Loading...
HomeMy WebLinkAboutPermit M13-183 - VULCAN INC - ALTERATIONVULCAN INC 3314 S 116 ST M13-183 City oilitukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-431-2451 Web site: http://www.TukwilaWA.gov MECHANICAL PERMIT Parcel No.: 1023049011 Address: 3314 S 116 ST TUKW Project Name: VULCAN INC Permit Number: M13-183 Issue Date: 10/23/2013 Permit Expires On: 04/21/2014 Owner: Name: APOLLO HOLDINGS LLC Address: 505 5TH AVE S #900 , SEATTLE, WA 98104 Contact Person: Name: JEFFREY BRANT Address: 5108 D ST NW , AUBURN, WA 98001 Email: PERMITS@EMERALDAIRE.COM • Contractor: Name: EMERALD AIRE INC. Address: 22043 68TH AVENUE SOUTH , KENT, WA 98032 Contractor License No: EMERAAI055BL Phone: 253 981-2767 Phone: 206 872-5665 Expiration Date: 04/01/2015 DESCRIPTION OF WORK: ADD MINI SPLIT SYSTEM, ADD SPLIT SYSTEM AIR HANDLERS, AND REROUTE DUCTWORK PER PLANS. Value of Mechanical: 100,000.00 Type of Fire Protection: UNKNOWN Electrical Service Provided by: Permit Center Authorized Signature: Fees Collected: $1,364.63 International Mechanical Code Edition: 2012 A)-AtDate: I - _-z` 1 3 I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this mechanical permit and agree to the conditions on the back of this p Signature: Print Name Date: )c /23413 This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. A -:-♦-J. 4",10f ^1,1A7 • • PERMIT CONDITIONS Permit No. M13-183 1: ***BUILDING DEPARTMENT CONDITIONS*** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 5: Readily accessible access to roof mounted equipment is required. 6: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 7: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 8: Manufacturers installation instructions shall be available on the job site at the time of inspection. 9: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 10: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 11: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. Inc: IMC -4/10 M13-183 Printed: 10-23-2013 CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov ;Mechanical;Pe><mit No. 12-J _ 1' Project No. 'Date Application Accepted: Date Application Expires: (For office use only) MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** SITE .LOCATION Site Address: 3 3l 4 So""'' 116+k 5 Tenant Name: V td a- in `'P .QPERTYxOWNER Name: �1tu LIC . H a[d‘ i l j.!% LLL / Address:505 vh A✓ S -' . rO© City:46,4 le State: VIM- Zip:', CNT' O' T -PERSON — person receiving all project 4coirununication . ' Name: Je:c yt >1 Address: 5l0 c` D C'+ 4'14,7 City: [1 Dctri) State Zip: Ca)) Phone:23.,? 6121 2747 Fax:2S3 972 5 797 Email: pmi,T56:(2 ,,te(cxleQc re ,GGwl King Co Assessor's Tax No.: 10'1304%91i Suite Number: Floor: 1 New Tenant: ❑ Yes ...No MECHANICAL CONTRACTOR INFORMATION Company Name: Efteet1A A f,. `� Address: 5)62g J 4,447 City: 11,,,b,ATtA State: Wit Zip: R9i Phone253 / ✓ p.7j t ,5 Fax: 2 i3 g?2 C 7 / Contr Reg No.:O mEQ� 5SQkExp Date: IA /\5 Tukwila Business License No.: B -. 7 J cos .$'2 Valuation of project (contractor's bid price): $ C2e2f 1'4° Describe the_scope of work in detail: Ada �'v' 500s/ vs � � a c 5, 2I t') ..5)/54e01 ci r \'lard ���.�J ►�12"jvt`�ec C�c'I Y��T l� f f ,6 ►1s': J Use: Fuel Type: Residential: Commercial: New New Electric 1 Gas Replacement Replacement Other: H: Applicanons\forrns-Applrcattons On Lme1201 I Apphcations\Mechanical Permit Application Revised 8-9-I l.does Revised: August 2011 bh Page 1 of 2 Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Furnace >100k btu Floor furnace Suspended/wall/floor mounted heater Appliance vent Repair or addition to heat/refrig/cooling system Air handling unit <10,000 cfm Unit Type Qty Air handling unit >10,000 cfm Evaporator cooler Ventilation fan connected to single duct Ventilation system Hood and duct Incinerator — domestic Incinerator — comm/industrial Unit Type Qty Fire damper Diffuser Thermostat Wood/gas stove Emergency generator Other mechanical equipment Boiler/Compressor Qty 0-3 hp/100,000 btu 3 3-15 hp/500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+ hp/1,750,000 btu PERMIT APPLICATION NOTES Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING O R OR AUTHRIZED AGENT: „le__ Signature: 'fir Je--Wr e/ Frc1✓L Mailing Address: 510 p /ow Print Name: Date:,A ) ' A 3 Day Telephone: 253 cig l 27‘7 Ahctin Fl:\Applications\Forms-Applications On Line\201 I Applications\Mechanical Permit Application Revised 8-9-1 Ldocx Revised: August 2011 bh City State Zip Page 2 of 2 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206-431-3665 Web site: http://www.TukwilaWA.gov Parcel No.: 1023049011 Address: 3314 S 116 ST TUKW Suite No: Applicant: VULCAN INC RECEIPT Permit Number: M13-183 Status: APPROVED Applied Date: 09/20/2013 Issue Date: Receipt No.: R13-02944 Payment Amount: $1,091.70 Initials: WER Payment Date: 10/23/2013 01:19 PM User ID: 1655 Balance: $0.00 Payee: EMERALD AIRE INC TRANSACTION LIST: Type Method Descriptio Amount Payment Check 2089 1,091.70 Authorization No. ACCOUNT ITEM LIST: Description Account Code Current Pmts MECHANICAL - NONRES 