4 3 3 3 4 5 24 27 31 33 36 38 39 40 40 39 37 18 13 10 8 6 5 Air Hand 3 6 4 3 2 1 7 16 80 90 95 97 96 97 98 99 98 96 93 32 22 17 13 10 8 Bldg 21 17 14 11 10 21 35 158 179 194 205 213 220 225 227 225 220 214 93 65 49 39 31 26 Zone 1 -6 -8 -9 -10 -11 -6 -3 35 43 50 57 62 67 70 71 70 68 65 25 12 5 0 -2 -5 Zone 2 -2 -3 -4 -4 -4 -3 -2 16 20 23 26 28 30 31 32 32 31 30 10 5 2 0 -1 -2 Zone 3 -5 -7 -8 -9 -10 -5 3 68 78 83 85 84 85 86 86 86 84 81 20 10 5 1 -1 -3 Load Express: Load Calculation Software Version 2.2 Peak Load Summary Peak Load Summary - Alternative I AIt1 Air Hand 1 AHU1 Areas ( ft2 ) Floor: 2,793.0 SlabOnG/ExFlr: 0.0 Roof: Skylight: Wall: Wall Glass: Partition: 2,793.0 0.0 571.0 500.0 954.0 Space Sens Load Spc Sens Ld W/Sfty Fctr Cool Airflow Cool Airflw W/Sfty Fctor Cooling Check Cool Check W/Sfty Fctr Heat Airflow Heat Airflw W/Sfty Fctr 61,610.1 Btuh 67,771.1 Btuh 3,298 cfm 3,628 cfm 1.18 cfm/ft2 1.30 cfm/ft2 3,298 cfm 3,628 cfm Heating Coil Peak Outside Air: OADB: 26 Cooling Coil Peak Peaked at Time: Mo/Hr: Outside Air: OADB: WB: RELHUM: 7 / 14 79 64 44.2% Cooling Coil Peak Heating Coil Peak Total Load Sens Load Percnt of Tot Peak Tot Sens Percnt of Tot ( Btuh) ( Btuh ) (%) ( Btuh) (%) ENVELOPE LOADS Solar Skylight Solar 0.00 0.00 0.00 Glass Solar 9,283.77 9,283.77 0.00 Sub Total 9,283.77 9,283.77 9.26 0.00 0.00 Conducted Skylight 0.00 0.00 0.00 Roof 7,114.90 7,114.90 -9,831.36 Glass 1,775.41 1,775.41 -11,477.20 Wall -7.44 -7.44 -1,331.57 Partition 0.00 0.00 0.00 SlabOnG/ExFlr 0.00 0.00 0.00 Sub Total 8,882.86 8,882.86 8.86 -22,640.10 40.63 INTERNAL LOADS Lights 8,399.78 8,399.78 0.00 People 12,731.30 5,609.10 0.00 Misc 31,906.40 31,906.40 0.00 Sub Total 53,037.50 45,915.30 52.88 0.00 0.00 MISC LOADS Outside Air 8,946.73 4,542.13 -27,007.30 Humidification 0.00 0.00 0.00 Infiltration 2,013.01 1,021.98 -6,076.63 Sup. Fan Heat 5,889.63 5,889.63 0.00 Ret. Fan Heat 4,711.70 4,711.70 0.00 Duct Heat Pkup 10,872.40 10,872.40 0.00 Exhaust Heat -3,331.44 -3,331.44 0.00 Sub Total 29,102.00 23,706.40 29.01 -33,083.90 59.37 OV/UNDR Sizing 0.00 0.00 0.00 Grand Total 100,306.00 87,788.30 -55,724.00 W/Safety Factor 110,337.00 96,567.20 -61,296.40 7 / 14 79 64 44.2% Load Express: Load Calculation Software Version 2.2 Peak Load Summary Peak Load Summary - Alternative 1 AIt1 Air Hand 2 AHU2 Areas ( ft2 ) Floor: SlabOnG/ExFlr: Roof: Skylight: Wall: Wall Glass: Partition: 1,372.0 0.0 1,372.0 0.0 137.0 115.0 693.0 Space Sens Load Spc Sens Ld W/Sfty Fctr Cool Airflow Cool Airflw W/Sfty Fctor Cooling Check Cool Check W/Sfty Fctr Heat Airflow Heat Airflw W/Sfty Fctr 27,449.2 30,194.1 1,469 1,616 1.07 1.18 1,469 1,616 Btuh Btuh cfm cfm cfm/ft2 cfm/ft2 cfm cfm Heating Coil Peak Outside Air: OADB: 26 Cooling Coil Peak Peaked at Time: Mo/Hr: 7 / 15 Outside Air: OADB: 80 WB: 64 RELHUM: 41.8% Cooling Coil Peak Heating Coil Peak Total Load Sens Load Percnt of Tot Peak Tot Sens Percnt of Tot ( Btuh) ( Btuh ) (%) ( Btuh) (%) ENVELOPE LOADS Solar Skylight Solar 0.00 0.00 0.00 Glass Solar 2,050.83 2,050.83 0.00 Sub Total 2,050.83 2,050.83 4.52 0.00 0.00 Conducted Skylight 0.00 0.00 0.00 Roof 3,767.02 3,767.02 -4,829.44 Glass 455.71 455.71 -2,639.76 Wall -2.22 -2.22 -319.48 Partition 0.00 0.00 0.00 SlabOnG/ExFlr 0.00 0.00 0.00 Sub Total 4,220.50 4,220.50 9.30 -7,788.68 32.40 INTERNAL LOADS Lights 4,237.04 4,237.04 0.00 People 6,267.10 2,768.50 0.00 Misc 15,748.10 15,748.10 0.00 Sub Total 26,252.30 22,753.70 57.86 0.00 0.00 MISC LOADS - Outside Air 4,055.57 2,412.13 -13,266.70 Humidification 0.00 0.00 0.00 Infiltration 912.50 542.73 -2,985.01 Sup. Fan Heat 2,624.01 2,624.01 0.00 Ret. Fan Heat 2,099.21 2,099.21 0.00 Duct Heat Pkup 4,843.98 4,843.98 0.00 Exhaust Heat -1,683.99 -1,683.99 0.00 Sub Total 12,851.30 10,838.10 28.32 -16,251.70 67.60 OV/UNDR Sizing 0.00 0.00 0.00 Grand Total 45,374.90 39,863.10 -24,040.40 W/Safety Factor 49,912.40 43,849.40 -26,444.50 Load Express: Load Calculation Software Version 2.2 Peak Load Summary Peak Load Summary - Alternative 1 Alt1 Air Hand 3 AHU3 Areas ( ft2 ) Floor: SlabOnG/ExFlr: Roof: Skylight: Wall: Wall Glass: Partition: 4,312.0 0.0 0.0 0.0 196.0 200.0 1,278.0 Space Sens Load Spc Sens Ld W/Sfty Fctr Cool Airflow Cool Airflw W/Sfty Fctor Cooling Check Cool Check W/Sfty Fctr Heat Airflow Heat Airflw W/Sfty Fctr 79,393.9 Btuh 87,333.2 Btuh 4,250 cfm 4,675 cfm 0.99 cfm/ft2 1.08 cfm/ft2 4,250 cfm 4,675 cfm Heating Coil Peak Outside Air: OADB: 26 Cooling Coil Peak Peaked at Time: Mo/Hr: Outside Air: OADB: WB: RELHUM: 7 / 14 79 64 44.2% Cooling Coil Peak Heating Coil Peak Total Load Sens Load Percnt of Tot Peak Tot Sens Percnt of Tot ( Btuh) ( Btuh ) (%) ( Btuh) (%) ENVELOPE LOADS Solar Skylight Solar 0.00 0.00 0.00 Glass Solar 5,134.45 5,134.45 0.00 Sub Total 5,134.45 5,134.45 4.45 0.00 0.00 Conducted Skylight 0.00 0.00 0.00 Roof 0.00 0.00 0.00 Glass 746.92 746.92 -4,590.88 Wall 45.76 45.76 -457.07 Partition 0.00 0.00 0.00 SlabOnG/ExFIr 0.00 0.00 0.00 Sub Total 792.68 792.68 0.69 -5,047.96 6.41 INTERNAL LOADS Lights 13,338.60 13,338.60 0.00 People 19,655.30 8,659.67 0.00 Misc 49,259.10 49,259.10 0.00 Sub Total 82,252.90 71,257.30 71.33 0.00 0.00 MISC LOADS Outside Air 12,156.40 7,012.41 -41,695.40 Humidification 0.00 0.00 -22,681.80 Infiltration 2,735.19 1,577.79 -9,381.47 Sup. Fan Heat 7,589.67 7,589.67 0.00 Ret. Fan Heat 3,035.87 3,035.87 0.00 Duct Heat Pkup 3,736.18 3,736.18 0.00 Exhaust Heat -2,118.12 -2,118.12 0.00 Sub Total 27,135.20 20,833.80 23.53-73,758.70 93.59 OV/UNDR Sizing 0.00 0.00 0.00 Grand Total 115,315.00 98,018.30 -78,806.60 