000.322.102.00.00 1,091.70 Total: $1,091.70 Printed: 10-23-2013 • • wq� City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206-431-3665 Web site: http://www.TukwilaWA.gov Parcel No.: 1023049011 Address: 3314 S 116 ST TUKW Suite No: Applicant: VULCAN INC RECEIPT Permit Number: M13-183 Status: PENDING Applied Date: 09/20/2013 Issue Date: Receipt No.: R13-02693 Payment Amount: $272.93 Initials: JEM Payment Date: 09/20/2013 12:31 PM User ID: 1165 Balance: $1,091.70 Payee: EMERALD AIRE INC, PERMIT TRANSACTION LIST: Type Method Descriptio Amount Payment Check 2072 272.93 Authorization No. ACCOUNT ITEM LIST: Description Account Code Current Pmts PLAN CHECK - NONRES 000.345.830 272.93 Total: $272.93 Printprl• (19-2f1-2fl1 INSPECTION RECORD Retain a copy with permit_ INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 431 -2451 - Project: Type of Inspection: Address:. ;3 I 47 Date. Called: Special Instructions: ' - Date Wanted I. -- id 1 l3 a.m P:11• Requester: Phone No:: Approved per applicable codes. Corrections required prior to approval. - COMMENTS:G /2�ig % =:l✓ 4-101,4.✓eve r Date: • RI/INSPECTION FEE SQUIRE . Prior to next inspectio fee must be p id at 6300 Southcenter Blvd., Suite 100. call to schedule reinspection. INSPECTION RECORD Retain a.copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION . 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670_ Permit Inspection Request Line (206) 431-2451 Project: t VZ.I i (IA t•J Type of spection: RP ✓eCidalf „----. ' { .. Address: Date Called: Special Instructions: Date Wanted:,% i Z 1 `" f ( erne ? p.m. Requester: vt Is: Q.4 L I. 2_06,., 22`St' Phone. No: Approved per applicable codes. Corrections required prior to approval. COMMENTS: R -t✓ yQb4t4,9,✓ 410/A e(, Date:. 12 /17/) n E1 NS ECTION FEE.REQUIRD. Prior/to next inspection, fee must be paid a 6300 Southcenter Blvd "Suite 100. Call to schedule reinspection. tit INSPECTION RECORD Retain a copy with permit (1i3-/83 INSPECTION NO. PERMIT NO. CITY Of TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 431-2451.. Projec : VL I Icy a NJ- --f! C . 1 Type of Inspection: Rotem- I,.-�_J- P l 11/4 X u I Address: ) e LI Si.( S1 Date Called: Spec al' structions: Date Want d: i 26 /I3 N• • Ftequestdr: Phone No: 266- g72 65 Ea Approved -per applicable codes. Corrections required prior to approval. COMMENTS: /g7i PF .[A�SPi( • Anp60%i 1 12511a1) - e 7-0 l / tL.ixe I Date: ) ///2-6!" NSPECTION. FEE.REQUIIRED. Priprr.to next inspection,. feemust be id at 6300 Southcenter Blvd., Suite 100: Call to schedule reinspection. TESTIINO AN1]1ACrc SERVICES, NMI AABC yv��3-i8� TUKWILA WAREHOUSE PROJECT 3314 SOUTH 116TH ST TUKWILA, WA 98168 PROJECT NO: 13-186 DATE: 12/9/2013 TECHNICIAN: ROB COALLIER FINAL TAB REPORT MECHANICAL ENGINEER: EMERALD AIRE INC. 5108 D ST. N.W., AUBURN, WA 98001 MECHANICAL CONTRACTOR: EMERALD AIRE INC. 5108 D ST. N.W., AUBURN, WA 98001 Page 1 of 17 12/09/2013 TAC SERVICES, LLC 4811 DESMOND STREET BELLINGHAM, WA 98229 PH: (360) 224-8555 FAX: (360) 464-9973 AD M IN ©TESTAN DOC COM AABC National Performance Guaranty Pursuant to the agreement between TAC Services, LLC. AABC Certified Testing & Balancing Agency and Emerald Aire, Inc. Client All systems shall be tested and balanced in accordance with the project plans and specifications and to the optimum performance capabilities of the equipment. Testing and balancing shall be done in accordance with the standards published by the Associated Air Balance Council. If the Agency listed above fails to comply with the specifications for any reason other than termination of business by the AABC agency or equipment malfunction or inadequacy which prevents proper balancing of the systems, AABC will investigate and, if warranted, will provide supervisory personnel to assist the member Agency to perform work in accordance with AABC Standards. This supervision will be provided at no additional cost to the building owner. This Guaranty is valid for one year from the date of submission of a test and balance report, provided the Agency is a current member of AABC, and may only be invoked in writing by the building owner, architect, or engineer of record. The Guaranty is limited to the terms and conditions as stated herein. Project Name Tukwila Warehouse Project Address 3314 South 116th Street Tukwila, WA 98168 Name of Engineer Douglas A. Happe Engineering Finn Emerald Aire, Inc. Email Address Address 5108 D Street N.W. Auburn, WA 98001 AABC Associated Air Balance Council 1518 K Street, N.W. Washington, D.C. 20005 202-737-0202 • Fax 202-638-4833 AABC Certified TBE info@aabc.com • www.aabc.com Date 12/09/2013 TBE # 08-02-04 By Robert R. Coallier Page 2 of 17 12/09/2013 TABLE OF CONTENTS DESCRIPTION COVER PAGE AABC NATIONAL PERFORMANCE GUARANTY TABLE OF CONTENTS PROJECT SUMMARY LEGEND SHEET FC -1 FC -2 FC -3 FC -4 EXISTING RTU SCHEMATIC DIAGRAMS Page 3 of 17 12/09/2013 41111 AABC PAGE 1 2 3 4 5-7 8 9-10 11-12 13-14 15 16-17 PROJECT SUMMARY 1.0 THE AIR SYSTEMS WERE TESTED AND THE RESULTS ARE AS TABULATED ON THE ATTACHED DATA SHEETS 2.0 