W/Safety Factor 126,847.00 107,820.00 -86,687.30 7 / 14 79 64 44.2% • Load Express: Load Calculation Software Version 2.2 Peak Load Summary Peak Load Summary - Alternative 1 Alt1 Bldg 1 Areas ( ft2 ) Floor: 8,477.0 SlabOnG/ExFlr: 0.0 Roof: 4,165.0 Skylight: 0.0 Wall: 904.0 Wall Glass: 815.0 Partition: 2,925.0 Heating Coil Peak Outside Air: OADB: 26 Cooling Coil Peak Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB: 79 WB: 64 RELHUM: 44.2% Cooling Coil Peak Heating Coil Peak Total Load Sens Load Percnt of Tot Peak Tot Sens Percnt of Tot ( Btuh) ( Btuh ) (%) ( Btuh) (%) ENVELOPE LOADS Solar Skylight Solar 0.00 0.00 0.00 Glass Solar 16,553.50 16,553.50 0.00 Sub Total 16,553.50 16,553.50 6.34 0.00 0.00 Conducted Skylight 0.00 0.00 0.00 Roof 10,609.90 10,609.90 -14,660.80 Glass 2,930.67 2,930.67 -18,707.90 Wall 36.53 36.53 -2,108.13 Partition 0.00 0.00 0.00 SlabOnG/ExFIr 0.00 0.00 0.00 Sub Total 13,577.10 13,577.10 5.20 -35,476.80 22.37 INTERNAL LOADS Lights 25,916.20 25,916.20 0.00 People 38,640.50 17,024.10 0.00 Misc 96,838.80 96,838.80 0.00 Sub Total 161,395.00 139,779.00 61.85 0.00 0.00 MISC LOADS Outside Air 25,437.30 13,785.80 -81,969.40 Humidification 0.00 0.00 -22,681.80 Infiltration 5,723.39 3,101.80 -18,443.10 Sup. Fan Heat 16,103.30 16,103.30 0.00 Ret. Fan Heat 9,846.78 9,846.78 0.00 Duct Heat Pkup 19,452.50 19,452.50 0.00 Exhaust Heat -7,133.55 -7,133.55 0.00 Sub Total 69,429.70 55,156.60 26.61 -123,094.00 77.63 OV/UNDR Sizing 0.00 0.00 0.00 Grand Total 260,956.00 225,066.00 -158,571.00 W/Safety Factor 287,051.00 247,573.00 -174,428.00 Load Express: Load Calculation Software Version 2.2 Peak Load Summary Peak Load Summary - Alternative 1 Alt1 Zone 1 Zone1 Areas ( ft2 ) Floor: 2,793.0 SlabOnG/ExFlr: Roof: Skylight: Wall: Wall Glass: Partition: 0.0 2,793.0 0.0 571.0 500.0 954.0 Space Sens Load Spc Sens Ld W/Sfty Fctr Cool Airflow Cool Airflw W/Sfty Fctor Cooling Check Cool Check W/Sfty Fctr Heat Airflow Heat Airflw W/Sfty Fctr 61,610.1 67, 771.1 3,298 3,628 1.18 1.30 3,298 3,628 Btuh Btuh cfm cfm cfm/ft2 cfm/ft2 cfm cfm Heating Coil Peak Outside Air: OADB: 26 Cooling Coil Peak Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB: 79 WB: 64 RELHUM: 44.2% Cooling Coil Peak Heating Coil Peak Total Load Sens Load Percnt of Tot Peak Tot Sens Percnt of Tot ( Btuh) ( Btuh ) (%) ( Btuh) (%) ENVELOPE LOADS Solar Skylight Solar 0.00 0.00 0.00 Glass Solar 9,283.77 9,283.77 0.00 Sub Total 9,283.77 9,283.77 11.30 0.00 0.00 Conducted Skylight 0.00 0.00 0.00 Roof 7,114.90 7,114.90 -9,831.36 Glass 1,775.41 1,775.41 -11,477.20 Wall -7.44 -7.44 -1,331.57 Partition 0.00 0.00 0.00 SlabOnG/ExFIr 0.00 0.00 0.00 Sub Total 8,882.86 8,882.86 10.81 -22,640.10 40.63 INTERNAL LOADS Lights 8,399.78 8,399.78 0.00 People 12,731.30 5,609.10 0.00 Misc 31,906.40 31,906.40 0.00 Sub Total 53,037.50 45,915.30 64.55 0.00 0.00 MISC LOADS Outside Air 8,946.73 4,542.13 -27,007.30 Humidification 0.00 0.00 0.00 Infiltration 2,013.01 1,021.98 -6,076.63 Sup. Fan Heat 0.00 0.00 0.00 Ret. Fan Heat 0.00 0.00 0.00 Duct Heat Pkup 0.00 0.00 0.00 Exhaust Heat 0.00 0.00 0.00 Sub Total 10,959.70 5,564.11 13.34 -33,083.90 59.37 OV/UNDR Sizing 0.00 0.00 0.00 Grand Total 82,163.90 69,646.10 -55,724.00 W/Safety Factor 90,380.20 76,610.70 -61,296.40 Load Express: Load Calculation Software Version 2.2 Peak Load Summary Peak Load Summary - Alternative 1 AIt1 Zone 2 Zone2 Areas ( ft2 ) Floor: SlabOnG/ExFlr: Roof: Skylight: Wall: Wall Glass: Partition: 1,372.0 0.0 1,372.0 0.0 137.0 115.0 693.0 Space Sens Load Spc Sens Ld W/Sfty Fctr Cool Airflow Cool Airflw W/Sfty Fctor Cooling Check Cool Check W/Sfty Fctr Heat Airflow Heat Airflw W/Sfty Fctr 27,449.2 30,194.1 1,469 1,616 1.07 1.18 1,469 1,616 Btuh Btuh cfm cfm cfm/ft2 cfm/ft2 cfm cfm Heating Coil Peak Outside Air: OADB: 26 Cooling Coil Peak Peaked at Time: Mo/Hr: Outside Air: OADB: WB: RELHUM: 7 / 15 80 64 41.8% Cooling Coil Peak Heating Coil Peak Total Load Sens Load Percnt of Tot Peak Tot Sens Percnt of Tot ( Btuh) ( Btuh ) l%) ( Btuh) (%) ENVELOPE LOADS Solar Skylight Solar 0.00 0.00 0.00 Glass Solar 2,050.83 2,050.83 0.00 Sub Total 2,050.83 2,050.83 5.47 0.00 0.00 Conducted Skylight 0.00 0.00 0.00 Roof 3,767.02 3,767.02 -4,829.44 Glass 455.71 455.71 -2,639.76 Wall -2.22 -2.22 -319.48 Partition 0.00 0.00 0.00 SlabOnG/ExFIr 0.00 0.00 0.00 Sub Total 4,220.50 4,220.50 11.26 -7,788.68 32.40 INTERNAL LOADS Lights 4,237.04 4,237.04 0.00 People 6,267.10 2,768.50 0.00 Misc 15,748.10 15,748.10 0.00 Sub Total 26,252.30 22,753.70 70.02 0.00 0.00 MISC LOADS Outside Air 4,055.57 2,412.13 -13,266.70 Humidification 0.00 0.00 0.00 Infiltration 912.50 542.73 -2,985.01 Sup. Fan Heat 0.00 0.00 0.00 Ret. Fan Heat 0.00 0.00 0.00 Duct Heat Pkup 0.00 0.00 0.00 Exhaust Heat 0.00 0.00 0.00 Sub Total 4,968.07 2,954.86 13.25 -16,251.70 67.60 OV/UNDR Sizing 0.00 0.00 0.00 Grand Total 37,491.70 31,979.90 -24,040.40 W/Safety Factor 41,240.80 35,177.80 -26,444.50 7 / 15 80 64 41.8% - Load Express: Load Calculation Software Version 2.2 Peak Load Summary Peak Load Summary - Alternative 1 Alt1 Zone 3 Zone3 Areas ( ft2 ) 4,312.0 0.0 0.0 0.0 196.0 200.0 1,278.0 Floor: SlabOnG/ExFlr: Roof: Skylight: Wall: Wall Glass: Partition: Space Sens Load Spc Sens Ld W/Sfty Fctr Cool Airflow Cool Airflw W/Sfty Fctor Cooling Check Cool Check W/Sfty Fctr Heat Airflow Heat Airfiw W/Sfty Fctr 79,393.9 87,333.2 4,250 4,675 0.99 1.08 4,250 4,675 Btuh Btuh cfm cfm cfm/ft2 cfm/ft2 cfm cfm Heating Coil Peak Outside Air: OADB: 26 Cooling Coil Peak Peaked at Time: Mo/Hr: Outside Air: OADB: WB: RELHUM: 7 / 14 79 64 44.2% Cooling Coil Peak Heating Coil Peak Total Load Sens Load Percnt of Tot Peak Tot Sens Percnt of Tot ( Btuh) ( Btuh ) (%) ( Btuh) (%) ENVELOPE LOADS Solar Skylight Solar 0.00 0.00 0.00 Glass Solar 5,134.45 5,134.45 0.00 Sub Total 5,134.45 5,134.45 4.98 0.00 0.00 Conducted Skylight 0.00 0.00 0.00 Roof 0.00 0.00 0.00 Glass 746.92 746.92 -4,590.88 Wall 45.76 45.76 -457.07 Partition 0.00 0.00 0.00 SlabOnG/ExFlr 0.00 0.00 0.00 Sub Total 792.68 792.68 0.77 -5,047.96 6.41 INTERNAL LOADS Lights 13,338.60 13,338.60 0.00 People 19,655.30 8,659.67 0.00 Misc 49,259.10 49,259.10 0.00 Sub Total 82,252.90 71,257.30 79.80 0.00 0.00 MISC LOADS Outside Air 12,156.40 7,012.41 -41,695.40 Humidification 0.00 0.00 -22,681.80 Infiltration 2,735.19 1,577.79 -9,381.47 Sup. Fan Heat 0.00 0.00 0.00 Ret. Fan Heat 0.00 0.00 0.00 Duct Heat Pkup 0.00 0.00 0.00 Exhaust Heat 0.00 0.00 0.00 Sub Total 14,891.60 8,590.21 14.45 -73,758.70 93.59 OV/UNDR Sizing 0.00 0.00 0.00 Grand Total 103,072.00 85,774.60 -78,806.60 W/Safety Factor 113,379.00 94,352.10 -86,687.30 7 / 14 79 64 44.2% 7/1/2014 City of Tukwila Department of Community Development TERRY COURSE 899 WEST MAIN ST AUBURN, WA 98001 RE: Permit No. M13-178 UPS 13035 GATEWAY DR Dear Permit Holder: Jim Haggerton, Mayor Jack Pace, Director In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 8/31/2014. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 8/31/2014, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, Bill Rambo Permit Technician File No: M13-178 6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 Tukwila Building Division Dave Larson, Senior Plan Examiner Building Division Review Memo Date: September 20, 2013 Project Name: UPS Permit # M13-178 Plan Review: Dave Larson, Senior Plans Examiner The Building Division conducted a plan review on the subject permit application. Please address the following comments in an itemized format with revised plans, specifications and/or other applicable documentation. (GENERAL NOTE) PLAN SUBMITTALS: (Min. size 11x17 to maximum size of 24x36. Please submit all plans on the same size paper. Revised plans need to be the same size as originally submitted). (If applicable) Structural Drawings and structural calculation sheets shall be stamped and signed. -1. ' , " 1, eket4oes not packetmatch the details of the planseEaeh document has a different structural engineer. rUktotOeightst of the rooftop:. aredifferent tint on the,prlans i hstd*AvitTU-3-;bUt:fi structural cafes packet shows new finning details forunit At Please revise the documents to match and there should only be one Structural Engineer of Record. 2. The WSEC Mechanical Summary Form is missing pages. Please submit a full Mechanical Summary with all relevant sections completed. Should there be questions concerning the above information please contact the Building Division at 206-431-3670. September 26, 2013 Terry Course Seattle Mechanical 899 W Main St Auburn, WA 98001 lb City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director RE: Correction Letter #1 Mechanical Permit Application Number M13•178 UPS —13035 Gateway Dr Dear Mr. Course, This letter is to inform you of corrections that must be addressed before your development permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the Building Department. At this time the Fire Department has no comments. Building Department: Dave Larson at 206 431-3678 if you have questions regarding the attached comments. Please address the attached comments in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that two (2) sets of revised plan pages, specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a `Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections/revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, I can be reached at (206) 431-3670. Sincerely, 7:120 Bill Rambo Permit Technician File No. M13-178 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 Tukwila Building Division Dave Larson, Senior Plan Examiner Building Division Review Memo Date: September 20, 2013 Project Name: UPS Permit # M13-178 Plan Review: Dave Larson, Senior Plans Examiner The Building Division conducted a plan review on the subject permit application. Please address the following comments in an itemized format with revised plans, specifications and/or other applicable documentation. (GENERAL NOTE) PLAN SUBMITTALS: (Min. size 11 x17 to maximum size of 24x36. Please submit all plans on the same size paper. Revised plans need to be the same size as originally submitted). (If applicable) Structural Drawings and structural calculation sheets shall be stamped and signed. 1. The structural packet does not match the details of the plans. Each document has a different structural engineer. The weights of the rooftop units are different and the new unit on the plans is listed as RTU -3 but the structural calcs packet shows new framing details for unit #4. Please revise the documents to match and there should only be one Structural Engineer of Record. 2. The WSEC Mechanical Summary Form is missing pages. Please submit a full Mechanical Summary with all relevant sections completed. Should there be questions concerning the above information please contact the Building Division at 206-431-3670. •PERMIT CORD COPY di PLAN REVIEW/ROUTING SLIP ACTIVITY NUMBER: M13-178 PROJECT NAME: UPS: DATE: 10/08/13 SITE ADDRESS: 13035 GATEWAY DR Original Plan Submittal X Response to Correction Letter # 1 Response to Incomplete Letter # Revision # after Permit Issued DEPARTMENTS: Kw ' 06 Building Division 11 Public Works n Fire Prevention Structural Planning Division n ❑ Permit Coordinator ❑ DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 10/10/13 Complete Incomplete ❑ Not Applicable u Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping 0 PW 0 Staff Initials: TUES/THURS ROUTING: Please Route /5.