FC -2: RESTRICTOR PLATE CREATED AT RETURN AIR FILTER TO HELP INDUCE DESIGN OSA CFM. AA BC 3.0 FC -3 / FC -4: ECONOMIZER HAS BEEN OMITTED DUE TO SENSITIVITY OF EQUIPMENT IN SPACE AND HUMIDITY CONTROL REQUIREMENTS. Page 4 of 17 12/09/2013 LEGEND SHEET AHU AIR HANDLING UNIT AC OR ACU AIR CONDITIONER UNIT ACCU AIR COOLED CONDENSING UNIT ADJ P.D. ADJUSTED PITCH DIAMETER AMP AMPERE AVG AVERAGE B.H.P. BRAKE HORSEPOWER C.D. CEILING DIFFUSER CFM CUBIC FEET PER MINUTE C.E. CEILING EXHAUST CH CHILLER CHWR CHILLED WATER RETURN CHW OR CHWS CHILLED WATER SUPPLY C.R. CEILING RETURN CT COOLING TOWER CWR CONDENSER WATER RETURN CW OR CWS CONDENSER WATER SUPPLY DB DRY BULB D.D. DIRECT DRIVE D.P. DIFFERENCE, NET DECREASE OR INCREASE DIA DIAMETER DISP DISPLACEMENT D.N.A. DATA NOT AVAILABLE D.N.L DATA NOT LISTED EAT ENTERING AIR TEMPERATURE EDC ELECTRIC DUCT COIL EDH ELECTRIC DUCT HEALER EF EXHAUST FAN EMCS ENERGY MANAGEMENT CONTROL SYSTEM (S) EWT ENTERING WATER TEMPERATURE FCU FAN COIL UNIT FH FUME HOOD FG FLOOR GRILLE Page 5 of 17 12/09/2013 F.E. FLOOR EXHAUST OR RETURN F.L.A FULL LOAD AMPERAGE FPB FAN POWERED BOX FPM FEET PER MINUTE F.S. FLOOR SUPPLY F.S.R FLOOR SUPPLY REGISTER FT. HD FEET OF HEAD FTU FAN TERMINAL UNIT GPM GALLONS PER MINUTE GFH GAS FIRED HEATER HC HEATING COIL HEATER O.L. THERMAL OVERLOAD PROTECTION FOR MOTORS LOCATED AT THE MOTOR STARTER HEPA HIGH EFFICIENCY PARTICULATE AIR H.F. HEPA FILTER HOA HAND/OFF/AUTO SWITCH H.P. HORSEPOWER HPS HIGH PRESSURE STEAM HRC HEAT RECOVERY COIL OR HEAT RECLAIM COIL HVAC HEATING , VENTILATION AND AIR CONDITIONING HWR HOT WATER RETURN OR HEATING WATER RETURN HWS HOT WATER SUPPLY OR HEATING WATER SUPPLY HX HEAT EXCHANGER I.D. INSIDE DIAMETER LAT LEAVING AIR TEMPERATURE L.D. LINEAR SUPPLY DIFFUSER LPS LOW PRESSURE STEAM L.T. LIGHT TROFFER LWG LOW WALL GRILLE LWR LOW WALL RETURN LWT LEAVING WATER TEMPERATURE MAU/MUA MAKE UP AIR UNIT MBH 1,000 BTU'S PER HOUR N.A. NOT ACCESSIBLE N.I. NOT INSTALLED N.T. NOT TAKEN N.V.L NO VALID LOCATION N.Z. NOZZLE O.D. OUTSIDE DIAMETER OPEN NO TERMINAL DEVICE INSTALLED O.S.A. MIN OUTSIDE AIR MINIMUM OAT OUTSIDE AIR TEMPERATURE Page 6 of 17 12/09/2013 PF POWER FACTOR PHC PREHEAT COIL PHC PHASE (S) PMP CIRCULATING PUMP P.P PERFORATED PLATE PSI POUNDS PER SQUARE INCH P.T. PITOT TRAVERSE RA RETURN AIR RF RETURN AIR FAN R.G. RETURN GRILLE RHC REHEAT COIL RPM REVOLUTIONS PER MINUTE SA SUPPLY AIR SAT SUPPLY AIR TEMPERATURE S.D. SUPPLY DIFFUSER SEF SMOKE EXHAUST FAN SF (AIR) SUPPLY FAN S.F. (ELECT) SERVICE FACTORS SHC STEAM HEATING COIL S.P. "W.C." STATIC PRESSURE RESISTANCE, MEASURED IN INCHES OF WATER COLUMN S.W.E. SIDEWALL EXHAUST S.W.R. SIDEWALL RETURN S.W.S. SIDEWALL SUPPLY TAB TESTING, ADJUSTING, AND BALANCING TSP TOTAL STATIC PRESSURE UH UNIT HEATER V VOLTS VAV VARIABLE AIR VOLUME VD VOLUME DAMPER VFD VARIABLE FREQUENCY DRIVE VP VELOCITY PRESSURE W WATTS WB WET BULB W.G. WATER GAUGE °F DEGREES FAHRENHEIT DP DIFFERENTIAL (DELTA) PRESSURE OR PRESSURE DROP DT DIFFERENTIAL (DELTA) TEMPERATURE, NET TEMPERATURE DECREASE OR INCREASE PSI POUNDS PER SQUARE INCH Page 7 of 17 12/09/2013 NMI AABC PROJECT: TUKWILA WAREHOUSE PROJECT LOCATION: TUKWILA, WA PROJECT NO: 13-186 CONTACT: ROB COALLIER SYSTEM: AREA SERVED: FC -1 ART OFFICE 104 UNIT DATA UNIT ID EQUIPMENT LOCATION TYPE / SIZE FC -1 ART OFFICE 104 CEILING RECESSED / 1.25 TON EQUIPMENT MFG. MODEL NO. SERIAL NO. MITSUBISHI SLZ-KA15NA 31M00447 TEST DATA SHEAVE & BELT DATA SPECIFIED ACTUAL FAN SHEAVE / BORE TOTAL CFM- FAN 390 390 BELT SIZE TOTAL CFM - OUTLET 390 390 QUANTITY R/A CFM 360 359 SHAFT C / C 0/A CFM 30 31 MOTOR SHEAVE / BORE FAN RPM D.D. D.D. SHEAVE ADJUSTMENT DIRECT DRIVE MOTOR MFG. MOTOR MITSUBISHI DATA SPECIFIED ACTUAL MOTOR HP 20 (W) VOLTAGE 208 211 SERVICE FACTOR 1.00 AMPERAGE 0.28 0.25 PHASE/Hz 1/60 HEATER SIZE / RATING THERMAL MOTOR RPM D.D. D.D. MOTOR FRAME# NONE PROVIDED SPEED 3 SPEED HIGH DESIGN ESP TEST PRESSURES 0.25 " W.C. INLET SP - " W.C. TESTED ESP N/APPL " W.C. DISCHARGE SP - " W.C. Page 8 of 17 12/09/2013 AABC PROJECT: TUKWILA WAREHOUSE PROJECT LOCATION: TUKWILA, WA PROJECT NO: 13-186 CONTACT: ROB COALLIER SYSTEM: AREA SERVED: FC -2 NON -COLD LIBRARY STORAGE 106 UNIT DATA UNIT ID EQUIPMENT LOCATION TYPE / SIZE FC -2 LEVEL 1 WEST CONCEALED CEILING / 2.5 TON EQUIPMENT MFG. MODEL NO. SERIAL NO. MITSUBISHI PEAD-A30AA4 OYW00002 TEST DATA SHEAVE & BELT DATA SPECIFIED ACTUAL FAN SHEAVE / BORE TOTAL CFM- FAN 740 728 BELT SIZE TOTAL CFM - OUTLET 740 728 QUANTITY R/A CFM 590 575 SHAFT C / C O/A CFM 150 153 MOTOR SHEAVE / BORE FAN RPM D.D. D.D. SHEAVE ADJUSTMENT DIRECT DRIVE MOTOR MFG. MOTOR MITSUBISHI DATA SPECIFIED ACTUAL MOTOR HP 240 (W) VOLTAGE 208 212 SERVICE FACTOR 1.00 AMPERAGE 2.2 1.9 PHASE / Hz 1 / 60 HEATER SIZE / RATING THERMAL MOTOR RPM D.D. D.D. MOTOR FRAME# NOT PROVIDED SPEED 5 SPEED HIGH DESIGN ESP TEST PRESSURES 0.40 " W.C. INLET SP 0.09 " W.C. TESTED ESP 0.20 " W.C. DISCHARGE SP 0.11 " W.C. Page 9 of 17 12/09/2013 REMARKS PROJECT: LOCATION: PROJECT NO: CONTACT: AABC TUKWILA WAREHOUSE PROJECT TUKWILA, WA 13-186 ROB COALLIER SYSTEM: AREA SERVED: FC -2 NON -COLD LIBRARY STORAGE 106 AREA SERVED NO. CODE SIZE AK 106 SUPPLY 1 TMS 14 F.H. DESIGN INITIAL FINAL FPM CFM FPM CFM FPM CFM 740 740 486 486 728 728 OSA RETURN 1 50F 24X24 1.10 150 153 538 590 664 728 524 575 FORM ID: LOW VELOCITY TEST SHEET Page 10 of 17 12/09/2013 AA ESC PROJECT: TUKWILA WAREHOUSE PROJECT LOCATION: TUKWILA, WA PROJECT NO: 13-186 CONTACT: ROB COALLIER SYSTEM: AREA SERVED: FC -3 ACCLIMATION ROOM 103 UNIT DATA UNIT ID EQUIPMENT LOCATION TYPE / SIZE FC -3 LEVEL 1 WEST HEAT PUMP / 3 TON EQUIPMENT MFG. MODEL NO. SERIAL NO. UEBERT MMD36E7AHSDG Y13KBI8807 TEST DATA SHEAVE & BELT DATA SPECIFIED ACTUAL FAN SHEAVE / BORE TOTAL CFM- FAN 1200 1211 BELT SIZE TOTAL CFM - OUTLET 1200 1211 QUANTITY R/A CFM SHAFT C / C 0/A CFM MOTOR SHEAVE / BORE FAN RPM D.D. D.D. SHEAVE ADJUSTMENT DIRECT DRIVE MOTOR MFG. MOTOR US MOTORS DATA SPECIFIED ACTUAL MOTOR HP 1/2 VOLTAGE 460 486 / 485 / 487 SERVICE FACTOR 1.00 AMPERAGE 1.4 0.9 / 1.1 / 1.2 PHASE / Hz 3 / 60 HEATER SIZE / RATING THERMAL MOTOR RPM 1070 1070 MOTOR FRAME# 48Y SPEED 2 SPEED LOW DESIGN ESP TEST PRESSURES 0.30 " W.C. INLET SP 0.15 " W.C. TESTED ESP 0.37 " W.C. DISCHARGE SP 0.22 " W.C. FC -3: ECONOMIZER HAS BEEN OMITTED DUE TO SENSITIVITY OF EQUIPMENT IN SPACE AND HUMIDITY CONTROL REQUIREMENTS. FORM: BELT DRIVEN FAN SHEET Page 11 of 17 12/09/2013 AA IBC PROJECT: TUKWILA WAREHOUSE PROJECT LOCATION: TUKWILA, WA PROJECT NO: 13-186 CONTACT: ROB COALLIER SYSTEM: AREA SERVED: FC -3 ACCLIMATION ROOM 103 AREA SERVED 103 NO. 1 CODE 300RS SIZE 20X8 AK 0.75 DESIGN FPM 400 CFM 300 INITIAL FPM 494 CFM 371 FINAL FPM 405 CFM 304 103 2 300RS 20X8 0.75 400 300 490 368 402 302 103 3 300RS 20X8 0.75 400 300 493 370 404 303 103 4 300RS 20X8 0.75 400 300 492 369 403 302 SUPPLY 1200 1477 1211 REMARKS FORM ID: LOW VELOCITY TEST SHEET Page 12 of 17 12/09/2013 TESTI NIC A * Ck' SERVICES' Ink AABC PROJECT: TUKWILA WAREHOUSE PROJECT LOCATION: TUKWILA, WA PROJECT NO: 13-186 CONTACT: ROB COALLIER SYSTEM: AREA SERVED: FC -4 ACCLIMATION ROOM 103 UNIT DATA UNIT ID EQUIPMENT LOCATION TYPE / SIZE FC -4 LEVEL 1 WEST HEAT PUMP / 3 TON EQUIPMENT MFG. MODEL NO. SERIAL NO. LIEBERT MMD36E7AHSDG Y13KBI8780 TEST DATA SHEAVE & BELT DATA SPECIFIED ACTUAL FAN SHEAVE / BORE TOTAL CFM- FAN 1200 1247 BELT SIZE TOTAL CFM - OUTLET 1200 1247 QUANTITY R/A CFM SHAFT C / C 0/A CFM MOTOR SHEAVE / BORE FAN RPM D.D. D.D. SHEAVE ADJUSTMENT DIRECT DRIVE MOTOR MFG. MOTOR US MOTORS DATA SPECIFIED ACTUAL MOTOR HP 1/2 VOLTAGE 460 489 / 489 / 488 SERVICE FACTOR 1.00 AMPERAGE 1.4 1.0 / 1.2 / 0.9 PHASE / Hz 3 / 60 HEATER SIZE / RATING THERMAL MOTOR RPM 1070 1070 MOTOR FRAME# 48Y SPEED 2 SPEED LOW DESIGN ESP TEST PRESSURES 0.30 " W.C. INLET SP 0.11 " W.C. TESTED ESP 0.30 " W.C. DISCHARGE SP 0.19 " W.C. FC -4: ECONOMIZER HAS BEEN OMITTED DUE TO SENSITIVITY OF EQUIPMENT IN SPACE AND HUMIDITY CONTROL REQUIREMENTS.. Page 13 of 17 12/09/2013 AABC PROJECT: TUKWILA WAREHOUSE PROJECT LOCATION: TUKWILA, WA PROJECT NO: 13-186 CONTACT: ROB COALLIER SYSTEM: AREA SERVED: FC -4 ACCLIMATION ROOM 103 AREA SERVED 103 NO. 1 CODE 300RS SIZE 20X8 AK 0.75 DESIGN FPM 400 CFM 300 INITIAL FPM 548 CFM 411 FINAL FPM 418 CFM 314 103 2 300RS 20X8 0.75 400 300 479 359 414 311 103 3 300RS 20X8 0.75 400 300 510 383 416 312 103 4 300RS 20X8 0.75 400 300 514 386 415 311 SUPPLY 1200 1538 1247 REMARKS FORM ID: LOW VELOCITY TEST SHEET Page 14 of 17 12/09/2013 PROJECT: LOCATION: PROJECT NO: CONTACT: SYSTEM: AREA SERVED: W AABC TUKWILA WAREHOUSE PROJECT TUKWILA, WA 13-186 ROB COALLIER EXISTING OFFICE 109 RTU OFFICE 109 AREA SERVED NO. CODE SIZE AK 109 SUPPLY 1 TMS 8 F.H. DESIGN INITIAL FINAL FPM CFM FPM CFM FPM CFM 100 100 71 71 93 93 REMARKS DAMPER 100% OPEN. FORM ID: LOW VELOCITY TEST SHEET Page 15 of 17 12/09/2013 P 71. 0 Ij - - - r SEE DCM .1 L- 1.668 DROP DOM MO DOCUM11311 ROM -14e DUCMORN SUMS, DOOMATM ROM 106 DUCTIODS MIA UHES 6016 OCOMATION 16011 I I 16,6 OUCT LP TO 1600, SEE DED16 1 HO DOM TO 16,18 RETUR11 OWLLE 0.1666 ON 00-361 SMTED [MOPPED TEFL61 SE6S 11061661 .Mao ALL DUCTACM EOUP OUTSCS AOSIMATIM 11061 STEEL MI MIS —rvom,r P -L;71 ,A1C, 1 I I I ETT6-1...68.1 Page 16 of 17 12/09/2013 ROOM SECTION NEW ME 1/0 C -C 11-AWM•66 116066,6•6 61 P666 (213-6116 6-06•66611.0 06.1,6TADM Propc646666201 LCD. 1 116C PIM - PSTA, 1 r I,.6 DIlIl 101.6113 p a g LP/E11 ft/CE/SI SCALE AS-MODED M201 D1S-0818 P F 0 — / f --- / • •-• , • • /• . . • / • ..• ./ ,/ /1-• /7 • " ,./,./ • i I '7 : —, ,•„/,';./ - • - - ;•/ • • ,._,... s....-- :, , . —.......„ . .... ..•. ., - •./ , .1 " • --17-17-7-7-1 , • , • , , • ••• sc•-4 •••• • ). • ; • :1. WOC 11, C0511.4 STS101 aqua mum 111D1 RELOCKLE• 0.35000 11100.051.0 . , • // y//.• °I', • / /2/ // .• , / / • • 111014011010 000rOP (TOTS TO MAW MOWS .70.767 ROOM; COMO noborws SOW.% ROCROP TO 10 07 MU: :def. /. •1101EC:.,/,./ •' • Page 17 of 17 12/09/2013 / ELM. UDC MG DUCTWORK CUCT•ORK RELEGATE 0011114 1 15, LL a RD1DAlt 9/102111 DATE • TOTOT DATE 01111 0113 O — OWE OWE g • 3 1.);3i,i.