(1 Structural Review Required ❑ No further Review Required ❑ REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved ❑ Notation: REVIEWER'S INITIALS: Approved with Conditions DUE DATE: 11/07/13 Not Approved (attach comments) ❑ DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg 0 Fire 0 Ping 0 PW 0 Staff Initials: PERMIT COORD COPY • PLAN REVIEW/ROUTING SLIP ACTIVITY NUMBER: M13-178 PROJECT NAME: UPS SITE ADDRESS: 13035 GATEWAY DR X Original Plan Submittal Response to Correction Letter # DATE: 09-17-13 Response to Incomplete Letter # Revision # After Permit Issued DE A TMEN S: Building nisi n Public Works J �✓ q` --I3 Fire Prevention op Planning Division Structural Permit Coordinator n S DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Comments: tzi Incomplete DUE DATE: 09-19-13 Not Applicable Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg El Fire ❑ Ping ❑ PW El Staff Initials: TUES/THURS ROUTING: Please RouteKZ. Structural Review Required No further Review Required n REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 10-17-13 Approved n Approved with Conditions Notation: REVIEWER'S INITIALS: DATE: n Not Approved (attach comments))( Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ►_ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents/routing slip.doc 2-28-02 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206-431-3665 Web site: http://www.ci.tukwila.wa.us REVISION SUBMITTAL Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: /0 -1 - 13 Lett Plan Check/Permit Number: M 13-178 ® Response to Correction Letter # 1 ❑ Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner Project Name: UPS Project Address: 13035 Gateway Dr Contact Person: Phone Number: RECEIVED CITY OF TUKWILA OCT 082013 PERMIT CENTER Summary of Revision: y+ems -t'► .L- j47L)c 1L1JG, I 190 C.. ce f `fi Utc vt j Nave aG� orrec_te 01 ..f•e,h(Y114 - (1).07-Lic+c)ral) 2 <le 1 jel ;1A, 1-,11./lee/ 0r1 D(2?Cvrlcnfs t, t /tea Sheet Number(s): r ! 1 .0 ) PI e 21 "Cloud" or highlight all areas of revision including date of revision Received at the City of Tukwila Per it Cejnter by: JM/`' Entered in Permits Plus on \applications\forms-applications on line\revision submittal Created: 8-13-2004 Revised: Contractors or Tradespeople Pri er Friendly Page General/Specialty Contractor A business registered as a construction contractor with L&l to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name Phone Address Suite/Apt. City State Zip County Business Type Parent Company IECS INC 2069399495 Po Box 19252 Seattle WA 981091252 King Corporation UBI No. 601639846 Status Active License No. IECS***044QL License Type Construction Contractor Effective Date 11/13/1996 Expiration Date 11/20/2014 Suspend Date Specialty 1 Specialty 2 Unused Heating/Vent/Air-Conditioning And Refrig (Hvac/R) Other Associated Licenses License Name Type Specialty 1 Specialty 2 Effective Date Expiration Date Status SEATTMI038NRSEATTLE MECHANICAL INC Construction Contractor Metal Fabrication Unused 8/19/1997 11/4/2001 Archived Business Owner Information Name Role Effective Date Expiration Date HUMPHREY, GEORGE President 01/01/1980 Bond Information No records found for the previous 6 year period Assignment of Savings Information Page 1 of 2 Savings Assignment of Savings Account Number Effective Date Release Date Assignment Type Impaired Date Amount Received Date 2 10/10/1996 3/4/2009 Bond 08/01/2012 $4,000.00 Insurance Information Insurance Company Name Policy Number Effective Date Expiration Date Cancel Date Impaired Date Amount Received Date 15 Nationwide Mutual Ins Co ACPACT0751563645608/01/2013 08/01/2014 $1,000,000.0007/26/2013 14 Allied Property a Cas Ins Co ACP7505636456 08/01/2012 08/01/2013 $1,000,000.00 08/15/2012 13 Twin City Fire Ins Co 52 UUN PE8855 08/01/2011 08/01/2013 08/15/2012 $1,000,000.0007/26/2012 12 WEST AMERICAN INS CO BKW1153913555 08/01/2010 08/01/2011 $1,000,000.00 07/28/2010 11 LIBERTY NORTHWEST INS CORP BKW1053913555 08/01/2009 08/01/2010 $1,000,000.0007/21/2009 10 FEDERAL MUTUAL INS CO 9821065 08/01/2007 08/01/2009 $1,000,000.00 06/26/2008 Summons/Complaint Information No unsatisfied complaints on file within prior 6 year period ' Warrant Information No unsatisfied warrants on file within prior 6 year period https://fortress.wa.gov/lni/bbip/Print.aspx 11/21/2013 It • pommornsemome Footnotes - (a) To cooling sans. . i110,OFTQP.0 I C OQUIPMENT SCHEDULE TAG LOCA TpN SERVES NOM. TONS TYPE ECON? FAN PERFORMANCE TC (a) (MBH) ! SC W (MBH) I. SEER OR EER HEAT INPUT (MBH) HEAT OUTPUT (MOH) AFUE (�') MIN OSA CFM ELECTRICAL DATA SOUND RATING (DBA) WEIGHT �5) BRAND MODEL NOTES VIPHM2 FLA MCA CIRCUn a CFM ESP' MG) HP 82 1,036 • ' r 48rCD12A2A6 1 PH RQQF 2nd FiR SOUTH lall 10 VERT VERT Ell Y Y 4,0ao 1.0 3.7 120 ,90 11.1 190 148 81 450 4643/60 26 30 8t 82 1,370 1,377 CARRIER CARRIER 48TCD12A2A6 48TCD12A2A6 1 1 4,000 4,000 1,0 1.0 10111 3.7 120 I 120 1 90 90 11.1 190 190 14811:11 148 81 450 450 46013/60 464(3/60 26 26 28 28 30 30 ROOF 1ST FL$ NI WING ROOF 2nd FGR N.E. WING 10 VERT 48TCD12A2A6 1 MI RTU -4 ROOF 1ST FLR SOUTH 10 . VERT Y . 4 .000 1.0 � 120 90 11.1 190 115 � 90 81 450 200 460/3/60 46W3/60 26 12.0 28 13.0 30 ' 82 1,278 CA LER 15 81 CARRIER 48TCDA05 RTU -5 ROOF 2ND FLR N.W. WING 10 VERT Y 1,600 0,8 1 35.0 13.0 . ble cooling rated at SOF db/67F wb Ind (b) Circuit breaker or MOCP amps. (c) Includes unit Only. Notes: I 1. Factory economizer, barpmetrlc relief & factory roof curb. comikas COMMERCIAL ZONE DAMPER SYSTEM "VVT" Provide a Zonex zone damper system with all items to provide a complete operating system. Includes by-pass dampers with static pressure: set point type controls. T1 SEVEN DAY PROGRAMMABLE THERMOSTAT, two stage, HoncyNell TB8220 or. equal to Vyarlt yvith cone damper system. M1 MOTORIZED DAMPER, outside air intake, DuroDyne 'Duro2ont' SPRD seiies, 24 volt, motorized spring return, or equal. Interlock to open whc,i' air unit runs. CONTROL NOTE: System capable of minimum 5 degree deadband, seven day programmable for each day per week, outside alr dampers close automatically when system is off or upon power failure, Interlocked to preve;,t simultaneous heating and cooling. Mount thermostat or sensor 60 inches abeve floor. CONTRCbL SE UENCE ECONOMIZERS Automatic modulation of outside air and return air dampers to provide up to 100% of outside air to reduce or eliminate the need for mechanical cooling as determined by the condition of outside air for cooling duty. Sletem shall be able to Integrate the operation of outside air cooling and mechanir.lcooling together to provide the most economical operation to maintain indoor esanditions and meet the cooling load. TAG GRILLE AND LOUVER SCHEDUP1 sump A Square Ceiling Diffuser, Modular core, T -bar frame, 24x24 face, No OBD, Shoemaker 700MA. 0 Not Used C Not Used X76! ET: D Eggcrate, aluminum grid 1/2', T -bar frame, Shoemaker 600T Series. GENERAL GRILLE NOTES: 1. All steel construction except as noted. 2. Standard white finish except as noted. PROJECT LOCATION VICINITY MAP SCALE: NONE HVAC GENERAL NOTES 1. VERIFY site conditions. 2: THERMOSTAT LOCATIONS: Verify all wall mounted control locations with i architect. - 3. CODES: Comply with all local & state governing codes. 4! COORDINATE ductwork and grille locations with lighting and other related trades with architect approval. Verify clearances & ceiling elevations before installation. 5, DRAWINGS are schematic in some areas and may not show exact routing or every offset which may be required. Provide a complete & properly working system with all necessary items 6. SEISMIC BRACING: Provide to meet local code requirements. Refer to the ASHRAE standards "Practical Guide to Seismic Restraint", 1999. 71 EXHAUST FAN TERMINATION: Shall not be less than 3 feet from a property line 1 or openings Into a building, e.g., operable windows and doors. 2009 IMC, sec. 501.2.1, item #3. 8; CONDENSATE DRAINS: Run 3/4' PVC pipe from cooling coil to nearby open site drain or to outside on roof. Elevate coil to allow for proper gravity drain operation. Provide approved 'P' trap at coil outlet. 2099 IMC, sec. 307. 9 SUBMITTALS: Provideequipmentsubmittals (before ordering & installation) on all major equipment items, controls, grilles, and louvers. Submit 4 copies to architect in a single notebook with items tagged according to drawing call outs. 10 TEST, ADJUST, & BALANCE: Provide proper system testing, adjusting, and balancing on both air and water according to NEBB & ASHRAE standards, including written reports. Use only technicians qualified & trained in TAB work. Include System Commissioning: Functional testing of sequences of operation to ensure theyoperate in accordance with the mechanical plans (2O WSEC, Sec 1416). 11, OPERATION & MAINTENANCE BOOKLET: Provide 0 & M manual to owner. Include cut sheets on main equipment and controls, maintenance insttuctioes, and marked up as built drawing (record drawings per 2889'WSEC, Sec 1416). 12 WALK-THRU instruction: Provide on site walk-thru for customer to demonstrate operation of system and answer questions. 13. GUARANTEE: Contractor shall warrant the completed system from defects for one year from date of final start up. 14. ELECTRICAL• All equipment to have a positive means of disconnect adjacent to i and in sight from equipment served. Provide a 120 volt receptacle located within 1 25 feet of equipment for service & maintenance purposes (2889'IMC sec. 306). 1 Line voltage work by others. 15. ROOFTOP UNITS ON CURBS: SEAL holes and cracks between duct and roof deck inside factory roof curb for noise control. FILE COPY Permit No. MVO 11 Plan review approvals to errors and omissions. Approval of construction n do iments does not awl' • - .-.3 thc: E oration of any adopted code or ordinance. Re::: tit of approved Fes! C ' , is ncnlvlsd d• BY 4en;%7 City Of "cul la WILDING DIVISIQ DUCT NOTES 1. DUCT CONSTRUCTION and installation per latest SMACNA Standards and the -29e9 IMC as required by the local code. Provide metal duct, except as noted. Underground duct shall be "Spunstrand" factory insulated fiberglass 2. BALANCING DAMPERS: Provide on all supply grille run out ducts up stream of grille. 3. DUCT INSULATION: Manville fiberglass duct wrap, type 75, FSK aluminum foil facing or equal. Supply and return ducts: Within conditioned space = R-3.3; outside bldg insulation envelope (attic) = R-7; in ground or in concrete = R-5.3; exposed in same cond. space served = hone. Outside air duct in conditioned space: R-7 with vapor barrier. Exhaust duct inside build = none, in attic = R-4. 0999-WVSEC, Table 14-5. 4. -DUCT SEALING -GENERAL 0 to 2' static pressure - seal all transverse joints on all duct. Above 2'- seal seams & joints. Inside build: DuroDyne 'DDS-181'gray or approved equal per UL 181 A -M, 1818-M listed. Outside: Polyurethane, Mameco Vulkem 116. OR approved. equal. 