• Vs. 111, 0111, L11,51,5 10.1 f SAM yr • K -Lf 1,01.100 hellclaVublie 00 Rojo. (103-08110W0DA*AGAD Dre.Ws•WWwKA 00 PrAWALVIDA0AL1202 LEVEL I MAC PIM WISSTAws (toot OWL.. WEST SCRAG •3-00113, M202 21.1-001.1 "Excellence & Integrity" www.emeraldaire.com • • CONDITIONINGtHEATING REFRIGERATION;CONTROLS•SALESaSERVICE•INSTALLATION. City of Tukwila Department of Community Development Building Division Attn: Allen Johannessen RE: Vulcan Inc. M13-183 Address: 3314 S 116 St Tukwila, WA Dear Allen, The following is the response to the Correction letter dated 8/02/13: October 8, 2013 1. Code notes and references throughout the cover sheet reference compliance with old outdated codes. City of Tukwila has adopted as of July 1 2013 the 2012 International codes including the 2012 Washington State Energy Codes with Washington State Amendments. Revise codes to show compliance with current codes. Update tables and table reference to show current code compliance. • Notes within the Title block have been updated to indicate 2012 Energy Code compliance. 2. Fan Coil table note indicates No Economizer Exception 1 WSEC. Under the current codes, provide the specific code reference for that exception. • Under 2012 Washington Energy Code, Economizer Exception 1 is applicable. Coversheet now shows how units meet specific requirements. CORRECTION LTR# M13H83 i ECEIVED Ci Y OF TUKWILA OCT 092013 I'ERMIT CENTER 5108 D Street NW Auburn, WA 98001 (253) 872-5665 (800) 291-5191 FAX (253) 872-5797 CONT.# EMERAAI055BL �J 1 LA 1,1, �J� � ' , 4sy City of Tukwila J � -„1 �,n r 2 1908 S Jim Haggerton, Mayor Department of Community Development Jack Pace, Director October 2, 2013 Jeffrey Brant 5108 D St NW Auburn, WA 98001 RE: Correction Letter #1 Mechanical Permit Application Number M13-183 Vulcan Inc — 3314 S 116 St Dear Mr. Brant, This letter is to inform you of corrections that must be addressed before your development permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the Building Department. At this time the Fire Department has no comments. Building Department: Allen Johannessen at 206 433-7163 if you have questions regarding the attached comments. Please address the attached comments in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that two (2) sets of revised plan pages, specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a `Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections/revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, I can be reached at (206) 431-3670. Sincerely, Bill Rambo Permit Technician File No. M13-183 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 • Tukwila Building Division Allen Johannessen, Plan Examiner Building Division Review Memo Date: October 1, 2013 Project Name: Vulcan Inc Permit #: M13-183 Plan Review: Allen Johannessen, Plans Examiner The Building Division conducted a plan review on the subject permit application. Please address the following comments in an itemized format with revised plans, specifications and/or other applicable documentation. (GENERAL NOTE) PLAN SUBMITTALS: (Min. size 11x17 to maximum size of 24x36; all sheets shall be the same size. New revised plan sheets shall be the same size sheets as those previously submitted.) (If applicable) Structural Drawings and structural calculations sheets by a registered engineer shall have a current signed stamp -seal. Architectural design sheets and documents by a registered architect shall also have a current signed stamp -seal. 1. Code notes and references throughout the cover sheet reference compliance with old outdated codes. City of Tukwila has adopted as of July 1 2013 the 2012 International codes including the 2012 Washington State Energy Codes with Washington State Amendments. Revise codes to show compliance with current codes. Update tables and table reference to show current code compliance. 2. Fan Coil table note indicates No Economizer Exception 1 WSEC. Under the current codes, provide the specific code reference for that exception. Should there be questions concerning the above requirements, contact the Building Division at 206-431-3670. No further comments at this time. • PERMIT CORD COPY PLAN REVIEW/ROUTING SLIP ACTIVITY NUMBER: M13-183 PROJECT NAME: VULCAN INC SITE ADDRESS: 3314 S 116 ST Original Plan Submittal X Response to Correction Letter # 1 DATE: 10-09-13 Response to Incomplete Letter # Revision # After Permit Issued DEPART ENTS: Bul ding D ision Public Works Ti Fire Prevention Structural Planning Division I Permit Coordinator n U DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 10-10-13 Complete Incomplete ❑ Not Applicable Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES/THURS ROUTING: Please Route Structural Review Required No further Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 11-07-13 Approved ❑ Approved with Conditions IW Not Approved (attach comments) ❑ Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg El Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents/routing slip.doc 2-28-02 PERMIT COORD COPY. PLAN REVIEW/ROUTING SLIP ACTIVITY NUMBER: X113-183 DATE: 09/20/13 PROJECT NAME: VULCAN INC SITE ADDRESS: 3314 S 116 ST