5. TURN VANES: Provide single thickness tum vanes (see detail) in all major square duct elbows, tees, or turns with inside radius less than 3/4 duct width. Square branch duct taps shall be 45 degree type per SMACNA standard. 6. FLEX DUCT (Insulated): For grille run outs up to 6 ft. long, except as noted. Provide adjustable metal elbows on all turns, unless a smooth full radius turn is made. Secure core with approved nylon or metal worm drive clamps. NO duct tape joints & screws allowed. 7. SOUND LINER: Provide sound lined metal supply &return ducts as shown on plans. Johns Manville 1lnacoustic RC flexible fiberglass liner with Permacote acrylic surface treatment or equal. Fabricate and install per duct liner standard of North American Insulation Manufacturer's Assoc. 8. FLEX CONNECTORS: Provide on all duct hook-ups to isolate air handling equipment (Neoprene coated fiberglass fabric type). 9. DUC SIZE CHANGES: Round galvanized ducts may be substituted for rectangular ducts that are NOT LINED. Provide circular equivalent of rectangular duct. Other equivalent rectangular duct sizes may be substituted to better fit space. 10. TEMPORARY DUCT CLOSURE: Seal off ductwork during construction to keep out construction dust, especially floor boots and low wall openings. SYSTEM DESCRIPTION Tenant improvement. Install rooftop HVAC units with ductwork. Demo old systr:ms and ductwork, reuse some existing ductwork. REVISIONS No changes shall be made to the scope of work without prior approvE l of Tukwila Building Division. NOTE: Revisions will require a new plan submittal and may include additional plan review fees. 1 LOCAL MAP SCALE: NONE SEPARATE PERMIT REQUIRED FOR: CI Mechanical 10 Electrical 0 Plumbing 0 Gas Piping City. of Tukwila BUR oiviQtoN iRWING INDEX M1.0 HVAC Schedules and Legend M1.1 Site & Building Key Plan M2.0 1st & 2nd Floor Demo Plans M2.1 1st Floor RCP & HVAC Plan M2.2 2nd Floor RCP & HVAC Plan M2.3 HVAC Zoning & Roof Plan HVAC LEGEiVD ABBV. DESCRIPTION Control Equipment GrilleA.ouver SYMBOL 0 IAH-11 4E11 IMIO OMB ON rAeleloW 1 f5:f VD YD PC TV FD AFF AT BS OSA RA SA Supply Duct Return/Exhaust D:act Duct under slab (Spunstrand) Flex Duct, insulated, Inside dimension Metal Duct Soundlined Duct Volume Damper Flex Connector Turning Vanes End Cap Change in duct size Surface Mount Supply Grille T -bar Supply Grille Round Supply Grlle Return/Exhaust Grille Sidewail SupplyReakeup Grille Sidewall ReturnF xhaust Grille Floor Drain Above Finished F,!oor Air Transfer Birdscreen Outside Air Retum Air Supply Air REVIEWED FOR CODE COMPLIANCE APPROVED NOV 0 4 2013 City of wila BUILDING VISION 'MI6 GRILLE CALL OUT 1..t,',.pENb 1 Grille Tag , i408 8 Number of Slots Grille Tag Flee: Size (IN) Sgtnre or Rectangular - hes=Size (IN) Round - Ali Quantity (CFM) tnele tes SIM Type Grille 1-77-77.7:..-- Sb Site (1N) 1S(0.5)-2 -.- Length (FT) 100 ----- Air Quantity (CFM) Air Pattern • Indicated by (arrows for ceiling grills, No Arrows Indicated four way pattern. Duct CALL oirr LEGENII ..-.Nb (Example call -out shown) 14/10.1 Lined metal duct, outside dud size. given. Number after dash is liner thickness (In.). 14/10 Metal duct size. 14 Round metal dud. 1 1/2 HR. 'UL' Dynamic Fire Damper. UL 555. Ruskin DIdD2 or equal. 'UL' Ceiling Fire Damper for up to 3 hr. rating. UL 555C. Ruskin CFD or equal. 1 1/2 HR. 'UL' Combination Fire -Smoke Damper with 115 volt connection to smoke detection system. Class 11, 250°F. UL 555 & UL 555S. Ruskin F5036 or equal. 1 HR, 'UL' Corridor Combination Fire -Smoke Damper with 115 volt connection to smoke detection system. Class II, 250°F. UL 555 & UL 555S. Ruskin FSD36-C or equal. Smoke Damper, 'UL' rated, with 115 volt connection telt smoke detection system. Class II, 250°F. UL 5555. Ruskin 5036 or equal. 1 1/2 HR. 'IJL' Combination Flre-Smoke Damper with grille access and 115 volt connection to smoke detectier: system. Class 11, 250'F. UL 555 & UL 555S. Ruskin FSD36GA or equal. NOTE: Ali fire/smoke daritpers to be Installed per manufacturer's IA' RECEIVED Instructions and shall have permanently labeled access door per 2012 IMC CITY0TTUKWIL sec. 607.4. OCT 0 8 2013 AIR QUALITY AND ENERGY COBE These plans comply with the 2012 IMC tnclud'ig Washington State Amendments Sec 403 Mechanical Ventilation and the 2012 Washington State Energy Code. PERMIT CENTE CORREGIION L7ft#� _�- tIO Q Luu M a If g tqNoE2 uJ cr u. 0 2 LU z Co W 1 1 Cti 41)4 i. •crs LP1 ro m W M 1 1 ftv, a JOB N0. I tg SHEET AREA OF WORK UNDER THIS PERMIT IN BUILDING S. GATEWAY CORPORATE CENTER VICINITY imp SCALE: NONE BUILDING 9 KEY PLAN SCALE: NONE REVIEWED FOR CODE COMPLIANCE APPROVED NOV 04 2013 City,of Tukwila BUILDING DIVISION E AUG 31 1 MI3 Q7•. RECEIVED CITY OF TUKWILA SEP 17 2013 PERMIT CENTER m NLA o mN Q N� oc4t , miurrez cvn—W'4 3 z z cc LL MECHANICAL CONSULTING SEATTLE MECHANICAL 01 131 CO Z3 Q) w t! CO N > 00 ■ U ate., ° Q a N f6 Ln v) O tU M W LL N IL Ln V W U W UJ d z W m 0 00 0 m 4 rn JOB NO. 30708 SHEET ■ NEW OFFICE EX. STAIR EX. ELEVATOR EX. STORAGE / / EX. STORAGE X EXISTING DUCT SHAFT UP 13/30 (TO RTU -2) EXISTING EXHAUST DUCT TO STAY. 00 cc EX. 4[VA EN 0 0 EX. STOP. TELE EXISTING AH -6 NEW OPEN OFFICE NEW O'EN OFFICE -\ EX. ''fFICE EXISTING DUCT SHAFT U 18/30. (TO RTU -4) /\ \ REVIEWED FOR CODE COMPLIANCE APPROVED NOV 0 4 2013 City of Tukwila BUILDING DIVISION EX. OFFICE 12 EX. OFFICE 13 EX. I !.AL1_. EX. STMT: I X (11i,rl- 1st FLOOR DEMO PLAN - EXISTING TO REMAIN SCALE: 1/8"=1'-0" .