X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # after Permit Issued EPARTMENTS: &ev Building Division Public Works Fire Preven ion Structural Planning Division Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Incomplete DUE DATE: 09/24/13 Not Applicable Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW 0 Staff Initials: TUES/THURS ROUTING: Please Route REVIEWER'S INITIALS: DATE: Structural Review Required ❑ No further Review Required ❑ APPROVALS OR CORRECTIONS: DUE DATE: 10/22/13 Approved ❑ Approved with Conditions ❑ Not Approved (attach comments) ,i<f Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg Fire ❑ Ping ❑ PW ❑ Staff Initials: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206-431-3665 Web site: http://www.ci.tukwila.wa.us BION SUBMITTAL Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: 10 g ! 13 Plan Check/Permit Number: M 13-183 ❑ Response to Incomplete Letter # ® Response to Correction Letter # 1 ❑ Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner Project Name: Vulcan Inc Project Address: 3 314 S 116 St Contact Person: ieg e (-6 „4±- Phone Number: 253— g 72 — 5‘65 Summary of Revision: l v �Qai . 1P x(17 A/' +c. �l _ cP f �P 202 Was b'& o,n En&y rock Co9h ,nye OCT .0 9 2013 PERMIT CENTER Sheet Number(s): !' ' 000 "Cloud" or highlight all areas of revision including date of revision Received at the City of Tukwila Permit Center by: ll tet' Entered in Permits Plus on \applications\forms-applications on line\revision submittal Created: 8-13-2004 Revised: Contractors or Tradespeople Pror Friendly Page 6 General/Specialty Contractor A business registered as a construction contractor with L&I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name EMERALD AIRE INC UBI No. 600591552 Phone 2538725665 Status Active Address 5108 D Street Nw License No. EMERAAI055BL Suite/Apt. License Type Construction Contractor City Auburn Effective Date 1/13/1995 State WA Expiration Date 4/1/2015 Zip 98001 Suspend Date County King Specialty 1 General Business Type Corporation Specialty 2 Unused Parent Company Other Associated Licenses License Name Type Specialty 1 Specialty 2 Effective Date Expiration Date Status SOUNDAI1580W SOUND AIR INC Construction Contractor General Unused 9/16/1985 8/15/1995 Archived Business Owner Information Name Role Effective Date Expiration Date HAPPE, DOUGLAS A President 01/01/2000 Bond Amount RIDGE, JOHN PATRICK Vice President 01/01/2000 1977929 RICHARDS, RON Secretary 01/13/1995 06/01/2000 TREMAINE, DAVIS WRIGHT Agent 01/13/1995 12/31/1999 DUPUIS-FRICKE, LINDA President 01/13/1995 12/31/1999 HAPPE, DOUGLAS A President 01/13/1995 12/31/1999 Bond Information Page 1 of 2 Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 4 THE HANOVER INSURANCE COMPANY 1977929 01/01/2011 Until Cancelled $12,000.00 01/06/2011 3 INS CO OF THE WEST 1352839 10/18/2001 Until Cancelled 01/01/2011 $12,000.00 03/29/2002 Assignment of Savings Information No records found for the previous 6 year period Insurance Information Insurance Company Name Policy Number Effective Date Expiration Date Cancel Date Impaired Date Amount Received Date 18 American Fire & Casualty Co BKA1455460136 04/01/2013 04/01/2014 $1,000,000.00 03/27/2013 17 Continental Western Ins Co CWP243447629 04/01/2012 04/01/2013 $2,000,000.00 03/27/2012 16 Continental Western Ins Co CWP2434476 04/01/2011 04/01/2012 $1,000,000.00 03/08/2011 15 Continental Western Ins Co CWP2434476 04/01/2010 04/01/2011 $1,000,000.00 03/29/2010 14 Continental Western Ins Co CWP2434476 04/01/2009 .04/01/2010 $1,000,000.00 03/20/2009 13 CONTINENTAL WESTERN INS CO CWP2434476 04/01/2008 04/01/2009 $1,000,000.00 03/18/2008 12 CONTINENTAL WESTERN INS CWP2434476 04/01/2007 04/01/2008 $1,000,000.00 03/09/2007 https://fortress.wa.gov/lni/bbip/Print.aspx 10/23/2013 PROS, GENERAL INFORMATION GENERAL MECHANICAL: VICINITY MAP: WSEC & COMMISSIONING NOTES: HVAC LEGEND & ABBREVIATIONS: PROPERTY TAX NO.: 102304-9011 LEGAL DESCRIPTION: LOT 1 TGW PORTION OF LOT 2 OF CITY OF TUKWILA SHORT PLAT NO 90 -1 -SS RECORDING NO 9003121481 BEGIN SW CORNER OF SAID LOT 2 TH S 81-20-44 E 74,95 FT TO POB TH N 08-27-39 E 326,50 FT TO N LINE OF LOT 2 & TERM OS SAID LINE --- SAID SHORT PLAT BEING A PORTION OF GOV LOT 3 '& OF SE 1/4 OF NE 1/4 OF SECTION 09-23-04 TGW PORTION OF GOV LOT 6 & OF SW 1/4 OF NE 1/4 OF SECTION 10-23-04 --- AKA LOT 1 OF CITY OF TUKWILA BOUNDARY LINE ADJ NO L93-0053 RECORDING NO 9309220848 PROJECT LOCATION: 3314 SOUTH 116TH ST TUKWILA, WA 98168 '20 `2 ki PROJECT DESCRIPTION: REMOVE INDICATED EXISTING DUCTWORK, REROUTE DUCTWORK, INSTALL SPLIT SYSTEM CEILING CASSETTE, INSTALL SPLIT SYSTEM WITH ALTERNATING UNITS, RELOCATE THERMOSTATS ACCORDINGLY STANDARDS' EQUIPMENT AND MATERIALS SHALL CONFORM WITH APPROPRIATE PROVISIONS OF ARL, ASME, ASTM, UL, NEMA, ANSI, SMACNA, ASHRAE, MFPA, OTHER APPLICABLE AGENCIES AND AHJ AS APPLICABLE TO EACH INDIVIDUAL UNIT OR ASSEMBLY CODES: ALL WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH ALL APPLICABLE NATIONAL, STATE AND LOCAL CODES AND ORDINANCES. IN CASE OF CONFLICT BETWEEN THE DRAWINGS/SPECIFICATIONS AND THE CODES AND ORDINANCES, THE MOST STRICT STANDARD (IN THE OPINION OF THE ENGINEER) SHALL APPLY. THE MECHANICAL CONTRACTOR SHAL SATISFY CODE REQUIREMENTS & REQUIREMENTS OF THE CONTRACT DOCUMENTS AS A MINIMUM STANDARD, APPLICABLE CODES: 0111 di IBC W/WASHINGTON STATE AMEN I II MENTS, S. 2012 WASHINGTON STATE ENERGY CODE, to- w N 1 AND INDOOR AIR QUALITY CODE, GENERALCONTRACTOR TO PROVIDE ACCESS TO FIRE AND/OR COMBINATION FIRE/SMOKE DAMPERS, NOT TO SCALE THERMOSTATS SHALL BE INTERLOCKED TO PREVENT SIMULTANEOUS HEATING AND COOLING PER WSEC 1 ECONOMIZERS SHALL MODULATE OUTSIDE AIR FROM MINIMUM TO 100% ECONOMIZER CONTROLS SHALL B CAPABLE OF EVALUATING OUTDOOR AIR COOLING CAPACITY PER WSEC 12 INSULATE REFRIGERANT PIPING PER WSEC, TABLE 0/5* SEAL DUCTWORK PER WSEC 1.1 INSULATE DUCTWORK PER WSEC TABLE 146 COMMISSIONING PER WSEC 1 INCLUDING COMMISSIONING PLAN, SYSTEMS BALANCING, FUNCTIONAL T STING, CONTROLS TESTING, OPERATION AND MAINTENANCE MANUALS, AND RECORD DRAWINGS, SHALL BE SUBMITTED TO OWNER ON PROJ e ray -(b C v�•�•� � v` O 12... {S S C. T ,pc#,;,.., HVAC CONTRACTOR: EMERALD AIRE INC 5108 I) STREET AUBURN, WA 98001 PROJECT MANAGER: CDNTACT: RYAN JOHNSON VOICE: (253) 872-5665 FAX: (253) 872-5797 GENERAL CONTRACTOR: WILCOX CONSTRUCTION 234 5TH AVE S EDMONDS, WA 98020 CONTACT JOHN ADISSON, VOICE: (425) 774-4185 FAX: (425) 774-4187 INDEX: M000 HVAC COVERSHEET AND SCHEDULES M201 LEVEL 1 HVAC PLAN - EAST M202 LEVEL 1 HVAC PLAN - WEST M205 ROOF LEVEL HVAC PLAN - EAST EQUIPMENT SCHEDULES FAN COIL UNITS # MANUF MODEL OUTDOOR UNIT HEATING COOL w CFM ESP („ WC) OSA (CFM) CE ONO ELECTRICAL WT DIM. CONTROL NOTES SOURC MBH HSPF/AFUE (COP) TONS SEER (SCOP) V/PH MCA MOCP FC -1 MITSUBISHI SLZ-KA15NA HP -1 HP 18.0 9.60 1.2 16 390 0.25 30 NO 208/1 1 15 36 23X23X10 MHK1 1 FC -2 MITSUBISHI PEAD-A30AA HP -2 HP A 32.0 9.40 2.5 15.5 740 0.40 150 NO 208/1 2.7 40 73 EXISTING EXISTING 1,2 FC -3 LIEBERT MM36E HP -3 HP /1\ 3. .' 1 1200 0.30 60 YES 460/3 21.1 25 225 58X30X24 7 -DAY FC -4 LIEBERT MM36E HP -4 HP 33.8 - 3.0 (241) 1200 0.30 60 YES 460/3 21.1 25 225 58X30X24 7 -DAY NOTES: 1. NO 2. EXISTING ECONOMIZER PER UNIT, COVERED EXCEPTION 1 WSEC. UNDER PREVIOUS PERMIT, TO REMAIN IN SAME LOCATION • ! e ► G HEAT PUMP UNITS # MFR MODEL COOLING CAPACITY HEATING CAPACITY ELECTRICAL DIM WEIGHT (LBS.) NOTES TONS CAPACITY (MBH) 51 SEER (SCOP) CAPACITY (MBH) HSPF (COP) V/PH MCA 11IIC�CP FLA HP -1 MITSUBISHI SUZ-KA15NA 1.25 15.0 16.00 18.0 9.60 208/1 12 15 .5 32x12x22 80 HP -2 MITSUBISHI PUZ-A3ONHA4 PFH037A-H 2.50 3.00/ 30.0 i . • 15.50 •' 32.0 33„: 9.40 " - 208/1 460/3 25 8.8 40 15 - 7.4 - 53X37X18 - 351 1 HP -3 LIEBERT HP -4 i LIEBERT PFH037A-H 3.00 33.6 (2.41) 33,8 - 460/3 8.8 15 7.4 53X37X18 351 NOTES: 1. AN COILS FC -1 & FC -2 DO NOT REQUIRE ECONOMIZERS, PER 2012 WASHINGTON STATE ENERGY CODE SECTION C403.3.1 EXCEPTION 1. A) BOTH UNITS ARE LESS THEN 33MBH' EACH B) THE . TOTAL CAPACITY FOR THE UNITS WITHOUT ECONOMIZERS IS 45 MBH, LESS THEN THE 72 MBH ALLOWED. C) PROJECT IS: NOT SHELL AND CORE, NOR INITIAL TI. D) EFFICIENCY 'RATINGS FOR AIR COOLED SPLIT SYSTEM HEAT PUMPS MUST BE 15% GREATER THEN MINIMUM VALUES, OR 1.15 X 13 SEER' = 14.95 SEER OR 1.15 X 7.7 HSPF = 8.855 HSPF BOTH UNIT'S EI FECIENCIES EXCEED THESE RATINGS. n SEPARATE PERMIT REQUIRED FOR: ❑ Mechanical � tumbing� s.JROM City of Tukwila BUILDING DIVISION FILE COPY Permit NoirSI" I Plan review approval is subject to errors and omissions. ;r34 of construccliion documents does not authorize 04: .i :ton of eny adopted code or ordinance. Receipt nt improved ky' s'y ;,«, ►jw Atli: By City Of itukwila BUILDING DIVISION REVISIONS No changes shall be made to the scope of work without prior approval of Tukwila Building Division. NOTA: Revisions will require a new plan submittal and may include additional plan review fees. 2' 8' ID GRD IDENTIFIER U SIDE WALL GRILL_ SUPPLY GRILLE El THERMAFUSER gl RETURN AIR GRILLE EXHAUST GRILLE EXHAUST FAN EQUIPMENT TAG O T -STAT Q CO SENSOR OD OCCUPANCY SENSOR L/V WIRE ED DUCT RUN 0 ELBOW 033 REDUCER pni SIDE TAPS 90 ELBOW W/ TURNING VANES n10 FLEXIBLE DUCT CV MANUAL DAMPER cop FIRE DAMPER a SMOKE DAMPER HP HP HTG HTR ID IN KW LAT LBS. LWT MA MAX MBH MIN MS NC NTS OA OBD OC OD PH PSI QTY R/A REF RET RH RLD RPM S/A SEER SH SOV SP TEMP UC V VAV VD VEL W W/ WB W/0 sitrp air Miff 1'1 at SMOKE/FIRE DAMPER MOTORIZED DAMPER BACKDRAFT DAMPER VARIABLE VOLUME/TEMPERATURE HEAT PUMP HORSEPOWER HEATING HEATER INSIDE DIAMETER INCHES KILOWATT LEAVING AIR TEMPERATURE POUNDS LEAVING WATER TEMPERATURE MIXED AIR MAXIMUM THOUSAND BTU'S PER HOUR MINIMUM MOTOR STARTER NOISE CRITERIA NOT TO SCALE OUTSIDE AIR OPPOSED BLADE DAMPER ON CENTER OUTSIDE DIAMETER PHASE POUNDS PER SQUARE INCH QUANTITY RETURN AIR REFRIGERANT RETURN RELATIVE HUMIDITY RELIEF DAMPER REVOLUTIONS PER MINUTE SUPPLY AIR SEASONAL ENERGY EFFICIENCY RATING SENSIBLE HEAT SHUT OFF VALVE STATIC PRESSURE TEMPERATURE UNDERCUT DOOR VOLT VARIABLE AIR VOLUME VOLUME DAMPER (HAND OPERATOR) VELOCITY WATT WITH WET BULB WITHOUT REVIEWED FOR CODE COMPLIANCE APPROVED OCT 21 2013 Cityof Tukwila BUILDING DIVISION CORRECTION LTR# M 1 0' 4' 16' SCALE: 1/8" = 1'-O' P:\Working Projects\Tukwila WH Project (213-0816)\Engineering\CAD Drawings\Tukwila WH Project\Sheets\M000 HVAC COVERSHEET AND SCHEDULES.dwg D PROJECT NORTH RECEIVED CITY OF TUKWILA OCT 092013 PERMIT CENTER c., sk�7A REVISIONS DESCRIPTION CORRECTION LETTER #1 RESPONSE, APPLICATION M13-1831 4k r- 1- C3 0 r- N) '."