-X.,11,,11.1,.. NEW OFFICE NEW OFFICE EX. OFFICE EX. OPEN OFFICE ACCOUNT G F0 LJ Li RTU -1 REUSE OLD CURB. USE CURB ADAPTOR RTU -2 REUSE OLD CURB. USE CURB ADAPTOR EXISTING DUCT SHAFT DN 2 © 18/30 VERIFY SIZE EX. OFFICE EY. S' 4I EX. ELEVATOR EX. BRE =`-k:RCCu� I EXISTING EXHAUST DUCT TO STAY. NOTE: VERIFY EXISTING DUCTWORK AND DETERMINE WHAT DUCTS CAN BE REUSED. EXISTING DUCT TO REMAIN, TYP. EX. OFFICE EX. OFF! -E Ex. OFFICE EX. OPEN OFFICE I— J EX. OFFICE EXISTING DUCT SHAFT DN 2 C 18/30 VERIFY SIZE EX. OFFICE - EX. k4 EX, MEN X. WO FEAE -----I—V _I I NEW TRAINING NEW STORAGE 3A -EX. OPEN OFFICE EX. STAIR RTU -4 REUSE OLD CURB. USE CURB ADAPTOR RTU -5 REUSE OLD CURB. USE CURB ADAPTOR i. OFFICE EX. Orrlr E ..X. OFFICE EX. O!'1 -'1(--.E. 2nd FLOOR DEMO PLAN - EXISTING TO REMAIN J EX OFFICE EXE SCALE: 1/8"=1'-0" Mt3 17 8 AUG Al 21114 RECEIVED CITY E 1001LA SEP 1 7 2013 PERMIT CENTER CC w w 'Z V w 9 W >_ SEATTLE MECHANICAL z W W vit:Al2 00 N 0mi CL ai V Ln rap) S� o M ro l7 V1 C ca 0 E CU 0 0 0 LL N Lu W N v W v LU W F- LU a DESIGN: I PFE m a co m 4 rn JOB NO. 30708 SHEET V V rkittaillIM aVV ►iioii�l/; n . _ wr.7�lr•► 'giggigrAPAIIIMINGIIMEISILIMM triN 100014:2_,AA PI dv a ai►���' �+ iii 1r1 chrE.ieta _4 iris .. Li. �; mon 110141.11 Fjw# F� Aria //rip %I 1■1 YI • onoui rail%/ � �►aG�' 4 M ®alpwimininrami` IFfi.44 ear/ iei;1�1 11�1�■1 /crehmf/1�1rit1 ew ai ./ r.J .sal 11754641015 w1 sials±rls±alwllw�drAr.r'/I ► t_iv% If11\ S. Ommr.4,44.61,6,,,,,,mmi,„444.,....,....------.1,- r//A1, «' ► }< ,rstissssss' +sem u�sss 4s,�issnrs,� 3�cif�l ZIMOZPII2a`2Ya'a7� EMENtf7K11 �'QiGR�{ iii, r�1 31►`&* Iwo 4 e iiViA6t . l" �1ssf 7s 11ssliet�1n a . l♦ E i1 1.ECltl iif+ F w m1zi��i�37Ir1F7�� INi47K 1:20.1 il4►,ir - ►�`rs'Yif_ s•s4ss so 41..�410146S,1is4Dis104" NI EhK f OCIN. ��4, ''y!'a!!7!1222222r ra1'!2'12T1 1122127 1161 400110d C i» .4,'� ilifK4SI GGOOK hiNGGEGCC444406 X4ENt Ii rF N[It3�' ►CCid �' Emma escamosssoriswr iw +il 1,„:"-;,....-:+.1t1�. * . ,' i�f',rii, j4iG �RPiOIZi63 VidiRa *Kil l«7.E� .�Iti►-Y r..... .........�a1Ci iw11 III•c ociia►CCi4 411'6'1 si5s6iyK iyiAiter44liK 49144AKi11 f71Kf7�1 I44;]K0IF MO.0 r� nZ'!'}2?�'s170!�?y'177'!'17� * Aiwa ZINZINZINR i1K�i]Kil i.1f].r.:110ocl11Sl► 5105•.•.l s!lssrnsssi l. + &%uIIIWW3Wi�i� �iii._~oFa, . �__IZZWT��"7C iEoliit•r,I•✓hll ,,„,v,:--_ K3P' S itz%777KJ4n7ifimcsi lii�ii &MAIL Adliainial `Yx un O 1st FLOOR ZONING PLAN SCALE: NONE 0 i< N L V° 0 0 0 u \ \ 00 0 l® \ \ \111111111hk._ ZONE DAMPER SYSTEM Design airflows indicated are peak airflows for proper zone damper system performance. (Typical multiplier Is 1.25 based on constant volume design) ,/4` X 0 jc< 1st FLOOR RCP PLAN SCALE: 1/8"=1'-0" x x x�x RTU -2 ZONE PE SCHEDULE ZONE ZONE DAMPER TAG ZONE DAMPER SIZE VVT CFM 0 1ST FLR NORTH ZD -1 16"0 1,600 0 1S FLR OPEN OFFICE (E.CORE) ZD -2 16"0 1,600 O 1ST FLR NORTH EAST OFFICES ZD -3 12"0 800 13 1ST FLR S.E. OFFICES (E.) ZD -11 10"0 450 TOTAL CFM 4,000 CFM BYPASS DAMPER(S) BP 1 ® 16"0 2,500 CFM BYPASS RUN OUT DUCT = 18"0 0 24/12 4 PLACES 10/10 A 350 NEW C.e.SF 10 NE 8/8 8 - 4 12 8/8 225 9 ADD SOFFIT OSA -&12/12 300 10 RTU -4 ZONE PESCHEDULE ZONE ZONE DAMPER TAG ZONE DAMPER SIZE VVT CFM 10 1ST FLR STOR/BATHS (WEST) ZD -8 12"0 850 11 1ST FLR OPEN OFFICE S. (N.CORE) ZD -9 14"0- 1300 12 1ST FLR EAST OFFICES (N.) ZD -10 16"0 1,400 13 1ST FLR S.E. OFFICES (E.) ZD -11 10"0 450 TOTAL CFM 4,000 CFM BYPASS DAMPER(S) BP 2014"0 3,200 CFM BYPASS RUN OUT DUCT = 20"O A10/10 400 3 PLACES ZD- 1 N Mi EXISTING AH -6 _NEWQFF!( 8 0 10/10 250 NEW_CFFICE 8/8 225 81 - AH -6 T NEW OPEN OFFICE 10/10 400 8/8 200 6 PLACES 160 6/6 100 10/10 300 \\) OD 24/24 2 PLACES EXISTING 30/18 DROPS EX.. ELE'/LTCP ZD -8 rz18/8 E X ST- 8/8 y,2Q0 •" is i 6/6 7 200 8t WQ 'EN vc/L'j 16 6/6 EX TEL 100 0 EX. STCF,. 8/8 200 14 EXISTING 30/18 DROPS © 24/24 2 PLACES 18 8/8 175 41-111-6- 16 \1 6 1- r - 10 14 10/10 A 400 ZD -3 120 REVIEWED FOR ,(CODE COMPLIANCE APPROVED NOV 0 4 2013 X. OFFICE 10 T1 X. OFFICE 10 EX. N4LL ZD -3 N N (81— 16 12 L 8 140 6;18/8 A 225 5 PLACES 6 EX. CFFICI ZD -11 100 ZD -10 160 N 6/6 75 EX. CFF' yH� 10 16 10 City of Tukwila BUILDING DIVISION 10/10 00 LACES 10/10 350 4 PLACES 6/6 75 1st FLOOR HVAC PLAN SCALE: 118"=1'-0" VliI78 AUG 312014 RECEIVED CITY OF TUKWILA SEP 1 7 2013 PERMIT CENTER z Y z IL CV w z C'3 w MECHANICAL SEATTLE MECHANICAL a)un CO c v - m m Lrri Owl < 0 13 Sr 00 qJ 00 4-' kr) C co* 00 U rn 0 Q 01 22 Q w o>,2".° > L to 3:o m n3 C7 V 05 0 U 0 0 LL tfl N W a W aroV w V w In I- 2 w a. Z W m 0 rn 0 o m 4 rn JOB NO. 30708 SHEET M2.1 i ; a�t.oxiaa s�!,yb� ►Eik gmri ri�el� lO�jITC r ■ ❑ •�I,y'NsSNsv11N6 `.ZEFZIECEEZEP isi wiiiaPW ���iir.�l !%742/.A.,..0611 111 waIwimatinsu l To= _j ....,..'Y -.NSW YY�/YY r1r VYYItI AZT. • aJ�312aa2 w w% wMIRE27www!•1 ! 1S. wt .. .mss 1rr rlrwwrwr.l iRr►.,rg 71IJ2�j Illy moron v !�l�Iesw l" jt' '+t] -, u .u4 ; ;wea= w mains awl rapainsmo p;_ W 94 P 555 w wwwwalrww��ww w+1- r- a�aQzwa2 wrrr�i • IYYYIIIirwwI:'� • fli4.fs!r�SfiGf4914w 11111101110111•11110.- www0uwww116!' - ter.%== ris!I sru, %� miumni mean n x -a =�,,;t.'i� u� moms �w w.�Iwww z ►u!Irsyrrss om w I1ogneinc- n gongton eon , lit; ill PI; �III1'e1I I11IIIIZ11111�I 11E111$1 II i....lagmais / I I// I», i�! !i! o mI. !uII &.magi ' ���iii rrAg�,�s/�e ,, 6S0Mi A�d9 zario a14 1111111SI111 11■■■ ara �a �ww:i J si , a(c�a�':••i1- • mil • w WAIIKeitalIPSVMW)M pranmeal /.-I//i' sr%� //.'r:!iI: r�%`rte%'L . • .^r!: /. �a%/ic►id%i//.'/ I/ ,®%I/ / e • • dre• • iiia i///.///%%//,L1MAriMrzA %.i.�-T.'.r. !Z• a•7 •[•iii Mir. .-yzr't a D-. %/.L►,!