- 0 N `PLOT DATE 10/8/2013 ❑ DESIGN DEVELOPMENT ,DRAWING DATE DATE N DATE DATE DATE COORDINATION PERMIT 10. 08. 2013 CONSTRUCTION AS BUILT I -- CD Li 0 WAREHOUSE m HVAC COVERSHEET AND SCHEDULES SCALE: AS -NOTED M000 213-0816 -I_ DUWAMISH .._.1.8X18..__RELI .. -DUCT......UP....._.TO........ROOF SEE DETAILI1 FORT DF 4� 18)<i8 DROP DOWN INTO ACCLIMATION ROOv1 140" DUCTWORK SUPPLIES ACCLIMATION ROC 160" DUCTWORK FROM UNITS ABOVE ACCLIMA ION ROOM 50RL 18x18 _AL` ,'1) OO ND 50F 1818 18X18 DUCT UP TO ROOF, AND DOWN TO 18X18 RETURN GRILLE 5OF SEE DETAIL 1 REUSE: EXIST. DOOR 1 038 SF 1-40 000 5 (TYP 4) 1 5"AFF 103E 1 5 " A F F ART OFFICE 335 SF EQUIP WI STEEL DRI FURNITURE SHOWN FOR REFERENCE ONLY (N.I.C.) 4"0 FOR OSA UP TO GOOSE NECK EXIST. ACCESS LADDER 'W/CAGE TO REMAIN FOSTER AINL ANS R A SS ALL DAMPERS ON FC -3&4 SYSTEM EQUIPPED WITH TEFLON SEALS 2" INSULATION AROUND ALL DUCTWORK OUTSIDE OF ACCLIMATION ROOM 4 OTh PE EXIST. ACCESS LADDER LOTS;T.TO T.O. LID OF CEMCOWIFON ROOM CAGE WAREHOUSE I-iA1 t N1J 1 .................................... FOSTER ANNEX l._.........._...................F SERVER ROJ.T EXISTING ELECTRICAL RM RELIEF HOOD O.S.A. INTAKE HOOD CURB LEVELING & ROOFING BY OTHFRS EXIST. DEMISING WALL TO REMAIN EXIST. CMU WALL NEW GNB WALL. SHOWN SHADED (T 30PW0 )4) ACCLIMATION 103 ACCLIMATION ROOM SECTION VIEW 1/8"= 1'-0" ECtUIP SIE '50F 18x18 1200[ WITH STAINL= S RIP--PANS—L 2' ALL DAMPERS 0,1WI K —3&4 SYSTEM EQUIPPED WIITHIjEIK33N1SEALS 2" INSULATION AROUND ALL DUCTWORK OUTSIDE ACCLIMATION ROOM MI83 8' 0' 4' SCALE: 1/8" = 1'-0" 16' PROJECT NORTH REVIEWED FOR :ODE COMPLIANCE 11" APPROVED OCT 2 2013 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA SEP 20 2013 PERMIT CENTER P:\Working Projects\Tukwila WH Project (213-0816)\Engineering\CAD Drawings\Tukwila WH Project\Sheets\M201 LEVEL 1 HVAC PLAN — EAST.dwg I REVISIONS DESCRIPTION I w PLOT DATE 9/18/2013 ® DESIGN DEVELOPMENT DRAWING DATE DATE • DATE DATE DATE COORDINATION PERMIT 09. 20. 2013 CONSTRUCTION AS BUILT WAREHOUSE Q J E -- 1 -= F- F- z w J U DRAWN BY: JB LEVEL 1 HVAC PLAN - EAST SCALE: AS—NOTED M201 213-0816 (C) OUTSIDE STORAGE EXISTING DOOR, SEE NOTE EXIST. CONC. WALK EXIST. DOOR (EXIST. PARKING AREA) NEW 10' ..0" HIGH CHAIN LINK FENCE, SEE SITE PLAN A-001 FOR FULL E:XTEN..I. OF FENCING NEW 10' HIGH CHAIN LINK GATE 8 or 2 EXIST. SHOWER ROOMS EXIST. BREAK ROOM 1 EXIST. MEN L.11._.i_ EXIST. 1, /OMEN EXISTING STAIR TO REMAIN P.O.C. TO EXISTING SYSTEM EXIST. A •CESS LADDER AND ENCLOSU2E TO REMAIN VAULT 5 % E9 5 F NEW INFILL WALL TO MATCH EXISTING ADJACENT WALL ASSEMBLY 1(E) FC -2I r RELOCATE EXISTING THERMOSTAT 0 m U) J EXISTING UNIT AND DUCTWORK Vont, keha, pr SEAL EXISTING CONCRETE IN HATCHED LOCATION, COORDINATE-. WITH IN FIE' CONDITIONS NEW DUCTWORK \\ NO T® NO 1 Vl r:���. E:;)1JIP11E:NIA, E L TO TRICA R)C) M. -AST N 0 (N RE.. DO 00R 20XE 300 (TYP 111 rn15" f El 1 5" RELOCATE EXISTING THER vIOSTAT 10` 60 SF '50F 24X24 EXISTING DOOR, SEE NOTE 2 /Or 'TMS 140 NON -COLD IBRARY STORAGE 668 SF REVIEWED FOR ODE COMPLIANCE ' APPROVED OCT 21 2013 City of Tukwila BUILDING DIVISION 740; RECEIVED CITY OF TUKWILA T) . I__...I........1 ..L_ .1. 1........I......_II r EXISTING DOOR, SEE NOTE 2 --- EXISTING DOOR LOCKED, PROVI' "DOOR IS BLO USE OTHER EN KEPT CLOSED AND SIGN INDICATING ED ON INSIDE, PLEASE RANCE DOORS." 2' SEP 2 0 2013 PERMIT CENTER 8' 0' 4' 16' SCALE: 1/8" = 1'-0" P:\Working Projects\Tukwila WH Project (213-0816)\Engineering\CAD Drawings\Tukwila WH Project\Sheets\M202 LEVEL 1 HVAC PLAN - WEST.dwg PROJECT NORTH U) z o o' DESCRIPTION w Q 8 PLOT DATE 9/18/2013 ❑ DESIGN DEVELOPMENT DRAWING DATE DATE DATE DATE DATE COORDINATION PERMIT 09. 20. 2013 CONSTRUCTION AS BUILT i- 0 LiJ 0 (Y 0_ WAREHOUSE w J H- I— 1- z LL I J U OD 03 z LEVEL 1 HVAC PLAN - WEST SCALE: AS -NOTED M202 213-0816 C) (N _ ___- _ ------ — ---- — RELIEF HOOD O.s.�� 'INTAKE HOOD N / _J J UNITS ON SLEEPERS [x] bUTSIDE AIR INTAKES MAINTAIN 10' CLEARANCE FROM "EXHAUST SOURCES FIELD TO VERIFY IMAISIMMtir 'Oft, GOOSENECK DOWN TO FC -1 UNIT ON SLEEPERS BY G.C. (3) 2' 8' 0' 4' SCALE: 1/8" = 1'-0" VIA 16' PROJECT NORTH REVIEWED FOR CODE COMPLIANCE APPROVED OCT 21 2013 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA SEP 2 0 2013 PERMIT CENTER P:\Working Projects\Tukwila WH Project (213-0816)\Enaineerino\CAD Drawinas\Tukwila WH Project\Sheets\M205 ROOF LEVEL HVAC PLAN — EAST.dwa z 1 DESCRIPTION O U) I DATE 1 PLOT DATE 9/18/2013 ❑ DESIGN DEVELOPMENT DRAWING DATE ❑ COORDINATION DATE • PERMIT DATE 09.20.2013 CONSTRUCTION DATE DATE AS BUILT WAREHOUSE I— In 00 C° 00 co I— O (n § d.. Y D ro to F- z LTJ c_) DRAWN BY: ROOF LEVEL HVAC PLAN - EAST SCALE: AS—NOTED M205 213-0816