%ii=i► s1®I s' • ..alit 7L �U►La UPPP %PE s • ' ' ` . ` :e • ivilf•ii • %/.%�Iw� iir li�-ail I Iii4 Id/ID AI•li.lol mur/o/iwrz iit arm" yr rr �%iwi�911 •j►-<..-lw•.•`•; sii aiw i llidU , . +,1s+ is si�1 .=. 4 PIUZlRUZ7�1 /21//21®/%/.� Si►alii� i Sii �i�iii _ . / .' ,I _ev 77 • o+ 0 • _ hi. tnd FLOOR ZONING PLAN SCALE: NONE LEI ZONE DAMPER SYSTEM Design airflows indicated are peak airflows for proper zone damper system performance. (Typical multiplier is 1.25 based on constant volume design) 1 ®L� RTU -3 E DAMPER SCHEDULE ZONE ZONE DAMPER TAG ZONE DAMPER SIZE VVT CFM O 2ND FLR OPEN OFFICE (E.CORE) ZD -4A -B 2014"0 2,050 0 2ND FLR NORTH OFFICES ZD -5 12"0 900 0 2ND FLR NORTH EAST OFFICE ZD -6 8"0 350 O 2ND FLR EAST OFFICES ZD -7 12"0 700 TOTAL CFM 4,000 CFM BYPASS DAMPER(S) BP 2®14"0 3150 CFM BYPASS RUN OUT DUCT = 20"0 REVIEWED FOR CODE COMPLIANCE APPROVED NOV 0 4 2013 City of Tukwila BUILDING DIVISION ►_r >< —71 \ \ 1® \ 0 v 0 X 0 0 0 1 r Plv4 VA X co xx, J r. 2nd FLOOR RCP PLAN SCALE: 1/8"=1'-0" 8/8 A 200 RTU -1 NEIJIE1-- 6/6 A 120 1 12 ED rzi 8/8 215 RTU -5 ZONE ER SCHEDULE ZONEDAMPER 1 ZONE TAG ZONE DAMPER SIZE VVT CFM 14 2ND FLR NEW TRAINING S.W. ZD -12 10"0 600 15 2ND FLR OPEN OFFICE CORE W. ZD -13 14"0 1,300 16 2ND FLR OPEN OFFICE CORE E. - ZD 14 16"0 1,500 17 2ND FLR EXIST. OFFICES S.E. ZD -15 10"0 600 TOTAL CFM 4,000 CFM BYPASS DAMPER(S) BP 2014'0 2,900 CFM BYPASS RUN OUT DUCT = 20110 9 � ®10/10 300 1 X.OFEN OFFICE 14 CGOUNTINC 14 8/8 ``.=J215 E> .iFFIGE n 6/6 �A120 8/8 215 0 10/10 360 RTU 10 rzl 8/8 215 10/10 A 250 2 PLACES EX. J,r' 8 $ 5FE41(61 AT T:,`IP I\ Eg 6/6 A 100 EX. ELE'4TOR EXISTING DUCT SHAFT DN 30/18 (UP TO RTU -4) 24/24 ZD -4A -B ZD -5 T1 8/8 180 3 PLACES 12 14 E 14 Ex. OFHC.E 8 F% C;f=ICE ZD -5 120 18 ZD -6 ZD -6 80. 107'10 350 1ti�10 A25 ,0 7 PLACES 1/6 00 EH - EX. OF- ' -f. 8 1 ZD -4B 140 rFj®3% -_-.-- ZD -7 UAB RTU -.4 120 EXISTING DUCT SHAFT DN 30/18 (UP TO RTU -2) ..,Nr"' AT 12 0 24/12 024/12 12 06)8/8 175 4 PLACES ZD -13 Ex. OPEN OFFICE 8. 6 12 NEW TF4ININC: 9 A10/10 300 2 PLACES NEW_STORAGE 13'11 T OD 24/12 24/12 6/6 100 ZD -13 140 12 16 16 EX. 6F /61 100 6/6 100 12 Ex ® 10 24/24 2 PLACES 10/10 350 4 PLACES 18 18 0 14 1 10 10 RTU -3 RTU DROPS: SA: 20/26-1 RA: 14/40-1 0.D. DUCT WITH 1" SL 4FTLONG a ZD -14 6 OFF IC. ®/66 100 4 PLACES 'AUG al 2014 2nd FLOOR HVAC PLAN SCALE: 1/8"=1'-0" it3- 17 160 8/8 200 RECEIVED CITY OF TUKWILA SEP 1 7 2013 PERMIT CENTER z w z C'3 w SEATTLE MECHANICAL vo 4-I Ln Baa m �• cm N cnc 1 C0 0 0 L) 0 0 LL IC N m N v V 2 n. 2 0 z 1 W rri c0 m 4 rn 0 JOB NO. 30708 SHEET 2 1 2 ZONE SCHEDULE ZONE NO. AREA SERVED AIR HANDLING UNIT ZONE DAMPER NO. 1 1ST. FLR - NEW OFFICE/ EXIST. LOBBY 1ST. FLR - NEW OFFICE/ W. STAIRS EXIST. AH -6 - 2 2ND. FLR - NEW OFFICE/ ACCTN RTU -1 - 3 1ST. FLR - NORTH OFFICES RTU -2 ZD -1 4 1ST. FLR - OPEN OFFICE RTU -2 I ZD -2 5 1ST. FLR - NE OFFICES RTU -2 1 RTU -3 , ZD -3 ZD -4 6 2ND. FLR - EX. OPEN OFFICE/HALL 7 2DN. FIR - NORTH EX. OFFICES RTU -3 I ZD -5 8 2ND. FLR - NE OFFICE RTU -3 ZD -6 9 2ND. FIR - E. OFFICES RTU -3 [ ZD -7 10 1ST. FLR - STORAGE/ EX. BATHS RTU -4 I ZD -8 11 1ST. FLR - NEW OPEN OFFICE SOUTH RTU -4 ZD -9 12 1ST. FLR - NEW OPEN OFFICE EAST EXP. RTU -4 ZD -10 . 13 1ST. FIR - EX. OFFICES S.E. RTU -4 I ZD -11 14 2ND. FIR - NEW TRAINING RTU -5 ZD -12 15 2ND. FLR - EX. OPEN OFFICE S.W. RTU -5 ZD -13 16 2ND. FLR - EX. OPEN OFFICE S.E. RTU -5 ZD -14 17 2ND. FLR - EX. OFFICES S.E. RTU -5 ZD -15 0 0"O-C�`"C) 0°0 o„o„o„o„o„o/, + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +4_- + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +•+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +. + 0 1 00 0005 0004 //,//////// //////////, /////////// ////////// ,//., ,,,/,,,/,./,/ /////////,///////// /,,,,/ /////////// ,,,,/, / /z�////// //////////JYX.`JDG///, .GL1 ///////,/// 7,7,,,, ///./,,,/ ,,,/./ „/,,,,,, , ,,,,,,, ,,,,,,,, /////////////////// //////////,./////// /////////// ,,,,, ,,,//,,,, /., , 4ZI,,,/,,,,, ,,,,,/////,,,, ////,/,// /////// ///////_, ///////////////////// ///,/////,//////, /////,//,,, - Ill Jill ,,.,,/,,,//,.,,,,,,//,/ ////////////////////////////////// ///////////////, ////////////,// /////////////// + + + + E+C_+ + + + D 1©++ ++ /. 7.+E :„÷ 41:E + + + + + + 1st FLOOR ZONING PLAN SCALE: NONE + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + # ��= + + + + + + + + 4 + + + + + + + + + + + + + + + 111 + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +.+ + + + + + + + + + + + + + + + + + + + +' + + + + + + + + + + + + + + + + + + + + + + G+,-• + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + . + + + lir /Al E”. E+r..4 + + + • ++ iYt.+.+++ AVM N / ��� l// 0 000 0 0 oo„o°o + + + + + + + + + + + + + + + + + + + + + + + 'JEW E*Q .E es 2nd FLOOR ZONING PLAN SCALE: NONE. C� w z CD W 2 REPLACEMENT (EXISTING = 1200 LBS) (INSTALL CURB ADAPTOR) 4 TON TOP FLOOR RTU -1 1,036 POUNDS V LJ W 2 J ung ocrt Q REPLACEMENT (EXISTING = 2430 LBS) (INSTALL CURB ADAPTOR) 10 TON LOWER FLOOR RTU -2 1,370 POUN11S 10 TON (NEW) TOP FLOOR RTU 1,377 POUNDS REVIEWED FOR CODE COMPLIANCE APPROVED NOV 0.4 2013 I %i41 I EXIST. CU -6 (AHU-6 LOWER FLOOR) REPLACEMENT (EXISTING = 2540 LBS) (INSTALL CURB ADAPTOR) 10 TON LOWER FLOOR RTU -4 City of Tukwila BUILDING DIVISION til (0 CL. 9- 0 0 0) .0 0 N U r 1 .I DEMO EXISTING MUA UNIT. PATCH HOLE & REROOF. REPLACEMENT (EXISTING = 1230 LBS) ONSTALL CURB ADAPTOR) 10 TON TOP FLOOR 1,377 POUNDS AUG 8 1 2014 ROOFTOP EQUIPMENT WEIGHTS INCLUDE CURB OR CURB ADAPTOR JOB NO. AC ROOF PLAN tillsNA RECEIVED CITY OF TUKWILA OCT 0 8 2013 PERMIT CENTER SHEET 30708